Loading...
CCPC Agenda 09/18/2008 GMP Co~T _~ou.nt~ MINUTES & RECORDS -, MEMORANDUM TO: Collier County Planning Commission FROM: David Weeks, AICP, Planning Manager, Comprehensive Planning Department DATE: September 10, 2008 RE: Deliverables for September 18, 2008 Adoption Hearing - GMP Amendments Please find attached the following itemslor petition CPSP-2007-7 (on Consent Agenda/, L CCPC Recommendations to be approved on 9/18/08 Consent Agenda 2, Map of Future Schools and Ancillary Facilities 3, Map of Existing Schools and Ancillary Facilities 4, Map of Public Facilities with School Co-location Opportunities Please find attached the following items for petitions CP-2006-7 and 8 (continuedlrom August 29 hearing/, L Supplemental Staff Report 2, 9/9/08 memo from Bob Duane of HoleMontes (attachment to Staff Report) 3. 9/9/08 memo from Russ Weyer of Fishkind & Assoc. (attachment to Staff Report) 4. Ordinance for CP-2006-7 reflecting it as part ()lthe combined Orange Blossom/ Airport Crossroads Commercial Subdistrict 5. Ordinance for CP-2006-8 reflecting it as part of the combined Orange Blossom/ Airport Crossroads Commercial Subdistrict 6. Exhibit "A" text of the combined Orange Blossom/Airport Crossroads Commercial Subdistrict 7. Exhibit "A" map of the combined Orange Blossom/Airport Crossroads Commercial Subdistrict 8. Exhibit "A" Future Land Use Map depicting the combined Orange Blossom/Airport Crossroads Commercial Subdistrict 9. 9/1 0/08 memo from TR Transportation Consultants, Inc. 10. 9/9/08 memo and intersection analysis from TR Transportation Consultants, Inc. II. Spreadsheet of Airport Road/Orange Blossom Drive intersection improvements cost analysis (Exhibit A, Proposed Intersection Improvements) 12. Map of proposed Airport Road/Orange Blossom Drive intersection improvements 13. Aerial map of Airport Road/Orange Blossom Drive intersection and surrounding properties (Exhibit B, Existing Conditions) Please find attached the following itemsfor petition CPSP-2006-13 (continuedlrom August 29 hearing): L Supplemental Staff Report 2. Section 5.04.04 of the LDC (attachment to Staff Report) ~, cc: Randy Cohen. AICP. Director, Comprehensive Planning Department Joe Schmitt, Administrator, CDES Division deliverables for 9-18-08 Adoption hearing G:\Comprehensive\Comp. Planning GMP DATAIComp. Plan Amendments\2006 petitions dw/9-10-D8 - --~--_. -...- .,.'-,. ",,_. .,-----,.-,---- .--. PETITION CPSP.2007.7 CCPC RECOMMENDATIONS ON THE SCHOOL CONCURRENCY AMENDMENTS AND INTERLOCAL AGREEMENT TO BE APPROVED ON THE SEPTEMBER 18, 2008 CCPC CONSENT AGENDA ", INTERLOCAL AGREEMENT Definitions 1. Educational Facilitv - Delete the word "boards" and insert the phrase "the School Board" to make definition consistent with Florida Statutes. [Revision is from change sheet provided at the 8/29 public hearing.] Educational Facilitv: Buildinos and e~uipment. structures and special educational use areas that are built. installed or established to serve primarilv the educational purposes and secondarilv the social and recreational purposes of the community and which may lawfullv be used as authorized bv the Florida Statutes and approved bv the School Board. 2. School District Five-Year CaDitallmDrovement Plan (CIP) - In the heading, delete the reference to "a.k.a. Educational Facilities Plan, as defined in s. 1013.35, F.S." as the two documents are not synonymous. [Revision is from change sheet provided at the 8/29 public hearing.] School District Five-Year Capital Improvement Plan (CIP): School Dislrict's annual comprehensive capital plannino document. that includes lono ranoe plannino for facilitv needs over a five-vear. ten-year and twenty-year plannino horizons. The adopted School District's five-year District Facilities Work Prooram and Capital Budoet as authorized bv Section 1013.35 F.S. Section 4.2 Insert "as a base for determining future student enrollment for each educational facility" after the word "projections" in the first sentence, and delete the text reference to COHORT Projection Waiver, as Waiver is no longer available through the FDOE. [Revision is from change sheet provided at the 8/29 public hearing.] 