Ordinance 90-054 ORDINANCE 90
AN ORDINANCE AMENDING ORDINANCE NUMBER 84-6, WHICH
ESTABLISHED TOLL GATE COM~ERCIAL CENTER PLANNED UNIT
DEVELOPMENT BY AMENDING PUD COVER PAGE TO REFLECT NA~4E
PLANNING FIRM SUBMITTING THE AMENDMENT; AMENDIN~THE
DESCRIPTION; AMENDING THE PROJECT INFORMATION~,.,
~ION TO REFLECT CHANGES IN TOTAL ACREAGE AND OT.~R --
ES OF [JtND USE; AMENDING THE CUq~RENT ZONINg]
TO REFLECT THE PROJECT'S PUD ZONING; AMENDING
LAND USE SECTION TO REFLECT COMMERCIAL
~MENT ACTIVITIES UNDERWAY IN CERTAIN PARTS OF~]THE
AMENDING VEGETATIVE COVER SECTION TO ADD T~E
D.O.T. R.O.W.; AMENDING THE WASTEWATER MANAGEMENT
~CTION TO REFLECT THAT COLLIER COUNTY OR INTERIM
FACILITIES WILL SERVE THE PROJECT; AMENDING SCHEDULE OF
DEVELOPMENT SECTION TO REFLECT CHANGES IN COMMENCEMENT
AND COMPLETION DATES FOR CERTAIN COMPONENTS OF THE
PROJECT, TO AMEND THE DESIGNATION OF CERTAIN COMPONENTS
OF SAID SCHEDULE AND TO REFLECT CHANGES TO THE ACREAGES
OF CERTAIN'COMPONENTS; AMENDING THE USE REGULATIONS FOR
PARCELS A-1 AND A-2 SECTION BY CHANGING THE TITLE OF
THIS SECTION AND THE REFERENCE TO PARCELS A-1 AND A-2 TO
PARTS WEST OF THE EAST LINE OF THE F.P.& L. EASEMENT,
'AMENDING THE PERMITTED AND PROVISIONAL USES SUBSECTION
TO ADD CERTAIN PERMITTED PRINCIPAL USES, TO ADD CERTAIN
PERMITTED PROVISIONAL USES AND DELETE OTHERS AND TO
REFER TO THE NEW COLLIER COUNTY SIGN ORDINANCE;
AMENDING USE REGULATIONS IN PARCELS B-l, B-2 AND
SECTION TO DELETE CERTAIN USES; DELETING THE MASTER PLAN
APPROVAL SECTION AND REPLACING IT WITH A PROJECT PLANS
SECTION; ADDING NEW SECTION TITLED DEVELOPMENT INTENSITY
LIMITATION; AMENDING ATTACHMENT NO. 1, UTILITY DIVISION
POLICY STIPULATIONS, TO ADD ADDITIONAL UTILITIES
REQUIREMENTS; BY ADDING A SECTION TITLED PROJECT
STIPULATIONS; AND BY PROVIDING AN EFFECTIVE DATE.
WHEREAS, on January 17, 1989, the Board of County
Commissioners approved Ordinance Number 84-6, which established the
Toll Gate Commercial Center Planned Unit Development; and
WHEREAS, William R. Vines of Vines & Associates, Inc.,
representing Ashley M. Papineau, petitioned the Board of County
Co~amiesioners of Collier County, Florida, to amend the Toll Gate
Commercial Center Planned Unit Development,
NOW, THEREFORE BE IT ORDAINED by the Board of County
Commissioners of Collier County, Florida that
SECTION ONE:
Cover Page of Ordinance 84-6 Toll Gate Commercial Center; is ~'
hereby amended to reed as follows:
Words-s~ek-%h~e~h are deleted; words underlined are added.
