Ordinance 93-24 FIL i.:D
ORDIN.,afl'aCE NO. ~3-
':~ NO. 89-05, ~ ~DED, FOR ~ ~INCOR~TED
~ OF COLLI~ CO~Y ~ ~ND ~E CAPITAL
~O~ EL~, ~LICIES, TO ~D CAPITAL
costs
UPDATING COSTS ~D ~ES~ TO ~ND ~E /~
DESI~RATION DES~I~IONS, ~LICIES, ~ ~%
USE ~P SERIES~ TO ~ND ~E ~FFIC CIR~TIO~
E~ EXISTING CONDITIONS ~D ~ ~, ..... .~
CONDITIONS ~PS, TAB~S, ~LICIES ~D TE~ TO
~D ~E ~BLIC FACILITIES E~ (SOLID W~TE
SUB-E~) ~L OF SERVICE ST~D~D~ TO ~ND
~ I~O~E ~ ~ST~ P~ ~LICIES~ TO ~ND
~E GO~EN GATE ~ ~TER P~ ~LICIES,
~OVIDING FOR S~BILITY~ ~D PROVIDING ~
EFFE~I~ DATE.
~, the ~ard of County Co~issioners adopted ~e CollSer
?~,: Co~ty Gr~ Management Plan on Janua~ 10, 1989~ and
~, CollSer County has held p~l~c hearSngs to provide for
an~ enc~rage ~1~ pa~$c~pat$on throughout the 1992 plan
~en~ent process 7 and
~, Collier cowry d~d s~mit the 1992 Gro~ Management
Plan ~en~ents to ~e State ~nd Pla~ng Agen~ for prelSm~na~
r~iew on ~ce~er 21, 1992~ and
,.~ ~, the State ~nd Planning Agen~ did review and make
~$tten objections to ce~ain sect$ons of the pro~sed Plan and
;,; transmitted ~e same in ~$~ng to Collier County wl~n ~e tSme
pr~Sded by law7 and
t:" ~, Collier county has m~xty days from receipt of the
~itten obJect~ons from the S~ate ~nd Planning Agen~ to adopt,
adopt wi~ changes or not adopt the proposed amen~ents to
, :'... Gr~ Manag~ent Plan7 and
L~77/~. ~, ~m Collier Co~ty Planning Co~ss~on ~n a manner
· ?~..~'~ .
prescribed by law d~d hold public hearings conceding the adoption
.' of the amen~ents to the Gro~ Management Plan on May 6, 1993, and
~ . reco~ended their adoption by the Board of County Co~iss~oners7 and
- i -
~' WHEREAS, the Board of County Commissioners of Collist County did
:i~ take action in the manner prescribed by law and did hold public
., hearings concerning the adoption of the amendments to the Growth
· Management Plan on May 25, 1993 and
i WHEREAS, all applicable substantive and procedural requirements
~if of law have been met~ and
'~'
· ' NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that:
~z ADOPTION OF 1992 GROWTH MANAGEMENT PLAN AMENDMENTS
This Ordinance as described herein, shall be known as the 1992
Growth Management Plan Amendment for Collier County, Florida. The
Collier County Growth Management Plan Amendment, attached hereto and
incorporated herein by reference as Exhibit A, consists of
l... amendments to the following= the Capital Improvement Element
.:- Policies, Capital Improvement Element Update for Costs and Revenues,
.:; Capital Improvement Element Schedule of Capital Improvementsx Future
lind Use Element, Future lind Use Designation Descriptions,
Policies, Future lind Use Map Seriesy Traffic Circulation Element
..' Existing Conditions and Future Conditions Maps, Tables, Policies and
Text~ Public Facilities Element (Solid Waste Sub-Element) level of
Service Standard~ Immokalee Area Master Plan Policies and Golden
v! Gate Area Master Plan Policies.
~...
'~ ~a~Z SEVERABILITY .
If any phrase or portion of this Ordinance is held invalid or
=~..~. unconstitutional by any court of competent Jurisdiction, such
' portion shall be deemed a separate, distinct and independent
provision and such holding shall not affect the validity of the
!. remaining portion.
;. ~E~==a~l_~z EFFECTIVE D~TE
This Ordinance shall become effective upon receipt of notice
from the Secretary of State that this Ordinance has been filed with
the Secretary of State.
- 2 -
P~SSED ~ND DULY ADOPTED by the Board of County Commissioners
Col. liar County this ~' day of ~~___, 1993.
~ ~ '. BOARD OF COUNTY CO~aSSIONERS
;r~;:,. CLERK CO~L~IER COUNTY, FLORID~
":; ':: '3:.; ,. ',..
. ~ tFRT 'L. SAUNDERS, CHAIRNAN
.... ~ ......... '~
Approve4' aS to' form and
~i.;.' legal sufficiencyx
r.. .
~ exefinancm filed with
~dent f ~t
Am County Attorney rxe
..:
The standards for levels of service of public facilities shall be as
':', follows:
Categor~APublia Faollities
', a~ County Roads
A1,1 County afterlois and collector roads= Level of Service as
~:<. indicated" "below on the basis of peak hour, peak season
traffic
;~' Level of Service "E" on the following designated roads=
Roads From - To
Airport Pulling Road Pine Ridge Road to Golden Gate
Golden Gate Parkway Airport Road to Santa Barbara
"' Boulevard
Coodlette-FTank Road Pine Ridge Road to Golden Gate
' Parkway
~(!':: Goodlette-FrankRoad Golden Gate Parkway to US 41
Pine Ridge Road Airport Road to 1-75
>"' A1.2 Level of Service "D" peak hour, peak season on all other
County arterial and collector roads, however any section of
~2 road may operate at Level of Service "E" for a period not to
exceed two fiscal years following the determination of Level
of Service "E" in order to provide the County with time to
restore Level of Service "D" by making appropriate improve-
ments. Development orders may be issued during the two year
.~ period to the extent their issuance is consistent with
Policies 1.5.3 and 1.5.4 of this Element.
State and Federal RoadsT
~: EXISTING ~XNSITIONZNG
]. RTIRAL~EA URBRNZZED ]~REA URBANZSED 2~REA
, 1-75 C D C
· .'.] US 41 C D
! SR-84
SR-951 -
~,., a3 County Burface Water Management Byetomes
~,.
;:~ * A3.1 Future "private" developments - water quantity and quality
standards as specified in Collier County Ordinances 74-50 and
90-10.
· A3.2 Existing "private" developments and existing or future public
· drainage facilities - those existing levels of service
identified (by design storm return frequency event) by the
· '~ ,., completed portions of the Water Management Master Plan as
... · Amended February 5, 1991
listed in the Drainage/Water Management Subelement of the
Public Facilities Element.
a4 County Potable Water Systemsz
A4.1 County systems
'~,., 135 gallons per day per capita plus 21% for non-residential
A4.2 City of Naples - 150 gallons per capita per day
A4.3 Private potable water systems:
Sewage flow design standards as identified in Policy 1.3.1 of
the Potable Water Subelement of this Growth Management Plan.
i~= aS County 8anitar~ Sewer Systemsz
A5.1 County systems:
100 gallons per day per capita plus 21% for non-residential
A5.2 City of Naples - 150 gallons per capita per day
A5.3 Private sanitary sewer systems:
Sewage flow design standards as identified in Policy 1.2.1 of
the Sanitary Sewer Subelement of this Growth Management Plan.
County Solid Waste Disposal Facilities~
A6.1 l.~zJatons of Solid Waste per capita per year
A6.2 Two years of landfill lined cell disposal capacity at present
fill rates
A6.3Ten years of landfill raw land capacity at present fill
rates
&7 County Parks and Recreation Faoilities~
A7.1 Regional Park land a 2.9412 acres per 1,000/pop.
!, A7,2 Community Park land - 1.2882 acres per 1,000/pop.
'~:=~ A7.3 Recreation facilities - $122.00 capital investment per
~' capita (at current cost}
!'. CategozTB Public Faoilitiesl
~]. B1 County Library Buildings : 0.33 square feet per capita
': B2 County Library Collection : 1.0 books per capita
/'.' B3 County Jail : C.OO2= 0.0024 beds per capita
B4 County Emergency Medical : 0.00006 EMS units per capita
;. Service
CIE - 6
Doc. Ref: 5958
;i!1'
capital improvement that is needed to achieve or maintain standards
for levels of service. Notwithstanding other provisions o£ this
polic~, general obligation bonds approved by referendum may be used
for any public facilities to acquire capacity needed vl~hin ~he five
year capital improvements plan o~ Zo~ excess capacity.
~e County shall no~ provide a publl~ ~aciZi~y, nor Ehall l~ aQ~ep~
~e proviElon oZ a publlQ facility by o~he~s, l~ ~e County Is ~abZe
to pay ~o~ ~e subse~en~ annual operating and maintenance costs
~e facility.
~ior to fiscal ~ear 1989-90, the County shall adopt a revised Ro~d
Impact Fee Ordinance requir~n~ the same level oZ Eelice standard aS
adopted in POli~ 1.1.50E this element In order to 8sBess new
development a pro rata share o~ the COSTS retired to finance
~ansportation improvements necessitated by such development.
~e C~ty shall continue to coilact impact fees for Parks and
Recreation and Libra~ ~acllities retiring the same level oZ
standard 82 8dopted ~n Policy ~,1,5 o~ this element in order to 882228
new development a pro rata share o~ the costs retired to finance
~,kE and Eecreation and Libra~ ~mprovemen~s necessitated by su~
development.
..; t ~oli~ ~.2.e~
· ' ~e Count~ viII ~ssue Revenue Bonds In FY94 ==d ~ se~ed ~ a
' non-ad valorim covenant to budget and appropriate to fund ~e revenue
~.'-~ shortfall for Gouty road improvements identified In ~e Schedule o~
Capital Improvements.
~e prima~ source o~ Zundinq for CIE Project ~400, County ~all, will
~;':~ · ~ a General Obli~ation Bond referendum for approval oZ a bond issue
, to ~ financed by n new ad valorem tax.
,~(! t Amended May 19, 1992
I AGENDA ITEM
-'. CIE-I1
: .o, rJ60,., , 198 MAY 2. 5 1993
facilities to met the standards for levels of service for existing
population and the proposed development. No building permit shall be
issued by the time mandated for the adoption of land development
regulations pursuant to Chapter 163.3202, F.S., including any
amendments thereto unless the levels of service for the resulting
development will achieve the standards in Policy 1.1.5, Category A,
and the requirements for Concurrency Management as outlined in the
policies within Objective 1.5 of this element are met.
Public facilities and services provided by Collier County with Public
funds in accordance with the 5-veer Schedule of Capital Improvements
will be limited to Service Areas established within the boundarie~
desicl~ated on MaD PW-1 titled. "Collier Countv's Three [3) Water
or Sewer Districts Boundaries". eDDearina in the Public Fscilitie~
Element for water and sewer. Roads improvements will be Provided
desicnated on MaD TR-4W titled. "5-veer Capital Improvement Elemen~
MAD". aDDearina in the Traffic Circulation Element. All other Dubll~
facilities and service tVDeS Will be PrOVided on a countv-wi~
availability basis.
CONCURR~fCX MANAGEMENT
~B~T!~CTIV2 1,St
To ensure that uublic facilities and services needed to suuuort
deVeloPment are nvallable concurrent with the impacts of such
development. the Countv's Concurrency Manaaement Svstem. shall be
Consistent with Cha~ter 163. Part II. Florida Statutes. and Rule
~-5,0055. Florida Administrative Code. The County shall establish
a reaulatorv and monitorina Droaram to ensure the schedulinqf
fundine and timeIv construction of Cateaorv A ~ublic facilities
concurrent with. or nrior to. the issuance of a buildina ~ermit to
achieve and maintain adopted level of service standards,
The concurrencvreauirement for thePotable Water. Sanitary Sewer.
Drainaae. and SolidW.asteLevel of Service Standards of this GrO~l;h
Hanaaement Plan will be achieved or maintained if any one of the
Zollowina standards of the Concurrency Manaaement System are met:
The necessary facilities and services are tn Place
time a bulldine ~ermit is issued~ oV
B. ~he necessary facilities and services. are under
construction at the time a bulldine permit is iSSUed: or
C. The necessary facilities and services ar~ruarante~d
an enforceable development a~reement that incl~ldes the
provisions of ~ara~raDhs A and B of this DOliCV.
enforceable development aareement may include. b~t is not
· limited to. development aareements ~ursu~nt to Section
163,3220. Florida Statutes. or an aareement
develooment order issued oursuant to Cha~ter 380, Florida
Statutes. The aareement must ~uarantee that the
necessary facilities will be in ~lace when the impacts of
the development occur.
The concurrency recmirement for the Recreation and Open Space Level
o~ Service Standerda of this Growth Mariacement Plan will be
achieved or maintained If any one of the followin~ standards
Concurrency HanaQement System are met2
~.ComDliance with any one of the standards set forth in
Policv 1.5.1 A. B. and C is met: or
B. At the time the bulldine permit is issued, the neceWsarv
facilities and services are the subject of a bindina
executed c~ntract which provides for commencement
actual construction of the reauired facilities withi~ one
year of the issuance of the bulldine permit: or
sso zoo
7
C. The necessary facilities and services are cuaranteed in
an enforceable development aareement which reauires
commencement of the actual construction of the facilities
within one veer of the issuance of the aDolicable
buildina permit. An enEorceable development a~reem~nt
mar include, but is not limited to. development
aareements mursuant to Section 163.3220. Florida
Statutes. or an aQreement or development order isW~ed
pursuant to Chapter 380. Florida Statutes.
· The concurrency rea~irement of the Traffic Circulation T~evel of
" Service Standards of this Growth Manaaement Plan will be achieved
or maintained if any one of the foliowine standards of th~
Concurrency Manaaement System are met:
A~ Compliance with any one of the standards set forth in
Policies 1.5.1 A. B. and C and 1.5,2 B and C is met~ or
In areas in which Collier County has committed to ~rovid~
the necessary public facilities and services in
accordance with its five-year schedule of capital
im~rovements. the concurrency reauirement of the Traffic
Circulation Iavel of Servic~ Standards would be achieved
or maintained if all of the foliowine standards o~ th~
Concurrency Manaaement System. based UDOn an Xdeauat~
Capital Improvements Proatom and adeauate im~lementina
reculations. are ~et~
1, ~ Capital rm~rovements Element and a five-year
Schedule of Capital Improvements which. in addition
to meetin~ all of the other statutory and rule
recuiraments. must be financialiv feasible. The
CaPital Improvements Element and Schedule of
Capital Imorovements mav recoanize and include
transportation ~ro~ects included in the first three
years of the e~licable. adopted Florida Department.
of Transportation five-year work orOcram, .
2. A five-year Schedule of Capital Improvements which
must include both necessary facilities to maintain
the adopted level of service standards to serve th~
new development oro~osed to be ~ermitted ~d th~
necessary facilities reauired to eliminate thos~
oortions o~ existina de~iciencies which are a
priority to be eliminated durina the five-~ear
oeriod under the Schedule of Capital Improvements.
3. A realistic. financially feasible fu~a svstem
based on currently available revenue sources w~ich
must be adeauate to fund the ~ublic facili~ie~
required to serve the development authorized by th~
bulldine ~ermit end which ~ublic facilities ar~
included in the five-veer Schedule of Capital
4. A five-year Schedule of Capital ~mprovements which
mu,~t include the estimated date of commencement of
actual construction and the estimated date
Dro~ect completion.
5. A five-veer Schedule of Capital Improvements which
munt demonstrate that all actual construction
the road facilities and the provision o~ services
is scheduled to commence in or before the third
Year of the five-year Schedule o~ CaPital
6. A nlan amendment is reauired to eliminate. defer
delay construction of any road ~ro~ect which
needed to maintain the adopted level o~ servic~
standard and which is listed in the five-year
Fz~edule o~ Improvements.
On or before October 1. 1993. the County shall implement. ~hrouah
the adoption of an ordinance. a ConcurrencvManaaement System which
shell include a reaulatorvproaram and monitorina system consiste~
with this Growth Manaaement Plan and consistent sDeci~icallv with
the ~olicies under Ob~ective 1.5 o~ this Cauital Improvements
Element. The monitorina system shall enable the County
determine whether it is adherina to the adopted Level of Servi~
Standards and its Schedule of Capital Improvements.
CONCURRENCY
I=prcvc=cn~= =boll ~= ~===d cn
,,,_a~,~ , ...... , -,,,a~-- from
AG~NDA ~EM
.~/ CIE - 16
' ~oo, ~60 P~s~ ~3 MAY ~ 5 1993
Doc. Ref: 5947
AGEMDA
CTE- 18 No, .
Doc. Ref: 5947
~ *. MAY 2 5 1993
,{~'
I' AGENDA ITEM
Ne. ,_,-.----
::
" cz~ - 2o MAY ~, 5 1993
~.=, :. Doc,Ref," 5947
~.:, .0, 060 .~ 207. -. ~ ~
~,/.
CONCURRENCY
OB,7'MCTIV~ 1.5 l
To ensure tha~ uublic facilities needed to suuoor~ develoumen~ are
available concurrent vith the imoacts o~ such development, the
Countv's Con~en~ Manaaement System. shall be consistent with
~aDter 163. Par~ II. Florida Statutes. and Rule 9J-5.0055. Florida
~dministrative C~e. The County shall est=blish a re~lato~ and
monitorina Droaram to ensure the schedulina. [undina and timeIv
cons~ction of Cateco~ A PUblic facilities con~rrent with. or
Drior to. the issuance of a buildina Demit to achieve and maintain
adopted level o[ se~ice standards. ·
~e con~encv re,mirement [or the Potable Water. Sanita~ Sewer.
~ainaae. and Solid Waste ~vel o[ Se~ice Standards of this Gro~h
~anaaement Plan will ~ achieved.or maintained i[ anv one o[ ~he
ZO11~ina standarda of ~e Con~en~ Manaaement System are
~e necessa~ facilities are in place at the time
~ildin~ pemit is issued: or
~ ~e necessa~ facilities are under constmction at the
~ime a buildins De~i~ iS iSSU~ Or
~e nece~sa~ ~acilities are ~aranteed in an enforceable
~~nt a~eement that includes ~e provisions o[
~ara~auhs A and B o[ this DOliCV. An enforceable
development a~eement may .include. but is not limited ~o.
development a~eements pursuant' to Section 163.3220.
Florida Statutes. 'or an a~reement or develo~e~ order
issued Pursuant to ChaPter 380. Florida Statute2, The
a~eement must ~arantee that the necessa~ fac~lities
will be in place when the impacts of the develOPment
~e con~en~ re~irement for ~e Recreation and ~en S~Ce ~vel
o[ Se~ice S~andards of this Gr~h Manaq~men~ Plan Will be
achieved or maintained if any one o[ the followin~ standards of the
Co~rre~w Management System are met:
Compliance with any one of the standards set [orth
Foli~ 1.5.1 A. B. and C is met: or
~ ~t the time the buildin~ Demit Is issued. the necessary
=acilities are the subject of a bindin~ executed contrac~
.. which provides for commencement of actual cons=mction of
..~he re~red facilities within one y~ar o~ ~c ~=~--
~f the buildina Debit: or ~
,1 '.; ...
C. ~he qecem~arvfacilities are auaranteed in an enforceable
develoomen~ aareement which readires the commencement of
the actual construction of the facilities within one veer
gf the issuance of the applicable bulldine permit. An
enforceable development aareement may include. but is not
limited to, development aareements pursuant to Section
163,3220. Florida .Statutes. or an aareement or
~eveloDment order issued pursuant to ChaPter 380. Florida
~tatutes.
The concurrency re~uirement of the Traffic Circulation Level of
Service Standards OC this Growth Management Plan will be achieved
or Maintained if any one of the foliowind standards of the
Concurrency Manaaement System ate met:
A. Compliance with any one of the standards set forth in
Folicies 1.5.1 A. B. and C and 1.5.2 B and C is ~e== Or
B. In area~ in which Collier County has committed tO PrOVide
the necessary PUbliC facili~ieS in accordance with its
five-veer schedule of capital improvements. the
concurrencvre~uirement of theTraffic Circulation Level
of Service Standards would be achieved or maintained if
all of the followin~ standards of the Concurrency
~ana~emen~ System. based UPOn an Adequate C~it~l
Improvements Procrram and adecruate imDlementin~
regulations. are met:
1, A Capital ImDrovements Element and a fiV¢-V~r
Schedule of Capital Improvements which. in addition
to meetinc all of the other statutory end rule
retirements. must be financially feasible, The
C~ital Improvements Element and Schedule of.
CaDira1 Improvements may recocnize a~d i~Cl~de
transportation Dro~ects included in the firs~ three
years of the applicable. adopted Florida
of Transportation five-year work Dropram.
2. A five-veer Schedule of Capital ImDrovement~ which
must include both necessary facilities to Maintain
the adoDte~ level of service standards to2erVe th~
new development DrODOSed tO be permitted and the
necessary facilities reouired to eliminate those
portions of eMis=in~ deficiencies Wb~C~ are
priority to be eliminated durin~ th~
period under the Schedule of Capital Improvements.
3. A realistic. financially feasible fundine system
based on currently available revenue sources which
must be adequate to fund the PUbliC [aci~itie-
reuuired to serve the development a ut~or{~ ~,, ~
buildin~ permit and which Dublit fa~o~i~
MAY 2 5 1993
included in the five-year Schedule of Capital
4. A five-year Schedule of Capital Improvements which
must include the estimated date of commencement of
actual construction and the estimated date of
Dro~ect completion.
5. A five-year Schedule of Capital Improvements which
must demonstrate that all actual construction of
~be road facilities is scheduled to commence in or
before the third year of the five-year Schedule of
Capital ImDrovements.
6. .A Plan amendment is reauired to eliminate. defer or
~elay construction of any road Dro~ect which is
needed to maintain the adopted level of service
standard and which is listed in the five-year
Schedule of Improvements.
0Zl Or before October 1o 1993. the County shall implement. throuah
the adoption of an ordinance. a Concurrency .Mana~eaent SYstem which
shall include a reaulatorv Dropram and monitorina system'consistent
With this Growth ManaGement Plan and consistent sDeCifica11~with
the POliCieS under ObJective 1.5 of this Capital Improvements
Element. The monitorina system shall enable the County to (
de~ermine whether it is adherina to the adopted Level of Service
Standards and its Schedule of Capital Improvements.
AGENDA ITEM
MAY ~ 5 1993
RE~UIR~w-I~TS FOR CAPITXL I~PROVEMENTS IHPLEI~TATION
S~EDU~E OF C~PIT~ IHPROVEHE~S
The Schedule of Capital Improvements on the following pages will
eliminate existing deficiencies, replace obsolete or worn out
facilities, and make available adequate public facilities for
future gro~h.
~ project is n~red and named, and its cost during each of ~e
.. ne~ five fis~l years is sho~ in ~ousands of dollars (000)
Ea~ project in ~tego~ A is consistent with the level of se~ice
s~ndards as identified wi~in this element and the appropriate
individual eleent of this Gro~ Management Plan.
~ch project in ~tego~ B is consistent with the level of semite
s~ndards as identified within this element. Optional elements
were not developed for Catego~ B facilities.
~....
~: aoo~ 060 ~,Ar,.,: 211 MAY ~ 5 1993
' /a"'
CA~'F. OORYA ·
111~ Argue Xo~ ~e 600 600
US 4~'~ V~rbL~
1,2 ~est ,p~aco 2
add 2
Al~.~llhg ~ad (~ 31) (~)
hdLo ~ad - ~den
~.4 m~Xest add 2
· 100
A~-~l~g ~sd (~~) 100
US 4~ - hdio ~id
1.8 mi~est tdd 2 ~tnes
Dzvis ~.leYi~ (S~ 84) (~~)
Santa Barbarl Boulov&rd -
1.4 milest add 2 lanes
4~40
~lden Os~e Psr~*r
~ 85~ - ~ 31
1.4 m~lest ldd 2 lanes ~d
grade searation ~
Road (~)
· 200
l~ksloe ~ad (~ 8~6) (~~) 200
US , 1 -
3.S milest replace 2
~ lines
' m 4~S
~ tlee ~ed (~ 8~6) ~u~e 150 32S
- ~ 951
s~less ~eplece 2 lensel
&dd ~ines
CArZOOJt! A ·
ROAD tXOdZCrSt
~ FLo~ Y--~ I(000)
10 Isles of ~p:i ~ad (~ 951) 10/94 02/96 56~ 5600
US 41 - ht~lesn~ H~ck
~ad
3,4 mLlest ~eplace 2 lanes;'
add 2 l~es
IX Isles of ~pFl ~ad (~ 95~) 10/95 ~2/96 250 5250 iS00
Sa 84 - h~lesnah
3,1 tallest replace 2 l~os/
add 2
X2 Zs~es of ~prL ~ad (SR 951) (~~)
US 41 - ~:co
X~ Ac~is~ion
13 Isles of ~pri
23rd Ave.
Boulevard ·
2.8 m~lest replace 2
add 2 hnos
US 41 - ~ 31
2.1 tallest add 2 lanes
~~~ ~ld ~ Blvd. (~~)
lanes . 10/97 12/98 50 S0
1.5 /~es: replace 2
add 2 lanes
ROAD PROJBC~ZIt COlJill COUh"Zr
~~ f~s~ rear S(000)
17 ht~Xesnke ~k ~ad 10t94 -1219S ?S00 7800
US 41 - Polly
2 m~lest replace 2
&dd 2
19~odlo~e Fr~ ~d (a 851)(~)
car~ca ~ad - ~ 846
2.5 miles, build 2 lanes
20 Oulf l~re Drive (D~)
V~derbil~ Beach ~ad -
lll~h Avenue
1.3 m/leas add 1
21 ~v~gs~n ~ad (No~) (~-~)
~ 846 - ~r~al ST~ ~nn.
6.2 mllesz build 2 lanes
2230
22 San~a Barbara Blvd./~ 12/94 10/94 30 2200
Green Canal - P~ne Ridge
(~ 896)
1 mixes replace 2 lanes7
add 2 l~as
23 Vuderbllt Beach ~ad 06/95 06/96 575 5550 6125
US 41 - ~ 31
3 ~ ~s~ ~urs 525 525
CATEOORY A
~' ~~ FLocsX
P~4e~ ~ ~ 92-93 )3-94
· S0
26 Woa~GXock had (~) S0
C~oon hid - 8R 29
~ mixes build 2
27 ~or Xoconlt~ct/on N/A H/A 307 630 628 600 2~65
recoAl~c~LoA a~ Various
28 ~raffic S/FIs ' H/A N/& 490 605 630 600 2325
~Jor installation a~
; various locations
~ 31 hnL~a Beach Road 10/94 12/96 800 2950 3?50
~ Vanderb/l~ Drive Co Coun~y-
~ line
~ 1.6 mLlesz add I lane (~ Ln
~ Lee County)
~ ~ ..
~ 32 8aata Barbara huleva~
Davis Blvd ~o Ra~leenake-
2 miles: build 4 lanes -.
33 ~tr Ba~ had 09/95 ~2/96 350 250 3200 3800
Davis B~- ~o Ra~b esna e-
~ ~ ced ~ A;is/tLon N/A N/A 200 200 200 200 800
had d
· CAmEOOilY A ·
~ *
~ 858 ~o ~ 846
37 Isles of ~pri b&4 (~ ~5~) ~ure 300 250 ISO ?00
~lden Os~e B~. ~o ~ 846
3.0 miles; add 2
38 Pedestr/n ~e~ass on sX 29 (~~)
aC ta~rkers Village '
~ 39 AL~-~XX~g ~i~ 09/94 10/95 350 4200 4550.
~ OoXden Oa~e Par~a~ ~o ?Lne
2,6 miles; 6
a0 ~le~e-Fra~ ~ad 08/96
~lden Cite Par~ay to
~ 5olana ~ad
~ 1.7 m~les~ 6 lan~g
F 41 P~e ~dge ~ad ~ture 70 ?0
A~rt ~ad to 1-75
2,0 m~los; 6 laning
~2 Vanderbilt Beach ~ad OS/94 08/95 so 32s0 3300
,~ A' to Gulf shore Dr~ve
CA_e'EOORY A
ROAD PROJ~C2Bt COI,T, XER COuJr:X' 5-YEAR CAPZT. AZ, X)a, ROVKMBN28
~onstruc4:Lon rtmuX year I(000)
proleeS ~ J:~l:132],l,~J,,~ ~2-93 t3,94 _94-95 ~ ~96-97 ~otsl
52 Livingston Road 10/96 12/97 170 200 1310 1680
Pine Ridge to Golden Gate
2.S mllesl 2 lanes
53 Livingston Road 06/96- 08/97 170 500 2618 3288
Golden Gate Parkway to Radio
Road
1. S miles I 2 lanes
54 Bald Eagle Drive 06/97 06/98 550 550
North and South of US 41
2.5 miles; 4 lanes
2125 2575
55 Airport-Pulling Road 04/96 04/97 4S0
Vanderhllt Beach to Pine
RIdge Road
2.0 miles; 6 lanes
., 325 325
56 Santa Barbara BIrd. Future
Golden Gate Parkway to Radio
Road
1.5 miles: 6 lanes
57 Livingston Road Future 170
alee Road to Vanderbiit
Beac Road
Lies/2 lanes .
S~ Z,Zv'~gston Road Future
iO~~~elt Beach P~ad to Pine
: Consf. z'u~4ma r~soaZ Year I(O00)
59 No~ ~ S~ne~ (~k&X~) 06/96 ~/96 JS 225 250
.25 BL~oBI 2 ~el
p~s o~ ~94 ~nuo Bond
Issue
~ ~S ~ 4635 527:37 11210 5386 3975 77943
·
Notes 8
· ~omolete~ LB deELne4 aa eLfhers (1) J.n BeryLca or (2) under
st~ction, at the t~ b~ the adoption o~ this Fou~h ~nual
"~ ~ Commtixm. , tLsca~ Tem~ 1(000)
43 ~u~ ~ail ~s~ (Us 41) ---.4: O6/~S 06/97 Z318 4~ 1803
Davis ~ulev~d ~o
Road (~ll ll14137)
~ami~ 2rail No~ (US 41)
Grade 8e~ta~ton a~
RldVe Road
~S ~ ~I ~o~ (US ~Z) 06/95 06/97 966 3202 4168
Z~kalee Road ~o Hy~le Road
(~PZl ll14~50)
~ , 46 ~amiamL ~rail Zas~ (US 41) (D~)
~ Ra~tlesnake-H~ck ~ad to
Bare~ ~S,
~ 47 ~aml~l ~ra~l Bast (US 41) (D~)
~ Alert ~ad ~o
~ H~ock Road
~ ** 3200
~ ~8 Davis ~uleva~ (SR 84) 06/95 06/97 ~8 620 2402
W A~rC ~ad Co Cou~t~ Barn
49 Road (~II 1114127)
50 Tamiui Trail Noah (US 41)
Z~kalee Road to Wigg~s
Pass
~J
00 ~nded in the adored ~ 5-ye~ ~:k
CATEGORY X . :' ~-~:: .', '~' -~ ' · .... ,
ROAD PROJ~C~II COALIll COUNTY 5-YFAY,
coutrua~,Lon · ,FAacal Year I(O00)
Pro~ect ~ rd~BBJAA~ 92-t3 fi:IA ?4-fi 9S-~t e~-~7 Total
43 Tamnatal Trail hat (US &l) (DEIA'A~)
Davis Boulevard to
Road
44 TamlamA Trail North (US 41) Future
Grade separation at PAne
Ridge Road
45 TamlamA Trail North CUB 41) (D~-~)
Tmmokalee ~oad to Laurel' Oak
Drive
46 Tamiaa~L Trail East (US 41)
Rattlesnake-Hammock Road to
Barefoot W~B. Road
47 TamnasA Trail East (US 41) (DEISTS)**
Airport Road to Rattlesnake-
Hammock Road ..
48 Davis Boulevard (BR 84) (DELl)
Airport Road to Kings Lake
Boulevard
49 David 2oulevard (SR 84) (DELETE)
Kin, · Lake Soulaward to
:;~.~'. Barn Road
A Trail North (US 41)
5; TaRs: ales Road to Wiggins
N~es,
ee TO be funded An the revised FDOT 5-year work program with revenue
~ :he additional 4 cent gas tax enacted by the 1990 Legislature.
~tnoLtoa F/oo~L 'r~r l(O00)
It' PFo4ect. ~ ~ ~2-93 J~3-9t ~4-95 /~5-96 tt-97
sx Ix 951 (D~)
N~ York DtL~ to ~
~ & ~ ~8 ~ 7097 57357 18617 5386 3975 92432
Notes t
tee Revised TDOT capacity tables eliminate the need for advancing
this project
· *,* ~ has approved a backlogged status ~OS due to their inability
to advance this ptoJegt .
CA~ZOORYA
DIU. TI4AO~ pRO,TECrS t COt?-TBX COtrH~ S-YEAR CAPZ":XT, X)O,t. OVZJI~'fi ZL.gmlf~
ConstructLob Fiscal Year I(000) I
290 Storm~ater M~ster plLn (~)
2gX District No, 6 (lAIy) (D~)
Basin plan and series
canals sad/or structure
improvements
292 Oordon RIver Extension (DILr~)
Basin Plan and series oZ
canals and/or structure
improvements
293 Cocohatches River 2Isles (DZLZ~B)
Aarlal Happing and Basin
Plan
294 Xaln Golden Oats S~stem (DELFZS)
Aerial Hopping And Basin
Plan ,'
295 Henderson Crook Bash (DILE22)
Detailed engineering/
environmental Basin Plan
296 Fake-Union Basin (DELETE)
Happing and Basin
2~_e~.~~ rn Coastal Basin
~i~!r~~ Happing and Basin
2 River Basin (DZI~Z2)
] Happing
,' ' Cosstx~c4~Lon ~lscal ~oor I(000)
299 Jlii~Xel
~)':A.T, 0 0 0 0 0 0
301 bly/Kast T~ ~ (~)
Station ~d Veh~clet
, 264
302 ~den Oi~e PaF~ay (~) 264
~S Station and Vehiclet
Coldon Gate Parlay
~cad
303 System Status Float ~t' 05/93 12/93 366 366
304 ~S Station and Vehicles 10/95 08/96 366 366
~catlon to ~ dete~
based on need
Undo t o~tn~ 366 36
305 ~ Station and Vehlclet
~ca~on to be dete~ed
based on ne~
" 366 366
306 ~s station and Vehicle Undorefined
Location to be detectned
based on need
~ ~] ~ 264 366 366 366 366 1728
Notest
, ~Dleted Is def~ed as ett~ert (1) ~ source oF (2) unde~
conerection
U~ate G ~enbnt by t~ B~,
· ~t~ FLeoA~ ~ear I(000)
400 ;ai~ ~e~on 06/94 04/96 26242 26242
Increase o~ 256 JaL~ ~ds a~
Naplee ~ail ~nter ~clud~g
~lnis~at~on a~
Facilities
- I
I ]111
~at~n ftw~X Year. l(~)
~ ~ ~ 92-93 ~ ~'~
SOO HoldOVers ~t~n - (~)
26,575 mq. ft* a~ttton
50X East~ NapXos Branch (~~)
~nstructton of 6~00
branch
3~ ~!!~r N~h Branch 07/93 01/94 344 344
3000 sq.~t. addition
' 449
S03 ~o Isl~d Branch 09/94 04/95 40 409
3300 sq.~t. addition
50~ L~ra~ ~ Xeno~atLon (D~)
Renovtte/r~el u~n
c~ple~on oZ Project
~S00
505 I~okalee Branch 09/96 OS/97 30 288 35 353
3000 sq.~. zddit~on
506 ~lden Oate Branch (CO~)*
3000 sq. ft. additLon
507 V~e a~s ~ranch ~ra~ 04/94 02/95 ~0 776 826
~ sq. ft. Br~ch
L~raa
~ 1972
~ ~ ~ 384 439 338
Notest
~ ~ Ls de~Ln~ as ~theFs (1) Ln se~Lce o: (2) unde:
const~Lon at the t~ o~ the adoptLon o~ thLs Fou=th ~ual
U~ate G ~n~nt by the B~
CA~BOOXY A '-
LIBRARY PBOJBC::L~t COLLIER COUN':Y S-1ZAIt CAPITAL IMPROV~fZN':S ~
SS0 ~:a~ ~~n X/A ~/A 3~3 269 929 986 ~045 3542
CA,egO01t~ A
OOYERXXEX~ BUXLDXNO8 ~t ~ ~ 5-~
~l~ F~I~Z ~ea~ l(000)
600 X~ ~u~uso (~~)
23,000 ~.~. ~o ~
60~ New Health BuLldhg (~~)
S0,O00 I~.~C. ~nLIh~ +
2S~OO0 i~.~C. Co h
~n~shed ~n ~g1/92 to
house health
activities, Social
Veter~s SedUces ~d ~bl~c
Seaices X~ln~s~ration
S04 BulldOg W Expans~n (D~)
15,000 sq. Zt. expansion OZ
warehouse · da~ care
605 ~ow Agriculture Center (~~) *
12,0O0 sq · ~ * nov
~o~ agricultural act~vtt~es/
mc7 o~ra~tng center
~ 0 0 0 0 0 0
Notest
· ~ Is de~ln~ as el~herz (1) In se~ce or (2) under
contraction at the t~ oZ the adoption o~ this F~h ~ual
U~a~e 2 ~n~n~ b~ t~ BCC
~ llscsl les: IlOOO)
~ni~ Park or ~bile
Facility
70! Biertie Trails ~n~lnu~s 75 75 150
4.8 miles of pav~ ~ralls
linking to sch~ls or
exlm~kng ~ralls
702 6~h ~u~ltr Park - Phase I la/93 06/94 1524 1500 3024
L~d & Phase I facilities
(32 acres)
V03 co~l~r Parks ~ P~se IX (~~)
(5) Phase II of ~nl~y '.
Park facilities for
I~kalee, Marco, East
Naples, Golden Ga~e & ~
1500
704 ~l~r P~l 06/94 10/94 1500
25 m=er ~ol In I~kalee
705 aecrsa~lon ~n~er 07/93 03/94 1300 1500 2800
floor, baskets, bleachers
and L~ker r~ Zsclli~ies
~ ~ Trails (D~)
~ Lea, unpaved
~? ~al Park ~n4 (D~)
~ acres of l~d only
708 ~mpstit/ve l~X (~~)
~ Mter F1, deck grands~d,
:ker r~ f&cLlit es
PAX]~ pROJ'EC'~ft COLLXER COTmTY
Co~gu~lon Fiscal year'l(O00)
709 ~rack and Field (D~)
710 Boat Ramps 11/92 07/93 2389 2389
12 lanes, parking, rest rooms,
lights, landscaping
711 7th Communitr Park - Phase X 07/95 03/96 868 1331 2169 4368
& XX
Phase I &II Zacllities'
(32 acres) in the Vineyards
08/94 06/95 2236 1264 3500
712 8th Co--unitr Park - Phase
& IX
Land & Phase I &Ir Zacllitles
(34 acres) located in
Orangetree vicinity
,
713 Regional Parks Facilities (COMPLr~))
Parkin9 Lot and Nature Trail
at Barefoot Seach
~149th Consunity Park - Phases Undetermined 1068 1068
X and IX
Land and facilities,
715 and 11 ac h I 08/93 12/93 150 1~0
~ C.~.~ruct I Bath House
all, Soccer and
all Fields
c~ 293
717 Tlge~tail Beach 10/94 03/9S 293
~...;ruc~c 120 parking spa~es
· I
~sk~ Fiscal Yesr l(O00)
S
718 ~ler ~r h~e~ Cl~ Undete~ 250 250
~ns~ ~is ~ hc~et
Ball
71~ Cla Pass Park 08/93. 02/94 420 420
~nst~ct Beach
~ 7341 8870 4405 1264 1068 22948
I
Notest
· ;~m~le~ed Lo defined as eithgrs (1) in service or (2) under
~tstruction at the time o~ the adoptLon o~ this Fou h Annual ClX. ~
B
Ja~e &Amendment by the CC, ~ ~
~ p]tOJ~C~St COlJ~lKa COUN~r 5-~ ~ ~ ~:~
~~ FiscAl TeAr I(O00)
801~t~lesnske R~ck ~sd 20" (~)
L.F. o~ 20" wk~er Hain
802 ~tr San ~ad IS' (~~)
S900 ~.F. oZ 16' w&~er ~&Ln
803 DAvis ~ulevs~ lt' (~~)
11070 L.F. of 16" Wa~er Hain
804Davis ~uleva~ 20' ' (~~)
2640 L.r. o~ 20- Wa~er ~tn
80591s~ Avenue 12' Zn~ercon, (~)
200 L,r, o~ 12- ~a~er
806 7th S~ret~ 12° ln~e~on, (~~)
100 L.F, o~ 12° Wata~ ~aXn
808 Aud~u ~ty Cl~ 16' (~D)
5230 L.F. o~ 16' Water
809 ~rlca ~ad P~p~g (~~)
S~orage Tank
Facilities
810 Car~ca ~ad ~a~ (~~)
~a~er S~o:age ~k ~d
~ ~n~ costs ~o Naples
81~ or No~ Reg. (~~)
I1 ~eet Wellfield S~gdr (~~)
~nst~ F~scal
813 hd~o.~ad 12e (~)
2430 L,F, of 12' Water ~ln
815 Phs ~dgo had 16' (~l~)
5280 L,F, o~ 16" Natel hLn
816~lstte had l~ensLon 16' (~!~)
10560 L,F, of 1~' Wats~ ~Ln
817leadate D~Lve 12e ' (~!~)
2640 L,F, of 12' Wate~ t~
818 A~ ~ad 16' (~~)
10,560 L.F. o~ 12' Wate~ ~n
819 Iuokalee had 20' (~~)
2000 L.F. of 12" Water Xain
820 l~okalee ~ad 20" (~~)
3500 ~,~, o~ ~6" Wa~er
821 V&aderbLlt DriYe IS' (~D)
5840 ~-~. of 16" W&~er
~Sl 12" (~~)
237C0 L,T, o~ 12" Wa=er
Lesnake-Hmck ~ad 20" (~~)*
L,F, Of 20" Water ~ln
826 t~ itreet 12" {~~)
66~0 L.F. o~ 12" Hater ~ln
CoufA~scf,/on rLacal Year l(O00) i
12~85 L.F. of 16" Water Ma~n
828~tal Reef WelXfield Phase I (D~)
p~s~ I of ~s~er Plan Project-
829Noah ~ty Rag. ~a~en~ (~;)
Plant
Const~ction of Noah ~unty
Regional Wa~er Trea~nt' Plant
830 I~lee ~ad 36° (D~)
10560 L.F. of 36' Water ~n
83X CR 95X 36' (~e~)
10560 L.F. of 36~ Water Hahn
832 Zuokalee ~ad 24' (~~)*
7920 L.F. of 24" Wa=er HaLn
833 I~kalee Road 20' (~~)
5280 L.F. of 20" Wa~er ~aLn
83& ~ail Creak P~ ~6"
7920 ~.T- of 16" Water
835 Z~ klee ~e4 X6" (~~)
E 26~ ,F. of 16" Wa~er
~Xee ~ad 12' (~~)
,,F. of 12' Wa~er ~n
236( L.F. of 16" Wi~ot
838 LS NO Z~evat~ f~ (D~)
WA~Xt. pROd'BC~Sa COLLXER ~ 5-~ ~X~ ~~ ~
~stm~Au 'FAso~ YsaF I(O00)
~ ~ ~ 92-93
839 O~d ~S iX ~6' (~~)
1800 L.F. Of 16" Wa~er h~
S40 Phe ~dge ~sd 16' (~~)
7920 L.F. of 16' Wa~er
841 Davis ~uleva~ 16' (~~)
6450 L.F. of 16" Wa~er ~
842 5 MG Om~d Tank (D~)
Storage Ta~ &
Facilities a~ Collier D~
843 12' Hahn at P~ne ~dgs ~ad
8000 L.F- of 12" ~ater Main
844 12' Main at PADs ~dge ~ad
2800 L.F- of 12' Wa~er ~An
846 12' Water Main at US 41 (D~)
6000 L.F. of 12' Wa~er Main
84? 12' Water Ma~n at Imkalee (~D)
Road
~$,n ,.F. of 12' Water Main
8~ 12' ~ tar ~ at ~ 41 (D~)
~ 8~ ~.F. of 12' Water Ma~
~ a~ lI
8~ ~lde a Gate Wellfield (~D)
Expan sign
851 ~ ~oster BratLore (~~) ~
constructLos F/seal Year l(000)
852 20' mh on ~ette Uad (~G)
E~ens~on
10560 L.F, O~ 20"
853 16" ~ ~ on ~l~ Drive (~D)*
11450 ~.~. O~ 16" HaLn
854 20" ~1~ - US 41 ~o~ (~D)
8000 ~.~. o~ 20' Hahn
I~kalee ~ad to W~ggL~s
Pass
855 12' ~ on ~d~o ~ad (~~)
21120 L.F. o~ 12"
~t~en ~:cLal D=Lve
and DavLs Blvd.
856 16' ~ - Liv~ngston ~ad (~~)
to ~ndese~e *'
8000 L,F, of 1~" ~ain
Pine Ridge Road to ~d~ere
257 16' Haln on Santa Barbara 09/93 12/93
5280 L,F, o~ 16' Hain
Davis BI~, to ~dio ~ad
~on ~ 951 11/93 07/94
85~, P ~ kt~ Trea~ent Plant 10/95 03/96 800 4000 4800
400 400 800
86~ife 2toFage & Xecoveq . 07/90 ~2/94
~a e, ason
~lt~Lon rLso~ Xea~ S(O00)
P~to~ ~ ~lo~iou 92-93 93-94
861 16' Ah - ~ &l ~ 12~93 08/94 1580 1580
31,600 L.F. o~ 16'
862 Z6' ~in - US il ~ :~ ~ 95~ ~2/93 08/94 750 ?SO
15,000 ~.T. o~ 16*
863 30' ~h ~ugh Pho ~dge 07/93 12/93
6,000 L.F., o~ 30~
86& p~o ~ge bad, P~so ~ 11/93 06/94 1000 1000
15,000 L.i. of 16~ ~
~ 4530 4400 0 0 0 8930
NOt· · !
· ~Mu~leted 18 defined as e~tho:t {1) in setrico or (2) under
,o
~ s adoption of this
Conl~zmc~Loa FiBall Yea~ I(000)
rro~ac~
901 Noah ~ty ~sLon (~~)
Was~ate:
E~luen~ DLo~sal
,
902 East and Sou~ Saplea (~O)
~llection System
e
906 U~Z ah~s~ra~ton (DE~)
nutld~g
Oestgn and ~nsC~ton
907 South ~ty P~p, ~s & (~;)
Dts~sal
~p Statton, Transmtnston .
HaLns and E~lue~
System
908 8" Force Ha~ 11/93 07/94
~; Station
Starton 20
1080 L.F. o~ 8" Force Hahn
=tce ~tn ~1/93 07/94 1100 1100
~ ~ ,on 20
~ L.F.
~ Station ll ~o Santa
~arb LEa
2400 L.F. o~
C~TEOOP, Y A
SSh'ZP., i'a..O~C':S~ CO~ZIX COZn4~ 5-'i'Z, XX
gl~ Davis S~vd, ~p S~a~.No.ll 06/93 05/94
Dep~gn ~d
gZ2 iO' Force Main Davis BXvd. (~~)
S~a~ion ~
7800 L.F. o~ 10' Force ~Ln
913 Davis BIrd,
~p S~s~Lon No. 14
Design ~d
91& 20° Force Ma~ ~.951/U8 41 (~~)
~ S~a~Lon ~8 ~o ~p
S~a~lon 1
11400 L,F. 0~ 20' Force
915 Pup S~a~lon No. 18 (~~)
Design and ~ns~lon .,
g16 Sou~h ~un~y hg. :rea~en~ 06/94 11/95
FAt/liar Expansion
Design sad ~ns~cb/on oZ
8 XGD Facility ~pansLon
~i? u~h ~tr Xeg. Trea~ent 06/93 12/94 2500 2~00
rac. litr Zxp~sian
;;gn ~d ~nst~ction oZ
D Facility Z~sion
8 ro~e ~ (~~)
;~esnske-H~ck ~sd
~ )S1 to Polly Avenue
~ 1~4 )0 L.F. o~ 20' Force ~n
"'q~' -!."~,...:~.-I,~!'- -.~ . .... ., · . -. , ~-~. -/~ I · ~ ~- . ' .. ff ', ~ ~ .. ·
I' ~ , ~tn~l~n FLeas1 Year I(000)
gX9 ~Xes~ke-I~ck ~ad 09/93 04/94 7~0
~p S~a~ton 20 - Demt~ and
920 ~ Station No. IS (~~)
Cg 951 -Destgn and
,
92~ ~2" force Hahn (~~)
~0800 L,f. o~ ~2" fo~ce Hath
Tol~et~ System- ~d~o
Tel~t~ System
~ 923 Noah ~tf Wastoaster (D~)
~ T~oa~ent Plant O~Fat~ons ·,
C O~ftco and L~a~o~ '
924 ~o~h '~ty 08/93 0~/94
Has~er ~mp S~a~ton 1.10
,
?~ ~ ~ can Bay Imp~voment (~~)
7~ 0 L.F. o~ Fogco ~tn and
i .kaloo ~ad Sewer/ (~~)
uent System
~ · ~ln s effluent line
~ ~ra ~, Plant to ~ail Creek
CATF. OORY a
SEWER pROJECX'St COLLISP, ~ 5-~
~mtn~u r~sca~ Year I(~0}
~rotoc~
927~8~eF ~ SU~lons X,Q3 i (~)
X,Q7
2 ~p 8~ations on ~kalee
~ad
928 24' Fo~s ~ln Z~a 1.06 to (~~)
1.07
20,000 L.F. o~ Force ~
~r~ Xl~n Road to
Bloss~ Dr~ve
929 P~p Station 3.17 12/93 09/94 700 700
.
US 41 Sou~h - Design ~d
~nst~ction
600
930 12' Force ~ 12/93 09/~4 600
US 4~ South ~p S~tion
3.17 to Station J · 18
20,000 L.F. o~ 12' Force Hain
· 1000
~31 12"/lS' Force ~ (CO~D) 1000
I~kalee ~ad - ~aLl C~eek
~o CR 951
O0 L.F. o~ 12"/16" Force
~ 6600 '6600
· Completed is deZined as eithirx (1)
COSTS & REVENUES BY TYPE OF PUBLIC FACILITY
In the table below, the left column itemizes the types of public
facilities and the sources of revenue. The center column contains the
5-year (FY93-97) amounts of restricted revenues. The right column is
a calculetion of the deficit for each type of public facility. All
deficits are accumuleted as e subtotel. Below the subtotal deficit is
the source of additional revenue that will be used by the County to
pay for the deficit in order to meintain the standards for levels of
service listed in CIE Policy 1.1.5.
COUNTY~RTERIAL & COLLECTOR ROADS $ 77,943,000
LESS Available Revenues:
Gas Taxes $ 7,561,000
Road Impact Fees 34,765,000
Revenue Bonds (Series FY94) ~ 77.943,000
Balance 0
STATE RO~DS NETWORK 14,489,000
LESS State/Federal Gas TaXes 14,489,000 ~
Balance 0
DRAII~OR PLkNB 3bND PROJECTB Balance 0
FATal & 8~ BYBT~ 15,530,000
~SS SySt~ Develo~ent Fees/User Fees
Balance 0
SOLID ~T=/~FILL 19,408,000
LESS SOlid Waste User Fees
~SS ~vailable Revenues:
P~k I~a~ Fees 17,282,600
Boating Improvement ~nds 850,000
Deficit (4,815,400)
~g~ ~l~ S~C~ 1,728,000
LESS G.O.B. Referendum
Balance 0
ClE - 52
Doc.Ref: 5958
"" 060,, Z42
"~ Duildings 1,972,000
V~'!>]' ;:' Collection 3,542. 000
j[ j~}[i:.?/ LESS Library Impact Fees
Deficit (1,862,000)
GOVL~N~BNT BUILDINGS Balance 0
· :'~ - FIRw DISTRICT
~ , Balance 0
f" Buttotal Defioit of Restrioted Revenue vs. Costs (6,677,400)
'," aDD Unres~ricted Revenues:
(Capital Revenue Fund)
!![:.. Balanoe $ 0
. ~f.:~.~,
;;~.
czz - ss MAY ~ 5 1993
3, Update of unLt costs;
4, Update of facilities requirements analysis to project ZO year
needs (by fiscal year) in order to program projects to meet
the service standards.
5. Update of revenue forecasts In order to evaluate financial
feasibility and the County's ability to finance capital
improvements needed to meet the service standards.
6. Revise and develop capital improvement projects for the next
five years. The first year's schedule of projects will be
incorporated into the County's budget effective October 1st.
7. Update of the public school an~ health facilities analysis.
In addition to the annual update, the County will perform an assess-
ment of the status of the Capital Improvement Element in November of
each year in conjunction with the release of the preliminary BEBR
population estimates and projections. This analysis will include an
assessment of the status of capital projects funded during the prior
fiscal year along with an assessment of existing and projected service
levels versus the adopted standards.
7, Concurrency Manaaement SYstem
The County shall establish by ordinance and maintain a Concurrency
· .Management System. The system shall consist of the following
components:
A. Annual m6nitoring report on the capacity and levels of
service of' public facilities compared to the standards for
levels of service adopted in Policy 1.1.5. of this Element.
The report shall summarize the actual capacity of existing
public facilities and forecast the capacity of existing and
planned public facilities for each of the five succeeding
fiscal years. For the purposes of long range capital
facility planning, a ten year forecast of projected needed
capacity will also be done. These forecasts will be based on
the most recently updated Schedule of Capital Improvements in
this Capital Improvement Element. This annual report will
constitute the evidence of the capacity and levels of service
of public facilities for the purpose of issuing development.
orders during the 12 months following completion of the
annual report.
B. Public facility capacity review. The County shall use the
procedures specified in Implementation Programs I and 2 to
enforce the requirements of Policy 1.5.1, 1.5.2 and 1.5.3 of
this Element.
C. Review of changes in planned capacity of public facilities.
The County shall review each amendment to this Capital
czs - ss MAY 2 5 1993
Doc. Ref: 5947
t
~ . COLr, IER COUNTY C~PITAL IHPROVEMENT2
~.~]~,, $ 77.943.000
~:: ~/';~ ' ZL 26,242,000
:,~:,' LIlY (B~IHG8) ~,972,000
'~:~,="'P~ & U~TIO, 22,948,000
~ '~i~:,:,..·.
a ~~~f~.~.~. SOMD W~/~FI~ 19,408,000
,o,, 060 ~.~, 245
C AJ! ORDglIANCS AHENDZIIG COLLZER GOUttrY ORD[IIAII
~ ~HPR~IEHSEVE P~NNZNG AND ~O OWE~PH~
~ 'REGU~TXOH A~ OF X~I5 ~ND ~A~ER ~-~,
COSTS, R~EHUE SO~CES, SUPPOSING
~O THE DATES Or ~NSTRUalON or FAClLZTXESv
EN~E~TED IN ~IE ~XER COU~
~AG~T P~ CAPITAL IHPROV~ErTT EL~ff
FOR CAPITAL PR~E~S ~N FISCAL X~S
~ROUGH 1996/~7; PROVIDING ~R S~E~BILIT~;
~O PROVZOIHG ~ EFFE~IVE DATE.
gHER[A~, ChApter 161, PRr~ IS, Florida 5~atu~el also
known as ~he ~cal Covernmen~ Comprehensive Pltnninq and
Oevelopmen~ Requle~ion Ac~ oZ 1915 end ~spter 93-5~ rioride
Administrative C~e, alma known ae the Nlnlmum Criteria
~, oZ ~ml Government Comprehensive Plens end De~e~lnt~lon
Compilenee r;ire8 tha~ Collier c~nty correct, u~ate, a~
t ,. s.) m~lfy cos~s, revenue sources, or the. dales 6~rconsz~c~ion
. ~scilitits enuera~ in the Collier ~unty Gr~ ~MgemenC
. ( Capital lmprovemen~ tlemen~ on an annual basisX
t ~S, Collier County has prepared
~ : ~e Capital Zmprovemen~ Zlemen~ or i~s Grw~h Hanaqemen~
~ .'.
(Ordinance No, lS-OS) tht~ ~mkes into consideration the
Zinan~laL resources o~ the County and o~ the Aqencies
:~:' De rloriaa~ and
-.. ~S, ~apter l~3, Par~ lie Florida S~a~u~es,
Sections ~63.3~77(3)(b) and 163.3187(2) provide ~or annual u~s~es
oZ local governmen~ Capital lmprovemen~ Elan,aCt tht~ co~ldor
' ~.. corrections, u~a~es, a~ m~lrlca~lone concernl~ cos~sJ revenue'
.~ " s~rces; acceptance o~ facilities pursuan~ to dedications which
are conmist,ha with the planl or the dates De consanction
· ' facilities enumerated in the Capital Improvements Element;
MIICREAS, the Collier County Planning Couisslon In
manner prescribed by lay did hold a public hea~i~ conc~rnL~ the
.,.
-~; ~.., ~ MAY g 5 1993
].
t'!';i' carrecLine, updstlne, ~nd modirylnq or cartale costs, reven~e
'~ sources. nnd ~he dat~, o( consir,cries of fatlilt|as enumerates in
l!~:o '. the CoLlier County Orovth Rsnagemsnt PLan Capital improvement
Element for capital prolecte In rimcat Years 1991/93 through
Z996/97 on Oetober Z, X~9] a~ reOommended thaC Lt be lubm/C~ed to
the Board o~ County CouLllLonegm, Re prepared, no~in9
consLderetionl In~ teco~enda~[onl~ and
~S, the Board o~ County CouLmitoneta did
ac~ton tn the msnne: prelcttbed by toy and dJd hoZd
hearth9 on October 27, X9~2/and
~ER~S, aXX applLcabXe substantive and proceduraX
fequ[~eme,~m of law have been met.
:: NO~, TH~RKFORE~ BE ZT ORBAiRED BY TH~
~t U~i~O o~ Cooto, Revenue reduces 8~ cone~t~on
Zmptoveuent gleeeat o~ GraPh Nonagemeat
% ~ls Ordinsnce~ as described herei~*skhall be kn~
cited an the ISS2 capital Improvement Zlemen~ Annual U~ste for
Collier C,unty~ Plotida. ~e Collier County ISO;
laprovmmn~ tiesent ~nusl U~ate, sttsch~ hereto as ~ibL~
: sad incorporated W reference herein, consis~in9
objectives, and policies; requirements got capital iaproveeents
implementation; and costs sM revenues. shall be the Collier
County Grovth Hsna~esen~ Plan Capital Improvement
U~ate ot l~t2 end shall supersede any end ell previous Capital
Improvement Elements applicable ~o the ,nlncorporsted ares
Collier County.
SExtoN ~ot Severability.
It any phrase or ~rCion of this O=dlnance
invalid or unconstitutional by any Court ot competent
Jurisdiction, such portLos shall be deemed s separate, dLstlnct,
and Independent provision and such holdinq shall no~ a~tect the
validity oe the resaininq portion.
AG[UDAIT[M
N0. _
"' MAY
end independent provinLon and
validity of the remaining poetion.
~Ec'r~oH TITRFJ;t K~ective Date.
Thle Ordinance .hell hmcome ~ffncttve upon re{elp~ 0£
notice from the Secretary of State that this Ordinance has been
~LZed vLth the Secretary o(
ATTEST: '.* ROARD OF COUIITY COH21]SjZOIItRS
JAH.ES C, GILE~p CLER~ OLLIE~ CO IT'/, FLORIDA
Approve4 am ~o form and
legal su£tlcienc-/z
' C' -,- MAY ~ 5 1993
35'
COLLIER COUNTY
GROWTH MANAGEMENT PLAN
TRAFFIC CIRCULATION ELEMENT
January, 1989
Amended Januaryt 1990
~anended February, 1991
Amended May 19, 1992
e, ·
Prepared by
COLLIER COUNTY
GROWTH PLANNING DEPARTMENT
. .je," '; "' ItB'PRXIITwD F]BRUARY, 1991
~ I ~-~=D 2 ~-FO~TED ~Y~ 1992
,oo, 060 ~,~L 240
TABLFL_4~._D_Qj~T/JJT~
~.~ A, PURPOSE TRAY- 1
18, SICSTEM OVERVIEW TiIA X- 2
:(~j~!~ e.sxxs~xz~a SICsTEM (~gsv) ~ZZ,.3 X- 3
1. Road Inventory
'~i/" 2. Levels of Service
'(~ 3. Traffic Count & Accident Frequency Data
4. Unacceptable Conditions - County Roads
5. Unacceptable Conditions - State Roads
D, FUTURE SYSTEM NEEDS TRA I-ta~aZ
1. Z..and Use Projections
2. Travel Demand Patterns
3. Traffic Circulation Constraints
4. Future Traffic Circulation Map - ~G1997
5. Future Traffic Circulation Map - ~2002
'. 6. Future Traffic Circulation Map - 2015
~, NON-MOTORIZED TRAVEL TRA 1-9940
'::.- Fo FIRBFRCTrV~S TRA 1-4447 1. Land Use Issues
2. Marco Island Airport Impacts
3. Inter-agency Coordination Cooperation
4. Funding of Roadway Improvements
G, IMPLEMENTATION STRATEGY TRa T--4~ 40
"+ E, ~OXZa, OBJECTIVES &POLICIES TRA Z'~k ~4
'!'~ '!~ LIST OF TABLES/MAPB/FIGURES
1k Generalized Daily Level of ....... ;-:axlmum V~lum~ TRA I-{~k12
Collier County Generalized Service Volumes
XB $eaily LOS Maximum Volumea for Florida TRA X-"l't14
-~ Collier County Route - SDeCifiC
Service Volumes
1C O~narallzad .... ' ........... Two ............ TRA
~ ~DI1v Service Volumes for S~te Roads
in Collier County
Annual Average Daily $e~-vlce Volumea FDOT's
Generalized Annual Average Daily Volumes fo~
non-state roadways. multilane and two lane
uninterrupted arterials
G~nerallzed Annual Average Daily Volumea foT
~Iorlda's Area~ Tran3itloning into
2 Existing Unacceptable Conditions on County Roads TRA Z-tt'2O
3 t~~ty |~aJ~r |:i~hway ~|etw~rk { .......... TRA
~-F-~-x ~,,uL=o~, Collier County Transportation
Planninu Database Capacity Analysis
4 Existing Unacceptable Conditions on State Roads TRA
S Collier County Major Highway Network Future T~A
Traffic Circulation Improvements -
Ta-XAW Existing Traffic Circulation Map Facility ~pe T~
- Western Collier County
TR-~ Existing Traffic Circulation Map Facility ~pe
- Eastern Collier County
~-XBW Existing Traffio Circulation Map Number of ~nes
- Western Collier County
TR-XB= Existing Traffio Circulation Map Number of ~nes T~
- Eastern Collier County
- ii -
LIS~ O~ ~B~8/M~PS/~IGUR~S
(oontinus~)
TR-lCW Existing Traffic Circulation Map Adopted Level of TRA I-
of Service Standards - Western Collier County
TR-lCl Existing Traffic Circulation Map Adopted Level of TRA
Service Standards - Eastern Collier County
TR-2W Existing Traffic Circulation Map Unacceptable TRAZ-te22
Conditions - Western Collier County
TR-ll Existing Traffic Circulation Map Unacceptable TRAI-te23
Conditions - Eastern Collier County
TR-] Traffic Circulation Constraints - Western TRAI-Re30
Collier County
eTR-4W $ Year Capital Improvement Element Map · TRA X-St J/
Western Collier County
TR-4N S Year Capit~l Improvement Element Map · TRAX-eI3S
Eastern Collier County
~eTR-SAW Future Traffic Circulation Nap - Year 19961 · T,RA Z-~J, 36
Western Collier County
#TR-SA! Future Traffic Circulation Map - Year 19961 , TRA X-~Je37
Eastern Collier County
#TR-SBW Future Traffic Circulation Map - Year 19961 · TRa x-else
Faciltty T~e - Western Collier County
eTR-SBB Future Traffic Circulation Map - Year 199fiZ · TRA I-~39
Eastern Collier County
eTR-6AW Future Traffic C~rculation Map - Year 200t~ , T'RXX-e~41
Western Collier County
ITR-IAI Future Traffic Circulation Map - Year 20011 , TRA l-4eta
Eastern Collier County
ITR-6BW Future Traffic CIrculation Map - Year 200~a * TRA X-4~aal
Facility Type - Western Collier County
ITR-6BB Future Traffic Circulation Map - Year 2001~ , TRA Z-4144
Eastern Collier County
-lii -
,oo.
_.%--.~-
LIST OF TABLES/MAPS/FIGURES
(~ontinued)
Collier County 2010 Financially Feasib18
Plan Update and 1990 Model Validation
TR-7~ Future Traffic-~¢avs MaD -_ year 2015
li~t~e/al_f~3aJM~r county ·
indicates items adopted
Amended May 19, 1992
The purpose of the Traffic Circulation Element is to plan for future
needs of both the motorlzed and non-motorized traveling public. The
~aJor highway network in Collier County is the principle circulation
system that permits the delivery o~ goods and services as well as
providing access to plac,ss of employment, schools, and recreation for
the r~sidents and vtsito~rs of Collier County. Since Collier County
does not have any ports, rail lines or high speed rail facilities, no
discussions of these modes appear in this element.
The traffic circulation fsystem is truly the "supply" side of the
"demand versus supply" equation (with land uses being the demand
side). As land uses conl:inue to increase, they place a heavier demand
on the existing supply of roadway miles. The roadway system's'effect-
irehess is therefore linked to the Future Land Use Element.
In Collier County, one of the fastest growing metropolitan areas in
the Country, both elements must be developed simultaneously. Growth
cannot be projected without knowing where the future road system will
be, and the future road l=ystem must be planned with the potential
growth in mind. To that end, land use modeling Is an Integral part of
the future traffic proJec=tion process.
The following steps were taken by Collier County in the development of
the Traffic CIrculation Element=
~Elrst, the existing system conditions were documented and the future
needs were examined. Later in this Element, the land use forecasting
methodology will be discussed.
secondly, a level of service (LOS) standard was needed to "measure"
the volume versus capacity of the existing and future systems. Having
such a method of measuring the service standard permits the
identification of deficiencies.
Lastly, the future highway needs were examined for three horizon
pertodsz
five (5) years - ;99~ 1997,
ten (10) years - 2~G~2002, and
for the year 2015.
The first period is to maintain consistency with the Capital Improve-
ment Element (CIE). The second period is to provide a ten year plan
"window" in which the last five years, show the advancement of needed
.projects towards the end of the 5 year CIE "window".
The year 2015 horizon is included to permit consistency with the local
Metropolitan Planning Organization efforts. Unlike the first two
periods, which cover the entire county, the 2015 period has a much
more limited study area, generally recognized as the Naples Urbanized
Area.
~e remaining portion of the Traffic Circulation Element will take up
a discussion of non-motorized travel demands, the vnrious perspectives
surrounding the Future Traffic Circulation System, nnd a presentation
of the Element's Goals, Objectives, and Policies.
~" ao SYSTEM OVERVIZW
Collier County is the l~rgest Counhy in the State and spans an area of
.-.. over 1,994 square miles (1,276,160 acres). The major central city
area is the City of Naples which covers 11.5 square miles and has a
- permanent population of ~ 20.001 (April 1, 1991 1992).
The greater Naples Urban Area, loosely defined as the lands west of
CR/SR-951 (including all of Marco Island) covers 129 square miles with
an estimated permanent population of {-~ 126.700. Seasonal
population increases in the Urban Area have been estimated as high as
32% during the winter months.
Approximately 20 miles northeast of the Naples Urban Area lies the
urban center of I~unokalee (an unincorporated community). I~okalee
has a permanent population of approximately ~ 15.991 but
witnesses substantial seasonal increases associated with the
agricultural industry.
/- Within the Naples Urban Area, a grid system of predominately county
roads makes up the major highway network. Major north/south routes
include North Tamiami Trail (US 41), Airport-Pulling Road (CR-31),
Interstate-T5, and Isle of Caprl Road (CR-951 and SR-951).
"The east/west links completing the grid are Immokalee Road (CR-846),
,. Pine Ridge Road (CR-896), Golden Gate Parkway (CR-886), Davis
Boulevard (SR-84), Rattlesnake Hammock Road (CR-S64), and East Tamiami
Trail (US 41).
· ; In addition to these major roads, other roads such as Radio Road
(CR-856), Santa Barbara Boulevard, and Vanderbilt Beach Road
· interconnect to provide the level of continuity needed to ensure an
i' adequate network configuration.
Linking the Naples Urban Area and the Immokalee urban center is the
" Immokalee Road (CR-846). Within Immokalee, SR-29 passes through to
the south on its way to intersect with Interstate-75, then to US 41,
and finally to Everglad~}s City. The northerly route of SR-29 out of
Immokalee leads to LaBelle in Hendry County.
In the past fifteen years, the County has made tremendous strides in
keeping up with the even increasing travel demands associated with
urban growth. This Element describes the continuation of the County's
efforts to provide the means to move people, goods, and services
throughout the County.
I]60 255
TRA I-2
1, Rosdvsy Znvsn~9/~y
~, The existing highway network inventory (Table 3) describes the major
links throughout the County, including those within the City of
Naples. This inventory Includes eli major roads regardless of the
Jurisdiction having operational responsibility.
The Inventory data was provided by the City of Naples Engineering
Department, Collier County Transportation Department, and the Florida
Department of Transportation.
The existing Traffic Circulation Naps (Nap TR-1AW through TR-1CE)
reflect operational characteristics as of e Aucust 1. 1992.
· The afterisis and coll,ictors have been classified according to the
State's Functional Classification System.
2. Levels of SeF~ice
As a clualitative measure of operational characteristics, the Level of
Service descriptions uz~ed for transportation planning are as follows:
The highest quality of service a particular class of highway can
provide. It is a condition of free flow in which there is little or
no restriction on speed or maneuverability caused by the presence of
other vehicles in the traffic stream. Stopped delay at intersections
is minimal.
~' A zone of stable flow and representing reasonably unimpeded traffic
operations at average travel speeds. The ability to maneuver within
. the traffic stream is only slightly restricted and stopped delays are
, not bothersome. Operating speed is beginning to be restricted by
other traffic. DriverEl are not generally subjected to appreciable
· tensions.
: ~. LOS Cl
Still represents stable traffic flow operations, however. the ability
to select speeds, maneuver and change lanes may be more restricted
than in LOS B. Longer queues (traffic lines) and/or adverse signal
coordination may contribute to lower average travel speeds.-Motorists
will experience an appreciable tension while driving.
Approaching unstable flow. Tolerable operating speeds are maintained
but are subject to considerable and sudden variations.
Freedom to maneuver and driving comfort are low because of
increased lane density. The'probability of accidents has increased
and most drivers consider this level of service undesirable.
The upper limit of LOS "E" is the capacity of the facility. Operation
at this level of service is unstable, and speeds will fluctuate widely
TRA I-3
from point to point. There is little independence of speed selection
and maneuverability. Driving comfort is low and accident potential is
high.
t f. LOS Ft
Describes forced-flow operations and represents traffic flow
characterized by extr~mely low speeds. Speed and rate of flow are
below levels attained in LOS E, and may, for short time periods,
drop to zero. Inters~ction congestion is likely at critical
signalized locations, with high approach delays resulting with the
queue continuing to grow upstream as long as the arrival rate
continues to exceed the discharge rate.
To. determine Level of Service on Collier County roads. several'tables
have been developed which identify maximum traffic volumes for each
LOS ranking for each_~.Decific roadway segment. These volumes identify
the maximum number Q= ~ehicles permitted on the roadwav in order to
operate at or above the identified LOS rankinG. These volumes are
then compared to the existinG traffic volumes on the rQadw~y.,
If a LOS D has been adopted for a SPeCifiC roadwaV segment. the tables
will identify the m~lXlmum number of vehicles Permitted in. order to
maintain a LOS D for~_~hat roadway. If the ~istin~ traffic volumes
exceed the maximum permitted volumes under LOS D. the roadway is
determined to be deficient and oDeretina under unacceptable
F~31ditions.
In order to quantify, and thus measure the level of service standards,
this element edo[Fcs utilizes the Generalized Daily Level of
~-,~,~ Volumes Tab].~3s as prepared ~-- the "'-~- Department
~,xoF~ .... ~, for fr,_-ewaya, local and ~ral roads ....... IA and
~r~-the Collier County Generalized Service Volumes for urban two-way
arterials, (Tables ~-~nd--1-~ 1A and 1D) as prepared by David Plummet
and Associates and adopted by FDOT and the County. These tables have
been prepared for various facilit~ and area types configurations~
_t~ Collier CoUnty arterials within the urbanlzed area only.
TaLl& ID displays rout,~ specific aer~ice volumes for Collier
For determinin~ the lev_el of service on transitlonln~ and rural
~ state roadways. highways and th~ Interstate, Florida
Department of Transportation has develope~.Collier County SPeCifiC LOS
tables for State Roads (Table lC].
To determine Level of Service on Collier County rural and urbanized
local roadwarD. thi$.e)~ement utilizes the Florida Department of
TransDortation,s Generalized Annual Average Daily Volumes for
non-state roadways. multilane and two lane uninterrupted arterials
257
The FOOT Generalized Daily Level of Service Maximum Volumes tables are
derived from peak hour, peak direction conditions. More specifically,
all the volumes are based upon the highest 15 minute period of the
~ 100th highest volume hour of the year for the higher directional
flow of traffic. The daily volumes. in the table include directional,
sub-hourly, hourly, daily, monthly, and seasonal peeking
characteristics of traffic.
A detailed description of the preparation and use of these tables is
provided in the Florida Highway System Plan LOS Manual.
To determine the level of s~-ice of eac.h highway se~,~,ent, the average
daily treEfie volumes on t.he ..... highway network were estimated by
~ Amended May 19, 1992
MAP TR-]A'~
EXISTING TRAFFIC; CIRCLJI.AI'ION MAP
: F"AC;II .I 'I'Y 'rYF'[.:
WESTERN COLLIER COUNTY HENDRY
r'~"=:::: ............. ~&'Li~'Fc~.' ....
(Xl~T1HO '*
URBANIZic. D I '*'
F'
~..,,.,.T,o,.,,.~ i "'b----.7_
URBANIZE{:} . ...: ~
I
Lr~ CO, . _j I ]
co. I :.
.I.,.., ~ :
BOQK
,;: !
HFJ~IORY CO.
~'~ CO~.UER CG,
: MAP TR-IAE
EXISTINC TRAFFIC CIRCULATION MAP
fACZLITY TYPE
EASTERN COLLIER COUNTY
,:. COLLI[R COUNT'r, FLORIDA
HENDRY CO,
COLLIER CO.
. , : COLLIER CO.
%' %' ~ MONROE CO.
, .
'-PP, A-?
060 260
..~
MAP TR-18W
EXISTING TRAFFIC CIRCULA'FION MAP
NUMBFR OF LANES
W~STERN COLLIER COUNTY, FLORIDA 141ENORY CO.
CO~.LIFR CO.
LEE CO.
COLUER CO.
., I
c~,ur. co, EXISTING TRAFFIC CIRCULATION MAP
:": NUMBER OF LANES
EASTERN COLLIEIt COUNTY, FLORIDA
COLLIER COUNTY. lrL{)tIOA
· .,.-,, r
HENDRY CO,
COLUE:R CO.
COt, UER CO.
,'
MONROE CO,
TRA-9
,,oo,, i"J60 ,,~.~. 262
:::,
"i:i~:'
II II III
.~. ;- ..
MAP TR-1Cw
EXISTINC TRAFFIC CIRCULATION MAP
ADOPTED LEVEL OF SERVICE STANDARDS
WESTERN COLLIER COUNTY HENDRY CO.
COLLIER CO.
IrE CO.
COLLI[R
,
~,~.~ , H[NDRY CO. MAP TR'~CE
i!i,.:: co~.u~. co. EXISTING TRAFFIC CIRCULATION MAP
ADOPTED LEVEL OF SERVICE STANDARDS
EASTERN COLLIER COUNTY
· HENORY CO.
. COtLIF]I CO.
:'~:~ '. ¢qt. Llt, cou. TT G[NF"A~IZrO SUvi~Syol. Ur!E~ Ill
.~,;. TNO-WAY ANNUAL AV~RAC~ BAIL/S£RVICI VOLUHES FOR URBAN TWO-NAY
I.'
~roup O Iloll te I.]3 e~n_~a~$ De= .m. lie. J.I Level at Service
~l~e~/~yp..t{2} A __B___ C O E
~: 2 Undivided ~lthout left-ruin bays IS,Ill 16,]RI 17,118 18,211 Zl,]ll
2 Divided |l,9Ol 21~388 31,3~1 22,711
4 Divided 31,311 46,90! 42,7de 45,581 41,3ll
i Undivided 54,~RI 58,469 61,eltl 65~191 61,111
~. i DIvided 57,7el 6],see 64,2,e ~8,41l
. Group ~ {I,34 to 1,75 sl<jn.m_~mls pa~ milet Level Be Service
Lenee/T~PelZI & B ..... C D S
' , 2 UndlVlde'd ~lthovt le[t-~o~n bays I]~/ll 14.90! I$,4,e ]l,)ll ITsall
'. 4 Undivided 33,591 35,711 it,]el 38,fll 4[,111
· 4 DIvided 35,311 37,689 39,9~1 41,111
I Undivided 51,101 5).eel 55,5;I 5e,51l
t DIvided 5),691 56,609 58,4;9 61,611
~... G~eup s (I.76 to i.5 ai~nal_~ pea mile) Level BE Service
~" ~-enee/TYPe[2) ~ S C D__
I!~.~!' 2 Undivided Nithaul ielt~~u~n bays ll,lel I),60e ]4,4l, l Is,lee IS,gel
'. i Undivided 38,681 58,58e 52,21! Si,611
Group C (I.I to 2.5 siSsale per mile) Level el Service
Lanes/TYPe[2) A S C D
i.-: 2 Undivided.without Jeft-tu=~ bayI ' -- II,fll ]3,511 ]l,lll
~:"' 4 Undivided
,~ .', 4 DIVIded -' 28,9el 34,911 37e31l 39,211
::,. TAIH,I~ IA (CONT~I))
COLLIER COgHIT GENERALIZED SERVIC¢ VOLUHE~ (1)
.'i"...' ~roup U I2,i.~t~ 3.5 ~!~na_.Jl~L ~E mile) LPvel of S,rvlce
.
~,anes/TYPell)
,::,;:. -
.~.,. 2 Undivided viihour left-ruin bays .... ]1,111 II,)ll
2 Undivided .... 13,gel 17,lie 11~511
li 2 DIvided .... ll,6/I ]7,91l 19,Sll
4 Undivided -- 28,SII 35,lll 37,111
~i 4 DIvided
.... 31,111 37,111 31,111
i Undivided
i DIvided
;~.~.:. ' Group I ~3,6 to 4.5 sl2nsls_.pet mlle~
i/~.!!: ; Level of Service
.~!~'i' ' 'l'enes/T~'Pe(]) A S C 0 ,, S
~.:~ . 2 Undivided viihour left-tern bays .... l,lll ]3,111 15,111
2 Undivided
:~::~';1' 2 DIvided .... ll,481 '15,511 37,111
:~!::~'.. -- -- l ..,.,
4 Undivided
· ' 4 Divided .... 21,~el 32,611
r-s. " --
h..;'
i Undivided
~'~ i DIvided ....
.... 34,661 5]~111 Sl,71l
· ,
~:' Group r (more than 4.5 sl~npIs pet mile) Level o[ Service
~. Lanes/?~Pe[2) /~ B C D S
2 Undivided Mlthout [elt-turn bays '* -- 5,3al 32,511 iS,Ill
] Undivided
'*' ". "- 6,781 ]S,711 ~1,111
~, " 4 Undivided
" .' 4 Divided .... I?,gll 21,Ill . 37,111
...... 33,61~ 31~311 31,~11
6 Undivided
i Dialdid .... ]9,411 45,211 Si,211
...:.
teethetest
Collies County Generallied Service volumes represent ettlmate~
o[ the maximum service qfolumes at different levels of service
given certain generalized Collier County specific Input
elsumptJons end should be used only foe general planning
applications.
;. 23 t=cept el noted, undivided end divided roads are IIIt~metl to
: -- Level o~ Service cannot be achieved.
BOURCI! David Plummet & Ase.lcletes (ueJn~ the LOS program provided
by the riotida Dep~rtment el Ttenepottarlonl.
..
i~.,.
~.~..
Footnote:
--- Level of Service cmt be achieved.
1 Sen/Ice vottaes
DALLY
Fat STATE ItCNID$ il COLLIEX CGJIfiY
Pt~PAI~ BY FOOT, JULY ~, 1992
&l North Trill L~ ~ LI~
41 North TraIL ~1~t~ ~ I~ V~llt ~ I~ ~,~ 39,~ ~,~ ~.~ ~,~ ~.~
~1 North Trait Vm~itt ~ R~ ~tf Park Drf~ ~,~ ~,~ ~,~ ~,~ ~.~ ~,~
North Trail ~tf Pe~ Drlw L~( ~ I/A ~,I~ 53,~ ~,~ 61,~ 61,~
North Trail Lmt ~ Park ~o~/~ ~ U/A ~,1~ 53,~ ~,S~ 61,~ 61.~
North Trait Park ~-~m
North Trail ~ A~ 12th
North Trail 12~ A~ Sth A~ ~h N/A N/A N/A ~.I~ &9,~ &9,~
5th A~ ~h ~tette-Fr~ R~ N/A N/A N/A ~,I~ &9,~ &9,~
East Trail ~tett~Fr~
East Trail ~ ~ idols I~(m~) Al~rt-httlN l~ N/A 8,~ ~,S~ ~,~ ~,~ ~,~
last Trail Af~rt-~ttl~ R~ aatti~e-~k i/A a,~ ~,S~ ~,~ ~,~ ~.~
E,t Trail httt~ek ~t~e L~ ~,~ ~,~ ~,~ ~,~ M,~ ~,~
E,t Trait ~te Ln ~ ~1 ~,~ ~,~ ~,~ ~,~ ~,~ ~,~
18 US &l C]I N Dede County Line 2,900 5,800 9,/,00 15,000 Z6,200
19 1-7~ Irl:~eed Cculty Line $R 29 21.7130 TI,&I~ 1,7,7130 57.600 61.900 61,rA30
20 1-7~ Sl Z'! Att|gator AtteY 21,700 TI./,IX3 &7.700 57,600 61,900 61.900
J 57,600 6t,90Q 61,~
21 1-7~ AttNatN' Array S~ 9~1 Z1,70(3 33,4~X3
22 i-~ ~ ;:$1 r~ ~ Zl,..w~O
;Z3 1-75 OI 8el {:X 8&~ 21,700 Tt0td)g /,7,700 57.600 61,900 610tO0
' 2&, 1-7~ C~ N Lee C4:w. llty Line :}1,700 ]3,tOO 1,7,7130 57,600 61,900 61.900
; ~:n 26 Sit 29 CJt 83;' 1-7~ 2,2130 5,/,013
r%,~ Z7 SIt 29 1-7'j Oil MeLt load 2,700 5/,4X3 8,7130 13,900 Z2,4~X) Z2,~)O
CO) 28 sit 29 of| Me{| load South of 13th S~reet 2,7130 5,~:~) 8,700 13,900 22,4~X) Z2,4~0
Z9 Sl1 Z9 $C~Uk ~f I:$th Street C3I 8&6 IlIA 10,700 29,900 33,000 :~/,,.~X) 32,,300
]0 S~t 29 C:X 844 Leke Trafford Itoed IlIA 10,7130 29,900 ~,000 .~,.100
I ~1 e,l Z9 ' L&ke ttlfford load Cl Zg~ ilA /,,~Q0 13,600 15,/~Q 16,/~3Q
32 $/1 29 CR ~ Sit 82 3,200 6,44X3 10,&00 16,~430 26,600 2:6,600
I "
84, DeYll leul. wacd Sit ~ ~ ~
Davis ~LM~ at~-~ttl~ l~ ~ h~ R~ 2,1~ 16,~ 19.~ ~,~ ~,~ ~.~
Devil ~tN~ ~s k~rl ~tM~ ~fo I~ 3,~0 11,1~ ~,1~ ~,&~ ~,~ ~,~
Devil ~tm~ I~tO l~ ~ ~I
Davis ~ ~ ~1/~ l-~ N/A ~,&~ ~,~ &S,~ 55,~ SS,~O
I
~ Zst~ Iri~e a ~2
~ ~2 ~ Port ~ PrJ~e 3,~0
I
FDOT's Annual Average Daily Volumes
For Non-State Roadways, Multiple and Two Lane
Uninterrupted Arterials
(A) Multi Lane Rural Ar~erials (Signa~ Group R)
I~3LTXLA/~E UNINTERRUPTED |~GIIWAYS
TWO-LAME UNINTERRUPTED H]GHWA¥S
(B) TWO Lane Local Roads (Signal Group L)
# 3, Traffio Count and Accident Freauenov Data
As part of a system-wide approach to.monitoring level of service
deficiencies, the County maintains two programs that assist in
determining where improvements are warranted.
The State and County Traffic Count programs regularly monitor vehicle
movement activities at more than 100 locations throughout the County.
Historical data from as far back as 1973 provide the basis for'
assisting with the projecting of future demands upon the system. The
annual average traffic volumes are provided in the Traffic Circulation
Element Support Document.
In addition to traffic volumes, accident frequency data is the next
most important factor considered by the County when determining the
need for improvement in the system. Traffic accident statistics, by
intersections, are compiled annually by the County and are reported in
the Support Document.
4. Unacceptable Conditions - County Roads
A capacity analysis of the existing major highway network was
performed using the methoaolc~les identified above wl~h the results
shown in Table 3 and on Map TR-2 (W & E).
Level of Service "D" has been established in this plan as the minimum
acceptable level of service standard for all County roads except the
following:
Roadway Fro~ To
Airport Road Pine Ridge Road Golden Gate Parkway
Golden Gate Parkway Airport Road Santa Barbara Blvd
Goodlette-Frank Road Pine Ridge Road Golden Gate Parkway
Goodlette-Frank Road US 41 Golden Gate Parkway
Pine Ridge Road Airport Road 1-75
The County has established LOS "E" as the minimum acceptable level of
service on these roads.
The existing LOS of each segment was compared to the adopted standard,
the County Roads with unacceptable conditions are identified in Table
2.
In all cases, two additional lanes are required to return the existing
system to an acceptable level of service. Since the County is
responsible for maintaining the adopted level of service in a manner
consistent with adopted policies, the additional lanes necessary to
return the County roads identified above to an acceptable LOS are.
programmed in the Capital Improvement Element.
Xmended }fay 19,
TRA 1-19
· 272
5. UnacoeDtab],e Conditions - 8tats Roads
For those portions of the State highway system located outside the
City of Naples this plan incorporates the level of service standards
found in the Florida Transportation Plan.
These standards applied to State roadways in the unincorporated areas
of Collier County and are as follows:
Existing Transitioning
Rura.1 Area Urbanized Area Urbanized Area
1-75 eB D~ C
US- 41 C D C
SR- 84 C D C
SR-951 - ~ D ~) C,
SR- 29 [} C - -
SR- 82 ~)C - -
_* This segment of ]:oadwav has been designated as a "backloaded
roadway" by the ]Florida Deoartment of Transportation. APril 6.
1993. Reconstru.ction along this segment will be expedited bv
FDOT.
# TABLE 2
EXISTING.UNACCEPTABLE CONDITIONS QN COUNTY RQA~
',C 1991
199~ 1991
Daily 1990
~." f~ Roadway Segment (Miles~ Volume LOS
19.500
31 Bonita Beach Road West of Vanderbilt 1.6 17~00 F
Drive
'~ e~ US 41 to Airport 2~0 20,752 --B
t~--R~'--R~md Goodlette-~rank Road .7 35,201 --9
~R-eee9 (cR ssl) ..........
R~dio ~oad Airport Road to 1~3 12,345 -~
~ ~i~ R~r~T~e~=k~e-- US 41 to Charlemagne .0
~~d Pine ..... Road to 1.0
~. Green Doulevard 12~155
~i' TRA 1-20
39 AIrPort Road Pine RidGe Road to 2.6 32.390 F
(CR-31) Golden Gate Parkway
Bour~ez Collier County Planning Department
Amended May 19, 1992
~ -
:; )~. :', MAP TR--2W
., EXISTING TRAFFIC CIRCULATION MAP
.. UNACCEPTAE3LE CONDITIONS
IVESTERN COLLIER COUNTY
liENDRY
T: '~<:::'.~ ............... :~&.~.- ....
' I ~,."' " ......
i . .......
;~:..'. '~"
~. ~ : .............. ~,t~ ........
.
~ .
.
,
/
......... ~ /
~C~oO
,
~oo~ 060 ~.~ 2~5
CCX, UER CO. MAP
?,:, EXISTING TRAFFIC CIRCULATION MAP
i~:],. UNACCEPIABLE CONDlllONS
EAS1ERN COLLIER COUNTY
,~',
CO(.L)£/I COUNIY, FLORIOA
[ _. HENORY CO.
"' CO{LIER CO.
e~..~.,,,,L
IhI~I~NgtT
Collier COUnty Tr;~nsportation Planning Datnbase Capacity Analysis
(IProposed 1993-97 CIE)
1991 Ex~aUng 1991
Counted Road L I~1 Yeu
~st Slg Min Dally LOS SaUce Q ~Std ~pe~ed
ID~ ClEf Road ~Unk F'~omRe Road O Std Volume Tebh Volume S ReUo Deficient
1 ~1 ~rpod ~. Immokelq~ ~. to Vsnde~ Bch.~.~ 4D A O 178~ tA 41 ~ A 0.~
__ 2 ~ C~1 ~od ~. %'ender~RJ]ch.~.~ to Pine Rdge 4D B D 257~ IA ~,~ A 0.67
3 ~ C~t ~d Rd. F~ne ~dg~ Rd. to Golden Q=te Pa~.' 4D A E 323~ 1B ~.~ F 1 .~ ~
__4 C~1 ~r~ Rd. CIolden ~te Per~ to ~dlo Rd. 6O D O 42~7 1A ~,~ C 0.76 ~.~1
5 3 C~1 Nrpod Rd. F~dio ~. $o Dm~t B~I. 6D D O 31~1 1A ~ C 0.~
__6 3 C~1 Nr~ ~. ()e~e B~, to U~I 6D B D 2~7~ IA 57~ A 0.~ >~1
7 ~ 'C~ Bald Eagle Dr. ~1. d S~1 2U L 0 ~ I D 13~ C 0.73
8 H C~ Bald Eagle Dr. $. of S~ I 2U L O ~9 1D 13~ C 0.71 1 ~7
__9 Bayshore (Kel~ ~. LI~t to~ommsson ~, 4D L O 137M 10 ~,~ C 0.47
10 31 ~ ~ech ~. Vted d Ve~er~ Or. 2U ~ B D 19~ 1B 17~ F 1.15
11 ~ ~r~n ~ad Lake Trsfi,}rd ~. lo tmmokolee Dr. 0 R D ~ I 1D 0 ~
j2 ~ ~u~ 8~n Rd. D~s BNcl. to CR ~ 2U L D 9~, ~ 10 13,~ C 0,71 >~1
~3 C~ ~un~ Road ~ U~I to Chokoloskee Islmnd 2R R D O ~ 10 15,~ A 0.~
14 ~ D~s BNd. LI~I t~irpd Rd. 6D C D ~179 1C ~ 8 0.42
15 ~ S~ Os~s BNd. lJr~d ~. to ~kNwd E~d 2U B 0 178~ 1C ~,~ C 0.87
__16 49 S~ D/~s BNd. Lak~{l B~. to ~un~ Barn ~. 2U B O 178~ 1C ~ C 0.87
__17 ~ Os~s B~. [~un~ Barn Rd. lo S~ts 8~srs B~d. 4D B O 1 ~ 1C 41 tI~ A 0.39
t8 S~ Os~t BWd. ~;an~ Bmtbsrs BNd, Io Isle of C.pd Rd. 2U A C ~ 1C 16,1~ E 0.~
_ IV Golden Gate 8Nd. C:~51 to ~lson B~. 2R R O 7,~ 10 14.~ C 0.~
~ C~ Golden Gate P~ LI~I to '3~dle~F~=nk ~. 6D E D 1~I~ 1A ~,~ C 0,~
21 5 C~ Golden Gate P~ (Ioodle~Frmnk Rd. to ~rpod Rd. 4D A D ~1~ 1A 41,~ A 0.81 1
~ ,C~ Golden Gate P~ IJr~d Rd. to 1-75 4D A E 21~3 1A 43~1~ A 0.49
_. 23 C~ Golden Gate P~ 1.75 to S~nts B=~b~= BNd. 4D A E 19RI 1A ~,1~ A 0.~
24 C~ Golden Gate P~ ~;~a Bnrbarm B~d. to Isle of Capd Rd 4D B D 11 ~ 1A ~,~ A 0.~
25 t9 C~1 G~dle~Ft6nk ~. t~mok~lee Rd. to Cedcl ~. 2U L D 0 1D 0 ~
~ C~1 G~dle~Frmnk ~. (~Hce F~J. to Pine ~dge ~. 2U L D 3723 10 13,~ C
27 i C~1 }~le~Ftmnk ~. 19he ~c~e ~. to Solsni Rd. 4D C E ~ 1A ~,~ B 0.~
28 i ~ C~1 O~dle~Frank Rd. []o1~ Rd. to Golden Gate P~. 4D 8 E 27~B 1A 39~ B O.B
_ ~ I C~1 O~dte~Frsnk Rd, Golden Gate P~sy to U~I 6O D E ~51; IA ~1~ C 0.51 >~1
_ ~ ] Green ENd. Semi E~rbarm BNd. to Sunlhine BWd. 2U L D ~ 1D 13,~ A 0.~;
31 Ou~shore Dr. 'l 11 ffi Ave N, to Vande~R Beach ~. 2U L ~ 2~4 1D 13m~ C 0.21
~ ~ 37 C~1 Isle of Capd Rd, Immok;iJse. Rd. to Golden Gate B~. 2R R D ~18 1D 15,~ B 0.~
_.~ ~ C~51 Imle of CapH Rd. Golden Gate BNd. to Pine ~dge Rd. 4R R 0 1 ~5 10 ~.7~ B 0.27
~ = C~51 Isle of Capd Rd. I~ne ~e Rd.to Golden Gila Parlay 4R R D 13~6 10 ~7~ B 0.~
,,. ~ ~ C~51 Isle of CapH Rd. ,3olden Gate Parlay to Oa~s BNd. 4R R D ~191 10 ~,7~ B 0.~
~ i 11 C~51 Isle of Capd Rd. Da~. Bk,d. to Ra~esnake Hammock R, 2R R D 11575 I O 15,~ D 0.73
_ ~ ] 10 C~51 Isle o~ Capd Rd. Ra~le.nake Hammock Rd. to U~t 2R R D 11575 10 15,~ D 0.73
12 S~51 Iileo{CapdRd. U~11oManateeRd. 4D 3 D I~ 1C ~,1~ B 0,43
.39 12 S~51 Isle o~ Capd Rd. Manat,~e Rd, to N~ York Dr, 4D O C 1~ 1C 42,~ B 0.47
51 S~51 Isle of Capd Rd. N~ Yg~ ~. to M~rco Island BHd~e 2U A C 1~ 1C 17r7~ D 1,12
S~51 I=le o( Capd Rd. Marco Isl=nd Bdd~e to CR 9~ 40 B C 1 ~Tt 1C 43,~ B 0.~ '
42] S~1 IsleotCapdRd. CR953toCR~ 4D A C 1~1 1C ~,~ B 0.~
~ I C~ 111 th Av.N. Ouffshoje Dr. to Vlnder~ Dr, 2U L D ~ 10 13,4~ C O.~
~ C~ 111ffiAv. N. Vende~Dr. toUS41 2U L D ~2 ID 13,~ C 0.~
~ i 6 ;~ Irarook&lee ~. U~I to Nrpod Rd. 4D 8 D 211B 1A ~,~ A 0.~ U/C
~ 6 C~ hnmok&lee Rd. ~r~rl~d. to 1-75 4D B D 15174 IA ~p~ A 0,40 U/C
47 8 C~ Irarook&lee ~. 1-75 te CR 951 2U A D 1~30 IA 19~4~ A 0.52
~ C~ Immokalee Rd. CR ~o SR ~ 2R R D Q 1D 15,~ A 0.~
49 S~ leerstate 75 , Brow~ ~un~ Une to SR ~ 4F I B O 1C ~p4~ A 0.~
~ S~ Imefstate 75 ~SR ~ to CR 951 4F I B ~ 1C ~,4~ A 0.~
51 S~ Interstate 75 CR ~,t to Pine ~dge Rd. 4F H C 14~t8 1C 47,7~ A 0.31
, ~ .... S~ Imer~ate 75 Rne Ftd,~e Rd. to Immokalee Rd, 4F H C 24~ 1C 47,7~ B 0.52
~ S~ InSeffete 75 immokalee Rd. to Lee Coun~ Une 4F H C ~1 ~9 I ~C 47~7~ B 0.~
_,H ~ke Tra~ord Rd. ~est of S~ 2U L D ~ 10 13.4~ ~
~ Lo~ Blvd. V=nd,~r~ Beach Rd. to Pine ~ge Rd. 2U L O ~e) 1D 13,4~ I C O.~
~ ~ Logan BNd. Pine I~e Rd. to Green BNd. 2U L O 12~1 10 13~4~ D 0.~ ~s~ng
57 21 ~ngston Road Irapedal SL to Immokalee Rd. O L ~' Q t D 0 ~
___
060 277
TABLE 3 CONT.
INYENgIT
Collier County Transportation Planning Database Capacity Analysis
(Proposed 1993-97 CIE)
1991 Existing Igg~ lggt
Counted Road L 1991 Year
F_Jdst Slg Men Dsdly LOS Ser~ce O V%Std Expected
IOl CIEIRoatl · LInk From/To Road Std Volume Table Volume 8 ReUo Deficient
-;1 n.stonRo.d Rd.00
; LIvingston Road Vandsrbi~ Bch. Rd. to Rne Ridi~e Rd. 0 L D O 1D Q NA NA
60 52 L~ng sign Road Pine Itdje Rd, to W~mdemere 0 L D 0 1D Q NA NA
~1 53 t_Mngston Road Gold,m Gate Parkway to i~dio R.t. O L D ...0 D O NA NA
6~ 21 CR860 EA/VL.MngstonRoad OId411oN/SL~.nastonRd. 0 L O 0 D 0 NA NA
63 N. letStreet MainSt. toNewMm'ketRd. 2U L D 5556 1D 13,4~) C 0.41 I
_64 ,Co~mp KeaJs CR 65~J~ Immok~lee Rd 0 R O 0 1D 0 NA 0NA~.59 ]
65 New E-W Road Vander~lt Dr. to Old 41 0 L D NA t D 0 NA
66 C, R8~7 Old US41 LJS41 to Lee C~unt,/Une 2U L O 7562 10 13,400 C
_ 67 ~ Pine Rdge Rd. Wed of US 41 4D L D ~ 1D 2~500 C 0.27
_68 14 CR896 Pine FIdC3e Rd. USd~ to GoodlaSts-Freak Rd. 6D C O 3~o52 1A 56,300 B 0.54
6~ 14 CR896 Pine Itdge Rd. Good'~'etle-Frenk Rd. to Shidey SL 6D D D 36(X~3 1A 56,300 C 0.64
~_.70 14 CR896 I~ne Rldgt Rd, ShirhySL to Airpod Rd, 6D ~ O 32323 1A 57s4OQ A 0.56
71 14 CR896 Pine Ridge Rd. Grade 9spore'aGe I~ Airpod Rd. NA NA NA NA NA HA NA NA
~' ~2 41 CP,896 Pine Rdge Rd. Airp<~ P,d. to 1-75 4D A E 28719 1A 43,100 A 0.67 2001
' 73 CR8~S Pine Ftdge Rd, 1-75 ~'o Is.~_le of Clpd Rd, 40 A D 8207 "~'A 41 r000 A 0.20
14 15 CR856 P, edioRd. Airp<~d__Rd. to_.. t..too..Ki_D.~s Way 40 L D 12767 10 291500 C 0.43 U/C
'~5 15 CR856 RedioRd. KingsWe~ueBh/d. 4D L D 956~1 10 29.500 C 0.32 Completed
_76 ~ 16 C~ Radio Rd. Sanla Barbara Blvd. to SR 84 2U L O 5167 1D 131400 C 0.39 >2001
T7 ~ 17 CR864 Rafflesnake Hack Rd USdl to Charlemagne BNd. 2U L O 12468 10 131400 [ D 0.93 F.x:i~ng
78 17 CR86.4 Rafflesnake Hack F~ Chaltems$ine Blyd. to County Barn Rd. 2U L O 9517 10 13.400 C 0.71 1~15
'79 17 CR864 Rafflesnake Hmck F~: Cou~:](jSam Rd. to Polly Ave. 2U L D 10101 1D 131400 C 0.75 19o4
~0 CR864 Profilesnake Hmck F~: PolI}~A.L~.~. to Isle of Capd Rd. 2U L D 3642 10 13~400 C 0.27
81 Seats Barbara Bird. Gre¢~n_.._Btvd. to Golden Get, Parkway 4D L D 13306 1D 29,500 C 0.45 >2001
82 5~ Sent, Barbara Btvd. Golclen.__Gate pattnNay to Radio Rd. 4 D L 0 18611 I D 291500 C 0.63 = 2000
63 Sans, Barbers BIrd. Pmd~ o Rd. to SR 84 4 D L D 9825 10 29~500 C 0.3,3
H 32 Santa Batt3era Bh/d. SPZ. 4 to Rafflesnake Hrnck Rd. 0 L O 0 10 0 NA NA
85 CR92 San Marco Bk, d, E. of' Collier BIrd, 2U L (:) 4 92S 10 1314OO C 0.37
156 SR29 Stale Road 29 US41 to 1-75 2R R C 0 1C 8,700 A 0.00
_
87 SFC29 State Road 29 1-75 to CR 2<JA South 2R R C O 1C 8,700 C 0.00
' B SR;Lx3 State Road 29 CR |.:'gA South to End of Four lane 4 C) C C 0 1C 29~900 B 0.0O
' 89 SFt2~ State Road 29 End of Four lano to CR 29A North 2U A C O 1C 13~600 A 0.{30
90 SR29 State Road 29 CR ;.xJA North to SR 82 2R R C 0 1C 10.400 B 0.00
01 SR29 State Road 29 SR I~ to Hendn/Count~ Hne 2R R C O 1C 915(X) B Q.00
_ ~2 SR82 State Road 82 SR ;~ to Lea Coun~ Une 2R R C 0 1C 81700 B O.00
93 US41 Tamiami Tr*q East !'Four Comers' to Goodlstle Rd. 6D E E 3.5562 1C 49,800 D 0.71 >2001
' 94 US41 Tealeel Trail East GoodlaSts Rd. to Da~As B~vd. 60 Q E 495,!,4 tC 491800 E 0.9~ 1998
_ 95 43 ' USdt 'salami Trail East Davis Bh/d. to A~rpod Rd. 40 C O 302G4 1C 33,900 D 0.89 1994
96 47 [ US41 ~amleml Trail East Airport Rd, to Rafflesnake Hack. Rd. 4D C D 0 1C 33,900 C 0.00 199~
07 46 US41 Tamlaml Trail East Ratre0.naka Hack, Rd. to Barfoot Was.' 4D 13) O, D 29o,84 tC 54,400 8 0.55 i >2001
_
98 US41 Tamiaml Trail East Ba.,edoot Was Rd. to Isle of Capd 4D A D 18~77 1C 54.400 A 0.35
9g US41 Tamleml Trail East Isle of Capd to CR 92 2R R C 46~9 1C 9,400 B 0.50 >2001
'~00 US41 Temiaml Trail East CR f}'2 to SR 29 2R R C 0 1C 9,400 A 0.Cx:)
101 US.41 Tamlaml Trail Ee.'st SR ;~ to Dade Coun~ Une 2R R C 0 t C 9,400 B 0.00
102 US41 Tamlaml Trail North Lee Co. ins to .~gglns Pass Rd. 40 A D 22097 t C 40,900 A 0.54 2001
"~03 50 US41 Tealeel Trail North Wigtins Pass Rd. to Immokelee Rd. 4D B D 31331 1C 40,900 A 0.77 1992
~H 45 US41 Temieml Trail North Immokelee Rd.to Vanderbilt Bch. Rd. 4D A D 32!04 1C 40,900 A 0.78 1995
~10~ 45 US41 Tameeel Trail Nodh VsnJer.~bl. lt Bch. Rd. to Guff Park Dr. 4D A D 35652 tC 40.900 B 0.87 1994
106 USdt Temiaml Trail Nodh Gulf Park Dr. to Pine Ridge Rd. 6D D D 40309 IC 58,500 C 0.69 :>2001
J07 44 us.dr Temiaml Trail North Grade Seperal~on (~ Pine Ridge Rd. NA NA NA NA NA NA NA NA NA
106 USdt Temiaml Trail North Pine Rid~ Rd. to Solaria Rd. 60 O E 35486 1C___ 61,400 C 0.58 2001
_
_~ us~t :T.mi.m~T,.~o.h So~ .... nd. to~ .... ,n,. 60 C O 3S4__._, tC_.47,700O 0.74
_. US41 Tamlaml Trail North Cre,ch Rd. to Golden Gala Patl~wsy 6D F D 39022 1C >.j471700 O 0.82 1998
11 t US4 t Tealeat Trail North 3ohJen Gate Parkway to 4|h Ave. N. 60 D O 33461 1C 47,700 D 0.70
112 ! US4t Temiaml Tr&jl North i4th i<ve, N. to 'Four Corners' 6D F D 29255 1C 40,100 CI 0.73 :>2001
_1.1.31 42 ~R862 WnderbillBeachRd. GuffshoreOf. toUS41 2U (2) B D__ 11371 119 12,000 O 0.95 1993
114 23 CR862 Van derbitt Beech Rd.[US41 to Airpod Rd. 0 L D 0 10. ~ 0 INA NA
.oo, 060 ;, 278'
·
~..
II
~,~ TABLE 3 CONT.
';. Collier County Transportation Planning Database Capacity Analysis
(Proposed 1993-97 CIE)
1991 F_Jd$tlng 1991 1991
Counted Rold .L 1991 Yeal
Exist Slg Men DeJly LOS Service 0 ~Stcl Expected
ID' CIEIRoed · Unk Fro'm/To Road Std VolumeTable Volume 8 Redo Deficient
15 I CR862 Vend~rb~lt Beech Ftd. AlCott Rd. to 1-75 2U D 3607 1 (:) C '
116. P_,RB6~ VmnderbiltBeechR!f'. I-7~tolsleofCapdRd. 2U D 15a2 tD C
t 17 25 CRO0t Vmnderbllt Delve Boe~ltm Beech Rd. to Wigginl Peal Rd. 2U L D 6280 I O 13,400 C . ..
'ti6 25 CRO01 VmnderbiltDdve WigginePellRd. lo111thAve. 2U L D 5957' 1(:) 13~400 C 0.44 .. >2001
.119 26 WestciockRd. C~monRd. toSR29 .... 0 R D 0 1D 0 NA NA
120 C~ WIggins Pale Rd. Vendorbelt (Ddve to US4t 2U / D 0 1D 13f400 NA NA ,
¥21 36 8R29 8ilte Reed 29 ... Ped. et~en Overpill NA NA NA ' NA .NA . NA NA NA
1..22 27 MaiD< P, econmtz~citon NA NA NA NA NA NA NA NA
123 28 'Trio Signde NA NA NA NA .NA NA NA NA
124 34 Advtnoed R(:)VV Accl~ mM~.n NA NA NA NA NA NA NA NA
)niece Othendee noted, m/I ExIsWng Sen4ce Vohrmee Ne obt,lned from the Coillet County
!~ed Level Of 8eMce Volume TabIll (Tw0-wey AA(:)T for UFom~ Attedell)
(1) Annhide bleed o~ ADTs thl~ Ne fectc~red I~.! in ixle fecto~ of 0.952.4,
(3) Bigrid (:imp *0' was ~'eCed by DPA to ref~'l tuburiNe eoncJione with en everego of one signs/per four mllee.
(4) Eddng BenADo Volume, from Link Specffic Anolymde (DPA July 1990)
('l Sen4ce Levels to be met be extenli~l of $antl BitoNe BIrd.
(~q All,~es ma~ F~W d~natkme by ao~acent ~ ~wner&
(~ Inad =~q,~cl~n of ~anee with de,~g.
~ Project ~ Cor~rren~ dn~ven; major funding from MSTD
.oo 060 279
T A-2
:.
The Existing Urbanized Areas and Transitioning Established Areas are
identified in Map TR-IAW. The Statewide Minimum Acceptable Operating
Level of Service Standards for the State Highway System are more
thoroughly explained in the Florida Highway System Plan LOS Manual.
Based upon the methodologies outlined above, the County has determined
that the State roads shown in Table 4 and on Map TR-2 (W & E) are
operating at or below the acceptable level of service.
-, # TA~E
EXISTIN~ UNACCEPTA~L~ cOmD~TIONS ON sTATE ROADS
..' LeNgth Daily
CIE# Roadwa~ Segment Mllg/_ VQlum~ LOS
51 Isle of Capr]. US 41 New York ~s3 19.868 D~
Road Drive to Marco eT.} ~gTeee
Island Bridge
~ I~okalee Road ~T5 ~2T49~
TT~ Vanderbilt Beach
Road
'- Vanderbilt Beach e-r.~ 36,210 B
~ Laurel .... Drive
~e [m~ Ai~ort Road to- eTe ~
~ county Darn Road ~
Under Cons~]. ' ,
Determined to b~..a ba~lo~ed roadway,
Source: Collier County Planning Department
# In the State's adopted ~ 1993-97 Work Program, construction
funds are programmed for portions of these segments, and several have
funds programmed for design and right-of-way acquisition. A copy of
the State's proposed ~)9e--95 1993-97 work program is included in the
Support Document.
D. FUTURE SYSTEM N~EDS
1. Land Use Pro~c~ions
'The development of the Future Traffic Circulation Map Series is based
upon estimated travel demand generated by projected land uses.
Increases in existing travel demands will occur wherever increased
growth occurs. Projecting where this land use activity will take
place is a process called land use forecasting or allocation.
TRA 1-27
Land use forecasting is based upon the premise that a certain amount
of development will occur during the period under study. In Collier
County, this amount of development is based upon the University of
Florida population projections, and the resultant demand for housing,
employment, shopping, etc.
Given that a certain number of dwelling units will be constructed and
a certain amount of commercial development will take place to support
it, the only thing left to determine is where those dwellings and
commercial areas will be located.
To that end, a computer model was developed to allocate growth
(dwelling units and employment) to the Naples Urban Area. Because
lands outside the urban area were not permitted to exceed the 1 unit
per 5 acre maximum allowed under the "A" zoning district, the computer
model was only used to allocate growth in the Naples Urban Area. In
addition, because of the relative size of the Immokalee Urban Area,
and the absence of readily available employment data, the computer
model was not used in the Immokalee Urban Area. Instead, manual
projection techniques were used to predict the growth in various land
use categories in Immokalee.
In the Naples Urban Area, the results of the Simplified Land Use
Allocation Model (SL~M) forecasts were used in two different studies
to produce travel demand estimates and projected corridor needs.
2. Travel Dema~d Patterns
It can be expected that travel demand patterns may shift in years to
come as development takes place in the future. As an example, two
studies conducted for the Naples Metropolitan Planning Organization
concluded that traffic zones in the North Naples community would
experience the greatest increases in travel demand based upon
historical and current land development patterns. This can also be
seen by examining the land use records that show the North Naples
Community having 6,206 acres zoned in approved PUDs resulting in
22,173 dwelling units. In addition, over 430 acres of approved
commercial land is found within these PUDs, resulting in a potential
for 3.4 million square feet of commercial area.
Utilizing land use information like this has permitted the County to
project the travel denand generated by future dwelling units (the
productions) and ~y the employment centers (the attractions). Travel
estimation techniques, both manual and computerized, reveal travel
movement patterns between traffic analysis zones on both the existing'
and future highway networks.
Travel estimation techniques such as "d].stribution" and "assignment"
result in volumes of traffic on each link in the network. By testing
different alternatives, e.g., adding two new lanes to a specific
-segment or by adding a new road, future traffic circulation patterns
can be developed.
TRA 1-28
The 1995 Naples Area Transportation Study (NATS) was adopted by the
Naples (Collier County) Metropolitan Planning Organization (MPO) in
March of 1985. This document and its supporting information are the
basis for the 1996 1997 and =00} 2002 Future Traffic Circulation Maps.
Because the study horizon year did not match the Future Traffic
Circulation Map horizon years, further analysis was performed in order
to interpolate (or extend)'the study results to the horizon years.
This was done manually utilizing the staff resources of the Planning
and Transportation Departments.
The 2015 Future Traffic-ways Map is intended to approximate the
Traffic-ways Plan adopted by the MPO. The 2015 2010 NATS provides the
technical support for the 2015 Future Traffic-ways Map and is
included in the Traffic ,Circulation Element Support Document.
The 1996 1997 Future Traffic Circulation Map is based upon the Capital
Improvement Element and supporting data and analysis is included in
the supporting data for that element.
3. Traffio Circql{~tion Constrain~
In many parts of the Nap].es Urban Area, traffic circulation movements
are constrained by the natural features of the landscape such as the
Gordon River. Still other parts offer constraints of the man-made
variety, such as golf courses and the Naples Airport. In many
instances approved developments (some existing, others not yet built)
block the way of logical extensions of urban collector and arterial
roads.
Map TR-3 depicts many of the traffic circulation constraints
identified during the alternatives development phase of this plan.
The single most noticeable constraint is the Gordon River as it
extends from the Naples Bay northward under the East Tamiami Trail
(US 41) to its connection with the Golden Gate canal system.
The characteristics of the highway network at this location resembles
an "hour-glass". On the western extreme, US 41 and Goodlette Road
converge on the narrow "straits" of the Gordon River bridge, while to
the east, US 41 and Davis Boulevard do likewise. The result is the
typical "bottleneck" effect when too much volume is forced through a
constructed area.
The other contributing factor to current and future congestion
problems is associated with the northwest/southeast configuration of
the East Trail (US 41). Because this roadway converges with the
east/west and north/south roadways at an angle it has the impact of
forcing or "squeezing" th,e travel demand into the confined area of the
Gordon River corridor. This one roadway serves both the north/south
and the east/west travel ,demand in the East Naples area.
TRA 1-29
060 282
'i~,~ } MAP TR-3
.:., TRAFFIC CIRCULATION CONSTRAINTS
, ;;~,. WESTERN COLLIER COUNTY
Travelers at the southeastern corner of the Urban Area have only one
route into the central City of Naples, i.e., the East Trail, whereas
travelers in the northea:~t reaches of the Urban Area have a multitude
of choices along the roadway grid for a route to downtown Naples.
In developing plans for new and expanded roadways that make up the
long range network, the County has kept in view these natural and man-
made traffic circulation constraints.. Even though environmental
concerns are usually add~essed through the permitting process, it is
important to consider various highway alternatives in light of the
sometimes fragile ecological features.
4. Future TrafficCirculat~On Map - Year ~ 1997
One of the adopted portions of this Element is the Future Traffic
Circulation Map for the year 1996 1997 (5 year planning horizon).
This map, more accurately a map series, identifies those projects
included in the 5 year Capital Improvement Element. The roadways
included in Table 5 ~=been projected to reach a level of aei~-ice D
durin9 t,he S year ~-- £r~me are funded in the proposed ~993-~997
Capital ImprOvement Element.
Map TR-4 (W & E) identifies the projects included in the CIE and
details the level of effort (e.g., design, right-of-way acquisition,
or construction) that is funded in the CIE Map Series TR-5 is similar
to the Existing Traffic Circulation Map Series TR-4 as it depicts the
lane requirements in the year ~96 1997 based upon completion of the
projects contained in the CIE.
~, Future Traffic circulation Map - Year ~ 2002
The second of three planning horizons found in this Element is the
year 2001 2002 (10 years). The Future Traffic Circulation Map Year -
2001 2002 differs from the 1996 1997 version because the County has
chosen this map to depict the "needs" of the County by the year 2001
2000. The 1996 1997 map represents a cost feasible plan.
Both Future Traffic Circulation Maps (1996 1997 and 20012002) depict
the number of lanes for each facility but do not identify the facility
type (i.e. collector, arterial, etc.). Since the State's Functional
Classification System is based upon a series of actual data tests, it
is inappropriate to speculate as to how a facility may be functionally
classified in five or ten years. Therefore, this Element presumes
that the roadways shown on the Future Traffic Circulation Maps (2001
2002) are of the same facility type as exist currently (Map 1A). Any
new facilities, added during these time frames are to be construed as
collectors unless otherwise noted in this element.
Map TR-6 (W and E) depicts the roadway needs in the year 2000 2002
based upon the travel demand generated by the residential densities
and the commercial intensities permitted by the Future Land Use Map.
It is the purpose of this map to provide the basis for adding projects
to the 5 Year Capital Improvement Element (CIE) during the annual
update process. Each year, as time advances, projects will move
TRA 1-31
C~XLI/R CCXNITY P. AJOIR RIGlIT, LAY NE~ FUT1JItE TF,~FFIC CIRCXX..ATICHI !I41°'ROVDIENT$ ' ~ - ~
LENGTH EXISTING ALX::E]) TOTAl.
CIE# ROADUAY NAN~ SEGMENT (Nft) I~N$ I,W, HI, ~ll~ I~N, NT, |NPROVI[NgNT NOTI~S ,
S GOLDEN GATE P",~"'.J~,*T C,,.~,LETTE-F~J~4~ ~.D TO AIRP"~T RD 1.6 4. 6.4. Z 9.6 ~ Z
11 ISLE OF CAPRI RD DAVIS BLV~ TO RATTLE$&A~CE HHC~ RD 3 Z 6 Z 12 ADD Z
1~ PINE RIDGE RD US 4.1 TO AIRPCX~T RD Z 4. 8 2 12 ADO 2 LANES
1G PINE RIDGE RD GRADE SEPARATION AT US &l - GRADE SEPARATION
17 RATTLESNAKE HNCK RD US 4.1 TO POLLY AV~ 2 2 /, Z 8 ADO 2 LANES
~ 21 LIVINGSTON RD CR ~,6 TO IMPERIAL ST Z E-U 6.2 0 0 2 12.4. NEW Z LANE RO
I 22 LOGAN BLVI) PINE RIDGE RD TO GREEN ILVI) 1 2 2 2 & ADD Z LANES
4..,.,
P.J Z] VANDERBILT BEACH RD US &l TO AIRPONT RD 2,2 0 0 2 &-4. NEW 2 LANE RD
26 ~$TCLOCIC RD CARSON RD TO $R 29 1 O 0 2 2 NEV 2 LANE RD (2)
27 NAJON RD RECNST PROJ
28 TRAFFIC $]GNALIZATION
INSTALLATION PROJECTS
31 BONITA REACH RO VAXDERIILT DR TO NICJCONT BLVO 1,6 2 3,2 2 6.& ADD 2 LANES
33 COUNTY IARN RD DAVIS BLVD TO RATTLESNAJ~ HHC~ lO 2 2 i 2 8 ADD 2 LANES
34, ADVANCED ROU ACI;XJISITION
35 CARSON RD LAI~E TRAFFORD RD TO IlI401CALEE RD 0.6 0 0 2 1.2 NEW 2 LANE RD
3~ AIRPOitT RD GOLDEN GATE PI5/1' TO PINE RIDGE RD 2.6 4. IO.& 2 1~.6 ADO 2 LANES
/,Z VANDERRILT BEACH BD US 4.1 TO GUt. FSHO~E DR 1.& 2 2.8 2 5.6 ADD 2 LANES
50 TANIAHI TRAIL N WIGGINS PASS RD TO IPttOCALEE RD 1.4. & 5.6 2 8.6 ADD 2 LANES (3)
TAJLE 5 (coat.)
COLLIER COUNTy 14AJOR HIGHgAY* NET~ONX: FUTURE TRAFFIC CIRCULATION ll4PRCN~NENTS - ;,,N~, . 44~6
LENGTH EXISTING ADOED TOTAL
~|E# ROADSJAY NANE SEGNENT (NIt) #tLliS ~N. Nia Iq:NS ~H, N|a |NpROV~NENT NOTES
51 ISLE OF CA}'~I ~ X,~d TC~t~ D~I TO NXX~) 5.1 2 &.2 2 iZ,'~ ADO 2 LANES O)
ISLAND IR]DGE AND $URCHAJIC~
5Z LIVINGSTON RD PINE RIDGE TO VTNOEHERE 1./, Z 2 ADO 2 LANES
5:S LIVINGSTON RD GOI.DEN GATE PARIG~AT TO RADIO RD 1.~$ 0 0 2 0 NEV 2 LANES
5/, BALD EAGLE DR NONTH AND SOUTH OF SR 9~1 2,3' 2 5./, 2 10,8 ADO Z LANES
5S AIRPORT ROAD VAJiDEREILT BEACH RD EXT TO PINE RIDGE 2.2 ~, 8.8 2 13.2 ADO 2 LANES
~ >..] SOURCE: COLLIER C(X,NTT TRANSI~IITATION DEPT,
!
Cr) :~
~ ~jI NOTES: CHANGES FOLLC&/ING tRANSt4ITTAL
r- (1) PROJECT DEFERREX) ' NOT NEEDED TO HAINTAIN CONCJ.)RRENCY DURZNG CIE PERIOD.
~ (2) PROJECT RETAINED IN 199'Z'96 CIE PERIOD ' NOT CCt4PLETED IN 1991, CARRY OVER INTO 1992'93
~ (]) PROJECT FULLY FLNDED BT STATE PAYBACI(
li
' ;j' MAP T~-4W
:'i: 5 YEAR CAPITAL IMPROVEMENT
ELEMENT MAP
Y4~STERN COLLIER COUI,ITY
,~... HENDRY CO,
~' ;" C~U[R CO,
:: ';.
, ,? ~ .
...
.
..
.,,
LEE CO.
COLUF. R
"!;.,
I~ '..: $.R. 84
:~'.. 9.,
I
·
I
d': ,
,'.;:; ,
COLUF, R COIJN TY. F'i,ORIO A
CUt, r
~H+H+ ~ Or
,,..... . .,.~ ..,., .,..,... ..,,,,~,..,o,t .,,,., / ~ ,.l
~ _.~,.~'__"..,'~-t'....~.r~.'~.' / "' TRA- 3 4 ~
.o. rJGo ,,,r,,, 287
: HENDRY CO, MA,o TR-4r'
":" cou~s~ co, 5 YEAR CAPITAL IMPROVEMENT
.~. ELEMENT MAP
· EASTERN COLLIER COUNTY
~i~:! '., ,,
~ COUNTY, ~OA
~"'? UAP TR-5AW
,~. FUTURE TRAFFIC CIRCULATION MAP
:, YEAR 1997
",; WI~STERN COLUER COUNTY
,;~. HENORY CO.
,?' C~UER CO.
~E CO.
;'.' C~UB CO.
~:.,: ·
LEE CO.
C~U~R CO.
~:;'
!
,:'.~
~.';, ,:'.
;, ;~ '. COt.t.l[lll CO MAP
~;:,: FUTURE TRAFFIC CIRCULATION MAP
';~';' YEAR 1997
~.~,,.
· ........
2',
'Z': .' %*%"'~ t ,~OHRO[ co,
~.',
:~. ,'
':~. ,oo~ 060~,~, 290
,.,.
MAP 'TR-58W
FUTURE TRAFFIC CIRCULATION MAP - YEAR lg97
FACILITY TYPE
V~S"ERN COLLIER COUNTY HENORY CO.
F :"-::::,'_ ............. '~&'i;~' ~'~;.' ....
i ~,,,, ,' '
i ,,' .......
i
i ............ ~,,:
i ' ' .......................
i
LE:f: Co. '
COMJF..R CO.
,~.,':
;,...,~- ,
,,!-~.
.:.
~.
/
COJ. JER COUNTY. F'LO~0A
FUTURE TRAFFIC. CIRCULATION MAP
YEAR 1997
EAS~RN C~UER C~NTY
- ~,
.... V~
';
,~..
. ..~.~...."' ~ k
HG'qDRY
couJr.~
060 29~ ":> '~?
BOOK
closer to the annual element (first year) of the 5 year CIE. Projects
will shift from the 10 year Future Traffic Circulation Map to the 5
year Future Traffic Circulation Map. In the same process, new roads
will be added to the 10 year map as the Count.y's roadway planning
advances towards the 2015 horizon.
§, NATS 2010 Financially Feasible Plan Update and Model
Validation ~p - Y~ar
MaD TR7A - NATS 2010 Financialiv Feasible Plan iljustrates an
affordable method of meetinc Collier CoU. D~Y's future roadway needs.
civen future travel demand. available financial resources and existing
Level of Service standards, The plan was developed and adopted bY the
MPO in December 1992,
~7, Future Traffic-ways Map - Year 2015
Whereas the ~996 ~ (5 year) Future Traffic Circulation Map reflects
the programming of a cost feasible plan, and the ~001 2002 (10 year)
Future Traffic Circulation Map depicts an overall 10 ye. ar need, the
Future Traffic-ways Circulation Map - Year 2015 (Map TR-7~) reflects
system-wide thoroughfare demands.
It is the purpose of the map to help identify existing future corridor
deficiencies and also where future thoroughfares might be located.
Where Map TR-7~ depicts the most recent recommendations of the Naples
Metropolitan Planning Organization (MPO) as part of the 2015 2010
Naples Area Transportation Study (NATS) Update supplemented by
improvements proposed in the Future Traffic Circulation MapsT~ MaD
TR-TB coos beyond the year 2010 to iljustrate future travel demaDdS,
='his Dlan is not financially feasible. The lane requirements shown
are based upon corridor demand volumes and are meant to depict a
chosen ~inancially =e~sib~ alternative to providing enough capacity
with the corridors.
It is expected that the MPO will periodically update the NATS and that
changes may occur, with such changes being considered by the County
for inclusion in this Element.
~, NON-~OTORIZED TRAVEL
Today in Collier County, there exists the potential for an in[egrated
network of bicycle paths and sidewalks that would provide a safe,
clean, healthy, and efficient opportunity for travel throughout the
urban area.
Many'of the major highways have bikeways and sidewalks incorporated
into their design. It is a policy of this plan that all future
capacity improvements described in this plan shall include provisions
for bikeways and/or sidewalks. In addition, the Subdivision Regulat-
ions of Collier County provide for the placement of sidewalks/
bikepaths either adjacent to the thoroughfare or as an integral part
of a pathway system throughout a development.
TRA 1-40
060 , ,293
~;.;i' MAP TR-6AW
'::!'.: FUTURE TRAFFIC CIRCULATION MAP
YEAR 2002
wESTERN COLUER COUNTY 14[NDRY CO.
L~__ COLUER CO.
"!" LEE CO., '
COLLIER CO. ..
CO. i
:..
:~ '~" ' t, -
.... t
:
mi .....
::.i. ,~, ',-,,,
/
.:
· ~? , MAP TR-6AE
...:/, - cou.,:, co. i
FUTURE TRAFFIC CIRCULATION MAP
;~" YEAR 2002
EASTERN COLLIER COUNTY
HENORY C~
~,.....'.
MAP TR-6BW
FUTURE TRAFFIC CIRCULATION MAP - YEAR 2002
:'~' ~' FACILITY TYPE
~S'T[RN COLLIER COUNTY HENDRY CO.
r ""<.:~, ........... '~'" ~-;~'~'~.' ....
< i,~.." ...... -~.-',...
~.'
' ' r' .............. '~ G ,3~ ~ ,~
i ~ "',
"; = l..:"",,
', f .........i ............""'"' ........~"~
CO. ! :
~:~ ' ..,_ ................)
~:i:.!.',,
'I
!k;~ ~ ."',
'&
/
.- /'
~ C~Co /., ".,
HeNDRY CO, MAP TR-68[
CO~U~R CO. FUTURE TRAFFIC CIRCULATION MAP
~' · YEAR 2002
C~[R CO,
.! . COLDCR CO4JNTY 2010 F1NANC1ALLY-FE:ASIBLE:
'~ ' PLAN UPDATE: AND 1930 MOOEL VAUOA'rlON
MAP TR-TA
:,'.; ' I
l ~:.'. . I
I
COLLIER COUNTY, ~ORIDA
lllllllll
SC~L~
5 . t,~. TRA OP ,.,
: ~, MAP TR-7O
FUTURE TRAFFICWAYS MAP
~. ,. YEAR 2015
:,I, ,~ W~STI~RN COLLIER C~TY
~",;! j LEE CO,
:~ - .
COLLIE~ CO.
'....
m
..~..~...~
+
I
.:! ,' I
I
-. -' C~ C~NTY, ~IDA
, f %'-..*~
.... FRE[WAY ~ RE~IR~EH~ jJ ..........
,~ ................... ~ .... , ......
,' . NEW ~R~
No inyentory of existing bikeway/pedestrian facilities exist and
therefore no analysis as to the condition of the system can be
performed.
It is also a policy of this plan that requires the County to develop
and implement a 5 year Bicycle Ways Plan in cooperation with the Parks
Transportation.
Such a plan shall document the extent of the existing system, noting
network deficiencies such as missing segments or substandard design/
construction and conditions. The Plan shall also provide for the
systematic completionof the network as well as documenting the need
for an on-going maintenance program.
The Plan should also include provisions to encourage the use and
promote safe bicycle operating practices of the Bikeways System. The
Florida Department of Transportation will assist the County in this
phase of the Plan by providing technical assistance and in some cases
funds where available.
Only by installing an adequate network coupled with an on-going
promotional program can the County provide an effective bikeway/
sidewalk program.
F. PERSPECTIVE8
~, Land Use Iss~
The Traffic Circulation Element is closely related to the Future
Land Use Element. It has long been the pattern that the development
of land necessitates improvements and expansion to the transportat-
ion system. The two elements are so closely tied, in fact, that
changes or shifts in the land'use patterns can drastically impact the
performance of the roadway system. It is for this reason that the
County requires most land development proposals (e.g., DRI, rezone,
and provisional use requests) to submit a Traffic Impact Statement.
An analysis of the proposal's impact is prepared and submitted to the
recommending and approving authorities.
As an alternative to this.pattern of demand driving the transportation
system improvements, the County has begun to explore ways to have the
roadway system guide the patterns and.densities of development. The
County can determine the type of roadway system it wishes to maintain
at the adopted level of service and then take steps to permit the type
of land uses that will be consistent with that system. In this way,
the County will be in a better position to keep the demand for
transportation services from outstripping the supply of the roadway
system.
The County has also recognized the importance of good site planning as
it relates to a projects ingress and egress from the major roadway
system. Inadequate control of access points, median openings and
TRA I - 4 7
060 3'00 , 7
signalized intersecticons can accelerate the deterioration of the
systems overall level of service just as fast as the increases in
traffic volumes.
~v Marco Island| AirPOrt Impacts
The Marco Island Airport, located east of SR-951 approximately 4.5
miles south of US 41 J.s a facility having a runway length of
approximately 5,000 feet. Access to the facility is from SR-951 via
Mainsail Drive. The ~Tacility currently provides only general aviation
services to the southern urban area.
Adjacent to the air strip is the Marco Shores Golf Club Community
consisting of a golf course and a phase one residential area of 240
condominium units. All other lands surrounding the facility are under
State ownership and are environmentally sensitive.
Peak season-peak hour traffic counts taken in 1988 at the inter-
section of Mainsail Drive at SR-951 reveal 120 vehicles using Mainsail
Drive during the period of 8:00a.m. and 10:00 a.m. This count would
include both residential and airport generated traffic.
A 1985 analysis of Marco Island Airport operation is part of the
Continuing Florida Aviation System Plan indicates the following
current conditions:
In 1985, Marco Island Airport had only 10 based aircraft and 4,300
annual operations (takeoffs and landings). By 1995, the facility
is expected to have only 30 fixed base aircraft and generate 6,700
operations from general aviation service. If commercial commuter
service is restored, such service could be expected to generate an
additional 3,300 oper~tions per year by 1995.
It is clear that the current limited use of this facility does not
impact SR-951. In the future, should the airport become a publicly
owned/operated facility, an increase in use, and therefore impacts,
might be expected. Until that time, however, the current facility
places no significant impact in SR-951.
3. Inter-aq~Dc~ Coordination Coo~erattg~
In Collier County, the responsibility for providing transportation ·
facilities rests with several different agencies.. Long-range planning
is the primary charge of the Naples (Collier County) Metropolitan
Planning Organization (MPO). The MPO is made up of local elected
officials and is charged by Federal and State laws to coordinate the
transportation planning activities for the Naples Urban Area. The
Collier County Planning Department provides staff services to the MPO.
The MPO coordinates its planning activities with the City, County, and
State Department of Transportation.
The programming and construction activities are handled by the City of
Naples, Collier County, and the Florida Department of Transportation.
· ' 060 3'01
:' BOOKPAGE
%..
Each agency's construction programs are monitored by the MPO to ensure
inter-agency consistency.
¢. Fundina of Roadway Improvements
In Collier County the pursuit of additional funding for roadway
improvements has led to the implementation of numerous funding
alternatives. The County has adopted all of the six cent local option
gas tax in addition to the one cent voted gas tax.
Impact fees for roadway construction were initiated in 1985 and
~odated in 1992. Municipal Service Taxing Units have been used to
implement area specific projects.
On the' State level, local governments through the Metropolitan
Planning Organization have directed their attention to the under-
funded State roads in Collier County. One of the MPO's roles is to
ensure that local governments in its Jurisdiction receive equitable
treatment within the FDOT District.
a. IMPL=MENTATION STRATEGY
As part of the Traffic Circulation Element, the County established
minimum acceptable level of service standards on the existing highway
system. For most County facilities, the level of service standard to
be maintained is "D" as measured on a peak season peak hour basis.
Several County and one State facility has been given a minimum LOS "E"
standard. In addition, those roads for which LOS "D" is to be
maintained are permitted to operate at LOS "E" for a.period not to
exceed 2 years. The reasons for adopting a "time frame" standard were
1.. Adopt the highest level Of service realistically possible and
2. To provide the practical methodology for implementing the
standard.
In general, it is the County's intention to have future roadway
improvement projects "production ready" when they fall below LOS "D".
That is, the design and R.O.W. acquisition steps of the road improve-
ment process will be substantially complete by the time a roadway
improvement is needed. This procedure then gives the County the two
year period (during which time the road operates at LOS "'E") to
actually do the construction of the improvement. Without this two
year LOS "E" period, the County would be forced to adopt a moratorium
while the construction takes place. Or, as the alternative, construct
the improvement while the road is still operating at an acceptable
level of service.
In addition to providing a construction period, the two years affords
the opportunity for another facility to come on line that has a
positive effect (as in the case of a new parallel facility) on the
level of service of the road operating at LOS "E". In this case, no
improvement to the LOS "E" road was even needed since a new road
increased the corridor capacity and took some of the burden off of the
,.' LOS "E" roadway.
I~1.
~t]-. On State maintained facilities, the County and the State have agreed
!:.]~.' to the level of service standards described in the element.
.' It is the purpose of this section to set out the strategy for
· implementing the level of service standards policy of the Traffic
Circulation Element. {t should be noted however that it is this
Plan's intent that all roadways with unacceptable conditions shall b~
remedied no later than October I, 1994 ~., ~ ~=~ r ~ ~ 1.5.3 ~
~- Capital Improvemen~-'Rure~.~-~T~--
It is this Dlan's intent to improve all roadways operatint under
unacceptable conditions within the first three Veers of the 5 veer CIE
and State Work Procram. as per Policy 1.5.3 of the Capital Improvement
MONITORIN~
In order to evaluate the current level of service of any segment of
highway identified on the Existing Traffic Circulation Map, the County
will put into place a monitoring program that will determine the
existing level of service of those roads with special attention to
roads that have exceeded their adopted level of service standard
during the previous year. It is the intention of this program to not
only determine if a level has been exceeded, but to also predict or
forecast when a level might be exceeded in the future. Such a
monitoring program will permit the proper planning and programming of
the various phases of the roadway projects (design, right-of-way
acquisition, permitting and construction).
Monitoring program
The County will be responsible for maintaining quarterly 24 hour
traffic counts on each County facility for which the level of service
standard is applicable. This includes all arterials and collectors
identified in the Traffic Circulation Map Series (Map TR-1A). The
· quarterly counts will be taken in such a manner to allow averaging to
replicate an annual average daily volume. The State is responsible
for maintaining an annual count program on all State facilities
identified on Map TR-1A (W and E).
The peak hour interpretation will be performed using the methodology
and capacity tables in the Traffic Circulation Element. This annual
peak hour level of service will be compared against the adopted
standard resulting in one of the following:
[Or Roads with an Rdo]~ted LOS of "D" Standard:
1. If the current LOS measured is "D" or better, no mitigating action
is required.
; TRA I-S0
!'!.. 060 3'03
//P
;i;"
~,i' "
"~'.'~-;, ;.
~:' 2. If the current LOS measured is "E" and the LOS was "D" or better
last year, then the roadway segment enters a transitional period
during which time the roadway may operate at LOS "E" for 2 years.
During this time, development orders may still be issued (the 2
year "E" period begins with the start of the next fiscal year).
If at the time the following year's determination is made the
roadway has dropped below LOS "E", the County will cease issuing
all development orders that would serve to increase the volume of
traffic on the affected link. No development orders negatively
impacting the affected link shall be issued until the link is
again operating at or better than the adopted b~vel of Service
Standard "D".
Development Orders determined to have an impact on any affected
link will be those within the areas of significant influence shown
on a map(s) prepared by the Transportation Department and approved
by the Board of County Commissioners.
3. If the measured level of service is worse than "E", the County
· will cease issuing all development orders that would serve to
increase the volume of traffic on the affected link. No
development orders negatively impacting the affected link shall be
issued until the link is again operating at or better than the
adopted Level of Service Standard (D).
Development Orders determined to have an impact on any affected
link will be those within the areas of significant influence shown
on a map(s) prepared by the Transportation Department and approved
by the Board of County Commissioners.
F~ Roads with.an ~dOpted LOS of "$" Standard:
1. If the current LOS measured is "E" or better then no mitigating
action is required.
2. If the current LOS measured is worse than E, the County will cease
issuing all development orders that would serve to increase the
volume of traffic on the affected link.
Development Orders determined to have an impact on any affected link
are those within the areas of significant influence as shown on a map
prepared by the Transportation Department and approved by the Board of.'
County Commissioners.
LOS DETERMINATION AND BCC FINDINGS
The current level of service determination (for County roads) will
be made as soon as the previous year's traffic count data is examined
and verified by the Transportation Department.
The annual average daily volumes will be calculated and the peak hour
volume interpreted based upon the available data. The Transportation
Department shall prepare a list of all roadway segments, for which a'
TRA 1-51
060 ',3'04
r'
level of service standard has been adopted, that shows the current LOS
(as determined above) as well as the adopted LOS standard found in
this plan.
