Loading...
Ordinance 99-59ORDINANCE 99- 59 AN ORDINANCE AMENDING ORDINANCE NUMBER 91-102, THE COLLIER COUNTY LAND DEVELOPMENT CODE, WHICH INCLUDES THE COMPREHENSIVE ZONING REGULATIONS FOR THE UNINCORPORATED AREA OF COLLIER COUNTY, FLORIDA, BY AMENDING THE OFFICIAL ZONING ATLAS MAP NUMBER 061314 BY CHANGING THE ZONING CLASSIFICATION OF THE HEREIN DESCRIBED REAL PROPERTY FROM "A" RURAL AGRICULTURAL AND "PUD" TO "PUD" PLANNED UNIT DEVELOPMENT KNOWN AS THE FIRST ASSEMBLY MINISTRIES EDUCATION AND REHABILITATION CAMPUS PUD, FOR PROPERTY LOCATED IN THE NORTHEAST CORNER OF THE INTERSECTION BETWEEN C.R. 951 AND THE LORDS WAY, IN SECTION 14, TOWNSHIP 50 SOUTH, RANGE 26 EAST, COLLIER COUNTY, FLORIDA, CONSISTING OF 79.1 + ACRES; PROVIDING FOR THE REPEAL OF ORDINANCE NUMBER 96-58, AS AMENDED, THE FORMER FIRST ASSEMBLY MINISTRIES EDUCATION & REHABILITATION CAMPUS PUD; AND BY PROVIDING AN EFFECTIVE DATE. Board WHEREAS, William L. Hoover of Hoover Planning, representing Rev. David Mallory and the First Assembly of God Church, petitioned the Board of County Commissioners to change the zoning classification of the herein described real property; NOW THEREFORE BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA; SECTION ONE: The Zoning Classification of the herein described real property located in Section 14, Township 50 South, Range 26 East, Collier County, Florida, is changed from "A" Rural Agricultural and "PUD" to "PUD" Planned Unit Development in accordance with the PUD Document, attached hereto as Exhibit "A", which is incorporated herein and by reference made part hereof. The Official Zoning Atlas Map number 061314, as described in Ordinance Number 91-102, the Collier~Cou ~nt~.~ Land Development Code, are hereby amended accordingly. SECTION TWO: ~,,:iT:, r.~ :~ Ordinance Number 96-58, as amended, known as the First Assembly Mmlstn~' ~E~clu¢~lmn Rehabilitation Campus PUD, adopted on October 8, 1996 by the Board of County Co~ssibfiers of Collier County, is hereby repealed in its entirety. ~,rn "~ SECTION THREE: This Ordinance shall become effective upon filing with the Department of State. PASSED AND DULY ADOPTED by the Board of County Commissioners of Collier County, Florida, this/q~ay o~ 1999. ATTEST: ~'' DWIGHT E.,.BRO~, Clerk ,t. s~gnatUrt Approved as tB Fo~ ~d Legal Sufficiency Marjor~ M. Student ' Assistant County Attorney BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA BY: This ordinance filed with the Secretary of ~f~ ~,~. d ay of and acknow!edgement of theft fili)~a received this ~_~1[' day Deputy Clerk, g/admin/suc/PUD-96-10(2 )/ORDINANCE/ -2- FIBST ASSEMBLY MINISTBIES EDgCATION & BEIIABILITATION CAMPgS A PLlUlIEB INIT DEVELOPMENT PREPARED FOR: REV. DAVID MALLORY FIRST ASSEMBLY OF GOD CHURCH 2132 SHADOWLAWN DRIVE NAPLES, FLORIDA 34112 3785 AIRPORT ROAD N., SUITE B PREPARED BY: WILLIAM HOOVER, AICP HOOVER PLANNING NAPLES, FLORIDA 34105 and BEAU KEENE, P.E. KEENE ENGINEERING 538 NINTH AVENUE SOUTH NAPLES, FLORIDA 34102 DATE FILE April 7, 1999 DATE REVISED Auaust 19, 1999 DATE REVIEWED BY CCPC~1999 DATE APPROVED BY BCC ~ ORDINANCE NUMBER __~ EXHIBIT "A" TABLE OF CONTENTS TABLE OF CONTENTS LIST OF EXHIBITS STATEMENT OF COMPLIANCE SECTION I PROPERTY OWNERSHIP AND DESCRIPTION SECTION II PROJECT DEVELOPMENT REQUIREMENTS SECTION III CAMPUS AREAS PLAN SECTION IV PRESERVE AREAS PLAN SECTION V DEVELOPMENT COMMITMENTS PAGE i ii 1 3 6 9 16 17 LIST OF EXHIBITS EXHIBIT A EXHIBIT B EXHIBIT C PUD MASTER PLAN PUD WATER MANAGEMENT PLAN TYPICAL INTERNAL ROAD SECTION FOR TTRVC LOTS STATEMENT OF COMPLIANCE The development of approximately 79.1 acres of property in Collier County, as a Planned Unit Development to be known as the First Assembly Ministries Education and Rehabilitation Campus PUD will be in compliance with the planning goals and objectives of Collier County as set forth in the Collier County Growth Management Plan. The community facilities of the First Assembly Ministries Education and Rehabilitation Campus PUD will be consistent with the growth policies, land development regulations, and applicable comprehensive planning objectives for the following reasons: The subject property is designated as Urban Residential Fringe on the Future Land Use Map of the Collier County Growth Management Plan, which permits the proposed land uses. The subject property is located at the northeast corner of the intersection between C.R. 951 and The Lord's Way. This strategic location allows the site superior access for the location of land uses for community and residential facilities, as permitted by the Future Land Use Element. This proposed rezoning is in the form of a Planned Unit Development as required by the Urban Residential Fringe Subdistrict. The proposed project will be responsible for all its necessary water management improvements, including the routing of all appropriate water through the project's water management system, as required by the Urban Residential Fringe Subdistrict. The project development is compatible and complementary to existing and future surrounding land uses as required in Policy 5.4 of the Future Land Use Element. Group Housing, which includes care units and adult living facilities, is permitted in the Urban Designated Areas per Policy 5.8 of the Future Land Use Element. Travel Trailer Recreational Vehicle Parks are permitted within this Urban Designated Area, since the project has direct access to an arterial roadway (C.R. 951) and is compatible with surrounding land uses, as required in the description of the Urban Designated Areas in the Future Land Use Element. Se The subject property's location in relation to existing or proposed community facilities and services permits the development's intensity of land uses as required in Objective 2 of the Future Land Use Element. The project shall be in compliance with all applicable County regulations including the Growth Management Plan. 10. All final local development orders for this project are subject to Division 3.15, Adequate Public Facilities, of the Collier County Land Development Code as set forth in Policy 3.1 of the Future Land Use Element. 