6-12-90
PLANNED UNIT DEVELOPMENT
FOR ~ "
TOLLGATE COMMERCIAL CENTER
COLLIER COUNTYt FLORIDA
PREPARED BY~
DR. NENO J. SPAGNA, PRESIDENT
FLORIDA INSTITUTE OF URBAN AFFAIRS, INC.
I~OX 1354
NAPLES, FLORIDA 33939
(813) 263-0399
WILLIAM R. VINES. AICP
VINES & ASSOCIATES. INC,
715 TENTH STREET SOUTH
NAPLES. FLORIDA 33940
{813~ 262-4164
JULY, 1983
REVISED: DECEMBER 15, 1983
AMENDED: JUNE 12. 1990
Words-st~ek-th~e~§h are deleted; words ~ are added. .~
IIC'Z'ZON TWOI
The legal description is hereby amended to read as follows:
LEGAL DESCRIPTION
Commencing at the southeast corner of Section 35, Township
South, Range 26 East, Collier County, Florida;
thence along the east line of said Section 35 North 1'-56'-55" Wet
200.14 feet to a point on the north right-of-way line of State Road
84 (Alligator Alley);
thence along said north right-of-way line, North 89'-45'-01# West
331.23 feat to a point of intersection of said north right-of-way
line and the south Limited Access, right-of-way line of State Road
93 (I-75), and the POINT OF BEGINNING of the parcel herein
described;
thence continue along said right-of-way line of State Road 84
(Alligator Alley) on the following five coursest
1) North 89'-45'-01" West 2398.66 feet~
2) South 89'-56'-16# West 1547.43 feet;
3) North 80'-43'-58" West 709.38 feet;
4) North 39'-52'-42# West 209.91 feet;
§) North 10e-24'-33" West 209.94 feet to a point on the East
Limited Access, right-of-way line of State Road 93 (I-75);
thence continue along said Limited Access, right-of-way line of
State Road 93 (I-75) on the following nine courses:
1) North 3'-19'-52" Eas~ 285.34 feet;
2) North 23'-37'-28" East 149.83 feet~
3) North 64'-12'-39" East 149.83 feet~
4) North 86e-37'-01# East 778.54 feet~
5) SOuth 87'-55'-12" East 318.82 feet~
6) South 78'-44'-38" East 318.32 feet;
7) South 74'-09'-17" East 1199.30 feet;
8) South 73e-00'-33" East 1904.96 feet;
9) southeasterly 233.67 feet along the arc of a circular
curve concave to the northeast, having a radius of
11621.16 feet, subtended by a chord which bears South
75~-35'-07" East 233.67 feet to the north right-of-way
line of State Road 84 (Alligator Alley); and the Point of
Beginning of the parcel herein described;
being a part of south 1/2, Section 35, Township 49 South, Range 26
East, Collier County, Florida~
etlbJect to easements and restrictions of record;
containing 69.40 acres of land more or less~
bearings ara based on Florida Departmerc of Transportation
right-of-way map for State Road 93
ALSO INCLUDING THE FOLLOWING
J Description of Dart of Section 35. Township 49 South.
Ranae 26 East. and Dart of Section 2. TOWnShiP 50 South. Ranae 26
Collier CountY. Florida
BEGINNING at the southeast corner of Tollaate Com~ercia! Center
Phase one. as recorded in Plat Book 16. Daae 1. Collier County
Public Records. Collier County. Florida:
thence alone the boundary of sa~d Dlat ~n the followina
four ~4~ described courses=
Sou~h 89'-~'-16" West 330.60 feet:
North 8~-4~'-58# West 709.38 feet=
North 39'-52'-42" West 209.91 feet:
North 1Q'-24'-33" West 209.94 feet:
thunce loavl~a said limo South 1'-28'-34" East 705.25 foe~
thence South 45~-46'-16" East 71.57 feet: thg~c9 North
89~-56'-02" East 1130.07 feet to a Do~nt
Words-st=~ek-~h=o~h are deleted; words underlined are added.
