Loading...
Agenda 02/25/2020 Item #16A 8 (FInal Plat - Silverwood@Ave Maria Phase 2)02/25/2020 EXECUTIVE SUMMARY This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Silverwood at Ave Maria (Phase 2), (Application Number PL20190002347) approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. OBJECTIVE: To have the Board of County Commissioners (Board) approve for recording the final plat of Silverwood at Ave Maria (Phase 2), a subdivision of lands located in Sections 5 and 6, Township 48 South, Range 29 East, Collier County, Florida, following the alternative procedure for approval of subdivision plats pursuant to Resolution 99-199. This procedure allows for the Board to approve the plat and associated construction documents for construction purposes and recording purposes concurrently. CONSIDERATIONS: The Development Review Division of the Growth Management Department has completed the review of the construction drawings, specifications, and final plat of Silverwood at Ave Maria (Phase 2). These documents are in compliance with the County Land Development Code and Chapter 177, Florida Statutes. This project is within the Ave Maria SRA. All fees have been paid. Security in the amount of 10% of the total cost of the required improvements, and 100% of the cost of any remaining improvements, together with a Construction and Maintenance Agreement for Subdivision Improvements, shall be provided and accepted by the County Manager or his designee and the County Attorney’s office prior to the recording of the final plat. This procedure is in conformance with Section 10.02.04 F.2 of the Land Development Code. The Development Review Division recommends that the final plat of Silverwood at Ave Maria (Phase 2) be approved for recording. FISCAL IMPACT: The project cost is $2,577,217.75 (estimated) to be borne by the developer. The cost breakdown is as follows: a) Water & Sewer $1,267,651.40 b) Drainage, Paving, Grading $1,309,566.35 The Security amount, equal to 110% of the project cost, is $2,834,939.53 The County will realize revenues as follows: Fund: Growth Management Fund 131 Agency: County Manager Cost Center: 138327 -- Land Development Services Revenue generated by this project: Total: $40,481.99 16.A.8 Packet Pg. 1273 02/25/2020 The Fees are based on a construction estimate of $1,309,566.35 (does not include Ave Maria Utilities) and were paid in November, 2019. The breakdown is as follows: a) Plat Review Fee ($1,000.00 + $5./ac) $ 1,195.00 b) Construction Drawing Review Fee Water & Sewer (.75% const. est.) n/a c) Drainage, Paving, Grading (.75% const. est.) $ 9,821.75 d) Construction Inspection Fee Water & Sewer (2.25% const. est.) n/a e) Drainage, Paving, Grading (2.25% const. est.) $29,465.24 GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public Facilities (COA) prior to the issuance of the construction plan final approval letter and plat recordation, except when the applicant elects to delay obtaining a COA for non-residential developments that are required to obtain approval of a site development plan prior to the issuance of a building permit. LEGAL CONSIDERATIONS: The applicant is requesting approval of the final subdivision plat and construction and maintenance agreement. The Board shall consider the County Manager or designee’s recommendation and shall take evidence and testimony