CAC Agenda 04/14/2011 R
CAC
REGULAR
MEETING
AGENDA
APRIL 14, 2011
i
_I
14, 201
NDA &. N
GENDA
COASTAL RY CO
THURSDAY, APRIL 14,
BOARD Of COUNTY COMMIS
THIRD FLOOR, COLLIER COUNTY
3299 TAMIAMI TRAIL EA
Sunshine law on A
PUBLIC NOTICE
I. Call to Order
II. Pledge of Aile
III. Roll Call
IV. Changes and
al of Agenda
V. Public: Comments
VI. Approval of CAC Minutes
1. March 10. 2011
VII. Staff Reports
1. EXDanded Revenue ReDort
2. Project Cost ReDort
3. Project Status
* Wiggins Pass Dredging
* Naples Beach Renourishment
* Jetty at Doctors Pass
4. Outfall Pipes - Renourishment Permit
rial
6. 195 10 Year Plan
7. fiscal Year 11/12 Proposed BudClet
B. Fiscal Year 11/12 Grant AI,lDlications
a. BackuD Material
I
I
_I
9. FDEP PermittinCl Status
XII.
Adjournment
All
in
if
please
are a person with a disability
proceeding, you are entitled, at no
Collier County Facilities Management
(239) 252-8380.
OFFICE OF THE COUNTY ATTORNEY
MEMORANDUM
TO:
Anthony P. Pires, Jr., Esq., Chairman
Coastal Advisory Committee Clam Bay Subcommittee
Colleen M. Greene, Assistant County Attome~0
March 18,2010
FROM:
DATE:
RE:
Sunshine Law and Agenda question
The issue presented is whether the Sunshine Law requires that an agenda be made available prior
to board meetings. In summary, the answer is no.
The Sunshine Law Manual (2009 Ed. VoL 31) provides the following:
The Attorney General's Office recommends publication of an agenda, if available, in the notice
of the meeting;. if an agenda is not available, subject matter summations might be used.
However, the courts have held that the Sunshine Law does not mandate that an agency provide
notice of each item to be discussed via a published agenda. Such a specific requirement has been
rejected because it could effectively preclude access to meetings by members of the general
public who wish to bring specific issues before a governmental body. See Hough v. Stembridge,
278 So. 2d 288 (Fla. 3d DCA 1973). And see Yarbrough v. Young, 462 So. 2d 515 (Fla. 1st
DCA 1985) (posted agenda unnecessary; public body not required to postpone meeting due to
inaccurate press report which was not part of the public body's official notice efforts). Thus, the
Sunshine Law has been interpreted to require notice of meetings, not of the individual items
which may be considered at that meeting. However, other statutes, codes or ordinances may
impose such a requirement and agencies subject to those provisions must follow them.
Accordingly, the Sunshine Law does not require boards to consider only those matters on a
published agenda. "[W]hether to impose a requirement that restricts every relevant commission
or board from considering matters not on an agenda is a policy decision to be made by the
legislature." Law and Information Services, Inc. v. City of Riviera Beach, 670 So. 2d 1014, 1016
(Fla. 4th DCA 1996).
Today's Coastal Advisory Committee Clam Bay Subcommittee was properly noticed in
compliance with the Sunshine Law on or about February 1, 2010. Further, the agenda for
today's meeting was also publically noticed on the County's website on Monday, March 15,
2010. The related back-up materials for the agenda were supplemented and available on the
County's website on Wednesday, March 17, 2010. In addition, a number of these materials also
appeared on the agenda for the Coastal Advisory Committee meeting on Thursday, March 11,
2010.
In my opinion, there is no violation of the Sunshine Law and no legal issue regarding the date the
agenda was published.
cc: Gary McAlpin, Director, Coastal Zone Management
CAC April 14, 2011
VI-1 Approval of CAC Minutes
1 of 8
MINUTES OF THE MEETING OF THE COLLIER COUNTY
COASTAL ADVISORY COMMITTEE
Naples, Florida, March 10,2011
LET IT BE REMEMBERED, that the Collier County Coastal Advisory
Committee, in and for the County of Collier, having conducted business
Herein, met on this date at 1:00 P.M. in REGULAR SESSION at
Administrative Building "F", 3rd Floor, Collier County Government
Complex Naples, Florida with the following members present:
CHAIRMAN: John Sorey, III
VICE CHAIRMAN: Anthony Pires
Jim Burke
Murray Hendel
Robert Raymond (Excused)
Joseph A. Moreland
Victor Rios
Wayne Waldack
Randy Moity
ALSO PRESENT: Gary McAlpin, Director, Coastal Zone Management
Colleen Greene, Assistant County Attorney
Gail Hambright, Accountant
Dr. Michael Bauer, City of Naples
CACApril14,2011
VI-1 Approval of CAC Minutes
2 of 8
I. Call to Order
Vice-Chairman Pires called the meeting to order at 1 :08 p.m.
II. Pledge of Allegiance
The Pledge of Allegiance was recited.
III. Roll Call
Roll call was taken and a quorum was established.
IV. Changes and Approval of Agenda
Mr. Rios moved to approve the Agenda subject to the following additions:
. VII.10 - Vanderbilt Beach Facilities update
. x'3. - Public Notice for CAC Applications
. XA. - Applications for CAC
Second by Mr. Waldack. Carried unanimously 7-0.
Gary McAlpin noted Item VII.9 may be heard early in the meeting, as Mr. Keehn of
Coastal Planning and Engineering has a time constraint.
V. Public Comments
None
VI. Approval of CAC Minutes
1. January 13, 2011
Mr. Moreland moved to approve the minutes of the January 13,2011 meeting.
Second by Mr. Waldack. Carried unanimously 7-0.
VII. Staff Reports
1. Expanded Revenue Report - Gary McAlpin
The Committee reviewed the "Tourist Tax Revenue Report - FY 2010 - 2011 "
updated through February 2011.
Chairman Sorey arrived at 1:23 pm and assumed the Chair.
2. Project Cost Report - Gary McAlpin
The Committee reviewed the "FY 2010/2011 TDC Category A: Beach
Maintenance Projects" updated through March 1,2011.
3. Clam Bay Marker Status
Gary McAlpin provided a copy of his emai1 to Collier County Staff members
dated January 28, 2011 and an email from Ryan Moreau, Planner, Florida Fish
and Wildlife Conservation Commission dated 3/2/11 - "Subject: RE: Clam Bay
Discussion Group Material," and included related backup documents outlining
the composition, goals, and status of the Stakeholder Discussion Group.
He noted there was a Stakeholder meeting on February 17, 2011 with a second
meeting scheduled for March 15, 2011.
CAC April 14, 2011
VI-1 Approval of CAe Minutes
3 of 8
4. Wiggins Pass Dredging - Update
Gary McAlpin noted Southwind Construction Corporation was approved to
complete the scope of work at a price of $750,000 and the work is currently being
undertaken.
9. Naples/Park Shore/Vanderbilt Conceptual Study and Renourishment-
Update
Stephen Keehn, Coastal Planning and Engineering presented the Slideshow
"Collier County 2006 - 2010 Beach Performance & Hot Spot Identification,"
which outlined the status of the Beach Renourishment Study being currently
undertaken by Staff and Consultants.
Gary McAlpin noted:
. Staff and consultants are in the process of preparing the Plan for the
major beach renourishment to be performed on Collier County and City
of Naples Public Beaches.
. The previous plan for renourishment incorporated a "standardized"
design for the areas to be renourished.
. The Plan for the future beach renourishment will be more "site
specific."
. Staff intends to return the Plan within the next 90 days to the Coastal
Advisory Committee, a Workshop may be held to aid in finalizing the
Plan.
. A similar study is underway for the Marco Island Beaches.
The Committee determined to hear Item #7 next.
7. Wiggins Pass Straightening Engineering Status
Gary McAlpin noted:
. The County has prepared a Plan to stabilize Wiggins Pass by
"straightening" the Pass through "soft engineering.
. An application was submitted to FDEP and the first Request for
Additional Information (RAI) seeks the provision of 4 additional studies
(Environmental Impact Statement, Inlet Management Plan, Modeling of
the Ebb Tide Shoal and related geo technical surveys.)
. The cost of the Scope of Work to address the studies sought in the RAI
is $177,000, however the Board of County Commissioners requested
Staff to contact FDEP to obtain a "commitment," if the studies were
completed, that a permit would be issued.
. The BCC also raised the issue whether "soft engineering" will be
successful and if a "hard engineering" solution should be considered.
. The cost to complete the work proposed to stabilize the Pass is
approximately $3.5M - 4.0M.
. Staff is in the process of determining how to proceed on the issue.
. An update will be provided at a future CAC meeting.
CAC April 14, 2011
VI-1 Approval of CAC Minutes
4 of 8
Mr. Moreland, Chairman of the Wiggins Pass Subcommittee expressed
concern regarding the length of time of the permit process. As identified by the
Boating Community, it is a navigational safety issue and delaying the process is
not in the best interest of the County.
Speaker
Nicole (Ryan) Johnson, Conservancy of Southwest Florida noted the goals of
the Plan to stabilize the Pass are promoting safety, minimizing erosion on the
south end of Barefoot Beach, lengthening the dredge cycle, and minimize
environmental damage all in a cost effective manner. She was disappointed that
the BCC was not convinced that "soft engineering" may meet the goals of the
Plan, and noted the previous Wiggins Pass Subcommittee, comprised of
Stakeholders, agreed this was the most optimal solution for meeting the goals for
the stabilization of the Pass. She submitted a copy of the white paper "Western
Carolina University Program for the Study of Developed Shorelines" and "A
Fiscal Analysis of Shifting Inlets and Terminal Groins in North Carolina"
prepared by Andrew S. Coburn, of Western Carolina University. These studies
endorse "soft engineering" solutions and should be reviewed by any parties
interested in this matter (CAC members, FDEP, BCC Members, etc.) She
recommended a meeting of the Wiggins Pass Subcommittee be convened to
discuss the matter.
Gary McAlpin noted a meeting with FDEP has not yet been scheduled and all
appropriate parties should be able to attend. He hopes to place the item on a BCC
Agenda in approximately 60 days.
5. Naples Berm Renourishment - Update
Gary McAlpin noted the work is underway south of Doctors Pass, with the
completion slated for April 1, 2011. The potential long term solution to
preventing the erosion from continually occurring in the area will be addressed in
the Naples/Park Shore/Vanderbilt Conceptual Study for Beach Renourishment.
6. Doctors Pass Jetty - Update
Gary McAlpin noted the project is 25% complete with a total of3800 tons of
rock to be placed.
8. Easement Status
Gary McAlpin noted:
. The BCC directed Staff to prepare a proposed Easement Agreement for
execution between private property owners and the County to permit public
beach access, for areas where public funds are expended for beach
renourishment on private property.
. The Tourist Development Council recommended the BCC not approve the
proposed agreement (the CAC previously approved the agreement in
concept with conditions.)
. Staff will seek direction from the Board of County Commissioners.
CAC April 14, 2011
VI-1 Approval of CAC Minutes
5 of 8
10. Vanderbilt Beach Restrooms Update
Gary McAlpin noted:
. The BCC had directed Staff to proceed with the design and permitting of
an elevated restroom/concession facility at Vanderbilt Beach.
. Residents in the area are not in favor of an elevated structure so the BCC
requested Staff inquire with FEMA on the feasibility of building the
structure "at grade."
. FEMA indicated the "at grade" facility would jeopardize the status of
Collier County property owners who have FEMA Flood Insurance.
. Staff will seek direction from the BCC within 60 days.
VIII. New Business
1. Clam Bay Site Specific Water Quality
a. Proposal
Gary McAlpin presented the Executive Summary "Recommendation to
approve a $77,148 Purchase Order to PBS&J to develop locally-relevant and
site-specific alternative water quality criteria for the Clam Bay estuary, and
provide continued technical support for the next 6 months to the Clam Bay
technical work team" dated March 10,2011 and document "Additional Work
Request Contract # 09-5262-CZ" dated March 7, 2011 for consideration. He
noted the County is proposing to develop Site Specific Water Quality Criteria
for Clam Bay, and the item is provided for information purposes; however the
CAC may provide a recommendation. The Purchasing Department advised
Staff that they are in compliance with County Purchasing policies. The
Pelican Bay Foundation is partnering with the County in the proposaL
Mr. Pires expressed concern the decision to award the Scope of Work when it
was not completed in accordance with the Competitive Consultants
Negotiation Act, and the proposed contract has not complied with required
purchasing policies.
Dr. Michael Bauer, City of Naples noted the Naples City Council may be
undertaking similar proposals, as any approved water quality criteria may
have an impact on Naples Bay and Moorings Bay. Moorings Bay is
interconnected with Clam Bay, so any criteria established for Clam Bay will
have an impact on Moorings Bay, and the water quality criteria preliminarily
identified by the Department of Environmental Protection may be unattainable
for Naples Bay.
Speaker
Marcia Cravens expressed concern on the proposed expenditures, as PBS&J
is being paid to duplicate services to review data on the Clam Bay System.
Their initial studies indicate the water quality in the system is "better than the
mean" for all Florida Estuaries, while their subsequent studies indicate that
there "was a problem" with the water quality in the system. Historic and
CAC April 14, 2011
VI-1 Approval of CAC Minutes
60f8
current data indicates the system meets Florida Department of Environmental
Protections standards for water quality.
Caitlin Weber, Conservancy of Southwest Florida expressed concern that
the scope of work may be premature, as the revised numeric nutrient criteria
to be established by the Environmental Protection Agency have not been
officially released.
Gary McAlpin noted although the required EP A numeric nutrient criteria
have not yet been officially established, the County is attempting to initiate a
"pre-emptive strategy." The Agencies have reacted favorably to the County's
input on the matter.
Mr. Rios moved to recommend the Board of County Commissioners approve
a $77,148 Purchase Order to PBS&J to develop locally-relevant and site-
specific alternative water quality criteria for the Clam Bay estuary and
provide continued technical support for the next 6 months to the Clam Bay
technical work team" and the "Additional Work Request Contract # 09-
5262-C.Z." Second by Mr. Moreland. Motion carried 8 'yes" -1 "no."
Mr. Pires voted "no. "
Mr. Pires indicated his "no" vote was predicated on issues concerning the
policies of the Collier County Purchasing Department and the input provided
by Caitlin Weber.
2. Talking Points for Secretary Vinyard/Scott
Gary McAlpin provided the document "Collier County Coastal Permitting
Experiences, " which outlines Staff concerns on the process of obtaining
environmental permits from the Florida Department of Environmental Protection
and Florida Fish and Wildlife Conservation Commission.
Chairman Sorey recommended Committee members email comments or
suggestions to Staff to assist them in further developing the talking points.
Speaker
Nicole (Ryan) Johnson, Conservancy of Southwest Florida noted the system
always may be improved but expressed concern on the "tone" of the "talking
points."
Gary McAlpin noted he intends the document to be "positive" in nature and
welcomes others input on experiences/issues, including that of the Conservancy.
IX. Old Business
None
X. Announcements
CAC April 14, 2011
VI-1 Approval of CAC Minutes
70f8
1. Public Notice for 2011- 2012 Category "A" Grant Application
Gary McAlpin provided a copy of the public notice "Coastal Advisory
Committee Accepting Category "A" Grant Applications Collier County, Florida"
dated February 16,2011 for information purposes.
2. Lessons from Gulf spill slipping away
Gary McAlpin provided a copy of an email from Wayne Waldack dated
February 14, 2011, Subject: "Gulf Oil Leak - Lessons Learned??" for information
purposes.
3. Public Notice for CAC Applications
Gary McAlpin provided a copy of the Press Release issued by the Board of
County Commissioners (BCC), seeking applications for vacant seats on County
Advisory Committees, including the Coastal Advisory Committee.
4. Applications for CAC
Gary McAlpin Announcements provided a copy of a memo to him from Ian
Mitchell, Executive Manager, Board of County Commissioners dated March 10,
2011 which identified Mr. James Burke, Mr. David Roellig and Mr. Theodore J.
Raia as applicants to fill vacancies on the Coastal Advisory Committee.
Speaker
Marcia Cravens addressed the Committee and expressed concern no Committee
member present has expertise in the area of Coastal Planning or Marine Biology.
When a recommendation is made to the BCC for new members to be appointed to
sit on the CAC, existing members strongly consider applicants who have this
background.
XI. Committee Member Discussion
Mr. Moreland recommended members of the Committee take a tour of Wiggins
Pass. It was determined individual tours would be most practical, and any member
who wishes to take a tour should contact staff.
Chairman Sorey noted he and Dr. Bauer continue to work on the concept of "Habitat
Islands" in Naples Bay and noted FDEP is willing to meet with the City of Naples on
the issue.
XII. Next Meeting Date/Location
April 14, 2011 - Government Center, Administration Bldg. F, 3rd Floor
CAC April 14. 2011
VI-1 Approval of CAC Minutes
80f8
There being no further business for the good of the County, the meeting was
adjourned by order of the chair at 3:42 P.M.
Collier County Coastal Advisory Committee
John Sorey, III, Chairman
These minutes approved by the Board/Committee on
as presented or as amended
~ '"
~t::
DO
No.
- <ll
;:!:o::
~~
0._
<((J)~
~~O
o>~
C ..........(1)..,
oS ~~::~
u aiN"';O~
CU 01")0.
'0 ..........'11"'0
0: :!.. ~ ::!"' ::!"'
............
....
....
<:)
N
I
<:)
....
<:)
N
>-
u..
.. ..........CDii'~
u
c :..~:..:..~..
.2
~ 1ft CICI 10......
tIIt......-~
..
.a
u
0(
..
::l ~ ~ ~ .li
c
c = ~..~..~..
0( "M 'lit M
~ CIOOlOtO
........CIOOCl
.., .. .. ..
......"I""N
.. .........
:;
E
E
::l
(.)
;;
'"
."
::l
III
.. gClOOOOOggggg ..
::l ..
c i :i:..~..~..~..g..~..:..~..~;:..~.. ..
c Q
0( CIO"~=~~g::;~:g:~ ..
.~ ..
: ~.. ~.. :i ~ :;.. :;.. ~.. ;:.. ~ ~.. :i :i
i .............."................... ..
::l
E
E
::l
(.)
1::
o
Co
Gl
0:::
Gl
:J
C
Gl
>
Gl
0:::
><
CIl
I-
...
III
.;:
:J
o
I-
..
u
c
~
..
>
t;~~:~i
~~~~~i
=~~~E~
Nq
..
::l
U
0(
>-
:2
'E
o
::0
[t;~:~a~
:..:.. ~.. ~ ~ ~.. : a a a : a
!;;:~~ctU)..o..
..tilt...;;:;::.
~
.;
I
~
,.
..
'"
."
::l
III
>-
S
c
o
:E
ooogggggoooo
oOOO........."l""...oooo
GlGllCICI........ ..c.o.....GJCQ
flQ"r.r"':~ ~ ~ ~:; N.....a.......:
.... 0..... 0......... M MM..............
::t;~;:i~;::::
..
..
..
Q
..
..
,.;
..
;;
'"
."
::l ..
III :;::::::3~~~~~~~~ ..
~ <>
c coi..t.o.;::!~:!~uiuiui,.; ~
c
0(
.,.
..
~
~
..
1::
~:~....:: ....::
=!.i ~ ~~ =:::::: i j
.g E E!! 2 ~'~~!!.;-e.~
u~f:;.gi4:::i.;...,~'S.
O~~""u.. eX
..
~
~ en
~t
00
No.
- (])
~o::
~~
0._
<(U)~
~~O
U>N
r-- r-- 0 C'l C'l 0
11) C'l 0 \J:> "'" 0
0 \J:> CO ..,. N N
[/'J M ~'"J r-- U) M rn 11) rn ..-i rn U) ..-i
H \J:> ,..:j ..-i ,..:j ,..:j ..,. H \J:> ,..:j H '"
<r: t- <r: "'" <C <C <r: N <C < ""
..-i E-< ...... E-< ...... E-< E-< E-< C'l 8 E-< \J:>
0 0 0 0 0 0 0
E-< E-< E-< E-< E-< E-< E-<
~ Il. P, Il.
CJ Il. P, P, p,
< ~ fiI ~ fiI fiI fiI fiI
Il. [/'J [/'J U) rn rn rn U)
l? CJ CJ 0 CJ CJ CJ
p P D D D P P
<.t; <.t; <C <C <C <C <r:
:>-<
E-<
H ,..:j H ,..:j ,..:j ,..:j H H
U P D ::J P ::J P P
>-) >-) >-) >-) >-) >-) >-)
:>-<
(Xl
E-<
0::
0 :z :z :z :z :z z z
Il. ::J ::J ::J ::J ::J D D
~ >-) >-) '"") >-) >-) >-) >-)
0::
-I<
0 -I< -I<
E-< -I<
:>-< -I< :>-<
:>-< -I< :>-< :>-< E-< :>-< :>-< :>-< :>-< :>-<
<.t; <.t; <.t; H <C E-< ~ <r: <C
:<: 0 :<: -I< :<: u :>: :z :<: :<:
~ :z .. p
< U) 0
E-< -I< ,..:j fiI fiI U -I<
-I< UJ fiI 0 -I< ..
E-< H H <C 0:: -I<
rn [/'J 0:: ex:: ~ ex:: ,..:j 0:: ~ 0:: ex:: U) 0::
H fiI Il. 0 Il. P, l? P, H Il. 0:: C, H c,
0:: ,..:j <.t; u <.t; 0 <.t; ex:: <C H < fiI < <.t; <l;
::J Il. 0:: :<: fiI H :.r: E-<
0 <r: <l; :<: :> 0 E-< 0
E-< :z ::8 H ~ U 0 E-<
:>-< -I< t- -I< 0"\ -I< CO -I< 0 -I< 0 -I< -I< ""
E-< -I< 0:: N -I< 0:: N -I< 0:: \J:> -I< 0:: ,...., -I< 0:: CO -I< ex:: -t: ~ ,....,
z < ..... <l; 0 <C t- ~ N ~ 0\ < .....
D :<: r-- :<: \J:> :>: M CO :<: \J:>
0 M .-l rl 11) N
U lI) "" 0 0
..... N
0::
fiI 0 11) 0\ 0 ro N
H (Xl \D (Xl N IXl "c:;tl IXl N IXl \J:> (Xl IXl N
,..:j fiI N ~ \J:> fiI \J:> ~ 0 ~ r-- fiI fiI C'l
H "" 0\ "" r- "" "" 0 "" C'l "" "" .-l
0 \J:> 0 M .-l 0
U "" M ro \J:>
.-l
M M 0"\ \J:> t- (Jj
Z 11) :z 0 z ..,. ~ N ~ 00 z Z rl
~ 11) ~ 00 ~ \J:> \J:> 0 ~ ~ t-
\J:> 00 >-) r-- >-) \J:> 0\
'" '" 0 0
N .-l lI) 0
rl
t- O 0"\ "" r-- 0\
U o::t' U "" U M U N U rl U U \J:>
rl fiI '" fiI I.() fiI \J:> ~ M ~ \J:> ;:..:J fiI 0
..... 0 t- O I.() 0 0 "" 0 '" 0 0 0
0 0 r-- lI) 11)
N N rl C'l t-
"
rl
0 M \J:> 0 rl 0 0
-, > OJ > CO > t- > ...... > C'l > > N
"" 0 0"\ 0 t- O "" 0 0 0 0\ 0 0 .-l
0 Z "" Z '" Z Z L[) :z "'" z z L[)
"'" \J:> 0 N
rl ...... C'l \.0
0
0:: t- "" lI) 0 ...... t-
O E-< "" E-< 11) E-< N E-< t- E-< \.0 E-< E-< 11)
N U N U CO U \D U N U 00 U U co
M 0 t- O '" 0 0 M 0 f"- 0 0 co
0 0 "" .-l r--
fiI .-l .-< N "'"
p:j
~ III
~1::
DO
No.
- Q)
;!o::
'E~
0._
<((/)~
~~'O
0>",
00 r- (/) (V) (/) N (/) If) (/) r- OO <D (/) r- (/) .--i (/) Cf) 0
H 0 H .--i H r- H "" H (V) H r- H l;O H <D H H 0
~ ro ~ r- ~ r- ~ "" ~ (V) ~ \D ~ LI) ~ CO ~ ~ N
E-< '" E-< 0'\ E-< ro E-< .--i E-< '" E-< (V) E-< '" E-< (V) E-< E-< M
0 M 0 rl 0 l;O 0 l;O 0 OJ 0 M 0 LI) 0 r- 0 0 0'\
E-< E-< LI) E-< E-< '" E-< E-< E-< M E-< .--i 8 E-< ""
'" rl l;O
M
CiI
0 0.. 0.. 0..
~ 0.. 0.. 0.. 0.. 0.. 0.. 0..
0.. W CiI W W CiI W CiI CiI CiI CiI
Ul (/) (/) (/) (/) (/) (/) (/) (/) (/)
c') 0 0 0 0 l'J 0 0 \,') 0
::> ::> ::> ::> ::> ::> ::> ::> ::> ::>
~ ~ ~ ~ ~ ~ ~ ~ ~ ~
CiI
0..
><
E-<
E-< H H H H H H H H H H
Z ::> ::> ::> ::> ::> ::> ::> ::> ::> ::>
::> '? IJ t-:J IJ '? '? t-:> t-:> IJ IJ
0
U
U
~
>-< Z Z Z Z Z Z Z Z Z Z
o:l ::> ::> ~ ::> ::> ::> ::> ::> ~ D D
t-:> t:l ~ t-:> t-:> t-:> IJ '? IJ t-:>
E-< ~
po; ;,,:; ~
0 po;
0.. ~ ;,,:; ~
CiI 0.. p:: ~
po; >-< ~ >-< '->< ~ >< >-< ~ >-< >-< >-< >-< ><
~ .. ~ :>~ '" ~ ~ 0.. ~ >< ~ <( ~ ~
Q '" :8 0:;;;;:: :8 :8 H ;;;:: :8
E-< ~ ;;;:: ......... H .. U1 H
>-< ::> 0 CiI ~ ;;;:: ~ ..
E-< H Z E-< 0 '" ..
I Z Z ::> 0 H :I: ""' '" ~
CiI H 0 ;;;:: ~ 0:; '"
X ;;;:: P:: ;;;:: 0:; P::O:; '-P:: > 0:; U1 0:; CiI 0:; 0 0:; 0:; GJ 0:;
~ E-< 0.. 0 0.. 00.. Ho.. P:: 0.. H 0.. H 0.. E-to.. 0:;0.. Ho..
E-t po; ~ 0 I'l; 0.. ~ CiI ~ CiI I'l; H ~ 0 ~ ~~ CiI ~ I'l;.,q::
~ Z ~ E-l E-< o:l Z :I: &I
E-< 0.. 0 0 Z 0 H U1 E-< 0
UJ ~ U u :r:: I rl ;;;:: (/) po; 0 E-<
H
0:; .. 0'\ ~ 0) .. r- ~ 0\ ~ L() .. 0'\ .. N .. L0 .. .. '"
::> .. P:: rl .. 0:; ro .. po; tC) .. 0:; N .. P:: r- .. 0:; 0 .. 0:; '" .. po; 0'\ .. 0:; .. po; M
0 ~ M I'l; (V) ~ '" ~ 0 <( N ~ (V) ~ 0') ~ M ~ ~ rl
E-< :8 If) ;;;:: rl ;;;:: LI) ;;;:: L() ;;;:: N '" 0 ;;;:: N ;;;:: \D
(V) N M N "" <D ,"
>-< N M M 0
E-< rl N
Z
::> N 0'\ 0'\ '" r- If) l;O 0 N
0 (l1 0 o:l l;O o:l rl (l1 0 (l1 "" (l1 0'\ (l1 N (l1 \D (l1 o:l N
U U1 co CiI l;O CiI 0'\ CiI LI) CiI M W co CiI l;O CiI LI) W CiI (V)
""' '" ""' M i:1. ro i:1. (V) i:1. r- i:1. M i:1. 0 ""' 0 i:1. ""' M
po; 0'\ M L() rl N 0'\ 0
CiI 0"\ '" l;O
H rl
H 0'\ M C"'i
H t,(j If) If) '" 0 <D
0 ~ 0'\ Z 0) Z 0'\ ~ r- Z N ~ 00:1' Z M Z <D Z Z M
U '" ~ r- ~ 0 M ~ 0 0'\ ~ 0 ~ rl ~ ~ r-
t-:> N t:l (V) "" t-:> '" t-:> 00 t-:> N t-:> 0'\ LI) 0')
l;O M <D ,-I M <D 0
l;O .--i 0
~
OJ ro l;O 0'\ 1.0 r- oo r- 0'\
U rl U 0 U 0'\ U L'l U N U r- U M U \D U U 1.0
rl CiI 0 CiI N CiI N CiI l;O U1 '" CiI '" ril l;O ril M U1 CiI 0
rl 0 rl 0 0 0 LI) 0 (J) 0 M 0 .--i 0 N 0 l;O 0 Q 0
0 M M rl M l;O Lf)
N l;O r-
'-
~
0 a N N M l;O If) 0'\ M 0
'- > l;O > rl :> 0 :> N > M > 0 > 00 :> M :> > N
'" 0 N 0 M 0 M 0 \D 0 00 0 r- 0 0'\ 0 ", 0 0 M
0 Z Z 0) Z M Z If) Z If) z Z 0'\ Z rl Z Z If)
M If) M N
If) 1.0
0
0:; (V) M M 1.0 "" N M r- r-
0 E-t M E-t If) E-t 0 E-< If) E-< '" E-< If) E-< 00 E-< L() E-< E-t If)
M U rl U If) U 0'\ U '" U '" U M U 0'\ U 0 U U 00
M 0 M 0 '" 0 M 0 (V) 0 r- 0 0 "'"'" 0 ro 0 0 00
0 00 M M .--i r-
"-1 (V) '"
m
..... l/)
.....t::
00
No.
- Q)
;!o::
:c~
0._
<(U)~
~~b
U>v
x
<(
l-
I-
V>
ii:
=>
o
I-
~
Z
=>
o
u
a::
....