11. The density of the TTRVC, care unit facility, and adult living facility shall be guided by the Land Development Code while the proposed 57 dwelling units and density of 1.5 dwelling units per acre for the multi-family units is in compliance with the Future Land Use Element of the Growth Management Plan based on the following relationships to required criteria: Maximum Permitted Density: Maximum Allowable Acreage Maximum Density Maximum Units Land Use 10.0 12.0 Units Per Acre 120 Campsites TTRVC Park 15.5 * 400 Rooms Adult Living Facility 15.5 * 400 Beds Care Unit Facility 38.1 1.5 Units Per Acre 57 Units Multi-Family 79.1 Total Acreage *Development standards and density are subject to Section 2.6.26 of the Land Development Code. Maximum allowable acreage and the number of units will not be exceeded. Residential density shall apply only to residential development tracts and not to tracts developed for non-residential purposes as required by Section 2.2.20.3.1 of the Land Development Code. SECTION I 1.1 1.2 1.3 1.4 1.5 PROPERTY OWNERSHIP AND DESCRIPTION PURPOSE The purpose of this Section is to set forth the location and ownership of the property, and to describe the existing conditions of the property proposed to be developed under the project name of First Assembly Ministries Education and Rehabilitation Campus PUD. LEGAL DESCRIPTION The subject property being 79.1+ acres, and located in Section 14, Township 50 South, and Range 26 East, is described as: The Southern half of the Northwest Quarter, less right-of-way, of Section 14, Township 50S, Range 26E, Collier County, Florida. PROPERTY OWNERSHIP The subject property is owned by the First Assembly of God Church, 2132 Shadowlawn Drive, Naples, Florida 34112. GENERAL DESCRIPTION OF PROPERTY AREA Ao The subject property is located at the northeast corner of the intersection between County Road 951 and The Lord's Way (unincorporated Collier County), Florida. Bo The property is currently vacant. The entire project site currently has PUD Zoning, except for the eastern 10.3-acre parcel being added and the 8.64 acres closest to the intersection of County Road 951 and The Lord's Way which is zoned United Methodist Church 951 PUD (PUD 93-3) and approved for a 20,000 square foot church. The entire project is proposed to be rezoned to a new PUD with the same name. PHYSICAL DESCRIPTION The elevation of the property is approximately 10' NGVD based on the USGS Belle Meade 7.5-Minute Quadrangle Map. The site is within Flood Zone "X" per Flood Insurance Rate Map (FEMA FIRM Panel #120067-0610-D date June 3, 1986). The predominate soil type of the site is #49-Hallandale and Boca Fine Sand according to the current Collier County Soil Maps. There is also an area in the Northwest corner of the site identified as #14 - Pineda Fine Sand, Limestone Substratum. The site vegetation is primarily hydric pine flatwoods with an area of cypress in the northwest corner of the property. The majority of the site has been heavily invaded with melaleuca trees; eradication of this exotic species onsite is underway as of the date of application of the PUD rezone package. 1.6 PROJECT DESCRIPTION The First Assembly Ministries Education and Rehabilitation Campus PUD will include a mixture of land uses for religious, community social services, and residential uses in a campus-type setting. This wide mixture of land uses is also intended to provide some services on-site, which will provide convenience for the many non-mobile residents and minimize traffic generation from the campus. The key facilities at build-out will include a maximum of: an auditorium for predominantly church use with 1800 seats, a chapel with 600 seats, a private school for 300 students in grades kindergarten through high school or Bible college, a child/adult care facility for 450 children/adults, a care unit facility with 400 beds, TTRVC for 120 travel trailer or park model lots, an adult living facility for 400 group housing units, and 57 multi-family units. If not all. of the 120 lots within the TTRVC or all of the 400 units of the adult living facility are constructed, those unused units would be replaced with multi-family units at a density of 1.5 units/acre. Some of the more visible accessory uses for residents and students include: numerous inside and outside recreational facilities, cafeterias, infirmary for residents and students, printing shop, a radio/television broadcasting studio, a 500-foot high radio/television tower, library, collection and distribution of used clothing and furniture, hair salon, labor pool for the on-site homeless, bus/vehicle maintenance garage, cemetery, and facilities management offices. The