Loading...
Agenda 09/13/2016 R Item #11E 11.E 09/13/2016 EXECUTIVE SUMMARY Recommendation to award and authorize the Chairman to execute Contract 16-6662, "White Boulevard over Cypress Canal Bridge Replacement Project", to Manhattan Road & Bridge Company, in the amount of $3,730,719.70, Project Number 66066, and authorize the necessary budget amendment. Approval of this item is contingent on approval of Agenda Items 16A41 and 16A42. (Jay Ahmad,Transportation Engineering Division Director) OBJECTIVE: To replace the White Boulevard Bridge and the raw water main over Cypress Canal. CONSIDERATIONS: The primary purpose of this Project is to replace an obsolete bridge located on White Boulevard in Collier County, Florida and resurface/reconstruct the roadway approaches to the bridge. Existing bridge number 034020 is located one mile east of CR 951 over the Cypress Canal. The bridge was built in 1965 and is currently identified by the Florida Department of Transportation as functionally obsolete(meaning the bridge is built to standards no longer used today) and scour critical (meaning the bridge is at high risk during a channel scour event such as a storm). The new bridge is designed to carry two 12' wide through lanes(one eastbound and one westbound)with 5'-6" shoulders and 6'-6" sidewalks on the north and south sides of the structure. The overall dimensions of the new bridge will be 50'-2"wide by 94"-0" long with 30' approach slabs constructed at the east and west ends of the bridge. Roadway approaches will be resurfaced/reconstructed,as appropriate,to facilitate a typical roadway cross section of two 12' through lanes (one eastbound and one westbound) with 4'-0" shoulders, 2'-0" wide Type F Curbs and 6'-0" sidewalks on the north and south sides of the roadway. Sidewalk construction on the north side off White Boulevard will extend to the limits of the existing sidewalk ends located east and west of Cypress Canal to provide continuity. Additional work includes; reconstruction of residential entrances, as necessary, within the limits of the project, public utility water main replacement at the bridge location and installation of various stormwater management features. The design Maintenance of Traffic (MOT) plan was developed to minimize impacts to the traveling public. The design MOT plan includes a temporary bridge located just north of the existing bridge to facilitate vehicle traffic during the bridge replacement. On May 25, 2016, the Collier County Growth Management Department, through its Transportation Engineering Division, issued Solicitation 16-6662, "White Boulevard over Cypress Canal Bridge Replacement Project", to acquire bids from contractors for this project. [The project name was inadvertently solicited as "White Boulevard over Cypress Canal Bridge Project; however the correct name is"White Boulevard over Cypress Canal Bridge Replacement Project."] Two thousand ninety-eight (2,098) notices of the bid were sent out and one hundred seven (107) were downloaded. Five (5) bids were received, opened and read publicly on June 27, 2016. The offers are summarized below. Packet Pg. 350 11.E 09/13/2016 Vendor Project Bid Manhattan Road& Bridge Company $3,730,719.70 Quality Enterprises USA, Incorporated $3,836,999.00 Ebsary Foundation Company $4,080,857.38 Zep Construction,Incorporated $4,279,682.14 Coastal Concrete Products, LLC. Costal Site Development $4,328,428.84 Staff and the engineer of record has determined that the lowest bid is fair and responsive and recommends awarding the contract to Manhattan Road &Bridge Company. The bid is approximately 13 percent above the design engineer's $3,312,714.64 opinion of cost. The contract, bid tabulation, and the engineer of record's letter of recommendation are all attached. The bid amount incorporates allowances in the amount of$256,500 for owner-directed additional work. The price for any additional work will be negotiated prior to commencement in accordance with the County's