Loading...
#08-5011-060 (WO Haskins)WORK ORDER Agreement for Fixed -Term Underground Utilities Contract (08 -5011) Dated: April 24, 2012 (RFQ #08- 5011 -60) Fixed Term Contract Expires March 11, 2013 This Work Order is for Underground Utility Construction services work known as: Project Name: Davis Boulevard from Santa Barbara Boulevard to Radio Road Utility Relocates Project No: 70045 & 73045 The work is specified in the Proposal Page, dated April 6, 2012 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above and Request for Quotation #08- 5011 -60, dated March 16, 2012, Work Order # (please fill out once received) is assigned to: Haskins, Inc. Scope of Work: As detailed in the attached Proposal Page and the following: • Task I - General (mobilization, maintenance of traffic, utility locates, survey layout and record drawings, silt fence) • Task II - Install Sewer Force Main • Task III - Install Potable Water Main • Task IV - Restoration • Task V - 15% Contingency for Unforeseen Conditions (ie: cap rock, other utility conflicts, etc.) Schedule of Work: Complete work within 90 days from the date of the Notice to Proceed which is accompanying this Work Order. Compensation: In accordance with Agreement #08 -5011, the County will compensate the Firm in accordance with following method(s): ®Negotiated Lump Sum; ❑Lump Sum Plus Reimbursable Costs; ®Time & Material (established hourly rate — Schedule A); ❑Cost Plus Fixed Fee, as provided in the attached proposal. Task 1 $ 82,371.00 (LS) Task II $239,390.90 (LS) Task III $228,358.40 (LS) Task IV $ 13,640.00 (LS) Task V $ 84,564.05 (TM) TOTAL PRICE $648,324.35 PREPARED BY: Nathan Is, Project Manager PI in an roject Management Department APPROVED BY: A on Cromer, P.E., PrinciDAProject Manager Planning and Proje g ent Department APPROVED BY: Tom 06elik, P.E., Department Director Plannin Project Management Department APPROVED BY: , Tom Wides, Department Director Operations Management Department ' Date Date -� Z- Date 4/ z v- Date APPROVED BY: Steve Messner, Department Director Date Waste ater epartme t APPROVED BY: J� P I a use , partment Director Date ater Depa ent APPROVED BY: Nicole Parker, Procurement Specialist Da Purchasing Department APPROVED BY: •�fl ® George Yilmaa, Administrator Dat �C ``�' Public Utilities ATTEST: � :Dwight E Brock, Clerk ,rt By: q_ By: (Print Name/Title) Approved as to Form and Legal Sufficiency: Jenni . White Assistant County Attorney BOARD OF COUNTY COMMISSIONERS Collier C unty Florida By: IL4 W. c�: Fred W. Coyle, Chairman HASKINS, INC. By: ben dwell �j %jer' (Print Name/Title) Q Co 7er County Adrr>inistrative Services i xvision Purchasing COLLIER COUNTY FLORIDA REQUEST FOR QUOTATION RFQ #08- 5011 -60 Davis Blvd. from Santa Barbara to Radio Road PROPOSALPAGE DUE DATE: April 6, 2012 at 3:30 pm The undersigned, as quoter, hereby declares that the firm has examined the specifications and is informed fully in regard to all terms and conditions pertaining to the project and, if this Proposal is accepted, to furnish same in full, according to the following: SEE SEPERATE EXCEL FILE FOR QUOTE SCHEDULE IN WITNESS WHEREOF, WE have hereunto subscribed our names on this 6TH day of APRIL 2012 in the County of TIFF in the state of cc), I ITg HASKINS INC. Firm's Complete Legal Name 239- 947 -1846 Telephone Number 239 - 947 -3857 FAX Number RMACPHEE @HASKINSINC.NET Email Address 10956 ENTERPRISE AVENUE Address ONITA SPRINGS City FLORIDA State 34135 Zip 574159 Fiori a rtifi a( of uth,,& ty 2e'c5' u en Number L%%mm.sunbiz.org/search/htmi) PRESIDENT Title HARLAN HASKINS Print Name Date R FQ— Contra ctDriven_Revised September2ooe 4 HASKINS QUOTE SCHEDULE 08- 5011 -60 DAVIS BLVD. FROM SANTA BARBARA TO RADIO ROAD PART 1: GENERAL_ ITEM • 1 -1 Mobilization EST. QUANT. 