First Assembly Ministries Education and Rehabilitation Campus PUD intends to establish guidelines and standards to ensure a high and consistent level of quality for proposed features and facilities. Uniform guidelines and standards will be created for such features and facilities as landscaping, signage, lighting, roadway treatments, fences and buffers. Furthermore, a similar architectural theme will be maintained throughout the campus for all structures and signage, as described in Section 4.8B of this PUD Document. The Master Plan is iljustrated graphically on Exhibit "A", PUD Master Plan. A Land Use Summary indicating approximate land use acreage is shown on the plan. 1.7 1.8 PHASING PLAN The project is intended to be developed in 2 major phases with the first phase being initiated in 1999 At this time, Phase I is intended to be constructed for the following described uses: a care unit facility for 400 persons, TTRVC park for up to 120 units, children's weekly summer camp, 57 apartments, church with a chapel of 600 seats, adult living facility for up to 120 units, child/adult care for 225 children/adults, and a private school for 150 students. All of these principal use facilities may not be initially constructed to their limits, but would likely be constructed in several minor phases within Phase I. Phase II is planned at this time for the following: expansion of the child/adult care facility to 450 children/adults, expanding the adult living facility to 400 units, expanding the school to 300 students, and adding an auditorium that would seat 1800 persons beyond the 600 seats provided in the church chapel. Phase II would likely be initiated in three to four years with completion of the principal facilities by approximately the year 2003. SHORT TITLE This Ordinance shall be known and cited as the "First Assembly Ministries Education and Rehabilitation Campus Planned Unit Development Ordinance". SECTION II PROJECT DEVELOPMENT REQUIREMENTS 2.1 2.2 PURPOSE The purpose of this Section is to delineate and generally describe the project plan of development, relationships to applicable County ordinances, the respective land uses of the tracts included in the project, as well as other project relationships. GENERAL Ao Regulations for development of the First Assembly Ministries Education and Rehabilitation Campus PUD shall be in accordance with the contents of this document, PUD-Planned Unit Development District, applicable sections and parts of the Collier County Land Development Code and Collier County Growth Management Plan in effect at the time of local final development order or building permit application. Where these regulations fail to provide developmental standards, then the provisions of the most similar district in the Collier County Land Development Code shall apply. Bo Unless otherwise noted, the definitions of all terms shall be the same as the definitions set forth in the Collier County Land Development Code in effect at the date of adoption of this PUD. Co All conditions imposed and graphic material presented depicting restrictions for the development of the First Assembly Ministries Education and Rehabilitation Campus PUD shall become part of the regulations which govern the manner in which the PUD site may be developed. Unless specifically waived through any variance or waiver provisions from any other applicable regulations, the provisions of those regulations not otherwise provided for in this PUD remain in full force and effect. Development permitted by the approval of this petition will be subject to a concurrency review under the provisions of Division 3.15 Adequate Public Facilities of the Collier County Land Development Code at the earliest, or next, to occur of either Final Site Development Plan approval, Final Plat approval, or building permit issuance applicable to this development. 6 2.3 2.4 2.5 2.6 DESCRIPTION OF PROJECT PLAN AND PROPOSED LAND USES The project Master Plan is iljustrated graphically by Exhibit 'W', PUD Master Plan. Areas iljustrated as lakes on Exhibit "A" shall be constructed as lakes or, upon approval, parts thereof may be constructed as shallow depressions for water detention purposes. Such areas, lakes and dry areas shall be of the same general configuration and contain the same general acreage as shown by Exhibit "A". Minor modification to all areas, lakes or other boundaries may be permitted at the time of Preliminary Subdivision Plat or Site Development Plan approval, subject to the provisions of Section 2.7.3.5 of the Collier County Land Development Code or as otherwise permitted by this PUD Document. In addition to the various areas and specific items shown in Exhibit "A", easements such as (utility, private, semi-public, etc.) shall be established and/or vacated within or along the property, as may be necessary. RELATED PROJECT PLAN APPROVAL REQUIREMENTS Exhibit "A", PUD Master Plan, constitutes the required PUD Development Plan. Except as otherwise provided within this PUD Document, any division of the property and the development of the land shall be in compliance with the Subdivision Regulations and the platting laws of the State of Florida. The provisions of Division 3.3, Site Development Plans of the Land Development Code, when applicable, shall apply to the development of all platted tracts, or parcels of land as provided in said Division 3.3 prior to the