Loading...
Ordinance 90-069 ORDINANCE 90- 69 AN ORDINANCE AMENDING ORDINANCE NUMBER 82-2 THE COMPREHENSIVE ZONING REGULATIONS FOR THE UNINCORPORATE~ AREA OF COLLIER COUNTY, FLORIDA BY AMENDING THE OFFICIAL ZONING ATLAS MAP NUMBER 49-26-3; BY CHANGING THE ZONING CLASSIFICATION OF THE HEREIN DESCRIBED REAL PROPERTY FROM "E" ESTATES TO "PUD" PLANNED UNIT DEVELOPMENT KNOWN AS ASTRON PIQ%ZA FOR A COMMERCIAL ~ :~' OFFICE PARK ON PROPERTY BORDERED TO THE NORTH BY PINE RIDGE ROAD (C.R. 896), TO THE EAST BY OAKS BOULEVARD, TO THE SOUTH BY 10TH STREET S.W. AND TO THE WEST BY THE D-2 CA~IAL, LOCATED IN SECTION 17, TOWNSHIP 49 SOUTH, RANGE 26 EAST, COLLIER COUNTY, FLORIDA, CONSISTING OF 7.6+ ACRES; AND BY PROVIDING AN EFFECTIVE DATE. WHEREAS, Pamela S. Mac'Kie of Cummings & Lockwood, representing Astron Development of Naples, Inc., petitioned the Board of County Commissioners to change the zoning classification of the herein described real property; NOW, THEREFORE BE IT ORDAINED by the Board of County Commissioners Of Collier County, Florida: The Zoning Classification of the herein described real property located in Section 17, Township 49 South, Range 26 East, Collier County, Florida, is changed from "E" Estates to "PUD" Planned Unit Development in accordance with the PUD document, attached hereto as . Exhibit "A" which is incorporated herein and by reference made part hereof. The Official Zoning Atlas Map Number 49-26-3, as described in Ordinance Number 82-2, is hereby amended accordingly. This ordinance shall become effective upon receipt of notice from the Secretary of State that this Ordinance has been filed with the Secretary of State. DATE: September 11 1990 BOARD OF COUNTY COMMISSIONERS , .- COLLIER COUNTY, FLORIDA ATT'~.ST: BY: JAMES C. GILES, CLERK MAX&'~. HASSE,/JR'.~ ~HAIR~A'N APPROVED AS TO FORM AND LEGAL SUFFICIENCY .~re~Qr'y of Stqge'sOfflc, e,.~ 3'85 ASSISTANT COUNTY ATTORI~EY R-90-19 ORDINANCE ASTRON PLAZA PLANNED UNIT DEVELOPMENT PROJECT SIZE AND LOCATION: 7.6 ACRES LOCATED IN SECTION 17, TOWNSHIP 49 SOUTH, RANGE 26 EAST COLLIER COUNTY, FLORIDA ASTRON DEVELOPMENT OF NAPLES, INC. 800 LAUREL OAK DRIVE, SUITE 203 NAPLES, FL 33963 PREPARED BY: COASTAL ENGINEERING CONSULTANTS, INC. 3106 S. HORSESHOE DRIVE NAPLES, FL 33942 CEC FILE NO. 90.117 REVISED DATE: AUGUST 15, 1990 PUBLIC HEARINGS: EAC: WMAB: CCPC: BCC:'9/11/90 ORDINANCE NUMBER: 90-69 BOOK ~,~9 PA~[ 386 EXHIBIT "A" INDEX Paae Executive Summary & Statement of Compliance SECTION I - PROPERTY OWNERSHIP AND DESCRIPTION 1.1 Legal Description I-1 1.2 Property Ownership I-2 1.3 General Description of Project Area I-2 1.4 Physical Description I-2 SECTION II - PROJECT DEVELOPMENT 2.1 General II-1 2.2 Project Development and Land Use II-1 2.3 Project Plan II-2 2.4 Project Phasing II-2 2.5 Site Development Plan Approval II-2 SECTION III - PERMITTED USES AND STANDARDS 3.1 Permitted Principal and Accessory Uses III-1 3.2 Development Standards III-1 SECTION IV - DEVELOPMENT COMMITMENTS 4.1 General IV-1 4.2 Streets IV-1 4.3 Water Management Regulations IV-2 4.4 Utilities, Water, and Wastewater IV-3 4.5 Utilities, Power, Telephone and CATV IV-5 4.6 Solid Waste Management IV-6 4.7 Environmental Regulations IV-~ 4.8 Subdivision Standards IV-7 4.9 Transportation Stipulations IV-8 EXHIBITS A. Conceptual PUD Master Plan, 8-1/2" x 11" - Exhibit "A" B. Typical Roadway Section, 8-1/2" x 11" - Exhibit "B" EXECUTIVE SUMMARY The purpose of this document is to set forth the permitted uses and regulations for Astron Plaza, a Planned Unit Development intended to provide office facilities to the professional community. By submittal of this document, the Petitioner is requesting to rezone 7.6 acres from Estates (E) to a Planned Unit Development (PUD). Subject property is included in the Pine Ridge/I-75 activity center as set forth in the newly adopted Collier County Growth Management Plan. Astron Plaza will utilize the existing vegetation and other native species within a thirty (30) foot landscape buffer on the south property line. This buffer will maintain the integrity of the neighborhood to the south. Access to the project will be limited to Oaks Boulevard. Astron Plaza will consist of four parcels. One parcel will initially be utilized for an interim wastewater treatment plant that will be decommissioned at such time as County sewage collection becomes available. STATEMENT OF COMPLIANCE This project is in compliance with the goals and objectives of the Growth Management Plan as defined by the Future Land use Element. The Future Land Use Element designates the subject area as the southeast corner of the Interstate Activity Center. The permitted uses in this project are allowed within Activity Centers. Development standards provided herein will ensure compatibility with surrounding developments. ' Ail improvements shall be in compliance with applicable regulations. Access to the site shall be limited so as to limit adverse impacts on the highway network and to ensure safe ingress/egress. PROPERTY OWNERSHIP AND DESCRIPTION ~ LEGAL DESCRIPTION .e s crt pti on of land su~-~; eyed being a part of Tract 10, Tract 25 and Tract 26 of Golden Gate Estates, Unit No. 33 (P.B. 6, Page 70), Collier County, Florida, containing 7.63 acres more or less as follows: All that part of Tract 10 of Golden Gate Estates Unit No. 33 according to the plat thereof as recorded in Plat Book 6, Page 70, Public Records of Collier County, Florida; LESS AND EXCEPTING therefrom the parcel descried as Parcel 138 in Official Records Book 850, page 1597, Public Records of Collier County, Florida; subject to easements and restrictions of records; containing 1.59 acres more or less; AND All that part of. Tract 25 of Golden Gate Estates Unit No. 3~ according to the plat thereof as recorded in Plat Book 6, Page 70, Public Records of Collier County, Florida; LESS AND EXCEPTING therefrom that parcel described as Parcel l13-R in Official Records Book 970, Page 705, Public Records of Collier County, Florida; subject to easements and restrictions of record; containing 2.94 acres more or less: All that part of Tract 26 of Golden Gate Estates Unit No. 33 according to the plat thereof as recorded in Plat Book 6, Page 70, Public Records of Collier~ County, Florida; LESS AND EXCEPTING therefrom that parcel described as Parcel 139 in Official Records Book 850, Page 1598, Public Records of Collier County, Florida; 39,, ,389 subject to easements and restrictions of record; containing 3.10 acres more or less. ~ PROPERTY OWNERSHIP The subject property is currently under the ownership of The " Vineyards ~nterchange Partnership, A Florida General Partnership consisting of the following: Ross W. McIntosh, Trustee 1391 Third Street S. Naples, FL 33940 Scott M. Pritchard 4861 12 Avenue SW Naples, FL 33999 S.W. Pritchard Jr. and Beatrice H. Pritchard Rt. 2, Box 741 Husband a nd Wife as an Arcadia, FL 33821 Estate by the Entirety Donald A. Gerth and Elizabeth C. Gerth 27721 Forrester Dr. SW Husband and Wife as an Bonita Springs, FL 33923 Estate by the Entirety 1.3 GENERAL DESCRIPTION OF PROJECT AREA 1.3.1 The project site contains 7.63 acres located in Section 17, Township 49 South, Range 26 East, Collier County, Florida. Said parcel is bordered to the north by Pine Ridge Road, to the east by Oaks Boulevard, to the south by 10th Street SW and to the west by the 1-75 Canal adjacent to Interstate 75. 1.3.2 The current zoning classification of the property is E - Estates District. 390 1.