Florida Power and hlaht easement: '
thence alone said line North 0'-46'-58" East 272.2 feet to
Point of Beainnina:
· containina 9.17 acres more or less:
~,~,-~ubJect to easements and restrictions of record.
~z .... SF~TION THREE:
Project Information of Ordinance 84-6, Toll Gate Commercial
Center is hereby amended to read as follows:
PROJECT INFORMATION
!91 Total Acres: 69v4 78.57
~! Number of acres devoted to various categories of land use=
Development area - ~8v9 42.37
Nater Management area - ~4v& 17.9
Road Right-of-Way - 4?9 6.7
FoP.L. Easement - 3.6
Flow Way - 5.0
Sewage Treatment Plant - 3.0
SECTION FOUR:
:?, ' Current Zoning of Ordinance 84-6, Toll Gate Co~ercial Center
i-~ hereby a~ended to read as follows:
CURRENT ZONING
The project eite is currently zoned A-~?-R~eA-A~e~tH~e? PUD.
SECTION FIVE:
.Existing Land Use of Ordinance 84-6, Toll Gate Commercial
Center, is hereby amended to read as follows:
EXISTING LAND USE
A~ the present time the site is unoccupied exceDt for initial
commercial de¥eloument activities which are under way on that
portion of the site 1vine west of the F.P.& L. easement. See-Mep-B
e~d-Mep-Bv
SECTION SIX:
Vegetative Cover of Ordinance 84-6, Tollgate Commercial
Center, is hereby amended to read aa follows:
VEGETATIVE COVER
A breakdown of the vegetative cover of the project area is as
follows, see Map F for detailed distribution=
Words-st~uek-thre~qh are deleted~ words ~ are added.
~ VEGETATIVE COI~IUNITY ACREAGE
A2 Transitional Zone Pine & cypress 6.5
B Saw Palmetto/Rusty Lyonia 5.7
C Transitional Zone/Cypress 29.4
D Saw Palmetto/Rusty Lyonia 3.7
E Functional Wetland 9.4
F Transitional Zone/Cypress 1.2
CP Cabbage Palm Heads 0.5
M Melaleuca 1.4
FPL Cleared and Filled Land 2.5
Former DOT R/W (S.R.-84~ 9.17
Total 69v4
78.57
There are no unique features of the vegetation. All species end
associations are "typical" for soil types common to pine flatwoods
of level sandy areas of Collier County.
Wastewater Management, of Ordinance 84-6, Toll Gate Commercial
Center, le hereby amended to read as follows=
WASTEWATERMANAGEMENT
'e~-s~te-treatment-ef-vae~ewa~e~-~evs-v~-~e-~rev~ded-~y-e~
exte~ded-ae~at&en-p~an~-des~ed-and-eenet~e~ed-~e-~a~e-e~
~a~-w~-be-des~g~ed-~e-ha~d~e-peak-~ews-~e~-be~-p~aees~
~ev~s~e~s-w~-be-made-~-the-des~g~-ke-½amd½e-~he-~gh-BeB-~eve~s
ek~ee~ed~--e~eaee-~eps-w&~-be-&ms~a~ed-w½e~e-~eeesea~M~ Waste
water treatment is beene nrovided by the Collier County SeWage
Treatment System. Temnorarv on-site wastewater treatmen~
facilities ~or which all necessary hermits have been aran~ed may ~
installed durin, any Defied o~ time in which sewaao ~reatme~
service is not available ~rom Collier County.
SECTION EIGHT:
~.. Schedule of Development of Ordinance 84-6, Toll Gate
~':, .~. Commercial Center is hereby amended tc read as follows:
SCHEDULE OF DEVELOPMENT
Project development will commence as soon as all required permits
have been obtained and will continue to build-out.
//~ The following schedule indicates the anticipated start and
completion dates for the various components of the project. Please
refer to Me~-Hr the Revised Master Develonment Plan.