issuance of a building permit or other development order. Appropriate instruments will be provided at the time of infrastructural improvements regarding any dedications and the methodology for providing perpetual maintenance of common facilities. AMENDMENTS TO PUD DOCUMENT OR PUD MASTER PLAN Amendments may be made to the PUD as provided in Section 2.7.3.5 of the Land Development Code. PROVISION FOR OFF-SITE REMOVAL OF EARTHEN MATERIAl The excavation of earthen material and its stock piling in preparation of water management facilities or to otherwise develop water bodies is hereby permitted. If after consideration of fill activities on those buildable portions of the project site are such that there is a surplus of earthen material, then its off-site disposal is also hereby permitted subject to the following conditions: Excavation activities shall comply with the definition of a 'development excavation' pursuant to Section 3.5.5.1.3 of the Land Development Code, whereby off-site removal shall be limited to 10% of the total calculated excavated volume to a maximum of 20,000 cubic yards. All other provisions of Division 3.5 Excavation of the Land Development Code are applicable. 3.1 3.2 3.3 3.4 SECTION III CAMPUS AREAS PLAN PURPOSE The purpose of this Section is to identify specific development standards for Tracts A, B, C, and D of the site as shown on Exhibit "A", PUD Master Plan. MAXIMUM PERMITTED DENSITY/INTENSITY Development on the project shall not exceed the following limits: a multi- purpose auditorium with 1800 seats, chapel with 600 seats, private kindergarten through high school or Bible college for 300 students, child/adult care for 450 children/adults, care unit facility for 400 persons on 15.4 acres, TTRVC for 120 travel trailer or park model lots only (at 12 lots/acre on 10 acres), adult living facility of 400 units on 15.4 acres, and 57 multi-family units (1.5 units/acre on 38.3 acres). If not all of the 120 lots within the TTRVC or all of the 400 units of the adult living facility are constructed, those units may be replaced with multi- family units at a density of 1.5 units/acre. GENERAL DESCRIPTION The PUD Master Plan has been designed to provide religious services, educational and rehabilitation social services, and residential homes within a Christian campus atmosphere. Generally the more aesthetic and least intensive land uses have been planned for the western half of the site. The 79.1+ acre site is located at the northeast corner of the intersection between County Road 951 and The Lord's Way. PERMITTED USES No building, structure or part thereof, shall be erected, altered or used, or land used, in whole or part, for other than shown below. Following the permitted use in parenthesis is the designated Tract(s) on the PUD Master Plan where such use is permitted. Accessory uses, shall be of such nature to serve the principal uses, on-site residents, and campus visitors directly associated with the principal uses. A. Permitted Principal Uses and Structures: 1. Church. (Tracts A, B, C, and D) Private school (kindergarten through high school or religious Bible college) (Tracts A, B, C, and D). Child care/adult day care center (Tracts A, B, C and D), Care unit facility (Tracts A and B), subject to Section 2.6.26 of the Land Development Code. Multi-Family units (Tracts A, B, C and D). Travel Trailer Recreation Vehicle Campground (residents must be directly involved with the campus facilities and no tent campsites permitted)(Tracts A and B). 7. Adult living facility/nursing home (Tracts A and B), subject to Section 2.6.26 of the Land Development Code. Permitted Accessory Uses and Structures: 1. J Se 10. Uses and structures that are accessory and incidental to the Permitted Uses within this PUD Document (Tracts A, B, C, and D). Guard house/campus security office (Tracts A, B, C, and D). Cafeteria (shall be an integral part of a principal use for on-site residents and visitors utilizing permitted principal uses on the campus only) (Tracts A, B, and C). Labor Pool (for on-site care unit residents only) (Tract A). Library (Tracts A, B and C). Collection and distribution of used clothing and furniture (within the care unit or facilities management building only) (Tract A). Infirmary (shall be an integral part of a principal use for on-site residents and students only) (Tracts A, B and C). Vehicle maintenance garage (to service vehicles providing campus bus and van transit only and to provide classes on vehicle maintenance) (Tract A). Overnight bus parking (for campus buses only or for buses whose passengers are utilizing permitted principal uses on the campus) (Tract A). Daytime bus parking (for campus buses only or for buses whose passengers are utilizing permitted principal uses on the campus). l0 3.5 Permitted in Tracts A, B, C, and D, with a minimum setback of fifty (50) feet from PUD boundaries and from the C.R. 951 Canal. 11. Pdnting shop (to serve permitted principal uses on the campus only) (Tracts A, B and C). 12. Recreational and church camp/youth ranch (Tracts C, and D). 13. Radio and television tower (a 500-foot guyed-tower (Tracts A, B, and that portion of D located east of the F.P.L. Easement). 14. Radio/television broadcasting studio (Tracts A, B and C). 15. Facilities management office (Tracts A, B and C). 16. Counseling center (Tracts A, B and C). 