Loading...
#10-5599 (Stantec Amend #1)Contract Amendment # 1 to Contract #10 -5599 Construction Engineering Inspection (CEI) Services for South Reverse Osmosis Wellfield Construction This amendment, datedTpk,,,tA 2012 to the original Agreement dated January 11, 2011, shall be by and between the4arties to, the original Agreement, Stantec Consulting Services, Inc. (to be referred to as "Consultant ") and Collier County, Florida, (to be referred to as "Owner"). Statement of Understanding RE: Contract 4 10 -5599 "Construction Engineering Inspection (CEI) Services for South Reverse. Osmosis Wellfield Construction" The additions to the existing language in the Agreement are shown herein by underlining; deletions from the Agreement are shown by stf:ikethr -eti ti'° In order to continue the services provided for in the original Agreement document referenced above, the Consultant agrees to amend the above referenced Agreement, including Article One, Consultant's Responsibility, Schedule A. Scope of Services, Schedule B, Basis of Compensation, and Schedule C, Project Milestone Schedule as follows: ARTICLE ONE CONSULTANT'S RESPONSIBILITY 1.5. CONSULTANT designates Mato Taylor, PE. Richard K. Ward., PE, a qualified licensed professional to serve as the CONSULTANT'S project coordinator (hereinafter referred to_ as the "Project Coordinator ") - for Phase Il of the Project. X 7C J'C Schedule A SCOPE OF SERVICES Phase I of the Proiect was designed, constructed and re- commissioned first. The County has evaluated the operation of Phase 1 after completion and re-commissioning and is proceeding with the final design and construction of Phase 2 of the Project. CEI services will be provided for Phase 2 of the Proiect in accordance with the original CEI services Agreement subiect to the changes in this amendment. Detailed Scope of Work — Phase 2 will include the work required to re-commission the remainder of the SRO Wellfield. The CEI will provide professional services for Phase 2 of the Proiect. Compensation for services for Phase 2 of the project will be in accordance with the hourly fees as set forth in Schedule B, Attachment 1 of the original Agreement. All dollar amounts listed for each task are "Not to Exceed" estimates for project control purposes. At the discretion of the County, sub tasks, and dollar amounts for each sub -task may be modified and /or deleted based on project requirements in accordance with lawful and properly approved County Purchasing Policy and Administrative Procedures in effect at the time such modifications are authorized. The CEI services will include the following tasks: TASK I — DETAILED OBSERVATION AND DOCUMENTATION X X TASK 2 — CEI PROJECT MANAGEMENT SERVICES 17 Phase I -Not To Exceed Phase 2 Not To Exceed 1.1 Construction Observation $ 165,880 T49M 157,765 1.2 Daily Log and Construction Documentation $ 15,984 TBB $ 20,410 1.3 Photographic Record $ 16;040 -$ 9,173 1.4 General Coordination $ 17,072 TB-D-$ 28.033 1.5 Observe Regulatory Agency Inspections $ 6,528 TBf) $ 41069 1.6 Construction Progress Meetings $` 25,136 TB-P4 25;261 1.7` Substantial Completion Inspections $ 8,600 TBD $ 7,692 1.8 Final Completion Inspection $ 3,566 TBB-$ 7.338 1.9 Final Construction Certification $ 1,604 TBP-$ 2,218 Total Compensation for Task 1 $ 261,41.0 Not to Exceed TBB-$ 261.959 Not to Exceed X X TASK 2 — CEI PROJECT MANAGEMENT SERVICES 17 Phase 1 -Not To Exceed Phase 2 Not To Exceed 2.1 1 General Management. & Oversight $ 32,488 4138 -$ 82,232 2.2 Coordination of Shop Drawings $ 3,720 T-BD $ 3,458 2.3 Monitor Project Records $ 9,920 T4A $ 22,100 2.4 As Constructed Field Drawings $ 1,632 T41 M$ 12,792 2,5 Start -up and Re- commissioning Support $ 8,364 TBB $ 11.792 Total Compensation for Task 2 $ 56,124 Not to Exceed $ 132,374 Not to Exceed 2.1 - General Management and Oversight — The CEI will provide support services customarily related to the construction observation, pre - construction design review, constructability review and inspection of similar projects including, but not limited to: * * I h. Within eiie week aftef �he eenstniefien eentr-acter- ne6ges the RNGP;EER and Geui4y tha4 the 3A'efk en the Pr-ejee! (fef eaeb 12hase) one month after the construction contractor completes all punchlist items to the satisfaction of the Project Coordinator and the COUNTY for Phase 2 and the work is substantially complete in accordance with the Contract Documents, the CEI