Resolution 2011-145
RESOLUTION NO. 2011 - --1A..5..
A RESOLUTION OF THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER COUNTY, FLORIDA, AS
GOVERNING BODY OF COLLIER COUNTY AND AS EX-
OFFICIO THE GOVERNING BOARD OF THE COLLIER
COUNTY WATER-SEWER DISTRICT, ESTABLISHING A
PROCEDURE FOR COLLIER COUNTY WATER-SEWER
DISTRICT CUSTOMERS TO RECEIVE CREDIT ADJUSTMENTS
BASED ON COOLING TOWER WATER EVAPORATION AND
SUPERSEDING AND REPLACING THE CURRENT PROCEDURE
CREATED BY RESOLUTION NO. 2002-365.
WHEREAS, the operation of cooling towers causes significant water evaporation thus
reducing the amount of metered potable water that eventually returns to the sewer; and
WHEREAS, in accordance with Ordinance No. 2001-73, Section 1.3, G.l, Collier
County Resolution No. 2002-365 established the procedure by which Collier County Water-
Sewer District customers who utilize cooling towers could receive credit adjustments based on
this water evaporation; and
WHEREAS, the Board of County Commissioners, as governing body of Collier County
and as ex-officio the governing board of the Collier County Water-Sewer District, desires to
supersede and replace Resolution No. 2002-365 and establish a new procedure for District
customers to receive these credit adjustments.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER COUNTY, FLORIDA, AS THE GOVERNING BODY OF
COLLIER COUNTY AND AS EX OFFICIO THE GOVERNING BOARD OF THE COLLIER
COUNTY WATER SEWER DISTRICT, that:
1. The Collier County Water-Sewer District "Procedure for Adjustment of Customer
Accounts for Cooling Tower Water That Does Not Return to the Sewer," attached
hereto as Exhibit A, is hereby adopted.
2. The application for cooling tower monthly water evaporation adjustment, as
required by the procedures set forth in Exhibit A, shall be in substantially the
form attached hereto as Exhibit B.
3. Resolution No. 2002-365 is hereby superseded and replaced in its entirety.
THIS RESOLUTION ADOPTED after motion; second and majority vote favoring
adoption on this the /.ErN daySEf'TE.l11RtR, 2011.
ATTEST: .
DWI?~:;-)~:.~~~, CLERK
,.< :~~' ", -.. ('
,..,.- -".',. " . ~\ ~ "
, -
By: ;, rOc .
....eeuty Clerk
\\\~.\I11' Ill( (I
\\\ ',,~.:,. ('/,
....'\.\. .\,1\...';\ .. ...; I.i/C')' 1/,>
....' (' ~l .'." t".....
BOARD OF COUNTY S:O:MMISSIONI;:RS. \_
OF COLLIER COUN~~'} FL9R1DX:' A:S~~ %
THE GOVERNING B~E)Y QF.' COLLIER ~.' ~
COUNTY AND AS a:. :OFFICI6-, THE.:; $
- ';:..,. .~. 0 ..' _ ... ' .....) ""
GOVERNING BOARD elF:, THE~COLLIER' f:'
;,., ./. '. . .
COUNTY WATER SEWE&PIS'T,RIC,T, ,:<\",/
/, ',' ~. .' 0, .\
'11/ . ) .J \\\'
II11 llHHI\\\
~w.
By:
FRED W. COYLE, CHAI
Approval as to form
and legal Sufficiency:
~-B\:J~
Jennife . White
Assistant County Attorney
2
EXHIBIT A
COLLIER COUNTY WATER-SEWER DISTRICT
PROCEDURE FOR ADmSTMENT OF CUSTOMER ACCOUNTS
FOR COOLING TOWER WATER THAT DOES NOT RETURN TO THE SEWER
PURPOSE
The purpose of this Collier County Water-Sewer District (CCWSD) procedure is to provide a
credit adjustment to the water and/or sewer account of a property owner who has a cooling tower
wherein water evaporation reduces the amount of registered water volume flowing through the
cooling tower inflow meter to that registered at the cooling tower outflow meter. The volume
difference between the inflow and outflow meters will be used to calculate a credit adjustment
with respect to the volume of water that has not returned to the CCWSD sewer system.
