Loading...
Agenda 07/09/2019 Item #16C15 (RFQ #14-6213-130 w/Douglas N. Higgins, Inc.)07/09/2019 EXECUTIVE SUMMARY Recommendation to approve a Work Order in the amount of $264,238 for Request for Quotation No. 14-6213-130 to Douglas N. Higgins, Inc., on the “Sunshine Boulevard and Green Boulevard Water Main Improvements” project, which is within the scope of work under Project Number 70222, the “Golden Gate City Compliance Assurance” project. OBJECTIVE: To meet demand, stay in compliance, and serve customers efficiently by providing a compliant and reliable potable water system to Collier County Water-Sewer District (“CCWSD”) customers. CONSIDERATIONS: The proposed scope of work under Project No. 70222, the “Golden Gate City Compliance Assurance” project, is consistent with the FY2019 Budget approved by the Board of County Commissioners on September 20, 2018. The Sunshine Boulevard and Green Boulevard Water Main Improvements project is included within the total Golden Gate City Compliance Assurance project. This project includes the replacement of the existing water main on Sunshine Boulevard fr om 17th Avenue Southwest to Green Boulevard. This is required because a section of the 10 -inch water main conflicts with the foundation of the proposed Sunshine Boulevard Sidewalk and Pedestrian Bridge Improvement Project (Local Agency Program # 435030-1-58-1) being completed by the Growth Management Department Transportation Engineering Division in coordination with the Florida Department of Transportation (“FDOT”). During design, the following additional objectives were identified, which will be completed within the scope of this project: 1. Replace approximately 150 feet of 10-inch asbestos cement water main under proposed sidewalk improvements. 2. As required by the Southwest Water Management District Permit, remove approximately 100 feet of 30-year old 10-inch ductile water main (aerial crossing attached to Green canal roadway bridge) and replace with a 14-inch directional drilled water main under Green canal. The water main size was increased to improve capacity and meet future growth demands within Golden Gate City. 3. Reconstruct water main connections at Green Boulevard and Sunshine Boulevard intersection. Due to FDOT grant timing, Board authorization for the utility relocation project is proceeding in advance of receiving the U.S. Army Corp Permit, which is expected in August of 2019. The CCWSD will complete all items above after receiving the US Army Corp Permit, and prior to the construction of the FDOT funded project. The County posted Request for Quotation (RFQ) No. 14-6213-130, “Sunshine Boulevard and Green Boulevard Water Main Improvements,” on April 18, 2019, and distributed it to all vendors on the Fixed - Term Underground Utilities Contract No. 14-6213 via the County’s electronic bid process. Of the six vendors notified, three submitted quotations by the May 3, 2019 deadline, as follows: VENDOR QUOTE Douglas N. Higgins, Inc. $264,238 Haskins, Inc. $301,390 Quality Enterprises USA, Inc. $337,268 16.C.15 Packet Pg. 1233 07/09/2019 Kyle Construction, Inc., Mitchell & Stark Construction Co, Inc. and Southwest Utility S ystems, Inc. did not submit quotes in response to the RFQ. The