~ PHYSICAL DESCRIPTION The physical characteristics of the site include a minute parcel of scrub cypress to the northeast (0.2 acres) with the majority of the site being upland consisting mainly of the following species: CANOPY slash pine Pinus elliotti cypress Taxodium distichum cabbage palm Sabal palmetto_ SUBCANOPY wax myrtle Myrica cerifera dahoon holly Ile× cassin~ Brazilian pepper $ch~Dus tereblDthifolius winged sumac Rhus coDallina strangler fig F icus aurea staggerbush Lyonia ferru~inea GROUND COVER, INCLUDING EPIPHYTES AND VINES bamboo vine ~lax laurifolia common air plant Tillandsia fasciculata spanish moss Tillandsia usneoides sedge CvDerus stri~osis bog buttons Lachnocau!op spp. broom s. edge ~dropoqon qlomeratus ; love vine Cassvtha fil iformis caesar weed ~rena ~0bat~ poison ivy To×icodendron radicans muscadine grape Vitis rotundifolia tickseed CoreoDsis ~ladiata reindeer lichen Cladonia. spp. contadina Contadina cane. scens finger grass Chloris petrae...~ golden polypody Phlebodium aureum Elevations within the project range from approximately 11.0 feet N.G.V.D. to 12.0 feet N.G.V.D. Existing drainage is to the west to the 1-75 canal. Native soil types in the area are Keri fine sand, Arzell fine sand, and Charlotte fine sand. Soil characterist'ics were derived from the soil survey of Collier County, Florida, issued by the U.S. Department of Agriculture in 1954. SECTION II PROJECT DEVELOPMENT Regulations for development of Astron Plaza shall be in accordance with the contents of this PUD Ordinance, and the Collier County Zoning Ordinance, with exceptions as approved by this ordinance. All terms shall be as defined in the "Collier County Zoning Ordinance" unless otherwise noted. 2.2 PROJECT DEVELOPMENT AND LAND USE 2.2.1 Ail necessary easements, dedications, or other instruments shall be granted to ensure the continued operation and maintenance of all service utilities. .~' The petitioner or any subsequent owners shall provide for maintenance o f any common open space, drainage, ~" f~cilities, lakes, recreational areas, natural areas or any other amenities associated with the proposed "' development. Prior to completion of the project all commitments in this PUD document shall be met by the developer or his designee. If certain commitments are to be met during the final phase of construction, adequate provisions shall be established to assure that all commitments are met by the developer or his designee at the time of completion of this project. II-1 2.2.2 Any variation in the master plan under =his section shall be pursuant to all thQ DQvelopment Regulations as outlined in Section 3.2 of this PUD Document and subject to 7.27j of the Zoning Ordinance 82-2. ~ PROJECT PLAN Astron Plaza PUD Master Plan, Exhibit "A" constitutes the PUD Master Plan. ~_~ pROJECT PHASING Specific project phasing is not anticipated for Astron Plaza. Project buildout will be dictated by market demand. 2.5 SITE DEVELOPMENT PLAN APPROVAL Prior to the recording of the Record Plat, final plans of the required improvements and buffering shall receive the approval of all appropriate Collier County governmental agencies to insure compliance with the P.U.D. Master Plan, The Subdivision Master Plan, the County Subdivision Regulations and the platting laws of the State of Florida and utility regulations. 2.5.1 The developer of any tract or parcel subsequent to subdivision shall be required to submit and receive approval of a site development plan in conformance with the requirements established within Section 10.5 of the Zoning Ordinance. I1-2 · 393 SECTION III PERMITTED USES AND STANDARDS PERMITTED PRINCIPAL AND ACCESSORY USES No building or structure, or part thereof, shall be erected, a~tered or used, or land used in whole or part, for other than the following. 3.1.1 Permitted Principal Uses and Structures Tracts 1, 2, 3 and 4 ~ a. Drive-in bank or financial institution. b. Offices, business and professional, including a restaurant not to exceed 2,000 sq. ft.; advertising and outside signage shall not be permitted for a restaurant. c. Day care center. d. Interim wastewater treatment facility (Tract 3 only) . e. Open space. f. Water management facility and essential servicesi road, water, sanitary sewer, etc. 3.1.2 Permitted Accessory Uses and Structures Accessory uses and structures customarily associated with the permitted principal uses will be allowed. ~_~ DEVELOPMENT STANDARDS The development