Loading...
Ordinance 91-031 ' orr:; 1;ANCE 9 1-, ']__J__ AN ORDINANCE AMENDING ORDIN~a~NCE NUMBEI~ 82-2 THE COMPREHENSIVE ZONING REGULATIONS FOR THE UNINCORPORATED AREA OF COLLIE~. COUNTY, FLORIDA, BY AMENDING THE OFFICIAL ZONING ATLAS MAP NUMBERS 50-26-2 AND 50-26-5; BY CHANGING THE ZONING CLASSIFICATION OF THE HEREIN DESCRIBED REAL PROPERTY FROM A-2 TO "PUD" PLANNED UNIT DEVELOPMENT KNOWN AS WATERFORD ES'FATES PUD CONSISTING OF 63 RESIDENTIAL DWELLING UNITS, LOCATED NORTH AND SOUTH OF WHITAKER ROAD, APPROXIMATELY ONE MILE NORTH OF RATTLESNAKE HAMMOCK ROAD (CR-864) AND APPROXIMATELY TWO MILES WEST OF Ct1-951, IN SECTIONS 9 AND 16, TOWNSHIP 50 SOUTH, RANGE 26 EAST, COLLIER COUNTY, FLORIDA, CONSISTING OF 19.4+- ACRES; AND BY PROVIDIN,; AN EFFECTIVE DATE. W~[EREAS, Beau Keene of Evers, Neal & Purse, Inc., repres.enting Dan Peppers and Dugan Porter, petitioned the Board of County Commissioners to change the zoning classification of the herein described real property; NOW,~THEREFORE BE IT ORDAINED by the Board of County Commissioners of Collier County, Florida: ~j~T I ON ONE: The Zoning Classification of the herein described real property located in Sections 9 and 16, Tow~nship 50 South, Range 26 East, Collier County, Florida, is changed from A-2 to "PUD" Planned Unit Development in accordance with the PUD Document, attached hereto as Exhibit "A" which is incorporated herein and by reference made part hereof. The Official Zoning Atlas Map Numbers 50-26-2 and 50-26-5, as described in ordinance Number 82-2, are hereby amended accordingly. SECTION TWO:. This Ordinance shall become effective upon receipt of notice from the Secretary of State that this Ordinance has been filed with the Secretary of State. PASSED AND DULY ADOPTED by the Board of County Commi~sionors of Col]ior County, Florida, this '~th day of Apr£l ., 1991. BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA JAMES .C. GILES, CLERK PATRICIA ANNE GOOD~ CHAIRMAN .:APPROVED AS ~ ~O~ ~D LEGAL SUFFICIENCY ASSIS~ CO~TY ATTO~Y R-90-27 0~IN~CE ~1~ ~ {l~ wl~ ~ ~reta~ of Slot?q ~Jftce ~ . nb/4194 ' ~y of ~ [~/ O~ ocknow¥~emepk 9f.~ -2- PLANNED UNIT DEVELOPHENT DOCUHENT FOR 2ATERFORD ESTATES Prepared By: Evers, Neal & Purse, Inc. 2403 Trade Center Way, Suite ~8 Naples, Florida 33942 ~ DATE ISSUED: July, 25~ 1990 ~'.. "'-" 'J~ DATE REVISED: .Apri~ 9t 1991 ~' ' : CCPC DATE: ' · March ?~ 1991 ORDINANCE NO.: -' " ' EXHIBIT "A" TABLE OF CONTENTS SECTIOM I, STATEMENT OF COMPLIANCE ........................ 1 & 2 SECTIOM II, PROPERTY DESCRIPTION AND OWNERSHIP ................ 3 2.1 - INTRODUCTION, LOCATION AND PURPOSE ...................... 3 2 2 - SHORT TITLE 3 · eeeeee,*eeeeleeeel~eeeee~eee~eeeeeleeeeeeee~e 2 3 - lEGAL DESCRIPTION 3 2 4 - TITLE TO PROPERTY 4 SECTION III, PROJECT DEVELOPMENT .............................. 5 3 1 - PURPOSE 5 3.2 - GENERAL PLAN OF DEVELOPMENT 3.3 - COMPLIANCE WITH APPLICABLE ORDINANCES ................... 5 3 4 - LAND USES 5 3 5 - PROJECT DENSIT"Y 5 TABLE I - LAND USES AND ACREAGE ............................... 6 3.6 - EASEMENTS FOR UTILITIES ................................. 7 3.7 - ROADS ................................................... 7 3.8 - ENTR^NCE FEATURES ....................................... 7 3 9 - OPEN SPACE 7 3 10 - CONCURRENCY MANAGEMENT 7 SECTION IV, RESIDENTIAL LAND USE .............................. 8 4 1 - PURPOSE 8 4.3 - PERMITTED USES AND STRUCTURES ....................... 8 & 4.4 - DEVELOPMENT STANDARDS .............................. 0 - 11 SECTION V, RECREATION ....................................... 12 5 1 - PURPOSE 12 ' 5.3 - PERMITTED USES AND STRUCTURES ......................... 12 5 4 - PLAN APPROVAL REQUIREMENTS 12 5 5 - PROPERTY DEVELOPMENT CRITERIA 13 SECTION VI, WATER MANAGEMENT AREAS ........................... 14 6 1 - PURPOSE 14 6 2 - DEVELOPMENT PLAN 14 ' 6.3 - PER,fITTED USES AND STRUCTURES .......................... 14 6 4 - PLAN APPROVAL REQUIREMENTS 14 SECTION VII, GENERAL DEVELOPMENT COMMITMENTS ................. 