Loading...
Agenda 02/28/2012 Item #11G2/28/2012 Item 11.G. EXECUTIVE SUMMARY Recommendation to adopt a resolution authorizing the condemnation of a Road Right -of -Way, Drainage and Utility Easement necessary for the construction of intersection improvements at 18th Avenue NE and Everglades Boulevard. Transportation Intersection Safety and Capacity Improvement Program (Project No. 60016). Estimated fiscal impact: $14,000.00. OBJECTIVE: To authorize the condemnation of a Road Right -of -Way, Drainage and Utility Easement necessary for the construction of improvements at the intersection of Everglades Boulevard and 18"' Avenue NE. CONSIDERATIONS: A Road Right -of -Way, Drainage and Utility Easement is needed for the construction of a wider pavement edge turning radius at the southeast corner of the intersection of 18th Avenue NE and Everglades Boulevard, so that school buses and larger vehicles making the northbound -to- eastbound right turn from Everglades Boulevard onto 18th Avenue NE are able to stay completely within the proper lane all the way through the turning movement. The owner of the property from which the easement is required has demonstrated an unwillingness to negotiate for the sale of the easement to the County ever since he learned that his lender might take all the proceeds from the sale, as is the lender's right under the terms of the mortgage. Therefore, taking the easement, using the County's power of eminent domain in accordance with the provisions of Chapters 73, 74 and 127, Florida Statutes, will be necessary for the construction of the proposed improvements. The Board is herewith being advised of the various factors considered by its professional engineering staff, which include the environmental impacts, costs, public health, safety and welfare considerations, and the long -range planning needs and impacts. In this regard the Board is referred to the attached technical memorandum prepared by Julio Ordonez, P.E., Traffic Operations Section of the Transportation Engineering Department of the Growth Management Division. By its review, concurrence and approval of this executive summary, the back -up documentation, and the proposed resolution, the Board will have determined that the Road Right -of -Way, Drainage and Utility Easement legal description (attached to the Resolution as Exhibit "A ") is required for the construction of the proposed improvements; and that it is necessary and in the public's best interest to take the easement through the County's power of eminent domain. FISCAL IMPACT: Should negotiations with the property owner fail to yield a settlement, and condemnation of the subject easement become necessary, the total costs are estimated not to exceed $14,000.00, which will come from the Transportation Supported Gas Tax fund. This amount includes not just the direct cost of the easement itself, it also includes all expenses for title work, real estate appraisals, filing fees, and those expenses, such as property owner attorney fees and expert witness fees, which the County is required to pay under the provisions of Sections 73.091 and 73.092, F.S. GROWTH MANAGEMENT IMPACT: As part of the County's proposed 5 year transportation work program, the Transportation Intersection Safety and Capacity Improvement Program is an integral part of Collier County's Growth Management Plan. LEGAL CONSIDERATIONS: A duly noticed public hearing is needed to acquire property by condemnation. A majority vote is needed for approval. - HFAC RECOMMENDATION: That the Board of County Commissioners of Collier County, Florida: 1. Adopt the attached Resolution; 2. Authorize its Chairman to execute same on behalf of the Board; and 3. Authorize any budget amendments that may be necessary to implement the collective will of the Board as evidenced by the adoption of the attached Resolution and the approval of this Executive Summary. Packet Page -616- 2/28/2012 Item 11.G. Prepared by: Kevin Hendricks, Right -of -Way Acquisition