Agenda 05/13/2013 Item #16C65/14/2013 16.C.6. EXECUTIVE SUMMARY Recommendation to approve a work order under Request For Quotation 08- 5011 -81 in the amount of $494,886 to Mitchell & Stark Construction Co., Inc., to replace the aerators on Oxidation Ditch No. 3 under North County Water Reclamation Facility Technical Support Project Number 73968. OBJECTIVE: Maintain treatment capacity and Irrigation Quality (IQ) water production at the North County Water Reclamation Facility (NCWRF). CONSIDERATIONS: On June 24, 2008, as Agenda Item 10G, the Board of County Commissioners (Board) adopted the 2008 Wastewater Master Plan Update, which identified the requirement for performing various Technical Support Projects at the NCWRF. The proposed scope of work for replacing the aerators on Oxidation Ditch No. 3 is consistent with the 2008 Wastewater Master Plan Update, Project 73968, "NCWRF Technical Support Project," Section 8, Table 8 -2, page 3 of 5, line 100; and with the 2010 Wastewater CIP Update, page 2 of 4, line 79, as identified in the 2011 User Fee Rate Study. This project will replace the aerators on Oxidation Ditch No. 3 at the NCWRF. Oxidation Ditch No. 3 has five separate rotating aerators that play a critical role in the wastewater treatment process and the production of IQ water. The aerators operate continuously, 24 hours a day, 7 days a week, 365 days a year. The existing aerators are approximately 18 years old, and have reached the end of their useful lives. They can no longer be repaired due wear and corrosion. Request for Quotation No. 08- 5011 -81, FY13 Oxidation Ditch #3 Aerator Replacement, was electronically distributed on March 27, 2013, to the five vendors under the Fixed -Term Underground Utilities Contract 08 -5011. Of the five vendors, three submitted quotations by the April 16, 2013, deadline. The quotations received are summarized in the table below: VENDOR PROJECT COST Mitchell & Stark $494,886 Douglas N Higgins $547,795 Haskins, Inc. $745,000 Kyle Construction Did Not Quote Quality Enterprises Did Not Quote County staff and the local project design engineer, Hole Montes, determined the low bid to be fair and reasonable and recommend awarding the contract to Mitchell & Stark Construction Co., Inc., as the lowest responsive and qualified local bidder. The quote tabulation and graph are Attachments 1 and 2; the engineer's letter of recommendation is Attachment 3. The low bid was $85,114 (14.7 percent) below the design engineer's estimate of $580,000, including allowance. The Purchasing Department concluded that bidding was competitive, and representative of market conditions. Mitchell & Stark Construction Co., Inc., has a satisfactory performance and warranty record on previous county wastewater utility - related projects. The bid specifications informed the bidders there may be unforeseen conditions associated with the project. The total project cost includes an allowance of $52,740.00 for owner - directed work that includes, but is not limited to, repairs due to structural deterioration, and replacement of defective associated Packet Page -2676- 5/14/2013 16.C.6. mechanical equipment. The price for any additional work will be negotiated prior to commencement in accordance with the county's Purchasing Policy and the terms of the agreement. FISCAL IMPACT: Funding is available in and is consistent with the FYI Capital Budget approved by the Board on September 20, 2012. The source of funding is the Wastewater User Fee Fund 414. This project is a direct replacement of assets that have reached the end of their useful lives; operating costs are unaffected. LEGAL CONSIDERATIONS: This item has been reviewed and approved by the County Attorney's Office, is legally sufficient for Board