4.23.2 Student Enrollment Proiections. The School District Bear€! shall utilize the Florida Department of Education (EDOE) five-year county-wide student enrollment projections as a base for determinino future student enrollment for each Educational Facilitv. The School Bear€! District may request that the EDOE projections be adjusted to reflect actual enrollment and development trends not anticipated by the EDOE projections. In formulatin@ SUGh a requm:t tlhe School Bear€! District will shall coordinate. and reach aoreement. with the County Local Governments on any adiustment{s) made to the five-year countywide FDOE student enrollment proiections resultino from the use of ~-. development data. as reouired bv Section 1013.35 (2)(a)1. F.S. regardin@ futldre population projoGtions and @r.O'.vth. The pfive-year population and student I ___'_M_ --- M____ "--" ~_.- ----.------ ~ Section 8.5 (a) Delete the term "educational plants" and insert the phrase "educational facilities and/or sites" to clarify intent of provision. [Revision is from change sheet provided at the 8/29 public hearing.] 8.5 +-.e Review Criteria. In reviewing and approving land use applications, rezoning requests and development proposals DRls. the CellFlty Local Governments will consider, if applicable, the following issues when r-oquesled by tho School Beard: (a) Providing schoel siloE; and facililios Educational Facilities and/or sites within planned neighborhoods. Section 12.2 Insert the term "Educational Facility" and delete the word "facility" to clarify term/intent in the first sentence. [Revision is from change sheet provided at the 8/29 public hearing.] Local Government Approval. Pursuant to Section 1013.33 (13). F.S.. a Local Government mav not denv the site applicant based on adeouacv of the site plan as it relates solelv to the needs of the Educational Facilitv... - Section 12.3 (b) Revise section to require the extension of the 2003 SBR ILA beyond its expiration date in May 2009; and, remove reference to the declaratory judgment as an option for resolving site planning issues between the School District and Board of County Commissioners for all existing mapped and future educational facilities approved under the 2003 SBR ILA. (b) Expiration of the SBR Interlocal Aareement Between the County and the School District. The Countv and the School District aoree that prior to the expiration of the SBR Interlocal Aoreement in Mav 2009. thev will neootiate in oood faith and use their best efforts to develop another SBR Interlocal Aoreement. to be entered into pursuant to Section 1013.33 (14) F.S. If the Countv and the School District are unable to aoree on another SBR Interlocal Aoreement prior to the expiration of the existino Aoreement then the 2003 SBR ILA expiration date shall be extended until: ( 1) such time as a new or amended SBR ILA is adopted to address site development of the existino mapped sites and future sites approved under the 2003 SBR ILA: and. (2) until the Countv. in coordination with the School District. is able to establish a new process for the development of sitino criteria that encouraoes the location of public schools proximate to urban residential areas to the extent possible. pursuant to Section 163.3180 (13) (0) 2. F.S.. and adopts amendments to the Future Land Use Element and map series. Immokalee area Master Plan and Golden Gate Area ~". Master Plan, to include new sitino criteria, consistent with Section 163.3177(6)(a). F.S. 3 .~...- -_.- --.-.. --.-.-- -, October 1 The School District shall submit to the Countv and Cities the District Educational Facilities Plan and financiallv feasible Five-Year Capital Improvement Plan. formallv adopted bv the School Board between Julv 1 and October 1 each vear. )0- PUBLIC SCHOOL FACILITIES ELEMENT Policy 1.4.1: Insert "or a date as may be later approved by the Florida Legislature" after the word "year" in the first sentence to avoid the need for a Growth Management Plan amendment should the Florida Legislature change the December 1 deadline in the future. Policy 1.4.1: No later than December 1 'I of each vear. or a date as mav be later established bv an amendment to Florida law. the Countv shall adopt bv reference the School District's annuallv updated and financiallv feasible Five-Year Capital Improvement Plan. as identified in Policv 