CONDITIONS
A credit adjustment shall be considered for cooling tower water evaporation upon completion of
the following steps:
1. The property owner has completed an application form (see Exhibit A) and submitted to
Utility Billing and Customer Service (UBCS) for approval
2, CCWSD has approved the proposed placement of the inflow and outflow meters that will
determine the water loss due to evaporation
3, The property owner installs and maintains (including replacement at a minimum of every
ten years) the inflow and outflow meters at no cost to CCWSD
4. CCWSD has completed an onsite inspection and approved that the installation m~ets
Collier County Utility Standards
5. The property owner provides via email to UBCS, monthly meter reads from both the
inflow and outflow meters by an agreed due date, the reads being confirmed with meter
register photographs
PROPERTY OWNER RESPONSIBILITY
I. The property owner must complete a Cooling Tower Adjustment Application Form and
submit to UBCS
2. The property owner must provide drawings and calculations by the Engineer of Record,
for the cooling tower water flows to CCWSD, to include, but not limited to the placement
of inflow and outflow meters and any associated cross connection control devices. The
property owner will be responsible for the supply and installation costs of the meters and
associated pipe work and devices
3. The property owner will advise CCWSD when installation work commences
4. The property owner will advise CCWSD when the installation is completed and ready for
inspection
5. Following approval by CCWSD that the installation meets Utility Standards the property
owner will provide monthly reads of both the inflow and outflow meters to UBCS at
Cooling Tower Adjustment Procedure
Page 1 of2
collierbilling@colliergov,net . The reads will be emailed together with photographs of the
meter registers, including meter serial number, to evidence the reads by the due date
advised by UBCS. The property owner will replace at a minimum of every ten years both
the inflow and outflow meters and provide confirmation to UBCS.
6. The property owner will allow right of access to CCWSD employees to inspect the
cooling tower and inflow and outflow meters at all reasonable times
ADJUSTMENT PROCEDURE
A. On receipt of the monthly inflow and outflow meter reads from the property owner,
UBCS will confirm the reads with the photographs provided
B. Any reads not evidenced by photographs will not be processed until photographs are
provided by the property owner
C. The difference between the inflow and outflow meters, the water loss due to evaporation
(WLE), will be used to calculate a sewer adjustment for each monthly bill for the
customer account providing water/sewer service to the cooling tower. The sewer volume
charge based on the water consumption registered at the potable water meter for the
account will be reduced by an amount calculated based on WLE, using the current
wastewater rate
D. The UBCS Billing supervisor will undertake random sample quality checks of cooling
tower credit adjustments and all adjustments will be reviewed and approved or denied by
the Utility Billing & Customer Service Manager before a credit adjustment is made to the
customer's account
E. The credit adjustment will then be applied to the next bill
GENERAL INSTRUCTIONS
A. In accordance with Utility Billing & Customer Service procedures a copy of the Cooling
Tower Credit Adjustment form will be scanned and attached to the customer account
B. Annually the recorded WLE will be audited by UBCS to review credited gallons against
Engineer of Record estimates, with follow up as necessary with the property owner
IMPLEMENTATION
The Utility Billing & Customer Service Manager, or his or her designee, shall be responsible for
implementation and interpretation of this procedure and is authorized to exercise the applicability
of this procedure to any property owner requests for cooling tower credit adjustments.
July 2011
Cooling Tower Adjustment Procedure
Page 2 of2
EXHIBIT B
~
Collier County Utility Billing
APPLICA TION for COOLING TOWER MONTHLY WATER
EVAPORATION ADJUSTMENT
Please print clearly when completing this application form.
I Utility Account No.
Name on Utility Account (Property Owner):
Folio Numbers:
Service Address:
City, State, Zip + Four:
Naples Phone No. :
Email Address:
Alternate Phone No. :
Owner{s) Agent:
(Provide written evidence of Designated Agent's/Officer's authority to execute legal documents for property owner)
Contact Person:
(This should be person able to discuss operation of cooling tower and meet Water Distribution onsite for inspection).
Position:
Phone Number:
Email Address:
*************************************************************************************
Cooline Tower Information
Meter Sizes: Inflow
Outflow
Meter Manufacturer and Model:
Engineer Estimate of daily demand of water cooling tower:
Manufacturer:
Location of Cooling Tower within Facility:
By signing this application, the property owner recognizes and agrees to abide by all existing rules and regulations
of the Collier County Water-Sewer District (CCWSD), and any amendments thereto, copies of said rules and
regulations and amendments thereto being available for inspection at Utility Billing and Customer Service (UBCS).
The property owner also agrees to:
I. Provide written evidence of Designated Agent's/Officer's authority to execute legal documents for property
owner
Page 1 of2
~Jt~
Collier County Utility Billing
2. Provide signed and sealed drawings and calculations by the Engineer of Record, for the cooling tower
water flows to eeWSD, to include, but not limited to the placement of inflow and outflow meters and
associated cross connection control devices
3. Advise eeWSD when installation work commences together with Building Permit number
4. Advise eeWSD when the installation is completed and ready for inspection
5. Receive from eeWSD a formal notice of approval that the installation is complete and meets Utility
Standards
6. Provide, following approval by eeWSD, monthly reads of both the inflow and outflow meters to UBeS,
The reads will be emailed to collierbillinl!@colliergov.net together with photographs of the meter registers,
including meter serial number, to evidence the reads by the due date advised by UBeS. Replace at a
minimum of every ten years both the inflow and outflow meters and provide confrrmation to UBes.