quote specifications informed the respondents there may be unforeseen conditions associated with the project. The quote amount incorporates an owner-directed allowance of $30,000 for work related to unforeseen conditions including, but not limited to, conflicts with existing facilities not reflected in record drawings and modifications or repairs resulting from unforeseen utility work associated with this project. The price for any needed additional work will be negotiated prior to commencement in accordance with the County’s Procurement Ordinance and the terms of the Agreement No. 14-6213. County staff determined the lowest quote to be fair and reasonable and recommends awarding the project to Douglas N. Higgins, Inc., the lowest responsive and qualified contractor. The quote received is 15 percent less than Johnson Engineering, Inc.’s cost opinion. In correspondence dated May 6, 2019, Johnson Engineering recommends awarding the project to Douglas N. Higgins, Inc., who has a satisfactory performance and warranty record on previous, similar utility-related projects. FISCAL IMPACT: The source of funding to relocate the utilities is Water User Fees, Fund (412). The project is expected to be completed in 2019. This is a replacement project; therefore, operating costs are not expected to change. The total project cost is summarized below: Description Cost Utility Relocation Project $264,238 Transportation Project* $235,000 Total Project Cost $499,238 *Includes $640,000 FDOT Grant LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority vote for Board approval. -SRT GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities and to remain in compliance with all regulatory programs. RECOMMENDATION: To approve a $264,238 Work Order under Request for Quotation No. 14- 6213-130 to Douglas N. Higgins, Inc., and authorize the Chairman to sign the attached Work Order. Prepared By: Shon D. Fandrich, P.E., PMP, Senior Project Manager, Public Utilities Engineering and Project Management Division ATTACHMENT(S) 1. Attachment No 1 - RFQ 14-6213-130 Quote Tabulation r1 (PDF) 2. Attachment No 2 - RFQ 14-6213-130 Quote Analysis (PDF) 3. Attachment No 3 - RFQ 14-6213-130 Higgins RFQ Form (PDF) 4. Attachment No 4 - RFQ 14-6213-130 Recommendation of Award Letter (PDF) 5. Attachment No 5 - RFQ 14-6213-130 Work Order (PDF) 6. Attachment No 6 - RFQ 14-6213-130 Project Map (PDF) 16.C.15 Packet Pg. 1234 07/09/2019 COLLIER COUNTY Board of County Commissioners Item Number: 16.C.15 Doc ID: 9138 Item Summary: Recommendation to approve a Work Order in the amount of $264,238 for Request for Quotation No. 14-6213-130 to Douglas N. Higgins, Inc., on the “Sunshine Boulevard and Green Boulevard Water Main Improvements” project, which is within the scope of work under Project Number 70222, the “Golden Gate City Compliance Assurance” project. Meeting Date: 07/09/2019 Prepared by: Title: – Public Utilities Planning and Project Management Name: Shon Fandrich 06/11/2019 12:03 PM Submitted by: Title: Division Director - Public Utilities Eng – Public Utilities Planning and Project Management Name: Tom Chmelik 06/11/2019 12:03 PM Approved By: Review: Water Pamela Libby Additional Reviewer Completed 06/11/2019 2:49 