17. Conference/convention facilities (must be in nature with the campus religious, educational or recreational facilities) (Tracts A, B, C and D). 18. Hair salon (within the care unit, and facilities management building and adult living facilities only) (Tracts A and B). 19. Recreational facilities, including but not limited to: gymnasiums, football fields, baseball fields, soccer fields, basketball courts, swimming pools, tennis courts, shuffle board courts, waterways for canoeing, gazebo, boat/fishing docks, boardwalks, horse/pony /llama stables and children's petting zoo (Tracts A, B, C, and D). 20. Carports/garages (Tracts A, B, C and D). 21. Cemetery (Tracts A, B and D). 22. Any other accessory uses and structures deemed comparable in nature by the Development Services Director. DEVELOPMENT STANDARDS A. Minimum Yards: (1) Principal structures: (a) Yards Along C.R. 951- One hundred (100) feet. 1! (2) (b) Yards Along The Lord's Way - Thirty-five (35) feet plus one (1) foot for each foot of building height over thirty-five (35) feet. (c) Yards Along the Northern and Eastern PUD Boundaries - Thirty-five (35) feet plus one (1) foot for each foot of building height over thirty-five (35) feet. (d) Side Yards Between Two (2) Tracts Within the PUD - None, as long as the minimum building separation requirements are met as described in Section 3.5B. of this PUD Document. (e) Yards from the internal paved vehicular use areas - Ten (10) feet unless attached to carports, garages or porticos. (f) The radio/television tower will be separated from all property boundaries by a minimum distance of fifty percent (50%) of the tower height or certified fall zone radius, whichever is greatest. Accessory Structures: (a) Yards Along C.R. 951- Fifty (50) feet, except for fishing docks which have no setback requirements. (b) Yards Along The Lord's Way - Twenty-five (25) feet. (c) Yards Along the Northern and Eastern PUD Boundaries - Twenty-five (25) feet except ten (10) feet for guy-wire anchors. (d) Side Yards Between Two (2) Tracts Within the PUD - None. (e) Carports, garages and porticos are permitted within parking areas. ..Distance Between Principal Structures; (1) Fifteen (15) feet or one-half (1/2) the sum of their whichever is greater, unless the structures are attached. heights, Co (2) The radio/television tower shall be separated a minimum of its fall- zone radius from any residential structures housing residents on a permanent basis. No guyed wires shall be permitted over any residential structures housing residents on a permanent basis. Minimum Buildin,q/Unit Size: (1) Care unit facilities shall be a minimum of fifteen hundred (1500) square feet plus one hundred fifty (150) square feet per live-in person, beginning with the seventh (7th) live-in person. (2) Guardhouses, storage facilities, and other accessory structures shall not have to meet a minimum size requirement. (3) Care unit facilities shall be designed not to exceed a floor area ratio (FAR) of 0.45, as specified in Section 2.6.26 of the Land Development Code. (4) Child care centers/adult day care centers shall meet all applicable development standards of the Land Development Code. Maximum Hei,qht: (1) Church, adult living facility, and care unit facility shall be limited to sixty-five (65) feet. (2) All other buildings shall be limited to forty (40) feet. Travel Trailer Recreational Vehicle Camp.qround Requirements: The campgrounds, of an approximate 10 acres overall park size, shall meet all the TTRVC requirements described in Section 2.2.11 of the Land Development Code, unless specified differently within this PUD Document. The TTRVC park may be operated throughout the year, at the discretion of the property owner, but permanent residency shall not be permitted. TTRVC residents shall not occupy the same site more than six (6) consecutive months unless the residents are directly affiliated with an on-site religious or social program. TTRVC residents directly affiliated with an on-site religious or social program shall not occupy the same site more than twenty-four (24) consecutive months except for volunteer and paid staff. Accessory camping cabins are not permitted. All lots must be at least 2,800 square feet in size and utilized for travel trailer/park model lots only, and all lots shall permanently remain rental lots (not subdivided and sold). An annual report showing TTRVC residency shall be 13 submitted with the annually required PUD Monitoring report. Such TTRVC annual report shall show the following for each TTRVC site: name(s) of residents, residents' affiliation with any on-site programs and the length of such programs, status as volunteer or paid staff, and dates residents moved-in and moved-out. Off-Street Parking and Loadin.q Requirements: (1) Based on the requirements, that the campus be designed to promote residents and visitors to travel on-site as pedestrians or bicyclists and the campus management to provide bus/van transit for residents to the on-site Sunday church services and everyday convenient bus/van transit to off-site key traffic attractions, the parking for the following uses shall be as shown below: (a) Parking for the care-unit facility shall be one (1) space for each six (6) beds. (b) Parking for the church chapel and auditorium shall be one (1) space per four seats in the chapel or assembly area. (c) Parking for the vehicle and general maintenance building shall be one (1) space