in regard to the final subdivision plat requirements identified in LDC sections 10.02.04 B, 10.02.04 C, and other provisions of the LDC, as well as Chapter 177, Florida Statutes. If the Board denies or places conditions on the final subdivision plat, it shall state reasons for such denial or conditions. This item has been approved as to form and legality, and requires a majority vote for Board approval -- SAA RECOMMENDATION: To endorse staff’s recommendation to approve the final plat of Silverwood at Ave Maria (Phase 2) (Application Number PL20190002347) for r ecording with the following stipulations: 1. Approve the amount of $2,834,939.53 as performance security for the required improvements; or such lesser amount based on work completed, and as is approved by the Growth Management Department. 2. Approve the standard form Construction and Maintenance Agreement and direct the County Manager or his designee: a. To withhold Certificates of Occupancy until the required improvements have received preliminary acceptance. b. To delay recording of the plat until suitable security and an appropriate Construction and Maintenance Agreement is approved and accepted by the County Attorney’s office and the Board of County Commissioners or the County Manager or his designee on behalf of the Board pursuant to Section 10.02.04 F.2 of the Land Development Code. Prepared by: Lucia S. Martin, Associate Project Manager, Development Review Division ATTACHMENT(S) 1. Location Map (PDF) 16.A.8 Packet Pg. 1274 02/25/2020 2. Opinion of Probable Cost (PDF) 3. Plat Map (PDF) 16.A.8 Packet Pg. 1275 02/25/2020 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.8 Doc ID: 11358 Item Summary: This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Silverwood at Ave Maria (Phase 2), (Application Number PL20190002347) approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. Meeting Date: 02/25/2020 Prepared by: Title: Technician – Growth Management Development Review Name: Lucia Martin 01/15/2020 1:49 PM Submitted by: Title: Project Manager, Principal – Growth Management Department Name: Matthew McLean 01/15/2020 1:49 PM Approved By: Review: Growth Management Department Judy Puig Level 1 Reviewer Completed 01/15/2020 3:03 PM Growth Management Development Review John Houldsworth Additional Reviewer Completed 01/16/2020 6:19 AM Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 01/16/2020 8:12 AM Growth Management Development Review Brett Rosenblum Additional Reviewer Completed 01/16/2020 3:27 PM Growth Management Operations & Regulatory Management Rose Burke Additional Reviewer Completed 01/21/2020 6:19 PM Growth Management Development Review Chris Scott Additional Reviewer Completed 01/24/2020 1:51 PM Growth Management Department Matthew McLean Additional Reviewer Completed 01/27/2020 10:45 AM Growth Management Department Thaddeus Cohen Department Head Review Completed 01/27/2020 3:53 PM Growth Management Department James C French Deputy Department Head Review Completed 01/27/2020 5:12 PM County Attorney's Office Sally Ashkar Level 2 Attorney Review Completed 02/05/2020 11:30 AM Office of Management and Budget Debra Windsor Level 3 OMB Gatekeeper Review Completed 02/05/2020 11:36 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 02/05/2020 1:48 PM Office of Management and Budget Laura Zautcke Additional Reviewer Completed 