Loading...
Agenda 10/09/2018 Item #16A1210/09/2018 EXECUTIVE SUMMARY Recommendation to award a Work Order to Preferred Materials, Inc., for construction of the “Airport Road and Davis Boulevard (Phase2) - Northbound Right Turn Lane” project in the amount of $518,443.49 (Project 60148). OBJECTIVE: To approve a Work Order for the north bound right turn lane improvement along Airport Road at Davis Blvd. CONSIDERATION: On June 1, 2018, Transportation Engineering staff sent construction plans and a bid schedule to four (4) construction companies who are under contract with the County under “Agreement #16-6663 for Roadway Contractors.” Staff requested quotations from those contractors for construction services for the Airport Road and Davis Boulevard (Phase2) - Northbound Right Turn Lane project. On June 22, 2018, the County received four (4) bids, as follows: Contractor Bid 1 Preferred Materials, Inc. $518,443.49 2 Bonness, Inc. $533,836.00 3 Wright Construction Group, Inc. $619,825.76 4 Ajax Paving Industries of Florida, LLC $716,714.01 Staff determined the lowest bid was fair and reasonable and recommend awarding the work order to Preferred Materials, Inc. The Procurement Services Division concluded that bidding was competitive. The bid was 4.1% higher than the engineer’s estimate of $497,933.92. The work order and bid analysis are attached. FISCAL IMPACT: The anticipated cost for this intersection improvement project is $518,443.49. Funding is available within project 60148. Source of funds are Road Impact Fees and or Gas Tax. The estimated useful life of the roadway improvements is 20 years with minimal to no repair cost during that duration of time. GROWTH MANAGEMENT IMPACT: This project is consistent with the Transportation Element of the Growth Management Plan. LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority ote for Board approval. -SRT RECOMMENDATION: To award a Work Order for “Airport Road and Davis Boulevard (Phase2) - Northbound Right Turn Lane” project to Preferred Materials, Inc. in the a mount of $518,443.49, and authorize the Chairman to execute the attached Work Order. Prepared by: Mark McCleary, P.E., P.S.M., Principal Project Manager, Transportation Engineering Division, Growth Management Department ATTACHMENT(S) 1. Work Order 60148 (PDF) 2. PHASE 2- BID ANALYSIS (002) (PDF) 16.A.12 Packet Pg. 338 10/09/2018 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.12 Doc ID: 6595 Item Summary: Recommendation to award a Work Order to Preferred Materials, Inc., for construction of the “Airport Road and Davis Boulevard (Phase2) - Northbound Right Turn Lane” project in the amount of $518,443.49 (Project 60148). Meeting Date: 10/09/2018 Prepared by: Title: Project Manager – Transportation Engineering Name: Mark McCleary 09/04/2018 11:24 AM Submitted by: Title: Division Director - Transportation Eng – Transportation Engineering Name: Jay Ahmad 09/04/2018 11:24 AM Approved By: Review: Growth Management Operations Support Christopher Johnson Additional Reviewer Completed 09/07/2018 9:57 AM Procurement Services Ted Coyman Additional Reviewer Completed 09/10/2018 9:48 AM Procurement Services Swainson Hall Additional Reviewer Completed 09/12/2018 8:54 AM Road Maintenance Travis Gossard Additional Reviewer Completed 09/12/2018 4:21 PM Procurement Services Sara Schneeberger Additional Reviewer Completed 09/14/2018 11:02 AM Procurement Services Catherine Bigelow Additional Reviewer Completed 09/17/2018 1:19 PM Procurement Services Opal Vann Level 1 Purchasing Gatekeeper Completed 09/04/2018 11:49 AM Growth Management Department Anthony Khawaja Additional Reviewer Completed 09/04/2018 12:23 PM Capital Project Planning, Impact Fees, and Program Management Rookmin Nauth Additional Reviewer Completed 09/04/2018 2:09 PM Growth Management Department Diane Lynch Level 1 Reviewer Completed 09/04/2018 3:07 PM Transportation Engineering Jay Ahmad Additional Reviewer Completed 09/05/2018 7:22 AM Growth Management Department Gene Shue Additional Reviewer Completed 09/05/2018 11:26 AM Growth Management Department James C French Deputy Department Head Review Skipped 09/13/2018 8:17 PM Growth Management Department Thaddeus Cohen Department Head Review Completed 09/17/2018 3:28 PM County Attorney's Office Scott Teach Level 2 Attorney Review Completed 09/24/2018 8:51 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 09/24/2018 10:01 AM 16.A.12 Packet Pg. 339 10/09/2018 Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 09/24/2018 11:32 AM Office of Management and Budget Susan Usher Additional Reviewer Completed 09/27/2018 9:41 AM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 09/30/2018 11:47 AM Board of County Commissioners MaryJo Brock Meeting Pending 10/09/2018 9:00 AM 16.A.12 Packet Pg. 340 16.A.12.a Packet Pg. 341 Attachment: Work Order 60148 (6595 : Airport NB Right at Davis (Phase2)) 16.A.12.a Packet Pg. 342 Attachment: Work Order 60148 (6595 : Airport NB Right at Davis (Phase2)) 16.A.12.a Packet Pg. 343 Attachment: Work Order 60148 (6595 : Airport NB Right at Davis (Phase2)) 16.A.12.a Packet Pg. 344 Attachment: Work Order 60148 (6595 : Airport NB Right at Davis (Phase2)) 16.A.12.a Packet Pg. 345 Attachment: Work Order 60148 (6595 : Airport NB Right at Davis (Phase2)) 16.A.12.a Packet Pg. 346 Attachment: Work Order 60148 (6595 : Airport NB Right at Davis (Phase2)) Bid Analysis - PHASE 2Airport Pulling Road And Davis NB RightLow Bid Low BidDESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNTLow BidEngineer's EstimateAverageEngineer's EstimateAverage1101-1 MobilizationLS 1 $59,050.00 $59,050.00 $38,712.25 $38,712.25 $106,032.63 $106,032.63 $114,305.05 $114,305.05$47,500.00 $47,500.00 $59,050.00 $47,500.00 79,524.98$ 124.32% 74.25%2 102-1Maintenance of TrafficLS 1 $28,455.00$28,455.00$25,992.38$25,992.38$41,352.25$41,352.25$110,412.88$110,412.88$31,700.00 $31,700.00 $28,455.00 $31,700.00 51,553.13$ 89.76% 55.20%3 102-3 Commercial Material for Driveway Maintenance CY 50 $76.00$3,800.00$67.93$3,396.50$75.00$3,750.00$61.21$3,060.50$35.00$1,750.00 $76.00 $35.00 70.04$ 217.14% 108.52%4 104-10-3 Sediment Barrier LF 381 $3.05$1,162.05$5.69$2,167.89$1.50$571.50 $1.96 $746.76$1.50$571.50 $3.05 $1.50 3.05$ 203.33% 100.00%5 104-18 Inlet Protection System EA 3 $553.75$1,661.25$203.25$609.75$150.00$450.00 $195.65 $586.95$150.00$450.00 $553.75 $150.00 275.66$ 369.17% 200.88%6 110-1-1 Clearing & Grubbing (0.25 Ac) LS 1 $12,000.00$12,000.00$15,251.79$15,251.79$74,966.47$74,966.47 $5,217.46 $5,217.46$5,000.00$5,000.00 $12,000.00 $5,000.00 26,858.93$ 240.00% 44.68%7 110-4-10 Removal of Existing Concrete Pavement SY 310 $45.90$14,229.00$28.07$8,701.70$41.50$12,865.00 $109.11 $33,824.10$15.00$4,650.00 $45.90 $15.00 56.15$ 306.00% 81.75%8 120-1 Regular Excavation CY 582 $31.50$18,333.00$32.50$18,915.00$28.50$16,587.00 $62.65 $36,462.30$33.00$19,206.00 $31.50 $33.00 38.79$ 95.45% 81.21%9 120-6 Embankment CY 11 $330.00$3,630.00$123.40$1,357.40$300.00$3,300.00 $545.61 $6,001.71$30.00$330.00 $330.00 $30.00 324.75$ 1100.00% 101.62%10 121-70 Flowable Fill (Contingency) CY 10 $350.00$3,500.00$201.94$2,019.40$250.00$2,500.00$326.09$3,260.90$165.00$1,650.00 $350.00 $165.00 282.01$ 212.12% 124.11%11 285-715 Optional Base, Base Group 15 - Type B12.5 (9") SY 647 $55.80$36,102.60$49.75$32,188.25$57.00$36,879.00$79.41$51,378.27$55.00$35,585.00 $55.80 $55.00 60.49$ 101.45% 92.25%12 327-70-16 Milling Exist Asph Pavt, 1 1/2 " Avg Depth SY 4,221 $4.50$18,994.50$6.20$26,170.20$4.59$19,374.39$4.43$18,699.03$4.00$16,884.00 $4.50 $4.00 4.93$ 112.50% 91.28%13 334-1-53 Superpave Asphaltic Conc, (Traffic C, PG 76-22) (2") TN 59 $152.99$9,026.41$203.61$12,012.99$153.74$9,070.66$229.60$13,546.40$180.00$10,620.00 $152.99 $180.00 184.99$ 84.99% 82.70%14 337-7-83 Asphalt Concrete Friction Course, (Traffic C, FC-12.5, PG 76-22) (1 1/2") TN 392 $168.89$66,204.88$184.31$72,249.52$169.73$66,534.16$160.14$62,774.88$216.00$84,672.00 $168.89 $216.00 170.77$ 78.19% 98.90%15 400-0-11 Concrete Class NS, Gravity Wall CY 68 $548.00$37,264.00$865.53$58,856.04$487.25$33,133.00$586.96$39,913.28$600.00$40,800.00 $548.00 $600.00 621.94$ 91.33% 88.11%16 425-1-351 Inlets, Curb, Type P-5, <10' EA 1 $15,200.00$15,200.00$5,431.73$5,431.73$13,749.24$13,749.24$9,782.73$9,782.73$5,400.00$5,400.00 $15,200.00 $5,400.00 11,040.93$ 281.48% 137.67%17 425-1-361 Inlets, Curb, Type P-6, <10' EA 1 $12,350.00$12,350.00$5,324.37$5,324.37$11,188.11$11,188.11$9,782.73$9,782.73$5,600.00$5,600.00 $12,350.00 $5,600.00 9,661.30$ 220.54% 127.83%18 425-6 Valve Boxes, Adjust EA 1 $1,100.00$1,100.00$514.90$514.90$1,006.07$1,006.07$1,304.36$1,304.36$450.00$450.00 $1,100.00 $450.00 981.33$ 244.44% 112.09%19 430-175-115 Pipe Culvert, Optional Material, Round, 15" S/CD LF 163 $155.00$25,265.00$125.71$20,490.73$127.41$20,767.83$123.91$20,197.33$150.00$24,450.00 $155.00 $150.00 133.01$ 103.33% 116.53%20 515-2-211 Pedestrian / Bicycle Railing LF 218 $74.20$16,175.60$155.82$33,968.76$105.00$22,890.00$150.00$32,700.00$150.00$32,700.00 $74.20 $150.00 121.26$ 49.47% 61.19%21 520-1-10 Concrete Curb & Gutter, Type F LF 422 $20.75$8,756.50$20.86$8,802.92$14.65$6,182.30$18.26$7,705.72$20.00$8,440.00 $20.75 $20.00 18.63$ 103.75% 111.38%22 522-2 Concrete Sidewalk and Driveway, 6" Thick SY 335 $41.25$13,818.75$62.06$20,790.10$34.20$11,457.00 $48.72 $16,321.20$50.00$16,750.00 $41.25 $50.00 46.56$ 82.50% 88.60%23 527-2 Detectable Warnings SF 24 $33.00$792.00$29.21$701.04$25.00$600.00 $39.13 $939.12$31.58$757.92 $33.00 $31.58 31.59$ 104.50% 104.48%24 570-1-2 Performance Turf, Sod (Incl. Fert. And Water) SY 200 $11.50$2,300.00$40.72$8,144.00$3.00$600.00$2.93$586.00$3.00$600.00 $11.50 $3.00 14.54$ 383.33% 79.11%SUBTOTAL (ROADWAY ONLY)$409,170.54 $422,769.61 $515,806.61 $599,509.66 $396,516.42SIGNING AND MARKING25 700-1-11 $19,434.50AS 6 $440.00$2,640.00$1,195.38$7,172.28$460.00$2,760.00$306.53$1,839.18$350.00$2,100.00 $440.00$306.53600.48$ 143.54% 73.28%26 700-1-60 Single Post Sign, Remove AS 1 $110.00$110.00$145.91$145.91$53.00$53.00$13.04$13.04$50.00$50.00 $110.00$13.0480.49$ 843.56% 136.67%27 705-11-3 Delineator, Flexible High Visability Median EA 1 $165.00$165.00$362.49$362.49$123.00$123.00$241.31$241.31$225.00$225.00 $165.00$241.31222.95$ 68.38% 74.01%28 706-3 Retro-Reflective Pavement Markers EA 61 $11.00$671.00$4.74$289.14$3.50$213.50 $4.57 $278.77$6.00$366.00 $11.00$4.575.95$ 240.70% 184.80%29 711-11-123 Thermoplastic, Standard, White, Solid, 12" for Crosswalk LF 489 $3.05$1,491.45$3.73$1,823.97$2.75$1,344.75 $3.59 $1,755.51$12.00$5,868.00 $3.05$3.593.28$ 84.96% 92.99%30 711-11-125 Thermoplastic, Standard, White, Solid, 24" for Stop Line LF 63 $6.00$378.00$7.45$469.35$5.50$346.50 $7.17 $451.71$22.80$1,436.40 $6.00$7.176.53$ 83.68% 91.88%31 711-11-141 Thermoplastic, Standard, White, 2-4 Dotted Guideline/6-10 Gap Extension, 6" GM 0.16 $3,300.00$528.00$4,064.92$650.39$3,000.00$480.00 $3,913.09 $626.09$3,000.00$480.00 $3,300.00$3,913.093,569.50$ 84.33% 92.45%32 711-11-170 Thermoplastic, Standard, White, Arrow EA 9 $75.00$675.00$88.07$792.63$65.00$585.00 $84.78 $763.02$361.20$3,250.80 $75.00$84.7878.21$ 88.46% 95.89%33 711-11-290 Painted Pavement Markings, Standard, Yellow, Island Nose SF 4 $11.00$44.00$13.55$54.20$10.00$40.00 $13.04 $52.16$103.20$412.80 $11.00$13.0411.90$ 84.36% 92.46%34 