:::;
...
o
u
~I
'"
~
o
....
~
'"
~
>
II
I
~
~
~I
~I
il
II
I
I
~
I
I
N
0Cl
N
.....
'^
'<I'
'"
<I>
N
&l
~
~
."
N
<t
'"
~'
."
...
...
'"
~.
;;t
...
m
...
a
m
~
~'
."
~
!
""
'"
m
a
o
'"
~
'"
~
~.
N
."
o
m
m
m'
~
'"
<t
""
~-
."
'"
o
~
g
N
0Cl
o
....
.....
'^
'^
'"
<I>
'"
~
~
""
'"
N
<t-
~
'"
....
<t
",'
~
....
<t
m
",'
);t
~
0"
~
."
'"
~
0"
;::';
."
'"
m
'"
m'
*
'"
o
....
a
....
....
::1
g:
."
N
'"
N
~.
N
."
'"
<t
....
~
<t
:G
~
....
o
:<l
;;,
~
ID
'<I'
....
'<1"
....
....
'"
<I>
'"
<t
....
~
...
<t
'"
N'
~
N
'"
'"
",'
<t
vi
""
'"
m
",-
'"
;;t
""
m
'"
~~
."
....
o
m
;::';-
~
o
...
o
~.
'"
."
....
<t
....
<to
*
...
'"
....
",-
~
."
o
....
~~
N
."
'"
'"
N
<t-
~
<t
m
o
~
""
o
~
o
:<l
ID
ID
....
o
en
....
'"
<I>
l:l
....
a
~
o
~
."
~
m
",-
~
."
<t
~
m-
~
~
a
<t
N
~-
....
<t
."
...
N
'"
a
'"
""
m
o'
~
@
",,-
g:
."
'"
o
....
m'
);t
'"
;e;
~.
vi
....
'"
m
",'
~
m
o
~
~
0Cl
ID
o
.n
'^
N
'"
<I>
....0
0....
0"1
. 0Cl
"'ID
ID....
.... .
.....
........
<1><1>
""
~
g
'^
0Cl
0Cl
..:
ID
ID
<I>
N
""
m
~
ID
'^
....
N
'"
0Cl
<I>
m
o
o
",'
:::
."
N
....
'^
..:
....
....
<I>
'"
'"
::::.
~
."
ID
en
o
a\
N
o
.....
<I>
N
'"
<t
~'
."
....
....
ID
.....
'<I'
ID
.....
<I>
~
",,'
:;;
."
'<I'
'^
'<I'
'"
N
en
N'
<I>
~
i
'"
.... ID
N '<I'
... .
. ....
.... '^
a~
<I>
'"
o
<t
",'
....
~
'"
o 0Cl
'" ....
~~ t
*~
<I>
<t
""
N
<t'
~
'^
'" ....
'" en
~::f
g: N
." .
....
<I>
...
~,
);t
0Cl
"'en
~, Nt
.... '^
o en
~~
'"
o
....
.....
<t
...
."
'"
'" N
~t O'l.
<t....
<t....
~~
'"
N
<t
N'
~
'"
.... '^
~, or-t
.... en
o ....
v:.~
o
...
~
o
:<l
...
.-l .:.;
~~
~ ~
~ en
~t
00
No.
i~
~~
0._
<(U)CO
O~:
<(~O
U>Ln
x
c:(
~
~
III
ii:
::l
o
~
>
~
Z
::l
o
U
ex:
....
:::;
.....
o
u
o
z
S
~
o
u
'"
<(
::!:
'"
;i
....
o
....
~
'"
::s
>
I
I
~
~
il
~I
~I
I
I
I
II
~
I
....
00
....
en
00
....
,.;
<I>
~
...
o
~
'"
'"
'"
a;
It
m
~
~'
~
~
'"
....
~'
'"
~
o
o
o
...'
~
'"
~
",'
~
""
'"
...
a
...
....
o
...'
~
~
o
",'
~
~
....'
...
;;:
~
;::,
E
m
~
~'
J;:;
'"
o
S
o
o
N
....
en
o
....
<t
....
,.;
<I>
....
o
g
~
'"
N
...'
~
'"
""
'"
""
a
:::
~,
N
N
'"
m
....
'"
~'
;;(
'"
...
...
",'
a
'"
~
""
'"
i
'"
~
o
",'
~
'"
~
'"
'"
~'
~
'"
'"
....
'"
",,'
""
'"
....
~
m'
J;:;
....
o
~
'"
g
N
o
lI'l
....
N
en
....
,.;
<I>
m
...
~'
'"
~
N
....
",'
;<;
'"
::;
o
N'
Et
""
""
o
0'
~
'"
N
o
'"
....'
o
~
...
'"
'"
",'
'"
~
'"
....
'"
m'
~
'"
....
o
1';'
...
'"
o
o
...
~'
'"
~
""
m'
'"
'"
....
~
",'
~
'"
...
:;;,
~
""
o
~
....
o
~
00
<t
'"
....'
<t
....
rri'
<I>
N
o
....
a
::l
""
",'
~
...
'"
'"
m'
~
""
...
....
...'
o
N
'"
~
a
N
en
:;j-
....
...
'"
'"
~
o
:;;'
;J..
~
;:}
....
m
'"
m
'"
'"
0'
""
N
'"
'"
""
~,
~
'"
g:
....
~
'"
~
'"
",'
~
en
o
o
~
""
o
~
<t
:!
en
N
N
,.;
<I>
....<t
"'....
"'!.....
.... '
....0
<to
,<t
.... '
<1>....
....
<I>
~
a
....
o
'"
....
....
en
<I>
~
~'
~
....
....
....
en
lI'l
o
....'
<I>
'"
""
....
....'
:::
'"
00
....
lI'l
,.;
o
....
....'
<I>
'"
o
o
....'
~
'"
00
<t
<t
en
N
o
....'
<I>
o
:;:
~'
'"
'"
lI'l
'"
....-
<t
en
....'
<I>
en
'"
'"
g
8
CO
N'
....
00
N'
<I>
""
'"
....
",'
'"
;J..
en
N lI'l
0, ....
~~
"'....
<t
N
<I>
....
...
m
i
'"
~, :!S
~~
"'N
00
....
<I>
~
~'
'"
m
oll'l
"", '"
~~
"'....
N
....'
<I>
:::
""
",,'
'"
....
'"
o
...
"1.<t
"'00
~ 0..
"'00
'"
....
<I>
N
N
'"
",,'
~
'"
""
...., 00
"''''
~Cl
"'<t
en
....
<I>
~
""
R
~
"",00
'" lI'l
::!; N...
"'lI'l
'"
lI'l
<I>
;::
~
l1l
o
N
.:.;
~ <(
~b
sl-
o
N
~ en
~1::
00
No.
~&
=c~
0._
<{U)~
~~O
o>co
x
<{
l-
I-
V>
a:
::l
o
I-
i=
z
::l
o
U
a::
w
:::;
.....
o
u
w
w
...
c(
~
o
:ii:
~
~
...
~
::;
""
::1i
>-
II
I
~I
!
~I
;1
i
II
I
II
II
I
I
'"
In
"
r>>
...
<I>
N
:;;
;;f
N
~
;::.
:;,
'"
o
o
<1>
;;f
'"
"'
:;,
'"
S(
o
ii
:;;
~,
'"
"'
"'
'"
;;f
S(
...
n'
'"
'"
~
;;f
n
"'
n
.-.
'"
N
;;\
'"
'"
~
~
In
"
'"
,,'
...
<I>
<1>
:!l
n'
'"
'"
"'
1;>
...
S(
'"
'"
'"
...
n'
'"
n
<1>
'"
;;f
N
"'
<1>
;;f
~
;;f
....
~
'"
....
...
;:
:;;
"'
;;f
5
'"
g
n'
'"
....
o
3.
'"
o
~
00
In
'"
...'
...
<I>
~
'"
~
'"
*
....
~
n
S(
n'
'"
'"
o
""
N'
'"
"'
N
"'
'"
<1>
...
1;>
'"
*
~
'"
'"
;::.
'"
n
"'
1;>
"'
o
3.
~
~
"
In
'"
r>>
<I>
"'
'"
a
....
....
'"
'"
&
*
...
,;
N
"'
<1>
'"
~,
'"
"'
*
....
"'
;j(
ill
;j(
"'
"'
"'
'"
S
...
'"
<1>
o
3.
:>g
o
N
....
"
...
r>>
<I>
"'
'"
'"
'"
o
....
'"
'"
"'
'"
~
n
~
'"
'"
"'
'"
o
""
"'
'"
N
....
'"
'"
"'
"'
'"
'"
...
"'
....
'"
a
~
'"
....
'"
'"
o
....
3.
'"
~
oln
0'"
000l.
..;~
<1><1>
....
(J\
...
.,'
<I>
"
...
....
~
<I>
'"
...
'"
.,'
<I>
....
...
.,
iii'
<I>
00
...
In
v5
<I>
o
"
'"
r>>
<I>
'"
.,
'" '"
.... ,
'" '"
<I>
o
00
......
'" ,
'" '"
<I>
'" 8
...'"
'" ,
'" In
<I>
'"
~~
'" In
<I>
....
~:::
;A~
<I>
In
"''''
N(J\
~rti
<I>
:::,;,j
~c(
-l-
So
~ I-
~ III
~t::
00
Nc.
- <I)
:!c::
=l!=
~ '"
c._
<(U)~
~~O
U>....
x
<(
l-
I-
lI>
a:
:>
o
I-
~
Z
:>
o
u
<<
w
:::i
.....
o
u
>
l-
e;
II>
...
C
<(
....
Cl
""
...
>
...
;;/
....
....
::;
'"
;$
>
II
~
I
~I
~
~I
;1
~
I
II
I
II
~I
'"
..
....
>
~
i:i:
0'1
'<t
....
en
00
""
...
'"
'"
",'
'"
'"
~
:t.
:J;
a
o
"
'"
,,-
'"
~
...
a
~
~
::;
'"
~.
'"
'"
"'
'"
",'
'"
...
'"
'"
~
'"
"'
"
:t.
'"
'"
'"
",'
'"
'"
~
",'
'"
'"
o
~
o
o
'"
00
\0
0'1
.;
o
....
""
"
:;;
",'
'"
...
;::
:t.
gJ
'"
~
~
'"
~
'"
on
...
~
o
:il
~
'"
'"
'"
"
::;'
'"
...
"'
"'
a
...
'"
'"
~
on
o
:;;.
'"
'"
o
'"
on-
'"
~
'"
:t.
"
o
~
'"
o
~
III
III
,...
'<t-
o
....
""
...
"'
...
",'
'"
~
:t.
'"
'"
...
::f.
...
"'
"'
~
"
'"
'"
a
g
~
'"
'"
i
::;
en
....
...
'"
~
a
en
"
:;:.
'"
~
...
:i
~
o
:t.
"'
~
"
o
~
III
'<t
....
M
0'1
""
"
...
...
'"
'"
gJ
"
~
'"
o
'"
",'
'"
'"
'"
~
'"
on
...
'"
~
'"
~
~,
...
'"
'"
"'
...
::f
'"
bO
en
~
'"
~
,Ii
on
"
en
::f.
'"
...
...
~
en
~
"'
o
~
N
0'1
0'1
..D
0'1
""
\00'1
00
'<tC!.
-0'1
III 00
'<t '<t
""""
~
",'
'"
....
0'1
0'1
..D
....
""
~
o
::f.
,...
'<t
....
o
N
""
on
o
"
~
\0
N
00
<<S
....
""
en
...
...
~
III
00
N
o
'<t
""
"
'"
...
~
'<t
00
\0
en
III
""
'"
on
"'
~
N
III
o
....
00
""
~
'"
~.
'"
~~
",00
"" r.D
...,...
"'""
'"
'"
...
:::'
'"
~ ~
00
0" r:ti
... III
"'""
...
o
"
~
,...
en 0'1
m N...
ti::
""
'"
R
:i
0'1
"'Ill
~"1
",' 0
'" '"
""
'"
"
...
....
'"
\0
... 0'1
c:"'!.
on' '<t
"'N
""
'"
"'
"
~
00
\0
... ....
'" -
",' 00
'" ....
""
;::
~
en
o
o
'"
...
.-l.:.i
3.~
;:: 0
~ I-
~ Ul
~t::
00
No.
. a.>
;!c::
:-e~
0._
<(UJ~
U~_
<(:0
u>oo
x
<(
l-
I-
V!
ii:
:J
o
I-
>
I-
Z
:J
o
U
a:
....
~
.....
o
u
>
....
Z
:J
o
V
cr:
III
::::;
....
o
V
'"
~
I-
~
~
~
>-
I
~
~
~I
il
~I
~
~
~
II
II
I
il
...
en
....
.n
00
....
vi
""
~
..
N-
~
'"
N
~
~-
'"
'"
o
:;;
*
N
~
",-
'"
;J,
..
'"
..
....-
....
t;
'"
;1;
....-
~
...-
'"
'"
...
N
'"
...
...
...
'"
'"
'"
..
....-
'"
~
o
~
~~
'"
~
",-
~
....
o
i
'"
....
..
",-
~
'"
~
~
o
...
...
,..:
o
...
,..:
""
....
'"
...
!
....
'"
....
~-
'"
'"
~
",-
'"
'"
'"
:'l
..
",-
'"
;J,
....
'"
~-
'"
t;
N
N
o
:1'-
'"
~
~
~
~
..
:'l
~-
~
...
'"
'"
..-
'"
,';i
'"
~~
;J,
'"
'"
..
*
~
N
",-
..
;;(
....
o
o
!:!.
'"
o
:'l
...
....
....
....
....
...
,..:
""
~
0-
'"
;;(
~
o
'i1'-
~
:;;
~-
a
~
..
",-
....
;J,
"'
'"
o
~
o
~
",-
'"
~
'"
....
N
s'
~
'"
...
....
:;;-
~
..
..
o
N-
o
~
'"
;1;
....-
'"
;J,
..
'"
..
N-
;;';
'"
o
'"
o
r~r
'"
'"
o
o
!:!.
....
o
:'l
o
...
00
.n
o
en
.n
""
..
o
'"
~'
'"
o
~
gf
;;(
'"
N
..
&
'"
..
o
a
'"
...
....
",-
*
:!l
'"
0-
'"
;::-
'"
...
'"
:;;-
....
~
:::
o
",-
..
t;
'"
..
....
a
....
'"
i
o
;;';
...-
'"
;;(
'"
~
0-
~
'"
'"
o
o
!:!.
'"
o
:'l
'"
'"
....
vi
..,
...
vi
""
..,'"
",00
"""!.
.....
...""
..,..,
... .
.""
""""
""""
'"
~
&
..,
..,
...
....
o
""
....
""
'"
..
....
",-
'"
N
'"
00
o
o
.n
00
'"
....
""
~
N-
..
;;(
....
'"
""
o
o
..,
....
""
..
....
'"
",-
a
en
...
00
....
..,
...
...'
""
N
~
~-
~
..,
'"
...
....
....
...
M
""
~
~'
...-
'"
...
'"
....
...'
...
""
..,'
""
'"
'"
N
~-
o
...-
'"
....
0'"
"'''''
'" .
",- ...
"'en
~, q-..
"''''
""
'"
'"
....
....-
~
'"
..,
'" ...
'" ...
", .,,;
"'''''
a~
""
N
N
'"
a
o
..'"
...en
~,~
~ ~..
""
'"
;!
....-
*
""
~8
~'m
~ ...
'" ...'
""
'"
'"
'"
~-
N
'"
o
~~
'" .
.q'~
~~
""
~
N
~-
;;(
....
...""
gt LIl.
....00
.....,
~~
s
o
!:!.
'"
o
:'l
... ..
.......
:'let
-....
So
:'l ....
~ '" N .... \D .... 0 '"
Ln CO CO 1'1\ 1'1\ 0 CO
~ .... \D \D .... \D NIX!.
O~ .... ",,- 00 '" '" cD -0
1'1\ N '" "" Ln ....\D
NO ~ Ln N .... 1'1\ CO "'....
0. 0: '" ",,- ",,- N- N- "" -
- Q) - ....
::!o:: :5 .... .... .... .... .... \D\D
> <I> <I> <I> <I> <I> <1><1>
~~
0._ ....
<{U)~ I "" '" ::. "- m ""
~~b '" "" 0 m Ln
'" N '" "- '" ....-
..' ~' ",' ! a 0
U>Ol ~ :'l; "" '"
'" ~ ~ N-
<I>
""
i "- m N .. "" 0
.. :!l .. '" ~ 1'1\
N 0 .. ....-
& s' t;- * ",' 0
t> t> * Ln
'"
<I>
'"
m ... N ... ~ CO
~ 0 '" 8 co
~ 0 N a\
;!,' ",' ", 0' ..' ""
.. 0 "" "" ""
"- "- ~ ~ ~
'" '" '"
<I>
0
.. N N 5l '" \D
~ .. ~ 0 N 0
~ N N '" cD
* 1:;' ",' ",,' :if \D
z '" .. N
:::l Z( ~ t> t> ",,-
0 <I>
U
a:
w m '" "- co
::; ~ ~ N
~ .. ~ \D
.... ~I "" "" N-
o 0' ...' 5 ",' m'
U 5: 5: N N 1'1\
:1 ::- ....
~ ;;f ;;f '" '" '" ....-
x U <I>
~ '" N
w
l- e '" "" "- N '" 1'1\
III ~ ~ 0 "- '" N ""
ii: ~I "- '" '" 0 ...
Cl ...' ",,' E' ~ ",' '"
:l .. 0 0
a: .. '" .. ....
0 w ;;f ;;f ;;f ;;f N
I- "'I> ....
i= .... W <I>
~ W '"
Z o ~ ... N ... ... '"
:l ... <( ~I ~ :i: "- '" "- ~....
0 '" ... m "" ... -
0 ...' ~' s' '" N "i' ~
U ~ "- m 8co
a: ::!: m '" 0
;;f ;;f N' .... N' NO, 0
LIJ :!! '" '" '" "'....
:::; <I>
-' e
0 z 1'1\
U ~ II ~ g: '" ~ "" ~ 0
~.. '" '"
!!! ~: '" m
;!,' ",,' ~,..:
0 "- 0 0
u ~ ~. ~, ~ClC!.
a: '" '" '" '" '" "'co
<( <I>
::!:
'" ... N "- 0 Ln
w II '" "" '"
.... ... 0 :g ~ "" ... ....
N "- ~.. "-
... ~.. ~' 0' 0"" ...i
<( ~ 0 ""
z 0 ~.. LI!.
;;f ;;f ;;f ;;f ;;f ",Ln
<I>
II co
m ... N ~ .. '" co
'" '" ~ '" '" ....
"- 0 :;;. 0.. 0
g "" 0' ",,' ~&
'" 0 '" ..
~ ~ ~ t> t> "'""
<I>
II '"
~, ~.. '" m :g \D
"" ~ ~.. ~
N ~,
:if ~. "'co
0 :'l; i~
'" '" '"
'" '" '" '" '"
<I>
....
~ m N "" '" '" co
::. '" m '" ~ ~..~
.. '" ""
a f a ! ..' ~~
! "'N
<I>
il '" "- "" '" s ::: .=J
0 0 0 0
0 0 0 0 0 ~ <(
~ ~ ~ ~ ~ ~...
'" "- "" '" So
~ ~ g g g
N N N ~ ...
~ '"
~t
00
No.
- <ll
:!o::
~~CO
<(U)~
U--'O
<(=0
u>~
x
oct
l-
I-
V>
a:
::>
o
I-
>
I-
Z
::>
o
u
a::
w
:::;
.....
o
u
I-
Z
w
::!:
I-
<<:
<I:
0..
<I:
'"
g
....
~
'"
;$
>-
II
I
~I
~I
il
~I
~
I
I
I
II
~I
'"
;$
>-
~
u:
0'1
o
...
N'
..,
..".
'"
N
."
'"
~
."
~
"
....
."
'"
"
"
,,'
."
"
5:
;i
'"
'"
"
~
'"
"
o
",'
."
"
"
"
zf
"
~
;i
"
"
00
."
00
~
'"
'"
"
;i
'"
o
o
i
co
o
N
,...'
N
..".
"
00
~
"
"
~
N
'"
~
"
N
'"
."
....
~~
."
'"
....
'"
1i
'"
....
"
:;f,
'"
"
"
",-
."
~
:;;
'"
;i
~
'"
."
'"
o
"
~
....
o
~
'"
~
ID
...
...
rIi
N
..".
00
~
'"
~
"'
"
o
;i
"
~
~
E:
a
'"
'"
'"
:;f,
....
o
'"
",'
."
g
~
;'b
'"
."
....
'"
;:
'"
'"
N
."
00
o
~
o
~
..,
,...
N
....'
N
..".
....
;J.
'"
'"
."
'"
a
~
....
."
~
g)
"
....'
."
N
~
:;f,
....
:;;
",'
."
g
....
;i
N
a
....
....
....
."
"'
"
~
'"
o
~
~
...
,...
0'1
rti'
N
..".
~
."
'"
'"
....
."
'"
'"
t>
o
:(l
....
."
~
~
....
"
:;:,
."
g:
....
:;f,
~
'"
",'
."
~
....
~
....
"
'"
'"
"'
~
'"
....
*
~
'"
~
,...0
0....
co"!.
ll:t"'~
........
""'..".
N
ID
ID
..".
co
0'1
0'1
...
..".
'"
N
ID
...'
..".
,...
....
,...
,...'
..".
0'1
..,
,...
ai
..".
co
o
'"
..:
..,
..".
0'1
;~
~::J
..".
co
o
o ..,
00 ,
~~
..".
N
'"
'" ,...
" ,
N' ....
'" ....
..".
00 ...
.... ..,
0, "'!.
.... '"
"'..".
....
o 0'1
~~
..".
'" ,...
.... 0
.... N
....-I" ..n
"'..".
.... ..
.... ...
~ <I:
-I-
~o
~ I-
~ '"
~t
00
No.
~- &
~:ffiCQ
<t.(/)~
t)~'O
<t.=~
()>~
x
<t.
l-
I-
III
ii:
:l
o
I-
>
I-
Z
:l
o
U
It:
w
::;
....
o
u
~
::l
I il
z
o
u
....
:!:
0-
::;
""
:;l
..
I
I
~
~
~I
~
I
II
I
II
~I
;
q-
00
o
,..:
q-
....
<I).
o
....
'"
&
~
o
::\'
'"
'"
o
'"
,;:;'
'"
N
::\
El
'"
'"
*
'"
'"
.,.
0'
~
'"
N
....
N'
';:;
'"
'"
:;;
R
....
~,
;;,
N
'"
'"
5
'"
~
~
'"
...
...
&
'"
o
~
~
....
.....
N
o
~
<I).
'"
'"
'"
&
'"
'"
'"
.,.'
v:
'"
.,.
'"
~
'"
'"
...
'"
N
'"
'"
....
....
r.:
~
o
;:!;
",'
N
~
N
'"
::;-
~
o
;;;
!
'"
'"
*
...
'"
....
R
'"
....
.,.
:::f
'"
...
i!l
a
....
~
'"
o
~
'"
00
.....
iii
11\
'"
<I).
'"
....
~
.,.
;:,
~
o
.,.
.,.
:ti'
'"
N
~
a
'"
o
.,.
0'
~
~
'"
N'
:i1
'"
;;;
o
",'
o
N
'"
.,.
;1.
a
...
....
'"
*
'"
N
'"
~
'"
.,.
'"
::\-
'"
'"
:::;
~
'"
o
~
....
o
~
'"
'"
N
iii
'"
00
<I).
'"
'"
'"
&
;;;
'"
N
...
'"
~
....
~
N
.,.
'"
a
'"
;1.
~
~
.....
~
....
...
'"
~
'"
:i:
....
~
'"
o
a
g;
a
'"
'"
'"
",'
v:
.,.
;1.
~
'"
o
o
!::!.
'"
o
o
N
.....
q-
11\
o
....
o
....
<I).
~~
"'''!.
,0
"'00
.....q-
11\ '
<l).q-
..".
~
i
11\
q-
N
N
.....
.....
<I).
'"
~
0'
~
00
q-
....
en
o
.....
<I).
N
.,.
o
~.
'"
'"
'"
....
g
.....
<I).
~
~
00
.....
q-
....
'"
.....
<I).
.,.
.,.
.,.
"'
~
'"
11\
'"
,..:
'"
N
<I).
~
o
:::-
.,.
'"
o
'"
q-
iii
'"
....
.....'
<I).
:;;;
~-
.,.
,:;;
'"
~ G;
~.. ,..:
~ ~
"'..".
'"
'"
'"
~
'"
'"
"''''
'" -
af ~
"'q-
<I).
'"
'"
'"
*
11\
'" N
~ ......
~.. ~
"'N
<I).
N
~
~.
'"
....
'"
~I"I!.
~.. ~
'" .....
..".
'"
'"
.,.
.,.'
...
'"
N .....
... ....
...11\
~. :i
"'<I).
....
...
.,.
&
r::~
",N
~.. t:1'I'"
"'",
"'<I).
~
o
!::!.
'"
~
;::.:.i
~ <I:
;:'1-
...0
~ I-
~ IJl
~t::
00
No.
~- ~
~~OO
4:Cf.):::
O~O
<(=N
o>~
x
<
l-
I-
III
ii:
:J
o
I-
~
Z
:J
o
U
Cl:
w
::;
.....
o
u
~
""
<(
a..
:>
""
6
z
:J
o
""
C:J
a..
~
<(
u
'"
~
~
o
....
~
~
>
I
I
~
~
~I
;1
il
II
I
II
I
~
I
o
...
00
en
'"
...
<I>
on
'"
....
'"
'"
~
",'
'"
v
"
v
.:;f
....
'"
'"
~
"
o
a
~
v
~
~
'"
~
~
a
~
~
~
;::,
'"
'"
g
N
'"
'"
~
g
N
Ln
00
ot
N'
ot
...
<I).
~
'"
N'
'"
'"
"
'"
N'
'"
N
~
d
v
'"
'"
on'
'"
m
v
'"
3f
:;j
"
~
....
on
on
,,'
N
'"
'"
v
'"
0'
N
'"
o
~
'"
"
a
'"
v
"
i.
~
"
o
o
~
'"
o
~
0'1
o
0'1
N
'"
...
<I).
a
~
~
8l
o
",'
'"
o
v
"
.:;f
~
a
~
N'
'"
'"
'"
~
a
~
o
N
N
'"
on
....
o
~
'"
~
'"
....
;!;
.:;f
'"
....
'"
d
'"
o
~
"
o
~
00
o
Ln
<<>
ot
...
<I).
~
....'
'"
~
'"
;i
~
'"
N'
'"
....
~
m
'"
....
'"
N
",'
'"
v
:;j
0'
;h
'"
'"
v
",'
~
....
m
o
~
on
'"
v
~
'"
v
'"
i.
N
....
N
'"
'"
!:'f
'"
d
'"
o
~
1!l
~
en
00
N
.D
'"
...
<I>
~
;:
~
'"
.:;f
....
~
;i
....
:2
",'
'"
o
:'l
:;;:
m
"
'"
....'
;h
"
~
0'
'"
'"
9
....
~
N
"
;'
'"
on
N
'"
~
'"
'"
d
v
'"
v
N
'"
o
....
o
N
-
'"
g
N
N'"
~~
'0
000
"".....
<1).<1>
Ln
en
'"
N'
...
<I>
'"
00
N
..;
...
<I>
""
00
ot
..;
...
<I>
.....
ot
.....
....
N
<I>
""
en
Ln
o
Ln
<I>
0'1
""
Ln
.D
00
...
<I>
.....
~ ~..
~' ;
'" ...
<I>
.....
~~
~' :s
"''''
<I).
~ ~
00
'<:t'o
~~
o
"'ot
~"l
~~
<I>
o
""
o Ln
.... ,
",' ""
'" ...
<I).
'"
ot
o Ln
'" ,
....' '"
'" ...
<I>
:::: ..:.i
~ <(
-I-
~ 0
~ I-
~ '"
~1::
00
No.
. Q)
~o:::
~~co
<!cn:
<.)~o
<C~('I')
<.)>~
X
<l:
l-
I-
'"
ii:
::::l
o
I-
>
I-
Z
::::l
o
u
a:
w
::;
....
o
u
-'
...
l-
e
=F
-'
...
l-
e
:I:
I:
~
~
>
II
I
~I
~I
~I
~I
~I
I
i
~
i
~I
il
en
en
...
"
oot
oot
o
...
<I).
'"
'"
o
OIl'
00
:J.
....
ill
~-
~
..,
...
...
....-
...
~
....
R
*
N
N
00
~
;;f
o
00
...
~-
....
;;f
'"
...
'"
~'
;;f
..,
~
Ef
;;f
'"
...
N
g
;;:
....
o-
N
....
'"
~
....-
'"
...
'"
:;;
o
...-
00
;;(
'"
i
o
N
...
en
o
rti
o
00
o
...
<I).
....
..,
'"
",-
fa
:g
'"
;;-
'"
'"
..,
N
~-
...
~
...
o
....
~'
'"
...
'"
00
N'
00
N
..,-
'"
'"
'"
'"
~'
..,'
'"
~
~,
~
'"
'"
....
...
",-
~,
'"
~
o
...'
...
....
'"
~
'"
~'
l;>
o
'"
~
~
'"
...
;;
a
....
o
~
"'
~
o
00
oot
~
'"
...
....
...
<I).
00
..,
N
",'
*
....
;;
....-
...
'"
'"
::::
~'
l;>
....
:!:
OIl'
'"
l;>
N
~
~:
'"
~
;'
~,
'"
'"
&l
....'
~
00
N
'"
~
00
IE
",'
*
~
[If
'"
'"
'"
N
'"
0'
5l
'"
'"
N
'"
&l-
:J.
00
o
o
~
o
~
1Il
00
...
.D
oot
en
~
<I).
'"
'"
~,
00
...
'"
~
gf
~
~
...'
00
:J.
m
'"
....