02/07/2020 9:48 AM County Manager's Office Leo E. Ochs Level 4 County Manager Review Completed 02/13/2020 12:59 PM Board of County Commissioners MaryJo Brock Meeting Pending 02/25/2020 9:00 AM 16.A.8 Packet Pg. 1276 SILVERWOOD AT AVE MARIA (PHASE 2) LOCATION MAP 16.A.8.a Packet Pg. 1277 Attachment: Location Map (11358 : Final Plat - Silverwood at Ave Maria (Phase 2)) 1 of 8 Project: Task: Prepared By:CW Date:11/4/2019 Checked By:DCH Date:11/4/2019 PERCENT DOLLAR EARTHWORK 52,013.00$              0% ‐$                           PAVING 482,886.45$            0% ‐$                           DRAINAGE 566,166.90$            0% ‐$                           POTABLE WATER 280,389.00$            0% ‐$                           SANITARY SEWER 797,037.00$            0% ‐$                           IRRIGATION 190,225.40$            0% ‐$                           LANDSCAPE AND LIGHTING 208,500.00$            0% ‐$                           TOTAL 2,577,217.75$         0% ‐$                           EARTHWORK, PAVING, DRAINAGE, LANDSCAPE AND LIGHTING: TOTAL O.P.C. = POTABLE WATER, SANITARY SEWER, IRRIGATION: TOTAL O.P.C. = NOTES: 1)This Opinion of Probable Cost shall be used for Review Fee Calculation Purposes Only. 2) 3) Daniel C. Hartley, P.E. FL Registration #73943 Peninsula Engineering Certificate of Authorization #28275 SUB‐TOTAL CONTINGENCY 2,577,217.75$                   TOTAL Silverwood at Ave Maria (Phase 2) Engineer's OPC for Subdivision Fee Calculations 52,013.00$                        482,886.45$                      1,267,651.40$                   566,166.90$                      797,037.00$                      1,309,566.35$                   190,225.40$                      208,500.00$                      280,389.00$                      Review Fees for lake excavation provided in separate Review Fee, with the lake excavation permit. Calculation Summary All costs provided in this OPC are based on recent contract prices, or the Engineers' latest known unit costs. These costs cannot be guaranteed at  this time due to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the availability of materials and labor. P:\Active_Projects\P-CCAM-017\001_Silverwood_Ph2\Submittals\County\PPL\Submittal 1\Working\Silverwood_Ph2_OPC_FeeCalc(Rev00).xlsx 16.A.8.b Packet Pg. 1278 Attachment: Opinion of Probable Cost (11358 : Final Plat - Silverwood at Ave Maria (Phase 2))Daniel C Hartley Digitally signed by Daniel C Hartley DN: c=US, o=PENINSULA IMPROVEMENT CORPORATION DBA PENINSULA ENGINEERING, ou=A01410C0000016D02F0F5AB000 047F6, cn=Daniel C Hartley Date: 2019.11.05 10:05:15 -05'00' 2 of 8 Project: Task: Prepared By: CW Date: 11/4/2019 Checked By: DCH Date: 11/4/2019 EARTHWORK ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE EW-1 EROSION CONTROL (TURBIDITY BARRIER, INLET PROTECTION, SEED AND MULCH)10,667 LF 1.00$ 10,667.00$ EW-2 NDPES MAINTENANCE 12 MONTH 500.00$ 6,000.00$ EW-3 SOD - 2' ALONG B.O.C.2,055 SY 3.00$ 6,165.00$ EW-4 SOD - LAKE BANKS 9,727 SY 3.00$ 29,181.00$ -$ -$ -$ -$ -$ SUB-TOTAL EARTHWORK = 52,013.00$ NOTE: Lake excavation review fees are paid with the Lake Excavation Permit application, and are therefore excluded from this calculation. Silverwood at Ave Maria (Phase 2) Engineer's OPC for Subdivision Fee Calculations P:\Active_Projects\P-CCAM-017\001_Silverwood_Ph2\Submittals\County\PPL\Submittal 