15 7 1 - PURPOSE 15 7 2 - GENERAL 15 · 7 3 - PUD MASTER PLAN 15 7 4 - ENVIRONMENTAL COMMITMENTS 16 7.5 - WATER MANAGEMENT AND ENGINEERING COMMITMENTS ...... 16 & 17 7.6 - TRANSPORTATION COMMITMENTS ........................ 17 - 19 7.7 - UTILITIES COMMITMENTS .................................. 19 7 8 - FIRE COMMITMENTS 20 7.9 - EXCEPTIONS TO COUNTY SUBDIVISION REGULATIONS ........... 20 PUD MASTER PLAN .................................... ATTACHMENT 1 · ~.-;~ SECTION I ~ i~i ~i ST&TEHENT OF COMPLIANCE The development of approximately 19.4 acres of property in Collier County, as a Planned Unit Development to be known as Waterford Estates, will be in compliance with the planning goals and objectives of Collier County as set forth in the Growth Management Plan. The res~.dential and recreational facilities of Waterford Estates will be consistent with the growth policies, land development regulations and applicable comprehensive planning objectives for the following reasons: 1) The subject property is in compliance with the Future Land Use Element (FLUE) of the Growth Management Plan ': (GMP) which ia evaluated as follows: A. The project development is compatible and complimentary to tho surrounding land uses. B. ImproYements are planned to be in substantial compliance with applicable regulations. C. The project development will result in an efficient and economical extension of community facilities and services. !/~ D. The project development is planned to incorporate natural systems for water management in accordance with their natural functions and capabilities. E. The subject property is located within the Urban Residential Designation as indicated in the GMP's Future Land Use Element (FLUE) and Future Land Use Map. More specifically, the site is within the Urban- Mixed Use District which permits a variety of residential develoI, ment subject to compliance with specified critexia. The proposed project is permitted a maximum base density of four (4) residential dwelling units per gross acre. Since the site consists of approximately 19.4 acres, the proposed project is permitted a maximum total of 78 units,~ Furthermore, ~he Petitioner proposes to construct a total of 63 units on the subject property (Reference: Companion Petition SMP-90-31). Therefore, the subject petition is in compliance with the FLUE of the GMP. Furthermore. the FLUE contains a new provision for interconnection that is staged as follows: "If the project fails to interconnect with all existing projects when physically possible, and fails to provide interconnection with all future adjacent projects, up to 1 (one) dwelling unit per gross acre may be subtracted as deemed appropriate by the BCC". ~Note: Action of the Board of County Commissioners limits the project to a maximu~ total of 63 rest~]entinl dwelling ~Although interconnection with adjacent projects is ~physically possibla, interconnection is not appropriate ~_or desirable given tbs configuration and location of the site, configuration of adjoining streets, and the neighboring land use psttern. Thorefore, the base density shall be permitted at a maximum of four (4) residential dwelling units per gross acre. However, per action of the Board of County Commissioners at its meeting on April 9, 1991, the project is permitted a maximum total of 63 residential dwelling units. (:~.~:., .' SECTION II PROPERT! DESCRIPTION AND OWNERSHIP 2ol INTI[ODUCTIONt LOCATION AND PURPOSE It is the intent of Daniel Peppers and Dugan Porter, hereinafter called "Developers", their successors and assigns, to establish a Planned Unit Development (PUD) on approximately 19.4 acres of property located in Collier County, Florida. The subject project is ~enerally located 0.8 miles East of County Barn Road and 0,6 miles North of Rattlesnake- Hammock Road in the Northwest ~ of Section 16 and the Southwest ~ of Section 9, Township 50 South, Range 26 East. More specifically, the project abuts the West line of Sunset BouLevard and is transacted by Whitaker Road. It is the purpose of nhis document to establish .