1 LS EXTENDED $ 50,000.00 $ PRICE 50,000.00 1 -2 !Maintenance of Traffic 1 j LS $ 20,000.00 $ 20,000.00 1 -3 Utility Locates 1 LS $ 3,000.00 $ 3,000.00 1-4 Survey Layout and Record Drawings I 1 LS $ 6,996.00 $ 6,996.00 1 -5 Silt Fence 2,500 LF $ 0.95 $ 2,375.00 $ 12,000.00 115 a a will • 1 LS $ 82,371.00 BID ADDENDUM NO. 1 Page 1 of 3 Bidder: PART 2:, SEWER FORCE MAIN ITEM • • ND ED PRICE 2 -1 Force Main a. "16" PVC C905 DR18 Force Main 1,520 ( LF $ 49.64 $ 75,452.80 b. 8" PVC C900 DR18 Force Main 80 LF $ 66.53 $ 5,322.40 c 6" PVC C900 DR18 Force Main 235 j LF $ 38.78 $ 9,113.30 d 4" PVC C900 DR18 Force Main 160 LF $ 48.44 $ 7,750.40 2 -2 Directional Drill 8" DIPS DR11 HDPE Casing w 14" DIPS DR11 Pipe Sta. 1178+55 1 LS $ 12,000.00 $ 12,000.00 j a b. jCarner Carr er Pipe StaHD83 2a0sing w /4" DIPS DR11 1 LS i $ 12,000.00 $ 12,000.00 c **8" DIPS DR11 HDPE Casing w /4" DIPS DR11 ,Carrier Pipe Sta. 1188 +55 1 LS $ 13,000.00 $ 13,000.00 d "16" DIPS DR11 HDPE Casing w /8' DIPS DR11 Carrier Pipe Sta. 1237 +55 Plug Valves 1 i LS $ 25,000.00 ' $ 25,000.00 x 2 -3 a. * *16" Plug Valve 5 EA $ 985.00 $ 4,925.00 b. * *8" Plug Valve 3 EA $ 655.00 $ 1.965.00 C ! * *6" Plug Valve 1 EA $ 625.00 $ 625.00 d * *4" Plug Valve 7 EA i $ 600.00 $ 4,200.00 2-4 Air Release Assembly (Force Main) 8 EA $ 3,525.00 $ 28,200.00 2 -5 Connection to Existing Main a. 14" Force Main 4 EA $ 3,165.00 $ 12,660.00 b. 8" Force Main 2 EA $ 2,475.00 $ 4,950.00 c 6" Force Main 1 EA $ 2,360.00 $ 2,360.00 d 4" Force Main 3 EA $ 2,280.00 $ 6,840.00 2 -6 Remove Existing Force Main 1,570 LF $ 6.70 $ 10,519.00 2 -7 Grout Existing Force Main 550 LF PART 2 SUBTOTAL: $ 4.56 $ 2,508.00 $ 239,390.90 BID ADDENDUM NO. 1 Page 1 of 3 Bidder: HASKINS QUOTE SCHEDULE 08- 5011 -60 DAVIS BLVD. FROM SANTA BARBARA TO RADIO ROAD PART 3: POTABLE WATER MAIN ITEM; Est. .. PRICE • 3 -1 Water Main a. 8" C900 DR14 PVC Pipe 200 LF $ 43.68 $ 8,736.00 b. 10" Ductile Iron Pipe { 100 LF $ 84.19 $ 8,419.00 c —16" Ductile Iron Pipe i 240 I LF I $ 69.81 � $ 16,754.40 3 -2 Directional Drill a ""'16" DIPS DR11 HDPE Casing w /8" DIPS DR11 ! Carrier Pipe Sta. 1189 +47 —LS $ 25,000.00 j $ 25,000.00 b 1""`20" DIPS DR11 HDPE Casing w110" DIPS DR11 Carrier Pipe Sta. 1209 +50 1 LS $ 50,000.00 $ 50,000.00 C. 1-18" DIPS DR11 HDPE Sta. 1232 to 1235 +50 1 LS $ 55,000.00 $ 55,000.00 3 -3 !Tapping Sleeve & Valve a. 116 "X8" Tapping Sleeve and Valve 1 EA 1 $ 5,446.00 $ 5,446_00 b. 116 "X10" Tapping Sleeve and Valve } 1 EA $ 6,500.00 $ 6,500.00 3 -4 Gate Valves a. 18" Gate Valve 2 EA $ 1,615.00 j $ 3,230.00 b. 10" Gate Valve 1 j EA $ 2,225,00 $ 2,225.00 3 -5 Air Release Assmbly (Water Main) 6 EA $ 1,970.00 $ 11,820.00 3 -6 !Connection to Existing Main a. b. 16" Water Main 10" Water Main 6 1 EA EA $ 2,820.00 $ 16,920.00 $ 2,398.00 $ 2,398.00 C 8" Water Main 1 EA $ 2,350.00 I $ 2,350.00 3 -7 Remove Existing Main 840 Grout Existing Main 260 LF $ 7.50 $ 6,300.00 3 -8 LF $ 10.00 $ 2,600.00 3 -9 1 Relocate Existing Meter and BFP Assemblies 1 LS PART 3 SUBTOTAL: $ 4,660.00 $ 4,660.00 $ 228,358.40 BID ADDENDUM NO 1 Page 2 of 3 Bidder: HASKINS QUOTE SCHEDULE 08- 5011 -60 DAVIS BLVD. FROM SANTA BARBARA TO RADIO ROAD BID ADDENDUM NO. 1 Page 3 of 3 Bidder: