Agenda 08/26/2025 Item #16B 4 (Resolution - The condemnation of fee simple interests in land necessary for construction of stormwater ponds for the expansionof the Wilson Blvd to 4-lands)8/26/2025 Item # 16.13.4 ID# 2025-2217 Executive Summary Recommendation to approve and adopt a Resolution authorizing the condemnation of those fee simple interests in land necessary for the construction of stormwater ponds required for the expansion of Wilson Boulevard from two lanes to four lanes between Golden Gate Boulevard and Immokalee Road. (Project No. 60229). Estimated fiscal impact: $2.5 million. OBJECTIVE: To acquire the land necessary for the construction of stormwater ponds for the widening of Wilson Boulevard between Golden Gate Boulevard and Immokalee Road, Project No. 60249 (the Project). CONSIDERATIONS: The Project will expand the subject segment of Wilson Boulevard from two lanes to four lanes, provide sidewalks, a shared -use pathway, bike lanes, drainage and related improvements. Construction is not scheduled in the County's Five -Year Work Program. However, the availability of undeveloped five -acre pond site properties on the Project corridor is limited and will decrease with future development. If the County is required in the future to select less desirable pond sites due to preferred sites being developed, acquisition, design, construction and maintenance costs will increase. Accordingly, it is in the County's best interest to acquire these pond sites now. Prior to initiating eminent domain proceedings, Section 73.015, Florida Statutes, requires a condemning authority to attempt to negotiate in good faith with the fee owners of the properties to be acquired; provide them with a written offer, and, if requested, a copy of the appraisal report upon which an offer is based; and attempt to reach an agreement regarding the amount of compensation to be paid for the parcel. The adoption of the attached resolution will provide staff with the Board's authorization to make purchase offers based upon the appraised value of the proposed pond sites, as determined by state -certified real estate appraisers, consistent with the requirements of Section 73.015, Florida Statutes. Purchase agreements will then be presented to the Board for approval. Condemnation proceedings will only be filed where agreements cannot be negotiated or where parcels cannot be closed due to title issues. The Board's professional Transportation Engineering Division staff and consultants have considered various factors during the design of the Project, including alternative alignments; public health, safety and welfare; long range planning needs; environmental impacts; and cost. The attached Pond Siting Report, dated June 16, 2025, was prepared by Jacobs, the County's engineering design consultants and is incorporated into this Executive Summary. Staff recommends that with the Board's review of the Pond Siting Report, this Executive Summary and the back-up documentation, and approval of the proposed Resolution, the Board finds that fee simple interests in the land as depicted in the legal descriptions attached to the Condemnation Resolution represent the most feasible location for construction of the pond sites required as part of the Project. Staff further recommends that the Board make a finding that it is necessary to acquire, by condemnation, the fee simple interests in land specified on each legal description attached to the Condemnation Resolution. In addition to the direct cost of the fee simple parcels required for construction of the ponds, the County is also required, where applicable, to pay all expenses for title work, real estate appraisals, and those expenses related to condemnation, when necessary, such as property owner attorney fees and expert witness fees, as required by Sections 73.091 and 73.092, Florida Statutes. These costs are included in the estimated fiscal impact below. To the extent settlements are achieved in lieu of litigation, these costs will be reduced significantly. This item is consistent with the Collier County strategic plan objective to design and maintain an effective transportation system to reduce traffic congestion and improve the mobility of our residents and visitors. FISCAL IMPACT: The fiscal impact associated with this item is estimated to be $2.5million. The primary funding source for the acquisition of right of way is through Road Impact Fee District Fund (3094), Wilson Boulevard from Golden Gate Boulevard to Immokalee Road Project (60229). Should impact fees not be sufficient, the secondary funding source will be Road Construction Gas Tax Fund (3083) and Transportation Capital Fund (3081). GROWTH MANAGEMENT IMPACT: This recommendation is consistent with the Long -Range Transportation Plan and Objective 1 of the Transportation Element of the Collier County Growth Management Plan to maintain the major roadway system at an acceptable Level of Service. Page 1639 of 4682 8/26/2025 Item # 16.13.4 ID# 2025-2217 LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires a majority vote for Board approval. — CMG RECOMMENDATIONS: 1. Approve the attached Condemnation Resolution; 2. Authorize the Board's Chairman to execute same on behalf of the Board; and 3. Authorize any budget amendments that may be necessary to implement the collective will of the Board as evidenced by the adoption of the attached Resolution and the approval of this Executive Summary. PREPARED BY: Michelle L. Sweet, ROW Coordinator, ROW Acquisition, Operations and Performance Management Division. ATTACHMENTS: Project Location Map Pond Siting Report Presentation -Condemnation Resolution-60229 Wilson Blvd Condemnation Resolution Page 1640 of 4682 PROJECT LOCATION MAP ^ ' Valencia GdIf Club $ Country Club b a �'.�inEagles if ClubEC ' v o — r tM VE NW I Randall BLVD k� � Cxdar�e Cane{ limlraka7'e� E} - - 241hAVE N1N 241MAVE NE a 1 � 22neAVE fJVP � 22ndAVE NE � a p ~ 201h AVE NW m 20111 AVr NE a — 1 _ a I=AVENW � ei 1MhAYE NE A J 9LVOWr Jun BLVDE - 16th AVE NW iwhAVE NE k f 14th AVE NW _ 141h AVENE ■ 12th AVE MW 121h AVE NE 9de Florida iGolf Club 1 d1h AVE NW 14th AVE NE modw A C Pneeb Cenel OPWRe 4ela "n Ca l U -4 C tr1 W F- Uj W W W W W W W v1. y W Lj n 4 H m M N N r older Gale BLVD W Golden BAD E WOMBLE I nty Road Colt Course l Road Study Limits al Q ProMtArea 0. U. �.l 1 r Body Iles — Page 1641 of 4682 .;acobs Pond Siting Report Wilson Boulevard Widening Design Golden Gate Boulevard to Immokalee Road June 16, 2025 4J Collier County MI Page 1642 of 4682 Table of Contents Introduction........................................................................................................................................................................3 Background......................................................................................................................................................................... 3 DesignCriteria....................................................................................................................................................................4 ExistingDrainage Patterns..............................................................................................................................................5 ProposedDrainage Patterns...........................................................................................................................................6 Basin1 Pond Site Requirements....................................................................................................................................9 Basin2 Pond Site Requirements................................................................................................................................. 12 Basin3 Pond Site Requirements..................................................................................................................................15 Basin4 Pond Site Requirements..................................................................................................................................21 Basin5 Pond Site Requirements..................................................................................................................................24 Basin6 Pond Site Requirements..................................................................................................................................29 EvaluationFactors.......................................................................................................................................................... 33 Appendices Appendix A: Wilson Boulevard Potential Pond Sites Exhibit...............................................................................41 Appendix B: Basin 3A and 313 Map and Photo Package........................................................................................42 Appendix C: Pond Site 4-2 Map and Photo Package.............................................................................................43 Appendix D: Pond Site 5-2 (Wet) Map and Photo Package................................................................................. 44 Appendix E: Wilson Boulevard Corridor ROW Impacts Exhibit............................................................................45 Appendix F: Pond Siting Report — Wilson Boulevard Corridor Study(2022)................................................... 46 Page 1643 of 4682 Pond Siting Report Pond Siting Report Wilson Boulevard Widening Design: (Basins 1- 6) Date: June 16, 2025 Project name: Design Services for Wilson Blvd Widening Contract No.: 22-8006 Purchase 4500225624 Order No.: Client: Collier County — Dennis McCoy, PE (PM) Prepared by: Jacobs Introduction Jacobs Jacobs 5811 Pelican Bay Boulevard Suite 305 Naples, FL 34108 Contact: Bill Gramer, PE, AICP Email: Bill.Gramer@jacobs.com Mobile: 239.860.4922 www.jacobs.com This Pond Siting Report has been prepared to provide the background and supplemental information necessary for the County acquisition of parcels for the purpose of constructing and maintaining stormwater treatment pond sites for the Wilson Boulevard Widening Project, which will widen Wilson Boulevard from an existing 2-lane rural facility to a 4-lane urban facility from Golden Gate Boulevard to Immokalee Road. Background The Collier MPO 2040 Long Range Transportation Plan identified this existing 2-lane rural section of Wilson Boulevard (from Golden Gate Blvd to Immokalee Rd) in the Needs Plan (Needs Rank 51) as a 4-lane urban typical section. The Collier MPO 2045 Long Range Transportation Plan identified this existing 2-lane rural section of Wilson Boulevard (from Golden Gate Blvd to Immokalee Rd) in the Existing Plus Committed (E+C) Roadway Project network (Map ID 100) as a 4-lane urban typical section. In 2022, Collier County initiated the Wilson Boulevard Corridor Study (Study) to evaluate future corridor improvements to widen Wilson Boulevard North (Wilson Boulevard), from Golden Gate Boulevard (CR 876) to Immokalee Road (CR 846) from a two-lane undivided facility to a four - lane divided roadway with curb and gutter with a "closed" (stormwater inlets, pipes, ponds) drainage system. As part of the Study, a preliminary Pond Siting Report (see Appendix F) was prepared which evaluated the stormwater recommendations and options for Collier County on the type, design, and location of the stormwater management facilities for the proposed improvements. The preliminary Pond Siting Report identified a minimum of 6 drainage basins required for the Jacobs Engineering Group Inc. Page 1644 of 4682 Pond Siting Report Jacobs project, with a combination of wet and dry ponds needed. Please refer to Appendix F for all relevant basin and pond volume requirements and calculations. In August 2023, Collier County entered into a service agreement with Jacobs Engineering Group (Jacobs) for the Design Services for Wilson Blvd Widening (Contract No. 22-8006, Project No. 60229). As part of the design process, a Final Pond Siting Report will be prepared and delivered (typically after 30% submittal). However, due to continuous development along the project corridor, multiple potential pond sites are becoming unavailable. To expedite obtaining the required pond sites for the widening project, Jacobs had begun evaluating and identifying potential pond sites on a basin -by -basin basis that meet the project design criteria. Four previous technical memorandums have been provided to the County that focused on a single basin and its necessary parcel acquisition(s): ■ Basin 1 Technical Memorandum (sent March 12, 2024) — Pond Site obtained ■ Basin 2 Technical Memorandum (sent January 29, 2024) — Pond Site obtained ■ Basin 4 Technical Memorandum (sent July 26, 2024) ■ Basin 5 Technical Memorandum (sent July 26, 2024) This Pond Siting Report provides a pond site evaluation for Basin 3 and Basin 6, as well as consolidates the information from the four previous memos into one document for streamlined access and documentation. Note: Basin 6 (from 22nd Ave NW/NE to Immokalee Road) will be included in this pond siting report, but no recommendation will be made at this time. The Immokalee Road 8-Lane Widening project and the planned St. John Paul II Parish (approximately 42 acres) development at the southwest corner of Wilson Boulevard and Immokalee Road will reconfigure the existing Immokalee Road Pond 7. It is anticipated that this pond will be reconstructed and utilized as a joint -use pond for the Church Site, the planned 8-lane widening of Immokalee Road and the widening improvements to Wilson Boulevard located within Basin 6. The agreement with the County and the proposed Church for a redesigned joint -use Pond 7 has not been finalized at this time. Therefore, if an agreement cannot be reached, an additional parcel will be required for a pond site in the future for Basin 6. This will require an addendum to this Pond Siting Report identifying the preferred pond site. An overall site area map exhibit of Wilson Boulevard Potential Pond Sites is provided in Appendix A. Design Criteria The existing Wilson Boulevard corridor drains to the Cypress and Corkscrew Canals within the North Golden Gate Basin (Water Basin Identification (WBID) 3278S), which is in the Big Cypress area of Collier County and within the jurisdiction of the South Florida Water Management District (SFWMD). The preliminary design of stormwater management systems for this project Jacobs Engineering Group Inc. Page 1645 of 4682 Pond Siting Report Jacobs is regulated by the rules and criteria set forth by SFWMD and the Florida Department of Environmental Protection (FDEP). This section outlines the requirements to meet water quality and quantity standards. North Golden Gate Sub -Basin (WBID 32785) is impaired for dissolved oxygen, with total nitrogen as the causative pollutant. Although there is not a current Total Maximum Daily Load or Basin Management Action Plan established, additional protective measures must be incorporated into the project improvements to provide reasonable assurance that the proposed discharge will not cause or contribute to violations of state water quality standards. Retention, detention, or a combination of both in the overall system have the following volumetric requirements: ■ Wet detention volume provided for the greater of the first 1 inch of runoff over the drainage area or 2.5 inches of runoff over the impervious area (excluding water bodies) ■ Dry detention volume provided equal to 75 percent of referenced amounts for wet detention ■ Retention volume provided equal to 50 percent of the referenced amounts for wet detention Additional protective measures required by SFWMD include a site -specific pollutant loading analysis and an additional 50 percent water quality treatment volume. Existing Drainage Patterns The existing Wilson Boulevard typical section is a two-lane undivided rural roadway. Runoff from the roadway drains to roadside ditches that ultimately discharge to the nearby canals, directly or via side streets. Approximate onsite basin divides were developed based on canal locations, drainage structures, 12-digit hydrologic unit sub -basin maps, 2-foot LIDARI contour elevations, and the Collier County Stormwater Management Facilities GIS database. Basins 1 and 2 (from Golden Gate Boulevard to Cypress Canal) Wilson Boulevard, from Golden Gate Boulevard to Cypress Canal, is within the Curry Island Drain sub -basin and generally drains north to the Cypress Canal. Although some adjacent properties appear to include depressional or wetland areas, the roadside ditches provide continuous conveyance within the existing ROW to the Cypress Canal. According to LIDAR contours, existing Wilson Boulevard elevations range between 12 and 14 feet. Jacobs Engineering Group Inc. Page 1646 of 4682 Pond Siting Report Basins 3, 4, 5, and 6 (from Cypress Canal to Immokalee Road) Jacobs North of the Cypress Canal to Immokalee Road, Wilson Boulevard is located along the boundary between two sub -basins, Curry Island Drain (to Curry Canal) to the west and Horsepen Slough (to Corkscrew Canal) to the east. Wilson Boulevard is approximately 1 mile east of Curry Canal and 3/8 of a mile west of Corkscrew Canal. To minimize impacts to existing residential driveways and reduce costs, the Corkscrew Canal will be proposed (to SFWMD) as the preferred outfall canal for basins 3, 4, 5, and 6. In this segment, Wilson Boulevard is traversed by nine side streets (10th Avenue to 24th Avenue) that extend west and east, terminating at the Curry and Corkscrew Canals, respectively. Because there are no existing side drains at the traversing side streets that would continue conveyance along Wilson Boulevard north -south, each side street crossing serves as a natural drainage divide and discharge point and conveys water to the west and east into their respective canals. For purposes of this evaluation, Wilson Boulevard from Cypress Canal to Immokalee Road was sub -divided into four basins, with divides at 14th Avenue, 18th Avenue, and 22nd Avenue. Basin 3 (from Cypress Canal to 14th Avenue) The existing Wilson Boulevard profile contains primarily flat slopes in this area and has an elevation near 12 feet. Basin 4 (from 14th Avenue to 18th Avenue) The existing Wilson Boulevard profile contains primarily flat slopes in this area and has elevations between 12 and 12.5 feet. Basin 5 (from 18th Avenue to 22nd Avenue) The existing Wilson Boulevard profile contains primarily flat slopes in this area and has elevations between 12 and 13 feet. Basin 6 (from 22nd Avenue to Immokalee Road) North of 22nd Avenue, the existing Wilson Boulevard profile elevations increase from 13 to 14 feet near 24th Avenue, and up to 15 feet at the tie-in with Immokalee Road. Proposed Drainage Patterns The Wilson Boulevard proposed typical section consists of four 11-foot-wide lanes with 5-foot- wide bike lanes, curb and gutter, a 6-foot-wide sidewalk on the west side of the road, a 10-foot- wide pathway on the east side of the road, a 22-foot-wide grassed median, and grassed ditches on each exterior of the road for a total 165-foot proposed ROW Easement (ROW) width. The proposed exterior ditches would maintain existing offsite drainage patterns within the ROW by Jacobs Engineering Group Inc. Page 1647 of 4682 Pond Siting Report Jacobs maintaining the hydraulic connections to the existing side street ditches. Runoff from the proposed roadway would drain to a closed storm sewer system along the proposed curb and gutter and conveyed to the proposed pond sites for water quality treatment and water quantity attenuation. The ponds will also serve as floodplain mitigation. Where feasible, two or more potential pond sites were identified within each basin based on a variety of factors including basin -specific estimated storage volume requirements, environmental conditions, soil conditions, site elevations (GIS contour elevations), discharge points, tailwater conditions, and physical impacts to existing infrastructure. Note: Sites that would impact occupied residential properties or public water supply wellheads were removed from consideration. Appendix A includes the proposed basin divides and potential pond site locations. Basin 1 (from Golden Gate Boulevard to 0.55 miles north along Wilson Blvd N) Proposed pond sites for Basin 1 would outfall north directly to the Cypress Canal. Two potential pond sites were identified for Basin 1 in the Study to avoid impacts to numerous water supply wells and minimize distance to the canal. Piped conveyance systems to and from the potential Basin 1 pond sites would be located within the Wilson Boulevard ROW. Basin 2 (from 0.55 miles south of Cypress Canal to Cypress Canal) Proposed pond sites for Basin 2 would outfall north directly to the Cypress Canal. Four potential pond sites were identified for Basin 2 in the Study to avoid impacts to numerous water supply wells and minimize distance to the canal. Piped conveyance systems to the potential Basin 2 pond sites would be located within the Wilson Boulevard ROW and/or easements should the location of the proposed ponds not be adjacent to Wilson Boulevard. The Pond 2 outfall pipes to the Cypress Canal will be located within the Wilson Boulevard ROW. Basin 3 (from Cypress Canal to 14th Avenue) Depending on the pond site location, Basin 3 could outfall directly south to the Cypress Canal or east to the Corkscrew Canal. Three potential pond sites were identified in the Study. Piped conveyance systems to the potential Basin 3 pond sites would be located within the Wilson Boulevard ROW, and possibly along easements within the side streets should the location of the proposed ponds not be adjacent to Wilson Boulevard. The Pond 3 outfall conveyance pipes could be located either within proposed Wilson Boulevard ROW or within easements along 10th Avenue NE to Cypress Canal or 12th Avenue NE to Corkscrew Canal. Jacobs Engineering Group Inc. Page 1648 of 4682 Pond Siting Report Basin 4 (from 14th Avenue to 18th Avenue) Jacobs Proposed pond sites for Basin 4 outfall directly to the Corkscrew Canal. Two potential pond sites were identified in the Study along the Cypress Canal and side streets, away from the public water supply wells. Depending on the pond site location, piped conveyance systems to and from the potential Basin 4 pond sites would be located within the Wilson Boulevard ROW and possibly along easements within either 16th Avenue NE to the Corkscrew Canal or Jung Boulevard E to the Corkscrew Canal. Basin 5 (from 18th Avenue to 22nd Avenue) Proposed pond sites for Basin 5 outfall directly to the Corkscrew Canal. Five potential pond sites (both wet and dry) were identified in the Study along Wilson Boulevard and side streets. Depending on the pond site location, piped conveyance systems to the potential Basin 5 pond sites would be located within the Wilson Boulevard ROW and possibly along easements within the nearby side streets. The Pond 5 outfall pipes would be located within easements either along 18th Avenue NE to Corkscrew Canal or 20th Avenue NE to Corkscrew Canal. Basin 6 (from 22nd Avenue to Immokalee Road) Proposed pond sites for Basin 6 outfall directly to the Corkscrew Canal. Four potential pond (both wet and dry) sites were identified in the Study along Wilson Boulevard and side streets, away from the Immokalee Road frontage. Depending on the pond site location, piped conveyance systems to the potential Basin 6 pond sites would be located within the Wilson Boulevard ROW and possibly along easements within the nearby side streets. The Pond 6 outfall pipes would be located within easements either along 22nd Avenue NE to Corkscrew Canal, 24th Avenue NE to Corkscrew Canal. Note: If a joint -use Pond 7 is deemed feasible, discharge will be to the Cocohatchee Canal through the existing outfall pipe. Jacobs Engineering Group Inc. Page 1649 of 4682 Pond Siting Report : ,acobs Basin 1 From Golden Gate Blvd to approximately 0.55 miles north of Golden Gate Blvd along Wilson Blvd Attachment 1: Wilson Boulevard Potential Pond Sites Exhibit (Basin 1) Ili li 1 lk Potential Pond Pond Site Parcek Line -Basins identified Parcel Cptlnt Legend Well HousVVault -100 R Well House Buffer 9--d" � Low Point • High Pant Jacobs Engineering Group Inc. County Acquired Pond Site 1-3 Jacobs —"NjjjF' 9 Page 1650 of 4682 7 Pond Siting Report Saco S Basin 1 Pond Site Requirements Basin 1 limits: From Golden Gate Blvd to approximately 0.55 miles north of Golden Gate Blvd along Wilson Blvd. Based on the Design Criteria and the amount of needed treatment and attenuation for the proposed amount of impervious area, the need for an approximate 4 Acre Pond Site has been identified for Basin 1. The proposed pond sites for Basin 1 would outfall north directly to the Cypress Canal. Two potential pond sites were identified for Basin 1 to avoid impacts to numerous water supply wells and minimize distance to the canal. The preferred pond site from the Study is no longer viable due to development. An additional alternative was identified during design. Piped conveyance systems to the potential Basin 1 pond sites would be located within the Wilson Boulevard ROW. The Pond 1 outfall pipes to the Cypress Canal may be located within the Wilson Boulevard ROW. Recommendation Jacobs identified 2 viable options for Basin 1 (see Attachment 1): Pond Site 1-1: Consisting of Parcel Numbers 246 and 247 (Total 4.52 Acres) Pond Site 1-3: Consisting of Parcel Numbers 241 and 242 (Total 4.51 Acres) Pond Site 1-3 was selected as the preferred alternative due to less anticipated wetland impacts. Additionally, the two tracts comprising Pond Site 1-3 are controlled entirely by one person who owns one of the tracts and controls the trust that owns the second tract, whereas Pond Site 1-1 consists of two owners. The parcels identified for Pond Site 1-3 are required for a stormwater pond in Basin 1, and Jacobs requested the County acquire these parcels to accommodate the stormwater treatment and attenuation needed for the Wilson Boulevard Widening Project. Note: The County has acquired the parcels for Pond Site 1-3. Jacobs Engineering Group Inc. 10 Page 1651 of 4682 Pond Siting Report Parcel No. 37280400008 (241) Property Appraiser: Prap a rty 5u m mary SIN pa IC 37280408W8 � � raAP16 2k,- U120 �i Add dCOLLIER C717NTT CIO OFFICE OF THE CTY ATrORNET Y•Y 3299 TAM IAM I TRAI L E r880 City NAPLES Stare FL 2iP 34112 y4 _Z'�" F Map Nw Strip No. Section Toxnshlp Range Run -U31. ,2d 4CO3 330/00514CO3 3 49 23 241 t Legg COLDER GATE ESF UNIT E4 5 1WF`F OF TH 5 87 Mllygt RFto0 'Talc.Ia05mr le>� S.h.ICuMe 330180 60LOENGATEESTONITI4 Sahool [Ohn Tw We CodeO 0 VACANTRESIDEN1AL a3132 5.1568 10.01 a Latest Sales History 2024 Certified Tarr Roll Np,•••8e -Pp�pr^Fmeunt Land wlua •'w•••'p•• $125.625 OVj3W24 6360144 !0 I_I Impa_ v- SO t 04FJWZI 9.4. U$U s74,000 1.114aWevaiaa 5135,625 Willis 5a931216 so ...._..�. r.1 141L aL�r•Lrm.w.r Coe Parcel No. 37280360009 (242) Property Appraiser: Fa •��� � �'�4xi e Property Summary Parcel Site Address Site Sim ID 37280360009 Disclaim City NAPLES 20 34120 Note COLLIERCOI1NW C/O OFFICE OF THE CT7' ATTORNEY 3299 TAMIAMI TRAI L E o80G b d City NAPLES State FL Zip 34112 Map Na. Strap No. Section Township Range Acres `Est mated - 4CO3 3301DO SO4CO3 3 49 27 2.34 Legal GOLDEN GATE EST UNIT 14 N 15GFr OF TR 5 Ailla o 87 M_llage Rat,.0 •C.1-1.t— Sub./Condo 330100 - GOLDEN GATE EST UNIT 14 School Other Total Use Cade O 0 - VACANT RESIDENTIAL 4.3132 5.7568 10.07 Latest Sales History 2024 Certified Tax Roll Iaar.nsa�,.,.�. ..ro nn�e..zirtvl Is.r .� se1 Gate Beak -Page Amount l Land Val S 146,250' 04/29/24 6360-175 So l,1 Improved Value S 0 04/30/21 5939-385d $66.00, t-1 Market Value S146,250 04/11/18 5497-1212 5 0 r-1 10Y. Non-Homertead C_ cpq_ e Jacobs Engineering Group Inc. : ,acobs Page 1652 of 4682 i , �� . rol.275RDUEI lOUE 271RDUE 272RDUI 275RDVE2 278POND 279PON❑ wea Hoy:� 14 285RD::E 7. 1IAE 1't* tIE �- 273RplIE - •' 274RDJEE 240RD11E 281RpLER?fE ■ C ` IC U = 289RDUE 24lRDUt 2�mBut 1 *j s1k z V-1t I5-. - - - 289RDUE 292ROULI Q85RDUF. 2- ORDUE1 292RDUE2 2994RDUE Jr - Dut �dQ{ll�� 290RpDE2 Pond Siting Report Basin 2 Pond Site Requirements Jacobs Basin 2 limits: Approximately 0.55 miles south of Cypress Canal to Cypress Canal. Based on the Design Criteria and the amount of needed treatment and attenuation for the proposed amount of impervious area, the need for an approximate 4 Acre Pond Site has been identified for Basin 2. The proposed pond sites for Basin 2 would outfall directly to the Cypress Canal. Four potential pond sites were identified for Basin 2 in the Study to avoid impacts to numerous water supply wells and minimize distance to the canal. Two of those proposed pond sites are no longer available due to development. Piped conveyance systems to the potential Basin 2 pond sites would be located within the Wilson Boulevard ROW. The Pond 2 outfall pipes to the Cypress Canal may be located within the Wilson Boulevard ROW. Recommendation Jacobs identified 2 viable options for Basin 2 (see Attachment 2): • Pond Site 2-1: Consisting of Parcel Numbers 290RDUE2 and 292RDUE1 (Total 4.52 Acres) • Pond Site 2-2: Consisting of Parcel Numbers 278 and 279 (Total 4.31 Acres) Pond Site 2-2 was selected as the preferred alternative due to reduced anticipated wetland impacts. Additionally, Pond Site 2-2 is owned entirely by a single owner, whereas Pond Site 2-1 consists of two owners (a "lot split" request has been filed for parcel 290RDUE2, Application No. PL20230000853). The parcels identified for Pond Site 2-2 are required for a stormwater pond in Basin 2, and Jacobs requested the County acquire these parcels to accommodate the stormwater treatment and attenuation needed for the Wilson Boulevard Widening Project. Note: The County has acquired the requested parcels for Pond Site 2-2. Jacobs Engineering Group Inc. 13 Page 1654 of 4682 Pond Siting Report Parcel No. 37118720106 (278) Property Appraiser: Jacobs Fampertyr Summary Parcel Site Address r� Site site III 37118720106 Disclaimer ,= City NAPLES Zone 34129� Note Name/ COLLIER COUNTY Address C/O OFFICE OF COUNTY ATTORNEY 3299 TAMIAMI TRAIL EAST #a00 City NAPLES State FL Zip 34112 Map No. Strap N. Section Township Range Acres 'Estimated 4C04 32SUO 13214CO4 4 49 27 2.58 Legal GOLDEN GATE EST UNIT 11 Sl/2 OF TRACT 132 MAi a O 87 Millwall t.0 •Calculations SuhJCcndo 3286DO- GOLDEN GATE EST UNIT II School Other Total Use Cade O 0 - VACANT RESIDENTIAL 4.3132 5.7568 10.07 Latest Sales History 2024 Certified Tax Roll (Nnl all Sales are lizt- a.. 1. Conri4ealialily) (—jert to Chaag.) Date 8eok-Page Amourd Land Value S 196,080 03/25/24 6354-1412 5 0 (+) Unproved Value $ 0 11/26/14 5098-181 S 0 (_) Market Value $ 196,080 -) 10°k Non -Homestead Cap 5115,473 , Parcel No. 37118720009 (279) Property Appraiser Parcel ID D37118720009 SiteisAddclress aimer Vt Name) COLLIERCOUNTY Address C/O OFFICE OF COUNTY ATTORNEY 3299 TAMIAMI TRAIL EAST 4800 City NAPLES Slate FL Zip 14112 Map No. Strap Ne. Section Township Range Acres, 'Estimated I 4C04 32960D 132 04C04 4 49 27 2.58 Legal GOLDEN GATE EST UNIT 11 N7/2 OF TRACT 132 AillaaO 87 Millaee RatesO'Calculations SuhJC ndo 328600 - GOLDEN GATE EST UNIT 11 School Other Total Use Code 0- VACANT RESIDENTIAL 4.3132 6.7568 10.07 Latest Sales History 2024 Certified Tax Roll (- a — a,. „ �« to .� .� a��m Is.a . c ..) Date Book -Page Amount land Value $ 196,080 03/25/24 6354-1412 so («7 Improeed Value 5 0 1112GY14 5090-193 SO 0B/03/98 Z482-213 5 0 f=7 Market Valve 4196,080 04/14)95 2049-42 S0 [-) 10%Non -Homestead Cap S115.473 s Jacobs Engineering Group Inc. 14 Page 1655 of 4682 ■ wpm — awe ;A -- will v.wlr 3t A _ V , �I �� � 31bR9JE: ir i 3RPVE 3Q,! DUE n:: 3l r_ #well vault 3z 37iRI7JE 323 325kLUE 329RDUE 33pgpuEl 334R1 295ROUE } _ ` ` + �A,. ND ot 314PDND F �w ;' E,CFZDUE 306RDUC � `30 E:OM 317ROUE 319RWE 32*DUE 327M3UE .amp. li7DuE. - f` UE �M t 326RDUE SS1i�lE 333RDUE _ 329RD17E 332RDuE i. lip 7 Pond Siting Report oaco s Basin 3 Pond Site Requirements Basin 3 limits: Wilson Blvd N from Cypress Canal to 1411 AVE NW/NE. Due to the construction of Vanderbilt Beach Road Extension (VBRX) and the existing drainage trunklines which cross Wilson Boulevard, Basin 3 has been split into two subbasins: Basin 3A (from Cypress Canal to VBRX) and Basin 3B (from VBRX to 14t" Ave NW/NE). Basin 3A Basin 3A limits are from Cypress Canal to VBRX. Two potential pond sites were identified for what is now Basin 3A in the Study to avoid impacts to numerous water supply wells and minimize distance to the canal. A third option was explored for this Pond Siting Report: Expanding the VBRX Wet Pond 3BN to Parcel 315. Jacobs recommends routing the water into the southern VBRX Wet Pond 3BS. VBRX Wet Pond 3BS and Wet Pond 3BN are connected with an equalizer pipe (see Figure 3-1). These wet ponds are near their capacity; therefore, Jacobs recommends acquiring Parcel 315 just north of the northern pond (Wet Pond 3BN) to expand the Wet Pond 3BN's treatment and attenuation capacities. The existing discharge pipes from VBRX will be utilized for these ponds which will result in significant cost savings for the project. Note: A permit modification to the VBRX project will be required. Figure 3-1 Jacobs Engineering Group Inc. ff: Page 1657 of 4682 Pond Siting Report Jacobs Based on the Design Criteria and the amount of needed wet detention and dry detention pre- treatment and attenuation for the proposed amount of impervious area, the need for an approximate 3 acre wet or dry pond site has been identified for Basin 3A. Recommendation — Basin 3A Jacobs identified 3 viable options for Basin 3A (see Attachment 3): • Basin 3A Pond Site 3-1: (Total 4.53 Acres) • Basin 3A Pond Site 3-2: Consisting of Parcel Number 295 (Total 4.38 Acres) • Basin 3A VBRX Pond 3BN Expansion: Consisting of Parcel No. 37549320007 (Parcel 315) (Total 2.5 Acres) Basin 3A VBRX Pond 3BN Expansion (Parcel 315) was selected as the alternative due to reduced anticipated wetland impacts, the cost savings by utilizing an already constructed discharge pipe (from VBRX), and the increased amount of stormwater storage achieved by expanding an existing pond versus constructing a new pond with berms, slope tie -downs, etc. This parcel is located along Wilson Boulevard and adjacent to an existing pond. Additionally, no permits have been filed recently to construct residential homes on this parcel. The parcel identified for Basin 3A is required for wet detention stormwater ponds in Basin 3, and at this time Jacobs is requesting the County acquire this parcel to accommodate the stormwater treatment and attenuation needed for the Wilson Boulevard Widening Project. Parcel 37549320007 (315) Property Appraiser: -Ell e,slr Jacobs Jacobs Engineering Group Inc. Parcel Site Address 37549320OD7 �.: Site NAPLES Site zone 34120 ID Disclaimer Ci}� Note Name 1 MACIAS JR. FLIBERTO=& NANCY Address 6961 LIVINGSTON WOODS LN City NAPLES State FL zip 34109 Map No. Strap No. Section Township Range Acres *Estimated 3C33 3316001310303 33 48 27 2.34 Legal GOLDEN GATE EST UNIT 19 S 150FT OF TR 131 W"lage 290 MillageRatesO *Calculations Area A Sub./Condo 331600 -GOLDEN GATE EST UNIT 19 School Other Total Use Cede • 0 - VACANT RESIDENTIAL 4.3132 7.8438 12.157 Latest Sales History 2024 Certified Tax Roll (Nor a115a1es are listed due lu Confidentiality) (Subpe l L. Change) Date Book -Page Amount Land Value $ 117,000 01/12/89 1408-1022 $10.000 w Improved Value so 17 Page 1658 of 4682 Pond Siting Report Basin 3B : ,acobs Basin 3B limits are from VBRX to 14th Ave NW/NE. The proposed expanded VBRX wet ponds system will be unable to treat and attenuate both Basin 3A and Basin 3B. Therefore, Jacobs identified the need for an additional parcel for a stormwater treatment pond. Based on the Design Criteria and the amount of needed wet detention and dry detention pre- treatment and attenuation for the proposed amount of impervious area, the need for an approximate 3-acre wet or dry pond site has been identified for Basin 3B. The proposed pond sites for Basin 3B would outfall directly to the Corkscrew Canal. Jacobs will explore the possibility of utilizing the existing VRBX discharge pipes to the Corkscrew Canal, which may result in significant cost savings. One potential pond site (Pond Site 3-3) was identified for what is now designated Basin 3B during the Corridor Study. A permit for constructing a single-family residence was issued on December 31, 2024 (PRFH20240937730) on one of the parcels for the proposed pond site. As a result, Jacobs identified an alternative pond site (Pond Site 3-4) at the northeastern parcel at the intersection of VBRX and Wilson Blvd. Piped conveyance systems to the potential Basin 3B pond site as well as outfall pipes to the Corkscrew Canal would be located within the Wilson Blvd ROW and VBRX ROW (existing discharge pipe). Recommendation - Basin 3B Jacobs identified 1 viable option for Basin 3B (see Attachment 3): • Basin 3B Pond Site 3-4: Consisting of Parcel Numbers 37490400102 (Parcel 313) (Majority of which County acquired for VBRX project) and Parcel No. 37490400005 (Parcel 314) (Approx. 3 Acres) Basin 3B Pond Site 3-4 was selected due to the elimination of the viability of Pond Site 3-3 due to the recently issued construction permit. Additionally, this parcel site is located near a major intersection (Wilson Blvd and VBRX), where a pond site is preferred versus the construction of a home due to access and safety reasons. Jacobs will explore the possibility of utilizing the existing outfall pipe from the VBRX project for Wet Pond 3BS and 3BN, potentially saving the County money. The parcels identified for Basins 3B are required for wet detention and/or dry detention stormwater ponds in Basin 3, and at this time Jacobs is requesting the County acquire these parcels to accommodate the stormwater treatment and attenuation needed for the Wilson Boulevard Widening Project. Jacobs Engineering Group Inc. 18 Page 1659 of 4682 Pond Siting Report : ,acobs Parcel 37490400005 (Parcel 314) Property Appraiser: parcel 374904C0005 Site Address ID 'Disclaimer w Name/ Address GARCIA, ERNESTINA 841 4TH ST SE Map Na. Strap No. Seaian Township Range Acres ^fstfmated 3C34 331300503C34 34 48 27 2.58 Legal fiOLDENUTEESTUNITUN165FTOFT115 M=11age 290 MiRage RatnO `Calculations Area O _ Sub./Condo 1313DO-GDLDEN GATE EST UNIT 18 56ao1 Other Total Use Cade 0- VACANT RESIDENTIAL 4.3132 7.8436 12.157 Latest Sales History 2024 Certified Tax Roll Ir✓m an sale: are ertea aye m co�ea:�t��i„yr ,aunlNs m cn,�g.1 Date Beak -Page Amount Land Valve $ 129,000 D6115/18 5522-1901 $ 120.000 Improved Value S 0 D611511B 5222-1903 S D -- 11l2Dl14 5101-683 5 D L=) Market Value $ 129,000 „016a3 - Ncn Homestead Cels 553A52 Field visits were conducted on the properties for Basins 3A and 3B, and the map and photo package is appended at the end of this report (see Appendix B). Jacobs Engineering Group Inc. 19 Page 1660 of 4682 Pond Siting Report Jacobs Parcel 37490400102 (Parcel 313) Property Appraiser Site Parcel 37490400102 Addis � S"' NAPLES IO 'Discla,mer C Name GARCIA, ERNESTINA Address 941 4TH ST SE City NAPLES State FL Zip 34117 Map No. Strap No. Section Township Range Acres -Estimated 3C34 33130051304 34 48 27 2.58 Legal GOLDEN GATE EST UNIT 19 S 1651T OF TR5 A,l�agOe 290 Wllage RatesO'Calcalatioas Sul,JCondo 331300 -GOLDEN GATE EST UNITIS School Other Total Use Code O 0 -VACANT RESIDENTIAL 4.3132 7.8438 12.157 Latest Sales History 2024 Certified Tax Roll I—m sales a:e °ned aye m co�re.m„I�n� Date Sauk -Page Amount Is�nren m cm�gel Lana Value S44,600 06/15/18 5522-1903 50 1,1 Improved Value SO 0615/18 5522. 1901 $120,000 1-1 Market Value S44,600 The County acquired a road right of way, drainage & utility easement over the southerly 100' of this property for the VBRX project. The entire property, as well as the parcel just north, are currently owned by the same owner. See below ROW map from the VBRX project. D9 140E/IDaa YI N tlN2b.56 3751952°La] i i 279 seas 324 RraRt=_R. suua�NE I Du 324 Rau Dil490 owls q Nfi9'31'36°E 9R4.92' 7DR RIGIIT of WAY sa: as OF FssFl�ye oil RF ' - aFFSEf: ]29 S,e LT la5.o9?T f. It ero.w E9 F1Fk CDLUER c9uett ° oTtvs'ET�5e.3 ooa '� DR e545/eD,o 27fi I+ N59'31'09'E C4Rr9, SANEsrINA 75 UGD09 �E>r `y rI 13.D0' DR M22/1933 3]d9bICOR05 g A•_ 1�oeafe I o 325 N TRACT 5 TRACT 132LT IIIV 277 NOq•s6'so'W 1sao.00' NR91_31' YO E 597.0_' ❑ECL count couNrr Sg0'29'oYE 13.00' CP 451fi/2135 Pe P5Wila9W Sfh 5a6>55.]e 321GACN FRNFSIINI ORSEr: It1.5r' LT FEE OR 5523/19°3 efN laS+Fa.R1 STA ree+SaAS 3149°49fi192 arF9Er: ae,aa' LT oF,A T:°a3,po' FIT 92 BIBS 894 U95 BIBS fi9I 698 699 7D0 701 702 7D3 704 705 N89'31'10'E 18193,54' Fr VANDERBILT BEACH ROAD a -,I o I '7 _ 27fi o� laatra.0 oECL sire ]a5 oa.a5 FFSEr: Ss°o' m COWEA eAs' Gl a sreeo os.]e D14zowlow6 - �•rlu N99'30'53'L 585.06' CENTERLINE SURVE7 241 -71 DELL 275 C 56C9 NE IND RFISFT� los ]a .9m5� & CONSTRl1C90N z m a Du n4aoaa5ces " TRACT 133 D. TRACT 4 °FTSFT I oFrsFr: ,teen• Rr COLLIfA CNM _ N00'2B'S01Y 225.09' DR elR1/ep33 ROW Map: Vanderbilt Beach Road Extension Project (May 08, 2023) Jacobs Engineering Group Inc. 20 Page 1661 of 4682 ��Well House 34 - A y '� 338ROUE 3a ] Rpl1E 'J 334RDUE 335RDUE 340liOl]F.F 345ROUE 345ii�UE349RDUE 5ok64Jf„— 35 RDUE y V38 DUE _ ' d Jl If .... 354RDIJI j � srr 34RBX1E 342R9UF, 344RiJUE 347RDUE 348RDUE ;. 352RDUE; JZ', 337ROLfE ■ _ r ..:ti• 351RDllE - 3 as M" w 0-1 '3"WDUE ..+. �•�Tl , 3fi0RpUE 354ROUE '�6LROUF �^ 363RDUE ■ Pond Siting Report Basin 4 Pond Site Requirements Basin 4 limits: Wilson Blvd N from 1411 AVE NW/NE to 1811 AVE NW/NE. Jacobs Based on the above Design Criteria and the amount of needed treatment and attenuation for the proposed amount of impervious area, the need for an approximate 4-acre wet pond site has been identified for Basin 4. The proposed pond site for Basin 4 would outfall directly to the Corkscrew Canal along a side street. Two potential pond sites were identified for Basin 4 during the Corridor Study to avoid impacts to numerous water supply wells and minimize distance to the canal; however, both of those sites are no longer viable due to recent permits filed for construction of a new home or lot split permit requests. As a result, potential alternative sites were evaluated, and one feasible site (Pond Site 4-2 (450POND): Parcel Number 37742200005) was identified for this pond siting report. Piped conveyance systems to the potential Basin 4 pond site would be located within the Wilson Boulevard ROW and either the Jung Blvd E or 18th AVE NE ROW. The Pond 4 outfall pipes to the Corkscrew Canal may be located within either the Jung Blvd E ROW or the 18tb AVE NE ROW. An environmental field review indicated the presence of significant gopher tortoise burrows/activity on Pond Site 4-2. Multiple field visits were conducted on the properties, and the Pond Site 4-2 map and photo package is appended at the end of this report (see Appendix C). A cost analysis of the anticipated gopher tortoise mitigation was conducted. Our gopher tortoise mitigation costs findings are summarized below: Gopher Tortoise Mitigation ($6,000/Tortoise, assuming 50% occupancy): o Encountered 33 Potentially Occupied Adult Burrows (round up to 34 whole burrows) o Pond Site 4-2 Cost Estimate = $102,000 (34*6,000*.5 = $102,000) Recommendation Jacobs identified 1 viable option for Basin 4 (see Attachment 4): • Pond Site 4-2 (450POND): Parcel Number 37742200005 (Total 4.65 Acres excluding Jung Blvd E and 18t' AVE NE ROW) Pond Site 4-2 was selected as the preferred pond site due to its availability and elimination of all previous alternatives. Additionally, no permits have been filed recently to construct residential homes on this parcel. Gopher Tortoise mitigation is anticipated with this parcel. Jacobs Engineering Group Inc. 22 Page 1663 of 4682 Pond Siting Report : ,acobs The parcel identified for Pond Site 4-2 is required for a stormwater pond in Basin 4, and at this time Jacobs is requesting the County acquire this parcel to accommodate the stormwater treatment and attenuation needed for the Wilson Boulevard Widening Project. Parcel 37742200005 (450POND) Property Appraiser: Jacobs Engineering Group Inc. 23 Page 1664 of 4682 ■ j�. - 1 E �. g. 3 VE 391ROVE _ =• 4pORDu } it ;...:. IlR9UE 2Rpllf 3R 4kF� 3929M r 3921'iDuE 95RDVE - 901I/G17 ti 1365R UMDUE 377R1)71E_i=. 