*
00
~
~
~
&l
00
0'
;;
..,'
'"
;;
'"
~-
;;f
'"
N
'"
~'
~
;;
'"
l
'"
N
'"
m
00
'"
'"
~
....'
::;\
'"
'"
;;
E
'"
o
o
!::!.
00
o
~
...
1Il
o
",'
en
o
a\
<I).
1Il'"
;::t
'1Il
...",
"'",
oot .
....
ootoot
<1).<1).
..,
'"
....
::;\-
:J.
o
o
...
"
o
o
N
<I).
~
a
'"
...
'"
1Il
~
...
oot
N
<I).
'"
:;;
....'
....
...
'"
o
'"
'"
a\
00
oot
....
<I).
..,
::::
OIl'
'"
'"
'"
...
oot
'"
"
...
o
rti
<I).
..,
'"
N
..,'
00
o
;;f
'"
...
...
a\
...
en
.;
<I).
'"
'"
'"
~:
...
;;f
...
...
'"
....
oot
1Il
.D
<I).
..,
..
o
",'
;;
;;f
en
~~
",' ...
.., en
:-ClC!.
",1Il
<I).
3
~'
o
..,'
'"
..~
0'"
LIlrti"
"'...
*~
<I).
N
~
g
'"
......
....00
~.. ~
~~
"'rti
<I).
~
;..
'"
'"
'"
m:
l.O...N'"
~~
"'...
<I).
'"
'"
..
",'
'"
:J.
...
~~
~~
"'oot
*::J
<I).
00
....
'"
....'
zt
o
",'"
",'"
o::t,N'
"''''
*~
<I).
~
~
g:
~
:::.:.;
~<
-I-
~e
~I-
~ '"
~t::
00
No.
- Q)
~o::
~~CO
<!.(J)~
U~O
<!.::!:V
u>~
x
<(
l-
I-
VI
02
:J
o
I-
>
I-
Z
:J
o
U
a:
w
::;
.....
o
u
-'
:;
a:
w
I-
!!:
<II
g
....
~
~
..
I~
~
ll;
i
~I
~I
il
~I
~I
I
~
~
i
i
I
od'
o
en
vi
"
..,.
o
a
~
...
....-
'"
;::
....
'"
'"
N
'"
...
'"
'"
on
'"
....
zf
o
'"
"
zt
'"
'"
'"
",-
'"
'"
~
....-
'"
::;;
o
,;
....
...
'"
.:i
"
on
N
~
on
:i:
'"
'"
o
o
S';
o
~
00
'"
od'
vi
od'
...
..,.
'"
'"
o
~
...
~
o
'"
N
",-
'"
'"
g
3f
....
~
~-
'"
o
~
~
...
N
N
~
o
~
&
N
'"
o
;::-
'"
'"
'"
'"
zf
...
'"
'"
",-
'"
'"
N
o
N-
'"
....
~
~
N
LI)
"
en
,.:
'"
...
..,.
'"
~
",-
'"
....
'"
....
~
on
...
N
~
~
~
'"
...
'"
a
~
0'
.';(
"
....
o
~-
'"
'"
'"
"
0'
N
'"
~
....
~
~
;::-
'"
~
N
~
....
~
",-
'"
'"
o
~
~
...
"
o
aO
od'
...
..,.
....
~
g
'"
"
"
::f
'"
o
'"
o
~
....
'"
'"
...-
.';(
'"
'"
00
~-
'"
~
'"
a
'"
o
'"
~
::l
"
*
....
g
....-
'"
'"
N
'"
on-
'"
....
'"
'"
;f.
'"
o
~
~
~
'"
...
en
...;
...
...
..,.
,,'"
",0
"''''!.
'...
od'",
00"
""..,.
'"
'"
'"
zf
00
"
\D
Q
od'
..,.
....
~
"
LI)
\D
.n
LI)
..,.
'"
'"
'"
~-
'"
'"
\D
\D
en
od'
..,.
on
...
...
Ef
od'
'"
o
,,'
od'
..,.
'"
5
LI)
od'
00
M
en
..,.
o
'"
'"
,,-
'"
'"
00
'"
\D
aO
...
...
..,.
...
o
00
~-
'"
~~
Nod'
NO, -.:i
Nen
"'..,.
N
'"
"
a
~~
'" 0
,,~ en
..."
"'..,.
'"
~
~
gJ~
0'"
of u\
...",
"'..,.
"
~
~-
'"
","
N'"
"en
~- :f
"'..,.
'"
~
",-
'"
...
"'''
oc:rtt
~~
..,.
~
;::-
'"
'"
3~
....- od'
'" ...
..,.
~
'"
g
N
::::,:j
~ '"
--I-
;::0
~I-
~ en
~t
00
No.
- Q)
;:!:c::
~~CO
<(U):
U~O
<(=1.0
u>~
x
<(
l-
I-
'"
ii:
~
o
I-
~
Z
~
o
u
r::r:
LLI
::;
-'
o
u
'"
a:
<(
...
w
::i:
o
:t:
w
-'
iii
o
::i:
'"
~
....
~
~
>-
II
I
~
~
~I
~I
il
~
I
I
I
~
'"
~
>-
5
'"
u:
...
...
en
.;
<Jl.
N
'"
;";
'"
'"
~
....
"'
'"
"'
~
'"
'"
~
'"
'"
....
1;>
'"
El
~
'"
~
"'
'"
N
....
en
'"
'"
N
'"
'"
~
o
I'l
...
~
...
N
...
<Jl.
o
::;
'"
o
'"
....
'"
en
:!1
'"
<Xl
N
~
o
o
....
'"
::;
o
~
....
en
<Xl
~
~~
'"
o
~
en
~
N
<Xl
~
en
~
m
'"
....
~
~
o
N
00
00
~
.;
...
<Jl.
:;:
'"
'"
<Xl
a
....
'"
'"
'"
<Xl
....
~
~
'"
'"
'"
en
",'
'"
....
'"
'"
;;f
N
'"
;;,.
'"
'"
'"
'"
;;f
<Xl
'"
1;>
<Xl
~
N
....
....
'"
<Xl
o
3.
~
o
N
N
...
...
.;
...
<Jl.
'"
:!l
'"
'"
~
<Xl
N
N
'"
N
o
1;>
"'
::;
;;f
~
o
",'
'"
~
;:f
N
<Xl
~.
'"
gJ
N
;;f
[;;
;:.
'"
~
en
'"
'"
'"
~
""
o
o
N
en
...
'"
,..:
...
<Jl.
00...
...0
"''''
mM
...'"
<Jl.<Jl.
'"
'"
'"
'"
o
00
N
...
<Jl.
N
gJ
'"
'"
'"
o
....
<Jl.
~
'"
...
N
~
....
<Jl.
:::
z;
o
...
...
N
<Jl.
o
::;
~
...
~
'"
.;
<Jl.
....
'"
o
:i
00
...
00
,..:
...
<Jl.
o
'"
'"
;;f
o
'"
o '"
en .
",' 0
'" ...
<Jl.
'"
....
;':.
'"
~~
<Xl ...
rt'l~ 0\
"'<Jl.
<Xl
<Xl
'"
;;f
000
",en
'" ~
N' ui
"'<Jl.
'"
....
z;
::::&1
"'Ill
.-t"N'
"'<Jl.
'"
'"
1;>
o
en
o en
.... .
'" ...
<Jl.
<Xl
en
~
N
...
~ roo...
'" '"
<Jl.
;;
o
~
~
o
N
::: .:.;
I'l <
-...
;;0
I'l ...
~ 1Il
~t::
DO
No.
. W
~o:::
=11::
c..SOO
<(U)~
()~O
<(:::!:",
u>~
x
<(
l-
I-
lI')
ii:
:::>
o
I-
>
I-
Z
:::>
o
u
a:
w
:::i
....
o
u
~
:E
<I:
....
W
...J
Cl
z
in
;
;!:
....
~
~
..
II
~
'"
I
~
~I
il
~I
~I
I
II
II
I
I
I
00
00
00
o
....
.....
<I>
~~
V>
gJ
...
~
'"
'"
'"
",'
V>
'"
'"
'"
~
o
o
'"
",'
;;t
'"
~
[;:i'
V>
...
'"
o
",'
~
'"
...
...
~'
V>
o
~
~
~
..
;f.
m
'"
",'
V>
o
...
...
",'
V>
'"
~
o
~
o
<I'
...
'"
o
N
<I>
'"
"'
'"
~
g
'"
...'
V>
'"
'"
'"
~
~
",'
V>
'"
C:;
a
...
~
...'
'"
V>
'"
'"
'"
a
'"
'"
'"
~
~
.,
~
'"
'"
o
~
'"
'"
"'
;f.
'"
a
V>
...
o
i
'"
....
...
...
iii'
lI)
N
<I>
~
~
...
'"
...
.,'
'"
'"
o
"'
~
...
'"
...
~
...
C:;
~'
'"
'"
...
::?;
~
'"
'"
...
a
...
...
a
"'
m
Ei
'"
.,
~~
'"
'"
:'l
:;;
'"
:;;
~
.,
o
.e!
~
<I'
N
....
iii'
.,.,
N
<I>
...
.,
"'
",'
'"
'"
5'
'"
"'
...
'"
::;:'
'"
o
...
'"
E:
'"
o
'"
~'
'"
:!i
...
...'
~
...
...
'"
'"
'"
'"
:!i
'"
~
"'
o
'"
a
.,
'"
o
~-
'"
...
;;
E:
'"
~
~
'"
o
.e!
.,
~
o
'"
lI)
'"
...
...
<I>
~~
",Ill!.
-00
<I'll)
lI)N
..... -
<I>.....
<I>
'"
:;;
~
'"
N
'"
.,.,
en
<I'
<I>
:!i
"'
a
'"
.....
lI)
"
<I'
<I>
'"
'"
'"
11
<I'
.,.,
'"
'"
.,.,
<I>
~
8f
....
N
...
<1'-
<I'
<I>
'"
::l
0'
~
....
...
o
~
00
<I>
...
...
...
a
.....
.,.,
00
N
.....
<I'
<I>
'"
..
...
...'
s.
lI)
"'...
~O'!..
~.. ~
'" .....
<I>
'"
'"
...
~
~ ~
",N
0" ...i
"'00
V> <I>
'"
o
a
., ::J
"'N
o _
~.. ~
'" .....
<I>
'"
~
::i
'"
~to
",...
",," ui'
~:.
'"
'"
~.
'"
.....
"'....
~"!.
~~
<I>
'"
'"
'"
~
........
......
0<1'
N""';
"'00
"'<I>
i
o
~
::l.:.;
~<
-I-
~o
~I-
~ IJl
~t::
00
No.
t~
~~CO
<{U)~
O~O
<{::!:t--
()>~
x
cl:
l-
I-
III
ii:
:J
o
I-
>
I-
Z
:J
o
U
llC
...
:::;
.....
o
u
II
'"
....
~
~
>
~
>
~I
~
II
~
~I
il
~I
il
II
I
II
II
il
~
I
00
qo
In
.n
....
o
N
<Jl.
'7
'7
'"
';!,-
V>
....
:';
....-
'"
V>
g:
'"
",,-
~
o
'7
'7
~
'"
'"
....
~~
V>
'"
'"
~
....
N
""
",'
""
'7
V>
~
a
N
'7
'"
",,-
~
V>
...
'"
o
",-
~
'"
'"
""
a
"'
N
'"
a
'"
o
o
~
o
~
In
In
In
""
In
o
N
<Jl.
m
...
~
'7
;1;
",-
~
:l:
""
~-
V>
....
....
o
E:
'"
::e
~
...
~
0-
....
'"
V>
g:
N
'7-
""
~
'"
'7
'"
~~
V>
~
",-
o
N
V>
'"
~
~
V>
'"
'7
'"
",,-
'7
V>
"'
~
~
V>
....
~
'"
~
l'Il
'"
00
...
o
....
N
<Jl.
'"
N
'"
....-
'7
V>
....
~,
~
~
~
'"
'"
'7
0-
~
'"
~
....-
8l
'"
"'
~-
E
'"
'"
N
'7-
....
'7
V>
'"
....
'7
",-
~
V>
'"
~
~
'"
o
o
....
0-
""
V>
N
"'
o
m-
V>
N
::l
~
""
o
o
1::'.
....
o
~
o
"
l'Il
.;
o
en
...
<Jl.
o
~,
~
""
'"
o
iil-
V>
~
'7
a
'"
'"
""
'7-
~
'"
'"
o
....-
g
V>
~
~-
~
'"
o
o
:;;-
'7
V>
N
::!l
0'
'7
~
....
....
'"
",-
Et
...
:;;
",-
~
...
'"
'"
~
'"
"'
""
~
'"
o
o
1::'.
""
o
~
....
l'Il
....
rsS
In
en
...
<Jl.
""
'"
'7
....-
'"
V>
'"
::!l
",-
~
'"
....
'"
*
'"
o
""
a
:g
g
o
:;;
~
V>
...
....
:::;-
'7
~
N
g
",-
m
V>
'"
'7
N
~~
V>
'7
""
o
'"
'"
V>
~
:::;-
'7
V>
'"
...
""
~
V>
~
'"
~
...."
00'"
oo"!.
'l'Il
l'Ill'll
"0
.... .
'0
........
<Jl.<Jl.
o
en
en
qo'
00
....
<Jl.
In
00
....
c
....
l'Il
<Jl.
In
....
l'Il
tii
....
....
<Jl.
In
:z
.n
l'Il
....
<Jl.
3
,,'
00
In
<Jl.
In
.0
00
g
"
...
<Jl.
....
~;!;
~, :-
~l'Il
V>N
<Jl.
"
0.0
",.0
L1'I...N'
o In
*~
<Jl.
....
'" .0
""In
M, ~
"'In
::!lo
V> .....
<Jl.
In
....en
~~
~.. ~
V> l'Il
<Jl.
en
",l'Il
~n'l
...- en
'" ....
V> ....
<Jl.
....
'" g
o .
~~
V> ....
<Jl.
... ..
......
~<{
-I-
go
~I-
~ en N .... 10 .... 0 00
~ ~ Ln 00 00 '" '" 0 Ln
..... 10 10 .... 10 N N,
O~ 0 ~' 00' .,; .,; .,r; , ~
NO .... '" N en ~ Ln .... 0
c. ~ '" N ..... '" 00 en.....
~& '" .,; ~' ~' N N ~ ,
10' ~
<( .... .... .... .... .... Ln
w ..".
~~ > ..". ..". ..". ..". ..". ..".
c.!!! co 00
<(/)~ ffi
U--'Q "" '" ~ " '" 0
"' '" "" 0 '" 10
<(=CO ~ '" '" '" " en ",'
",' ",' ",' m "
()>~ .... '" '" ~ '" :;; N
e; ~ '" '" '"
'" '" '" '" N'
VI ..".
10
II " '" '" '" .. '"
I%: '" ~ '" '" '" en
0 '" 0 '" '" .....
!:i ",' ~ :;; ~ '" '"
'" '"
c:( ;;; " " '" '" 00
W '" '" '" '" N'
I%: ..".
~ .....
<( '" .... '" .... ~ Ln
'" 0 '" '" Ln
... ~I '" 0 '" 0 '" .,;
W ~ ",' ",' 0 ",'
.... '" '" 0 "" "" 10
C] " ;;; ~ '" '" 00
Z '" '" '" N'
Vi ..".
:.: Ln
I%: '" '" '" " '" '"
c:( ~I '" 0 0 "" '" .,
~ '" '" '" '" '" 10'
W :;(' ,,' ",' oo m .....
0 '" '" ""
:!: '" '" "" " " .,
0 '" '" '" '" '" .,;
:I: ..".
W
.... ....
iii '" '" '" '" " 10
en '" ~ '" ~ .,
0 ~I "" '" ""
:!: 0 .-i ,,' m '" a\
0 0 ~ '" '" 0
'" '" ~. ~. 00
X .... ..... ;;i .,;
~ '" '" '" '"
<C ..".
l- I%:
I- w 10
on I- en "" " '" '" 0
= ~ ~ 0 " '" '" .,
~I " '" ~. 0
.-i 00 :i ui .,;
::) '" 0 '" 0 00
0 '" '" " 0 '" .....
",' N d N d a\
I- '" '" '"
> ..".
I-
Z '" .... '" .... .... ; 00
::) N
~I '" 0 ~ ~ " '"
0 '" "" ""
.-i 00 ~ ",' ~. ~. .,r;
U ~ '" " 10
'" ~ 0 :,::. 00
a: ",' N N ",' aO
U.I '" '" '" '" '" '"
:::; ..".
-'
0 > '" '" '" '" '" Ln
U I%: II "" 0
~~ en 0 '" en '" '"
'" ~ '" '" ::}
C ~ ;J; oo a\
~ " 0 N
0 " ~. ~ '" '" ~. ....
;;i .-i ;;i .....'
I%: '" '" '"
C] ..".
~
:!: Ln
~ II .... '" '" " 0 ~ ....
.... 0 '" '" "" Ln
'" " "" " '" "
:!: ~. ui 0 ,,' " ",' .,;
'" 3 5 '" 0 00
~. 0 ~. 0
~ .-i ..... .,
z '" '" '" '" '" '" .,'
..".
~
0 II .,
c '" .... '" ~ '" '" en
Z '" '" ~ '" '" 0
" 0 '" 0 0 Ln'
0 ~. m 0 ",,' "' 0
u '" 0 '" '" '" en
"" ~ "" ;;; " ;;; N
VI '" '" '" .,;
I- ..".
Z
W ....
:!: '"
I- w '" "" '" '" "" 0 00
"' "" '" "" '" "" ~ .,
I%: ~ ~ '" '" '" '" ......
~ "' ",' ::f ui "'
> '" 0 "" '" '" '"
c:( 0 '" '" '" '" '" '" .,
z '" '" '" '" '" '" N'
..".
N
!I '" '" "" '" '" :;; '"
'" '" '" '" ....
~ '" '" "" '" "" 0
::f ~. ~ ~ ",' ",,'
'" " 0
'" '" '" '" '" '" .,
'" '" '" '" '" ....'
..".
'" '" " "" '" ~ ....
:1i 8 0 0 0 .... .:.;
> 0 0 0 0 0 ~
~ '" ~ ~ ~ ~
5 U> " "" '" ~
0 0 0 0 0 0
VI ~ 0 ~ 0 ~ 0 I-
u:: '" '" '"
..- '"
"-t:
00
No.
~&
:c1ij
0._
<{U)
UC'\l~
<(::0
U>..-
tJ)
+'"
(.)
Q)
'-
o
L.
a..
Q)
(.)
s::
ca
s::
Q)
+'"
or" s::
,-
or" ca
~:E
-
O.s::
or" (.)
o ca
N Q)
>m
u. :
~
-
D..
<(
IJ)
E
CO
;;,
o
li.
iii
'"
"
C
CO
C
u:
E
,g
...
...
in
..
"
.s
CO
"
a.
::l
~
o
C)
Q)
+'"
ca
(.)
(.)
C
I-
~ lI)
~t
00
No.
- Q)
..q-o::
;~
0._
<(U)'"
ON_
<(:::!:o
O>N
~ II)
~t::
00
No.
- Q)
:!o::
=:t::
..... CIl
0._
<UJ",
~~'Q
0>'"
...
....
.0
GO
o
.,;
.....
..,
of
<D
C"l
l/)
o
."
"
C
::I
...
U)
-'
~
~
CAC April 14, 2011
VIII-1 New Business
1 of4
EXECUTIVE SUMMARY
Review of CAC Applicants
OBJECTIVE: To make a recommendation to the BCC for appointments to the Coastal
Advisory Committee.
CONSIDERATIONS: Two CAC seats are vacant representing the unincorporated area
of Collier County. County Ordinance indicates that Advisory Boards and councils are
encouraged to make recommendation on vacancies on their board or Council.
Attached is a recap of the applicants for this vacancy. Please review these applicants
with the goal to make recommendations for appointment to this CAC vacancy.
STAFF RECOMMENDATION: County Ordinance indicates that staff is not to make
recommendations for County Commission appointments.
RECOMMENDATION: To review applicants and make recommendations for
appointment to these CAC vacancies.
PREPARED BY: Gail Hambright, CZM
en
en
~ Ql
DC
N'Vi
- :J
~CJ
:= ~
~ Ql
~Z
O~'<t .... C 0
<(~b ~ 0 ....
O>N C +i "C
n:l C
..n u n:l
CI1 ::J III
III "C llO
III CI1 C
CI1 .... +i
u
0 C CI1
... n:l CI1
Q. > E
CI1
n:l a:; "C
.... ... C
III CI1
n:l in :I::
0 E
u n:l
~ n:l 0
...
.... llO ....
.~ 0 III
... III
> Q. CI1
.... .s::. c
.~ llO
~ u C
::J
III
E .5 '~
n:l "C
OJ - ....
C III C
U CI1 n:l
0 ...
s::: Q. CI1 in
CO ::J .... ...
s::: "C .5 n:l
.- CI1 "C :::
-c III CI1 n:l
n:l .... >
r... .c n:l
0 ... ,~
"C .... C
III
CI1 C ::J
r... :E 0 E
OJ E E E
c.. CI1 CI1 0
* III "C u
III
n:l ... C
CI1 0
....
.c Ill' c
- E CI1
n:l n:l E
.s::. ... CI1 iii
III llO >
CI1 0 (5 ....
... c
CI1 Q. > CI1
~ .... c E
E c "C C
E CI1 C llO
E n:l 'iij
0 CI1 III
U llO Q. n:l
III n:l 'iij CI1
:c c ... ....
n:l CI1 CI1
.... E "C Q.
- n:l E
0 ~
n:l 0
Q. .... cu u
:c III "C
n:l U
III 0 C C
... u CI1 n:l
CI1
.c , '~ CI1
E III CI1 ~
.!::! Q. n:l
CI1 E )( 1::
~ n:l CI1 CI1
C "C "C
> C C
"C n:l ::J
III
~ III
~ Cll
oc:
C\J "Ci)
- :J
""'CO
:: ~
~ Cll
~Z
U~"'"
<(~O
U>""
~
~
~
~
~
~
~~
00
~U
00>
s~~
MU~
~>
~~
~-<
-<~
-<
~
00
-<
o
U
~
~
....
~
~
~
01
'"
(1)
>-
'"
(1)
>-
VJ.
~
....
~
....
>
....
~
U
-<
;;..
Eo-;
....
;
o
u
~O~ ~'" Co~" ~~ 8 (1) ~>.~
~ 5 !a '" (1) ~ ...... "'0 ,p > ~ ,:;-' d"Q
- ~ ::l (1) (1) ..... 0 ~...... (1) .: (1) ~ ~ ~
'Oo;'::::0"E8tat). otl(1)Q(jOJ)",(1)~E r.rJ~'-'
u U :-'~.... ~ ::l ~'u 2.:::.:S ::;E .D "'0 ;g ro r.rJ r.S d <+-< ~ ~ :>
.., ~ d -0 0..... ..... c c (1).... ~ . (1) - ~ 0 rI'::;
...... ~ ~ (1) "'0 '" ......, .- - u ~ OJ) i5. >..... 0 . ~ ,n .....
o ;.:::: ..... ::l > S ::l Co ...... e.o.:s ..;::; d 5 0....;::; g U ~ ~ ~ ~
C - r.rJ C ..... 0'-' . ~.- ~ u ~ '" ...... ::l ~ (1) >.
.S 8 (1)~ I ~ ~.<:: U.D~ > 1;:; ~ S .....:l....... u g ~ s C 'O~ ta
.';::: (1) "':> ~o..:.2 ..g~ 0 (1)ta ~u .....0"2 c.';:::
- ......::l l-. . C'l ...--. U ~ C 0 U "'..... 0.. ~ 0 -
ro ~.';:::.D ro g ~ .';::: ;:;;-........... 5 "E ~ ~ (1) Qf ro - .....
8 s S s:: ~ 5 a=5~~"'O s~~ ~ cO ~ fr8::;E
C ~ S .2 (1) ~.';::: S ro ~ > ~ ~ 0 'Vi '8 .S r.rJ ~ ~ "'0 ~
o (1) 0 0:= .....:l::l >- ...... ~ ..... ~ (1) (1) (1).';::: ~ (1) C ~ .....
..;::; C U U 0 g "'0 ~ (1) '0 ~ S >. OJ) ~ ~ 0'" ~ 0 0''''' C
ro r- >. <+-< U ..... ...... ~ _ 0 ,ro "'0 ..... (1) ...... ::: ..... d:) (1)
t >. ~ 0 ..... '" 0 '" ,,"' ~ C = . ~ 0 0. ro :-:: ~ ~ E
o ~ 0 ",'~ ~ ....<+=<-.;::a:l ::l 0 5 ~"'O 1 > N~.....
0.. ro '" '" l-..... C ~ '" 0 U ..... (1) - - ..... ..... . ~ C
'" d:) 's:.E C (1).:S ~ ro r/l ::: C U S.D (1) ta U:-:: C'O
~g~'~~g]~~~j~E]~5~5~~~~
E-<r.rJC'l~ oUrg~~.....:l~'O (1)r.rJ I::;E> S 8::;E.t::~
'" ~ _ 0. V ~ ro " ~ ~ _ (1) 0 C'- (1) ~ (1)
C .c t)..... ~ C . .';:::~ ~ ..... bD..... 0.. ro ..... ~ ~ 0 <:::: ",' C >
(1) C''''' g (1) ro u ::l 8.S (1) ~ ::l ~ E..... ~ 0 C..... ~
N ::l .t:: ::l U ::l 0 U C OJ) - 0 r.rJ C''''' ta r/l '::::' ~ S (1)
~ ~ ~~oo~~-~~OO ~ ~~OO ~oo
u8a86~~U::;E>8j~tLEO I ~~Q~~
~
U '" '"
Z ta ta
~ (1) (1)
~ >. >.
.... 0 0
VJ. ..... .....
~ 0 0
~ ..... .....
lr) V")
Z
0 '0
....
~ C
< 0
~ '0
~ u
U "'0 "'0
(1) (1)
U .!:: .!::
0 ..... .....
(1) (1)
~ ~
(1)~ 00 0'1
0 ......
> ..... t......
.;: "<:t ::l"<:t
VJ. 0 ~ O~
VJ. U
~ (1) ro ro
> :'9 0:'9
0 ~ C ~
~ U 0 ro 0
C ~ N-
~ (1) c~
6 rn U rn
(1) (1)
...... 00- N~
00 ~
~~z ~z
VJ.
~ ~
~~S
~~~
....<(1)
~ z.~ (1)
~..::.d
1il ~
u ::;E$
''''0
~ C
..s:::~
0.(1)
(1) ~
'" 0
~::;E
rJ)
~ rJ)
~ Q)
o C
N"U;
-q--~
;:;;; ;:
~ Q)
~Z
U~V
c:x::~O
u>v
Ul
Q)
>-
0\
0\
0\
:~~O\~
S '+-< .a 9
t)o~~
~ ;;.-. .~ 0 ~
;:::;: g.S .... ;...
i--l ro ro on 0/)
'+-<;>....00
o ~ ltN a
"E~Uos:::
roO~Q)ro
ou02:.a
0::1 '~0::I.t:: a
o ~ ~ a ;::l
-g~'Eac;J
OUl Q) 0;;.-.
U~~Ua
Q) ;... ;... s::: ;::l
;...r--O"o....
Q) 0''''' Ul Q)
a....~....~~ Q)
3 ~ 1.0 ;> '+-< .t::
"..~O\;...O~
Q)Q)0\Q);...s:::;
~ ;... - ~.~ a
..s:::c..o...:lo..s:::o
U....~UUU
on
-
s:::
ro
..s:::
....
Q) Ul
;... ;...
o ro
~~
"'0
Q)
.=
....
Q)
~
-d
..2: ro
0::I:g
;;'-'0
ro......
0::I~
s::: on
ro Q)
.~i
~z
0... _00
0"<1"0
00-
o If) "<1"
1.0 :t:t: ("'f)
~
~
o
~
"'0
.~
Cl
Ul
Q)
>-<
Q)
;>
o
;;.-.;..."-
ro ::!l.c;
t:O ~'a
s::: ~ ro
~ .~ a
..... s::: ;::l
~o::r:
~.~ ;...
if'u r.8
.8 ~ ~
"'tat!)......
"'O~~
3~::r:
o Q) . ~
~~g
ro 0 2
0::1 ;;.-. c;J
~ 1:: s:::
u &.8
~~o
~~~
Ul
;...
ro
~
o
-
I
If)
"'0
Q)
~
u
:.a
.S
....
o
Z
00
o
-
~
~ ("'f)
,..,.. "<1"~ ro
-0"'0
~ "<1" .t::
u"";,9
:.= c.. ~
Q) ~ ~
0... :'~
t"--"'O-;:::
- ;> ~
[::iiiz
ro
.~
~
~
Q)
;...
o
"'0
o
Q)
..s:::
r--
e
e
-
CAC April 14, 2011
VIII-1-a New Business
1 of9
Board of County commiSSioners. .~.... .'. -..!
3301 East Tamiami Trail . .1
Naples,FL34112 ~.,\'l.~ fI,: .--
(239) 252-8606 . ....... "."~' ".' /?
Fax: (239) 252-6406 '. ,,_ '..' '...:.....'....'..... :'.'
-'J '. . .1
pplication for Advisory Committees/Boards it 7'< J
n #3'
Name:~ uR Ie! :fA lfJ ES I5LJ R. J V Home Phone: !"q~31 t.p
Home Address: S"rO I C tJ:vn ~ IJa.. :# .fD f Zip Code: ~ ''L 1 of
:::::; Employment' c::.:::::q~;~~~~ <>f,";;;,&~~E RO~::ua;'L~tA
Board or CommUtee AppUed fo," (u L l-lJ I' leu Ilq GlIt Snf l AI.lIt/S"'(f din"" 1I1tE
Category (if applicable):
Example: Commission District, Developer, environmentalist, lay person, etc.