action and only requires a majority vote for approval —SRT. GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. RECOMMENDATION: That the Board of County Commissioners, as Ex- officio Governing Board of the Collier County Water -Sewer District, approve a work order under Request for Quotation 08- 5011 -81 in the amount of $494,886, which includes an allowance in the amount of $52,740.00 for unforeseen conditions, to Mitchell & Stark Construction Co., Inc.; and, authorize the Chairwoman to sign the work order after final review by the County Attorney's Office. Prepared By: Wayne Karlovich, Senior Project Manager, Public Utilities Planning and Project Management Department. Attachments: Attachment 1 - Quote tabulation Attachment 2 - Graph Attachment 3 — Engineer's Recommendation Letter Attachment 4 - Work Order Packet Page -2677- 5/14/2013 16.C.6. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.C.16.C.6. Item Summary: Recommendation to approve a work order under Request For Quotation 08- 5011 -81 in the amount of $494,886 to Mitchell & Stark Construction Co., Inc., to replace the aerators on Oxidation Ditch No. 3 under North County Water Reclamation Facility Technical Support Project Number 73968. Meeting Date: 5/14/2013 Prepared By Name: KarlovichWayne Title: VALUE MISSING 4/19/2013 11:43:41 AM Submitted by Title: VALUE MISSING Name: KarlovichWayne 4/19/2013 11:43:43 AM Approved By Name: ParkerNicole Title: Contracts Specialist,Purchasing & General Services Date: 4/19/2013 12:48:05 PM Name: HapkeMargie Title: Operations Analyst, Public Utilities Date: 4/19/2013 1:21:31 PM Name: Jon Pratt Date: 4/19/2013 1:37:18 PM Name: MarkiewiczJoanne Title: Manager - Purchasing Acquisition,Purchasing & Gene Date: 4/20/2013 6:57:45 PM Packet Page -2678- Name: Joseph Bellone Title: Manager - Utility Billing & Cust Serv.,Utilities F Date: 4/22/2013 10:08:48 AM Name: Steve Messner Title: Plant Manager,Water Date: 4/22/2013 10:43:04 AM Name: JohnssenBeth Date: 4/22/2013 11:30:01 AM Name: WardKelsey Title: Manager - Contracts Administration,Purchasing & Ge Date: 4/22/2013 2:19:14 PM Name: JacobsSusan Title: Operations Analyst, Public Utilities Date: 4/22/2013 3:56:02 PM Name: PajerCraig Title: Project Manager, Senior,Public Utilities Engineeri Date: 4/22/2013 9:30:13 PM Name: ChmelikTom Title: Director, Public Utilities Engineering Date: 4/25/2013 1:12:33 PM Name: TeachScott Title: Deputy County Attorney,County Attorney Date: 4/26/2013 3:19:42 PM Name: YilmazGeorge Title: Administrator, Public Utilities Date: 4/28/2013 4:35:25 PM Name: KlatzkowJeff Title: County Attorney Date: 4/29/2013 9:13:01 AM Name: UsherSusan Title: Management/Budget Analyst, Senior,Office of Manage Date: 5/2/2013 2:17:48 PM Name: OchsLeo Packet Page -2679- 5/14/2013 16.C.6. Title: County Manager Date: 5/2/2013 4:49:49 PM Packet Page -2680- 5/14/2013 16.C.6. a8 Z a ed MDed 2 / B ± 0 2 k \ \ § # 2 / \ \ Q _ / \ O E ± _ 0 LU / � e B . _ u � m 3 § % / Ln 0 U ƒ � $ 0 _ 0 E $ § / c 2 m / / a) (.0 / s � � § $ % V) \ / e E k -C4 _ 4 R g $ / t co ƒ r4 L Ln u � � k � |S U)0 ƒ = %g ® W L $ t & © -0 \(\U) ( ) 0 o a [ y °.0 0 / / = % U- Lj�� / /k\\ k f 0 2 o ƒ3�3$ .9.0,9LEL§Z/ VL% tko cu Ln Ln crco LL Cf- LL cu UO CL 5/14/2013 16.C.6. *41" HOLE MONTES ENGINEERS • PLKNINERS • SURVEYORS April 17, 2013 950 Encore Way • Naples, Florida 34110 - Phone 239.254.2000 - Fax: 239.254.2099 Wayne Karlovich, P.E., Senior Project Manager Collier County Public Utilities 3339 Tamiami Trail East Suite 303 Naples FL 34112 RE: .EVALUATION OF QUOTATIONS OXIDATION DITCH 3 NORTH COUNTY WATER RECLAMATION FACILITY HM File No. 2012.056 Dear Wayne, We have reviewed the 3 quotes received by the County on Oxidation Ditch 3 for County Quote No. 08- 5011 -81. The 3 bidders