Following the preparation of the roadway list, if the volume of
traffic of any segments are found to exceed their adopted LOS, a
report of the Department':s findings concerning all of the County's
roads will be transmitted to the Board of County Commissioners. In
the event that one or more of the County roadway segments have entered
(or are still in) the two year transitional period at LOS "E", the
Department shall prepare a preliminary assessment of the areas
surrounding the affected segment. A preliminary determination of the
area of significant influence surrounding the segment will be made and
depicted on a map. These maps will be transmitted to the Board of
County Commissioners along with the Department's level of service
report.
.For any roadway segmeAt having a level of service that requires a
moratorium on the issuance of development orders, the Transportation
'Department shall prepare a detailed map depicting the suggested areas
of significant influence surrounding the affected link. Such map(s)
shall be presented to the Board during an advertised 'public hearing at
which time the Board will. review the suggested area of significant
influence, make adjustments as warranted, and shall take the
appropriate steps to impose a moratorium covering the area of
significant impact. Each individual segment shall be covered in such
a manner so as to facilitate the lifting of the moratorium when the
affected link returns to an acceptable level of service.
Building permits issued prior to the action by the Board to enact a
moratorium shall be held vested so long as they remain otherwise
· ~ valid.
AREA~ OF SIGNIFICANT INFLUENCE
The purpose in delineating areas of significant influence is to
clearly define which areas are impacting a roadway found to have a
substandard level of service and further, are subject to moratorium.
While it is probably true that a specific land use in one part of the
County has some potential for impacting a road fifteen miles away in
another part of the County, it is more reasonable to expect that most
of the significant impacts on any given roadway segment will come from
the land uses located closer to it.
The County will therefore develop a network of "envelopes" that
surround major road segments. It should be noted that in some cases,
several links (part of the network between two intersections) can be
added together to forma continuous segment. This is done because in
some cases, any impact on one link in the segment would generally
affect all links in the segment.
'. TRA 1-52
-.- ,oK 080 305
· '~ /
In general, the areas of significant influence surrounding a segment
will radiate out from the segment a distance of one to two miles.
Sometimes, natural or man-made features, e.g., rivers and interstate
highways, will act as barriers and tend to cut off the influence area.
Some influence areas may be found to overlap other influence areas.
This is to be expected since in many cases a given land use affects
more than one roadway.
Another factor in determining the scope of an influence area will be
the roadway facility type or functional classification. Basically,
the four types of facilities are freeways/expressways, principle
arterials, minor arterials and collectors. A fifth type of roadway,
local streets, .are not part of the,major highway network and therefore
not included in this element.
Based upon a facilities function, it can be assumed that a principle
arterial exerts a greater scope of service than a minor arterial or a
collector. And likewise, a minor arterial exerts a greater scope than
a collector. As such, the arterials will generally have a greater
area of significant influence than the collectors.
The size and patterns of the influence areas will be developed follow-
ing an examination of traffic movement patterns and the relative
attractiveness of one facility versus another. It can be generally
assumed that the majority of the impact from adjacent land uses would
affect the nearest link, although where two links are near equidistant
from the land use area, an overlapping of influence areas may occur.
The Transportation Department will identify these influence areas on a
map and transmit them to the Board of County Commissioners for review.
'
GOALS, 0BJECTIV~$ AND POLICIES
GOAL 1: TO PIa%N FOR, DEVELOp AND OPERATE A SAFE, EFFICIENT, AI~D COST
EFFECTIVE TRANSPORTATION SYSTEM THAT PROVIDES FOR BOTH THE
MOTPRIZED A/~D NON-MOTORIZED MOVEMENT OF PEOPLE AND GOODS
THROUGHOUT COLLIER COUNTY.
~ OBJECTIVE 1:
The County will maintain the major roadway system (excluding State
highways) at an acceptable Level of Service by implementing
improvements to the following roadways that have been identified as
operating below level of "D".
¢IE # Roadway From To
~T. Immokalee Road US-'41
31 97. Bonita Beach Road W. of Vanderbilt Drive
4r~.~l~-~--T~i~k~ Goodlette Frank Road
~-~ 67. ~attlesnake ]]a~nmock u~ 41 Charlemagne
~ ~T. ~o~~~ ......... Road
39 Airport Road Pine Ridge Road Golden Gate Par
Policy 1.1:
The County will annually adopt a Secondary Road Improvement Program
covering a period no less than five (5) years, which shall include
those projects needed to maintain the network at the adopted Level of
Service standard.
Policy 1.2:
The County shall annually appropriate the funds in the ensuing fiscal
year to accommodate those phases of projects listed in the annual
element (first year) of the Secondary Road Program.
Policy 1.3:
County arterial and collector roads shall be maintained at Level of
Service "D" or better on the basis of the peak season peak hour
traffic volume.
Level of Service "E" or better shall be maintained on the following
designated roadways.
Roadway [ro~ To
Airport Road Pine Ridge Road Golden Gate Parkway
Golden Gate Parkway Airport Road Santa Barbara Blvd
Goodlette-Frank Road Pine Ridge Road Golden Gate Parkway
Goodlette-Frank Road US 41 Golden Gate Parkway
Pine Ridge Road Airport Road 1-75
# Amended May 19, 1992
TRA 1-54
,oo, 060 307
Level of service "D" or better shall be maintained on all other
· ~=. arterial and collector roads, however, any section of road may operate
.'~ at Level of Service "E" for a period not to exceed two (2) fiscal
years following the determination of Level of Service "E" in order to
provide the County with time to restore Level of Service "D" by making
appropriate improvements.
To ensure that these adopted standards are maintained, a monitoring
program and implementation strategy have been identified in the
.Implementation Strategy section of the Traffic Circulation Element and
are hereby referenced by this policy.
· *** Policy 1.4:
For the purpose of regulating development orders, Collier County has
adopted the following level of service standards for state maintained
roads:
'~'; Existing Transitioning
=,iI~ Rural Area Urbanized Area Urbanized Area
'~' 1-75 e~ DG c
,.. us-41 c D C
ill.= SR-84 C D C
SR-951 - e ~ ~C,
SR-29 ~ ~ - -
SR-82 D ~ - -
!CC- * This secment of roadway has been desionated as a backloqged
~'~!" ' roadway by the Florida Department of Transportation,
~.~ Reconstruction alona this seament will be exnediSed bv FDOT.
**** Amended February, 1991
¢~..
:, 060 3'08
/,-
OBJECTIVE 2
The County will maintain the adopted Level of Service standard as
provided for in Policy 1.3 by making the improvements identified on
the Five (5) Year Future Traffic Circulation Map.
Policy
The County shall include in its Secondary Road Program those projects
necessary to maintain the adopted Level of Service on the roads
identified on the Five (5) Year Future Traffic Circulation Map.
Policy 2.2z
The County shall annually appropriate the funds necessary to
implement those projects show in the annual element (first year) of
the Secondary Road Program.
.
TRA 1-56
i..OBJECTIVE 3:
.( The County shall provide for the protection and acquisition of
existing and future right-of-ways.
I". Th~ County shall davelop and implem=nt a Right-of-Way Protection
t Policy ~.Z $,~:
The County shall implement an advanced Right-of-Way Preservation and
Acquisition Program ~hin six months of the adoption of t.hc
R~ght-of-Way Protection Or~ bY DeSember 31. 1992.
Policy 3~ $,~:
The County shall include in its annual Capital Improvement Element no
less than $200,000 per year specifically earmarked for use in an
advanced Right-Of-Way Acquisition Program.
Policy ~.43.3:
The County shall acquire sufficient amount of right-of-way to
facilitate no less than a cross section of six (6) traffic lanes,
appropriate turn lanes, medians, drainage canals, and shoulders
sufficient for pull-off and landscaping for all roadways identified
on the Future Traffic Circulation Maps. Exceptions to the right-of-
way standard may be considered when it can be demonstrated, through a
traffic capacity analysis, that the maximum number of lanes at
build-out will be less than the standard.
!..
# Amended May 19, 1992
,oo, 060 , :3i0
!..'7
:
~:~:.~
OBJECTIVE 45
The County shall provide for the safe and convenient movement of
pedestrians, motorized, and non-motorized vehicles.
4 **** Policy 4.1:
The County shall prepare and adopt a 5 Year ~icycle Ways Plan in co-
operation with the Parks and Recreation Department by December 31,
1992 1993.
Policy 4.2~
The County shall to the greatest extent possible, provide funds for
the implementation of the Bicycle Ways Plan.
Policy 4.3~
The County shall include the installation of sidewalks and/or bike
paths as part of all roadway improvement projects identified on the
Traffic Circulation Map.
Polioy 4.45 "
The County shall provide for the safe movement of motortzed vehicles
through implementation of its Subdivision Regulations and highway
'. design standards ordinances.
**** A/~ended February, '1991
~'..!'i# = ~unended May 19, 1992
.i?] TRA 1-58
, ,/~
.. OBJECTIVE 5:
The County will coordinate'the Traffic Circulation System development
process with the Future Lmnd Use Map-
~!'-' The County Commission will. review all fezone requests with
,' consideration of their impact on the overall system, and shall not
approve any such request that significantly impacts a roadway segment
already operating and/or projected to operate within one year at an
unacceptable Level of Service unless specific mitigating stipulations
are approved.
~olicy
Significant Impact is hereby defined as generating a volume of
traffic equal to or greater than 5% of the Level of Service C peak
hour volume of an impacted roadway.
!:.
i'-[ OBJECTIVE 6=
~,. The County shall coordinate the Traffic Circulation Element with the
~>-.. plans and programs of the State, Region, and other local
.i~? Jurisdictions.
Policy 6.1:
The Traffic Circulation Element shall incorporate to the greatest
degree possible, the long range plans of the Naples (Collier County)
Metropolitan Planning Organization.
· i Policy 6.2:
The Traffic Circulation Element shall consider any and all applicable
'i.i roadway plans of the City of Naples, South-west Florida Regional
. Planning Council and Lee County.
Policy 6.3:
· : The Traffic Circulation Element shall be consistent in its interface
i~:' into the arterial/collector system within the City of Naples.
Policy 6.4.'
The Traffic Circulation Element shall consider the State's adobted
..~.
Five (5) Year Work Program, the Florida Transportation Plan, and the
State Land Development Plan.
# **** Policy 6.5
The Naples MPO 1995 & ee~l~5 2010 plans have identified a need for an
interchange at 1-75 and Golden Gate Parkway. An Interchange
Justification Report shall be prepared bv the Florida Department of
Transportation and submitted to the P~ Federal Highway
Administration by October 1, ~992 1995.
>~{= **** Adopted February, 1991
~,\j TRA 1-60
The County shall develop and adopt standards for safe and efficient
ingress and egress to adjoining properties, as well as encourage safe
and convenient on-site traffic circulation.
# ** Policy 7.1:
By July 1, 1992 the County shall develop and adopt an Access Control
Policy that ensures the protection of the arterial and collector
system's capacity.
Policy 7.2:
The. County shall encourage the interconnection of local streets
between developments to facilitate the convenient movement throughout
the local road network unless such action will promote through
traffic.
Policy 7.3:
The County shall implement, through its Zoning Ordinance, the
provision of safe and convenient on-site traffic flow and the need
for adequate parking for motorized and non-motorized vehicles as a
primary objective in review for Planned Unit Developments, Site
Development Plans, and other land development applications.
Policy 7.4:
The County shall develop corridor management plans (see the Future
Land Use Element) that take into consideration urban design and
landscaping measures that will p~omote positive development along
the major arterial entrances to the urban area.
=]7~. **** Amended February, 1991
~j #= Amended May 19, 1992
~.~ TRA 1-61
' 060- :314
OBJECTIVE 8:
The County shall establish ~ ,'Concurrency Management System" for the
scheduling, funding, and timely construction of necessary road
facilities.
TCE MASTER ~ Part I
(Adopted 5/19/92)
TRA 1-62
,oo~ O6O~,~.: 3i5
L.
COLLIER COUNTY
GROWTH MANAGEMENT PLAN
PUBLIC FACILITIES ELEMENT
Solid Waste Subelement
:,
January, 1989
Amended May 25, 1993
RE-PRINTED FEBRUARY, 1991
~oo~' 060 ~ 3'16
MEMOP, J~4OU!'I
· ,~
'~'~ DATE: September 16, 1992
YO: Collier County Planning Commission
:~':.'~ FROH: Teresa Rtesen
Solid I~a:ste Finance Supervisor
SUBJECT: Amendments to The Growth Management 1992 Plan
Follc~ing are proposed ~mendments and updates to the Sol ld'~aste 1992 Growth
. Management P1 an:
A. (PAGE ~-9 3.2 Sources of Solid Has~q
1. Three m~Jor sources of sol(d waste are (denttfied in Table [ shying
current monthly tonnage and percent of the waste stream received at Naples
Landfill during ~98~/8~ ~990/91 fiscal year. A similar Table Zl ts shown for
the [mokalee area.
TABLE Z
,:. ( 'SOURCES OF SOLiO ~ASTE AT ~PLES ~DFZLL
TONS-PER TONS PER -~-OF~TOTAb % OF TOTAL
-Ng~H MONTH -REGEtVED RECEIVED
RESiDENTiAL -~TO~O 6,600 -2~=S~
CO~ERC[AL & ~HDUSTR[AL -~;~ 6.850 -~S~ 23.0~ '
CONSTRUCT. & ~0 CL~R~HG -9:~ 16.68~ -~T~ 55.0~
~O;OOO 30. 131 tO0~ 100.0%
FR~: Operating Data H .... t~86/87 FY lggO/gl (Appendix'
TABLE I I
SOURCES OF SOLID ~ASTE AT I~O~LEE ~DFILL
TORB-P~R TONS R(q I-OF-TOTA~ ~ OF TOTAL
-HO~H-- ~ONT~ -REGEtVEO RECEIy~D
:~. RESIDENTIAL I C~ERCIAL 842 ].67~ -~4~
** CONSTRUCTION & BI~SS t38 ~ -~ 11~
AGRICULTURE -:,~ . 411 -~
-JT3J6 Z ,34Z. JO~
AGENDA ITEM
.. .FR~: Operation data F~-J986/8i FY 1990/91 (Appendix !1) No.
:.
,;:..
;,,,;'.;:
~ .... 2. _JUSTIFICATION: Sources of information and statistics to refl'ect FY
.: 90/91. See Appendix I.
I)- SW-25 Policy 1.2.7:
1. The Level of Service for Solid Waste Sub-Element shall be:
a. ~SS 1.39 tons of Solid Waste per capita per year.
b. Two (2) years of lined landfill cell capacity at present disposal
rate.
c. Ten (10) years of landfill raw land capacity at present disposal
i~/~ rate.
:'.... 2. The following is factual data on how ~e 1.39 level of service was
established:
FY90/91:
Total waste received at HLF , 387,947 tons
:~:.. Removal of the following for purposes of recycling:
Biomass/Inert - 98,296 tons
Construction/Demolition - 60,520 tons
White Goods .~ 627 tons
Tires · - 1.126 tons
To~al removal ~LF - 227,378 tons
Total waste received at ILF - 28,180 tons
-. Removal of the following for purposes oF recycling:
Btomass - 56~ tons
Inerts - 1,691 tons
Tires & White Go~s - 845 tons
Plastic - 5,072 tons
~es/Recy - 282 tons
Total removal ILF - 19,726 tons
.. ' Total Waste received at both landfills - (16,127 tons
Less are waste recycled - f169.0~3) tons
:::.. Total in lined cell - Z47,10~ tons
Weighted population FY 90/91 - 177,171
tons dt tded by 177,171 weighted popul
.!: 297,101 - .~Level of Service Standard ation
.!. 1
.... :.::~
AGENDA ITEM
%.. ;y: Ha, __
,,i:~ · MAY 2 5 1993
pAGE 5Wrl6 4.0 LEtfEL OF SERVICE
1, A requSrement of the 9J-5 $s to establish a Level of Serv$ce Standard for
use as a basis in determining the Capital Improvement Element for the 5 year
(1989-1994) Capital Improvement Plan.
The Level of Service Standard ts to provide the continuation of Solid Waste
Disposal service to the year 1994 as presently exists in Collier County. To
provide this continued serv$ce, a review of population growth of landfill
requirements Indicated that the standards would be based upon the following
conditions.
1. i,SS !.39 tons of solid waste per c~plta per year
~, 2. Two (2) years of landfill lined-cell disposal capacity at present
· fill rates.
3. Ten (10) years of landfill raw land capacity at present fill rates.
Based upon these standards. It was determined that a five year Capital
Improvement Plan would Include $3.025,000 for landfill raw land expansion in
FY 88/8g. Total expenditures for lined landfill cells, closure of Cells 3
and 4, and lined cells at In~nokalee Landfill would be $11.251 million through
Fiscal Years 1993/94 to maintain the Level of Service standards.
The--data-feF-eseab)~sM~g-(he-t,S~--&ens-ef-se~id-was(e-peF--eap~&a-per-yeaF
was-based-upen-)andF~i)-tenRage-and-papula(#ea-es~ima(es-FeF-FY-86/87,--Sinee
t~ai-(~me-eeRC~Rued-grew(~-In-Ga)ileF-Geun(y-and-reeoFded-(ennage-reee~ved-aa
.the--)andf~))-~nd(ea(es-(ht-~n-FY--87/88-?he-ieve)-of-seFvtee--vas-I,7J~(ens
per-eapiaa-pe~-yea~,--T~e-rate-ef-se)td-~as?e-de)iveFed-te-(he-)aRdft))-(eday
indiea~es--ne-deeFease--~n--~is-~eve)-ef--eeFviee=--ThereFere;-the--iandF~i
eapae#~y--ea)eu)a(iens-(Re)ude~f~(R-Appendix-W~-are-Fer--a-~eve)-eF-$ervlee-eF
~,~-aRd-a-eempaHsen-eF-~evei-ef-Serv#ee-a(-J=;J=
The oriqtnal ~evel of ServiCe $~andard wai |,7) tons of solid waste oar
~apita based Qn estimates of tonnaqe and population. A tarqet Of 1.55 tons
per capita was est~bllihCd. ACtual tOnnaqe re~OrdS for. FY 90/91 and
population estimates show ~R aGtu~) ton~aqe per capita Level of Service of
1.39. This reductioR .Of per Capita tOnn)g¢.. Of ~olld waste is due to
Implementation of electants of the.County_Solid Waste MaSter plan.
~e~tens--te~be-~p)emc~(e~f-as-par~-ef-~e-L~evn~y-Hes~eF-P~aa-aFe-expeeeed-~e
Fed~ee--~he~presenh~eve~-eF--~eFv~ee-ef-~=Tj-~ens/eapi~a~yea~--te-~e-Grew~
geneFa(lea--per-peFsen-ee~-be-ee~(Fe))ed-by-~e-~ai~d-~as(e-OepaF~ee~-b~(-by
sepaFa~en;--Fesevree..FeeeveFy~-aad-)andf~))-m~n~ng;~ai~--ef-w~#eh-ea~-reduee
(he--amoua~-ef-~a~eF~a~-de~vered--~e-a-~andf~i-to--a-~aRdfii~;-eF-s~et~--~e
ra~e--ef-prev#diR~-ne~f-~a~dfi~-aeFeage=--As--e-~enseFva~ive-pre~e~i#eR-~t~is
du~#~g-~he-five-yeaF-p~aRR#Rg-per~ed-ef-th#s-p~aR=
All solid waste delivered to the Naples Landfill will be deposited in Cell
#6, Phase I, starttn,] in Hay 1988. Other landfill clefs ...... 4 ire
MAY 2 5 1993
These cells are proposed For landfill mining to obtain cover material.
landfill mining is not utilized, the cells ~111 be prepared for closure.
Based upon this operation plan, Cel~ 16 ~tll be filled in FY 2000/200] using
the present ].39 tons/ca,.Ira/year.
the--p~eseat-~TT~-to~$/ea~plta~yeae'--o~-la-Ma~e~--~998-ff-e~e--~aa~l~-aaste~
te~s/eapita/yea~T---A~se-'base~--upea--the-~T~-caleulattoa--an~-t~e-~evet-.e~
~989~
~e ten ~ea~ 'r~ l~nd requirement' means that; ~hen the available space for
l~ndfillJng ~11o~s for Ion ~e~rs or less of landfilllng, then an additional
site Is [o be added to ~he courtly inventory. Today, Collier County h~s ~ess
more than ten (~0) ~e~s ~99~ f200i) left aL the Naples L~ndfi11.
ehe--~-yeaes-ef-epe~att,~'ee-~he-p~ese~--Naples-~andft~l-~976-te-~997~-the
annua~--se~id-~as~e-ee~nage-~eeelved--~i~-be-~;3~3;gog-tens--e~-2~ggg_tens
p~ejeeted-~e-be-4~Tg;ggg-tens-er-4~$;Ogg-tens/yea~ Fro~ 1992 throuqh
the total soltd ~ste lined cell tonnage fs oro.tected to be Z.869.000 tons
an avqraq~ ~ 286.900 tons/yea~, To provide for ~t least ten xears of
landfill ~t the present Level of Service rate, a site equal in size to the
present 320 acres is required.'
expeeta~ey-t~ae~ke-p~epa~-five-ae~e-ee~s-fe~-t~ekatee-~teekade_Read~tt~
eaeA-Aave-an-expeet~-~fe-ia~ex~ess-ef-flve-years,
pepu~a~tea--fe~-fe~-ae,s~As,--TAus-tAe-~etghte~-average~-pepula~tea-fe~989
Ex~e~8Ing--~Ais-ee-]ggg.-tAe-seaseaa~-expee~a~aen-is-fer-242;934-peep~e-la-~he
2. ~USTIF~CATZON; Narrative revised to reflect ne~ Level of Se~lce
s[~ndard; ].39 tons per capita pe~ xea~.
~': '" · AGENDA IT[M
~'~ ~AY ~ 5 1993
APPP, E'14D I X ~!
(
So'lid ~l'ast~ Catagorie$
At Haples LandFill lgTg through lggZ
· At [~kalee Landfill lg8Z through 199Z
Chart of Haples Landfill
Residential (Inc. ~ard ~aste)
Residential ~ Co~erclal
Residential ~ Ce~rclal - Construction (Inc. 8~omass)
AGENDA ITEM
¢.,: MAY 2 5 1993
060 3'21
::..' BOOKPA~t
RPPEHD]X fl
SANITARY LAHOFILL
~0LL[ER COUHTY. FLORIOR
The following are the material types ~hlch correspond to the 'Katertal°
portion of you receipt. By using this as a guide, you ~Ill be able to Insure
that you have been charged for the proper material..
WEIGHT IS NO LONGER ROU~EO TO THE ~£AR£ST TON
NLelSER RRTERI~L RATE/TON
Yd $4.25/112yd.
Yd $8.$0/yd
O1 Franchise Residential Pass thru rate
02 Concr6te, Oirt, Sand $2S.O0/ton
03 Land CiearSng/Bto~ass $18.00/ton
04 Garbage $2S.O0/ton
OS Coa~erctal $2S.00/ton
06 Construction $2S.O0/ton
07 Concrete $2S.00/ton
08 Oirt, Sand $2S.O0/ton
og Oemolttion SZS.OO/ton
10 Hetals $2S.O0/ton
1! t~hite Goods $2$.00/ton
12 Wood $2S.OO/ton
13 Paper S2$.00/ton
14 Hiscellaneous Waste $2S.O0/ton
IS Rubber/Tires $SS.OO/ton
I6 Landfill Rolloff $2S.OO/ton
17 Special Handling $2S.O0/ton
18 Special Handling (nixed) $2S.OO/ton
20 Sludge SZS.O0/ton ·
~ote:
1. Hatertal type '02" ~ust be free. froa all othe~ types of waste and usable
as backfill or cover eaterial in order to qualify at no charge.
$t/-33 I",~'^~£~°^
":' ':"' MAY g 5 1993 "
-
IrAqi'S LAJ~I'It t
TYP~ O N D J ~ n A H J J A S TOT~ ' Z T~
~TE 7 ~] Z 6 67 31 ~0 2 18 ~ ~ ~ 3 2~ 0.11
~TALS 10 ~ t& 1~ 8 T 3 3 10 ~ t6 7 ' Z 11& O.~
~IT( ~S 11 16 12 13 ~ 6 14 t8 l& 9 · ~ 11 11 149 0.~
~ 12 103 117 131 1~ 1~ 87 ~ 1~ 1~0
~R 13 ~5 ~ &5 &l ~8 26 ~ 21 ~ ~ 52 ~ &52 0.18
T~ ~TE 14 IOT4 13~ 11~ 1353 1~ 2117 1~ 1281 l&~ l~T 1~ 11~ .I~ 6.~
~/TiREt 1S 19 ~ ~2 32 31 .~ &Z ZZ ~ 39 *~ 1~ ~1 0.IS
~FILL ~L~ 16 8 ~ 3 4 16 2 6 3 4 2 9 10 ~ 0.~
Dirt ~ ~ ~ II 2 ~ 13 8 315 2 2 18 Z 7 11 ~1 0.18
~[ClAL ~LINO 17 2 2 2 3 2 2 2 2 2 2 2 2 ~ 0.01
~ClA~ ~LIRO 18 2 2 2 2 2 2 2 2 2 2 2 2 2& 0.01
~ S~CIAL ~LlmO ~ 2 ~ 2 2 2 2 2 2 2
~ 1~.14 4~ S302 5527 ~ SS~ 6~ ~ 53~ 52~ ~ ~T &~9 ~7 ~.~
~ 1.4.14.5 9~3 1~! 111~ 11~ 1~18 14~ 11~ 1~ 1~59 ~ 10710 1~ 1~ ~.~
~ ~$T* ~1~ ~3 1~0 ~ ~ ~1 101~ ~I0 11612
#Z$TC~IC)3. K~TEII~L TON~GE 8T TYPE
W~ ( ~3 ~ ~3 10~ 8~ 102~ ~T ~4 676 ~ ~ ~! ~ 3.~
~RCI~ S 5310 5923 61~8 6~ ~Z ~T 7171 ~ ~ 6~1 6312 5910
~:~M 6 ~93 ~ 4717 ~ ~ ~31 ~1 ~ ~ ~9 ~S ~ ~1 ~-~
~ 12 ~ ~ 1&3 107 119 131 ~ 97 !]9 1~ 133 1~ 1~ O.U
f~ 13 1~ &o 56 ~ 37 SS 3T 35 39 49 U 27 ~ 0.16
T~ ~l 14 1~ ~ 1189 ~T IZ~ 11~ 1597 1~ ~ 1~5 ~Za ~1 21~ 6.M
~l~/T/~J 1~ 17 ~ 24 16 21 ~ ~3' 50 !!4 112 1~ I~8 ~ 0.~
~flLL ~LOF 16 4 Z S 3 6 5 10 6 4 ~ 1L 3
OI~T ~ ~ ~ Z 2 ~ 12 ~ 4 65 3 23 3 3 3 I~ O.M
~ ~cl~ ~LJMO 1T Z Z 19 2 Z 3 S 3 3 3 1T 3 ~ 0.~
~ ~ClA~ ~LING 18 2 Z ' 3 IS 19 39 15 3 3 3 ~ 3 0 0
~ TO~A~ Z~O ~ ~4 2~ ~539 Z~16 26101 2~1 ~ 27~ ~ ~
~ ~.14 5t~ ~M S2~ ~21 S~ S~ S~T S~1 ~ S~ ~SS ~ ~ ~.~
~ 1,4,1&,5 1~0Z 12~91 11433 121~ t2~1 141~ 1~ 11976 t~ZZ 1~1 12767 1~
~ ~ST* 11328 1~3 1~1 t1~ 113M 13~ ~3133 15915 155~ 15~ 1~ IM 1~9 SZ.3?
~sxl~ ~SI~[~T I 31~ ~ 3139 401& 3S3S ~ ~02 3S2~ 3210 ~119 ~ ~ ~1 11.~
· ~C,~I~T,~ Z 41~ 2~ ~ 2S~ ~1 2658 3~ ~2 4~ 3~ ~ 4~1 ~7 12.1
C~ET! T 6 ~9 19 52 21 ~ ~ ~3 fl ~ ~ 18 ~31 o.1~
O[~ITIW 9 3 T ~ ~ 31 3 0 0 3 13 t6 ~ I~ 0.~
~ 12 8 14 14 13 1~ ~ ~ 49 Lo - ~ 51 ~ 3sz 0.1
f~l 13 1~ 1M IM 128 1~ 132 92 141 126 132 1~ 113 15~ 0.~
DI~T ~ ~ 8 8 S 10 6 ~ 6 0 3 0 O 0 0 S~ 0.17
~Ct~ ~L]~ 17 3 3 3 3 3 S 3 0 0 0 0 0 ~ 0.01
~ ,~ 18 3 5 3 6 3 17 7 11 S S 0 0 6S 0.~
o 'SL~ Z0 2&0 ~T ~9 !1~ MT ~ 1033 IS~ 1~ 7~7 ~ ~ t~& 2.~
NINI~ ~R~IZE
~ nJNl~ fEt~ ~ ~ ~ 0 24 119 _ 0.~
~ TOTAL 28~ 2~11 ~1~ 31~ 3~8 312~ ~1 3114S 3~ 3~10 ~ ~ ~ 1~.~
~ T~ LI~ ~LL 21~ ~316' 1~ *~9 24~3 24187 21&27 21~ 22~T ~74 ~ I~1& ~ ~.74
~ ~t~ OAYs 26 26 ~ ZT 24 2~ ~ 27 26 ~ 27 ~ 311
~ T~s KR ~&Y TOT~L I107 1~ 1~ 1149 1~ 1158 11~ 11~ 1271 11~ 1274
Li~
l*&*l& ~S39 5521 S]~ ~ ~8 TU3 T130 ~S 6112
1-4614.S .12024 12i~ 121~ ISO~ 1~J~ 1~ 14SM 1~ 1~
~ST* 167~ 14024 1~ t~8 16~21 1S~6 1~ 17~ ~39 1~
FISCAL TL~ YG'9$ AT li/~LES LANOFILL
0 M O J f N A # J J A S TOTAL ·
F~LVCRI?'s t'~ll0tilT 3567 '33q, 3J.12 LM( 3522 3871 4,0Z6 &IX~ 367'2 LO2? ~ ~610 L~7'01
· LAXO C:~ltll4JllGvAt ZTq;? 2187 19~9 2O64 2247 2296 2~06 27~$ ~09 2242 26S6 2615 21~03 9.~
co4~fcl~ 6533 656~ 6~3'~ ~ 739? ~ 8010 7218 ~a58 6315 609q5 S619 ~2193
· c:cmsL'r JKJCT ICX 6693. 8033 7081 7097 &~? 6228 6946 5~59 ~ ~9~ 69S1 6601 ~216
c:cmcxti i ~ 17 2S 63 /)3 44 & 30 20 I o - 13 261 0.09'2
OI~T AMO SXN~ 2~ 0 o 3~2 o O S :0 ~ _~.7 ~ 22 &37 0.1S~
~l'~m,. I T II~l 137 S&$ 2~ 23~ 124 ~ 201 ~ ~5 331 150 243 ~ 1.~
~T~s 2T 1T I S 9 11 0 : 1 Z 0 & 0 ~
~ ILO 7& ~ 1~ ~ eZ 93 ~ ~ ~ ~ ~ 10~ 0.35~
HISC ~! 3~ ~ 1~ ~16 1~1 21M ~5 2132 1MT ~T' ~ 1013 ~10
· ~l/tlffl 87 118 ~ 112 ~ 161 103 126 102 52 ~ 31 1126 0.~
tills 1S I.. 0 M 0 0 0 0 0 0 0 0* 0 0 M
rites 16 I~. o ~ o o o o o o o o -o o ~ o.olz
· ~ o 0 0 3 o 6 0 0 0 0 0 6 17 0.01~
SL~ ~ 1~3 1218 12~ ~ 13S9 1~2 15~2 1~1 10~6 923 ~ 1~11
LIst T~ 1/2 ~ 0 0 0 0 0 0 0 0 0 0 0 0 0 0.~
~LF ~ M~E 0 O 0 0 O 0 0 0 0 0 0 '0 0 0.~
t~t LI~ ~LL 1~3 16925 1~ 1~ 1~ l~T 19135 S~q ~SM~ 1~ 15~6 161~ ~3~ O.~
.~l~ OAtS 2T 25 Z6 ~ 24 26 26 2T ~ 26 2T ~ 310
T~S ~ OAT TOTAl. 921 1~1 ~ l~T . ~ 1~Z 10~ 91T W ~ ~ ~S ~1 A~.
t~l ~ pAY x x x x X X X
...in Jl~ cett K3 6~ 61T ~Z ~ ~1 ~ 65T ~3 ~ S~ ~ ~ x~. TP
1~ 127~ 12276 I~11 13~8 I~22a 15276 l&O~ 11~T 13~7 12~ t16~3 1~
. .
#ISTOqlC~L AqTEtlAL T~I~KG~ BY TYK. &AG PJKX:fSSIIG .; - . -
*~ST~I~ 6 7~ ~10 ~ ~ 4~Z 4~7 43~ 3~9 4358
OttT ~ ~ 8 10 0 10 O 0 7 0 0 15 19
0.~
TIllS 16 I,. 1T O 0 0 0 0 0 o O G 0 ~ 0.0~
LESt T~ 1/2 ~ 0 0 0 0 O 0 0 O 0 0 0 0.~
~LI ~ ~ ~f 0 0 0 O 0 0 0 0 0 O O 0.~
T~ ~t DAY TOTAL ~ ~ 916 ~2 911 ~ ~ ~ ~T
...iff II~ cett 632 6~ 6~ 6~ 6SS ~ ~4 S~ S3S 491. ' LI~ C
zl~J ~1 ~ ~ .~6 32 &3 50 52 ~ &O 0 0 &~ 0.~
*~L OTK~ 144~ lq~ 1491T 1~3 14~T IS~ 14T41 1~1S 124~ 11741 0 0 141~T
· . j j A S TOTAl,,
D~ITI~ 0 0 0 ~ 0 0
~ETE O 0 0 o o' o o
~TA~ 5T T iO . 12 6 9 10
~ASS 0 0 0 0 0 0 0 0 0 0 0 0
OT~I~ 0 O 0 0 0 0 0 0 0 0 0 0 0
I~ DI~ 443 4~ ~ 553 S~ 613 576 ~ 5~2 &~ S~ 516
~. ~w ~ o 3 7 0 7 0 0 0 O 3 10 0 0
OTHER I~l~S
C04.LI[R C~U#TY Iq~LIC T~ltl~ OI¥1I|OII-IC)LI~ ~! DEP~NT
0 x O J P M A M J J A S
T~S ~2 1~2 1117 1152 11~ t~ $t87 1~ * 14~ ~ 1161 11~
67 18 ~ 3T 13 & * ~
D[~ITI~ ZT 1~ 2T ~ ~ z ~ 33 ~ ~s 13
~ETE 0 ~ 0 & ~ 10 ~S 71 ~T ~ $1~
DIrT ~ 22 8 1S 12 9 ~ 33 &Z 24 11 S 4S3 ~T
wIT[ ~S 9 S 9 ~ S 15 ? 6 0
0 0 O 0 0 0 0 0 0 0 0 0
GLA~S 24 23 ~ 30 35 19 35 32 &S 22 ~
~l[t 0 0 0 0 0 0 0 0 T 0 0 0 T
OTN[R O 21 159 165 126 ~ 3~ 1~ 12~ 31T SS ~ 4131
TOT~ T~S 1311 1~7 16~ l~T 16~ 2111 ~
o
~ cc~ ~ 3 0 0 I 0 11 0 2 ~ 2~
~ l~ DI~ S16 ~ ~T ~Z 674 ~5 ~ 0 76
~. CL[~ ~ 24 0 0 ~ 12 0 6 S ' 0 0 0
~ A~L OTKER ~1 1~ 8~ 7~ ' ~T 1~ 1555 1~ 2~7 $TL9 1~0
?~ lOT~ I~S 1~11 I~T 1671 I~T 16~ 2111 ~ ~19 ~ ~ Z~T
~ ~SN TIP FEE S9,141 S~3,~O S~,~9 J11,~ Sl1,511 S~,~Z S22,2M S~,2~ ~7,9~ S~3,W S13,~ ~1,M1
I~ ~lSf TIP tEE ~,~? S7,8~ M,~ J9,Sff ~,~ S9,~S S9,811 S1,~1 ~,~1 ST,~ ~,~ ST,~fl S103,~9
fKAI. L ~*JJ T~d SZ,~9 S2,~9 ~,261 ~,~ SZ,~l ~,3~ ~,40Z SZ,42( ~,SOZ S1,8~ ~,~T
OTntA
C:~4.LlrJt CiXA(TY GC:~Itm~#T
ENYIItCIOqCNTAL SERVICes DIVISION
S~.lO W. STI' IqA#AGe~#T OI~PAJtT~#T
ipiqXA~irlr LANOfrILL ACTIVITY fttrlq~T
IT 1909-9~) 0 N D J F R ~ R J J A S TOTAl.
fit 17062
TONS ·
r.&JtlxM 1013 1091 1ZST 1531 1269 1567 1672 2350 2282 1091 11e, Z
T),,~O W, ST! 24 &O 27 L2 20 26 30 20 T 9 11
L.AKO CLL~ I #G 11S &l 62 12~ 31 I11 150 91 4.8 350 58 7 1207'
Oc:m $TIKC~I I0~ 33 · 0 19 0 0 0 0 3 2 0 0 63
26 . 9 0 0 0 0 0 135 0 11 0 * 3 1~,
O[~cli. IT IO,I ~0 L~ 1 11S 207 103 ' &5 142 13~ 2 ?'0 12 933
CX;NCXiiI~ .~q. ,~x.o 711 917 271 2~6 359 4269
DI~T SA~ 997' 15 ;,2 3 · ; .... 0
~cco 35 &O '.,1 18 33 18 SS 60 Z 0
PAP[~. O ~ 51 0 0 O: ~2 6~ 0 0 0 0 ~01
META~ 7 0 0 2 12 O* 1 1 14 10 0 0
~ITE GCXX)$ 13 20 2 2 28 3~ 21 21 7 & 10 8 178
CLASS 0 0 0 0 0 0 0 0 o 0 0 0 0
~r~mtm 42 · d~ 12 59 ~ 65 7'2 103 110 L1 Sa 83 139
OTNt{ 0 0 0 0 0 · 0 0 0 0 0 0 0
PLASTIC 27 3 4,3 191 3ZT Z73 157 2350 ZMI 76 8 1S
TOTAL les ~ 1419 t588 2113 2187 ~26 2424 ~ 60S& 6~09 1909 t655 1450 32116
TI~'C$ 1078 918 1159 1356 1117 1207 1200 2171 1~6~ 7&Z 709 573 13776
72 ·T
CCKA 67 67 72 82 67 6~ 9~ 89
MrwOt! C~m~ o o 11 o I lO 18 11 o o o o 51
INCK OISJ' 607 636 677 711 618 4.66 747 ~3 60G 373 585 511
CO*M. CL~U ~ 0 6 0 61 50 ~5 458 M 105 145 132 8
ALL OT#£~ 17~4 ?~0 8~8 1~3 . 1~,1 I6~I 11o7 $0~ - S4~:S 1119 ~ 87Q
TOTAL lCmS 2].62 1419 15~, 2113 2187 2~26 2424 6(~ 6~ 19(~ 1655 1450
FAAN. & PASJ TM~ S2,545 S2,671 ~,671 ~,~ ~,~ ~,~7 S2,837 S2,~ ~,~1
TOTAL t~ ~1,3~ ~7,~S ~6,4~ t~,~ ~,5S7 S37,~1 S3T,~I S~,~ ~5,074 ~,~ S19,5~ SIT,~
~*STE/T~S ~ ~ D[G 3~ fEB ~ ~R ~Y ~ ~
~R~ 1,1S~ 12~ 1~ 1~ 1~ 1~ 20~1 2~ I~T 1311
~IsC ~STE Z & 1 0 1 0 I 0 O
~ST~T~ 4~ ~ 2~ 1M 19 M . 24 13 10
o~ o o 0 0 o 7 o o o o
DIRT ~ 0 0 0 0 O 0 O 0 0 0
~ 2 21 2& 32 33 &9' I 61 o o
~t~L o I & 4 7 lO 1 I I 0
GLASS 0 0 0 0 0 0 0 0 0 0
Ot~EI 0 0 0 - 0 0 0 0 O 0 0
PLASTIC M 0 0 ' 89 3~ 2~ 2~6 IS~ 1~1
LAR~
~[~lt ~ 6 1s 0 0 6 18 6 Il t 0
I~ DI~ ~RCIAL 0 0 0 510 3~ U3 ~11 ~ ~3 350
~ CLEA~ (~lx~) 0 0 0 0 3~ 3~ 0 0 0
~ ~[A~ (~St~TiO ~ 0 0 0 133 ~4~ ~3 ~6 8 102
M CLEA~ (li~SS) 0 0 0 0 0 0 Z 0 0
~l CW~M) 1~ 269 1~ 2~ 0 0 3~ S41 SS9 0
~1 (~ST~TI~) 0 O 0 0 0 0 11~ 30T 110
ALL OT.(~S ~Z 4~ 4~ 927 ~2 1037 976 2~1 1914
u~ss 18 6 6 I ~ 21 8 ~ ~
c~ 48 Z3 24 1~ 19 ~ 24 13 10 S
~t[s ~ ~ 33 ~ 43 39 58 61 SZ 33
f~StlC M 0 0 ~ ~ 2~ 2~ 15~ 1~1
tOTAL 1~ 1~ ~ i~ S~ ~ ~T 1~3 I~8
AL~ m~ t153 I~ 1~ IT6T tit4 ~S ZtM ~ 1~1 1313
I~ Ds ~ CW~-I~ ~.l~Z M,35Z M ~. s9,3~
ALL OTHER IKI~I ~,~1 ~,~ SS,~S ST,AT6 t11,~ J13,ZZT t11,7~ ~,7~ S17,1~
PLAS~IC O 1 1~3 67 139 ~ Z~ 1~3 1~1 IL16 ~1~
! ~A~C~ISf-K~S 1 t~l ~2 510 &~T 4~ ~ S~ ~ ~ ~
II.sS 3 69 ST 30 1~ ' 65 L8 53 91 63 87
~lsx~ L 310 ~9 222 135 1~3 125 16T I~ 1~
OI~ITI~ 9 0 0 0 0 O 0 2 S~ 2 0
~t*ul 10 0 0 1 t · I I 7 8 19
~ IZ O 8 S9 ~ 2( ~s ~ ~T ~
TI~ES 1S 39 33 35 37 ' tT &l ~ ~0 6S
OT~[I O 0 O 0 0 0 0 0 0 0
IOTAL T~I '1~3 1852 1~3 1~4 ~ ~11 ~ ~Sfl ~IZ &219
767 ~1 a~o 015 053 ~ 9~ ~3~8 1153
cc~ ~ ~ lOT 97 M - ~ t~ lol lO2
~I~T ~ 0 0 1 0 0 0 '0 0 0 . O
c~ CLZA~ (~) 0 0 & 0 O 0 0 0 0 0
~ CLE~ (II.SS) 0 0 0 0 0 0 0 0 0 0
~1 (C~ST~T3~) 1~ 134 ~ ~3 ~] 5J 0 0 Z 0
c~ 241 187 1~ 61 &2 ~9 3S Z& 69
~IT[ ~S 19 21 9 12 11 18 40 l& ~ ~
tills 39 33 3S 3~ 4T &l ~ ~o 6S
PLASTIC I 153 67 1~9 2M 2~ 1033 1~1 m6
TOTa~ 5~ S~ 2U 431 ~ ~93 12~ 1929 167&
ALL ~f~ 12M 12~ IS21 tS13 1~t 131~ 1~9 1~9 15~ 1919
~LL ~IA J~J~J S?,S~ tg,~ ~,MT J16,8~ JlO,~ Jl~,~J ~,~Z ~1,12T S31,~ Sl!,16T
i~.'- ~
~., CO~IR ~OUNT~
.; GROWTH MANAGEMENT PLAN
~ .'
FUTURE LAND USE ELEMENT
Prepared
Collier County
Growth Planning Department
January, 1989
Amended January, 1990
Amended May, 1990
Amended June, 1990
Amended February, 1991
Amended December 17, 1991
Amended May, 1992
Amended August, 1992
Amended May 25, 1993
j;!.i r:-
.~ RE-PRINTED FEBRUARY, 1991
' 'RE-PRINTED & RE-FORM~LTTED IN AUGUST, 1992
!~:.!:. ~oo~ 060 ~: 333/
TABLE OF CONTENTS
Page
TABLE OF CONTElq'ZS
Q~. :.,. SUMMARY
A. PURPOSE
..f C · UNDERLYII~a CONCEPT8
/~'~ Protection of Natural Resource Systems
~r= Coordination of Land Use &Public Facilities
Management of Coastal Development
Provision of Adequate & Affordable Housing
Attainment of High Quality Urban Design
Improved Efficiency and Effectiveness in the
Land Use Regulatory Process
Protection of Private Property Rights
D. SPECIAL ISSUES
Coordination of Land Use and Public Facility
: Planning
Level of Service Standards
Z Vested Rights
E. FUTURE LAND USE MAP
'.tt..,~Cj!~=* lI · IMPLEMENTATION STRATEGY
'.~:~" C..~OIsLL8, OBJEC,~EIVES AND POLICIES 10
,.! ~,.
,,., FUTURE LAND USE DESIGNATIONS DESCRIPTION SECTION
Urban Designation
~. Density Rating System
~1:/ AgricUltural/Rural Designation
Estates Designation
Conservation Designation '.
"~ FUTURE LAND USE MAP SERIES (Attached) In Plastic Pocket
.,]'..:
(!-, IZI, SUPPORT DOCUMENT = LAND USE DATA AND ANALYSIS
(Separate Table of Contents)
. · Indicates adopted portions of Element
·: LU-I-i
~i..,
SUIO~ARY
The Future Land Use Element includes three major sections:
Overview,
Land Use Data and Analysis.
The Overview simply provides an introduction as to the purpose, basis,
underlying concepts and special issues addressed by the Element.
The Implementation Strategy is where the Element is brought into
effect. Included are the Goals, Objectives, Policies and Future Land
Use Map.
The third section consists of Support Document: Land Use Data and
Analysis. The information. found there provides a basis for the
Implementation Strategy and serves to meet the requirements of Section
9J-5.006, Florida Administrative Code, minimum requirements for the
Future Land Use Element.
';' · LU-I-ii
060 335
.!:::: I,,Z >-
'! .!