% OF
COMPONENT ACREAGE SITE START COMPLET~
PaFee~s-A-~T-A-~
Development parcels west
of the east line of the
F.P.& L. easeme~ 25.§7
: Words-s~uek-threu~h are deleted; words Mn~are added.
Na%uFa~-Reten~en-AFee 3.0 4T3 3.8 1988 1989
~984 ~986
Road Construction 4.3 6v~ 5.5 1988 1989
~:r PiP*L* Easement 3.62 5T~ 4.6 -- --
'Parcels B-l, B-l, B-3 22.5 ~r~ ~8.6 ~ 1990
~. Lake #2, incl.
Retention Area 11.6 ,6,~ ~ ~984 ~086
Wastevater Treatnent site 3.0 4T~ 3.8 ~984 ~987
~Natural Flow Way 5.0 ~TE 6.3 ~
Totals 78.57 100.0
N~Et ~s amended p~ document e~anda the o=iainallv
~ro4ec~ Ueve~o~=en~ a=ea bv addina 9.17 acres o~ fo~er ~T
ri=ht-ot-wav 1vine within and west o~ the Florida Power
BECTION NINE~
Use Regulations for Development Parcels A-1 and A-2 of
Ordinance 84-6, Toll Gate Commercial Center is hereby amended to
read as follows:
USE REGULATIONS FOR ~ PARCELS A-~-ANB-A-2
1) Intended use of PaFee~s-A-~-?-A-R? ~eveloDment parcels west of
th~ ~ast line of the F.P.& L. easement. ~ncludina the added
~ 17 acres off former DOT r[aht-of-wav.
It is the intent of this document that PaFee}s-A-~-snd-A-2
deYeloDment parcels west of the east line of the F.P.& L.
~asement be used for commercial purposes which serve the
motoring public using Interstate 1-75 as well as providing
limited commercial goods and services of an areawide nature
for the Naples, Marco Island, Golden Gate and the Immokalee
urban areas.
Further it is the intent of this document that Pa~ee~s-A-~-and
A-2_dev~lgpment parcels west of ;the east line of the F.P.& L.
easement shall be used in accordance with' all current federal,
state and county regulations except as specified otherwise in
this document by the Collier County Board of County
Commissioners.
2) Permitted Principal Uses and Structures
No building or structure, or part thereof, shall be erected,
altered or used or land or water used, in whole or in part for
other than the following:
(1) Automobile service station including engine tune-ups and
minor repairs, and car wash facilities which are
accessory uses.
(2)Banks and financial institutions, business and
professional offices.
(3) Cocktail lounges and commercial entertainment.
Words-st~ue~-thrsu~h are deleted; words ~ are added,
.-_6-
(4) Convention and exhibition halls.
(S) Department stores; drug stores; dry cleaning shops and
dry goods stores.
(e) Electronic games and furniture sales.
(7) Ice cream shops and dairy drive-in stores.
(8) Motels; hotels and other transient lodging facilities.
(9) Research and design labs; restaurants and fast food
restaurants.
(10) Shopping centers ,see-ee=~ien-~ers-e~-e=d&nenee-e~-~.
(11) Souvenir stores and stationery stores.
(12) Supermarkets.
(13) Variety'stores: vehicle rental-automobile and U-Haul
type of vehicles and equipment including outside display;
veterinary offices and clinics; no outside kenneling.
(14) Any other commercial or professional service which is
comparable in nature with the foregoing uses and which
the Planning Implementation Director determines to be
compatible in the district.
Permitted Provisional Uses and Structures
(1) Car wash facilities which are principal uses.
~ ~2~ Permitted uses with less than 1,000 square feet
gross floor area in the principal structure.
DeveloPment Standards
(1) Minimum Lot Area: Ten thousand (10,000) square feet.
(2) Minimum Lot width: One hundred (100) feet as measured at
the front building setback line.