~tandards end ~uidelines for. the future development of this property. ~.~ SHORT TITLE ~ ~. T:his ordinance shall be known and cited as ~Raterfor~ ~statea 2.3 ~L~GAL DESCRI~ION The subject proper:y bein8 19.4~ acres is described as follows: E } of the SW } of the NW ~ of the NW } of Section 16, Township 50 South, Range 26 East; Reservin8 the North 30' and the East 30' Road RiEht-of-Way ~. E ~ of ~he NW ~ of the SW ~ of ~he NW ~ of Section 16, Township . ~ ~ ,~ 50 South, ~an~e 26 East; Reservin~ ~he Eas~ 30' and the 30' Road Rizht-of-~ay · E ~ of ~he N~ ~ of Ch~ ~V ~ of ~h~ N~ ~ of S~c~ion 16, Township SO Sou~h~ Range 25 Eas~ Less the Sou~h 30~ and ~h~ Ea~ 30~ Road Right-of-Way and S ~ of~ the SW ~ of the SW ~ of the SW ~ of Section 9, Township 50 South, Range 26 East; SubJec~ to an easement across the East 30' ior ingress and egress and Road Righ~-of-Way all properties situated, lying and being in Collier County, 2.& ? T'rTLE TO PItOPEItT! , '. The subject propere~ is owned by Daniel Peppers Dus~n Porter. [,. ~ PROJECT DEYELOPMENT PURPOSE (' :;. Th,.~ purpose of this Section is to generally describe the plan ....;~'"'" of the development and delineate the general conditions that will apply to the project. - ' GEiMERAL PLAN OF DEYELOPNENT · Watsrford Estates is a planned'community including a mixture of residential uses and recreational, conservation and water management related elements. 3.3 COMPLIANCE WITH APPLICABLE ORDINANCES The project is intended to he in compliance with the applicable Collier County Zoning and Subdivision Regulations an well as other Collier County Development codes in effect at the title building permits are requested. .. 3.'& LAND USES Table I is a schedule of the-intended land use types with approximate acreages. The arrangement of these lend use types ti, .. is shown on Exhibit "A", PUD Master Plan. Minor changes '-~ and variations in design and acreages shall be permitted at final design to accommodate topography, vegetation and other site conditions. 3.5 PROJECT DENSITY .The total acreage of %/aterford Estateo is approximately 19.4 acres and the GMP permits the project a maximum base density of ~.0 units per gross acre. However, per action of the Board of County Commissioners at its meeting on April 9, 1991, the project is permitted a maximum total of 63 residential dwellin~ uni ts. ~'. ~';'N*:' - "" ~ATERFORD ESTATES · ~'LAND USE APPROIIHATE ACREAGE ' .-, ~- Roadway 2.8 .3' ~a~er~Manasemen~ . ' 2.9 .... :~... R-O-~ Reserved for Dedication 2.9 .. ;, , .~,~.' , . .' ,~. 3.§ igASEMENTS FOR UTILITIES ~C:~utilitie~ and other purposes as me~ be needed. Said easements ' i and'improYements shall be in compliance with the Collier Count! Subdivision Regulations in e~£ect at the time a ~ermit is " requ~te~ or required. All necessar~ easemeats~ dedications or other instruments shall be granted ~o ensure the continued operation and maintenance o£ all service utilities in compliance with applicable regulations in effect at the time approvals are requested. 3.7 ~OADS ~, All roads within the deYelopment (not including any portion of Whitaker Road, Sunset Blvd., Adkins Avenue, or the Santa Barbara 31~d. Extension) shall be private roads to be perpetually maintained by an appropriate homeowner's ,~', "ISso¢iat:ton. .':.~[ 5~.~ide ,s~rips o~ land adjacent ~o each side o[ ~hitaker Road '~ ma~; be ~ilized for beautification purposes. Permitted uses .and structures within this area include: fences, signage, ,,...% ::*~ '.:'::landscaping and other customary uses associated with entrance '~ :- '"bea~tification.,,, :i All~ nece:~sary easements, dedications or other instruments ~,' shall be granted to ensure the continued operation and maintenance of these facilities in substantial compliance !~ with applicable regulations in effect at the time approvals " are* requested. 