4.2 in the CIE of this Comprehensive Plan. and as formallv adopted bv the School Board between Julv 1 and October 1 each vear. Policy 1.4.3: Revise policy to emphasize coordinated public school facilities planning, ~~" consistent with Florida Statutes. Policy 1.4.3: The Countv. in coniunction with the School District. shall coordinate the lono ranoe public school facilities needs over the five and ten vear plannino periods with its Comprehensive Plan. includino the Future Land Use Map and map series. to provide sufficient land use cateoories proximate to residential development in which public schools are allowed. and include criteria to encouraoe the location of schools proximate to urban residential area to the extent possible. pursuant to 163.3177(6)(a). F.S. )0- PUBLIC SCHOOL FACILITIES ELEMENT DATA AND ANALYSIS REPORT Summary of Anticipated Ancillary Plant Needs (page 26) Second paragraph, delete both references to "shown in Figure 7" as site references are now noted in the map table. [Revision is from change sheet provided at the 8/29 public hearing.] The Northeast Maintenance/Transportation Satellite Facility is currently scheduled to be completed during FY 2008/2009 for a total cost of approximately $6 million. The District has not yet identified a location for this facility. though the facility will not likely be more than 25 acres in size. Its anticipated location is northeast of the City of - Naples. The Immokalee Maintenance/Transportation Facility is currently scheduled to be completed by the end of FY 2009/2010, and will cost just over $10 million to 5 ~"_,__._,__._. 'h_ ,,__ ~_...".. fi"..__'" _._..._"__~_h ...--..--- -- Map has been modified to correct mislabeled schools and to include schools inadvertently omitted when School District maps were re-created by the County (refer to attached map). ~ FIGURE 11 WITHIN THE PUBLIC SCHOOLS FACILITIES ELEMENT DATA AND ANALYSIS REPORT PUBLIC FACILITIES WITH SCHOOL CO-LOCATION OPPORTUNITIES MAP Map has been modified to correct mislabeled schools and to include schools inadvertently omitted when School District maps were re-created by the County (refer to attached map). '" INTERLOCAL AGREEMENT FOR PUBLIC SCHOOL FACILITY PLANNING AND SCHOOL CONCURRENCY, CAPITAL IMPROVEMENT ELEMENT, AND PUBLIC SCHOOL FACILITIES ELEMENT Grammatical changes, changes to sentence structure, consistency of dates, consistent reflection of CCPC-directed revisions (e.g. "... provided such adoption does not affect the Local Governments' ability to maintain a financially feasible CIE for the current five-year planning period.") and other revisions that do not change the meaning or intent of the respective provisions, as needed, throughout .- the documents listed. " FUTURE SCHOOLS AND ANCILLARY FACILITIES MAP AND PUBLIC FACILITIES WITH CO-LOCATION OPPORTUNITIES MAP Revise Map Note to reflect that all mapped and future facility sites approved under the 2003 SBR ILA shall comply with all provisions of that Agreement, as noted below. Map Note: This map depicts sites for future school facilities, as required by Chapter 163, F.S. and Rule 9J-5, F.A.C. These sites have been deemed consistent with the locational criteria established by the School Board Review (SBR) Interlocal Agreement (ILA), adopted on May 15, 2003 by the District School Board and on May 27,2003 by the Board of County Commissioners, and subsequently adopted in the Future Land Use Element. golden Gate Area Master Plan, and Immokalee Area Master Plan. Development of these sites shall comply with all provisions of the 2003 SBR ILA until such time as the SBR ILA is amended. " FUTURE LAND USE ELEMENT AND MAP SERIES (refer to attached maps) Revise Policy 5.14 to reflect extension of 2003 SBR ILA expiration date until such time as the SBR ILA is amended; and, revise map series to reflect revised map note .-- to extend SBR ILA expiration date and to correct mislabeling/omissions. etc. 7 -,.- .- ,_.-_.. .-.-. --, . -~.._---" .