396 ti I r 1 381 R3LrE - I � � ' -T- Wilson:Bl�tl, :- �! Ab AW Na 37CR.71JE 3i'lRDl1E. = 1.:4ifl7l:F .. ?i]•iRDD 369RD1E 3i.�/.E 3iLRDL�E 373RDU4: 31MR)1E 3R4Cc,71; aSSR3UE 34 E 94RDilE ^."CAI;: gp2R'J11E • 3 7RD1F Rti9RDIJE �'•S�' � 4C3R[JDE DRY- ,, POND +' �r AT 451POND fVJET POND r 52POND Pond Siting Report Basin 5 Pond Site Requirements Basin 5 limits: Wilson Blvd N from 18th AVE NW/NE to 22n' AVE NW/NE. Jacobs Based on the above Design Criteria and the amount of needed wet detention and dry detention pre-treatment and attenuation for the proposed amount of impervious area, the need for an approximate 4-acre wet pond site and approximate 2-acre dry pond site has been identified for Basin 5. The proposed pond sites for Basin 5 would outfall directly to the Corkscrew Canal. Five potential pond sites were identified for Basin 5 during the Corridor Study to avoid impacts to numerous water supply wells and minimize distance to the canal. However, one of those sites are no longer viable (Pond Site 5-1) due to development, and another potential pond site's (Pond Site 5-4) size has been reduced by half due to development. The preferred alternative from the Corridor Study (Pond Site 5-2, consisting of a 5.28-acre wet pond site and a 2.18-acre dry pond site) was selected for this Pond Siting Report. Piped conveyance systems to the potential Basin 5 pond sites as well as outfall pipes to the Corkscrew Canal would be located within the Wilson Boulevard ROW and the 18th AVE NE ROW. An environmental field review indicated the presence of significant gopher tortoise burrows/activity on Pond Site 5-2 (Wet, Parcel Numbers: 37742280009 (451POND) & 37743480002 (452POND)). Multiple field visits were conducted on the properties, and the Pond Site 5-2 (Wet) map and photo package is appended at the end of this report (see Appendix D). A cost analysis of the anticipated gopher tortoise mitigation was conducted. Our anticipated gopher tortoise mitigation costs findings are summarized below: • Gopher Tortoise Mitigation ($6,000/Tortoise, assuming 50% occupancy): o Encountered 41 Potentially Occupied Adult Burrows (round up to 42 whole burrows) o Pond Site 5-2 (Wet) Cost Estimate = $126,000 (42*6,000*.5 = $126,000) Recommendation Jacobs identified 2 dry pond options and 2 wet pond options to accommodate both wet detention and dry detention pre-treatment for Basin 5 (see Attachment 1): • Pond Site 5-2 (Dry): Consisting of Parcel Number: 37740280001 (368POND) (Total 2.18 Acres excluding Wilson Blvd and 18' AVE NE ROW) • Pond Site 5-2 (Wet): Consisting of Parcel Numbers: 37742280009 (451POND) (Total 2.64 Acres excluding 18' AVE NE ROW), and 37743480002 (452POND) (Total 2.64 Acres excluding 18th AVE NE ROW) • Pond Site 5-3 (Wet): Consisting of Parcel Numbers 376 and 377 • Pond Site 5-4 (Dry): Consisting of Parcel Number 397 Jacobs Engineering Group Inc. 25 Page 1666 of 4682 Pond Siting Report Note: Pond Site 5-3 (Wet) would have substantial impacts to forested freshwater wetlands, Class III Waters, and require additional floodplain compensation based on field visits and a review of adjacent single-family construction permits filed for the northern (parcel 380) and southern (parcel 373) neighboring parcels (County permit no. PRFH20220418388 and PRFH20230836105). Jacobs did not recommend the alternative Pond Site 5-3 (Wet), due to the significant costs of anticipated wetland mitigation, anticipated floodplain compensation, and additional costs associated with additional outfall pipes. Note: Pond Site 5-2 (Dry) is needed to achieve the needed dry detention treatment and attenuation requirements. Pond Site 5-2 (Dry) was selected over Pond Site 5-4 (Dry) due to the proximity of Pond Site 5-2 (Wet) pond site, thus saving money on discharge pipes. Both Pond Sites 5-2 (Dry) and Pond Site 5-4 (Dry) would require some wetland mitigation. Jacobs Pond Site 5-3: Forested freshwater wetlands, Class III Waters We anticipate Pond Sites 5-2 (Wet) will share a drainage outfall pipe down 18th AVE NE with Pond Site 5-2 (Dry) as well as with Pond Site 4-2, and all three ponds will share 1 single outfall pipe to the Canal, minimizing impacts to residential driveways and existing infrastructure, thus saving the County money on construction. The parcels identified for Pond Site 5-2 (Wet) (451POND and 452POND) and Pond Site 5-2 (Dry) (368POND) are required for both a wet detention and dry detention stormwater pond in Basin 5, and at this time Jacobs is requesting the County acquire these parcels to accommodate the stormwater treatment and attenuation needed for the Wilson Boulevard Widening Project. Jacobs Engineering Group Inc. 26 Page 1667 of 4682 Pond Siting Report : ,acobs Parcel 37740280001 (368POND) Property Appraiser (Pond 5-2 (Dry)): ParceDl 37740280001 AddSite ress NAPLES `Disclaimer Name / Address LESTER 11, CLARENCE SHELBY 4412 E FAIRFIELD ST State AZ Zi 85205- P 5201 Section Township Range Acres 'Estimated 27 48 27 2.81 Legal GOLDEN GATE EST UNIT 23 S 18DFT OF TR 3 OR 663 PG 761 MLIlage 290 Millage Rates O Area O 'Ca cul lations Sub./Condo 232800 - GOLDEN GATE EST UNIT School Other Tot.# Use Code D 0 - VACANT RESIDENTIAL 4.3132 7.8438 12.157 Latest Sales History 2024 Certified Tax Roll {Hof a115alanae�txe li;�layl =Ly) d (Subjeai le CM1aege) Cee$ Date Book -Page Amount Land Value 175,625 09/01176 663-761 So (+7 Improved Value 5 0 {=7 Market Value $ 175.625 Parcel 37742280009 (451 POND) Property Appraiser (Pond 5-2 (Wet)): 5 it. Par" 37742280009 Address � wry, NAPLES 'Discaimer Name Address VANDER KLOOSTEP, MATT14EW DAWN KATHLEEN VANDER IQDOSTER 11 ZEBULON PLACE site Zen e 34120 I 'Note City PALM COAST state FL Zip 32164 Map No. Strap No. Section Township Range Acres 'Estimated 3C27 332800 28 13C27 27 48 27 2.73 Legal GOLDEN GATE EST UNIT23E180FTOFTR28 I Millage 290 Millage Ra�tesD Area D •Ca cull ations S.b./Cando z32600 -GOLDEN GATE EST UNIT School Other Tatal Use Cade D 0 - VACANT RESIDENTIAL 4.3132 7.6438 12.157 Latest Sales History 2024 Certified Tax Roll 1�afaa5al�..en�aa�ero 1 fog 9.1 _ Ill -k-Pag. Land Val. $170.6251 Date Bvok-Page Amount L _ 08/D7l22 fi1fi3-777 $120. 00 t+7 Improved Value so' i 01/26/99 2505-3242 90 (-) Market Value $170625': Page 1668 of 4682 Pond Siting Report Jacobs Parcel 37743480002 (452POND) Property Appraiser (Pond 5-2 (Wet)): 5Xe 221 Pa ID 37743480D02 Address ABTH I=11" VE 'Disclaimer NE AdNadressme/ SPEE4 PROPERTIES LLC 2430 STH ST NE Section Township Range Acres 'Estimated 27 48 27 173 Va 290 Sub./Condo z32800 - GOLDEN GATE EST UNIT Use Cade O 0 - VACANT RESIDENTIAL Latest Sales History tNo al ConFitlentia YR eon Date Book -Page Amount 01/08/24 6323-3962 50 2024 Certified Tax Roll (s-n 1eo cNa ) Land Value S 17 (+} Improved Value Jacobs Engineering Group Inc. 28 Page 1669 of 4682 Pond Siting Report Basin 6 From 22" d Ave NW/NE to Immokalee Road : ,acobs Attachment 6: Wilson Boulevard Potential Pond Sites Exhibit (Basin 6) . • tr - Ski -r . f.' -1' - - 4i — l 901RDU 4*TE IMIJEAS2Ai lE! 4i5V-0&E 416R6UE �a � 425HDVE ORbI] " •�1 Uq'Lkf It.'E42InC_'E 02R011� REM f 414ROIJE � !� � c •:i ?ROUE 4k3E51 i f - .. Jacobs Engineering Group Inc 29 Page 1670 of 4682 Pond Siting Report Basin 6 Pond Site Requirements Basin 6 limits: Wilson Blvd N from 22nd AVE NW/NE to Immokalee Road. Jacobs Based on the above Design Criteria and the amount of needed treatment and attenuation for the proposed amount of impervious area, the need for an approximate 3 to 4-acre wet pond site has been identified for Basin 6, with the potential for dry detention treatment. The intent of this Pond Siting Report is to identify the alternative pond sites in Basin 6; however, Jacobs is not recommending to the County to acquire any pond site at this time due to the planned Immokalee Road 8-Lane Widening project and the planned St. John Paul II Parish (approximately 42 acres) development at the southwest corner of Wilson Boulevard and Immokalee Road. These projects are evaluating the feasibility of reconfiguring the existing Immokalee Road Pond 7 as a joint -use pond for the Church Site, the planned 8-lane widening of Immokalee Road and the improvements to Wilson Boulevard in Basin 6. If a joint -use Pond 7 is deemed feasible, discharge will be to the Cocohatchee Canal through the existing 48" outfall pipe. Note: The agreement with the County and the proposed Church for a redesigned joint -use Pond 7 has not been finalized at this time. Therefore, if an agreement cannot be reached, an additional parcel(s) will be required for a pond site in the future for Basin 6. This will require an addendum to this Pond Siting Report identifying the preferred pond site. If needed for the Widening Project, the recommended pond site for Basin 6 would outfall directly to the Corkscrew Canal along a side street. Three potential pond sites (one dual pond site) were identified for Basin 6 during the Corridor Study to avoid impacts to numerous water supply wells and minimize distance to the canal. At this time, all parcels for the three alternatives remain undeveloped and available for potential pond sites and no permits have been filed on the four parcel sites for construction of a single-family home. Piped conveyance systems to the potential Basin 6 pond site would be located within the Wilson Boulevard ROW and either 22nd AVE NE ROW or 24th AVE NE ROW. The Pond 6 outfall pipes to the Corkscrew Canal may be located within either 22nd AVE NE ROW or 24th AVE NE ROW. Recommendation At this time, Jacobs does not recommend acquiring any potential pond site(s) in Basin 6 until further exploration of the feasibility of utilizing the future redesigned Pond 7 from the Immokalee Road 8-Lane Widening Project and St. John Paul II Parish Church Development. When/if a pond site must be recommended for Basin 6, an addendum to this Pond Siting Report will be provided to the County which recommends the preferred alternative. Jacobs Engineering Group Inc. tit Page 1671 of 4682 Pond Siting Report : ,acobs Parcel 37740880003 (Parcel 404) Property Appraiser: Site Pa ID 37740880003 Address �� Gsittee NAPLES 'Disclaimer Address /ress HUYNH H NGUYEN & LIEN THI PHAM REVOCABLE LIVING TRUST 530 102ND AVE N site _ Zone34120 •NoYe City NAPLES State FL Zip 34108-3209 Map No. Strap No. Section Township Range Acres 'Estimated 3C27 332800 10 03C27 27 48 27 2.81 Legal GOLDEN GATEESTUbUT23 N 1801FTOFTR 10 OR 1393 PG 1609 A=11�aO 290 Millage RatesO 'Cakulatians Sub./Cando 332800 - GOLDEN GATE EST UNIT 23 Schoel Other Total Use fade0 0- VACANT RESIDENTIAL 4.3132 7.6438 12.157 Latest Sales History 2024 Certified Tax Roll �noi an sales eye linen eue rn connee .."'t lsu m c get Data Book -Page Amount Land Value 5 175,625 12/06/22 6198-1T19 80 I�) Improved Value Sg 11 /09/^8 1393-1609 S12,900 I_I Market Value 5175,625 Parcel 37741760009 Property Appraiser: Jacobs Engineering Group Inc. Property SummaryProperty Detail- - 5ita , Site Pa lee' 37741760009 Address ` � NAPLES Zone 34129 'Di'daim CRY Note Name! SEGURA, ARCADID=&NIDUI Address 4500 NW 192ND ST City MIAWGARDENS State FL Zip 33055-2124 Map No. Strap No. Section Township Range Acres C ,,mated 3C27 332300 21 03C27 27 48 27 2.73 Legal GOLDEN GATE EST UNIT 23 W 1B0FT OF TR 21 OR 1312 PG 2002 A. 290 Mill— Rates O'Cal-ratlans SuhJCondo 332800- GOLDEN GATE EST UNIT23 School Other Total Use Cade O 0 - VACANT RESIDENTIAL 4.3132 7.8438 12.157 Latest Sales History 2024 Certified Tax Roll lHar.��Sz�esarrRstMeuetutnnfieenlfanorl c,�ela�ror '.) Date Book -Page Amount Land Value S 170,625 12/01/87 1312 2002 S 7,200 i,l Improved Value $ G [-1 Market Value $170,625 31 Page 1672 of 4682 Pond Siting Report : ,acobs Parcel 37741440002 (Parcel 424) Property Appraiser: Parcel 52 , 10 37741440002 Address •Diarlab __ Name/ JOSE& MONICA DIAZ REV TRUST Address 2230 18TH AVE NE Sire Site City NAPLES Zo 34120I Not. Section Township Range Acres °Estimated 27 48 27 5.15 Legal GOLDEN GATE EST UNIT 23 TR 15 MArIeaU 290 Mina eg RatesO 'Calc�lrtions Sub./Condo 3328DO-GOEUEN GATE ESTUNTT23 School Other Total Use CodeO 0- VACANT RESIDENf1AL 1.3132. 78438 12.157 Latest Sales History 2024 Certified Tax Roll Irrara ..� — —t. o� M marl (s� r uoa eel Dave Book -Page Amwrrt Land Value S321875�! O6J28124 6377-1240 50 (_� Improved Valve SO OSJ28/24 6377-1237 S 0 Markel Value $32187S Parcel 37743920009 Property Appraiser: Jacobs Engineering Group Inc. 32 Page 1673 of 4682 Pond Siting Report ROW Acquisition: Evaluation Factors Project Purpose and Need Jacobs The primary purpose of the Wilson Boulevard widening project is to address population growth, traffic congestion and lack of system connectivity in the Golden Gate Estates and eastern Collier County areas. The project is needed to increase capacity along Wilson Boulevard and to improve overall traffic circulation and connectivity in the Golden Gate Estates and eastern Collier County areas. r nHVcwmrr f 82` cc�l+racov�vTr f I II�saNilve I Cal' ICorks'cmw Swa city of Heglonat San nary Benita Ecosystem Watershed Springs Rwk Aw zs Swamp Mlu'IR ora M OR North +>Fxl>Rv r. Ty NAPl ooLbrr„Rrr Is Project LIX[h]4CIX�N7Y +T Q I Area 4 Florida Panther Golden National ldfife rate Raluga 9] Al TOR ALLEY 8S City of NApses 29 Sand Stall FWssi FahahalChee Sirnrtd MINNYa SLR Big Cypress 5 rfek So WE 1" Natonal Aresem City � St P, � Tell Tell N f Marco Islands 90 151; _ Nalional Wiidtile Refuge Gulf of America e.. IY nY _ N W E Everglades Ilanal Paiir L �pBmp�. S — - — - — • rvwncf canrrr Not to Scale Regional Location Map Jacobs Engineering Group Inc. 33 Page 1674 of 4682 Pond Siting Report Project Location Map Jacobs The following factors were considered prior to recommending the proposed project improvements and determining the preferred typical section and needed ROW easements for the roadway widening as well as the stormwater management: 1. Alternative Alignments Capacity Need The project is needed to relieve existing and future traffic congestion along Wilson Boulevard, particularly between Immokalee Road, the Vanderbilt Beach Road Extension (VBRX) (under construction), and Golden Gate Boulevard. Wilson Boulevard will function as an arterial north - south collector in Golden Gate Estates area. While Wilson Boulevard currently operates at an acceptable level of service (LOS), the 2021 AUIR notes that Wilson Boulevard has experienced a 10% to 20% increase in peak hour directional traffic volume since 2020. Furthermore, preliminary traffic modeling indicates that, without the proposed improvements, Wilson Jacobs Engineering Group Inc. 34 Page 1675 of 4682 Pond Siting Report Jacobs Boulevard will be failing by 2045 in the segment between the future VBRX and Immokalee Road. The VBRX project extends Vanderbilt Beach Road from Collier Boulevard (CR 951) to 16th Street Northeast and includes a new intersection at Wilson Boulevard (construction of VBRX is estimated to be completed by 2026). The VBRX project provides additional east -west connectivity and capacity in eastern Collier County and Golden Gate Estates area. VBRX is expected to help relieve traffic congestion in the area, particularly along Golden Gate Boulevard and the already congested Immokalee Road, which is a regional east -west facility that carries traffic from eastern Collier County to 1-75 and Naples. When the VBRX project is complete, traffic along Wilson Boulevard is expected to increase as travelers use the facility to access VBRX as an alternative east -west route in the area. System Connectivity Need The project is needed to improve the overall traffic network and system connectivity in the Golden Gate Estates and eastern Collier County area. Mobility in eastern Collier County is constrained by conservation lands in the northeastern and southeastern parts of the County. The area also is constrained by a canal system (South Florida Water Management District [SFWMD] Golden Gate Canal Basin) created in Collier County during the 1960s to drain the lands for residential development. The development resulted in residential lots that are 1 to 5 acres in size and are connected by a coarse grid of roads with few connecting cross streets, and a canal system that traverses the residential grid. Most of the roadways in eastern Collier County and Golden Gate Estates dead end at the canals, reducing overall mobility in the area. North -South Roadway Alternatives Currently, there are no north -south roadways east of Collier Boulevard that are wider than two lanes in eastern Collier County today. Wilson Boulevard would be the first four -lane roadway east of Collier Boulevard (approximately 5 miles to the east) and will provide additional north - south capacity and connectivity in the area. The recent shoulder improvements and bridge addition on 8tb St NE provided connectivity improvements in the area from Randall Boulevard to Golden Gate Boulevard, but did not increase overall capacity. The planned shoulder improvements and bridge addition on 16th St NE will provide connectivity improvements in the area from Randall Boulevard to Golden Gate Boulevard but will not increase overall capacity. The planned 4-lane widening of Everglades Boulevard from Oil Well Road to future VBRX (Phase II) will increase capacity and improve connectivity in the area. All of these roadway improvements have been considered during the preparation of the Wilson Boulevard Corridor Study. The proposed roadway improvements are identified in the 2045 LRTP. Wilson Boulevard Corridor Study A corridor study was performed in 2022 (Wilson Boulevard Corridor Study) to evaluate alternatives to widen Wilson Boulevard North (Wilson Boulevard), from Golden Gate Boulevard (CR 876) to Immokalee Road (CR 846) from a two-lane undivided, rural facility to a four -lane divided, urban roadway with curb and gutter with a "closed" (stormwater inlets, pipes, ponds) Jacobs Engineering Group Inc. 35 Page 1676 of 4682 Pond Siting Report Jacobs drainage system. The full version of the original study is available for review under the Collier County Transportation Planning Section's past studies at: https://www.colliercountyfl.gov/government/transportation-management-services/capital- prolect-planning-impact-fees-and-program-management/transportation-planning- section/planning-studies Wilson Boulevard is located within a roadway easement that is 100 feet wide (50 feet on either side of the plat centerline). Wilson Boulevard is approximately 27 feet wide, and was constructed east of the center plat line, leaving approximately 18 feet of existing roadway easement available to the east of the roadway and approximately 55 feet available to the west of the roadway. A typical section analysis was performed to identify a typical section that addresses the project's purpose and need and meets design criteria, but minimizes impacts to resources in the project area, including numerous residential properties and driveways, non-residential properties, environmentally sensitive areas, and the Collier County Public Utilities Department water supply production wells and associated infrastructure. Various typical section widths (between 160 feet to 200 feet wide) were evaluated. The analysis revealed that a typical section width of 165 feet met the project needs with the least amount of impacts along the project corridor, with 80 feet required to the west of the center plat line, and 85 feet east of the center plat line (typical). Excerpt from the Wilson Boulevard Corridor ROW Impacts Exhibit (Appendix E) Jacobs Engineering Group Inc. [eZ: Page 1677 of 4682 Pond Siting Report Jacobs The above excerpt from the Wilson Boulevard Corridor ROW Impacts Exhibit illustrates the various corridor widths that were evaluated. The impacts to neighboring homes and well houses/vaults were evaluated at varying ROW widths (in five-foot intervals). The intent for establishing the alignment was to provide a "line of best fit" and minimize/equalize impacts to both the western and eastern parcels, whenever possible. Please refer to Appendix E to view the entire Wilson Boulevard Corridor ROW Impacts Exhibit. Note: An additional 5 feet is required on the eastern side to accommodate the 10-foot-wide pathway and to avoid impacts to the existing public utility wells located on the west side of the corridor. a 3 PROPOSED 166' RIGHT OF WAY $Wpw.lk + + Madl.. t t 9.1h *Y 17' . 22' IV . 11' . 3' .2'.3'. 10. U ,a 'PROPO850 80' RIGHT OF WAY *PROPOSED l3' RIGHT OF WAY (PROPOSED 100'AT WELL SITES} 'RIGHT OF WAY LIMITSM ISTR 18 UTION SUBJECT TO CHANGE DURING DESIGN 2. Safety Factors A preliminary review of crash data indicates the highest crash locations within the study area were at the two major intersections, Golden Gate Boulevard and Immokalee Road. Additionally, no lighting exists along the project corridor. Safety enhancements proposed include lighting at the intersections and all cross streets to improve nighttime visibility for motorists, pedestrians, and bicyclists. Currently, there are no bicycle lanes or sidewalks along Wilson Boulevard within the project limits, forcing bicyclists and pedestrians, along with transit users, to share the road shoulder with motorists. The proposed improvements are anticipated to increase pedestrian and bicyclist safety by adding a sidewalk (6-feet), a shared -use path (10-feet), and bike lanes (5- foot) to reduce conflicts between motorists, pedestrians, bicyclists, and transit users. Further, the improvements include the addition of a raised median (22 foot wide) and turning lanes (right turn lanes and median left turn lanes) at cross streets along Wilson Boulevard to help reduce conflict points associated with left turns from residential properties and businesses along the project corridor, and to reduce conflict points at the intersections. Jacobs Engineering Group Inc. 37 Page 1678 of 4682 Pond Siting Report Jacobs Enhancing Emergency Access An increasing number of residents in northeastern Collier County are in a relatively isolated area of Collier County and have access to a limited roadway network for emergency evacuations related to hurricanes and brush fires. The proposed improvements provide additional capacity for emergency evacuations. Furthermore, the proposed improvements will improve north -south mobility and connectivity along the project corridor, enhancing access and reducing travel time for emergency responders. Improving Multimodal Mobility One Collier Area Transit (CAT) bus route runs along the project corridor (Route 19) and is served by six bus stops. The lack of sidewalks and bike lanes along the project corridor, as well as the lack of bus stop pads, make transit use in the area challenging. The addition of sidewalks, a shared -use path, bicycle lanes, and bus stop pads will provide a user-friendly experience that promotes walking, bicycling, and transit use within the project area. Additionally, within the project limits, Immokalee Road and Golden Gate Boulevard include pedestrian and bicycle facilities, and similar facilities are being constructed as part of the VBRX project. The addition of pedestrian and bicycle facilities on Wilson Boulevard will improve connectivity and multimodal mobility options from Wilson Boulevard to other major facilities in the area. Improving Congestion and Traffic Operations The widening of Wilson Boulevard will improve congestion, traffic operations, and safety on the nearby existing north -south parallel roadway arterial collectors (Collier Boulevard, 8t" St NE, 16t" St NE (planned bridge and shoulder improvements), Everglades Boulevard (planned 4-lane widening), and Desoto Boulevard) by redirecting traffic away from those congested roadways in the Golden Gate Estates. Since Collier Boulevard (6-lane), Wilson Boulevard (2-lane), 8tb St NE (2-lane), Everglades Boulevard (2-lane), and Desoto Boulevard (2-lane) are currently the only 5 major north -south arterials serving the Golden Gate Estates, this roadway widening will improve access during evacuation as well as response times for the area's Emergency Services, especially when the Vanderbilt Beach Road Extension construction is completed. Safety considerations and design criteria includes: • Alignments (Horizontal and Vertical) are based on Florida Department of Transportation (FDOT) Criteria • Vertical profile will mitigate flooding of the roadway during storm events • A 22-foot median will be provided • Turn lanes will be provided at all cross -street intersections • Sight Distance criteria will be met or exceeded throughout the corridor • Signing and pavement markings are based on FDOT and Collier County guidelines Jacobs Engineering Group Inc. C Page 1679 of 4682 Pond Siting Report Jacobs • A 10-foot multi -use pathway will be provided along the east side of Wilson Boulevard, and a 6-foot sidewalk will be provided along the west side of Wilson Boulevard to provide for safe circulation of pedestrian and bike traffic • 5-foot bike lanes will be provided along Wilson Boulevard • Lighting will be provided at all intersections, the entire corridor may be lit pending public feedback • Collier County Public Schools bus pads are planned at every cross street 3. Long Range Planning Factors The Collier Metropolitan Planning Organization (MPO) and Collier County Transportation Planning division have been planning the widening of Wilson Boulevard for many years. Past planning activities are as follows: The Collier MPO 2035 Long Range Transportation Plan (adopted December 2010) identified this existing 2-lane rural section of Wilson Boulevard (from Golden Gate Blvd to Immokalee Rd) in the Needs Plan as a 4-lane urban typical section. The Collier MPO 2040 Long Range Transportation Plan (adopted December 2015) identified this existing 2-lane rural section of Wilson Boulevard (from Golden Gate Blvd to Immokalee Rd) in the Needs Plan (Needs Rank 51) as a 4-lane urban typical section. The Collier MPO 2045 Long Range Transportation Plan (adopted December 2020) identified this existing 2-lane rural section of Wilson Boulevard (from Golden Gate Blvd to Immokalee Rd) in the Existing Plus Committed (E+C) Roadway Project network (Map ID 100) as a 4-lane urban typical section. The Collier MPO 2050 Long Range Transportation Plan (Draft, due December 2025) identifies this existing 2-lane rural section of Wilson Boulevard (from Golden Gate Blvd to Immokalee Rd) in the Existing Plus Committed (E+C) Roadway Project network as a 4-lane urban typical section. 4. Environmental Factors The alternatives analysis considered environmental factors such as wetlands, panther habitat, gopher tortoise impacts, etc. The historic hydrology in the regional area has been impacted by the drainage network of nearby canals, including Curry, Cypress and Corkscrew Canals. The canals have severed historical sheet flow and severely altered the hydroperiod of wetlands in the area due to the existing Wilson Boulevard roadway. Roads and roadside ditching have also altered historical wetlands in the area, isolating their hydrologic connection. Wetlands and Surface Waters Preliminary desktop analysis indicates potential impacts to adjacent wetlands within the proposed ROW easement footprint. These potential impacts are associated with existing hydric soil. Mitigation would be required should field investigations indicate the presence of wetlands Jacobs Engineering Group Inc. 39 Page 1680 of 4682 Pond Siting Report Jacobs within the limits of construction. The amount of mitigation required for direct and secondary impacts will be determined by the permitting agencies. Additional wetland and surface water impacts from the project pond sites will be determined based on the pond sites identified and acquired during the design phase. During the evaluation of feasible pond sites, impacts to existing wetlands will be considered when analyzing preferred alternative pond sites in an effort to minimize impacts to wetlands. Other minor surface water impacts associated with the bridge replacement and widening at the Cypress Canal are anticipated. Additionally, widening the roadway and extending the length of the existing bridge culvert at the Cocohatchee Canal is anticipated to result in temporary surface water impacts. A natural resources evaluation is recommended during the design phase to assess potential impacts to wetlands and to facilitate coordination and concurrence with the permitting agencies. Protected Species and Habitat Based on the review of available information from the Florida Fish and Wildlife Conservation Commission (FWC) and USFWS in relation to the potential habitat impacts that may be associated with the proposed project, potential federal and state-listed/protected species (including protected non -listed wildlife species) were identified that may occur in the project vicinity. A Florida Natural Areas Inventory (FNAI) Tracking List was obtained for the project area, as well as an IPaC report. Wilson Boulevard, north of the Cypress Canal, is located within the Secondary Panther Zone. Impacts are anticipated and will be mitigated for clearing of lands for the project area (additional widening) and pond sites. Impacts from the Cypress Canal Bridge will be negligible to the man-made canal, and the proposed bridge will include wildlife shelves to facilitate wildlife connectivity. Best management practices will be followed during construction, such as floating turbidity barriers to minimize turbidity within the existing canals. 5. Costs of Competing Alternatives Costs to construct this project have been carefully considered in the analysis during the planning and design stages of this project. During the Alignment Alternatives Analysis, the preferred alignment was chosen to minimize construction costs, environmental impacts, ROW acquisition and residential and business displacement to the greatest extent practicable. The preferred alignment was chosen based on the best combination of those factors. The design process only considers and includes those elements essential to the purpose of the project, thereby maintaining the costs in the Capital Improvement Program and insuring a financially feasible construction project. The current estimate of Probable Cost is $95M (FY25). As the project progresses through the design and permitting, the overall project costs will become more defined and developed. Jacobs Engineering Group Inc. 40 Page 1681 of 4682 Pond Siting Report Appendix A Wilson Boulevard Potential Pond Sites Exhibit Jacobs Engineering Group Inc. Jacobs 41 Page 1682 of 4682 426RDUE 423RDUE 420RDUE 416RDUE415RDUE412RDUE411RDUE 406RDUE 405RDUE401RDUE 400RDUE 399RDUE 396RDUE 395RDUE392RDUE 391RDUE 390RDUE 386RDUE 385RDUE382RDUE 381RDUE 380RDUE 377RDUE376RDUE 372RDUE 371RDUE 367RDUE 366RDUE365RDUE 362RDUE 358RDUE 357RDUE355RDUE353RDUE350RDUE349RDUE346RDUE345RDUE 341RDUE 340RDUE 339RDUE 338RDUE 335RDUE334RDUE330RDUE329RDUE325RDUE323RDUE322RDUE 320RDUE 316RDUE312RDUE311RDUE307RDUE304RDUE303RDUE 300RDUE 299RDUE 298RDUE 295RDUE 293RDUE 289RDUE 288RDUE 285RDUE 282RDUE 275RDUE1 271RDUE 272RDUE266RDUE265RDUE 262RDUE261RDUE 260RDUE 259RDUE 256RDUE 255RDUE 254RDUE 251RDUE 250RDUE 249RDUE 248RDUE 245RDUE 244RDUE243RDUE240RDUE239RDUE 236RDUE 235RDUE 234RDUE 233RDUE 229RDUE228RDUE 226RDUE 165RDUE 373RDUE 291RDUE 427RDUE425RDUE 424RDUE 422RDUE421RDUE 419RDUE 418RDUE 417RDUE 414RDUE 413RDUE 410RDUE 409RDUE 408RDUE 407RDUE 404RDUE 403RDUE 402RDUE 398RDUE 397RDUE 394RDUE393RDUE 389RDUE 388RDUE 387RDUE 384RDUE383RDUE 379RDUE 378RDUE375RDUE374RDUE 370RDUE369RDUE364RDUE 363RDUE 361RDUE 360RDUE 359RDUE 356RDUE354RDUE 352RDUE 351RDUE 348RDUE347RDUE344RDUE 343RDUE 342RDUE 337RDUE 336RDUE 333RDUE 332RDUE 331RDUE 328RDUE 327RDUE326RDUE324RDUE 321RDUE 319RDUE 318RDUE 317RDUE306RDUE305RDUE302RDUE 301RDUE 297RDUE296RDUE294RDUE 292RDUE1 290RDUE2 287RDUE286RDUE284RDUE283RDUE281RDUE280RDUE277RDUE 276RDUE 274RDUE 273RDUE270RDUE 269RDUE 268RDUE 267RDUE 264RDUE 263RDUE258RDUE257RDUE 253RDUE 252RDUE 247RDUE246RDUE 237RDUE 232RDUE 231RDUE 230RDUE 227RDUE164RDUE 118RDUE 119RDUE 133RDUE 132RDUE 129RDUE 128RDUE1 126RDUE 125RDUE 124RDUE 123RDUE 122RDUE 121RDUE 167RDUE 168RDUE 169RDUE 170RDUE 171RDUE 172RDUE 174RDUE 175RDUE 176RDUE 177RDUE 178RDUE 179RDUE 180RDUE 181RDUE 182RDUE 183RDUE 130RDUE 173RDUE 120RDUE 166RDUE 131RDUE 145RDUE 146RDUE 147RDUE 148RDUE 149RDUE 150RDUE 151RDUE 152RDUE 153RDUE 154RDUE 155RDUE 156RDUE 157RDUE 158RDUE 159RDUE 160RDUE 161RDUE 162RDUE 163RDUE 225RDUE 224RDUE 223RDUE 222RDUE 221RDUE 220RDUE 219RDUE 218RDUE 217RDUE 216RDUE 215RDUE 214RDUE 213RDUE 212RDUE 211RDUE 210RDUE 209RDUE 208RDUE 207RDUE 206RDUE 292RDUE2 127RDUE 128RDUE2 290RDUE1 275RDUE2 2nd ST NE Golden Gate BLVD E2nd ST NW Randall BLVD4th ST NW 3rd ST SW Wilson BLVD N 1st ST SW Wilson BLVD S 2nd ST SE 4th ST SE 12th AVE NE10th AVE NEJung BLVD E14th AVE NE16th AVE NE20th AVE NE18th AVE NE22nd AVE NE24th AVE NEGolden Gate BLVD W24th AVE NE16th AVE NE18th AVE NE10th AVE NE12th AVE NEJung BLVD E20th AVE NE22nd AVE NE14th AVE NEImmokalee RD24th AVE NW22nd AVE NW20th AVE NW18th AVE NWJung BLVD W16th AVE NW14th AVE NW12th AVE NW10thAVE NW2nd ST NE 4th ST NE 1st ST NW 3rd ST NW 50 Wilson BLVD S 322 Golden Gate BLVD W 105 1st ST SW 30 Golden Gate BLVD W 140 Golden Gate BLVD W 50 Wilson BLVD S 50 Wilson BLVD S 78 4th ST SE 202 Golden Gate BLVD W 326 Golden Gate BLVD E 448 Golden Gate BLVD W 230 Golden Gate BLVD W 130 Golden Gate BLVD E 450 Golden Gate BLVD W 50 Wilson BLVD S 176 Golden Gate BLVD W 352 Golden Gate BLVD E 442 Golden Gate BLVD W 444 Golden Gate BLVD W 104 3rd ST SW 130 Golden Gate BLVD W 120 Golden Gate BLVD W 160 Golden Gate BLVD E 69 4th ST SE 440 Golden Gate BLVD E 170 Golden Gate BLVD E 70 Golden Gate BLVD E 261 Golden Gate BLVD W 545 Golden Gate BLVD W 221 Golden Gate BLVD W 91 3rd ST NW 343 Golden Gate BLVD E 241 Golden Gate BLVD W 411 Golden Gate BLVD W 165 Golden Gate BLVD W 23 Golden Gate BLVD E 171 Golden Gate BLVD W 383 Golden Gate BLVD W 21 Golden Gate BLVD E 121 Golden Gate BLVD W 521 Golden Gate BLVD W 90 3rd ST NW 441 Golden Gate BLVD E 353 Golden Gate BLVD E 341 Golden Gate BLVD E 121 Golden Gate BLVD E 141 Golden Gate BLVD E 331 Golden Gate BLVD W 261 Golden Gate BLVD E 321 Golden Gate BLVD W 371 Golden Gate BLVD W 391 Golden Gate BLVD W 265 Golden Gate BLVD W 141 Golden Gate BLVD W 181 Golden Gate BLVD W 361 Golden Gate BLVD E 231 Golden Gate BLVD E 73 Wilson BLVD N 161 Golden Gate BLVD E 91 Golden Gate BLVD E 105 2nd ST NE 106 2nd ST NE 305 Golden Gate BLVD E 80 4th ST NE 81 Golden Gate BLVD E 77 Golden Gate BLVD W 78 Wilson BLVD N 96 4th ST NE 85 Wilson BLVD N 111 3rd ST NW 110 1st ST NW 115 2nd ST NE 110 3rd ST NW 108 4th ST NE 120 2nd ST NE 120 Wilson BLVD N 145 3rd ST NW 125 2nd ST NE 120 4th ST NE 140 3rd ST NW 135 4th ST NE 131 1st ST NW 151 3rd ST NW 130 1st ST NW 140 2nd ST NE 150 3rd ST NW 141 1st ST NW 130 Wilson BLVD N 140 4th ST NE 160 3rd ST NW 160 1st ST NW 161 2nd ST NE 171 3rd ST NW 161 1st ST NW 170 3rd ST NW 170 Wilson BLVD N 171 4th ST NE 171 Wilson BLVD N 171 2nd ST NE 170 2nd ST NE 181 Wilson BLVD N 180 3rd ST NW 181 3rd ST NW 190 Wilson BLVD N 181 1st ST NW 191 4th ST NE 190 1st ST NW 191 2nd ST NE 221 1st ST NW 211 3rd ST NW 210 3rd ST NW 220 1st ST NW 223 2nd ST NE 209 4th ST NE 220 2nd ST NE 210 4th ST NE 240 5th ST NW 230 3rd ST NW 231 3rd ST NW 231 1st ST NW 230 1st ST NW 241 2nd ST NE 243 4th ST NE 240 2nd ST NE 259 Wilson BLVD N 260 3rd ST NW 261 3rd ST NW 270 3rd ST NW 261 2nd ST NE 260 2nd ST NE 270 1st ST NW 260 4th ST NE 280 2nd ST NE 290 3rd ST NW 255 1st ST NW 281 2nd ST NE 280 1st ST NW 280 4th ST NE 290 2nd ST NE 311 Wilson BLVD N 321 3rd ST NW 321 1st ST NW 320 3rd ST NW 314 Wilson BLVD N 310 4th ST NE 321 4th ST NE 320 2nd ST NE 321 Wilson BLVD N 326 4th ST NE 331 Wilson BLVD N 345 3rd ST NW 340 3rd ST NW 331 2nd ST NE 331 1st ST NW 340 Wilson BLVD N 340 1st ST NW 371 1st ST NW 361 3rd ST NW 360 3rd ST NW 361 Wilson BLVD N 360 Wilson BLVD N 365 2nd ST NE 371 4th ST NE 360 4th ST NE 375 Wilson BLVD N 391 3rd ST NW 380 Wilson BLVD N 390 3rd ST NW 381 4th ST NE 380 2nd ST NE 381 Wilson BLVD N 380 4th ST NE 385 2nd ST NE 411 Wilson BLVD N 411 2nd ST NE 410 2nd ST NE 421 4th ST NE 440 Wilson BLVD N 420 1st ST NW 420 3rd ST NW 431 1st ST NW 430 1st ST NW 435 2nd ST NE 440 2nd ST NE 441 4th ST NE 440 1st ST NW 430 4th ST NE 461 1st ST NW 460 Wilson BLVD N 461 2nd ST NE 461 3rd ST NW 460 3rd ST NW 462 1st ST NW 471 1st ST NW 471 4th ST NE 470 Wilson BLVD N 471 2nd ST NE 466 2nd ST NE 483 1st ST NW 490 3rd ST NW 480 1st ST NW 481 2nd ST NE 484 2nd ST NE 488 Wilson BLVD N 491 4th ST NE 510 1st ST NW 496 Wilson BLVD N 519 2nd ST NE 505 1st ST NW 520 2nd ST NE 511 4th ST NE 500 3rd ST NW 521 3rd ST NW 530 1st ST NW 523 1st ST NW 532 2nd ST NE 500 Wilson BLVD N 531 2nd ST NE 541 4th ST NE 530 4th ST NE 557 Wilson BLVD N 555 3rd ST NW 560 Wilson BLVD N 560 4th ST NE 561 2nd ST NE 541 1st ST NW 561 4th ST NE 580 5th ST NW 542 1st ST NW 570 4th ST NE 545 1st ST NW 580 3rd ST NW 590 Wilson BLVD N 581 2nd ST NE 581 4th ST NE 580 4th ST NE 620 3rd ST NW 561 1st ST NW 610 2nd ST NE 611 2nd ST NE 620 Wilson BLVD N 611 4th ST NE 610 4th ST NE 581 1st ST NW 640 3rd ST NW 640 Wilson BLVD N 630 2nd ST NE 631 2nd ST NE 643 4th ST NE 660 3rd ST NW 661 3rd ST NW 621 1st ST NW 660 Wilson BLVD N 671 4th ST NE 661 2nd ST NE 671 Wilson BLVD N 670 1st ST NW 681 3rd ST NW 641 1st ST NW 680 Wilson BLVD N 670 2nd ST NE 691 4th ST NE 691 2nd ST NE 680 4th ST NE 710 3rd ST NW 683 1st ST NW 710 Wilson BLVD N 727 2nd ST NE 731 3rd ST NW 700 4th ST NE 720 1st ST NW 730 2nd ST NE 740 3rd ST NW 741 2nd ST NE 714 Wilson BLVD N 741 4th ST NE 742 4th ST NE 711 1st ST NW 760 1st ST NW 760 2nd ST NE 751 4th ST NE 760 4th ST NE 766 Wilson BLVD N 775 3rd ST NW 770 2nd ST NE 771 2nd ST NE 780 2nd ST NE 741 1st ST NW 830 3rd ST NW 781 4th ST NE 780 4th ST NE 821 3rd ST NW 810 2nd ST NE 841 1st ST NW 810 4th ST NE 811 2nd ST NE 811 4th ST NE 820 2nd ST NE 820 1st ST NW 820 4th ST NE 855 1st ST NW 834 Wilson BLVD N 839 2nd ST NE 840 2nd ST NE 840 4th ST NE 845 4th ST NE 882 3rd ST NW 865 1st ST NW 867 2nd ST NE 881 3rd ST NW 875 Wilson BLVD N 870 1st ST NW 860 5th ST NW 880 Wilson BLVD N 888 3rd ST NW 880 2nd ST NE 883 2nd ST NE 920 Wilson BLVD N 380 10th AVE NW 940 Wilson BLVD N 180 10th AVE NE 360 10th AVE NW 140 10th AVE NW 162 10th AVE NE 120 10th AVE NW 180 10th AVE NW 961 Wilson BLVD N 230 10th AVE NE 282 10th AVE NW 280 10th AVE NE 210 10th AVE NE 324 10th AVE NW 164 10th AVE NW 424 10th AVE NE 446 10th AVE NE 981 Wilson BLVD N 100 10th AVE NE 991 Wilson BLVD N 212 10th AVE NW 85 10th AVE NW 105 10th AVE NE 411 10th AVE NW 141 10th AVE NW 311 10th AVE NW 123 10th AVE NW 141 10th AVE NE 131 10th AVE NE 183 10th AVE NE 261 10th AVE NW 231 10th AVE NE 231 10th AVE NW 161 10th AVE NW 211 10th AVE NW 361 10th AVE NW 181 10th AVE NW 121 10th AVE NE 111 10th AVE NE 383 10th AVE NW 211 10th AVE NE 281 10th AVE NW 1041 Wilson BLVD N 441 10th AVE NE 1040 Wilson BLVD N 285 10th AVE NE 165 10th AVE NE 421 10th AVE NE 391 10th AVE NE 265 10th AVE NE 1060 Wilson BLVD N 461 10th AVE NE 1082 Wilson BLVD N 1081 Wilson BLVD N 400 12th AVE NW 210 12th AVE NW 280 12th AVE NW 340 12th AVE NW 1160 Wilson BLVD N 310 12th AVE NW 190 12th AVE NW 160 12th AVE NW 370 12th AVE NW 160 12th AVE NE 120 12th AVE NE 260 12th AVE NW 180 12th AVE NE 120 12th AVE NW 362 12th AVE NE 240 12th AVE NW 280 12th AVE NE 140 12th AVE NW 1170 Wilson BLVD N 330 12th AVE NE 310 12th AVE NE 390 12th AVE NW 390 12th AVE NE 260 12th AVE NE 104 12th AVE NW 341 12th AVE NW 95 12th AVE NE 105 12th AVE NW 105 12th AVE NE 191 12th AVE NW 145 12th AVE NW 405 12th AVE NW 311 12th AVE NW 255 12th AVE NW 431 12th AVE NW 119 12th AVE NW 1245 Wilson BLVD N 161 12th AVE NW 281 12th AVE NW 231 12th AVE NE 261 12th AVE NW 415 12th AVE NW 143 12th AVE NE 271 12th AVE NE 441 12th AVE NE 257 12th AVE NW 311 12th AVE NE 211 12th AVE NE 333 12th AVE NE 411 12th AVE NE 361 12th AVE NE 1271 Wilson BLVD N 435 12th AVE NW 1270 Wilson BLVD N 1295 Wilson BLVD N 1321 Wilson BLVD N 1320 Wilson BLVD N 1340 Wilson BLVD N 280 14th AVE NW 362 14th AVE NW 320 14th AVE NE 390 14th AVE NW 130 14th AVE NW 250 14th AVE NW 190 14th AVE NW 160 14th AVE NE 420 14th AVE NE 190 14th AVE NE 1370 Wilson BLVD N 330 14th AVE NW 152 14th AVE NW 130 14th AVE NE 360 14th AVE NE 410 14th AVE NW 256 14th AVE NW 276 14th AVE NE 288 14th AVE NE 112 14th AVE NE 240 14th AVE NE 348 14th AVE NE 180 14th AVE NE 120 14th AVE NE 260 14th AVE NW 440 14th AVE NE 1380 Wilson BLVD N 1381 Wilson BLVD N 90 14th AVE NW 390 14th AVE NE 460 14th AVE NE 100 14th AVE NE 95 14th AVE NW 361 14th AVE NW 107 14th AVE NE 231 14th AVE NW 341 14th AVE NW 331 14th AVE NW 121 14th AVE NW 389 14th AVE NE 421 14th AVE NW 317 14th AVE NW 411 14th AVE NE 423 14th AVE NE 183 14th AVE NE 121 14th AVE NE 131 14th AVE NE 289 14th AVE NE 355 14th AVE NE 345 14th AVE NE 367 14th AVE NE 263 14th AVE NW 277 14th AVE NE 1441 Wilson BLVD N 471 14th AVE NE 431 14th AVE NE 211 14th AVE NW 1460 Wilson BLVD N 161 14th AVE NE 1471 Wilson BLVD N 1474 Wilson BLVD N 1481 Wilson BLVD N 235 14th AVE NE 1482 Wilson BLVD N 1485 Wilson BLVD N 1511 Wilson BLVD N 1510 Wilson BLVD N 1541 Wilson BLVD N 1544 Wilson BLVD N 130 16th AVE NW 460 16th AVE NE 196 16th AVE NE 170 16th AVE NW 430 16th AVE NE 410 16th AVE NW 284 16th AVE NE 262 16th AVE NE 1560 Wilson BLVD N 330 16th AVE NE 360 16th AVE NW 328 16th AVE NW 260 16th AVE NW 310 16th AVE NW 410 16th AVE NE 366 16th AVE NE 350 16th AVE NE 130 16th AVE NE 110 16th AVE NW 120 16th AVE NE 210 16th AVE NE 110 16th AVE NE 388 16th AVE NE 240 16th AVE NW 140 16th AVE NE 1580 Wilson BLVD N 1591 Wilson BLVD N 107 16th AVE NW 321 16th AVE NW 275 16th AVE NE 411 16th AVE NE 99 16th AVE NE 311 16th AVE NE 337 16th AVE NE 361 16th AVE NE 461 16th AVE NE 431 16th AVE NE 290 Jung BLVD W 260 Jung BLVD W 410 Jung BLVD W 130 Jung BLVD W 380 Jung BLVD W 320 Jung BLVD W 1677 Wilson BLVD N 240 Jung BLVD W 220 Jung BLVD W 360 Jung BLVD W 190 Jung BLVD W 108 Jung BLVD E 164 Jung BLVD W 110 Jung BLVD W 140 Jung BLVD E 90 Jung BLVD E 230 Jung BLVD E 70 Jung BLVD E 260 Jung BLVD E 210 Jung BLVD E 95 Jung BLVD E 1711 Wilson BLVD N 275 Jung BLVD W 133 Jung BLVD W 321 Jung BLVD W 205 Jung BLVD W 361 Jung BLVD W 231 Jung BLVD E 209 Jung BLVD E 165 Jung BLVD W 1730 Wilson BLVD N 111 Jung BLVD E 1741 Wilson BLVD N 461 Jung BLVD E 441 Jung BLVD E 1740 Wilson BLVD N 180 18th AVE NW 1761 Wilson BLVD N 220 18th AVE NW 402 18th AVE NW 1760 Wilson BLVD N 420 18th AVE NE 360 18th AVE NE 320 18th AVE NW 380 18th AVE NW 388 18th AVE NE 130 18th AVE NW 280 18th AVE NW 1771 Wilson BLVD N 430 18th AVE NE 340 18th AVE NE 120 18th AVE NE 106 18th AVE NE 91 18th AVE NW 311 18th AVE NW 231 18th AVE NW 113 18th AVE NW 371 18th AVE NW 341 18th AVE NE 135 18th AVE NW 463 18th AVE NE 181 18th AVE NW 169 18th AVE NW 161 18th AVE NE 1831 Wilson BLVD N 321 18th AVE NW 359 18th AVE NE 1830 Wilson BLVD N 115 18th AVE NE 431 18th AVE NE 261 18th AVE NE 331 18th AVE NW 411 18th AVE NE 291 18th AVE NE 171 18th AVE NE 321 18th AVE NE 141 18th AVE NE 441 18th AVE NE 1841 Wilson BLVD N 391 18th AVE NE 1840 Wilson BLVD N 221 18th AVE NE 1861 Wilson BLVD N 221 18th AVE NW 241 18th AVE NE 1860 Wilson BLVD N 1867 Wilson BLVD N 1899 Wilson BLVD N 1920 Wilson BLVD N 410 20th AVE NE 420 20th AVE NW 180 20th AVE NE 1940 Wilson BLVD N 140 20th AVE NW 240 20th AVE NW 320 20th AVE NW 1959 Wilson BLVD N 280 20th AVE NW 374 20th AVE NW 1960 Wilson BLVD N 240 20th AVE NE 260 20th AVE NE 310 20th AVE NE 220 20th AVE NW 340 20th AVE NW 220 20th AVE NE 260 20th AVE NW 280 20th AVE NE 1971 Wilson BLVD N 390 20th AVE NW 170 20th AVE NE 440 20th AVE NE 384 20th AVE NE 140 20th AVE NE 360 20th AVE NE 120 20th AVE NE 330 20th AVE NE 106 20th AVE NW 108 20th AVE NE 107 20th AVE NW 377 20th AVE NW 2020 Wilson BLVD N 121 20th AVE NE 291 20th AVE NW 273 20th AVE NW 181 20th AVE NW 261 20th AVE NW 281 20th AVE NW 167 20th AVE NE 221 20th AVE NE 321 20th AVE NW 375 20th AVE NW 141 20th AVE NE 467 20th AVE NE 161 20th AVE NW 191 20th AVE NE 2040 Wilson BLVD N 441 20th AVE NE 281 20th AVE NE 261 20th AVE NE 2045 Wilson BLVD N 415 20th AVE NE 361 20th AVE NE 373 20th AVE NE 321 20th AVE NE 339 20th AVE NW 111 20th AVE NW 239 20th AVE NE 2061 Wilson BLVD N 2060 Wilson BLVD N 141 20th AVE NW 2071 Wilson BLVD N 2081 Wilson BLVD N 2082 Wilson BLVD N 2175 Wilson BLVD N 2130 Wilson BLVD N 2179 Wilson BLVD N 180 22nd AVE NW 170 22nd AVE NE 160 22nd AVE NW 2187 Wilson BLVD N 330 22nd AVE NE 2160 Wilson BLVD N 420 22nd AVE NE 290 22nd AVE NW 270 22nd AVE NW 250 22nd AVE NW 110 22nd AVE NE 2191 Wilson BLVD N 110 22nd AVE NW 2170 Wilson BLVD N 182 22nd AVE NE 140 22nd AVE NE 360 22nd AVE NW 160 22nd AVE NE 470 22nd AVE NE 130 22nd AVE NW 370 22nd AVE NW 312 22nd AVE NE 390 22nd AVE NE 360 22nd AVE NE 440 22nd AVE NE 218 22nd AVE NE 234 22nd AVE NE 280 22nd AVE NE 90 22nd AVE NW 430 22nd AVE NE 95 22nd AVE NE 391 22nd AVE NW 321 22nd AVE NW 2211 Wilson BLVD N 231 22nd AVE NW 2222 Wilson BLVD N 331 22nd AVE NW 411 22nd AVE NE 311 22nd AVE NW 421 22nd AVE NE 243 22nd AVE NE 231 22nd AVE NE 341 22nd AVE NW 359 22nd AVE NE 181 22nd AVE NE 2230 Wilson BLVD N 361 22nd AVE NW 463 22nd AVE NE 211 22nd AVE NW 165 22nd AVE NE 371 22nd AVE NW 2231 Wilson BLVD N 431 22nd AVE NE 293 22nd AVE NW 245 22nd AVE NE 381 22nd AVE NE 2240 Wilson BLVD N 311 22nd AVE NE 2275 Wilson BLVD N 2280 Wilson BLVD N 2281 Wilson BLVD N 2308 Wilson BLVD N 2311 Wilson BLVD N 2310 Wilson BLVD N 2335 Wilson BLVD N 2330 Wilson BLVD N 220 24th AVE NE 130 24th AVE NE 240 24th AVE NW 220 24th AVE NW 292 24th AVE NW 330 24th AVE NE 162 24th AVE NW 270 24th AVE NW 310 24th AVE NW 360 24th AVE NW 190 24th AVE NW 168 24th AVE NE 380 24th AVE NW 110 24th AVE NW 192 24th AVE NE 260 24th AVE NW 80 24th AVE NW 50 24th AVE NW 372 24th AVE NE 460 24th AVE NE 392 24th AVE NE 122 24th AVE NE 244 24th AVE NE 90 24th AVE NE 111 24th AVE NW 407 24th AVE NW 131 24th AVE NE 373 24th AVE NE 171 24th AVE NE 191 24th AVE NE 461 24th AVE NE 441 24th AVE NE 241 24th AVE NE 391 24th AVE NE 411 24th AVE NE 191 24th AVE NW 391 24th AVE NW 121 24th AVE NE 361 24th AVE NW 12540 Immokalee RD 13260 Immokalee RD 13250 Immokalee RD 12802 Immokalee RD 13260 Immokalee RD 13260 Immokalee RD 13246 Immokalee RD 13062 Immokalee RD 384 Randall BLVD 13260 Immokalee RD 384 Randall BLVD 384 Randall BLVD 13240 Immokalee RD 2425 2nd ST NW 13260 Immokalee RD 13245 Immokalee RD POND SITE 6-1 4.25 AC POND SITE 3-1 4.53 AC POND SITE 3-3 4.84 AC POND SITE 4-2 4.65 AC POND SITE 5-2 5.28 AC 6-3 1.92 AC POND SITE 6-3 2.57 AC POND SITE 3-2 4.38 AC POND SITE 1-1 4.52 AC POND SITE 2-1 4.52 AC POND SITE 3-4 3.48 AC POND SITE 2-2 4.31 AC POND SITE 5-4 2.48 AC 5-2 2.18 AC POND SITE 5-3 4.49 AC POND SITE 1-3 4.51 AC POND SITE 6-2 3.83 AC Basin 1 Basin 2 Basin 3 Basin 4 Basin 5 Basin 6Well House 11 Well Vault 12 Well Vault 13 Well House 14 Well Vault 15 Well Vault 16 Well Vault 37 Well Vault 32 Well Vault 31 Well House 34 Legend Potential Pond Site Parcel Line Basins Identified Parcel Count Well House/Vault 100 ft Well House Buffer Roadway Elevation Low Point High Point 0 1,000 2,000500 Feet ¯Wilson Boulevard Potential Pond Sites Exhibit Original Print Size: 96" x 36"VBRXVBRX238RDUE 241POND 242POND 278POND 279POND 368POND314POND313POND 310RDUE309RDUE 308RDUE 315POND 450POND 451POND 452POND WET POND DRY POND Page 1683 of 4682 Pond Siting Report Appendix B Basin 3A and 3B Map and Photo Package Jacobs Engineering Group Inc. Jacobs 42 Page 1684 of 4682 LEGEND Observation Point ® Survey Area 0 112.5 1:2,700 225 450 1 1 1 1 1 Feet 1 inch = 225 feet Notes: Surveyors: Felicia Kirby Survey Date: 4/16/2025 Service Layer Credits: World Imagery: Earthstar Geographics Aerial imagery: Collier County, 2025 VICINITY MAP Immokalee Rd ' Z IL y • p" c !a 0 • 3 Golden Gate Blvd W Golden Gate Blvd E Wilson Boulevard Widening Habitat Classification Survey Collier County, Florida 1,j) Collier County Jacobs \\DC1 VS01 \GISPROJ\C\COLLIERCOUNTY\W ILSON_BLVD\MAPFILES\VANDERBILT_PHOTOLOGWANDERBILT_PHOTOLOG.APRX Page 1685 of 4682 ID: 19 Date: 4/16/2025 Notes: Wilson Boulevard Widening Habitat Classification Survey DATA LOCATION \\dnivsOl\GISProj\C\C011ierCounty\Wilson_Blvd\MapFilea\Vanderbilt_PholoLog\Vanderbilt_PholoLog.apr PhotoLog 4/21120253: 18 PM AGAWINAM * Collier County Jacobs682 `,WqEW wsr -�-i12th AVE NWAIP- 12thAVth:i IV E 12th AVE NW` 4k •12th AVElNE CIO Wilson Boulevard Widening Habitat Classification Survey ID: 34 Date: 4/16/2025 Notes: 6" 10YR 5/1 no signs of hydrology. 