How long have you lived in Collier County: Years: \"3 Months:_
Are you a registered voter in Collier County: Yes L No_
eommISS'dYU1
Do you currently hold public office? &es ~ No _. If so, what is that office? IV N 1= C>
No~~ NrtP~~ ~ _,Scttf rj)J.S:dt..iCT ---'
Have you ever been convicted of any offense against the Law? Yes_ No ~
If yes, explain:
Do you or your employer do business with tbe County? Yes _ No _ If yes, under what circumstances?
Would you and/or any organizations with ~m you are affiliated benefit from decisions or recommendations
made by tbis advisory board? Yes_No If yes, please list tbe organizations:
NOTE: All advisory board members must update their profile and notify the Board of County Commissioners
in the event that their relationsbip changes relating to membersbips of organizations tbat may benefit tbem in
the outcome of advisory board recommendations or they enter into contracts with the County.
Do you now serve, or bave you ever served, on a Collier County board or committee? Yes.L No_If
yes, please list the c, ommitteeslboards: _ ,. . CO /""l '1& ~l VlD VI rOO r /J., . " LL.'
r NOW S.tJ2W otV \~ \. C(,Ll\4-1 VlVry L 0 1'<.,}'1" IV <,). ,- f...{)MtI':ll t.;.G
It
.
e
CAC April 14, 2011
VIII-1-a New Business
2 of 9
JIM BURKE
5801 Glencove Drive, #508
Naples, FL 34108
239 598-3140
email:therightperson71@comcast.net
. North Naples Fire & Rescue District Board of Commissioners,
2008 to present.
. Collier County Fire Service Steering Committee, Vice President,
2008 to present.
· Collier County Coastal Advisory Committee, (CAC), 4th year.
. Pelican Bay Services Division (PBSD) Board of Directors 8
years.
o Chairman - Government Relations
o Past Chairman & Vice Chairman.
o Past Chairman, PBSD Clam Bay Committee
. Founding Member, Secretary-Treasurer, Citizens
Transportation Coalition of Collier County. (CTCCC)
. Collier County District 2 Advisory Committee - Active
Participant. (This committee is currently inactive)
. Collier County Republican Executive Committee - Pct.
Alternate.
. Glencove in Pelican Bay Condo Association
o Board President - 3 years
o Board Member - 5 years
. St. William Church, Knights of Columbus, 4th Degree
o Youth Director
o Past Deputy Grand Knight
o Past Membership Director
. Collier Harvest Volunteer, 10th year.
. Retired - Management Background with Proctor & Gamble,
Holiday Inn Hotels Co., Promus Hotels.
. BS, Industrial Relations, LeMoyne College, Syracuse, NY
. Widowed, 5 Children, 10 grand children.
. Pelican Bay Property Owner since 1987, Full time Resident
since 08/98.
02/16/38
CAC April 14, 2011
VIII-1-a New Business
3 of 9
e Please list your community activities (civic clubs, neighborhood associations, etc. and positions held:
Education:
Experience:
e
Please attach any additiono.l information you feel pertinent. This application should be forwarded to Sue Filson, Executive
Manager to the Board of County Commissioners, 3301 East Tamiami Trail, Naples, FL 34112. lfyou wish, please fax your
application to (239)252-6406 or e-mail to suelilson(ii>.t:ollief'l{ov.neL Thank you for volunteering to serve the citizens of
Collier County.
e
CAC April 14, 2011
VIII-1-a New Business
4 of 9
Mitchelllan
.rom:
ent:
To:
Subject:
dsroellig@naples.net
Monday, February 28, 2011 9:52 AM
Mitchelllan
New On-line Advisory Board Application Submitted
Advisory Board Application Form
Collier County Government
3301 E. Tamiami Trail
Naples, FL 34112
(239)252-8606
Application was received on: 2/28/2011 9:51:36 AM.
Name: pavid Roelligj Home Phone: ~39-594-2210/
Home Address: ~OOO Pelican Bay Blvd. #5041
City: lNaple~ Zip Code: ~41 081
Phone Numbers
Fax: Business: ~39-594-221 01
It-Mail Address:
Board 1 Committee Applied for: lCoastal Advisory Commirte~
Category: lNot indicate~
Work Place: lRetirecil
How long have you lived in Collier County: Imore than 151
Have you ever been convicted of any offense against the law? ~
lNot Indicate~
Do you or your employer do business with the County? ~
1N0t Indicated!
NOTE: All advisory board members must update their profile and notify the Board of County
Commissioners in the event that their relationship changes relating to memberships of
organizations that may benefit them in the outcome of advisory board recommendations or they
enter into contracts with the County.
e
Would you andlor any organizations with whom you are affiliated benefit from decisions or
1
CAC April 14, 2011
VIII-1-a New Business
5 of 9
recommendations made by this advisory board? ~
40t lndicate~
Are you a registered voter in Collier County? IYesl
Do you currently bold public office? IH2J
Do you currently or ever served on a Collier County Board or Committee? IYesl
Education:
I1.B.S. Geology, Wayne State University 2. Numerous coastal conferences and semin~
e
2
CAC April 14, 2011
VIII-1-a New Business
6 of 9
Mitchelllan
.rom:
ent:
To:
Subject:
tedraia@yahoo.com
Tuesday, March 08, 201110:19 PM
Mitchelllan
New On-line Advisory Board Application Submitted
Advisory Board Application Form
Collier County Government
3301 E. Tamiami Trail
Naples, FL 34112
(239)252-8606
Application was received on: 3/8/201110:18:51 PM.
Name: ~-heodore 1. Rai~
~39-594-28511
~117 Pelican Bay Blvd., Apt. 404\
lNaple~
1341081
Pho'nc herS
Fax: siness:
_Mail Address: ~edraia(a)vahoo.con~
Board I Co:nnnitteeApplied for: !coastal Advisory committe~
Category: !Not indicated!
~
Have you ever been convicted of any offense against the law? ~
!Not Indicated!
Do you or your employer do bWliness with the ~ounty? ~
!Not Indicated!
e
Would you and/or any organizations with whoJr( you are aff'illated benefit from 'decisions ~r
1
-.
CAC April 14. 2011
VIII-1-a New Business
7 of 9
recommendations made by this adviscuy board? ~
~
~
~
!pelican Bay Service Divisio~
Education:
IB.s., M.D.I
Board, Town of Harvard, MA 3 ears Board of Zonin A eals 3 ears Conservatio
e
e
2
CAC April 14, 2011
VIII-1-a New Business
80f9
1.
Board of County Commissioners
3301 East Tamiami Trail
Naples, FL 34112
(239) 252-8606
Fax: (239) 252-6406
&-tC~1
~~".
:.it.--
/;\. . _ .--. _.1 -.' _ __<'#
'.\ ---- - ---- ~.";. .::j
" 1M;1
--Application for Advisory
Committees/Boards'
Name: Joseph A. Moreland
Home Address: 5821 Cinzano Court
Fax No. Business Phone:
Jmorel24U~@AuL.com
Place of Employment: Retired
Board or Committee Applied for: Costal Advisory
Category (if applicable):
Example: Commission District, Developer, environmentalist, lay person, etc.
Home Phone: 239348 1546
Zip Code: 34119_
e-mail address:
How long have you lived in Collier County: Years: 13 _ Months: _
Are you a registered voter in Collier County: Yes _
Do you currently hold public office? Yes _ _ If so, what is that office? Member of Costal
AdVISOry CommIttee
Have you ever been convicted of any offense against the Law? No
If yes, explain:
Do you or your employer do business with the County? No If yes, under what circumstances?
N/A - -
Would you ~d/or any organizations with whom you are affiliated benefit from decisions or
recommendatIons
made by this advisory board? Yes?_ No_ If yes, please list the organizations: Pelican Isle
Yacht Club
NOTE: All advisory board members must update their profile and notifY the Board of County
Commissioners
in the event that their relationship changes relating to memberships of organizations that may
benefit them in
the outcome of advisory board recommendations or they enter into contracts with the County.
If
Do you now serve, or have you ever served, on a Collier County board or
committee? Yes If
yes, please list the committeeslboards: COSTAL ADVISORY COMMITTEE
VIII-1-a New Business
9 of 9
Please list your community activities (civic clubs, neighborhood associations, etc. and positions
held:
Commodor Pelican Isle Yacht Club
Costal Advisory Committee
Vineyards Board of Directors ( Treasurer)
Board, Habitat for Humanity (Construction, Mentor)
Guardian Ad Litem20th Judicial District
~catiol~ LL~Universi~ofVin1;:lf<' ia~~.2' LLB, - & .Virginia Coll~~e.QfLaVll, U- BS.
U, In strIa a eme and Ul. or. e lIons - Itel1 to ra tI~ tlefor the .S.
uP1:eme ~ourt, - .~(a}rmY omman an enerat Statl1 gmge, - ~e~ns ttanguage InstItute
resldo 0 Monteray (jerman
~xp~rie~e: ~reSid~u..tial A~PPi~et1t as ChW:1~t:m~~'J2 the Federal.Executive
G.tvlce, e u ener \.,.:Q s tor yrronm t Irs . e .ot(;ommerce,
lrecto~ 1 BAf ICe Q?, IVIPflie ensc;; lfe~tor~. '.. lC~ 0 e enf~tWlzatlOn
repareuness; Imstrator t1mted :states FIre AdmmlstratlOn.
Please attach any additional information you feel pertinent. This application should be forwarded to Sue Filson, Executive
Manager to the Board of County Commissioners, 3301 East Tamiami Trail. Naples, FL 34112. Jfyou wish. please fax your
application to (239)252-6406 or e-mail tosuefilson(cl)Co!lierllov.net. Thank you for volunteering (0 serve the citizens Of
Collier County.
CAC April 14, 2011
VIlI-2 New Business
1 of3
EXECUTIVE SUMMARY
Endorse the recommendation of the Clam Bay markers work group for the
marking of Clam Bay and recommend staff to proceed with the required permit
applications including the FWC, USACE, and the USCG.
OBJECTIVE: Endorse the recommendation of the Clam Bay markers work group for
the marking of Clam Bay and authorize staff to proceed with the required applications
including the FWC, USACE, and the USCG.
CONSIDERATIONS: On January 13, 2011, the CAC recommended that Collier County
not move forward with the permit application or installation of navigational markers in
Clam Bay due to additional and unexpected costs being added to the project by the
permitting agencies. The CAC further recommended that the County petition the
USACE to close the 1998 permit noting that the County has acted in good faith to come
into permit compliance but that the denial of timely and cost effective permits from
FDEP, the USCG and FWC has prevented this from happening. Additionally, the CAC
also recommended that the County, Pelican Bay and Seagate community jointly meet
and resolve the marking of Clam Bay to facilitate safety and overall community
acceptance.
This position was approved by the Board of County Commissioners at their January 25,
2011 meeting as Agenda Item 10J.
Two public meetings were held to discuss the marking plan. The first meeting was held
on 2/17/2011 and the second 3/15/2011. The following stakeholder group was
developed to participate in the discussion and speak for their respective communities.
In addition, the public was offered the opportunity to speak at each meeting. The stake
holder group included:
. John Sorey - Vice Mayor for the City of Naples /CAC Chairman
. Ernie Wu - President of the Seagate Homeowners Community
. Steve Feldhaus - Secretary of the Pelican Bay Foundation
. Keith Dallas - Chairman of the Pelican Bay Services Division
. Mary Johnson - President of the Mangrove Action Committee
. Kathy Worley - Environmental Specialists from the Conservancy
. Marsha Cravens - Audubon Society of SW Florida
. Gary McAlpin, Marla Ramsey and Pamela Keyes from the County
This stakeholder group with the exception of the Seagate community endorsed the
attached marking plan. This plan has the following key comments:
1. The marking system will be informational markers and not navigational markers.
FWC is the lead agency that will permit the marker system since they are
primarily responsible for waterway signage. The permit will be issued by FWC
contingent on review and concurrence by USACE and the USCG. Both the
CAC April 14, 2011
VIIl-2 New Business
20f3
USACE and the USCG have concurrent jurisdiction for this waterway and a
permit from both agencies will also be required. A permit, review or concurrence
from FDEP is not required.
2. Clam Bay is a multi-use route. Kayakers, canoes, boaters and swimmers all use
the same estuary and route. FWC has determined through review with its legal
department that the proposed marking system would not prevent any access or
use of this estuary by any user.
3. Only canoe trail markers for the route between Clam Pass and the Seagate
neighborhood will be permitted. Installation of Local Knowledge signs on each of
the 12 marker poles will also be proposed. Two Informational markers will be
placed at the beach and one will be placed at the entrance to the Seagate
neighborhood. Informational markers that identify the position of shoals and
seagrasses will be permitted. We have identified 5 markers that will be used in
the system. These will be used to guide users into the deeper water.
Informational signs on either side of the tram bridge can be added. These signs
do not come under FWC's jurisdiction
4. Based on preliminary review, FWC is in conceptual concurrence with our
proposed plans. FWC will however not approve anything until a permit
application is received, and it can be reviewed in detail.
5. Seagate has indicated that their major concern is that the pass and access is
safe. With the amount of markers proposed, the informational signs and the
environmental markers as outlined above, we believe that this accomplishes their
major concerns.
6. Collier County will submit the application and be the permit holder.
Responsibility for the marker installation and sign maintenance is currently being
discussed.
ADVISORY COMMITTEE RECOMMENDATION: Staff is recommending approval of
this item.
This item was reviewed and approved on 4/6/2011 by the Pelican Bay Services Division
with the stipulation that permitting, maintenance and Installation continue to be their
responsibility. In addition, the PBSD along with the Pelican Bay Foundation have
offered to commit funding for the project. The original canoe trail markers permit
application and installation was by the Pelican Bay Services Division.
FISCAL IMPACT: Costs for the permitting and installation of these markers will be
$15,000 - $25,000. Funding sources will be identified as responsibility is determined.
GROWTH MANAGEMENT IMPACT: No impact to the growth management plan would
result from this Board action.
LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney's
Office, requires majority vote, and is legally sufficient for Board action. - CMG
CAC April 14, 2011
VIII-2 New Business
30f3
RECOMMENDATION: Endorse the recommendation of the Clam Bay markers work
group for the marking of Clam Bay and authorize staff to proceed with securing the
required permits including the FWC, the USACE, and the USCG.
Prepared by: Gary McAlpin, Coastal Zone Management
CAC April 14, 2011
VIII-2-a New Business
1 of6
Discussion with Ryan Moreau on 2/23/2011 based on questions from the Clam Bay marker workshop
held on 2/17/2011.
Key points are as follows:
1. Marker #1 which is the most southern marker and closest to the Seagate neighborhood can be move
further to the south to better align with the canoe/kayak launch location. Seagrass signage can either be
added to this pole or separately marked to protect the sea grass beds in this area.
2. Installation of Local Knowledge signs on each of the 12 marker poles did not necessarily concern him and
he is willing to allow more of these signs but wants to be able to look at the whole proposal in its totality
rather than piecemeal. He is more concerned that too many markers and/or signs on marker poles would
prevent safe navigation by cluttering this narrow path.
3. With respect to poles for shoal and seagrass markers instead of buoys, his position is that with a narrow
route, buoys would be safer for users if hit and less clutter in the route. He will however evaluate these
signs being on poles and make his decision when he evaluates the entire package.
4. He has no issues with the signs on either side of the tram bridge. This does not come under his
jurisdiction.
S. He wants us to submit our plan that is the consensus of the entire community and he will review it
holistically without all the telephone calls and the constant pressure from everyone in our community
calling and lobbying him.
6. He understands that this is a multi use route. Kayakers, canoers, boaters and swimmers will use the same
estuary. He has reviewed this with his legal department and this marking system would not prevent any
of the user's access or uSe.
7. The County ordinance number cannot be placed on FWC signage.
8. The permit will be iSsued by FWC contingent on review and Concurrence by USACEand the USCG. Both
the USACE and the USCG have concurrent jurisdiction for this waterway. FWC's is primarily responsible
for signage in this instance and is taking the lead. A permit is not required from the USACE orthe USCG.
Their involvement will be limited to only review and concurrence and will be obtained by FWC.
9. A permit, review or concurrence from FDEP is not required.
10. Based on preliminary review, FWC is in conceptual concurrence with our proposed plans. FWC's will
however not approve anything until a permit application is received and it can be reviewed in detail.
11. Tha attached route map and marker recommendations reflect our discussions from 2/17/2011 and
guidance from FWCon the 2/23/2011 telephone call.
'"
'"
a.>
~ c:
C; O(i)
N =>
.CO
~ ~
=EZ
0..",
<l:N<D
Uo_
<l:::0
U>""
CV)
ZWa:::
Oa:W
5ti
I- a 0 V)
:J. Wc:Cl a:
<c a::: a:::. W
uWo:i!:
J. .~ ~. ~
V') 3:0 V)
.;tO~C
c.;ZOZ
~~9~
~Sfh
u9~
III
III
~ Ql
-- .~
o III
N ::l
_Cll
~ ~
- Ql
'i::Z
~'P
U~CO
<(--
u5~
Q,)
c.
E
ro
><
UJ
C
0.0
.-
V)
I
0:::
~
....J
ZCV')
O .w 0::
5!:w
j::=>>!ci
:::) CI 0 V')
<c~c:Q0::
uwo::w
1CDO:iE
CLI..-=::
V)W....~
V)...J=>>~
~~OV')
Q.;O~C
lIl:::~gz
lIIC ...J ...J <(
<(<eo..
....UW
UOW
...J~
'"
'"
Q)
~ r::
~.~
_co
V:;:
~ Q)
=cz
C-<ll
<l:NCD
U,_
<l::O
U>Ltl
~
'\~
O~
IICCC
16
tIIIfii?
Vl
Vl
~ Q.l
~ c
O"(i)
N ::l
.ra
;! ~
'C~
c.
<( cp
UN'"
<(...L'+-
u5~
CAC April 14, 2011
VIII-3 New Business
1 of 3
EXECUTIVE SUMMARY
Recommendation to approve $29,729 in design alternative studies for the
Vanderbilt Beach park/restroom facility as directed at the March 8, 2011 BCC
meeting and request authorization for associated budget amendments.
OBJECTIVE: Obtain approval for expenditures for the design alternative studies for the
Vanderbilt Beach park/restroom facility as directed at the March 8, 2011 BCC meeting.
CONSIDERATIONS: The existing Vanderbilt Beach restrooms are approximately 15
years old, in need of significant refurbishment and are undersized to meet current public
demands. Vanderbilt Beach is one of the County's most popular beach parks. Adequate
beach parking exists at this location with the County's parking garage on Vanderbilt
Beach Road.
The proposed Vanderbilt Beach park/restroom facility design engineering, permitting
and construction contract bidding was approved by the BCC on 7/27/2010 (Item 16D9)
for $160,000 to address overall community needs consistent with current County
practices and existing beach park facilities.
The BCC directed staff on March 8, 2011 to develop alternatives to constructing an
elevated restroom, deck and concession park facility at the current FEMA VE 14
location. Options requested were:
1. Renovate existing facility - Utilizing the appraisal and structural inspection of the
existing facility, develop a conceptual plan and evaluate the options to renovate
the existing facility.
2, Design a new flood proofed facility at grade in proposed AE zone - Develop
conceptual design and overall facility cost for an at-grade facility, flood proofed
for the new proposed AE zone. This would require this facility to be built farther
off the beach and not in the footprint of the existing facility. This is a preserve
area.
3. Refurbish the existing bathroom and expand bathrooms in garage as needed for
capacity - Evaluate if this is possible due to code restrictions and if possible,
determine how much the existing facility can be refurbished (task1) and develop
conceptual layout for bathrooms in the parking garage. Included would be a
walkway through the preserve.
4. Construct a new facility at grade in the existing bathroom footprint (VE14). - If
FEMA guidelines were ignored, what would a new facility conceptual layout/cost
be? This would include the demolition of the existing facility, design and build
new restrooms, ADA accessible ramp, steps and a reduced deck.
5. Construct a new elevated facility - Develop a conceptual plan and options to
demolish the existing facility and construct a new elevated facility to conform to
VE 14 FEMA guidelines. This would include the restrooms, a small deck and
either an elevator or ADA access ramps.
CAC April 14, 2011
VIII-3 New Business
2 of 3
6. Renovate existing facility for concession storage - In conjunction with a new
bathroom facility, develop a conceptual plan to renovate the existing bathroom
for concession storage. This would include storage for chairs, umbrellas, shade
structures, etc. but exclude food and beverage items.
7. The Growth Management Division will also determine:
. The City of Naples history/circumstances surrounding FEMA flood
variances granted within the City especially the Port Royal variance.
. Determine if a Letter of Map Revision (LOMR) is appropriate to qualify this
specific site to an AE zone based on actual site elevations provided by
Coastal Zone Management.
These options will not be consistent with the existing County beach park facilities at
Tigertail, Clam Pass or Barefoot Beach Park. Each of these facilities has concessions
and are elevated. Staff will be required to review these options with the Pelican Bay
Foundation. The Pelican Bay Foundation holds restrictive covenants on this parcel as a
condition of the property deed transfer. These options will also be reviewed with
community organizations throughout the County as well as the Parks and Recreation
Advisory Board, the Coastal Advisory Committee and the Tourist Development Council.
Cost to develop these design options are as follows:
1. Renovate existing facility -
2. New facility in proposed AE zone -
3. Refurbish existing bathroom and add bathrooms in garage-
4. Construct reduced facility at grade in VE zone -
5. Construct reduced elevated facility in VE zone -
6. Renovate existing bathroom for concession storage -
7. Coordination-
8. BCC Presentations -
9. Contingencies-
10. Reimbursable -
Total
$ 1,810
$ 7,169
$ 3,414
$ 3,729
$ 3,076
$ 980
$ 1,970
$ 3,885
$ 3,466
$ 230
$29,729
Overall project costs along with design throwaway costs for each option will be
presented with each item.
ADVISORY COMMITTEE RECOMMENDATIONS: This item will be presented to The
Parks and Recreation Advisory Board, the Coastal Advisory Committee and also the
Tourist Development Council for recommendations.
FISCAL IMPACT: The cost of this option development will be $29,729. All funds will be
provided from Category "A" Tourist Development Tax Fund 183 - Beach Park Facilities.
A budget amendment will be required to allocate the necessary funds from Fund 183
reserves.
CAC April 14, 2011
VIII-3 New Business
3 of 3
GROWTH MANAGEMENT IMPACT: There is no impact to the Growth Management
Plan related to this action. This study will identify specific impacts, if any each option
would present to the Growth Management Plan.
LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney's
Office, requires majority vote, and is legally sufficient for Board action. - CMG
RECOMMENDATION: Approve $29,729 in design alternative studies for the Vanderbilt
Beach park/restroom facility as directed at the March 8, 2011 BCC meeting and
authorize associated budget amendments.
PREPARED BY: Gary McAlpin - Director, Coastal Zone Management
CAC April 14, 2011
VIII-3-a New Business
1 of 8
~inGary
.
From:
Sent:
To:
Cc:
Subject:
MottToni
Thursday, March 31, 2011 9:24 AM
McAlpinGary
NoonanDick; LeonardRoosevelt
FW: Public bathrooms at the end of Vanderbilt Beach Road
Gary,
Per the email chain below, we called Jim for clarification, but he is out of the office for a week. I spoke to Dick Noonan,
Building Inspector, CC Building Review & Permitting. Dick said that the Property Appraiser's assessed value can be
utilized or we can obtain a value from a licensed property appraiser. Whichever is higher is used for the 50% calculation.
Roosevelt is a licensed property appraiser, Dick also said that FEMA will accept a 20% add on to the appraised value.
With that being said, please see the information below:
PropertY Appraiser Assessed Value:
Bath House $17,066
W Deck $1,474
TOTAL: $18,540 + 20% ($3,708) = $22,248 and 50% = $11,124
Roosevelt's Insured Cost Replacement Value:
Bath House & W Deck - $28,000 + 20% ($5,600) = $33,600 - 50% = $16,800
Please note that the Property Appraiser is the only one that can provide an "assessed value." A licensed property
appraiser can only provide "market value" or "cost value." Typically market value is higher than assessed value, but
lower than cost value. It is our suggestion that we use the cost value because it is the cost we currently have insured
with Risk Management and is the highest value obtainable with all three approaches. The cost value is fully defensible.
Below is the lDC that references the 50% provision. Please let us know if you require any additional information from
us.
Thank you.
Toni & Roosevelt
lDC 5,05.08.B.3. Architectural and Site Design Standards (see highlighted)
B.
Applicability. The provisions of section 5.05.08 apply:
1.
To all new buildings and projects submitted on or after November 10, 2004 in the zoning districts set out
below. At the applicant's request, projects submitted between November 10, 2004 and January 2,2005 may
be reviewed for compliance with the requirements of section 5.05.08 as they were set forth in the LDC
before November 10,2004.
a.
Commercial zoning districts.
b.
Non-residential PUD districts, and non-residential components of any PUD district.
c.
Business park districts.
2.
1
CAC April 14, 2011
VIII-3-a New Business
2 of 8
To non-residential buildings and projects submitted on or after November 10, 2004 in any zoning district, but
only when the following conditions exist:
a,
The project site is located on an arterial or collector road, as described by the Traffic Circulation
Element of the GMP. or
b.
A proposed building's footprint would be located within 300 feet of the boundary of a residentially
zoned district.
a.
.~
I:
ltl
~'Ij
From: LorenzWilliam
Sent: Thursday, March 31, 2011 8: 13 AM
To: ValeraCarollna; MottToni
Cc: BellowsRay; BosiMichael; WileyRobert; TurnerJim
Subject: RE: Public bathrooms at the end of Vanderbilt Beach Road
Toni.. Please consult with Jim Turner regarding the value calculation..thanks.
CBif( Lorenz
William D. Lorenz Jr., P.E., Director
Land Development Services Department
Growth Management Division/Planning and Regulation
Tele: 239.252.2951; Fax: 239.252.6710
E-mail: Wil/iamLarenz@Col/ierQov.net
From: ValeraCarolina
Sent: Wednesday, March 30, 2011 5:32 PM
To: MottTonl
Cc: LorenzWllllam; BellowsRay; BosiMichael; WileyRobert
Subject: Public bathrooms at the end of Vanderbilt Beach Road
2
CAC April 14 . 2011
VIII-3-a New Business
3 of 8
Teni,
During our telephone conversion yesterday, you mentioned that you were interested in knowing what LOe orovisions
mav aootv if the scooe of the imorovements to the beach oubUc bathrooms on Vanderbilt Beach Road were limited to
interior renovations and oerhaos re-oaintin~.
I Checked with Ray Bellows, Zoning Manager, and Robert Wiley, Principal Project Manager, and It seems that such scope
may only require a building permit approval.
However, please keep in mind that FEMA requirements are triggered when the improvements reach 50% of the
assessed value of the subject building (exclusive of the parking garage, which is within the same site). Also note that
"assessed value" is not meant to be the "property appraiser's" assessed value, but the cost of the existing bathroom
building regardless of its location (please contact Robert Wiley for further clarifications.); and that the building permit
may (or may not) trigger other requirements if the y improvements are beyond the existing permit and variance.
As I mentioned in our telephone conversation, we will be glad to meet with your consultants to go over specific LDC
requirements that may be triggered by other options that your consultant may be (or will be) considering.
Please let us know if you need further clarifications, or if you have any other questions.
Hope this helps,
CAROLINA VALERA
Principal Planner
Comprehensive Planning Section
Growth Management Division
Collier County Government
T:239.252.8498 F:239,252.6347
Under Florida Law. e.rnail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send
electronic mail to this entity. instead, contact this office by telephone or in writing.
3
,c,'-':
.
a
-
CAC April 14, 2011
VIII-3-a New Business
4 of 8
Victor J. Latavish Architect, PA .
April 2, 2011
Collier County Coastal Zone Management
Attn: Clint Perryman, Project Manager
3301 East Tamiami Trail
Naples, Florida 34112
Re: Proposal for Professional AlE Services for e
Vanderbilt Beach Restroom Alternative D ign Studies
Dear Mr. Perryman,
I am pleased to submit this proposal for pro ional Architectural services to provide
alternative design studies for .the Vanderbilt B h Restroom. This proposal includes
preparation of prelim in NY building layouts and pre . cross sections suitable for overlay
on aerial photographs and site plans prq>ared by Civil Engineer, plus preparation of the
following documents and related work: ;
I
1. Existing Restroom Facility- Structural ~tion and Renovation Feasibility Report
a. Review plans of existing facility I
b. Review building permit documents :
c. On-site observations of exiSting stn:tcture
d. Prepare a Structural Inspection and Renovation Feasibility Report
2. AlE Zone Alternative- Preliminary Design Study
a. Prepare preliminary building plan and preliminary cross-section
b. Review plan, permit considerations, and proposed budget with County staff
3. Refui'bish Existing B~h Restroom and Expand Facilities at Parking Garage
a. Prelimiotlry plan of restrooms added to existing parking garage
b. Review refurbishing plan, expansion plan, permit considerations, and proposed
budget with County staff
4. VE-Zone At-Grade Alternative
a. Prepare preliminary building plan and preliminary cross-section
b. . Review plan, permit considerations, and proposed budget with County staff
S. VE-Zone Elevated Structure Alternative
a. Prepare preliminary building plan and preliminary cross-sectiOn, including
ramps, stairs, and elevator design study
b. Review plan, permit considerations, and proposed budget with County staff
Member oftbe American Institute of Architects AA 1831
4100 Corporate Squarc, Suite 100, Naples, Florida 34104
Telephone 239.643.166S
TelcfiM;simile 239.643.6192
CAC April 14, 2011
VIII-3-a New Business
5 of 8
6. Beach Storage Renovation Design 'Study
a. Review selective demolition requirements
b. Review plan, permit considerations, and proposed budget with County staff
7. Coordination
a. Predesign Conference with Civil Engineer, FEMA, and Building Official
b. Coordinate preliminary plans with Civil Engineer
8. Meetings
a. Attend 4 progress meetings and/or community meetings as requested by client
b. Attend 1 BCC meeting
9. Contingency
a. Prepare alternative plans or revisions
b, Related additional services
EXCLUSIONS
1. Civil Engineering services are provided under a separate contract.
2. This proposal does not include detailed floor plans, exterior elevations, or renderings
which can be developed for the selected alternative at a later date. Similarly, Contract
Documents used for permits, bidding, and construction can be developed for the
selected alternative at a later date.