Manager, Transportation Engineering Department Attachments: (1) Condemnation Resolution with Exhibit "A "; (2) Technical memorandum from Julio Ordonez, P.E.; and (3) Vicinity Map. Packet Page -617- 2/28/2012 Item 11.G. COLLIER COUNTY Board of County Commissioners Item Number: 11.G. Item Summary: Recommendation to adopt a resolution authorizing the condemnation of a Road Right -of -Way, Drainage and Utility Easement necessary for the construction of intersection improvements at 18th Avenue NE and Everglades Boulevard. Transportation Intersection Safety and Capacity Improvement Program (Project No. 60016). Estimated fiscal impact: $14,000. Meeting Date: 2/28/2012 Prepared By Name: BoschRobert Title: Right Of Way Coordinator,Transportation Engineerin 2/14/2012 10:06:26 AM Approved By Name: CalvertEugene Title: Project Manager, Principal,Transportation Engineering & Construction Management Date: 2/14/2012 2:27:35 PM Name: OrdonezJulio Title: Project Manager, Principal,Transportation Engineer Date: 2/14/2012 3:45:43 PM Name: NauthRookmin Title: Management/Budget Analyst,Transportation Administr Date: 2/15/2012 7:47:40 AM Name: BetancurNatali Title: Executive Secretary,Transportation Engineering & C Date: 2/15/2012 9:53:53 AM Name: TaylorLisa Title: Management/Budget Analyst,Transportation Administr Date: 2/15/2012 10:15:24 AM Name: GossardTravis Packet Page -618- 2/28/2012 Item 11.G. Title: Superintedent - Roads & Bridges,Transportation Eng Date: 2/15/2012 3:34:04 PM Name: HendricksKevin Title: Manager - Right of Way,Transportation Engineering Date: 2/16/2012 9:54:42 AM Name: AhmadJay Title: Director - Transportation Engineering,Transportation Engineering & Construction Management Date: 2/16/2012 11:35:01 AM Name: FederNorman Title: Administrator - Growth Management Div,Transportati Date: 2/16/2012 1:37:59 PM Name: AshtonHeidi Title: Section Chief/Land Use- Transportation,County Attor Date: 2/16/2012 3:31:18 PM Name: MarcellaJeanne Title: Executive Secretary,Transportation Planning Date: 2/17/2012 9:39:52 AM Name: KlatzkowJeff Title: County Attorney Date: 2/17/2012 3:56:11 PM Name: UsherSusan Title: Management/Budget Analyst, Senior,Office of Manage Date: 2/21/2012 12:00:12 PM Name: OchsLeo Title: County Manager Date: 2/21/2012 2:05:07 PM Packet Page -619- 2/28/2012 Item 11.G. RESOLUTION NO. 2012- A RESOLUTION AUTHORIZING THE CONDEMNATION OF A ROAD RIGHT -OF -WAY, DRAINAGE, AND UTILITY EASEMENT NECESSARY FOR THE CONSTRUCTION OF INTERSECTION IMTROVEMENTS AT 18TH AVENUE NE AND EVERGLADES BOULEVARD. (TRANSPORTATION INTERSECTION SAFETY AND CAPACITY IMPROVEMENT PROGRAM PROJECT NO. 60016.) WHEREAS, the acquisition of right -of -way for the construction of intersection improvements is included in Collier County's Five Year Transportation Work Program (Project No. 60016); and WHEREAS, school buses and larger vehicles making the northbound -to- eastbound right turn at the intersection of 18th Avenue NE and Everglades Boulevard require a larger pavement curve radius than presently exists in order to stay completely within the proper lane all the way through the turning movement; and WHEREAS, plans and specifications have been prepared for improvements to said intersection; and WHEREAS, construction of the proposed intersection improvements will require the acquisition of additional right -of -way at the southeast corner of said intersection; and WHEREAS, the location for the construction of the proposed improvements has been fixed by survey and is collectively represented by the legal description attached hereto as Exhibit "A" and which by reference is made a part hereof; and WHEREAS, after consideration of the availability of alternate routes and locations, the comparative costs of the project alternatives, various impacts upon the environment, long range planning options, and public safety considerations, the Board desires to exercise its right to condemn property for public purposes. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that it has been determined by the Board that the intersection improvements at referenced above at 186' Avenue NE and Everglades Boulevard (hereinafter referred to as "the Project "), being part of the Transportation Intersection Safety and Capacity Improvement Program (Project No. 60016), is necessary and in the public's best interest in order to protect the health, safety and welfare of the citizens of Collier County. AND IT IS FURTHER RESOLVED that the acquisition of the proposed easement described in Exhibit "A" for construction of the Project is an integral part of the County's long range planning effort, and is included in the Capital Improvement Element of the Collier County Growth Management Plan, as approved by the Florida Department of Community Affairs. Packet Page -620- 2/28/2012 Item 11.G. AND IT IS FURTHER RESOLVED that the Board has reviewed the technical memorandum discussing competing alternatives for construction of the Project, and the costs associated with the design, property rights acquisition, and construction of the Project, as well as public safety and welfare considerations associated with the design and construction of the Project, and various impacts to the environment, and the Board finds that after consideration of these issues, the most favorable alternative for construction of the proposed improvements requires the acquisition of the Road. Right -of -Way, Drainage and Utility easement described in Exhibit "A ", attached hereto and incorporated herein. AND IT IS FURTHER RESOLVED that the taking of the perpetual, non - exclusive Road Right -of -Way, Drainage and Utility Easement described in Exhibit "A" will provide County with the right to place and/or excavate materials for the purpose of constructing, operating, and maintaining roadway, bikepath and sidewalk improvements, drainage structures, including but not Iimited to ditches, swales, earthen berms, rip -rap and retaining wall systems, underground pipes, various types of water control structures and any and all manner of public and private utility facilities. AND IT IS FURTHER RESOLVED that all property shall be put to public purposes. AND IT IS FURTHER RESOLVED that the County staff and Office of the County Attorney are hereby authorized and directed to immediately acquire by gift; purchase or condemnation in accordance with the provisions of Chapters 73, 74 and 127, Florida Statutes, the easement more particularly described in Exhibit "A," attached hereto and incorporated herein. AND IT IS FURTHER RESOLVED that no mobile homes are located on the property sought to be acquired and therefore it will not be necessary to remove any mobile homes from the property to be acquired. This Resolution, adopted on this second and majority vote. ATTEST: DWIGHT E. BROCK, CLERIC , Deputy Clerk Approved as to form and legal sufficiency: Heidi. Ashton -Cicko Assistant County Attorney Section Chief, Land Use /Transportation day of 2012, after motion, BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA By: FRED W. COY, Chairman .Pawn I. Packet Page -621- 2/28/2012 Item 11.G. i EXHIBIT A LEGAL DESCRIPTION (PERPETUAL, NON - EXCLUSIVE ROAD RIGHT -OF -WAY, DRAINAGE AND UTILITY EASEMENT) COMMENCING AT THE NORTHWEST CORNER OF TRACT 2 OF GOLDEN GATE ESTATES UNIT 71 AS .RECORDED IN PLAT BOOK 5, PAGE 7 OF THE PUBLIC RECORDS OF COWER COUNTY, FLORIDA; THENCE RUN S89'40'50 "E ALONG .THE NORTH LINE OF SAID TRACT 2 A DISTANCE OF 50.00 FEET; THENCE DEPARTING SAID NORTH LINE, RUN SOO.19'WW A DISTANCE OF'30 00 FEET TO THE INTERSECTION OF THE EAST RIGHT —OF —WAY LINE OF EVERGLADES BOULEVARD WITH THE SOUTH i RIGHT —OF —WAY LINE OF 18TH AVENUE NORTHEAST AND THE POINT OF BEGINNING: THENCE RUN 589'40'50 "E ALONG SAID 1 SOUTH RIGHT —OF —WAY LINE OF 18TH AVENUE NORTHEAST A DISTANCE OF 33.00 FEET; THENCE DEPARTING SAID SOUTH RIGHT —OF —WAY LINE, RUN S45'19'10 "W A DISTANCE OF 46.67 FEET TO A POINT ON THE EAST RIGHT—OF—WAY .UNE OF EVERGLADES BOULEVARD; THENCE RUN N00'19'10 "E ALONG SAID EAST RIGHT —OF —WAY LINE A DISTANCE OF 31OO,FEET TO THE POINT OF BEGINNING. i CONTAINING THEREIN 0.013 ACRES OR 544.50 SQUARE FEET. j TECM - RO'' C DEC 0 6 2010 1 � ICI DE GAjCE STATES U IT O. 71 P.8 5.PAE7 SURVEYOR'S NOTES: I. THIS IS NOT A SURVEY. L. THIS DOCUMENT IS CERTIFIED EXCLUSIVELY TO THE ENTITIES LISTED HEREON AND SHALL NOT BE RELIED UPON BY ANY OTHER ENTITY OR ENTITIES WHOMSOEVER. S: REPRODUCTIONS OF THIS DOCUMENT ARE NOT VAUD UNLESS THEY BEAR THE ORIGINAL SIGNATURE AND RAISED EMBOSSED SEAL OF THE LICENSED LAND SURVEYOR UNDER WHOSE DIRECTION IT WAS PREPARED. BEARINGS SHOWN HEREON ARE BASED ON THE NORTH LINE OF TRACT 2 OF THE PLAT OF GOLDEN GATE ESTATES UNIT 71, RECORDED IN PLAT BOOK 5, PAGE 7 OF 114E PUBLIC RECORDS OF COLLIER COUNTY, FLORIDA AS BEARING S89'40'50 "E. CERTIFIED 70: COLLIER COUNTY BOARD OF COUNTY COMMONERS o- !NT OF. COMMENCEMENT. i fIf JT OF BEGINNING 1. LINE TABLE. L1 S89'40'50 "E 50.00' L2 S00"19'10 "W 30;00' L3 589'40'50 "E 33:00' ! L4 $45'19'10 "W 46.67' L5 N00'19'10 "E 33.00' f f i DEAN R. DATE HOARD OF ER COUNTY cowasSI0NIM LTION >SWMC68 DfVfmx d'IEIPANCE ' VWARnnw 11xx MWAMIRFS =a" DRD DATE: SCALE: RA^f°.'+sarM'L 04104 lagoa:ser -aide oRD 12 -02 -10 SKETCH AND DESCRIPTION SHEET 1 " = 100' EVBRGIADE9 BLVD. k 15M AT= N.E. ADD1iIONAL T EH noasoo oAOS R/TI POR ffnMSEC= OQ1lt0Y8'NE'Im OF RAS 32..48 „28 "0 10090_ N A A PARCEL 215 RDUE 1 Packet Page -622- 2/28/2012 Item 11.G. EVERGLADES BOULEVARD INTERSECTION IMPROVEMENTS AT 18th AVENUE N.E. COLLIER COUNTY PROJECT NUMBER 60016 TECHNICAL MEMORANDUM Prepared for: COLLIER COUNTY TRANSPORTATION ENGINEERING DEPARTMENT Right -of -Way Acquisition Section 2885 South Horseshoe Drive Naples, Florida 34104 Prepared by: Julio F. Ord6iiez, P.E. Traffic Engineering Section 2885 South Horseshoe Drive Naples, Florida 34104 March 21, 2011 Revised on January 7, 2012 Everglades Boulevard Intersection Improvements at 18th Avenue N.E. Packet Page -623- 2/28/2012 Item 11.G. TABLE OF CONTENTS 1.0 INTRODUCTION .................................................................................................................. ............................... 3 2.0 PROJECT DESCRIPTION .................................................................................................... ..............................3 3.0 NEED FOR IMPROVEMENTS ............................................................................................ ..............................3 4.0 EXISTING CONDITIONS ..................................................................................................... ..............................3 4.1 ROADWAYS ................................................................................................................................ ..............................3 4.2 RIGHT-OF- WAY ........................................................................................................................... ..............................3 4.3 UTILITIES .................................................................................................................................... ..............................4 4.4 TRAFFIC SIGNALS ....................................................................................................................... ..............................4 5.0 EVALUATION FACTORS .................................................................................................... ..............................4 5.1 ALTERNATIVE ALIGNMENTS ....................................................................................................... ..............................4 5.2 PUBLIC SAFETY ......................................................................................................................... ............................... 5 5.3 LONG RANGE PLANNING ........................................................................................................... ............................... 