and their quoted price are identified below as provided by the County Purchasing Department. The apparent low quote is from Mitchell & Stark Construction Co. Inc. in the amount of $494,886.00. Bidder _[ I Mitchell & Stark Const. Co. Inc. 2 DN Higgins, Inc. 3 Haskins, Inc. Bid $494,886.00 $547,795.00 ` $745,000.00 Mitchell & Stark has successfully completed other construction projects for Collier County and is on the County's list of approved utility contractors. The engineer's estimate is $580,000.00. Therefore, we reconunend award of this construction contract to Mitchell & Stark in the amount of $494,886.00 subject to a final review by the Purchasing Department of the quotation documents. Please contact us if there are any questions about this quote evaluation. Thank you, HOLE MONTES, INC,,,....-- -y R. Ph.D., P.E., B.C.E.E. nvirormiental Engineering Manager /Associate JRT; dlh H:\2012\2012056\GMC Correspondence \C1 Client Corrspondence\20130417 WK Award Letter JRT.doc Packet Page -2683 - Naples - Fort Myers WORK ORDER Agreement for Fixed Term Under-round Utilities Contract #08-5011 Contract Date: March 11, 2008 Fixed Term Contract Expires March 10, 2014 (RFQ 08-5011-81) This Work Order is for Underground Utility Construction Services for work known as: Project Name: NCWRF Oxidation Ditch #3 Aerator Replacement Project No: 73968,44.6 5/14/2013 16.C.6. The work is specified in the proposal dated April 16, 2013 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above and Request for Quotation 408-5011-81 dated March 27, 2013. as modified by Addendum I thru 2, attached hereto a part of this Work Order.. is assigned to: Mitchell & Stark Construction Co.. Inc. Scope of Work: As detailed in the attached proposal and the following: • Task I -Perform all Contract Work described in the Contract Documents • Task 11 -Allowance for Owners Use as Directed Schedule of Work: Complete work within 545 days from the date of the Notice to Proceed which is accompanying this Work Order. CQmpcn ion: In accordance with Agreement #08-5011. the County will compensate the Firm in accordance with following method(s): MNegotiated Lump Sum; ❑Lump Sum Plus Reimbursable Costs, OTIme & Material (established hourly rate - Schedule A)- ❑Cost Plus Fixed Fee, as provided in the attached proposal. Task 1 $442,146.00 (LS) Task 11 $52.740.00 _(T&M) TOTAL FEE $494.886.00 A PREPARED BY: Waype Karl ov ich, Senior Project Manager APPROVED BY: '71' Craig Pa' Jer Priniiipal Project Manager �71 APPROVED BY: 4't Tom Chmelik, PPMD Director APPROVED BY: ,`Jon Pratt, NCWRF Manaaer APPROVED-Elle'4­��—I. ,, APPROVED BY: Wastewater Operations Manager Steve Messner. Interim Wastewater Director Date Date Date Date Date Date APPROVED BY. George Yilmaz, Administrator Date"' APPROVED BY: Nicole Parker, Procurement Strategist Date r?7\ Packet Page -2684- kv 5/14/2013 16.C.6. II Work Order RFQ #08-5011 -81 Page 2 ATTEST: Dwight E. Brock, Clerk BY: Deputy Clerk AT7W-. By t pa� L (Print Na-merfitle) Approved as to Form and Legal Sufficiency: Assistant County Attorney BOARD OF COUNTY COMMISSIONERS Collier County, Florida By: Georgia A. Hiller, Esq.,Chairwoman Mitchell & Stark Construction Co., Inc. BY: (Print Name/Title) Packet Page -2685- 5/14/2013 16.C.6. REQUEST FOR WOTATIONS UNDER CONTRACT M-5011 "Annual Contract for Undergroilind Utilities" Date: Match 27, 2093 From: Nicole Parker, Procurement Strategist 239-252-4270, Telephone Number 239-252-8549, Fax Number To: Prospective Vendors Subject: RFQ #f38 FY1 3 Oxidation Ditch 93 Aerator Repiacemenj As provided in the referenced contract, the Collier Courtly Purcinagmg Department M the referenced projeproject soliciting quotes for AJI quotations for individual projects shall be in accordance with the