Loading...
Agenda 05/14/2019 Item #16A 1 (WO/Bonness, Inc. - Airport Rd/Davis Blvd)05/14/2019 EXECUTIVE SUMMARY Recommendation to award a Work Order to Bonness, Inc., for construction of the “Airport Road and Davis Boulevard (Phase1) - Southbound Right Turn Lane” project in the amount of $749,821.61 (Project 60148). OBJECTIVE: To approve a Work Order for the south bound right turn lane improvement along Airport Road at Davis Blvd. CONSIDERATION: On March 12, 2019, Transportation Engineering staff sent construction plans and a bid schedule to four (4) construction companies who are under contract with the County on “Agreement No. 16-6663 for Roadway Contractors.” Staff requested quotations from those contractors for construction services for the “Airport Road and Davis Boulevard (Phase1) - Southbound Right Turn Lane" project. On March 29, 2018, the County received four (4) bids, as follows: Contractor Bid 1 Bonness, Inc. $749,821.61 2 Ajax Paving Industries of Florida, LLC $763,922.85 3 Preferred Materials, Inc. $779,233.08 4 Wright Construction Group, Inc. $1,031,260.79 Staff determined the lowest bid was fair and reasonable and recommend awarding the work order to Bonness, Inc. The Procurement Services Division concluded that bidding was competitive. The bid was 4.0% higher than the engineer’s estimate of $720,394.02. The work order and bid analysis are attached. FISCAL IMPACT: The anticipated cost for this intersection improvement project is $749,821.61. Funding is available within project 60148. Source of funds are Road Impact Fees and or Gas Tax. The estimated useful life of the roadway improvements is 20 years with minimal to no repair cost during that duration of time. GROWTH MANAGEMENT IMPACT: This project is consistent with the Transportation Element of the Growth Management Plan. LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote for Board approval. -SRT RECOMMENDATION: To award a Work Order for “Airport Road and Davis Boulevard (Phase1) - Southbound Right Turn Lane” project to Bonness, Inc., in the amount of $749,821.61, and a uthorize the Chairman to execute the attached Work Order. Prepared by: Mark McCleary, P.E., P.S.M., Principal Project Manager, Transportation Engineering Division, Growth Management Department ATTACHMENT(S) 1. SB Right Phase 1 Airport and Davis- BID ANALYSIS (PDF) 2. Work Order 16-6663 4.8.19 (PDF) 3. Approved Permit Package (1) (PDF) 16.A.1 Packet Pg. 518 05/14/2019 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.1 Doc ID: 8513 Item Summary: Recommendation to award a Work Order to Bonness, Inc., for construction of the “Airport Road and Davis Boulevard (Phase1) - Southbound Right Turn Lane” project in the amount of $749,821.61 (Project 60148). Meeting Date: 05/14/2019 Prepared by: Title: Project Manager – Transportation Engineering Name: Mark McCleary 04/08/2019 7:59 AM Submitted by: Title: Division Director - Transportation Eng – Transportation Engineering Name: Jay Ahmad 04/08/2019 7:59 AM Approved By: Review: Transportation Engineering Jay Ahmad Additional Reviewer Completed 04/08/2019 