1\Working\Silverwood_Ph2_OPC_FeeCalc(Rev00).xlsx 16.A.8.b Packet Pg. 1279 Attachment: Opinion of Probable Cost (11358 : Final Plat - Silverwood at Ave Maria (Phase 2)) 3 of 8 Project: Task: Prepared By: CW Date: 11/4/2019 Checked By: DCH Date: 11/4/2019 PAVING ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE PAV-1 3/4" ASPHALTIC CONCRETE TYPE S-III (FIRST LIFT) 10,340 SY 5.95$ 61,523.00$ PAV-2 3/4" ASPHALTIC CONCRETE TYPE S-III (SECOND LIFT) 10,340 SY 5.95$ 61,523.00$ PAV-3 8" LIMEROCK BASE 10,340 SY 7.00$ 72,380.00$ PAV-4 12" STABILIZED SUBGRADE 12,925 SY 1.60$ 20,680.00$ PAV-5 TYPE 'F' CURB 63 LF 16.00$ 1,008.00$ PAV-6 TYPE 'F' CURB - PITCH OUT 232 LF 16.00$ 3,712.00$ PAV-7 2' VALLEY GUTTER 8,626 LF 8.25$ 71,164.50$ PAV-8 3' VALLEY GUTTER CROSSING 328 LF 21.25$ 6,970.00$ PAV-9 CONCRETE SIDEWALK (4" THICK) 43,747 SF 3.85$ 168,425.95$ PAV-10 SIGNAGE 1 LS 5,000.00$ 5,000.00$ PAV-11 ROADWAY STRIPING 1 LS 5,000.00$ 5,000.00$ PAV-12 TEMPORARY LIMEROCK TURN-AROUND 1 LS 1,500.00$ 1,500.00$ PAV-13 TEMPORARY CONSTRUCTION ENTRANCE 4 EA 1,000.00$ 4,000.00$ SUB-TOTAL PAVING = 482,886.45$ Silverwood at Ave Maria (Phase 2) Engineer's OPC for Subdivision Fee Calculations P:\Active_Projects\P-CCAM-017\001_Silverwood_Ph2\Submittals\County\PPL\Submittal 1\Working\Silverwood_Ph2_OPC_FeeCalc(Rev00).xlsx 16.A.8.b Packet Pg. 1280 Attachment: Opinion of Probable Cost (11358 : Final Plat - Silverwood at Ave Maria (Phase 2)) 4 of 8 Project: Task: Prepared By: CW Date: 11/4/2019 Checked By: DCH Date: 11/4/2019 DRAINAGE ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE DRA-1 8" HDPE SECONDARY DRAINAGE PIPE 3,443 LF 18.00$ 61,974.00$ DRA-2 10" HDPE SECONDARY DRAINAGE PIPE 516 LF 20.00$ 10,320.00$ DRA-2 12" HDPE SECONDARY DRAINAGE PIPE 251 LF 22.00$ 5,522.00$ DRA-3 15" RCP STORM SEWER 687 LF 33.30$ 22,877.10$ DRA-4 18" RCP STORM SEWER 498 LF 41.30$ 20,567.40$ DRA-5 24" RCP STORM SEWER 777 LF 60.80$ 47,241.60$ DRA-6 30" RCP STORM SEWER 412 LF 80.00$ 32,960.00$ DRA-7 36" RCP STORM SEWER 751 LF 97.80$ 73,447.80$ DRA-8 42" RCP STORM SEWER 538 LF 120.00$ 64,560.00$ DRA-9 8" MITERED END 5 EA 1,250.00$ 6,250.00$ DRA-10 18" FLARED END 1 EA 3,202.00$ 3,202.00$ DRA-11 24" FLARED END 2 EA 3,355.00$ 6,710.00$ DRA-12 30" FLARED END 1 EA 4,021.00$ 4,021.00$ DRA-13 36" FLARED END 2 EA 4,320.00$ 8,640.00$ DRA-14 42" FLARED END 1 EA 5,200.00$ 5,200.00$ DRA-15 VALLEY GUTTER INLET (DOUBLE) 22 EA 3,414.00$ 75,108.00$ DRA-16 CONTROL STRUCTURE 1 EA 10,000.00$ 10,000.00$ DRA-17 DITCH BOTTOM INLET (Outfall) 1 EA 10,000.00$ 10,000.00$ DRA-18 JUNCTION BOX 3 EA 2,356.00$ 7,068.00$ DRA-19 GRATE INLET 12 EA 2,604.00$ 31,248.00$ DRA-20 YARD DRAIN 10 EA 825.00$ 8,250.00$ DRA-21 TYPE 'X' INLET 56 EA 800.00$ 44,800.00$ DRA-22 MODIFIED TYPE "D" INLET 2 EA 3,100.00$ 6,200.00$ SUB-TOTAL DRAINAGE = 566,166.90$ Silverwood at Ave Maria (Phase 2) Engineer's OPC for Subdivision Fee Calculations P:\Active_Projects\P-CCAM-017\001_Silverwood_Ph2\Submittals\County\PPL\Submittal 1\Working\Silverwood_Ph2_OPC_FeeCalc(Rev00).xlsx 16.A.8.b Packet Pg. 1281 Attachment: Opinion of Probable Cost (11358 : Final Plat - Silverwood at Ave Maria (Phase 2)) 5 of 8 Project: Task: Prepared By: CW Date: 11/4/2019 Checked By: DCH Date: 11/4/2019 POTABLE WATER ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE WAT-1 6" PVC WATER MAIN (C900, DR18) 1,666 LF 13.60$ 