3.9 OPEN SPACE " A'iminimum of sixty percen~ (60%) of the project's gross area : ,' e~all be devoted to usable open space in accordance with ~' Coll~or County Ordinance 89-42. This requiromont ~hall not apply to individual development parcels. 3.10 CONCURRENCY MANAGEMENT '~ Development permitted by approval of this petition will be :~,:- ,:.subjec~ to a concurrency review under the provisions of the ? "Adequate Public Facilities Ordinance (APF0) No. 90-24 at ... .:, the ear:k±es~ or next to occur of either final SDP approval, "' :~.i or bu±ld±ng permit issuance applicable to ~his project. £ .?: , ::' 'q, ''r~:' ': SECTION I~ ,. The purpose o~ ~hia section is ~o se~ ~or~h ~he devel~pmen~ plan and regula~ions for ~he areas desiina~e~ on A~achmen~ 1, PUD Nas~er Plan, as Residen:ial. : ' t,.' -t' .. 4,2, NAIIMUM D~ELLIN~ UNITS ,' I maximua number of 63 sinSl~ family a~tached and/or detached unite may bm constructed. 1,3 PERNITTED USES AND STRUCTURES No building or structure, of par: thereof, shall be erected, altered or used, or lend used, in whole or part, for other '-- than the following: : ...../ A. Principal Uses: · ,,.: (2) Duplex ~,. .,. :.' . (3) Earthminins to b. permit~ed only ~( with water manasemen~/lake(s) sittns pursuan~ -,'-. to Collier County Ordinance No. 88-26. B. lccessor~ Uses: . (1) Customary accessory uses and structures, includin8 / priva:e 8ara8es. ':: '~'-; (2) Model Homes: :,. · a)~ Model homes shall be permitted in conjunction with the promotion of the development. No , more than three "Dry Models" mai be constructed ~' prior to recording of a pla: for the project if applied for by the project owner. Site(s) for the model(s) must conform :o toning standards and bo located on a future platted lot. A metes and bounds legal description shall be provided on the site plan required  as par% of the building permit issuance. ,; · Access shell be provided to each ~odel from the model serving as a "Sales Center" or an approved independent "Sales Center". Access ". shall be for pedestrian traffic only; no paved road will be allowed. ¥'" ' ' b) A "Sales Center'' may be constructed prior to recording of a plat. The "Sales Center" ..... shell be limited to one structure (one building permit). It may be serviced by a temporary utility system (i.e., dry well and septic tank/drainfield) prior to availability of central utility systems at which time connection to the central system will be made. Interim fire protection facilitiem in accordance with NFPA requirements are required unless a permanent water system is available to serve the Center. c) Review and approval of the "Salem Center" ........ shall follow the requirements of the Site Development Plan process (Zoning Ordinance, Section 10.5). A metes and bounds legal description shall be provided as part of the application. Access to the "Sales Center" shall be provided by a paved road or temporary driveway which meets County Standards. A water management plan must be provided which accommodates the runoff from the "Sales Center", the required parking, and access road/driveway and any other impervious surfaces. The system shall be designed to fit in with the master water management system for the entire development. d) At the time of building permit application ~ .... for a "Sales Center", a temporary use permit shall be obtained. "Sales Centers" may not be occupied until a Certificate of Occupancy is issued. Models must obtain a conditional  Certificate Occupancy purposes of for model only. Models may not be occupied until a permanent Certificate of Occupancy is issued. (3) Recreation facilities. (4) Water management facilities. DEVELOPMENT STANDARDS A. Gederal: Ail yards, setbacks, etc. shall be in relation to individual lot boundaries. B. Minimum Lot Area: 6,000 square feet. l P':~': !'~ Corner lots - 70 feet average between front and r:~.