5 5.4 ENVIRONMENTAL IMPACT ......................................................................................................... ............................... 5 5.5 COSTS ......................................................................................................................................... ..............................5 6.0 SUMMARY OF POPOSED IMPROVEMENTS ................................................................. ..............................6 LIST OF FIGURES FIGURE 1 -1 Project Limits FIGURE 1 -2 Project Location Map FIGURE 4 -1 Existing Conditions FIGURE 4 Intersection Improvements, Alternative 1 FIGURE 5 Intersection Improvements, Alternative 2 FIGURE 6 Existing Conditions Auto Turn Analysis FIGURE 7 Intersection Improvements, Alternative 1 Auto Turn Analysis FIGURE 8 Intersection Improvements, Alternative 2 Auto Turn Analysis LIST OF TABLES TABLE 1 Alternative 1 Cost Estimate TABLE 2 Alternative 2 Cost Estimate 2 Packet Page -624- 2/28/2012 Item 11.G. 1.0 INTRODUCTION Collier County is undertaking intersection improvements on Everglades Boulevard at 18a' Avenue N.E. intersection. The project is located in the eastern part of the county, as shown in Figure 1. The specific purpose of the project is to improve safety and enhance capacity at the existing intersection within the limits shown in Figure 2. 2.0 PROJECT DESCRIPTION The Collier County Transportation Engineering Department proposes minor intersection improvements on Everglades Boulevard at 18�' Avenue N.E. Ultimate improvements for this corridor are projected to take place beyond the 2035 long range plan. The intent of the project is to improvement the radii at the northeast and southeast corners of the Everglades Boulevard/18t' Avenue N.E. intersection. These minor and cost effective improvements will allow school buses and other larger vehicles to make better and safer turns as shown in Figures 4 and 6. 3.0 NEED FOR IMPROVEMENTS This project is being developed to accommodate the school buses and other larger vehicles for right turn movements on the northbound approach of Everglades Boulevard at the 18th Avenue N.E. intersection. Additional right -of -way must be acquired on land parcels at the southeast and northeast corners of the Everglades Boulevard/18'b Avenue N.E. intersection to be able to construct the improvements. The parcel at the northeast corner is desirable to improve visibility at the intersection, so it should be acquired only if the property owner is willing to work with the County. The parcel at the southeast corner is necessary to improve the intersection geometry to facilitate turning maneuvers, so it must be acquired via condemnation if needed. 4.0 EXISTING CONDITIONS 4.1 Roadways Everglades Boulevard is a two -lane two -way arterial road with a dedicated northbound right turn lane and southbound left turn lane at the 18th Avenue N.E. intersection. 18th Avenue N.E. is a two -lane two -way collector road with a dedicated westbound left turn lane at the intersection with Everglades Boulevard (Figure 4 -1). 4.2 Right -of -way The existing right -of -way on Everglades Boulevard is 100', with the existing roadway centered in the eastern half of the easement. On 18th Avenue N.E., the existing right -of -way is 60', with the existing roadway centered on the easement. All of the existing right -of -way within the project limits is cleared and maintained by Collier County periodically. ki Packet Page -625- 2/28/2012 Item 11.G. 4.3 Utilities The existing power lines (FPL) on Everglades Boulevard are located along the east right -of- way line and on 18th Avenue ME along the south right -of -way line. Telephone lines (Century Link) follow the same location and Cable TV lines (Comcast) are attached to the power poles. An existing power pole located at southeast corner of the intersection precludes the construction of a larger radius for the turns. 4.4 Traffic Signals This intersection is currently signalized, with the system operating during school hours and on flashing mode the rest of the day. Existing traffic signal poles are located at the southwest and northeast corners of the Everglades Boulevard/18t' Avenue N.E. intersection. 