5% stressed and dead cypress. 80% fern understory al: ;a "'del►�33� 0 lr l r i rry• .. ••eJ.:� - �r1 ...J. k � 4• f,s, � ��' • 1,�' ti< r DATA LOCATION x. • -12th AVE NW 12th�A+ EE NE N Yam. ���0 � • i �� _ 1E,� • � d , w: - s Collier County Jacobs \\d.1vsOl\GISProj\C\Colli.i ..nty\Wilson_BlvMMapFilea\Vand,rbilt_PhotoLogW-d,rbilt_PhotoLog.apn PhotoLog 4/21120252:39 PM AGAWINAM J Page 1689 of 4682 ID: 35 Date: 4/16/2025 Notes: Cabbage palm fluccs Wilson Boulevard Widening Habitat Classification Survey DATA LOCATION \\d.1vsOl\GISProj\C\Colli.i ..nty\Wilson_BlvMMapFilea\Vand,rbilt_PhotoLogW-d,rbilt_PhotoLog.apn PhotoLog 4/21120252: 10 PM AGAWINAM Collier County Jacobs Page 1690 of 4682 rl LA `YK �--:12th AVE NW f � 0 1 k. x. -12th AVE NW 2 1M ACNE-� �� 4 ;o �. I k. Wilson Boulevard Widening Habitat Classification Survey ID: 38 Date: 4/16/2025 Notes: Stressed and leaning cypress. Pine cabbage palm. No hydrology no soils DATA LOCATION \\d.1vsOl\GISProj\C\Colli.i ..nty\Wilson_BlvMMapFilea\Vand,rbilt_PhotoLogW-d,rbilt_PhotoLog.apr PhotoLog 4/21120252:40 PM AGAWINAM Collier County Jacobs Page 1693 of 4682 Wilson Boulevard Widening Habitat Classification Survey ID: 39 Date: 4/16/2025 Notes: 40 % organic nodules 3/1 first 1 ". 4/1 3" then 5/2 311-6". Roots up to 6" Canopy Cypress 30, cabbage palm 30, pine 20 percent \\d.1vsOl\GISProj\C\C011ieiCounty\Wlson_BNMMapFiles\Vand.rbilt_PhotoLogW.ntlerbilt_PhotoLog.ap,PhotoLog4/21120252:53PMAGAWINAM Collier County Jacobs682 •ram c_ •t112th AVE NW"-+r I PM w* 12th-AVhjNL =•ems, .. i ' 1!r::iiSs t - s .y ' we' ; t `►t 12th AVE NW` -r 12th AVEINE M m -s c ®° 0 y i 0 4w FA ci -.12th AVE NWINN 0 x. -12th AVE NW L 12th'AVE NE o Vi y i z t. 1: t i ^ 12th AVE NWL 12th AVE NEB 0 m 0 0 tp Ji V�, Rd ff 1 2th AVE NW"-P - ;.,-r . --, r.! , , - • 0 10 "?4 -12th AVE NW �l , AVE NWMPW -TO All, el T99AW c; --1 1 2th AVE NWIO� Ai I 0 a � r •R'�l ^:12th AVE NJ •; 12th AVE NW k4k 12th AVE NEVkF -� 0 Y` iR 1 2th AVE NWIO� ",0712th AVE-NE- 40d "'I ID: 53 Date: 4/16/2025 Notes: Oak cabbage palm and pine with understory of sabal palm Wilson Boulevard Widening Habitat Classification Survey DATA LOCATION \\d.1vsOl\GISProj\C\Colli.i ..nty\Wilson_BlvMMapFilea\Vand,rbilt_PhotoLogW nd,rbilt_PhotoLog.apn PhotoLog 4/21120252: 13 PM AGAWINAM & Collier County Jacobs Page 1708 of 4682 --�:12th AVE NW op tV-12WAVEJNEVP� 3-04 - _ m S O Vi I k. Wilson Boulevard Widening Habitat Classification Survey ID: 55 Date: 4/16/2025 Notes: 5/1 with 2/1 organic nodules 4" then 4/2 to 6" deep. Roots to 6" Sword fern understory cabbage palm canopy DATA LOCATION hir- t 12th AVE NW 12th QVE NE le.R • --_ f ol ....ed . y Y Collier County Jacobs \\d.1vsOl\GISProj\C\Colli.i ..nty\Wilson_BlvMMapFilea\Vand,rbilt_PhotoLogW-d,rbilt_PhotoLog.apn PhotoLog 4/21120252:48 PM AGAWINAM Page 1710 of 4682 Pond Siting Report Appendix C Pond Site 4-2 Map and Photo Package Jacobs Engineering Group Inc. Jacobs 43 Page 1711 of 4682 AA do t 'Lem �a W ° ilk °aa �•�,� _' Q � ay, Qqo ` • / v u ... r ,fit , �� y � v• • � 1 !.. ' Q W .. O zm • ° n77 .•.• z w �N � • 0 25 50 100 1 1 1 1 1 1 1 1 Feet State f Florida, Ma, r, Micro!^ft AL Legend GOPHER TORTOISE SURVEY MAP Q Active Burrow A Abandoned Burrow Basin 4 (Pond Site 4-2) Q Active Juvenile Burrow 0 Right -of -Way Surveyors: Felicia Kirby, Vanessa Davis Q Active (maybe juvenile) Burrow Survey Dates: 8/28/2024 and 8/29/2024 Q Inactive Burrow Survey Notes: Pedestrian transects were performed east O Inactive Juvenile Burrow to west approximately every 8-15 feet based on visibility. The site experienced rain events within 24 hours of each survey. Page 1712 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 1 Notes: Active Gopher Tortoise Burrow. Signs of activity. Photo Date: 8/28/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1713 of 4682 .1 en A � rr t `• Ard I Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 4 Notes: Burrow, anticipated active, just rained last night but likely active. Photo Date: 8/28/2024 ,. 46% Wilson Blvd Widening Gopher Tortoise Survey Page 1716 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 5 Notes: Juvenile burrow, looks abandoned due to vegetation and lack of track marks Photo Date: 8/28/2024 RAI ;,7.._ _'YID! y. � • •; *' + I+ a r .. oF-- Page 1717 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 6 Notes: Active Gopher Tortoise Burrow, large Photo Date: 8/28/2024 F Wilson Blvd Widening Gopher Tortoise Survey Page 1718 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 7 Notes: Active Gopher Tortoise Burrow, large Photo Date: 8/28/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1719 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 8 Notes: Burrow, anticipated active just hasn't come out today after rainstorm Photo Date: 8/28/2024 Page 1720 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 9 Notes: Active Gopher Tortoise Burrow, medium size. Signs of activity today Photo Date: 8/28/2024 L A r, Wilson Blvd Widening Gopher Tortoise Survey Page 1721 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 10 Notes: Abandoned juvenile burrow Photo Date: 8/28/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1722 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 11 Notes: Active gopher tortoise burrow, large Photo Date: 8/28/2024 w is, - 3 Wilson Blvd Widening Gopher Tortoise Survey Page 1723 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 12 Notes: Active small, likely juvenile burrow Photo Date: 8/28/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1724 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 13 Notes: Abandoned burrow Photo Date: 8/28/2024 _16 _n " v IA Wilson Blvd Widening Gopher Tortoise Survey Page 1725 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 14 Notes: Active gopher tortoise burrow, large. Signs of activity today. Photo Date: 8/28/2024 1� 4 . P _'V. Wilson Blvd Widening Gopher Tortoise Survey Page 1726 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 15 Notes: Active gopher tortoise burrow, large Photo Date: 8/28/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1727 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 16 Notes: Active gopher tortoise burrow, medium size Photo Date: 8/28/2024 .. �. ♦y t ► w 1 40 ip Wilson Blvd Widening Gopher Tortoise Survey Page 1728 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 18 Notes: Possible burrow. If not one is anticipated around this are Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1730 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 19 Notes: Abandoned juvenile burrow Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1731 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 20 Notes: Looked abandoned but trails show someone is nearby Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey 14 Page 1732 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 21 Notes: Active gopher tortoise burrow Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1733 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 23 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1735 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 26 Notes: Active burrow under hedges, likely in neighbors property Photo Date: 8/29/2024 Ad Wilson Blvd Widening Gopher Tortoise Survey Page 1738 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 27 Notes: Smaller burrow, looks abandoned Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1739 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 29 Notes: Active gopher tortoise burrow. Signs of activity. Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1741 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 30 Notes: Small burrow, maybe juvenile Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1742 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 31 Notes: Very small burrow Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1743 of 4682 ef % 4t lira, 4M 4r 4i ' 4A A db, Jr. ` r AVON. Awlaw, Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 33 Notes: Abandoned burrow with shell of dead tortoise Photo Date: 8/29/2024 -���R'-_ ;� rs, �q;�-��y� s�. � -� c fig• - -� Wilson Blvd Widening Gopher Tortoise Survey Page 1745 of 4682 tiyy ��� - i - y/ fa �i ;. ram ; � �. �,� _� �.�,� y ��, - may, , ' !� r �a i � .�a 'T:. � � � Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 36 Notes: Juvenile gopher tortoise burrow. Potentially occupied Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1748 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 37 Notes: Potential burrow, however may not be anything Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1749 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 38 Notes: Large burrow Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1750 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 40 Notes: Gopher tortoise burrow, large Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1752 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 41 Notes: Occupied burrow, large Photo Date: 8/29/2024 1 Wilson Blvd Widening Gopher Tortoise Survey Page 1753 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 42 Notes: Large occupied burrow. Signs of recent activity. Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1754 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 43 Notes: Occupied burrow Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1755 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 44 Notes: Large active burrow Photo Date: 8/29/2024 i A "� W7 A Wilson Blvd Widening Gopher Tortoise Survey Page 1756 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 45 Notes: Potential juvenile, inactive Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1757 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 46 Notes: Juvenile burrow Photo Date: 8/29/2024 f� `'�., � X Wilson Blvd Widening Gopher Tortoise Survey Page 1758 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 47 Notes: Abandoned collapsed burrow Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1759 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 48 Notes: Occupied burrow Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey 16 Page 1760 of 4682 Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 49 Notes: Occupied burrow. Signs of activity. Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1761 of 4682 Pond Siting Report Appendix D Pond Site 5-2 (Wet) Map and Photo Package Jacobs Engineering Group Inc. Jacobs 44 Page 1762 of 4682 ot . r 4. 0 Z� ' A. ¢ "•�1�, - . ♦� n ° `i-4 �.• Off' �'� ^!�? � + �` 1 OC3 , i t M , ^. PA 25 50 � �- V r � •� Feet Staie�f Flarid.a f l.axa•r; ful•i•eroL-- 014. Legend 0 Active Burrow 0 Active Juvenile Burrow O Active (maybe juvenile) Burrow 0 Inactive Burrow O Inactive Juvenile Burrow GOPHER TORTOISE SURVEY MAP Right -of -Way Basin 5 (Pond Site 5-2) Limits Not Surveyed Surveyors: Felicia Kirby, Vanessa Davis Survey Dates: 8/27/2024 and 8/29/2024 Survey Notes: Pedestrian transects were performed east to west approximately every 8-10 feet based on visibility. The site experienced rain events within 24 hours of each survey. Page 1763 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 1 Notes: Active Gopher Tortoise Burrow Photo Date: 8/27/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1764 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 2 Notes: Gopher Tortoise Burrow, looks active Photo Date: 8/27/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1765 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 3 Notes: Active Gopher Tortoise Burrow Photo Date: 8/27/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1766 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 4 Notes: Active Gopher Tortoise Burrow Photo Date: 8/27/2024 Z} Wilson Blvd Widening Gopher Tortoise Survey Page 1767 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 5 Notes: Active Gopher Tortoise Burrow Photo Date: 8/27/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1768 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 7 Notes: Active Gopher Tortoise Burrow, Gopher Tortoise in Burrow Photo Date: 8/27/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1770 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 8 Notes: Active Gopher Tortoise Burrow Photo Date: 8/27/2024 Wilson Blvd Widening Gopher Tortoise Survey ,d Page 1771 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 9 Notes: Active Gopher Tortoise Burrow Photo Date: 8/24/2024 l S'' .14 1 t �r 4 y,�A CY111i 3. war i�ie. t x A. ■ ray i►11 Wilson Blvd Widening Gopher Tortoise Survey Page 1772 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 10 Notes: Small gopher tortoise burrow, may be considered juvenile Photo Date: 8/27/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1773 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 11 Notes: Active gopher tortoise burrow Photo Date: 8/27/2024 A! Oro. .� yf ar Wilson Blvd Widening Gopher Tortoise Survey Page 1774 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 12 Notes: Active gopher tortoise burrow, IargE Photo Date: 8/27/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1775 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 13 Notes: Active gopher tortoise burrow Photo Date: 8/27/2024 `- s Wilson Blvd Widening Gopher Tortoise Survey Page 1776 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 14 Notes: Active gopher tortoise burrow Photo Date: 8/27/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1777 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 15 Notes: Active gopher tortoise burrow Photo Date: 8/27/2024 iIl �i .,L F ' t t `i <C, -.42 .. • , VUA Wilson Blvd Widening Gopher Tortoise Survey Page 1778 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 16 Notes: Active gopher tortoise burrow Photo Date: 8/27/2024 E FA FA l4 Wilson Blvd Widening Gopher Tortoise Survey Page 1779 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 17 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 I ► - tL Wilson Blvd Widening Gopher Tortoise Survey Page 1780 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 18 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1781 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 19 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1782 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 20 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey !rl IT. .. 9 1 Y Page 1783 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 21 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1784 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 23 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1786 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 24 Notes: Active gopher tortoise burrow, large. Small burrow adjacent. Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1787 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 25 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 M i .Ae ^" ti � Wilson Blvd Widening Gopher Tortoise Survey Page 1788 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 26 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 5 u i Wilson Blvd Widening Gopher Tortoise Survey Page 1789 of 4682 r.- -41'. 40 1 g Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 28 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1791 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 29 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 A. i r �irWS ' x . A► �� Wilson Blvd Widening Gopher Tortoise Survey Page 1792 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 30 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 L� Wilson Blvd Widening Gopher Tortoise Survey Page 1793 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 31 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1794 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 32 Notes: Occupied burrow Photo Date: 8/29/2024 k - - Wilson Blvd Widening Gopher Tortoise Survey Page 1795 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 33 Notes: Occupied burrow Photo Date: 8/29/2024 WIN, Wilson Blvd Widening Gopher Tortoise Survey Page 1796 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 34 Notes: Occupied burrow Photo Date: 8/29/2024 A Wilson Blvd Widening Gopher Tortoise Survey Page 1797 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 35 Notes: Unoccupied burrow, looks inactive Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1798 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 36 Notes: Large occupied burrow Photo Date: 8/29/2024 r Wilson Blvd Widening Gopher Tortoise Survey �j Page 1799 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 37 Notes: Occupied, not sure if this is another entrance to the same burrow Photo Date: 8/29/2024 0 44 f twk Wilson Blvd Widening Gopher Tortoise Survey Page 1800 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 38 Notes: Large burrow Photo Date: 8/29/2024 ,dr re Wilson Blvd Widening Gopher Tortoise Survey Page 1801 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 39 Notes: Occupied burrow Photo Date: 8/29/2024 1+. f ifY� - F. :-- _�•�'� , Yam' �` X..iS ��1 . Y + • ,f'or' — — � s AL r ' lY,-. -"r/. �.f I - 4rA'T �' F, �..�T� 1 • 'AT•� 7 Page 1802 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 40 Notes: Pine needles indicate no gopher tortoise was out today, possibly inactive burrow Photo Date: 8/29/2024 Page 1803 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 41 Notes: Occupied burrow, may be juvenile or just above juvenile Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1804 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 42 Notes: Large occupied burrow Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1805 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 43 Notes: Large active burrow Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1806 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 44 Notes: Large active burrow Photo Date: 8/29/2024 -47 ili+ � Wilson Blvd Widening Gopher Tortoise Survey Page 1807 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 45 Notes: Occupied burrow Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1808 of 4682 Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 46 Notes: Occupied burrow Photo Date: 8/29/2024 Wilson Blvd Widening Gopher Tortoise Survey Page 1809 of 4682 Pond Siting Report Appendix E Wilson Boulevard Corridor ROW Impacts Exhibit Jacobs Engineering Group Inc. Jacobs 45 Page 1810 of 4682 POT STA. 20+00.0020 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 POT STA. 189+66.22WILSON BLVD WILSON BLVD VANDERBILT BEACH RD (CR-862)VANDERBILT BEACH RD (CR-862)12TH AVE NW10TH AVE NWWilson Blvd IMMOKALEE ROAD24TH AVE NW22TH AVE NW20TH AVE NW18TH AVE NWJUNG BLVD W16TH AVE NW14TH AVE NW14TH AVE NW12TH AVE NW10TH AVE NWGOLDEN GATE BLVD W/E85' 90' 95' 100' 85' 90' 95' 100' 85' 90' 95' 100' 85' 90' 95' 100' CORRIDOR 160' ROW 60' - 50' FROM EDGE OF 160' CORRIDOR 50' - 40' FROM EDGE OF 160' CORRIDOR 40' - 30' FROM EDGE OF 160' CORRIDOR 30' - 20' FROM EDGE OF 160' CORRIDOR 20' - 0' FROM EDGE OF 160' CORRIDOR PROPERTY BOUNDARIES OBTAINED BY CCPANFeet 200400WELL HOUSE OFFSET 71' WELL HOUSE OFFSET 61'WELL HOUSE OFFSET 61'WELL HOUSE OFFSET 53' WELL HOUSE OFFSET 58'WELL HOUSE OFFSET 61' GAS STATION OFFSET 71' OFFSET: 132-80 = 52' OFFSET: 113-80 = 33' OFFSET: 129-80 = 49' OFFSET: 132-80 = 52' OFFSET: 113-80 = 33' OFFSET: 125-80 = 45'OFFSET: 128-80 = 48'OFFSET: 123-80 = 43' OFFSET: 107-80 = 27' OFFSET: 110-80 = 30' OFFSET: 124-80 = 44' OFFSET: 128-80 = 48' OFFSET: 124-80 = 44' OFFSET: 108-80 = 28' OFFSET: 112-80 = 32' OFFSET: 118-80 = 38' OFFSET: 129-80 = 49' OFFSET: 81-1 = 1' OFFSET: 131-80 = 51' Page 1811 of 4682 Pond Siting Report Jacobs Appendix F Pond Siting Report - Wilson Boulevard Corridor Study (2022) Jacobs Engineering Group Inc. 46 Page 1812 of 4682 .;acobs Subject Preliminary Pond Siting Analysis Project Name Wilson Boulevard Corridor Study Attention Lorraine Lantz, AICP From Angela Shepard, P.E. Date December 7, 2021 1. Introduction Memorandum 5801 Pelican Bay Boulevard Suite 505 Naples, FL 34108 United States T +1.239.596.1715 F +1.239.596.2579 www.jacobs.com Collier County initiated the Wilson Boulevard Corridor Study to evaluate future corridor improvements to widen Wilson Boulevard North (Wilson Boulevard), from Immokalee Road (CR 846) to Golden Gate Boulevard (CR 876), from a two-lane undivided facility to a four -lane divided roadway with curb and gutter. This memorandum documents the preliminary pond siting evaluation of stormwater recom- mendations and options for Collier County on the type, design, and Location of the stormwater management facilities for the proposed improvements. The analysis consisted of the following: ■ Calculate the probable pervious and impervious areas associated with the project improvements ■ Calculate the preliminary treatment requirements of the proposed improvements with considerations for discharge points and whether the receiving water bodies are impaired ■ Assess soils and land use information and define potential drainage basins along the 3.22-mile-long corridor ■ Identify potential pond site Locations and sizes based on estimated water quality and water quantity requirements ■ Assess impacts for each option ALL elevations used in calculations and maps in this document are based on the North American Vertical Datum of 1998 (NAVD), unless specified otherwise. Any supporting data based on the National Geodetic Vertical Datum of 1929 (NGVD) was converted using the following equation: NAVD = NGVD — 1.3' 2. Design Criteria The Wilson Boulevard corridor drains to the Cypress and Corkscrew Canals within the North Golden Gate Basin, Water Basin Identification (WBID) 3278S, which is in the Big Cypress area of Collier County and within the jurisdiction of the South Florida Water Management District (SFWMD). The preliminary design of stormwater management systems for this project is regulated by the rules and criteria set forth by PPS1105211510SWF Page 1813 of 4682 Preliminary Pond Siting Analysis SFWMD and the Florida Department of Environmental Protection (FDEP). This section outlines the requirements to meet water quality and quantity standards. The project area does not traverse or discharge to any designated Outstanding Florida Water (OFW) as defined in Chapter 62-302 of the Florida Administrative Code (FAC). All other water traversed by this proposed study area have been designated Class III waters. North Golden Gate Sub -Basin (WBID 32785) is impaired for dissolved oxygen, with total nitrogen as the causative pollutant. Although there is not a current Total Maximum Daily Load or Basin Management Action Plan established, additional protective measures must be incorporated into the project improvements to provide reasonable assurance that the proposed discharge will not cause or contribute to violations of state water quality standards. Additional protective measures required by SFWMD include a site -specific pollutant loading analysis and an additional 50 percent water quality treatment volume. 2.1 Potential Permits The following permits are anticipated for this project: ■ National Pollutant Discharge Elimination System General Permit (FDEP) • Section 404 Individual Permit (FDEP) • Individual Environmental Resource Permit (ERP) (SFWMD) 2.2 SFWMD Attenuation/Water Quantity Criteria All basins within the study area are open basins. The SFWMD discharge rate criteria are as follows: ■ The offsite discharge rate is limited to rates not causing adverse impacts to off -site properties, and: — Historic discharge rates; or — Rates determined in previous Agency permit actions; or — Rates specified in SFWMD criteria. A design storm event of 25-year frequency over 72 -hour duration shall be used to compute the discharge rates. — Stormwater attenuation for reconstruction of the existing roadway requires the proposed ponds attenuate the difference between the 25-year/72-hour pre- versus post -discharge rate. 2.3 Collier County Attenuation/Water Quantity Criteria The study area is within basins where the maximum allowable discharge rates were approved in 2016. It is anticipated these criteria will not apply because the Wilson Boulevard Corridor project involves the proposed reconstruction of an existing roadway. The 2016 discharge rates are as follows: ■ Cypress Canal Basin 0.06 cubic feet per second per acre (cfs/acre) ■ Corkscrew Canal Basin 0.04 cfs/acre 2.4 SFWMD ERP Treatment/Water Quality Criteria Retention, detention, or a combination of both in the overall system have the following volumetric requirements: Wet detention volume provided for the greater of the first 1 inch of runoff over the drainage area or 2.5 inches of runoff over the impervious area (excluding water bodies) PPS1105211510SWF Page 1814 of 4682 Preliminary Pond Siting Analysis ■ Dry detention volume provided equal to 75 percent of referenced amounts for wet detention ■ Retention volume provided equal to 50 percent of the referenced amounts for wet detention 2.5 SFWMD Land Use and Coverage Criteria Projects having greater than 40 percent impervious area and that discharge directly to the Big Cypress area of Collier County are required to provide at least 0.5 inch of dry detention or retention pretreatment as part of the required retention/detention. Pursuant to subsection 62-555.312(3), FAC, stormwater retention and detention systems are classified as moderate sanitary hazards with respect to public and private drinking water wells. New stormwater treatment facilities are not allowed within 100 feet of a public drinking water well nor within 75 feet of a private drinking water well. However, per Collier County correspondence, a 300-foot-wide buffer to an existing public water supply well may also be required and has been applied as a constraint to this evaluation (Abbot, pers. comm. 2021). 2.6 SFWMD Wet Retention/Detention Area Dimensional Criteria (Measured at or from the Control Elevation) ■ Area: 0.5-acre minimum ■ Width: 100-foot minimum for linear areas in excess of 200 feet length; irregular -shaped areas may have narrower reaches but have to average at least 100 feet ■ Depth: minimum shallow, littoral area (portion of detention bodies shallower than 6 feet) must be the Lesser of 20 percent of the wet detention area or 2.5 percent of the total of the detention area (including side slopes) plus the basin contributing area ■ Side slopes no steeper than 1:4 (vertical: horizontal) from top of bank out to a minimum depth of 2 feet below the control elevation 2.7 Floodplain/FLoodway Involvement The Federal Emergency Management Agency flood insurance rate maps (FEMA 2005) for Collier County (Panel Numbers 12021 CO240H and 12021 C0430H) indicate the study area is located within Zones AE and Zone AH of the 100-year floodplain (base flood elevation ranges from EL 13 to EL 14 NAVD). SFWMD requires no net encroachment into the floodplain, between the average wet season water table and that encompassed by the 100-year event, which will adversely affect the existing rights of others. Because the proposed Wilson Boulevard roadway improvements are anticipated to reduce floodplain storage, the proposed stormwater pond sites and roadside swales will need to provide compensating storage to demonstrate no net decrease in floodplain storage. 2.8 Methodology to Meet Water Quantity (Attenuation) and Water Quality (Treatment) Criteria The methodology to meet water quantity and water quality criteria for the Wilson Boulevard study area is as follows: ■ Identify total pond storage requirements for each basin within the study area — Establish the preliminary treatment requirements of the proposed improvements PPS1105211510SWF Page 1815 of 4682 Preliminary Pond Siting Analysis • Calculate the probable pervious and impervious areas associated with the project improvements and apply SFWMD criteria with an additional 50 percent to account for impaired receiving waterbody • Perform preliminary nutrient analysis to identify types of stormwater facilities and best management practices with sufficient nutrient removal efficiencies capable of meeting net improvement standards — Determine pre- and post -development runoff volumes from potential drainage basins along the 3.22-mile-long corridor and pond sites • Identify precipitation amount for the 25-year, 72-hour storm using the 3-Day Rainfall; 25-Year Return Period Isohyetal Maps referenced in Appendix C of the SFWMD ERP Applicant's Handbook Volume II (SFWMD 2016) • Estimate the pre -development and post -development runoff, using Soil Conservation Service (SCS) Runoff Curve Number (CN) Method sited in Soil Conservation Service Technical Release 55 Method (NRCS 1986) and SFWMD ERP Applicant's Handbook Volume II ■ Identify pond discharge points and existing tailwater conditions — Use simulated 25-year/5-day stage hydrographs for estimated normal water levels and peak stages of Cypress Canal and Corkscrew Canal — Include a positive drainage gradient above canal normal water levels for wet detention pond control elevations based on distance from discharge point ■ Identify stormwater pond sites — Review available geographic information system (GIS) data to identify vacant and undeveloped parcels outside the existing right-of-way (ROW) for potential pond sites Avoid existing public water supply wells and associated 300-foot-wide buffer per County instruction • Avoid wetland and floodplain impacts, unless other alternative sites would affect residences, businesses, or public water supply wells • Evaluate potential pond sites for impacts to physical, environmental, and hydrologic impacts to determine the preferred pond site alternative — Use maximum treatment and attenuation estimates — Estimate site -specific storage height • For dry detention/retention, review available soils and GIS data to estimate seasonal high water table (SHWT) and set pond bottom elevation for minimum vertical clearance • For wet detention, set normal water level based on tailwater constraints Set wet detention and dry retention/detention pond site berm elevations at or below minimum allowable proposed roadway profile elevations anticipated to be 2 to 3 feet above existing grade and check — Estimate required pond area (acres) • Required pond size (acres) based on storage height and required volumes • Include 15% contingency for preliminary information • Compare to identified sites parcel sizes (acres) PPS1105211510SWF Page 1816 of 4682 Preliminary Pond Siting Analysis 3. Existing Drainage Patterns The existing Wilson Boulevard typical section is a two-lane undivided rural roadway. Runoff from the roadway drains to roadside ditches that ultimately discharge to the nearby canals, directly or via side streets. Approximate onsite basin divides were developed based on canal locations, drainage structures, 12-digit hydrologic unit sub -basin maps, 2-foot LIDAR' contour elevations, and the Collier County Stormwater Management Facilities GIS database. 3.1 Basins 1 and 2 (from Golden Gate Boulevard to Cypress Canal) Wilson Boulevard, from Golden Gate Boulevard to Cypress Canal, is within the Curry Island Drain sub -basin and generally drains north to the Cypress Canal. Although some adjacent properties appear to include depressional or wetland areas, the roadside ditches provide continuous conveyance within the existing ROW to the Cypress Canal. According to LIDAR contours, existing Wilson Boulevard elevations range between 12 and 14 feet. 3.2 Basins 3, 4, 5, and 6 (from Cypress Canal to Immokalee Road) North of the Cypress Canal to Immokalee Road, Wilson Boulevard is located along the boundary between two sub -basins, Horsepen Slough (to Corkscrew Canal) to the east and Curry Island Drain (to Curry Canal) to the west. Wilson Boulevard is approximately 1 mile east of Curry Canal and 3/8 of a mile west of Corkscrew Canal. In this segment, Wilson Boulevard is traversed by nine side streets (10th Avenue to 24th Avenue) that extend east and west, terminating at the Curry and Corkscrew Canals, respectively. Because there are no existing side drains at the traversing side streets that would continue conveyance along Wilson Boulevard north -south, each side street crossing serves as a natural drainage divide and discharge point. For purposes of this evaluation, Wilson Boulevard from Cypress Canal to Immokalee Road was sub- divided into four basins, with divides at 14th Avenue, 18th Avenue, and 22nd Avenue. 3.2.1 Basin 3 (from Cypress Canal to 14th Avenue) The existing Wilson Boulevard profile contains primarily flat slopes in this area and has an elevation near 12 feet. 3.2.2 Basin 4 (from 14th Avenue to 18th Avenue) The existing Wilson Boulevard profile contains primarily flat slopes in this area and has elevations between 12 and 12.5 feet. 3.2.3 Basin 5 (from 18th Avenue to 22nd Avenue) The existing Wilson Boulevard profile contains primarily flat slopes in this area and has elevations between 12 and 13 feet. 3.2.4 Basin 6 (from 22nd Avenue to Immokalee Road) North of 22nd Avenue, the existing Wilson Boulevard profile elevations increase from 13 to 14 feet near 24th Avenue, and up to 15 feet at the tie-in with Immokalee Road. 1 LIDAR stands for light detection and ranging. PPS1105211510SWF Page 1817 of 4682 Preliminary Pond Siting Analysis 4. Proposed Drainage Patterns The Wilson Boulevard proposed typical section consists of four 11-foot-wide lanes with 5-foot-wide bike Lanes, curb and gutter, a 6-foot-wide sidewalk on the west side of the road, a 10-foot-wide pathway on the east side of the road, a 22-foot-wide grassed median, and grassed ditches on each exterior of the road for a total 165-foot proposed ROW width. The proposed exterior ditches would maintain existing offsite drainage patterns within the ROW by maintaining the hydraulic connections to the existing side street ditches. Runoff from the proposed roadway would drain to a closed storm sewer system along the proposed curb and gutter and conveyed to the proposed pond sites for water quality treatment and water quantity attenuation. Where feasible, three or more potential pond sites were identified within each basin based on a variety of factors including site -specific estimated storage volume requirements, soils conditions, GIS contour elevations, discharge points, tailwater conditions, and physical impacts. However, sites that would impact occupied residential properties or public water supply wellheads were removed from consideration. Attachment 1 includes the proposed basin divides and potential pond site locations. 4.1 Basin 1 (from Golden Gate Boulevard to Station 66+30) Proposed pond sites for Basin 1 would outfall directly to the Cypress Canal. Two potential pond sites were identified for Basin 1 along the eastern side of Wilson Boulevard to avoid impacts to numerous water supply wells. Piped conveyance systems to and from the potential Basin 1 pond sites would be located within the Wilson Boulevard ROW because no other options (that is, public side streets) are available. 4.2 Basin 2 (from Station 66+30 to Cypress Canal) Proposed pond sites for Basin 2 would outfall directly to the Cypress Canal. Four potential pond sites were identified for Basin 2 to avoid impacts to numerous water supply wells and minimize distance to the canal. Piped conveyance systems to the potential Basin 2 pond sites would be located within the Wilson Boulevard ROW and/or easements should the location of the proposed ponds not be adjacent to Wilson Boulevard. The Pond 2 outfall pipes to the Cypress Canal may be located within the Wilson Boulevard ROW or within easements along 2nd Street NE to the Cypress Canal. 4.3 Basin 3 (from Cypress Canal to 14th Avenue) Depending on the pond site location, Basin 3 could outfall directly to either the Cypress Canal or Corkscrew Canal. Three potential pond sites were identified to avoid the future Vanderbilt Beach Road Extension facilities. Piped conveyance systems to the potential Basin 3 pond sites would be located within the Wilson Boulevard ROW, and possibly along easements within the side streets should the location of the proposed ponds not be adjacent to Wilson Boulevard. The Pond 3 outfall conveyance pipes could be Located either within proposed Wilson Boulevard ROW or within easements along 10th Avenue NE to Cypress Canal or 12th Avenue NE to Corkscrew Canal. 