SCHEDULE
We are prepared to provide services as needed to meet your schedule.
BASIC SERVICES FEE SCHEDULE: '
1. Existing Building-Inspection & Renovation Report T &M est. $1,810.00
2. AlE Zone Alternative- Preliminary Design Study T&M est. $1,510.00
3. Refurbish Beach Restroom & Parking Garage Alternative T&M est. $1,140.00
/
4. VB-Zone At-Grade Alternative T&M est. $940.00 / ./
S. VE-Zone Elevated Structure Alternative T &M est. $940.00 v
6. Beach Storage Renovation Design Study T &M est. $370,00
7. Coordination T &M est. $680.00
8. Meetings T&M est. $1,480.00
9. Contingency T &M est. $850.00
10. Reimbursable Expenses T &M est. $80.00
Total $9,800.00
Page 2 of 3
CAC April 14, 2011
VIII-3-a New Business
6 of 8
.r
Thank you for the opportunity to submit this Proposal for Professional AlE Services.
Please feel free to call if you have any questions or if additional information is needed.
Sincerely,
VICTORJ. LATAVISH ARClDTECT, PA
,~/
Victor J. Latavish, AlA
President
Page 3 of 3
CAe April 14, 2011
VIII-3-a New Business
7 of 8
v.
'.
PROJECT NAME: V ANDERBIL T BEACH RESTROOM ALTERNATIVES ANALYSIS
CEC PROJECT NO: 10.192
DATE OF ISSUANCE: April !. 2011
EFFECTIVE DATE: April!. 2011
CLIENT: Collier County
PROJECT MANAGER: Michael Poff
Coastal Engineering Consultants, Inc. (CEC) is hereby directed to provide the following services in
connection with the Vanderbilt Beach Restroom facility. This work assignment shall be conducted in accordance
with the terms and conditions of our Continuing Contract for Professional Engineering Services for Coastal
Zone Management Projects (CONTRACf) No. 09.5262.
SCOPE OF SERVICES
The scope of services presented herein is designed to assist Collier County's Coastal Zone Management (CZM)
Department review alternatives in connection with the renovation and I or expansion of the Vanderbilt Beach
restroom facility. For Tasks I to VI below, the evaluations for each option wiIl include the foIlowing parameters as
well as coordination with CZM's architect:
1. Environmental hnpacts (e.g. T &E species, dune vegetation, wetlands, mangroves);
2. Rules and Regulations (e.g. FEMA, ADA, federaVstatellocal regulatory);
3. Institutional (e.g., distance to MHW, specific uses);
4. Construction Budget (site work, mitigation, design and pennitting, and construction management); and
5. Timing (e.g. FEMA flood zone map revision, pennit processes).
Task I Renovate Existin2 Facilitv
To be completed by the County's Architect.
Task D Constroct New FacDitv in ProD~ed AE Zone
Develop a concept plan and evaluate the option to construct a new facility at grade in the proposed AE Zone as
depicted on the proposed FEMA flood zone map to be provided by CZM. The facility will include restrooms,
access ramps I stairs, decks on the west and north sides, and storage areas for beach items like chairs, and
umbrellas. This is within the preserve area
Task ill Refurbish Existin2 Bathroom and Emand Bathrooms in Gara2e
Develop a concept plan and evaluate the option to refurbish the existing facility (Task I option) and add
additional bathrooms in the parking garage. This plan will include an elevated boardwalk through the preserve
area from the existing facility to the garage.
Task IV Constroct Reduced Facilitv at Grade in VE Zone
Develop a concept plan and evaluate the option to demolish the existing facility and construct a new facility at
grade in the VE Zone. The facility will include restrooms, ADA access ramp, steps, and reduced deck
Task V Constroct Reduced Elevated Facility in VE Zone
Develop a concept plan and evaluate the option to demolish the existing facility and construct a new elevated
facility in the VB Zone. The facility will include restrooms, ADA access ramps, stairs, and reduced deck.
Investigate the feasibility of using an elevator versus ramps for ADA access to the new facility.
Task VI Renovate ExistiDlz Bathroom for Concession Stora2e
In conjunction with a new bathroom facility, develop a concept plan to renovate the existing bathroom for
concession storage. This would include storage for chairs, umbrellas, shade structures, etc. but would not
include food and beverage items.
r --
i
CAC April 14, 2011
VIII-3-a New Business
8 of 8
..
CEC No. 10.192
April 1, 2011
Page 2of2
Task VII Client Coordination
Provide client coordination including attending two meetings with County; provide contract administration.
Task VIII BCC Presentation
CEC will assist prepare and present the alternatives analysis to the BCC.
Task IX Continl!encies
Provide budget for contingencies to account for such things as an additional concept, an additional meeting or
revisions to concept plans.
Task X Reimbursable Exoenses
Provide budget for reimbursables.
It is anticipated that upon selection of the preferred alternative, additional design and related seIVices will be
necessary thus they are reserved for future phases. h is understood the County will address the FEMA-
LOMR seIVices and the County's Architect will complete the structural inspection of the existing structure.
BUDGET SUMMARY
Task Description Fee Basis
I Renovate Existing Facility $0 T&M
II Construct New Facility in Proposed AE Zone $5,659 T&M
III Refurbish Existing Bathroom & Expand Bathrooms in Garage $2,274 T&M
IV Constl11ct Reduced Facility at Grade in VE Zone ..$2,!.789 T&M
V Constl11ct Reduced Elevated Facility in VE Zone $2,136 T&M
VI Renovate Existing Bathroom for Concession Storage $610 T&M
VII Client Coordination $1,290 T&M
VIII BCC Presentation $2,405 T&M
IX Contingencies $2,616 T&M
X Reimbursables $150 T&M
Total $19,929
RECOMMENDED:
APPROVED:
Date: April 1. 2011
Date:
By:
By:
Michael T. Poff, P.E.
Client (Authorized Signature)
1:\DATA\20J(1\/019Z\Work Orders\10192_Work Order_20J J0401.doc
CAC April 14, 2011
VIII-4 New Business
1 of2
EXECUTIVE SUMMARY
Endorse a recommendation to approve the emergency dredging request for the
Marco Island Collier Bay entrance channel.
OBJECTIVE: Endorse a recommendation to approve an out of cycle emergency
dredging request for Marco Island's Collier Bay entrance channel.
CONSIDERATIONS: Conduct an emergency dredge project of the entrance channel to
Collier Bay. The project includes excavating approximately 12,000 cubic yards of beach
compatible sand from the previously permitted borrow area (DEP Permit No. 0068437-
002-JC through 0068437-005-JC and USACE Permit No. 198800290(IP-MN)), and
placing the sand along the previously permitted beach fill DEP Permit No. 0222764-001-
JC and USACE Permit No. 198800290(IP-MN)-2004.
The purpose of the project is to restore safe navigation by removing the shoal that has
created hazardous conditions for the boating community. An Emergency Resolution
form the City of Marco Island is attached.
A PowerPoint presentation is attached.
This entrance channel was dredged in 2001 using TDC funds and the dredged sand
was placed on Hideaway Beach. The Rock Jetty was built in 2005 using TDC funds.
County Ordinance 2001-03 authorizes this activity as per section 2, item D.
In partnership with Collier County, the Hideaway Beach Improvement District through
the City of Marco Island is funding the engineering and permitting of this project. Funds
requested for this out of cycle grant are for permitting fees and on site dredging. All
permits will be jointly issued to both the City of Marco Island and Collier County.
$280,000 has been estimated as the expected dredging and permit fee cost for this
project. If during the design, permitting or bidding process additional funding is
required, supplemental grant requests will be submitted.
ADVISORY COMMITTEE RECOMMENDATIONS: Staff is recommending approval of
this request.
FISCAL IMPACT: $280,000 is estimated to fund this project. The Source of funds is
from Category A Tourist Development Tax fund 195. Funds were not budgeted for this
item in the FY 10/11 budget. However, sufficient unallocated reserves ($7,200,000)
exist to fund this request.
GROWTH MANAGEMENT IMPACT: There is no impact to the Growth Management
Plan related to this action.
LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney's
Office, requires majority vote, and is legally sufficient for Board action. - CMG
CAC April 14, 2011
VIII-4 New Business
20f2
RECOMMENDATION: Endorse a recommendation to approve an out of cycle
emergency dredging request for Marco Island's Collier Bay entrance channel.
PREPARED BY: Gary McAlpin
CAC April 14, 2011
VIII-4-a New Business
1 of 8
RESOLUTION NO. 11-05
A RESOLUTION OF THE CITY OF MARCO ISLAND, FLORIDA DECLARING
A.N EMERGENCY FOR THE DREDGING OF THE ENTRANCE TO COLLIER
BAY, ALSO KNOWN AS COLLIER CREEK, TO RESTORE SAFE
NAVIGATION WITHIN THE CHANNEL, IN THE CITY OF MARCO ISLAND,
FLORIDA; AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, the entrance to Collier Bay, also known as Collier Creek, within the City of
Marco Island, is located in Sections 5, 6 and 7, Township 52 South, Range 26 East, Collier
County, Florida; and
WHEREAS, the City of Marco Island Waterways Advisory Committee, at its meeting of
March 24, 2011, reviewed the cun:'ent status of the channel entrance and determined that an
emergency situation exists due to the excessive deposition of sand into the previously dredged
area; and
WHEREAS, pursuant to the recommendation of the Waterways. Advisory Committee the
Marco Island City Council finds that the area has experienced severe limitations to safe
navigation and increased scol.lring velocities along the adjacent waterfront infrastructure, and
agrees that emergency dredging of the channel is necessary; al1d
WHEREAS, the .area of the City's entrance to Collier Bay, also known as Collier Creek,
has experienced severe limitation to safe boating navigation and increased scouring velocities
along the aqjacent waterfront infrastructure as a result of significant deposits of sand within the
channel; and
WHEREAS, the City is working jointly with the Collier County Coastal Zone
Management (CZM) department to seek Florida Department of Environmental Protection/Corp
of Engineers (FDEP/COE) pennits for emergency dredging of the entrance to Collier Bay.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Marco
Island, Florida, that:
SECTION 1. The emergency dredging of the entral1ce to Collier Bay is a viable
temporary solution to tlle erosion; and the City, with support trom the CZM, is making an
application to FDEP/COE for an emergency permit approval to dredge the channel as described
above.
SECTION 2. FDEP/COE is requested to expedite pemlitting and approval for the
emergency dredging, as FDEP/COE did for a rock revetment abutting the roadway Royal Marco
Way, and for the CZM to support a request for Tourist Development funds from the Collier
County Board of Commissioners to finance the emergency dredging project.
SECTION 3. The City Council of the City of Marco Island declares an emergency
and directs and authorizes the City Manager or his designee to support and assist the eZM in
1
CAC April 14, 2011
VIII-4-a New Business
2 of 8
obtaining governmental approvals for the emergency dredging of the entrance to Collier Bay,
also known as Collier Creek.
SECTION 5. EFFECTIVE DATE. This Resolution shall take effect immediately
upon its adoption.
DULY PASSED AND ADOPTED in open and regular session by the City of Marco
Island, Florida, this 4th day of April 2011.
ATTEST
~'
~/Yl ... ..../'/
LaUl1l.M. Lilian, cit$t ClOt ..
CITY OF MARCO ISLAND, FLORIDA
BY;~~--
..'" Gerard M. Gibson, Chairman
2
III
III
Q)
~ c
;; O(i)
N :::J
.CD
~ ~
=Ez
c.",
<('CO
<.:>"/"_
<(:::0
<.:>><'>
\',.'
rJ)
rJ)
..... C1l
"If"'" .~
OrJ)
N ::l
.co
~ ~
_ C1l
.~Z
<( 'l'
U,-CO
<(-.....
u5~
.
;.
...
U)
U)
::.~
o U)
N ::l
.lIl
~ ~
~Z
c.",
<l;,
o'i""
<C:::b
O>l()
)
-,-.
'"
'"
...... a.>
'If""" .~
0'"
N :>
_0)
~ :=
_ a.>
.~Z
<( '1'
u"'fOO
<(--
u5~
Vl
Vl
.... Q)
O'~
N ::s
_CD
~~
- Q)
.~Z
<( '1'
o"fCO
<(--
0=0
>.....
II>
II>
Q)
""'c
o'U)
N :>
.co
v 3:
""'Q)
:cz
c.",
<('00
u'f'_
<(::0
u>OO
CAC April 14, 2011
VIII-5 New Business
1 of 1
EXECUTIVE SUMMARY
Marco Island Project
OBJECTIVE: Update the CAC on the Marco Island South Conceptual Design Project.
CONSIDERATIONS: For information only.
GROWTH MANAGEMENT IMPACT: There is no impact to the Growth Management
Plan related to this action.
RECOMMENDATION: For information update only.
PREPARED BY: Gail Hambright, CZM
o
o
t'"
s::
~
o
o
~n
n
Ii
~I
o n
Ii
.::!!::!!
;i;"tD
'Z
00
0."
""-
5'9
=0
,...,.-g
6
;:po 0
. --l g
;:po.
rG.r--.J
. 0.0-
-r-.)
90
00
o
.~
~
"l
~
=1'
'"
""
=
0.
<
Q..
'"
::l
'"
en
:s-
O
...
m..
,-,-,-'-'-'-'-'--", II
..
..-30.......
..-40..................................
----'7............................... ................. ... ....... 't" "t' "t" ......
............... ...........
..........................................
.......................
..........................................................................
""............
aii
...."" ..
ii~
!~~
.,.;;...".-
....
'rZ
'00
n.'.
t\1......
""0
;.~.b
:,..,.R
-0
:::0-0
'-1~
::0-'
iC)..N
. oF'
-I',)
:9~
'00
o
~
IgJ
~
~
~.
,"
..
:::C
.c.
<:
Q..
'"
~
..
9
~
I'Jq
..
<
o
C
3
CD
(":I
:T
llo)
~
lD
CD
;;0
llo)
....
CD
-
~
""-
'<
..:J;.
Ht ...
.... .......
...................... ~~
5000__--___ ___~ _ ~~-_:--
.O-._._~_____~___~~~~~..~.............. ...................................
...C..........,.....~.....
..-5000 ................................. . ;/_ ...............
~. .....................................
..-10000...~..................~......................................
....................................~
.
..-15000 ... .. . . . .. . . . .. .. . .. . . .. . . .. .. .. .
~o
~~
ID::T
G)~
IlIID
~::!
IDa.
mID
III
::::I
a.
tQ=:
~..9:!
::::lID
l:LG)
tQllI
..,e
ID(Q
IlIID
~.g:
e.a.
ID("')
(ile
N
en
3
CD
UJ
("')
e
..,
..,
ID
::::I
-
i:
ID
-
ID
..,
:=I
a.
ID
G)
III
e
~
N
0
c.. c..
5- c
iii' i"
::l lXllXl ::l
C CD CD C
::.-::.-
III 5' 5' ~
'< g,g,
lXllXl
iil iil
III III
...... 00
:IE :IE ==
III III 1Il 1Il
!!!! ::.-::.-
1Il 1Il ~ sa
CD CD
!Cil: ' .
8.IR ~f
CD 1Il g,1lI
-c CD 1Il
CD .. l5'c
~8. g,iil
c ~g,
CD C
== !!.
... i3
,g ,g
I t jh )n *
o
o
'"
'"
I t jh )n *
c..
5-
iii'
::l
C
~
~f
ill:
-c
CD ..
g,CD
~ g,
il:
;iiii
~
o
'"
lXllXl
CD CD
::.-::.-
~~
~~
CD CD
~~
:IE :IE
III III
CDS'
iiI iiI
I t jh )n *
o
o
'"
~
tn
I t jh )n *
o
o
'"
tn
N
o
c..
5-
iii'
::l
C
~
'"
'"
22
;;rut
::.-::.-
sa sa
CD CD
il:il:
8.IR
CD 1Il
-c
CD ..
g,CD
~ g,
il:
;;;
~
s: s:
CD CD
DI DI
1/1 1/1
s:: s::
'"" '""
CD CD
C. 0 C.
s::
'""
'""
CD
::J
- 0
AI s::
0 '""
'""
1/1 CD
CD ~.
" ::J
:; -
~ t) b
ED ll' 1._# ,.."" Lj<
';;;C' .,;;::, 0- - - AI
CD 'S ~""> ,.. j;;::: h' 0
~
::r ~. 1/1
:r CD
c. 1
'3. ED B
0
'"" N ;F
CD .3l
DI
" ::r
:e 0
a '""
~ CD
~ CD
'"" :,::;
1/1
:,::; m
m N
N -
-
!i Q. .
'" 2l
'~ ED ~ 0
'""
CD ;F
DI
" ::r
:e 0
a '""
c c CD
CD CD CD
;$ '"" ;$
1/1
W W
C C
::;
..
M
~ i ~
~, ~
Val
~ ~
c.Q)
et:Z ~...
<.>~
et::
<.>>
I/)
z
o
i=
o
w
.,
o
0::
D-
C
Z
:J
u..
III
en
..
~
i;:
o
Cl
W
I-
et:
o
o
C
I-
c
.2
~
~
c
I
i!
~
~. ~ ~ ~.~~~~~
~~8~8~~
r---:j ~ ~ Oc
cccccco~
CCQCCCC=
~
"'
~
,
'" '"
~"'~~"'~
i7: g f ~
l-" ~
'"
iii
~
;,0
...
ccccoc
:!
'"
~
,
'" '"
~ ~
00
on on
...
l-
~
~
;,0
...
CCCCCCCCi
'"
~
~
,
CCCCCCCO
on
;;
~
,
'" '"
~"'~"'~~
g g i1i;
111 00 t"Il:::!
..; ...
:!:
i:l
:<l
,
::l
::J
'"
...
;,0
...
'" ~ '"
g
l-
~'"
<:i
on
...
s
~
;,0
...
gCCCC
g
1.5 .s ~ .s.~.! .el~
t 011 ;:I 011 OIl o.c Olll~
~ 1 g 111 ~I .
';. i:l ~ i:l i:l i:l i:l'~
= , e; ~ ~ olI ~I.
~=~=t.~l
E ~~j5gJ
r ~ ,= .~ 'G ~ e
, t-i:E~~a
tt;'Cii-;j ;u
=!~~ 0
~ '; 1.. ~
.~ :t: ; ~ c.Q
;.. ,,~ ~ 0 ,~
=~:l&:=cf :a
o ~:. .s :. e ~
S ~ ,~ ,; ,il 0 !
~ ';.!fl ~:: ...
~i~ ~ ~
e~
Q
Z
;;;;J
"-
on
~
....
~
~~~U.~.~II~~
~ UU lEi:i
;:i ori' I:::
"''''l'''~
~ ~
QQO=O
QQQCQ
~~
~~
=====
"''''
Q====
~
0==0=
"''''~'''~
l !
~
OQQCO
"''''~
=====
~"'~
<:i ~
~ ..,
8.l"'l"'~.~.
~ ~ ~ :<l ~ :Ii
a=ggg;ei'1
.c.,g,.:;,=,=...-l el~
00===="-=
~-nU:Ls1
:'~e~~...-larl.
~.c~==~'t
Vl--.;!"'CI'5"
~!:h:: :1'5
.... .- .c - 1: = ~
;. e.." 's ~ 8 cii
I t il ... e ... :=
1~5~~i~
:: = j ~ g ~ ,;
= e.;'~ '5! ~ ~
S""!8i:l=:
..s::s to ",,Q~'-
~ = '5 Ar: .= 1
'!; r.: :Il'f'1; "-
=t=~g ~
=Sfl')-:: ~
~r.lE~5J .:l
~ ~
~
IX!
=I
~~~~~
C1\~~~g
:g. '" oct .., oct
.., ~ on
~
...
~"'~8.~
~ ~:<l ~
'"
~"'8.l~
~ 5:<l ~
'"
~~~&.~.
~ ::! t i i
~.&.~~.~.
~ ~ ili ~ j!!
to')....... \0
'"
~~.~.~&.
~lnp~
'"
~~~~~.
~Cl:!~~
~
~
~.~~~8.
s: N ~ ~ :l!
N ....... ~
'"
~ '"
!
'"
l"'~~l
~ ~ ~ i
l~~~~
~ ~ ~ !:; i
~::';'3
g ] 'j :i ~
\"l'a'a~j,
.siig';
~ -; G.l u
I '01: u
:f ;I ~ =
'C :g lIlI ==
.a D:I ~ r:
'a il
i ~
iJ
~~
'C Ii
s...
!~
~ l
f
l:.:i
!~. 8.
l- ~ ~
~ ...
~~~~~
!'f"I....lil...._
~:g..~~
~ ..,
~.~!~~.
to 8 .. .,: ill
~ ~ ...
~~.!l~
~ ~ CIO S ~
~ ...
~~~~~.
~ :: ::;j ~ ~
~ ...
~l!~~.
~ ~ .. '" !
~~~.~.~
:0 ili i (2 01:
~ ..,
~~~~.~.
'" ... on
.... ClIO '" ~
~~.~~~
:;; ;l; i Ii ~
~ ..,
~~~!~
:t Ol:l ClC i7l ~
~~~.~.~.
~ ~ = :l! III
~ ..,
~.~~.~.~
~~~~~
i! t ~ e 1
~ ~ ~ Ii ...
~z Sj,
.e- I 1:1 =
&!"'g';rn
\"l "",
, ~ ~
.. c...
'~ il '; olI
d i i.~
~'5 !i
co ~ :l'"
E '" to ~
;; :>-
f
..
..
il::
...
=
co
If
Q
~~~~~
:lf~1t:f.
_00--f'1.
vi "':"':00
~l~~;
~ iil ;::: = =
III ....... GO
~l~.~.t
;:!i :7l ~ = r--
III ....... i
~&.~~;
... I,() GO.... ""
N !'P) .... .... 00
II) ....... r--
~~~~t
~ ~ ::: = i
III ........ r--
~8.~~!.
~~~=~
III ..............
~~.~.~.~
~ 2 ~ = '"
III ........ r--
~l~~;
!~~=~
1Il .... .... .. Ol:l
~~~~.;
:!; ~ :;!:
II) .. ... .. CIO
~~.~~t
~ ~ s!U
~~~~!.
:; ill ~ ! r:
Ill........... 00
i~~~l
'a~l~~
'iJ - ~ j rn
~ L~ ~
~ .!l ! =
... < '"
~ i
:a
.!l
!
=
~
~
:ii
"
'8
...
-<
~
-=
~
~
:i
-=
~
<:0
M
..
..;
-=
...
...
M
0-
~
-=
...
0-
'"'
in
..;
~
M
~
M
-=
...
,.,
...:
M
,.,
M
~
...:
0-
~
-=
...
M
~
vi
M
-=
...
'"
g
,.,
'Ii
~
lI'l
i
0-
M
~
~
,.,
,.,
..;
'"
r-l
'"
Z
r-l
~
r-l
..;l
<
...
o
...
~~'"
~ g:i
~ ~ 1
s
"'~.~.~.~.g
8~~~1I"l
..._oc .....
'1 :
,.,
&.-'"
... on l
~ ~ a
:<l ... ~
;,0
...
~ ~ '"
~ :ff ~
2 ~ a.
;,0
...
~-'"
~ l1!!
~ ~ a
,
~-'"
. ~
~ ~~ a
~ ... ~
;,0
...
l-l~"''''''''''
~ ~- PO
~ ..; t:!,
;,0
...
~-'"
::: .l
Oil ~ ~
~ ..; e
,
l-'"
~ ill ~
~ ~ a.
,
~ -'"
~ ~ ~
~ ... e
,
~ g '"
!'P) iii oq.
E :q. ~
= .. e
...
,
..!i"''''
s ~ E
~ ... ~
;,0
...
e~i~l~l~
{J~.c~a!:~o
t i :l1.l! , - ,
~~"i::l1iiilEi
'" " ~ .:. [ ! !l ~
e~-Ie:. .!lc
'= e e e... ,g
~~ 5J,i! ,~
.iaCl:l~ ell:
,~ ~ ~
" ..
..
i:l
...
r-l
;;;;J
Z
r-l
~
~
'" '" '"
'" '" '"
'" '" '"
'" '" '"
'" '" '"
'" '"
'" '"
i~.~.~~
~ iil ~ ~ ~
ti C7\
~ ~ g
g~:;;
..
M
...
~. ~ ~
~ ~ ,.,
..
M
...
~~g
ill ~ ~
'"
M
...
~ ~ g
~~....
(2
M
...
~. ~ ~
~ ~ oc
lI'l
M
...
~~g
r;;.........
... ,.,
I:!I
...
8. ~ ~
iil ~
~ t6
,.,
...
~~. ~ g
~ ~ .... ~
,.,
...
~l~g
in~"~
~ ...
,.,
...
~ ~ ~
..;~ .
o-"l.~
M '" -=
:! - M
I
1'i~. ~
~~ ~
~ ~ ~
~
~J ~
-!'f"I M
0-'" M
:'r: C7\r-
" :!l
~~. ~
. - .......
~~ ,.,
..... ti ~
...
~ ~ ~
g~ ~
:r;: \Q
n ~
~ i7: -=
:!- g 5:
,., '" oc
O-...r- ocr III
~
-= '" -=
~~. ~
..c:' Q
lI'l ~ on
"'t14:f '"
M oC
~ ~~ ~
00 ~ ..;
_ r-- ~
:2- ~ \Ii
~
; ~~ ~
:S~ ti
~~ ~
I M
~ ~ ~
~~ ..;
"t ~
:3- l!l '"'
M
$ ~ ~
~: .-:
"l.~ ~
~ ~
r-l
;;;;J
Z
r-l
~
~
...l
~
o
...
rJl
r-l
rJl ..
Z =
r-l =
,:l.. ..
><: ;.
I<l ..
rJli:l:
rJl '0 ..
r-l .. "
...l ~ =
I<l i: ..
~.a~
~t-g
~~:
",c'"
c",c
c",...
~gg:i
~U')Q
Soj~
c"''''
a ~g.~
~gc....
:<l ",.g. '"
i::oa~
~g8~
",oc'..
~"'g'"
~ "'. .
;,0"''''
... ...
ggg
Cl\QQN
~ 0" 0 rJi
~:i:g'"
,.oOrti
...
cc",
g8~
~ cicioO
!::88'"
~flirsi
,
"'''''''
...8g~
~ !ig"~
~ ~::
;,0
...
",88g
~gg::!
~~~
,
c",c
:!I8 ~
. ci M"
~:i:. ...
;,0 '"
...
8C'"
...",8:&
Egg;e
~ ~:..
, ...
g88
!'P)OCM
~ gg::
",,,,c
"" .,r't
,
"'''''''
~ggg
... 0 ca;
~8c'"
~ ..;:;:.
... ...
'" '" '"
~ ~ ~
'" '" "
In In In
&!&!&!
"... ~
oJ: i.!
e-E'7
1n~O
.l!" ~
.. 0 0
(,) c '"
'" S
0::..
l;(,)
';'
::E
III
ell
~
ell
III
ell
0::
~
'l:l
C
III
:Ii
~
N
'"
'"
,.;
....
'"
8'
'"
'"
...
~
'"
~
N
'"
"'.
...
....
c
~
'"
t:
"i
'"
'"
....
..
'"
'"
~
~
....
;i
'7
8
....
.,;
rg
't
c
...
...
~
...
"i
c
'"
....
oti
8
~
c
'"
'"
'"
..
"'.
...
c
~
<:i
...
"'.
...
c
'"
..
...
..
0,>
8
'"
N
...
c
oi
'"
'"
...
...
....
..,
'"
'"
..
,.;
...
'"
.,;
'"
;;;
'"
...
'7
'"
:&
..;
...
'"
N
....
'"
:2
...
"',
'"
..;
c
c
'"
,.:
...
'"
~
'"
...
..
~
~
g
'"
oj
...
~.
....
~
'"
oti
'"
....
,.:
<II
'"
~
"
In
&!
"
I!!
'S
&!
~
~
~
o
:.
!!!
..
o
III
::l
g
::l
I/)
ell
~
ell
III
~
CAC April 14, 2011
VIII-7 New Business
1 of 1
FY11/12 -195 Fund Budget and Analysis
FY 10/11 Carry Forward
Less Capri Pass/Collier Bay Emer Dredge in Marco
Carry Forward Total
Projected FY11/12 Revenue
Tourist Tax Revenue for Beaches/Inlets
Revenue Reimbursement FDEP
Revenue - FDEP Cost Share Contract
Tilling and Cleaning Revenue
Projected Expenses
1. Regulatory and Permit Compliance - FY 10/11
Sea Turtle Protection Program
Beach Tilling
Physical Beach Monitoring - Entire County
Biological Monitoring
2. Planned Projects/Future Projects - FY 10/11
Wiggins Pass Intermediate Dredging - Engineer
Emergency Truck Haul - Vista @ Park Shore
FY12/13 County Beach Design and Permitting
FY12/13 Marco Beach/B'water Design/Permitting
Laser Grade North Marco Beach (R133-R141)
Tigertail Beach Refurbishment
Capri Pass/Collier Bay Emergency Dredge
3. Beach Maintenance - FY 10/11
Collier County/Marco Island
City of Naples
Vegetation Repairs/Exotic Removal
Naples Pier and Dock Maintenance
4. Administration Fee's - FY 10/11
Fund 195 Administration
Indirect Administrative Costs
Tax Collector Fee's (2,5%)
6. Other Expenses - FY10/11
Renourishment and Emergency Reserves
Revenue Reserve (5%)
Category D Pier Reserve
Revenue Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Total Expenses
Sub-Total
Fund Balance Total
FY11/12 Totals
$30,680,200
-$280,000
$30,400,200
$4,355,000
-$3,400,000
$50,000
$1,500
$1,006,500
$168,100
$17,500
$267,800
$30,000
$483,400
$50,000
$350,000
$600,000
$300,000
$20,000
$25,000
$0
$1,345,000
$139,000
$76,850
$75,000
$55,000
$345,850
$510,540
$107,700
$108,900
$727,140
$21,000,000
$217,800
$79,000
$21,296,800
$24,198,190 $24,198,190
$7,208,510
CAC April 14, 2011
VIII-8 New Business
1 of 6
EXECUTIVE SUMMARY
Share TDC Category" A" Grant Applications from the City of Naples, The City
of Marco Island and Collier County for FY -11/12.
OBJECTIVE: To share Category "A" grant applications and requests.
CONSIDERATIONS: Received TDC Category "A" Grant Applications as follows:
2010/11
PROJECTIDESCRIPTION: AMOUNT REOUESTED GRANTED
1. Re~ulatorv and Permit Comnliance
Sea Turtle Protection Program - Collier County $168,100 $164,600
Beach Tilling - Collier County - 80171 $ 17,500 $ 17,500
Physical Beach & Pass Monitoring Collier County Beaches - $267,800 $260,000
90536
Biological Monitoring - 90033 $ 30,000
SUB-TOTAL $483,400 $442,100
2. Planned Proiects
Wiggins Pass Maintenance Program - Engineering - 90522 $ 50,000 $750,000
Emergency Truck Haul- Vista's at Park Shore - 88030 $350,000 0
FY 12/13 Beach Design and Permit with HS Solutions - 80096 $600,000 $300,000
MI Renourish Design & Permit with BW Solutions - 80166 $300,000 $150,000
Laser Grading North Marco Beach (R133-RI41) $ 20,000 0
Tigertail Beach Refurbishment $ 25,000 0
SUB-TOTAL $1,345,000 $1,200,000
3. Beach Maintenance
Beach Maintenance - Collier County/Marco Island - 90533 $139,000 $ 135,000
Beach Maintenance - City of Naples- 90527 $ 76,850 $ 75,850
Vegetation Repairs/Exotic Removal - County Wide - 90044 $ 75,000 $ 75,000
Naples Pier Annualized Repair & Maintenance - City of $ 55,000 $ 55,000
Naples - 90096
SUB-TOTAL $345,850 $340,850
4. Administration Fee's
Fund 195 and 183 Administration - Collier County - 90020 $510,540 $511,100
Indirect Administration Costs $107,700 $117,700
Tax Collector Fee's (2.5o/c0 $108,900 $104,863
SUB-TOTAL $727,140 $733,633
5. Other EXDenses
Renourishment and Emergency Reserves $21,000,000 $14,500,000
Revenue Reserve (5%) $ 217,800 $ 217,800
Category D Pier Reserve $ 79,000 $ 79,000
CAC April 14, 2011
VIII-8 New Business
2 of 6
SUB-TOTAL $21,296,800 $14,796,800
TOTAL $24,198,190 $17,563,413
COUNTY ATTORNEY FINDING: A finding by the County Attorney is not required for this
item.
STAFF RECOMMENDATIONS:
Ree:ulatorv and Permit Comoliance:
All these items are required by FDEP permit and required by law. Approval is recommended.
Planned Proiects:
)i> Wiggins Maintenance Program - Engineering for - Intermediate Dredging of Wiggins Pass
for FY 2012/13. Approval is recommended.
)i> Emergency Truck Haul- Vista's at Park Shore - The Vista's condominium is located directly
south of the Seagate emergency renourishment recently completed. This location was
previously approved for re-nourishment by the CAC but analysis and design could not be
accomplished by Sea Turtle nesting season. Approval is recommended.
)i> FY 12/13 Beach Design and Permit with HS Solutions - This item will fund beach design
and permitting to determine a renourish plan (including Hot Spot permanent solution) for the
main Collier County beaches. The conceptual design basis should be completed and these
funds are a preliminary estimate to begin the design. Approval is recommended.
)i> Marco Island Renourish Design & Permit with BW Solutions - This item will fund beach
design and permitting to determine a renourish plan (including Hot Spot permanent solution)
for the Marco Island South beach. The conceptual design basis should be completed and
these funds are a preliminary estimate to begin the design. Approval is recommended.
)i> Laser Grading North Marco Beach (R133-RI4l) - Laser grade the northern portion of Marco
Island Beach just south of Sand Dollar Island. This has had limited effectiveness in the past
but is requested by the Marco Island Beach committee.
)i> Tigertail Beach Refurbishment - Tigertail will be tilled prior to turtle nesting season.
Investigate what options exist to enhance the beach at Tigertail to be more attractive to
tourists. Approval is recommended.
Beach Maintenance:
Exceptional beach experience for our residents and visitors has been at the heart of our success in the
past. These items are required to maintain that experience. Approval is recommended.
Administration Fee's:
This item funds County staff to manage the projects, maintain the beaches, administer the program.
It includes the Director; an Office Manager/Accountant; a Field Supervisor/Project Manager; and
two equipment operators to clean and maintain the County and Marco Beaches. It also includes
Administrative Indirect Fees required for administrative functions like purchasing, information
technology, motor pool and human resources. Tax collector fees are also included in this item.
Approval is recommended.
CAC April 14, 2011
VIII-8 New Business
3 of 6
Other Exoenses:
This item provides for board mandated renourishment reserves, emergency reserves and revenue
reserves. Approval is recommended.
FISCAL IMPACT: The total amount of grant applications for FY 11112 in the amount of
$24,198,190 is in the proposed budget for Category "A" Tourist Development Taxes.
GROWTH MANAGEMENT IMPACT: There is no impact to the Growth Management Plan
related to this action.
RECOMMENDATION: That the CAC recommend approval of the attached Tourist Development
Category "A" grant applications and request in the amount of $24, 198, 190 and approve all necessary
grant agreements per County Attorney's approval.
PREPARED BY: Gail Hambright, CZM Accountant
CAC April 14, 2011
VIII-8 New Business
40f6
(Revised)
TOURIST DEVELOPMENT CATEGORY ~'A" FUNDING POLICY
I. Use of TDC Cateflory A Fund: To finance beach park facilities of beach improvement,
maintenance, renourishment, restoration and erosion control, including pass and inlet
maintenance, shoreline protection, enhancement, cleanup or restoration of inland lakes and rivers
to which there is public access, as these relate to the physical preservation of the beach, shoreline
or inland lake or rive. (Cod or Ordnance, Division 3. Sec. 126-83.)
2. Source of other funds: Federal or State funds are desirable and should be diligently pursued.
3. Mandatory annual budget allocation of funds and maintenance of reserves.
a. Catastrophe reserves shall be accumulated in the budget with $IM in 2004 plus $0.5M
per year thereafter (up to a maximum of $1 OM). In the event of a catastrophe requiring
the expenditure of all or part of these reserves, $0.5M will continue to be set aside.
b. Major renourishment reserves shall be accumulated in the budget with $2M per
year after the completion of the major renourishment project currently in planning
and permitting (as a November 2003; projected to start setting aside funds in FY
2006).
c. Beach park facilities (including beach access property acquisition) shall be funded at an
average of$2M per year. This funding allocation shall be adjusted annually in an amount
equal to one-third of the TDC Category "A" revenues.
d. Remaining funds may be used for eligible grant applications as outlined in the policy
below.
4. Eliflibility: Eligible beach areas qualify for Category "A" funding. An "eligible beach area" is:
a. Accessible to the public; and
b. No more than one-half mile from a beach park facility, public access point, hotel or motel
and if at least 80% of the entire beach area is classified as eligible, otherwise ineligible
gaps will be deemed eligible.
5. Ineligible beach areas:
a. Beach areas not meeting the criteria for eligibility of paragraph 4. above, are not eligible
for Category "A" funding. Renourishment or maintenance of these beach areas are the
responsibility of adjacent property owners and must be privately funded.
b. An area of an ineligible beach that is subject to high erosion, with the recommendation of
the Coastal Advisory Committee and determination by the Board of County
Commissioners as being in the public interest, may have erosion control structures
installed, with Category "A" funding.
CAC April 14. 2011
VIII-8 New Business
50f6
6. Inlet Sand Bvvassinf!. The bypassing of sand across inlets may be funded by Tourist
Development Tax Category "A" funding provided the Inlet Management Plan recommends the
bypassing, the dredging of the pass or inlet is recommended by the Coastal Advisory Committee
meets the inlet funding policy criteria and is approved by the Board of County Commissioners as
being in the in the public interest. No TDC Category "A" funding will be approved for dredging
non-beach compatible material except in situations where significant channel alignment and
depth changes are required to correct and deviate from routine maintenance dredging past
practices.
7. Shore vrotection structures and project sponsorship. Projects, including construction and
maintenance of shore protection structures (groins, jetties, breakwaters, etc.), may be funded by
Category "A" funding for eligible beaches. However, 'ownership' responsibilities must rest with
an entity other than "Tourist Development Taxes" - i.e. there must be a project sponsor (private
interest, taxing districts, municipalities or County Departments other than those funded with
Tourist Development Taxes).
Grant Application Review. The Coastal Advisory Committee and the Parks and Recreation
Advisory Board will prepare and maintain a proposed prioritized annual spending plan for the use of
Tourist Development Tax Category "A" funds, with a ten year projection. The proposed plans will
be submitted to the Board of County Commissioners (BCC) for their consideration and approval, via
the TDC. These submissions will coincide with the annual Collier county budget cycle. The Coastal
Advisory Committee will review all requests for Tourist Development Tax Category "A" funds, with
the exception of County maintained beach park facilities that will be handled by the Parks and
Recreation Advisory Board. Both advisory boards will make recommendation for approval, denial
or modification to the BCC, via the TDC, consistent with the BCC established policy for use of these
funds.
CAC April 14, 2011
VIII-8 New Business
60f6
Evaluation/Approval Guidelines for TDC Category A Yearly Grant Requests by the Coastal
Advisory Committee
Yearly grant requests to the Coastal Advisory Committee will be evaluated, prioritized and funded
based on the following criteria.
1. Grants associated with the completion of a previously approved project that are required to
complete that project.
2. Grants required to meet Permit Regulatory Compliance. Examples of these grants would be
Physical and Biological monitoring, turtle monitoring, shorebird monitoring and tilling.
3. Safety related activities and projects, which are the responsibility of the CAC.
4. Commitments covered by inter-local agreement and lor projects previously
approved/identified in the 10 year plan. Examples would be the dredging of Clam, Wiggins,
Doctors, Caxambas and Capri Passes and the 10-year cycle of beach re-nourishment.
5. Projects or studies that improve or have a high probability of improving our beach efficiency,
the preservation ofCAC capital or save us money. These projects would have to have a
undisputed payout. Items that would fall into this category would be engineering or studies
that could lengthen times between dredge events or re-nourishments.
6. Grants associated with the maintenance and upkeep of our beaches. Examples of these
activities that preserve the quality of the beach experience are beach cleaning, raking and
grading.
7. Projects that outside funding or third party funding can be obtained on that offset the capital
cost. Examples would be FDEP funding, FEMA funding or third party grants.
8. Necessary or required projects would be next. Examples of this type of projects would be
Doctors Pass Rip-Rap replacement.
9. New projects not required by law or consent decree would follow.
CAC April 14, 2011
VIII-8-a New Business
1 of 43
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY "A" GRANT APPLICATION
Beach Renourishment and Pass Maintenance
Collier County Sea Turtle Protection ProgramlEnvironmental Compliance
1. Name and Address of Project Sponsor Organization:
Collier County Parks and Recreation Department
North Collier Regional Park
15000 Livingston Road
Naples, FL 34109
2. Contact Person, Title and Phone Number:
Name: _Barry Williams, Director
Address: _15000 Livingston Road
City _Naples ST FL ZIP 34109
Phone: _239-252-4035 FAX: _252-530-6538
Other: _239-280-7035
3. Organization's Chief Official and Title:
Barry Williams, Director
Collier County Parks and Recreation Department
4. Details of Project- Description and Location:
The following activities require coastal construction permits from the State of Florida and
thus a sea turtle monitoring program.
1. Beach nourishment;
2. Construction, excavation or maintenance of coastal inlet and related shoals;
3. Beach cleaning and grooming activities landward of the mean high-water line.
4. Beach cleaning following a red tide or storm event.
The following excerpts from current regulations (Chapter 16B-41 Rules and Procedures
for Application for Coastal Construction Permits, Florida Administrative Code), provides
for the scope of the permitting process and protection of marine turtles as it relates to the
aforementioned activities.
16B-41. 00 1 Scope
This chapter provides the requirements and procedures for the issuance, denial, transfer,
renewal, modification, suspension and revocation of coastal construction permits. In this
Chapter Coastal Construction is defined as "any work or activity on or encroaching upon
CAC April 14, 2011
VIII-8-a New Business
2 of 43
........
sovereignty lands of Florida, below the mean high-water line of any tidal water of the
state, which is likely to have a material physical effect on existing coastal conditions or
natural shore and inlet processes."
16B-41.0055 Protection of Marine Turtles (Florida Administrative Code)
(1) In keeping with the Departments Authority to protect marine turtles pursuant to
Section 370.12, Florida Statutes, any application for a permit under this Chapter for
coastal construction that affects marine turtles shall be subject to the conditions and
requirements for marine turtle protection as part of the permitting process.
(2) The Department shall require appropriate measures to protect marine turtles and
their habitat, such as: nest surveys, nest relocation, nest marking, modification of coastal
construction, measures to reduce sand compaction, and short and long term monitoring to
assess the impacts of the permitted coastal construction on marine turtles and their
habitat.
The Parks and Recreation Department, marine turtle permit holders for Collier County,
monitor the following beaches for sea turtle activities as State and federal permit
requirements for beach renourishment, beach raking, allowance for the use of vehicles
on the beach for surveys, beach cleanup following a red tide or storm event and special
events.
Barefoot Beach: construction, excavation or maintenance of Wiggins Pass (only that
area included within the area of influence of Wiggins Pass; 1 mile north of Pass south to
Wiggins Pass); pass material disposal location (renourishment); beach cleaning following
a storm event and red tide
Vanderbilt Beach: beach nourishment; construction, excavation or maintenance of a
coastal inlet and related shoals (Wiggins Pass and Clam Pass); beach cleaning and
grooming activities landward of the mean high-water line.
Park Shore: beach nourishment; construction, excavation or maintenance of a coastal
inlet and related shoals (Clam Pass and Doctors Pass). Upland sand temperature studies
as required by the State.
City of Naples: beach nourishment; construction, excavation or maintenance of a coastal
inlet and related shoals (Doctors Pass and Gordon Pass)
City of Marco Island: construction, excavation or maintenance of a coastal inlet and
related shoals (Big Marco Pass and Caxambas Pass); Beach nourishment; Hideaway
Beach T-Groin; beach cleaning and grooming activities landward of the mean high-water
line.
The duties and associated costs of the pro!!:ram are as follows:
1. Administrative/permitting
2. Reconnaissance and beach zoning including installation and maintenance of DNR
location reference monuments for CZM and Sheriff department 500 feet increments
along 26 miles of beach
3. Daily monitoring (7 days/wk./beach -April Ol-May 01 depending on
renourishment schedules through Oct.31)
4. Evaluation, mapping and data entry
CAC April 14, 2011
VIII-8-a New Business
3 of 43
5. Responding to sea turtle disorientations (associated with renourishment and beach
profile, as required by the State)
8. Reports (Sea Turtle Protection Plan- Annual Report; special reports per each beach
nourishment and T-groin units, Index Nesting Beach Reports (Vanderbilt); State
Productivity Reports, Beach Compaction Reports)
9. Mobilizationldemobilization-
10. Vehicle maintenance- ATV's, penetrometers, data loggers
11. Supplies- acquisition, maintenance, inventory
12. Sand studies including beach compaction, sand temperature and ground/surface
water studies and associated reporting requirements
13. Dune vegetation monitoring and exotic removal
14. Nest relocation in construction areas
15. Monitoring and reporting of escarpments
16. Additional studies required as required StateIFederal permits (Florida Statute
Chapter.161-053 F.A.C. Chapter 62b-33)
17. Stranding reports and removal of injured, sick and dead sea turtles from all County
beaches (average 50-100/yr).
18 Public awareness- news media and public speaking upon request.
19. State mandated beach lighting compliance inspections and follow-up
21. Assist with maintaining rope and posting along the dunes
22. Other duties as requested by CZM Department
23. Provide technical assistance and respond to data requests from coastal engineering
consultants upon request.
The purpose of this application is to obtain funds to perform the requirements of a sea
turtle protection program in the specified locations.
5. Estimated project start date: October 1, 2011
6. Estimated project duration: One (1) year
7. Total TDC Tax Funds Requested: $ 168.100
8. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Collier County Tourist Development Council
Category" A" Grant Application Page 2
"""lIlIIIII
CAC April 14, 2011
VIII-8-a New Business
4 of 43
Collier County Sea Turtle Protection Program/Environmental Compliance
(project Title)
PROJECT BUDGET
PROGRAM ELEMENT
TDC Funds Requested
City/Taxing District Share
State of Florida Share
Federal Share
TOTAL
AMOUNT
$ _168,100_
$
$
$
$
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc)
_Personnel
_ Operatine:
_Capital-l (one) replacement ATV_
TOTAL
$_143,900_
$_20,700_
$ 3,500_
$
$
$ _168,100_
I have read the Tourist Development Category" A" Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with all guidelines and criteria.
. ~hc>h()/I
Date
'"
'"
::.~
0'"
N :;,
.co
~ ~
'EZ
~'1'<')
,,00'<1'
~~O
U>1O
~
IV
...
Q)
o
...
Q)
ll.O
"'C
:J
!Xl
N
.-t
o
N
>-
LL.
W
...J
t::
;:)
I-
<t:
w
III
o
o
Ql
m
...,.
.-t
'VI-
!::!::
.!:!! >- >-
'i1j ..c ..c
... ... ...
Q) Q) Q)
o VI VI
...88
Q)\OVl
~ IIi
:J
!Xl
N
.-t
o
N
>-
LL.
.!:!!
IV
.;::
Q)
...
IV
~
Q)
u
c:
~
~
Q)
a::
"'C
c:
VI VI VI IV
~ ~ ~.I
IV
.~
::0
:J
0-
Q)
1::
:J
I-
IV
Q)
III
,go j
~ ~
~ C5
Qj ~
"'C ll.O
"0 .!:
:I: ,!:
.....!l' ........ '-
- .E.E.E
'E ~
E ... Q) OJ Q)
Q)ll.O :;:;:;
_O-c: "'C"'C"'C
Ql Q)'P Q) Q) Q)
<::J: 1:: ~ .c:.c:.c:
@J:JE ~~~
I- IV !:: "QJ "QJ "QJ
~ .~ g ~ ~ ~ ~
o ,- '- '- ....
o lU l1P"QJ Q) Q) Q) ....
rn~... VI c.c.c..:
o 0000
o 0000
LI'l .-trnON
...t IIi N ~ .-t ~
c.
o
Qj
>
Q)
o
iii
c:
... .~
~ VI
E ~
c: ~ e
.g :J 0;-
lU.o~
E .; ~
$a ~ ...
~~~
!::~6
l::;~88
ENNorn
OJ~~~~
:!: \0 \0 \0 \0
c:
o
'p
c: 13
og
'p <t:
c. .
.;:: c.
u lU
III U
~ !::
Qj
c:
c:
o
VI
...
Q)
0-
...
c:
OJ
E
...
'E
E
o
U
888
LI'lNCO
.-t~
VI
VI
Q)
c:
'iij
:J
!Xl
ll.O
OJ
a::
a:;
>
~
I-
...
:J
o
o
.-t
rn
o
"'"
\0
Q)
ll.O
lii"'C
.c: IV
U Q)
~ 1:
Q) OJ
tl ~
<t:";::-
OJ 0
c: .0
o ~
-a~
Q) Q)
- Q)
Q) -
I- LL.
00
rn rn
N <:t
.-t \D
""''''''
I.Ol..O
VI
..... ...
Q) c:
::0 r3
:J .;::
11I.0 ~
III :J 1.l
t:: ...J :J
IV "'C C.
C. c: 1Il~
..l, to ..:w:
~ Qj 0
_ :::s 0
LL. LL. !Xl
~~~
<:t <:t .-t
\D N ...,.
"'" L1"J L1"J
l..Ol..Ol..O
III
c:
o
'p
c.
.;::
u
1.l
:J
VI
o
o
,....
o
N
lU
...
o
:5
:J
III
o
o
LI'l
rn~
.....
c:
Q)
E
Q)
U
lU
0..
Q)
...
~
*
IV
...
'Q.
lU
U
8
g
.-t
00
\0
.-t
'VI-
...J
~
~
~
o
.....
c:
Q)
>
,S:
~
....
c:
~
...
:J
U
g
o
C'\I
.......
c:
Q)
~
.9
o
10
C'\I
:J
o
>-
lU
IX!
32
lU
l/l
lU
~
00
..-
C'\I
C'\I
Ct)
10
.0
...,.
C'\I
,...
lU
.E
!
10
..-
0)
C'\I
V
10
o
o
C'\I
10
o
o
C'\I
!
.......
c:
~
.9
o
<0
Ct)
Q)
'I::
'j!!
ll.
o
10
C'\I
:J
g,
lU
IX!
32
lU
l/l
~
32
lU
l/l
~
<0
g
10
Ct)
10
.0
10
.....
..--
lU
.E
(ij
~
,...
00
o
o
10
o
o
C'\I
10
.....
o
~
IX!
LO
00
..-
<(
:I:
LL
>
III
~
...,
0)
o
Ct)
..-
In
o
o
C'\I
I/l
I/l
Q)
;: .5
o I/l
N ::l
.CD
;! ~
'Ez
~CPC')
Uco'<t
<(~'O
U>IO
-
N
<">
N
o
~
..0
It)
.....
.....
CU
~
CU
::.:.
--::::::l
ex)
ex)
o
o
It)
o
o
N
~
~
ex)
o
o
N
It)
o
o
N
l:
Q)
l!:!
~
o
It)
N
:J
g,
CU
CO
2'
:E
~
o
It)
N
:J
o
>-
CU
CO
:i:
CU
(/)
~
~
:i:
CU
(/)
~
~
0>
<">
<">
N
U
U
CAC April 14, 2011
VIII-8-a New Business
7 of 43
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY "A" GRANT APPLICATION
Beach Renourishment and Pass Maintenance
Beach Tilline:
1. Name and Address of Project Sponsor Organization:
Coastal Zone Manae:ement
Collier County Government
3299 Tamiami Trail East. Suite 103
Naoles. Florida 34112
2. Contact Person, Title and Phone Number:
Name: Gail Hambrie:ht. Accountant
Address: Collier County Government
3299 Tamiami Trail East. Suite 103
City Naoles ST FL ZIP 34112
Phone: 252-2966 FAX: 252-2950
3. Organization's Chief Official and Title:
Fred W. Covle. Chairman
Board of County Commissioners
4. Details of Project- Description and Location:
Beach tilline: is required bv FDEP oermit and is oerformed directlv orior to
turtle nestine: Season. Tilline: is oaid on an acre basis for re-nourished
beaches.
5. Estimated project start date: October 1. 2011
6. Estimated project duration: 12 Months
7. Total TDC Tax Funds Requested: $17.500.00
8. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes (X) No ( )
CAC April 14, 2011
VIII-8-a New Business
8 of 43
Collier County Tourist Development Council
Category "A" Grant Application Page 2
Beach Tilline:
PROJECT BUDGET
PROGRAM ELEMENT AMOUNT
TDC Funds Requested $ 17,500.00
Cityrraxing District Share $
State of Florida Share $
Federal Share $
TOTAL $ 17,500,00
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc)
Contractual Services
$ 17.500.00
$
$
$
$
$ - 17,500.00
TOTAL
I have read the Tourist Development Category "A" Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with all guidelines and criteria.
Signature of Sponsor Organization's Chief Official
Date
CAC April 14, 2011
VIII-8-a New Business
9 of 43
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY "A" GRANT APPLICATION
Beach Renourishment and Pass Maintenance
Phvsical Beach and Pass Monitorine: of Collier County Beaches
1. Name and Address of Project Sponsor Organization:
Coastal Zone Manae:ement
Collier County Government
3299 Tamiami Trail East. Suite 103
Naoles. Florida 34112
2. Contact Person, Title and Phone Number:
Name: Gail Hambrie:ht. Accountant
Address: Collier County Government
3299 Tamiami Trail East. Suite 103
City Naoles ST FL ZIP 34112
Phone: 252-2966 FAX: 252-2950
3. Organization's Chief Official and Title:
Fred W. Covle. Chairman
Board of County Commissioners
4. Details of Project- Description and Location:
This is required to satisfv FDEP oermit requirements on an annual basis for
the Vanderbilt. Park Shore and Naoles Beaches and oasses that were
renourished in 2005 and includes sonar verification. e:round truthine: the
hardbottom ede:e and FDEP aerials.
5. Estimated project start date: October 1.2011
6. Estimated project duration: 12 Months
7. Total TDC Tax Funds Requested: $267.800.00
8. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes (X) No ( )
CAC April 14, 2011
VIII-8-a New Business
10 of 43
Collier County Tourist Development Council
Category "A" Grant Application Page 2
Phvsical Beach and Pass Monitorinl!: of Collier Countv Beaches
PROJECT BUDGET
PROGRAM ELEMENT AMOUNT
TDC Funds Requested $ 267 .800.00
City/Taxing District Share $
State of Florida Share $
Federal Share $
TOTAL $ 267.800.00
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc)
Engineering Fees
$ 267.800.00
$
$
$
$
TOTAL
$ 267.800.00
I have read the Tourist Development Category "A" Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with all guidelines and criteria.
Signature of Sponsor Organization's Chief Official
Date
CAC April 14, 2011
VIII-8-a New Business
11 of 43
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY "A" GRANT APPLICATION
Beach Renourishment and Pass Maintenance
Bioloe:ical Hardbottom Monitorine:
1. Name and Address of Project Sponsor Organization:
Coastal Zone Manae:ement
W. Harmon Turner Bide:.
3301 East Tamiami Trail. Suite 103
Naoles. Florida 34112
2. Contact Person, Title and Phone Number:
Name: Gail Hambrie:ht. Accountant
Address: W. Harmon Turner Bide:.
3301 East Tamiami Trail. Suite 103
City Naples ST FL ZIP 34112
Phone: 252-2966 FAX: 252-2950
3. Organization's Chief Official and Title:
Fred W. Covle. Chairman
Board of County Commissioners
4. Details of Project- Description and Location:
This Bioloe:ical Monitorine: includes the Artificial Reef but not sonar
verification of the hard bottom an/or e:round truthine:.
5. Estimated project start date: October 1.2011
6. Estimated project duration: 12 Months
7. Total TDC Tax Funds Requested: $30.000.00
8. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes (X)
No ( )
CAC April 14, 2011
VIII-8-a New Business
12 of 43
Collier County Tourist Development Council
Category" A" Grant Application Page 2
Bioloe:ical Hardbottom Monitorine:
PROJECT BUDGET
PROGRAM ELEMENT AMOUNT
TDC Funds Requested $ 30.000.00
City/Taxing District Share $
State of Florida Share $
Federal Share $
TOTAL $ 30.000.00
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc)
Engineering Fees
$ 30.000.00
$
$
$
$
TOTAL
$ 30.000.00
I have read the Tourist Development Category" A" Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with all guidelines and criteria.
Signature of Sponsor Organization's Chief Official
Date
CAC April 14, 2011
VIII-8-a New Business
13 of 43
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY "A" GRANT APPLICATION
Beach Renourishment and Pass Maintenance
Wie:e:ins Pass Maintenance Proe:ram - Ene:ineerine:
1. Name and Address of Project Sponsor Organization:
Coastal Zone Manae:ement
Collier County Government
3299 Tamiami Trail East. Suite 103
Naoles. Florida 34112
2. Contact Person, Title and Phone Number:
Name: Gail Hambrie:ht. Accountant
Address: Collier County Government
3299 Tamiami Trail East. Suite 103
City Naoles ST FL ZIP 34112
Phone: 252-2966 FAX: 252-2950
3. Organization's Chief Official and Title:
Fred W. Covle. Chairman
Board of County Commissioners
4. Details of Project- Description and Location: Intermediate Drede:ine: of
Wie:e:ins Pass for FY 2012/13.
5. Estimated project start date: October 1.2011
6. Estimated project duration: 12 Months
7. Total TDC Tax Funds Requested: $50.000.00
8. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes (X) No ( )
CAC April 14, 2011
VIII-8-a New Business
14 of 43
Collier County Tourist Development Council
Category" A" Grant Application Page 2
Wie:e:ins Pass Maintenance Proe:ram - Ene:ineerine:
PROJECT BUDGET
PROGRAM ELEMENT AMOUNT
TDC Funds Requested $ 50,000.00
City/Taxing District Share $
State of Florida Share $
Federal Share $
TOTAL $ 50,000.00
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc)
Engineering Fees
$ 50,000.00
$
$
$
$
$ 50,000.00
TOTAL
I have read the Tourist Development Category "A" Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with all guidelines and criteria.
Signature of Sponsor Organization's Chief Official
Date
CAC April 14, 2011
VIII-8-a New Business
15 of 43
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY "A" GRANT APPLICATION
Beach Renourishment and Pass Maintenance
Emere:encv Truck Haul- Vista's at Park Shore
1. Name and Address of Project Sponsor Organization:
Coastal Zone Manae:ement
Collier Countv Government
3299 Tamiami Trail East. Suite 103
Naoles. Florida 34112
2. Contact Person, Title and Phone Number:
Name: Gail Hambrie:ht. Accountant
Address: Collier Countv Government
3299 Tamiami Trail East. Suite 103
City Naoles ST FL ZIP 34112
Phone: 252-2966 FAX: 252-2950
3. Organization's Chief Official and Title:
Fred W. Covle. Chairman
Board of Countv Commissioners
4. Details of Project - Description and Location: The Vista's condominium is
located directly south of the Seae:ate emere:encv renourishment recently
comoleted. This location was previously aooroved for re-nourishment by the
CAC but analvsis and desie:n could not be accomolished bv Sea Turtle
nestine: season.
