Loading...
Ordinance 92-075 ORDINANCE 92-7~, ~ ORDINANCE AMENDING ORDINANCR" ~BER ~-102, THE COLLIER CO~TY ~D D~ENT ~DE WHICH ESTABLISHES ~E COMPREHENSI~ ~ZONING REGU~TIONS FOR ~E UNINCORPO~TED ~EA OF COLLIER COUNTY, F~RIDA, BY ~ENDING THE OFFICIAL ZONING AT~S ~P ~BER 9501S; BY C~GING ~E ZONING C~SSIFICATION OF THE HE~IN DES~IBED ~AL 'PROPERTY ~OM "~D" TO "~D", P~D ~IT D~PMENT, ~0~ AS O~GE B~SSOM G~DENS PUD, FOR 40 ~LTIP~ F~ILY D~LLING ~ITS, FOR PROPERTY ~TED ON ~ NORTH SIDE OF O~GE B~SSOM DRIP, APPROXI~TELY 700 FE~ EAST OF AIRPORT-PULLING ROAD (C.R. 31), LYING IN SE~ION 1, TO.SHIP 49 SO.H, ~GE 25 EAST, COLLIER CO~TY, F~RIDA, CONSISTING OF 11.7 A~S; BY ~P~LING ORDIN~CE ~BER 85-5 ~ICH ORIGINA~Y ESTABLIS~D ~E O~GE B~SSOM G~DENS ~D; ~D BY PROVIDING ~ EFFE~I~ DATE. WHEREAS, the Orange Blossom Gardens Planned Unit Development (PUD), which permits 84 dwelling units at a density of 7.2 units per acre, has been found to be inconsistent with the Density Rating System contained in the FiXtUre Land Use Element of the Growth Management Plan; WHEREAS, the Collier County Growth Planning Department petitioned the Board of County Commissioners to change the zoning classification of the herein described real property to be consistent with the Future Land Use Element, of the Growth Management Plan; NOW THEREFORE BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA~ The Zoning Classification cf the herein described real property located in Section 1, Township 49 South, Range 25 East, Collier County, Florida, is changed from "PUD" to "PUD", Planned Unit Development, in accordance with the PUD document attached hereto as Exhibit "A" which is incorporated herein and by reference made part hereof. The Official Zon~ng~Atlas Map Number 9501S, as described in Ordinance Number 91-102, is hereby amended accordingly. Ordinance Number 85-5, known as the Orange Blossom Gardens PUD, adopted on January 15, 1985 by the Board of County Commissioners of Collier County, Florida, is hereby repealed in its entirety. This Ordinance shall become effective upon receipt of notice from the Secretary of State that this Ordinance has been filed with the Secretary of State. PASSED A~{D DULY ADOPTED by the Board of County Commissioners of Collier County, Florida, this ~ day of October , 1992. · 4ATTEST: .' ..". '.~, BOARD OF COUNTY COMMISSIONERS Approval'am to form and legal sufficiency ~a~J~ie M% Student Aeeis%ant County Attorney TI~ om~nance reed ~t~ ~e ZO ORANGE BLOSSOM GARDENS PLANNED UNIT DEVELOPMENT PREPARED BY: COASTAL ENGINEERIN~ CONSULTANTg, INC. REVISED OCTOBER 19, 1992 BY THE COLLIER COUNTY LONG RANGE PLANNING DE.P. ARTMENT Exhibit TABLE OF CONTENTS PAGE SECTION I PROPERTY OWNERSHIP, DESCRIPTION AND 1-1 STATEMENT OF COMPLIANCE 1.1 Purpose 1.2 Legal Descrl'ption 1.3 Property Ownership 1.4 General Description of the Property Area 1.5 Physical Description 1.6 Statement of Compliance SECTION II PROJECT DEVELOPMENT 2-1 2.1 Purpose 2.2 General 2.3 Project Plan and Land Use Tracts 2.4 Maximum Project Density 2.5 Site Development Plan Approval Process SECTION III MULTI FAMILY RESIDENTIAL DEVELOPMENT 3-1 3.1 Purpose 3.2 Maximum Dwelling Units 3.3 Permitted Uses 3.4 Regulations 3.4.1 Minimum Lot Area 3.4.2 Minimum Lot Width ' 3.4.3 Minimum Yards 3.4.4 Minimum Floor Area 3.4.5 Maximum Meight 3.5 Off Street Parking SECTION IV DE%-ELOPMENT STANDARDS ~ ~ .. 4-1 4.1 Purpose 4.2 General 4.3 P.U.D. Master Development Plan 4.4 Clearing, Grading, Earthwork & Site Drainage 4.5 Street Construction 4.6 Easements for Underground Utilities 4.7 Utility Department Stipulations 4.8 Water Supply 4.9 Solid Waste Disposal 4.10 Other Utilities 4 · 11 Signs 4.12 Landscaping 4.13 Water Management 4.14 Polling Places 4.15 Platting 4.16 Environmental Stipulations 4.17 Traffic LIST OF EXHIBITS Exhibit "A" (Figure 1) - PUD Master Plan Exhibit "B" (Figure 2) - PUD Master Drainage Plan SECTION I PROPERTY OWNERSHIP, DESCRIPTION AND STATEMENT OF COMPLIANCE 1.1 PURPOSE The purpose of this Section is to set forth the location and ownership, and to describe the existing condition of the property proposed to be developed under the project name of Orange Blossom Gardens. 1.2 LEGAL DESCRIPTION The E% of the NE~ of the NW ~ of the SW~ and the W% of the NE% of the }~% of the SW~ of Section 1, Township 49 South, Range 25 East, Collier County, Florida. 1.3 PROPERTY OWNERSHIP The BubJect property is CUrrently under the ownership of Lone Oak 1.4 GENERAL DESCRIPTION OF THE PROPERTY AREA A. The project site contains 11.7 acres (+). It is located on the north side of Orange Blossom Drive approximately 671' east of Airport Road. Orange Blossom Drive inter~ects Airport Road approximately 1% miles north of Pine Ridge Road. B. Current zoning is PUD. The parcel is bounded on the south by Orange Blossom Drive then land zoned PUD, Planned Unit Development (Lo~e Oak),..on the east and west by private property zone'd A, Ru~'~I Agricultural, and on the north by land zoned PUD (Citrus Gardens). The property is within the Collier County Water and Sewer District and Collier County Water Management District #7. 1.5 PHYSICAL DESCRIPTION The subject property has been farmed. About 40% of the 11.7 acres has been used as a borrow pit which now covers approximately 4% acres of the site and extends off the property to the west. Less than 30 feet east of the east property line a borrow pit runs along 90% (+) of the property line. The land directly north of the site has been used in the past for agricultural purposes and as an excavation site (borrow pit) but is now developed with a residential project around a lake. Soil types found on the site are: Arzell sand (approx. 60%), and Immokalee fine sand (approx. 40%). (Soil characteristics are from the USDA soil survey of Collier County dated March, 1954.) 1.6 STATEMENT OF COMPLIANCE The Orange Blossom Gardens Planned Unit Development is consistent with the Collier County Growth Management Plan for the following reasons: A. The project site is designated Urban Residential on the Future Land Use Map and in the F~ture Land Use Element. The permitted uses in this PUD are permitted in the Urban Residential Area. Properties designated Urban Residential are permitted a base density of up to 4 units per acre. The property is located within the Traffic Congestion Area resulting in the reduction of 1 unit per acre (from 4 1-1 C57. 23 units/acre to ) units/acre). An interconnecticn with adjacent properties is not feasible. No other provisions of the Density Rating System to add or subtract density are applicable. Therefore, a density of 3 units per acre conforms to the Density Rating System contained in the Future Land Use Element. The Board of County Commissioners has determined a density of 3.42 units/acre (40 units) is necessary so as to allow a development compatible with surrounding properties. B. The project is compatible with surrounding land uses in accordance with Policy 5.4 of the Future Land Use Element. Elevations within the project site range from 10.5(+) to 11.5(+) with the average grade being 11.2. Three auger borings within the project site failed to find bedrock. The borings were discontinued at a depth of 19 feet. Vegetation consists of scattered second-growthpine trees, some small Wax Myrtle shrubs, grasses and Brazilian Pepper. The area appears to have been cleared for agricultural use. Four shallow swales run the length of the property north to south. Water management for the project will utilize a swale through property to the northwest to convey lake overflow from storm runoff to the Airport Road Canal. A baffled weir will limit the discharge rate to an amount acceptable to the Collier County Water Management Department. SECTION I~ PROJECT DEVELOPMENT 2.1 PURPOSE The purpose of this section is to describe the general plan of development for the project including land uss and density. 2.2 GENERAL A. Regulations for development of Orangs'Blossom Gardens shall be in accordance with the contents of this document, and any applicable sections and/or parts of the Collier County Land Development Code. B. Unless otherwise noted, the definitions of all terms shall be the same as those set forth in the Land Development Code. 2.3 PROJECT PLAN AND LAND USE TRACTS A. The project site plan, including street layout and lend use, is shown in Exhibit A, the P.U.D. Master Plan. There will be one land use tract plus necessary street rights of way. In. addition to the various areas and specific items shown on Exhibit A, such easements (utility, private, semi-private, semi-public, etc.) shall be established within or along the various tracts as may be necessary or deemed desirable for the service, function or convenience of the project residents. 2.4 MAXIMUM PROJECT DENSITY '~ A maximum of 40 residential dwelling units in a multi-family configuration shall be constructed in the project area. The gross project area is 11.68 acres. The gross density will be 3.42 units per acre. 2.5 SITE DEVELOPMENT PLAN APPROVAL PROCESS The procedures outlined in Division 3.3 of the Land Development Code shall be followed for Site Development Plan approval. SECTION ~ MULTI FAMILY RESIDENTIAL DEVELOPMENT 3. I PURPOSE Th,~ purpose of this section As to set forth the deveXopment plans and regulations for the project. 3.2 MAXIMUM DWELLING UNITS A maximum of 40 dwelling units will be constructed on the site. 3.3 PERMITTED USES No building, structure or par~ thereof, shall be erected, altered, or used, or land used, in whole or in pa~, for other than the following: A. Principal Uses: 1. Multi-family residences B. Accessory Uses: 1. Accessory uses and structures, including storage facilities. 2. Recreational uses and facllAties, such as swimming pools, and children' s playground areas. Such uses shall be visually and architecturally compatible with adjacent residences. 3.4 REGULATIONS .... 3.4.1 Minimum Lot Area: A. I acre · 3.4.2 Minimum Lot Width: A. 200 feet 3.4.3 Minimum Yards: A. Setback along north, south and west side -35' B. Setback along east sade - 25I C. Setback from lake - 30" D. Distance between principal structures - 20'. 3.4.4 Minimum Floor Area: A. 900 square feet 3.4.5 Maximum Height: A. Two floors of living area with option of having one (1) floor of parking beneath the living area. 3.5 OFF STREET PARKING Off-street parking shall be provided as required by Division 2.3 of the Land Development Code. 3-1 SECTION IV DEVELOPMENT STANDARDS 4.1 PURPOSE The purpose of this section is to set forth the standards for the development of this project. 4.2 GENERAL All facilities shall be constructed in strict accordance with the final development plan and all applicable state and local laws, codes and regulations. 4.3 P.U.D. HASTER DEVELOPMENT PLAN A. Exhibit "A" (Figure 1), the P.U.D. Master Plan, iljustrates the proposed development. B. Minor site alterations to the Master Plan may be permitted in accordance with Subsection 2.7.3.5 of the Land Development Code. C. Ail necessary easements, dedications, or other instruments shall be granted to insure the continued operation and maintenance of all service utilities and project areas. 4.4 CLEARING, GRADING, EARTHWORK & SITE DRAINAGE All clearing, grading, earthwork & site draina~9 work shall be performed in accordance with applicab~e State'~d local codes. 4.5 STREET CONSTRUCTION Ths internal road will be 24" wide with 90' parking 18 feet deep, in accordance with zoning regulations. 4.6 EASEMENTS FOR UNDERGROUND UTILITIES Easements for underground utilities such as power, telephone, cable T.V., wastewater collection, water distribution, and similar uses shall be located and granted as required for those purposes. 4.7 UTILITY DEPA~ENTSTIPUI~TIONS A. Water distribution, sewage collectio~ and transmission facilities to serve the project are to be designed, constructed, conveyed, owned and maintained in accordance with Collier County Ordinance No. 88-76, as amended, and other applicable County rules and regulations. B. Ail customers connecting to the water distribution and sewage collection facilities to be constructed will be customers of the County and will be billed by the County in accordance with the County's established rates. C. The on-site water distribution system to serve the project must be connected to the District"s 12 inch water main on the west side of Airport Pulling Road consistent with the main sizing requirements specified in the County's Water Master Plan and extended throughout the project. During 4-1 design of these facilities, dead end mains shall be eliminated by looping the internal pipeline network. D. The utility construction documents for the project's sewerage system shall be prepared so that all sewage flowing to the County's master pump station is transmitted by one (1) main on-site pump station. The Developer's Engineer shall meet with the County staff prior to commencing preparation of construction drawings, so that all aspects of the sewerage system design can be coordinated with the County's sewer master plan. E. The existing off-site water facilities of the District must be evaluated for hydraulic capacity to serve this project and reinforced as required, if necessary, consistent with the County's Water Master Plan to insure that the District's water system can hydraulically provide a sufficient quantity of water to meet the anticipated demands of the project and the District's existing committed capacity. F. The existing off-site sewage transmission facilities of the District must be evaluated for hydraulic capacity to serve this project and improved as required outside the project's boundary to provide adequate capacity to transport the additional wastewater generated without adverse impact to the existing transmission facilities. 4.8 WATER SUPPLY See Utility Departments Stipulations, Section 4.7. 4.9 SOLID WASTE DISPOSAL .... ' Arrangements shall be made with the Collier County solid'waste disposal franchise holder to provide for solid waste collection to serve the project. 4.10 OTHER UTILITIES Utility lines for Telephone, Power, and Cable T.V. service, when available, shall be installed underground. 4.11 SIGNS Ail signs shall be in accordance with Division 2.5 of the Land Development Code. 4.12 LANDSCAPING All landscaping shall be in accordance with Division 2.4 of the Land Development Code. The open space area identified on the PUD Master Plan shall be grassed and landscaping shall be provided around the perimeter. A landscaped buffer in accordance with Section 2.4.7, Alternative B, of the Land Development Code shall be provided along the north and west property lines except where the lake is located, and along the south property line except at the project entrance. 4.13 WATER MANAGEMENT A. Detailed site drainage plans shall be submitted to the Project Review Services Section for review. No construction permits shall be issued unless and until 4-2 approval of construction in accordance with the submitted plans is granted by the Project Review Services Section. B. An Excavation Pe~it will be required in accordance with Division 3.5 of the Land Development Code in order to bring the existing lake into compliance with present-day standards. 4.14 ~LLING PI~CES Space shall be provided within common areas for the pUll, cee of pe~mitting residents to vote during elections, if recruited by the Collier County Supervisor of Elections in accordance with Section 2.6.30 of the Land Development Code. 4.15 PIA~ING Platting shall be required if units ara to be sold fee simple or if the project is developed as an integrated phased SDP, in accordance with Section 3.2.4.4 of the Land Develo~mment Code. 4.16 E}~VIRO~MENTAL STIP~IATIONS A. Native species shall be utilized, where available, to the maximum extent possible in the site landscaping design. A landscaping plan will be submitted to ~roJect Review Services for their review and approval. ~nis plan will depict the incorporation of native'species and their mix with-other species, if any. ~ne goal of site landscaping shall be in the recreation of native vegetation and habitat characteristics lost on the site during construction or due to past activities. B. Ail exotic plants, as defined in the:~nd Development Code, shall be removed during each phase of constru~ion from development areas, open spaces areas, and preserve areas. Following site development a maintenance program shall be implemented to prevent reinvasion of t~e site by such exotic species. ~nis plan, which will describe control techniq%~es and inspection intervals, shall be filed with and subject to approval by Project Review Services. C. If, during the course of site clearing, excavation, or other construction activity, an archaeological or historical site, az~cifact, or other indicator is discovered, all development at that location shall be immediately stopped and the ~roJect Review Services Section notified. Development will be suspended for a sufficient length of time to enable the Project Review Services Section or a designated consultant to assess the find and detez~ine the proper course of action in regard to its salvgeability. ~ne Project Review Services Section will respond to any such notification in a timely and efficient manner so as to provide only a minimal interruption to any construction activities. 4.17 %~RAFFIC The developer shall provide a fair share contribution toward the capital cost of a traffic signal and related intersection improvements should they become needed in the future. The signal will be owned, operated and maintained by the County. ORANGE B~OSSOM CARDENS LAKE IEWAOE TREATMENT AREA ORANGE BLOSSOM DRIVE SCALE ORANGE BLOSSOM GARDENS. MASTER"PLAN ~OOK · CONSULTA..NTS .' INC.. Figure I ' Exhibit & AIRPOR'T' ROAD CANAl.. ~ I I ; OAANOI BLOB 8OSd COASTAL, ENOINEllqltdO C04qlIIUI,,TANTL iHc. I~i f"~----a'~ '" MASTER DRAINAGE PLAN " Figure 2 £xhtbt~ a COUNTY OF COLLIER I, IAMES C. GILES, Clerk of Courts in and for the Twentieth Judicial Circuit, Collier County, Florida, do hereby certify that the foregoing is a true copy of: Ordinance No. 92-75 which was adopted by the Board of County Coutlsionera on the 19th day of October, 1992, during Specia~ Session. WITNESS my hand and the official .leal of ~ Board of County Commissioners of Collier County, Florida, this day of October, 1992. " Clerk of Courts and.Olerg .. Ex-officio to Board'of County ¢ommtsstoner~ Deputy Clerk