{"id":18510,"date":"2025-03-05T11:22:05","date_gmt":"2025-03-05T16:22:05","guid":{"rendered":"https:\/\/www.collierclerk.com\/?p=18510"},"modified":"2026-01-20T12:59:31","modified_gmt":"2026-01-20T17:59:31","slug":"improvements-to-collier-county-boat-ramp-parks","status":"publish","type":"post","link":"https:\/\/app.collierclerk.com\/collierclerkcom\/improvements-to-collier-county-boat-ramp-parks\/","title":{"rendered":"Improvements to Collier County Boat Ramp Parks"},"content":{"rendered":"<p><b><span data-contrast=\"auto\">Caxambas Park Boat Ramp<\/span><\/b><span data-ccp-props=\"{&quot;335559739&quot;:0}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">On March 12, 2024, the Board of County Commissioners awarded an Invitation to Bid (ITB) to Kelly Brothers, Inc. in the amount of $2,735,926.67 for the Caxambas Park and Boat Ramp Rehabilitation Project.\u00a0 Due to a combination of aging infrastructure and the devastating effects of Hurricane Ian, the park requires repair and rehabilitation, including the replacement of the seawall, docks, boat ramp, floating docks and guide piles, fixed timber docks, boat lift structure, electrical system, site restoration, and paving.\u00a0\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Phase I of the renovation focused on re-opening the boat ramp.\u00a0\u00a0 Phase II will include the replacement of the fueling service system destroyed by Hurricane Ian and is expected to be completed in late 2025.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Collier County announced the reopening of the Caxambas Park boat ramp on Marco Island on Saturday, February 15, 2025.\u00a0 The boat ramp operates from sunrise to sunset.\u00a0 The onsite Ship Store had a soft opening from 7 a.m. to 3 p.m. with limited sundry items, adding frozen bait and other goods over time. Ship Store hours will extend to 5 p.m. once fully operational.<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Per City of Marco Island Ordinance, the only permitted accessory commercial operations at Caxambas Park are the fuel station and the Ship Store.<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><b><span data-contrast=\"auto\">Collier Boulevard Park Boat Ramp<\/span><\/b><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:0}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">With the reopening of the Caxambas Park boat ramp, and following the Presidents\u2019 Day holiday weekend, the Collier Boulevard Park boat ramp closed at dusk on February 17, 2025, to commence rehabilitation of that facility\u2019s boat ramp.\u00a0 This project has been in the planning stages for several years and was delayed due to Hurricane Ian\u2019s damage to Caxambas Park, its repair, and the impact of its boat ramp closure on our local boating community. <\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:0}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The project will include replacing the existing seawall and boat ramp structures, installing new timber pilings, and adding a floating boat dock.\u00a0 These repairs and improvements will provide boaters and guests safer access to the water. The Board approved a $1,224,873.00 construction contract with Kelly Brothers, Inc. on October 22, 2024.\u00a0 Renovation is expected to be completed by late summer.<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:0}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">To minimize disruption to the public\u2019s access at the County\u2019s public boat ramps, this project\u2019s timeline was coordinated to align with the reopening of the Caxambas Park and Boat Ramp Rehabilitation Project.\u00a0\u00a0<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">To mitigate further delays, long lead time items such as the floating dock and aluminum gangway were pre-purchased to reduce the risk associated with supply chain issues.\u00a0 The contractor is scheduled to complete the work on a timeline that will facilitate a reopening of the Collier Boulevard Park Boat Ramp in the last quarter of 2025.\u00a0\u00a0<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:0}\">\u00a0<\/span><\/p>\n<p><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p><b><span data-contrast=\"auto\">Bayview Park Boat Ramp<\/span><\/b><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:0}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">On February 25, 2025, the Board of County Commissioners approved an Interlocal Agreement with the City of Naples for the use of Bayview Park to remove debris as part of the Naples Pier Renovation.\u00a0 This will require the use of eight (8) boat trailer spaces and a portion of the docks at Bayview Park to offload debris removed from the Naples Pier, which was significantly damaged from Hurricane Ian.\u00a0 (See aerial view below).\u00a0\u00a0<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:0}\">\u00a0<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-18511 aligncenter\" src=\"https:\/\/www.collierclerk.com\/wp-content\/uploads\/boat-ramp.png\" alt=\"\" width=\"401\" height=\"372\" srcset=\"https:\/\/app.collierclerk.com\/collierclerkcom\/wp-content\/uploads\/boat-ramp.png 401w, https:\/\/app.collierclerk.com\/collierclerkcom\/wp-content\/uploads\/boat-ramp-300x278.png 300w, https:\/\/app.collierclerk.com\/collierclerkcom\/wp-content\/uploads\/boat-ramp-150x139.png 150w\" sizes=\"auto, (max-width: 401px) 100vw, 401px\" \/><\/p>\n<p><span data-contrast=\"auto\">The balance of the park, including the boat ramp, will remain open to the public. The debris identified will be collected from above and below the surface of the water.