- and as contained in the FLUE, GGAMP, or lAMP, as applicable, and are allowed within the existing zoning district on the property. These sites are depicted on the Future Land Use Map Series and Public School Facilities Element Map Series. f'.s consistoncy is achieved for the remaining sites, via flJtur-e GMP amondmont& and/or zoning amendments and/or conditional lJse appro'/als, these sites will be added to tho FutlJro Land Use Map Scrim;. Development of the mapped sites shall be subject to the provisions of the twe oeneral Interlocal Agreements adopted in accordance with Sootions 163.3177(6)(h) and 163.31777, Florida StaMes, on May 15, 2003 by the Collier County School Board and on May 27, 2003 by the Board of County Commissioners, and as subseouentlv amended and restated, with an effective date of December 2008. and subiect to the implementino land development reoulations to be adopted: and, shall be subiect to the School Board Review (SBR) Interlocal Aoreement. adopted on Mav 15. 2003 bv the Collier Countv School Board and on Mav 27, 2003 bv the Board of Countv Commissioners. until such time as the SBR ILA is amended. and subject to the implementing land development regulations to bo adopted. d. Future sites for public educational plants and ancillary plants: As additional sites for educational plants and ancillary plants are acquired by the Collier County School Board and deemed to be consistent with the FLUE, GGAMP, or lAMP, as applicable, and allowed by existing zoning on the site, these sites will be added to the Future Land Use Map Series and Public School Facilities Element Map Series, as provided for in the twe oeneral Interlocal Agreements~ adopted if! accordanco ,,"ith Soctions 163.3177(6)(h) and 163.31777, Florida Statutos, on -- May 15, 2003 by the Collier County School Board and on May 27,2003 by the Board of County Commissioners, and as subseouentlv amended and restated. with an effective date of December 2008, and subiect to the implementino land development reoulations to be adopted; and. shall be subiect to and the School Board Review (SBR) Interlocal Aoreement. adopted on Mav 15. 2003 bv the Collier Countv School Board and on Mav 27. 2003 bv the Board of Countv Commissioners. until such time as the SBR ILA is amended. Future development of these sites will be subject to the provisions of the twe aforementioned oeneral Interlocal Agreements and SBR Interlocal Aoreement, and subject to the implementing land development regulations to bo adopted, Prior to site acquisition, the Collier County School District will provide notification to property owners as follows: 1) for sites located within the Urban Designated Area of the Future Land Use Element of the Growth Management Plan, notices shall be sent to all owners of property within 500 linear feet of the property lines of the site under consideration for acquisition; 2) for sites not located within the Urban Designated Area of the FLUE of the Growth Management Plan, notices shall be sent to all owners of property within 1,000 linear feet of the property lines of the site under consideration for acquisition. At the public hearing to consider the land acquisition, all public commentary received as a result of these notices will be provided to the Collier County School Board. e. Zoning district provisions for future educational plants: Except to the extent that such would be in conflict with the Rural Fringe Mixed Use District adopted on June 19, 2002, or the Rural Lands Stewardship Area Overlay adopted on October 22, 2002, all future educational plants shall be allowed in zoning districts - as follows: 9 --- ,-.-- .._._.,--~ -.-, ,---..---.-- educational plants and ancillary plants, within the lAMP area, are depicted on the Future Land Use Map Series in the countywide FLUE and on the Public School Facilities Element Map Series, and referenced in FLUE, Policy 5.14 and Intergovernmental Coordination Element, Policy 1.2.6. All of these sites are subject to the !we oeneral Interlocal Agreement6~ adopted in aGGordanGe with Soctiom; 1€l3.3177(€l)(h) and 1€l3.31777, Florida Statutos, on May 15, 2003 by the Collier County School Board and on May 27, 2003 by the Board of County Commissioners, and as subseouentlv amended and restated. with an effective date of December 2008, and subiect to the implementino land development reQulations to be adopted: and. shall be subiect to the School Board Review (SBR) Interlocal Aoreement. adopted on Mav 15. 2003 bv the Collier Countv School Board and on Mav 27.2003 bv the Board of Countv Commissioners. until such time as the SBR ILA is amended. and subject to the implementing land development regulations to be adoptod. All future educational plants and ancillary plants shall be allowed in zoning districts as set forth in FLUE Policy 5.14. 11 ----_._->-"-~-~.__. .,-..--.- --""".- ._-~- -------- Ancillary FaclJltySlte -School Distrlct_SR 29 Op.ning TBD fCU approval required _ propos'd ImmokallNlMllint.nanceandTranllPortatlon &nelllle per 2003 SBR lLAl , .'1':" .':''':R'C>ORDR~:' '" "'?<~!;i,,:'F,i CR846 ....r., IMMOKALEE RD E1ementarySchool"U" Opening 2024 Elementary School "N" Opening 2023 fPar1<1and PUDCommltmenl) ElemenlllrySchool"l" Opening 2011 OIl WlOi/ RD ;"IMMOKALEE RD ElementarySchool"K" Opening 2016 , (I',k.a_ SileL,per2003SBRILAJ , , & ,~ ~~'Cl VANDERFJILT.BEACHRO ;/ '," ~'*" :~ ",', " ~ , ,~ ~ i5: ~ : '. , , f",_GOLDEN,GAfE BLVD ~ ' " l~ 0 ~ Q < " ~ - :'8 0 , Middlll Schoo' "Do" " PINE RIDGE,RD Openi"g202.l ~ GREEN,BLVD High SChoo. "DDO" Opening 2027 EJeml!nlary School '"p" " Opening 2019 ~ , 1-15 U5 '.,'--.. ~ j~ ~ ;', 1!'~ ,-'.'" :<'~-" .;'- .}, '-"c ',.; ~ -- ~~~ ~'< '., .< t ~ ., . ... V " ~ .. FUTUREMIDDlESCHOQLOCAT'ON FUTURE HIGH SCHUCl LOCATION ~F'fTUR"ANCILiARYSITE ""'-'Major Roads <!II C>tyLimijs Local Roads {) ... 'Nater TownofAvl!Malia Eden Park uliElem...ta,y . ...."'""., ~:~:::;.:" ..'."..: ii.. 4""',~.,""mm.._ ;',nlllford ',-"1.:':""" ,",,'. T".r'. c--Cenle. Elomeflta'y'.. '~;dO~".... ""r;, , . mmolca....,G;R.B46 ,:HIOII_., . ..! ' ""~,-, "'" ''''''''('''",,0,", I'Jem"nta,y ': ..E"'~~lary IMMOKA/,EE.REJ'E ~=~la'Y. CR.858 c,..,,,,,,,. Mid,jl,> i;:::";~~:=tto """ '" \"' { GlIWCoasI CI'P'''~" Pol", 0:: High M.I~1e V) . ~~'~Jg~ . Ii ", l.1ureIOo. Sool>olPaln, ' E_lary flemenlary V'"eyar<\S E",""'"lary C. P,neR,dg<' ,OS.eeola ~,;;:'~~~' I~tdcll< %.A"~le""'ntB'Y .. ,Q ~~nIColliet ~~=t~,y High GoklenGme GoId<lnGal<\t-:.w.p'.imary" Inlermed'ale....... ", ~::,i .."...." Gold!,:" Terra"" I~";/;"~O"~" ,("'te~,;"~GoJ"nT"rr""" MOM",;" Inlft,mediah! '..OoklenGate 'Mil<epavis* High Elementary 1-75 ;{' '" ..,,~ '" ~. 6 . .r!A 8 I-"Iy Avalon ~ Elementary Ele""'nla'Y<~' lely . High , I . . . . ...., - V /. --- ~ , El'STl""..DIIl.t:SO<OOl .,"m""H1~aQi(>lJc "'ST'NGA~C1UA"Y"'ClUT1U _C~(Ount"[ GIS/CAD M4pp:>ing s.-dioll Z m N " W 1,. .1..:::::::' ".' .. T""'"' I>o,".'.'~ ."., .. Immoka~eRd .",. .';;".::/,,,,'"""'" .::' .~.",:":,:::.,... Oil Well Rd I ~ .; Immokalea.Rd I " .,~ ......U. ....;j ::-.".~;...,--:::::/:,~" , . - ,.. ~,,,' ," ,""",.."" - ~ Yanderblll.Beacl1Rd - - -''':~ .. . . .L " Golden Gate Blvd , . ""'."","" ;fI:,.: ~ 0 .., 'PineRidge Rd u .. :.".Il ~,,~.. ..","".",.""e t" "~,,,,,,',"' :"~,,'~;..,O" " z . . ~ 0- :. ~ w Public Facilrties '^"~, Ii ExisbngElement<ll)/SChoolS City Limits ,;, ExistingMiddleSchocls ImmokOllee Urban Area or. Tcmn of Ave MlI'"ia Existil'lg High Schaols . Conservation Areas . Future Eleml!nlary School Locations COlliarCauntyParks . FutlJre Middle Schaol Locatiol1s . FulureHigh SChool Locations .J'" Major Roads ~ FulureAnci~ary Site Co~r Coun:t.y SUPPLEMENTAL STAFF REPORT COLLIER COUNTY PLANNING COMMISSION FROM: COMMUNITY DEVELOPMENT & ENVIRONMENTAL SERVICES DIVISION COMPREHENSIVE PLANNING DEPARTMENT CORBY SCHMIDT, AICP, PRINCIPAL PLANNER HEARING DATE: SEPTEMBER 18, 2008 (Continued from August 29, 2008) SUBJECT: 2006 CYCLE OF GROWTH MANAGEMENT PLAN AMENDMENTS - PETITIONS CP-2006-7 AND CP-2006-B ONLY (Adoption Hearing) ELEMENTS: FUTURE LAND USE ELEMENT (FLUE) AND FUTURE LAND USE MAP AND MAP SERIES This staff report supplement addresses only two petitions, both of which were continued from the August 29 CCPC 2006 Cycle GMPA hearing, petitions CP-2006-7 and CP-2006-8. This staff report supplements its parent staff report, which also addressed petitions CP-2006-7 and CP- ~- 2006-8 only. CCPC ADOPTION RECOMMENDATION and COMMENTS: At their August 29, 2008 hearing, the CCPC, by consensus vote, recommended that modifications be prepared, recognizing changes made since Transmittal hearings, including combining the two proposed subdistricts into the single, Orange Blossom/Airport Crossroads Commercial Subdistrict, as noted herein, and as proposed by petitioners' agents - (vote: 5/0) subject to text revisions