5. Estimated project start date: October 1.2011
6. Estimated project duration: 12 Months
7. Total TDC Tax Funds Requested: $350.000.00
8. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes (X) No ( )
CAC April 14, 2011
VIII-8-a New Business
16 of 43
Collier County Tourist Development Council
Category" A" Grant Application Page 2
Emere:encv Truck Haul- Vista's at Park Shore
PROJECT BUDGET
PROGRAM ELEMENT
AMOUNT
TDC Funds Requested
CityfTaxing District Share
State of Florida Share
Federal Share
$ 350.000.00
$
$
$
TOTAL
$ 350.000.00
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc)
Engineering Fees
$ 350.000.00
$
$
$
$
$ 350.000.00
TOTAL
I have read the Tourist Development Category" A" Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with all guidelines and criteria.
Signature of Sponsor Organization's Chief Official
Date
CAC April 14, 2011
VIII-8-a New Business
17 of 43
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY "A" GRANT APPLICATION
Beach Renourishment and Pass Maintenance
FY 12/13 Beach AnalvsislModel with Hot Soot Solutions
1. Name and Address of Project Sponsor Organization:
Coastal Zone Manae:ement
Collier Countv Government
3299 Tamiami Trail East. Suite 103
Naoles. Florida 34112
2. Contact Person, Title and Phone Number:
Name: Gail Hambrie:ht. Accountant
Address: Collier Countv Government
3299 Tamiami Trail East. Suite 103
City Naoles ST FL ZIP 34112
Phone: 252-2966 FAX: 252-2950
3. Organization's Chief Official and Title:
Fred W. Covle. Chairman
Board of Countv Commissioners
4. Details of Project- Description and Location: This item will fund beach
desie:n and oermittine: to determine a renourish olan (incJudine: Hot Soot
oermanent solutions) for the main Collier Countv beaches. The conceotual
desie:n basis should be comoleted and these funds are a oreliminarv estimate
to bee:in the desie:n.
5. Estimated project start date: October 1.2011
6. Estimated project duration: 12 Months
7. Total TDC Tax Funds Requested: $600.000
8. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes (X) No ( )
CAC April 14, 2011
VIII-8-a New Business
18 of 43
Collier County Tourist Development Council
Category" A" Grant Application Page 2
FY 12/13 Beach Analvsis/Model with Hot Soot Solutions
PROJECT BUDGET
PROGRAM ELEMENT
AMOUNT
TDC Funds Requested
Cityffaxing District Share
State of Florida Share
Federal Share
$ 600.000.00
$
$
$
TOTAL
$ 600.000.00
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc)
Engineering Fees
$ 600.000.00
$
$
$
$
$ 600.000.00
TOTAL
I have read the Tourist Development Category" A" Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with all guidelines and criteria.
Signature of Sponsor Organization's Chief Official
Date
CAC April 14, 2011
VIII-8-a New Business
19 of 43
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY "A" GRANT APPLICATION
Beach Renourishment and Pass Maintenance
Marco Island Renourishment Desie:n & Permit with BW Ene:ineerine:
1. Name and Address of Project Sponsor Organization:
Coastal Zone Manae:ement
Collier Countv Government
3299 Tamiami Trail East. Suite 103
Naoles. Florida 34112
2. Contact Person, Title and Phone Number:
Name: Gail Hambrie:ht. Accountant
Address: Collier Countv Government
3299 Tamiami Trail East. Suite 103
City Naoles ST FL ZIP 34112
Phone: 252-2966 FAX: 252-2950
3. Organization's Chief Official and Title:
Fred W. Covle. Chairman
Board of Countv Commissioners
4. Details of Project- Description and Location: This item will fund beach
desie:n and oermittine: to determine a renourish olan (includine: Hot Soot
permanent solution) for the Marco Island South beach. The conceotual
desie:n basis should be comoleted and these funds are a oreliminarv estimate
to beine: the desie:n.
5. Estimated project start date: October 1.2011
6. Estimated project duration: 12 Months
7. Total TDC Tax Funds Requested: $300.000.00
8. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes (X)
No ( )
CAC April 14, 2011
VIII-8-a New Business
20 of 43
Collier County Tourist Development Council
Category "A" Grant Application Page 2
Marco Island Renourishment Desie:n & Permit with BW Ene:ineerine:
PROJECT BUDGET
PROGRAM ELEMENT
AMOUNT
TDC Funds Requested
City/Taxing District Share
State of Florida Share
Federal Share
$ 300.000.00
$
$
$
TOTAL
$ 300.000.00
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc)
Engineering Fees
$ 300.000.00
$
$
$
$
TOTAL
$ 300.000.00
I have read the Tourist Development Category "A" Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with all guidelines and criteria.
Signature of Sponsor Organization's Chief Official
Date
..
CAC April 14, 2011
VIII-8-a New Business
21 of 43
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY "A" GRANT APPLICATION
Beach Renourishment and Pass Maintenance
Cltv of Marco Island Laser Grading Protect
(Project Title)
1. Name and Address of Project Sponsor Organization:
Cltvof Marco Island
50 Bald Eagle Drive
Marco Island. FL 34145
2. Contact Person, Title and Phone Number:
Name: Nancv Richie. Environmental Specialist
Address: 50 Bald Eagle Drive
City Marco Island ST FL ZIP 34145
Phone: 239-389-5003 FAX: 239-393-0266
Other: nrichie@cltvofmarcoisland.com
3. Organization's Chief Official and Title:
Dr. James Riviere. Cltv ManaCler, Cltv of Marco Island
4. Details of Project- Description and Location:
The area of the Marco Island beach south of the Tioertail Laooon to the north property
line of "Residents' Beach" (between Beach Monuments R133 to R141 - map attached) is
extremelv wide thus creating a tOPOQraphv and drainaoe issue that creates standin9
water that staanates. resultino in odor and health concerns and also creates poor
conditions for successful sea turtle and shorebird nestina. To improve the condition of the
beach and have lona term sustainabilitv of the healthv condition. laser oradino this area
to a DOsitive slope to the Gulf of Mexico will improve water drainaoe and alleviate the
standinQ water issue. thus alleviate the odor and health concerns on this popular
recreational beach and important sea turtle and shorebird habitat. Laser 9radino is done
bv tractor and oradino eouipment usino a laser to prooram the exact slope necessarv for
a healthv beach. Doino the project outside of sea turtle nestino season. a Florida
Deoartment of Environmental Protection (FDEP) field oermit will be the necessarY permit
reauired.
s. Estimated project start date: November 01. 2011 (or as soon 8$ DOsslble)
6. Estimated project duration: 14-30 days
7. Total TDC Tax Funds Requested: $20.000
8. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes (X)
No ( )
Collier County Tourist Development Council
Category" A" Grant Application Page 2
City of Marco Island Laser Grading Project
CAC April 14, 2011
VIII-8-a New Business
22 of 43
(Project Title)
PRO.JECT BUDGET
PROGRAM ELEMENT
TDC Funds Requested
Cityrraxing District Share
State of Florida Share
Federal Share
TOTAL
AMOUNT
$ 20.000.00
$Q
$Q
$Q
$ 20.000.00
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc)
Permittina: FDEP Field Permit
Contractor
TOTAL
$
$
$
$
$
I have read the Tourist Development Category "A" Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with anguitlelinesan~riteria.
/ //
/0/
" .-.. C;==- \
Signature of Sponsor Organization's Chief Official
$ 20.000.00
3/1 ). \
'Date
CAC April 14, 2011
VIlI-8-a New Business
23 of 43
EXIDBIT A
The attached aerial depicts the area approximately between Beach Monument
R 133 to R 141, or from the southern end of the Tigertail Beach lagoon to the
northern property line of Resident's Beach, Marco Island. The area to be graded
is shown in "hatch" marks and the project would be done 15 feet seaward of the
dune vegetation line and 15 feet landward of the high tide line. The area
measures approximately 5,700 - 6,000 square feet.
'.
CAC April 14, 2011
VIII-8-a New Business
.4
. .
ISLAND
o
CAC April 14, 2I1:1{'l.se y<"
Vllt1l=!" NewJB~n~d 1/1 Ct
25 of 43 ,. Ii
.
..
F
""..
City of
Marco Island
50 Bald Eagle Drive
Marco Island.
Florida 34145
239.389.;"iOOO
Fax: 2?iSl-3S9.4?i59
Cityofmlu'coisland ,com
CAC April 14, 2011 ..
VIII-8-a New Business
MARCO ISLAND STREET INDEX 26 of 43
1ST, 2ND, aRa AVE. C-6 BRJAllWOaO CT. E'" ELKHORN CT. B.. KIRK TERR. E-l PEACH CT. F... SOMERSET CT. s.6
5TH, 6TH AVI!. C.. BUCCANEER CT. M ELM CT. B" KIRKWOOD ST. [).o\ PEACOCK TERR. 0-2 SOUTH BEACH OR. A"
ABACO CT. C-3 BUTTeRCUP CT. B... _SSY CT. a.li PELICAN CT. C.2 SOUTH FLORAL ST. F'"
ABSEVlLLE CT. C.2 BUTTERFIELD CT. D-5 EMBER CT. C.2 LAMPlIGHTER C.3 PEPPERWOOa CT. 0-6 S. HtlATHWOOO OR. Q.3
ACORN CT. F... BUTT1!RFl.Y CT. C-6 EUBANKS CT. 0-1 LANOMARK ST. C.3 PERJWIIlKLE CT. .1.-$ SOUTH SEAS CT. C-6
AOOlSON CT. E-l BUTTONWOOD CT. D-I LANTANA LN. A-S PERRINE CT. 11-4 Sl'ANISH CT. c.3
AOIf\ONOACK CT. C-3 FAlRLAWN CT. a.. LAUREL CT. C" PERSIAN CT. D-2 SI'INNAKER OR. A-li
AOMlAALTYCT. C.S CALUSA CT. E... FERN CT. C-6 U!ATHER FERN LN. .1.-5 PERU ST. C-2 SPRUCE AVE (;,2
ALAMEDA CT. 0-2 CAMEO CT. a.li FIELDSTONE OR. (;,2 U!EWAIUl CT. E'" Pl!TT1T CT. E.l STARFISH CT. F...
ALGONQUIN cr. E-3 CANARY CT. E-3 FIJlCT. M LeLAND WAY 0-3 PHeASANT CT. 0-2 STILLWATER CT. F...
AI.MIlfllA CT. E-2 CANBY CT. e... FIRWDOO CT. 0-5 LeO CT. E-l PIeDMONT CIR. D-5 STONE CT. C.,
AMAZON CT. EI-4 CAPISTl'IANO CT. C-6 FLAMINGO ClR. 11-3 LEWIS CT. Il-5 PIeDMONT CT. eof STRAWBERRY CT. C...
AMBER OR C.2 CAPRI CT. 0-2 FORRl!ST CT. 0-2 LIDO CT. C-2 Pl.ANTATION CT. B" lWNBlRO AVE. C..
ANCHOR CT. E... CARA CT. C.3 FOURWlNOS AVE. C"" UGHTHOUSl! CT. C-3 PLUM CT. C-3 lWNOROP CT. Cof
ANOALUSlA TERR. O-! CARIBBEAN CT. Il-5 FREEPORT AVE. [).o\ ULAC AVE. C-6 POLYNESIA CT. E..!5 lWNFl.OWER CT. c-3
ANDROS AVE. [)04 CASCADE CT. E... FRONT ST. C-6 LILY CT. Q.3 POST CT. C-6 SUNSET COVE C.S
ANGLeR CT. E'" CASTAWAYS ST. B-4 FRUITLAND AVE. c-s UME TERR. M PI'llceCT. B-5 lWNSET ST. N. & S. F-3
ANTIGUA CT. C-2 CAXAMBAS CT. 0-1 LIVE OAK LN. A-6 PRIMROSE CT. C.3 SWALLOW AVE. C.,
ANTILLeS CT. D-5 CAXAMBAS OR. 0-1 GALLEON AIlE, CT. M LOYALTY CT. C.! PI'lOVENCI! CT. E-3 SWAN OR. C.l
APATAKI CT. E"" CAXAMBAS RD. E-l GATEHOUSE CT. Aof LUDLAM CT. C.2 _SCT. B.S
QUAIL ST. C.S SYCAMORE CT. C.3
APPLE CT. C" ceDAR CT. c-e GAYER WAY B.7 LUDLOW RD. 0-1 OUINTARA CT. 0.2
APRICOT CT. a... ceNTURY CT. 11-5 G_UM CT E"" TAHm RD. 0-4
APRIL CT. E-2 ceNTURY DR. 8-5 GlRALOA CT. M MACAO CT. E-2 RAINIIOW CT. Q.3 TAu.wooo ST. C-6
ARAWAK AVE. B-3 CHALMERS OR. C-6 GOLDCOAST CT. [Hi MADAGASCAR CT. E-3 RANDY CT. M TAMPA Pl.ACE 0.7
ARCADIA CT. 0-1 CHANNEl.. CT. E... GOOENROD AVE. C-6 MAGNOLIA cr. B-6 RAYMOND CT. A" TARPON CT. 0-5
ARUBA CT. 0-3 CHESTNUT CT. 0-11 GRANADA OR. E-2 MAJORCA CIR. [)04 REO IlAY LN. A-II TAYLOR CT. A.5
ASTER CT. C-3 CLIFTON CT. A-S GRAP1!WooO CT. E"" MANGROVE CT. 8-5 REDWOOD CT. Cof TEMPLEWOOO CT. 0-4
AUIlURNOALE AVE. 0-2 CLYBURN ST. 0-3 GRAY CT. A-6 MANOR TERR. B-4 REGATTA CT. 0-3 THORPE! CT. A"
AUSTIN CT. A-S COCO PLUM LN. A-lI G_ARST. B-4 MAPLE AVE, CT. C-3 RENARD CT. A" THRUSH CT. s.6
AZTI!C CT. C.2 COLUER BLl/ll. N. C-6 GREENVlEW ST. 0-4 MARCO LAKE OR. C-6 RICHARDS CT. A-6 TlGeRTAIL CT. M
COLUeR BLVD. $. B-3 GULFPORT CT. e.< MARIANA CT. C.2 RICHMOND CT. E-! TRAVIl>A TERR E.2
BAHAMA AVE. N.. S e.3 COUJeR CT. C.l GULFSTREAM ST. M MARINER ST. F-3 RIO CT. C.5 TREASURE CT. M
BALBOA CT. 0-3 COlJ.INGSWOOD AVE. 0-2 GUMSO UMBO LN. A-6 MA/lLIN CT. C.2 RIVER CT. B-5 TRENT CT. III-S
BALD EAGLE DR. C"" COL~LAVE. A-S MARQIJl!SAS CT. C"" RIVI!RHEAO AVE. 0... TRINIOAO AVE. 0-4
BALI'OUIlOR. 0-3 cOLUMlWS WAY 0-3 HAMMOCK CT. 0-2 MARTlNlQUI! CT. o-s ROSIN CT. C-6 TRlI'OU CT. o-s
IIALI CT. C... CONOVER CT. 0-2 HARTLEY AVE. C-S MAUNOElI CT. .1.-6 1l000001LL CT. E.. TULIP CT. c-3
IIALMORAL CT. E-3 COPELAND OR. 0-1 HARTLEY ST, C-5 MAYWOOD CT. E.. ROCKPORT CT. 11I-6 TWtUGHT WAY Q.3
IIALSAM CT. 0-6 COPPl!RFIELD CT. EI-4 HAWAII ClR. E-3 MCILVAINE CT. 0-1 ROMANO TERR. E-4 TWtN OAK CT. C.2
BAL 11C TeRR. 0.2 CORAL CT. e.< HAWAII CT. E-3 MEADOWLARK CT. E-5 ROOKERY CT. D-5 VALLEY AVE. c-a
BAMBOO CT. o-s CORONAOA CT, c.3 HAZELCREST ST. M MEDElRA E-3 ROSE CT. C.. VERNON PL. 8.7
BANYAN CT. C-1 COTTAGE CT. A-S HEATHWOOO OR. 0-3 MI!NllEL CT. c-a ROYAL MARCO WAY 11I-7 VIU.A CT. E-3
IIARBADOS AVE., CT. E-4 COTTONWOOO CT. C-4 HEIGHTS CT. 0-1 M!!NORCA CT. E'" RUBY CT. C-4 WAlKlKI CT. [Hi
IIARIlAROSA CT. E-3 COVl!WOOO CT. 1!-3 HENOl!RSON CT. A-S _IMACAVE. 0-4 RUPl!RT OR. 11-7 WALES CT. C-6
IIARCELONA CT. 0-2 CRESceNT ST. 11-5 HERNANDO OR. A-5 MILAN CT. 1l-6 WATeRFALL CT. E.3
IIARFlELD CT. E.l CUSHING LN. 0-4 HERON CT. C-6 MIMOSA CT. C-2 SAVADORE CT. 0-2 WATERLEAF CT. C.~
BARFIELD OR. N. D-5 CUTLER CT. 0-2 HICKORY CT. C-3 MISTLETOE CT. C-3 SAMOA AVE. C.. WATERSIDE OR. A-6
BARFIELD OR. S. E-l CYRUS ST. M HIDEAWAY CR. A-6 _0 cr: C.2 $AN MARCO RD. C-4 WA'f'Ef'tNAY CIF!. C-6
BA8lI CT. C-6 HIGHLAND CT. M MOON CT. C-6 SANDHILL ST 0-3 WA'f'Ef'tNAY CT. C-4
BATTERSEA CT. C-2 DADE CT. E-2 HOLLY CT. 11-5 MORNING GLORY LN. A-lI SATURN CT. B-4 WATERWAY OR. C""
BAY RD. E.l DAISY CT. C-3 HOLLYHOCK CT. F-4 MULBeRRY CT. 0-6 SAXON ST. M WATSON RD. E-l
BAYPORT AVE. [).o\ DAN RIVeR CT. F.. HONDURAS AVE. F-4 SCOTT OR. E-l WAVEClitl!ST CT. E-5
BAYSIDE CT. B-4 DANA CT. C-3 HONEYSUCKLE AVE. M NASSAU CT. 0-4 SEABREI!ZE OR. A-II WAYNE AVE M
IlEACH DRIVE A'" DANDELION cr: B-4 HULL CT. B-6 NASEAU RD. 0-$ SEA CT. B-4 WHITEHEART AVE. M
!lEACH LilY LN. A'" OEUlRODK WAY 0-3 H~NGBIF!O CT. 1!-4 NAUTILUS CT. 8-5 SEA OUNE LANE A" WHITEHEART CT. C-3
IlEACHCOMIlI!R $'I: B-3 OEVON CT. E-2 HUNKIN CT. A-S Nl!WELl. TERR. E.l SEA LAV1!NOl!R LN. A-S WILD CHERRY LN. A-II
SEAVER CT, C-4 DILL CT. C-3 HUNT CT. C-6 SEA DATE LN. A-II WIUl COFI'I!I! LN. A-II
!lEGONIA CT. E~3 DIPLOMAT CT. 11-5 HURON CT. C.l OLD MARCO LANE B-6 SEAGRAPE! OR. C-l WILD ORCHID LN. A'"
!lELVEOERE CT. 0-3 DOGWOOD Oil. E-3 HYACINTH CT. N OLOS cr. E-l SEAHORSE CT. E-4 WilLOW cr: C-lI
III!RMUDA RD. 0-4 OOI.I'HIN CT. C-3 OUVE CT. C.. SEAVlEW CT B-4 WlNOBROOK CT. E"
BIMINI AVE. 0..& OORANDO CT. 11-1 INDIAN HIL1. E.' OMALLEY'S ALLEY c"',e SEMINOLE CT. E-4 WINDMILL AVE. 0-5
BIRCH CT. c-3 DOVE CT. B-4 INLET OR. E.l ORANGE CT. C-II SHADOW RIDGE CT. o-s WINDWARD OR. C-II
BIRWOOO TERR. 0-$ DOW CT. C-6 IRIS cr. 0-11 ORCHID CT. C.2 SHALlMAR CT. C.2 WlNTl!RBeRRY OR. C-2
BISCAYNEWAY 0-3 DOXSEE TERR. 0-1 IROHWOOO CT. C.3 ORLEANS CT. E-3 SHEFFIELD AVE. 1"-3 WINTERGREEN CT. B-4
BLACKMORE ST A.S llRlFlWOOO CT. C.3 IVORY CT. C"" ORTEGA LA. B-4 SHENANDOAH CT. C-3 WOODBINE CT. E"
BLUI!BIRO AVI! D-S JAMAICA CT., RD. 0-4 OSCEOLA CT. E.' SHIP CT. B-4 WORTHINGTON ST. M
BLUEBONNET cr. B-t ECHO ClR. c.tl JAVA CT. C.2 OSPREY CT. 0.2 SHOREcREST CT. E-4 WREN ST. e-a
BLUE HIlL CT. F-4 EDEN CT. C-5 JOY ClR. S." E. C-6 SHORES CT. 0-1 YARMOUTH ST. 0-3
BONO CT. C-3 EOGEWATER CT. C-6 JUNE CT. C-6 PALM ST. 11-7 SKYLARK AVE. 0-4 YELLOWIlIRD ST. C-S
BONITA CT. C-6 IlOINGTON PI.. 11I-7 JUNIPER CT. C-6 PANAMA CT. C.l SNELL CT. A'"
BOUNTY CT. E-3 ELKCIR. 8-1 PARK AVE. C-5 SNOWl!JI!RRY CT. C-6
BRAOFORtl CT. 8-6 ELKCAM ClR. E. C-6 KENDALL OR. A-6 PARTRIDGE cr: C-2 SOCIETY CT, 0-4
BREAKWATER CT. C-3 ELKCAM 0111. W. C-6 KINGSTON CT. 0-4 PARKHOUSE CT. A'" SOLANA CT. N
NORTH END CONDOMINIUMS SHOPPING SOUTH END CONDOMINIUMS
AORIATIC 1 B-lI CENTERS ANAHlTA 32 C., MISTY COVE 65 C.l
AHGLI!IlS COVE AT MARCO BAY 2 C-II ElOAT CLUB CONDOMINIUM so C., MOORINGS 57 C.l
BAYFRONT PLACE 33 B-lI I ROYAL PALM MALL 0-5 BOIJRGAINVII.I.EA GAROeNS 34 C.l NAUTILUS " C-'
IIAYSlOE CLUB 3 B-lI ' TOWN CENTER MALL C-6 BREEZY POINT 35 CO, OUlE SOUTH GAROENS ~9 C-l
COLUER BAY APTS. 4 B-7 SHOPS OF MARCO E-3 CAllA DE MARCO 31 C-l OI.OE SOUTH VIEWS 110 C.,
COQUINA GARDeNS 5 C-S . MARCO WALK c.a CAXAMSAS SOUTH IlEACH TERRACE 83 C., PALM ISLE i1 C-'
COURT OF PALMS 6 B-6 SHOPS OF COURTYARD TOWERS 79 C., PANAMA CLUB 82 C_,
ooCKSIOE 7 B-II OLD MARCO B-7 CROWS NEST 40 C.l PELICAN PERCH 63 C.l
GRANll BAY 8 C-lI lj ISLAND PLAZA EBB TIDE 4! C-' PI'lOVENCIl 88 E-3
ISLAND VILLAGE 10 C-' BUSINESS CENTER C.I FLORENTINE GARDI!NS 44 C-l SEABURY 88 C.l
MARCO INN VILLAS 9 B-7 @I ROMANPLAZA C-6 Fl.OR\!NTlNE VILLAS 45 C., SHELL llILE H 0.1
MARCO MANOR 11 C..!5 <li CROWN ROYAL PLAZA B-4 HARBOUR BOAT CLUll 46 C., SOUTHERN BREI!ZE GARDENS 68 C-l
MARCO RESORT" CLUB 12 C-1 HUllON COVE 47 C.l SUN HARIlOR CLUB 4a C.l
ISLAND CLUB ., 48 C.l SUNNY SHADOWS '"' C.l
MARCO VILLAS 13 c-s CHURCHES ISLAND CLUB 8a so C.l SURFWALK 71 C.,
MARCO VISTA 14 B.7 0 FIRST BAPTIST 0.2 ISLAND CLUlI #3 46 C.l SWALLOWS 72 Co,
MODeL VILLAGE 15 1l-7 t) Jf!WISH CENTER C-2 ISLANOl!R COVE 51 C.l TIKIHOUse 73 Co,
OLDE MARCO CONDOS 81 B-7 3 CHURCH OF GOO C-5 LE CLUB CAXAMBAS 62 (;., TOWNHOUse SQUARE 74 C.l
PARADISE VIL.LAGE 16 B-6 NEW 1.1I'2 COMMUNITY CHURCH 0-3 LIDO CLUB 53 C.l TROPICAL ISLE 11 C-l
PAVlLUON CLUB 17 B-7 0 LUTHERAN B.$ !4ARGUI!RITA CLUIl 54 C.l Tl'IOPICANA 8a C-l
PINEHURST 18 C-6 3 PRESBYTERIAN 11-5 MARINERS PALM HARIlOR t.< C-1 VANTAGe POINT 78 C-l
RIVERSIDE CLUB 19 C.7 SAN MARCO MARlSOL PLAZA 66 C-l VISTA DEl. SOL 78 C.,
SAND DOLLAR VILLAS 20 C-5 CATHOLIC B-3 MAXIM!! CLUB 41 C.l VOYAGeR n C-l
SANOSTAR VILLAS 21 C-5 I EPISCOPAL c-s PARKS & RECREATION
SlIIIOKEHOUSE BAY 22 B-5 . UNITED CHURCH E-4
SMOKEHOUSE HARBOUR a3 B-6 . weSLEY UNITED CAXAMBAS PARK C.l COMMUNITY FACILITIES
SUNRISE BAY RESORT 24 C-7 METHODIST E.3 FRANK E. MACKLE PARK 0-3
SUNSET COVE 8<1 C-5 JANE HITTLER PARK Il-S CHARTER MIDDLE SCHOOL 0-4
TAHmAN 25 C.5 LEIGH PLUMMER PARK E-5 CITY HALL 0...
VILLA DEL MAilE 26 B..s RACQUET CLUB 0-3 FIRE STATION 0-4
VILLAGE AT SMOKEHOUSE BAY 7:1 B-6 ~ SOUTH MARCO BEACH HISTORICAL MUSEUM 0-3
VlLLE De MARCO EAST 28 B-7 ACCESS B-1 UBRARY 0-3
VILLI! De MARCO weST 29 B-7 y.. TlGERTAIL PUBLIC BEACH A-5 MACKLE PARK MAINTENANCE o-a
PRINT MARCO HEALTH CARE CENTER
WAV1!RL Y GARDeNS ~ C-6 SHO'. TOMMIE BARFIELD 0... 0-4
weSTVIEW ON THE BAY 31 B-5 W1NTERBERRY PARK 0-2 TOMMIE BARFIELD
VETERANS COMMUNITY ELEMENTARY 0-4
POLICE OEPTARTIIIENT 0-4
?J'~'7t) PARK C-S YMCA 0-3
CAC April 14, 2011
VIII-8-a New Business
27 of 43
Wednesday, March 02 2011
Mr. Gary McAlpin, Director
Coastal Zone Management
3301 East Tamiami Trail
W. Harmon Turner Bldg.
Suite #103
Naples, FL 34112
Re: Collier County Tourist Development Council Category" An Grant Application
Beach Renourishment and Pass Maintenance Category
Project Title: City of Marco Island Laser Grading Project
Dear Gary,
Please find attached the grant application for laser grading the northern portion of the
Marco Island beach. The City's Beach Advisory Committee unanimously approved a
motion to have this area of the beach graded to improve topography, drainage issues
and sea turtle and shorebird habitat. The City Manager has approved the project. The
funds requested are estimated based on past laser grading projects and could easily
less in cost.
If more information is required, pleas contact me at anytime. Thank you and the Collier
County Coastal Advisory Committee for the consideration of this project.
Sincerely,
@~/ /f;diV
Nancy J. Richie
Environmental Specialist
c/ Dr. James Riviere, City Manager
City Council
City of Marco Island Beach Advisory Committee
Randy Moity, Collier County Coastal Advisory Committee
Wayne Waldack, Collier County Coastal Advisory Committee
Victor Rios, Collier County Coastal Advisory Committee
Maura Kraus. Collier County Sea Turtle Program
CAC April 14, 2011
VIII-8-a New Business
28 of 43
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY "A" GRANT APPLICATION
Beach Renourishment and Pass Maintenance
Tie:ertail Beach Refurbishment
1. Name and Address of Project Sponsor Organization:
Coastal Zone Manae:ement
Collier Countv Government
3299 Tamiami Trail East. Suite 103
Naoles. Florida 34112
2. Contact Person, Title and Phone Number:
Name: Gail Hambrie:ht. Accountant
Address: Collier Countv Government
3299 Tamiami Trail East. Suite 103
City Naoles ST FL ZIP 34112
Phone: 252-2966 FAX: 252-2950
3. Organization's Chief Official and Title:
Fred W. Covle. Chairman
Board of Countv Commissioners
4. Details of Project- Description and Location: Tie:ertail will be tilled orior to
turtle nestine: season. Investie:ate what ootions exist to enhance the beach at
Tie:ertail to be more attractive to tourists.
5. Estimated project start date: October 1.2011
6. Estimated project duration: 12 Months
7. Total TDC Tax Funds Requested: $25.000.00
8. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes (X) No ( )
CAC April 14, 2011
VIII-8-a New Business
29 of 43
Collier County Tourist Development Council
Category "A" Grant Application Page 2
Wie:e:ins Pass Maintenance Proe:ram - Ene:ineerine:
PROJECT BUDGET
PROGRAM ELEMENT AMOUNT
TDC Funds Requested $ 25.000,00
City/Taxing District Share $
State of Florida Share $
Federal Share $
TOTAL $ 25.000.00
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc)
Engineering Fees
$ 25.000.00
$
$
$
$
$ 25.000.00
TOTAL
I have read the Tourist Development Category "A" Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with all guidelines and criteria.