4.4 Basin 4 (from 14th Avenue to 18th Avenue) Proposed pond sites for Basin 4 outfall directly to the Corkscrew Canal. Two potential pond sites were identified along the Cypress Canal and side streets, away from the public water supply wells. Depending on the pond site location, piped conveyance systems to and from the potential Basin 4 pond sites would be Located within the Wilson Boulevard ROW and possibly along easements within either 16th Avenue NE to the Corkscrew Canal or Jung Boulevard E to the Corkscrew Canal. PPS1105211510SWF Page 1818 of 4682 Preliminary Pond Siting Analysis 4.5 Basin 5 (from 18th Avenue to 22nd Avenue) Proposed pond sites for Basin 5 outfall directly to the Corkscrew Canal. Four potential pond sites were identified along Wilson Boulevard and side streets. Depending on the pond site location, piped convey- ance systems to the potential Basin 5 pond sites would be located within the Wilson Boulevard ROW and possibly along easements within the nearby side streets. The Pond 5 outfall pipes would be located within easements either along 18th Avenue NE to Corkscrew Canal or 20th Avenue NE to Corkscrew Canal. 4.6 Basin 6 (from 22nd Avenue to Immokalee Road) Proposed pond sites for Basin 6 outfall directly to the Corkscrew Canal. Three potential pond sites were identified along Wilson Boulevard and side streets, away from the Immokalee Road frontage. Depending on the pond site location, piped conveyance systems to the potential Basin 6 pond sites would be located within the Wilson Boulevard ROW and possibly along easements within the nearby side streets. The Pond 6 outfall pipes would be located within easements either along 22nd Avenue NE to Corkscrew Canal or 24th Avenue NE to Corkscrew Canal. 4.7 Basin Summary Table 1 lists total dry pre-treatment and wet detention pond storage requirements estimated for each basin and pond site based on probable pervious and impervious areas associated with the project improvements and resulting required water quality and water quantity volumes. Attachment 2 includes site -specific basin calculations. PPS1105211510SWF Page 1819 of 4682 Preliminary Pond Siting Analysis Table 1. Basin and Pond Volume Requirements Basin From Sta To Sta Length (feet) Pond Site ID Total Basin Area (acres) Impervious Area (acres) Water Quality Required (acre-feet) Water Quality +50% (acre-feet) 0.5" Dry Pre- treatment (acre-feet) Attenuation Required (acre-feet) Total Wet Pond Volume (acre-feet) 1 37+00 66+30 2,930 1-1 16.58 5.68 1.38 2.07 0.69 3.84 5.23 1-2 15.47 1.29 1.93 0.64 4.63 5.92 2 66+30 96+10 2,980 2-1 14.48 5.37 1.21 1.81 0.60 3.20 4.41 2-2 14.38 1.20 1.80 0.60 3.13 4.33 2-3 15.05 1.25 1.88 0.63 3.20 4.45 2-4 15.29 1.27 1.91 0.64 4.11 5.38 3 96+10 129+30 3,320 3-1 16.03 6.98 1.45 2.18 0.67 3.89 5.40 3-2 15.53 1.45 2.18 0.65 3.11 4.64 3-3 16.05 1.45 2.18 0.67 3.11 4.62 4 129+30 155+80 2,650 4-1 14.24 5.98 1.24 1.87 0.59 3.23 4.50 4-2 13.31 1.24 1.87 0.55 3.70 5.01 5 155+80 182+20 2,640 5-1 15.22 5.56 1.27 1.90 0.63 4.09 5.36 5-2 13.55 1.16 1.74 0.56 4.20 5.37 5-3 15.84 1.32 1.98 0.66 5.84 7.16 5-4 15.39 1.28 1.92 0.64 5.86 7.15 6 182+20 205+00 2,280 6-1 11.22 5.11 1.06 1.60 0.47* 3.44 5.04* 6-2 10.79 1.06 1.60 0.45* 3.07 4.66* 6-3 11.95 1.06 1.60 0.50 3.38 4.48 * In Basin 6, Sites 6-1 and 6-2 do not accommodate dry pre-treatment. Corresponding total wet pond volumes reflect the volume required without dry pre-treatment. PPS1105211510SWF Page 1820 of 4682 Preliminary Pond Siting Analysis 5. Potential Pond Sites Table 2a through 2f summarizes the details and considerations related to each site within Basins 1 through 6, respectively. For pond sites to remain viable in cases where Available Parcel Area is less than Estimated Pond Area with 15% Contingency, additional roadway profile adjustments may be required and are described in the Comments, Advantages and Disadvantages. Attachment 3 provides calculations for pond size estimates. Attachment 4 provides additional supporting documentation. Table 2a. Potential Pond Sites Matrix — Basin 1 Factors Pond Site 1-1 Pond Site 1-2 1. Estimated Pond Area 5.5 4.4 2. Pond Area with 15% Contingency 6.3 5.0 3. Available Parcel Area (acre), 5.8 4.9 excluding areas within 300 feet of public water supply well 4. Parcel ID 3728056003, 3728048002, 37280800006, 37280920009, 3728044000 37280760007 5. Land Use Vacant Residential, Wooded Vacant Residential, Wooded 6. Proximity to outfall 3,800 linear feet (LF) 2,500 LF 7. Proximity to farthest onsite basin 2,050 LF 3,300 LF extent 8. Accessibility Maintenance and pipes to/from Maintenance and pipes to/from Wilson Boulevard Wilson Boulevard 9. Easements Required N/A N/A 10. Soils; A/D, C/D; A/D; Estimated SHWT EL 11.0 EL 10.5 11.NWL/Dry Bot.EL EL 12.0 / EL 12.0 EL11.2/EL11.5 12. Estimated Wetlands Impacts Direct Impact: 5.8 acres N/A Secondary Impacts 13. Public Water Supply Well Proximity 300-foot-wide protection zone within 300-foot-wide protection zone or adjacent to parcel within or adjacent to parcel 14. Private Well Proximity Potential Yes, pond site adjacent to developed Yes, pond site adjacent to property developed property 15. Permit Status in Collier County N/A N/A Growth Management Division (GMD) Public Portal 16. Comments, Advantages, Farther proximity to discharge point Closer proximity to discharge Disadvantages results in higher control elevation and point allows for control larger pond footprint. May require an elevation to be lower resulting additional 0.5-foot elevation increase in smaller pond footprint to proposed profile. required Ranking 2 1 PP511052115105WF Page 1821 of 4682 Preliminary Pond Siting Analysis Table 2b. Potential Pond Sites Matrix - Basin 2 Factors Pond Site 2-1 Pond Site 2-2 Pond Site 2-3 Pond Site 2-4 1. Estimated Pond Area 3.2 3.1 3.8 4.0 2. Pond Area with 15% 3.7 3.6 4.3 4.6 Contingency 3. Available Parcel Area 4.6 3.9 4.1 4.3 (ac), excluding areas within 300 feet of public water supply well 4. Parcel ID 37281280007 37281320006 37281400007 37118720106, 37118720009 5. Land Use Vacant Residential, Vacant Residential, Vacant Residential, Vacant Residential, Wooded Wooded Wooded Wooded 6. Proximity to outfall 675 LF 425 LF 50 LF 1,700 LF 7. Proximity to farthest 2,200 LF 3,080 LF 3,400 LF 1,800 LF onsite basin extent 8. Accessibility Maintenance and Maintenance and Maintenance from Maintenance and pipes to/from pipes to/from 2nd Street NE, outfall pipes to/from Wilson Boulevard to Wilson Boulevard directly adjacent to Wilson Boulevard to canal canal canal 9. Easements Required N/A N/A Yes; (for pipes from N/A Wilson Blvd) 10. Soils; A/D, B/D; A/D; A/D, B/D; A/D; Estimated SHWT EL 11.5 EL 11.5 EL 12.0 EL 11.5 11.NWL/Dry Bot.EL EL 10.2 / EL 12.5 EL 10.0 / EL 12.5 EL9.8/EL13.0 EL 10.8 / EL 12.5 12. Estimated Wetlands N/A N/A N/A N/A Impacts 13. Public Water Supply 300-foot-wide 300-foot-wide N/A 300-foot-wide Wells protection zone protection zone protection zone adjacent to parcel within parcel adjacent to parcel 14. Private Well Yes, pond site Yes, pond site N/A Yes, pond site Proximity Potential adjacent to adjacent to adjacent to developed property developed property developed property 15. Permit Status in N/A N/A N/A N/A Collier County GMD Public Portal 16. Comments, Single parcel, Single parcel, Single parcel adjacent Multiple parcels Advantages, adjacent to Wilson adjacent to Wilson to canal, requires pipe centrally located. Disadvantages Boulevard Boulevard, smallest easement. May May require an site required require an additional additional0.5-foot 0.5-foot increase to increase to roadway roadway profile. profile. Ranking 2 1 3 4 PPS1105211510SWF 10 Page 1822 of 4682 Preliminary Pond Siting Analysis Table 2c. Potential Pond Sites Matrix - Basin 3 Factors Pond Site 3-1 Pond Site 3-2 Pond Site 3-3 1. Estimated Pond Area 3.5 3.0 3.5 2. Pond Area with 15% 4.0 3.4 4.0 Contingency 3. Available Parcel Area (ac), 4.5 4.3 4.8 excluding areas within 300 feet of public water supply well 4. Parcel ID 37492000005 37549720005 37492200009, 37492240001 5. Land Use Vacant Residential, Vacant Residential, Vacant Residential, Wooded Wooded Wooded 6. Proximity to outfall 50 LF 50 LF 700 LF 7. Proximity to farthest onsite 3,400 LF 3,200 LF 3,050 LF basin extent 8. Accessibility Maintenance and pipes Maintenance and pipes Maintenance and pipes to/from 10th Avenue NE to/from Wilson to/from 12th Avenue NE to canal Boulevard to canal 9. Easements Required Yes N/A Yes (10th Avenue) (12th Avenue) 10. Soils; A/D, B/D; B/D; B/D, C/D; Estimated SHWT EL 11.5 EL 11.0 EL 11.5 11. NWL / Dry Bot. EL EL 9.8 / EL 12.5 EL 9.8 / EL 12.0 EL 10.4 / EL 12.5 12. Estimated Wetlands Impacts N/A N/A N/A 13. Public Water Supply Wells N/A N/A N/A 14. Private Well Proximity Yes, pond site adjacent to Yes, pond site adjacent N/A Potential developed property to developed property 15. Permit Status in Collier N/A N/A N/A County GMD Public Portal 16. Comments, Advantages, Single parcel adjacent to Single parcel adjacent to Multiple parcels, central Disadvantages discharge point but discharge point location in basin farthest for conveyance to pond Ranking 2 1 3 PPS1105211510SWF 11 Page 1823 of 4682 Preliminary Pond Siting Analysis Table 2d. Potential Pond Sites Matrix — Basin 4 Factors Pond Site 4-1 Pond Site 4-2 1. Estimated Pond Area 4.2 3.3 2. Pond Area with 15% 4.8 3.8 Contingency 3. Available Parcel Area (ac), 4.5 4.2 excluding areas within 300 feet of public water supply well 4. Parcel ID 37492560008 37493440004, 37493440101 5. Land Use Vacant Residential, Wooded Vacant Residential, Wooded 6. Proximity to outfall 700 LF 50 LF 7. Proximity to farthest onsite 2,500 LF 3,100 LF basin extent 8. Accessibility Maintenance and pipes to/from Maintenance and pipes to/from along along Jung Boulevard E and/or 16th 16th Avenue NE Avenue NE 9. Easements Required Yes (Jung Boulevard E or 16th Yes (16th Avenue NE) Avenue NE) 10. Soils; B/D; A/D; Estimated SHWT EL 12.0 EL 11.5 11.NWL/Dry Bot.EL EL 10.4 / EL 13.0 EL 10.0 / EL 12.5 12. Estimated Wetlands Impacts N/A N/A 13. Public Water Supply Wells N/A N/A 14. Private Well Proximity Yes, pond site adjacent to developed N/A Potential property 15. Permit Status in Collier County N/A N/A GMD Public Portal 16. Comments, Advantages, Both sites are generally central to Both sites are generally central to Disadvantages basin and are located along side basin and are located along side streets to canal. May require an streets to canal; site 4-2 is adjacent to additional 0.5-foot elevation canal increase to proposed roadway profile. Ranking 2 1 PPS1105211510SWF 12 Page 1824 of 4682 Preliminary Pond Siting Analysis Table 2e. Potential Pond Sites Matrix - Basin 5 Factors Pond Site 5-1 Pond Site 5-2 Pond 5-3 Pond 5-4 1. Estimated Pond Area 5.2 2.6 (wet) 1.0 (dry) 5.8 5.4 2. Pond Area with 15% 6.0 3.0 (wet) 1.1 (dry) 6.7 6.2 Contingency 3. Available Parcel Area 4.1 5.2 (wet) 2.2 (dry) 4.9 5.0 (ac), excluding areas within 300 feet of public water supply well 4. Parcel ID 37598680002, 37740280001 (dry), 3759840004, 37740760000, 37598720001 37743480002and 37598480008 37740840001 3774228009 (wet) 5. Land Use Vacant Residential, Vacant Residential, Vacant Residential, Vacant Residential, Wooded Wooded Wooded Wooded 6. Proximity to outfall 2,200 LF 500 LF 2,600 LF 2,500 LF 7. Proximity to farthest 11400 LF 2,700 LF 2,050 LF 2,000 LF onsite basin extent 8. Accessibility Maintenance and pipes Maintenance and Maintenance and Maintenance and pipes to/from Wilson pipes to/from Wilson pipes to/from Wilson to/from Wilson Boulevard and 20th Boulevard and 18th Boulevard and 20th Boulevard and 20th Avenue NE Avenue NE Avenue NE Avenue NE or 22nd Avenue NE 9. Easements Required Yes Yes Yes Yes (20th Avenue NE or (20th Avenue NE) (18th Avenue NE) (20th Avenue NE) 22nd Avenue NE) 10.Soils; B/D; A/D, B/D; 12.5 (wet) A/D, B/D; A/D; Estimated SHWT 12.0 A/D; 11.5 (dry) 11.5 11.0 11.NWL/Dry Bot.EL EL 11.3 / EL 13.0 EL 10.2 / EL 12.5 EL 11.5 / EL 12.5 EL11.4/EL12.0 12. Estimated Wetlands N/A Direct Impact: 2.2 ac Direct Impact: 4.9 ac Direct Impact: 3 ac Impacts Secondary Impacts Secondary Impacts Secondary Impacts 13. Public Water Supply N/A N/A N/A N/A Wells 14. Private Well Proximity Yes, pond site adjacent Yes, pond site N/A Yes, pond site adjacent Potential to developed property adjacent to to developed property developed property 15. Permit Status in PRBD20140514836, N/A N/A PRROW200210836837, Collier County GMD (2014), house PRROW20210627487, Public Portal demolition, complete Cancelled, abandoned 16. Comments, Multiple parcels, too Split dry pre- Impacts to high Multiple parcels, too Advantages, small for pond needs. treatment and wet quality wetlands. small for pond needs. Disadvantages May be used in tandem sites are located in Multiple parcels, May be used in tandem with another site series without need centrally located, but with another site and/or and/or additional 1 to for additional pipes. additional pipe additional 1 to 2-feet 2-feet elevation Wetland impacts at required and too elevation increase for increase for proposed dry pond site small for pond proposed profile. profile. needs. May need additional 1 to 2-feet elevation increase to proposed profile. Ranking 3 1 4 2 PPS1105211510SWF 13 Page 1825 of 4682 Preliminary Pond Siting Analysis Table 2f. Potential Pond Sites Matrix - Basin 6 Factors Pond Site 6-1 Pond Site 6-2 Pond Site 6-3 1. Estimated Pond Area 2.6 2.2 2.4 (wet) 0.9 (dry) 2. Pond Area with 15% 3.0 2.5 2.7 (wet) 1.1 (dry) Contingency 3. Available Parcel Area (ac), 4.0 3.9 2.6 (wet) 2.0 (dry) excluding areas within 300' of public water supply well 4. Parcel ID 37741440002 37743920009 37741760009 (wet), 37740880003 (dry) 5. Land Use Vacant Residential, Vacant Residential, Vacant Residential, Wooded Wooded Wooded 6. Proximity to outfall 1,400 LF 50 LF 1,150 LF 7. Proximity to farthest 1,400 LF 3,050 LF 2,300 LF onsite basin extent 8. Accessibility Maintenance and pipes Maintenance and pipes Maintenance and pipes to/from Wilson to/from Wilson to/from Wilson Boulevard Boulevard and 24th Boulevard and 24th and 22nd Avenue NE Avenue NE Avenue NE 9. Easements Required Yes Yes Yes (24th Avenue NE) (24th Avenue NE) (2211 Avenue NE) 10. Soils; A/D and B/D; A/D; A/D; Estimated SHWT EL 13.0 EL 13.5 EL 12.0 11.NWL/Dry Bot.EL EL10.8/N/A EL10.0/N/A EL 10.6 / EL 13.0 12. Estimated Wetlands Direct Impact: 1.5 acres N/A Direct Impact: 0.7 acres Impacts Secondary Impacts (south) Secondary Impacts 13. Public Water Supply Wells N/A N/A N/A 14. Private Well Proximity N/A Yes, pond site adjacent to Yes, pond site adjacent to Potential developed property developed property 15. Permit Status in Collier N/A N/A N/A County GMD Public Portal 16. Comments, Advantages, Single parcel, high Single parcel, high Split dry pre-treatment Disadvantages ground elevations ground elevations and wet sites are located relative to roadway; not relative to roadway; not in series without need for able to provide dry pre- able to provide dry pre- additional pipes. Wetland treatment; requires treatment; requires impacts at dry pond site tandem pond and/or tandem pond and/or overtreatment in other overtreatment in other basins basins Ranking 3 2 1 PPS1105211510SWF 14 Page 1826 of 4682 Preliminary Pond Siting Analysis 6. Recommended Pond Site Locations Based on the considerations from Tables 2a through 2f, the following pond site locations are recommended for the Wilson Boulevard Corridor improvements. 6.1 Basin 1 Pond Site 1-2 has an estimated area of 5.0 acres and is located within Parcels 37280800006, 37280920009, and 37280760007. No wetland impacts are anticipated at this location. Piped conveyance systems to and from Pond Site 1-2 would be located within the proposed Wilson Boulevard ROW. 6.2 Basin 2 Pond Site 2-2 has an estimated area of 3.6 acres and is located within Parcel 37281320006. No wetland impacts are anticipated at this location. Piped conveyance systems to and from Pond Site 2-2 would be Located within the proposed Wilson Boulevard ROW. 6.3 Basin 3 Pond Site 3-2 has an estimated area of 3.4 acres and is located adjacent to the Cypress Canal within Parcel 37549720005. There are no anticipated wetland impacts at this location. Piped conveyance systems to Pond Site 3-2 would be located within the proposed Wilson Boulevard ROW. 6.4 Basin 4 Pond Site 4-2 has an estimated area of 3.8 acres and is located adjacent to Corkscrew Canal within Parcel 37493440004. There are no anticipated wetland impacts at this location. Piped conveyance systems to Pond Site 4-2 would be located within the proposed Wilson Boulevard ROW and along 16th Avenue NE. 6.5 Basin 5 Pond Site 5-2 has an estimated area of 4.1 acres and is located along 18th Avenue NE within Parcels 37740280001, 37743480002, and 3774228009. Although 2.2 acres of wetland impacts are anticipated, Pond Site 5-2 is the only alternative that accommodates both wet detention and dry detention pre- treatment without raising the roadway profile more than anticipated 2 to 3 feet. Piped conveyance systems to Pond Site 5-2 would be located within the proposed Wilson Boulevard ROW and along 18th Avenue NE. 6.6 Basin 6 Pond Site 6-3 has an estimated area of 3.8 acres and is located along 22nd Avenue NE within Parcels 37741760009 and 37740880003. Although 0.7 acres of wetland impacts are anticipated at the site Located on the south side of 22nd Avenue NE, Pond Site 6-3 is the only alternative that accommodates the anticipated proposed roadway profile. Piped conveyance systems to Pond Site 6-3 would be located within the proposed Wilson Boulevard ROW and along 22nd Avenue NE. 7. Design Phase Considerations Potential pond sites and size estimates in this memorandum are preliminary and require additional evaluation during the design phase including wetland delineation, geotechnical borings, and topographic survey. Although a 15% contingency has been included for pond site sizes, a pond site -re-evaluation is PPS1105211510SWF 15 Page 1827 of 4682 Preliminary Pond Siting Analysis recommended shortly before right-of-way acquisition occurs in subsequent design phases. Additional design considerations are described but not limited to the following sections. 7.1 Basin Divides and Conveyance Limitations Preliminary onsite drainage basins were estimated based on existing drainage patterns, canal locations, and anticipated conveyance system length limitations. During the design phase, adjustments to drainage basins may be required to optimize the stormwater conveyance systems to selected pond sites. 7.2 Proposed Roadway Profile Because of a variety of factors, potential pond site storage estimates are based on anticipated project improvements to Wilson Boulevard including raising the proposed roadway elevations approximately 2 to 3 feet higher than existing elevations. During the design phase, proposed roadway profile elevations will need to be optimized to minimize required ROW, promote efficient stormwater conveyance, and ensure peak design high water stages do not encroach into travel lanes. Additional feasibility considerations during the design phase will be needed to ensure stormwater conveyance systems are accommodated in proposed dry pre-treatment systems. Because of high groundwater tables along the corridor, sump conditions may be required. 7.3 Proposed Roadside Swales The proposed typical section includes approximately 30 feet on each side between the back of sidewalk or pathway to the proposed Wilson Boulevard ROW. These exterior areas of the corridor are occupied by proposed swales to maintain existing offsite drainage patterns. During the design phase, these areas could be considered for floodplain compensation and/or dry pre-treatment, pending refinements to offsite drainage area delineation, calculated pond storage, and stormwater conveyance systems. 7.4 FLoodplain Impacts and Compensation During the design phase, the total volume of floodplain storage impacts from Wilson Boulevard proposed roadway improvements will be determined and compared to proposed floodplain compensation volumes provided within Wilson Boulevard ROW and stormwater ponds. If net floodplain storage is decreased, further floodplain analysis and evaluation of Big Cypress Basin watershed resources may be required to demonstrate the project will not adversely affect the existing rights of others. 7.5 GeotechnicaL Considerations In addition to the geotechnical information needed for pond design such as soil permeability, water table conditions and depth to any confining layer, a seepage and slope stability analysis should be considered where proposed ponds maintain water levels above existing ground. 7.6 Pond Site Parcel Availability Status As described in the Section 2.8, vacant and undeveloped parcels are considered candidates for potential pond sites. During the project's ROW acquisition phase, all pond site properties should be reviewed for pending permit applications in the Collier County GMD Public Portal. PPS1105211510SWF 16 Page 1828 of 4682 Preliminary Pond Siting Analysis 7.7 Project Limits The Preliminary Pond Siting Analysis is based on study limits from Golden Gate Boulevard to Immokalee Road. During the design phase, project limits may extend north and south to provide taper areas that tie the additional lanes to existing conditions. Although additional roadway improvements are anticipated to be minor, additional stormwater accommodations may be necessary to meet water quantity and water quality requirements. 8. References Abbot, Alicia E.I., PMP, Collier County Government. 2021. Personal communication email with Recipient Bill Gramer, Jacobs Engineering Group. September. Collier County Property Appraiser. 2021. Property Summary. https://www.collierappraiser.com/ Collier County, Florida. 2021. ALLOWABLE POST -DEVELOPMENT DISCHARGE FORMULAS FOR COLLIER COUNTY CANALS (Code of Ordinances. Chapter 90. ARTICLE II. DIVISION 2. Sec. 90-41). October. Federal Emergency Management Agency (FEMA). 2005. Flood Insurance Rate Maps for Collier County, Florida (Panel Numbers 12021 CO240H and 12021 C0430H). November. Florida Department of Environmental Protection (FDEP). 2021. Comprehensive Verified List. June. https://fLoridadep.aov/sites/default/files/Comprehensive-Verified-List 06212021.x1sx Florida Department of Transportation (FDOT). 2022. Drainage Design Guide. January. Jacobs Engineering Group Inc. (Jacobs). 2019. Final Pond Siting Report, Immokalee Road (CR 846) at Randall Boulevard Intersection. May. Jacobs Engineering Group Inc. (Jacobs). 2021. Drainage & Permitting Technical Memorandum, Vanderbilt Beach Road Extension from Collier Boulevard to 16t" Street. June. South Florida Water Management District (SFWMD). 2010. Canals in South Florida: A Technical Support Document. April. https://www.sfwmd.Qov/sites/default/files/documents/canaLssfL appendixa-c.pdf South Florida Water Management District (SFWMD). 2016. ENVIRONMENTAL RESOURCE PERMIT APPLICANT'S HANDBOOK. May 22. South Florida Water Management District (SFWMD). 2018. Map: Works of the Big Cypress Basin. April. https://www.sfwmd.Qov/sites/default/files/documents/map works of the bcb.pdf United States Department of Agriculture Natural Resources Conservation Service (NRCS). 1986. Urban Hydrology for Small Watersheds. Technical Release 55. June. PPS1105211510SWF 17 Page 1829 of 4682 Attachment 1 Proposed Basin Divides and Potential Pond Sites Page 1830 of 4682 1�. ��� '1 II +•. '-'S.-F..ti 'C 1 - 3�C `k;�7 °' Ir 'C.`J �J "� �_ t .v,..I I I� I ►°�,z�. \`( c I1 \\\ 1� J Ai_II_15-�/ / IIII ^ j I \J \J EL 14i I n J € 4 II I I sr.t__Illl IeLI islil 7� i7 If --- -I-_---_-_- - - sr -1wdJ 1 IIII ,` v\f iC•\ IIli \ y�I i r >- - 5,f\ I)�; InIlII l_ \r ia 5 _ 3 i POND-1-?� 1 cj \ -\ `( •,. _ tinjllll /iI IllNhlll�hlNlIul';-_ <` \) D POND \EL-i� IT o goo sooPpkD II) fI�SITE SITEEL 5-1 ATE AL 11 %.1 _ ; Feet Ilk, EL fa-2 EL zeL�_I ll 3 nl E , 7 mll. rr \ Iz t�-� BASIN 5 \(( ' L -z ------_ -------- ----N--6 -------- - -- -- - - - - - - - - -- -- -— — — — — EL z BASIN 3 B BASIN BASI ASIPi'I��1I16I I} - - - - - - - — - - - - - - - - - - - - - - - - - - - - - - - - - - _ - - - - -T L - - = TL- q 7 - - - - - - - - --- -- - -- ---- -__--------------------------- _ E III -- - - -- - ----�--------------------------------------- ----- Z" --- - ---- - -- -- _---------=----------- __- — ------ — ---- r-- \\I — ( EL r - - c EL 12 cE 7z E �° BASIN 2 . �, i, r - r r \ EL_aa II' r \ 1 l\ \! _ - i - I % J ' E 1 17a, \ l i \ `' �) �_c ( � \ Ly rJ1-J1.: ) ` I _ _ l eL7a 1 f , r EL ]4 EL ]2 ) II \, \ \ ` ^` �: 4 Eu14 to Ilk EL Etta) / _ � __,� � J > �, EL v a r - 1 i eLv pz 1 1 PQk� V > r .y EL 74 L r ( �� -�- II J III E( EL r V I ) lEL ] POI POND7211 lie �J A v eL7 ..� �.' I.I IIII II , - l ELu� ��1 �1 y » ,J -� n�z ���;POf\f� z SITE E�7a s`.► c ��� v ,I A i y ry j - SIT SITE, L� ) EL 1z-- _ II �a` POND ^ POND A , v_ EL�2 `I v �w-vEL, j 5-2 = ti �� SITE 5 4 6 31 z 6-1 r. EL 70 J A \ 2-1 �; 2-2 f y\-EL 7z 1 v� 'fr.� -- A I �'g +ice s - -� �� �� - r� SITE 1-7 � "� r SITE 1 2 I � �� II ra /v - - � - I � � � I� _ '` ' - � � -- POND EL z vJ l �i 74 J s -3` V� F�i 7 CA s _ Aw EL 14 is \eL]z'':- 14� V �L�". . ;. �. �'�` .: _ — SITE 6 3 P,ONRI,;.v,'� r - EL 14, -�': r - A ^ � y S I T� 3=Y"� v �L At _' r \ ,-;• �-- :� / A I A J �v� �r�� � c t � I w � � � �-J � I DEL -E �__- POND I I � �ei�1211 r�I'.-J �.`-,,►" ��s'�' ... � J. •i..�` w•��.�9: �� _ _ A II I v T) a � _1� ti - -.y �� EL1q r Lr �� EL1� SITE II'la �F ---�i2 I'I ��v �.-_ "�i r ,w A r= J,--V - i ' a EL9z� s' �► ^ ` �I E 7R'°+� �+� . ►� i ' t as _ / r �I v vr�EL 7e E� 7� i \ M �,'I �� - 'yam I v y� - - 61 , _ A_ 7 POND - F POND II r ► ��A. �� -�,. •:- __ _ r - r. a J�w. 1. V I �r �1 w �I�.., ) �'_ ►I IT7a > •v A ��=,1 _ !! SITE 3-3 E�-1 _J t.. SITE 4-1 ' :, �; i �:;� ►• l \.s-' - \, \ V l r/ r' •._ POND c► rl rr. .t 1 _ ti'9r- iLk+^ �v__yaw 'x W �s - _ s i _ a ti �a� 12 $r' • — i \ _ - af. i7 — °-- - l L -_ - ''#- EL IE - - - F 4 LEGEND - - - - - - �r _ -- _. 2;1�D ST NE , - -- _ , — - -- — - - L, 2i _ m �1 �� L 14 : r _ �I BASIN ROW AREA ` -- - his�� �:. . --1 l ; s v� II 1) �' 1 r�� �� 1 / \� �� �_ a� �`v L! IF ti �- 73► - v r- �� 'ow' :ire. `' II ■ i J - _- -i � VJ /t -_.I - (EL i2 r� _ � 1 ■ ..ram. ( i1r. '-. 1 r 'i - _, A I sl RECOMMENDED POND SITE �, �1 �� r - - ��`---_,v v�,- a' _ _ J f �R EL� AF,.- - (� w .. 1 1 � EL 1 al 1 L _ .€ J - EL ]4 ntI • ) fi�L • _ �`— POTENTIAL POND SITE s', v f_ - : J \ i \II bl 1 �' II POND �oi.l�-�� r'l'-p' -� �I r '�' _ II 1 V� �/ �!�a\ . „r - _i :�' y-I _ Crs. • .1 - = c��.. SITS 6�ZL1q j l-s- POTENTIAL EASEMENT v rr, v �v I ��� � r. - - -v aSLTE 4-2 �E� �z " .�: ��' : EL 1 -- _ - v 11 �� µvh y w �_` A �� III I,r �� r _- �`7r11 '��� Ei---=- rJv EL 12 -_ �I ��5..- - ---- �... / ELF 100 WIDE BUFFER TO PUBLIC WATER SUPPLY WELL ��I 1 � � � - � � � EL8 �■ __ v1�y- � �i►-�'�--- -�� �_ -�_1 v ) _ __yrl(= - 1 =, \ �l' t 1 _ _ � � / 'r:.'s } � � ,r k f � � � I �Cr � +1•._ p,..viry i' v_ V A - i- .J J I v1 /---v 1 �). 1 v �� I�j A \; -JIi t _ _v � I i�! +s i � 1 'ti. .• 'f '+N �'ar�r'•jai fp �-- .i � _.i ( -_, A� 300'-WIDE BUFFER TO PUBLIC WATER SUPPLY WELL u [� '�:� '; �` +� ,I .._ - - ^s ' r i� • +jc'C .;.� � 'II , _rl-�� �`, .rr rs r r I I ��'��' �::� tii rr �_ r � �• -�:�r� _.': - 2' LIDAR CONTOUR _� �' v II I �„ "I r aV• I -r' 1 �I I� �'�. �.� �;' - 1 .%�� �' �' � +i'�x�i., d+s.� -� I I .. at --. A rA - .�. � - =y I x• `�- -+gy; •....: .. i f' ,I I� __/ �v' _ p. � '� •\�^-, q• a- .. .� •ti .�. 1� 'I-. / �r - '� I. ���5 V� GI S PROPERTY LINES •; _ �'.�r ICI - _ C. II I l > > 3f� � I s:�, rr• ,r �J'� I -'�t .�r ,�: •x -ter r � I Page 1831 of 4682 Attachment 2 Basin Calculations Page 1832 of 4682 PROJECT TITLE: lWilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: jBasin Water Quality and Quantity Calculations I MADE BY: AS 11/16/21 BASIN DESIGNATION: jBasin 1-1 1 CHECKED BY: DL 11/17/21 Basin Location and From STATo STA Size Typical Section ROW 37+00. 66+30. Basin Length 2,930 LF 165 LF Water Quality Typical Section ROW x Basin Length = Basin ROW Area = 11.10 ac Paved Area+ Basin (ROW Area) _ Treated Paved Area = 5.68 ac Percent Impervious = Pond Site Area = 5.48 ac 51% Total (ROW + Pond) Basin Area = 16.58 ac A. 1.0 " Over Total Basin Area = 1.38 Ac-Ft B-1 2.5 " Over Treated Paved Area = 1.18 Ac-Ft 1.38 Ac-Ft C.1 50% Additional Treatment Volume for Impaired Waterbody 2.07 Ac-Ft D.1 0.5 "Required Dry Detention or Retention Pre -Treatment as part of Required 1 0.69 Ac-Ft Treatment Volume E.1 20% of Wet Detention Area = 0.66 ac F.1 2.5% of Wet Detention and Drainage Basin Areas = Min Littoral Shelf Area = 0.41 ac Water Quantity PRE -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Fair Condition) 102, Boca fine sand -Urban A/D 49 3.99 195.3 Open Spaces (Fair Condition) 128, Pineda fine sand, limestone C/D 79 1.33 104.9 Wood or Forest Land (Good Cover) 102, Boca fine sand -Urban A/D 25 3.03 75.7 Wood or Forest Land (Good Cover) 128, Pineda fine sand, limestone C/D 70 1.01 70.6 Pond Site Area Wood or Forest Land 102 and 105 A/D and C/D 48 4.48 212.8 Pond Site Area Wetlands 100 1.00 100.0 Impervious (Paved parking, roads, etc.) 98 1.75 171.4 TOTALS 16.58 930.7 COMPOSITE CN 56.1 POST -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Good Condition) 102, Boca fine sand -Urban A/D 39 4.06 158.5 Open Spaces (Good Condition) 128, Pineda fine sand, limestone C/D 74 1.35 100.2 Open Spaces (Good Condition, Pond Site) A/D and C/D 57 2.16 122.0 Impervious (Open Water, Pond Site) 100 3.32 332.0 Impervious (Paved parking, roads, etc.) 98 5.68 1 556.7 TOTALS 16.58 1269.4 COMPOSITE CN 76.6 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S--------------------------------> S = ( 1000 / CN ) - 10 (inches) 2) DETERMINE RUNOFF - R--------------------------------> R = (P - 0.2*S)A2 / ( P + 0.8*S) (inches) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R)--------------------------------> V(R) = (R / 12)*BASIN AREA (acres -feet) Agency Design Storm Frequency P S R V(R) (in) (in) (in) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE) 5.10 7.81 1.10 1 1.52 FDOT Storm Drain 3 yr / 24 hr (POST) 5.10 3.06 2.67 1 3.69 3 yr / 24 hr Attenuation Volume (ac-ft) 2.16 SFWMD Open Basin 25 yr / 72 hr (PRE) 1 10.50 7.81 1 4.77 6.59 SFWMD Open Basin 25 yr / 72 hr (POST) 1 10.50 3.06 7.55 1 10.43 Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3.84 Dry Detention or Retention Pre -Treatment Volume (ac-ft) 0.69 Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) 5.23 Page 1833 of 4682 PROJECT TITLE: lWilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: 113asin Water Quality and Quantity Calculations MADE BY: AS 11/16/21 BASIN DESIGNATION: 113asin 1-2 CHECKED BY: DL 11/17/21 From STA 37+00. Basin Location and To STA 66+30. Size Typical Section ROW 165 LF Water Quality Typical Section ROW x Basin Length = Basin ROWArea= 11.10 ac Treated Paved Area = 5.68 ac Pond Site Area = 4.37 ac Total (ROW + Pond) Basin Area = 15.47 ac A. 1.0 " Over Total Basin Area = B-1 2.5 " Over Treated Paved Area = Basin Length 2,930 LF Paved Area + Basin (ROW Area) _ Percent Impervious = 51% C.1 50% Additional Treatment Volume for Impaired Waterbody D.1 0.5 "Required Dry Detention or Retention Pre -Treatment as part of Required Treatment Volume 1.29 Ac-Ft 1.18 Ac-Ft 1.29 Ac-Ft 1.93 Ac-Ft 0.64 Ac-Ft E.1 20% of Wet Detention Area = 0.47 ac F.1 2.5% of Wet Detention and Drainage Basin Areas = Min Littoral Shelf Area = 0.39 ac Water Quantity PRE -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Fair Condition) 102, Boca fine sand -Urban AD 49 3.99 195.3 Open Spaces (Fair Condition) 128, Pineda fine sand, limestone C D 79 1.33 104.9 Wood or Forest Land (Good Cover) 102, Boca fine sand -Urban A 1) 25 3.03 75.7 Wood or Forest Land (Good Cover) 128, Pineda fine sand, limestone C/D 70 1.01 70.6 Pond Site Area Wood or Forest Land 102, Boca fine sand -Urban A/D 25 4.37 109.3 Impervious (Paved parking, roads, etc.) 98 1.75 171.4 TOTALS 15.47 727.2 COMPOSITE CN 47.0 POST -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Good Condition) 102, Boca fine sand -Urban A/D 39 4.06 158.5 Open Spaces (Good Condition) 128, Pineda fine sand, limestone C/D 74 1.35 100.2 Open Spaces (Good Condition, Pond Site) 102, Boca fine sand -Urban A/D 39 2.02 78.8 Impervious (Open Water, Pond Site) 100 2.35 235.0 Impervious (Paved parking, roads, etc.) 98 5.68 556.7 TOTALS 15.47 1129.2 COMPOSITE CN 73.0 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S--------------------------------> S = ( 1000 / CN) - 10 2) DETERMINE RUNOFF - R--------------------------------> R = (P - 0.2*S)A2 / (P + 0.8 *S) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R)--------------------------------> V(R) = (R / 12)*BASIN AREA (inches) (inches) (acres -feet) Agency Design Storm Frequency P (in) S (in) R (in) V(R) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE) 5.10 11.27 0.57 0.74 FDOT Storm Drain 3 yr / 24 hr (POST) 5.10 3.70 2.36 3.04 3 yr / 24 hr Attenuation Volume (ac-ft) 2.30 SFWMD Open Basin 25 yr / 72 hr (PRE) 1 10.50 11.27 3.48 4.49 SFWMD Open Basin 25 yr / 72 hr (POST) 10.50 3.70 7.08 9.12 Required 25 yr / 72 hr Attenuation Volume (ac-ft) 4.63 Dry Detention or Retention Treatment Volume (ac-ft) 0.64 Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) 5.92 Page 1834 of 4682 PROJECT TITLE: lWilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: jBasin Water Quality and Quantity Calculations I MADE BY: AS 11/16/21 BASIN DESIGNATION: jBasin 2-1 1 CHECKED BY: DL 11/17/21 Basin Location and From STATo STA Size Typical Section ROW 66+30. 96+10. 165 LF Water Quality Typical Section ROW x Basin Length = Basin ROW Area= 11.29 ac Treated Paved Area = 5.37 ac Pond Site Area= 3.19 ac Total (ROW + Pond) Basin Area = 14.48 ac Water Quantity Basin Length 2,980 LF Paved Area+ Basin (ROW Area) _ Percent Impervious = 48% A. 1.0 " Over Total Basin Area = 1.21 Ac-Ft B-1 2.5 " Over Treated Paved Area = 1.12 Ac-Ft 1.21 Ac-Ft C.1 itional Treatment Volume for Impaired Waterbody 1.81 Ac-Ft D. 0.5 " Required Dry Detention or Retention Pre -Treatment as part of Required 0.60 Ac-Ft Treatment Volume E.1 200/ of Wet Detention Area = Min Littoral Shelf Area = 0.22 ac F.1 2.5% of Wet Detention and Drainage Basin Areas = 0.36 ac PRE -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Fair Condition) 102, Boca fine sand -Urban A/D 49 4.05 198.6 Open Spaces (Fair Condition) 110, Hallandale fine sand B/D 69 1.35 93.2 Wood or Forest Land (Good Cover) 102, Boca fine sand -Urban A/D 25 3.08 77.0 Wood or Forest Land (Good Cover) 110, Hallandale fine sand B/D 55 1.03 56.4 Pond Site Area Wood or Forest Land 102 and 110 A/D, B/D 40 3.19 127.6 Impervious (Paved parking, roads, etc.) 98 1.78 174.3 TOTALS 14.48 727.2 COMPOSITE CN 50.2 POST -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Good Condition) 102, Boca fine sand -Urban A/D 39 4.44 173.1 Open Spaces (Good Condition) 110, Hallandale fine sand B/D 61 1.48 90.2 Open Spaces (Good Condition, Pond Site) 102 and 110 A/D, B/D 50 2.09 104.3 Impervious (Open Water, Pond Site) 100 1.11 110.5 Impervious (Paved parking, roads, etc.) 98 5.37 526.3 TOTALS 14.48 1004.4 COMPOSITE CN 69.4 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S--------------------------------> S = ( 1000 / CN ) - 10 2) DETERMINE RUNOFF - R--------------------------------> R = (P - 0.2*S)A2 / ( P + 0.8*S) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R)--------------------------------> V(R) = (R / 12)*BASIN AREA (inches) (inches) (acres -feet) Agency Design Storm Frequency P (in) S (in) R (in) V(R) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE) 5.10 9.91 0.75 0.90 FDOT Storm Drain 3 yr / 24 hr (POST) 5.10 1 4.41 2.06 2.49 3 yr / 24 hr Attenuation Volume (ac-ft) 1.59 SFWMD Open Basin 25 yr / 72 hr (PRE) 1 10.50 1 9.91 1 3.94 1 4.75 SFWMD Open Basin 25 yr / 72 hr (POST) 1 10.50 1 4.41 1 6.59 1 7.95 Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3.20 Dry Detention or Retention Treatment Volume (ac-ft) 0.60 Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) 4.41 Page 1835 of 4682 PROJECT TITLE: lWilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: jBasin Water Quality and Quantity Calculations I MADE BY: AS 11/16/21 BASIN DESIGNATION: jBasin 2-2 1 CHECKED BY: DL 11/17/21 Basin Location and From STATo STA Size Typical Section ROW 66+30. 96+10. 165 LF Water Quality Typical Section ROW x Basin Length = Basin ROW Area= 11.29 ac Treated Paved Area = 5.37 ac Pond Site Area = 3.09 ac Total (ROW + Pond) Basin Area = 14.38 ac Water Quantity Basin Length 2,980 LF Paved Area+ Basin (ROW Area) _ Percent Impervious = 48% A. 1.0 " Over Total Basin Area = 1.20 Ac-Ft B-1 2.5 " Over Treated Paved Area = 1.12 Ac-Ft 1.20 Ac-Ft C.1 itional Treatment Volume for Impaired Waterbody 1.80 Ac-Ft D. 0.5 " Required Dry Detention or Retention Pre -Treatment as part of Required 0.60 Ac-Ft Treatment Volume E.1 200/ of Wet Detention Area = Min Littoral Shelf Area = 0.20 ac F.1 2.50/ of Wet Detention and Drainage Basin Areas = 0.36 ac PRE -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Fair Condition) 102, Boca fine sand -Urban A/D 49 4.05 198.6 Open Spaces (Fair Condition) 110, Hallandale fine sand B/D 69 1.35 93.2 Wood or Forest Land (Good Cover) 102, Boca fine sand -Urban A/D 25 3.08 77.0 Wood or Forest Land (Good Cover) 110, Hallandale fine sand B/D 55 1.03 56.4 Pond Site Area Wood or Forest Land 102 and 110 A/D, B/D 40 3.09 123.6 Impervious (Paved parking, roads, etc.) 98 1.78 174.3 TOTALS 14.38 723.2 COMPOSITE CN 50.3 POST -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Good Condition) 102, Boca fine sand -Urban A/D 39 4.44 173.1 Open Spaces (Good Condition) 110, Hallandale fine sand B/D 61 1.48 90.2 Open Spaces (Good Condition, Pond Site) 102 and 110 A/D, B/D 50 2.09 104.5 Impervious (Open Water, Pond Site) 100 1.00 100.0 Impervious (Paved parking, roads, etc.) 98 5.37 526.3 TOTALS 14.38 994.1 COMPOSITE CN 69.1 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S--------------------------------> S = ( 1000 / CN ) - 10 2) DETERMINE RUNOFF - R--------------------------------> R = (P - 0.2*S)A2 / ( P + 0.8*S) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R)--------------------------------> V(R) = (R / 12)*BASIN AREA (inches) (inches) (acres -feet) Agency Design Storm Frequency P (in) S (in) R (in) V(R) (a-ft) FDOT Storm Drain 3 yr / 24 hr (PRE) 5.10 9.88 0.75 0.90 FDOT Storm Drain 3 yr / 24 hr (POST) 5.10 4.46 2.04 2.45 3 yr / 24 hr Attenuation Volume (ac-ft) 1.55 SFWMD Open Basin 25 yr / 72 hr (PRE) 1 10.50 9.88 1 3.95 1 4.73 SFWMD Open Basin 25 yr / 72 hr (POST) 1 10.50 4.46 1 6.56 1 7.86 Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3.13 Dry Detention or Retention Treatment Volume (ac-ft) 0.60 Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) 4.33 Page 1836 of 4682 PROJECT TITLE: lWilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: 113asin Water Quality and Quantity Calculations MADE BY: AS 11/16/21 BASIN DESIGNATION: 113asin 2-3 CHECKED BY: DL 11/17/21 From STA 66+30. Size Basin Lize nand To STA 96+10. STypical Section ROW 165 LF Water Quality Typical Section ROW x Basin Length = Basin ROW Area= 11.29 ac Treated Paved Area = 5.37 ac Pond Site Area = 3.76 ac Total (ROW + Pond) Basin Area = 15.05 ac A.1 1.0 " Over Total Basin Area = B.1 2.5 " Over Treated Paved Area = Water Quantity Basin Length 2,980 LF Paved Area + Basin (ROW Area) _ Percent Impervious = 48% 1.25 Ac-Ft 1.12 Ac-Ft 1.25 Ac-Ft C.1 50% Additional Treatment Volume for Impaired Waterbody 1 1.88 Ac-Ft D.1 0.5 "Required Dry Detention or Retention Pre -Treatment as part of Required 1 0.63 Ac-Ft Treatment Volume E.1 20% of Wet Detention Area = Min Littoral Shelf Area = 0.19 ac F.1 2.51% of Wet Detention and Drainage Basin Areas = 0.38 ac PRE -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Fair Condition) 102, Boca fine sand -Urban A/D 49 4.05 198.6 Open Spaces (Fair Condition) 110, Hallandale fine sand B/D 69 1.35 93.2 Wood or Forest Land (Good Cover) 102, Boca fine sand -Urban A/D 25 3.08 77.0 Wood or Forest Land (Good Cover) 110, Hallandale fine sand B/D 55 1.03 56.4 Pond Site Area Wood or Forest Land 102 and 131 A/D and B/D 40 3.76 150.4 Impervious (Paved parking, roads, etc.) 98 1.78 174.3 TOTALS 15.05 750.0 COMPOSITE CN 49.8 POST -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Good Condition) 102, Boca fine sand -Urban A/D 39 4.44 173.1 Open Spaces (Good Condition) 110, Hallandale fine sand B/D 61 1.48 90.2 Open Spaces (Good Condition, Pond Site) 102 and 131 A/D and B/D 50 2.79 139.5 Impervious (Open Water, Pond Site) 100 0.97 97.0 Impervious (Paved parking, roads, etc.) 98 5.37 526.3 TOTALS 15.05 1026.1 COMPOSITE CN 68.2 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S--------------------------------> S = ( 1000 / CN) - 10 2) DETERMINE RUNOFF - R--------------------------------> R = (P - 0.2*S)^2 / (P + 0.8 •S) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R)--------------------------------> V(R) = (R / 12)*BASIN AREA (inches) (inches) (acres -feet) Agency Design Storm Frequency P (in) S (in) R (in) V(R) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE) 5.10 10.06 0.72 0.91 FDOT Storm Drain 3 yr / 24 hr (POST) 5.10 4.66 1.97 2.47 3 yr / 24 hr Attenuation Volume (ac-ft) 1.56 SFWMD Open Basin 25 yr / 72 hr (PRE) 10.50 10.06 1 3.88 1 4.87 SFWMD Open Basin 25 yr / 72 hr (POST) 10.50 4.66 1 6.43 1 8.06 Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3.20 Dry Detention or Retention Treatment Volume (ac-ft) 0.63 Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) 4.45 Page 1837 of 4682 PROJECT TITLE: lWilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: 113asin Water Quality and Quantity Calculations MADE BY: AS 11/16/21 BASIN DESIGNATION: 113asin 2-4 CHECKED BY: DL 11/17/21 From STA 66+30. Basin Location and To STA 96+10. Size Typical Section ROW 165 LF Water Quality Typical Section ROW x Basin Length = Basin ROW Area= 11.29 ac Treated Paved Area = 5.37 ac Pond Site Area = 4.00 ac Total (ROW + Pond) Basin Area = 15.29 ac A.1 1.0 " Over Total Basin Area = B.1 2.5 " Over Treated Paved Area = Water Quantity Basin Length 2,980 LF Paved Area + Basin (ROW Area) _ Percent Impervious = 48% 1.27 Ac-Ft 1.12 Ac-Ft 1.27 Ac-Ft C.1 50% Additional Treatment Volume for Impaired Waterbody 1 1.91 Ac-Ft D.1 0.5 "Required Dry Detention or Retention Pre -Treatment as part of Required 1 0.64 Ac-Ft Treatment Volume E.1 20% of Wet Detention Area = Min Littoral Shelf Area = 0.35 ac F.1 2.51% of Wet Detention and Drainage Basin Areas = 0.38 ac PRE -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Fair Condition) 102, Boca fine sand -Urban A/D 49 4.05 198.6 Open Spaces (Fair Condition) 110, Hallandale fine sand B/D 69 1.35 93.2 Wood or Forest Land (Good Cover) 102, Boca fine sand -Urban A/D 25 3.08 77.0 Wood or Forest Land (Good Cover) 110, Hallandale fine sand B/D 55 1.03 56.4 Pond Site Area Wood or Forest Land 102, Boca fine sand -Urban A/D 25 4.00 100.0 Impervious (Paved parking, roads, etc.) 98 1.78 174.3 TOTALS 15.29 699.6 COMPOSITE CN 45.8 POST -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Good Condition) 102, Boca fine sand -Urban A/D 39 4.44 173.1 Open Spaces (Good Condition) 110, Hallandale fine sand B/D 61 1.48 90.2 Open Spaces (Good Condition, Pond Site) 102, Boca fine sand -Urban A/D 39 2.23 87.0 Impervious (Open Water, Pond Site) 100 1.77 177.0 Impervious (Paved parking, roads, etc.) 98 5.37 526.3 TOTALS 15.29 1053.6 COMPOSITE CN 68.9 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S--------------------------------> S = ( 1000 / CN) - 10 2) DETERMINE RUNOFF - R--------------------------------> R = (P - 0.2*S)A2 / (P + 0.8 •S) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R)--------------------------------> V(R) = (R / 12)*BASIN AREA (inches) (inches) (acres -feet) Agency Design Storm Frequency P (in) S (in) R (in) V(R) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE) 5.10 11.85 0.51 0.65 FDOT Storm Drain 3 yr / 24 hr (POST) 5.10 4.51 2.02 2.58 3 yr / 24 hr Attenuation Volume (ac-ft) 1.93 SFWMD Open Basin 25 yr / 72 hr (PRE) 10.50 11.85 1 3.31 1 4.21 SFWMD Open Basin 25 yr / 72 hr (POST) 10.50 4.51 1 6.53 1 8.32 Required 25 yr / 72 hr Attenuation Volume (ac-ft) 4.11 Dry Detention or Retention Treatment Volume (ac-ft) 0.64 Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) 5.38 Page 1838 of 4682 PROJECT TITLE: lWilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: 113asin Water Quality and Quantity Calculations MADE BY: AS 11/16/21 BASIN DESIGNATION: 113asin 3-1 CHECKED BY: DL 11/17/21 From STA 96+10. Size Basin Lize nand To STA 129+30. STypical Section ROW 165 LF Water Quality Typical Section ROW x Basin Length = Basin ROW Area= 12.58 ac Treated Paved Area = 6.98 ac Pond Site Area = 3.45 ac Total (ROW + Pond) Basin Area = 16.03 ac A.1 1.0 " Over Total Basin Area = B.1 2.5 " Over Treated Paved Area = Water Quantity Basin Length 3,320 LF Paved Area + Basin (ROW Area) _ Percent Impervious = 56% 1.34 Ac-Ft 1.45 Ac-Ft 1.45 Ac-Ft C.1 50% Additional Treatment Volume for Impaired Waterbody 1 2.18 Ac-Ft D.1 0.5 "Required Dry Detention or Retention Pre -Treatment as part of Required 1 0.67 Ac-Ft Treatment Volume E.1 20% of Wet Detention Area = Min Littoral Shelf Area = 0.24 ac F.1 2.51% of Wet Detention and Drainage Basin Areas = 0.40 ac PRE -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Fair Condition) 102, Boca fine sand -Urban A/D 49 2.41 118.0 Open Spaces (Fair Condition) 110 and 131, Hallandale and Riviera fine sand B/D 69 3.61 249.3 Wood or Forest Land (Good Cover) 102, Boca fine sand -Urban A/D 25 1.83 45.7 Wood or Forest Land (Good Cover) 110 and 131, Hallandale and Riviera fine sand B/D 55 2.74 150.9 Pond Site Area Wood or Forest Land 102, Boca fine sand -Urban A/D 25 3.45 86.3 Impervious (Paved parking, roads, etc.) 98 1.98 194.2 TOTALS 16.03 844.4 COMPOSITE CN 52.7 POST -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Good Condition) 102, Boca fine sand -Urban A/D 39 2.24 87.2 Open Spaces (Good Condition) 110, Hallandale fine sand B/D 61 3.36 204.7 Open Spaces (Good Condition, Pond Site) 102, Boca fine sand -Urban A/D 39 2.25 87.8 Impervious (Open Water, Pond Site) 100 1.20 120.0 Impervious (Paved parking, roads, etc.) 98 6.98 684.3 TOTALS 16.03 1184.0 COMPOSITE CN 73.9 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S--------------------------------> S = ( 1000 / CN) - 10 2) DETERMINE RUNOFF - R--------------------------------> R = (P - 0.2*S)A2 / (P + 0.8 •S) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R)--------------------------------> V(R) = (R / 12)*BASIN AREA (inches) (inches) (acres -feet) Agency Design Storm Frequency P (in) S (in) R (in) V(R) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE) 5.10 8.98 0.89 1.19 FDOT Storm Drain 3 yr / 24 hr (POST) 5.10 3.54 2.43 3.25 3 yr / 24 hr Attenuation Volume (ac-ft) 2.06 SFWMD Open Basin 25 yr / 72 hr (PRE) 10.50 8.98 1 4.28 1 5.72 SFWMD Open Basin 25 yr / 72 hr (POST) 10.50 3.54 1 7.20 1 9.61 Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3.89 Dry Detention or Retention Treatment Volume (ac-ft) 0.67 Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) 5.40 Page 1839 of 4682 PROJECT TITLE: lWilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: 113asin Water Quality and Quantity Calculations MADE BY: AS 11/16/21 BASIN DESIGNATION: 113asin 3-2 CHECKED BY: DL 11/17/21 From STA 96+10. Size Basin Lize nand To STA 129+30. STypical Section ROW 165 LF Water Quality Typical Section ROW x Basin Length = Basin ROW Area= 12.58 ac Treated Paved Area = 6.98 ac Pond Site Area = 2.96 ac Total (ROW + Pond) Basin Area = 15.53 ac A.1 1.0 " Over Total Basin Area = B.1 2.5 " Over Treated Paved Area = Water Quantity Basin Length 3,320 LF Paved Area + Basin (ROW Area) _ Percent Impervious = 56% 1.29 Ac-Ft 1.45 Ac-Ft 1.45 Ac-Ft C.1 50% Additional Treatment Volume for Impaired Waterbody 1 2.18 Ac-Ft D.1 0.5 "Required Dry Detention or Retention Pre -Treatment as part of Required 1 0.65 Ac-Ft Treatment Volume E.1 20% of Wet Detention Area = Min Littoral Shelf Area = 0.20 ac F.1 2.51% of Wet Detention and Drainage Basin Areas = 0.39 ac PRE -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Fair Condition) 102, Boca fine sand -Urban A/D 49 2.41 118.0 Open Spaces (Fair Condition) 110 and 131, Hallandale and Riviera fine sand B/D 69 3.61 249.3 Wood or Forest Land (Good Cover) 102, Boca fine sand -Urban A/D 25 1.83 45.7 Wood or Forest Land (Good Cover) 110 and 131, Hallandale and Riviera fine sand B/D 55 2.74 150.9 Pond Site Area Wood or Forest Land 110 , Hallandale fine sand B/D 55 2.96 162.7 Impervious (Paved parking, roads, etc.) 98 1.98 194.2 TOTALS 15.53 920.8 COMPOSITE CN 59.3 POST -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Good Condition) 102, Boca fine sand -Urban A/D 39 2.24 87.2 Open Spaces (Good Condition) 110 and 131, Hallandale and Riviera fine sand B/D 61 3.36 204.7 Open Spaces (Good Condition, Pond Site) 110, Hallandale fine sand B/D 61 1.95 119.1 Impervious (Open Water, Pond Site) 100 1.01 100.6 Impervious (Paved parking, roads, etc.) 98 6.98 684.3 TOTALS 15.53 1195.9 COMPOSITE CN 77.0 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S--------------------------------> S = ( 1000 / CN) - 10 2) DETERMINE RUNOFF - R--------------------------------> R = (P - 0.2*S)A2 / (P + 0.8 •S) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R)--------------------------------> V(R) = (R / 12)*BASIN AREA (inches) (inches) (acres -feet) Agency Design Storm Frequency P (in) S (in) R (in) V(R) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE) 5.10 6.87 1.31 1.70 FDOT Storm Drain 3 yr / 24 hr (POST) 5.10 2.99 2.71 3.50 3 yr / 24 hr Attenuation Volume (ac-ft) 1.81 SFWMD Open Basin 25 yr / 72 hr (PRE) 10.50 6.87 1 5.21 1 6.74 SFWMD Open Basin 25 yr / 72 hr (POST) 10.50 2.99 1 7.61 1 9.85 Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3.11 Dry Detention or Retention Treatment Volume (ac-ft) 0.65 Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) 4.64 Page 1840 of 4682 PROJECT TITLE: lWilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: 113asin Water Quality and Quantity Calculations MADE BY: AS 11/16/21 BASIN DESIGNATION: 113asin 3-3 CHECKED BY: DL 11/17/21 Basin Location and From STATo STA Size Typical Section ROW 96+10. 129+30. Basin Length 3,320 LF 165 LF Water Quality Typical Section ROW x Basin Length = Basin ROW Area = 12.58 ac Paved Area = Basin (ROW Area) _ Treated Paved Area = 6.98 ac Percent Impervious = Pond Site Area = 3.48 ac 56% Total (ROW + Pond) Basin Area = 16.05 ac A.1 1.0 " Over Total Basin Area = 1.34 Ac-Ft B.1 2.5 " Over Treated Paved Area = 1.45 Ac-Ft 1.45 Ac-Ft C.1 50% Additional Treatment Volume for Impaired Waterbody 2.18 Ac-Ft D.1 0.5 "Required Dry Detention or Retention Pre -Treatment as part of Required 0.67 Ac-Ft Treatment Volume E.1 20% of Wet Detention Area = Min Littoral Shelf Area = 0.25 ac F.1 2.5% of Wet Detention and Drainage Basin Areas = 0.40 ac Water Quantity PRE -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (xc) PRODUCT Open Spaces (Fair Condition) 102, Boca fine sand -Urban A/D 49 2.41 118.0 Open Spaces (Fair Condition) 110 and 131, Hallandale and Riviera fine sand B/D 69 3.61 249.3 Wood or Forest Land (Good Cover) 102, Boca fine sand -Urban A/D 25 1.83 45.7 Wood or Forest Land (Good Cover) 110 and 131, Hallandale and Riviera fine sand B/D 55 2.74 150.9 Pond Site Area Wood or Forest Land 131 and 128 B/D and CID 63 3.48 217.2 Impervious (Paved parking, roads, etc.) 98 1.98 194.2 TOTALS 16.05 975.3 COMPOSITE CN 60.8 POST -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Good Condition) 102, Boca fine sand -Urban AD 39 2.24 87.2 Open Spaces (Good Condition) 110, Hallandale fine sand B/D 61 3.36 204.7 Open Spaces (Good Condition, Pond Site) 131 and 128 B/D and C/D 68 2.21 149.3 Impervious (Open Water, Pond Site) 100 1.26 126.3 Impervious (Paved parking, roads, etc.) 98 6.98 1 684.3 TOTALS 16.05 1251.9 COMPOSITE CN 78.0 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S--------------------------------> S = ( 1000 / CN ) - 10 2) DETERMINE RUNOFF - R--------------------------------> R = (P - 0.2*S)A2 / ( P + 0.8*S) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R)--------------------------------> V(R) = (R / 12)*BASIN AREA (inches) (inches) (acres -feet) Agency Design Storm Frequency P (in) S (in) R (in) V(R) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE) 5.10 6.46 1.41 1.89 FDOT Storm Drain 3 yr / 24 hr (POST) 5.10 2.82 2.80 3.74 3 yr / 24 hr Attenuation Volume (ac-ft) 1.85 SFWMD Open Basin 25 yr / 72 hr (PRE) 10.50 6.46 5.41 7.24 SFWMD Open Basin 25 yr / 72 hr (POST) 10.50 2.82 7.74 10.35 Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3.11 Dry Detention or Retention Treatment Volume (ac-ft) 0.67 Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) 4.62 Page 1841 of 4682 PROJECT TITLE: lWilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: 113asin Water Quality and Quantity Calculations MADE BY: AS 11/16/21 BASIN DESIGNATION: 113asin 4-1 CHECKED BY: DL 11/17/21 From STA 129+30. Basin Location and To STA 155+80. Size Typical Section ROW 165 LF Water Quality Typical Section ROW x Basin Length = Basin ROW Area= 10.04 Ac Treated Paved Area = 5.98 ac Pond Site Area = 4.20 ac Total (ROW + Pond) Basin Area = 14.24 ac A.1 1.0 " Over Total Basin Area = B.1 2.5 " Over Treated Paved Area = Water Quantity Basin Length 2,650 LF Paved Area + Basin (ROW Area) _ Percent Impervious = 60% 1.19 Ac-Ft 1.24 Ac-Ft 1.24 Ac-Ft C.1 50% Additional Treatment Volume for Impaired Waterbody 1 1.87 Ac-Ft D.1 0.5 "Required Dry Detention or Retention Pre -Treatment as part of Required 1 0.59 Ac-Ft Treatment Volume E.1 20 % of Wet Detention Area = Min Littoral Shelf Area = 0.25 ac F.1 2.5 % of Wet Detention and Drainage Basin Areas = 0.36 ac PRE -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Fair Condition) 113 and 125,Holopaw and Oldsmar fine sand A/D 49 2.64 129.5 Open Spaces (Fair Condition) 131 Riviera fine sand B; D 69 2.16 149.2 Wood or Forest Land (Good Cover) 113 and 125,Holopaw and Oldsmar fine sand A 1) 25 2.01 50.2 Wood or Forest Land (Good Cover) 131 Riviera fine sand B; D 55 1.64 90.3 Pond Site Area Wood or Forest Land 131 Riviera fine sand 13 D 55 4.20 230.9 Impervious (Paved parking, roads, etc.) 98 1.58 155.0 TOTALS 14.24 805.2 COMPOSITE CN 56.6 POST -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Good Condition) 113 and 125,Holopaw and Oldsmar fine sand A/D 39 2.23 87.1 Open Spaces (Good Condition) 131 Riviera fine sand B/D 61 1.83 111.5 Open Spaces (Good Condition, Pond Site) 131 Riviera fine sand B/D 61 2.93 178.5 Impervious (Open Water, Pond Site) 100 1.27 127.2 Impervious (Paved parking, roads, etc.) 98 5.98 585.6 TOTALS 14.24 1089.9 COMPOSITE CN 76.6 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S--------------------------------> S = ( 1000 / CN) - 10 2) DETERMINE RUNOFF - R--------------------------------> R = (P - 0.2*S)A2 / (P + 0.8 *S) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R)--------------------> V(R) = (R / 12)*BASIN AREA (inches) (inches) (acres -feet) Agency Design Storm Frequency P (in) S (in) R (in) V(R) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE) 5.10 7.68 1.13 1.34 FDOT Storm Drain 3 yr / 24 hr (POST) 5.10 3.06 2.67 3.16 3 yr / 24 hr Attenuation Volume (ac-ft) 1.82 SFWMD Open Basin 25 yr / 72 hr (PRE) 1 10.50 7.68 4.83 5.73 SFWMD Open Basin 25 yr / 72 hr (POST) 10.50 3.06 7.55 8.96 Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3.23 Dry Detention or Retention Treatment Volume (ac-ft) 0.59 Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) 4.50 Page 1842 of 4682 PROJECT TITLE: lWilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: 113asin Water Quality and Quantity Calculations MADE BY: AS 11/16/21 BASIN DESIGNATION: 113asin 4-2 CHECKED BY: DL 11/17/21 From STA 129+30. Basin Location and To STA 155+80. Size Typical Section ROW 165 LF Water Quality Typical Section ROW x Basin Length = Basin ROW Area= 10.04 ac Treated Paved Area = 5.98 ac Pond Site Area = 3.27 ac Total (ROW + Pond) Basin Area = 13.31 ac A.1 1.0 " Over Total Basin Area = B.1 2.5 " Over Treated Paved Area = Water Quantity Basin Length 2,650 LF Paved Area + Basin (ROW Area) _ Percent Impervious = 60% 1.11 Ac-Ft 1.24 Ac-Ft 1.24 Ac-Ft C.1 50% Additional Treatment Volume for Impaired Waterbody 1 1.87 Ac-Ft D.1 0.5 "Required Dry Detention or Retention Pre -Treatment as part of Required 1 0.55 Ac-Ft Treatment Volume E.1 20% of Wet Detention Area = Min Littoral Shelf Area = 0.22 ac F.1 2.51% of Wet Detention and Drainage Basin Areas = 0.33 ac PRE -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Fair Condition) 113 and 125,Holopaw and Oldsmar fine sand A/D 49 2.64 129.5 Open Spaces (Fair Condition) 131 Riviera fine sand B/D 69 2.16 149.2 Wood or Forest Land (Good Cover) 113 and 125,Holopaw and Oldsmar fine sand A/D 25 2.01 50.2 Wood or Forest Land (Good Cover) 131 Riviera fine sand B/D 55 1.64 90.3 Pond Site Area Wood or Forest Land 102 Boca fine sand A/D 25 3.27 81.7 Impervious (Paved parking, roads, etc.) 98 1.58 155.0 TOTALS 13.31 656.0 COMPOSITE CN 49.3 POST -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Good Condition) 113 and 125,Holopaw and Oldsmar fine sand A/D 39 2.23 87.1 Open Spaces (Good Condition) 131 Riviera fine sand B/D 61 1.83 111.5 Open Spaces (Good Condition, Pond Site) 102 Boca fine sand A/D 39 2.19 85.4 Impervious (Open Water, Pond Site) 100 1.08 107.9 Impervious (Paved parking, roads, etc.) 98 5.98 585.6 TOTALS 13.31 977.6 COMPOSITE CN 73.5 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S--------------------------------> S = ( 1000 / CN) - 10 2) DETERMINE RUNOFF - R--------------------------------> R = (P - 0.2*S)A2 / (P + 0.8 •S) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R)--------------------------------> V(R) = (R / 12)*BASIN AREA (inches) (inches) (acres -feet) Agency Design Storm Frequency P (in) S (in) R (in) V(R) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE) 5.10 10.29 0.69 0.77 FDOT Storm Drain 3 yr / 24 hr (POST) 5.10 3.61 2.40 2.66 3 yr / 24 hr Attenuation Volume (ac-ft) 1.89 SFWMD Open Basin 25 yr / 72 hr (PRE) 10.50 10.29 1 3.81 1 4.22 SFWMD Open Basin 25 yr / 72 hr (POST) 10.50 3.61 1 7.14 1 7.92 Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3.70 Dry Detention or Retention Treatment Volume (ac-ft) 0.55 Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) 5.01 Page 1843 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: Basin Water Quality and Quantity Calculations MADE BY: AS 11/16/21 BASIN DESIGNATION: jBasin 5-1 CHECKED BY: DL 11/17/21 Basin Location and From STA 155+80.To STA 182+20. Site Typical Section ROW 165 LF Water Quality Typical Section ROW x Basin Length = Basin ROW Area = 10.00 ac Treated Paved Area = 5.56 ac Pond Site Area = 5.2F ac Total (ROW + Pond) Basin Area = 15.22 ac A.1 1.0 " Over Total Basin Area = B.1 2.5 " Over Treated Paved Area = Water Quantity Basin Length 2,640 LF Paved Area = Basin (ROW Area) _ Percent Impervious = 56% 1.27 Ac-Ft 1.16 Ac-Ft 1.27 Ac-Ft C.1 0 Additional Treatment Volume for Impaired Waterbody c- D.1 0.5 " Required Dry Detention or Retention Pre -Treatment as part of Required 1 0.63 Ac-Ft Treatment Volume E.1 20% of Wet Detention Area = 0.45 ac F.1 2.5% of Wet Detention and Drainage Basin Areas = Min Littoral Shelf Area = 0.38 ac PRE -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Fair Condition) 113, Holopaw fine sand A/D 49 4.79 234.6 Wood or Forest Land (Good Cover) 113, Holopaw fine sand A/D 25 3.64 90.9 Pond Site Area Wood or Forest Land 117, Immokalee fine sand B/D 55 5.22 287.1 Impervious (Paved parking, roads, etc.) 98 1.58 154.4 TOTALS 15.22 767.0 COMPOSITE CN 50.4 POST -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Good Condition) 113, Holopaw fine sand A/D 39 4.44 173.3 Open Spaces (Good Condition, Pond Site) 117, Immokalee fine sand B/D 61 2.99 182.6 Impervious (Open Water, Pond Site) 100 2.23 222.6 Impervious (Paved parking, roads, etc.) 98 5.56 544.6 TOTALS 15.22 1123.1 COMPOSITE CN 73.8 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S--------------------------------> S = ( 1000 / CN) - 10 2) DETERMINE RUNOFF - R--------------------------------> R = ( P - 0.2*S)^2 / ( P + 0.8*S) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R)------------------> V(R) = (R / 12)*BASIN AREA (inches) (inches) (acres -feet) Agency Design Storm Frequency P (in) S (in) R (in) V(R) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE) 5.10 9.84 0.76 0.96 FDOT Storm Drain 3 yr / 24 hr (POST) 5.10 3.55 2.43 3.08 3 yr / 24 hr Attenuation Volume (ac-ft) 2.12 SFWMD Open Basin 25 yr / 72 hr (PRE) 10.50 9.84 3.96 5.02 SFWMD Open Basin 25 yr / 72 hr (POST) 10.50 3.55 7.18 9.11 Required 25 yr / 72 hr Attenuation Volume (ac-ft) 4.09 Dry Detention or Retention Treatment Volume (ac-ft) 0.63 Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) 5.36 Page 1844 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: I Basin Water Quality and Quantity Calculations MADE BY: AS 11/16/21 BASIN DESIGNATION: 113asin 5-2 CHECKED BY: DL 11/17/21 From STA 155+80. Basin Location and To STA 182+20. Size Typical Section ROW 165 LF Water Quality Typical Section ROW x Basin Length = Basin ROW Area = 10.0 ac Treated Paved Area = 5.56 ac Pond Site Area = 3.5T ac Total (ROW + Pond) Basin Area = 13.55 ac A.1 1.0 " Over Total Basin Area = B.1 2.5 " Over Treated Paved Area = Water Quantity Basin Length 2,640 LF Paved Area = Basin (ROW Area) _ Percent Impervious = 56% 1.13 Ac-Ft 1.16 Ac-Ft L16 Ac-Ft C.1 50% Additional Treatment Volume for Impaired Waterbody 1.74 Ac-Ft D.1 0.5 "Required Dry Detention or Retention Pre -Treatment as part of Required 1 0.56 Ac-Ft Treatment Volume E. 20°/u of Wet Detention Area = 0.27 ac F.1 2.5% of Wet Detention and Drainage Basin Areas = Min Littoral Shelf Area = 0.34 ac PRE -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Fair Condition) 113, Holopaw fine sand A/D 49 4.79 234.6 Wood or Forest Land (Good Cover) It 3, Holopaw fine sand A/D 25 3.64 90.9 Pond Site Area Wood or Forest Land 113, 125, 131, 120 A/D, B/D 30 3.55 106.4 Impervious (Paved parking, roads, etc.) 98 1.58 154.4 TOTALS 13.55 j 586.3 COMPOSITE CN 43.3 POST -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Good Condition) 113, Holopaw fine sand A/D 39 4.44 173.3 Open Spaces (Good Condition, Pond Site) 113, 125, 131, 120 A/D, B/D 43 2.17 93.4 Impervious (Open Water, Pond Site) 100 1.37 137.5 Impervious (Paved parking, roads, etc.) 98 5.56 544.6 TOTALS 13.55 j 948.7 COMPOSITE CN 70.0 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S---------------> S = ( 1000 / CN) - 10 2) DETERMINE RUNOFF - R--------------------------------> R = (P - 0.2*S)A2 / (P + 0.8*S) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R)--------------------------------> V(R) = (R / 12)*BASIN AREA (inches) (inches) (acres -feet) Agency Design Storm Frequency P (in) S (in) R (in) V(R) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE) 5.10 13.10 0.39 0.45 FDOT Storm Drain 3 yr / 24 hr (POST) 5.10 4.28 2.11 2.39 3 yr / 24 hr Attenuation Volume (ac-ft) 1.94 SFWMD Open Basin 25 yr / 72 hr (PRE) 10.50 13.10 2.96 3.34 SFWMD Open Basin 25 yr / 72 hr (POST) 10.50 4.28 6.68 7.54 Required 25 yr / 72 hr Attenuation Volume (ac-ft) 4.20 Dry Detention or Retention Treatment Volume (ac-ft) 0.56 Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) 5.37 Page 1845 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: I Basin Water Quality and Quantity Calculations MADE BY: AS 11/16/21 BASIN DESIGNATION: 113asin 5-3 CHECKED BY: DL 11/17/21 From STA 155+80. Basin Location and To STA 182+20. Size Typical Section ROW 165 LF Water Quality Typical Section ROW x Basin Length = Basin ROW Area = 10.00 ac Treated Paved Area = 5.56 ac Pond Site Area = 5.84 ac Total (ROW + Pond) Basin Area = 15.84 ac A.1 1.0 " Over Total Basin Area = B.1 2.5 " Over Treated Paved Area = Water Quantity Basin Length 2,640 LF Paved Area = Basin (ROW Area) _ Percent Impervious = 56% 1.32 Ac-Ft 1.16 Ac-Ft 1.32 Ac-Ft C.1 50% Additional Treatment Volume for Impaired Waterbody 1.98 Ac-Ft D.1 0.5 "Required Dry Detention or Retention Pre -Treatment as part of Required 1 0.66 Ac-Ft Treatment Volume E.1 20% of Wet Detention Area = 0.67 ac F.1 2.5% of Wet Detention and Drainage Basin Areas = Min Littoral Shelf Area = 0.40 ac PRE -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Fair Condition) It 3, Holopaw fine sand A/D 49 4.79 234.6 Wood or Forest Land (Good Cover) 113, Holopaw fine sand A/D 25 3.64 90.9 Pond Site Area Wood or Forest Land 113, 120, 117 A/D and B/D 30 5.84 175.3 Impervious (Paved parking, roads, etc.) 98 1.58 154.4 TOTALS 15.84 j 655.2 COMPOSITE CN 41.4 POST -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Good Condition) It 3, Holopaw fine sand A/D 39 4.44 173.3 Open Spaces (Good Condition, Pond Site) 113, 120, 117 A/D and B/D 43 2.48 106.8 Impervious (Open Water, Pond Site) 113, 120, 117 100 3.36 335.8 Impervious (Paved parking, roads, etc.) 98 5.56 544.6 TOTALS 15.84 j 1160.5 COMPOSITE CN 73.3 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S--------------------------------> S = ( 1000 / CN) - 10 2) DETERMINE RUNOFF - R--------------------------------> R = (P - 0.2*S)^2 / (P + 0.8*S) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R)--------------------------------> V(R) = (R / 12)*BASIN AREA (inches) (inches) (acres -feet) Agency Design Storm Frequency P (in) S (in) R (in) V(R) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE) 5.10 14.18 0.31 0.41 FDOT Storm Drain 3 yr / 24 hr (POST) 5.10 3.65 2.38 3.14 3 yr / 24 hr Attenuation Volume (ac-ft) 2.73 SFWMD Open Basin 25 yr / 72 hr (PRE) 10.50 14.18 2.69 3.55 SFWMD Open Basin 25 yr / 72 hr (POST) 10.50 3.65 7.11 9.39 Required 25 yr / 72 hr Attenuation Volume (ac-ft) 5.84 Dry Detention or Retention Treatment Volume (ac-ft) 0.66 Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) 7.16 Page 1846 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: I Basin Water Quality and Quantity Calculations MADE BY: AS 11/16/21 BASIN DESIGNATION: 113asin 5-4 CHECKED BY: DL 11/17/21 From STA 155+80. Basin Location and To STA 182+20. Size Typical Section ROW 165 LF Water Quality Typical Section ROW x Basin Length = Basin ROW Area = 10.00 ac Treated Paved Area = 5.56 ac Pond Site Area = 53T ac Total (ROW + Pond) Basin Area = 15.39 ac A.1 1.0 " Over Total Basin Area = B.1 2.5 " Over Treated Paved Area = Water Quantity Basin Length 2,640 LF Paved Area = Basin (ROW Area) _ Percent Impervious = 56% 1.28 Ac-Ft 1.16 Ac-Ft 1.28 Ac-Ft C.1 50% Additional Treatment Volume for Impaired Waterbody 1.92 Ac-Ft D.1 0.5 "Required Dry Detention or Retention Pre -Treatment as part of Required 1 0.64 Ac-Ft Treatment Volume E.1 20% of Wet Detention Area = 0.64 ac F.1 2.5% of Wet Detention and Drainage Basin Areas = Min Littoral Shelf Area = 0.38 ac PRE -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Fair Condition) It 3, Holopaw fine sand A/D 49 4.79 234.6 Wood or Forest Land (Good Cover) 113, Holopaw fine sand A/D 25 3.64 90.9 Pond Site Area Wood or Forest Land 113 and 125 A/D 25 5.39 134.7 Impervious (Paved parking, roads, etc.) 98 1.58 154.4 TOTALS 15.39 614.E COMPOSITE CN 39.9 POST -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Good Condition) It 3, Holopaw fine sand A/D 39 4.44 173.3 Open Spaces (Good Condition, Pond Site) 113, 120, 117 A/D 39 2.21 86.3 Impervious (Open Water, Pond Site) 100 3.18 317.5 Impervious (Paved parking, roads, etc.) 98 5.56 544.6 TOTALS 15.39 j 1121.7 COMPOSITE CN 72.9 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S--------------------------------> S = ( 1000 / CN) - 10 2) DETERMINE RUNOFF - R--------------------------------> R = (P - 0.2*S)^2 / (P + 0.8*S) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R)--------------------------------> V(R) = (R / 12)*BASIN AREA (inches) (inches) (acres -feet) Agency Design Storm Frequency P (in) S (in) R (in) V(R) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE) 5.10 15.04 0.26 0.33 FDOT Storm Drain 3 yr / 24 hr (POST) 5.10 3.72 2.35 3.01 3 yr / 24 hr Attenuation Volume (ac-ft) 2.69 SFWMD Open Basin 25 yr / 72 hr (PRE) 10.50 15.04 2.49 3.20 SFWMD Open Basin 25 yr / 72 hr (POST) 10.50 3.72 7.06 9.06 Required 25 yr / 72 hr Attenuation Volume (ac-ft) 5.86 Dry Detention or Retention Treatment Volume (ac-ft) 0.64 Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) 7.15 Page 1847 of 4682 PROJECT TITLE: lWilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: JCN and SCS Runoff Volume Calculation MADE BY: AS 11/16/21 BASIN DESIGNATION: 113asin 6-1 CHECKED BY: DL 11/17/21 From STA 182+20. Basin Location and To STA 205+00. Size Typical Section ROW 165 LF Water Quality Typical Section ROW x Basin Length = Basin ROW Area= 8.64 ac Treated Paved Area = 5.11 ac Pond Site Area = 2.58 ac Total (ROW + Pond) Basin Area = 11.22 ac A.1 1.0 " Over Total Basin Area = B.1 2.5 " Over Treated Paved Area = Water Quantity Basin Length 2,280 LF Paved Area + Basin (ROW Area) _ Percent Impervious = 59% 0.93 Ac-Ft 1.06 Ac-Ft 1.06 Ac-Ft C.1 50% Additional Treatment Volume for Impaired Waterbody 1.60 Ac-Ft D. 0.5 "Required Dry Detention or Retention Pre -Treatment as part of Required 0.47 Ac-Ft Treatment Volume E.1 20 % of Wet Detention Area = Min Littoral Shelf Area = 0.26 ac F.1 2.5% of Wet Detention and Drainage Basin Areas = 0.28 ac PRE -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Fair Condition) 113, Holopaw fine sand A/D 49 2.48 121.6 Open Spaces (Good Condition) 117, Immokalee fine sand B/D 69 1.65 114.1 Wood or Forest Land (Good Cover) 113, Holopaw fine sand A/D 25 1.88 47.1 Wood or Forest Land (Good Cover) 117, Immokalee fine sand B/D 55 1.26 69.1 Pond Site Area Wood or Forest Land 113, Holopaw fine sand A/D 25 2.58 64.5 Impervious (Paved parking, roads, etc.) 98 1.36 133.4 TOTALS 11.22 549.8 COMPOSITE CN 49.0 POST -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Good Condition) 113, Holopaw fine sand A/D 39 2.12 82.5 Open Spaces (Good Condition) 117, Immokalee fine sand B/D 61 1.41 86.1 Open Spaces (Good Condition, Pond Site) 113, Holopaw fine sand A/D 39 1.27 49.4 Impervious (Open Water, Pond Site) 100 1.31 131.4 Impervious (Paved parking, roads, etc.) 98 5.11 500.7 TOTALS 11.22 850.1 COMPOSITE CN 75.8 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S--------------------------------> S = ( 1000 / CN) - 10 2) DETERMINE RUNOFF - R--------------------------------> R = (P - 0.2*S)A2 / (P + 0.8 *S) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R)--------------------> V(R) = (R / 12)*BASIN AREA (inches) (inches) (acres -feet) Agency Design Storm Frequency P (in) S (in) R (in) V(R) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE) 5.10 10.40 0.68 0.63 FDOT Storm Drain 3 yr / 24 hr (POST) 5.10 3.20 2.60 2.43 3 yr / 24 hr Attenuation Volume (ac-ft) 1.79 SFWMD Open Basin 25 yr / 72 hr (PRE) 1 10.50 10.40 3.77 3.52 SFWMD Open Basin 25 yr / 72 hr (POST) 10.50 3.20 7.45 6.96 Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3.44 Dry Detention or Retention Treatment Volume (ac-ft) 0.00 Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) 5.04 Page 1848 of 4682 PROJECT TITLE: lWilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: JCN and SCS Runoff Volume Calculation MADE BY: AS 11/16/21 BASIN DESIGNATION: 113asin 6-2 CHECKED BY: DL 11/17/21 From STA 182+20. Basin Location and To STA 205+00. Size Typical Section ROW 165 LF Water Quality Typical Section ROW x Basin Length = Basin ROW Area= 8.64 ac Treated Paved Area = 5.11 ac Pond Site Area = 2.16 ac Total (ROW + Pond) Basin Area = 10.79 ac A.1 1.0 " Over Total Basin Area = B.1 2.5 " Over Treated Paved Area = Water Quantity Basin Length 2,280 LF Paved Area + Basin (ROW Area) _ Percent Impervious = 59% 0.90 Ac-Ft 1.06 Ac-Ft 1.06 Ac-Ft C.1 50% Additional Treatment Volume for Impaired Waterbody 1.60 Ac-Ft D. 0.5 "Required Dry Detention or Retention Pre -Treatment as part of Required 0.45 Ac-Ft Treatment Volume E.1 20 % of Wet Detention Area = Min Littoral Shelf Area = 0.17 ac F.1 2.5% of Wet Detention and Drainage Basin Areas = 0.27 ac PRE -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Fair Condition) 113, Holopaw fine sand A/D 49 2.48 121.6 Open Spaces (Good Condition) 117, Immokalee fine sand B/D 69 1.65 114.1 Wood or Forest Land (Good Cover) 113, Holopaw fine sand A/D 25 1.88 47.1 Wood or Forest Land (Good Cover) 117, Immokalee fine sand B/D 55 1.26 69.1 Pond Site Area Wood or Forest Land 113 and 120 A/D 25 2.16 53.9 Impervious (Paved parking, roads, etc.) 98 1.36 133.4 TOTALS 10.79 539.1 COMPOSITE CN 50.0 POST -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Good Condition) 113, Holopaw fine sand A/D 39 2.12 82.5 Open Spaces (Good Condition) 117, Immokalee fine sand B/D 61 1.41 86.1 Open Spaces (Good Condition, Pond Site) 113 and 120 A/D 39 1.28 50.1 Impervious (Open Water, Pond Site) 100 0.87 87.1 Impervious (Paved parking, roads, etc.) 98 5.11 500.7 TOTALS 10.79 806.4 COMPOSITE CN 74.7 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S--------------------------------> S = ( 1000 / CN) - 10 2) DETERMINE RUNOFF - R--------------------------------> R = (P - 0.2*S)A2 / (P + 0.8 *S) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R)--------------------> V(R) = (R / 12)*BASIN AREA (inches) (inches) (acres -feet) Agency Design Storm Frequency P (in) S (in) R (in) V(R) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE) 5.10 10.02 0.73 0.66 FDOT Storm Drain 3 yr / 24 hr (POST) 5.10 3.38 2.51 2.25 3 yr / 24 hr Attenuation Volume (ac-ft) 1.60 SFWMD Open Basin 25 yr / 72 hr (PRE) 1 10.50 10.02 3.90 3.51 SFWMD Open Basin 25 yr / 72 hr (POST) 10.50 3.38 7.31 6.57 Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3.07 Dry Detention or Retention Treatment Volume (ac-ft) 0.00 Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) 4.66 Page 1849 of 4682 PROJECT TITLE: lWilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: JCN and SCS Runoff Volume Calculation MADE BY: AS 11/16/21 BASIN DESIGNATION: 113asin 6-3 CHECKED BY: DL 11/17/21 Basin Location and From STATo STA Size Typical Section ROW 182+20. 205+00. Basin Length 2,280 LF 165 LF Water Quality Typical Section ROW x Basin Length = Basin ROW Area = 8.64 ac Paved Area = Basin (ROW Area) _ Treated Paved Area = 5.11 ac Percent Impervious = Pond Site Area = 3.31 ac 59% Total (ROW + Pond) Basin Area = 11.95 ac A.1 1.0 " Over Total Basin Area = 1.00 Ac-Ft B.1 2.5 " Over Treated Paved Area = 1.06 Ac-Ft 1.06 Ac-Ft C.1 50% Additional Treatment Volume for Impaired Waterbody 1.60 Ac-Ft D.1 0.5 "Required Dry Detention or Retention Pre -Treatment as part of Required 0.50 Ac-Ft Treatment Volume Water Quantity E.1 20% of Wet Detention Area = Min Littoral Shelf Area = 0.21 ac F.1 2.5% of Wet Detention and Drainage Basin Areas = 0.30 ac PRE -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Fair Condition) 113, Holopaw fine sand A/D 49 2.48 121.6 Open Spaces (Good Condition) 117, Immokalee fine sand B/D 69 1.65 114.1 Wood or Forest Land (Good Cover) It 3, Holopaw fine sand A/D 25 1.88 47.1 Wood or Forest Land (Good Cover) 117, Immokalee fine sand B/D 55 1.26 69.1 Pond Site Area Wood or Forest Land 113 and 120 A/D 25 3.31 82.8 Impervious (Paved parking, roads, etc.) 98 1.36 133.4 TOTALS 11.95 568.0 COMPOSITE CN 47.5 POST -DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET LAND -USE DESCRIPTION SOIL NAME SOIL GROUP CN AREA (ac) PRODUCT Open Spaces (Good Condition) It 3, Holopaw fine sand A/D 39 2.12 82.5 Open Spaces (Good Condition) 117, Immokalee fine sand B/D 61 1.41 86.1 Open Spaces (Good Condition, Pond Site) 113 and 120 A/D 39 2.28 88.8 Impervious (Open Water, Pond Site) 100 1.03 103.3 Impervious (Paved parking, roads, etc.) 98 5.11 1 500.7 TOTALS 11.95 861.4 COMPOSITE CN 72.1 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S--------------------------------> S = ( 1000 / CN ) - 10 2) DETERMINE RUNOFF - R--------------------------------> R = (P - 0.2*S)A2 / ( P + 0.8*S) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R)--------------------------------> V(R) = (R / 12)*BASIN AREA (inches) (inches) (acres -feet) Agency Design Storm Frequency P (in) S (in) R (in) V(R) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE) 5.10 11.03 0.60 0.60 FDOT Storm Drain 3 yr / 24 hr (POST) 5.10 3.87 2.28 2.27 3 yr / 24 hr Attenuation Volume (ac-ft) 1.68 SFWMD Open Basin 25 yr / 72 hr (PRE) 1 10.50 11.03 1 3.56 1 3.54 SFWMD Open Basin 25 yr / 72 hr (POST) 1 10.50 3.87 1 6.96 1 6.93 Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3.38 Dry Detention or Retention Treatment Volume (ac-ft) 0.50 Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) 4.48 Page 1850 of 4682 Attachment 3 Pond Size Calculations Page 1851 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. I MADE BY: AS 11/16/21 POND DESIGNATION: Pond 1-1 CHECKED BY: DL 11/17/21 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: a. Check of Pond Site Conditions b. Check of Tailwater Conditions Pond Site Location = STA. 57+00, RT Pond Site Existing Ground Elevation = Varies 10.0 to 13.0 ft Pond Site Soil Type = Boca fine sand (102, A/D) and Chobee, limestone substratum -Dania, ponded (105, C/D) Pond Site Estimated Depth to Groundwater = Varies 0.0 to 0.5 ft Estimated SHWT = 11.00 ft Distance to Discharge Point = 3800 Positive Drainage Gradient = 0.06% Discharge Point NWL Estimation = 9.7 Discharge Point Peak Stage Estimation = 12.5 c. Summary of Controlling Soils and Minimum NWL = 12.0 Tailwater Conditions The pond(s) will be a combination of: Wet Detention and Dry Detention STEP NO.2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) LF Cypress Canal ft. Storage Height (SH) = Maximum DHW - Pond NWL Maximum DHW - Pond Bottom Minimum Existing Roadway Elevation = 12.0 Minimum Proposed Roadway Elevation = 14.5 Berm Elevation = 14.5 Freeboard to DHW = 1.0 Maximum DHW Elevation = 13.5 Proposed Wet Pond NWL / Dry Pond Bottom EL = 12.0 Clearance to ESHWT = 1.0 SH Available = 1.5 STEP NO.3 - TOTAL PEAK STORAGE VOLUME REOUIREMENT The Total Peak Storage Volume Required is: Volume Peak (ac-ft) = 5.23 Volume Peak (cf) = 227626 STEP NO.4 - POND CONFIGURATION ft. 12.0 ft. ft. 14.5 ft. ft. 14.5 ft. ft. 1.0 ft. ft. 13.5 ft. ft. 12.0 ft. ft. 1.0 ft. ft. 1.5 ft. Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 Dry Detention 0.69 30090 2.3 ft. (vertical) filename: Pond 1-1.xls worksheet: RW REQUIREMENT PT.1 Page 1852 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to hnmokalee Road SUBJECT: R/W Requirement Estimate Pt. 2 MADE BY: AS 11/16/21 BASIN DESIGNATION: Pond 1-1 CHECKED BY: DL 11/17/21 STEP NO.4 - POND CONFIGURATION cont. Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims = 6.0 SH = 1.5 ft 1.5 ft L = 399 ft 326 ft W = 363 ft 54 ft Pond Area at Control/Bot EL = 3.32 acres 0.41 acres STEP NO. 5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) Wet Detention Dry Detention Side slopes are 1: 6 4 Length @ Top of SH = 417 ft 338 ft Width @ Top of SH = 381 ft 66 ft Pond Area at SH = 3.64 acres 0.51 acres Volume Provided at SH = 5.23 ac-ft 0.69 ac-ft Volume Required = 5.23 ac-ft 0.69 ac-ft STEP NO. 6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS Wet Detention Dry Detention Side slopes are 1: 4 4 Desired Maintenance Berm Widths = 20 ft. 1 > ft. Length @ Outside Maintenance Berm = 465 ft 376 ft Width @ Outside Maintennace Berm = 429 ft 104 ft Minimum Pond Area Requirement = 4.58 acres 0.90 acres Contingency = 15% Pond Area Requirement = 5.26 acres 1.04 acres TOTAL WET AND DRY POND AREA REQUIREMENT 6.30 acres STEP NO.7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr / 24 hr Attenuation Volume = 2.16 ac-ft 3 yr 24 hr Pond EL = 12.5 Length Between Pond and Roadway Low Point = 1750 ft. Energy Losses @ 0.05% = 0.9 ft Roadway Low Point EL = 14.5 HGL Clearance at Roadway Low Point = 1.1 ft (OK) STEP NO.8 - CHECK OF ESTIMATED LITTORAL AREA Length @ Bot of Littoral Area (2' below NWL) = 375 Length @ Top of Littoral Area (ft) = 411 Width @ Bot of Littoral Area (2' below NWL) = 339 Width @ Top of Littoral Area (ft) = 375 Bot of Littoral Area (2' below NWL) = 2.92 Top of Littoral Area (F above NWL) = 3.54 acres Littoral Area Requirement (acres) = 0.41 Littoral Area Provided (acres) = 0.62 (OK) Page 1853 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 1 MADE BY: AS 11/16/21 POND DESIGNATION: Pond 1-2 CHECKED BY: DL 11/17/21 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: a. Check of Pond Site Conditions b. Check of Tailwater Conditions Pond Site Location = STA. 70+00, RT Pond Site Existing Ground Elevation = Varies 10.0 to 14.0 ft Pond Site Soil Type = Boca fine sand (102, A/D) Pond Site Estimated Depth to Groundwater = 0.5 ft. Estimated SHWT = 10.5 ft. Distance to Discharge Point = 2500 Positive Drainage Gradient = 0.06% Discharge Point NWL Estimation = 9.7 Discharge Point Peak Stage Estimation = 12.5 c. Summary of Controlling Soils and Minimum NWL = 11.2 Tailwater Conditions The pond(s) will be a combination of: Wet Detention and Dry Detention STEP NO.2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) LF Cypress Canal ft. Storage Height (SH) = Maximum DHW - Pond NWL Maximum DHW - Pond Bottom Minimum Existing Roadway Elevation = 12.0 ft. 12.0 ft. Minimum Proposed Roadway Elevation = 14.5 ft. 14.5 ft. Berm Elevation = 14.5 ft. 14.5 ft. Freeboard to DHW = ft. 1.0 ft. Maximum DHW Elevation = 13.5 ft. 13.5 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL = 11.2 ft. 11.5 ft. Clearance to ESHWT = 0.7 ft. 1.0 ft. SH = 2.3 ft. 2.0 ft. STEP NO.3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT The Total Peak Storage Volume Required is: Wet Detention Dry Detention Volume Peak (ac-ft) = 5.92 0.64 Volume Peak (cf) = 257973 28075 STEP NO.4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 1.5 ft. (vertical) filename: Pond 1-2.xls worksheet: RW REQUIREMENT PT.1 Page 1854 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to hnmokalee Road SUBJECT: R/W Requirement Estimate Pt. 2 MADE BY: AS 11/16/21 BASIN DESIGNATION: Pond 1-2 CHECKED BY: DL 11/17/21 STEP NO.4 - POND CONFIGURATION cont. Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims = Z..0 6.0 SH = 2.3 ft 2.0 ft L = 453 ft 262 ft W = 226 ft 44 ft Pond Area at Control/Bot EL = 2.35 acres 0.26 acres STEP NO.5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) Side slopes are 1: 6 4 Wet Detention Dry Detention Length @ Top of SH = 480 ft 278 ft Width @ Top of SH = 254 ft 60 ft Pond Area at SH = 2.80 acres 0.38 acres Volume Provided at SH = 5.92 ac-ft 0.64 ac-ft Volume Required = 5.92 ac-ft 0.64 ac-ft STEP NO. 6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS Wet Detention Dry Detention Side slopes are 1: 4 4 Desired Maintenance Berm Widths = 20 ft. 15 ft. Length @ Outside Maintenance Berm = 528 ft. 316 ft. Width @ Outside Maintennace Berm = 302 ft. 98 ft. Minimum Pond Area Requirement = 3.66 acres 0.71 acres Contingency = 15% 15% Pond Area Requirement = 4.21 acres 0.81 acres TOTAL WET AND DRY POND AREA REQUIREMENT 5.02 acres STEP NO.7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM V MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr / 24 hr Attenuation Volume = 2.30 ac-ft 3 yr 24 hr Pond EL = 12.0 Length Between Pond and Roadway Low Point = 3000 ft. Energy Losses @ 0.05% = 1.5 ft Roadway Low Point EL = 14.5 HGL Clearance at Roadway Low Point = 1.0 ft (OK) STEP NO.8 - CHECK OF ESTIMATED LITTORAL AREA Length @ Bot of Littoral Area (2' below NWL) = 429 Length @ Top of Littoral Area (ft) = 465 Width @ Bot of Littoral Area (2' below NWL) = 202 Width @ Top of Littoral Area (ft) = 238 Bot of Littoral Area (2' below NWL) = 1.99 Top of Littoral Area (1' above NWL) = 2.54 acres Littoral Area Requirement (acres) = 0.39 Littoral Area Provided (acres) = 0.55 (OK) Page 1855 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 1 MADE BY: AS 11/16/21 POND DESIGNATION: Pond 2-1 CHECKED BY: DL 11/17/21 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: a. Check of Pond Site Conditions b. Check of Tailwater Conditions Pond Site Location = STA. 88+00, RT Pond Site Existing Ground Elevation = 12.0 ft. Boca fine sand -Urban (102, A/D) and Hallandale fine Pond Site Soil Type = sand (110, B/D) Pond Site Estimated Depth to Groundwater = Varies 0.5 to 1.0 ft. Estimated SHWT = 11.5 ft. Distance to Discharge Point = 675 Positive Drainage Gradient = 0.06% Discharge Point NWL Estimation = 9.7 Discharge Point Peak Stage Estimation = 12.5 c. Summary of Controlling Soils and Minimum Wet Detention NWL = 10.2 Tailwater Conditions The pond(s) will be a combination of: Wet Detention and Dry Detention STEP NO.2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) LF Cypress Canal ft. Storage Height (SH) = Maximum DHW - Pond NWL Maximum DHW - Pond Bottom Minimum Existing Roadway Elevation = 12.0 ft. 12.0 ft. Minimum Proposed Roadway Elevation = 14.5 ft. 14.5 ft. Berm Elevation = 14.5 ft. 14.5 ft. Freeboard to DHW = 1.0 ft. 1.0 ft. Maximum DHW Elevation = 13.5 ft. 13.5 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL = 10.2 ft. 12.5 ft. Clearance to ESHWT = -1.3 ft. 1.0 ft. SH = 3.3 ft. 1.0 ft. STEP NO.3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT The Total Peak Storage Volume Required is: Wet Detention Dry Detention Volume Peak (ac-ft) = 4.41 0.60 Volume Peak (cf) = 192036 26277 STEP NO.4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 0.4 ft. (vertical) filename: Pond 2-1.xls worksheet: RW REQUIREMENT PT.1 Page 1856 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to hnmokalee Road SUBJECT: R/W Requirement Estimate Pt. 2 MADE BY: AS 11/16/21 BASIN DESIGNATION: Pond 2-1 CHECKED BY: DL 11/17/21 STEP NO.4 - POND CONFIGURATION cont. Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims = `' 2.0 SH = 3.3 ft 1.0 ft L = 311 ft 223 ft W = 155 ft 112 ft Pond Area at Control/Bot EL = 1.11 acres 0.57 acres STEP NO.5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) Wet Detention Dry Detention Side slopes are 1: 6 4 Length @ Top of SH = 350 ft 231 ft Width @ Top of SH = 195 ft 120 ft Pond Area at SH = 1.57 acres 0.63 acres Volume Provided at SH = 4.410 ac-ft 0.602 ac-ft Volume Required = 4.409 ac-ft 0.603 ac-ft STEP NO.6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS Wet Detention Dry Detention Side slopes are 1: 4 4 Desired Maintenance Berm Widths = 20 ft. 15 ft. Length @ Outside Maintenance Berm = 398 ft. 269 ft. Width @ Outside Maintenaace Berm = 243 ft. 158 ft. Minimum Pond Area Requirement = 2.22 acres 0.97 acres Contingency = 15% 15% Pond Area Requirement = 2.55 acres 1.12 acres TOTAL WET AND DRY POND AREA REQUIREMENT 3.67 acres STEP NO. 7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr / 24 hr Attenuation Volume = 1.59 ac-ft 3 yr 24 hr Pond EL = 11.4 Length Between Pond and Roadway Low Point = 1900 ft. Energy Losses @ 0.05% = 1.0 ft Roadway Low Point EL = 14.5 HGL Clearance at Roadway Low Point = 2.2 ft (OK) STEP NO.8 - CHECK OF ESTIMATED LITTORAL AREA Length @ Bot of Littoral Area (2' below NWL) = 287 Length @ Top of Littoral Area (ft) = 323 Width @ Bot of Littoral Area (2' below NWL) = 131 Width @ Top of Littoral Area (ft) = 167 Bot of Littoral Area (2' below NWL) = 0.86 Top of Littoral Area (F above NWL) = 1.24 acres Littoral Area Requirement (acres) = 0.22 Littoral Area Provided (acres) = 0.38 (OK) Page 1857 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 1 MADE BY: AS 11/16/21 POND DESIGNATION: Pond 2-2 CHECKED BY: DL 11/17/21 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: a. Check of Pond Site Conditions b. Check of Tailwater Conditions Pond Site Location = STA. 88+00, RT Pond Site Existing Ground Elevation = Varies 12 to 14 ft. Boca fine sand -Urban (102, A/D) and Hallandale fine Pond Site Soil Type = sand (110, B/D) Pond Site Estimated Depth to Groundwater = Varies 0.5 to 1.0 ft. Estimated SHWT = 11.5 ft. Distance to Discharge Point = Positive Drainage Gradient = Discharge Point NWL Estimation = Discharge Point Peak Stage Estimation = 425 0.06% 9.7 12.5 c. Summary of Controlling Soils and Minimum Wet Detention NAIL = 10.0 Tailwater Conditions The pond(s) will be a combination of: Wet Detention and Dry Detention STEP NO. 2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) LF Cypress Canal ft. Storage Height (SH) = Maximum DHW - Pond NWL Maximum DHW - Pond Bottom Minimum Existing Roadway Elevation = 12.0 ft. 12.0 ft. Minimum Proposed Roadway Elevation = 14.5 ft. 14.5 ft. Berm Elevation = 14.5 ft. 14.5 ft. Freeboard to DHW = 1.0 ft. 1.0 ft. Maximum DHW Elevation = 13.5 ft. 13.5 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL = 10.0 ft. 12.5 ft. Clearance to ESHWT = -1.5 ft. 1.0 ft. SH = 3.5 ft. 1.0 ft. STEP NO.3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT The Total Peak Storage Volume Required is: Wet Detention Dry Detention Volume Peak (ac-ft) = 4.33 0.60 Volume Peak (cf) = 188561 26096 STEP NO.4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 0.3 ft. (vertical) filename: Pond 2-2.xls worksheet: RW REQUIREMENT PT.1 Page 1858 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to hnmokalee Road SUBJECT: R/W Requirement Estimate Pt. 2 MADE BY: AS 11/16/21 BASIN DESIGNATION: Pond 2-2 CHECKED BY: DL 11/17/21 STEP NO.4 - POND CONFIGURATION cont. Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims = ? a 25 SH = 3.5 ft 1.0 ft L = 296 ft 249 ft W = 148 ft 99 ft Pond Area at Control/Bot EL = 1.00 acres 0.57 acres STEP NO.5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) Wet Detention Dry Detention Side slopes are 1: 6 4 Length @ Top of SH = 338 ft 257 ft Width @ Top of SH = 190 ft 107 ft Pond Area at SH = 1.47 acres 0.63 acres Volume Provided at SH = 4.33 ac-ft 0.60 ac-ft Volume Required = 4.33 ac-ft 0.60 ac-ft STEP NO.6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS Wet Detention Dry Detention Side slopes are 1: 4 4 Desired Maintenance Berm Widths = 20 ft. 15 ft. Length @ Outside Maintenance Berm = 386 ft. 295 ft. Width @ Outside Maintenaace Berm = 238 ft. 145 ft. Minimum Pond Area Requirement = 2.10 acres 0.98 acres Contingency = 15% 15% Pond Area Requirement = 2.42 acres 1.13 acres TOTAL WET AND DRY POND AREA REQUIREMENT 3.55 acres STEP NO. 7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr / 24 hr Attenuation Volume = 1.55 ac-ft 3 yr 24 hr Pond EL = 11.1 Length Between Pond and Roadway Low Point = 2780 ft. Energy Losses @ 0.05% = 1.4 ft Roadway Low Point EL = 14.5 HGL Clearance at Roadway Low Point = 2.1 ft (OK) STEP NO.8 - CHECK OF ESTIMATED LITTORAL AREA Length @ Bot of Littoral Area (2' below NWL) = 272 Length @ Top of Littoral Area (ft) = 308 Width @ Bot of Littoral Area (2' below NWL) = 124 Width @ Top of Littoral Area (ft) = 160 Bot of Littoral Area (2' below NWL) = 0.77 Top of Littoral Area (F above NWL) = 1.13 acres Littoral Area Requirement (acres) = 0.20 Littoral Area Provided (acres) = 0.36 (OK) Page 1859 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 2 MADE BY: AS 11/16/21 BASIN DESIGNATION: Pond 2-3 CHECKED BY: DL 11/17/21 STEP NO. 4 - POND CONFIGURATION cont. Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims = 1.2 1.0 SH = 3.7 ft 0.5 ft L = 225 ft 232 ft W = 188 ft 232 ft Pond Area at Control/Bot EL = 0.97 acres 1.23 acres STEP NO.5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) Wet Detention Dry Detention Side slopes are 1: 6 4 Length @ Top of SH = 270 ft 236 ft Length @ Top of SH = 232 ft 236 ft Pond Area at SH = 1.44 acres 1.27 acres Volume Provided at SH = 4.45 ac-ft 0.63 ac-ft Volume Required = 4.45 ac-ft 0.63 ac-ft STEP NO.6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS Wet Detention Dry Detention Side slopes are 1: 4 4 Desired Maintenance Berm Widths = 20 f 15 ft. Length @ Outside Maintenance Berm = 318 ft. 274 ft. Width @ Outside Maintennace Berm = 280 ft. 274 ft. Minimum Pond Area Requirement = 2.04 acres 1.72 acres Contingency = 15% Pond Area Requirement = 2.35 acres 1.97 acres TOTAL WET AND DRY POND AREA REQUIREMENT 4.32 acres STEP NO. 7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM V MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr / 24 hr Attenuation Volume = 1.56 ac-ft 3 yr 24 hr Pond EL = 11.1 Length Between Pond and Roadway Low Point 3100 ft. Energy Losses @ 0.05% = 1.6 ft Roadway Low Point EL = 14.5 HGL Clearance at Roadway Low Point = 1.9 ft (OK) STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA Length @ Bot of Littoral Area (2' below NWL) = 201 Length @ Top of Littoral Area (ft) = 237 Width @ Bot of Littoral Area (2' below NWL) = 164 Width @ Top of Littoral Area (ft) = 200 Bot of Littoral Area (2' below NWL) = 0.76 Top of Littoral Area (F above NWL) = 1.09 acres Littoral Area Requirement (acres) = 0.19 Littoral Area Provided (acres) = 0.33 (OK) Page 1860 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 1 MADE BY: AS 11/16/21 POND DESIGNATION: Pond 2-3 CHECKED BY: DL 11/17/21 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: a. Check of Pond Site Conditions b. Check of Tailwater Conditions Pond Site Location = STA. 94+00, RT Pond Site Existing Ground Elevation = Varies 12 to 14 ft. Pond Site Soil Type = Boca fine sand -Urban (102, A/D) and Riviera fine sand (131, B/D) Pond Site Estimated Depth to Groundwater = Varies 0 to 0.5 ft. Estimated SHWT = 12.0 ft. Distance to Discharge Point = 50 Positive Drainage Gradient = 0.06% Discharge Point NWL Estimation = 9.7 Discharge Point Peak Stage Estimation = 12.5 c. Summary of Controlling Soils and Minimum Wet Detention NWL = 9.8 Tailwater Conditions The pond(s) will be a combination of: Wet Detention and Dry Detention STEP NO.2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) LF Cypress Canal ft. Storage Height (SH) = Maximum DHW - Pond NWL Maximum DHW - Pond Bottom Minimum Existing Roadway Elevation = 12.0 ft. 12.0 ft. Minimum Proposed Roadway Elevation = 14.5 ft. 14.5 ft. Berm Elevation = 14.5 ft. 14.5 ft. Freeboard to DHW = 1.0 ft. 1.0 ft. Maximum DHW Elevation = 13.5 ft. 13.5 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL = 9.8 ft. 13.0 ft. Clearance to ESHWT = -2.2 ft. 1.0 ft. SH = 3.7 ft. 0.5 ft. STEP NO.3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT The Total Peak Storage Volume Required is: Wet Detention Dry Detention Volume Peak (ac-ft) = 4.45 0.63 Volume Peak (cf) = 193841 27312 STEP NO.4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 0.03 ft. (vertical) filename: Pond 2-3.xls worksheet: RW REQUIREMENT PT.1 Page 1861 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 1 MADE BY: AS 11/16/21 POND DESIGNATION: Pond 2-4 CHECKED BY: DL 11/17/21 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: Pond Site Location = STA. 78+00, LT Pond Site Existing Ground Elevation = 12.0 ft. a. Check of Pond Site Conditions Pond Site Soil Type = Boca fine sand -Urban (102, A/D) Pond Site Estimated Depth to Groundwater = 0.5 ft. Estimated SHWT = 11.5 ft. Distance to Discharge Point = 1700 LF Positive Drainage Gradient = 0.06% _ b. Check of Tailwater Conditions Discharge Point NWL Estimation = 9.7 Cypress Discharge Point Peak Stage Estimation = 12.5 Canal c. Summary of Controlling Soils and Minimum Wet Detention NWL = 10.8 ft. Tailwater Conditions The pond(s) will be a combination of: Wet Detention and Dry Detention STEP NO.2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) Storage Height (SH) = Minimum Existing Roadway Elevation = Minimum Proposed Roadway Elevation = Berm Elevation — Freeboard to DHW = Maximum DHW Elevation = Proposed Wet Pond NWL / Dry Pond Bottom EL = Clearance to ESHWT = SH = Maximum DHW - Pond NWL Maximum DHW - Pond Bottom 12.0 ft. 12.0 ft. 14.5 ft. 14.5 ft. 14.5 ft. 14.5 ft. 1.0 ft. 1.0 ft. 13.5 ft. 13.5 ft. 10.8 ft. 12.5 ft. -0.7 ft. 1.0 ft. 2.7 ft. 1.0 ft. STEP NO.3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT The Total Peak Storage Volume Required is: Wet Detention Volume Peak (ac-ft) = 5.38 Volume Peak (cf) = 234328 STEP NO.4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 Dry Detention 0.64 27748 1.02 ft. (vertical) filename: Pond 2-4.xls worksheet: RW REQUIREMENT PT.1 Page 1862 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 2 MADE BY: AS 11/16/21 BASIN DESIGNATION: Pond 2-4 CHECKED BY: DL 11/17/21 STEP NO.4 - POND CONFIGURATION cont. Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims = ' z 2.7 SH = 2.7 ft 1.0 ft L = 340 ft 266 ft W = 227 ft 99 ft Pond Area at Control/Bot EL = 1.77 acres 0.60 acres STEP NO.5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) Wet Detention Dry Detention Side slopes are 1: 6 4 Length @ Top of SH = 373 ft 274 ft Length @ Top of SH = 259 ft 107 ft Pond Area at SH = 2.22 acres 0.67 acres Volume Provided at SH = 5.38 ac-ft 0.64 ac-ft Volume Required = 5.38 ac-ft 0.64 ac-ft STEP NO.6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS Wet Detention Dry Detention Side slopes are 1: Desired Maintenance Berm Widths = ft. Length @ Outside Maintenance Berm = 421 ft. 312 ft. Width @ Outside Maintennace Berm = 307 ft. 145 ft. Minimum Pond Area Requirement = 2.97 acres 1.04 acres Contingency = 15% 15% Pond Area Requirement = 3.41 acres 1.19 acres TOTAL WET AND DRY POND AREA REQUIREMENT 4.60 acres STEP NO. 7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr / 24 hr Attenuation Volume = 1.93 ac-ft 3 yr 24 hr Pond EL = 11.8 Length Between Pond and Roadway Low Point = 1500 ft. Energy Losses @ 0.05% = 0.8 ft Roadway Low Point EL = 14.5 HGL Clearance at Roadway Low Point = 2.0 ft (OK) STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA Length @ Bot of Littoral Area (2' below NWL) = 316 Length @ Top of Littoral Area (ft) = 352 Width @ Bot of Littoral Area (2' below NWL) = 203 Width @ Top of Littoral Area (ft) = 239 Bot of Littoral Area (2' below NWL) = 1.47 Top of Littoral Area (F above NWL) = 1.93 acres Littoral Area Requirement (acres) = 0.35 Littoral Area Provided (acres) = 0.46 (OK) Page 1863 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 1 MADE BY: AS 11/16/21 POND DESIGNATION: Pond 3-1 CHECKED BY: DL 11/17/21 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: a. Check of Pond Site Conditions b. Check of Tailwater Conditions Pond Site Location = STA. 102+00, RT Pond Site Existing Ground Elevation = 12.0 ft. Pond Site Soil Type = Boca fine sand -Urban (102, A/D) and Riviera fine sand (131, B/D) Pond Site Estimated Depth to Groundwater = Varies 0 to 0.5 ft. Estimated SHWT = 11.5 ft. Distance to Discharge Point = 50 Positive Drainage Gradient = 0.06% Discharge Point NWL Estimation = 9.7 Discharge Point Peak Stage Estimation = 12.5 c. Summary of Controlling Soils and Minimum Wet Detention NWL = 9.8 Tailwater Conditions The pond(s) will be a combination of: Wet Detention and Dry Detention STEP NO.2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) LF Cypress Canal ft. Storage Height (SH) = Maximum DHW - Pond NWL Maximum DHW - Pond Bottom Minimum Existing Roadway Elevation = 12.0 ft. 12.0 ft. Minimum Proposed Roadway Elevation = 14.5 ft. 14.5 ft. Berm Elevation = 14.5 ft. 14.5 ft. Freeboard to DHW = 1.0 ft. 1.0 ft. Maximum DHW Elevation = 13.5 ft. 13.5 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL = 9.8 ft. 12.5 ft. Clearance to ESHWT = -1.7 ft. 1.0 ft. SH = 3.7 ft. 1.0 ft. STEP NO.3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT The Total Peak Storage Volume Required is: Wet Detention Dry Detention Volume Peak (ac-ft) = 5.40 0.67 Volume Peak (cf) = 235326 29087 STEP NO.4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 0.0 ft. (vertical) filename: Pond 3-1.xls worksheet: RW REQUIREMENT PT.1 Page 1864 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 2 MADE BY: AS 11/16/21 BASIN DESIGNATION: Pond 3-1 CHECKED BY: DL 11/17/21 STEP NO.4 - POND CONFIGURATION cont. Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims = ' z 2 3 SH = 3.7 ft 1.0 ft L = 280 ft 252 ft W = 187 ft 110 ft Pond Area at Control/Bot EL = 1.20 acres 0.63 acres STEP NO.5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) Wet Detention Dry Detention Side slopes are 1: 6 4 Length @ Top of SH = 324 ft 260 ft Length @ Top of SH = 231 ft 118 ft Pond Area at SH = 1.72 acres 0.70 acres Volume Provided at SH = 5.40 ac-ft 0.67 ac-ft Volume Required = 5.40 ac-ft 0.67 ac-ft STEP NO.6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS Wet Detention Dry Detention Side slopes are 1: 4 4 Desired Maintenance Berm Widths = 20 ft. 15 ft. Length @ Outside Maintenance Berm = 372 ft. 298 ft. Width @ Outside Maintennace Berm = 279 ft. 156 ft. Minimum Pond Area Requirement = 2.39 acres 1.06 acres Contingency = 15% 15% Pond Area Requirement = 2.74 acres 1.22 acres TOTAL WET AND DRY POND AREA REQUIREMENT 3.97 acres STEP NO.7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr / 24 hr Attenuation Volume = 2.06 ac-ft 3 yr 24 hr Pond EL = 11.2 Length Between Pond and Roadway Low Point = 3100 ft. Energy Losses @ 0.05% = 1.6 ft Roadway Low Point EL = 14.5 HGL Clearance at Roadway Low Point = 1.7 ft (OK) STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA Length @ Bot of Littoral Area (2' below NWL) = 256 Length @ Top of Littoral Area (ft) = 292 Width @ Bot of Littoral Area (2' below NWL) = 163 Width @ Top of Littoral Area (ft) = 199 Bot of Littoral Area (2' below NWL) = 0.96 Top of Littoral Area (F above NWL) = 1.33 acres Littoral Area Requirement (acres) = 0.24 Littoral Area Provided (acres) = 0.38 (OK) Page 1865 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 1 MADE BY: AS 11/16/21 POND DESIGNATION: Pond 3-2 CHECKED BY: DL 11/17/21 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: a. Check of Pond Site Conditions b. Check of Tailwater Conditions Pond Site Location = STA. 98+00, LT Pond Site Existing Ground Elevation = Varies 12 to 14 ft. Pond Site Soil Type = Hallandale fine sand (110, B/D) Pond Site Estimated Depth to Groundwater = 1.0 ft. Estimated SHWT = 11.0 ft. Distance to Discharge Point = 50 Positive Drainage Gradient = 0.06% Discharge Point NWL Estimation = 9.7 Discharge Point Peak Stage Estimation = 12.5 c. Summary of Controlling Soils and Minimum Wet Detention NWL = 9.8 Tailwater Conditions The pond(s) will be a combination of: Wet Detention and Dry Detention STEP NO.2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) LF Cypress Canal ft. Storage Height (SH) Maximum DHW - Pond NWL Maximum DHW - Pond Bottom Minimum Existing Roadway Elevation = 12.0 ft. 12.0 ft. Minimum Proposed Roadway Elevation = 14.5 ft. 14.5 it. Berm Elevation = 14.5 ft. 14.5 ft. Freeboard to DHW = 1.0 ft. 1.0 ft. Maximum DHW Elevation = 13.5 ft. 13.5 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL = 9.8 ft. 12.0 ft. Clearance to ESHWT = -1.2 ft. 1.0 ft. SH = 3.7 ft. 1.5 ft. STEP NO.3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT The Total Peak Storage Volume Required is: Wet Detention Dry Detention Volume Peak (ac-ft) = 4.64 0.65 Volume Peak (cf) = 202171 28193 STEP NO.4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 0.0 ft. (vertical) filename: Pond 3-2.xls worksheet: RW REQUIREMENT PT.1 Page 1866 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 2 MADE BY: AS 11/16/21 BASIN DESIGNATION: Pond 3-2 CHECKED BY: DL 11/17/21 STEP NO.4 - POND CONFIGURATION cont. Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims = ? a 4.0 SH = 3.7 ft 1.5 ft L = 296 ft 259 ft W = 148 ft 65 ft Pond Area at Control/Bot EL = 1.01 acres 0.38 acres STEP NO.5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) Wet Detention Dry Detention Side slopes are 1: 6 4 Length @ Top of SH = 340 ft 271 ft Length @ Top of SH = 192 ft 77 ft Pond Area at SH = 1.50 acres 0.48 acres Volume Provided at SH = 4.64 ac-ft 0.65 ac-ft Volume Required = 4.64 ac-ft 0.65 ac-ft STEP NO.6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS Wet Detention Dry Detention Side slopes are 1: 4 4 Desired Maintenance Berm Widths = 20 ft. 15 ft. Length @ Outside Maintenance Berm = 388 ft. 309 ft. Width @ Outside Maintennace Berm = 240 ft. 115 ft. Minimum Pond Area Requirement = 2.14 acres 0.81 acres Contingency = 15% 15% Pond Area Requirement = 2.47 acres 0.94 acres TOTAL WET AND DRY POND AREA REQUIREMENT 3.40 acres STEP NO.7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr / 24 hr Attenuation Volume = 1.81 ac-ft 3 yr 24 hr Pond EL = Length Between Pond and Roadway Low Point = 2900 ft. Energy Losses @ 0.05% = Roadway Low Point EL = 14.5 HGL Clearance at Roadway Low Point = STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA 11.2 1.5 ft 1.8 ft (OK) Length @ Bot of Littoral Area (2' below NWL) = 272 Length C Top of Littoral Area (ft) = 308 Width @ Bot of Littoral Area (2' below NWL) = 124 Width @ Top of Littoral Area (ft) = 160 Bot of Littoral Area (2' below NWL) = 0.77 Top of Littoral Area (F above NWL) = 1.13 acres Littoral Area Requirement (acres) = 0.20 Littoral Area Provided (acres) = 0.36 (OK) Page 1867 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 1 MADE BY: AS 11/16/21 POND DESIGNATION: Pond 3-3 CHECKED BY: DL 11/17/21 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: Pond Site Location = STA. 120+00, RT Pond Site Existing Ground Elevation = 12.0 ft. a. Check of Pond Site Conditions Pond Site Soil Type = Riviera and Pineda fine sand (131, B/D and 128, C/D) Pond Site Estimated Depth to Groundwater = 0.5 ft. Estimated SHWT = 11.5 ft. Distance to Discharge Point = 700 LF Positive Drainage Gradient = 0.06% _ b. Check of Tailwater Conditions Discharge Point NWL Estimation = 9.9 Corkscrew Discharge Point Peak Stage Estimation = 12.7 Canal c. Summary of Controlling Soils and Minimum Wet Detention NWL = 10.4 ft. Tailwater Conditions The pond(s) will be a combination of: Wet Detention and Dry Detention STEP NO. 2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) Storage Height (SH) = Maximum DHW - Pond NWL Maximum DHW - Pond Bottom Minimum Existing Roadway Elevation = 12.0 ft. 12.0 ft. Minimum Proposed Roadway Elevation = 14.5 ft. 14.5 ft. Berm Elevation = 14.5 ft. 14.5 ft. Freeboard to DHW = 1.0 ft. 1.0 ft. Maximum DHW Elevation = 13.5 ft. 13.5 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL = 10.4 ft. 12.5 ft. Clearance to ESHWT = -1.1 ft. 1.0 ft. SH = 3.1 ft. 1.0 ft. STEP NO.3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT The Total Peak Storage Volume Required is: Wet Detention Dry Detention Volume Peak (ac-ft) = 4.62 0.67 Volume Peak (cf) = 201410 29133 STEP NO.4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 0.4 ft. (vertical) filename: Pond 3-3.xls worksheet: RW REQUIREMENT PT.1 Page 1868 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 2 MADE BY: AS 11/16/21 BASIN DESIGNATION: Pond 3-3 CHECKED BY: DL 11/17/21 STEP NO.4 - POND CONFIGURATION cont. Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims = 2 5 SH = 3.1 ft 1.0 ft L = 332 ft 263 ft W = 166 ft 105 ft Pond Area at Control/Bot EL = 1.26 acres 0.64 acres STEP NO.5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) Wet Detention Dry Detention Side slopes are 1: 6 4 Length @ Top of SH = 369 ft 271 ft Length @ Top of SH = 203 ft 113 ft Pond Area at SH = 1.72 acres 0.70 acres Volume Provided at SH = 4.62 ac-ft 0.67 ac-ft Volume Required = 4.62 ac-ft 0.67 ac-ft STEP NO.6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS Wet Detention Dry Detention Side slopes are 1: 4 4 Desired Maintenance Berm Widths = 20 ft. 15 ft. Length @ Outside Maintenance Berm = 417 ft. 309 ft. Width @ Outside Maintennace Berm = 251 ft. 151 ft. Minimum Pond Area Requirement = 2.40 acres 1.07 acres Contingency = 15% 15% Pond Area Requirement = 2.76 acres 1.23 acres TOTAL WET AND DRY POND AREA REQUIREMENT 4.00 acres STEP NO.7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr / 24 hr Attenuation Volume = 1.85 ac-ft 3 yr 24 hr Pond EL = Length Between Pond and Roadway Low Point = 2750 ft. Energy Losses @ 0.05% = Roadway Low Point EL = 14.5 HGL Clearance at Roadway Low Point = STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA 11.6 1.4 ft 1.5 ft (OK) Length @ Bot of Littoral Area (2' below NWL) = 308 Length @ Top of Littoral Area (ft) = 344 Width @ Bot of Littoral Area (2' below NWL) = 142 Width @ Top of Littoral Area (ft) = 178 Bot of Littoral Area (2' below NWL) = 1.00 Top of Littoral Area (F above NWL) = 1.40 acres Littoral Area Requirement (acres) = 0.25 Littoral Area Provided (acres) = 0.40 (OK) Page 1869 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 1 MADE BY: AS 11/16/21 POND DESIGNATION: Pond 4-1 CHECKED BY: DL 11/17/21 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: a. Check of Pond Site Conditions b. Check of Tailwater Conditions Pond Site Location = STA. 146+00, RT Pond Site Existing Ground Elevation = 12.5 ft. Pond Site Soil Type = Riviera fine sand (131, B/D) Pond Site Estimated Depth to Groundwater = 0.5 ft. Estimated SHWT = 12.0 ft. Distance to Discharge Point = 700 Positive Drainage Gradient = 0.06% Discharge Point NWL Estimation = 9.9 Discharge Point Peak Stage Estimation = 12.7 c. Summary of Controlling Soils and Minimum Wet Detention NWL = 10.4 Tailwater Conditions The pond(s) will be a combination of: Wet Detention and Dry Detention STEP NO.2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) LF Corkscrew Canal ft. Storage Height (SH) = Maximum DHW - Pond NWL Maximum DHW - Pond Bottom Minimum Existing Roadway Elevation = 12.0 Minimum Proposed Roadway Elevation = 14.5 Berm Elevation 14.5 Freeboard to DHW = 1.0 Maximum DHW Elevation = 13.5 Proposed Wet Pond NWL / Dry Pond Bottom EL = 10.4 Clearance to ESHWT = -1.6 SH = 3.1 STEP NO.3 - TOTAL PEAK STORAGE VOLUME REOUIREMENT The Total Peak Storage Volume Required is: ft. 12.0 ft. ft. 14.5 ft. ft. 14.5 ft. ft. 1.0 ft. ft. 13.5 ft. ft. 13.0 ft. ft. 1.0 ft. ft. 0.5 ft. Volume Peak (ac-ft) = 4.50 Volume Peak (cf) = 196200 STEP NO.4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 Dry Detention 0.59 25837 0.4 ft. (vertical) filename: Pond 4-1.xls worksheet: RW REQUIREMENT PT.1 Page 1870 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 2 MADE BY: AS 11/16/21 BASIN DESIGNATION: Pond 4-1 CHECKED BY: DL 11/17/21 STEP NO.4 - POND CONFIGURATION cont. Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims = 1 5 SH = 3.1 ft 0.5 ft L = 279 ft 293 ft W = 199 ft 195 ft Pond Area at Control/Bot EL = 1.27 acres 1.31 acres STEP NO.5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) Wet Detention Dry Detention Side slopes are 1: 6 4 Length @ Top of SH = 316 ft 297 ft Length @ Top of SH = 236 ft 199 ft Pond Area at SH = 1.71 acres 1.36 acres Volume Provided at SH = 4.62 ac-ft 0.67 ac-ft Volume Required = 4.62 ac-ft 0.67 ac-ft STEP NO.6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS Wet Detention Dry Detention Side slopes are 1: 4 4 Desired Maintenance Berm Widths = 20 ft. 15 ft. Length @ Outside Maintenance Berm = 364 ft. 335 ft. Width @ Outside Maintennace Berm = 284 ft. 237 ft. Minimum Pond Area Requirement = 2.37 acres 1.83 acres Contingency = 15% Pond Area Requirement = 2.73 acres 2.10 acres TOTAL WET AND DRY POND AREA REQUIREMENT 4.83 acres STEP NO.7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr / 24 hr Attenuation Volume = 1.82 ac-ft 3 yr 24 hr Pond EL = 11.6 Length Between Pond and Roadway Low Point = 2200 ft. Energy Losses @ 0.05% = 1.1 ft Roadway Low Point EL = 14.5 HGL Clearance at Roadway Low Point = 1.8 ft (OK) STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA Length @ Bot of Littoral Area (2' below NWL) = 255 Length @ Top of Littoral Area (ft) = 291 Width @ Bot of Littoral Area (2' below NWL) = 175 Width @ Top of Littoral Area (ft) = 211 Bot of Littoral Area (2' below NWL) = 1.02 Top of Littoral Area (F above NWL) = 1.41 acres Littoral Area Requirement (acres) = 0.25 Littoral Area Provided (acres) = 0.38 (OK) Page 1871 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 1 MADE BY: AS 11/16/21 POND DESIGNATION: Pond 4-2 CHECKED BY: DL 11/17/21 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: a. Check of Pond Site Conditions b. Check of Tailwater Conditions Pond Site Location = STA. 139+00, RT Pond Site Existing Ground Elevation = Varies 12 to 14 ft. Pond Site Soil Type = Boca fine sand (102, A/D) Pond Site Estimated Depth to Groundwater = 0.5 ft. Estimated SHWT = 11.5 ft. Distance to Discharge Point = 50 Positive Drainage Gradient = 0.06% Discharge Point NWL Estimation = 9.9 Discharge Point Peak Stage Estimation = 12.7 c. Summary of Controlling Soils and Minimum Wet Detention NWL = 10.0 Tailwater Conditions The pond(s) will be a combination of: Wet Detention and Dry Detention STEP NO.2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) LF Corkscrew Canal ft. Storage Height (SH) = Maximum DHW - Pond NWL Maximum DHW - Pond Bottom Minimum Existing Roadway Elevation = 12.0 Minimum Proposed Roadway Elevation = 14.5 Berm Elevation 14.5 Freeboard to DHW = 1.0 Maximum DHW Elevation = 13.5 Proposed Wet Pond NWL / Dry Pond Bottom EL = 10.0 Clearance to ESHWT = -1.5 SH = 3.5 STEP NO.3 - TOTAL PEAK STORAGE VOLUME REOUIREMENT The Total Peak Storage Volume Required is: ft. 12.0 ft. ft. 14.5 ft. ft. 14.5 ft. ft. 1.0 ft. ft. 13.5 ft. ft. 12.5 ft. ft. 1.0 ft. ft. 1.0 ft. Volume Peak (ac-ft) = 5.01 Volume Peak (cf) = 218208 STEP NO.4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 Dry Detention 0.55 24154 0.0 ft. (vertical) filename: Pond 4-2.xls worksheet: RW REQUIREMENT PT.1 Page 1872 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to hnmokalee Road SUBJECT: R/W Requirement Estimate Pt. 2 MADE BY: AS 11/16/21 BASIN DESIGNATION: Pond 4-2 CHECKED BY: DL 11/17/21 STEP NO.4 - POND CONFIGURATION cont. Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims = ? a 2.0 SH = 3.5 ft 1.0 ft L = 307 ft 235 ft W = 153 ft 118 ft Pond Area at Control/Bot EL = 1.08 acres 0.63 acres STEP NO.5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) Wet Detention Dry Detention Side slopes are 1: 6 4 Length @ Top of SH = 349 ft 243 ft Length @ Top of SH = 195 ft 126 ft Pond Area at SH = 1.56 acres 0.70 acres Volume Provided at SH = 4.62 ac-ft 0.67 ac-ft Volume Required = 4.62 ac-ft 0.67 ac-ft STEP NO.6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS Wet Detention Dry Detention Side slopes are 1: 4 4 Desired Maintenance Berm Widths = 20 ft. 15 ft. Length @ Outside Maintenance Berm = 397 ft. 281 ft. Width @ Outside Maintennace Berm = 243 ft. 164 ft. Minimum Pond Area Requirement = 2.22 acres 1.05 acres Contingency = 15% Pond Area Requirement = 2.55 acres 1.21 acres TOTAL WET AND DRY POND AREA REQUIREMENT 3.76 acres STEP NO.7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr / 24 hr Attenuation Volume = 1.89 ac-ft 3 yr 24 hr Pond EL = 11.4 Length Between Pond and Roadway Low Point = 2800 ft. Energy Losses @ 0.05% = 1.4 ft Roadway Low Point EL = 14.5 HGL Clearance at Roadway Low Point = 1.7 ft (OK) STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA Length @ Bot of Littoral Area (2' below NWL) = 283 Length @ Top of Littoral Area (ft) = 319 Width @ Bot of Littoral Area (2' below NWL) = 129 Width @ Top of Littoral Area (ft) = 165 Bot of Littoral Area (2' below NWL) = 0.84 Top of Littoral Area (F above NWL) = 1.21 acres Littoral Area Requirement (acres) = 0.22 Littoral Area Provided (acres) = 0.37 (OK) Page 1873 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 1 MADE BY: AS 11/16/21 POND DESIGNATION: Pond 5-1 CHECKED BY: DL 11/17/21 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: a. Check of Pond Site Conditions b. Check of Tailwater Conditions Pond Site Location = STA. 171+00, LT Pond Site Existing Ground Elevation = 13.0 ft. Pond Site Soil Type = Immokalee fine sand (117, B/D) Pond Site Estimated Depth to Groundwater = 1.0 ft. Estimated SHWT = 12.0 ft. Distance to Discharge Point = 2200 Positive Drainage Gradient = 0.06% Discharge Point NWL Estimation = 9.9 Discharge Point Peak Stage Estimation = 12.7 c. Summary of Controlling Soils and Minimum Wet Detention NWL = 11.3 Tailwater Conditions The pond(s) will be a combination of: Wet Detention and Dry Detention STEP NO.2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) LF Corkscrew Canal ft. Storage Height (SH) = Maximum DHW - Pond NWL Maximum DHW - Pond Bottom Minimum Existing Roadway Elevation = 12.0 Minimum Proposed Roadway Elevation = 14.5 Berm Elevation 14.5 Freeboard to DHW = 1.0 Maximum DHW Elevation = 13.5 Proposed Wet Pond NWL / Dry Pond Bottom EL = 11.3 Clearance to ESHWT = -0.7 SH = 2.2 STEP NO.3 - TOTAL PEAK STORAGE VOLUME REOUIREMENT The Total Peak Storage Volume Required is: ft. 12.0 ft. ft. 14.5 ft. ft. 14.5 ft. ft. 1.0 ft. ft. 13.5 ft. ft. 13.0 ft. ft. 1.0 ft. ft. 0.5 ft. Volume Peak (ac-ft) = 5.36 Volume Peak (cf) = 233281 STEP NO.4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 Dry Detention 0.63 27624 1.3 ft. (vertical) filename: Pond 5-1.xls worksheet: RW REQUIREMENT PT.1 Page 1874 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 2 MADE BY: AS 11/16/21 BASIN DESIGNATION: Pond 5-1 CHECKED BY: DL 11/17/21 STEP NO.4 - POND CONFIGURATION cont. Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims = `' 1.0 SH = 2.2 ft 0.5 ft L = 443 ft 233 ft W = 219 ft 233 ft Pond Area at Control/Bot EL = 2.23 acres 1.25 acres STEP NO.5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) Wet Detention Dry Detention Side slopes are 1: 6 4 Length @ Top of SH = 469 ft 237 ft Length @ Top of SH = 246 ft 237 ft Pond Area at SH = 2.64 acres 1.29 acres Volume Provided at SH = 5.36 ac-ft 0.63 ac-ft Volume Required = 5.36 ac-ft 0.63 ac-ft STEP NO.6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS Wet Detention Dry Detention Side slopes are 1: 4 4 Desired Maintenance Berm Widths = 20 ft. 15 ft. Length @ Outside Maintenance Berm = 517 ft. 275 ft. Width @ Outside Maintennace Berm = 294 ft. 275 ft. Minimum Pond Area Requirement = 3.48 acres 1.74 acres Contingency = 15% 15% Pond Area Requirement = 4.01 acres 2.00 acres TOTAL WET AND DRY POND AREA REQUIREMENT 6.00 acres > Site 5-1 STEP NO. 7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr / 24 hr Attenuation Volume = 2.12 ac-ft 3 yr 24 hr Pond EL = 12.2 Length Between Pond and Roadway Low Point = 1100 ft. Energy Losses @ 0.05% = 0.6 ft Roadway Low Point EL = 14.5 HGL Clearance at Roadway Low Point = 1.8 ft (OK) STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA Length @ Bot of Littoral Area (2' below NWL) = 419 Length @ Top of Littoral Area (ft) = 455 Width @ Bot of Littoral Area (2' below NWL) = 195 Width @ Top of Littoral Area (ft) = 231 Bot of Littoral Area (2' below NWL) = 1.87 Top of Littoral Area (F above NWL) = 2.41 acres Littoral Area Requirement (acres) = 0.38 Littoral Area Provided (acres) = 0.54 (OK) Page 1875 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 1 MADE BY: AS 11/16/21 POND DESIGNATION: Pond 5-2 CHECKED BY: DL 11/17/21 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: a. Check of Pond Site Conditions b. Check of Tailwater Conditions Pond Site Location = STA. 157+00, RT, 18th AVE NE Pond Site Existing Ground Elevation = a (dry detention). Varies 12 to 14 b (wet detention). Varies 13 to 14 Pond Site Soil Type = a. Holowpaw 113 and Oldsmar 125 (A/D) b. Riviera (131, B/D) and Malabar (120, A/D) Pond Site Estimated Depth to Groundwater = a. Varies 0.5 to 1.0 ft b. Varies 0 to 0.5 ft Estimated SHWT = a. 11.5 ft. b.12.5 Distance to Discharge Point = 500 Positive Drainage Gradient = 0.06% Discharge Point NWL Estimation = 9.9 Discharge Point Peak Stage Estimation = 12.7 c. Summary of Controlling Soils and Minimum Wet Detention NWL = 10.2 Tailwater Conditions The pond(s) will be a combination of: Wet Detention and Dry Detention STEP NO. 2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) LF Corkscrew Canal ft. Storage Height (SH) = Maximum DHW - Pond NWL Maximum DHW - Pond Bottom Minimum Existing Roadway Elevation = 12.0 Minimum Proposed Roadway Elevation = 14.5 Berm Elevation = 14.5 Freeboard to DHW = 1.0 Maximum DHW Elevation = 13.5 Proposed Wet Pond NWL / Dry Pond Bottom EL = 10.2 Clearance to ESHWT = -2.3 SH = 3.3 STEP NO.3 - TOTAL PEAK STORAGE VOLUME REOUIREMENT The Total Peak Storage Volume Required is: Wet Detention ft. 12.0 ft. ft. 14.5 ft. ft. 14.5 ft. ft. 1.0 ft. ft. 13.5 ft. ft. 12.5 ft. ft. 1.0 ft. ft. 1.0 ft. Dry Detention Volume Peak (ac-ft) = 5.37 0.56 Volume Peak (cf) = 234098 24586 STEP NO.4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 0.3 ft. (vertical) filename: Pond 5-2.xls worksheet: RW REQUIREMENT PT.1 Page 1876 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 2 MADE BY: AS 11/16/21 BASIN DESIGNATION: Pond 5-2 CHECKED BY: DL 11/17/21 STEP NO.4 - POND CONFIGURATION cont. Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims = a 3.0 SH = 3.3 ft 1.0 ft L = 346 ft 264 ft W = 173 ft 88 ft Pond Area at Control/Bot EL = 1.37 acres 0.53 acres STEP NO.5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) Wet Detention Wet Detention Side slopes are 1: 6 4 Length @ Top of SH = 386 ft 272 ft Length @ Top of SH = 213 ft 96 ft Pond Area at SH = 1.88 acres 0.60 acres Volume Provided at SH = 5.38 ac-ft 0.56 ac-ft Volume Required = 5.37 ac-ft 0.56 ac-ft STEP NO.6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS Wet Detention Dry Detention Side slopes are 1: 4 4 Desired Maintenance Berm Widths = 20 ft. 15 ft. Length @ Outside Maintenance Berm = 434 ft. 310 ft. Width @ Outside Maintennace Berm = 261 ft. 134 ft. Minimum Pond Area Requirement = 2.60 acres 0.95 acres Contingency = 15% 15% Pond Area Requirement = 2.98 acres 1.09 acres TOTAL WET POND AREA REQUIREMENT 4.08 acres STEP NO.7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr / 24 hr Attenuation Volume = 1.94 ac-ft 3 yr 24 hr Pond EL = 11.4 Length Between Pond and Roadway Low Point = 2400 A. Energy Losses @ 0.05% = 1.2 ft Roadway Low Point EL = 14.5 HGL Clearance at Roadway Low Point = 1.9 ft (OK) STEP NO.8 - CHECK OF ESTIMATED LITTORAL AREA Length @ Bot of Littoral Area (2' below NWL) = 322 Length @ Top of Littoral Area (ft) = 358 Width @ Bot of Littoral Area (2' below NWL) = 149 Width @ Top of Littoral Area (ft) = 185 Bot of Littoral Area (2' below NWL) = 1.10 Top of Littoral Area (F above NWL) = 1.52 acres Littoral Area Requirement (acres) = 0.34 Littoral Area Provided (acres) = 0.42 (OK) Page 1877 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 1 MADE BY: AS 11/16/21 POND DESIGNATION: Pond 5-3 CHECKED BY: DL 11/17/21 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: a. Check of Pond Site Conditions b. Check of Tailwater Conditions Pond Site Location = STA. 162+00 LT Pond Site Existing Ground Elevation = Varies 12 to 14 ft Holowpaw 113 and Malabar 120 (A/D), Immokalee Pond Site Soil Type = (117, B/D) Pond Site Estimated Depth to Groundwater = Varies 0.5 to 1.0 ft Estimated SHWT = 11.5 ft. Distance to Discharge Point = 2600 Positive Drainage Gradient = 0.06% Discharge Point NWL Estimation = 9.9 Discharge Point Peak Stage Estimation = 12.7 c. Summary of Controlling Soils and Minimum Wet Detention NWL = 11.5 Tailwater Conditions The pond(s) will be a combination of: Wet Detention and Dry Detention STEP NO.2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) LF Corkscrew Canal ft. Storage Height (SH) = Maximum DHW - Pond NWL Maximum DHW - Pond Bottom Minimum Existing Roadway Elevation = 12.0 Minimum Proposed Roadway Elevation = 14.5 Berm Elevation = 14.5 Freeboard to DHW = 1.0 Maximum DHW Elevation = 13.5 Proposed Wet Pond NWL / Dry Pond Bottom EL = 11.5 Clearance to ESHWT = 0.0 SH = 2.0 STEP NO.3 - TOTAL PEAK STORAGE VOLUME REOUIREMENT The Total Peak Storage Volume Required is: ft. 12.0 ft. ft. 14.5 ft. ft. 14.5 ft. ft. 1.0 ft. ft. 13.5 ft. ft. 12.5 ft. ft. 1.0 ft. ft. 1.0 ft. Wet Detention Volume Peak (ac-ft) = 7.16 Volume Peak (cf) = 311847 STEP NO.4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 Dry Detention 0.66 28753 1.6 ft. (vertical) filename: Pond 5-3.xls worksheet: RW REQUIREMENT PT.1 Page 1878 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 2 MADE BY: AS 11/16/21 BASIN DESIGNATION: Pond 5-3 CHECKED BY: DL 11/17/21 STEP NO.4 - POND CONFIGURATION cont. Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims = 3.0 SH = 2.0 ft 1.0 ft L = 468 ft 286 ft W = 312 ft 95 ft Pond Area at Control/Bot EL = 3.36 acres 0.62 acres STEP NO.5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) Wet Detention Wet Detention Side slopes are 1: 6 4 Length @ Top of SH = 492 ft 294 ft Length @ Top of SH = 336 ft 103 ft Pond Area at SH = 3.80 acres 0.70 acres Volume Provided at SH = 7.16 ac-ft 0.66 ac-ft Volume Required = 7.16 ac-ft 0.66 ac-ft STEP NO.6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS Wet Detention Dry Detention Side slopes are 1: 4 4 Desired Maintenance Berm Widths = 20 ft. 15 ft. Length @ Outside Maintenance Berm = 540 ft. 332 ft. Width @ Outside Maintennace Berm = 384 ft. 141 ft. Minimum Pond Area Requirement = 4.77 acres 1.07 acres Contingency = 15% 15% Pond Area Requirement = 5.48 acres 1.24 acres TOTAL WET POND AREA REQUIREMENT 6.72 acres STEP NO.7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr / 24 hr Attenuation Volume = 2.73 ac-ft 3 yr 24 hr Pond EL = 12.3 Length Between Pond and Roadway Low Point = 1750 A. Energy Losses @ 0.05% = 0.9 ft Roadway Low Point EL = 14.5 HGL Clearance at Roadway Low Point = 1.4 ft (OK) STEP NO.8 - CHECK OF ESTIMATED LITTORAL AREA Length @ Bot of Littoral Area (2' below NWL) = 444 Length @ Top of Littoral Area (ft) = 480 Width @ Bot of Littoral Area (2' below NWL) = 288 Width @ Top of Littoral Area (ft) = 324 Bot of Littoral Area (2' below NWL) = 2.94 Top of Littoral Area (F above NWL) = 3.58 acres Littoral Area Requirement (acres) = 0.40 Littoral Area Provided (acres) = 0.64 (OK) Page 1879 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 1 MADE BY: AS 11/16/21 POND DESIGNATION: Pond 5-4 CHECKED BY: DL 11/17/21 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: a. Check of Pond Site Conditions b. Check of Tailwater Conditions Pond Site Location = STA. 162+00 LT Pond Site Existing Ground Elevation = Varies 12 to 14 ft Pond Site Soil Type = Holowpaw 113 and Oldsmar 125 (A/D) Pond Site Estimated Depth to Groundwater = Varies 0.5 to 1.0 ft Estimated SHWT = 11.0 ft. Distance to Discharge Point = 2500 Positive Drainage Gradient = 0.06% Discharge Point NWL Estimation = 9.9 Discharge Point Peak Stage Estimation = 12.7 c. Summary of Controlling Soils and Minimum Wet Detention NWL = 11.4 Tailwater Conditions The pond(s) will be a combination of: Wet Detention and Dry Detention STEP NO. 2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) LF Corkscrew Canal ft. Storage Height (SH) = Maximum DHW - Pond NWL Maximum DHW - Pond Bottom Minimum Existing Roadway Elevation = 12.0 ft. 12.0 ft. Minimum Proposed Roadway Elevation = 14.5 ft. 14.5 ft. Berm Elevation = 14.5 ft. 14.5 ft. Freeboard to DHW = 1.0 ft. 1.0 ft. Maximum DHW Elevation = 13.5 ft. 13.5 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL = 11.4 ft. 12.0 ft. Clearance to ESHWT = 0.4 ft. 1.0 ft. SH = 2.1 ft. 1.5 ft. STEP NO.3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT The Total Peak Storage Volume Required is: Wet Detention Dry Detention Volume Peak (ac-ft) = 7.15 0.64 Volume Peak (cf) = 311242 27929 STEP NO.4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 1.5 ft. (vertical) filename: Pond 5-4.xls worksheet: RW REQUIREMENT PT.1 Page 1880 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 2 MADE BY: AS 11/16/21 BASIN DESIGNATION: Pond 5-4 CHECKED BY: DL 11/17/21 STEP NO.4 - POND CONFIGURATION cont. Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims = 1.6 4.0 SH = 2.1 ft 1.5 ft L = 465 ft 258 ft W = 298 ft 64 ft Pond Area at Control/Bot EL = 3.18 acres 0.38 acres STEP NO.5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) Wet Detention Wet Detention Side slopes are 1: 6 4 Length @ Top of SH = 490 ft 270 ft Length @ Top of SH = 323 ft 76 ft Pond Area at SH = 3.63 acres 0.47 acres Volume Provided at SH = 7.15 ac-ft 0.64 ac-ft Volume Required = 7.15 ac-ft 0.64 ac-ft STEP NO.6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS Wet Detention Dry Detention Side slopes are 1: 4 4 Desired Maintenance Berm Widths = 20 ft. 15 ft. Length @ Outside Maintenance Berm = 538 ft. 308 ft. Width @ Outside Maintennace Berm = 371 ft. 114 ft. Minimum Pond Area Requirement = 4.58 acres 0.81 acres Contingency = 15% 15% Pond Area Requirement = 5.27 acres 0.93 acres TOTAL WET POND AREA REQUIREMENT 6.20 acres STEP NO.7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr / 24 hr Attenuation Volume = 2.69 ac-ft 3 yr 24 hr Pond EL = 12.2 Length Between Pond and Roadway Low Point = 1700 A. Energy Losses @ 0.05% = 0.9 ft Roadway Low Point EL = 14.5 HGL Clearance at Roadway Low Point = 1.5 ft (OK) STEP NO.8 - CHECK OF ESTIMATED LITTORAL AREA Length @ Bot of Littoral Area (2' below NWL) = 441 Length @ Top of Littoral Area (ft) = 477 Width @ Bot of Littoral Area (2' below NWL) = 274 Width @ Top of Littoral Area (ft) = 310 Bot of Littoral Area (2' below NWL) = 2.77 Top of Littoral Area (F above NWL) = 3.39 acres Littoral Area Requirement (acres) = 0.38 Littoral Area Provided (acres) = 0.62 (OK) Page 1881 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 1 MADE BY: AS 11/16/21 POND DESIGNATION: Pond 6-1 CHECKED BY: DL 11/17/21 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: a. Check of Pond Site Conditions b. Check of Tailwater Conditions Pond Site Location = STA. 198+00, RT Pond Site Existing Ground Elevation = 14.0 ft. Pond Site Soil Type = Holopaw fine sand (113, A/D) and Immokalee fine sand (117, B/D) Pond Site Estimated Depth to Groundwater = Varies 0.5 to 1 ft. Estimated SHWT = 13.0 ft. Distance to Discharge Point = Positive Drainage Gradient = Discharge Point NWL Estimation = Discharge Point Peak Stage Estimation = 1400 LF 0.06% _ 9.9 Corkscrew 12.7 Canal 0.8 ft. (vertical) c. Summary of Controlling Soils and Minimum Wet Detention NAIL = 10.8 ft. Tailwater Conditions The pond(s) will be a combination of: Wet Detention (Dry Detention not feasible at estimated SHUT) STEP NO.2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) Storage Height (SH) = Maximum DHW - Pond NWL Minimum Existing Roadway Elevation = 12.0 ft. Minimum Proposed Roadway Elevation = 15.0 ft. Berm Elevation = 15.0 ft. Freeboard to DHW = 1.0 ft. Maximum DHW Elevation = 14.0 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL = 10.8 ft. Clearance to ESHWT = -2.2 ft. SH = 3.2 ft. STEP NO.3 - TOTAL PEAK STORAGE VOLUME REOUIREMENT The Total Peak Storage Volume Required is: Volume Peak (ac-ft) = 5.04 Volume Peak (cf) = 219459 STEP NO.4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 filename: Pond 6-1.xls worksheet: RW REQUIREMENT PT.1 Page 1882 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 2 MADE BY: AS 11/16/21 BASIN DESIGNATION: Pond 6-1 CHECKED BY: DL 11/17/21 STEP NO.4 - POND CONFIGURATION L/W Ratio Based on Available Parcel Dims = SH = 3.2 ft L = 414 ft W = 138 ft Pond Area at Control/Bot EL = 1.31 acres STEP NO.5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) Wet Detention Side slopes are 1: 6 Length @ Top of SH = 453 ft Length @ Top of SH = 177 ft Pond Area at SH = 1.84 acres Volume Provided at SH = 5.04 ac-ft Volume Required = 5.04 ac-ft STEP NO.6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS Wet Detention Side slopes are 1: 4 Desired Maintenance Berm Widths = 20 ft. Length @ Outside Maintenance Berm = 501 ft. Width @ Outside Maintennace Berm = 225 ft. Minimum Pond Area Requirement = 2.58 acres Contingency = 15% Pond Area Requirement = 2.97 acres TOTAL WET AND DRY POND AREA REQUIREMENT 2.97 acres STEP NO.7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr / 24 hr Attenuation Volume = 1.79 Length Between Pond and Roadway Low Point = 1100 Roadway Low Point EL = 15.0 STEP NO.8 - CHECK OF ESTIMATED LITTORAL AREA Length @ Bot of Littoral Area (2' below NWL) = 390 Width @ Bot of Littoral Area (2' below NWL) = 114 Bot of Littoral Area (2' below NWL) = 1.02 Littoral Area Requirement (acres) = 0.26 ac-ft 3 yr 24 hr Pond EL = 11.9 ft. Energy Losses @ 0.05% = 0.6 ft HGL Clearance at Roadway Low Point = 2.5 ft (OK) Length @ Top of Littoral Area (ft) = 426 Width @ Top of Littoral Area (ft) = 150 Top of Littoral Area (F above NWL) = 1.47 acres Littoral Area Provided (acres) = 0.45 (OK) Page 1883 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 1 MADE BY: AS 11/16/21 POND DESIGNATION: Pond 6-2 CHECKED BY: DL 11/17/21 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: Pond Site Location = STA. 198+00, RT Pond Site Existing Ground Elevation = 14.0 ft. a. Check of Pond Site Conditions Pond Site Soil Type = Holopaw and Malabar fine sand (113 and 120, A/D) Pond Site Estimated Depth to Groundwater = 0.5 ft. Estimated SHWT = 13.5 ft. Distance to Discharge Point = 50 LF Positive Drainage Gradient = 0.06% = 0.0 ft. (vertical) b. Check of Tailwater Conditions Discharge Point NWL Estimation = 9.9 Corkscrew Discharge Point Peak Stage Estimation = 12.7 Canal c. Summary of Controlling Soils and Minimum Wet Detention NWL = 10.0 ft. Tailwater Conditions The pond(s) will be a combination of: Wet Detention (Dry Detention not feasible at estimated SHWT) STEP NO.2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) Storage Height (SH) = Maximum DHW - Pond NWL Minimum Existing Roadway Elevation = 13.0 ft. Minimum Proposed Roadway Elevation = 15.0 ft. Berm Elevation = 15.0 ft. Freeboard to DHW = 1.0 f* Maximum DHW Elevation = 14.0 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL = 10.0 ft. Clearance to ESHWT = -3.5 ft. SH = 4.0 ft. STEP NO.3 - TOTAL PEAK STORAGE VOLUME REOUIREMENT The Total Peak Storage Volume Required is: Wet Detention Volume Peak (ac-ft) = 4.66 Volume Peak (cf) = 203061 STEP NO.4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 filename: Pond 6-2.xls worksheet: RW REQUIREMENT PT.1 Page 1884 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to hnmokalee Road SUBJECT: R/W Requirement Estimate Pt. 2 MADE BY: AS 11/16/21 BASIN DESIGNATION: Pond 6-2 CHECKED BY: DL 11/17/21 STEP NO.4 - POND CONFIGURATION L/W Ratio Based on Available Parcel Dims = 14 a SH = 4.0 ft L = 390 ft W = 97 ft Pond Area at Control/Bot EL = 0.87 acres STEP NO.5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) Wet Detention Side slopes are 1: 6 Length @ Top of SH = 438 ft Length @ Top of SH = 145 ft Pond Area at SH = 1.46 acres Volume Provided at SH = 4.66 ac-ft Volume Required = 4.66 ac-ft STEP NO.6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS Wet Detention Side slopes are 1: 4 Desired Maintenance Berm Widths = 20 ft. Length @ Outside Maintenance Berm = 486 ft. Width @ Outside Maintennace Berm = 193 ft. Minimum Pond Area Requirement = 2.16 acres Contingency = 15% Pond Area Requirement = 2.48 acres TOTAL WET AND DRY POND AREA REQUIREMENT 2.48 acres STEP NO.7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr / 24 hr Attenuation Volume = 1.60 ac-ft 3 yr 24 hr Pond EL = 11.4 Length Between Pond and Roadway Low Point = 2750 ft. Energy Losses @ 0.05% = 1.4 ft Roadway Low Point EL = 15.0 HGL Clearance at Roadway Low Point = 2.3 ft (OK) STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA Length @ Bot of Littoral Area (2' below NWL) = 366 Length @ Top of Littoral Area (ft) = 402 Width @ Bot of Littoral Area (2' below NWL) = 73 Width @ Top of Littoral Area (ft) = 109 Bot of Littoral Area (2' below NWL) = 0.62 Top of Littoral Area (F above NWL) = 1.01 acres Littoral Area Requirement (acres) = 0.17 Littoral Area Provided (acres) = 0.39 (OK) Page 1885 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT: R/W Requirement Estimate Pt. 1 MADE BY: AS 11/16/21 POND DESIGNATION: Pond 6-3 CHECKED BY: DL 11/17/21 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: a. Check of Pond Site Conditions b. Check of Tailwater Conditions Pond Site Location = STA. 181+00 and STA 186+00, RT Pond Site Existing Ground Elevation = Varies 12 to 14 ft. Pond Site Soil Type = Holopaw fine sand (113, A/D) Pond Site Estimated Depth to Groundwater = 0.5 ft. Estimated SHWT = 12.0 ft. Distance to Discharge Point = 1150 Positive Drainage Gradient = 0.06% Discharge Point NWL Estimation = 9.9 Discharge Point Peak Stage Estimation = 12.7 c. Summary of Controlling Soils and Minimum Wet Detention NWL = 10.6 Tailwater Conditions The pond(s) will be a combination of: Wet Detention Dry Detention STEP NO.2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) LF Corkscrew Canal ft. Storage Height (SH) = Maximum DHW - Pond NWL Maximum DHW - Pond Bottom Minimum Existing Roadway Elevation = 13.0 ft. 13.0 ft. Minimum Proposed Roadway Elevation = 15.0 ft. 15.0 ft. Berm Elevation 15.0 ft. 15.0 ft. Freeboard to DHW = 1.0 ft. 1.0 ft. Maximum DHW Elevation = 14.0 ft. 14.0 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL = 10.6 ft. 13.0 ft. Clearance to ESHWT = -1.4 ft. 1.0 ft. SH = 3.4 ft. 1.0 ft. STEP NO.3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT The Total Peak Storage Volume Required is: Wet Detention Dry Detention Volume Peak (ac-ft) = 4.48 0.50 Volume Peak (cf) = 195270 21684 STEP NO.4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 0.7 ft. (vertical) filename: Pond 6-3.xls worksheet: RW REQUIREMENT PT.1 Page 1886 of 4682 PROJECT TITLE: Wilson Boulevard: Golden Gate Boulevard to hnmokalee Road SUBJECT: R/W Requirement Estimate Pt. 2 MADE BY: AS 11/16/21 BASIN DESIGNATION: Pond 6-3 CHECKED BY: DL 11/17/21 STEP NO.4 - POND CONFIGURATION Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims = 6.0 SH = 3.4 ft 1.0 ft L = 474 ft 347 ft W = 95 ft 58 ft Pond Area at Control/Bot EL = 1.03 acres 0.46 acres STEP NO.5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) Wet Detention Wet Detention Side slopes are 1: 6 4 Length @ Top of SH = 515 ft 355 ft Length @ Top of SH = 136 ft 66 ft Pond Area at SH = 1.60 acres 0.54 acres Volume Provided at SH = 4.48 ac-ft 0.50 ac-ft Volume Required = 4.48 ac-ft 0.50 ac-ft STEP NO.6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS Wet Detention Dry Detention Side slopes are 1: 4 4 Desired Maintenance Berm Widths = 20 ft. 15 ft. Length @ Outside Maintenance Berm = 563 ft. 393 ft. Width @ Outside Maintennace Berm = 184 ft. 104 ft. Minimum Pond Area Requirement = 2.37 acres 0.94 acres Contingency = 15% Pond Area Requirement = 2.73 acres 1.08 acres TOTAL WET AND DRY POND AREA REQUIREMENT 3.81 acres STEP NO.7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr / 24 hr Attenuation Volume = 1.68 ac-ft 3 yr 24 hr Pond EL = 11.9 Length Between Pond and Roadway Low Point = 2000 ft. Energy Losses @ 0.05% = 1.0 ft Roadway Low Point EL = 15.0 HGL Clearance at Roadway Low Point = 2.1 ft (OK) STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA Length @ Bot of Littoral Area (2' below NWL) = 450 Length @ Top of Littoral Area (ft) = 486 Width @ Bot of Littoral Area (2' below NWL) = 71 Width @ Top of Littoral Area (ft) = 107 Bot of Littoral Area (2' below NWL) = 0.73 Top of Littoral Area (F above NWL) = 1.19 acres Littoral Area Requirement (acres) = 0.21 Littoral Area Provided (acres) = 0.46 (OK) Page 1887 of 4682 Attachment 4 Supporting Documentation Page 1888 of 4682 From: AbbottAlicia To: Gramer, Bill/SWF Cc: Shepard, Anaela/ORL; Kirby, Felicia; LibbyPamela Subject: [EXTERNAL] RE: Stormwater Pond Setbacks Date: Wednesday, September 29, 2021 4:55:07 PM Attachments: imaae001.ona From a CDM Smith e-mail dated April 27, 2018 • "Under rule 62-555.312 a well cannot be sited closer than 50 feet from surface water. On the other hand, if the well goes in first, then the surface water feature must be sited at least 300 feet from the well to conform with ERP requirements." Regards, Alicia Abbott E.I., PMP Project Manager Collier County Government Public Utilities Engineering & Project Management 3339 Tamiami Trail East, Suite 303 Naples, FL 34112 Phone: 239-252-5344 Cell: 239-877-3961 From: Gramer, Bill/SWF <Bill.Gramer@jacobs.com> Sent: Wednesday, September 29, 2021 10:16 AM To: AbbottAlicia <Alicia.Abbott@colliercountyfl.gov>; LibbyPamela <Pamela.Libby@colliercountyfl.gov> Cc: Shepard, Angela/ORL <Angela.Shepard@jacobs.com>; Kirby, Felicia <Felicia.Kirby2@jacobs.com> Subject: Stormwater Pond Setbacks EXTERNAL EMAIL: This email is from an external source. Confirm this is a trusted sender and use extreme caution when opening attachments or clicking links. Alicia, We are trying to locate potential ponds along Wilson Boulevard and as you would imagine the existing wells limit available sites. Can you please send me the County's required Setbacks for Ponds Vs. Well Heads Pond Built First = Well Built First= • SFWMD Criteria shows 100 ft from Public Wells and 75 Ft from Private Wells Page 1889 of 4682 • The FDEP Wellfield Protection Act 500 ft Setback does not really address Stormwater facilities Thanks Bill Gramer, P.E., AICP Vice President Transportation D 239-431-9222 M 239-860-4922 JACOBS 5801 Pelican Bay Blvd., Suite 505 Naples, Florida 34108 NOTICE - This communication may contain confidential and privileged information that is for the sole use of the intended recipient. Any viewing, copying or distribution of, or reliance on this message by unintended recipients is strictly prohibited. If you have received this message in error, please notify us immediately by replying to the message and deleting it from your computer. Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. Page 1890 of 4682 Wilson Bvld Corridor Study fl" - — ur75 LO +n , LL' f� try Y .. Bonita Say 1 q ) � Club Naples D z 03 r� r Heritage M in o 1846 Bay Golf d 327$t7� Country Club L O �_ 2.5Cr,Ave NW Y Boulder Lake 0 E fm rrlok atee`f''td 8du 24t11 Avv' N"N 2 4th Avu NF mm is L 22 rd A,j�. N IN 22 rd AvV , NE: . D r • as 00 rt — — c`ara.Pf, t. a aJ a Q f~ loth A,,{ n,'44,' Lth Awe L 1N Calu �Lli Y „ Pi ne Goylf C I CL 18th Ave NIN 1 Rth Ave NE --. .... Jung Ei v I d' '4 J Ling Blvd E - 1 r, th Ave NI ih Ave NE ri island Rd 0 Ranciall Blvd Lu z L 1-1th Awe NVV z 1 4tr7 Ave NE 32735 � Golf a 12#h vt NS^; 12th Ave NF. Clubof the; Olde 0 Eve rgLade7 Florida m Golf 1 C.th AvF N4'd 10th Aye NL Club ; ,, W z 7. — — - :r w u, w uj w z W uJ uJ z z �� z li v7 rfi Z' z rp v] u• 7 L L CV `r v} C31 N N r'J 4V ' "N C:ra rJen Gate El No F -me Blvd '. ' 8FG { Goldam foie Bled x �. Flaaaa• Community Paik September 17, 2021 Waterbody IDs (WBIDs) Group 1 Verified List WBIDs 2{J to q, 211In. 2,1th 22nd 20th 16 th Ave N E 1,11h Ave NE 12th 10t 9:1, .tVe N`_ 1'-'. h ,', HE 4'h A.,-f r-11 1:36,112 0 0.4 0.8 1.6 mi 0 0.5 1 2 km FDEP/DEAR, FDEP, DEAR, Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NIL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community, FDEP,DEAR Map created by Map Direct, powered by ESRI. undefined Florida Department of Environmental Protection makes no wa rra nty, expressed or implied,or assumes any legal liability or responsibility for the accuracy,completeness,or usefulness of any information, apparatus, prod uct,or process disclosed,or represents that its use would not infringe prisaWoMW rfdfi4682 Map Direct Search Results Fri Sep 17 2021 13:50:06 GMT-0400 (Eastern Daylight Time) Search Made: Search Box 502 feet wide at 26.25696152 x-81.60337190 26° 15'25.0615" x -81 °36' 12.1388" Search Results: 2 ■ Verified List Waterbody Ids (WBIDs) - Verified List WBIDs 1�3278S WBID 1� Everglades West Coast GROUP NAME 1� North Golden Gate WATERBODY NAME 009-2714 OGC NUMBER • 2 CYCLE E)GROUP I NUMBER ODissolved Oxygen PARAMETER ASSESSED ODissolved Oxygen PARAMETER GROUP O3F WATERBODY CLASS OStream WATERBODY TYPE ® Southwest Coast PLANNING UNIT 32785 WBID(ASSESSED) 32785 WBID (CURRENT) Waterbody IDs (WBIDs) in 3278S WBID IM Everglades West Coast GROUP NAME 1� NORTH GOLDEN GATE WATERBODY NAME (SD) South Regulatory District DISTRICT E 3F CLASS E Group 1 GROUP NUMBER O03090204 HUC Page 1892 of 4682 Emiles UNITS E STREAM WATER TYPE R 72785.118637 PERIMETER id72.829 WATERBODY SIZE CHANGES WBID created, Run 30; WBID modified, Run 33 - K.ODonnell EDITS Southwest Coast PLANNING UNIT No Results Found in: • Florida Total Maximum Daily Load (TMDL) - Florida TMDLs • Restoration Plans • Statewide Basin Management Action Plan (BMAP) General Areas Disclaimer: This report is only intended to be used as an approximation of the possibility of nearby regulated features. It is not intended for legal purposes. Neither the State of Florida,nor the FDEP,makes any warranty,expressed or implied,including the warranties of merchantability and fitness for a particular purpose arising out of the use or inability to use the data,or assumes any legal liability or responsibility for the accuracy,completeness,or usefulness of any information,apparatus,product,or process disclosed,or represents that its use would not infringe privately owned rights. Use of information contained on the FDEP web pages constitutes understanding and acceptance of our disclaimer. Page 1893 of 4682 NOTES TO USERS LEGEND This map is for use in administering the National Flood Insurance Program. It does not necessarily identify all areas subject to flooding, particularly from local drainage sources of small size. The community map repository should be consulted for possible updated or additional flood hazard information. To obtain more detailed information in areas where Base Flood Elevations (BFEs) and/or floodways have been determined, users are encouraged to consult the Flood Profiles and Floodway Data and/or Summary of Stillwater Elevations tables contained within the Flood Insurance Study (FIS) report that accompanies this FIRM. Users should be aware that BFEs shown on the FIRM represent rounded half -foot elevations. These BFEs are intended for flood insurance rating purposes oses u onlyand should not be used as the sole source of flood elevation information. Accordingly, flood elevation data presented in the FIS report should be utilized in conjunction with the FIRM for purposes of construction and/or floodplain management. Coastal Base Flood Elevations shown on this map apply only landward of 0.0' North American Vertical Datum of 1988 (NAVD 88). Users of this FIRM should be aware that coastal flood elevations are aIs❑ provided in the Summary of Stillwater Elevations table in the Flood Insurance Study report for this jurisdiction. Elevations shown in the Summaryof Stillwater Elevations table should be used for construction and/or floodplain management purposes when they are higher than elevations shown on this FIRM. Boundaries of the floodways were computed at cross sections and interpolated between cross sections. The floodways were based on hydraulic considerations with regard to requirements of the National Flood Insurance Program. Floodway widths and other pertinent floodway data are provided in the Flood Insurance Study report for this jurisdiction. Certain areas not in Special Flood Hazard Areas may be protected by flood control structures. Refer to Section 2.4 "Hood Protection Measures" of the Flood Insurance Study report for information on flood control structures for this jurisdiction. The projection used in the preparation of this map was Florida State Plane east zone (FIPSZONE 0901). The horizontal datum was NAD 83, GRS1980 spheroid. Differences in datum, spheroid, projection or state plane zones used in the production of FIRMS for adjacent jurisdictions may result in slight positional differences in map features across jurisdiction boundaries. These differences do not affect the accuracy of this FIRM. Flood elevations an this map are referenced to the North American Vertical Datum of 1988. These flood elevations must be compared to structure and ground elevations referenced to the same vertical datum. For information regarding conversion between the National Geodetic Vertical Datum of 1929 and the North American Vertical Datum of 1988 visit the National Geodetic Surve website at htt ://www.n s.noaa. ov! or contact Y p 9 9 the National Geodetic Survey at the following address: NGS Information Services NOAA, NM GS12 National Geodetic Survey SSMC- 3. #9202 1315 East-West Highway Silver Sprinq, MD 20910- 3282 To obtain current elevation, description, and/or location information for bench marks shown on this map; please contact the Information Services Branch of the National Geodetic Survey at (301) 713-3242, or visit its website at http:/Iwww.ngs.noaa.gov/. Base map information shown on this FIRM was derived from multiple sources. This information was compiled from Collier County Government (2003, 2008, 2009), U-S- Bureau of Land Management (2005), 3001, Inc. (2004), NOAA-National Geodetic Survey (2008), and U -S- Geological Survey (2009) at a scale of 1:24,000. Corporate limits shown on this map are based on the best data available at the time of publication. Because changes due to annexations or de -annexations may have occurred after this map was published, map users should contact appropriate community off icia]s to verify current corporate IimIt locations. Please refer to the separately printed Map Index for an overview map of the county showing the layout of map panels: community map repository addresses: and a Listing of Communities table containing National Flood Insurance Program dates for each community as well as a listing of the panels on which each community is located. Contactthe FEMA Map Information eXchangeat 1-877-FEMA MAP (1 -877-336-262 7) for information on available products associated with this FIRM. Available products may include previously issued Letters of Map Change, a Flood Insurance Study report, and /or digital versions of this map. The FEMA Map Information eXchange may also be reached by Fax at 1-800-358-9620 and its website at http:Hwww.msc.fema-gov/. If you have questions about this map or questions concerning the National Flood Insurance Program in general, please call 1-877-FEMA MAP (1-877-336-2627) or visit the FEMA website at http://www.fema.gov/. 81 °37'30.00" 26-1845.00" 75.' 5 15` 14.5 - ZONE AE 13.5- 14 13.5-, 14 13.5- 14' 715000 FT 13.5 Z Q 0- 0 ZONE AH 710000 FT 14 I;• ZONE AH' H , - ZONE AE 14, ZONE AE ZONE AH 16 JOINS PANEL 0230 455000 FT 460000 FT 8TH 5T NE 10TH ST NE 12TH 5T NE 14TH ST NE 16TH ST NE 18TH 5T NE ZONE AH 465000 FT 470000 FT 7091 - - -SrH.ADY HOLL0V+ - 8L,rN..E 5 - ZONE s'i a u,i y+ � --- f•w ,. < '�K 16 ZONE A k. t - )LL�W BLVD W► AH _ -� T • t 7. -1'6 16 6�- i. �' �} 75 co ZC �' e S ••• rn H E AH 1 1'6 r"�` �• 1 s£`� r 1 2 0 7f5 - yy I >•' 75�i ' '76• �t zS1 S� ���.5,50TH 5T VE25� .c" 7. 75.5 --� � �-, ':�:.. - .•. [x>'lrlr►i f+ulr C rrrr< - ZOP ..115.5 - ZONE A E 15.5 •ZQAIE;AM. ZONE AH PO"RT ORANGE'WAY PORT R NGE CT {1 �•r s i 1-1ESAPEAKE 8 . POTOMAC OCEAN B+-t1FF ` CT ZONE AE •••: 1 U 91 T_ *. . i* . ' . * . * . * ti r r' ZONE AE _. • ZONE _ r 1: ZONE `AE ZONE AH ZONE+ .. NE AH ;14.,5•• :;,4- ;r, ' AE 15.5 `• • •• • $•t ; 14 ��` .. I 1 ..... � d 14 5V _-4'1 _ d. 14 '. _ MYSTIC RIVER DR DG7325 OIL WELL HiG A'� VICTORY LN ZONE AE T�� �1 GROVE DR ZONE PAR ❑R N AHZONE 1 ORANGE AE # 73.59" I ZONE ' . GROVETRL lW.�_ z AE ZONE r,.•� _ - ZONE u 5r7 1 AE Q-, j ��r VARDIN PL ZONELU i 1 w _ AH ZONE 7'4- 5 < ['rnrrrl 'AJ7574 = - - AH , ' lu z` ri 'ZD• E ZONE AE 4 � ,-j ,t • � 2 r� ZONES '. r t7 M _ C r--rLEPdA C E 3 �' w ZONE AH Z( • r' r•�, ' 7•' _ 2ZONE f .' l ► .ti VALENCIA AE F' ? � •� �} LAKES CIR X. ,` 4.... GROVE ❑R ~ ZONE AEA 14.5 01P =v Qr ;► i _ r 15 7'S •:� Ba'ssol� 15 '''+Za E AE , i ZONE1 1.r EAE 14.5 y' .r: c, ZON,... 145 81 a33'45.00" 26°18'45.00" [N1J I C. 1Vlr%r /-1rL1_/-% Jr1VVVIN k-AN I r11J r1A114CL IQ LOCATED WITHIN TOWNSHIP 48 SOUTH, RANGE 27 EAST. DG7324 ZONE AE 291 0000mN ZONE AE ' zs09' c> N 16�IIN�R�Ii�l��l�lki � . ZONE AE N� LiFl .��I��i4i��l�p�ll��i!: 290809c"'N 29Q7Doom N - z. ' AE - 1- - .� r._ ,� a . - - rn :� ZONE AE 14.54 x.�. .5 •.•. n�i �� �1► c5 r� _ .,'...� RANDALL BLVD • ... p -� `tom---74�� - _ `.-^--,-�� _J 73 r = „ram F 73.5... :7;4:;5'. '` `74.5 14.5 w ZONE E � •ia ��t�El- �� �.•r-..-�-_ -� AJ7573 - , �. s _•• iMM EFto•AD' -- �: v �',' y 14.5 F�►, 14.5 ° ` u) Sri �'4 14 .. r Z N X. l 7 --13-5 74 W 3 ••13 rli. �'•.. • • • 24TH AVE NE K �. r • ° ' • • '�: 24TFi'R11E NE" _ .. F 24TH AVE; 74 r _ .--- _ �-. :.•4- � ^'ti:' _ �" � :1,•. ..�.. �.. � I • - P +�}+'. 14.5 r1' - r• y RAI - - - - ''/-- N4�! 1 f e-- ZONE - r 7%4 I ;� ` G • r- ,•. 4 i• .r ."" 'r. , • A 14 AH r ` 73.5 06 IN 13 1: 705000 FT 13:5'r t. •r ��' `' �!• �` :ZDNE�.• .�: n �"�'�- * A':''•'.:.. i" I 75 _ 15 MW 2.s . 1 1 ` ^/ 73 5 74 1: �.., 14 •. -r'� - ; -:, 74:5 -. 22ND AVE a>l i .� 74 22ND VE"rJE;. 14.5 .. ,.� ;.;�.�� , w`•v � � .►;� �"•y,�..- � � I . �`k+:'.� •� ;�:: �' •`''".Xf Z.• E �� E AH y, � 111 4�14.5 1� Kit ZONE Ah ZONE AE z�'r-7~3 73 Z;., , ZONE AE 700000 FT �•' fV y 13 t 13.5�' u •:� 73----:r-r ` 13 j SHADY LN - 13 . C• • ►r•ess Cr ►ru! ZONE AH 13 p''�" 1 2T i AV.•I i• a }� y(��' .�l+r.. . •' ' 3 '•• aA yf Y � 26015'00.00" •.! ZONE'.i 81°3T30.00" ZONE AH 43$0000mE ZONE AH 74 I ZONE ZONE AH AH 13.5 ZONE All "'AJ7572 > w 15 tr•rr�' :-�,•••'•'• „•.ti;, 13.5 �;_F' r, v �` � {' (lrrr T e , ,�y _ �• � � r-•7.3.5, - �., �+�t . �' � _ H � ZONE z� -14-5--- •-�. ,y• % Ark'' 1 13,5 _ / �I•+- 2 ENE ---.r. �• .. L •r ZON •� , -- AM� f20TFI il'IE ► �• ' i.r 5 * S #prr:• ^�' 4. _ AEr NEr, .. E 7 �F4 �!` t 113.5 DG7327 2 93.5 13.5:. - •-� T ,.X1 35 r,x° 16T+.H E E� k 1 7 3 A X. � duo -. •ti• ' �•'�;� ,Z0NE AH' • • �� T,Fi• . ,E NEid.� 135 v �� 73 �• � • 73•.40 13 13vJ 105 S �• .:. I r 1,3.. ' �49 as9OGGG» E ZONE AH ZONE AH 13 aa00GoomE JOINS PANEL 0430 aa10000mE ZONE AH :A d" ZONE AH 4420"""E WXJ 16 ..� 14 - �1.. �-0 ' 2905000mN x •' . ,8TH AVE 17G7338 � , --- • •• 73 5 ^j`4��13.5 - JUNG BL11Dl:Ci . 14 14 14 14 ' _-•r�� 2Y 7� :+-1 L J I• -1�3� r 04..,..,.,,N ZONE - or 14 AH- L•r. .. 7; I"' •:4�'"rT ZO N E A H ir. x -- 26015'00.00" ZONE AH 4430ODOME 8103345.00" SPECIAL FLOOD HAZARD AREAS SFHAS) SUBJECT TO INUNDATION BY THE 1% ANNUAL CHANCE FLOOD The 1% annual chance flood (100-year flood), also known as the base flood, is the Flood that has a 1% chance of being equaled or exceeded in any given year. The Special Flood Hazard Area is the area subject to flooding by the 111/6 annual chance Flood. Areas of Special Flood Hazard include zones A, AE, AH, A0, AR, A99, V and VE. The Base Flood Elevation is the water -surface elevation of the 1% annual chance flood. ZONE A No Base Flood Elevations determined. ZONE AE, AE Base Flood Elevations determined. ZONE AH, AH Flood depths of 1 to 3 Feet (usually areas of ponding); Base Flood Elevations determined. ZONE AO Flood depths of 1 to 3 feet (usually sheet flow on sloping terrain); average depths determined. For areas of alluvial fan flooding, velocities also determined. ZONE AR Special Flood Hazard Area formerly protected From the 1% annual chance flood by a flood control system that was subsequently decertified. Zone AR indicates that the former flood control system is being restored to provide protection from the 1% annual chance or greater flood. ZONE A99 Area to be protected from 111/6 annual chance flood by a Federal flood protection system under construction; no Base Flood Elevations determined. ZONE V Coastal Flood zone with velocity hazard (wave action); no Base Flood Elevations determined. ZONE VE Coastal flood zone with velocity hazard (wave action); Base Flood Elevations determined. FLOODWAY AREAS IN ZONE AE The Floodway is the channel of a stream plus any adjacent floodplain areas that must be kept free of encroachment so that the 1% annual chance flood can be carried without substantial increases in flood heights. OTHER FLOOD AREAS ZONE X Areas of 0.2% annual chance Flood; areas of 1% annual chance flood with average depths of less than 1 foot or with drainage areas less than 1 square mile; and areas protected by levees From 1% annual chance flood. OTHER AREAS ZONE x Areas determined to be outside the 0.2% annual chance floodplain. ZONE D Areas in which Flood hazards are undetermined, but possible. ® COASTAL BARRIER RESOURCES SYSTEM (CBRS) AREAS OTHERWISE PROTECTED AREAS (OPAS) CBRS areas and OPAs are normally located within or adjacent to Special Flood Hazard Areas. 1% annual chance floodplain boundary 0.2% annual chance floodplain boundary Floodway boundary - - Zone D boundary ■�s�sr��aaasss��• CBRS and OPA boundary i Boundary dividing Special Flood Hazard Areas of different Base Flood Elevations, flood depths or flood velocities. �►• � 513 - Base Flood Elevation line and value; elevation in feet* (EL 987) Base Flood Elevation value where uniform within zone; elevation in feet* * Referenced to the North American Vertical Datum of 1938 {NAVD 88) A A Cross section line 23 - - - - - - - 23 Transect line Geographic coordinates referenced to the North American 97=Q7'30".32°22'30" Datum of 1983 (NAD 83) 42750oamN 1000-meter Universal Transverse Mercator grid value, zone 17 6000000 FT 5000-foot grid value: Florida State Plane coordinate system, east zone (FIPSZONE 0901),Lambert Conformal Conic projection DX5510 Bench mark {see explanation in Notes to Users section of this FIRM panel) M1.5 River Mile MAP REPOSITORY Refer to Map Repositories list on Map Index EFFECTIVE DATE OF COUNTYWIDE FLOOD INSURANCE RATE MAP November 17, 2005 EFFECTIVE DATE(S) OF REVISIONS) TO THIS PANEL May 16 2012 - to update corporate limits to change Base Flood Elevations to add Base Flood Y P P g Elevations, to add Special Flood Hazard Areas, to change Special Flood Hazard Areas, to change zone designations, to update roads and road names, to update the effects of wave action, to reflect revised shoreline, to reflect updated topographic information, and to modify Coastal Barrier Resources Areas and Otherwise Protected Areas. For community map revision history prior to countywide mapping, refer to the Community Map history table located in the Flood Insurance Study report for this jurisdiction. To determine if flood insurance is available in this community, contact your insurance agent or call the National Flood Insurance Program at 1- 800- 638- 6620. ICI MAP SCALE 1" = 1000' 500 0 1000 2000 FEET METERS 300 0 300 600 ID PANEL 0240H FIRM m LL m FLOOD INSURANCE RATE MAP COLLIER COUNTY, m FLORIDA m im AND INCORPORATED AREAS PANEL 240 OF 1225 (SEE MAP INDEX FOR FIRM PANEL LAYOUT) m m 61 CONTAINS: COMMUNITY NUMBER PANEL SUFFIX COLLIER COUNTY 120067 0240 H Notice to User The Map Number shown below should be used when placing map orders: the Community Number shown above should be used on insurance applications for the subject community. aEe�� MAP NUMBER CD 12021 CO240H tnw ` °qT MAP REVISED fi��Np S�G� MAY 1612012 m Federal Emergency Managenlcnt Agency i' Page 1895 of 4682 FU7 GG7 GG6 Lee County Cork3 Cork2 Collier County FU6 3 w U al Y O — U a Corkl GG5 Coco1 Coco2 Coco3 Cocohatchee Canal Coco4 U FUS w 0 Curry 1 0 � AR2 2 n 175W3 CR951 N ' a MILLER3 d� Cypress1 — GG4 m c ¢m a O a c Y a � 175W2 Golden Gate Main Canal a a n a O. T U Q Green Canal C-e cor,r, otor FU4S U AR1 GG1 GG Main I75W1 CR951S GG3 a GG2 BCB BCB I Field Station HC2 W, J Gulf of Mexico Works of the Basin 21 BCB Structures tsCanal Reach Controlled, Operated and Maintained by BCB Canal Reach Maintained by BCB* Canal Overbank Controlled, Operated and m Maintained by Collier County** *Note: Canal Reach Controlled and Operated by Collier County, subject to Limiting Conditions (3rd Amendment to Agreement C-11759, 02109/2012) **Note: Canal Overbank Controlled and Operated by Collier County, subject to Limiting Conditions (3rd Amendment to Agreement C-11759, 02109/2012) (CEF way.,......... �md�ed *areaa�e., mawme wy am .—d P1W pe.banaeceo y�em eeon Vm.g.1reboym ne oin nv m, neereiy ee umrem eyTm nc�6i.—d-.e nsb, �c.maairoai—d m, nnioa de—,.- maw..a..r-... Ana i,bindi, dd— �mb.�.*. ax.a .�m.reaea ro .. �reb e r BIG CYPRESS BASIN SFWMD 2660 Horseshoe Dr. N. Naples, Florida 34104 239-263-7615 M Works of the District S489 ® CERP Pump Stations Manatee Mitigation Area Tieback Levee Spreader Basins CERP Canals Comprehensive Everglades Restoration Plan MILLER2 .. _ TFU3 a S488� v C-485 S486 $4$7 U MILLERI I FU2 c 0 7 LL FU1 Manatee Qs-489 Mitigation Area N W E o il a Miles S BCB \ SFWMD -_ Facility and Infrastructure Map - Mar2019 Urban Collier County, Florida Page 6 of Canals in South Florida Appendix C: Primary Water Management Features Table C-22. BCB-operated water control structures in the Big Cypress Basin. Type Control Crest Elevation (ft. NGVD) Structure ID Net Length (feet) Function Comments Top of Bank Elevation ft. msl Moveable crest weir with manually operated hydraulic flap gate Flood Control & Salinity he Airport Road Canal (S.) Subbasin empties into GG-1 Crest elev.: Flap Up: +3.35; Control he Main Golden Gate Canal a short distance Flap Down: +2.00 upstream ofthis structure. Igth=112 ft; top of bank: 9.5 ft Fixed crest weir with 2 manually operated Approx. 2 miles upstream ofGG-I near the 1-75 GG-2 bottom opening sluice gates Flood Control & Over- verpass. The 1-75 Canal Subbasin empties into the crest elev.: +5.00 ; sluice gate: -1.00 Jrainage Prevention Main Golden Gate Canal a short distance upstream Igth=105 ft; top of bank: 9.5 ft f this structure. Fixed crest weir with 2 manually operated pprox. 6 miles upstream ofGG-2 at the eastern end GG-3 bottom opening sluice gates Flood Control & Over- f 1 7th Avenue S.W. (within the Golden Gate crest elev.: +7.50; sluice gate: -0.50 rainage Prevention community) Igth=100 ft; top of bank: 13.0 ft Fixed crest weir with 2 manually operated Approx. 8.35 miles upstream of GG-3. Located 250 GG-4 bottom opening sluice gates Flood Control & Over- ft. east and 100 ft. south of the intersection of crest elev: +9.50; sluice gate: +2.50 drainage Prevention Golden Gate Boulevard and 8th Street N.E. in Igth=100 ft; top of bank: 13.0 ft Golden Gate Estates. Fixed crest weir with 2 manually operated pprox. 4 miles upstream of GG-4. Located 500 ft GG-5 bottom opening sluice gates Flood Control & Over- north of the Randall Boulevard Bridge over the crest elev:+10.50; sluice gate :+4.5o Jrainage Prevention Golden Gate Canal in Golden Gate Estates. Igth=95 ft; top of bank: 15.0 ft Non -operable fixed crest weir with Vee-notch Flood Control & Over- Approx. 3.5 miles upstream of GG-5. This structure GG-6 crest elev: +12.10 rainage Prevention is approx. 2.5 downstream of the northerly terminus Igth: 49 ft; top of bank: 18.0 ft f the Main Golden Gate Canal. Concrete sheetpile fixed crest weir with Vee-n Seasonal Water level Located on a side branch of the Main Golden Gate GG-7 otch equipped with flashboards. Control 3anal near the northerly terminus of 2Oth Street crest elev: +13.1 Over -drainage Prevention N.E. off 47x' Avenue N.E.. Igth = 44 ft; top of bank: 16.3 ft (design flood elev.) Fixed crest weir with 2 manually operated Flood Control & Over-d Located upstream of GG-3, at the north end of 25th Cypress-i bottom opening sluice gates rainage Street N.W. from the intersection of Golden Gate crest elev.: +9.50; sluice gate: +2.50 Prevention Estates. Igth: 42 ft; top of bank: 10.0 ft Fixed crest weir w/roller gate and back 1-75-1 pumping facilities Flood Control & Over- drainage Located at 1-75 Canal Outfall to Main Golden Gate Crest elev.: +6.20 gate: +1 .00 Prevention anal System. Igth: 96 ft; top of bank: 10.0 ft Water elevation gauging station (fixed I-75-2 concrete weir immediately upstream) Data Collection 1-75 Canal at Pine Ridge Road weir crest elev. += 8.00 Igth=71.5; top of bank: (unknown) Fixed crest weir with one bottom opening and one top opening sluice gate - manually Flood Control & Over- 1-75-3 operated Approximately 2 miles downstream of the northern crest: +i1.00 rainage Prevention terminus of the 1-75 Canal. top gate: +10.00; bottom gate: +1.5 Igth: 23 ft; top of bank: 9.0 ft Amil gate with back pumping capabilities Discharge Elev: +7.50 msl Flood Control & Over Located on Airport -Pulling Road approximately 2000 CR-31 S wet season +8.50 msl irainage ft north of Golden Gate Parkway (CR 886) dry season Invert: -2.3' msl Prevention Size: D-710; top of bank: 10.4 ft Amil gate with back pumping capabilities Discharge Elev: +7.50 msl Flood Control & Over- Located on Airport -Pulling Road approx. one mile CR-31 N wet season +8.50 msl drainage south ofGolden Gate Parkway (CR 886) dry season Invert: +2.0' msl Prevention . Size: D-500; top of bank: 10.2 ft Fixed crest weir with manually HEN-1 operated slide gates (2) and one sluice gate Salinity and Flood Control North side of US-41 approx. 2000' east of County crest: +5.00; slide gates: +3.5 msl; & Over -drainage Prevention Road 951 sluice gate: +0.5 msl; top of bank: 7.0 ft Adjustable crest weir (stoplog) Flood Control & Over- pprox. 1 V miles west of the easterly end of Stewart MERRITT-1 crest range: -4.9 to+9.0 drainage Blvd. in Golden Gate Estates Igth: 25 ft; top of bank: 8.5 ft Prevention Fixed crest weir with manually Flood Control & West end of98th Avenue SE from intersection of MILLER-1 operated flashboards Overdrainage Everglades Blvd in Golden Gate Estates, Six crest: +3.90 Prevention miles downstream of MILLER-2 Igth: 68 ft; top of bank: 9.5 ft C-65 Page 1897 of 4682 Big Cypress Basin: Simulated 25-Year/5-Day Stage Hydrographs Page 1898 of 4682 Kc4 A-"s 6w1 W& NOW All stacie ciata in NAvLj Iftaq NAVU Stage Hydrograph for S-Day 25-Year Storm wrier t-1 M PFCSS N 7W. 00 11.2 -- - - - - - - - - - - - - - - L - - - - - - - - - - - - - - - - L - - - - - - - --- - - - - - - - - I - - - - - - - - - - - - - - -- - - - - - - - - L - - - - - - - - .. ... ... .. .. ... .. - - - - - - - - -- - - - - - - - - - - - - - - - --- - - - - - - - T - - - - - - --- - - - - - - - - - - - - - - - - - - - - - - I - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - 7- L.. .... .... - - - - - - - - r ao--- - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - k - - - - - - - - - - - - - - - - I j -4 - -T, T. . . .... .. . .... - - - -- - - - - - - - - - - - - - T - - - - - - - - - - - - - - - - - - - - - 1-a- 58.199s r-&Igwj sa6-l9g8 I 14.iggs CVDress around 31ll St. NW jwj Siege Fydrgraph for fi-bay 25-Year Storm W.Ior L.va- CYPFM5'XAN 4" 00 120-- . .... . . ... .... . . .... . ... ... ... .... ... . . - - - . . ... ... . .. ... ... ... .... ... - - - - - - - I L 10.6- - ... ... ... .... .... - - - . . ... ... ... ... ... ... . .... . ... .... - I. . . ... ... ... ... J fryaF 41 . .... ... 8.6 ............ L& -17 p Z W c yA 175t'S't. NW ssaU - 1 - Page 1899 of 4682 Irs�] Novo Stage Ridrograph for 5-Day 25-Year Storm around I 61h St of C)Eress Can nal I it 11.4 ... . . .... . . ... --4 . . . . ....... ... ... - - - -i . .. .... . .. .... ...... ....... ... ... . . .... . . .... . . ... - - - - -- - - - . . . . ... ... . .... ... .... . .. .... ... ... .. ... . . ... ... .. ... ... ... .. ... ... ... ... . . . .. ... . . ... ... ... ... ... ... 4- - - - - __.________a________ .. .... ... .... .. .. . ... ... - - - - - - - . . ....... ... ... ... I. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1-4 -------- -------- 7 -------- ----- -- 1. V ". (Dress dround 6'St. NW - GY PP� N 2&22 00 3,; Stage NyOrograph For 5-Day 25-Year Storm at Cu" Canal VV.%rL.-I I I . - CU%RYCAN 2409.00 124-- - - - - - - - - - - - - - - - - - 12.21 . . . ... ... ... . . . .. ... ... ... ... ... . r - - - - - - - - L - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1j)4: ------------------------------- ------ - -------- r -------- W------- K- L- - - - - - - --- - - - - - - - - - - - - - - L - - - - - - - - . .. . ... .. . . .. .... 92 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - - - - - ,-B(Y 3-a-1996 6 "'M, "r,A 84. '"M ks Sto Curry Canal Page 1900 of 4682 \� AVON b"a Pvu"rapn 10F 5-L)by 25-year strum - - - - --- - - - -- - - --- - - - -- - - - - - - - I - - - - - - - - . ..... ...... ... .. t IT- 7 9: . . ... ... ... -- - - - - - - - - - - - - - - - - - - - - I T ... ... . . ... II ... ... .... . .... ... ... L . . . .1 A ... . ... ... ... ..... .... ... .. . ... .... ... .... Y—L" — ccw-,ZAMNlC4N &II&W .14 "M 00M 00 DD.W.00 WD000 M,50AW DU:W:W WWV D(;:QO.W 0C)"M W;W:W 00:00W =0000 00:00:W DOMM W.01� 0 _ r I 1-9m 2A-'D 7-0-I"s 4-6.1"s 15-0-ir5 C-4-1009 7-3.1w SA-im 0-6.19" 10-0-IM 11-9-sm 12-9-lim sst-Im Q( 13N �rs Cork Screw Canal :r..a -AID for &Dav myear S10(m Ve L-1 — OPAN(� IIII 1-W ... . . ... ... . ... ... ... . .... ... .. - L- - - . ... ... - - - --- - - - - - - - - - - - - - - - - - - - I- - - - - - - - - - - - - - - - - - --------- --- -------- --- 4jK- ------------ L ------ --- 9A... ... ... ... ... ... ... .... . ... ... ... k . . . . . 00t*00 DOW- —0 130n019 D0.mm WM!W wm:w -m' m 1-U 3-&190 431 74-1M 84-1-6-Im 12-8-Ims 134-Im 143,19" "' 0*,m '"-,*5 11 jj� Via'", I �T Orange Canal -3- Page 1901 of 4682 2l9. rrm,.g-p. ., ..y ,,'}Ted! WOrm 2.4-- - L - - - - - - - - _I_- - - - - - - - - - - - - - - - - - --- - - - L r - - - --- - - - - - - 7 - - - - - - - - - - - - - - - Y - - - - - • L Dabo: W DwW- . . . G 'q .6 6— 4pX o �;k ic' rd 01 a gc gcnvrapn jar .Tuay 4D. Year z4orm . . . . .... ... .... .... - 7 I. T. r .. ... ... ... -4 - - - - -- IIA, - . ..... .. IL2- . . .. ... ... . ... ... ... - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -I - - - - L I T Ai- - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - - - - - - --. :- - - -.. - - -.. - - - - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - - - - - 0.6-- r 12T) IA -1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0/11,X Fa Union Canal M!, W— — - QQLcwc-kT5"N 1�m.w t r-S gym, L� - FAKhlliChG�N 101M.06 i 4 ?4b hrg Page 1902 of 4682 IFee1] nAvnlitSlage F*drograph for 5-Day 25-Year Storm at Upstream CY#1 W.Mr Level CYPHEsscAN oM.W - �. I I I I , I = r I l [ I I I 1 I I 1 1 9.8 �y _ J I I r I I I I I I I I I I I I I r I I M 996 7-H 1975 9-&1M 11$,49G 17.8-, 995 ,�V `� 4J I �' 1 Ui)stream CY#1 -go rryp q_pIOr .7,-udY C.']-i Cdr al 4P rl a wYi rL' 1 ui LaliR4 2 I I ,.9 _ _ _ _ _ . _ , . _ _ _ _ _ _ _ _ _ _ _ _ _I_ _ _ _ _ _ r T _ - _ _ _ - _ Y - _ _ _ _ _ _ _ I • I I I I I I I , I _ I - - - - - - - - - - - - - - - - - -.- - - - -'- - - - - - - ' - - - - - - - - - - . - - . - . - - - - - . - . - . - - Water Level —GOLOBK;A TEMAN 15824 OD 1-B•1985 M-1995 54-1 RN i-&, 986 &&f995 F,-�1995 13-&.1995 153109' D Jews ALP Upstream GG#4 -5- Page 1903 of 4682 .... ... 7jage riyurygrapn fur D-uay [Neer 3 urm M UplrOUW Ul Miler*Z .... ...... . 20- . . ... ... ... .. . . . . .... ... .... . ... .... . - - - - - - .. . .... . .... . .. .. . ... .... 1,2 -- - - - - - - - - I - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - 1.0- . ... ... ... . 7 1 06- . ... ... - - - - - - - - I - - - - - - - -- -- . . ... .... .. - - - - - - - - - - - - - - - - - - - - - - - - - - T - - - - - - - - - .... ._I.... . ... . ... ..... I'&l995 1-0-1905 1- M. 1 -J. Y-8-199j 0-&lm 114-199�5 IM.IA95 1 Upstream Miller#3 VV.INF Le"i — O&LMCAN * 00 -6- Page 1904 of 4682 ENVIRONMENTAL RESOURCE PERMIT APPLICANT'S HANDBOOK VOLUME II Effective: MAY 22, 2016 11 x►roo E is ; x1PLES Wilson Blvd, 10.5 inches F$ A TLANT1417 a 0 Z A X i1 10 rT. a]ERI:E M III IF 1 #$TUART JUNIV2 F3 aALE uGw 1$ 1# 15 JG 17 BUrA RAT-09 T JC I.5 14 LK3944GALE 1.3 1� 11 W-Ami I jr Fa � a I 1 41 11 3 II f aY 11M lT • 111C ES Wlw FIGURE - , -DAB' RAINFALL: 5-YE R RETURN PERIOD Page 1905 of 4682 11/15/21, 1:31 PM Precipitation Frequency Data Server NOAA Atlas 14, Volume 9, Version 2 V"� Location name: Naples, Florida, USA* Latitude: 26.253*, Longitude:-81.607* Elevation: 13.23 ft** source: ESRI Maps ** source: USGS""`" POINT PRECIPITATION FREQUENCY ESTIMATES Sanja Perica, Deborah Martin, Sandra Pavlovic, Ishani Roy, Michael St. Laurent, Carl Trypaluk, Dale Unruh, Michael Yekta, Geoffery Bonnin NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) Duration ��������� 1 2 5 10 25 50 100 200 500 1000 0.572 T 0.643 F 0.763 0.866 F 1.01 F 1.25 1.37 1.54 1.68 5-min (0.462-0.712) (0.519-0.802) (0.613-0.956) (0.691-1.09) (0.779-1.33) (0.845-1.51) (0.897-1.73) (0.940-1.97) (1.01-2.30) (1.06-2.55) 0.837 0.942 1.12 1.27 1.48 1.65 1.83 2.01 2.26 2.46 10-min (0.676-1.04) 11 (0.759-1.18) (0.898-1.40) (1.01-1.60) (1.14-1.95) 1 (1.24-2.22) 1 (1.31-2.53) 1 (1.38-2.89) (1.48-3.37) (1.56-3.73) 1.02 1.15 1.36 1.55 1.81 2.02 2.23 2.45 2.76 3.00 15-min (0.824-1.27) 1 (0.926-1.43) (1.10-1.71) (1.23-1.95) (1.39-2.38) 1 (1.51-2.70) (1.60-3.09) (1.68-3.52) (1.80-4.11) (1.90-4.55) 1.57 1.77 2.09 2.38 2.79 3.11 3.45 3.81 4.30 4.68 30-min (1.27-1.96)1 (1.42-2.20) (1.68-2.62) (1.90-3.00) (2.14-3.67) (2.33 4.18) (2.48-4.79) (2.61-5.48) (2.81-6.41) (2.96-7.11) 2.07 2.32 2.76 3.14 3.68 4.12 4.57 5.05 5.70 6.22 60-min (1 .67-2.57) (1.87-2.90) (2.22-3.45) (2.50-3.95) (2.83-4.85) (3.08-5.53) (3.29-6.34) (3.45-7.26) (3.73-8.50) ( 3.94-9.45) 2.56 2.88 3.42 3.89 4.57 5.12 5.69 6.29 7.11 7.76 2-hr (2.08-3.17) (2.33-3.57) (2.76-4.25) (3.12-4.87) (3.54-5.98) (3.86-6.83) (4.12-7.84 4.34-8.98) (4.70-10.5) (4.96-11.7 ) ) ( 2.78 3.15 3.77 4.31 5.09 5.72 6.37 7.05 8.00 8.74 3-hr (2.27-3.43)1 (2.56-3.88) 1 (3.05-4.67) 1 (3.47-5.37) (3.96-6.64) (4.32-7.59) (4.63-8.74) (4.89-10.0) (5.31-11.8) (5.63-13.1) 3.12 3.60 4.42 5.14 6.17 7.01 7.88 8.79 10.1 11.0 6-hr 2 (2.94-4.41) (3.60-5.44) (4.16-6.36) (4.83-8.01) (5.34-9.26) (5.77-10.7) (6.15-12.4) ( 6.74-14.7) (7.18-16.5) 3.44 4.08 5.19 6.15 7.55 8.69 9.88 11.1 12.9 14.3 12-hr (2.83-4.18) 1 (3.35-4.97) (4.24-6.33) (5.00-7.55) (5.95-9.76) 1 (6.66-11.4) (7.30-13.4) (7.87-15.7) (8.72-18.8) (9.37-21.1) 3.94 4.67 5.96 7.12 8.84 10.3 11.8 13.4 15.7 17.5 24-h r (3.25-4.75) (3.85-5.64) (4.90-7.23) (5.82-8.68) (7.03-11.4) (7.94-13.4) (8.78-15.9) (9.56-18.8) (10.7-22.7) (11.6-25.8) 4.72 5.47 6.82 8.06 9.95 11.6 13.3 15.2 17.9 20.0 2-day (3.92-5.65) (4.53-6.55) (5.63-8.20) (6.62-9.75) (7.98-12.8) (9.02-15.1) ( 10.0-17.9) ( 10.9-21.2) ( 12.4-25.8) ( 13.4-29.3) 5.24 6.09 7.59 8.95 11.0 12.7 14.5 16.5 19.2 21.5 3-day (4.36-6.25) 1 (5.06-7.27) 1 (6.29-9.09) (7.38-10.8) (8.83-14.0) 1 (11.0-19.4) (11.9-22.8) (13.4-27.6) (14.5-31.3) 5.70 6.63 8.24 9.68 11.8 13.6 15.4 17.4 20.2 22.4 4-day (4.76-6.78) (5.52-7.89) (6.84-9.84) 1 (7.99-11.6) (9.49-15.0) (10.6-17.5) 1 (11.7-20.5) (12.6-24.0) (14.1-28.8) (15.2-32.5) 7.06 8.03 9.71 11.2 13.3 15.1 16.9 18.9 21.6 23.7 7-day (5.91-8.34) (6.72-9.50) (8.10-11.5) 1 (9.28-13.4) (10.8-16.7) (11.9-19.3) (12.9-22.3) (13.8-25.8) (15.2-30.6) (16.2-34.2) 8.38 9.37 11.1 12.5 14.6 16.3 18.1 20.0 22.6 24.6 10-day (7.04-9.86) (7.86-11.0) (9.24-13.1) (10.4-14.9 ( 11.8-18.2) (12.9-20.7) (13.8-23.8) (14.7-27.2) (16.0-31.8) (16.9-35.4) ) 12.3 13.4 15.3 16.8 18.9 20.6 22.2 23.8 25.9 27.5 20-day (10.3-14.3)1 (11.3-15.7) 1 (12.8-17.9) (14.1-19.9) (15.3-23.2) (16.3-25.7) (17.0-28.7) (17.6-31.9) (18.5-36.1) (19.2-39.3) 15.3 16.7 18.9 20.7 23.0 24.6 26.2 27.7 29.6 30.9 30-day (13 0-17.8)1 (14.2-19.5) 1 (16.0-22.1) (17.4-24.3) (18.6-27.9) (19.6-30.5) (20.2-33.6) (20.6-36.9) (21.2-40.9) (21.7-43.9) 19.0 20.9 23.7 25.8 28.5 30.3 32.0 33.4 35.1 36.2 45-day (16.2-22.0) (17.7-24.2) (20.0-27.5) (21.7-30.2) (23.1-34.2) (24.1-37.2) (24.7-40.6) (24.9-44.1) (25.2-48.1) ( 25.5-51.2) 33.4 35.4 37.3 38.8 40.4 41.3 60-day E;�QF-24.-3-�F-27-.7-�F-30-.3-7F (20.7-28.1) (23.5-32.1) (25.5-35.3) (27.1-39.9) (28.3-43.3) (28.8-47.1) (28.9-50.9) (29.1-55.1) (29.3-58.3) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_Printpage.html?lat=26.2530&Ion=-81.607O&data=depth&units=english&series=pds Page 1906 of 4�62 11/15/21, 1:31 PM Precipitation Frequency Data Server PDS-based depth -duration -frequency {DDF) curves Latitude: 26.2530 Longitude:-81.60701 4� 40 35 C 30 a a 25 O 20 Q u 15 ai CL o. 10 5 0 OA a N A� pp8 N f+'1 +.� - O O O Ln O 1-1 ri r7 �D � N rn V �Q Duration 45 40 35 c t30 n -6 25 0 +� 20 4T 'CL 15 EL EL 10 --- ..... ............... ........... ...-.....-- ...-- .---. -- ---- — ...---.� 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NDAA Atlas 14, Volume 9, Version 2 Created {GMT: Mon Nov 15 18:31-00 2021 Back to Top Maps & aerials Small scale terrain Average recurrence interval (years) — 1 2 — 5 — 1Q 25 50 100 200 500 1000 Duration — 5-min — 2-day — t0-mm — 3-day 15-min --- 4-day — 30--min — 7Aay — 50-min — 10-day — 2fir — 20-aay — 3fir — 30-0ay — e-nr — 45—day — 12-hr — 60-day — x4frr https://hdsc.nws.noaa.gov/hdsc/pfds/pfds—printpage.html?lat=26.2530&Ion=-81.6070&data=depth&units=english&series=pds Page 1907 of A62 11/15/21, 1:31 PM Precipitation Frequency Data Server �f _dil Well Rd ! .V Bonita Bay Eat yZsy ' mmoka'.re A. _ I I w 3km 2mi Large scale terrain 7LORIDA Port 5 aitlt Luca WestPalrr Cape Cor�a IBoca Raton* jCoral Springs e ' Pompano E :Miall' + y m 100knn �a 60mi �} Large scale map PcprtStLurie West Palm c ape Goes[ Beach ' I Coral Springs �ccaRaton ■� PompanoB Mia b 100km 60mi Large scale aerial https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=26.2530&Ion=-81.607O&data=depth&units=english&series=pds Page 1908 of A62 11/15/21, 1:31 PM Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=26.2530&Ion=-81.607O&data=depth&units=english&series=pds Page 1909 of 462 Collier County Property Appraiser Property Summary Site Parcel No 37280440000 Address Name / Add *Disclaimer THACKSTON, GLENDA SUE 196 RIVERWOOD RD Site City NAPLES Site Zone 34120 Note NAPLES State 1 FL Zipi 34114 MFap No. Strap No Section Township Range Acres *Estimated 4CO3 330100 6 04CO3 1 3 49 27 2.81 Legar GOLDEN GATE EST UNIT 14 N 180FT OF TR 6 OR 1207 PG 67 1 Millage Area s 87 Millage Rates o *Calculations Sub./Condo 330100 - GOLDEN GATE EST UNIT 14 School Other Total Use Code a 0 - VACANT RESIDENTIAL 4.889 6.5335 11.4225 Latest Sales History (Not all Sales are listed due to Confidentialitvl 10/06/05 ook-Pa a 3905-3611 WAmount $ 0 07/02/03 3331-1196 $ 54,500 07/01/86 1207-67 $ 0 04/01/74 585-1081 $ 0 2021 Preliminary Tax Roll (Subject to Change) Land Value $ 60,064 (+) Improved Value $ 0 (_) Market Value $ 60,064 (-) 10% Cap $ 38,139 (_) Assessed Value $ 21,925 (_) School Taxable Value $ 60,064 (_) Taxable Value $ 21,925 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1910 of 4682 Collier County Property Appraiser Property Summary Site Site Zone Parcel No 37280480002 Address Site City NAPLES *Note 34120 *Disclaimer Name / Address I GOULAIT, CATHERINE ANN 5175 THANE RD JUNEAU Stat AK Zip 99801-7716 MFap No. Strap No Section Township Range Acres *Estimated 4CO3 330100 6 14CO3 1 3 49 27 2.34 F- Lega GOLDEN GATE EST UNIT 14 S 150FT OF TR 6 Millage Area la 187 Sub./Condo 330100 - GOLDEN GATE EST UNIT 14 Use Code a 10 - VACANT RESIDENTIAL Latest Sales History Not all Sales are listed due to Confidentiality) 7 ook-Pa a Amount 03/06/08 06/06/64336-1679 $ 0 8 277-783 $ 0 Millage Rates O *Calculations School Other Total 4.889 1 6.5335 1 11.4225 2021 Preliminary Tax Roll (Subiect to Chanae) Land Value $ 50,018 (+) Improved Value $ 0 (_) Market Value $ 50,018 (-) 10% Cap $ 33,166 (_) Assessed Value $ 16,852 (_) School Taxable Value $ 50,018 (_) Taxable Value $ 16,852 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1911 of 4682 Collier County Property Appraiser Property Summary Site 314 Site Zone Parcel No 37280560003 Address WILSON Site City NAPLES *Note 34120 *Disclaimer 1 BLVD N Name / Addr TERRA HOME BUILDERS INC 4420 18TH ST NE M Cites NAPLES I State I FL I Zip134120 lap No. Stra N Section Township Range Acres *Estimated 4CO3 330100 7 14CO3 3 49 27 2.81 Leg GOLDEN GATE EST UNIT 14 S 180FT OF TR 7 Millage Area O 87 Millage Rates 0 *Calculations _ Sub./Condo 330100 - GOLDEN GATE EST UNIT 14 School Other Total _ Use Code 0 - VACANT RESIDENTIAL 4.889 6.5335 11.4225 Latest Sales History (lint all Salac ara lictarl Am to Cnnfirlantialitvl DateW Book -Page IWAmoun 12/28/20 5877-1622 $ 107,000 10/09/01 2905-1213 $ 0 04/11/96 2169-1757 $ 0 02/09/96 2147-1585 $ 0 03/04/94 1920-609 $ 0 02/01/86 1179-2368 $ 8,000 2021 Preliminary Tax Roll (Subject to Change) Land Value $ 80,085 (+) Improved Value $ 0 (_) Market Value $ 80,085 (_) Assessed Value $ 80,085 (_) School Taxable Value $ 80,085 (_) Taxable Value $ 80,085 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1912 of 4682 Collier County Property Appraiser Property Summary Site Parcel No 37280760007 Address Name / Add *Disclaimer BOTET, DAYLAR BELKIS BOTET BELKIS PICHARDO 8235 IVIS CLUB DR AT 302 Site City NAPLES Site Zone 34120 Note NAPLES State Fl- I Zipi 34104 MFap No. ]111Strap No Section Township Range Acres *Estimated 4CO3 330100 10 04CO3 1 3 49 27 1.64 Legar GOLDEN GATE EST UNIT 14 N 105FT OF TR 10 OR 1015 PG 1342 Millage Area s 87 Millage Rates o *Calculations Sub./Condo 330100 - GOLDEN GATE EST UNIT 14 School Other Total Use Code a 0 - VACANT RESIDENTIAL 4.889 6.5335 7 11.4225 Latest Sales History (Not all Sales are listed due to Confidentialitvl 08/02/21 ook-Pa a 5995-2830 W Amoun $ 135,000 06/16/21 5969-3415 $ 70,000 04/01 /83 1015-1342 $ 6,100 12/01/81 1 948-1712 $ 4,700 10/01 /80 1 887-1448 $ 0 2021 Preliminary Tax Roll (Subject to Change) Land Value $ 46,740 (+) Improved Value $ 0 (_) Market Value $ 46,740 (-) 10% Cap $ 27,054 (_) Assessed Value $ 19,686 (_) School Taxable Value $ 46,740 (_) Taxable Value $ 19,686 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1913 of 4682 Collier County Property Appraiser Property Summary Site Parcel No 37280800006 Address Name / Address I City *Disclaimer THUMAN, ERWIN GUILLERMO DANY ELIZABETH THUMAN 470 WILSON BLVD N NAPLES Site City NAPLES Site Zone 34120 Note State 1 FL Zipi 34120 Map No. ]111Strap No-jlff� Section Township Range Acres *Estimated 4CO3 3301001014CO3 1 3 49 27 1.17 Lega GOLDEN GATE EST UNIT 14 S 75FT OF N 180FT OF TR 10 OR 919 PG 1274 Millage Area s 87 Millage Rates o *Calculations Sub./Condo 330100 - GOLDEN GATE EST UNIT 14 School Other Total Use Code a 0 - VACANT RESIDENTIAL 4.889 6.5335 11.4225 Latest Sales History (Not all Sales are listed due to Confidentialitvl 07/28/21 ook-Pa a 5995-3526 WAmoun $ 107,500 06/16/21 5969-3415 $ 70,000 05/01/81 919-1274 1 $ 2,700 11/01/74 1 605-1975 1 $ 0 2021 Preliminary Tax Roll (Subject to Change) Land Value IM $ 33,345 (+) Improved Value $ 0 (_) Market Value $ 33,345 (-) 10% Cap $ 19,300 (_) Assessed Value $ 14,045 (_) School Taxable Value $ 33,345 (_) Taxable Value $ 14,045 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1914 of 4682 Collier County Property Appraiser Property Summary Site 496 Site Zone Parcel No 37280920009 Address WILSON Site City NAPLES *Note 34120 *Disclaimer 1 BLVD N Name / AddrilWALTI CONSTRUCTION SERVICES LLC 3780 29TH AVE SW M Cites NAPLES I State I FL I Zip134117 lap No. Stra N Section Township Range Acres *Estimated 4CO3 3301001104CO3 3 49 27 2.81 Leg GOLDEN GATE EST UNIT 14 S 180FT OF TR 11 Millage Area O 87 Millage Rates v *Calculations _ Sub./Condo 330100 - GOLDEN GATE EST UNIT 14 School Other Total _ Use Code 0 - VACANT RESIDENTIAL 4.889 6.5335 11.4225 Latest Sales History (Not all Sales are listed due to Confidentialitv) �ateW Book -Page WAmoun 05/06/20 5763-2493 $ 0 02/23/10 4543-74 $ 0 07/16/02 3073-860 $ 64,500 04/13/00 2663-947 $ 25,000 07/23/98 2443-3486 $ 0 04/19/94 1 1936-1626 1 $ 14,500 04/01/88 1 1343-484 1 $ 10,500 01/01/83 1 1003-1560 1 $ 8,700 2021 Preliminary Tax Roll (Subject to Change) Land Value $ 80,085 (+) Improved Value $ 0 (_) Market Value $ 80,085 (-) 10% Cap $ 46,352 (_) Assessed Value $ 33,733 (_) School Taxable Value $ 80,085 Taxable Value $ 33,733 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1915 of 4682 Collier County Property Appraiser Property Summary Site 720 Parcel No 37281280007 Address WILSON Site City NAPLES *Disclaimer BLVD N Name / AddrVPADAVATHIL, JACOB THOMAS AS A PADAVATHIL 5200 LANCELOT LN Site Zone 34120 *Note M Cites DAVIE I State I FL I Zip133331-3371 lap No. Stra N Section Township Range Acres *Estimated 4CO3 330100 16 4CO3 3 49 27 5.15 Leg GOLDEN GATE EST UNIT 14 TR 16 OR 1445 PG 31 Millage Area O 87 Millage Rates v *Calculations _ Sub./Condo 330100 - GOLDEN GATE EST UNIT 14 School Other Total _ Use Code 0 - VACANT RESIDENTIAL 4.889 6.5335 11.4225 Latest Sales History (Not all Sales are listed due to Confidentialitv) DateW Book -Page IWAmoun 11/05/04 3674-1188 $ 230,000 05/31/89 1445-31 $ 0 03/01/87 1 1257-914 1 $ 55,000 11/01/85 1163-481 $ 0 05/01/84 1083-824 $ 0 2021 Preliminary Tax Roll (Subject to Chanae) Land Value $ 110,081 (+) Improved Value $ 0 (_) Market Value $ 110,081 (-) 10% Cap $ 69,897 (_) Assessed Value $ 40,184 (_) School Taxable Value $ 110,081 Taxable Value J1$ 40,184 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1916 of 4682 Collier County Property Appraiser Property Summary Site Parcel No 37281320006 Address Name / Add *Disclaimer RAMOS, MARITZA 811 2ND ST NE Site City NAPLES Site Zone 34120 Note NAPLES State 1 FL Zipi 34120 MFap No. ]111Strap No Section Township Range Acres *Estimated 4CO3 330100 17 04CO3 1 3 49 27 2.58 Legar GOLDEN GATE EST UNIT 14 N 1/2 OF TR 17 Millage Area s 87 Millage Rates o *Calculations Sub./Condo 330100 - GOLDEN GATE EST UNIT 14 School Other Total Use Code a 0 - VACANT RESIDENTIAL 4.889 6.5335 11.4225 Latest Sales History (Not all Sales are listed due to Confidentialitvl 03/05/18 ook-Pa a 5483-25 WAmount $ 0 01/11/00 2629-3498 $ 0 11/23/99 2614-259 $ 0 04/01 /79 806-1092 $ 0 09/01/68 284-835 $ 0 2021 Preliminary Tax Roll (Subject to Change) Land Value $ 73,530 (+) Improved Value $ 0 (_) Market Value $ 73,530 (-) 10% Cap $ 1,301 (_) Assessed Value $ 72,229 (_) School Taxable Value $ 73,530 (_) Taxable Value $ 72,229 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1917 of 4682 Collier County Property Appraiser Property Summary Site Parcel No 37281400007 Address Name / Address 4 City *Disclaimer SPERLING JT REVOCABLE TRUST 24440 WOODSAGE DR BONITA SPRINGS Site City NAPLES Site Zone 34120 Note State'FL Zipi 34134 Map No. ]111Strap NoJW Section Township Range Acres *Estimated 4CO3 330100 19 04CO3 1 3 49 27 5.6 Legar GOLDEN GATE EST UNIT 14 TR 19 OR 914 PG 1198 1 Millage Area s 87 Millage Rates o *Calculations Sub./Condo 330100 - GOLDEN GATE EST UNIT 14 School Other Total Use Code a 0 - VACANT RESIDENTIAL 4.889 6.5335 T 11.4225 Latest Sales History (Not all Sales are listed due to Confidentialitvl 10/24/14 ook- 5097-1571 Amount $ 0 10/25/04 3666-2308 $ 287,500 05/05/04 3555-3669 $ 140,000 04/25/81 914-1198 $ 0 2021 Preliminary Tax Roll (Subject to Change) Land Value $ 125,215 (+) Improved Value $ 0 (_) Market Value $ 125,215 (-) 10% Cap $ 72,397 (_) Assessed Value $ 52,818 (_) School Taxable Value $ 125,215 (_) Taxable Value $ 52,818 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1918 of 4682 Collier County Property Appraiser Property Summary Site Parcel No 37118720009 Address Name / Add *Disclaimer BRODIE, MARSHALL E 15721 SW 76 AVE Site City NAPLES Site Zone 34120 Note NAPLES State 1 FL Zip 33157 MFap No. ]111Strap No Section Township Range Acres *Estimated 4C04 328600 132 04C04 1 4 49 27 2.58 Legar GOLDEN GATE EST UNIT 11 N1/2 OF TRACT 132 Millage Area s 87 Millage Rates o *Calculations Sub./Condo 328600 - GOLDEN GATE EST UNIT 11 School Other Total Use Code e 0 -VACANT RESIDENTIAL 4.889 6.5335 11.4225 Latest Sales History (Not all Sales are listed due to Confidentialitvl 11/18/98 ook-Pa 2482-213 Amount $ 0 04/14/95 2049-42 $ 0 04/13/95 2049-40 $ 37,000 06/01/73 547-41 $ 0 2021 Preliminary Tax Roll (Subject to Change) Land Value IM $ 90,300 (+) Improved Value $ 0 (_) Market Value $ 90,300 (-) 10% Cap $ 29,739 (_) Assessed Value $ 60,561 (_) School Taxable Value $ 90,300 (_) Taxable Value $ 60,561 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1919 of 4682 Collier County Property Appraiser Property Summary Site Parcel No 37118720106 Address Name / Add *Disclaimer BRODIE, MARSHALL E 15721 SW 76 AVE PALMETTO BAY Site City NAPLES Site Zone 34120 Note State'FL Zip 33157 Map No. Strap NojW Section Township Range Acres *Estimated 4C04 32860013214C04 1 4 49 27 2.58 Legar GOLDEN GATE EST UNIT 11 S1/2 OF TRACT 132 Millage Area s 87 Millage Rates o *Calculations Sub./Condo 328600 - GOLDEN GATE EST UNIT 11 School Other Total Use Code e 0 -VACANT RESIDENTIAL 4.889 6.5335 11.4225 Latest Sales History 2021 Preliminary Tax Roll Not all Sales are listed due to Confidentiality) Sub'ect to Chan e) Date ook-Pa a Amount Land Value $ 90,300 (+) Improved Value $ 0 (_) Market Value $ 90,300 (-) 10% Cap $ 29,739 (_) Assessed Value $ 60,561 (_) School Taxable Value $ 90,300 (_) Taxable Value $ 60,561 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1920 of 4682 Collier County Property Appraiser Property Summary Site Site Zone Parcel No 37492000005 Address I Site City NAPLES *Note 34120 Name / Add *Disclaimer VILLAFRANCA, ARNALDO=& BARBARA 6930 SW 178TH AVE SOUTHWEST RANCHE � State ' FL Zip 33331-1823 Map No. Strap No].W Section Township Range Acres *Estimated 3C34 ]IIIW331300 24 3C34 1 34 48 27 5 LegaT GOLDEN GATE EST UNIT 18 TR 24 1 Millage Area s 290 Sub./Condo 331300 - GOLDEN GATE EST UNIT 18 Use Code a 0 - VACANT RESIDENTIAL Millage Rates O *Calculations School Other Total 4.889 8.7835 1 13.6725 Latest Sales History 2021 Preliminary Tax Roll Not all Sales are listed due to Confidentiality) Sub'ect to Chan e) o ak-Pa a Amoun Land Value $ 142,500 07/31/95 2084-27 $ 27,000 (+) Improved Value $ 0 (_) Market Value $ 142,500 (-) 10% Cap $ 77,119 (_) Assessed Value $ 65,381 (_) School Taxable Value $ 142,500 (_) Taxable Value $ 65,381 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1921 of 4682 Collier County Property Appraiser Property Summary Site Site Zone Parcel No 37549720005 Address Site City NAPLES *Note 34120 *Disclaimer Name / Add VENTI, CAROL LOUISE PO BOX 20512 KEIZER Stat OR I Zip 97307 Map No. Strap Nojnff� Section Township Range Acres *Estimated 3C33 331600 136 3C33 1 33 48 27 5.15 F— Legar GOLDEN GATE EST UNIT 19 TR 136 Millage Area la 1290 1 Millage Rates O *Calculations Sub./Condo 1331600 - GOLDEN GATE EST UNIT 19 1 School Other Total Use Code a 10 - VACANT RESIDENTIAL Latest Sales History Not all Sales are listed due to Confidentiality) loj=ook- Amobd 01/12/83 1003-463 $ 14,000 02/01 /77 1 678-1134 $ 0 4.889 8.7835 1 13.6725 2021 Preliminary Tax Roll (Subiect to Chanae) Land Value $ 146,775 (+) Improved Value $ 0 (_) Market Value $ 146,775 (-) 10% Cap $ 76,122 (_) Assessed Value $ 70,653 (_) School Taxable Value $ 146,775 (_) Taxable Value $ 70,653 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1922 of 4682 Collier County Property Appraiser Property Summary Site Site Zone Parcel No 37492200009 Address Site City NAPLES *Note 34120 *Disclaimer Name / Address SUNSHINE WAY INVESTMENTS LLC 1249 PARK AVE #17C NEW YORK Stat NY I Zip 10029 Map No. Strap Nojnff� Section Township Range Acres *Estimated 3C34 ]1111331300 28 03C34 1 34 48 27 2.73 F— Legar GOLDEN GATE EST UNIT 18 E 18OFT OF TR 28 Millage Area la 1290 1 Millage Rates O *Calculations Sub./Condo 1331300 - GOLDEN GATE EST UNIT 18 1 School Other Total Use Code a 10 - VACANT RESIDENTIAL Latest Sales History Not all Sales are listed due to Confidentiality) ook- Amount 07/30/16 5321-967 $ 0 06/11/10 4579-1619 $ 0 03/09/10 4544-912 $ 10,500 4.889 8.7835 1 13.6725 2021 Preliminary Tax Roll (Subiect to Chanae) Land Value $ 77,805 (+) Improved Value $ 0 (_) Market Value $ 77,805 (-) 10% Cap $ 42,108 (_) Assessed Value $ 35,697 (_) School Taxable Value $ 77,805 (_) Taxable Value $ 35,697 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1923 of 4682 Collier County Property Appraiser Property Summary Site Parcel No 37492240001 Address Name / Add *Disclaimer JORDANELL CAPITAL LLC 19111 COLLINS AVE APT 801 SUNNY ISLES BEAC Site City NAPLES Site Zone 34120 Note State'FL Zipi 33160-2379 Map No. Strap No].W Section Township Range Acres *Estimated 3C34 ]IIW331300 28 13C34 1 34 48 27 2.27 Legar GOLDEN GATE EST UNIT 18 W 150FT OF TR 28 Millage Area s 290 Sub./Condo 331300 - GOLDEN GATE EST UNIT 18 Use Code a 0 - VACANT RESIDENTIAL Latest Sales History (Not all Sales are listed due to Confidentialitvl 11/02/10 ook-Pa a 4619-2422 WAmoun $ 6,700 06/25/87 1273-423 $ 0 04/01/86 1190-574 1 $ 0 05/01 /82 1 971-1784 1 $ 0 Millage Rates a *Calculations School Other Total 4.889 8.7835 1 13.6725 2021 Preliminary Tax Roll (Subject to Change) Land Value $ 64,695 (+) Improved Value $ 0 (_) Market Value $ 64,695 (-) 10% Cap $ 35,013 (_) Assessed Value $ 29,682 (_) School Taxable Value $ 64,695 (_) Taxable Value $ 29,682 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1924 of 4682 Collier County Property Appraiser Property Summary Site Parcel No 37492560008 Address Name / Add *Disclaimer BENDER TR, DORIS L 66TH STREET SW UTD 10/23/97 2660 66TH STREET SW Site City NAPLES Site Zone 34120 Note NAPLES State Fl- I Zip 34105 Map No. Strap No Section Township Range 3C34 331300 32 3C34 1 34 48 27 Legar GOLDEN GATE EST UNIT 18 TR 32 Millage Area s 290 Sub./Condo 331300 - GOLDEN GATE EST UNIT 18 Use Code a 0 - VACANT RESIDENTIAL Latest Sales History (Not all Sales are listed due to Confidentialitvl 11/26/97 ook-Pa a 2366-2338 WAmount $ 0 09/01 /89 1468-147 $ 0 06/01/89 1448-291 1 $ 22,000 07/01 /86 1208-434 1 $ 0 Acres *Estimated 5 Millage Rates a *Calculations School Other Total 4.889 8.7835 1 13.6725 2021 Preliminary Tax Roll (Subject to Change) Land Value $ 142,500 (+) Improved Value $ 0 (_) Market Value $ 142,500 (-) 10% Cap Ji $ 77,119 (_) Assessed Value $ 65,381 (_) School Taxable Value $ 142,500 (_) Taxable Value $ 65,381 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1925 of 4682 Collier County Property Appraiser Property Summary Site Site Zone Parcel No 37493440004 Address Site City NAPLES *Note 34120 *Disclaimer Name / Address 0 CAPITAL HOMES INVEST & ALL LLC A 3211 10TH AVE NE NAPLES State 1 FL Zip 34120 Map No. ]111Strap Nojnff� Section Township Range Acres *Estimated 3C34 331300 47 03C34 1 34 48 27 2.27 F— Legar GOLDEN GATE EST UNIT 18 W 150FT OF TR 47 Millage Area la 1290 1 Millage Rates O *Calculations Sub./Condo 1331300 - GOLDEN GATE EST UNIT 18 1 School Other Total Use Code a 10 - VACANT RESIDENTIAL Latest Sales History Not all Sales are listed due to Confidentiality) ook- Amoun 06/15/21 5971-1314 $ 210,000 09/23/93 1 1867-2401 $ 6,500 4.889 8.7835 1 13.6725 2021 Preliminary Tax Roll (Subiect to Chanae) Land Value $ 64,695 (+) Improved Value $ 0 (_) Market Value $ 64,695 (-) 10% Cap $ 32,004 (_) Assessed Value $ 32,691 (_) School Taxable Value $ 64,695 (_) Taxable Value $ 32,691 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1926 of 4682 Collier County Property Appraiser Property Summary Site Site Zone Parcel No 37493440101 Address Site City *Note *Disclaimer Name / Address 0 CAPITAL HOMES INVEST & ALL LLC A 3211 10TH AVE NE NAPLES State 1 FL Zip 34120 MFap No. ]111Strap No Section Township Range Acres *Estimated 3C34 331300 47 13C34 1 34 48 27 2.73 F— Legar GOLDEN GATE EST UINT 18 E 18OFT OF TR 47 Millage Area la 1290 1 Millage Rates O *Calculations Sub./Condo 1331300 - GOLDEN GATE EST UNIT 18 1 School Other Total Use Code a 10 - VACANT RESIDENTIAL Latest Sales History Not all Sales are listed due to Confidentiality) ook- Amoun 06/15/21 5971-1314 $ 210,000 09/23/93 1 1867-2401 $ 6,500 4.889 8.7835 1 13.6725 2021 Preliminary Tax Roll (Subiect to Chanae) Land Value $ 64,980 (+) Improved Value $ 0 (_) Market Value $ 64,980 (-) 10% Cap $ 32,289 (_) Assessed Value $ 32,691 (_) School Taxable Value $ 64,980 (_) Taxable Value $ 32,691 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1927 of 4682 Collier County Property Appraiser Property Summary Site Parcel No 37598680002 Address Name / Address 4 City *Disclaimer STEWART, RONALD 208 FITCHBURG ST SW PALM BAY Site City NAPLES Site Zone 34120 Note State 1 FL Zipi 32908-1301 Map No. Strap No Section Township Range Acres *Estimated 3C27 331900 131 03C27 1 27 48 27 2.81 Legar GOLDEN GATE EST UNIT 20 S 180FT OF TR 131 Millage Area s 290 Sub./Condo 331900 - GOLDEN GATE EST UNIT 20 Use Code a 0 - VACANT RESIDENTIAL Latest Sales History (Not all Sales are listed due to Confidentialitvl 08/07/10 ook- 4611-902 Amount $ 0 02/20/03 3223-1701 $ 0 03/15/96 2159-1156 $ 0 03/01/92 1696-1913 $ 22,000 10/01/87 1302-2278 $ 11,000 05/01/76 1 651-1292 $ 0 Millage Rates a *Calculations School Other Total 4.889 8.7835 1 13.6725 2021 Preliminary Tax Roll (Subject to Change) Land Value $ 80,085 (+) Improved Value $ 0 (_) Market Value $ 80,085 (-) 10% Cap $ 41,535 (_) Assessed Value $ 38,550 (_) School Taxable Value $ 80,085 (_) Taxable Value $ 38,550 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1928 of 4682 Collier County Property Appraiser Property Summary Site 2045 Parcel No 37598720001 Address WILSON Site City NAPLES *Disclaimer 1 BLVD N Site Zone 34120 *Note lap No. Stra N Section To ip Range Acres *Estimated 3C27 331900 131 13C27 27 48 27 2.34 L GOLDEN GATE EST UNIT 20 N 150FT OF TR 131 Millage Area O 290 Millage Rates v *Calculations _ Sub./Condo 331900 - GOLDEN GATE EST UNIT 20 School Other Total Use Code 0 - VACANT RESIDENTIAL 4.889 8.7835 i 13.6725 Latest Sales History (Not all Sales are listed due to Confidentialitv) �ateW Book -Page WAmoun 08/26/13 4962-1119 $ 0 09/26/97 2350-859 $ 30,000 08/01/81 1 934-55 $ 6,000 08/01/81 1 934-46 $ 0 06/01/69 1 313-387 $ 0 2021 Preliminary Tax Roll (Subject to Change) Land Value $ 66,690 (+) Improved Value $ 0 (_) Market Value $ 66,690 (-) 10% Cap $ 35,578 (_) Assessed Value $ 31,112 (_) School Taxable Value $ 66,690 Taxable Value $ 31,112 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1929 of 4682 Collier County Property Appraiser Property Summary Site Site Zone Parcel No 37740280001 Address Site City NAPLES *Note 34120 *Disclaimer Name / Add LESTER, ELOISE C 4412 E FAIRFIELD ST MESA State 1 AZ Zip 85205-5201 MFap No. Strap No Section Township Range Acres *Estimated 3C27 332800 3 13C27 1 27 48 27 2.81 Legar GOLDEN GATE EST UNIT 23 S 180FT OF TR 3 OR 663 PG 761 1 Millage Area s 290 Sub./Condo 332800 - GOLDEN GATE EST UNIT 23 Use Code a 0 - VACANT RESIDENTIAL Millage Rates O *Calculations School Other Total 4.889 8.7835 1 13.6725 Latest Sales History 2021 Preliminary Tax Roll Not all Sales are listed due to Confidentiality) Sub'ect to Chan e) ook- Amount Land Value $ 80,085 09/01/76 663-761 $ 0 (+) Improved Value $ 0 (_) Market Value $ 80,085 (-) 10% Cap $ 43,339 (_) Assessed Value $ 36,746 (_) School Taxable Value $ 80,085 (_) Taxable Value $ 36,746 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1930 of 4682 Collier County Property Appraiser Property Summary Site Parcel No 37742280009 Address Name / Address City *Disclaimer PHAM ET AL, THANH 578 98TH AVE N Site City NAPLES Site Zone 34120 Note NAPLES I State 1 FL Zipj 34108-2220 MFap No. ]111Strap No Section Township Range Acres *Estimated 3C27 332800 28 13C27 1 27 48 27 2.73 Legar GOLDEN GATE EST UNIT 23 E 18OFT OF TR 28 Millage Area s 290 Sub./Condo 332800 - GOLDEN GATE EST UNIT 23 Use Code a 0 - VACANT RESIDENTIAL Millage Rates O *Calculations School Other Total 4.889 8.7835 1 13.6725 Latest Sales History 2021 Preliminary Tax Roll Not all Sales are listed due to Confidentiality) Sub'ect to Chan e) ook- Amount Land Value $ 77,805 01/26/99 2505-3242 $ 0 (+) Improved Value (_� Market Value (-) 10% Cap $ 0 $ 77,805 $ 42,108 11/23/98 2483-2149 $ 0 05/15/98 2420-1465 $ 0 02/02/96 2145-618 $ 0 Assessed Value $ 35,697 (_) School Taxable Value $ 77,805 (_) Taxable Value $ 35,697 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1931 of 4682 Collier County Property Appraiser Property Summary Site 221 18TH Parcel No 37743480002 Address Name / Address City *Disclaimer AVE NE CUNNINGHAM, EMRON=& STACEY 2430 8TH ST NE Site City NAPLES Site Zone 34120 Note NAPLES I State 1 FL Zipi 34120 MFap No. ]111Strap No Section Township Range Acres *Estimated 3C27 332800 43 13C27 1 27 48 27 2.73 Legall GOLDEN GATE EST UNIT 23 W 180FT OF TR 43 OR Millage Area s 290 Sub./Condo 332800 - GOLDEN GATE EST UNIT 23 Use Code a 0 - VACANT RESIDENTIAL Latest Sales History (Net all Sales are listed due to Confidentialitvl Date ook-j Amoun 10/14/14 5086-2710 $ 48,000 04/04/02 3012-749 $ 42,000 05/16/97 2313-3222 $ 15,000 01/26/93 1791-935 $ 14,000 03/01/88 1338-1836 $ 9,000 Millage Rates a *Calculations School Other Total 4.889 8.7835 1 13.6725 2021 Preliminary Tax Roll (Subject to Change) Land Value $ 77,805 (+) Improved Value $ 0 (_) Market Value $ 77,805 (-) 10% Cap $ 19,304 (_) Assessed Value $ 58,501 (_) School Taxable Value $ 77,805 (_) Taxable Value $ 58,501 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1932 of 4682 Collier County Property Appraiser Property Summary Site Parcel No 37598400004 Address Name / Add *Disclaimer TOSCANO, ALBA MELISSA PEREZ A 27551 SHRIVER AVE BONITS SPRINGS Site City NAPLES Site Zone 34120 Note State'FL Zip 34135 Map No. ]11Strap NojW Section Township Range Acres *Estimated 3C27 331900 128 13C27 1 27 48 27 2.81 F— Legar GOLDEN GATE EST UNIT 20 N 180FT OF TR 128 OR 279 PG 637 Millage Area s 290 Sub./Condo 331900 - GOLDEN GATE EST UNIT 20 Use Code a 0 - VACANT RESIDENTIAL Millage Rates O *Calculations School Other Total 4.889 8.7835 1 13.6725 Latest Sales History 2021 Preliminary Tax Roll Not all Sales are listed due to Confidentiality)Sub'ect to Chan e) ook-Pa Arnow Land Value $ 80,085 03/04/21 5906-36 $ 76,000 (+) Improved Value $ 0 70�8/24/04 3630-1806 $ 0 Market Value $ 80,085 (-) 10% Cap $ 41,535 (_) Assessed Value $ 38,550 (_) School Taxable Value $ 80,085 (_) Taxable Value $ 38,550 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1933 of 4682 Collier County Property Appraiser Property Summary Site Parcel No 37598480008 Address Name / Add *Disclaimer FERNANDEZ, ARNOLDO BOU SANDRA CUESTA TENENBAUM 250 GRAND CANAL DR Site City NAPLES Site Zone 34120 Note MIAMI State 1 FL Zipi 33144 MFap No. Strap No Section Township Range Acres *Estimated 3C27 331900 129 03C27 1 27 48 27 2.81 Legar GOLDEN GATE EST UNIT 20 S 180FT OF TR 129 Millage Area s 290 Sub./Condo 331900 - GOLDEN GATE EST UNIT 20 Use Code a 0 - VACANT RESIDENTIAL Latest Sales History (Not all Sales are listed due to Confidentialitvl 04/21/17 ook- 5390-2844 Arno $ 65,000 02/10/17 5364-1186 $ 0 04/15/94 1936-616 $ 15,500 02/24/94 1917-276 $ 0 10/01/90 1564-717 $ 12,000 08/01 /89 1 1461-1961 1 $ 6,600 Millage Rates a *Calculations School Other Total 4.889 8.7835 1 13.6725 2021 Preliminary Tax Roll (Subject to Change) Land Value $ 68,072 (+) Improved Value $ 0 (_) Market Value $ 68,072 (-) 10% Cap $ 18,983 (_) Assessed Value $ 49,089 (_) School Taxable Value $ 68,072 (_) Taxable Value j& $ 49,089 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1934 of 4682 Collier County Property Appraiser Property Summary Site 2082 Parcel No 37740760000 Address WILSON Site City NAPLES *Disclaimer BLVD N Site Zone 34120 *Note lap No. Strap NoM I Section Township Range Acres *Estimated 3C27 332800 8 13C27 1 27 48 27 2.81 Leg GOLDEN GATE EST UNIT 23 N 180FT OF TR 8 Millage Area O 290 Millage Rates v *Calculations _ Sub./Condo 332800 - GOLDEN GATE EST UNIT 23 School Other Total Use Code 0 - VACANT RESIDENTIAL 4.889 8.7835 i 13.6725 Latest Sales History (Not all Sales are listed due to Confidentialitv) ate 08/06/21 ook- 6005-2067 Amoun $ 120,000 03/28/00 2656-268 $ 0 03/28/00 2656-267 $ 0 03/29/99 2528-1108 $ 0 03/25/97 2298-835 $ 0 05/01/79 812-259 $ 0 05/01/79 812-255 $ 0 2021 Preliminary Tax Roll (Subject to Change) Land Value $ 80,085 (+) Improved Value $ 0 (_) Market Value $ 80,085 (-) 10% Cap $ 43,339 (_) Assessed Value $ 36,746 (_) School Taxable Value $ 80,085 Taxable Value IW& $ 36,746 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1935 of 4682 Collier County Property Appraiser Property Summary Site Parcel No 37740840001 Address Name / Address City *Disclaimer D AMATO, LINDA B DALE LENNER EST AMY LUTTERS 7234 E OAKRIDGE CIR LANTANA Site City NAPLES Site Zone 34120 Note State 1 FL Zipj 33462 Map No. Strap No. jK Section Township Range Acres *Estimated 3C27 332800 9 13C27 1 27 48 27 1 2.81 Legar GOLDEN GATE EST UNIT 23 S 180FT OF TR 9 OR 848 PG 1465 Millage Area s 290 Sub./Condo 332800 - GOLDEN GATE EST UNIT 23 Use Code a 0 - VACANT RESIDENTIAL Millage Rates O *Calculations School Other Total 4.889 8.7835 1 13.6725 Latest Sales History 2021 Preliminary Tax Roll Not all Sales are listed due to Confidentiality) Sub'ect to Chan e) ook-Pa a Amount Land Value $ 68,072 12/01/79 848-1465 $ 0 (+) Improved Value $ 0 08/01/68 284-14 $ 6,200 Market Value $ 68,072 (-) 10% Cap $ 44,189 (_) Assessed Value $ 23,883 (_) School Taxable Value $ 68,072 (_) Taxable Value $ 23,883 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1936 of 4682 Collier County Property Appraiser Property Summary Site Parcel No 37741440002 Address Name / Address City *Disclaimer L AND C DIAZ REV TRUST 2230 18TH AVE NE Site City NAPLES Site Zone 34120 Note NAPLES I State 1 FL Zipi 34120 Map No. Strap Nojnff� Section Township Range 3C27 ]IIIW332800 15 3C27 1 27 48 27 Legar GOLDEN GATE EST UNIT 23 TR 15 Millage Area s 290 Sub./Condo 332800 - GOLDEN GATE EST UNIT 23 Use Code a 0 - VACANT RESIDENTIAL Latest Sales History (Not all Sales are listed due to Confidentialitvl 11/09/99 ook-Pa 2609-3249 Amount $ 0 09/30/96 2233-2409 $ 28,000 09/30/96 2233-2396 $ 0 09/01 /90 1560-1904 $ 0 08/01/90 1553-740 $ 0 Acres *Estimated 5.15 Millage Rates a *Calculations School Other Total 4.889 8.7835 1 13.6725 2021 Preliminary Tax Roll (Subject to Change) Land Value $ 146,775 (+) Improved Value $ 0 (_) Market Value $ 146,775 (-) 10% Cap $ 79,432 (_) Assessed Value $ 67,343 (_) School Taxable Value $ 146,775 (_) Taxable Value $ 67,343 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1937 of 4682 Collier County Property Appraiser Property Summary Site Site Zone Parcel No 37743920009 Address 1 Site City NAPLES *Note 34120 *Disclaimer Name / Add VIELE 11, DONALD L=& HEATHER L 4412 LYN H U RST RD SPRINGFIELD State 1 L I Zipj 62711-7130 Map No. Strap Nojnff� Section Township Range 3C27 332800 51 03C27 1 27 48 27 Legar GOLDEN GATE EST UNIT 23 TR 51 Millage Area s 290 Sub./Condo 332800 - GOLDEN GATE EST UNIT 23 Use Code a 0 - VACANT RESIDENTIAL Acres *Estimated 5 Millage Rates O *Calculations School Other Total 4.889 8.7835 1 13.6725 Latest Sales History 2021 Preliminary Tax Roll ot all Sales are listed due to Confidentiality)Sub'ect to Chan e) ook-Pa a Amount Land Value $ 131,770 7112'29/20 5867-3085 $ 0 (+) Improved Value $ 0 10/06/99 2598-2872 $ 30,000 (_� Market Value $ 131,770 (-) 10% Cap $ 66,389 (_) Assessed Value $ 65,381 (_) School Taxable Value $ 131,770 (_) Taxable Value $ 65,381 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1938 of 4682 Collier County Property Appraiser Property Summary Site Site Zone Parcel No 37740880003 Address Site City NAPLES *Note 34120 *Disclaimer Name / Address City THI-PHAM, LIEN 530 102ND AVE N NAPLES I State 1 FL Zipj 34108-3209 Map No. ]111Strap Nojnff� Section Township Range Acres *Estimated 3C27 332800 10 03C27 1 27 48 27 2.81 F— Legar GOLDEN GATE EST UNIT 23 N 180FT OF TR 10 OR 1393 PG 1609 Millage Area la 1290 Millage Rates O *Calculations Sub./Condo 332800 - GOLDEN GATE EST UNIT 23 School Other Total Use Code a 10 - VACANT RESIDENTIAL Latest Sales History Not all Sales are listed due to Confidentiality) loj=ook-Pa a Amoun 11/09/88 1393-1609 $ 12,900 12/01/75 1 637-926 $ 0 4.889 8.7835 1 13.6725 2021 Preliminary Tax Roll (Subiect to Chanae) Land Value $ 80,085 (+) Improved Value $ 0 (_) Market Value $ 80,085 (-) 10% Cap $ 43,339 (_) Assessed Value $ 36,746 (_) School Taxable Value $ 80,085 (_) Taxable Value $ 36,746 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1939 of 4682 Collier County Property Appraiser Property Summary Site Parcel No 37741760009 Address Name / Address 4 City *Disclaimer SEGURA, ARCADIO=& NIDIA 4500 NW 192ND ST MIAMI GARDENS Site City NAPLES Site Zone 34120 Note State'FL Zip 33055-2124 Map No. Strap No].W Section Township Range Acres *Estimated 3C27 332800 21 3C27 1 27 48 27 2.73 Legall GOLDEN GATE EST UNIT 23 W 180FT OF TR 21 OR 1312 PG 2002 Millage Area s 290 Sub./Condo 332800 - GOLDEN GATE EST UNIT 23 Use Code a 0 - VACANT RESIDENTIAL Millage Rates O *Calculations School Other Total 4.889 8.7835 1 13.6725 Latest Sales History 2021 Preliminary Tax Roll Not all Sales are listed due to Confidentiality) Sub'ect to Chan e) o ak-Pa Amoun Land Value $ 77,805 12/01/87 1312-2002 $ 7,200 (+) Improved Value $ 0 (_) Market Value $ 77,805 (-) 10% Cap $ 42,108 (_) Assessed Value $ 35,697 (_) School Taxable Value $ 77,805 (_) Taxable Value $ 35,697 If all Values shown above equal 0 this parcel was created after the Final Tax Roll Page 1940 of 4682 �e Collier County Transportation Management Services Department Transportation Engineering Division Condemnation Resolution Wilson Boulevard (Golden Gate Boulevard to Immokalee Road) Recommendation to approve and adopt a Resolution authorizing the condemnation of those fee simple interests in land necessary for the construction of stormwater ponds required for the expansion of Wilson Boulevard from two lanes to four lanes between Golden Gate Boulevard and Immokalee Road. (Project No. 60229) Jay Ahmad, RE Director, Transportation Engineering Page 1941 of 4682 , I Hi i rn m HE VIE HE V1 E g DE o SAE NE o HE NE W ND IN Project Locati r7 Cabie� CAI r Coll Chp Olgs LIoug9 1 N P� • v m g � Y n N R N �"J'VO K • . on Map 0■ CAGieea wuu� JOCK VAE NM J 54P VAL NM JYw dWE VIM Inuo BrAD M �9{Y dAE NM WIJ VAE HM 33UQ VAE I 3vN VAE V N N H H H m m in _e Collier County Transportation Management Services Department Transportation Engineering Division Page 1942 of 4682 W 0 pr Z4 AL Via I- L& — a4- L7 F - jb- jili ft, J,l I- 6-- -N� - - - - - ------- CF 1 91 ­4 �e Collier County Transportation Management Services Department Transportation Engineering Division Overall Proposed Improvements • Four lane widening from Golden Gate Blvd to Immokalee Rd. • Side street drainage improvements. • Replace bridge over Cypress Canal; widen or replace bridge box culvert over Cocohatchee Canal. • Curb, gutters, sidewalks, shared -use pathway, on -street bike lanes, bus stop enhancements, medians, drainage, raw water main & well house improvements. • Corridor or intersection lighting. Page 1944 of 4682 Need for Improvements 0 0 Population Growth in Golden Gate Estates Traffic congestion Lack of system connectivity in Golden Gate Estates and eastern Collier County Growth in Rural Land Stewardship Area Meet Long Range Transportation Plan _e Collier County Transportation Management Services Department Transportation Engineering Division Page 1945 of 4682 �e Collier County Transportation Management Services Department Transportation Engineering Division Considerations for Condemnation Resolution 1. Alternative Alignments 2. The Costs of Competing Alternatives 3. Public Health, Safety and Welfare 4. Long Range Planning 5. Environmental Impacts Page 1946 of 4682 Alternati 6 WLq;,9F1. Wj5&Uft N dFFS€f: 0Pa-8U M 3V :L ve Alignments r 3„ !L . �yti• ti _ 1 h r� h _e Collier County Transportation Management Services Department Transportation Engineering Division 6 W r�r� 60' - 59 FROM EDGE OF 160' CORRIDOR i 50' - 40' FROM EDGE OF 160' CORRIDOR r �r El 40' - 30' FROM ED E OF 160' CORRIDOR k � ti 30• - 2b• FROM EDGE OF 760' COAR DOA 20' - 0' FROM EDGE OF 160 CORRIDOR I Page 1947 of 4682 Collier County R � h t o f Wa �� u I S I t I o n Transportation Management Services Department Transportation Engineering Division • Four pond sites already acquired/purchased • Authority requested to purchase/condemn seven additional pond sites • All pond site properties are presently unimproved • Construction not currently funded • Pond sites need to be acquired while properties remain undeveloped Page 1948 of 4682 Condemnation Resolution Wilson Boulevard (Golden Gate Blvd to Immokalee Rd) Collier County Transportation Management Services Department Transportation Engineering Division Recommendation to approve and adopt a Resolution authorizing the condemnation of those fee simple interests in land necessary for the construction of stormwater ponds required for the expansion of Wilson Boulevard from two lanes to four lanes between Golden Gate Boulevard and Immokalee Road. (Project No. 60229). Estimated fiscal impact: $2.5million. Page 1949 of 4682 RESOLUTION NO.2025- A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, AUTHORIZING THE CONDEMNATION OF THOSE FEE SIMPLE INTERESTS IN LAND NECESSARY FOR THE CONSTRUCTION OF STORMWATER PONDS REQUIRED FOR THE EXPANSION OF WILSON BOULEVARD FROM TWO LANES TO FOUR LANES BETWEEN GOLDEN GATE BOULEVARD AND IMMOKALEE ROAD; MAKING FINDINGS OF PUBLIC PURPOSE AND NECESSITY; AND AUTHORIZING THE APPROPRIATE STAFF TO INITIATE EMINENT DOMAIN PROCEEDINGS (PROJECT NO.60229). WHEREAS, Collier County (the "County") is authorized by Chapter 73 and 74, Florida Statutes to condemn necessary lands and property for public purposes or uses; and WHEREAS, the fee simple interests in land hereinafter described in Exhibit "A", attached hereto and incorporated herein (the "Property") are needed for the construction of stormwater ponds required for the expansion of Wilson Boulevard from two lanes to four lanes between Golden Gate Boulevard and Immokalee Road (Project No. 60229) (hereinafter referred to as "the Proj ect"); and WHEREAS, acquisition of the Property and construction of the Project addresses long- range planning and safety needs and is included in the Capital Improvement Element of the Collier County Growth Management Plan, as approved by the Florida Department of Economic Opportunity; and WHEREAS, construction of the Project will require the acquisition of the Property; and WHEREAS, the location for the construction of the proposed ponds has been fixed by survey and is collectively represented by the legal descriptions comprising Exhibit "A"; and WHEREAS, after consideration of the availability of alternate routes and locations, the comparative costs of the stormwater pond site alternatives, various impacts upon the environment, long range planning options, and public safety considerations, the Board desires to exercise its right to condemn property for public use or purpose and the Property to be condemned is necessary for that use. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that: 1. The above recitals are incorporated herein and made a part hereof by this reference. 2. The Board declares that it is necessary to acquire by eminent domain, fee simple Gov Page 1950 of 4682 title to the land described in Exhibit "A" ("the Property") for the public purpose of construction of the proposed ponds as part of the Project to protect the health, safety, and welfare of the citizens of Collier County. 3. The Board has considered alternative locations for the proposed ponds, various impacts to the environment, public health, safety and welfare considerations associated with the design and construction of the Project, long range planning, and the costs associated with the property rights acquisition and construction of the Project; and the Board finds that after consideration of these issues, the most feasible location for construction of the proposed ponds is collectively represented by the legal descriptions comprising Exhibit "A." 4. The County Manager or her designee and the Office of the County Attorney are hereby authorized and directed to immediately acquire by gift, purchase, or condemnation, in accordance with the provisions of Chapters 73, 74 and 127, Florida Statutes, the Property more particularly described in Exhibit "A", attached hereto and incorporated herein. This Resolution adopted on this day of motion, second and majority vote. ATTEST: CRYSTAL K. KINZEL, Clerk of the Circuit Court & Comptroller , Deputy Clerk 91'cevn ed as to form and legality: M. Greene Managing Assistant County Attorney 2025, after BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA Burt L. Saunders, Chairman CAO Page 1951 of 4682 EXHIBIT "A" POND SITE PARCELS - WILSON BLVD PROJECT NO. 60229 (ALL INTERESTS TO BE ACQUIRED IN FEE SIMPLE) PARCEL 313POND: The South 165 feet of Tract 5, GOLDEN GATE ESTATES, UNIT NO. 18, according to the plat thereof recorded in Official Records Book 7, Pages 7 & 8, of the Public Records of Collier County, Florida. PARCEL 314POND: The North 165 feet of Tract 5, GOLDEN GATE ESTATES, UNIT NO. 18, according to the plat thereof recorded in Official Records Book 7, Pages 7 & 8, of the Public Records of Collier County, Florida. PARCEL 315POND: The South 150' of Tract 131, GOLDEN GATE ESTATES, Unit 19, according to the plat thereof, recorded in Plat Book 7, Pages 77 and 78, of the Public Records of Collier County, Florida. PARCEL 368POND: The South 180 feet of Tract No. 3, GOLDEN GATE ESTATES, UNIT NO. 23, according to the map or plat thereof as recorded in Plat Book 7, Pages 9 and 10, of the Public Records of Collier County, Florida. PARCEL 450POND: All of Tract 27, GOLDEN GATE ESTATES UNIT NO. 23, according to the plat thereof, as recorded in Plat Book 7, at pages 9 and 10, of the Public Records of Collier County, Florida. PARCEL 451 POND: The East 180 feet of Tract No. 28, GOLDEN GATES ESTATES, UNIT NO. 23, according to the map or plat thereof, as recorded in Plat Book 7, Pages 9 and 10, of the Public Records of Collier County, Florida. PARCEL 452POND: The West 180 feet of Tract 43, GOLDEN GATE ESTATES, UNIT NO. 23, according to the plat thereof as recorded in Plat Book 7, Page 9, of the Public Records of Collier County, Florida. Page 1952 of 4682