term, conditions, and specibcations stated herein and in accordance with the terms and conditions of Contract #08-5011 of which your firm was an awardee, NOOTHER FIRMS A ELIGIBLE TO SUBMIT OR RECEIVE AN AWARD FOR THIS PROJECT. RFQ Due Date: Non Mandatory Pro-Quote Meeting DateirTime: Pre -Quote Meeting Localdon,, O&A Deadline: Nurriber of Days to Completion: UqUfa3te(] uamages: Plans and Specftabons: -4r." 17, 7011, a,3:00 I Arn: 1, 0o i,,m, 485 OyL to Substantial fg) days to Firicti CompitqIc7l days totrl day catty Novt,,jnbei The Oxitxion Ditcl, #Ii Shy: 00 f-Aly pErnlnn f-orr, Dece.mb, � ) 2313 t, April 15, 2014. No Shall 15 do!­ or, he Oxidation clic'i 'hi, iim ?uric j. —, j, . C, ' C0r,,-);)l i hit, oe e ,ntrzictor shall SCheIdL&' r-an-fuct the -more to i Description Quantky i Price I UOM Total I Perform all Contract Work described in the Contract Documents t t $442.148 L$ $44211.11,46 Allowance Fund for Owners Use as Directed. {Refer to Specillcation Section 01135 for more S52,7 TM $52,740 TOTAL $404,856 Year quotation response for this Project is due no later than the date and time specified above. We will not accept any quotation responses later than the noted time and date. tf your firm is unable to respond electronically, Your quotation must be received in the office of the Purchasing Department at the above referenced address no later than the time and date specified. We took forward to your participation in this request for informationiquotation process. Performance and payment bonds shall be requWed if ttke lowest responsive quote exceeds $200.000. Mitchell & Stark Construction Co., Inc Film's Complete Legit N Signature --T \ . I I I' C__- -_ Vice President Title —Michael P. Westhater 4116 2013 Print Name Date RFQ *M5011.81 Packet Page -2686- 5U14/2013 16_C.6. �a,- I 0� V i From: ParkerNicole �eni: Tuesday, Apr 02.201812:20 PKX 7o: icole VVeothofer;Bhan Penner; Tammy Ludwig; Brandy Bartokzne(b ins.00m);LouGaudio;K8amieCohen;Ky|aConatruodon|no; HHASK|NS@HASK]NS|NC.NET; Mitchell Penner Cc: KedovichVVoyno Subject: ADDENDUM #1 for RFQ 08-5011 -81 FYI 3 Oxidation Ditch #3 Aerator Replacement 1. Contract Mew Section 11910, 7.O3133asfollows: ] New Anchor Bolts shall be RED HEAD Adhesive S7 Hybrid Epoxy. The installation shall ho(|ovv anchor bolt r-nanuiacturet's approved installation procedures included but not limited to: o. Clean out the drilled hole from bottom with forced air. b. Brush hole. c Complete the preparation of the hole by repeating forced air cleaning, 2. Can-tract. Section 119L8,2l4Basfollows: VUas G. Non-machined surfaces to receive two coats with Sherwin Williams, Dura-Plate 235 B67A235 Haze Gray to total finished dry film thickness (DFT) of 8 to 12.0 mils by manufacturer. After installation all damaged coating shall berecnated per paint manufacturer's recommended procedures. Reniseci* G� Surfaces to receive two coats with Sherwin Williams, Dura'P|ate 235 867A235 Haze Gray to total finished dry fi|m thickness (DFT)ofQto12.O mils bymanufactuner. After installation all damaged coating shall bepecoa1ed per paint manofacture,s recommended procedures. E?,. C�,_lntract 2;pedficatons-Devise Section 11918,2'U4Casfollows: 141/es C. K4achinedendstoredaiveonecoatofRus1Veto444butthatcoadnQmuxtbenenoovedphnrtoinsLaUatioo. Revised C. Machined ends in contact with the bearings and couplings tn receive one coat of Rust Veto 444 but that coating must be removed and the surfaces prepared prior to installation per bearing manufacturer's recommended procedures and requirements and coupling manufacturer�s recommended procedures and requirements, respectively. PsrkerNicole 'A8zdnesdaY, March Z7,28133:57PM ��. ParkerNiode; Ryan; 8ekmeU; PhkeWesthefer Brian Penner; TammyLudwig; Bnandy8arho}one LouGaudko; Marcie Cohen; Kyle Construction Ioc; qL Mitchell CZ:KadnvichVVaync 3w�Jfmc'_-: RF808-SO11-81 Ff13(}xidaUon Ditch #3 Aerator Replacement Good afternoon —p\ease see the oftachedRFQ,thanks, Nicole Parker PmopementStratel-is�k CoNeF County Purchasinp Department 1 Packet Page -2687- nO 332; Tammni WO Eas-c Napkv FL 3411-1 TV 239-252-4270 Fam 239-252-6549 And: Llgy aw_ky rim onlvorgyv,mo � 5/14/2013 16.C.6. y;w 1 7 in lespon,"', , . '�!