711-16-101 Thermoplastic, Standard - Other Surfaces, White, Solid, 6" GM 0.24 $8,300.00$1,992.00$10,162.29$2,438.95$7,500.00$1,800.00 $9,782.73 $2,347.86$5,400.00$1,296.00 $8,300.00$9,782.738,936.26$ 84.84% 92.88%35 711-16-131 Thermoplastic, Other Surfaces, White, Skip, 6", 10-30 Skip GM 0.13 $2,760.00$358.80$3,387.43$440.37$2,500.00$325.00 $3,260.91 $423.92$1,500.00$195.00 $2,760.00$3,260.912,977.09$ 84.64% 92.71%36 711-16-201 Thermoplastic, Standard - Other Surfaces, Yellow, Solid, 6" GM 0.08 $8,300.00$664.00$10,162.29$812.98$7,500.00$600.00 $9,782.73 $782.62$5,400.00$432.00 $8,300.00$9,782.738,936.26$ 84.84% 92.88%SUBTOTAL (SIGNING AND MARKING ONLY)$9,717.25 $15,452.66 $8,670.75 $9,575.19 $16,112.00ROADWAY LIGHTING37 630-2-11 Conduit, Furnish & Install, Open Trench LF 50 $6.85$342.50$17.34$867.00$6.20$310.00$8.09$404.50$10.00$500.00 $6.85$8.099.62$ 84.67% 71.21%38 635-2-11 Pull & Splice Box, F&I, 13" X 24" Cover Size EA 2 $660.00$1,320.00$406.49$812.98$600.00$1,200.00$782.62$1,565.24$700.00$1,400.00 $660.00$782.62612.28$ 84.33% 107.79%39 641-2-60 Prestressed Concrete Pole, Complete Pole Removal- Pedestal/Service Pole EA 1 $465.15$465.15$1,308.90$1,308.90$420.00$420.00$547.83$547.83$500.00$500.00 $465.15$547.83685.47$ 84.91% 67.86%40 715-1-12 Lighting Conductors, F&I, Insulated, No. 8 - 6 LF 246 $1.80$442.80$2.03$499.38$1.65$405.90$2.15$528.90$1.75$430.50 $1.80$2.151.91$ 83.72% 94.36%41 715-1-60 Lighting Conductors, Remove & Dispose, Contractor Owns LF 150 $0.61$91.50$0.68$102.00$0.55$82.50$0.72$108.00$0.30$45.00 $0.61$0.720.64$ 84.72% 95.31%42 715-7-11 Load Center, F&I, Secondary Voltage EA 1 $17,600.00$17,600.00$11,517.26$11,517.26$15,900.00$15,900.00$20,739.40$20,739.40$9,000.00$9,000.00 $17,600.00$20,739.4016,439.17$ 84.86% 107.06%43 715-500-1 Pole Cable Distribution System, Conventional EA 1.00 $885.00$885.00$609.74$609.74$800.00$800.00$1,043.49$1,043.49$550.00$550.00 $885.00$1,043.49834.56$ 84.81% 106.04%SUBTOTAL (ROADWAY LIGHTING ONLY)$21,146.95 $15,717.26 $19,118.40 $24,937.36 $12,425.50SIGNALIZATION44 630-2-11 Conduit, Furnish & Install, Open Trench LF 115 $7.75$891.25$16.26$1,869.90$7.20$828.00$9.39$1,079.85$10.00$1,150.00 $7.75$9.3910.15$ 82.53% 76.35%45 632-7-2 Signal Cable- Repair/Replace/Other, Furnish & Install LF 280 $4.80$1,344.00$6.77$1,895.60$4.40$1,232.00 $5.74 $1,607.20$6.00$1,680.00 $4.80$5.745.43$ 83.62% 88.44%46 632-7- 4 Signal Cable, Adjust PI 1 $3,000.00$3,000.00$3,387.43$3,387.43$2,760.00$2,760.00 $3,600.05 $3,600.05$1,000.00$1,000.00 $3,000.00$3,600.053,186.87$ 83.33% 94.14%UNIT PRICE COMPARISONPreferred Materials, Inc. Bonness, Inc. Wright Construction Ajax Paving Ind., Inc.Engineer's Estimate 16.A.12.bPacket Pg. 347Attachment: PHASE 2- BID ANALYSIS (002) (6595 : Airport NB Right at Davis (Phase2)) Bid Analysis - PHASE 2Airport Pulling Road And