8:30 AM Growth Management Department Christine Arnold Level 1 Reviewer Completed 04/08/2019 8:31 AM Growth Management Operations Support Christopher Johnson Additional Reviewer Completed 04/08/2019 9:18 AM Growth Management Department Anthony Khawaja Additional Reviewer Completed 04/08/2019 3:09 PM Capital Project Planning, Impact Fees, and Program Management Mark McCleary Additional Reviewer Skipped 04/09/2019 9:38 AM Procurement Services Opal Vann Level 1 Purchasing Gatekeeper Completed 04/09/2019 10:11 AM Growth Management Department Gene Shue Additional Reviewer Completed 04/09/2019 6:36 PM Procurement Services Ted Coyman Additional Reviewer Completed 04/17/2019 9:52 AM Procurement Services Evelyn Colon Additional Reviewer Completed 04/17/2019 1:51 PM Procurement Services Swainson Hall Additional Reviewer Completed 04/17/2019 2:15 PM Procurement Services Catherine Bigelow Additional Reviewer Completed 04/19/2019 12:42 PM Growth Management Department James C French Deputy Department Head Review Skipped 04/08/2019 4:48 PM County Attorney's Office Scott Teach Level 2 Attorney Review Completed 04/22/2019 8:49 AM Growth Management Department Thaddeus Cohen Department Head Review Completed 04/22/2019 10:09 AM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 04/22/2019 10:47 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 04/24/2019 11:30 AM 16.A.1 Packet Pg. 519 05/14/2019 Office of Management and Budget Susan Usher Additional Reviewer Completed 05/03/2019 12:54 PM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 05/05/2019 8:16 PM Board of County Commissioners MaryJo Brock Meeting Pending 05/14/2019 9:00 AM 16.A.1 Packet Pg. 520 Bid Analysis No. 60148 SB Right Airport and Davis (Phase 1) DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT COST TOTAL COST Low Bid Eng. Est.Average Eng. Est.Average 101-1 Mobilization LS 1 $46,275.20 $46,275.20 $35,000.00 $35,000.00 $66,000.00 $66,000.00 $190,829.24 $190,829.24 102-1 Maintenance of Traffic LS 1 $42,163.44 $42,163.44 $40,000.00 $40,000.00 $73,761.72 $73,761.72 $173,389.34 $173,389.34 102-3 Commercial Material for Driveway Maintenance CY 50 $99.69 $4,984.50 $35.00 $1,750.00 $63.74 $3,187.00 $60.00 $3,000.00 104-10-3 Sediment Barrier LF 755 $1.74 $1,313.70 $1.75 $1,321.25 $3.72 $2,808.60 $1.50 $1,132.50 104-18 Inlet Protection System EA 5 $173.53 $867.65 $175.00 $875.00 $212.46 $1,062.30 $150.00 $750.00 110-1-1 Clearing & Grubbing (0.25 Ac)LS 1 $9,309.79 $9,309.79 $14,000.00 $14,000.00 $12,113.58 $12,113.58 $12,760.57 $12,760.57 110-4-10 Removal of Existing Concrete Pavement SY 764 $25.14 $19,206.96 $49.50 $37,818.00 $25.14 $19,206.96 $37.00 $28,268.00 120-1 Regular Excavation CY 893 $32.19 $28,745.67 $45.50 $40,631.50 $36.38 $32,487.34 $24.00 $21,432.00 120-6 Embankment CY 1 $145.32 $145.32 $45.00 $45.00 $14.06 $14.06 $850.00 $850.00 121-70 Flowable Fill (Contingency)CY 50 $161.63 $8,081.50 $300.00 $15,000.00 $75.00 $3,750.00 $350.05 $17,502.50 285-715 Optional Base, Base Group 15 - Type B12.5 (9")SY 1,419 $50.86 $72,170.34 $61.65 $87,481.35 $52.44 $74,412.36 $66.55 $94,434.45 