~ rearlot lines. In the case of wedge-shaped corner ':i lots, the front lot line shall be a line ! interconnecting the two points where side lot lines intersect street right-of-ways. ~7>ii 2) Interior lots - 60 feet average between front and ~ ;~ rear lot lines Do'~' Minimum Yard Requirements: · 1) Front Yard - 25 feet. ~:' 2) Side Yard - 7.5 feet unless zero lot line units are utilized where the minimum side yard shall (L?, be increased to 10 feet for the non-zero lot line. :,~ 3) Rear Yard - 20 feet. ,~ 4) Ail yards abutting a street shall be front yards. ~)1 Four-sided corner lots shall have two front and .~i~ tvo side yards (except where a lot abuts more than two streets; in this case, each side of the lot ab~ttin8 a street shall have a front yard). Five-sided corner lots shall have two front, two s~de and one rear rard with the rear yard being farthest from the abutting streets (except where a lot abuts more than two streets; in this case, each side of tho lot abutting a street shall have a front yard). E. Minimum Floor Area of Principal Structures: 1)One story: 1,200 square feet of living area exclusive of patio and garage. 2) Two story: 1,600 square feet of living area exclusive of patio and garage. F. Maximum Hei~h_~t: (1) Principal Structures - 30 feet. (2) Accessory Structures - 15 feet. G. Off-Street Parkin~ Re~uirements: As required by Collier County regulations in effect at the time building permits are requested. - 10- ,m..., mmm mm{m Signs: As requirod by Collior County rogulations in affect ,3at the time building permits are requested. As required by Collier County regulations in effect at the time building permits are requested. Additional Requirements: 1) Tracts B and D, as identified on the PUD Master attached uaita or entirely with single-family detached units. Furthermore, all iota developed in Tracts B and D shall be entirely zero-lot line units or entirely non-zero lot line units. 2) Tracts F and H, as identified on the PUD Master Plan, shall be developed entirely with single-family attached units or entirely with single-family detached units. Furthermore, all lots developed in Tracts F and H shall bs entirely zero-lot line units or entirely non-zero lot line units, 3) Each residential lot shall be developed with a maximum of one residential dwelling unit per lot. Furthermore, all single-family attached units shall be Joined along a common wall at the property line ~eparating the two residential lots while %.-_. maintaining a_minimum of a 10 foot si~e yard setback requirement for the non-zero side yard lot lines. In addition, all single-family detached units shall be required to maintain a minimum of a 7.5 foot side yard setback requirement for all side yards. SECTION ¥ 5,1 PURPOSE The parpos~ of this section is to set forth the development plan and regulations for the area designated on Attachment 1, PUD Master Plan, as Recreation. D~¥~LOPMENT PLAN The primary purpose end functEen of the recreation ares will be ko provide common recreation facilities for use · by residents and guests. 5.3 PERMITTED USES AND No ildln8 or structure, or part thereof, shall be erected, all,red or used, or land used, in whole or in part, for oth~r than the following: A. Permitted Principal Uses and Structures: 1. Open space and outdoor recreational facilities. 2. Pools, tennis courts, shuffleb°~rd courts, racquetball courts, associationYrecreation/meeting halls, chickee huts. 3. Perimeter fence and similar security s~ructures. B. Permit~ed Accessor~ Uses and Structures: 1. Accessory uses and structures customarily associated with principal uses permitted in this district. 5,4 PL;~N ~PPROYAL Plans for ~hese uses shall be submitted to Development Services for staff review and approval of the plans and their concept/design. Construction plans shall be in accordance with these approved plans. The perimeter boundaries of such plans shall be recorded in the same manner as a platted lot. PROPERTY DEVELOPMENT CRITERIA A. Overall site design shall be harmonious in terms of landscaping, enclosure of structures, location of access streets and parking areas (if any) and location and treatment of buffer areas. B. Minimum Yards - Both Frincipal and Accessory Structures: 1) Front Yard: 20 feet. 2) Side Yard : 7.5 feet. .... 