will provide a signed and scaled certification by a professional engineer registered in the State of ,--n I Florida, that the Work was done under his supervision and performed in accordance with the Contract Documents, including all approved shop drawings and change orders except as noted. r. * * TASK 3 — ADDITIONAL SERVICES ALLOWANCE Task 4 — MISCELLANEOUS REIMBURSABLE EXPENSES � Phase I -Not To Exceed Phase 2 -Not To Exceed 3.0 Additional Services (Allowance) $ 20,000 TBP L26,161 Total Compensation for Task 3 $ 20,000 Not To Exceed TBP $ 26,161 Not to Exceed i Task 4 — MISCELLANEOUS REIMBURSABLE EXPENSES 4.0 — Miscellaneous expenses for reproducing documents that exceed the number of documents described in this Agreement and postage and handling of Drawings and Specifications. Expense of over-time work requiring higher than regular rates approved in advance and in writing by OWNER. SUMMARY OF SERVICES COSTS Not to Exceed TASK I — DETAILED OBSERVATION AND DOCUMENTATION $261.959 TASK 2 — CEI PROJECT MANAGEMENT SERVICES $ 132,374 TASK 3 — ADDITIONAL SERVICES $ 26,161 TASK 4 — MISCELLANEOUS REIMBURSABLE EXPENSE $ 7,472 Total Compensation for Phase 2, Tasks I through 4 $427.966 Phase 1 -Not To Exceed Phase 2 Not To Exceed 4.0 Miscellaneous Reimbursable expenses $ 5,000 T-BD-$ 7,472 Total Compensation for Task 4 $ 5.000 Not to Exceed Tom - -$ 7,472 Not to I Exceed I 4.0 — Miscellaneous expenses for reproducing documents that exceed the number of documents described in this Agreement and postage and handling of Drawings and Specifications. Expense of over-time work requiring higher than regular rates approved in advance and in writing by OWNER. SUMMARY OF SERVICES COSTS Not to Exceed TASK I — DETAILED OBSERVATION AND DOCUMENTATION $261.959 TASK 2 — CEI PROJECT MANAGEMENT SERVICES $ 132,374 TASK 3 — ADDITIONAL SERVICES $ 26,161 TASK 4 — MISCELLANEOUS REIMBURSABLE EXPENSE $ 7,472 Total Compensation for Phase 2, Tasks I through 4 $427.966 SCHEDULE B BASIS OF COMPENSATION 7r x x 2. COMPENSATION TO CONSULTANT ITEM TASK ESTIMATED AMOUNT— Phase 1: ESTIMATED AMOUNT— Phase 2: Detailed Observation and Documentation 1.1 Construction Observation $ 165,880 TBD--$157.,765 1.2 Dail.: Log and Construction Documentation $ 15,984 Tom-$ 20A 10 1.3 Photographic Record $ 16,040 TEW-$ 9,173 1.4 General Coordination $ 17,072 T3P -$ 28,03`3 1.5 Observe Regulatory Agency Inspections $ 6,528 TBD $ 4,069 1.6 Construction Progress Meetings $ 25,136 TRD-$ 25,261 1.7 Substantial Completion Inspections $ 8,600 T44).-$ 7,692 j 1.8 Final Completion Inspection $ 3,566 T4D-$ 7,338 1.9 Final Construction Certification $' 1,604 TB-B -$ 2,218 Total Compensation for Task 1 $ 260,410 T-B9 $ 261,959 CEI Project Management Services 2.1 General Management & Oversight $ 32,488 TBD-$ 82,232 2.2 Coordination of Shop Drawings $ 3,720 TBD $ 3,458 2.3 Monitor Project Records $ 9,920 T44)-$ 22,100 2.4 As Constructed Field Drawings $ 1,632 T44)-$ 12,792 15 Start-up and Re- commissioning Support $ 8,364 TBD-$ 11,792 Total Compensation for Task _2 TBD $ 132,3'74 3.0 Additional Services (Allowance) $ 20,000 TB4) -$ 26361 4,0 Miscellaneous Reimbursable expenses $ 5,000 -$ 7.472 TOTAL FEE NOT TO EXCEED (Total Items 1.1 through 4.0 ) $ 341,5341 1 $458,466$ 427,966 In addition to the above amendments, Contract 10 -5599 shall be revised to state: • This Amendment shall extend the Agreement by an additional 484 (four hundred eighty) days, through July 30, 2013. • The Consultant agrees that this amends the original Contract and that the Consultant agrees to complete said services in the amount of $427,966.00; (Four ' Phase One of the Project included an approved change order in the amount of S' )0,500.00; which brings the actual amount expended for Phase One to $372i034. hundred and twenty seven thousand, nine hundred and sixty six dollars), as per Exhibit "A1 -A ". All other terms and conditions of the Agreement shall remain in force. IN WITNESS WHEREOF, the Consultant and the County have each, respectively, by an authorized person or agent, hereunder set their hands and seals on the date(s) indicated below. ATTEST: Dwight E. Brock. Clerk FD Scott R. Teach Deputy County Attorney ATTEST: Co orate Secreta&Witness Sign tune -- 1^ ICA Print Xame OWNER: BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA BY : W. FRED W. COYLE, CHAIAJAN Accepted: a , 2012 CONSULTANT: STANTEC CON ING SERVICES INC.. By: FERMIN A. DIAZ Vice- President