PM Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 06/11/2019 3:27 PM Public Utilities Planning and Project Management Benjamin Bullert Additional Reviewer Completed 06/11/2019 3:31 PM Procurement Services Opal Vann Level 1 Purchasing Gatekeeper Completed 06/11/2019 3:55 PM Public Utilities Operations Support Joseph Bellone Additional Reviewer Completed 06/11/2019 4:24 PM Capital Project Planning, Impact Fees, and Program Management Trinity Scott Additional Reviewer Completed 06/13/2019 7:59 PM Wastewater Beth Johnssen Additional Reviewer Completed 06/14/2019 9:40 AM Procurement Services Patrick Boyle Additional Reviewer Completed 06/17/2019 2:22 PM Procurement Services Swainson Hall Additional Reviewer Completed 06/17/2019 2:52 PM Procurement Services Ted Coyman Additional Reviewer Completed 06/18/2019 1:10 PM Procurement Services Catherine Bigelow Additional Reviewer Completed 06/19/2019 2:24 PM Public Utilities Department Sarah Hamilton Level 1 Division Reviewer Completed 06/19/2019 11:09 PM Public Utilities Department George Yilmaz Level 2 Division Administrator Review Completed 06/24/2019 2:10 PM County Attorney's Office Scott Teach Level 2 Attorney Review Completed 06/24/2019 5:42 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 06/26/2019 1:58 PM Office of Management and Budget Laura Wells Level 3 OMB Gatekeeper Review Completed 06/26/2019 4:25 PM 16.C.15 Packet Pg. 1235 07/09/2019 Office of Management and Budget Susan Usher Additional Reviewer Completed 06/27/2019 2:45 PM Grants Therese Stanley Additional Reviewer Completed 06/28/2019 11:38 AM County Manager's Office Leo E. Ochs Level 4 County Manager Review Completed 06/28/2019 2:59 PM Board of County Commissioners MaryJo Brock Meeting Pending 07/09/2019 9:00 AM 16.C.15 Packet Pg. 1236 16.C.15.a Packet Pg. 1237 Attachment: Attachment No 1 - RFQ 14-6213-130 Quote Tabulation r1 (9138 : Sunshine Boulevard and Green Boulevard Water Main $0.00 $50,000.00 $100,000.00 $150,000.00 $200,000.00 $250,000.00 $300,000.00 $350,000.00 $400,000.00 Eng Est Higgins Haskins, Inc.QE Results for RFQ 14-6213-130 - Sunshine and Green Blvd WM Improvements KEY: Dashed Green- AVERAGE BID Dashed black- +/-1 std dev of avg bid 16.C.15.b Packet Pg. 1238 Attachment: Attachment No 2 - RFQ 14-6213-130 Quote Analysis (9138 : Sunshine Boulevard and Green 16.C.15.cPacket Pg. 1239Attachment: Attachment No 3 - RFQ 14-6213-130 Higgins RFQ Form (9138 : Sunshine Boulevard and Green Boulevard Water Main 16.C.15.cPacket Pg. 1240Attachment: Attachment No 3 - RFQ 14-6213-130 Higgins RFQ Form (9138 : Sunshine Boulevard and Green Boulevard Water Main 16.C.15.cPacket Pg. 1241Attachment: Attachment No 3 - RFQ 14-6213-130 Higgins RFQ Form (9138 : Sunshine Boulevard and Green Boulevard Water Main 16.C.15.cPacket Pg. 1242Attachment: Attachment No 3 - RFQ 14-6213-130 Higgins RFQ Form (9138 : Sunshine Boulevard and Green Boulevard Water Main 2122 Johnson Street ■Post Office Box 1550 ■Fort Myers, Florida 33902-1550 (239) 334-0046 ■ Fax (239) 334-3661 SINCE 1946 May 6, 2019 Via Email Only: Shon.Fandrich@colliercountyfl.gov Shon Fandrich, P.E., PMP Senior Project Manager Collier County Public Utilities Engineering and Project Management Division 3339 Tamiami Trail East, Suite 303 Naples, FL 34112-5361 