5.0 EVALUATION FACTORS The following factors were considered during the evaluation of the project to be completed: 5.1 Alternative Alignments Basically three conditions were considered during the evaluation of the project: • Existing alignment without any improvements (Figure 3). • Alternative 1: Improvements to the southeast and north east corners - existing alignment with improvements at the southeast and northeast corners of the intersection. This alternative consists on improving the return radii at the southeast and the northeast corners of the intersection, as shown in Figure 4. With this alternative, right -of -way acquisition is required. Corner clip parcels will be needed to accommodate the proposed improvements. The existing power pole could be relocated to provide more room for the construction a larger turning radius for the northbound right turn lane at the southeast corner. The existing signal pole could also be relocated to provide more and safer utility clearance, providing for improved sight distance at the northeast corner. A SFWMD permit will not be required. The limits of the project will be localized and confined to the southeast and the northeast comers of the intersection. The cost of the project is minimal compared with the added benefits (see section 5.5 below). Alternative 2: Improvements to shift the intersection westward New alignment on Everglades Boulevard to avoid improvements at southeast corner of the intersection. This alternative consists on improving the entire intersection by shifting it approximately 17' to the west of its current location, as shown in Figures 5A and 5B. With this alternative, neither right -of -way acquisition nor utility relocations will be needed. The shifting of the entire intersection will take place in a fully cleared and maintained right - 4 Packet Page -626- 2/28/2012 Item 11.G. of -way on Everglades Boulevard, thus having negligibly environmental and drainage impacts. A SFWMD permit will be more likely required. The limits of the project will be increased to more than 1,000 feet north and south of the intersection. These improvements are shown in Figure 5 -4. The cost of this alternative is very high compared with the added benefits (see section 5.5 below). 5.2 Public Safety Construction of the improvements at the Everglades Boulevard/18t' Avenue N.E. intersection will improve the turning of school buses and other larger vehicles at this location. The larger radius at the southeast corner of the intersection will provide for better right turn movements on the northbound approach and better vehicular operations, enhancing the capacity of the facility. Pedestrian and bicycle facilities are none existing within the project limits. 5.3 Long Range Planning The Collier County Transportation Planning Department identifies improvements to the Everglades Boulevard corridor from I -75 to Golden Gate Boulevard in its 2035 Long Range Transportation Plan; improvements from Golden Gate Boulevard to Randall Boulevard are identified to take place outside this plan, beyond the 2035 planning window. The Everglades Boulevard at 18a' Avenue N.E. intersection is included within this corridor, construction of the ultimate improvements will take many years before any construction gets done at this location. 5.4 Environmental Impact No significant environmental impacts were found at the intersection of Everglades Boulevard and 18'b Avenue N.E. with any of the alignment alternatives reviewed in 5.1 above. Alternative 1 considers improvements at the southeast and northeast corners in fairly small property parcels that will have no significant impacts to the environment or the drainage of patterns in the area. Alternative 2 considers improvements to the entire right -of- way corridor on Everglades Boulevard, which is currently cleared and maintained by the County; still, a SFWMD permit is very likely to be required because of the size of the proj ect. 5.5 Costs The following are the costs estimated for the alignment alternatives reviewed in 5.1 above: • Existing alignment without any improvements: $0.00 • Existing alignment w /improvements at the SE corner, Alternative 1: $30,000.00 (Table 1). • New alignment on Everglades Boulevard at the SE corner, Alternative 2: $660,000.00 (Table 2). 