7, Allow right of access to eeWSD employees to inspect the cooling tower at all reasonable times
Printed Name of Property Owner (or Designated Agent)
Signature of Property Owner (or Designated Agent)
Printed Title of person signing if Corporation:
Date
Please complete the form and return to: collierbilling@colliergov.net
les, FL 34104
*************************************************************************************
This section to be completed bv CCWSD after site inspection visit:
Date ofInspection:
Installation complete and in accordance with CCWSD Utility Standards
Inspected by (Print Name):
Signature:
Engineer of Record Drawings and Calculations received and reviewed?
A
orate Authori
YES
YES
NO
NO
Approval:
Water Distribution Manager
Date:
Forwarded to UBCS to be associated with Utility Account on:
Page 2 of2
16C 8
RESOLUTION NO. 2002 - ....lfi.5
A RESOLUTION OF THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER COUNTY, FLORIDA, AS THE
GOVERNING BODY OF COLLIER COUNTY AND AS EX-
OFFICIO THE GOVERNING BOARD OF THE COLLIER
COUNTY WATERlSEWER DISTRICI' TO AUTHORIZE THE
PUBLIC UTILITIES ADMINISTRATOR OR HIS DESIGNEE TO
EXECUTE COOLING TOWER DEDUCT METER AGREEMENTS
BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS
OF COLLIER COUNTY, FLORIDA, and as the Governing Body of Collier County
and as Ex-Officio the Governing Board of the Collier County Water/Sewer District, that:
1. The Public Utilities Director (James W, DeLony) or his designee is hereby
authorized on the Board's behalf to execute written agreements for cooling
tower deduct meters with the property owners.
2. Owner must submit a fonnal application and all procedures must be
adhered to.
3. A draft example of the subject Agreement is attached as Exhibit "A".
This Resolution adopted this /~ daYOf'/ ~ ~ ,2002 after
fJ}Qtic;ltJ,. second and majority vote favoring adoption.
- . ~.~
ATTEST: ~':
DWIGH"f, E.$ROCK, CLERK
..~y:' .0(;';-I4p~
.,'c: . ' Deputy Clerk
Attest '1 to Ch.tr.en',
If~t.... onl1.
Approved as to fonn and
legal sufficiency.
16'-\ PJ~
Thomas C, Palmer,
Assistant County Attorney
/..:.::..\\\\'...\ .......::::....../
.: 3 '.:~/. '\~'"
:":,' ".... ';~...'" . ~
BOARD OF COUNTY COMMISSIONERS '/ i.
COLLIER COUNTY, FLO~A, A 7~.,: .... -
POLITICAL SUBDIVISIONOFl'HE; ~~"" . :;
STATE OF FLORIDA, AND"AS EX- '.\":...".:. ,.f
OFFICIO THE GOVERNING B'0ARD . ." ":::..
OF THE COLLIER COUNTY W A~l:l,,\l\\\\'
SEWER DI~ /
BY'J~~3&
AGREEl\1ENT FOR COOLING TOWER
REDUCTION METER INSTALLATION, READINGS,
INSPECTIONS AND MAINTENANCE
16s;;
THIS AGREEMENT, is entered into this_ day of , by
and between the COUIER COUNTY WATER-SEWER DISTRICT, with its principal place of
business at 3301 East Tamiami Trail, Naples, FL. 34112 ("District"), and
, ("Owner') with its principal address as
, City , ST. , Zip.Code,
WHEREAS, Owner has requested that the District install a cooling tower reduction
meter to measure evaporation loss of water (that is not returned to the sewer system).
WHEREAS, a cooling tower is part of an air conditioning system that allows heat from
the air conditioning system to transfer to potable water as it flushes around the compressor coils,
which process use up large quantities of potable water; and
WHEREAS, to accommodate the proposed reduction meter, the Owner must provide
access to the property for the District to install the meter, read the meter monthly for its
registered water consumption. inspect the meter monthly, and provide maintenance as needed.
THE PARTIES AGREE AS FOLLOWS:
1. The above recitals are true and correct and are incorporated herein.
2. Owner hereby grants to the District right of entry onto the property for access to read,
inspect and maintain the meter.
3. Each month the District shall take a usage reading and inspect the meter, and shall
perform periodic maintenance as needed.
4. The meter will be installed until a pre-approved method of installation is agreed to in
writing by District and Owner.