(3) Minimum Yard Requirements:
a. Front Yard - Twenty-fivo (25) feet plus one (1) foot
for each two (2) feet of building height over fifty
(50) feet.
b. Side yard - None or a minimum of five (5) feet with
unobstructed passage from front to rear ya~-d for
non-residential uses. Fifteen (15) feet for motels,
hotels and transient lodging facilities plus one (1)
foot for each two (2) feet of building height over
fifty (50) feet.
c. Rear yard - Twenty-five (25) feet.
d. Waterfront - Twenty-five (25) feet from the normal
water line of any artifically created body of water,
excluding observation decks, bridges and walkwaye.
(4) Maximum Height: One hundred (100) feet.
(5) Minimum Floor Area of Principal Structure: One thousand
(1,000) square feet per building on the ground floor.
Words-st~uek-~hreu~h are deleted; words underlined are added.
'7--
(6) Maximum Density: Twenty-six (26) units per gross acre of
:~ land for hotels, motels or transient lodging facilities.
~:.' (7) Distance Between Structures: Same as for side yard ~ ..
,,'~ setbacks. '
~:" (8) Signs: As required
the Collier County Si~n Ordinance~
(9) Minimum Off-Street Parking and Off-street Loading
Requirements: As required in Section 8 of Ordinance
82-2.
(10)Minimum Landscaping Requirements: As required in Section
8.30 of Ordinance 82-2.
i:, (11) Outside Merchandise Storage and Displaying: Unless
specifically permitted for a given use, outside storage
or display of merchandise is prohibited.
SECTION TEN:
~". Use Regulations in Parcels B-l, B-2 and B-3 of Ordinance
:' . 84-6, Toll Gate Commercial Center is hereby amended to read as
follows=
!~i~..' 2) Permitted Principal Uses and Structures
. . No building or structure, or part thereof, shall be erected,
· '~2~ altered or used, or land or water used, in whole or in part of
~.: other than the following:
~ (1) Any principal use or structure permitted on development
" Parcels A-~-a~d-A-~? wes~ 9£ the east line of the
(2) Assembly operations in an enclosed building.
(i (3) Building supplies and contractors storage facilities;
bulk storage yards not including Junk or salvage yards.
(4) Car wash, communications service and equipment repair.
(5) Freight movers and storage.
(6) Laboratories, research, design and testing; laundries;
lawn maintenance shops and plant nurseries; light
manufacturing or processing (include food processing but
not abattoir; packaging or fabricating in a completely
enclosed building).
(7) Miscellaneous uses such as express office; telephone
exchange; motor or bus or truck or other transportation
terminal and related uses; motorcycle sales, service and
repair ~ne~d&ng-e~s~e-~sp½ay; museums and tourist
attractions.
(8)New and used car sales, service and repair including
outside display.
.~' (9) Offices, general purpose.
~ .... ~8~-Ree~ee~ena~-Veh~e~e-Pa~kT
,": (10~ ~ Warehousing, wholesaling, storage and distributing
i!! . Words-s~ek-~h~e~gh are deleted; words underl~Ded are added.
establ~shmonts and similar usgs. ,::~
~ Any other commercial or professional use which is~
comparable in nature with the foregoing uses and with ~he ~
foregoing uses and which the Planning Implementation ~ /~
Director determines to be compatible in the district, t
SECTION ELEVEN:
Master Plan Approval of Ordinance 84-6, Toll Gate Commercial
i~ Center is hereby deleted and replaced as to add a Project Plans
Section to read as follows:
HASTBR-PBAN-APPReVAB
8~b~w~s~on-Mas~e~-P~ a~-epp~ova~-as-shown-on-Map-N-~s-~eq~es~ed-as
par%-e f-~h;~s-Pb~J-subm;,~alL T
The Anended Master Plan for Tollgate Co~ercial Center. identifie~
as Wilson. Miller. Barton. Soll& Pee~. Inc. File Number RZ-91B.
dated FebruarY. 1990. is an attachment to and an inte~ral Dart o~
this amended Planned Unit Development document. Also attached to
this Planned Unit Development document is an exhibit identified ~s
WMBS & P File Number RZ-91A. which is a composite plan indicati~q
platted development areas west of the F.P.&L. easement: ori=inall¥
approved but unDlatted development areas east of the F.P.&L.
easement: and the 9.17 acre tract of land which this Amended PUD
document incorporates in the Tollgate Commercial Center oro4ect.