-! Packet Page -2688- 5/14/2013 16.C.6. KarlovichWayne AMW prom: ParkerNicole Sent: Wednesday, April 10, 2013 8:27 AM To: ParkerNicole; Ryan; Belwell; Mike Westhafer, Brian Penner; Tammy Ludwig; Brandy Bartolone (brandyb @dnhiggins.com); Lou Gaudio; Marcie Cohen; Kyle Construction Inc; HHASKINS @FIASKINSINC.NET; Mitchell Penner Cc:.: KarlovichWayne Subject: ADDENDUM #2 for RFO 08- 5011 -81 FYI Oxidation Ditch #3 Aerator (Replacement Good morning — the due date TO this RFQ has been changed to: Tuesciav, April 16, 20113 at 3PM. From: ParkerNicole Sent:: Tuesday, April 02, 2013 12 :20 PM To: ParkerNicole; Ryan; Belwell; Mike Westhafer; Brian Penner; Tammy Ludwig; Brandy Bartolone (t_a,nd vb Anhiagin .t:om); Lou Gaudio; Marcie Cohen; Kyle Construction Inc; t±1A , itli 3r H ,SrINSIfl i; Mitchell Penner Cc: KarlovichWayne Subject, ADDENDUM #1 for RFQ 08- 5011 -81 FY13 oxidation Ditch #3 Aerator Replacement Goon: aftiarnoor, — here is the Addendum #1 info: Contract Specifications -ADD New Section 12910, 2.03133 as follows: 3. New Anchor Bolts shall be RED HEAD Adhesive 57 Hybrid Epoxy. The installation shall follow anchor bolt manufacturer's approved installation procedures included but not limited to: a. Glean out the drilled hole from bottom with forced air. b. Brush hole. Complete the preparation of the hole by repeating forced air cleaning. Contract Specifications - Revise Section 11910,2.04B as follows: Was B. Non - machined surfaces to receive two coats with Sherwin Williams, Dura -Plate 235 1367A235 I-laze Gray to total finished dry film thickness (DF ) of 8 to 12.0 mils by manufacturer. After installation all damaged coating shall be recoated per paint manufacturer's recommended procedures. Revised B. Surfaces to receive two coats with Sherwin Williams, Dura -Plate 235 B67A235 Fiaze Gray to total finished dry film thickness (DFr) of 8 to 12.0 mils by manufacturer. Ater installation all damaged coming shall be recoated per paint manufacturer's recommended procedures. contract Specifications- Revise Section 11910, 2.040 as follmn =s: Was U. Machined ends to receive one coat of Rust Veto 444 but that coating must be removed prior to ins�:allation. revised Machined ends in contact with the bearings and couplings to receive one coat of Rust Veto i!4,4 but That coating must be removed and the surfaces prepared prior to installation per bearing manufacturer'=s recommended procedures and requirements and coupling manufacturer's recommended proceduras and requirements, respectively. Fro -an ParkerNicole 53eri :: !iilednesday, March 27, 2013 3:57 PM uo:'Parkeftcole; Ryan; Belwell; Mile Westhafer; Brian Penner; Tammy Ludwig; Grandy Bartolone (.,rardyb:d�dnhiogans.cgm); Lou Gaudio; Marcie Cohen; Kyle Construction Inc; HHASKINS€dHA5KINSINC.REI; Mitchell Packet Page -2689- 5/14/2013 16.C.6. Penner Cc, KarlovichWayne Sukject: RFQ 08-5011-81 FY13 Oxidation Ditch #3 Aerator Replacement Good afternoon -- ;Tease see the attached RFQ,. thanks. Nicole Park.e, Procurement Strategist L - Hier County Purchasing Departmem oN - 3327 Tamiami Trail Eas-, Napiec, P- 34112 Tel: 21 q-252'-4270 Fax: 239-252-6549 i you do r,( )i wa Fit vo our e- ii�3ij a. ddli'e ss ze�j �n n,�, r p 0 n2s to a p LAN:,; rsc 0."-' " :-.2 'J z i: I col v',' i �ce r elspl'one or in vmitt ng, 2 Packet Page -2690-