Davis NB RightLow Bid Low BidDESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNTLow BidEngineer's EstimateAverageEngineer's EstimateAverageUNIT PRICE COMPARISONPreferred Materials, Inc. Bonness, Inc. Wright Construction Ajax Paving Ind., Inc.Engineer's Estimate 47 632-7-6 Signal Cable, Remove- Intersection PI 1 $465.15$465.15$2,032.46$2,032.46$420.00$420.00 $547.83 $547.83$400.00$400.00 $465.15$547.83866.36$ 84.91% 53.69%48 635-2-11 Pull & Splice Box, F&I, 17" X 30" Cover Size EA 4 $708.80$2,835.20$575.86$2,303.44$640.00$2,560.00 $834.79 $3,339.16$700.00$2,800.00 $708.80$834.79689.86$ 84.91% 102.75%49 639-1-122 Electrical Power Service, F&I, Underground, Meter Purchased By Contractor AS 1 $1,640.00$1,640.00$4,742.40$4,742.40$1,480.00$1,480.00 $1,930.46 $1,930.46$2,200.00$2,200.00 $1,640.00$1,930.462,448.22$ 84.95% 66.99%50 639-2-1 Electrical Service Wire, Furnish & Install LF 40 $6.00$240.00$3.05$122.00$5.40$216.00 $7.04 $281.60$6.00$240.00 $6.00$7.045.37$ 85.23% 111.68%51 639-2-6 Electrical Service Wire, Remove LF 60 $1.55$93.00$0.68$40.80$1.40$84.00 $1.83 $109.80$1.00$60.00 $1.55$1.831.37$ 84.70% 113.55%52 641-2-12 Prestressed Concrete Pole, F&I, Type P-Ii Service Pole EA 1 $2,000.00$2,000.00$1,083.98$1,083.98$1,810.00$1,810.00 $2,360.90 $2,360.90$1,400.00$1,400.00 $2,000.00$2,360.901,813.72$ 84.71% 110.27%53 641-2-60 Prestressed Concrete Pole, Complete Pole Removal- Pedestal/Service Pole EA 1 $465.15$465.15$169.37$169.37$420.00$420.00 $547.83 $547.83$1,000.00$1,000.00 $465.15$547.83400.59$ 84.91% 116.12%54 646-1-11 Aluminum Signals Pole, Pedestal EA 2 $1,850.00$3,700.00$1,219.47$2,438.94$1,670.00$3,340.00 $2,178.29 $4,356.58$1,400.00$2,800.00 $1,850.00$2,178.291,729.44$ 84.93% 106.97%55 646-1-60 Aluminum Signals Pole, Remove EA 1 $310.00$310.00$203.25$203.25$280.00$280.00 $365.22 $365.22$250.00$250.00 $310.00$365.22289.62$ 84.88% 107.04%56 653- 1-11 Pedestrian Signal, Furnish & Install Led Countdown, 1 Way AS 2 $1,020.00$2,040.00$677.49$1,354.98$920.00$1,840.00 $1,200.02 $2,400.04$900.00$1,800.00 $1,020.00$1,200.02954.38$ 85.00% 106.88%57 665-1-11 Pedestrian Detector, Furnish & Install, Standard EA 2 $310.00$620.00$270.99$541.98$280.00$560.00 $365.22 $730.44$300.00$600.00 $310.00$365.22306.55$ 84.88% 101.12%58 670-5-400 Traffic Controller Assembly, Modify AS 1.00 $3,765.00$3,765.00$2,709.94$2,709.94$3,400.00$3,400.00 $4,434.84 $4,434.84$500.00$500.00 $3,765.00$4,434.843,577.45$ 84.90% 105.24%SUBTOTAL (ROADWAY SIGNALIZATION ONLY)$23,408.75 $24,896.47 $21,230.00 $27,691.80$17,880.00CONTINGENGYLS 1 $55,000.00$55,000.00 $55,000.00 $55,000.00 $55,000.00 $55,000.00 $55,000.00 $55,000.00$55,000.00GRAND TOTAL $518,443.49 $533,836.00 $619,825.76 $716,714.01 $497,933.9216.A.12.bPacket Pg. 348Attachment: PHASE 2- BID ANALYSIS (002) (6595 : Airport NB Right at Davis (Phase2))