SECTION TWELVE:
Development Intensity Limitation Section is hereby added to
· read as follows:
DEVELOPMENT INTENSITY LIMITATION
E~Dansion of the land area embraced bY the oriainallv approved 69.4
acre Toll Gate PUD bv addition of 9.17 acres of former SR-84
ri~ht-of-wav lvin~ west of the F.P.& ~,. transmission line easement,
does not authorize an increase in the overall Toll Gate PUD
development ~ntensitv which was approved via Collier County
Or~inance 84-6 and DRI Develooment Order 84-1. The maximum amoun~
of buildin~ sauare footage and traffic ~eneration permitted within
the Dro4ect shall not exceed that which was forecast bv th~
oriainal ADA. which is dated JulY. 1983. The maximum amount of
permitted buildin~ s~uare footage for all Dro~ect development is
518.700 sauare feet. The maximum amount of traffic ~eneration for
all Dro4ect development is 13.890 vehicular trios Der day~
' SECTION THIRTEEN:
Attachment No. 1, Utility Division Polic~, Stipulations ks
'ii:: hereby amended to read as follows:
ATTACHMENT NO. I - UTILITY DIVISION POLICY STIPULATIONS
Words-st~uek-~h~ou~h are deleted~ words gD&Le~L~are added.
--9--
:,.'
1) All construction plans and technical specifications for the~
proposed Utility Facilities must be reviewed and approved b~
the Utility Division prior to commencement of construction.~
2) All on-site and off-site Utility Facilities constructed by the
Developer in connection with the Development shall be
constructed to County Standards at no cost to the County and
shall be deeded to the County Water-Sewer District, in
accordance with applicable County Ordinances and Regulations.
3) All customers connecting to the water distribution and sewaae
collection san&~ary-sewer-amd-wa~e~-d~s~r~bu~en facilities
will be customers of the County Water-Sewer District and will
be billed in accordance with a the county's established rates.
e~rue~ure-app~oved-b¥-~he-eou~yv--Rev&ew-ef-~he-p=epesed
~a~es-end-subsequen~-appreva~-by-~he-Bea~d-e~-eeun~y
eemm~so~oRe~-muse-be-eemp~e~ed-p~er-ee-ae~va~en-ef-~he
eo~eee~en~ensm~ss~en-sys~em-end-was~ewe~e~-~ee~men~
eomp~anee-w~h-eeun~y-e~nanee-Ne?-~6-9~-as-amemded?-~e~sed
e~-superaeded~ ~hould the County not be in a Oosition to
orovide water and/or sewer service to the oro~ect, the water
and/or sewer customers shall be customers of the interim
utility established to serve the oro~ect until the County's
off-site water and/or sewer facilities are available to serve
the pro~ect.
4) ~11 construction on the proposed sanitary sewer system shall
utilize proper methods and materials to insure water tight
conditions.
5) Rppropriate Utility Easements dedicated to the County
Water-Sewer District must be provided for the proposed ~ater
and Sewer facilities to be constructed, when they do not lie
within pubic rights-of-way or Utility Easements.
Data required under County Ordinance No. 80-112 must be
submitted and approval granted prior to approval of the
construction documents for the pro~ect. Submit a copy of the
approved DER permit application for the sewage collection and
transmission system and a copy of the approved DER permit
application and construction permit for the wastewater
treatment facility to be utilized.