327-70-16 Milling Exist Asph Pavt, 1 1/2 " Avg Depth SY 6,329 $3.65 $23,100.85 $2.50 $15,822.50 $4.31 $27,277.99 $4.10 $25,948.90 334-1-53 Superpave Asphaltic Conc, (Traffic C, PG 76-22) (2")TN 142 $125.06 $17,758.52 $136.00 $19,312.00 $145.85 $20,710.70 $179.58 $25,500.36 337-7-83 Asphalt Concrete Friction Course, (Traffic C, FC-12.5, PG 76-22) (1 1/2")TN 621 $141.35 $87,778.35 $131.00 $81,351.00 $102.79 $63,832.59 $169.02 $104,961.42 400-0-11 Class NS Concrete (Gravity Wall)CY 107 $579.75 $62,033.25 $585.00 $62,595.00 $340.34 $36,416.38 $495.00 $52,965.00 425-1361 Inlets, Curb, Type P-6, <10'EA 1 $7,984.67 $7,984.67 $7,500.00 $7,500.00 $20,688.23 $20,688.23 $5,000.00 $5,000.00 425-1201 Inlets, Curb, Type P-9, <10'EA 1 $7,379.58 $7,379.58 $7,500.00 $7,500.00 $4,642.42 $4,642.42 $5,500.00 $5,500.00 425-2-63 Manhole, P-8, (Partial) (Top Only)EA 1 $2,488.81 $2,488.81 $3,000.00 $3,000.00 $1,606.49 $1,606.49 $3,500.00 $3,500.00 430-175-118 Pipe Culvert, Optional Material, Round, 18" S/CD LF 10 $854.40 $8,544.00 $115.00 $1,150.00 $157.15 $1,571.50 $300.00 $3,000.00 515-2-211 Pedestrian / Bicycle Railing LF 270 $133.04 $35,920.80 $115.00 $31,050.00 $159.34 $43,021.80 $98.00 $26,460.00 520-1-10 Concrete Curb & Gutter, Type F LF 1,068 $22.40 $23,923.20 $25.00 $26,700.00 $31.76 $33,919.68 $15.25 $16,287.00 522-2 Sidewalk Concrete, 6" Thick SY 677 $49.29 $33,369.33 $50.00 $33,850.00 $58.08 $39,320.16 $34.25 $23,187.25 527-2 Detectable Warnings SF 130 $31.19 $4,054.70 $26.00 $3,380.00 $22.31 $2,900.30 $21.00 $2,730.00 550-10-221 Fencing, Type B, 5.1' - 6.0', W/ Barb Wire ATTMT LF 63 $28.16 $1,774.08 $22.00 $1,386.00 $26.56 $1,673.28 $21.44 $1,350.72 550-60-226 Fence Gate, Type B, Double, 24.1' - 30.0' Openning EA 1 $2,928.62 $2,928.62 $2,500.00 $2,500.00 $2,761.97 $2,761.97 $3,449.16 $3,449.16 570-1-2 Performance Turf, Sod (Incl. Fert. And Water)SY 458 $12.65 $5,793.70 $4.60 $2,106.80 $9.56 $4,378.48 $5.00 $2,290.00 SUBTOTAL (ROADWAY ONLY)$558,096.53 $573,125.40 $593,525.89 $846,478.41 $529,809.55 $558,096.53 $529,809.55 $642,806.56 105%87% SIGNING AND MARKING 700-1-11 Single Post Sign, F&I, Ground Mount, Up to 12 SF AS 8 $746.70 $5,973.60 $260.00 $2,080.00 $1,274.76 $10,198.08 $1,198.00 $9,584.00 700-1-60 Single Post Sign, Remove AS 3 $198.75 $596.25 $17.30 $51.90 $53.12 $159.36 $35.00 $105.00 700-3601 Single Panel, Remove, Up to 12 SF AS 6 $85.54 $513.24 $11.55 $69.30 $53.11 $318.66 $35.00 $210.00 705-11-3 Delineator, Flexible High Visability Median EA 4 $396.80 $1,587.20 $213.00 $852.00 $265.57 $1,062.28 $170.00 $680.00 706-3 Retro-Reflective Pavement Markers EA 144 $4.05 $583.20 $4.00 $576.00 $3.72 $535.68 $8.83 $1,271.52 710-11-190 Painted Pavement Markings, Standard, White, Island Nose SF 12 $3.47 $41.64 $3.45 $41.40 $3.19 $38.28 $7.57 $90.84 711-11-102 Thermoplastic, Standard, White, Solid, 8" for Urdan Island GM 0.16 $5,205.75 $832.92 $5,190.00 $830.40 $4,780.31 $764.85 $11,356.62 $1,817.06 711-11-123 Thermoplastic, Standard, White, Solid, 12" for Crosswalk LF 1096 $3.12 $3,419.52 $3.10 $3,397.60 $2.87 $3,145.52 $6.81 $7,463.76 711-11-124 