Agenda 10/09/2018 Item #16A 910/09/2018 EXECUTIVE SUMMARY Recommendation to approve Change Order No. 1 for Johnson Engineering, Inc., for the “Sunshine Blvd. from 17th Ave. SW to Green Boulevard” LAP project, for the design of sidewalk and pedestrian bridge improvements in the amount of $27,604 (Project No. 33505). OBJECTIVE: To approve Change Order No. 1 to Johnson Engineering in the amount of $27,604, needed to cover the cost of a bridge hydraulic recommendation analysis for the pedestrian bridge, consisting of a bridge hydraulic and scour analysis report and a canal topographic survey. Additional time of 150 days is proposed to allow the consultant to assist, perform the analysis, certify and closeout the LAP design project, and will also allow review time for FDOT. CONSIDERATION: The proposed pedestrian bridge involves the re-use of an existing 3-span prefabricated steel truss bridge taken from a previous pedestrian bridge location on Vanderbilt Drive. The original scoping of the pedestrian bridge design work anticipated that the longer bridge center span would be located outside the top of the canal opening. During the 60% design review phase, FDOT provided comments requesting assurance that no adverse impact will be created by the proposed bridge in terms of water surface rise and anticipated scour which requires a bridge hydraulic analysis to be performed. Furthermore, an existing SFWMD and County canal maintenance ramp is present at the proposed location which will be eliminated because of this pedestrian bridge. To address any future road improvements and current sight distance concerns, the proposed bridge alignment will result in the bridge support pilings installed on the slopes of the Green Canal within the high-water level elevation. On March 28, 2017 (Agenda item 16A2), the Board of County Commissioners (Board) approved a contract with Johnson Engineering, Inc., for Engineering and Design Services for LAP funded projects. This project has two components, a sidewalk and a pedestrian bridge. The County issued the purchase order for that work on October 19, 2017. As stipulated in contract number 15-6471, Exhibit IV, Section 8, work order assignments more than $200,000 shall be approved by the Board of County Commissioners. Change Order No. 1 increases the project cost by $27,604, or 15% percent of the original total of $184,124, for a new total of $211,728. FISCAL IMPACT: The total increase to the award amount is $27,604 for a new total work order award of $211,728.00. Funding is currently available within the Growth Management Transportation Capital Fund 310. A budget amendment is necessary to appropriate funds for the project. Source of funds is Transportation Capital Fund 310. GROWTH MANAGEMENT IMPACT: This project is consistent with the Transportation Element of the Growth Management Plan. LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote for Board approval. -SRT RECOMMENDATION: To approve Change Order No. 1 to Work Order No. 4500182655 for the “Sunshine Blvd. from 17th Ave. SW to Green Boulevard” LAP project awarded to Johnson Engineering, Inc., which increases contract time by 150 days and the contract amount by $27,604, for a revised total contract amount of $211,728; authorize the Chairman to sign the attached Change Order; and authorize any, and all, budget amendments that may be required to carry out the collective will of the Board. Prepared by: Chad Sweet, P.E., Senior Project Manager, Transportation Engineering Division, Growth Management Department 16.A.9 Packet Pg. 289 10/09/2018 ATTACHMENT(S) 1. Concept Plans - Sunshine Sidewalk and Ped. Bridge (PDF) 2. C.O#1 - Work Order 15-6471 (PDF) 16.A.9 Packet Pg. 290 10/09/2018 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.9 Doc ID: 6504 Item Summary: Recommendation