Loading...
FPL Transformer Pad Location and Specification WRh5618445 fir` R719 FPL TRANSFORMER PAD LOCATION AND SPECIFICATION PROJECT: NERDC DATE: July 7.2017 ADDRESS: 14700 Immokalee Road Naples.Fl.,34120 CUSTOMER AGREES TO: Provide recorded casement for all FPI.facilities on Customer's property. FPI will not start construction until these easements are cleared by the customer of all conflicts preventing construction. Should paving.grass,landscaping or sprinkler systems he installed prior to construction al the underground distribution facilities,the customer will hear the cost of restoring same to their original condition. Provide location and depth information for all underground facilities and fill or cut to within 6 inches of final grade within the easement. (See attached referenced prints.) Notify PPI.representative two weeks in advance of paving schedule so that FPI can install ducts if required Make arrangements for location of FPI.pads as shown on location sketch. Provide and install secondary service to padmount transformer. Use a maximum of 8 cables per leg. (See pad detail for entrance space availability for customer service cable) Terminate conduits 3 inches above final grade and provide 7 feet of cable per leg beyond the conduit ends for connection to transformer terminals Compact and level 3 inches below final grade an area sufficient for the concrete pad Provide clear space of 8 feet at the front and 4 feet at sides and rear of the transformer pad to allow for a safe working arca. Keep area above transformer pad clear to allow setting transformer with a crane. If current transformers are required,provide and install 1 1/2 inch rigid conduit from CT's to meter location. Maximum horizontal distance from pad to meter is NA feet. Provide a clear space 36 inches in front of meters. If built up meter centers are to be used,provide FPI.representative with shop drawings of centers and layout sketch of meter room for FPL approval prior to purchase FPL AGREES TO: Provide pad and install the padmount transformer. Provide and install primary ducts and/or cable from FPI,facilities to the padmounted transformer. Provide and install ground rods at the transformer. Connect customer's service cables to FPL facilities in transformer compartment Provide meter wiring when current transformers arc required. Provide 277/480 V,three phase service. REPRESENTING CUSTOMER: I hereby certify th I am aut' ized to accept - ' 'fications on behalf of the customer and that 1 have delivered a copy of these specifications to the customer an :II affec "+ contractors. ,•- NAM . DATE: a `a'11Ifa (signature) Andy Solis NAME: - (print or type) Chairman TITLE: TELEPHONE.N: 39- aS a- 04,0 o2 REPRESENTING FPL: I hereby certify that I am authorized to accept these specifications on behalf of Florida Power and Light Company. iz NAME:_a,J.01",. _ ATE:Jul[7,2017 a`. ."‘ Approved as to form and legality MT c 3A'C3� a.`C:1 .k -.....„ ''-. Assistant County Att t`ly'Iey �s Attest as to_„„,.. 71_ , ''' i'•hal an'S— .1 sin