5 Packet Page -627- 2/28/2012 Item 11.G. 6.0 SUMMARY OF PROPOSED IMPROVEMENTS Improvements to the intersection of Everglades Boulevard at 18th Avenue N.E. can be accomplished in a very quick and cost effective manner by implementing Alternative 1. The cost of the improvements at the southeast is significantly lower than Alternative 2, which requires the shifting of the entire roadway on Everglades Boulevard. Alternative 1 is recommended for implementation. 6 Packet Page -628- T� f�* + .:A�ietj,R�:j `�.` tk E'er ". �r� , } �... "'# ,�,�. 'r't i� r�"'�" �• £ »+• •' •., ,i '�ia. � t y t c 4 " r x Std � � w: d '°"".'°`,.., t :i t t � :a a � 1 1 'ri � �iP. 'k.F .�:; eta `°.... 4 ''k � ,y+r Y� �it� '4 +�41" �4,t;�•d`�, t 11rr y x '`� s,.- 9 ' _ � ' � $ `# � � '.< r § � �t �•Y 1 �. �° 7t 4,�- -3 # F� •+k1: ,4 , i LN ���t . .R, �'+..;a" 'i fi 4 �• yJ t t. Y '� ,,? 3 � .i f t 5.. .� .- �*-�:, } #, .`r`a'h r j Pti��x` rlf e�x�.0 e.;• P 3`� .+f �� � t t xf? a a Fi '�`^r �F M.� ' � r f� , , , 4 �4A� , K {��.. .��i, a , ..< a`v'F' o .,.E �, a Syr ."�a'��+c :4,y .. - } i - _ } �• i �. E t i a e _ i �VF� d 4N i 4 r '.� �., ��� � [[ ' a , � : �7Y � b 4. rx.Y'a4t' � •.. M�' ! �' i -"^ # Te �.:' .W n•. - i9}g ` k, y 7 y� dPsnrt„y.p +7 -' A+ Y• ^ .�i P '' 1 d J. r . •a 4 K s. .. .. �j,�'^� .Sy �' Y.'.A�` �• r +r x� F< i lam' S+� "� • i" r t ° + , . {s d •- t r!>ar' ,{4 L,y1� "S ��,E?" : Q A 3 �, • • - r ;SiF" i,rT T 2.. ti i 9:(� *• P t 1 6 6 -�. r '�A$ a• , ..,.„� • Ei.i°^`l" a, C;�'x ' i f i°:b '"7'% "P' } F a. � s. � � �,-iF rra'.n' - ._ ....._. �� '. 'GT1 � }' R, •� �1 I n ��t6. 3�r rY` x t:$ =y,✓,. <�� y? '��#�i,�� � � 'A F 4�� b i_ ,' {�5y. . %... � E._. R •'.�� � �3 �` � a� �L t s i } y 'T -.. •L" f K �Y��� 1 � Ord "1� ���tL � a ^f '�} 4' �'� 'fit .. i - t �( s eft ' 7 "}' : r ar. '�•'% ° .. .� r ;° . "r 4 3p i' „�, `' .y�'' t ""#*'s "'' •:iti E' is a 9 �� ;..�� ..,�:. � •t:. s� �:� sra ^`�°.,�r i .. ,,� xi:: � a,. 2�{. a x �. ',.�. �„ r { ` ^� i ■ :. {s �4w + aff get �� OW F All Sri .,.: ow . 09", r % a ��>'�� -a�*'F ��.�=x'rf.. .� � 3i. k r,'. .,� 3 s.'�i I � .•,,, Fw T ..�� �}'#^' � ;'t£gY., '� L tt y' a ,, ."x y�p,-,411��"Rt' 1• fix. ,,( &p 4 it' #�yt' 9iy. a��.(i p V. ,,tri s-A ` Vv tE f_7 Y a r:'. ,�"�„ Ei c�, L ,i3 �':xz d t ``� r`;:. ^ "�� �r ^ "t!�j�'iyry' �<+ y" �R t !. � R,�•%R, ^ ' R. r�, $1i sG;i �. _G:.+A ^y Y Jk §I: r�Y d ,{ 4. �" ` Y�y "�, x� '$* . „ � �W 1 •£' .3� .Yep.. y9,., -x t€ ::'' #'�T w` k'A�' ✓. �,d..1v.Y '.a" "��-.. - t M' a a �` s t- ,s•.c �. ,� � �:5is t:.� _ .,- :x.sx'^.a-v�t �. .., -?r . >;�- . . -_.� _� _ ?�".. •�.._. ;t"�i:::.. x.,. Mme.+`: �Y,�e�'x'',;�;p n*�'Y�',.�5,�. ^i+:l ^�..s.- .R. �?E.�� .e. f' .v «5,. w .,: mot. t. ,•, x 4 itx t V EFS.i �}'u�e'A +P`.:t"" r a, iR q•t (m. A ,g.`+CaU�' `w- .:+4!, r �9$ •! &4 �' �b+ �wh�r -• r.:. �" �T�5... �' yy. ,�1[ * ;�Y f.CV$J v 'g�+�r !_iY ��y #�a($e'gr� k . VON '�','iR_,/ -'�_ A''.F'S saZ a°v )I'#•�' Y r! a F� +� i f • �P y .,aF Gpai�Y "21- �, ^ .0rucal (,i EXIST. CURB AND EXIST. POWER EVERGLADES BOULEVARD INTERSECTION IMPROVEMENTS AT 18th AVENTTF M F Packet Page -631- FIGURE 3 EXISTING CONDITIONS AVE I'A I(TO 2 EVERGLADES BOULEVARD FIGURE 4 INTERSECTION IMPROVFMF.NT.S INTERSECTION IMPROVEMENTS — ALTERNATIVE 1 AT 18th AVENU Packet Page -632- 1 IMPROVEMENTS AT N.E. & S.E. CORNER ONLY I G1Tmsponainn ErgnxrnplDasq xmwOAGWAr PgOJECryryAyrseclmsln't 11EVEgGLADES 6l I1A71B AVENUE 1-1. 