RE: Bid Recommendation for Collier County RFQ 14-6213-130 Project: Sunshine & Green Blvd WM Improvements - Low Bidder: Douglas N. Higgins, Inc. Dear Shon: The bid opening for the above-referenced project took place on Friday, May 3, 2019. Collier County provided the results of the bid opening to Johnson Engineering and we performed an evaluation of the results and our recommendation is contained herein. BIDDER BID AMOUNT Douglas N. Higgins, Inc. $264,238.00 Haskins, Inc $301,390.00 Quality Enterprises USA, Inc. $337,268.00 Following the bid opening, Collier County prepared the enclosed Bid Tabulation Analysis, which includes an analysis for mathematical errors. No errors were discovered. For comparison purposes, Johnson Engineering provided Collier County with an Opinion of Probable Construction Cost in the amount of $309,446.00. All bidders acknowledged the addendums. The results show Douglas N. Higgins, Inc. as the low bidder. Based upon our review, the low bidder, Douglas N. Higgins, Inc., appears to be a reasonable and responsive bid. Subject to concurrence with the County’s Purchasing and Contracts Administration Division, we believe selection of Douglas N. Higgins, Inc. by Collier County for the intended work contained within the bid documents would be an appropriate choice. Should you have any questions, or require additional information, please let us know. Very truly yours, Michael S. Dickey, P.E. MSD/bnw Director of Utility Services Enclosures 20149700-211 16.C.15.d Packet Pg. 1243 Attachment: Attachment No 4 - RFQ 14-6213-130 Recommendation of Award Letter (9138 : Sunshine Boulevard and Green Boulevard Water 16.C.15.dPacket Pg. 1244Attachment: Attachment No 4 - RFQ 14-6213-130 Recommendation of Award Letter (9138 : Sunshine Boulevard and Green Boulevard Water 16.C.15.dPacket Pg. 1245Attachment: Attachment No 4 - RFQ 14-6213-130 Recommendation of Award Letter (9138 : Sunshine Boulevard and Green Boulevard Water 16.C.15.dPacket Pg. 1246Attachment: Attachment No 4 - RFQ 14-6213-130 Recommendation of Award Letter (9138 : Sunshine Boulevard and Green Boulevard Water 16.C.15.dPacket Pg. 1247Attachment: Attachment No 4 - RFQ 14-6213-130 Recommendation of Award Letter (9138 : Sunshine Boulevard and Green Boulevard Water Collier County Public UtilitiesBid number 14-6213-130COLLIER COUNTY PUBLIC UTILITIESEngineering and Project Management DivisionSUNSHINE BLVD WATER MAIN IMPROVEMENTS - PHASE 1Bid Tabulation5/6/2019ITEM NO. DESCRIPTION EST. QUANTITY UNIT UNIT PRICE EXTENDED PRICE UNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICE1 Mobilization1 LS 30,000.00$ 30,000.00$ 24,000.00$ 24,000.00$ 4,000.00$ 4,000.00$ 57,000.00$ 57,000.00$ -$ -$ -$ 2 Maintenance of Traffic1 LS 8,000.00$ 8,000.00$ 17,000.00$ 17,000.00$ 6,200.00$ 6,200.00$ 9,100.00$ 9,100.00$ -$ -$ -$ 3 Preconstruction Audio/Video Recording1 LS 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 3,000.00$ 3,000.00$ 600.00$ 600.00$ -$ -$ -$ 4 Survey and Record Drawings1 LS 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 8,500.00$ 8,500.00$ 5,800.00$ 5,800.00$ -$ -$ -$ 45,000.00$ 48,000.00$ 21,700.00$ 72,500.00$ ITEM NO. DESCRIPTION EST. QUANTITY UNIT UNIT PRICE EXTENDED PRICE UNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICE5 