\u00a0 A barge will be docked at Bayview Park no more than two days per week for a duration lasting 4-6 months. The debris will be dried out, offloaded, sorted, and removed via dump trucks. The hours of operations will be limited to 8:00 am &#8211; 5:00 pm on weekdays only, no weekends or holidays unless agreed to by the City and County Manager.\u00a0\u00a0<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">There is a concern with Friday operations recognizing the closure of the 951 Boat Ramp. Both parties have agreed to monitor any impacts, and work collaboratively to address any issues that may arise. The City has additionally agreed to add law enforcement as necessary.\u00a0 When the barge is not docked at the park, the public will have use of the dock.\u00a0 However, the eight boat trailer spaces will remain reserved for the contractor, Shoreline Foundation, Inc., for the debris removal duration of 4-6 months.<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The City presented the plan to the community on February 6, 2025, at the Bayshore Gateway Triangle Advisory Board meeting.\u00a0 The community asked why other locations, including the Naples Landings, were not more suitable.\u00a0 The City and contractor explained that the barge was too large and that the run times for other locations would drive up costs for the project. Bayview is the most efficient location for the project.\u00a0\u00a0<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The other issues discussed in the meeting relating to the Pier project have been addressed in the MOU, including the hours of operation, access to the docks when the barge is not docked, and assurances that materials will not spill into Danford Street when removed.\u00a0 The community discussed the need for a future sidewalk on Danford Street as there are concerns about park traffic and pedestrians on a regular basis. The Advisory Board made two separate motions. The first motion supported Bayview Park as a staging area for debris removal. The second motion was to work with the residents to plan for a future sidewalk as part of the future Danford Steet roadway and stormwater maintenance project.\u00a0 Both motions passed on a 7-0 vote.\u00a0<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Once permitted, the project is expected to take 18 months to complete. Materials will be staged next to the Pier.<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p><strong><a href=\"https:\/\/designrr.page?id=451671&amp;token=2061160639&amp;h=5370\">Read and download the March 2025 Newsletter here.\u00a0<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Caxambas Park Boat Ramp\u00a0 On March 12, 2024, the Board of County Commissioners awarded an Invitation to Bid (ITB) to &#8230; <\/p>\n<p class=\"read-more-container\"><a title=\"Improvements to Collier County Boat Ramp Parks\" class=\"read-more button\" href=\"https:\/\/app.collierclerk.com\/collierclerkcom\/improvements-to-collier-county-boat-ramp-parks\/#more-18510\" aria-label=\"Read more about Improvements to Collier County Boat Ramp Parks\">Read more<\/a><\/p>\n","protected":false},"author":19,"featured_media":18511,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[1496,1493,1494,1495,1440],"class_list":["post-18510","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-and-announcements","tag-bayview-park-boat-ramp","tag-boat-ramp-parks","tag-caxambas-park-boat-ramp","tag-collier-boulevard-park-boat-ramp","tag-march-2025-newsletter","infinite-scroll-item","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-25","resize-featured-image"],"_links":{"self":[{"href":"https:\/\/app.collierclerk.com\/collierclerkcom\/wp-json\/wp\/v2\/posts\/18510","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/app.collierclerk.com\/collierclerkcom\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/app.collierclerk.com\/collierclerkcom\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/app.collierclerk.com\/collierclerkcom\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/app.collierclerk.com\/collierclerkcom\/wp-json\/wp\/v2\/comments?post=18510"}],"version-history":[{"count":2,"href":"https:\/\/app.collierclerk.com\/collierclerkcom\/wp-json\/wp\/v2\/posts\/18510\/revisions"}],"predecessor-version":[{"id":18532,"href":"https:\/\/app.collierclerk.com\/collierclerkcom\/wp-json\/wp\/v2\/posts\/18510\/revisions\/18532"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/app.collierclerk.com\/collierclerkcom\/wp-json\/wp\/v2\/media\/18511"}],"wp:attachment":[{"href":"https:\/\/app.collierclerk.com\/collierclerkcom\/wp-json\/wp\/v2\/media?parent=18510"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/app.collierclerk.com\/collierclerkcom\/wp-json\/wp\/v2\/categories?post=18510"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/app.collierclerk.com\/collierclerkcom\/wp-json\/wp\/v2\/tags?post=18510"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}