per seven hundred fifty (750) square feet. (d) Parking shall not be required for the on-site accessory recreational uses. (e) The Development Services Director may administratively approve joint parking in Tract C between the church and private school and/or child/adult care facility, similar to that described in Section 2.3.5.4 of the Land Development Code, where the applicant can demonstrate that the parking supply will suffice for all of the proposed uses at all times in Tract C. The credit for this joint parking shall not exceed fifty (50) percent of the required parking for the private school and/or child/adult care facility. (2) All other land uses shall meet the standards of Division 2.3 of the Land Development Code in effect at the time of building permit application. Open Space Requirements: 14 Ho A minimum of thirty (30) percent open space of the gross area for the entire PUD shall be devoted to open space, as described in Section 2.2.20.3.5 of the Land Development Code. The petitioner shall submit data at the time of each Site Development Plan application demonstrating that the subject parcel has a minimum of thirty (30) percent open space or that the subject parcel measured cumulatively with all previously developed parcels within the PUD totals a minimum of thirty (30) percent open space. Buffering Requirements: (1) A twenty (20) foot wide Type "D" Buffer shall be provided along County Road 951, with the landscaping as required in Section 2.4.7.4 of the Collier County Land Development Code. (2) A ten (10) foot wide Type "D" Buffer shall be provided along The Lord's Way with the landscaping as required in Section 2.4.7.4 of the Collier County Land Development Code. (3) A fifteen (15) foot wide Type "B" Buffer shall be provided along the eastern and northern PUD boundaries, with the landscaping as required in Section 2.4.7.4 of the Collier County Land Development Code. (4) Buffering between internal parcels of the campus shall not be required so as to encourage on-site pedestrian and bicycle traffic. (5) Buffering and landscaping shall be provided around the perimeter of the tower and anchors, per Section 2.6.35 of the Land Development Code. Si.~ns (1) As described in Section 2.5.5.2.4.1 of the Collier County Land Development Code the entire project shall be limited to one (1) pole or ground sign, with a maximum sign area of one hundred (100) square feet, a minimum fifteen (15) foot setback from all rights-of-way and easements, maximum height of twenty (20) feet, and with changeable copy permitted. (2) Signage shall also meet the architectural standards further described in Section 4.8B. of this PUD Document. 15 4.1 4.2 SECTION IV PRESERVE AREAS PLAN PURPOSE The purpose of this Section is to identify specific development standards for the Preserve Areas as shown on Exhibit "A", PUD Master Plan. PERMITTED USES No building, structure or part thereof, shall be erected, altered or used, or land used, in whole or part, for other than the following: A. Permitted Principal Uses and Structures: 1. Passive recreational areas including recreational shelters. 2. Biking, hiking, nature trails and boardwalks. 3. Water management structures. 4. Native preserves and wildlife sanctuaries. 5. Supplemental landscape planting, screening and buffering within the Natural Habitat Preserve Areas, after the appropriate environmental review. 6. Any other use deemed comparable in nature by the Development Services Director. 16 SECTION V DEVELOPMENT COMMITMENTS 5.1 5.2 5.3 PURPOSE The purpose of this Section is to set forth the regulations for the development of this project. GENERAL All facilities shall be construCted in strict accordance with Final Site Development Plans, Final Subdivision Plans and all applicable State and local laws, codes, and regulations applicable to this PUD. Except where specifically noted or stated otherwise, the standards and specifications of the official County Land Development Code shall apply to this project even if the land within the PUD is not to be platted. The developer, his successor and assigns, shall be responsible for the commitments outlined in this document. The developer, his successor or assignee, shall follow the PUD Master Plan and the regulations of this PUD as adopted and any other conditions or modifications as may be agreed to in the rezoning of the property. In addition, any successor or assignee in title, is subject to the commitments within this agreement. PUD MASTER PLAN Ao Exhibit "A", PUD Master Plan iljustrates the proposed development and is conceptual in nature. Proposed area, lot or land use boundaries or special land use boundaries shall not be construed to be final and may be varied at any subsequent approval phase such as Final Platting or Site Development Plan approval subject to the provisions of Section 2.7.3.5 of the Collier County Land Development Code, ad may be amended from time to time. Bo All necessary easements, dedications, or other instruments shall be granted to insure the continued operation and maintenance of all service utilities and all common areas in the project. 