Install Water Main Pipelines (Installation Only)a. 6" Water Main - PVC C900 DR18 20 LF 100.00$ 2,000.00$ 52.00$ 1,040.00$ 149.00$ 2,980.00$ 58.00$ 1,160.00$ -$ -$ -$ b. 8" Water Main - PVC C900 DR18 46 LF 100.00$ 4,600.00$ 52.00$ 2,392.00$ 71.00$ 3,266.00$ 110.00$ 5,060.00$ -$ -$ -$ c. 12" Water Main - PVC C900 DR18 515 LF 40.00$ 20,600.00$ 59.00$ 30,385.00$ 40.00$ 20,600.00$ 47.00$ 24,205.00$ -$ -$ -$ d. 12" Water Main - PVC C900 DR14 (Under 17th Ave SW) 40 LF 40.00$ 1,600.00$ 60.00$ 2,400.00$ 80.00$ 3,200.00$ 140.00$ 5,600.00$ -$ -$ -$ 6Install 14" HDPE DR11 Horizontal Directional Drill from STA 4+97 to STA 8+93 (Installation Only)1 LS 85,000.00$ 85,000.00$ 69,000.00$ 69,000.00$ 70,000.00$ 70,000.00$ 62,000.00$ 62,000.00$ -$ -$ -$ 7 Connect to Existing Water Main (Installation Only)a. Connect to Existing 6" Water Main 1 EA 3,000.00$ 3,000.00$ 1,400.00$ 1,400.00$ 6,275.00$ 6,275.00$ 2,200.00$ 2,200.00$ -$ -$ -$ b. Connect to Existing 8" Water Main 3 EA 5,000.00$ 15,000.00$ 2,400.00$ 7,200.00$ 6,450.00$ 19,350.00$ 4,400.00$ 13,200.00$ -$ -$ -$ c. Connect to Existing 10" Water Main 1 EA 8,000.00$ 8,000.00$ 2,400.00$ 2,400.00$ 6,630.00$ 6,630.00$ 4,400.00$ 4,400.00$ -$ -$ -$ 8 Install Air Release Valve (Installation Only)2 EA. 2,500.00$ 5,000.00$ 2,100.00$ 4,200.00$ 2,330.00$ 4,660.00$ 2,900.00$ 5,800.00$ -$ -$ -$ 9 Install Fire Hydrant Assembly (Installation Only)1 EA. 3,500.00$ 3,500.00$ 2,100.00$ 2,100.00$ 3,025.00$ 3,025.00$ 2,650.00$ 2,650.00$ -$ -$ -$ 10 Install Gate Valves (Installation Only)a. 6" Gate Valve 1 EA. 2,000.00$ 2,000.00$ 700.00$ 700.00$ 1,250.00$ 1,250.00$ 2,300.00$ 2,300.00$ -$ -$ -$ b. 8" Gate Valve 3 EA. 2,200.00$ 6,600.00$ 700.00$ 2,100.00$ 1,450.00$ 4,350.00$ 2,300.00$ 6,900.00$ -$ -$ -$ c. 10" Gate Valve 1 EA. 2,500.00$ 2,500.00$ 900.00$ 900.00$ 1,800.00$ 1,800.00$ 2,400.00$ 2,400.00$ -$ -$ -$ d. 12" Gate Valve 4 EA. 3,000.00$ 12,000.00$ 1,000.00$ 4,000.00$ 2,450.00$ 9,800.00$ 2,400.00$ 9,600.00$ -$ -$ -$ e. 16" Gate Valve 3 EA 4,500.00$ 13,500.00$ 1,500.00$ 4,500.00$ 4,400.00$ 13,200.00$ 4,500.00$ 13,500.00$ -$ -$ -$ 184,900.00$ 134,717.00$ 170,386.00$ 160,975.00$ ITEM NO. DESCRIPTION EST. QUANTITY UNIT UNIT PRICE EXTENDED PRICE UNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICE11 General Restoration1 LS 10,000.00$ 10,000.00$ 19,000.00$ 19,000.00$ 9,000.00$ 9,000.00$ 25,000.00$ 25,000.00$ -$ -$ -$ 12 Concrete Sidewalk Restoration9 SY 100.00$ 900.00$ 200.00$ 1,800.00$ 150.00$ 1,350.00$ 60.00$ 540.00$ -$ -$ -$ 13 Asphalt Driveway Restoration187 SY 50.00$ 9,350.00$ 45.00$ 8,415.00$ 47.00$ 8,789.00$ 19.00$ 3,553.00$ -$ -$ -$ 14 Asphalt Roadway Restoration190 SY 80.00$ 15,200.00$ 58.00$ 11,020.00$ 150.00$ 28,500.00$ 72.00$ 13,680.00$ -$ -$ -$ 15 Abandon and Remove Existing Water Maina. Existing 6" Water Main 10 LF 12.00$ 120.00$ 17.00$ 170.00$ 37.00$ 370.00$ 42.00$ 420.00$ -$ -$ -$ b. Existing 8" Water Main 15 LF 15.00$ 225.00$ 17.00$ 255.00$ 40.00$ 600.00$ 42.00$ 630.00$ -$ -$ -$ c. Existing 10" Water Main 265 LF 15.00$ 3,975.00$ 17.00$ 4,505.00$ 75.00$ 19,875.00$ 38.00$ 10,070.00$ -$ -$ -$ 16 Abandon and Grout Existing Water Maina. Existing 8" Water Main 560 LF 10.00$ 5,600.00$ 7.00$ 3,920.00$ 10.00$ 5,600.00$ 20.00$ 11,200.00$ -$ -$ -$ b. Existing 10" Water Main 348 LF 12.00$ 4,176.00$ 7.00$ 2,436.00$ 15.00$ 5,220.00$ 25.00$ 8,700.00$ -$ -$ -$ 49,546.00$ 51,521.00$ 79,304.00$ 73,793.00$ ITEM NO. DESCRIPTION EST. QUANTITY UNIT UNIT PRICE EXTENDED PRICE UNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICEUNIT PRICEEXTENDED PRICE17Allowance: Allowance for unforeseen conditions will be made at the appropriate contract price for time & materials, lump sum, and / or contract unit price. 