Procurement Ordinance and the terms of the agreement. FISCAL IMPACT: This project will be funded through several sources including: Project Number Department Fund Amount Source of Funds 66066 GMD 313 $3,445,998.17 Gas Taxes 70071 PUD 412 $284,721.53 Water User Fees Capital Funding is available in project 66066, and is consistent with, the FY2016 Capital Budget approved by the Board on September 24,2015. A budget amendment in the amount of$284,721.53 is necessary from the Well/Plant Power Systems Project 70069 to Project 70071 in the Water User Fees Capital Fund 412. The completed project can be expected to have the following operational and maintenance impacts: • The bridge and roadway features will be new, therefore, minimal to no maintenance costs are expected to be incurred within the first 5 to 7 years of service and will be absorbed into the regular maintenance schedule thereafter. • Annual operation cost of the raw water main replaced during the project will remain the same or decrease. • The new stormwater features will require minimal maintenance and normal maintenance will be absorbed into the regular maintenance schedule resulting in minimal cost impact. GROWTH MANAGEMENT IMPACT: This project is in accordance with the goals and objectives of the Transportation Element of the Growth Management Plan. LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote for Board approval.-CMG RECOMMENDATION: To award Contract 16-6662, White Boulevard over Cypress Canal Bridge Replacement Project to Manhattan Road & Bridge Company, in the amount of$3,730,719.70, authorize the Chairman to sign the attached contract,and authorize the necessary budget amendment. Packet Pg. 351 11.E 09/13/2016 Prepared by: Anthony 0. Stolts,P.E., Sr. Project Manager,Transportation Engineering Division,Growth Management Department ATTACHMENT(S) 1. [Linked}Contract 16-6662(103 pages) (PDF) 2.Bid Tabulation 16-6662(2 pages) (PDF) 3.Bid Recommendation Letter 16-6662 (1 page) (PDF) Packet Pg. 352 11.E 09/13/2016 COLLIER COUNTY Board of County Commissioners Item Number: 11.E Item Summary: Recommendation to award and authorize the Chairman to execute Contract 16- 6662, "White Boulevard over Cypress Canal Bridge Replacement Project",to Manhattan Road & Bridge Company, in the amount of$3,730,719.70, Project Number 66066, and authorize the necessary budget amendment. Approval of this item is contingent on approval of Agenda Items 16A41 and 16A42. (Jay Ahmad,Transportation Engineering Division Director) Meeting Date: 09/13/2016 Prepared by: Title: Project Manager, Senior—Transportation Engineering Name: Anthony Stolts 07/27/2016 10:01 AM Submitted by: Title: Division Director-Transportation Eng—Transportation Engineering Name: Jay Ahmad 07/27/2016 10:01 AM Approved By: Review: Transportation Engineering Jay Ahmad Level 1 Add Division Reviewer Completed 07/27/2016 10:17 AM Transportation Engineering Gary Putaansuu Level 1 Add Division Reviewer Completed 07/27/2016 10:58 AM Procurement Services Lissett DeLaRosa Level 1 Purchasing Gatekeeper Completed 07/27/2016 2:24 PM Growth Management Department Lisa Taylor Level 1 Add Division Reviewer Completed 07/29/2016 11:19 AM Growth Management Department Diane Lynch Level 1 Division Reviewer Completed 07/29/2016 11:27 AM Growth Management Department Gene Shue Level 1 Add Division Reviewer Completed 08/01/2016 3:20 PM Procurement Services Sandra Herrera Level 1 Purchasing Reviewer 1-4 Completed 08/02/2016 3:36 PM Procurement Services Evelyn Colon Level 1 Purchasing Reviewer 1-4 Completed 08/03/2016 9:40 AM Public Utilities Planning and Project Management Tom Chmelik Level 1 Add Division ReviewerCompleted Procurement Services Allison Kearns Level 1 Purchasing Reviewer 1-4 Completed 08/13/2016 10:14 AM Public Utilities Planning and Project Management Oscar Martinez Level 1 Add Division ReviewerCompleted County Attorney's Office Colleen Greene Level 2 Attorney Review Completed 08/15/2016 4:28 PM Growth Management Department