2.L %t ia anticioated that the County Utilities Division will
gltimatelv suoolv ootable water to meet :he consumotive demand
and/or receive and treat the aewaca cenerated bv this oro~ect.
~hould the County system not be in a oosition to euooly
potable water to the Dro~ect and/or receive the ore, act's
wastewater at the time develooment commences, the Develooer.
at his exoen~e will install and o0erate interim wate~
and on-site treatment facilities and/or interim on-site sewaoa
treatment end disoosal facilities adequate to meet all
recuirements of the aDDro~riate reaulatorv a~encies. An
&~reement shall be entered into between the County and the
Develooer. bindina on the Develooer. his assians or successors
reqerdinc any interim treatment facilities to be utilized.
The aareement must be leaallv sufficient to the County.
~o t~e aooroval of construction documents for the oro~ect and
be in conformance with the recuirements o: Collier County
Ordinance HO. 88-76, as amended.
If an interim on-site water suoolv, treatment and transmission
facility is utilized to serve the oro4ect, it must be orooerly
sizgd t9 suo~lv averace seek day domestic demand, in addition
to ~ire ~low demand at a rate aonroved by the aoorooriate Fire
Control District servicina the oro~ect area.
Words-st~eek-threuqh are deleted; words ~ are added.
Pro~ect stipulations ere hereby added to read as Eollowss
PRO~B~ STIPU~TIONS
AllaDDlvstipulationSto this amendment.C°ntained in the original PUD document shall
~ere shall be only two Points of access to Davis Boulevard.
and they shall be located as shown on the original site Plan.
Individual parcels within the Dro4ect shall no~ have direct
access to Davis Boulevard, Access shall be via the internal
ci~culation system.
Detailed Davina. aradin~. S~e drainage and utility plans
shall be submitted to Pro4ect Review Services fo~ review. No
const~ction De.its shall be i~sued unless and until approval
~f thm UrODO~gd ~on~tru~tl0n In acco~danc~ with th~ mubmitt~
~lmns is ~ranted by Project Review Services.
Design and construction of all improvements shall be sub~ect
to compliance with the appropriate provisions of the Coliier
~ountv Su~ivision Re~lations.
~ In accordance with the Rules of the soB~h Florida Water
Management District. {S~D) Chapters 40E4 and 40E-40. thi~
Project shall be designed for a storm eveB~,,of 3U~y duration
and ~5-year return fre~ency.
~ A cooY of S~D Pe~it or Early Work Pe~it is re.ired prior
to co~st~ctio~ Dla~ aDDrOVal~
~ Work within Collier County right-of-way shall meet the
retirements of Collier County right-of-way Ordinance 82-~1,
All retirements of su~ivis~on ordinance must be met. since
no variances were requested.
~1~ Ordinance shall become effective upon receipt of notice
from ~e Secretary of State that this Ordinance has been filed
~e Secreta~ of_~_State.
?J- Wordm-st~uek-~h~ouqh are deleted; words ~ are added.
[~:i' '<. I, JAMES C, GILES, Clerk of Courts in and for the
icg~:(,: ' T~entleth Judicial Circuit, Collier County, Florida, do
hereby certify that the foregoing la a true copy of:
~,,: Ordinance No. 90-54
the 12th d~y of June, 1990, during Re~lar Session
~l;~J,~'.'. WITNESS my hand and the official seal of the Board of
I~}~': ' Co~ty Co~lssloners of Collter Count~, Florida, this ~Oth
;~.'"'<~:' da~ of June, 1990.
~?~.,~., ; · .','
· ~ '~' JAMES C. GILES ,~'~;':1.;
Clerk of Cou~s and Cle~%~' .. ~'~
Ex-officio to Board of ~' ".'.. ~...,'
Count~ Co~tsstoners '~ '
.
B~'~ /~/~u~n K~n~on ~, ..J':¢
~ Deputy Clerk
i ~o,~ :,-
".