I. OVERVIEW
· X. PURPOSE
The geographic framework for ~k/rowth in Collier County is established
by the Future Land Use E].ement. As such, the Element is central to
planning for and management of natural resources, public facilities,
coastal development, houe~ing and urban design. The Element is also
important to the County'~; system of land development regulation and to
private property rights.
The purpose of the Future Land Use Element is to guide decision-making
by Collier County on regulatory, financial and programmatic matters
pertaining to land use. Most directly, this Element controls the
location, type, intensity an~ timing of new or revised uses of land.
The land use strategy in this Element is closely coordinated with a
strategy for provision of public facilities as found in the Capital
Improvements and Public l~acility Elements of this Growth Management
Plan.
B. BASIS
This Element is based in large part on the Future Land Use Element
adopted as part of the 1!)83 Collier County Comprehensive Plan. The
land use strategy put fourth in that Plan has served Collier County
well therefore a general continuation is provided. The best
characteristics of the 1983 Comprehensive Plan include the use of a
binding Future Land Use Map with designated "Urban" areas and the
confinement of Intensive Zoning Districts thus intensive land uses to
those areas~ and the use of a Point Rating System to determine
permissible residential densities. An Evaluation and Appraisal Report
on the 1983 Plan is included in the Support Document to this Element.
In addition, this Element is based on the Support Document: Land Use
Data and Analysis and the summation of the detailed planning conducted
for each of the other portions of the Growth Management Plan. Data,
analysis and implementation strategies from the various elements have
contributed to the geographic framework through the configuration of
the designations on the Future Land Use Map and the associated
standards for use of land.
New and existing research and literature have also contributed to the
Future Land Use Element. A reference list of pertinent literature is
found within the Support Document.
The State Comprehensive Plan and the Southwest Florida Regional
Comprehensive Policy Plan form another basis for the Future Land Use
Element. Chapter 163,.Florida Statutes, the "Local Comprehensive
Planning and Land Development Regulation Act" and Chapter 9J-5,
Florida Administrative Code, "Minimum Criteria for Review of Local
Comprehensive Plans and Determination of Compliance" provide detailed
requirements on the scope and content of the Element.
: Finally, major contributions to this Element have been provided by the
public through the Collier County Growth Management Citizens Advisory
~' Committee, Collier County Planning Commission and other groups and
'7 individuals.
'," C. UNDERLYING CONCEPTS
!,!~, The land use strategy e~Jtablished by this Element is based on a series
=' of concepts which emerge from the foundation cited earlier. The policy
,' direction and implementation mechanisms closely relate to these
underlying concepts.
Protection of Natural Resource Systems
Collier County is situated in an unique, sensitive and intensely
interactive physical. environment. Natural resources are abundant: a
subtropical climate with annual wet and dry seasons; enormous ground-
water productivity; vast wetland areas; large ranges of habitat with
diverse and unique flora and fauna; extensive and highly productive
estuarine,systems; and many miles of sandy beach. These natural
resources perform functions which are vital to the health, safety and
welfare of the human population of the County, and serve as a powerful
magnet to attract and retain visitors and residents. Therefore,
protection and management of natural resources for long-termviability
is essential to support the human population, ensure a high quality of
life, and facilitate economic development. Important to this concept
is management of natural resources on a system-wide basis.
The Future land Use Element is designed to protect and manage natural
resource systems in several ways. Urban Designated Areas on the
Future Land Use Map are located and configured to guide concentrated
population growth and intensive land development away from areas of
great sensitivity and toward areas more tolerant to development.
Within the Urban Designated Areas this Element encourages Planned Unit
Development zoning and assigns maximum permissible residential density
based on the gross land area. Through site plan review procedures in
the County's Land Development Regulations land alteration and
construction is guided to the portions of the property more tolerant
to development, thus in effect an on-site transfer of development
rights. Also, a broadEar Transfer of Development Rights provision
exists in County Land Development Regulations.
An Area of Critical Concern Overlay is included on the Future Land
Use Map to ensure implementation of all applicable Land Development
Regulations in the Okaloacoochee Slough, Big Cypress Swamp,
Fakahatchee Strand and Ten Thousand Islands areas. To be a part of
the County's Land Development Regulations are standards for protection
of groundwater particularly in close vicinity to public water supply
wells as explained in the Natural Groundwater Aquifer Recharge
Element.
Of crucial importance to the relationship between natural resources
and land use is the completion and implementation' of multi-objective
watershed management plans as described in the Water Management
LU-I-2
,oo 060,, ,3'37
.,~.
.~,..
i;::"
-' Element. Water is the greatest integrator of the physical environment
"' in that it links together dynamic ecological and human systems.
Therefore, the watershed management plan must take into account not
only the need for drainage and flood protection but also the need to
maintain water table levels and an approximation of natural discharge
to estuaries. The watershed management plans will have implications
for both water management and land use practices.
Finally, natural resources are also protected through close spatial
and temporal coordination of land development with the availability of
adequate infrastructure (public or private facilities) to ensure
· optimized accommodation of human impacts particularly in relation to
water supply, sewage treatment and management of solid waste. This
coordination is accomplished through the provision of public
facilities as detailed in the Capital Improvement and Public Facility
Elements and through the Level of Service Standards found herein.
Coordination of Land Use and Public Facilities
At the heart of Florida's Growth Management Act (Chapter 163, Florida
Statutes) is the requirement that adequate service by public
facilities must be available at the time of demand by new development.
This requirement is achieved by spatial coordination of public
facilities with land uses through the Future Land Use Map; and
temporal coordination through Level of Service Standards. The Level
of Service Standards are binding, no final local Development Order may
be issued which is not consistent with the Concurrency Management
System. Binding Level of Service Standards have been established for
roads, water supply, sewage treatment, water management, solid waste
and parks. While the standards in the Capital Improvement and Public
Facility Elements serve to guide public provision of infrastructure,
within the context.of the Future Land Use Element the Standards serve
to assure the availability of adequate facilities whether public or
private.
The Urban Service Area concept manifested in this Element is crucial
to successful coordination of land development and the provision of
adequate public facilities. It is within Urban Designated Areas on
the Future Land Use Map that the mere intensive Zoning DistriCts are
permissible thus the more intensive land uses. Since Urban Designated
Areas are where intensive land uses are guided, it is also where
fiscal resources are concentrated for the provision of roads, water
supply, sewage treatment and water management. Also, facilities and
services such as parks, government. buildings, schools and emergency
services are primarily located within Urban Designated Areas. Outside
of the Urban Designated Areas only lower intensity land use is
permissible thus fewer roads and a lower level of water management is
provided and there is no, or very limited, central water and sewer.
It is important that the Urban Designated Area not be so large that
public facilities cannot be efficiently and effectively planned for
and delivered; and not be so small that the supply of land available
for development is extremely limited with resultant lack of site
selection options and competition leading to elevated land priceS. It
LU-I-3
,ooK 060 3'38'
iLl '~
,~,
is also important that the time frames for land use and public
facility planning be coordinated as discussed later in this Overview.
Management of Coastal Development
T~o major coastal development issues in Collier County are the
protection of natural resources and the balancing of risk in natural
hazard areas.
Extensive populated areas in Collier County are vulnerable to periodic
salt water inundation from tropical storms. It is extremely important
that an acceptable balance between at-risk population and evacuation
capability be achieved. In addition public and private investment in
such~lnerable areas must be carefully considered.
This issue is addressed hera and in the Hurricane Evacuation Element
through several measures. A Coastal Management Area is identified on
the Future Land Use Map essentially as all lands seaward of US 41.
This line is based on the close fit to the storm Category I SLOSH area
(potential for salt water flooding from I storm in 12 years) and
evacuation planning areas. Within the Coastal Management Area maximum
permissible residential density is limited in recognition of the level
of risk, the existing deficiency of evacuation shelter space and
existing patterns of density. A Coastal High Hazard Area is
identified in the Hurricane Evacuation Element and policies are
provided. Finally, coastal natural hazards and addressed through Land
Development Regulations already in effect relating to coastal building
standards per Chapter 161, Florida Statutes, and protection of
structures from floods per County participation in the FEMA Flood
Insurance Program.
Provision of Adenlate and Affordable Housing
An emerging issue in Collier County is the availability of adequate
and affordable housing for low and moderate income populations. The
Future Land Use Element encourages the creation of affordable housing
through provisions which allow for increased residential density if
the proposed dwelling units would be affordable based on the standards
found in the Housing ]Element.
Attainment of High Quality Urban Design
The report of the Regional/Urban Design Team for the Haples area dated
April 1987 and subsetlent recommendations of the R/UDAT Citizen
Co~uuittee provide another underlying concept. While the Growth
Management Plan as a whole provides the requisite foundation for
superior urban design through a sound framework for growth (protection
of natural resources, thoughtful guidance of land uses, adequate
public facilities and adequate housing), the Future Land Use Element
provides several additional measures.
Major attention is given to the patterns of commercial development in
Collier County. Concern about conunercial development relates to
transpor~cation impacts both on a micro (access to road network} and
macro (distribution of trip attractors and resultant overall traffic
LU- I - 4
060 3'39
?circulaticn) level and it relates to aesthetics and sense of place.
Within the Traffic Circulation Element a commitment to adopt standards
"" for road access as a part of the Land Development Regulations is
included. The Future Land Use Element includes improved locational
criteria for commercial development. Also, this Element provides for
Commercial Activity Centers located away froTa areas subject to long
range traffic congestion.
The Activity Centers are intended to p~ovide for concentrated
commercial development but with carefully configured access to the
road network. Superior urban design is therefore promoted by
carefully managing road access, avoiding commercial strip development,
improving overall circulation patterns and providing for community
focal points.
A second urban design initiative relates to Corridor Management Plans.
The Future Land Use [:lement commits to the completion of such plans
for two roadways initially and to extend the concept to other roads in
the future. The plans will identify an urban design theme for a
particular road and recommend a package of Land Development
Regulations (land use, height, setback, landscaping, signage,
lighting, etc.) and public works (landscaping, lighting, signage,
etc.) to achieve that theme. The City of Naples and collier county
are cooperating on the first roads to be treated with this approach.
Improved Efficiency and Effectiveness in the Land Use Regulatory
Process
Attention has been devoted to improving the land use regulatory
process through straightforward requirements and procedures. This has
lead to the style and structure of this Plan; a commitment to re-
organize the County's development review process; and through future
effort to compile all Land Development Regulations into single code.
Protection of Private Property Rights
Important to every facet of this Element is maintenance of a careful
balance between private property rights and the general public
interest. Although sound land use management by definition
establishes limits on use of property, care has been taken to'ensure
the limits are rational; fair; based on the health, safety and welfare
of the public; and that due process is provided. Of particular
importance is the issue of vested rights which is addressed later in
this Overview.
D. SPECIAL ISSUES
Coordination of Land Use and Public Facility Planning
It is important that the time frames of land use planning and public
facilities planning be coordinated. During the development of this
Growth Management Plan it became clear that an incongruity exists in
that under the 1983 Collier County Comprehensive Plan.enough land in
the western coastal area was designated Urban for approximately
317,200 dwelling units (exclusive of the City of Naples) which would
take until the year 2050 to build-out. Of this, approximately 53.,800
,0. 080 3'40 , z
dwelling units were built and 120,000 dwelling units zoned but unbuilt
as of January 1988 (exclusive of the City of Naples). In the
Immokalee Urban Area enough land had been included for a build-out
time horizon of 2105. This is contrasted by the time frames for
public facility planning which are at 10 years for all facilities
except roads where a 2015 plan for the majority of the western coastal
Urban Designated Area is nearing completion. The 2015 plan is designed
to accommodate approximately 153,400 dwelling units (exclusive of the
City of Naples).
As previously discussed, Level of Service Standards for public
facilities which are binding on land development are adopted for
roads, water supply, sewage treatment, water management, parks and
solid waste. Of these, the first are most closely tied to the
development of a property - adequate roads, water, sewer and water
management must be on or adjacent to a property for it to be
developable. Parks and solid waste are a matter of ensuring adequate
countywide capacity. To narrow the issue further, it is recognized
that the approach to adequate water management is regulatory - a level
of on-site storm flood protection is required. In the case of water
and sewer,-although County provided systems are substantial and
expanding, a large amount of such service is self-provided without
major adverse ramifications. Thus, the critical issue becomes
coordination of land use and transportation time frames.
The difficulties that this incongruity could lead to include:
- An internally inconsistent Plan;
- Failure to reserve adequate right-of-Way at time of zoning;
- Condemnation of land after zoning or after development in
order to obtain adequate right-of-way;
- Temporary prohibitions on issuance of Development Orders due
to violations of Level of Service Standards; and
- Progressive lowering of Level of Service Standards.
This Growth Management Plan responds to the time frame discrepancy
through immediate action and through process oriented commitments.
First, the Traffic Circulation Element includes an Objective to co-
ordinate with the Future Lend Use Element and a policy to complete
long range transportation planning which coincide with the timeframe
of the Future Lend Use Map. Second, the Density Rating System has
been adjusted to moderate maximum permissible densities in areas
subject to long range congestion. Third, commercial development
opportunities in the form of Activity Centers are provided away from
areas subject to long range traffic congestion. Level of Service
Standards that are binding on the issuance of Development Orders are
adopted as part of this Element, as well as the Capital Improvement
Element. Finally, a Zoning Evaluation Program has been established.
LU- I - ~
d*** The areas identified as subject to long range traffic congestion
consist of the western coastal Urban Designated Area seaward of a
boundary marked by Airport Road (including an imaginary extension
north to the Lee County boundary), Davis Boulevard, County Barn Road
and Rattlesnake Hammock Road consistent with the Activity Center's
residential density band located at the southwest quadrant of the
intersection of Rattlesnake Hammock Road and County Road 951
(including an imaginary extension to the east). The basis for this
determination is the proposed 2015 Transportation Plan which forecasts
future land use based on existing development, potential development
and population projections. The land use forecasts are the basis for
projected unconstrained traffic circulation from which once compared
to the existing roadway network future roadway needs are derived.
Since the 2015 roadway needs have not met with public acceptance,
concern has developed about the acceptability of the roadway needs
anticipated by 2050, the time frame of the western coastal Urban
Designated Area. Therefore, the strategy discussed above is promoted
(i.e. exten~ time frame of transportation.planning, moderate maximum
permissible densities in areas subject to long range congestion,
provide commercial development opportunities which serve to modify the
overall traffic circulation pattern'and re-evaluate existing zoning).
Level of Service Standards
Standards for adequate service for roads, water, sewer, water manage-
ment, parks and solid waste are adopted as a part of this Element as
well as the Capital Improvement Element. While a major purpose of the
standards in the Capital Improvement Element is to drive the funding
of facility expansion commensurate with the demand created by
population growth, the major purpose for inclusion in this Element is
to serve as a regulatory tool.
., ObJeotive 2 states:
.:.. ... No local Development Order shall be issued unless required
~j;. public facilities meet the req~irements of the Concurrency
~.. Management System found in the Capital Improvement Element
~>. · ..
As discussed in the previous section, implementation of the Standards
will rely on the following strategies:
Parks'- Annual Certification of Adequate Capacity;
Solid Waste - Annual Certification of Adequate Capacity;
Water Management - Project - Specific Regulatory Requirement;
· Sewage - Project - Specific Capacity Test (may be provided
· publicly or privately as a central or individual system);
d**e /&mended February, 1991
LU-I-7
Water - Project - Specific Capacity Test (may be provided
publicly or privately as a central or individual system)~ and
~. Roads.- Project - Specific Capacity Test.
It is recognized that difficulties may arise in situations where the
County is not providing the facility or service but is responsible for
implementation of a reguls. tory Level of Service Standard. This is the
case with State Roads running through the County~ with independent and
City of Naples water and newer districts within the County~ and
conversely, with County Roads running through the City of Naples. In
these instances effort ha8 been made to coordinate the "regulatory"
Level of Service Standard with the "funding" Level of Service
Standard. However, if there is a failure by the service prorider,
adjustment to the regulatory effort may be forced. For example, if
the State Department of Transportation allows a road to fall below its
"funding" standard (which is the same as the County's "regulatory"
standard) and there is no commitment to accelerate funding and
construction, four optionsl appear available:
- A moratorium may be imposed but may not be sustainable if
· there is no commitment to improve the road by a definite and
reasonable times
=.=' - The County may improve the road~
- The private sector may improve the road~ or
- The regulatory Level of Service Standard may be lowered
through a Comprehensive Plan amendment process that would
· take about six months.
Vested Rights
The issue of vested rights for appro~ed but unbuilt development is an
important consideration in the Future Lend Use Element. The issue
emerges with regard to existing zoning which is inconsistent with this
Plan~ with regard to the magnitude of approved but unbuilt residential
dwelling units in relation to the difficulty of forecasting
development trends and resultant facility needs~ with regard to
transportation planning time frames and right-of-way needs~ and with
regard to approved but unbuilt commercial zoning in light of the
Commercial Land Use Study which found that of the approximately 4,500
acres of commercially zoned land in the County as of 1986, only 25% is
developed (see Support Document).
This Growth Management Plan responds to the vested rights issue by
establishing a program which reviews all previously approved zoning.
Within three years after Plan adoption, all zoning will be reviewed.
If it is determined to be inappropriate and is not vested, the zoning
will be adjusted to an appropriate classification. Annually there-
after, zoning will be re-evaluated on the fifth anniversary of its ·
approval. This Plan commits to establishment of such a process by
LU-I-8
AUgust 1989 (see Appendi)c C of the Support Document for a complete
discussion of the vested rights issue).
, Z. FUTURE LAND USE MA~
The Future Land Use Map depicts the desired extent and geographical
" distribution of land useas in the County. Mixed use categories are
'j used to generally describe the character of allowed development.
' Within each of these cat~gories, a range of uses are permitted based
· upon specific standards ns described in the Description Section of
· this Element. These use~z include residential, commercial, industrial,
agricultural, recreationnl, conservation, 'educational and public
" facilities.
The Future Land Use Map series includes seven additional maps:
Future Land Use Map - Public Facilities, which shows existing and
planned public facilities~
Future Land Use Map - Natural Resources: Waterwells, Cones of
Influence, Rivers, Bays, Lakes, Floodplains,
Harbors and Minerals (this map also shows
those properties proposed for public
acquisition by the State Department of
Natural Resources Conservation and
Recreational Lands Program (CARL) and the
South Florida Water Management District's
Save our Rivers Program)~
Future Land Use Map - Natural Resources~ Wetlands~
Future Land Use Map -- Natural Resources: Soils~ and
Future Land Use Map - Interstate Activity Center (three maps
showing the boundaries of the Activity
Centers located at the thre~ Interstate
Interchanges).
With the expansion of Activity Center maps, these maps are located at
the end of the Future Land Use Element. Activity Center maps'are
located within the Element.
II. IMPLEMENTATION STRATEGY
GOALS, O~JECTIVES AND POLICIES
GOAL l Z TO GUIDE LAND ~ISE DECISION-MAKING SO AS TO ACHIEVE AND
MAINTAIN A HIGI[ QUALITY NATURAL AND HUMAN ENVIRONMENT WITH A
WELL PLANNED MIX OF COMPATIBLE LAND USES WHICH PROMOTE THE
PUBLIC'S HEALTh[, SAFETY AND WELFARE CONSISTENT WITH STATE
PLANNING REQUIP~ENTB AND LOCAL DESIRES.
OBJECTIVE lX
Unless otherwise permitted in this Growth Management Plan, new or
revised uses of land shall be consistent with designations outlined on
the Future Land Use Map. The Future Land Use Map and companion Future
Land Use Designations, Districts and Sub-districts shall be binding on
all Development Orders effective with the adoption of this Growth
Management Plan. Through the magnitude, location and configuration of
its components, the Future Land Use Map is designed to coordinate land
use with the natural environment including topography, soil and other
resources; promote a sound economy; coordinate coastal population
densities with the Regional Hurricane Evacuation Plan; and discourage
unacceptable levels of urban sprawl.
Policy 1.1~
The UR3AN Future Land Use Designation shall include Future Land Use
Districts and Subdistricts for:
A. DTtBAN - MIXED HSE DISTRICT
1. Urban Residential
2. Urban Residential Fringe
3. Industrial under Criteria
4. Commercial under Criteria
B. DTtBAN - COMMERCIAL DISTRICT 1. Activity Center
2. Future Activity Center
3. PUD Neighborhood Commercial
C. ~RBAN - INDUSTRIAL DISTRICT
1. Industrial under Criteria
Standards and permitted uses for each Future Land Use Dis~rict and
Subdistrict are identified in the Designation Description Section.
Policy 1.25
The AGRICULTURAL/RURAL Future Land Use Designation shall include
Future Land Use Districts and Subdistricts for:
LU-I-IO
,oo 060 3'45 >
:!!; . ':: ~ .-
(;'I A. A6RICULTURAL/EURAL , MIXED USE DISTRICT
1, Agricultural/Residential Subdistrict
~... 2, Commercial under Criteria
B. RURAL - INDUSTRIAL DISTRICT
C. RURAL - SETTleMENT AREA DISTRICT
Standards and permitted uses for each Future land Use District and
Subdistrict are identified in the Designation Description Section,
" Pollc~ 1,3Y
The ESTATES Future land Use Designation shall include a Future
land Use District and Subdistrict for~
A. ESTATES - MIRED USE DISTRICT
1, Residential Estates Subdistrict
2, Commercial under Criteria
Standards and permittea uses for the Future land Use District and
Subdistricts tdentifie~ in the Designation Description Section,
Polic~ 1,4x
The CONSERVATION Future land Use Designation shall include a Future
ra. nd Use District and Subdistrict for:
A. CONSERVATION - MIXED USE DISTRICT
1, Public lands Acquired for Conservation
Standards and permitted uses for the Future land Use District and
Subdistrict are identified in the Designation Description Section,
LU-I-11
OBJ~eT~v~ 2:
i~ In order to ensure the coordination of land use with the availability
.!I of public facilities, the following standards for land development
shall be required by the time mandated for the adoption of Lend
". Development Regulations pursuant to Chapter 163.3202, F.S., including
any amendments thereto. No local Development Order shall be issued
unless required public facilities meet the requirements of the
Concurrency Management System contained in the Capital Improvement
Element. A level of service ordinance will be prepared as part of the
land development regulations that will provide guidelines to implement
level of service standards. "Local Development Order" shall be
defined as any approval by the County having the effect of permitting
development.
Polic~ 2.11
Level of Service Standard - Roads: Adequate capacity shall be
available as defined by the standards in the Capital Improvement
Element. As part' of the development of a Level of Service ordinance
and implementing program, a network of "envelopes" shall be developed
around major road seg~ments which represent geographic areas where
development may impact that road. Any regulator7 measures resulting
from an insufficient ~avel of Service for a roadway shall be applied
throughout an entire "envelope". The ~avel of Service standards are
based on peak season hour volume.
PoliCy 2.2X
':, Level of Service Standard - Water Supply: Adequate capacity shall be
available as defined by the standards found in the Capital Improvement
Element.
Polic~ 2.3l
Level of Service Standard - Sewage: Adequate capacity shall be
available as defined by the standards found in the Capital Improvement
Element.
POliCy 2.4l
Level of Service Standard - Water Management: Adequate flood
protection shall be available as defined by the standards in the
Capital Improvement Element.
Policy 2.5z
Level of Service Standards - Parks: Adequate capacity shall be
available as defined by the standards in the Capital Improvement
Element.
Polioy 2.'61
Level of Service Standard - Solid Waste: Adequate capacity shall be
available as defined by the standards in the Capital Improvement
Element.
OBJBCTIV~ 31
order to ensure protection of natural and historic resources,
ensure the availability of suitable land for utility facilities,
ensure consistency of development with level of service standards,
promote compatible land uses within the airport noise zone and
generally provide for management of growth in an efficient and
effective manner, the following regulatory strategy shall be followed:
- Land Development Regulations to implement this Growth
Management Plan shall be adopted and codifted and the
development review process shall be evaluated and improved by
the time mandated for the adoption of L~nd Development
Regulations pursuant to Chapter 163.3202, F.S., including any
amendments thereto. These Regulations shall encourage
creative solutions which address the unique situations of
Collier County.
Poli~ 3.1~
Adopt Land Development Regulations that contain provisions to
implement this Growth Managemen~ Plan and which at a minimum:
a. Regulate the subdivision of land. The existing subdivision
ordinance shall be updated and procedural requirements
streamlined.
b. Protect environmentally sensitive lands and provide for open
space. This shall be accomplished in part-through
integration of State of Florida Big Cypress Area of Critical
State Concern regulations into the Collier County Land
'Development Code.
c. Regulate areas subject to seasonal and periodic flooding and
provide for drainage and stormwater management. This shall
be accomplished through continued adherence to South Florida
Water Management District Surface Water Management
regulations.
d. Protect potable wator wellfields and aquifer recharg~ areas.
This shall be accomplished through the creation and
implementation of a wellfield protection ordinance. The
ordinance shall establish cones of influence based on'
groundwater travel times, restrict land uses and activities
within the cones of influence and establish development
standards for those activities beyond the cones of influence
which may endanger the wellfields and aquifer recharge areas
based on their potential for pollution.
e. Regulate signage. The existing Sign Ordinance shall be
updated. As a minimum, the ordinance shall amend the
frontage requirements for signs, consider allowing shared
signs for smaller properties, define terms within the
ordinance to clarify its intent and establish an amortization
schedule for non-conforming signs.
LU-I-13
f. Znsure safe and convenient on-site traffic flow and vehicle
- parking need~i through strict enforcement of the Zoning
~'~ Ordinance anti development of detailed site planning and
! design standards including access requirements from roadways,
k~ lighting, surfacing materials, locational requirements
relative to the parcel they serve and landscaping and
buffering criteria.
g. Provide that no "Local Development Order" be issued unless
required public facilities meet the requirements of the
Concurrency Management System contained in the Capital
Improvement Element. "Local Development Order" shall be
defined as any approval by the County having the effect of
permitting development to occur. The Land Development
Regulation which implements the Concurrency Management System
shall include provision for review of existing and planned
public facility capacity relative to existing and committed
land use at time of application for rezoning, definition of
and prohibition of issuance of a "local development order"
that would be inconsistent with the Concurrency Management
System and establishment of a time limit on zoning approvals,
requiring that if no development has occurred within a
defined period of time after approval of a zoning, the zoning
wou~dwill be reevaluated bv the Board of County
Commissioners ~BCC) and may be re~Qned Tever~ to a lower
classification.
h. Ensure the availability of suitable land for utility
facilities necessary to support proposed development. For
privately provided facilities this shall be accomplished
through continued compliance with the Zoning Ordinance which
requires the identification and location of all utilities
which will serve the development.
i. Protect historically significant properties. This shall be
accomplished through amendment to the existing Zoning
Ordinance based on recommendations in the Historic and
Archaeological Survey. The amendments shall include
provisions which require identification of and mitigation for
known historic resources on a property as a part of project
review at time of rezoning.
J. Mitigate incompatible land uses, with the area designated as
the Naples Airport Noise Zone receiving first priority Zone.
This shall be accomplished through adoption of regulations
which require sound-proofing for all new residential
structures within the 65 LDN Contour as identified on the
Future Land Use Map. Also,.all property records of the
County shall indicate that the respective properties are
within the Airport Noise Zone. The boundary of the Naples
Airport Noise Zone shall be made consistent with the 65 LDN
contour identified in the Naples Airport Part 150 Study when
approved by the Federal Aviation Authority.
LU-I-14
!il=~ Establish procedures to notify the Naples Airport Authority
of all development proposals within 20,000 feet of the
~" airport which exceed height standards established by the
Federal Aviation Administration.
** k. No development o~:ders shall be issued which are inconsistent
with the Growth l{anagement Plan, except for preliminary
development orders where a Compatibility Exception has been
granted or where a positive Determination of Vested Rights
has been made. A zoning re-evaluation program shall be
adopted as a Land Development Regulation to identify and
evaluate unimproved but zoned property.
In this regard, the County's Land Development Regulations
shall establish a process and criteria:
1. to determine whether the zoning on such a property is~'
consistent with the Growth Management Plan;
2. to determine whether inconsistent zoning on such a
property is nonetheless compatible with surrounding,
existing land uses where consistent zoning would not be
or whether another inconsistent but less intensive
zoning classification would also be compatible and would
further the goals and objectives of the Growth
Management Plan;
3..' to determine whether inconsistent and incompatible
zoning on such a property is nonetheless vested; and
4. to determine to what zoning classification inconsistent,
incompatible, non-vested zoning on such a property
should be rezoned to be consistent with the~growth
Management Plan, and to actually accomplish that
rezoning. Any Compatibility Exception granted must
comply with all other requirements of the Growth
Management Plan.
This zoning re-evaluation program shall be completed. for all
unimproved propez~y in the County by January 10, 1991, for.
all commercial rezoned and non-residential property and by
January 10, 1992, for all other property. The Growth
Management Plan ~hall be amended in the amendment cycle next .'
following the issuance of any Compatibility Exception,
pursuant to Section 163.3187, Florida Statutes, to reflect
any land u~e changes required pursuant to the issuance of any
such Compatibility Exception. Building permits for any such
Compatibility Exceptions shall be contingent upon said Growth
Management Plan ~aendment being adopted. At all times,
property shall be permitted a minimum beneficial use subject
** Amended May, 1990
060 3'50
to the other provisions of the Growth Management Plan. All
Compatibility Exceptions and Determinations of v~ested Rights
shall be subject to appeal to the Board of County
Commissioners.
1. In order to ensure that adequate public facilities are
available concurrent with service demands generated by new
growth and development in accordance with the requirements of
the Local Gover~ment Comprehensive Planning and Land
Development Re~llation Act, Section 163.3161 et. esq.
Florida Statute~t (1987), it shall be the policy of Collier
County to achieve "concurrency" through a Concurrency
Management System adopted ~s part of this Plan in the Capital
Improvement Element. In addition, as the second element of
the County's concurrency program, the County shall, as a part
of the land development regulations to be prepared and
adopted within one year of the submittal date of this Plan,
implement a program to bring planned, permitted and zoned
development capacity into alignment with the capacity of
existing, programmed and planned capital improvements. The
program of aligning development capacity with capital
improvements capacity shall provide for the recognition and
protection of vested property rights and shall provide
individual property owners with a reasonable opportunity to
take advantage of existing investment backed development
expectations.
·
Po1i~ 3 · ~ ~
As part of the process to formulate the Land Development Regulations,
the.development review process shall be evaluated and improved by the
time mandated for the adoption of Land Development Regulations
pursuant to Chapter 163.3202, F.S., including any amendments thereto.
. Improvements shall focus on efficiency and effectiveness through
unification of all review staff in a single organizational unit and
through a streamlining of procedures. Also, an assessment shall be
made of integrating all appropriate Land Development Regulations into
a single Ordinance.
~.~
~,~'~, LU-I-16
..~
. ,oo ]60 3'51
·
OBJECTIVE 4:
In order to improve coordination of land use~ with natural and
historic resources, public facilities, economic development, housing
II and urban design, the Future Land Use Element shall be continually
' refined through detailed planning. Future studies might address
specific geographic or issue areas. All future studies must be
consistent with the Growth Management Plan and further its intent.
Polioy
:. A detailed Sector Plan for Golden Gate Estates shall be developed and
incorporated into this Growth Management Plan by August 1991. The
Sector Plan shall address Natural Resources, Future Land Use, Water
Management, Public Facilities and other considerations.
Poli~ 4.2:
Corridor Management Plans shall be developed by Collier County in
conjunction with the City of Naples and incorporated into this Growth
Management Plan by August, 1991. The Plans shall identify appropriate
urban design objectives and recommend Land Development Regulations and
Capital Improvements to accomplish those objectives. Plans shall be
completed for the following road corridors: Goodlette Road and Golden
Gate Parkway from US 41 to Santa Barbara Boulevard. A major purpose
of the corridor plans shall be elimination or reduction of uses
inconsistent with the community's character.
Policy 4.32
An Industrial Land Use Study shall be developed and incorporated into
the SUDDOrt document of this Growth Management Plan by
~nt SerVices Division ~ by September 19~. The
study shall include a detailed inventory of industrial uses,
projections of demand for industrial land and recommendations for
future land use allocations and locational criteria.
Policy direction created as a Dart of the Industrial Land Use Study
2h~ated in the implementation section of the Growth
~e 1993 amendment cycle. The study shall be
coordinated with the Economic Development Council of Collier County.
# ee** Policy 4.4x
Access Management Plans for each of the Activity Centers designated on
the Future Land Use Map shall be developed and incorporated into ~his
Growth Management Plan by August 1993. The Access Management Plans
are intended to minimize the number of access points to the roadway
network through methods such as frontage roads, bypass roads and
interconnection of projects.
Policy
Maintain and update on an annual basis the following demographic and
land use 'information: Existing permanent population, existing
seasonal population, projected population, existing dwelling units and
projected dwelling units. Included with this data base shall be a
forecast of the geographic distribution of anticipated growth.
e,e~ Amended February, 1991 # Amended May 19, 1992
LU-I-17
OBJECTIVE S l
In order to promote sound planning, eHsure compatibility of land uses
and further the implementation of the Future Land Use ~-lement, the
following general land use policies shall be implemented upon the
adoption of the Growth Management Plan.
eee, IR Policy 5.1s
~{Gw residential zonir~-shall only be~ek~ittcd at a density eqaal
or leas than that~aflned by th~ ........ ~atlng Sy~t~.. ilowe~-~r, any
~hanga to an existing D~-elop~ant Order, whether realdential,
....................... '-' which ~e~ta all ~' the following
s~Xall b~ dee~ed conslatent with the .~tura ~nd Use =foment.
x-ozone will be a oct to .... ~-~ ~ ~
~.I~.
~ The ~-~z which ..... ~je~t of the ........ ~ development
~Manage~ent ~lan; and
~ounty Co~l~Ioner~ finds that the change
............ a ~i~nificant reduction ~- the density
intenalty permitted ~-- that development ....... or results
~~ant b~nefits to the County. ."or purpose~
~sity or intensity e~al t~ ~ greatez
QO%.
App~ovea aevel~p~en~ ~z-aeza ~hich have ~en ~e~-iewea unae~ ~he
~ha~ authorizes c~nat~Gtion ~m. ence aria cGntinue in go~ fait~ ~ay
ala~ ~e fo~G con~laten~ .................... Use :le~en~
cri~eri~: aria: a~e ~e~ ann ~ha reduction in a~n~i~y or intenai~y
"'~ ........ ~'~ devel~ent u~gk ~; c~ ~ vk ~reate~' tha~ 4~'-.
Change ~' approved pl~nned unit
........... ity
~.,~ ~ ..,~ r~preaent at. increase to the approvad .... ~-- ~ Inten~
of us& ahall also be d{~e~ed conalat~nt under t.~la poli~' aubject
................................. I p nt of ~egi I
{mpa~t which~r~ also PUD's.
· **, ~ended Feb~a~, 1991
· R ~ended Au~st 4, 1992, Remedial Plan ~en~ent (Ordinance No.
92-50) .
LU-I-18
,o. 060 353'
Th~ County ahall raTlad thia pQlicy to delete the references to th~
goning ~& ,~Taluatlon ~rogra~, when ~uch reference3 aze no Longer
.,~ ~.~, ~., a on, to d~lat~ the --" ........ ~ -~ longer
All rezonin~s must be consistent with this Growth Management Plan.
Planned Unit Developments {PUD] aDDroved prior to adoption of the Pi~
(January 10. 1989) and found to be consistent throuuh the Zonin~
Reevaluation Program will be Dermi~ to make chanues provided the
amount of commercial land use,.Dermitted number of dwellinu units and
~he intensity of development allowed by ~h~ PUD (includin~ impacts to
roads. water. sewer. draina~e. solid waste and Darks) are no~
increased. Chan~es to resid~Dtial zonin~ districts which constitute a
reduction in density will alsQ be permitted.
POl~6~ 5.2~
All'proposed development shall be reviewed for compliance with the
Comprehensive Plan and those found incompatible shall not be
permitted.
Discourage unacceptable levels of urban sprawl in order to minimize
the cost of community facilities by confining urban intensity develop-
ment to areas designated as Urban on the Future Land Use Map and by
requiring that any changes to the Urban Designated Areas be contiguous
to an existing Urban Area boundary.
Poli~ 5.4x
New developments shall be compatible with and complimentary to the
surrounding land uses.
~ncourage the use of existing land zoned for urban intensity uses
before permitting development of other areas. This shall occur by
planning for the expansion of County owned and operated public
facilities and services to existing zoned land before servicing other
areas.
Poli~f
Permit the use of cjuster housing,. Planned Unit Development techniques
and other innovative approaches to conserve open space and environ-
mentally sensitive areas. Amend the zoning and'subdivision
regulations as necessary to allow innovative land development
techniques.
Polio~
Encourage recognition of identifiable communities within the urbanized
area of western Collier County. Presentation of economic and demo-
graphic data shall be based on Planning Communities and commonly
recognized neighborhoods.
LU-I-19
,oo 060 3'54
!,,,
e Policy
Group Housing which may include the following: Family Care Facility,
Group Care Facility, Care Units, Adult Congregate Living Facility and
Nursing Homes, shall be permitted within the Urban Designated Area
subject to the definitions and regulations as outlined in the Collier
County Land Development Code (Ordinance 91-102, adopted October 30,
1991) and consistent with the locational req~Jirements in Florida
Statutes (Chapter 419.001 F.S.). Family Care Facilities which are
residential facilities occupied by not more than six (6) persons shall
be permitted in residential areas.
,see Policy 5.95
Properties Which do not conform to the Future Land Use Element but are
improved or are found to have vested zoning rights through the Zoning
Re-evaluation Program described in Policy 3.1K shall be deemed
consistent with the Future Land Use Element.
,e ,R Policy 5.105
Exemptions based on vested rights or compatibility determinations that
are granted as provided for in the Zoning Re-evaluation Program
established pursuant to Policy 3.1K and identified in Appendix I shall
be considered consistent with the Future Land Use Element. These
properties shall be considered consistent with the Future Land Use
Element only to the extent of the exemption granted and in accordance
with all other limitations and timelines that are provided for in the
Zoning Re-evaluation Program. Nothing contained in this section
(policy) shall exempt any development from having to comply with any
provision of the Gro~:h Management Plan other than the zoning
re-evaluation program.
~ Policy 5.11z
Compat.ibility exceptions granted as provided for in the Zoning Re-
evaluation Program established pursuant to Policy 3.1K shall be
considered consistent with the Future Land Use Element. These
properties shall be considered consistent with the Future Land Use
Element only to the extent of the compatibility exception granted and
in accordance with all other limitations provided for in the Zoning
Re-evaluation Program. Nothing contained in this policy shall exempt
any development from having to comply with any provision of the Growth
Management Plan other than the Zoning Re-evaluation Program.
Compatibility exceptions which receive a positive determination shail
be identified on the Future Land Use Map series. The mapping of
compatibility exceptions shall be completed by January, 1993 and may
be amended as necessary to include any remaining compatibility
exceptions granted pursuant to the Program.
The County shall review this. policy to delete the references to the
Zoning Re-evaluation Program when such references are no longer needed
and, in addition, to delete the policy when it is no longer needed.
,e Adopted May, 1990 **** Amended February, 1991
# Amended May 19, 1992
eR Amended August 4, 1992, Remedial Plan Amendment (Ordinance No. 92-50
LU-I-20
/ :7,.-.-
OBJECTIVE 6!
In order to provide sa~e, decent and sanitary housing for all Collier
County residents, the number of substandard housing units shall be
reduced by 10% annually after adoption and implementation of the
Housing Code Ordinance.
Policy 6.1x
As part of the process to formulate Land Development Regulations, a
Housing Code Ordinance shall be adopted by the time mandated for the
adoption of Land Development Regulations pursuant to Chapter 163.3202
F.S., including any amendments thereto. The ordinance shall address
the minimum structural standards for housing units.
Poli~
The County shall continue to seek housing related grants through state
and federal programs. Examples of these programs include the
Community Development Block Grant program (CDBG), the Community
Reinvestment Act (CRA), the State Housing Finance Agency and the
Farmers Home Administration.
Policy 6°32
By August 1, 1989, a Code Enforcement Board shall be established.
This Board shall have the authority to impose fines and other non-
criminal penalties as a method to enforce the codes and ordinances of
Collier County when violations occur. One of the codes that will be
enforced by this Board is the Housing Code.
**** Policy 6.42 ".' ....
A detailed Sector Plan for the Immokalee Community shall be developed
and incorporated into this Growth Management Plan by February 1991.
The Sector Plan shall address Natural Resources, Future Land Use,
Public Facilities, Housing, Urban Design, Land Development Regulations
and other considerations. Major purposes of the Sector Plan shall be
coordination of land use and transportation planning, redevelopment or
renewal of blighted areas and elimination of land uses inconsistent
with the community's character.
· !7=:-e**e Amended February{, 1991
..
.,.
LU-I-21
Book 060 3'56
FUTURE LAND USE DESIGNATION DESCRIPTION SECTION
The following section describes the land use designations shown on the
Future Land Use Map. These designations generally indicate the types
of land uses for which zoning may be requested. However, these land
use designations do not guarantee that a zoning request will be
approved. Requests may be denied by the Board of County Commissioners
based on criteria in the Zoning Ordinance or in special studies
completed for the County.
~PRaAN DESIGNATION
Urban Designated Areas on the Future Land Use Map include two general
portions of Collier County: areas with the greatest residential
densities and areas in close proximity which have or are projected to
receive, future urban support facilities and services. It is intended
that Urban Designated Areas accommodate the majority of population
growth and that new intensive land uses be located within them.
The boundaries of the Urban Designated Areas have been established
based on several factor~] including: patterns of existing development,
patterns of approved but unbuilt development, natural resources, water
management, hurricane risk, existing and proposed public facilities as
well as population projections and the land needed to accommodate the
growth.
. # **** The Urban Designation will also accommodate future non-
residential uses including essential services as defined by the most
recent Collier County Zoning Ordinance. Other permitted non-
residential land uses may include: parks, open space and recreational
use; water-dependent and water-related uses (see Conservation and
Coastal Management Element, Objective 11.1 and including the policies
for siting criteria); child care centers; community facilities such as
churches, cemeteries, schools, fire and police stations; utility and
communication facilities; earth mining, oil, extraction and related
processing; agriculture; and travel recreational vehicle parks
provided that the following criteria are met - the site has direct
access to a road classified as an arterial and the use will be
compatible with surrounding land uses. Support medical facilities
such as physicians' offices, medical clinics, treatment, research and
rehabtlttative centers and pharmacies (as long as the dominant use is
medical related) may also be permitted provided they are located
within ~ mi. le of existing or approved hospitals or medical centers
which offer primary and urgent care treatment for all types of
injuries and traumas (such as, but not limited to, Marco Urgent Care
and Golden Gate Urgent Care). Approval of such support medical
facilities may be granted concurrent with the approval of new
hospitals or medical centers which offer primary and urgent care
· **** Amended February, 1991
.~ ~ Amended May 19, 1992
LU-I-22
treatment for all types of injuries and traumas (such as, but not
limited to, Marco Urgent Care and Golden Gate Urgent Care).
Stipulations to ensure that the construction of such support medical
facilities are concurrent with hospitals or such medical centers shall
be determined at the time of zoning approval. In addition, certain
land uses are permitted under criteria as described later.
A. Urban - Mixed Use District
This District is intended to accommodate a variety of residential land
uses including single family, multi-family, duplex, mobile home and
mixed use (Planned Unit Development). Certain industrial and
'commercial uses are also allowed under criteria.
eeee 1. Urban Resident~al Subdistrict
The Purpose of this subdistrict i~ to provide for higher densities in
an area with relatively few natural resource constraints and where
existing and planned public facilities are concentrated.
Maximum eligible residential density in the Coastal Urban Subdistrict
shall be determined through a Density Rating System. Water-dependent
and water-related land uses shall be encouraged within the coastal
region of this subdistric.t.
This may be accomplished by encouraging coordinated mixed-use sites of
water-dependent and water-related uses through the inclusion of other
recreational uses which may benefit from the proximity to and/or
integration with water-dependent and water-related uses. These
principal uses may include water-related parks, marinas (public or
private), yacht clubs, and related accessory and recreational uses,
such as boat storage, launching facilities, fueling facilities,
restaurants, health club~. Any water-dependent and/or water-related
land use shall encourage the use of the Planned Unit Development
technique and/or other innovative approaches to conserve
environmentally sensitive features and to assure compatibility with
surrounding land uses.
Priorities for shoreline land use shall be given to water dependent
principal uses over water-related land uses. In addition to the
criteria of compatibility with surrounding land uses and consistency
· with the siting policy of the Conservation and Coastal Management
Element (Policy 11.1.4), the following land use criteria shall be u~ed
for prioritizing the siting of water-dependent and water-related uses:
a. Presently developed sites~
b. Sites where water-dependent or water-related uses have been
previously established~
c. Sites where ~horeline improvements are in place~
ee~e Amended February, 1991
LU-I-23
d. Sites where damage to viable, naturally functioning~ and
wetlands or other environmentally sensitive features could be
minimized.
2. Urban Resid.ential Fringe Subdistrict
The purpose of this subdistrict is to provide transitional densities
between the Urban Designa. ted Area and the Agricultural/Rural Area.
Residential land uses may be allowed at a maximum density of 1.5 units
per gross acre subject to the following conditions:
a. All rezone{x must be in the form of a Planned Unit
Development~ and
b. Proposed d,~velopment in the area shall be fully
responsibl,~ for all necessar~ water management improve-
ments, including the routing of all on-site and
appropriat,a off-site water through the proJect's water
management system, and a fair share cost of necessary
improvements to the CR 951 canal/out-fall system made
necessary by new development in the area.
· 3. Urban Coastal Fringe
The purpose of this subdistrict is to provide transitional densities
between the Conservation Designated Area and the Urban Designated
Area. It includes that area south of US 41 between the City of Naples
and Collier-Seminole State Park, including Marco Island.
In order to facilitate hurricane evacuation and to protect the
adjacent environmentally sensitive Conservation Designated Area,
residential densities in this area will be limited to a maximum of
four dwelling units per acre. Rezones are recommended to be in the
form of a Planned Unit Development.
DENSITY RATING SYSTEM
Within Urban Designated kreas as identified on the Future Land Use Map
a base density of 4 residential dwelling units per gross acre is
permitted. However, that base level of density may be adjusted
depending on the characteristics of the project.
Consistency with the following characteristics would add to the' base
density:
1. Conversion of Commercial Zoning
If the project includes conversion of commercial zoning which is not
located within an Activity Center or which is not consistent with
adopted siting criteria for commercial land use, a bonus of 16
dwelling units may be added for every I acre of commercial zoning
which is converted. These dwelling units may be distributed over the
entire project. The project must becompatible with surrounding land
uses.
· Adopted January, 1990
LU-I-24
359
2. Proximity to Activity Canter
If the project is in close proximity to an applicable Activity Center,
the following density may be added:
- If the project is within an Activity Center, up to 16
residential units per gross acre may be permitted.
- If the project is within I mile of the Activity Center, 3
residential units may be added.
The density band around an Activity Center shall be measured by the
radial distance from the'center of the intersection around which the
Activity Center is situated. If 50% or more of a project is within
the density.band, the additional density applies to the entire
project. Density bands shall not apply within the Estates
Designation.
~ 3. Affordable Housing
Affordable Housing Density Rating System - FLUE
To encourage the provision of affordable housing within the Urban
Designated Area, a maximum of 8 residential units per gross acre may
be added to the base density if the project meets the definitions and
requirements of the Afford'able Housing Density Bonus Ordinance
(Ordinance ~91-102,.adopted October 30, 1991).
4. Residential In-fill
To encourage residential in-fill, 3 residential dwelling units per
gross acre may be added if the project is 10 acres or less in size
located within an area with central public water and sewer service.
The following conditions must be met: the project must be compatible
with surrounding land uses~ the property in question has no common
site development plan with adjoining property~ there is no common
ownership with any adjacent parcels~ and the parcel in question was
not created to take advantage of the in-fill residential density.
e,ee 5, Roadway Access
If the project has direct access to 2 or more arterial or collector
roads as identified in the Traffic Circulation Element, i residential
dwelling unit per gross acre may be added. Density credits based on
future roadways will be awarded if the developer commits to construct
a portion of the roadway (as determined by the County Transportation
Department) or the road is scheduled for completion during the first
five years of the CIP.
Consistency with the following characteristic would subtract density:
1. If the project is within the area identified as subject to
long range traffic congestion which consists of the western
eeee Amended February, 1991
~ Amended May 19, 1992
LU-I-25
coastal Urban Designated Area seaward of a boundary marked by
Airport Road (including an imaginary extension north to the
· ~' Lee County boundary), Davis Boulevard, County Barn Road and
Rattlesnake Na~unock Road consistent with the Activity
Center's residential density band located at the southwest
quadrant of the intersection of Rattlesnake Nammock Road and
County Road 951 (including an imaginary extension to the
east), i dwelling unit per gross acre would be subtracted~
and
2. If the project fails to interconnect with all existing
projects when physically possible and fails to provide inter-
connection with all future adjacent projects, up to 1
dwelling unit per gross acre may be subtracted as deemed
appropriate by the BCC.
Conditionsx
1. In no case shall maximum permitted density exceed 16
~.' residential dwelling units per gross acre.
2. The maximum permitted density shall not exceed 4 residential
dwelling units per gross acre within the Traffic Congestion
Area which includes the Coastal Management Area, unless it is
increased through conversion of commercial zoning, provision
of affordable housing, use of the provision for residential
in-fill, or for density awarded within the boundaries of an
Activity Center. Properties adjacent to the Traffic
Congestion Area shall be considered part of the Traffic
Congestion Area if their principal access is to a road
forming the boundary of the Area.
sees3. The maximum permitted density shall not exceed 4 residential
eR dwelling units per gross acre within a portion of the Coastal
Management Area which is bounded by the City of Naples to the
west, US 41 to the north and the Area of Critical State
Concern to the east, excepting Marco Island, which shall be
allowed up to 6 dwelling units per gross acre for projects
that qualify for a commercial zoning conversion bonus as set
forth in the Density Rating System. Any project qualifying
for such a bonus shall prepare and implement a hurricane
evacuation pl~tn for the project, which shall be subject to
review by the Collier County Emergency Management Director.
A second exception to this density standard shall be made to
allow a maximum of 12 dwelling units per gross acre (maximum
S dwelling units per gross acre on Marco Island) for afford-
able housing not to exceed a maximum of 600 affordable
housing units in the Urban Coastal Fringe Area provided
~.' ee~e Amended February, 1991
=r. eR Amended August 4 1992, Remedial Plan Amendment (Ordinance No. 92-50
'Ui' '
!i~c '= ] LU-I-26
appropriate mitigation is provided consistent with Policy
13.1.2 of the Conservation and Coastal Manag.ment Element.
The 600 affordable housing units to be allowed in the Urban
Coastal Fringe Area and eligibility therefore will be
determined by using the U.S. Department of Housing and Urban
Development income definitions, bedrooms per unit and
additional guidelines outlined in the Affordable Housing
Density Bonus (AHDB) Ordinance 90-89 adopted on November 27,
1990 and shall be distributed throughout the Urban Coastal
Fringe Area based on hurricane evacuation routes as defined
by the Housing and Urban Improvement Director. All units
(including market rate) awarded by the AHDB Ordinance above
the permitted base density of 4 dwelling units per gross
acre, plus any other density bonus available minus any
density reduction for traffic congestion or coastal
management area shall be counted toward the 600 dwelling unit
cap.
4. Travel Trailer Recreational Vehicle Parks shall be allowed to
develop at ~ density consistent with the Zoning Ordinance.
3. Industrial ~nder Criteria
The Industrial Iand Use Designation provides for the full array of
industrial land uses as described in the Zoning Ordinance for
Industrial and Light Industrial Zoning Districts. The Plan also
allows for limited expansion adjacent to those Industrial Designations
provided certain conditions are met regarding access, traffic
circulation and infrastructure provision. In addition, certain
Industrial land uses may be permitted within Urban Designated Areas
under criteria.
The following criteria must be met:
The proposed project must be in the form of an Industrial Planned
Unit Development. Intensities of use shall be limited to:
technological research, design, and product development; light
manufacturing, processing and packaging in fully enclosed
building; corporate headquarters; medical laboratories, clinics,
treatment facilities and research and rehabilitative centers;
printing; lithographing and publishing; and laboratories.
The boundaries of the proposed project must be transitional,
therefore, the uses along the perimeters must be compatible with
non-industrial uses. The project must have direct access to an
arterial and an internal circulation network which prohibits
industrial traffic from traveling through predominantly
residential areas. The project must have central water and sewer
and shall not generate noise or odor so as to be incompatible with
surrounding land uses.
'" 06O 362
'~' BOOKPAr,[
'~,.:'. ! ",?
.As a part of the Count~'s Land Development Regulations, an Industrial
Planned Unit Development Zoning District shall be established and
include standards for the following:
Standards for en overall Master Development Plan for the entire
parcel of land and require Site Development Plan approval for each
lot or building areaW
List of permitted uses~
Minimum tract size and lot area~
Buffering, landscaping and open space requirements~
Regulations regarding signage, lighting, outdoor storage, parking
and loading~ and
Setback requirements and maximum building height.
eeee eR 4. Commorolal Under Criteria
Within the Urban-Mixed Use District certain in-fill commercial
development may be permitted. This shall only apply in areas already
substantially zoned or developed for such uses. The following
standards which limit the intensity of uses must be met:
a. The subject parcel must be bounded on both sides by improved
commercial property or commercial zoning consistent with the
Future Land Use Element or commercial property granted an
exemption or compatibility exception as provided for in the
Zoning Re-evaluation Program and should not exceed 200 feet
in width, although the width may be greater at the discretion
of the Board of County Commissioners. Uses that meet the
intent of the e-~ Cl/T C~mme~ial Professional/Transitional
d~istrict are only required to be bounded on one side by
improved commercial property or consistent commercial zoning
or commercial property granted an exemption or compatibility
exception as provided in the Zoning Re-evaluation Program.
b. The proposed use must not generate in excess of five'percent
o~ level of service C design capacity on abutting streets
that provide access to the proJect~ and
c.The proposed use must not exceed a floor area of 25,000
square feet.
eeee A~ended February, 1991
i~¢I Amended May 19, 1992
Amended August 4, 1992, Remedial Plan A~.endment (Ordinance No. 92-50
....]
LU-I-28
.
Cl/T zoning used pursuant to this subsection shall only be
applied one ~ime to serve as a transitional use and will not
be permitted to expand adjacent to other Cl/T zoning. The
only exception is the expansion of Cl/T zoning that was
approved pursuant to the Zoning Re-evaluation Program. The
County shall regularly amend the Future Land Use Map series
to incorporate and be consistent with changes in the Cl/T
zoning within the Urban-Mixed Use District.
* B. Urban - Commerolal.Distriot
Through the use of mixed use Activity Centers and neighborhood
centers within large PUDs, this District is intended to accommodate
virtually all new commercial zoning within Urban Designated. Areas.
, 1. Activity Center Subdistrict
Mixed use Activity Centers have been designated on the Future Land Use
Map. The locations are based on inter-sections of major roads and on
spacing criteria. The mixed use Activity Center concept is designed
to concentrate almost all new commercial zoning in locations where
traffic impacts can readily be accommodated, to avoid strip and
disorganized patterns of commercial development and to create focal
points within the co~nunity.
With the exception of the three Interchange Activity Centers, the
Activity Centers are all of the same configuration and size - square,
% mile on a side, measured from the center point of the intersection,
totaling 160 acres. Activity Centers at the 1-75 interchanges have
been specifically defined on the following maps.
see Existing Mixed Use Activity Centers may be re-designated as
Master Planned Mixed Use Activity Centers. Master Planned Activity
Centers are those which have a unified plan of development in the form
of a Planned Unit Development, Development of Regional Impact or an
area-wide Development of Regional Impact which must encompass at least
one or more full quadrants of a designated Activity the public
n~twozk, ~:aatez Plunned Activity Center3 are Center. In recognition
of the benefit resulting from the coordination of planned land uses
and coordinated access points to ~he D~blic..,road network. Master
Planned Activity Centers are encouraged through the allowance of
flexibility in the boundaries, mix, and location of uses permitted ·
within a designated Hixed Use Activity Center and may be permitted to
modify the square configuration. Consistent with other Activity
Centers, Master Planning Activity Centers are intended to be mixed use
in character. Permitted land uses include commercial, residential,
and institutional. The full array of commercial land uses may be
allowed. The actual mix of land uses shall be determined using the
criteria for other~LtXe~ Us~ ~ctivtty ~centers outlined below.
Interchange Activity Centers are not eligible for the Master Planned
Mixed Use Activity Center Designation.. All of the following criteria
must be met for a project to qualify as a Master Planned Mixed Use
Activity Center:
~ · Amended January, 1990 eeee Amended June, 1990
171
:t,. :L.', , ' .. ,. ,
see 1. The applicant ~hall have unified control of at least one or
more full quadrants of a designated Activity Center. Any
publicly owned land within the quadrant will be excluded from
acreage calculations to determine unified control~
see 2. The permitted land uses and total acreage allocation for a
Master Planned Activity Center shall be the same as for
designated Activity Centers (i.e. a maximum of 160 acres)=
however, a Master Planned Activity Center encompassing more
than one quadrant shall be afforded the flexibility to re-
distribute a part or all of the 40 acre allocation from one
quadrant to another, up to a maximum of 160 acres for the
entire Activity Center~ and
see 3. The location and configuration of all land uses within a
Master Planned Activity Center shall be compatible with and
relate to Sxisting site features, surrounding development,
and existing natural and manmade constraints. Commercial
uses shall be generally directed to the intersection of the
designated Mixed Use Activity Center so long ~s they do not
adversely impact the intersection and are oriented so as to
provide coordinated and functional transportation access to
major roadways serving the Activity Center. Commercial land
uses shall not be designed in a traditional strip commercial
pattern along public roadways or as isolated tracts.
Isolated tracts shall be defined as tracts which are not
functionally related or integrated with surrounding land uses
and the planned transportation network.
Activity Centers are intended to be mixed-use in character. The
actual mix of the various land uses (i.e. commercial, residential,
institutional) shall be determined during the rezoning process
based on consideration of the following factors:
- The amount, typ~a and location of existing zoned and developed
commercial uses within or in close proximity of the Activity
Center~
-Existing pattem~s of land use within or in close proXimity.of
the Activity Center~
- Market demand and service area for the proposed commercial
land uses to be Used as a guide to explore the feasibility of'
the requested l~mnd uses~
- Adequacy of infrastructure capacity, particularly roads~
- Compatibility of the proposed development with and adequacy
of buffering for adjoining properties~
see Amended June, 1990
060 365
---- m
- Hatural or man-m~mde constraints;
- Criteria identified in the Zoning Ordinance; and
- Other relevant factors.
~ As a part of all Petitions for Rezone within Activity Centers the
applicant shall include an evaluation of the factors cited above. In
addition, the applicant shall generally identify development trends
within the Activity Center and demonstrate compatibility with existing
and proposed development through urban design criteria such as
buffering and architectural controls and how the proposed project
would limit adverse impacts on the highway network by controlling road
access points and coordinating on and off-site movement of traffic
with surrounding properties. If any project is 75% within an Activity
Center, the entire project shall be considered to be within the
Activity Center. In addition to the 'above referenced 75% rule, if a
parcel of land is partially within an Activity Center, is part of a
final subdivision plat which has received approval by the Board of
County Commissioners prior to May 19, 1992 and is five (5) acres or
less in size, the entire parcel shall be considered to be within the
Activity Center. The 75% provision does not apply to the Interchange
Activity Centers since the boundaries of these Activity Centers are
specifically delineated with respect to zoning and property ownership.
The standard for intensity of uses within each Activity Center is
that the full array of commercial uses may be allowed. It is
preferred that all new commercial zoning within Activity Centers shall
be in the form of a Planned Unit Development.
Industrial land uses shall be allowed within the Interchange
Activity Centers identified below:
:': a. the southwest and southeast quadrants of Immokalee Road
~' and
'/f Interstate 75 Interchange Activity Center
.~." b. all quadrants of CR-951 and Interstate 75 Interchange
~,.
.,~ Activity Center.
Based on the unique location and function of Interchange Activity
Centers, some Industrial land uses that serve regional markets
and derive specific benefit when located in the Interchange
Activity Centers shall be allowed, provided each such use is
reviewed and found to be compatible with existing and approved
land uses. Industrial uses shall be limited to: manufacturing,
warehousing, storage and distribution.
The following conditions shall be required to ensure
compatibility of Industrial land uses with other commercial,
· # Amended May 19, 1992
Amended February 16, 1993
"" LU-I-31
060 366
residential and/or institutional land. uses in the Interchange
Activity Centers~ to maintain the appearance of these Interchange
Activity Centers as gate~ays to the community~ and to mitigate
any adverse impacts caused by noise, glare ol~ fumes to the
adjacent property owners.
,,I - Landscaping, buffering and/or berming shall be installed
..I along the Interx~tate~ and
" - Fencing shall b~a wooden or masonry~ and
~:. - Each project shall adhere to the Collier County Sign
~.'. Code~ and
~-~ - Wholesale and storage uses shall not be permitted
~=,~ immediately adjacent to the right-of-way of the
Interstate~ and
- No outside stor~zge or display shall be permitted~. and
~ - If hazardous products or hazardous wastes (as defined in
the Ground Water Protection Ordinance No. 91-103 as
adopted on November 6, 1991) are generated, used or
stored on the site, a containment plan for hazardous
material handling and emergency response shall be
required to be provided to the County Manager~ and
- Annual monitoring reports shall be submitted as part of
the monitoring requirements for Planned Unit
Developments on types, quantities and disposition of
hazardous materials~ and
- Disposal or release of hazardous wastes to soil or water
shall be prohibited~ and
~!~- - Central water and sewage systems shall be required
LI' within the identified Interchange Activity Centers~ and
·
.T No septic tank systems shall be permitted~ and
Ii
!!. - No direct access to the Interstate right-of-way shall be
permitted~ and
~I.! - Until (1) an Access Control Policy is adopted by Collier
County pursuant to Policy 7.1 of the Traffic Circulation
Element or (2) an Access Management Plan is adopted by
Collier County pursuant to Policy 4.4 of the Future Land
Use Element is developed and incorporated into the
Growth Management Plan by August 1993 or (3) the State
of Florida Access Management Plan (where applicable) is
LU-I-32
/7
in place and which are at least as restrictive as the
guidelines below, all new rezoning npprovals shall be
required to adhere to spacing of full access points with
median openings of 1320 feet as measured from the end of
the taper of the ramp furthest from the Interchange~ and
Joint access and frontage roads shall be established
when frontage cannot meet the access spacing~ and
Access points and median openings shall be designed to
provide adequate turning radii to accommodate truck
traffic and to minimize the need for U-turn movements~
and
The developer l~hall be responsible to provide all
necessary traffic improvements (i.e., traffic signals,
turn lanes, deceleration lanes, etc.)~ and
A maximum floor area ration (FAR) for the designated
Industrial land uses component of the projects shall be
established at .45~ and
The land use m~x at the two (2) designated interchanges
may include residential, commercial or industrial land
uses provided each land use is compatible. The land use
mix and intensity of uses are as follows:
a. the southwest and southeast quadrants of Immokjlee
Road and Interstate 75 Interchange Activity Center
shall contain the following mix of land uses:
commercial - 75% and industrial - 25%
· b. all quadrants of CR-951 ~nd Interstate 75
Interchange Activity Center shall contain the
following mix of land uses: residential - 5%,
commercial - 52% and industrial - 43%
This land use mix may vary due to market demand and
demonstrated need for a particular type of land use~
changed conditions or shifts in land use patterns~ and
negative impacts on public infrastructure. The maximum
degree of change permitted in the type of land use would
allow no more than 25% variation from the land use mix
and intensity identified for.each Interchange Activity
Center.
The Planned Unit Development and/or rezon~ng ordinance document shall
contain specific language regarding the permitted Industrial land uses,
c0mpatib~lity requirements, and development standards consistency with
the above guidelines, site specific development details will be
reviewed during the Site Development Plan review process.
There shall be no minimum acreage limitation for such Planned Unit
Developments except all requests forrezoninu must be at least for~y
th'ousand {40.000) s~uare feet in area unless the proposed fezone is ~n
extension of an existing zoninq district consistent with the Future
Land Use Element or the property is considered to be a legal
non-conforming lot prior to the original adoption of the Growth
Management Plan. All new residential zoning shall be consistent with
the Density Rating System. Hotels and motels that locate within an
Activity Center will be allowed to develop at a density consistent with
the Zoning Ordinance.
Existing commercially zoned and developed areas which are not within an
Activity Center or do not meet other commercial siting criteria will be
allowed to expand only to the extent permitted under the zoning
classification for that property. Expansion involving aggregation of
additional property occurring after adoption of this Plan shall be
subject to the policies of this Plan.
From time to time new Activity Centers may be proposed. The minimum
level of intersection ~hich may be eligible for other new Activity
Centers is one with an arterial-collector junction. Also, no two
centers may be closer than two miles from each other base on center
points. New Activity Centers would require market Justification and
must meet size, spacing and use limitations expressed earlier.
The intersection of Airport-Pulling Road and Vanderbilt Beach Road is
designated as a Future Activity Center. Upon completion of Vanderbilt
Beach Road from CR 951 to.US 41 this intersection shall automatically
become artActivity Center and at that time become eligible for
commercial zoning requests.
Access from the roadway network into the Activity Centers shall be
carefully managed. Policy 4.4 of this Element makes a commitment to
develop access management plans for each Activity Center by August 1930
1993. During the interim to the extent possible access points shall
be kept to a minimum and individual projects shall be encouraged to
combine points of access. Coordination of access with existing and
future projects shall be required as appropriate at time of zoning and
site plan approval.
It is recognized that new development within the Traffic Congestion
Area as identified on the Future Land Use Map will be difficult to
INTERSTATE ACTIVITY C NTER - FUTURE'LAND
~O~ ROAD {C~ ~6} - ~T~.~ 7S
'~,~accommodate on the existing and planned road network. Therefore,
proposals for commercial development within the area shall be subject
to thorough transportation review and appropriate requirements shall be
imposed to coordinate and minimize access points onto the road network
and to ensure mitigation of all impacts on road capacity.
2- PUD Neighborhood Commercial Subdistrict
For PUD's of 300 acres or more or with 1,000 dwelling units or more, a
neighborhood commercial center may be allowed subject to the following
standards:
a. Commercial zoning shall be no closer than two miles to the
nearest Activity Center and no closer than two'miles from the
nearest PUD commercial zoning of ten acres or greater in
size.
b. The configuration of the commercial parcel shall allow no
more frontage than depthl
c. The commercial parcel shall be no greater than 15 acres in
size; and
d. No construction in the commercial designated area shall be
allowed until 50% of the building permits for the development
are issued unles~ otherwise authorized by the Board of County
Commissioners.
****C. Urban - Industrir~l Distriot
The Industrial Land Use District is intended for industrial type uses
and shall be reserved for that. Intensities of use shall be those
related to light manufacturing, processing, storage and warehousing,
wholessling, distribution and other basic industrial uses as described
in the Zoning Ordinance for Industrial and Light Industrial Zoning
Districts. The boundarie~ of Industrial Districts are transitional;
therefore, the uses along their perimeters must be compatible with
non-industrial uses. All industrial areas should have direct access
to an arterial or collector. In addition access may be provided via a
local road that does not ~ervice a predominately residential area.
It is possible that due to changing conditions within the County,
there may be a need for additional industrial land. These conditions
may include build-out or lack of future services and facilities for
current sites. New industrial land use may be approved outside of the
Industrial District, however, the following criteria must be met: the
rezone shall be in the fo~ of a Planned Unit Development; the
proposed site must not be "spot industrial" and therefore must be
adjacent to existing land designated or zoned industrial; the proposed
land use must be compatib].e with adjacent land uses; and, necessary
infrastructure including an internal road network and central water
and sewer must be provided or in place. In addition, non-contiguous
industrial use may be penaitted in the Urban Designated Area under
the criteria cited earlielr.
ee,e Amended February, 1991
LU-I-3S
060 3'73 / j
# AGRICULTURAL/RURAL DESIGNATION
The Agricultural/Rural I~nd Use De~ignation .is for those areas that
are remote from the existing development pattern, lack public
facilities and services, are environmentally sensitive or are in
agricultural production. Urbanization is not promoted, therefore
allowable land uses are of low intensity. A limited selection of land
uses other than low density residential and agricultural will be
permitted. Such uses include: essential services as defined in the
most recent Collier County Zoning Ordinance~ parks, open space and
recreational use~ community facilities such as churches, cemeteries,
schools, fire and police stations~ utility and communication
facllities~ earth mining, oil extraction and related processing~
asphalt plant as a Conditional Use as defined in the Collier County
Land Development Code (Ordinance 91-102 adopted October 30, 1991),
provided that the asphalt plant is compatible with surrounding land
uses, is not located in a County, State or Federal Jurisdiction wet-
land areas and any required buffer zones, is not located within the
Greenline Area of Concern for the Florida State Park System as
established by the Department of Natural Resources (DNR) or within the
Area of Critical State Concern as depicted on the Future Land Use Map,
and is not located within 1,000 feet of a natural reservation~ migrant
.labor housing as provided in the most recent Zoning Ordinance; travel
trailer recreational vehicle parks providing that the following
criteria are met - the site has direct access to a road classified as
an arterial and the use will be compatible with surrounding land use.
A. Agricultural/Rural - Mixed Use District
1. Agricultural/Residential Subdistrict
The purpose of this subdistrict is to protect and encourage
agricultural activities while providing for low density residential
use in outlying areas. Residential land uses may be allowed at a
maximum density of i unit per 5 gross acres.
2. commercial Under Criteria
Within the Agricultural/Rural-Mixed Use District Commercial
development may be allowed providing the following standards for
intensity of use are met:
a. The project ~s 2.5 acres or less in size~
b. The project is no closer than 5 miles from the nearest
developed commercial area, zoned commercial area or
designated Activity Center (measured'by radial distance)~
c. The proposed uses are considered lowest order goods and
services~
d. The project is located. on an arterial or collector
roadway~ and
e. The project is buffered from adjacent properties.
# Amended May 19, 1992
LU-I-39
eeeeB. Rural - Industrial District
'-"r The Industrial Land Use District is intended for industrial type uses
and shall be reserved for that. Intensities of use shall be those
related to light manufacturing, processing, storage and warehousing,
wholesaling, distribution and other basic industrial uses as described
in the Zoning Ordinance for Industrial and Light Industrial Zoning
Districts. The boundaries of Industrial Districts are transitional~
therefore, the uses along their perimeters must be compatible with
non-industrial uses. All industrial areas should have direct access
to an arterial, collector or local road that does not service a
predominantly residential area.
It is possible that due to changing conditions within the County,
there may be a need for additional industrial land. These conditions
may include build-out or lack of future services and facilities for
current sites. New industrial land use~ may be approved outside of
the'Industrial District, however, the following criteria must be met:
the fezone shall be in the form of a Planned Unit Development~ the
project shall have direct ac.cess to an arterial~ collector, or lucal
road that does not service a predominantly residential area~ the
proposed site must not be "spot industrial" and therefore must be
adjacent to existing land designated or zoned industrial~ the proposed
land use must be compatible with adjacent land uses~ and, necessary
infra-
structure including an internal road network and central water and
sewer must be provided or in place. No new industrial land uses shall
be permitted in the Area of Critical State Concern. For the purposes
of interpreting this policy, oil and gas exploration, drilling, and
production ("oil extraction and related processing") shall not be
deemed to be industrial land uses and shall continue to be regulated
by all applicable federal, state, and local laws.
C. Rural - Settlement Area District
1. Settlement Area District
Consists of Sections 13, 14, 23, and 24, Township 48 South, Range 27
East (the former North Golden Gate Subdivision), which was zoned and
platted between 1967 and 1970. In settlement of a lawsuit pertaining
to the permitted uses of this property, this property has beefi
"vested" for the uses specified in that certain "PUD by Settlement".
zoning granted by the County as referenced in that certain SETTLEMENT
AND ZONING AGREEMENT dated the 27th day of January, 1986.
By designation in the Growth Management Plan as Settlement Area, the
Plan recognized the property as an area which is outside of the Urban
Designation and which is currently far removed from supportive
services and facilities. Expansion of the Settlement Area in terms of
additional lands or dwelling units, shall be discouraged. It's
existence will have no precedential value or effect so far as
Justifying similar uses on surrounding or adjacent property. The
eeee Amended February, 1991
LU-I-40
Area Land Use District is limited to the area described above and
shall not be available as a land use district for any other property
in the County.
~,-. The uses permitted include=
:' a. Agricultural uses and related facilities;
.:.. b. Residential ulles, not to exceed'two living levels in height,
!~- and a maximum n-m~er of 2,100 dwelling unitsw
c. Neighborhood commercial uses and hotel, motel and transient
lodging facilities, not to exceed 22 acres in size;
d. Golf courses, parks, playgrounds, and other similar
recreation and open space uses;
e. Community facilities, such as a fairgrounds site,
agricultural extension station, fire and police stations;
f. Educational facilities, religious facilities, governmental
activities and child care center;
' g. Earth mining; and
.i~..~ h. Essential services as defined by the most recent Collier
.~!:i~. County Zoning Ordinance.
All in accordance with the ZONING AND DEVELOPMENT DOCUMENT for the
property as approved by the County.
ZSTATES DESIGNATION
The Estates Land Use ~signation are lands which are already sub-
divided into semi-rural residential (2.25 acres as an average)
essentially consisting of the Golden Gate Estates Subdivision. The
area is identified as having potential for population growth far
removed from supportive services and facilities. Expansion of the
area will be discouraged.
J Pursuant to Policy 4.1 of the Future Land Use Element, the Golden
Gate Area Master Plan encompassing the Estates Designation was adopted
by the Collier County Board of County Commissioners on February 5,
1991. Refer to the Golden Gate Area Master Plan for siting criteria
and development standards for specific land uses.
CONSERVATION DESIGNATION
The overall purpose of the Conservation Designation is to conserve and
maintain the natural resources of Collier County and their associated
environmental and recreational benefits. All native habitats possess
ecological and physical characteristics that Justify attempts to
maintain these important natural resources.
Amended May 19, 1992
7.. LU-I-41
! .
"' 060 :376 /
Barrier Islands, coastal bays and wetlands deserve particular
I/,attention because of their ecological value and their sensitivity to
perturbation. It is because of this that all proposals for develop-
ment in the Conserverich Designation must be subject to rigorous
review to ensure that the impacts of the development do not destroy or
unacceptably degrade the inherent functional values.
The Conservation Lend Use Designation is intended to protect certain
vital natural resource areas of the County owned by the public.
Standards for development of these areas are found in the Conservat-
ion and Coastal Management Element and the County's Land Development
Regulations. The Conservation Designation will accommodate future
non-residential uses including essential services as defined in the
most recent Collier County Zoning Ordinance; parks, open space and
recreational use; community facilities such as churches, cemeteries,
schools, fire and police stations; utility and communication
facilities; earth mining; agriculture; and oil extraction and related
processing. The boundaries of the Conservation District may
periodically change as properties are acquired.
A. Public Lands - Mixed Use District
This District includes such areas as Everglades National Park, Big
Cypress National Preserve, Fakehatches Strand State Preserve,
Collier-Seminole State Park, Rookery Bay National Estuarine
Sanctuary Research Reserve, Delnor-Wiggins State Park and Audubon
Corkscrew Swamp Sanctuary (privately owned). Single family
residential development may be allowed within these areas at a
maximum density of 1 unit per 5 gross acres. However, within the
Big Cypress National Preserve private in-holdings may be developed
for residential use with a maximum density of 1 unit per 3 gross
acres. Also, ........ th~ National Prea~r~a land zoned
Area of Critical State Concern Overlay
The Big Cypress Area of Critical State Concern was established by
the 1974 Florida Legislature. The Critical Area is displayed on
the Future Land Use Map as an overlay area. All Development Orders
within the area shall comply with Chapter 27F-3, Florida
Administrative Code, "Boundary and Regulations for the Big Cypress ·
Area of Critical State Concern" or the followin~ re~ulations.
whichever are more restri~ive.
The regulations include:
A. Site Alteration
1. Site alteration shall be limited to 10% of the total site
size, and installation of non-permeable surfaces shall not
exceed 50% of any such area. However, a minimum of 2,500
square feet may be altered on any permitted site.
LU-I-42
060 /
2. ~'xcep~ f~ roads~ a=ny non-permeable surface greater than
20,000 square feet shall provide for release of surface run
off, collected or uncoilacted, in a manner approximating the
naturel surf.c. water flow regim. of th. area.
:!~I 3. Soils exposed during site alteration shall be stabilized and
retention ponds or performance equivalent structures or
systems maintained in order to retain run off and siltation
on ths const~mction site. Restoration of vegetation to site
alteration areas shall be substantially completed within 180
days following completion of a development. Re-vegetation
shall be accomplished with pre-existing species or other
suitable species except that undesirable exotic species
~L~ shall not be replanted or propagated.
species are listed below.
Australian Pine - lCasuarina ~DD.~ ~
Bishopwood - IBlschofia Javanical
Brazilian Pepper (holly) - lShinus terebinthfoliusl'
Castor Dean -- r, icinus ~,o~unis
~,, Znakep~ant Sansev~ara tr~asc~ata
Day Jasmine
Melaleuca (caJeput) - IMelaleuca leucadendra SDD.~
Downy Rosemyrtle - [Rhodomvtus toment~S~)
Earleaf Acacia - [Acacia auriculiformis)
Catclaw Mimosa - [Mimosa piers)
Java Plum - ~syZygiu~ cumi~i~
Qu~ansland U~ralla Tr~ Sc,hafZl~ra aotinophylla
'"-'-~-- Wadelie - Wedella
4. No mangrove trees or salt.marsh grasses shall be destroyed or
otherwise altered. Plants specifically protected by this
regulation include: All wetland Dlants listed by the Florida
DePartment of Environmental Regulation in Chapter.17-301.
Florida Administrative_Code, as amended.
................ La9
Needler~sh - Juncua roemerianu~
Zal~ordgra-=;sea - S. patens S.cynosuroldaa, S.
~aashora ~altgrass - Dlstlchlls spitate
5. Fill areas and related dredge or borrow ponds shall be
aligned substantially in the direction of local surface water
flows and shall be separated from other fill areas and ponds
by unaltered areas of vegetation of comparable size. Dredge
or borrow ponds shall provide for the release of storm water
as sheet flow from their downstream end into unaltered areas
LU-I-43
I
- of vegetation. Access roads to and between fill areas shall
..,.., provide for the passage of water in a manner approximating
the natural flow regime and designed to accommodate the 50
year storm. Fill areas and related ponds shall not
substantially retain or divert the total flow in or to a
slough or strand or significantly impeded tidal action in any
portion of the estuarine zone.
6. Man-made lakes, ponds, or other containment works shall be
constructed with a maximum slope of 30 degrees to a depth of
six feet of water. Whenever mineral extraction is completed
in new quarrying lakes, shoreline sloping,.P/~l~alg_~
littoral shelves with nursery drown a~uatic ve~etation.
restoration or revegetation of the Property and disposal of
spoils or railings shall be completed before abandonment of
the site. Existing quarrying lakes are exempt from this
provision, except that whenever any person carries out any
activity defined in Section 380.04, Florida Statutes, ~
amended as development or applies for a development permit as
defined in Section 380.031, Florida Statutes, ~ to
develop any existing quarrying lake area, these regulations
shall apply.
7. Finger canals shall not be constructed in the Critical Area.
...... zule ahall .... apply to aite altezati~na undertaken
.................. t~e ag~Icul~u~al u~e -' land ~r f~r
............. ~ land te &g~icul~u~al usa. For land zone~
aortculture that is enoaoed ~n or ~ DrODOSinO bona fid.
aoriculture useesq. site alteration Dercentaoe limits may
adjusted for s~te alteration activities des~ned
r~and/or environmental DUrDOSeS aS set forth in
Environmental Impact Statement aDDroved by the Board o[
County Commi~sioners. Such site alteration activities may
include~ [i) prescribed fires and associated firebre~S
aDDroved by th Florida Department Of Forestry; (ii) ~emoval
and control of listed eXOt~ plan smecies; [ili) native
habitat reS~oration. tVDiCal Of the immed~ate vicinity;
enhancement of foraoinq habitat for wildlife sDecie~.w~th
native. natu~rallv, and locally occurrino plant specieS;
restoration of historical hvdrOpe[~o~s[ and [vi) other
~est~ned for conservat~on and environmental
purposes ~ev~ewed on a case bY cas~ bas~s.
B. Drainage
1. Existing drainage facilities shall not be modified so as to
: discharge water to any coastal waters, either directly or
through existing drainage facilities. Existing drainage
facilities shall not be expanded in capacity or length except
in conformance with paragraph (2) below~ however,
modification.,~ may be made to existing facilities that will
raise the ground water table or limit salt water intrusion.
LU-I-44
~.
2. New drainage facilities shall release water in a manner
approximating the natural local surface flow regime, through
['.e: a spreader pond or performance equivalent structure or
system, either on site or to a natural retention, or natural
. filtration and flow area. New drainage facilities shall also
maintain a ground water level sufficient to protect wetland
vegetation through the use of weirs orperformance equivalent
structures or systems. Said facilities shall not retain,
divert, or otherwise block or channel the naturally occurring
flows in a strand, slough or estuarine area.
3. New drainage facilities shall not discharge water into~o any
coastal waters either directly or through existing drainage
facilities.
.......... facilitle~ modified
; 4. Thla r~l~ ~hall not apply .... Q ....
C. Transportation
1. Transportation facilities which would retain, divert or
otherwise block surface water flows shall provide for the
re-establishment of sheet flow through the use of interceptor
spreader systems or performance equivalent structures and
shall provide for passage of stream, strand, or slough water
through the use of bridges, culverts, piling construction or
performance equivalent structures or systems.
2. Transportation facilities, shall be constructed substantially
parallel to the loca! surface flow, and shall maintain a
historic ground water level sufficient to protect wetland
vegetation.through the use of weirs or performance equivalent
structures or systems and as feasible, the flows in such
works shall be released to natural retention filtration-and
flow areas.
3. Transportation facility construction sites shall provide for
siltation and run-off control through the use of settling .
ponds, soil fixing or performance equivalent structures or
~,'. systems.
D. Structure Installation
'~' 1. Placement of structures shall be accomplished in a manner
"( that will not adversely affect surface water flow or tidal
,., action.
2. Minimum lowest floor elevation permitted for structures shall
be at or above the 100 year flood level, as established by
the Administrator of the Federal Flood Insurance
Administration. The construction of any structure shall meet
LU-I-45
060 380
'
additional Federal Flood Insurance.Land Management and Use
Criteria (24 CFR 1910), as administered by the appropriate
local agency.
3. Thla rule ahall not ~pply to at~cturea uaed or intended
u~ in connection ..... the agricultural use -' the lah~T
All Development Orders issued for projects within the Big Cypress Area
of Critical State Concern shall be rendered to the State of Florida
Department of Community Affairs for review with the potential for
appeal to the Administration Commission per Chapter 9J-1, Florida
Administrative Code,"Dev.mlopment Order Requirements for Areas of
Critical State Concern".
Port of the Islands is a unique development which is located within
the Urban Designated Area, but is also totally within the Big Cypress
Area of Critical State Concern. However, a portion of the development
was determined "vested" by the State of Florida, thus exempting it
from the requirements of Chapter 380, Florida Statutes. Further,
there is an existing Development Agreement between Port of the
Islands, Inc. and the State of Florida Department of Community Affairs
dated July 2, 1985, which regulates land uses at Port of the Islands.
Given the unique and isolated location, and the existing Development
Agreement, development within Port of the Islands shall be regulated
by the Development Agreement and the overall residential density and
commercial shall not exce.ed that permitted under zoning at time of
adoption of this Plan.
· Area Of Environmental Conoern Overlay
Areas of environmental concern are identified on the Future Land Use
Map. Primarily, these represent coastal beaches, marshes, hardwood
swamps and cypress forests; wet prairies and low pinelands; and,
brackish marshes. These are included as general representations for
informational purposes. This overlay does not constitute new
development standards. Standards for development are found in the
Conservation and Coastal Management Element and the Land Development
Regulations.
· Amended January, 1990
= 060 381
~ .
.,~,,.
MAP 5
SOILS-- FUTURE LAND USE MAP
COLLIER COUNTY
GROWTH MANAGEMENT PLAN
.
FUTURE LAND USE ELEMENT
APPENDIX F
i!'~ FUTURE LAND USE MAP SERIES
L~ ZONING RE-EVALUATION PROGRAM
.) COMMERCIAL UNDER CRITERIA
', These maps represent those properties that have been found coneistent
with the Future Land Use Element through the Zoning Re-evaluation
Program and through application of the Commercial Under Criteria
provision of the Future Land Use Element.
060 P,G 3'83
--- I
cuc, o.,* ~c,~t8 I cuc. o.. ^cK, I
EX~5~ ~G ACRES~
C~: ~BAN COABTAL
EXM~32~ 0.2
~: URBAN COASTAL FR~CE '
EXM~ 0.48 ACRE8
C-~ ~BAN RE~I~N~AL
C~ 0.4~ ACRES ~'~
C-~ URBAN RE~N~AL ~ ~
EX~O2~E~ ~l ACRES
~ ~ ~BAN ~8~AL I~ ~BAN COASTAL FRMM
CEX~ O~!AGREE JCEX~O~ ~4 AC~ C~ O.~ ACRE~
~S
O~
............ ~ ........ h~~
~ I~qBAN RESI~N'TIAI,,
CEX-030~.~, 0.20 ACSES
IRS4F-O; ~J~ISAN COASTAL FRINGE
I F. Xi~02d~EN. LSR ACRES ~ LIPISAN RESIdeNTIAL
CEX-O01-EI~ 2.G4 ACREO
~ e ~ ~AN COASTAL
C~ ~42 ACRE8
C~; ~OAN COASTAL FR CEX~I~E~ O.17
~ . ~ URBAN COASTAL FRIN~
EXM-022-P.F, ~ ACRES
~ AGRICULTU~AL/RES~ENTIAL I
EXM-023..JIF, 0.19 ACRE8
M~:morandum
~]~'. TO: Board of County Commissioners
" FROM: Michelle EdwardsTArnold, Senior Planner
~]~.-. DATE: May 10, 1993
~.i . RE: Petition CP-92-01, Xaly Development Corporation
This memorandum is designed to brief you on the amendment
proposed by Lely Development Corporation to modify the
boundary of the Urban Area as identified on the Future Land
Use Map. The petitioner requested that the Board of County
Commissioners accept this application for an amendment to the
Comprehensive Plan at the transmittal hearing held by the
Board of County Commissioners on November 3, 1992.
AMENDMEN~ TO THE FUTURE LA/~D USE MAP
A. Proposed Amendment'.' Modify the boundary of the Urban
Area on the Future Land Use Map.
Petition Number:' CP-92-01
Petitioner: Lely Development corporation
Request: The request is to change the Urban boundary to
~ more closely reflect the Department of Environmental
Regulation (DER) and ~he U.S. Army Corps of Engineers
Jurisdictional lines for'wetlands and input from the
County Environmental staff. The proposed boundary will
result in approximately 7 acres of land being changed
from the Urban Designation to the Agricultural/Rural
Designation. The Petitioner's application is attached.
B. JUstification: ~ts amendment is requested by the
Petitioner for the Laly Lakes PUD, which is currently
under review for rezoning approximately 1495 acres of
land, containing 720 units and golf course development.
During the review of the Lely Lakes PUD it was identified
that the project had densities higher than one unit per
five acres in areas that are designated as
Agricultural/Rural on the Future Land Use Map. It was
also determined that the boundary of the Urban Area,
which is based on environmental considerations at this
location, should be modified to more accurately reflect
the DER and U.S. Army Corps of Engineers jurisdictional
lines. This modification to the Urban boundary line
should result in designating those lands more suitable
for development as Urban and those less sui
Agricultural/Rural Designation.
MAY 2 5 1993
~,~.!'
~ C. DCA ObJection:' The proposed Urban Coastal Fringe land
,:.. use on the two parcels which are adjacent to the
southern and western boundaries of the proposed Lely
~. Lakes Development of Regional Impact (Amendment CP-92-01)
.I~ have not been analyzed for suitability for development at
the densities permitted in the Urban Coastal Fringe
Category, based on soils, topography, and natural
resources, including vegetative cover, wetlands, and
wildlife habitat, or the suitability for development
based on flood hazards, including coastal flooding.
Furthermore, the proposed amendment for these parcels
is not consistent with Objectives I and 3 and Policy 3.1
b of the Future Land Use Element concerning the
coordination of land uses with the natural environment,
and Objectives 6.2, 6.8, and 7.7 and Policy 6.2.2 of the
Conservation and Coastal Management Element, concerning
the coordination of land use with protection of wetlands
and wildlife habitat, and limiting densities in the
coastal high-hazard area. Furthermore, information
regarding the compatibility of the amendment with these
objectives and policies has not been included [Rules
9J-5.005 (2) (a) , (5) (a) , (5) (b), and (6), 9J-5.006
(2)(b) 3.,4., and 5., (2)(e), (3.)(b)1. and 4., (3)(c)1.
and 6. and (4) (a), 9J-5.012 (2) (b), (e) (2), (3)(b)1.,. 2.,
and 6., and (3)(c)1.,3., and 7., and 9J-11.00~. (1)(b)D.].
D. DCA Recommendation: Include an analysis of the
suitability for. development of these parcels at the
densities permitted in the Urban Coastal Fringe Category,
based on soils, topography, and natural resources,
including vegetati,~e cover, wetlands, and wildlife
habitat, and the suitability for development based on
flood hazards, including coastal flooding. Include
information regarding the compatibility of the amendment
with Objectives i and 3 and Policy 3.1b of the Future
Land Use Element, and Objectives 6.2, 6.8 and 7.7 and
Policy 6.2.2 of the Conservation and Coastal Management
Element. Revise the amendment, based on this data and
analysis, and revise the amendment to be consistent with
the above mentioned objectives and policies.
E. Staff Response: When DCA staff reviewed this amendment
they identified two parcels adjacent to the Lely Lakes
Project'as part of the request to include these within
the Urban Area. This was a misinterpretation of the map
as these two parcels are already designated as Urban
on the Future Land Use Map. A phone conversation with
DCA staff on April 7, 1993 clarified that these two
parcels are already designated as Urban and this request
does not affect that designation. It should also be
noted that Lely Lakes project is not a Development of
Regional Impact (DRI) because it is below the re ulr~NOA~T~
County of 800 dwelling uni s. Me.
F. Staff Recommendation: Approval of the modification of
,; the Urban boundary line as proposed. ·
,,,'~,.' U. CCPC Recommendat~o3l: Approve the amendment as proposed
. P~P,.~.,,, 17/,.,,,,t,, ,~--d~d-J DA~.-'. ~""'~3
,' Mi~elle ~dwards-Arnold
Barbara A. Cacchione, A.I.C.P.
Chief Planner
David J. Pettrow, U
Fran~ W. B~J. tte A.I.C.P.
Comm~nit-y Development
Services Administrator
.,. ~,."
t.:,'F '
LEGEND
Jr'ROM URBAM
~ L,U~DS .ADDED
PROPO~ ~
If
II
II
II
LELY
LAKES
~.i~. '-'i';',u,~r.t,,r ~ I. :'. - .
~,:~', .IH)'SSTOA":S' P-/,U. i:S'rA~T SOUTI/a'~T CORP.
~,! . CON~/giICZ,U, PROP/311',.Z~ .SOUTh'VZ3T CORP.
URBA~ BOUNDARY 6H~N~E
~,; ,' EXHIBIT MAY 2 5 1993
:'~'½: Prepared ~I: )lcAnl,r, Asber a..4~feeamtes. P.A.
McA!,~'LY, ASHER AND ASSOCtATF.-S. P.A.
FItOFF..~IONAI, FJIGINEEIS, tI..ANNeJ~ i LAND 5t~l~V~YOR$
3101 T&MIAMI TIMJL EAST, SUITE
NAPiF, J, ~.JORIDA 3396241~0
April 16, 1993
· Mr. Tim Cannon, Planning Manager
':! Bureau of Ixx:al Planning
Division of Resource Plarmlng and M rot.
!-:j; Florida 13q,aximent of O~mmunity
2740 Centerdew Ddv~
. ~allahass~. Florida 32399
'~ Re.: Collle~ County Amendment 93-I (CP-92-01)
," Subject: Respons~ to Obj~clions, Recommendsllons. and Comm~nU
'I
-,
Dear Mr. Cannon: ....
Pursuant to our telephone conferenc~ on April 7, of this y~ar, conductecl from the
of rico of Barbara Cacchione. Collier County's Chief Long Range Planner. this
co~nd~nc~ is invaded to clarify the proposed urban boundary change.
In x~fe. reac~ to your of~c~'s Objection, as contalnexi in the ORC report, you contend
that: 'The proposexi Urban Coastal Fxinge land use on the two parcels which are
adjacent to the southern and western boundaries of the proposed Lcly Lakes
Development of Regional Impact (Amendment CP-92-01) have not b~en anal ' 'for
suitability for development at the densities permittell in the Urban Coastd~dF~inge
Category, based on soils. topography. and natural resources. including vegetative
( cover. wedands, and wildfire habitat, or the saiLability for devdopme. nt ha.sell on flood
hazards, including coastal flooding. Furthermore, the proposed amendment for these
paXT~lS is not consistent with Objectives I and 3 and Policy 3.1.b of the Future Land
Use Element concerning the coordination of land uses with the natural environment,
and Objeciives 6.2, 6.8, and 7.7 and Policy 6.2'-2 of the Conservation and Coastal
Management Element, concerning the coordination of land use with protection of
wetlands s. nd wildlife habitat, and limiting densities in the coastal high-hazard area.
Furthermore, information regarding the compatibility of the amendment with these
objectives and policies has not been includexi [Rules 91-5.00C2)(a), (5)(a), (5)(b). and
4
(oD, 9I-5.006<2)<b) 3 ....and 5., C2)(e), C3)<b)'X. and 4., (3)<c) I. and 6. and (4) (a),
91-5012(2)(b), (c)(2), (3)'(b)l., 2., and d.. and (3)(c)I., 3.. and 7., and
11.00~(1)(b)5.]." Further, you s~ forth your Bur~au's x~:omme~dation 1o: "Include an ·
analysis of the suitability for development of thes~ parcds at th~ d~nsi~cs p~rmitted in '
the Urban Coastal Frixtge Category, based on soils. topography. and natural re. sources,
including vegetative cover, wetlands, and wildlife habitat. and the suitability for
d~vdopment based on flood h37nrds, including coastal flooding. Include information
x~gardxng the compatibility of the amendment with Objectives 1 and 3 and Polic 3.1.b
of the Future Land Use Element, and Objectives 6.2, 6.8, and 7.7 and Policy ~.2.2 of
the Conservation and Coastal Management Element. Revis~ the amendment, based on
this data and analysL% and revise the amendment to be consistent with the above-
mentioned objectives and policies.'
,
"' '~ ' AGENDA HEWN
· ' MAY E 5 1993
,oo, 060 4=00
~.CP-92-01 DCA ORC Rcsl~
April 16, 1993
P, at~c Two
Our phon6 discussion revealed that your Bureau had no objccllon to lhc rectified Urban
Boundary chani~ within the proposed Lcly Lakes pro]cot boundaries, but you
rnimln ~ ihat ih~ amendment propo~xl to cxpand lhc Urban Boundary b~yond lha
proj~undarics. In far. i, no ~xpanslon of ih. Urban Boundary im proposed cith.r
within the propomcxt projcct boundaries, or beyond. For ~our convenience, I hava
prepared another drawing, attachcd and mad~ a part of Ibis corrc~ndcncc, which
clearly d ictm the amcndmcnt'$ ini~nL Thos~ areas hatched flight to Icfi, and colon~d
oranl~c, ~c~ow th~ cximtinl~ Urban Boundary, those arcam hatchcxi left to flight, and
colorcxi I~rccn, show whcr~ the proposed chan{;~ would occur, and where th~ two
hatchtugs cross show wh~e no chani~e ix proposed. ThO two parc~ rcfcrrmccd in your
Bun:a.'$ analysis ax~ not affcr. J~d by $h~ proposed chani~c.
Finall , our offic~ should undcritand thai tha number of dwcllinl~ uultm proposed in
L~I]~ ~m Planned Un|l Dcvelo sent (720 du.), falls below lha D~vclopmcnt of
R~ional Impact Tl~old for Coltier County (800 du.), am ~ forth in Chapier 28-24,
F.A.C.
If you have any furiher qu~nm, plcase do not h~tate to i~ve m~ a call at th~ number
~ under ih~ le~rhcad addz~ss.
Sinc~y:
= '
,"' Dw~t Nadcau
. Planning Dirccior
- Euclosur~ -. -
AGEHDA ITEM
· ,! ;.
- -
MAPS CAN ]~K FOURD OR ASSOCIATED
35 MM YIL~.
GOLDEN GATE AREA I~ASTER PLAN
Prepared for
COLLIEN COUNTY
BOARD OF COUNTY COMXISSIONERS
February 5, 1991
Amended May 19, 1992
Amended August 4, 1992
Amended May 25~ 1993
F=BRUARY, 1991
AUGUST, 1992
COLLIER COUNTY BOARD O[ ~OUI~TY C0HHISSIONERS
Honorable 1knno Goodnight
Honorable Hax lo Hesse Jr., Chairman
Honorable Burr L. Sounders
NoncEable Richard Shanahan
Honorable Hichael Volpe
vi
COLLIER COUNTY PI.~ING
~".' FEed Keyes~ Chairman
WilliamTracy
Joe Christy
: Jackis Willjams
~-~ Raymond Link
.". Wayne Young
Clarence Smuder
Kenneth Hunt
FEed Thomas
CITIZENS STEERING CO~HITTEE
Jim Coleta, Chairman
Frank DollsCave
Norm Hatchet
Bruce Dilges
jr'. David Ritchio
~( Phil Gio~Eida
~eneva Till
· ~', George Keller
DIVISION OF COMMUNITY DEVELOPMENT
Frank 'W, Brutt
..,-' - Ronald M, Lee
Robert E, Blanchard
Barbara X, Cacchione
,oo, 060 , 405
~/~--
;:!.; T~BLB OF CONTENTS
.- .. Page
'w. ~!. ] l, INTRODUCTION 1
XI, OVERVIEW 3
A. County-wide Planning Process
B. Golden Gate Planning Process
XII. XMPLEMENTATXON SECTION
:.' A. Goals, Objectives and Policies
B. Land Use Designation Description 14
i~:~: 1 · Urban
2. Estates
3. Rural Settlement
C. ~ Conditional Uses 28
SUPPORT DOOU'/~N~ .
MaD Pace
i Golden Gate Master Plan Study Area
2 Golden Gate Parkway Professional Office 18
Commercial District
3 Urban Mixed Use Activity Center
4 CR-951 Commercial Infill Designation · 22
5 Golden Gate Estates Neighborhood Centers 24
6 Randall Boulevard Commercial District 26
- /ff
· 2"" I. INTRODUCTION
]/'=Collier County has experienced a tremendous rate of population growth
since 1980 and the trend is anticipated to continue. In response to
the anticipated population increase and the Growth Management Act of
1985, Collier County adopted a revised Growth Management Plan in
January of 1989 as part of a statewide effort to effectively manage
growth. The Golden Gate Area (see Map 1) has grown at an even higher
rate than the County-wide rate since 1980 and is projected to
contribute significantly to County-wide growth in the future.
The Golden Gate Area is currently subject to the regulations outlined
in the County's Growth Management Plan. However, the unique
'characteristics of the area resulted in a decision to prepare a
separate Master Plan for Golden Gate. This Master Plan will become a
separate Element of the County,s Growth Management Plan and shall
supersede Objective 1, Policy 1.1, and Policy 1.3 of the County-wide
Future Land Use Element. All other Goals, Objectives, and Policies
contained in the Future Land Use Element and all other Elements are
applicable. In addition, the Golden Gate Area Future Land Use Map
will be used instead of the County-wide Future Land Use Map.
This plan includes three major sections=
The g_~Za~ section provides an introduction to county-wide and
· Golden Gate Area planning efforts.
The IMPLeMENTaTION 8TRATEG~ places the Plan into effect.
Strategies have been developed to address land use, public
fa~ilities, and natura'l resources. This section also includes the
Goals, Objectives, and Policies, and the Golden Gate Ar~ Future
Land Use Hap.
The SUPPORT DOCUMENT outlines data and information used to develop
the implementation Strategy and the Goals, Objectives, and
Policies.
407
GOLDEN GATE AREA MASTER PLAN
STUDY AREAS
C. II,
MAImCO __
1,
(:3TY
t.,.
/
nLlf ~.-C~'.O~4
~i,, '
'R. CO~ra[TY-WIDE PLANNING PROCESS
'.As mandated by Chapter 163, Florida Statutes, the "Local Comprehensive
r Planning and Land Development Regulations Act" and Chapter 9J-5,
Florida Administrative Code, "Minimum Criteria for Review of Local
Comprehensive Plans and Determination of Compliance", Collier County
.;. adopted a new Growth Management Plan in Januar~ of 1989. This
legislation requires all Counties and municipalities throughout the
], Btate of Florida to develop a plan which consists of the following
;~'. elements:
~. 1. Land Use;
2. Traffic Circulation, Mass Transit and Aviation
· ... (counties with population greater than 50,000)~
~;. 3. Housing;
~'.:<. 4. PUbliC Facilities;
~,; 5. Capital Improvement;
6. Recreation.and Open Space;
7. Intergovernmental Coordination;
,~'7 8. ~ousing; and
9. Conservation and Coastal Management (Coastal
Counties).
~. The FutUre Land Use Element is one of the pillars of the Growth
:. Management Plan and is designed to guide decision making by Collier
County on regulatory, financial and programmatic matters pertaining to
· I,- land use. More specifically,'the Element controls the location, type,
'~!;" intensity and timing of new o~ revised uses of land.
~.. GOLDEN GATE AREA PLANNING PROCES~ .
· Collier County's Future Land Use Element is divided into two sections.
,. The first section outlines the Coals, Objectives and Policies. The
.~;- second section is the Land Use Data and Analysis.
Policy 4.1, contained within the Goals, Objectives and Policies
section, states the following:
"A detailed sector plan for Golden Gate Estates shall be developed
and incorporated into this Growth Management Plan by August, 1991.
The sector plan shall address Natural Resources, Future Land Use,
Water Management, Public Facilities and other considerations."
- 3 -
To that end, the Board of County Commissioners created a Citizens
Steering Committee comprised of nine citizens from the Golden Gate
Community.
The Committee and staff began meeting in October of 1988. The
committee was originally charged with assisting staff in a limited
fashion. Primary responsibility included providing specific
recommendations on the objectives of the Master Plan, identifying
issues and concerns, and assisting in the development of a request for
a proposal to engage consultant assistance in the preparation of the
Golden Gate Area Master Plan.
During the course of committee meetings, it was agreed upon that the
Master Plan would be prepared in-house by staff in lieu of a
consultant. In light of this, the committee's role expanded to work
more closely with staff to refine the issues and recommend alternative
courses of action.
T~is plan is formulated and based on the issues/concerns identified by
the committee and staff which include the provision of an appropriate
balance of land uses, protection of natural resources, and provision
of adequate public facilities.
410
III. IMPLEMENTATION STRATEGY
This section places the plan into effect. Implementation strategies
include the Goals, Objectives and Policies, the Land Use Designation
Description Section, and the guidelines for ~r~ ~
uses.
X. ~OALS. OBJECTIVES AND POLICIEg
gg..AX~S TO GUIDE LAND USE AND PUBLIC FACILITY DECISION MAKING WHILE
BALANCING THE NEED TO PROVIDE BASIC SERVICES WITH NATURAL
!*' RESOURCE CONCERNS THROUGH X WELL PLANNED MIX OF COHPATIBLE
.v~. LAND USES WHICH ENSURE THE NEALTH~ SAFETY~ WELFARE, AND
f]: QUALITY OF LIFE OF TEE LOCAL RESIDENTS.
OBJECTIV3 1, 1 t
Unless otherwise permitted in this Master Plan, new or revised uses of
land shall be consistent with designations outlined on the Golden Gate
Area Future Land Use Map. The Golden Gate Area Future Land Use Map
and companion Future Land Use Designations, Districts, and
Subdistricts shall be binding on all development orders effective with
the adoption of this Master Plan.
Folic~ 1.1.1s
The URBAN Future Land Use Designation shall include Future Land Use
Districts and Subdistricts for:
A. URBAN - MIXED USE DISTRICT
1. Urban Residential
i);~ 2~ Golden Gate Parkway Professional Office Commercial
District
B. UltBAN - COMMERCIAL DISTRICTS
~,.;.. 1. Activity Center
2. CR-951 Commercial Infill Designation
3. Commercial Under Criteria
4. Interstate Activity Center
~..
Standards and permitted uses for Golden Gate Area Future Land Use
Districts and Subdistricts are identified in the Land Use Designation
Description Section of this Element.
Policry 1.1.2s
:;. The ESTATES Future Land Use Designation shall include Future Land Use
Districts and Subdistricts for:
A. ESTATES - MIXED USE DISTRICT
~:2' 1. Residential Estates
2. Estates - Neighborhood Center
3. Randall ~oulevard Commercial District
- 5 -
.Standards and permitted uses for each Golden Gate Area Future Land Use
i,,.District and Subdistrict are identified in the Land Use Designation
?.Description Section of this Element.
Polio3[
;;(".'The AGRICULTURAL/RURALFuture Land Use Designation shall include the
' following Future Land Use District:
· X. SETTLEM]CNT AREA DISTRICT
Standards and permitted uses for each Future Land Use District and
Subdistrict are identified in the Designation Description Section.
Poli~
t~ Conditional Use requests shall adhere to the guidelines
]~.. outlined in the~r~fa~dLtt~Use Description Section.
~ 'Poli~ 1.1.5
~r~fi~fal~Lttt~ Use requests shall be approved by the Board of
!!=," County Commissioners by a Super Majority (4/5) vote.
T~e unimproved properties granted a positive determination through
the Zoning Re-evaluation Program established pursuant to Policy 3.1K
of the Future Land Use Element and identified in Exhibit 1, shall be
considered consistent with this Master'Plan. Those properties shall
be conside~ed consistent with this Master Plan only to the extent of
the determination granted and in accordance with all other limitations
and timelines provided. Nothing contained in this policy shall exempt
any development from having to comply with any other provision of the
Growth. Management Plan.
The County shall revise this policy to delete the references to the
~' Zoning Re-evaluation Program, when such references are no longer
~. needed and, in addition, to delete thepolicy when it is no longer
needed.
!.' Poli~ 1.1.7z
To encourage higher density residential and promote mixed uses in
- close proximity to Activity Centers, those residential zoned
,~!i properties permitting up to 12 dwelling units per acre which were
located within and consistent with the Activity Center designation at
~ Golden Gate Parkway and Coronado Parkway (see Appendix 8 of the
Support Document for map) established by the 1989 Collier County
Growth Management Plan and subsequently removed by the creation of a
new Activity Center via the adoption of the Golden Gate Area Master
Plan are recognized as being consistent with this l~aster Plan.
Amended August 4, 1992, Remedial Plan Amendment (Ordinance No.
92-50).
- 6 -
.PolioT 1.1.01
'~:'No development orders shall be issued inconsistent with the Golden
Gate Master Plan with the exception of development orders issued
pursuant to provisional uses and fezones approved based on the
County-wide Future Land Use Element (adopted January 10, 1989,
Ordinance 89-05) which was in effect at the time of approval. Any
subsequent development orders shall also be reviewed for
consistency with the Grovth Management Plan based on the County-wide
Future Land Use Element.
;OBJ~CTI~ 1.25
~.'Ensure public facilities are provided at ~n acceptable level of
Requests for new uses of land shall be subject to level of service
standards and concurrency requirements for public facilities as
outlined in the Capital Improvement Element of the Growth Management
Plan,
: Policy 1.2.25
The Golden Gate Area Master Plan shall be updated on an annual basis
. to reflect changes in programmed public facility improvements,
..- Polio) 1,2,31
Within one year of adoption of this plan, the Collier County
Transportation Department shall explore alternative financing methods
!~!~= to accelerate paving of lime-rock roads in the Estates. If feasible,
the alternative that provides the opportunity for paving the largest
i number of road miles shall be Implemented within two years of the
'~ completion of the study.
Polto~ 1.2.45
Consistent with Florida Chapter Law #89-169, Florida CIties*Water
Company shall provide updated water and sewer service data to the
Collier County Utilities Division on an annual basis.
Polioy 1.2.55
Due to the continued use of individual septic systems and private
wells within a densely platted urban area, Florida Cities Water
company is encouraged to expand their sewer and water servioe area to
include all of that area known as Golden Gate City at the earliest
possible time.
:" Pollc~ 1.2.61
2: Within one year of adoption of this plan, the Golden Gate Fire
:.~,~: District in cooperation with County entities, if appropriate, shall
~' attempt to complete an agreement with the City of Naples and Collier
· County for access to their water supply line for purposes of. emergency
" fire control. This access shall only be used when personal property
i and human lives are threatened.
', .~.. . ,p,. ;;-I
% ,,':'..
' m I
~;!i OB,.TICT:VE
':;!'i,.,The County shall protect and preserve the valuable nature1 resources
];": within the Golden Gate study area,
.: Policry 1.3.1t
The Planning Services Environmental Review staff shall coordinate with
all'other units of local governments involved in land use activities,
permitting, and regulating to ensure that all local natural resource
protection regulations are being enforced,
:!:':*' P011~ 1.3.2l
!:i::" The Golden Gate Area Master Plan shall be updated within a reasonable
time period after the date set forth for completion in Policies 1,1
.~ and 1,3 of the Conservation and Coastal Management Element of the
r Growth Management Plan,
i"
Policrar 1.3.3l
:!,U Due to the valuable water resources that exist in the Golden Gate
, Estates Area n Ground Water Protection Ordinance shall be adopted.
1.4S
Provide a living environment which Is aesthetically acceptable and
*enhances' the quality of life.
*The County's Code Enforcement Board shall strictly enforce the Zoning
'. :Ordinances to control illegal storage of machinery, vehicles, and
Junk, and the illegal operation of commercial activities within the
Golden Gate Area.
'-.. ~ol1~ 1.4.21
~ *Within one year of adoption of this plan, the County's Solid Waste
· division shall create a mandatory garbage pick-up program in Golden
Gate City and in Golden Gate Estates.
Policr~ 1,4.3I
Collier County shall cooperate with local organizations to conduct
biannual clean-up days. The local organization shall petition the
Board of County Commissioners to waive land fill tipping fees during
these events.
Pol4Cl' 1,4,4X
*' Within one year of adoption of the plan, staff shall research and
provide recommendations to the Board of County Commissioners as to the
appropriateness of creating an Architectural Review Board for the
· Gol'den Gate Parkway Professional Office Commercial District.
- 10 -
The County recognizes that Southern Golden Gate Estates
(SGGE), that area which lies south of State Road 84 to US 41
is an area of special environmental sensitivity and hydro-
logic importance and that restriction of development and
strict regulation of uses is necessar~ to prevent great harm
to the public health, safety and welfare. The County shall
develop an interim strategy for protecting its resources,
promoting the restoration of SGGE, and assisting in the
State's land acquisition and panther recovery efforts.
OBJBCTXV~ 2. I t
Tmmediately upon adoption of this Objective, implement a system
Except for minimal road maintenance to include traffic signage, right-
of-way. mowing and road surface patching/grading, the County shall
limit road improvements in the SGGE to placement of an interim surface
on portions of Betson Boulevard.
l>ol~cr~ 2.1.2l
Consistent vtth the Public ~aciltttes Element, p~bltc sewer an~ water
~actltttes shall not be expanded into SGGE.
Special taxing districts associated with tnfrastz~cture t~provements
shall not be create~ for or expanded into SGGE.
Amended August 4, 1992, Remedial Plan Amendment (Ordinance No.
92-50). Added new Goal, Objectives and Policies
- 11 -
OBJBCTIV~ 2.2~
,!:'::-In order to further its goal of protecting this area of special
environmental sensitivity, the County will coordinate with DNR in an
v effort to assist the State's ac~uisition of privately owned property
within SGGE, to the extent consistent with recognition of existing
· ?. private property rights.
Pol~o~
The County shall direct inquiries regarding options for the sale or
donation of land to the State, or other inquiries regarding
acquisition, to the Florida Department of Natural Resources (DNR)
Bureau of Land Acquisition's designee, as provided by DNR.
,,½ .,!. l~l~cry 2.2.2:
~.'.. The County will support the Florida Department of Community Affairs in
'any effort to include the SGGE in'the Big Cypress Area of Critical
State Concern.
PolLc~ 2.2.3~'
Immediately upon adoption of this policy, implement a system for
.~ ~evieving applications for development in SGGE which will include the
· ,.. folioring tvo step procedure:
f~ Step I.: Pre-application Procedure:
,-. A. Notice to DNR, Bureau of Land Acquisition, of the
I~!. application vithin S days of receipt;
~ .... B. Notice to the applicant of DNR's acquisition program,
,,x the lack of public infrastructure and the proposed
~.;
~ restoration program for SGGE;
C. Within the notice of DNR's acquisition program, the
applicant shall be encouraged to contact DNR, Bureau of
Land Acquisition to determine and negotiate vhether DNR
" intends to purchase applicant's property at fair market
"~ value;
:~!, D. Prior to the processing of an application for develop-
ment approval (Step II) the applicant shall provide tp
'i' the County proof of coordination with DNR. Upon
execution of a contract for sale, the pre-application
shall be placed in abeyance pending completion of the
.,,,. purchase by DNR:
'~" Step II: ApplicatiOn Review Procedure:
E. The County shall review the environmental impacts of the
application in order to minimize said impact;
~' F. The County shall apply section 2.2.24.3.2, Development
~" Standards and Regulations for ACSC-ST of the County,s
Unified Land Development Code or Chapter 28-25, Florida
!~ Administrative Code, "Boundary end Regulations for the
~.= Big Cypress Area of Critical State Concern", whichever
]~]' is stricter~ and,
U. The County shall provide a minimum review and processing
time of 180 days from the date of commencement of the
pre-application procedure before any development permits
are issued.
B. lAND USE DESIGNATION DESCRIPTION SECTION
Ti~e following section describes the three land use designations shown
on the Golden Gate Area FUture Land Use Map. These designations
generally indicate the types of land uses for which zoning may be
requested. Mowever, these land use designations do not guarantee that
a zoning request will be approved. Requests may be denied by the
Board of County Commissioners based on criteria in the Zoning
Ordinance or in special studies completed for the County.
A. Urban-Mixed Use
This district is intended to accommodate a variety of residential and
commercial land uses including single-family, multi-family, duplex,
and mixed use (Planned Unit Development). Commercial land uses are
also permitted in this district.
1. Urban Residential
All land within the urban mixed use designation is zoned and platted.
However, any parcel to be rezoned is subject to the following density
rating system:
~ENSITY RATIN~ SYSTEM
A base density of four residential units per gross acre is permitted.
The base level of density may be adjusted depending upon the
characteristics of the project.
Consistency with the following characteristics would add to the base
density:
· 1. If the project includes conversion of commercial zoning which is
not located within an Activity Center or which is not consistent
with adopted siting criteria for commercial land use, a bonus of
up to 16 dwelling units may be added for every one acre of
commercial zoning which is converted. These dwelling units may be
distributed over the entire project. The project must be
compatible with surrounding land uses.
2. Proximity to Activity Center - if the project is in close
proximity to an applicable Activity Center, the following density
may be added:
If the project is within an Activity Center, up to 16 residential
If the project is within one mile of the Activity Center, 3
residential units may be added.
The density band around an Activity Center shall be measured by
the radial distance from the center of the intersection around
which the Activity Center is situated. If 50% or more of a
project is within the density band, the additional density applies
- 14 -
----- M I
to the entire project. Density bands shall not apply within the
Estates Designation.
Affordable Housing - provision of Affordable Housing as defined by
the Affordable Housing Density Bonus Ordinance (~90-S9 adopted
November 22, 1990) would add S dwelling units per gross acre.
This bonus may be applied to portions of projects.
Residential Infill - to encourage residential infill, three
residential dwelling units per gross acre may be added to the base
if the project is 10 acres or less in size located within an area
with central public water and sewer service. The following
conditions must be met:
the project must be compatible with surrounding land uses~
the property in question has no common site development plan with
adJ oining property ~
there is no common ownership with any adjacent parcels; and
the parcel in question was not created to take advantage of the
in-fill residential density.
Roadway Access
1. If the project has direct access to two or more arterial or
collector roads as identified in the Traffic Circulation
Element, one residential dwelling unit per gross acre may be
added. Density credits based on future roadways will be
awarded if the developer commits to construct a portion of
the roadway (as determined by the County Transportation
Services Division) or the road is scheduled for completion
during the first five years of the Capital Improvement
Schedule.
2. If the project fails to interconnect with all existing
projects when physically possible and fails to provide inter-
connection with all future adjacent projects when physically
possible, I dwelling unit per gross acre shall be
subtracted.
CONDITIONSz
In no case shall the maximum permitted density exceed 16
residential dwelling units per gross acre~ and
Group housing which may include the following: Family Care
Facility, Group Care Facility, Care Units, Adult Congregate Living
Facilities and Nursing Homes, shall be permitted within the Urban
Mixed Use District and Urban Commercial Districts subject to the
Amended May 19, 1992
1~TC definitions and regulations as outlined in the Collier County Land
~. Development Code (Ordinance 91-102, adopted October 30, 1991 and
consistent with locational requirements in Florida Statutes
~= (Chapter 419.01 F.S.). Family Care Facilities which are
residential facilities occupied by not more than six (6) persons
shall be permitted in residential areas.
2. GOLDEN GATE PRRR3TAY PROFESSIONAL OFFICE CO~34ERCIAL DISTRICT
The provisions of this district (see Map 2) are intended to provide
Golden Gate City'with a viable Professional Office Commercial
District. The Professional Office. Commercial District has two
purposes. First, to serve as a bona-fide entry way into Golden Gate
City. Secondly, to provide a community focal point and sense of place.
The uses permitted within this district are generally low intensity,
office development which will minimize vehicular traffic, provide
suitable landscaping, control ingress and egress, and ensure
compatibility wi~h abutting residential districts.
:i Development Criteria for the district are as follows:
~" A. Permitted principal uses and structures:
1. Art, Graphics and Design Studios;
2. Business and Real Estate Offices;
3. Mortgage Brokers~
4. Professional Offices;
· 5. Financial institutions~
6. Sit down restaurants; and
, 7. Any other professional or commercial use which is
comparable in nature with the foregoing uses and which
the Community Development Administrator or his designee
determines to be compatible in this district.
· B. Minimum project area shall be two (2) acres.
C. Projects shall be submitted in form of a PUD (S acre
there shall be no minimum acreaae re~uirement for PUD fezoDes
except for the requirement that all requests for rezonin~
must be at least forty thousand f40.0.00) s~uare feet in ~re~
unless the DrODOSed reZone is a~ extension of an e~ist~Bg
zon~na district consistent with the Golden Gate Area Master
Plan shall ~ waived).
D. Access points shall be limited to I per 450 feet commencing
at center line of Santa Barbara Boulevard.
!i. -. - 16 -
060. -422
E. Access to projects shall be provided exclusively via Golden
Gate Parkway.
~=. F. Projects shall make provisions for shared parking arrange-
ments with adjoining developments.
G. Projects shall provide deceleration and acceleration lanes.
..:~ H. Projects shall encourage pedestrian traffic by prov~ding
sidewalks. Adjacent projects shall coordinate location of
sidewalks.
I. Buildings shall be set back from Golden Gate Parkway a
minimum of 40 feet.
J. Buildings shall be set back from rear lot line a minimum of
25 feet.
K. Buildings shall have a maximum height of twenty five (25)
feet plus ten (10) feet for under building parking.
L. Each project shall be limited to. one sign not to exceed 20
'i?~ square feet and six (6) feet in height. No flashing or
mechanical signs shall be allowed. Signs shall be located at
~= a minimum of 15 feet from the right-of-way.
>~ M. Project shall provide a 10 foot buffer between vehicular
~:~, right-of-way and required sidewalk.
.~ N. Ten (10) foot buffer required in item M shall provide land-
scaping of one (1) shade tree per thirty (30) linear feet.
Such trees shall be minimum of eight (S) feet in height and
one and one-half (1~) inches in diameter at the time of
planting that shall have a minimum canopy of fifteen (15)
feet at maturity. In addition, a hedge or berm planting
combination shall be planted along the entire length of this
ten (10) foot buffer consistent with the Zoning Ordinance.
O. A minimum of ten (10) percent of the gross vehicular use area
shall be landscaped to provide visual relief. One (1) tree,
as described in item N, shall be provided for each seventy~
five (75) square feet of this landscaped area. This land-
scaping shall be placed within the vehicular use area.
P. Project shall be required tg provide off street parking~
~on~iat~nt with Z~ti~n G ~f C~llie~ Count~ Z~nlng Grdinanc~
!]>;, Q. Central Water and Sewer facilities shall be available prior
"> to development.
of isolated lots existing at the date of adoption of this
Master Plan may petition the Zonlr~ Board of Zoning Appeals for a
.'~ variance from the standards in this District as will not be contrary
~= to the public interest when owing to special conditions peculiar to
~ the property, a literal enforcement of these standards would result in
'3 unnecessary and undue hardship.
The procedures and standards for granting such variances shall be
s~eas follows [similar to those set forth in SubaeGti~n ll.l.b.1)
~trroug~ the Collier County Zoning Ozdinance~ Land Development
Code {Ordinance 91-102. adopted October 30. 1991). A variance may be
granted if the above stated condition occurs includina the followina:
{he variance shall not confer on the petitioner special Drivileaes
denied to others in the same zonina district= the variance shall not
be in~urious to the surroundina neiahborhood or otherwise detrimental
~o the Public welfare= and the variance shall be the minimum variance
that makes Possible a reasonable use of the land. building 9r
~tructure.
B. Urban Commercial Distriot~
{! 1. Rotivitv Center
,i The Activity Center designated on the Future Land Map is intended to
[! accommodate new commercial zoning within the Urban Designated Area.
The Activity Center concept is designed to concentrate new and
existing commercial zoning in locations where traffic impacts can
· readily be accommodated, to avoid strip and disorganized patterns of
commercial development, and to create focal points within the
~: community. The size and configuration of the Activity Center is
:!!.. outlined on Map 3.
~!'l~ Activity Cen~ers are intended to be mixed-use in character. The
7~ actual mix of the various land uses (i.e., commercial, residential,
'~. institutional) shall be determined during the rezoning process based
.. on consideration of the following factors:
· The amount, type and locations of existing zoned and
developed commercial uses within or in close proximity of the
· Activity Center;
· Existing patterns of land use within or in close proximity.of
the Activity Center;
· Market demand and service area for the proposed commercial
land uses to be used as a guide to explore the feasibility of
~'i=! the requested land uses;
":' ' Adequacy of infrastructure capacity, particularly roads;
"' Compatibility of the proposed development with and adequacy
, of buffering for adjoining properties;
· Natural or man-made constraints;
~ .:
Natural or man-made constraints~ Criteria identified in the
Zoning Ordinance~ and
Other relevant factors.
As a part of all'Petitions for Rezone within Activity Centers, the
applicant shall include an evaluation of the factors cited above. In
addition, the applicant shall generally identify development trends
within the Activity Center and demonstrate compatibility with existing
and proposed development through urban design criteria such as buffer-
ing and architectural controls and how the proposed project would
limit adverse impacts on the highway network by controlling road
access points and coordinating on and off-site movement of traffic
with surrounding properties.
The standard for intensity of uses within each Activity Center is that
the full array of commercial uses may be allowed. It is preferred
that all new commercial zoning within Activity Centers shall be in the
form of a Planned Unit Development. There shall be no minimum acreage
limitation for such Planned Unit Developments. All new residential
zoning shall be consistent with the Density Rating System. Hotels and
motels that locate within an Activity Center will be allowed to
develop at a density consistent with the Zoning Ordinance.
Existing commercially zoned and developed areas which are not within
an Activity Center or do not meet other commercial siting criteria
will be allowed to expand only to the extent permitted under the
zoning classification for that property. Expansion involving
aggregation of additional property occurring after adoption of this
Plan shall be subject to the policies of this Plan.
2. CR-951 Commercial Infill DesignatiOn
Due to the existing zoning and land use pattern in the Commercial
In[ill Designated areas (see Map 4) and the need to ensure adequate
development standards to buffer adjacent land uses, commercial uses
shall be permitted under the following criteria:
A. Commercial uses shall be limited to uses ~
intensity transitional commercial uses that are compatible
with both residential and commercial. convenience commercial
to provide for small scale ShODDine and Personal needs. and
intermediate commercial to provide for a wider variety ~[ ..
coods and services in areas that have a hiaher decree of
automobile traffic. These uses sh~11 be similar to C-1, c-2,
or c-3 zoning districts outlined in the Collier County~r~g
O~ainance (~2-2 ad~tea ~anua~- S, 19~2}. Land Development
Code ~Ordinance 91-102. adopted October 30. 1991~.
B. Rezones shall be in the form of a Planned Unit Development
(~a~Ye--~-re there shall be no minimum acreace recuirement for
PUD fezones except for the re~uirement that all requests lOT
rezoninc must be at least forty thousand [40.000~ sauare feet
,oo, 060 427
Map # 4
{.l:.l, 4
. (:.It. !)51
' I~lffll rlNfllfm. IIiMtIIIA
I Illl Itlt,:l Ills "'1 ' '
· L~L
=~ ': GII~l I U[.~] ' ' ' ILL '~ ' .....
. (
.~. L,.
~.~., "
.- /c .....
I .... --
.....
~--o~6'{~'-oAtc..d .... { '
.: ~ ~,~'~
~.,
in area unless the oroDosed feZOne is an extension of an
existing zoning district consistent with the Golden Gate Are~
Haster Plan -' ...... ~hall ~a walved};
C. Projects within the tnflll area shall make provisions for
shared parking arrangements with adjoining commercial
developments when applicable;
D. Driveways and curb cuts for projects within the Commercial
Infill area shall be consolidated with adjoining commercial
developments; and
E. Access to projects shall not be permitted from CR-951.
#3. Commercial under Criteria
Within the Urban-Mixed Use District certain infill commercial develop-
ment may be permitted. This shall only apply in areas already
substantially zoned or developed for such uses. The following
standards which limit the intensity of uses must be met:
a. The subject parcel must be bounded on both sides by improved
commercial property or commercial zoning consistent with the
Golden Gate Ar~a Future Land Use Element or commercial
property granted an exemption or compatibility exception as
provided for in the Zoning Re-evaluation Ordinance and should
not exceed 200 feet in width, although the width may be
greater at the discretion of the Board of County
Commissioners. Uses that meet the intent of the e-~ C-1/T
Commercial Professional/Transition~] d ~tstrict are only
required to be bounded on one side by improved commercial
property or consistent commercial zoning or commercial
property granted an exemption or compatibility exception as
provided in the Zoning Re-evaluation Ordinance.
# b. The proposed use must not generate in excess of five percent
of level of service C design capacity on abutting streets
that provide access to the proJect~ and
c. The proposed use must not exceed a floor area of 25,600
square feet.
4. Interstate Activity Center
On the fringes of the Golden Gate Master Plan boundaries there are
several parcels that are located within the Interstate Activity Center
at 1-75 and Pine Ridge Road as detailed in the County-wide Future Land
Use Element (FLUE). Parcels within this Activity Center are subject
to the County-wide FLUE and not this Master Plan. Appendix 9 of the
support document provides a detailed map of the Activity Center
boundaries.
I:.l{. I1,11~
(/1
~.:
GOLt)EII e;AIt, [|UULLVAI(UO ..... ().
!:.i .... ( .WI_!I:TE Ill. V1), T ~ ,
.... ... Irllll(!;IAII I.%
LEUEfiU
.-
2o E2TRTE5 DESIGNATION
/'~' This designation is characterized by low density semi-rural
residential lots with limited oppertuniti~s for other land uses.
Typical lots are 2.25 acres in size. However, there are some legal
non-conforming lots as small as 1.25 acres. Intensifying residential
density shall not be permitted.
!.: a. Estates-Mixed Use Desi~nati~-
1. Residential Estates Subdistrict - single-family
residential development may be allowed within the Estates Mixed Use
Subdistrict at a maximum density of one unit per 2~ gross acres unless
the lot is considered legally non-conforming.
2. Estates NelahborhoO4 Centers - recognizing the need to
provide basic goods and services to Estates residents, Neighborhood
Centers have been designated on the Golden Gate Area Future Land Use
Map ·
The locations are based on intersections of major roads and spacing
criteria (See Map 5). The centers are designed to concentrate all new
commercial zoning in locations where traffic impacts can be readily
accommodated and to avoid strip and disorganized patterns of
commercial development.
With the exception of the node at CR-951 and Pine Ridge, all nodes are
i:,: 20 acres in size. The node at CR-951 and Pine Ridge Road is 10 acres
and is located only on the west side of the intersection due to the
presence of a 50 foot canal and subsequent expansion of CR-951 which
will significantly reduce the amount of developable property directly
east of CR-951.
The development criteria for the nodes are as follows:
A. Commercial land uses shall be limited to uses ~
intensity transitional commercial uses that are compatible
with both residential and commercial. convenience commercial
to Provide for small scale ShODDin~ and personal needs.
intermediate commercial to provide for a wider variet~ of
aoods and services in areas that have a hi~her de~ree of
automobile traffic. These uses shall b- similar to C-1, CT2,
or C-3, zoning districts outlined in the Collier County
Z~nlng O~dinance (~2-2 ad~pted January S, 19~2) Land
Development Code fOrdinance 91-102. adopted October
1991~.
Amended May 19, 1992
~- B. Future e ~ommercial land uses are limited to 5 acres and
.. ~ball only be located in the EStates NeiGhborhood Center
located on CR-951. The remaining acreage in the Neighborhg0d
~, ~enter at CR-951 may be utilized for single-family
' residential or Conditional Uses allowed in the Estates zoning
district such as churches. social or fraternal organizations.
~hild care centers. schools. and GROUP care facilities.
ivaluation of the F~tUre Nelahborhood Centerslocated at the
intersection of Golden Gate Boulevard and Wilson Boulevard
~Dd on CR-846 will b~ ~omDl~ed durina the Evaluation and
~pDraisal Report {EAR] ~9 ~etermine whether there is a demand
~or additional commercial in the Estates Area. If a demand
~s identified. one or both of these intersections may be
~esianated as Neluhborhood Centers. Until such time. the
only permitted use at the FUtUre NeiGhborhood Centers is
residential development consistent with the Estates Zonin~
District. The parcels immediately adjacent to the existing
~ommercial at the northeast ~l/adrant of Golden Gate Boulevard
and Wilson Boulevard may ~U~lifv for conditional use under
the transitional use prOVision under the Conditional Use
~ection of this Master Plan Element.
C. A single project shall utilize only 50% of the total allowed
commercial acreage. The percentage may be increased at the
discretion of the Board of County Commissioners;
D. The project shall make.provisions for shared parking arrange-
ments with adjoining developments;
~:: E. AcCess points shall be limited to one per 180 feet commencing
from theright-of-way. A. maximum of three curb cuts per
quadrant shall be allowed;
:~,.' F. Driveways and curb cuts shall be consolidated with adjoining
~.ij developments;
;;/~f"'. G. Driveways accessing parcels on opposite sides of the roadway
"' shall directly line
~:.
H. Projects directly abutting residen~ially zoned property shall
~' provide, at a minimum, a 75 foot buffer;
I. Projects shall provide a 25 foot wide landscaped strip
between the abutting right-of-way and the off-street parking
~. area;
The Neighborhood Center designation does not guarantee that commercial
zoning will be granted. The designation only provides the opportunity
.,. to request commercial zoning.
3. Randall B~ulevard Commercial District - recognizing the
~,.i unique development pattern and characteristics of surrounding land
::.: ....
" I { :\ N I ~ ,,\ I, I, I '.~ ~ I ~ I. i.: \t .,\ i {..!)
!' ~:l}~.'llXll.:!t'{:i;\l, I~I.'-;'I'!?,.[CT
I Ill lll l,t ! I~,lllll',,. IIIllIlltA
-.;- .
usee# the Randall Boulevard Commercial District has been designated on
the Golden Gate Area Future Land Use Map. Also see Map 6.
The development criteria for the district are as follows:
I~ A. Project shall be submitted in a form of a PUD.
~i B. Commercial uses shall be limited to the following:
1. Automobile Service Station.
2. Barber and Beauty Shops.
~'~'=' 3. Child Care Centers.
4. Convenience Stores.
5. Drug Stores.
~? ~ 6. Food Markets.
~:~' 7. Hardware Stores.
S. Laundries - self service only.
9. Post Offices and professional offices.
10. Repair Shops - Radio, TV, small appliances, Shoes~ and
Restaurants including fast food restaurants but not
~i=- drive-in restaurants.
L!i~. 11. Shopping Center.
12. Veterinary Clinics - no outside kennelin~.
C. Projects shall provide adequate buffering from residential
areas.
D. Projects shall make provisions for shared parking
:~ arrangements with adjoining developments.
'~ 3. AGRICULTURAL/RURAL - SETTLEMENT AREA DISTRICT
A. Settlement Area District '
Consists of Sections 13, 14, 23 and 24, Township 48 South, Range 27
East (the former North Golden Gate Subdivision), which was zoned and
platted between 1967 and 1970. In settlement of a lawsuit pertaining
to the permitted uses of this property, this property has been
"vested" for the uses specified in that certain "PUD" by Settlement
zoning granted by the County as referenced in that certain SETTLEMENT
· AND ZONING AGREEMENT dated the 27th day of January, 1986.
- 28 -
.
R
By designation in the Growth Management Plan and the Golden Gate Area
Master Plan as Settlement Area, the Plan recognized the property as an
area which is outside of the Urban Designation and which is currently
far removed from supportive services and facilities. Zx'Pansion of the
Settlement Area in terms of additional lands or dwelling units, shall
be discouraged. It's existence will have no precedential value or
effect so far as Justifying similar uses on surrounding or adjacent
property. The Settlement Area Land Use District is limited to the
area described above and shall not be available as a land use district
for any other property in the County.
The uses permitted include:
1. Agricultural uses and related facilities;
:'. 2. Residential uses, not toexceed two living levels in height,
and a maximum number of 2,100 dwelling units7
3. Neighborhood commercial uses and hotel, motel and transient
· lodging facilities, not to exceed 22 acres in size;
ij~; 4. Golf courses, parks, playgrounds, and other similar
t~.. recreation and open space uses;
~," 5. Community facilities, such as a fairgrounds site,
-r,~ agricultural extension station, fire and police stations;
6. Educational facilities, religious facilities, governmental
~:. activities and child care center,
~,, 7. Earth mining; and
8. Essential services as defined by the most recent Collier
County Zoning Ordinance.
'~ All in accordance with the ZONING AND DEVELOPMENT DOCUMENT for the
property as approved by the County.
C. T~G~I=IGI~L CONDITIONAL USER
Various types of PTov~E~l~~uses are permitted in
residential zoning districts within the study area. In order to
control the location and spacing of new~~33~h~a~uses,
the following shall apply to requests for
UseS:
1. Essential Services
which are defined as those services desianed and operated
provide water. sewer. ads. teleDhoneo electric. and cable
television or communications to the ~eneral DUbli~
~utllned in ~e~tion =.I$ of ~- Collier C~unty Zonin~
Ordlnan~a ~2-2 adopted ~anua~y S, l=O2 shall be allowed
anywhere within the Estate Zoning District~
- 29 -
,oo 060 , 435
Services provided within the Southern Golden Gate Estates
shall be consistent with Goal 2. Ob~ective 2.1. and Policies
2.2.2 and 2.1.3 of the ~Qlden Gat~ Area Master Plan.
e 2. ~CD/L~tt/a~ uses (except essential services)
shall not be permitted on. Golden Gate Parkway within the
Estates Designated Area west of Santa Barbara Boulevard and
those parcels immediately adjacent to the west side of CR-951
within the Estates Designated Area unless the parcel is
directly bounded by~=~~33~L~uses on two (2)
or more side yards with no intervening rights-of-ways or
waterways;
3. ~C~l~ttl~uses shall be limited to Neighborhood
Centers s~Ject to the following:
a. ~e project shall provide adenate buffering from
adjacent prope~ies; and
b. Projects shall coordinate =Access Management Plans with
other projects within the Activity nodes. to facilitate a
sound traffic movement pattem.
In addition, ~~uses may be granted in
transitional areas. ~e pu~ose of ~is provision is to allow
~~uses in areas adjacent to non-residential uses
generally not appropriate for residential use. ~e ~
~use will act as a transitional use between non-residential
and residential areas. The following criteria shall apply for
Transitional ~Conditional Use re~ests:
a. Site shall be directly adjacent to a non-residential use
(zoned or developed);
b. Siteshall be no closer than % road mile from the
intersection of a Neig~orhood Center;
c. Site shall be 2.5 acres or more in size and shall not
exceed 5 acres;
d. Provisional uses shall be located on ~e a11ow~le
acreage directly adjacent to ~e non-residential use;
e. Site shall not be adjacent to a church or other place of
worship, school, social or fraternal organization, child
care center, convalescent home, hospice, rest home, home
for ~e aged, adult foster home, children's home,
rehabilitation center~ and
~ ~ended May 19, 1992
. - 3~ -
f. Project.shall provide adequate buffering from residential areas.
I Group Housing which may include the following: Family Care
Facility, Group Care Facility, Care Units, Adult Congregate Living
Facilities and Nursing Homes, shall be permitted within the Urban
Mixed Use District and Urban Commercial Districts subject to the
definitions and regulations as outlined in the Collier County Land
Development Code (Ordinance 91-102, adopted October 30, 1991 and
consistent with locational requirements in Florida Statutes (Chapter
419.01 F.S.). Family Care Facilities which are residential facilities
occupied by not more than six (6) persons shall be permitted in
residential areaz.
Amended May 19, 1992
~00~, I]60,'.~.'. 437
APPENDIX 10
!_ GOLDEN GATR MXZTER ~L~
~ FUTUR~ LAND UZE MAP HERIEH
ZONING RE-~VALUATION PROGRAM
", COMI{ERCIAL UNDER CRITERIA
These maps represent those propertie's that have been found consistent
with the Golden Gate Master Plan through the Zoning Re-evaluation
Program and through application of the Commercial Under Criteria
provision of the Master Plan.
- 32 -
-.
CAN BE FOUND ON ASSOCL~.TED
IMHOKALEE MASTER PLAN
Prepared
COLLIER COUNTY
GROWTH PLANNINa DEPARTMENT
&
L.WoAo ASSOCIATES
(FORMALLY PLANNINa SERVICES)
P.O. BOX 3164
STUART, FLORIDA 34995
YEBRUARY 1991
Amended May 19, 1992
Amended August 4, 1992
Amended May 25, 1993
RE-PRINTED FInRUARY, 1991
RI-FORMATTED i RE-PRINTED FEBRUARY, 1993
440
TIll IMPLFa4XNTATION STRATEGY
This section is where the plan is placed into effect.
Implementation strategies include goals, obJ ectives and policies,
and the land use designation section.
= ~ Ao GOAL8~. OBJECTIVES aND POLICIES
POPULATION
~OAL It TO MAINTAIN A HIGH QUALITY OF POPULATION ESTIMATES TIEAT
EMPLOY Ale APPROPRIATE MIX OF CENSUS METHODOLOGIES
CONSISTENT WITH FLORIDA STATE PLANNING REQUIItEM~NT8 AND
THE UNIQUE NEEDS OF TH~ IMMOKALEB COEMUNXTY,
OBJECTIVE I · 1 X
Provide accurate annual estimates of the housing units and the
population residing in the Immokalee community. Estimates will be
coordinated with Collier County and the State of Florido's.
planning procedures. By 1992, population estimating standards and
projection procedures for the Immokalee community will be
developed and implemented in a manner that ensures that these
standards and procedures are well maintained over time.
Policy
: Employ timely Immokalee population estimates in establishing and
maintaining adequate housing and Level Of Service (LOS) Standards
to ensure the community is adequately served by the Immokalee
urban areo's sanitaz7 sewer, solid waste collection, subsurface
..~. drainage, and potable water systemsX roadsX and recreational
.!. facilities.
Policy 1.1.2t
Provide for an uncomplicated and efficient process of gathering
and monitoring the population-related information generated by the
independent Immokalee Water and Sewer and Fire distrlcts~ ~he
Collier County Public Schools~ Florida State entities including
but not limited to the departments of Agriculture, Community
Affairs, Health and Rehabilitative Services, and Labor and
Employment Security~ and Federal entities including but not
limited to the Public Health Service and the U.S. Postal Service.
Polio= 1.1.3t
Bye} SCptmeber 1993 establish and implement a planning
agreement between the Collier County Agricultural Exte~sion
Division. the Southwest Florida Research and Education Center. th~
Southwest Florida Regional Plannin~ Council and the ~
Planning Departs&at Collier County Community DeveloDment Services
9
~ to conduct an--amma~ _~ive county roalonal labor survey to
~ ~n the Immokalee area ~ to reoor~ gainful emplo~ent
pr~ided by agri~lture, related agri-~ndustries, constmct~on,
and ~e hospitality ~ndust~, and shall include a five ~ear
forecast of furze l~or needs for ~ese industries, as ~ell as
ho~ing,re~l=~ents and repo~ same according to the oc~pation.
080 .~.,~ 4 ~2
,~ OBJECTITB 1.2S
One year after the ~g, 199S Evaluation and Appraisal Repor~
!' submittal date, the Growth 'Planning Department shall conduct a
mid-decade census of the Immokalee urban area, employing the best
available methodologies, to ensure that the most accurate possible
population data is employed for adequate housing and for
maintaining adopted Level Of Service (LOS) standards for sanitary
sewer, solid waste, drainage, potable water, roads, and
recreational facilities in the Immokalee area. Sound demographic
data is necessary and will be developed prior to the preparation
of public facilities plans, regulations, and ordinances.
Polic~
Preplanning for conducting a mid-decade census of the Immokalee
Urban Area must be completed prior to ~994 1995~
Poli~ 1.2.2S
Ensure the availability of sufficient and appropriately located
land for the sanitary sewer, solid waste, drainage, and potable
water utility facilities necessary to support approved renewal and
development activities by employing the best available population
projections and locational analyses for estimating the need for
and location of future public facilities and housing.
~..
LANDUSw
GOAL IZz ZNKAXCB IMMOIALIS,S QUALXTX O~ LI~B~ FA~URAL BIAUT~
INVZRONXINTA~ QUXLXTY XND 8X~LL-TOWN CHM~CTER, ZTS STABLI
NIlZGIIBOItlIOODS~, ~ ITS STATUS A~ THll UKBXN HUB FOR
SURROUNDING AGRZCULTIF~J,L
O]~TIC~Ztl ll.~l
Unless otherwise permitted in ~his KeePer ~lsn lot Zmmokales,
or revised uses ol land shall be consis4~nt vith deei~nations
location and configuration o£ its components, the Future Land Use
Map is designed to coordinate land use with the natural
environment including topography, soil and other resources~
maintain and develop cohesive neighborhood units~ promote a sound
economy~ and discourage undesirable growth and development
patterns, (This objective shall supersede Objective 1 in the
Count~-wide Future Land Use Element o~ the Growth Management
Plan,)
The Immokalee Master Plan Future Land Use Designation shall
include Future Land Use Districts and Subdistricts for:
A. Residential Designation 1. Low Residential District
2. Mixed Residential District
3. High Residential District
B. Commercial Designation 1. Commercial District
2. Neighborhood Center District
3. Commerce Center - Mixed Use District
4. Commercial Development within PUD Subdistrict
5. Commercial Under Criteria Subdistrict
C. Industrial Designation
1. Industrial District
2. Commerce Center - Industrial District
Standards and permitted uses for each Immokalee Master Plan Future
Land Use District and Subdistrict are identified in the Designation
and Description Section. (This Policy shall supersede Policies 1.1
and 1.3 in the County-wide Future Land Use Element of the Growth
Management Plan. In addition, the Immokalee Master Plan Future Land
Use Map shall be used instead of the County-wide Future Land Use
Map.)
12
,o. 444 a
Peli~
Collier County shall closely coordinate the location, timing,
intensity and design of future development. This policy shall be
implemented through the County's Adequate Public Facilities
Ordinance.
land use transition between lower and higher intensity uses shall
be achieved through the use of natural vegetative open space
buffers, physical barriers such as harms, hedges or other
landscape cover, setbacks and height limitations as described in
the zoning and landscape sections of the County Zoning Ordinance.
Policy II.1.4t
A mixed-residential land use category shall be established that
allows for the mix of residential structures. As part of
implementation of this Plan, the existing Village Residential
zoning district shall be revised to reflect the intent of the
Mixed Residential land use category, and incorporated into the
County's land Development Regulations.
Polic~ II.l. Sx
Compatibility of uses and their intensities with surrounding
properties within the CommerceCenter - Mixed Use District shall
.be achieved via the development of an areawide plan for the
district. Once completed, the Immokalee Master Plan shall be
amended to incorporate the areawide plan. This plan shall be
prepared by the eo~~by
~nue~~L~and Will address the following issues:
- compatibility
traffic impacts
- parking
- buffering
- setbacks
- architectural character
- signage
- reuse/redevelopment incentives
- pedestrian circulation
- economic incentives
land uses that meet the residential needs of ~he Immokalee
community (e.g. day care, health care needs, schools, grocery
shopping, recreation) shall be designated within a reasonable
walking distance of those portions of the community which are or
will likely become heavily pedestrian in nature.
Polic~ XI.X.Ts
Existing agricultural activities may continue within the Urban
Designated Area. New agricultural uses are permitted as long as
they do not become either a nuisance or create noxious conditions.
13
445
~y 1992, the Growth Planning Department will review an<] take steps
to encourage redevelopment efforts for the South Immokalee Area
,'~"' bounded by South 9th street to the west, Main Street to the north,
.. 16th Street SE to the east and to the south by Eustis Avenue (on
the east side of 1st Street) and Doak Avenue (on the west side of
1st Street) and the residential area located in the Industrial
Designation bounded by New Market Road and 10th Court South. These
efforts to encourage redevelopment shall include but shall not be
limited to, the upgrading of substandard structures; reviewing land
use patterns; rezoning inconsistent land usesl and the provision of
sidewalks, street lighting and community beautification.
~r~ram'~ appllcati~n deadllna and ~Iaster ~lan adoption, hut
~,all L~ considered .......... with thla .... tar ~lan only
extent of th& detemlnati~n granted and In accordanc~ -'=~ all
other ll~Itatlona and ti~linea provided. · .... ~ ...........
......... ' ................ ' ................ Management Plan
The
· ~':/ Poli~ II.l.~ ~
~. Upon adoption of ~e I~okalee Master Plan, no development orders
/ shall be ~ssued for ~ose prope~tes that are ~nconsts~ent vtth
the ~nd Use Designations identified in the I~okalee Master Plan.
Prope~les which do not confom to the I~okalee Master Plan Eha11
be rezoned by the County to a Zoning District consistent vith the
Master Plan, C~II~&~ C~un~y'a Gro~h ~l&nnlng ~e~ar~an~ ahall
........................... ~eL'tle~ f~un~ t~ ~e Ir, c~nalsten~
· with thi~ :-:a~tar .................................. '-
County Initlatea z~zona. (This objective shall supersede
b
O Jective I in the County-wide ~ture ~nd Use Element of the
Gro~h Management Plan. )
· ~ended Au~st 4, 1992, Remedial Plan ~en~ent (Ordinance
No. 92-50)
14
Poliay XX.l.i~10s
The County shall evaluate downuown Immnkalee and designate a
Central Business District in which the County's off-street parking
requirements shall be modified to reflect the needed parking for
businesses located in the defined area.
OBJBCTZVB XX.21
Ensure the Land Use designations and related zoning ordinance
support the rehabilitation and creation of affordable housing.
· ' PollinS lI.2.11
~x ....... l I~;2, t~he erowt~ l~n~ Rants Planning Department ~
~ommunitV Development Services Division shall review and amend as
appropriate all County Development Regulations to ensure that the
ability to provide affordable housing in Immokalee is not being
unreasonably constrained by such ordinances.
Poli~$ XI.a.2s
~y Januaz~- 19~& t~The Community Development Services Division
shall adopt Land Use and Zoning regulations which will encourage
residential infi11 in areas served by sewer, water, schools and
shopping.
Zy =a;;u&.]- i==2&~The Community Development Services DivisiOn
shall further evaluate the actual availability of land for
affordable housing when wetlands, other environmentally important
areas, and active agricultural land uses are taken into
consideration.
!:
15
Encourage innovative approaches in urban and project design which
enhance both the environment and the' visual appeal of Immokalee.
~olicrZ ll.3olz
· Ea~a~Te~~l~~design, adopt and fund a
program for green belts, linear parks, and other related green
spaces which will contribute to the maintenance of sound
environment and enhance the quality of life.
When a proposed project clearly demonstrates benefit to low to
moderate income citizens by promoting affordable housing or
enhances the local economy by creating employment opportunities,
the Board of County Commissioners may direct, as necessary,
amendments to the Immokalee Master Plan or Zoning Ordinance to
provide for the proposed project.
O&TIGwX'X'~I lX,4s
Provide land use designations, criterin and zoning which recognize
the needs of that significant portion of Immokalee's population
which is primarily pedestrian in nature.
Poli~y ll,4olt
~y January 1993, review and amend as appropriate, the County
Zoning Ordinances for the provision of facilities that meet the
needs of the pedestrian and biking population of Immokalee (i.e.,
bike racks, etc.).
0B3~CTI~I ZZ.Ss
Recognizing the increasing need for farm labor, to ensure an
.adequate number of decent, safe, healthful, and affordable housing
units for farm workers in Immokalee, sites for housing for farm
workers which complies with section 10D-25 of Florido's
Administrative Code and the Housing Code of Collier County shall
be designated so as to keep pace with the population.
PolioT ZI.S.II
New development for housing for seasonal, temporary or migrant
workers shall be permitted in any land use designation provided
they are permitted under Section-10D-25 and do not conflict with
the zoning districts or Land Use map.
Yolio~ XX.S.2t
"Migrant Labor Camps" as defined by Section 10D-25 of FAC can also
be developed in any commercial land use area if they conform to
the requirements delineated in the ~ General ~
Zoning District (C-4) of Collier County's Zoning Code regarding
development standards, parking, landscaping and buffering
requirements and are. permitted under Section 10D-25 of F.A.C.
OBJ=CTIVS ll.6s
Ensure that land use policies do not adversely affect either
public or private wells for potable water.
Poli~ 11.6.11
Review all existing, proposed and future land use and zoning
policies, regulations and criteria to ensure that they do not
allow or encourage land uses which will adversely affect potable
wells for public or private use.
Polic~ 11.6.21
B~ January 1992, complete a screening of the public and private
wells in the Urban Designated Area to identify any possible
groundwater contamination. If a problem is identified, the County
shall recommend ways of correcting the problem and establish a
monitoring program to ensure safe and sanitary conditions of
public and/or private wells for potable use.
19
GOaL llll C~TR ~ RNVZItOI~L~T WITHIN WHICH ~L WO~ZNQ~ DZB~D
F~ILZ~S~ WILL ~ X ~MO~ O?~RT~ITY TO ?~C~
IDE~IFZED IN TH~ I~O~E~STER
B~ ~ SeDte~er 199~, the ~ount~'2 ~O~m~nitv Develcome~t
Se~ices Division will have prepared
~ear comprehensive hous~n~ plan which h~s
accomplishi~ Housin~ Co~l III w~th~n the ten ~ear time ~rame and
maintain~n~ ~at ~oal thereafter.
address ~e ~eeded roles and actions o~ both the p~l~c (~cal,
State, Federal) and priv~te sectors (~.e.
co~tt~R~ retired resources).
~li~ ZZZ,I.~z
~ ~ SeDte~er 1993, the ~ ~o~itv Development
2e~ices Division shall h~ve completed a housin~ study that
~nclude such components as the
1. an ~nvento~ of the existing housing stock by housing
t~e, tenure, condition, occupancy and projection of
housing demand7
2. an analysis of existing and approved s~sidized housing,
migrant camp and ram worker housing or other special'
housing for low income families, and present demand for
such housing in order to identify sites~
3. a review of all ~odes and ordinances as identified in
Policy II.2.1 and an identification of any obstacles
that may prevent the provision of adenate, sold, safe,
healthful and affordable housing, e.g., financial,
available land, development codes, impact fees;
4. implementation strate~ to implement plan
reco~endations and policies, this shall include
measurable, annual targets as indicated in Section
VIII.B of Appendix XTI
5. an evaluation of the actual availability of land for
affordable housing when wetlands, other enviro~entally
sensitive areas, and active agricultural land uses are
taken under consideration as identified in Policy
II.2.3.~
20
oo, f]60 , -452
6. an inventory of vacant land in the UDA by location,
owner, tax liabilities and zoning classification to be
updated annually and made available to the Development
Services Department in ImmokaleeT. l
7. provide a research report on strategies to increase the
supply of unimproved land for residential development
for low and very low income households and make
recommendations for the Immokalee Area Future Land Use
Map.
Upon completion of the housing study, the Immokalee Master Plan
shall be amended in the next amendment cycle to include the study.
The County's housing plan and budget for Immokalee will include at
least the elements indicated in the Table of Contents shown in
Appendix X.
Among the analyses required of the County in order to complete the
quality of housing plan described above is the analysis required
by 9J-5 F.A.C. of the County for the'housing element in its
comprehensive plan.
Polic~ III.1.3z
Provide strong public participation during the development of the
housing study.
21
OBJECTrV2 IZI.2Z
Collier County shall promote the conservation and rehabilitation
of housing in Immokalee neighborhoods.
Pol/~ lZl.2.1l
Expansion of urban facilities and services should enhance or
maintain the viability of existing urban residential areas.
Needed public infrastructure improvements in these areas should
receive priority in the County's Capital Improvement Element.
Assist in upgrading existing neighborhoods through active code
enforcement, removing blighting influences, e.g., abandoned
vehicles, and concentrating capital improvements, e.g., road
paving, park development, in such neighborhoods.
Within one year of adoption of this plan, the County's Solid Waste
division shall create a mandatory garbage pick-up program in
Immokalee.
'* 22
OB~ICTM lll. S s
Collier County will respond to the housing needs identified in the
housing study of Immokalee by county initiatives which will reduce
the cost of housing development for low and very low income
households.
Poll~ lII.3.1s
After the Housing study is complete and based on affordable
housing needs identified in the study, by~~
~ County's Communit~ Development Services staff will
initiate the rezoning process for identified **priority" parcels of
land to increase the amount of lots for housing development for
low and very low income households. "Priority parcels" will be
defined as such: those parcels which have water and sewer readily
available and which are bounded by improved residential land on at
least one side (the contiguous lots on at least one side are
developed) or those parcels of which the owner shall provide a
commitment to develop very low or 1or income households or to sell
for development of same. Such rezoning shall not occur on a
parcel where there is an.existing economic activity without the
owner;8 consent.
Polioy III.3.2z
By January 1992 ensure that adequate infrastructure is provided
for sites for affordable housing to low and very low income
households in accordance with location criteria established in the
Future Land Use Element. For possible methods of funding this
infrastructure, the County may consider the use of tax increment
finanoing as well as other methods it determines financially
feasible.
The c~ounty shall pursue research into initiatives as land banking
of foreclosed land due to county held liens, land grants from
c~ounty and other public holdings, as well as tax incentives for
private owners who commit to development for affordable housing
for very low and low income families.
~ol,q zzz. 3.4 z
By January 1993 the County will rezone those areas of Immokalee
which are predominantly mobile home so that residents in areas
with a predominance of mobile homes will be zoned as mobile home
development. '
060 455
~' By~anuary 1993 the County will have in place a pilot plan of
innovative programs and regularcry reforms to reduce the costs of
~!" development and maintenance of safe, healthful, and affordable
~(,. housing for low and very low income households in Immokalee.
Poliw/
By January 1993 the County will have expedited development review
process for developers of housing for low and very low income
households.
Polls/llX.4.2s
By ~ September 1994. Collier County's Community
Development Services will furnish preapproved plans and
specifications for several models for single family homes of one,
two, three or four bedrooms, duplexes, or multi-family apartments
to'families for owner occupied or for non-profit developers.
Poli~y III.4.3s
By January 1993 the County shall consider a waiver of all impact
fees levied by Collier County for developers of affordable units
for low or ver~ low income households in Immokalee.
.=. Policy/II.4.4s
i~- By ~ SePtember 1994. the County Attornev's Office will
..... research those steps under law to provide deferral for at least
;~.!.' two years the ad valorem taxes and special assessments for new
~,~, apartments built for and rented to very low and low income
;:~:" 'households.
". By~m~Septmeber 1993~ the County's Houstna and Urban
Improvement Department of the Community Development Servlceg
i', Division will develop and implement a formal mechanism to network
the resources among the private developers and contractors
especially among the volunteers in the retired community,
appropriate County officials, and those Immokalee residents in the
market for affordable housing so as to create a full
private/public partnership to address housing starts.
Poliwf III.4.6s
By~a~ September 1994. the County's Compliance Services
~t of the Community DeveloDment Services Division will
research and, if lawful, enact an ordinance to require owners of
substandard units who are cited for violations of County
ordinances because his/her units present a serious threat to the
public health, safety, or welfare, to pay a penalty not to exceed
$500 per violation of which will be used not only for County
Administration of code enforcement, but also to assist tenants who
were victims of substandard conditionsl such ordinance will
provide that if the penalty is not readily paid by the owner, the
24
060 , 456
County will £orvard such sums to the tenant and place a lien
against the property for said sum. If the penalty is less than
two months rant, the County shall waive any and'all administrative
costs. This provision shall not apply to tenants whose relocation
is due to a code change within its first year of application when
such citation is due only to implementation of that code change.
~oo~ 060,,,~,~ 457~ ~ ~
O~'lC~XVl XXX,Ss
B~ 2002 there shall be an adequate supply of housing to assure
safe, healthful and affordable housing for agricultural workers in
Immokalee.
PolioT XlI.5.Xl
Zy :anua.-y I~2 ~lhe County's HoUsin~ and Urban Improvement
DeDa~men~ of the Comunitv Development Se~ices Division will
mee~ a~ least twice a year with representatives of the Famers
Home A~inistration for both multi-family and for single family
housing as well as with appropriate officials of the Department of
Couunity Affairs to improve the County's ability to attract more
gove~ent grants and loans to develop housing for fan worker
f~ilies.
POl/~ XXX.S.2z
By ~ Se~te~er 1994. the County's Compliance Se~tces
DeDa~ment of the Co~unt~v Development Se~ices Division will
establish a m~iftcatton of those provisions of the Collier County
Housing Code which are already covered in the standards of the
S~ate of Florida Envtro~ental Health for those units licensed as
migrant labor camps prior to the passage~the Collier County
Housing Code Ordinance.
PoX~ XlZ.5.3~
The County Manager or his deslgnee shall be responsible for
co11~orattng to make an annual repo~ to the Board of County
Co~tsstoners on 1denttried ~ltvlng ~a~ers for five o=* more
seasonal, t~pora~ or migrant fan workers" as defined in 10D-25
F.A.C. and prepared by ~. The repo~ shall include
reco~endattons on Improvements needed to ensure County c~e and
F.A,C. compliance and suggested amen~ents to County codes which
are restricting needed rehabilitation and new developments.
PolL~ ZXZ.5.4:
~ Janua~ 1992, in cooperation with all private groups seeking to
fu~tsh shelters for the homeless, and/or abused women and
children or to establish a hospice care center for AIDs victims in
I~okalee, ~e County will take effective measures to establish or
assist w~ ~e establis~ent of these facilities.
,oo, 060 458
CONBERVXTION
r. QOXL ZVI TRI COU!iTY BII3~L COIITZNU] TO PL3~ll FOR TIEI PROTICTIOII,
CONB]I~VXTZO!I, ]IXIIXQFJIIIIT OF ZTB NXTURXL ILIBOURCE8 XB
DICTXTED BY TI~ CUILRINT XDOPTED GROWTH MAI~GE!~NT PLIdIo
OB;ICTIVI IV, 1l
The County shall protect and preserve natural resources within and
adjacent to the Immokalee Urban Designated Area in accordance with
the Growth Management Plan.
Poli~ IV.I.II
The Immokalee Master Plan shall be updated as appropriate to
reflect the recommendations resulting from the programmatio
commitments of the Conservation and Coastal Management Element of
" the Growth Management Plan.
,?;, ,.
~.; Polic~ IV.l.2t
~j; By ~eTme September.. 1993. ~he Environmental Services
Division shall conduct an environmental survey of the Urban
Designated Area of Immokalee will be conducted and appropriate
areas will be designated as "ST" (environmentally sensitive). The
survey should consider the data provided by the soil conservation
survey as identified in Appendix XII.
459
RECREATION
GO~T~ VX PROVIDI XI~L~ HXGX QUALITY XND DIVERBB It~CRZATIOII~L
OPPORTUNITXI2 TYPICALLY PROVIDED BY TII~ PUBLIC XN X
COIDIUNZTY TI~ BIZ] OF ZMHOIU~EE; FOR ALL X~OKAI~g
CITI2ENB IN A COBT IFFICIENTHMflfER.
O~TXCTIV~ V. IZ
Collier County shall implement a parks and recreation program that
results in a system of parks and facilities convenient to all
Immokalee residents (seasonal end permanent), as well as
recreation equipment and staffing, that reflect their recreational
preferences and offer recreational opportunities to all age
groups.
I~licTV. l.lt
By~mua~j-~ September 1993, Collier County's Public Services
Division shall complete and publish for public comment, and
~n~r~t~adopt a 5 year plan and budget for parks and
recreation that would meet the needs and characteristics of the
total population (seasonal and permanent) of Immokalee.
The plan and budget will be based upon such things as a survey
the preferences and priorities of Immokalee's seasonal and
permanent population. The survey should include:
a. ~uestions concerning community-wide and neighborhood
park recreation issues.
b. Differentiates by neighborhood the estimates of the
population's priorities among alternative combinations
of types of parks and recreation sites, facilities,
equipment, and services.
c. Be conducted during peak permanent and seasonal
population periods.
"~oliorV. 1.St
Future parks will be encouraged to be sited in the designated
neighborhood centers but will not be limited to these areas. This
may be accomplished through methods including but not limited to
the County purchase of land, private sector land donations, or
through an Interlocal agreement between Collier County and the
Collier County School Board.
28
.~-: (3014.7., VZI TH] J~TI:IILI L33D O'fll PATFERN fiKALT- BB BUPPORTED BY X
11~"Z'WOK 01 ROZ4~St PEDEBTRZAN 'WAYB; ~ BZIIWAYB
MAINTAINS ZMMOXAL~B'B SMALL-TOWN CIIARACTER; YET ACHZEVE8
::. ZF/ZCZw-NT AND BAFZ TRAFFIC MOVEKENT.
O~TXCTIVX VZ. 1 t
The County shall provide for the safe and convenient movement of
pedestrians, motorized .and non-motorized vehicles.
.:- Polio~ VZ.I.II
The County's MetroDoliten plannina Oraanization Section of the
Community Development Services Division shall complete a
transportation study for the Immokalee Urban Designated Area by
~ September 1994. Once completed and accepted by the
Board of County Commissioners, the Immokalee Master Plan shall be
amended to incorporate the transportation study. The study will
review existing roadway conditions, identify deficiencies and make
recommendations considering 811 of the following:
a. Consider all recommendations in the Collier County 5
Year Bicycle Ways Plan7
9~'(i b. Give highest priority to completion of the grid network
~": with consideration of those segments identified in the
~, ~ Transportation section of the Support Document7
:r~ c. Identify all right-of-way. on a thoroughfare
· rights-of-way protection map7 and
d. Establish a loop road.
Poll~
The Traffic Circulation Map will graphically depicts Immokalee's
future roadway network, and identiflies specific roadway
. improvements needed to implement the Immokalee Master Plan Future
. land Use Map. These improvements will be prioritized and placed
into the Capital Improvement Element after further transportation
analysis is completed. The proposed alignments shall be
considered as protected future roadway rights-of-way, no
structures or buildings will be allowed to be placed in such
rights-of-way. Further, at the time a landowner seeks development
approval of his project, the right-of-way shall be dedicated to
the County for future roadway use.
. The Collier County 5 Year Bicycle Ways Plan shall give priority to
. linking existing and future residential neighborhoods to each
other, designated neighborhood centers, commercial, employment and
:.. public service areas. This plan will reflect the unique needs of
the Zmmokales com-unity and also take into consideration the need
for pedestrian walk ways in lmmokalee.
Existing and future bikeways shall be graphically depicted on the
Traffic Circulation Map of the Immokalee Master Plan, and shall
become part of the Collier County 5 Year Bicycle Ways Plan.
30
INFIt~STRUCTURa
GOAL VZZ$ TO PROT~CT TI~ H~ALTH AND SAFETY OF THE .PUBLIC BY
EIIBURZN2 ACCTEBB TO ENVIRONMENTaLLY 80~rltD, COST w-FFECTIVE
AND IMPLEMENTASIa POTABLE FATEIt, WASTEWATER FXCILITIEB
AND BTOItMW'ATER MANAGEHEIIT BYBTEMBo
0BJECTIV2
The County shall assure that the adopted level of service
standards for potable water and wastewater facilities are met.
For development that requires the use of the Immokalee Water and
Sewer District services the following provision appliesz If the
level of service standards (LOS) for potable water and wastewater
as described the County's Growth Management Plan are not met, no
development approvals shall be issued until sufficient capacity is
added to satisfy the particular LOS standard.
· Consistent with Florida Chapter Law 89-169 (House Bill 599), the
Immokalee Water and Sewer District shall provide updated water and
sewer data to the Collier County Utilities Division and the County
Division of Community Development.
OBJECTIVB VII.S1
The County and/or th~ South Florida Water Management District
(SFWMD) shall assure that the stormwater management systems are
adequate to meet the needs of the surrounding land uses.
'Z~e County shall include an evaluation of the existing Immokalee
area stormwater facilities into its County-wide Stormwater Master
Plan and follow-up with detailed studies of proposed stormwater
improvements to be included in the Capital Improvement Element.
Poliq~l.2.2s
~y ~ SePtember 1995,. the c~/ounty's Environmental
Services Division shall undertake a Mes~er Drainage Study. A key
concept to be considered is the creation of an areawide drainage
system, instead of the smaller individual drainage systems
required by South Florida Water Management District and Collier
County.
i,i" -.
;
- ~NTERGOVEItt~4XNTAL COORDINATION
GOAL VIIIt EFFICIENT AND EFFECTIVE GOVERNMENTAL (COUNTY, STATE,
FEDERAL) ACTIONS AND RXSOURCI ALLOCATION2 WHICH AEE
APPROPRIATELy RESPONSIVE TO ALL REBIDENT~ REGARDLESS
OF THEIR RESIDENCE, INCOME, AGE, RACE, SEX,
OCCUPATION, OR SPOKEN LANGUAGE.
OBJECTIVE VIII.11
Establish a Public-private body whose function is to improve the
effectiveness of and coordination among public agencies operating
in Immokalee.
PoliCy VllZ.l.ls
By ~ SePtember 1993, the ~ County ~LS~aEL~a~
, whose purpose
shall be to improve the coordination among and effectiveness of
all public agencies ~pe~atlng In I=.-=-.Gkalee. The Council shall be
broad based and shall include representatives from governmental
agencies (HRS & LABOR); local government; health, housing and
social service organizations; employers; farmworkers; the Collier
County School Board; in order to ensure cooperation to
coordination in achieving an effective, workable plan.
Polic~VIII.I.at
Cause to be created by the Information and Referral (I&R) Task
Force =anu&~- l, l~D~ and maintained thereafter a service
evaluation, planning, budgeting, implementation, and progress
reporting process whose annual cycle would include at least the
following:
· a. ~mTt~er~ compilation and publication of a
'~ comprehensive, inter-agency report of the noteworthy
. service outputs, expenditure totals, and revenues (by
~ major source and in total) of all Federal, State, and
. local public services budgeted for the next annua~
"' b. ~mtt~tiT~ publication of progress achieved by
public services in ImmoMalee, comparing budget to
actual, as well as a report of policy and/or
coordination issues being considered for action by the
eo~ncie~ in the next six months.
c. Organize a comprehensive, inter-organization,
multilingual, case management service (which includes
~. such elements as Outreach, Assessment, referral,
· . follow-up and progress reporting) to research and/or
demonstrate how existing resources may be bette~
organized&to ~6tt~r 6ddr~s th~ ~li~In~tion ~:
......................... ~ha~ n~n-~n~id6ntlal
Advi let
Cause to be created by the Information and Referral Task Force
, c?a~ by September 1994 and maintained thereafter an annual
', process for amendment and publication of a forecast of public
service and facility needs for each of the subsequent five years,
showing for each its status with regard to any priority ranking
and/or budgeting decision made by one or more of the public
agencies serving Immokalee.
.-
....
,{ ·
Establish a means by which there can be more effective
· · communications between residents and County government, and
whereby County government can more effectively represent the needs
des res of residents to State and Federal agencies.
and
:~CONOHIC
CON:N~TBX~Z.
OB3ZC~ZlZ IX.IS.
Prepare a plan for economic development for the lmmokalee Area.
',.' By ~maTT-~%~ Sentember 1994, ~he CommunitF Development Services
!;'j. Division shall prepare an economic component/study to be
~... incorporated into the Immokalee Master Plan. The study should:
a. Identify the economic conditions of the Immokalee area
" including population, income, housing, agriculture and
other employment opportunity.
b. Provide recommendations to enhance and diversify the
local economy and strategies for achieving this.
~'~- =&nu&.]- i==2, The Community Development Services Divisio~f
Transportation Services Division and Real ProDerrv DePartment.
shall promote the developmsnt of the Immokalee Airport and
surrounding commercial and industrial areas. This would be
accomplished by. implementing the capital improvements program set
forth in the Immokalee Airport Master Plan. These improvements
shall be made part of the Capital Improvement Element of the
Collier County Growth Management Plan. In addition, an associated
economic development promotion program for the Airport will be
prepared and implemented.
Develop a program with strategies to promote the incentives of
Enterprise Zone designation.
~ Investigate the opportunities for renewal and redevelopment under
" the Safe Neighborhood Act. The County shall also pursue any
grants or funding available under this Act to assist with
e enhancing the Immokalee community.
Coordinate with the Collier County School Board to ensure that the
employment skills and training needed for the types of industries
targeted in the economic component/study are closely aligned to
Job opportunities that will become available.
,~ 7~
~! The following section describes lend usa designations shown on the
~.', Zmmokalea Hastar Plan Future land Use Map. These designerions
~-~ generally indicate the types of land uses for which zoning may be
~! requested. However, these lend use designations do not guarantee
· ' that a zoning request viII be approved.
Residential Designation
This designation is intended to accommodate a variety of
.:. residential land uses including single-family, duplexes,
~'.." multi-family, and mobile.homes, which does not preclude seasonal,
· temporary and Migrant farmworker housing.
1. Low Residential District
The purpose ofthis designatio~ is to provide for a low density
residential district. Residential dwellings shall be limited to
single-family structures and duplexes. Multi-family dwellings
shall be permitted provided they are within a Planned Unit
Development. Mobile home development shall be permitted in the
form of mobile home subdivisions or parks and as a mobile home
overlay as defined by the Collier County Zoning Ordinance.
A density less than or equal to four (4) dwelling units per gross
acre is permitted.
2. Mixed Resi~ential District
The purpose of this designation is to provide for a mixture of
housing types within medium density residential areas. Residential
dwellings shall include single-family structure,multi-family
dwellings, individual mobile homes, and duplexes on a lot by lot
basis.
A density less than or equal to six (6) dwellings units per gross
acre is permitted.
3, Xigh ResidentIn1 District
-? The purpose of this designation is to provide for a district of
:='~' high density residential development. Residential dwellings shall
be limited to multi-family structures and less intensive units
such as single family and duplexes provided they'are compatible
with the district. Mobile home developments shall be permitted
only in the form of mobile home subdivisions or parks as defined
in the County's Zoning Ordinance.
A density less than or equal to eight (8) dwelling units per gross
acre is permitted.
Non-Residential Uses
Non-residential uses permitted within the residential
classifications are limited to those uses that are compatible
f Amended May 19, 1992
38
060 :'70
PAG[
uses include: parks, open space and publicly-owned recreational
uses, churches, libraries, cemeteries, public and private schools,
Zoning Ordinance.
day-care centers and essential services as defined in the County's
Commercial Designation
The designation is intended to accommodate a variety of commercial
land uses including neighborhood oriented commercial uses,
commerce center uses, general highway commercial and commercial
development within Planned Unit Developments. Migrant Labor Camps
are also permitted with the Commercial designations.
~. Commercial District
The purpose of this designation is to provide for retail, office,
transient lodging facilities and highway commercial that serve the
needs of the traveling public. These commercial uses must be
located on a major arterial or collector roadway.
The following developmen~ criteria must be met for future
development within the Commercial District along S.R. 29.
A. The following development criteria must be met for future
development within the Commerical District along S.R. 29.
- Access points shall be limited to one (1) per 440
feet. If the 440 foot access requirement fall
within 50 feet Of an existing road, whether on the
same or opposite road frontage, the access shall
align with the existing road. Those areas that do
not meet the 440 foot spacing requirement shall
provide access off existing adjacent roadways and
shall not permit access to S.R. 29.
- Projects shall make provisions for shared parking
arrangements with adjoining developments.
- Projects shall provide deceleration and
acceleration lanes.
- Projects shall encourage pedestrian traffic by
providing sidewalks. Adjacent projects shall
coordinate location of sidewalks. '
- Buildings shall be set back from S.R. 29 a minimum
of twenty-five (25) feet.
- Buildings shall be set back from the rear lot line
a minimum of fifty (50) feet.
75
- Projects shall provide a ten (10) foot buffer
between vehicular right-of-way and required
· sidewalks. Adjacent projects shall coordinate
landscape plans.
- Projects shall provide a ten (10) foot landscape
buffer between adjacent residential development.
- Buildings shall have a maximum height of
twenty-five (25) feet plus ten (10) feet for under
building parking.
- A minimum of 2.5% of the gross area of the interior
vehicular use area shall be landscaped to provide
visual relief.
- Central water and sewer facilities shall be
available prior to development of projects.
~ B. The following development criteria must be met for future
!';~. development within the Commercial District along Jefferson
~:!C Avenue.
- Access points for future commercial development
=:~j' shall be limited to a maximum of one (1) ~er 150
,~: feet.
i~ - Commercial projects must provide a ten (10) foot
;! landscape buffer on Jefferson Avenue.
'ii' - Projects shall be encouraged to make provisions for
shared parking arrangements with adjoining
~;. developments.
'~C,' - Commercial building shall be set back from
Jefferson Avenue a minimum of fifty (50] feet.
=i?~' - Commercial buildings shall have a maximum height of
.~ twenty-five (25) feet plus ten (10) feat for under
~. building parking.
'~' - To encourage the integration of properties, ~ollier
County may consider vacating the alley for those
contiguous properties that front New Market Road
and extend to Jefferson Avenue.
- Central water and sewer facilities shall be
· available prior to development of projects.
Owners of lots or combination of lots having less than
=!' the 150 feet required frontage as of the date of
~!7 adoption of this amendment may petition the eof~ Board
;2'~ ~ Amended May 19, 1992
'i'., 40
of Z2ElllgAppeals for a variance from the standards in
this District as will not be contrary to the public
interest when owing to special conditions peculiar to
the proper~y, a literal enforcement of these standards
would result in unnecessary and undue hardship.
2. Neighborhood Center District
The purpose of this land use classification is to provide for
centers of activity that serve the needs of the surrounding
neighborhoods. The centers should contain a mix of neighborhood
oriented uses such as day care center, parks, schools, and
governmental activities, e.g., general government branch office.
Other development criteria that shall apply to all neighborhood
centers includes the following=
: a. To achieve a neighborhood character, these centers are
encouraged to be anchored by elementary schools,
neighborhood scale parks, and/or churches.
b. A center should be limited to 80-120 acres in size, and
will serve a population ranging between 5,000 to 7,500
people, or accommodate a service area of one (1) mile
radius.
c. The Neighborhood Centers should be no closer than one
(1) mile.
d. Non-resldenti~l uses shall be permitted up to 50% but
not less than 20% of .the size of the Neighborhood
' Center.
=: e. Residential development within the designated
:-~ neighborhoods center shall permit a maximum density of
. 12 units per gross acre.
'/ Residential Dwelling shall be limited to multi-family
· structures and less intensive units such as
single-family and duplexes provided they. are compatible
with the district. Mobile home developments shall be
permitted only in the form of mobile home subdivisions
or parks as defined in the County's Zoning Ordinance.
· f. Commercial development shall be permitted within a .
f., Neighborhood Center provided all of the following .
' criteria are met.
1. Commercial uses shall be limited to barber and
beauty shopsy drug stores~ deli$ meat market~
bicycle services[ restaurantX dry cleaningx
veterinary clinics~ medical offices~ laundry
facilities~ any other convenience commercial uses
which is compatible in nature with the foregoing
41
uses. ~he Collier County School Board v111 be
notified of any proposed use to avoid confZict with
the nearby schoolsy and
~=~ 2. No commercial use shall be permitted within a 1/4
~ mile of a school within a Neighborhood Centsty and
~j- 3. Access'to the commercial development must in no way
conflict with the school traffic in the areay and
~"~ 4. The design of any proposed commercial development
=~'. must take into ·consideration the safety of the
~,: school children.
~' 5. The projects within the Neighborhood Centers shall
~. make provisions for shared parking arrangements
;~. with adjoining developmentsy
!.. 6. Driveways and curb cuts shall be consolidated with
adjoining developmentsX
7. Projects directly abutting residentially zoned
· property shall provide, at a minimum, a 50 foot
.:' setback and landscape buffer~
., 8. Projects shall provide a 10 foot wide landscaped
strip between the abutting right-of-way and the
off-street parking area.
/' From time to time new Neighborhood Centers may be prohosed. No
two centers may be closer than one mile from each other. New
Neighborhood Centers would require market Justification and must
meet size, spacing and use criteria expressed earlier.
There is one Future Neighborhood Center identified along Carson
Road (the east, west alignment). If and when the area begins to
contain the uses intended for the district (schools, parks,
churches, etc.), it shall automatically'become a Neighborhood
Center and at that time become eligible for commercial zoning
requests. The Master Plan will be amended to incorporate the new
neighborhood center. The spacing requirement for commercial
zoning in relation to schools is 1/4 mile.
3. commeroe center - Mixed Use Dietriot
The purpose of this designation is to create a major activity
center that services the.entire'Immokalee Urban Designated Area
and surrounding agricultural area. The Mixed-Use District shall
function as an employment center and shall encourage commercial
and institutional uses. Uses permitted within this subdistrict
shall include shopping center, governmental institutions, middle
or high school, community park and other employment generating
uses. Other permitted commercial uses shall include transient
lodging facilities.
42
In considering new commercial zoning, priority shall be given to
protecting existing residential uses.
Residential development is permitted within the mixed-use
subdistrict at.a maximum density of twelve (12) units per gross acre.
Residential dwellings shall be limited to multi-family structures
and less intensive units such as single-family and duplexes
provided they ere compatible with the district. Mobile home
developments shall be permitted only in the form of mobile home
subdivisions or parks as defined in the County's Zoning Ordinance.
The mixed-use district will be controlled via a series of
performance standards that address issues of buffering, noise,
signage, lighting, architectural compatibility, lot size, parking
and landscaping.
:"~ Non-commerolal Uses
'~ In addition to those mixed-uses permitted within this subdistrict
"' uses such as parks, open space and publicly-owned recreational
" uses, churches, libraries, cemeteries, public and private schools,
i'/ day-care centers and those essential services as defined in the
Zoning Ordinance are permitted.
Industrial Designation
This designation is intended to accommodate a variety of
industrial land uses such as Commerce Center - Industrial and
Industrial.
l. Industrial District
The purpose of this designation is to provide industrial type uses
including those uses related to light manufacturing, processing,
..' storage and warehousing, wholesaling, distribution, packing
houses, recycling and other basic industrial uses as described in
the Zoning Ordinance for the Industrial ana Light
Zoning Districts. Accessory uses and structures customarily
associated with the uses permitted in this district, including
offices, retail sales, and structures which are customarily
accessory and clearly incidental and subordinate to permitted
principal uses and structures are also permitted. No residential
facilities shall be permitted in the district except for housing
of security guards, watchmen or caretakers whose work requires
residence on the premises. ·
2. Commeroe Center - Industrial Dietriot
.. The purpose of this designation is to create a major Activity
Center that serves the entire Immokalee Urban Designated Area and
surrounding agricultural area. The Industrial ~istrict shall
function as an employment center and shall encourage industrial
and commercial uses. Higher intensity commercial uses including
packing houses, industrial fabrication operation and warehouses
43
shall be permitted within this District. Accessory uses end
structures customarily associated with the uses permitted in this
district, including offices, retail sales, and structures which
are customarily accessory and clearly Incidental and subordinate
to permitted principal uses and structures are also permitted. No
residential facilities shall be permitted in the district except
for housing of security guards, watchmen or caretakers whose work
requires residence on the premises.
Non-Industrial Uses
.'] In addition to those industrial uses permitted within this
,. district, uses such as those essential services as defined in the
Zoning Ordinance are permitted.
Special Provisions
~' X. Densit7 Bonuses
a. Proximity to Neighborhood Center and Commerce
~: Center-Mixed Use
If 50% or more of a project is within a Neighborhood Center and/or
Commerce Center-Mixed Use, then the maximum density allowed within
the Neighborhood Center or Commerce Center-Mixed Use of twelve
(12) units per acre can be averaged in with the density of the
portion of the project outside of the Neighborhood Center for the
entire proJect~ however, appropriate buffering to adjacent lower
intensity uses must achieved.
b. affordable Housing
" Provision of Affordable Housing as defined in the Housing Element
would add eight (8) dwelling units per gross acre above the
maximum density of the district~ however, no density may exceed
sixteen (16) units per acre. This bonus may be applied to an
entire project or portions of a project provided that the project
is located within Neighborhood Center (NO), Commerce Center
,. (CC-MU), and all residential districts.
· ~.. o. Residential Infi11
To encourage residential infi11, 3 residential dwelling units per
gross acre may be added if the project is ten (10) acres or less
in size. The following conditions must be met: the project must
be compatible with surrounding land usesx the property in question
has no common site development plan with adjoining propertyy there
is no common ownership with any adjacent parcels~ and the parcel
in guestion was not created to take advantage of the infill
residential density.
d. RoadweT access
If the project has direct access.to two (2) or more arterial or
collector roads or if there is project commitment for provision of
~ interconnection of roads with existing or future adjacent
projects, one (1) residential dwelling unit per gross acre may be
· . added above the maximum density of the district.
44
., 2, Commercial Development within Planned Unit
Development
Commercial development shall be permitted within a Planned Unit
:.. Development provided the following size and development criteria
are met. There are three (3) categories for PUD Commercial. The
O', commercial component within a PUD will be allowed to develop up to
n the maximum acreage specified in the table below.
CATEGORY I CATEGORY II CATEGORY III
PUDAC. 80+ 160+ -300+
'. , COMM.AC. 5 ac. 10 ac. 20 ac.
PE10~ITTED
· " ZONING C-2 C-3 C-2. C-3 & C-4
In addition to the above criteria, the following standards must
also be met~
· a. Commercial zoning shall be no closer than one (1) mile
to the nearest commerce center and no closer than one
, mile from the nearest PUD commercial zoning of ten acres
or greater in sizel
b. The configuration of the commercial parcel shall be no
more frontage than depth unless otherwise authorized by
the Board of County commissionstel
# c. Commercial zoning or development shall be no closer than
a ~ mile from the nearest elementary school within a
Neighborhood Center~ and
" d. No construction in the commercial designated area shall
be allowed until 30% of the project has commenced'
construction unless otherwise authorized by the Board of
County Commissioners.
3. Commercial Under Criteria
Within the Immokalee Urban Designated Area certain infi11
..; development may be permitted. This shall apply to areas without
Commercial Land Use Designation and only if the area are already
substantially developed for such uses. The following standards
which limit the intensity of uses must also be met:
a. The proposed use must be bounded by existing commercial
development on both sides and the parcel should not
',. exceed 200 feet in width. although the width may be
greater at the discretion of the Board of County
CommissionsreX
# Amended May 19, 1992
'45
~'~ # b. The proposed use must not generate in excess of five
~; percent of level of service C design capacity on
.~; abutting streets that provide access to the proJectx and
~ c. The proposed use must not exceed a floor area of 25,000
'.;
t ~mended Hay 19, 1992
46
STATE OF FLORIDA
I, DWXGHT E. BROCK, Clerk of Courts ~n and for the
~ent~eth Judicial C~rcu~t, Collier Count~, Florida,
hereb~ cer=~f~ that the fore~oing ~s a true ccp~ of:
Ordinance No. 93-24
which was adopted b~ the Board of County Commissioners on
the 25th day of May, 1993, during Regular Session.
WITNESS my hand and the official seal of the Board of
County Commissioners of Collier Count3[, Florida, this let
day of June, 1993.
DWIGHT B. BROCK ...--~:... .. ....
Clerk of Courts and Clerk_%\%.~,~S ~ '
Ex-offtcio to Board of ~ ........... '~,
County Commissioners
.~..':..~ ...-...,
Deput~ Clerk '~' 2'
· .'.
/., · ..
· . 23 ~ :3 '~ '