3)' Redr Yard : 10 feet. 4) Separation between structures: 10 feet. C. Maximum Hei~h~ - 30 feet. D. Other Standards: Off-street parking, landscaping, -'signage, and other standards not addressed herein shall be as required by Collier County regulations ia effect at the time building permits are requested. E. Site Development Plan (SDP) approval ahall be required for the recreation area in accordance with Section I0.5 of'the Colli~r'Count! Zoning Ordinance. - 13- S~CTION VI WATER MANAGEMENT AREAS 6o! PURPOSE The purpose of this section is to set forth the development plan and regulations for the areas designated on Attachment 1, PUD Master Plan, as Water Management. .-~ 6.2 DEYELOPMENT PLAN The primary purpose of the water management areas will be for flood protection and water detention in accordance with applicable codes and ordinances. 6.3 PERMITTED USES A~D STRUCTURES No building or structure, or part thereof, shall be erected, altered or used, or land used, in whole or in part, for other than the following: A. Permitted Principal Uses and Structures: 1. Open space. 2. Lakes and other functional facilities for use such as water management. 3. Perimeter fence and similar securit! structures. B, Permitted Accessor~ Uses and Structures~ 1. Accessor! umes and structures customaril! associated with principal uses permitted in this district. 6°4 PLAN APPROVAL REQUIREMENTS Plans for these uses shall be submitted to Development Services for staff review and approval of the plans and their concept/design. Construction plans shall be in accordance with these approved plans. The perimeter boundaries of such plans shall be recorded in the same manner am a platted lot. SECTION VII GENERAL DEVELOPHENT COHHITHENTS 7.1 PURPOSE The. purpose of this Section is to set forth the development commitments of the project. 7,2 GENERAL A. Ail facllitie~ shall be constructed in strict accordance with the Collier County Subdivision Regulations, the County Zoning Ordinance and all applicable federal, state and local codes in effect at the time building permits are requested. B. This project ~hall be required to meet all Count7 ordinances in effect at the time buildin$ permits are requested. C. Subsequent to approval o£ this project, final construction plans and final subdivision plat shall be submitted for review and approval. 7,3 PUD MASTER PLAN A. The PUD Haster Plan, attached as Attachment 1 hereto, is an iljustrative preliminary development plan. The design criteria and layout iljustrated on the PUD Haster Plan shall be understood to be flexible s°~'thar~the'final"design may satia[! the project criteria and comply with all applicable requirements of this ordinance. B. Ail necessary easements, dedications or other instruments sh~ll be granted to ensure the continued operation and maintenance of all service utilities and aL1 areas in the pro~ect. C. Revisions to the PUD ~aster Plan may be permitted subject to Subsection 7.27J, of the Zoning Ordinance. EN¥I~ONMENTAL COMM£TMENTS A. Ail proposed mitigation for impacts to Collier County Jurisdictional wetlands shall comply with the ratios and requirements of Appendix 7 of the South Florida Water Management District rules. }litigation areas shall be surveyed prior to final construction plan approval and designated as a conservation easement and/or tract with protective covenants pursuant to Florida Statutes, Chapter 704.06. B. Prior to final plat/construction plan approval, the developer shall submit a typical building lot site clearing plan to be included in the homeowners' documents. WATER MA~&GEMENT A~P ENGINEERING COMMITMENTS A. Detailed paving, grading, site drainage and utility plans shall be submitted to Project Review Services for review. No construction permits shall be issued unless and until approval of the proposed construction in accordance with the submitted plans is granted by Project Review Services. B. In accordance with the Rules of the South Florida Water ...... Management District (SFWMD), Chapters 40E4 and 40E-40, this project shall be designad for a storm event of 3-day duration and 25-year return frequency. C. Design and con~truction of all improvaman~s shall be .subject to compliance with the appropriate provisions of the Collie;' County Subdivision Regulations. D. An Excavation Permit will be required for the proposed lake(s) in accordance with Collier County Ordinance No. 88-26 and SFWMD rules. Ail lake setbacks required by this Ordinance shall be adhered to unless reduced utilizing lake setback curves. E.A copy of SFWMD Permit or Early Work Permit is required prior to construction plan approval. F. Landscaping shall not be placed within the water management areas unless specifically approved by ?ro~ect Review Services. G. In addition to the 100 ft. of right-of-way being dedicated for the future Santa Barbara Boulevard extension, the developer shall dedicate an additional 140 ft. for a drainage easement for canal widening and maintenance purposes in accordance with the District No. 6 Drainage Study. Any reduction to this requirement is subject to review and approval by the W~,ter Management Director. H. For all off-site roads to be improved by the developer, drainage improvements for these roads to insure a positive discharge and adequate capacity is required in accordance with Collier County standards and South Florida Water Management District rules. Construction permit from South Florida Water Management District is required. Ail improvements shall be approved by the Transportation Services Director. Such improvements shall be limited to re-grading of roadside swales to insure positive and adequate flow. I. This project perimeter grading shall be designed for zero discharge for lO0-year, 3-dey storm event, unless drainage improvements, guaranteeing a positive outfall to Royal Woods Golf and Country Club, are constructed as part of the project development. J. Platting is required, in accordance with Collier County Subdivision Regulations, if any lots, tracts or parcels are to be sold. K. Work within Collier County right-of-way shall meet the requirements of Collier County right-of-way Ordinance No. 82-91. 7,6 TRANSPORTATION COMMITME~TS A. Based upon Future trip assignments to Santa Barbara Boulevard Extension (Davis Blvd. to RattlesnakevHammock Road), Whitsker Road, Sunsot Boulevard, and Polly Avenue, the following needs to be addressed by Collier County and/or the developer (subject to the determination of the Collier County Transportation S~rvices Administrator) prior to initiation of final development processes to include permits for site work: 1. The Developer shall provide appropriate right-of- way dedications for Whitaker Road (County Barn Rd. to Sunset Blvd.), Santa Barbara Blvd. Extension (parcel frontage), Sunset Blvd. (parcel frontage to Adkins Avenue), and Adkins Avenue (Sunset Blvd. to Santa Barbara Blvd. Extension). - 17- 2. Improvement of the above noted segments of Whitaker Road, Sunset Blvd. and, also, Polly Avenue to County ~> Standards i 3. The Developer shall dedicate appropriate drainage easements consistent with the overall area development plan. 4. Improvement of off-site drainage conveyance to a positive outfall. {' B ThE developer shall provide a fair share contribution toward the capital cost of a traffic signal at the project access to Santa Barbara Blvd. vis Whitaker Road when deemed warranted by the County. The signal shall be owned, operated, and maintained by Collier County. C. All traffic control devices used, excluding street name signs, shall comply with the Manual on Uniform Traffic Control Devices as required by Chapter 316.0747, Florida Statutes. D. Th~ Developer shall provide arterial level street lighting at all project accesses. E. Access improvements shall not be subject to impact fee credits and, excluding signalization, shall be in place before any certificates of occupancy are issued. F. Road impact fees shall be aa set forth in Ordinance 85-55, as amended, end shall be