1VRM--S AL EqN 1—,p 1vx9rzu11116— EVERGLADES BOULEVARD FIGURE 5A INTERSECTION IMPROVEMENTS INTERSECTION IMPROVEMENTS - ALTERNATIVE 2 AT 18th AVENUE N.E. SHIFTED INTERSECTION IMPROVEMENTS Packet Page -633- W w 00 EVERGLADES BOULEVARD INTERSECTION IMPROVEMENTS AT 18th AVENUE 1\T v Packet Page -634- GLADES BOULEVARD LEGEND ® PAVEMENT WIDENING ® PAVEMENT REMOVAL E3 MILLING do RESURF. FIGURE 5B INTERSECTION IMPROVEMENTS - ALTERNATIVE 2 OVERALL LIMIT OF IMPROVEMENTS EVERGLADES BOULEVARD FIGURE 6 INTERSECTION IMPROVEMENTS AUTO TURN ANALYSIS - EXISTING CONDITIONS AT 18th AVENUE' rT P Packet Page -635- raLr,eL rage -030- 8 EVERGLADES BOULEVARD FIGURE 8 INTERSECTION IMPROVEMENTS AUTO TURN ANALYSIS - ALTERNATIVE 2 AT 18th AVENUE N F SHIFTED INTERSECTION IMPROVEMENTS Packet Page -637- 2/28/2012 Item 11.G. EVERGLADES BOULEVAR AT 18th AVENUE N.E. INTERSECTION IMPROVEMENTS COLLIER COUNTY PROJECT No. 60016 TABLE I CONCEPTUAL COST ESTIMATE - OPTION 1 IMPROVEMENTS AT THE SOUTHEAST AND NORTHEAST CORNERS DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT MOBILIZATION LS 1 $3,000.00 $3,000.00 MAINTENANCE OF TRAFFIC LS 1 $1,500.00 $1,500.00 STAKED SILT FENCE (TYPE III) LF 100 $1.501 $150.00 STANDARD CLEARING & GRUBBING LS 1 $2,000.00 $2,000.00 EXCAVATION CY 100 $30.00 $3,000.00 EMBANKMENT CY 100 $50.00 $5,000.00 OPTIONAL BASE GROUP 15 (9" THICK) SY 50 $20.00 $1,000.00 ASPHALTIC CONC. TYPE SP -9.5 TN 50 $75.00 $3,750.00 ASPHALTIC CONC. TYPE SP -12.5 TN 50 $75.00 $3,750.00 CURB & GUTTER, TYPE "F" LF 75 $15.00 $1,125.00 SODDING (BAHIA) SY 200 $5.00 $1,000.00 SIGN (SINGLE POST) AS 2 $200.00 $400.00 RELOCATE SIGN (SINGLE POST) AS 2 $150.00 $300.00 TRAFFIC STRIPE, SOLID, THERMO. (6" WHITE) LF 75 $0.50 $37.50 TRAFFIC STRIPE, SOLID, THERMO. (24" WHITE) LF 12 $3.00 $36.00 SUB - TOTAL: $26,048.5 0 15% CONTINGENCY: $3,907.28 TOTAL: $29,955.7 8 1/20/2012 Prepared by: Tr Packet Page -638- ons Department 2/28/2012 Item 11.G. EVERGLADES BOULEVAR AT 18th AVENUE N.E. INTERSECTION IMPROVEMENTS COLLIER COUNTY PROJECT No. 60016 TABLE 2 CONCEPTUAL COST ESTIMATE - OPTION 2 OVERALL INTERSECTION IMPROVEMENTS DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT MOBILIZATION LS 1 $35,000.00 $35,000.00 MAINTENANCE OF TRAFFIC LS 1 $50,000.00 $50,000.00 STAKED SILT FENCE (TYPE III) LF 4,000 $1.50 $6,000.00 STANDARD CLEARING & GRUBBING LS 1 $30,000.00 $30,000.00 EXCAVATION CY 2,000 $10.00 $20,000.00 EMBANKMENT CY 3,000 $15.00 $45,000.00 OPTIONAL BASE GROUP 15 (9" THICK) SY 2,250 $20.00 $45,000.00 REMOVAL OF EXIST. ASPHALT PAVEMENT SY 2,000 $2.00 $4,000.00 MILLING EXIST. ASPHALT PAVEMENT (1" AVG.) SY 6,000 $2.00 $12,000.00 ASPHALTIC CONC. TYPE SP -9.5 TN 600 $75.00 $45,000.00 ASPHALTIC CONC. TYPE SP -12.5 TN 2,500 $75.00 $187,500.00 CONCRETE DRIVEWAY W /CULVERTS & M.E.S. EA 8 $8,000.00 $64,000.00 SODDING (BAHIA) SY 10,000 $2.00 $20,000.00 SIGN (SINGLE POST) AS 10 $200.00 $2,000.00 RELOCATE SIGN (SINGLE POST) AS 10 $150.00 $1,500.00 REFLECTIVE PAVEMENT MARKERS EA 121 $5.00 $605.00 TRAFFIC STRIPE, SOLID, THERMO. (6" WHITE) LF 8,000 $0.50 $4,000.00 TRAFFIC STRIPE, SOLID, THERMO. (24" WHITE) LF 72 $3.00 $216.00 TRAFFIC STRIPE, SOLID, THERMO. (6" YELLOW) LF 4,000 $0.50 $2,000.00 SUB - TOTAL: $573,821.00 15% CONTINGENCY: $86,073.15 TOTAL: $659,894.15 1/20/2012 Prepared by: Tr Packet Page -639- ons Department �z Lu W 1ht a 'LW i� O >i d 7� z a r GOL[ i 2/28/2012 Item 11.G. VICINITY MAP 4 I v Z-0 I I I —% • 27TH .AVE NE 1 N 25TH AUC NN! 25TH AWE N E 8v1M(74L4'��c Rfl -. RANDALLELVD Nr-- 24TH AVE NW � J ^47H AVE NE O 247HAVEtJE z'�TH ?l +ENE N 22N DAVE NW p 22 F7DAAVE NE 2 —AVE NE jllj --ND AVE NE n 207H AVE NW > 207H AVE NE 20TH AVE NE 20TH AVE NE 18TH AVE NIN 19TH E 197H AVE 19TH A,�E NE JUNG BLVD E 167H AVE NV4 18TH AVE NE 187H AVE NE TT AVE NE ii 14TH AVE NW 147 H� E w 14 PROJECT LOCATION 14TH AVE NE 12TH AVE NV. 127H� E co 127H. 127H AVE NE 107H AVE NW 10TH AVE NE 10tH AVE NE 10TH AJE NE d m w 87H AVE NE d L o to w w GTH AVE NE w z = '� z z W z W z W z W z W z W z � -- .- z z m LO Lo m N v r o1 r cq r tp r [ri y 2 m 22 N 4TH ALE NE Co 2 2 c9 N 0 F = = r h h h CV z ryG 2NDAVE NE BLVD E BEN G TE BLVD W GOLDEN GATE 2NDAVESE ij''�` Packet Page -640-