5. Owner hereby agrees to indemnify and hold harmless the District, its elected and
appointed officers, employees and/or agents from all claims and suits whatsoever for
damages to propeny and/or injuries to persons, including death, and all judgments, court
costs, attorney fees and all other related expenses arising out of or relating to the cooling
tower, installation of the reduction meter, and readings, inspections and maintenance.
6, The meter will continue to be owned by District and a $4.00 surcharge for each deduct
calculation will be applied to Owner's monthly utility bill,
1
NO. AGE)% tt"
SEP 1 0 2002
PG. .L
16C 8
7. This Agreement shall run with the land; All terms, covenants and conditions are and shall
be binding upon Owner's representatives, successors and assigns.
IN WITNESS WHEREOF, the parties hereto, acting under authority of their respective
authorized offices, have caused this Agreement to be duly executed as of the day and year fIrst
above issued.
ATTEST:
BY:
BY:
(L.S.)
WITNESS
TypelPrint Name of Witness
TypelPrint Name and Title
ACKNOWLEDGl\1ENT
STATEOFFLORIDA )
COUNfY OF COLLIER)
The foregoing instrument was acknowledged before me this
, by
day of
, as
Personally known
for
OR Produced Identification: Type of Identification produced.
Notary Public
My Commission Expires:
Typed, printed or stamped name of Notary Public
COllIER COUNTY WATER-SEWER DISTRICI'
By:
James W. DeLony, P .E., Utilities Administrator
Approved as to form and legal sufficiency:
By: lD 1.0 ~Jt..L---
Thomas C. Palmer, ssistant County Attorney
2
~Jt: ITE"
NO. e.
SEP 1 0 2002
PG. ..3
16C 8
-
PROCEDURE FOR COOLING TOWER DEDUCT l\1ETERS
Purpose of Procedure: To provide a mechanism to evaluate the feasibility of
installation of meters at facilities that utilize cooling towers. Cooling towers work by
taking in large amounts of water, most of which evaporates prior to being returned to the
wastewater collection system. The purpose of the two meters being installed is to
accurately measure the amount of evaporation that is occurring in the cooling tower and
provide a credit for this water that is not being placed into the wastewater collection
system. The deduct meters would measure the amount of water that is being sent to the
cooling tower and the amount of water that is leaving the cooling tower, The difference
in the two meter readings each month will provide the amount of credit towards the sewer
charges imposed on this account.
Procedure:
Q Customer desiring the installation of the deduct meters on their cooling tower
facilities will make application to the Collier County Water Distribution Section.
The application forms will be available on the County Web Page, and will be
available at Utility Billing/Customer Service located at 2685 South Horseshoe
Drive. Please note that the application form is attached/enclosed.
Q After a customer has filled out and returned the form to Water Distribution, a site
inspection will be performed to determine the feasibility of the installation. The
facility must be able to handle the placement of two 2" radio read meters, one on
the upstream and one on the downstream side of the cooling tower. The facilities
must be such that the placement of the meters will allow it to be read by the latest
radio technology being employed by Collier County.
Q After the site inspection is completed, a written estimate of the cost to place the
meters will be forwarded to the Facility Owner for acceptance. The acceptance
package will include an Agreement that must be executed prior to any work being
commenced. The standard Agreement is attached/enclosed.
Q Once the two above items are received and executed by Collier County, Water
Distribution employees will do the installation of the meters and will then forward
the meter information to the Utility Department of Finance for set-up of the
meters into the County's billing system. An invoice will be forwarded to the
Facility Owner and upon payment the deduction of the sewer charges for the
monthly utility billing will begin.
Q Collier County will apply a monthly surcharge for each individual deduct
calculation to the monthly water/sewer utility bill.
AGtE ITEM
NO . t!--
SEP 1 0 2002
PG.
APPLICATION FOR COOLING TOWER DEDUCT l\1ETERS
16C 8
Facility Name:
Facility Address:
Facility Owner:
(This should be person authorized to execute legal. documents for facility.)
Contact Person:
(This should be person able to discuss operation of cooling tower and meet Utility
Representative onsite for inspection.)
Position:
Phone Number:
Fax. Number:
Billing Address:
Size of potable meter:
Cooline: Tower Information
Size:
Engineer Estimate of daily demand of water to cooling tower:
Manufacturer:
Location of Cooling Tower within Facility:
Size of upstream line to cooling tower:
Size of downstream line to cooling tower:
To be filled by Utility after site visit:
Date of Site Inspection:
Inspector:
Unusual Site Conditions:
Able to complete installation in a satisfactory manner: (Yes or No)
Estimated Labor Costs:
Estimated Material Costs:
AGtrtpl' I H"
NO. &~
SEP 1 0 2002
PG . tl}'
Forwarded to Facility Owner: