Ordinance 92-089 AN ORDINANCE AMENDING ORDINANCE NUMBER
LO91-102 THE COLLIER COUNTY LAND
DEVELOPMENT CODE W~ICH ESTABLISHED THE
COMPREHENSIVE ZONING REGULATIONS FOR THE
UNINCORPORATED AREA OF COLLIER COUNTY,
LORIDA BY AMENDING THE OFFICIAL ZONING
TLAS MAP NUMBER 060910 BY CHANGING THE
ONING CLASSIFICATION FROM "A" AND "A"
ITH CONDITIONAL USE "6" (CHURCH) TO
C-3" FOR THE HEREIN DESCRIBED PROPERTY
CATED 700 FT. EAST OF SANTA BARBARA
OULEVARD ON THE SOUTH SIDE OF DAVIS
BOULEVARD IN SECTION 9, TOWNSHIP 50
SOUTH, RANGE 26 EAST, COLLIER COUNTY,
FLORIDA; PROVIDING FOR STAFF AND
PLANNING COMMISSION STIPULATIONS; AND BY
PROVIDING AN EFFECTIVE DATE.
WHEREAS, Dr. Neno J. Spagna of Florida Urban Institute,
Inc., representing New Hope Ministries, Inc., petitioned the
Board of County Commissioners to change the zoning
~lassification of ~he herein described real property;
NOW, THEREFORE BE IT ORDAINED BY THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER COUNTY, FLORIDA: ~. ~'
The Zoning Classification of the herein described real
property located in Section 9, Township 50 South, Range 26
East, Collier County, Florida, is'.changed from "A" and "A"
with Conditional Use "6" for a church to "C-3" and the
Official Zoning Atlas Map Number 060910, as described in
Ordinance 91-102, the Collier County Land Development Code is
hereby amended accordingly:
West 1/2 of the Northeast 1/4 of the Northwest 1/4
of the Northwest 1/4, Section 9, Township 50 South,
Range 26 East, Collier County, Florida. Less an
easement on, over and along the North 75 feet of
said property for Road right of way.
be and the same for which the rezone is hereby approved
subject to the following conditions: :
1. A Traffic Impact Statement shall be required at the
time of any eDP submission.
2. Detailed paving, grading, site drainage and utility
plans shall be submitted to Project Review Services
for review. No construction permits shall be
issued unless and until approval of the proposed
construction in.accordance with the submitted plans
is granted by Project Review Services.
3. Design and construction of all improvements shall
be subject to compliance with the appropriate
provisions of Division 3.2. of Collier County
Ordinance No. 91-102.
4. An Excavation Permit will b~ required for any
proposed lake(s) in accordance with Division 3.5 of
Collier County Ordinance No. 91-102 and SFWMD
rules. "
5. Work within Collier County right-of-way shall meet
the requirements of Collier County Right-of-Way
Ordinance No. 82-91.
6. All requirements of Division 3.2 of the Collier
County Land Development Code must be met since no
exceptions were requested.
7. Detailed water management plans and calculations,
signed and sealed by a Florida Professional
Engineer shall be provided prior to construction
plan approval.
8. This project shall be required to meet all County
..:.~.. Ordinances.in effect at the time final construction
documents are submitted for development approval.
9. Water distribution, sewage collection and
transmission facilities to serve the project are to
be designed, constructed, conveyed, owned and
maintained in accordance with Collier County
Ordinance No. 88-76, as amended, a~d other
applicable County rules and regulations.
10. Ail customers connecting to the water distribution
and sewage collection facilities to be constructed
will be customers of the County and will be billed
by the County in accordance with the County's
established rates.
11. The on-site water distribution system to serve the
project must be connected to the District's 16"
water main on the south side of Davis Boulevard
consistent with the main sizing z~quirements
specified in the County's Water Master Plan and
extended throughout the project. During design of
these facilities, the following features shall be
incorporated into the distribution system:
A. Dead-end mains shall be eliminated by looping
the internal pipeline network.
B. Stubs for future system interconnection with
adjacent properties shall be provided to the
east and the south property lines of the
project, at locations to be mutually agreed to
by the County and the Developer during the
design phase of the project.
12. There shall be only one connection to the County
Central Sewer System or a Master Pump Station as
follows:
The utility construction documents for the
project's sewerage system shall be prepared so that
all sewage flowing to the County's master pump
station is transmitted by one (1) main on-site pump
-2-
,oo,
station. Due to the design and configuration of
the master pump station, flow by gravity into the
station will not be possible. The Developer's
Engineer shall meet with the County staff prior to
commencing preparation of construction drawings, so
that all aspects of the sewerage system design can
be coordinated with the County's sewer master plan.
13. The following off-site Utilities Improvements shall
be made.
A · Water
The existing off-site water facilities of the
District must be evaluated for hydraulic
capacity to serve this project and reinforced
as required, if necessary, consistent with the
County"s Water Master Plan to insure that the
District's water system can hydraulically
provide a sufficient quantity of water to meet
the anticipated demands of the project and the
District's existing committed capacity·
B. Sewer
The existing off-site sewage transmission
facilities of the District must be evaluated
for hydraulic capacity to serve this project
and improved as required outside the project's
boundary to provide adequate capacity to
· .,'.. transport the additional wastewater generated
without adverse impact to the existing
transmission facilities.
14. Protected plant and animal species surveys may be
required for all separate and additional site plans
submitted to Collier County for approval if any
previous protected species, surveys"are over two
years old.
This Ordinance shall ~ecome effective upon receipt of
notice from the Secretary Of State that this Ordinance has
been filed with the Secretary of State.
PASSED AND DULY ADOPTED by the Board of County
County, Florida, this /~ day of
Commissioners
of
Collier
C(~LL~ER !~OUliTY, FLORIDA
Es c.. MIO.^EL .3PE,
APPROVED AS TO FORM AND LEGAL SUFFICIENCY
-'rT'v. .... .,~ 'rn ~.,~.~.-
MARJOR~E M. STUDENT Thls or~lnomce flied with the
ASSISTANT COUNTY ATTORNEY Se. cr;~ory of_,~tote's Offic.e..L~
/~,"'~'~ of ,,wv/-.
R-91-12 REZONE ORDINANCE and acknow~edgeme~n~o.f t~at
nb/6793 filina received tb~
-3- oi~- -'-'"~ '- '
STATE OF FLORIDA )
COUNTY OF COLLIER
I, JAMES C. GILES, Clerk of Courts In and for the
Twentieth Judtctal Circuit, Collier County, Florida, do
hereby certif%' that the foregoing is a true copy of:
Ordinance No. 92-89
~h~ch was adopted by the Board of County Commiss~oners on
the lOth day of November, 1992, during Regula~'S~ssion.
WITNESS my hand and the official seal of the Board
County Commissioners of Collier County, Florida, this 12th
day of November, 1992. :
JAMES c. ~ILES
Clerk of Courts and
County Commissioners
Deputy Clerk