standards provided herein apply to Tracts 1 .i through 4 unless specifically noted otherwise. There will be no more than 4 tracts, with a maximum floor area not to exceed ~i 110,000 square feet. ~ 1. Minimum Lot Area - Thirty-nine Thousand (39,000) SF 2. Minimum Lo~ Width - One Hundred Fifty (150) feet III-1 39 , 394 3. Minimum Yard Requirements (a) Front Yard - fifteen (15) feet from the internal road right-of-way or road easement line. (b) Side Yard - one-half (1/2) of building height with a 10' minimum. (c) Building setback from the Pine Ridge Road and Oaks Boulevard right-of-way -Twenty-five (25) feet. (d) Building setback from the 1-75 Canal easement - Twenty-five (25) feet. (e) Building setback from 10th Avenue SW right-of- way - Fifty (50) feet. 4. Distances Between Principal S~n4ctures - Fifteen (15) feet or a distance equal to one-half (1/2) the sum of the building heights, whichever is greater. 5. Maximum Height - Thirty-five (35) feet. 6. M~nimum Floor Area of ?ri~ipal Structure: One Thousand (1,000) square feet per building on the ground floor. 3.2.1 The prgposed on-site wastewater treatment and disposa~ facilities are to be constructed as part of the proposed project and shall be regarded as interim. They shall be constructed to Local, State and Federal standards and are to be owned, operated and maintained by the Developer, his assigns or successors until such time as the County's off-site sewer facilities are available to service the project. The interim treatment facilities shall supply services only to those lands owned by the Developer and approved by the County for development. The utility facility(ies) may not be expanded to provide sewer service outside the development boundary approved by the County without written consent of the County. Tract 3 will be reserved for an interim on-site wastewater treatment facility. This tract of land will revert to the permitted principal uses when the wastewater treatment facility is decommissioned. Wastewater Treatment Plant (WWTP) Development Standards: (a) Yard Requirements for WWTP: 50' (all yards). (b) WWTP Buffer Requirements: 10' landscape buffer along the east, south and west perimeter and 20' along the north perimeter, in accordance with Section 8.37 of the Zoning Ordinance. (c) Absorption Beds Buffer Requirements: 10' landscape buffer around all perimeters of the site in accordance with Section 8.37 of the Zoning Ordinance. (d) The vegetative buffer placed around the treatment plant and ponds shall be located in a manner so as not to affect the proper operation of the treatment process. (e) The land application site shall De located away from any drainage ditch and/or swale that may affect the proper operation of the land disposa~ site. There will be a berm surrounding the treatment site, a minimum of four feet above effluent level in the absorption beds. A continuous hedge of shrubs shall be planted on Tract 3 property lines. All shrubs are to be cold hardy and a minimum of 36" in height. The shrubs on the north side of Tract 3 must be 10 gallon size with a minimum of 54" in height. All shrubs are to be planted on 36" centers. Trees must be cold hardy and have a minimum height of 7 feet with a 3 foot spread. The trees on the north side of Tract 3 must have a minimum height of 8 feet with a 4 foot spread and must be evergreen so not to drop all III-3 their foliage during the winter season. An example of the evergreen tree is a Live Oak. Trees will be planted on an average of 25 foot centers. When the wastewater treatment facility is decommissioned and Tract 3 reverts to the permitted principal uses, these buffer/landscape design criteria will no longer be in effect. The buffer/landscape requirements for Tract 3 will then be as required in Section 8.30 of the Zoning Ordinance 82-2 latest amendments, and this document. 3.2.2 A landscape buffer shall be provided along the south property line adjacent to Tenth Avenue SW and partially along the east property line adjacent to Oaks Boulevard. Said landscape buffer shall be in accordance with Section 8.37 of the Zoning Ordinance, except the buffer shall be a minimum of 30' in width. Water management facilities are not permitted within this buffer area. (Also see Section 4.7, Environmental Regulations). 3.2.3 Signs will be allowed as permitted by the Collier County Sign Ordinance 89-60 and latest amendments and as may be regulated by deed restrictions and covenants. 3.2.4 Minimum landscaping requirements shall be met as required in Section 8.30 of the Zoning Ordinance 82-2 and latest amendments and as may be required around the WWTP/Tract 3 site. 3.2.5 Minimum off-street parking and off-street loading requirements shall be met as required in Section 8 of the Zoning Ordinance 82-2 and latest amendments. 3.2.6 Lighting: All lights shall be located and oriented in such a manner so as not to produce glare onto adjacent roadways or nearby properties. III-4 3.2.7 Prior to any site plan approvals or the sale of any fractional part of the project/site, the owners shall establish and record covenants and/or deed restriction applicable to all of the properties under this PUD. These covenants and/or deed restrictions shall set one consistent theme for architectural design and signage so that all individual parcel developments shall have compatible character, color schemes, roof materials, and signage design. Said regulations, covenants, and/or deed restrictions shall be of acceptably high standards and shall be enforced by the owner and developer SECTION IV DEVELOPMENT COMMITMENTS 4.1 GENERAL It is the Developer's intent to adhere to sound planning principles and practices and to assure that project facilities are constructed in accordance with the final development plan as approved by all applicable municipal agencies, and in accordance with federal, state and local laws, codes, and regulations. 4.2 STREETS ':': 4.2.1 Streets shall be private and located within a sixty (60) i' foot easement. Project design and construction shall ~': meet or exceed Collier County standards in effect at the .; i~i''~ time of construction plan approval. The Developer shall comply with the "Road Impact Fee Ordinance" County Ordinance No. 85-55 and realizes that the fee shall be paid to the County Manager, or his designee, or an agreement for payment approved by the County Manager, or his designee, prior to issuance of any building permits. !'ii" 4.2.2 Ail traffic control devices used, excluding street signs, ~'~ shall conform with the Manual on Uniform Traffic Control Devices (Chapter 316.0747 Florida Statutes). 4.2.3 There shall be only one point of access to the project from Oaks Boulevard and it shall be approximately centered on that frontage. 4 2.4 The developer shall provide an east bound right turn lane on Pine Ridge Road and a south bound right turn lane on Oaks Boulevard at the project entrance. 4.2.5 The developer shall provide collector level street lighting at the project entrance. 4.2.6 The above improvements are considered "site related" as defined in Ordinance 85-55 and shall not be applied as credits toward any impact fees required by that ordinance. They shall be in place before any certificate of occupancy are issued. Payment of Impact fees shall be in accordance with the fee schedule as set forth in ordinance 85-55 4,~ WATER MANAGEMENT REGULATIONS 4.3.1 An excavation permit will be required for the proposed detention area in accordance with Collier County Ordinance No. 88-26 and South Florida Water Management District. 4.3.2 A minimum of 200 feet separation shall be provided between the retention areas and the sewer treatment plant absorption beds, in accordance with South Florida Water Management District rules. 4.3.3 Detailed landscape and water management plans and water management calculations shall be submitted to show that the required quantity of water can be provided in the area jointly used as a landscape and drainage easement. i.,-i ?v-2 ' 4.4 UTILITIE$~ WATER AND WASTEWATER · 4.4.1 Water distribution, sewage collection and transmission · and interim water and/or sewage treatment facilities to ~* serve the project are to be designed, constructed, ~ conveyed, owned and maintained in accordance with Collier ~ County Ordinance No. 88-76, as amended, and other · .. applicable County rules and regulations. %~.. 4.4.2 All customers connecting to the water distribution and ,%' sewage collection facilities to be constructed will be ~ customers of the County and will be billed by the County in accordance with the County's established rates. Should ~'" the County not be in a position to provide water and/or '. sewer service to the project, the water and/or sewer .... customers shall be customers of the interim utility established to serve the project until the County's off- site water and/or sewer facilities are available to serve !.i~ the project. ~'; 4.4.3 It is anticipated that the County Utilities Division will ~:'~ ultimately supply potable water to meet the consumptiv~ ~'~' demand and/or receive and treat the sewage generated by this project. Should the County system not be in a position to supply potable water to the project and/or receive the project's wastewater at the time development commences, the Developer, at his expense will install and operate interim water supply and on-site treatment facilities and/or interim on-site sewage treatment and '~' disposal facilities adequate to meet all requirements of ~.· the appropriate regulatory agencies. Such facilities will ':" be adequately buffered and landscaped. An agreement ~:i shall be entered into between the County and the ~' Developer, binding on the Developer, his assigns or successors regarding any interim treatment facilities to % be utilized. The agreement must be legally sufficient to the County, prior to the approval of construction IV-3 documents for the project and be in conformance with the requirements of Collier County Ordinance No. 88-76, as amended. 4.4.4 If an interim on-site water supply, treatment and transmission facility is utilized to serve the project, it must be properly sized to supply average peak day domestic demand, in addition to fire flow demand at a rate approved by the appropriate Fire Control District servicing the project area. 4.4.5 Extension of the off-site water distribution system to serve the project shall be coordinated with Collier County to extend the 16" water main from the present temporary end on Napa Boulevard to the north right-of-way line on Pine Ridge Road, as provided by the Vineyards PUD water transmission/distribution master plan. From this point the Developer shall install a 16 x 16 x 16 x 12 cross with a 16" stub and valve to the east and to the west. A 12" water main extension shall be jack and bored under Pine Ridge Road and terminate at the south right- of-way.~ At that terminus, the Developer shall install ~ 12 x 12 x 8 tee with a 12" stub and valve to the east. The 8" water main extension shall be jack and bored under Oaks Boulevard to service the project. 4.4.6 The utility construction documents for the project's sewerage system shall be prepared to contain the design and .construction of the on-site force main which will ultimately connect the project to any future central sewage facilities of the District. It must be interconnected to the pump station with appropriately located valves to permit for simple re-direction of the project's sewage when connection to the County's central sewer facilities becomes available. IV-4 4.4.7 Prior to approval of construction documents by the County, the Developer must present verification, pursuant to Chapter 367, Florida Statutes, that the Florida Public Service Commission has granted territorial rights to the Developer to provide sewer and/or water service to the project until the County can provide these services through its water and sewer facilities. 4.4.8 The existing off-site water facilities of the District must be evaluated for hydraulic capacity to serve this project and reinforced as required, if necessary, consistent with the County's Water Master Plan to insure that the District's water system can hydraulically provide a sufficient quantity of water to meet the anticipated demands of the project and the District's existing committed capacity. 4.4.9 Appropriate easements for the projects internal water and sewer system shall be documented on the construction plans and shall be dedicated to the Collier County Water- Sewer District. 4.4.10 Construction drawings, technical specifications and all pertinent information shall be submitted in accordance with the Collier County Ordinance 88-76 and shall be approved prior to the issuance of building permits. 4.5 UTILITIES, POWER. TELEPHONE AND CATV Power, Telephone, Cable Television and any additional utilities that may initially or at some future date serve the project, shall be installed as per County Ordinance No. 76-6 Article XI, Section 19, Utilities, and in compliance with any other applicable state or county laws, codes, and regulations. SOLID WASTE MANAGEMENT Solid waste management shall be assigned to a County franchised hauler who shall be responsible for the collection and disposal of all solid waste generated by this development. 4.7 ENVIRONMENTAL REGULATIONS 4.7.1 Petitioner shall be subject to Ordinance 75-21 as amended by Ordinance No. 89-58 and Ordinance No. 82-2 as amended by Ordinance. 89-49 (Preservation of Native Habitat and Tree Removal Permit). Preservation of vegetation shall be subject to the following: a. Retention of existing native vegetation in the green space areas and landscaping. Specifically, saw palmetto cjusters shall be utilized in landscaping. b. Native woody vegetation harboring protected epiphytes that cannot be retained shall be incorporated into the southern 30 foot buffer or landscaping by transplanting. In addition, native woody vegetation, greater than or equal to 6 feet in height shall be transplanted to meet County landscaping requirements and to obtain the required 80% buffer opacity. c. A thirty (30) foot native species vegetative buffer along the entire southern boundary shall extend to the southeast corner and taper off along the east, southeast boundary. The thirty (30) foot native species vegetative buffer shall be retained, enhanced and maintained. Any areas of vegetation within the buffer zone that must be impacted due to the proposed drainage swale shall be compensated for.by increasing the buffer zone area 1:1. 4.7.2 Petitioner shall comply with Ordinance No. 82-37 as amended by Ordinance No. 89-53 (Removal of Exotic Species). Prior to the Final Plat approval, an Exotic Removal Maintenance and Monitoring Program shall be submitted and approved by the Project Review Services Environmental Staff. ~ ~4.8 SUBDIVISION STANDARDS 4.8.1 Design and construction of all improvements shall be i; subject to compliance with the appropriate provisions of the Collier County Subdivision Regulations. 4.8.2 Platting is required in accordance with Collier County Subdivision Regulations, if any lots, tracts, or parcels ~ are to be sold. .~:~ 4.8.3 Work within Collier County right-of-way shall meet the requirements of Collier County right-of-way Ordinance 82- 4.8.4 Internal access into each tract as shown on the site plan is informational only. Location and number is subject to Subdivision Master Plan or SDP approval. ~... 4.8.5 This project is approved for rezoning purposes only. ~!. Subdivision Master Plan and/or a Site Development Plan(s) shall be submitted for approval at a later date, as required by the Subdivision Regulations and Zoning Ordinance. 4.8.6 Exhibit "E", Typical Roadway Section, indicates s~dewalks are not proposed. The requirement to provide sidewalks, or not to, will be addressed during the Subdivision Master Plan approval process. .8.7 Exceptions to the Subdivision Regulations will be addressed during the Subdivision Master Plan approval process. No exceptions are granted in approving this rezone request. IV- 7 4.8.8 An excavation permit will be required for the proposed detention area in accordance with Collier County Ordinance No. 88-26 and South Florida Water Management District. 4.8.9 A minimum of 200 feet separation shall be provided between the retention areas and the sewer treatment plant absorption beds, in accordance with South Florida Water Management District rules. 4.8.10 Detailed landscape and water management plans and water management calculations shall be submitted to show that the required quantity of water can be provided in the area Jointly used as a landscape and drainage easement. 4.8.11 Detailed paving, grading, site drainage and utility plans shall be submitted to Project Review Services for review. No construction permits shall be issued unless and until approval of the proposed construction in accordance with the submitted plans is granted by Project Review Services · 4.8.12 Provide. a SFWMD right-of-way permit and a DOT permit (as necessary) for discharging into the 1-75 canal. 4.9 TRANSPORTATION STIPULATIONS 4.9.1 There shall be only one point of access to the project and it shall be approximately centered on the Oaks Boulevard frontage of the property. 4.9.2 The developer shall provide an eastbound right turn lane on Pine Ridge Road at Oaks Boulevard, and left and right turn lanes on Oaks Boulevard at the project entrance. 4.9.3 The developer shall provide collector level street lighting at the project entrance on Oaks Boulevard. IV-8 4.9.4 Access improvements shall not be subject to impact fee crQdits and shall Ua in place before any certificates of occupancy are issued. 4.9.5 The road impact fee shall be as set forth in Ordinance 85-55 as amended, and shall be paid at the time building permits are issued unless otherwise approved by the Board of county Commissioners. 4.9.6 Ail traffic control devices used shall conform with the Manual on Uniform Traffic Control Devices as required by Chapter 316.0747, Florida Statutes. 4.9.7 In consideration of pending implementation of Growth Management Regulations and the potential of adjacent roadways not conforming to appropriate service level standards due to the rate of increase of traffic volumes versus scheduled/funded roadway capacity improvements, the applicant should be advised that future land development activities in the area may be subject to future land use control consistent with the above regulations. P~ . ~EY~DS - ~RCI~L [~T~[ AND ~TE~ ] PINE glO~ gOAD (2~' R/W ) ..... ~'- ~ACT 2 ~ E- ~4TES ~ACT I ~ ~ ~ tOO' ~ :~":;~ ~ 60' RIGHT OF WAY PAVEMENT o ,. SHCULDER ;' ~1 6' t2' '1 I2' to' _I I~' I 6'! t' ....,. ? ? , ' - · ~6" [IMEROCK BASff WAT[~ ~ SEE NOTE NO. ! BELOW ~ SANITARY O' SEWER TYPICAL' ROADWAY SECTION NOTE: L THE ALIGNMENT OF THE ROAD WITHIN THE RIGHT OF WAY AS SHOWN IS CON- CEPTUAL. FINAL ALIGNMENT OF THE ROAD WITHIN THE RIGHT OF WAY WILL BE DETERMINED DURING FINAL DESIGN TO ALLOW FOR OPTIMIZATION OF UTILITY LOCATION WITHIN THE RIGHT CF WAY. - £XHtBtl~ B MAY ~990 t[I~ ASTRON '"'DEVELOPMENT OF NAPLES, INC. ] ., 8Ar . .' ASTR'ON PLAZA ~mt, .. r s. 1,90.. 117 CoA~AL ENGiNEE~ING'CONS6LTANTS, ]Nc. jrlL[ I, 9o STATE OF FLORIDA ) COUNTY OF COLLIER ) I, JAMES C. GILES, Clerk of Courts in and for the '!/i:~ Twentieth Judicial Circuit, Collier County, Florida, do hereby certify that the foregoing is a true copy of: - ,~ Ordinance No. 90-69 !i:.:~, which was adopted by the Board of County Commissioners on ..; · the llth day of September, lg90, during Regular Session. WITNESS my hand and the official seal of the Board of County Commissioners of Collier County, Florida, this 13th ~!~. day of September, ~990. ~' i!, · ~ JAMES C. GILES ','." ~.. Clerk of Courts and Clerk'' " '~' · Ex-officio to Board of.',~ County Commissioner, s '~, ,.. :.'~ /By: /s/Maureen Kenyon '.' - " Deputy Clerk Y"' 39 , 410