Jeanne Marcella Level 2 Division Administrator Completed 08/17/2016 9:54 AM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 08/17/2016 11:05 AM County Attorney's Office Jeffrey A.Klatzkow Level 3 County Attorney's Office Review Completed 08/18/2016 11:31 AM Office of Management and Budget Susan Usher Level 3 OMB 1st Reviewer 1-4 Completed 08/19/2016 2:16 PM Packet Pg. 353 11.E 09/13/2016 County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 08/27/2016 10:38 AM Public Utilities Operations Support Joseph Bellone Level 3 Add Division Reviewer Completed 08/30/2016 11:54 AM Board of County Commissioners MaryJo Brock Meeting Pending 09/13/2016 9:00 AM Packet Pg. 354 ssaidiY aano paenalnog 0144M,,`Z999-96;oeiq.uo3:5696) (sa6ed z)Z999-91.uo!WIngey pm 3uauayoe;;y M m a W E V 3" a LI e.. 88000888888800 888888 8$88P$g 888. 88888g88os No 888 8 888 82 888888888088088888808 2888.88 gg"8 oggSgo8 , 8$8888888 0 28888888880,8 8888888800888 88888888088888 0.888 888 8 �88e e8o P88 8 r889 I 8888 .8 -„...8,888.8888888,0888,08848 . 080 „„ „ „ „„„.,, „„...„ „ „„ „.,, , „"S o ...„„ „„ o g8m8 8 08 8 S o8 ..,0 4ry ry ry ry rvrvrvry mmmd 8 ;;72,7, m'rv.. W E F 8888888888 8ma .888 88888 888 888888 888888888 88o8888 68§R§18 $8 m n8m 8mg 8S „ „ 8 e .,, „ 8 .,. „„„„ „ r08888� 80 o8S 888 88 088888888 888,8 88 888 e o o' 8,a o a 88. ...... ......„ „„„.,, „ ^ „ o ”„ S "'8.,' a v 8g888o88�8g 8'88888888 888888882 888888888888888888 8Ep88888 8 g88o88$8m�8$e U88$8$g8$ g28888 g�gPB m88 c8828 g 88 .8 80 888$88888888 8 5888888 0288§ sg28 M 1 f, „ „ „ „ „ „„ „ „ „„„„„ „ „ „ „„„ „ „tt s o „„ o n'LL;tt,t w„6-;,- ,5r,E wwwwwwww ,tt±5±5588±55±8 LL 588 5 __- 3 F 'AI -- 3 www 3 3 8 8 8___ _ O. 3 0 EE 2 g. gAg 5 - _ --- 8982--_ 8Wz_ - W 5 i 2 l-, o N --- L 8 w p E a a S z ''a o 023 a - 5° G �_=oF 6��ooa__o?a oo ELA oggoduf z 3Ncz 5- ommw„_ mz , ° _ o w LL5 V a3 zf - - m as - W - ° o f a m a ° „ a „” gg 3 d d o o d ,d o o d d o e b b o d o d iE .” ”` '. ..,.......ti........ry n ry ry n n ry n ry ry m m m m m m m y v a v v v v v v a” „ L7,2;n; 8 we«3Jeo@eelme SLIM`5999 loeiluo0 9 9 ) (6ed z)Qse#mp9e me 7_Rm« m £ )7. ^ 0- 288828;„ 888888,;, ; 88 , ; ,§M E F':, }2 Wa \ /§ j ! " , ,,,,,,,,.,," \\\4282v4aa.-//-81“, \ ,( :101 / 8:88!8: ;: 8;84888! ! ,, ! ` § !!!71a, § a- \\\\)\{/7){)}}}\///\ \ \\ \ } ; 8-.0,,lel;l: q f„,! }!:«AK!§'Wg.,!4 ) }( } ( 1115Ra zgiaRa ::§:: c,.„, :& : 7 _° }{{/ \ 88 8 ) ,,,,,,,,,,,,,, \},.y ± . ; § :: § ,$;:,la,=:,aase:E;=. ; 8$ , s \ {/\§\\\R\\\\\\\\}\\j \ \} \ \ \\B!\|\t\\B\\!!!/f!\ 2 (\ \ 21 8888888882!8888"88 ! °. 8 4k15/!!;;}\K§00k2 - § (k 8 § \\a a,,,424\}§\»}}(\ g \, 6 ( 'Ll'LittttntttnLq,' -5. “;,,„,;=2','',;,OF,.=2tF.,2FgL84 ;;(( !\)\ \ - ` g° 5,c)\:\: / ' \ \ 'q'13))\}\ }\ 2 _ ~\ 5,:q2 nEL,-; }!\ 4/ : _ :§ :;!§ ) \ _ 7>t...- T,.“12. . \ ;§ §t ( c-' 8s {\\j/([(( : ) \}\ 28 .L ,( ) }{ liN1 A n 0 �\j2.7L22 8F.. .8, 2 22 ; 2 GNOLI € 'eit'f ARBER& "3 UNDAGE INC. Professional engineers,planners&land surveyors 7400 Tarnianzi Trail North,Suite 200,Naples,Florida 34108-(239)597-3111-Fly:;(239)566-2203 July 5, 2016 Anthony O. Stolts, P.E. Senior Project Manager Collier County Growth Management Department Transportation Engineering Division 2885 S. Horseshoe Drive Naples, FL 34104 Re: White Boulevard at Cypress Canal Bridge Replacement Project No. 66066 Bid#16-6662 Date: June 27, 2016 Bridge#034830 ABB PN 10-0046 Dear Mr. Stolts: Based upon our review of the bids received for the above-listed project it is our opinion that Manhattan Road &Bridge Co. is the low bidder for the project. We are not aware of any outstanding issues or problems with Manhattan Road&Bridge Co. that would prevent us from recommending their selection as the low bidder. Agnoli, Barber&Brundage, Inc. looks forward to working successfully with Manhattan Road&Bridge Co. on this project. Sincerely, AGNOLI, BARBER &BRUNDAGE, INC. Edward F. Tryka, III, P.E. Project Manager n - in <J1 C1 Attachment: Bid Recommendation Letter 16-6662 (1 page) (1695 : Contract 16-6662, "White Boulevard