1 TBD 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ -$ -$ -$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ NO BIDSouthwest Utility Systems, Inc.NO BIDNO BIDNO BIDNO BIDNO BIDMitchell & Stark Construction Co., Inc.NO BIDNO BIDNO BIDNO BIDNO BIDKyle Construction, Inc.NO BIDNO BIDNO BIDNO BID337,268.00$ 30,000.00$ 73,793.00$ 160,975.00$ 72,500.00$ 301,390.00$ 30,000.00$ 79,304.00$ 170,386.00$ 21,700.00$ PROJECT TOTAL:309,446.00$ 264,238.00$ 30,000.00$ 51,521.00$ Haskins, Inc. Quality Enterprises USA. Inc.SECTION 1 SUBTOTAL:SECTION 2: WATER SYSTEMDouglas N. Higgins, Inc.Engineer's EstimateSECTION 1: GENERALSECTION 2 SUBTOTAL:SECTION 3 SUBTOTAL:SECTION 3: RESTORATIONSECTION 4 SUBTOTAL:SECTION 4 ALLOWANCES SUBTOTAL:SECTION 3 RESTORATION SUBTOTAL:SECTION 2 WATER SYSTEM SUBTOTAL:SECTION 1 GENERAL SUBTOTAL:30,000.00$ 49,546.00$ 184,900.00$ 45,000.00$ 134,717.00$ 48,000.00$ SECTION 4: ALLOWANCEBID SUMMARYSunshine Blvd and Green Blvd Water Main Improvements70222.3.1 / 20149700-211Page 1 of 116.C.15.dPacket Pg. 1248Attachment: Attachment No 4 - RFQ 14-6213-130 Recommendation of Award Letter (9138 : Sunshine Boulevard and Green Boulevard Water / WORK ORDER/PURCHASE ORDER Contract 14-6213 "Annual Contract for Underground Utilities alJ,d General Contractors" , Contract Expiration Date: July 7, 2020' This Work Order is for professional water main replacement construction services for work known as: Project Name: Sunshine Blvd & Green Blvd Water Main Improvements -Constrnction Project No: 70222.3.2/ The work is specified in the proposal dated May 3, 201/wbich is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above, this Work Order/Purchase Order is assigned to: Douglas N. Higgins, Ini. Scope of Work: As detailed in the attached proposal and the following: *Task! Water Main Construction*TaskII Water Main Constmction Allowance Schedule of Work: Complete work within 9o'days from the date of the Notice to Proceed which is accompanying this Work Order. The zonsitltaut agrees that auy Work Order that extends beyond the expiration date of Agreement # 14-6213 will smvive and remain subject to the terms and conditions of that Agreement until the completion or termination of this Work Order. Compensation: In accordance with the Agreemen�referenced above, the County will compensate the Firm h1 accordance with following method(s): !XlNegotiated Lump Sum (NLS) □Lump Sum Plus Reimbursable Costs (LS+RC) �Time & Material (T &M) ( established hourly rateSchedule A) 0Cost Plus Fixed Fee (CPFF), as provided in the attached proposal. Task I Task II TOTAL FEB $234,238.00 (NLS) / $ 30,000.00 $264,238.00 �-1 £;/·! PREPARED BY:_'�===--�;;_:,;____,_/_ t:.