17 5.4 SCHEDULE OF DEVELOPMENT/MONITORING REPORT 5.5 A Site Development Plan shall be submitted per County regulations in effect at time of site plan submittal. The project is proposed to be completed in several phases. The landowners shall proceed and be governed according to the time limits pursuant to Section 2.7.3.4 of the Land Development Code. B. Monitoring Report: An annual monitoring report shall be submitted pursuant to Section 2.7.3.6 of the Collier County Land Development Code. WATER MANAGEMENT 5.6 Excavation permits will be required for the proposed lakes in accordance with Division 3.5 of the Collier County Land Development Code, as amended. Excavated material from the property is intended to be used within the project site. Detailed paving, grading and site drainage plans shall be submitted to Engineering Review Services for review. No construction permits shall be issued unless and until approval of the submitted plans is granted by Engineering Review Services. In accordance with the Rules of the South Florida Water Management District (SFWMD), this project shall be designed for a storm event of 3- day duration and 25-year frequency. Design and construction of all improvements shall be subject to compliance with the appropriate provisions of Division 3.2 of the Collier County Land Development Code. Use of grassed surface with a stabilized subgrade, shall be limited to the parking spaces. All parking aisles serving required parking spaces shall be paved. Pdor to Final SDP approval a Big Cypress Basin (SFWMD) Right-of-way Permit, to allow discharge into the C.R. 951 Canal, shall be submitted. UTILITIES Water distribution, sewage collection and transmission, and interim water and sewage treatment facilities to service the project are to be designed, 18 5.7 constructed, conveyed, owned and maintained in accordance with Collier County Ordinance No. 88-76, as amended, and other applicable County rules and regulations. All customers connecting to the water distribution and sewage collection facilities to be constructed will be customers of the County and will be billed in accordance with the County's established rates. Should the County not be in a position to provide water and/or sewer service to the project, the water and/or sewer customers shall be customers of the interim utility established to service the project until the County's off-site water and/or sewer facilities are able to serve the project. Co It is anticipated that the County Utilities Division will ultimately supply potable water to meet the consumptive demand and/or receive and treat the sewage generated by this project. Should the County system not be in a position to supply potable water to the project and/or receive the project's wastewater at the time development commences, the Developer, at his expense shall install and operate interim water supply and/or interim on-site sewage treatment and disposal facilities adequate to meet all requirements of the appropriate regulatory agencies. An agreement shall be entered into between the County and the Developer, binding on the Developer his assigns or successors, regarding any interim treatment facilities to be utilized. The agreement must be legally sufficient to the County prior to the approval of construction documents for the project and be in conformance with the requirements of Collier County Ordinance No. 88-76, as amended. Do If an interim on-site water supply, treatment and transmission facility is utilized to service the project, it must be properly sized to supply average peak day domestic demand, in addition to fire flow demand at a flowrate approved by the appropriate fire control district serving the project area. Public Service Commission Territories: Prior to approval of the construction documents by the County, the Developer must present verification that the Florida Public Service Commission has granted territorial rights to the Developer to provide sewer and/or water service to the project until the County can provide these services through its water and sewer facilities. TRAFFIC Ao Improvements to The Lord's Way shall be detailed at the Site Development Plan stage. Paving and drainage requirements will be as required by Appendix B of the Collier County Land Development Code for 19 Do Eo a collector street within a sixty (60) foot right-of-way. Improvements to the C.R. 951 Canal crossing may be required during permitting with the Big Cypress Basin and shall be in conformance with the requirements of the Big Cypress Basin Board. At a minimum, the roadway crossing shall be upgraded to at least 36 feet of pavement to accommodate two way traffic as well as a left turn lane. Guardrails shall be provided if the culvert end walls are coincident with the edge of the shoulders. The actual design shall be reviewed by the Collier County Transportation Services Department prior to final approval. The Developer shall provide a right turn lane and a left turn lane at the The Lord's Way/CR-951 intersection prior to the issuance of any Certificates of Occupancy. Ordinance 93-64 (Section IIl.A.l.b.