22,657.60$ WAT-2 6" PVC WATER MAIN (C900, DR14) 151 LF 15.00$ 2,265.00$ WAT-3 8" PVC WATER MAIN (C900, DR18) 1,885 LF 19.30$ 36,380.50$ WAT-4 8" PVC WATER MAIN (C900, DR14) 54 LF 20.60$ 1,112.40$ WAT-5 10" PVC WATER MAIN (C900, DR18) 949 LF 33.50$ 31,791.50$ WAT-9 6" GATE VALVE 6 EA 900.00$ 5,400.00$ WAT-10 8" GATE VALVE 10 EA 1,338.00$ 13,380.00$ WAT-13 AIR RELEASE VALVE 1 EA 1,557.00$ 1,557.00$ WAT-14 FIRE HYDRANT ASSEMBLY (COMPLETE) 15 EA 3,960.00$ 59,400.00$ WAT-15 TEMP. BACTERIAL SAMPLE POINT 3 EA 324.00$ 972.00$ WAT-16 PERM. BACTERIAL SAMPLE POINT 1 EA 1,730.00$ 1,730.00$ WAT-17 1-1/2" DOUBLE WATER SERVICE (SHORT SIDE) (COMPLETE)41 EA 962.00$ 39,442.00$ WAT-18 1-1/2" DOUBLE WATER SERVICE (LONG SIDE) (COMPLETE)39 EA 1,147.00$ 44,733.00$ WAT-19 1" SINGLE WATER SERVICE (SHORT SIDE) (COMPLETE)10 EA 572.00$ 5,720.00$ WAT-20 1" SINGLE WATER SERVICE (LONG SIDE) (COMPLETE)6 EA 816.00$ 4,896.00$ WAT-21 TESTING 1 LS 2,500.00$ 2,500.00$ WAT-22 REMOVE EX BLOW-OFF AND CONNECT TO EX.WATER MAIN 4 EA 1,613.00$ 6,452.00$ SUB-TOTAL POTABLE WATER = 280,389.00$ Silverwood at Ave Maria (Phase 2) Engineer's OPC for Subdivision Fee Calculations P:\Active_Projects\P-CCAM-017\001_Silverwood_Ph2\Submittals\County\PPL\Submittal 1\Working\Silverwood_Ph2_OPC_FeeCalc(Rev00).xlsx 16.A.8.b Packet Pg. 1282 Attachment: Opinion of Probable Cost (11358 : Final Plat - Silverwood at Ave Maria (Phase 2)) 6 of 8 Project: Task: Prepared By: CW Date: 11/4/2019 Checked By: DCH Date: 11/4/2019 SANITARY SEWER ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE SAN-1 8" SDR 26 PVC GRAVITY SEWER MAIN (0'-6' CUT) 194 LF 29.70$ 5,761.80$ SAN-2 8" SDR 26 PVC GRAVITY SEWER MAIN (6'-8' CUT) 1131 LF 34.90$ 39,471.90$ SAN-3 8" SDR 26 PVC GRAVITY SEWER MAIN (8'-10' CUT) 979 LF 43.10$ 42,194.90$ SAN-4 8" SDR 26 PVC GRAVITY SEWER MAIN (10'-12' CUT) 553 LF 49.30$ 27,262.90$ SAN-5 8" SDR 26 PVC GRAVITY SEWER MAIN (12'-14' CUT) 919 LF 67.90$ 62,400.10$ SAN-6 8" SDR 26 PVC GRAVITY SEWER MAIN (14'-16' CUT) 303 LF 92.30$ 27,966.90$ SAN-7 8" SDR 26 PVC GRAVITY SEWER MAIN (16'-18' CUT) 384 LF 100.00$ 38,400.00$ SAN-8 4' SANITARY SEWER MANHOLE (6'-8' CUT) 8 EA 4,458.00$ 35,664.00$ SAN-9 4' SANITARY SEWER MANHOLE (8'-10' CUT) 5 EA 5,342.00$ 26,710.00$ SAN-10 4' SANITARY SEWER MANHOLE (10'-12' CUT) 1 EA 6,510.00$ 6,510.00$ SAN-11 4' SANITARY SEWER MANHOLE (12'-14' CUT) 3 EA 9,647.00$ 28,941.00$ SAN-12 4' SANITARY SEWER MANHOLE (14'-16' CUT) 3 EA 11,561.00$ 34,683.00$ SAN-13 4' SANITARY SEWER MANHOLE (16'-18' CUT) 2 EA 13,000.00$ 26,000.00$ SAN-14 4' SANITARY SEWER MANHOLE (18'-20' CUT) 1 EA 15,000.00$ 15,000.00$ SAN-15 6" SERVICE LATERAL (SINGLE) 23 EA 950.00$ 21,850.00$ SAN-16 6" SERVICE LATERAL (DOUBLE) 78 EA 997.00$ 77,766.00$ SAN-17 6" PVC FORCE MAIN (C900 DR18) 1,510 LF 15.90$ 24,009.00$ SAN-18 6" PVC FORCE MAIN (C900 DR14) 64 LF 17.40$ 1,113.60$ SAN-19 6" FORCE MAIN PLUG VALVE 1 EA 1,954.00$ 1,954.00$ SAN-20 FORCE MAIN AIR RELEASE VALVE 1 EA 3,224.00$ 3,224.00$ SAN-21 TELEVISION INSPECTION 4,463 LF 5.30$ 23,653.90$ SAN-22 PUMP STATION (COMPLETE)1 EA 225,000.00$ 225,000.00$ SAN-23 TESTING 1 LS 1,500.00$ 1,500.00$ SUB-TOTAL SANITARY SEWER = 797,037.00$ Silverwood at Ave Maria (Phase 2) Engineer's OPC for Subdivision Fee Calculations P:\Active_Projects\P-CCAM-017\001_Silverwood_Ph2\Submittals\County\PPL\Submittal 1\Working\Silverwood_Ph2_OPC_FeeCalc(Rev00).xlsx 