to approve Change Order No. 1 for Johnson Engineering, Inc., for the “Sunshine Blvd. from 17th Ave. SW to Green Boulevard” LAP project, for the design of sidewalk and pedestrian bridge improvements in the amount of $27,604 (Project No. 33505). Meeting Date: 10/09/2018 Prepared by: Title: Sr. Project Manager – Transportation Engineering Name: Chad Sweet 08/22/2018 3:06 PM Submitted by: Title: Division Director - Transportation Eng – Transportation Engineering Name: Jay Ahmad 08/22/2018 3:06 PM Approved By: Review: Procurement Services Opal Vann Level 1 Purchasing Gatekeeper Completed 08/22/2018 3:15 PM Transportation Engineering Anthony Khawaja Additional Reviewer Completed 08/22/2018 3:17 PM Procurement Services Sara Schneeberger Additional Reviewer Completed 08/23/2018 8:57 AM Capital Project Planning, Impact Fees, and Program Management Rookmin Nauth Additional Reviewer Completed 08/23/2018 9:29 AM Growth Management Department Gene Shue Additional Reviewer Completed 08/23/2018 3:56 PM Growth Management Department Diane Lynch Level 1 Reviewer Completed 08/24/2018 1:09 PM Procurement Services Ted Coyman Additional Reviewer Completed 08/29/2018 2:33 PM Growth Management Operations Support Christopher Johnson Additional Reviewer Completed 09/06/2018 7:58 AM Growth Management Department James C French Deputy Department Head Review Skipped 09/06/2018 10:09 PM Growth Management Department Thaddeus Cohen Department Head Review Completed 09/11/2018 2:16 PM Grants Erica Robinson Level 2 Grants Review Completed 09/19/2018 3:33 PM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 09/20/2018 1:23 PM County Attorney's Office Scott Teach Additional Reviewer Completed 09/24/2018 10:07 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 09/26/2018 10:54 AM Office of Management and Budget Susan Usher Additional Reviewer Completed 09/27/2018 9:56 AM Grants Therese Stanley Additional Reviewer Completed 09/28/2018 3:23 PM 16.A.9 Packet Pg. 291 10/09/2018 County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 09/30/2018 11:33 AM Board of County Commissioners MaryJo Brock Meeting Pending 10/09/2018 9:00 AM 16.A.9 Packet Pg. 292 16.A.9.aPacket Pg. 293Attachment: Concept Plans - Sunshine Sidewalk and Ped. Bridge (6504 : C.O.#1 for Sunshine Blvd. from 17th Ave. SW to Green Blvd.) 16.A.9.aPacket Pg. 294Attachment: Concept Plans - Sunshine Sidewalk and Ped. Bridge (6504 : C.O.#1 for Sunshine Blvd. from 17th Ave. SW to Green Blvd.) 16.A.9.aPacket Pg. 295Attachment: Concept Plans - Sunshine Sidewalk and Ped. Bridge (6504 : C.O.#1 for Sunshine Blvd. from 17th Ave. SW to Green Blvd.) 16.A.9.aPacket Pg. 296Attachment: Concept Plans - Sunshine Sidewalk and Ped. Bridge (6504 : C.O.#1 for Sunshine Blvd. from 17th Ave. SW to Green Blvd.) 16.A.9.c Packet Pg. 297 Attachment: C.O#1 - Work Order 15-6471 (6504 : C.O.#1 for Sunshine Blvd. from 17th Ave. SW to Green Blvd.) 16.A.9.c Packet Pg. 298 Attachment: C.O#1 - Work Order 15-6471 (6504 : C.O.#1 for Sunshine Blvd. from 17th Ave. SW to Green Blvd.) 16.A.9.c Packet Pg. 299 Attachment: C.O#1 - Work Order 15-6471 (6504 : C.O.#1 for Sunshine Blvd. from 17th Ave. SW to Green Blvd.) 16.A.9.c Packet Pg. 300 Attachment: C.O#1 - Work Order 15-6471 (6504 : C.O.#1 for Sunshine Blvd. from 17th Ave. SW to Green Blvd.) 16.A.9.c Packet Pg. 301 Attachment: C.O#1 - Work Order 15-6471 (6504 : C.O.#1 for Sunshine Blvd. from 17th Ave. SW to Green Blvd.) 16.A.9.c Packet Pg. 302 Attachment: C.O#1 - Work Order 15-6471 (6504 : C.O.#1 for Sunshine Blvd. from 17th Ave. SW to Green Blvd.) 16.A.9.c Packet Pg. 303 Attachment: C.O#1 - Work Order 15-6471 (6504 : C.O.#1 for Sunshine Blvd. from 17th Ave. SW to Green Blvd.) 16.A.9.c Packet Pg. 304 Attachment: C.O#1 - Work Order 15-6471 (6504 : C.O.#1 for Sunshine Blvd. from 17th Ave. SW to Green Blvd.)