(1) sets forth the requirements for this left turn lane. The Developer shall provide a fair share contribution toward the capital cost of a traffic signal at the CR-951 access location when deemed warranted by the County. Prior to making this determination, the petitioner shall provide a traffic signal warrant analysis prepared by a Professional Engineer familiar with the warrant analysis procedure. Such study shall be signed and sealed by the professional engineer preparing it. This Department reserves the right to review and advise the Board of County Commissioners as to whether or not any such signal is warranted. The signal will be owned, operated, and maintained by Collier County. The Developer shall provide arterial level street lighting at the project access points onto The Lord's Way and at The Lord's Way's access onto C.R. 951 prior to the issuance of any Certificates of Occupancy. Road impact fees shall be as provided in the schedule contained in Division 4.1 of the Collier County Land Development Code, as may be amended, and shall be paid at the time building permits are issued unless otherwise approved by the Board of County Commissioners (BCC). Access improvements shall not be subject to impact fee credits, and excluding traffic signals, shall be in place prior to the issuance of any certificates of occupancy. A full median opening at the intersection of C.R. 951 and The Lord's Way is consistent with the location criteria of the County's Access Management Policy. However, there shall be no right vested in this development toward the preservation of that median opening. Any such median opening should be the subject of an application for a Work Within The Right-of-Way Permit and shall meet all of the requirements of the Access Management Plan. The County 2O 5.8 5.9 reserves the right to modify any median opening if, in the County's opinion, an operational or safety hazard becomes evident. Go All traffic control devices, excluding street name signs, shall conform with the Manual of Uniform Traffic Control Devices. PLANNING Ao Pursuant to Section 2.2.25.8.1 of the Land Development Code, if during the course of site clearing, excavation or other construction activity an historic or archaeological artifact is found, all development within the minimum area necessary to protect the discovery shall be immediately stopped and the Collier County Code Enforcement Department contacted. All buildings, signage, landscaping and visible architecture infrastructure shall have a similar architectural theme and be aesthetically unified. Said similar architectural theme shall include: a similar architectural design and use of similar materials and colors throughout all of the buildings, signs, and walls to be erected on the site. Landscaping and streetscape materials shall also be similar in design throughout the site. A conceptual design master plan shall be submitted concurrent with the first application for Site Development Plan approval demonstrating compliance with these standards. The care unit facility may be eligible for impact fee waivers or deferrals with approval of the Board of Collier County Commissioners. The church or school shall be made available to the Supervisor of Elections for a poll site. Residential density shall apply only to development tracts being developed as residential and not to tracts developed for non-residential purposes, per Section 2.2.20.3.1 of the Land Development Code. ENVIRONMENTAL This PUD shall be in compliance with the Collier County Land Development Code and the Growth Management Plan Conservation and Coastal Management Element in effect at the time of final development order approval. An exotic vegetation removal, monitoring and maintenance (exotic free) plan for the site, with emphasis in the conservation/preservation areas, Co Do shall be submitted to Current Planning Environmental Staff for review and approval prior to final site plan/construction plan approval. Environmental permitting shall be in accordance with the State of Florida Environmental Resource Permit Rules and be subject to review and approval by Current Planning Environmental Staff. Removal of exotic vegetation alone, shall not be the sole component of mitigation for impacts to Collier County jurisdictional wetlands. Buffers shall be provided around wetlands, where possible, extending at least fifteen (15) feet landward from the edge of wetland preserves in all places and averaging twenty-five (25) feet from the landward edge of wetlands. Where natural buffers are not possible, structural buffers shall be provided in accordance with the State of Florida Environmental Permit rules and be subject to review and approval by Current Planning Environmental Staff. Petitioner shall minimize the effects of the tower on wildlife in conformance with F.A.A. regulations. 22 ['X~"rlNG CR-151 C. ANN. p.J = EXHIBIT 'C' 35' ROADWAY AREA 10' _ 2[ 2' 10' 10' 2'. 9' 10' ~"UT,LITY ESM'T. I'(TYP-.---1= ....//CONCRETE/- 1-1/2" ASPHALT,CJ;'(Ty~:. S-,,,) '-:ilijj VALLEyI :GUTTER4' ::_.4' .-"-UTILITY ESM'T. 4 .2% SLOP~._E / =2% SLOPE I 2~ SLOPE /I (TYP.) ~% SLOPE D? ~.,' / / / J / / / ,. / / / / / .' (' ) VARIES j' ~ SUBGRADE SIDEWALK_/ WATER MAIN-./ k SANITARY SEWER TYPICAL INTERNAL ROAD SECTION FOR TTRVC LOTS N.T.S. Date: September !5, !996 I II II Keene. Engineering 240 Aviation Drive North Naples, Florida .t4104 ',',,, (~,4,) ~o3-o~23 STATE OF FLORIDA) COUNTY OF COLLIER) I, DWIGHT E. BROCK, Clerk of Courts in and for the Twentieth Judicial Circuit, Collier County, Florida, do hereby certify that the foregoing is a true copy of: ORDINANCE NO. 99-59 Which was adopted by the Board of County Commissioners on the 14th day of September, 1999, during Regular Session. WITNESS my hand and the official seal of the Board of County Commissioners of Collier County, Florida, this 16th day of September, 1999. DWIGHT E. BROCK Clerk of Courts and Ex-officio to Board County Commissioners By: Ellie ~of fman, Deputy Clerk