paid at the time building permits are issued unless otherwise approved by the Board of County Commissioners. G. Because of the p~tential of adjacent roadways not conforming to appropriate service level standards due to the rate of increase of traffic volumes versus scheduled/funded roadway capacity improvements, the developer is advised that future land development activities in the area may be subject to future land use control consistent with the Adequate Public Facilities Ordinance. H.With reference to Attachment 1 to this document, the following stipulations shall apply: '~i 1. A total of 174 feet of right-of-way East of the section line shall bo dedicated to Collier County as part of the platting process. - 18- 3'00 2.S~id right-of-way shall be dedicated for roadway and drainage purposes, 3, The use of 20 feet of this right-of-way along the Es, stern side for a berm to facilitate the water m~naRement lake is satisfactory with th~ sttpulat£on thet modifications to the berm may be mede by Collier County as a result of permitting and construction of Santa Barbara Boulevard. UTILITIES COMMII~ENTS A. Water service shall be provided through connection to th~ County central water system. B. The water main must be extended from the Collier County Water/Sewer District's existing transmission main on Whitaker Road to the project site and extended within the project, aa required. The system must be properly designed and sized to supply average and peak day domes~ic demand in addition to fire flow demand at a rate approved by the appropriate Fire Control District servicing the project area. C. Construction documents for the water and sewer improvements relating to the development of the property must be reviewed and approwed by Project Review Services prior to the approval of building permits on the property. D. Conveyance of the water and sewer service improvements to the Collier County Water/Sewer District must be completed prior to epproval of any Certificates of Occupancy for structures on the property. E. Construction and ownership of the water and sewer facilities shall be in compliance with all Utilities Division standards, policies, ordinances, practices, etc. in effect at the time construction approval is requested. i~, Sewer service shall be provided through connection to the County central sewer system. G. Connection to the existing water and sewer facilities within Whitaker Road right-of-way is required and must be fully iljustrated on the final construction plan and supporting engineering construction drawings as to location, size and configuration. H. This project shall be designed for central water and sewer systems. - 19 - ~ 7.8 FIII~ COMMITMEMTS ~ , Fire hydrants shall be appropriately located to meet the requLrements and approval of the local fire district. 7.9 EICEPTIONS TO COUNT! SUBDIVISION REGULATIONS A. .Article II, Section I?.H: Dead-end streets shall be designed as a cul-de-sac. However, such streets shall ~ot exceed 1,200 feet in length. B. Article I, Section 19: Street name sign~ shall be ~3pproved by Project Review Services and all traffic ,:.irculation signsge shall meet USDOT FHWA HUTCD requirements and standards. C. Article XI, Section 10: The requirement for reference ~erkers to be placed in water valve covers is waived, :~ubject to Project Review Services approval and subject t:o meeting State Statutes. - 20- ' STAT].-'. OF FLORIDA ) COUN:~Y OF COLLIER ) I, JAMES C. GILES, Clerk of Courts in and for the Twentieth Judicial Circuit, Collier County, Florida, do hereby certify th~At the foregoing is a true copy of: Ordinance No. 91-31 which was adopted by the Board of County Commissioners on the 9th day of April, 1991, during Regular Session. WITNESS my hand and the official seal of the Board of County Commissioners of Collier County, Florida, this 12th day of April, 1991. :~:.%:.i: JAMES C. GILES .~,.~ ~. t,~' .- ~.',':, Clerk of Courts and Clerk' ' Ex-officio to Board of.~ ~ County Commissioners ., DePUty Clerk /d :%%