16.A.8.b Packet Pg. 1283 Attachment: Opinion of Probable Cost (11358 : Final Plat - Silverwood at Ave Maria (Phase 2)) 7 of 8 Project: Task: Prepared By: CW Date: 11/4/2019 Checked By: DCH Date: 11/4/2019 IRRIGATION ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE IRR-1 4" PVC IRRIGATION MAIN (C900,DR18) 1,949 LF 11.50$ 22,413.50$ IRR-2 4" PVC IRRIGATION MAIN (C900, DR14) 146 LF 12.40$ 1,810.40$ IRR-3 6" PVC IRRIGATION MAIN (C900, DR18) 2,545 LF 17.00$ 43,265.00$ IRR-4 6" PVC IRRIGATION MAIN (C900, DR14) 117 LF 18.50$ 2,164.50$ IRR-5 4" GATE VALVE 7 EA 820.00$ 5,740.00$ IRR-6 6" GATE VALVE 3 EA 954.00$ 2,862.00$ IRR-7 1-1/2" DOUBLE IRRIGATION SERVICE (SHORT SIDE) (COMPLETE)37 EA 999.00$ 36,963.00$ IRR-8 1-1/2" DOUBLE IRRIGATION SERVICE (LONG SIDE) (COMPLETE)41 EA 1,231.00$ 50,471.00$ IRR-9 1" SINGLE IRRIGATION SERVICE (SHORT SIDE) (COMPLETE)10 EA 572.00$ 5,720.00$ IRR-10 1" SINGLE IRRIGATION SERVICE (LONG SIDE) (COMPLETE)7 EA 852.00$ 5,964.00$ IRR-11 REMOVE EX. BLOW-OFF AND CONNECT TO EX. IRRIGATION MAIN 4 EA 1,545.00$ 6,180.00$ IRR-12 TESTING 1 LS 1,500.00$ 1,500.00$ IRR-13 TEMPORARY BLOW-OFF 3 EA 1,724.00$ 5,172.00$ IRR-14 AIR RELEASE VALVE 0 EA 1,498.00$ -$ IRR-15 -$ SUB-TOTAL IRRIGATION = 190,225.40$ Silverwood at Ave Maria (Phase 2) Engineer's OPC for Subdivision Fee Calculations P:\Active_Projects\P-CCAM-017\001_Silverwood_Ph2\Submittals\County\PPL\Submittal 1\Working\Silverwood_Ph2_OPC_FeeCalc(Rev00).xlsx 16.A.8.b Packet Pg. 1284 Attachment: Opinion of Probable Cost (11358 : Final Plat - Silverwood at Ave Maria (Phase 2)) 8 of 8 Project: Task: Prepared By: CW Date: 11/4/2019 Checked By: DCH Date: 11/4/2019 LANDSCAPE AND LIGHTING ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE LL-1 STREET LIGHTING 26 EA 2,250.00$ 58,500.00$ LL-2 LANDSCAPING (CODE MIN.) 1 LS 150,000.00$ 150,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ ‐$                           SUB-TOTAL LANDSCAPE AND LIGHTING = 208,500.00$ Silverwood at Ave Maria (Phase 2) Engineer's OPC for Subdivision Fee Calculations P:\Active_Projects\P-CCAM-017\001_Silverwood_Ph2\Submittals\County\PPL\Submittal 1\Working\Silverwood_Ph2_OPC_FeeCalc(Rev00).xlsx 16.A.8.b Packet Pg. 1285 Attachment: Opinion of Probable Cost (11358 : Final Plat - Silverwood at Ave Maria (Phase 2)) Digitally signed by Lance T Miller, PSM #5627 DN: cn=Lance T Miller, PSM #5627, o=and the signature must be verified on any electronic copies. SHA-1 authentication code must be verified on any electronic copies., ou=Digitally signed and sealed using a SHA-1 authentication code; and Printed copies of this document are not considered signed and sealed, email=lance.miller@stantec.com, c=US Date: 2020.01.15 13:34:38 -05'00' Adobe Acrobat version: 2019.021.2005816.A.8.cPacket Pg. 1286Attachment: Plat Map (11358 : Final Plat - Silverwood at Ave Maria (Phase 2)) 16.A.8.cPacket Pg. 1287Attachment: Plat Map (11358 : Final Plat - Silverwood at Ave Maria (Phase 2)) 16.A.8.cPacket Pg. 1288Attachment: Plat Map (11358 : Final Plat - Silverwood at Ave Maria (Phase 2)) 16.A.8.cPacket Pg. 1289Attachment: Plat Map (11358 : Final Plat - Silverwood at Ave Maria (Phase 2)) 16.A.8.cPacket Pg. 1290Attachment: Plat Map (11358 : Final Plat - Silverwood at Ave Maria (Phase 2)) 16.A.8.cPacket Pg. 1291Attachment: Plat Map (11358 : Final Plat - Silverwood at Ave Maria (Phase 2))