Thermoplastic, Standard, White, Solid, 18" for Diagonals and Chevrons LF 91 $4.28 $389.48 $4.25 $386.75 $3.93 $357.63 $9.34 $849.94 711-11-125 Thermoplastic, Standard, White, Solid, 24" for Stop Line LF 225 $5.78 $1,300.50 $5.75 $1,293.75 $5.31 $1,194.75 $12.62 $2,839.50 711-11-141 Thermoplastic, Standard, White, 2-4 Dotted Guideline/6-10 Gap Extension, 6"GM 0.06 $2,892.08 $173.52 $2,880.00 $172.80 $2,655.83 $159.35 $6,309.23 $378.55 711-11-160 Thermoplastic, Standard, White, Message EA 6 $63.63 $381.78 $63.45 $380.70 $58.43 $350.58 $138.80 $832.80 711-11-170 Thermoplastic, Standard, White, Arrow EA 12 $57.84 $694.08 $57.70 $692.40 $53.12 $637.44 $126.18 $1,514.16 711-11-290 Painted Pavement Markings, Standard, Yellow, Island Nose SF 30 $3.47 $104.10 $3.45 $103.50 $3.19 $95.70 $7.57 $227.10 711-16-101 Thermoplastic, Standard - Other Surfaces, White, Solid, 6"GM 0.23 $4,280.29 $984.47 $4,270.00 $982.10 $3,930.48 $904.01 $9,337.66 $2,147.66 711-16-131 Thermoplastic, Other Surfaces, White, Skip, 6", 10-30 Skip GM 0.24 $1,098.99 $263.76 $1,095.00 $262.80 $1,009.17 $242.20 $2,397.51 $575.40 711-16-201 Thermoplastic, Standard - Other Surfaces, Yellow, Solid, 6"GM 0.14 $4,280.29 $599.24 $4,270.00 $597.80 $3,930.50 $550.27 $9,337.66 $1,307.27 SUBTOTAL (SIGNING AND MARKING ONLY)$18,438.50 $12,771.20 $20,714.64 $31,894.57 $38,084.47 $18,438.50 $38,084.47 $20,954.73 48%88% ROADWAY LIGHTING 630-2-11 Conduit, Furnish & Install, Open Trench LF 130 $16.12 $2,095.60 $6.80 $884.00 $12.75 $1,657.50 $6.50 $845.00 630-2-12 Conduit, Furnish & Install, Directional Bore LF 560 $32.25 $18,060.00 $27.05 $15,148.00 $24.91 $13,949.60 $17.00 $9,520.00 635-2-11 Pull & Splice Box, F&I, 13" X 24" Cover Size EA 4 $518.29 $2,073.16 $450.00 $1,800.00 $828.59 $3,314.36 $390.00 $1,560.00 715-1-12 Lighting Conductors, F&I, Insulated, No. 8 - 6 LF 2,070 $2.82 $5,837.40 $1.80 $3,726.00 $1.65 $3,415.50 $1.25 $2,587.50 715-1-60 Lighting Conductors, Remove & Dispose, Contractor Owns LF 2,190 $0.86 $1,883.40 $1.40 $3,066.00 $1.27 $2,781.30 $0.20 $438.00 715-4-14 Light Pole Complete, Furnish & Install Standard Pole Standard Foundation, 45' Mounting H EA 1 $7,601.62 $7,601.62 $8,900.00 $8,900.00 $8,198.81 $8,198.81 $8,300.00 $8,300.00 715-4-60 Light Pole Complete, Relocate EA 3 $4,722.22 $14,166.66 $3,535.00 $10,605.00 $3,254.88 $9,764.64 $1,600.00 $4,800.00 715-11-211 Luminaire, F&I- Replace Existing Luminaire On Existing Pole/Arm, Roadway, Cobra Head EA 2 $2,879.40 $5,758.80 $2,250.00 $4,500.00 $2,074.67 $4,149.34 $2,500.00 $5,000.00 715-500-1 Pole Cable Distribution System, Conventional EA 1 $719.85 $719.85 $716.25 $716.25 $659.68 $659.68 $300.00 $300.00 SUBTOTAL (ROADWAY LIGHTING ONLY)$58,196.49 $49,345.25 $47,890.73 $33,350.50 $39,000.00 $58,196.49 $39,000.00 $47,195.74 149%123% SIGNALIZATION 110-4-10 Removal Of Existing Concrete SY 3 $76.84 $230.52 $45.00 $135.00 $276.20 $828.60 $254.27 $762.81 522-2 Sidewalk Concrete, 6" Thick SY 3 $76.84 $230.52 $50.00 $150.00 $414.29 $1,242.87 $34.25 $102.75 630-2-11 Conduit, Furnish & Install, Open Trench LF 70 $23.04 $1,612.80 $8.15 $570.50 $26.56 $1,859.20 $7.05 $493.50 630-2-12 Conduit, Furnish & Install, Directional Bore LF 435 $62.20 $27,057.00 $53.00 $23,055.00 $36.12 $15,712.20 $45.95 $19,988.25 632-7-1 Signal Cable- New Or Reconstructed Intersection, Furnish & Install PI 1 $3,800.81 $3,800.81 $6,605.00 $6,605.00 $4,620.99 $4,620.99 $5,727.00 $5,727.00 632-7-6 Signal Cable, Remove- Intersection PI 1 $345.53 $345.53 $485.00 $485.00 $860.46 $860.46 $420.00 $420.00 635-2-11 Pull & Splice Box, F&I, 17" X 30" Cover Size EA 16 $466.46 $7,463.36 $675.00 $10,800.00 $1,062.30 $16,996.80 $587.00 $9,392.00 641-2-80 Prestressed Concrete Pole, Complete Pole Removal- Pole 30' And Greater EA 1 $3,685.63 $3,685.63 $7,655.00 $7,655.00 $4,886.57 $4,886.57 $6,636.00 $6,636.00 646-1-11 Aluminum Signals Pole, Pedestal EA 6 $950.20 $5,701.20 $1,860.00 $11,160.00 $1,487.22 $8,923.32 $1,615.00 $9,690.00 653- 1-11 Pedestrian Signal, Furnish & Install Led Countdown, 1 Way AS 6 $679.54 $4,077.24 $963.00 $5,778.00 $541.77 $3,250.62 $835.00 $5,010.00 653-1-60 Pedestrian Signal, Remove Ped Signal- Pole/Pedestal To Remain AS 6 $230.35 $1,382.10 $161.50 $969.00 $88.70 $532.20 $140.00 $840.00 665-1-11 Pedestrian Detector, Furnish & Install, Standard EA 6 $270.66 $1,623.96 $329.00 $1,974.00 $191.21 $1,147.26 $285.00 $1,710.00 665-1-60 Pedestrian Detector, Remove- Pole/Pedestal To Remain EA 6 $115.18 $691.08 $80.75 $484.50 $29.74 $178.44 $70.00 $420.00 670-5-400 Traffic Controller Assembly, Modify AS 1 $2,188.34 $2,188.34 $3,860.00 $3,860.00 $1,062.29 $1,062.29 $3,345.00 $3,345.00 SUBTOTAL (ROADWAY SIGNALIZATION ONLY)$60,090.09 $73,681.00 $62,101.82 $64,537.31 $46,500.00 $60,090.09 $46,500.00 $65,102.56 129%92% PROJECT ALLOWANCE LS 1 $55,000.00 $55,000.00 $55,000.00 $55,000.00 $55,000.00 $67,000.00 $55,000.00 $55,000.00 GRAND TOTAL $749,821.61 $763,922.85 $779,233.08 $1,031,260.79 $720,394.02 $749,821.61 $720,394.02 $831,059.58 104%90% Percent over the Engineer's Estimate = 104% Bonness, Inc.Ajax Paving Ind of FL,LLC Preferred Materials Wright Cons. Group Engineer's Estimate Price Comparison Low Bid Low Bid 16.A.1.a Packet Pg. 521 Attachment: SB Right Phase 1 Airport and Davis- BID ANALYSIS (8513 : Airport Road and Davis Boulevard (Phase1) - Southbound Right Turn 16.A.1.b Packet Pg. 522 Attachment: Work Order 16-6663 4.8.19 (8513 : Airport Road and Davis Boulevard (Phase1) - Southbound Right Turn Lane) 16.A.1.b Packet Pg. 523 Attachment: Work Order 16-6663 4.8.19 (8513 : Airport Road and Davis Boulevard (Phase1) - Southbound Right Turn Lane) 16.A.1.b Packet Pg. 524 Attachment: Work Order 16-6663 4.8.19 (8513 : Airport Road and Davis Boulevard (Phase1) - Southbound Right Turn Lane) 16.A.1.b Packet Pg. 525 Attachment: Work Order 16-6663 4.8.19 (8513 : Airport Road and Davis Boulevard (Phase1) - Southbound Right Turn Lane) 16.A.1.b Packet Pg. 526 Attachment: Work Order 16-6663 4.8.19 (8513 : Airport Road and Davis Boulevard (Phase1) - Southbound Right Turn Lane) 16.A.1.b Packet Pg. 527 Attachment: Work Order 16-6663 4.8.19 (8513 : Airport Road and Davis Boulevard (Phase1) - Southbound Right Turn Lane)