Signature of Sponsor Organization's Chief Official
Date
CAC April 14, 2011
VIII-8-a New Business
30 of 43
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY "A" GRANT APPLICATION
Beach Renourishment and Pass Maintenance
Beach Maintenance for Collier CountvlMarco Island
1. Name and Address of Project Sponsor Organization:
Coastal Zone Manae:ement
Collier Countv Government
3299 Tamiami Trail East. Suite 103
Naoles. Florida 34112
2. Contact Person, Title and Phone Number:
Name: Gail Hambrie:ht. Accountant
Address: Collier Countv Government
3299 Tamiami Trail East. Suite 103
City Naoles ST FL ZIP 34112
Phone: 252-2966 FAX: 252-2950
3. Organization's Chief Official and Title:
Fred W. Coyle. Chairman
Board of Countv Commissioners
4. Details of Project- Description and Location:
Collier Countv and Marco Island beach c1eanine:.
5. Estimated project start date: October 1. 2011
6. Estimated project duration: 12 Months
7. Total TDC Tax Funds Requested: $139.000.00
8. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes (X)
No ( )
CAC April 14, 2011
VIII-8-a New Business
31 of 43
Collier County Tourist Development Council
Category "A" Grant Application Page 2
Beach Maintenance for Collier Countv/Marco Island
PROJECT BUDGET
PROGRAM ELEMENT AMOUNT
TDC Funds Requested $ 139,000.00
City/Taxing District Share $
State of Florida Share $
Federal Share $
TOTAL $ 139,000.00
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc)
Engineering Fees
$ 139,000.00
$
$
$
$
$ 139.000.00
TOTAL
I have read the Tourist Development Category "A" Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with all guidelines and criteria.
Signature of Sponsor Organization's Chief Official
Date
CAC April 14, 2011
BEACH CLEANING VIII-8-a New Business
32 of 43
195-116361
195-116361 Beach Cleaning
Pro' ect
OPERATING BUDGET 135,000 211,474 84,470 53,188 139,000 0 135,000
631400- Engineering Fees 0 0 0 0 0 0 0
631410 - Surveying Fee 0 0 0 0 2,500 0 2,500
634990 - Landscape Inc 0 0 30 30 0 0 0
634999 - Other Contractual 92,400 166,335 50,700 66,500 0 66,500
640410 - Motor Pool Rental Charge 0 0 233 0 1,000 0 0
643300 - Trash and Garbage 0 0 1,782 2,000 2,500 0 2,500
645260 - Auto Insurance 2,700 2,700 675 2,700 3,600 3,600
646430 - Fleet Maint 1 10,300 22,246 4,040 10,300 10,000 0 10,000
636440 - Fleet Maint ISF Parts & Sublet 9,100 0 7,059 9,100 19,500 19,500
646445 - Fleet Non Maint 2,800 7,840 2,343 2,800 3,000 0 3,000
647110 - Printing and Binding 0 679 7,279 7,279 1,500 0 1,500
649010 - Licenses and Permits 0 1 0 0 0 0
649030 - Clerks Records 0 0 500 500 500 500
652140 - Personal Safety 0 200 200 200 500 500
652490 - Fuel and Lub 17,700 10,817 8,894 17.700 27,400 0 27,400
652910 - Minor Operating 0 656 656 500 0
652990 - Other Operating Expenses 0 0 79 79 500 500
CAPITAL OUTLAY 0
764180 - Machinery 0 0 0 0 0
Total 270,000 422,947 168,940 106,376 139,000 0
CAC April 14, 2011
VIII-8-a New Business
33 of 43
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY "A" GRANT APPLICATION
2012 Beach Renourisbment and Pass Maintenance
Naoles Beach Maintenance
(Project Title)
1. Name and Address of Project Sponsor Organization:
City Of Naples
735 Eighth Street South
Naples, Florida 34102
2. Contact Person, Title and Phone Number:
Name: David Lykins, CSD Director
Address: 280 Riverside Circle
City: Naples State:""L ZIP:
Phone: 239/213-7110 FAX: 239/213-7130
34102
Other: dlvkins(tV,naplesuov.com
3. OrganizAtion's Chief Elected OHicial and Title:
Hon. Bill Barnett
City Mayor
4. Details ofProject~ Description and Location:
Description: This is an on-going TDC funded project for support of maintain on local beaches.
The City in recent years has taken over the upkeep and grooming of TDC eligible beaches from
the County. Under this project, the City removes litter, accumulation of algae, and rocks along
public access beach portions of the Gulf within the City's jurisdictional limits. This is a benefit to
both residents and tourist populations, and is beneficial to the preservation of the sand beach
and shoreline. This year's request includes equipment operator's salary and benefits; equipment
fuel and maintenance, contractor and equipment.
Location: Signification coordination of effort continues between the City and Collier County
concerning beach maintenance. The project boundary location is from southernmost State-
permitted beach cleaning area within the City's jurisdictional boundary to Clam Pass in Collier
County.
5.
Estimated project start date:
October 1, 2011
6.
Estimated project duration:
12 Months
7.
Total TDC Tax Funds Requested:
$76,850
8. lfthe full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes (X)
No()
Collier County Tourist Development Council
Category "A" Grant Application - Page 2
NaolesBeacb Maintenance
(Project Title)
PROJECT BUDGET
PROGRAM ELEMENT
TDC Funds Requested
Cityrraxing District Share
State of Florida Share
Federal Share
'fOTAL
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc)
Salaries
- -
_Equipment Fuel and Maintenance
Additional Beacb Cart - Gas w/ Manual Bed Lift
- -
_ Additional Two Beach Trasb Compactors at Pier _
'fOT AL
CAC April 14, 2011
VIII-8-a New Business
34 of 43
AMOUNT
$ _76,850
$
$
$
$ _76,850___
$_48,000
$_7,000
$_11,850
$_10,000
$ _76,850__
I have read the Tourist Development Category "A" Beach Funding Policy covering beach
renourishment and pass maintenance and agree that my organization will comply with all
guidelines and criteria.
xJJ . lvL /iF""
A. William Moss, City Manager
',//7/1/
Date
CAC April 14, 2011
VIII-8-a New Business
35 of 43
EXHIBIT A
ADDITIONAL INFORMATION
E.LIGIBILITY: Beach Maintenance activities will take place on beach area that are least 80%
classified as eligible under the TDC guidelines. The project boundary location is from
southernmost State-permitted beach cleaning area within the City's jurisdictional boundary to
Clam Pass in Collier County.
ORGANIZATIONAL CAPACITY: The City of Naples will be the primary recipient
and lead agency for controlling and completing all aspects and activities proposed in this
grant application. The City will remain the lead agency for the duration of funding and
will be the sole point of contact for all matters related to this proposal. The City has the
managerial and financial capability to ensure proper planning, management, and
completion of the project described in this application.
BUDGET ASSURANCES: Dual Compensation: If a City project staff'member or
consultant is involved simultaneously in two or more projects, the statfwill not be
compensated for more than I 00% of their time for any such dual involvement.
PROJECT LOCATION MAP:
CAC April 14, 2011
VIII-8-a New Business
36 of 43
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY" A" GRANT APPLICATION
Beach Renourishment and Pass Maintenance
Vee:etation Reoair/Exotic Removal County Wide
1. Name and Address of Project Sponsor Organization:
Coastal Zone Manae:ement
Collier County Government
3299 Tamiami Trail East. Suite 103
Naoles. Florida 34112
2. Contact Person, Title and Phone Number:
Name: Gail Hambrie:ht. Accountant
Address: Collier County Government
3299 Tamiami Trail East. Suite 103
City Naoles ST FL ZIP 34112
Phone: 252-2966 FAX: 252-2950
3. Organization's Chief Official and Title:
Fred W. Coyle. Chairman
Board of County Commissioners
4. Details of Project- Description and Location:
Dune olantine: and exotic removal e:reatlv contribute to a healthv beach
environment. Each vear the county sets aside $75.000 to reoair dune
vee:etation and remove exotics on all our county beaches.
5. Estimated project start date: October 1.2011
6. Estimated project duration: 12 Months
7. Total TDC Tax Funds Requested: $75.000.00
8. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes (X)
No ( )
CAe April 14, 2011
VIII-8-a New Business
37 of 43
Collier County Tourist Development Council
Category "A" Grant Application Page 2
Vee:etation Reoair/Exotic Removal County Wide
PROJECT BUDGET
PROGRAM ELEMENT
AMOUNT
TDC Funds Requested
City/Taxing District Share
State of Florida Share
Federal Share
$ 75,000.00
$
$
$
TOTAL
$ 75,000.00
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc)
PlantingfRemoval
$ 75,00.00
$
$
$
$
TOTAL
$ 75,000.00
I have read the Tourist Development Category "A" Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with all guidelines and criteria.
Signature of Sponsor Organization's Chief Official
Date
CAC April 14, 2011
VIII-8-a New Business
38 of 43
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY "A" GRANT APPLICATION
2012 Beach Renourishment and Pass Maintenance
Naples Pier Annualized Repair and Maintenance
(Project Title)
1. Name and Address of Project Sponsor Organization:
City Of Naples
735 Eighth Street South
Naples, Florida 34102
2. Contact Person, Title and Phone Number:
Name: David Lykins, CSD Director
Address: 280 Riverside Circle
City: Naples State: FL ZIP:
Phone: 239/213-7110 FAX: 239/213-7130
34102
Other: dlvkins~naplesl!ov.com
3. Organization's Chief Elected Official and Title:
Hon. Bill Barnett
City Mayor
4. Details of Project- Description and Location:
Description: The activity description for this project includes labor and material for the upkeep
and safety of the pier. The pier is a pubic access beach facility as a tourist attractor and
destination. The pier structure has a shoreline erosion control and beach preservation effect.
Additionally, the public safety through the continued maintain of the pier is of paramount
importance. Repair and maintenance issues include responsibility and public safety of pier
structure, wooden deck, restrooms and storage facilities as well as water and electrical
systems related to the pier's use as a fishing, tourist and beach preservation structure.
Location: The project location is at the 12 Avenue - South terminus beach end. Please refer to
Project Location Map found in Exhibit A.
5.
Estimated project start date:
October 1,2010
6.
Estimated project duration:
12 Months
7.
Total TOC Tax Funds 'Requested:
$55,000
8. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes (X)
NoO
I
CAC April 14, 2011
VIII-8-a New Business
39 of 43
--l
I
I
Collier County Tourist Development Council
Category "A" Grant Application - Page 2
_ Naples Pier Annualized Repair and Maintenance_
(Project Title)
PROJECT BUDGET
PROGRAM ELEMENT
AMOUNT
TDC Funds Requested
Cityrraxing District Share
State of Florida Share
Fedeml Share
$ _$55,000
$
$
$
TOTAL
$ _$55,000
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring etc)
_Salaries and Material
$_$55,000
$
$
$
$
TOTAL
$ _55,000
I have read the Tourist Development Category "A" Beach Funding Policy covering beach
renourishment and pass maintenance and agree that my organization will comply with all
guidelines and criteria.
x vO.tv~ IY~
A. William Moss, City Manager
? !i7111
Date
EXIllBIT A
CAC April 14, 2011
VIII-8-a New Business
40 of 43
ADDITIONAL INFORMATION
ELIGIBILITY: The pier structure is no more than one-half mile from a public beach
facility, public access point, and hotel or motel facilities and is on a beach area classified
as eligible.
BUDGET ASSURANCES: Dual Compensation: If a City project staff member or
consultant is involved simultaneously in two or more projects, the staff will not be
compensated for more than 100% of their time for any such dual involvement.
PROJECT LOCATION MAP:
CAC April 14, 2011
VIII-8-a New Business
41 of 43
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY "A" GRANT APPLICATION
Beach Renourishment and Pass Maintenance
Fund 195 Administration
1. Name and Address of Project Sponsor Organization:
Coastal Zone Manae:ement
Collier Countv Government
3299 Tamiami Trail East. Suite 103
Naoles. Florida 34112
2. Contact Person, Title and Phone Number:
Name: Gail Hambrie:ht. Accountant
Address: Collier Countv Government
3299 Tamiami Trail East. Suite 103
City Naoles ST.f!! ZIP 34112
Phone: 252-2966 FAX: 252-2950
3. Organization's Chief Official and Title:
Fred W. Covle. Chairman
Board of Countv Commissioners
4. Details of Project- Description and Location: This item funds Countv staff to
manae:e the oroiects. maintain the beaches. administer the oroe:rams. It
includes the Director: an Office Manae:er/ Accountant: a field
suoervisorv/Proiect Manae:er: and two EQuioment Ooerators to clean and
maintain the Countv and Marco Beaches. It also includes Administrative
Indirect Fees required for administrative functions like ourchasine:.
information technoloe:v. motor 0001 and human resources. Tax collectors
fees are also include in this item. Aooroval is recommended.
5. Estimated project start date: October 1. 2011
6. Estimated project duration: 12 Months
7. Total TDC Tax Funds Requested: $727.140.00
8. If the full amount requested cannot be awarded, can the program/project
be restructured to accommodate a smaller award?
Yes (X) No ( )
CAC April 14, 2011
VIII-8-a New Business
42 of 43
Collier County Tourist Development Council
Category "A" Grant Application Page 2
Fund 195 Administration
PROJECT BUDGET
PROGRAM ELEMENT AMOUNT
TDC Funds Requested $ 727.140.00
City/Taxing District Share $
State of Florida Share $
Federal Share $
TOTAL $ 727.140.00
PROJECT EXPENSES:
(Engineering, Mobilization, Contractor, Monitoring ete)
Funding 195 and 183 Administration
Indirect Administration Cost
Tax Collector Fee
$ 510.540.00
$ 107.700.00
$ 108.900.00
$
$
$ 727,140.00
TOTAL
I have read the Tourist Development Category "A" Beach Funding Policy covering
beach renourishment and pass maintenance and agree that my organization will
comply with all guidelines and criteria.
Signature of Sponsor Organization's Chief Official
Date
eZM ADMINISTRATION
195-110407
CAC April 14, 2011
VIII-8-a New Business
43 of 43
Proiect
PERSONAL SERVICE - TOTAL 460,800 466,895 249,333 451,442 459,566 0 459,566
512100 - Regular Salaries 313,968 313,968 156,844 313,968 313,679 0 313,679
512600 - ER 457 2,500 2,500 2,105 2,500 2,000 0 2,000
513100 - Other Salaries 10,560 10,560 17,357 7,220
514100 - Overtime 0 0 1,202 1,202 0 0 0
519100 - Reserve for Salaries 0 6,095 0 0 0 0
521100 - Social Security Matching 24,082 24,082 13,443 24,082 24,066 0 24,066
522100 - Retirment 40,885 40,885 18,429 40,885 35,258 0 35,258
523150 - Health Insurance 56,850 56,850 28,425 56,850 63,730 0 63,730
523151 - Health Insurance 11,100 11,100 11,100 11,100 12,466 0 12,466
523160 - Life Insurance 855 855 428 855 847 0 847
524100 - Workers Compensation Regular 300 300
OPERATING BUDGET - TOTAL 161,600 167,837 148,750 162,259 158,674 0 158,674
631820 - Clerk of Board 2,500 2,500 1,403 2,500 2,500 0 2,500
631990 - Other Professional Services 0 0 0
634204 - IT Direct Client 0 0 0
634207 - IT CAP Allocation 600 600 300 600 1,600 0 1,600
634210 - Office Automated 9,300 9,300 4,650 9,300 16,600 0 16,600
634970 - Indirect Cost 117,700 117,700 117,700 117,700 107,700 0 107,700
634980 - Interdepartment Pay 0 0 0
634999 - Other Contractual 6,900 6,900 2,703 6,900 2,520 0 2,520
639964 - Storage Contract 55 125 200 0 200
640200 - Mileage Reimbursable 2,000 2,000 0 0 0 0
640300 - Travel Prof 1,000 1,000 977 1,000 2,500 0 2,500
640410 - Motor Poll Rental Charge 0 0 0 0 500 500
641230 - Telephone Access Charge 1,100 1,100 731 1,100 2,200 0 2,200
641700 - Celular Telephone 2,400 2,400 755 2,400 2,000 0 2,000
641900 - Telephone System 1,500 1,500 243 1,500 0 0 0
641950 - Post Freight 1,000 7,237 7,162 565 1,500 0 1,500
645100 - Insurance General 2,900 2,900 1,450 2,900 2,900 0 2,900
645260 - Auto Insurance
646430 - Fleet Maint I 100 100 0 100 100 0 100
636440 - Fleet Maint ISF Parts & Sublet 0 0 0 0 200
646445 - Fleet Non Maint 100 100 49 100 200 0
646710 - Office Equipment 0 0 1,206 1,206 0 0 0
647110 - Printing and Binding 500 500 690 1,000 500 0 500
649010 - Licenses and Permits 1,000 1,000 130 500 500 500
651110 - Office Supplies 6,000 6,000 2,280 5,000 4,500 4,500
651210 - Coping Charges 0 0 26 26 500 500
652490 - Fuel and Lub 0 0 237 237 1,454 0 1,454
652920 - Computer Software 1,000 1,000 0 1,000 500 500
652990 - Other Operating Expenses 0 0 913 1,000 1,000 1,000
654210 - Dues and Memberships 3,000 3,000 5,000 5,000 5,000
654360 - Other Training 1,000 1,000 90 500 1,500
CAPITAL OUTLAY 6,500 6,500 0 0 0 0 0
762200 - Building Improvement 6,500 6,500 0 0
Total 628,900 641,232 398,083 613,701 618,240 0 618,240
Direct Cost (18,867) (107,700)
Total 510,540
CAe April 14, 2011
VIII-9 New Business
10f6
EXECUTIVE SUMMARY
FDEP Permitting Status
OBJECTIVE: Update the GAG on the FDEP Permitting Status
CONSIDERATIONS: For information only.
GROWTH MANAGEMENT IMPACT: There is no impact to the Growth Management
Plan related to this action.
RECOMMENDATION: For information update only.
PREPARED BY: Gail Hambright, CZM
c
CAC April 14, 2011
VIlI-9 New Business
20f6
- u
Public Services Division
Coastal Zone Management
April 5, 2011
Secretary Herschel T. Vinyard, Jr.
Flerida Department .of Envirenmental Pretectien
3900 Cemmenwealth Blvd.
Mail Statien 1 0
Tallahassee, FL 32399-3000
Re: Cellier Ceunty FDEP Permitting Discussien
Dear Secretary Vinyard:
The Cellier Ceunty Beard .of County Cemmissieners and the Naples City ceuncil in a
jeint werkshep held en 2/7/2011 directed staff teaddress ceastal permitting issues and
cencerns te Geverner Scett and DEP Secretary Vinyard. In additien te addressing mere
reutine permit preblems and inefficiencies, beth lecal gevernments wanted te develep
mere effective and permanent selutiens te reeccurring beach eresienal areas (hot
spets) and alse Pass/Inlet maintenance dredging.
With that said, many empleyees within the FDEP organizatien previde exceptienal
service and suppert te lecal gevernments. In SW Florida, Cellier Ceunty values and
greatly appreciates the dedicatien, ceeperatien and cemmitment .of several .outstanding
empleyees. Dr. Lainie Edwards, Jen Iglehart and Jenny Cewart frem the Ft Myers
.office and Mike Barnett are examples .of empleyees that previde exceptienal suppert te
.our ceunty. We weuld like te recegnize these empleyees and draw their centribution to
yeur attention.
Hewever, Cellier Ceunty has ever the years been frustrated with the State and Federal
permitting precess fer .our ceastal prejects. We understand that the State and Federal
permitting process has, by law, many layers .of review andappreval that are part .of the
permit issuance precess and help te achieve the commen geal .of a final permit that will
pretect .our citizens, envirenment, ecenemy and quality .of life. The time and reseurces
that it takes te .obtain a permit has been an exercise that we have ceme te accept as a
necessary part .of the precess. Hewever, with .our Ceunty suffering from reductiens in
revenues, we wanted te make DEP aware .of .our fiscal censtraints and the impacts .of
extended permit review processes en .our Ceunty. We have already been ferced te
questien all .of .our pregrams, precedures and expenditures. Our geal is te find mutually
acceptable mechanisms t.o increase efficiency between Cellier C.ounty and DEP in the
permitting precess, with an intended eutceme .of enhanced cemmunicatien,
cellaberatien and efficiency.
Collier County CoaslalZooe Management. 3299 Tamiami Trail East, Suile 103 . Naples.. Florida 34 112-5746 . 239-252-2966 . FAX 239-252-2950
www.colfiergov.netfcoastalzonemanagemenl
CAC April 14, 2011
VIlI-9 New Business
S crt; tat; s c he !T. V i ~l~~l J
t: E P P 1
o I
e 12
Passllnlet Maintenance Dredaing
Wiggins Pass has been maintenance dredged 13 times .over the last 30+ years.
Hist.orically, the pass has been dredged every tw.o years but recent trends have the
channel filling in every 18 m.onths t.o un-navigable conditi.ons. In additi.on t.o this unsafe
b.oating c.onditi.on, Baref.o.ot Beach and the mangrove channel t.o the n.orth have been
er.oding. Each dredging event c.ostsappr.oximately$750,OOO and Callier C.ounty has
determined that this situati.on cann.ot c.ontinue and we have initiated a navigati.on
improvement project.
DEP has expressed c.oncern .over the current dredge template (s.oft-engineering,sand
dike s.oluti.on) for straightening Wiggins Pass. Many members .of the community w.ould
like a structural jetty s.oluti.on t.o res.olve this issue. H.owever, it's imp.ortant far DEP t.o
understand that finding a nan-structural s.olution has widespread supp.ort am.ong the
stakeh.olders in Callier C.ounty. The C.ounty w.ould like t.ounderstand better the
c.oncerns DEP has with the current permit applicati.on. In additi.on, if DEP has
determined that this appr.oach is n.ot suitable, haw can Callier C.ounty and DEP w.ork
t.ogether t.o find a permanent s.oluti.on to manage and pr.otect the entire Wiggins Pass
system?
The Fl.orida Park Service rep.orts thr.ough the FDEP .organizati.on. FDEP is als.o
resp.onsible far the independent stewardship .of coastal programs and assets. On the
Wiggins Pass permitapplicati.on far straightening the channel, DEP is n.ot .only the
permit applicati.on reviewer, but als.o the manager .of the State park. This has led t.o
same c.oncern ab.out haw the permit review arm .of DEP interacts with the res.ource
management arm.of DEP. Callier C.ountyis c.oncerned that DEP has been biased
t.owards the Fl.orida Park System in its stewardship.of .overall c.oastal issues in this area.
We believe this is a c.onflict .of interest and that FDEP is unreas.onable in its current
permitting requirements and .overly reactive t.o the State Park system. Thus, .on the
W.iggins Pass permit applicati.on far straightening the channel, C.olli.er C.ounty would like
t.o be able to further participate in discussi.ons between the permitting arm and the
res.ource management arm .of DEP in .order t.o address any issues that arise and t.o
avert any p.otential unexpected issues that could have been avoided if better
c.ommunicati.on were in place,
Reoccurrina Beach Erosional AreasChot spots)
Callier C.ounty has several significant hat spat l.ocati.ons al.ong its coast where
accelerated er.osi.on is the rule rather that the excepti.on. These areas require c.onstant
attenti.on and r.outine expenditure of funds t.o pr.otect the upland structures, pr.ovide far
wildlife habitat and a p.ositive beach experience far .our t.ourists. Callier County is in the
process .of m.odeling these areas t.o determine the mast appropriate l.ong term soluti.on
t.o address this recurring problem. We are l.o.oking t.o inc.orp.orate these hot spat
See!(' r H
II e (
CAC April 14, 2011
VIlI-9 New Business
tjo,f91r Jr
F' r~p Pc fHI tln~!")
pn
a 13
solutions into our next major beach renourishment within the next 2 to 4 years. We
have an open slate in considering the most cost effective, technically feasible and
environmentally friendly solution. Our approach will most likely investigate the removal
of existing groin structures as well as the placement of new permanent structural
solutions. How can Collier County and DEP work together to find a permanent solution
to address the recurring erosional areas?
Permittina Issues and Concerns
Listed below are some of our perceptions of experiences with permitting Collier County
Projects. We ask that you consider our concerns and perhaps survey other coastal
communities to learn of their permitting experiences. We would be happy to organize a
cross section of coastal communities to discuss common concerns and work with you to
develop recommendations to address any concerns. Our intent would be for this to
result in frank, open and constructive dialogue conducted in.a respectful and solution-
oriented manner. This tone is important because many I.ocal governments are reluctant
to raise issues with your agency. Local governments are key stakeholder in the
permitting process and our input/feedback should be critically considered.
Key concerns, issues and comments relative to FDEP are as follows:
1. The necessary regulatory framework often results in a lengthy permitting
process. Sometimes it appears that the agency delays in making a decision.
However, we would like for DEP to explore if there are better efficiencies that
could be .employed to ensure that once all necessary information is provided, the
review process occurs in an efficient and timely manner.
2. The first Request for Additional Information (RAI) typically asks questions
addressed in the submittal. This lack of appropriate review adds to the time and
the cost to execute the projects. How can the County better work with DEP
permit review staff to ensure that necessary information is provided by the
County and that DEP staff is able to readily find that information in the application
packet? Such . improved efficiencies will helpto. ensure that the first Request for
Additional Information (RAI) does not ask questions that are already answered in
the application packet.
3. Duplicate reviews and overlapping responsibilities by local, state and federal
agencies are another major issue. How can the County, DEP and other review
agencies better coordinate review to ensure that multiple agency review does not
result in cost--prohibitive delays in permit review and issuance?
4. Agencies appear to be afraid to move forward and make decisions especially in
light of public comments. Often the pUblic will express concern to the agencies
regarding a permit application after they have not received what they believe is a
satisfactory or desired response from the County. This process typically slows
down an already time consuming process. How can the permitting process
continue to move forward and still address the public concerns?
Secr tar
CAC April 14, 2011
VIIl-9 New Business
50f6
e r 5 ;; ~; \ '[ V \ n J
ID P Pc
t ! \
'\ r i! :;
^"
Page 14
5. Agencies practice "permit extortion", waiting till the last minute and extracting
concessions due to completion needs. During Collier County's last major beach
renourishment, we were required to install a one acre artificial reef at a cost well
over $1,000,000 even though the scientific data did not support it. Subsequent
yearly monitoring has confirmed our position and the scientific data that there has
been no impact to the near shore hardbottom off our coasts. DEP must continue
to be cognizant of the fact that Collier County has a narrow window for
completion of coastal projects. This is required to avoid incompatible activities
during sea turtle nesting season. How can better communication occur to ensure
that the County maintains its necessary timeline for permit issuance, in order to
have project completion by the beginning of turtle season? In addition, how can
the County better coordinate with DEP on mitigation requirements, to ensure that
what is proposed for mitigation is appropriate and does not create an undue .or
unnecessary hardship on the County?
6. Permitting always seems to be in a panic or emergency mode which results in
rash decisions that negatively affect our project costs. How can the County and
DEP work together to keep the permitting process from entering into the panic or
emergency mode, which could result in less than optimal decisions and
potentially drive up the cost to the County?
7. Annual monitoring on projects is very expensive, resource intensive and time
consuming. Collier County routinely spends $500,000 to $1,000,000 per year on
monitoring and related regulatory activities. Turtle monitoring, shorebird
monitoring, beach tilling, inlet monitoring, physical beach surveys, biological
monitoring and dune plantings are covered by permit conditions. Collier County
wants to be sure that these required activities, which are a necessary part of the
permitting process, result in a true benefit for the cost and that the mitigation is in
a fair proportion to the proposed impact. For example, biological monitoring is a
concern because it appears that the data collected from this monitoring is not
used in agency or external reports that would benefit listed species or give
feedback as to the efficiency of the activities being monitored. Better use of
monitoring reports should be a priority for DEP.
8. FDEP fails to give direction on the level of mitigation that is required to satisfy
their concerns consequently, a significant amount of time in the RAI process is
spent proposing and negotiating solutions that might be acceptable to the
agency. Recently on the Wiggins Pass Maintenance Dredg.ing Permit process
turbidity requirements in Outstanding Florida Waters took over two months to
resolve. How can the County and DEP better communicate, so that the County
can learn as soon as possible what mitigation will be required as part of a permit
application, especial.ly when the permit is asking for a variance from State rules?
9. Florida's beach renourishment cost share program solicits on a yearly basis
projects for state participation in funding. Concerns exist relative to project
scoring and selection. More transparency in the selection, scoring and funding
process is suggested. Project presentations along with feedback on scoring and
funding should be provided.
CAC April 14, 2011
VIII-9 New Business
60f6
c e l'\ jJefs b;:!"I Vin.)
r Perm
P a
l'i!
Key concerns, issues and comments relative to FWC areas follows:
1. Regional Biological Opinions are used on federal projects by the USACE. These
allow the USACE to perform various dredging events without obtaining a
Biological Opinion for every dredging event. FWC requirements are more
restrictive than the federal government and require a Biological Opinion for every
dredge event. This at a minimum adds at least 6 months and additional costs to
the permit. Could the FWC provide additional information to the County
explaining the need for this additional layer of review and how the requirement of
the Biological Opinions for each dredge event is necessary to protect our
endangered and threatened sea turtles?
2. The turtle permitting process by FWC needs review. FWC has developed the
regulations but also permits who obtains the permit to do the work, Permits are
tightly controlled and a pool of qualified permit holders does not exist for
competition to perform the work. If more permit holders were available,
competition would increase and costs to implement the program would decrease.
With the number of permit holders being maintained at the current amount, we
are concerned that there are significant inefficiencies. The amount of qualified
permit holders should be examined, to determine if there would be a benefit to
increasing their number.
3.. Most permits require that renourishment only be accomplished outside of turtle
nesting season. This limitation means that dredges are in high demand and
limited availability have increased renourishment costs. Adequate safeguards
could be developed for many projects that provide for turtle protection and allow
renourishment during nesting season. This would significantly reduce the costs
and less the impact of renourishment during prime tourist season. Depending on
speCifiC situations dredging costs could be reduces by as much as 25 percent.
We look forward to our meeting on 4/15/2011 to discuss these and other issues of
concern.
Sincerely I
Gary McAlpin, PE
CC: John Sorey
Leo Ochs
Marla Ramsey