�---=�-'--"-"""----'------Shon D. Fandrich, Senior Project Manager Date Page lof3 16.C.15.e Packet Pg. 1249 Attachment: Attachment No 5 - RFQ 14-6213-130 Work Order (9138 : Sunshine Boulevard and Green Boulevard Water Main Improvements) 16.C.15.e Packet Pg. 1250 Attachment: Attachment No 5 - RFQ 14-6213-130 Work Order (9138 : Sunshine Boulevard and Green Boulevard Water Main Improvements) 16.C.15.e Packet Pg. 1251 Attachment: Attachment No 5 - RFQ 14-6213-130 Work Order (9138 : Sunshine Boulevard and Green Boulevard Water Main Improvements) 16.C.15.e Packet Pg. 1252 Attachment: Attachment No 5 - RFQ 14-6213-130 Work Order (9138 : Sunshine Boulevard and Green Boulevard Water Main Improvements) 16.C.15.e Packet Pg. 1253 Attachment: Attachment No 5 - RFQ 14-6213-130 Work Order (9138 : Sunshine Boulevard and Green Boulevard Water Main Improvements) 16.C.15.e Packet Pg. 1254 Attachment: Attachment No 5 - RFQ 14-6213-130 Work Order (9138 : Sunshine Boulevard and Green Boulevard Water Main Improvements) 16.C.15.e Packet Pg. 1255 Attachment: Attachment No 5 - RFQ 14-6213-130 Work Order (9138 : Sunshine Boulevard and Green Boulevard Water Main Improvements) 16.C.15.e Packet Pg. 1256 Attachment: Attachment No 5 - RFQ 14-6213-130 Work Order (9138 : Sunshine Boulevard and Green Boulevard Water Main Improvements) 16.C.15.e Packet Pg. 1257 Attachment: Attachment No 5 - RFQ 14-6213-130 Work Order (9138 : Sunshine Boulevard and Green Boulevard Water Main Improvements) 16.C.15.e Packet Pg. 1258 Attachment: Attachment No 5 - RFQ 14-6213-130 Work Order (9138 : Sunshine Boulevard and Green Boulevard Water Main Improvements) 16.C.15.ePacket Pg. 1259Attachment: Attachment No 5 - RFQ 14-6213-130 Work Order (9138 : Sunshine Boulevard and Green Boulevard Water Main Improvements) 16.C.15.ePacket Pg. 1260Attachment: Attachment No 5 - RFQ 14-6213-130 Work Order (9138 : Sunshine Boulevard and Green Boulevard Water Main Improvements) 16.C.15.ePacket Pg. 1261Attachment: Attachment No 5 - RFQ 14-6213-130 Work Order (9138 : Sunshine Boulevard and Green Boulevard Water Main Improvements) 16.C.15.ePacket Pg. 1262Attachment: Attachment No 5 - RFQ 14-6213-130 Work Order (9138 : Sunshine Boulevard and Green Boulevard Water Main Improvements) 16.C.15.ePacket Pg. 1263Attachment: Attachment No 5 - RFQ 14-6213-130 Work Order (9138 : Sunshine Boulevard and Green Boulevard Water Main Improvements) 16.C.15.ePacket Pg. 1264Attachment: Attachment No 5 - RFQ 14-6213-130 Work Order (9138 : Sunshine Boulevard and Green Boulevard Water Main Improvements) 16.C.15.ePacket Pg. 1265Attachment: Attachment No 5 - RFQ 14-6213-130 Work Order (9138 : Sunshine Boulevard and Green Boulevard Water Main Improvements) 16.C.15.ePacket Pg. 1266Attachment: Attachment No 5 - RFQ 14-6213-130 Work Order (9138 : Sunshine Boulevard and Green Boulevard Water Main Improvements) 16.C.15.ePacket Pg. 1267Attachment: Attachment No 5 - RFQ 14-6213-130 Work Order (9138 : Sunshine Boulevard and Green Boulevard Water Main Improvements) 70222.3 – Sunshine and Green Blvd Water Main Improvements 16.C.15.f Packet Pg. 1268 Attachment: Attachment No 6 - RFQ 14-6213-130 Project Map (9138 : Sunshine Boulevard and Green 70222.3 – Sunshine and Green Blvd Water Main Improvements 16.C.15.f Packet Pg. 1269 Attachment: Attachment No 6 - RFQ 14-6213-130 Project Map (9138 : Sunshine Boulevard and Green