appearing below, and the following: (1) Intersection work is to be under construction before a building permit is issued, and is to be completed before the issuance of a certificate of occupancy (CO); (2) Separate the responsibility for contributing to the cost of intersection improvements to each individual party, as entry now reads like one party's delay in entering into a DCA could hold up the others' on-site development; (3) Address FDOT question/concern in our ORC Response document, properly dismissing comments regarding consideration of traffic impacts extending to US 41 and 1-75; -- rSinole underline I siR!)le strike tRre~!)h entries denote August 29 CCPC consensus action for formal Adoption consideration on September 18.] - 1 - ----- .""~ --- ...--- -._- (4) CP-06-7 attorney, Rich Yovanovich's suggested reVISions, including; how the vehicular interconnection is required "when it becomes available" between the one property and the other; scrutinize value of the phrase, "to minimize the impacts on the surrounding street system" in subsection (c); consider timing required by the phrase, "construction per the approved plan must be completed before the issuance of any certificate of occupancy" in subsection (d); consider timing required by the phrase, "prior to a certificate of occupancy can be issued' in subsection (e); scrutinize value of the provision, "All principal buildings shall be set back a minimum of one (1) foot from the Subdistrict boundaries for each foot of building height." as subsection (f); and, the use of the term, "interconnections" need not be in plural form; (5) Staff directed to consider and use best planning discretion to revise/remove the setback standards entry from Subdistrict provisions. Parcel 2 subsection (d)(iii); and whether the height limitation, from same subsection, should apply to entire Subdistrict, or revise/remove it; (6) Prior to further CCPC adoption consideration, CP-06-7 and CP-06-8 agents will prepare and submit to Transportation Planning staff a unified analysis, design, funding and construction plan for Orange Blossom Drive-Airport Road intersection improvements. Such plan must sufficiently accommodate project traffic through intersection design, including additional background failures as part of that design and be accepted by the Transportation Planning Director; and provide and present the accepted improvements plan (as it now appearJ as part of tbe supplemental materials prOl'zded toyouforyourSeptember /8 Adoption heari,!v to the CCPC; (7) Prior to further CCPC adoption consideration, CP-06-8 marketing consultant, Russ Weyer of Fishkind & Associates will prepare, submit to staff (and present) substantiating materials/text document (a.r it now appears as part olthe mpp/emental materia!r promded to you for your September /8 Adoption bearing) to show justification for utilizing the analysis method which bases office allocation needs on a 2: 1 ratio, particularly highlighting how this number/relationship was derived, and how it has been tailored to local area in their Office Needs Analvsis; and, (8) Revise language to the Subdistrict provisions, reflecting changes presented by the applicant's agent and as made part of the motion, including a general reference to fraternal and civic associations other than the Italian American Club, the deletion or revision to, subsections (c)(v) and (d)(v) (aJ tbey now appear below). Such revision may include the phrase "sufficient to accommodate its project traffic through intersection design, and its additional background failures as part of that design". ISinole underline / single strike tRre~gh entries denote August 29 CCPC consensus action for formal Adoption consideration on September 18.] - 2- C. Urban Commercial District [Page 63] 11. Orange Blossom/Airport Crossroads Commercial Subdistrict This Subdistrict consists of two parcels comprising approximately 10 acres and is located on the southwest corner of Orange Blossom Drive and Airport Road. This Subdistrict allows for existing institutional uses, such as the Italian American Club clubhouse or another fraternal or civic association, future institutional uses for a school, and limited commercial, professional and general offices, and similar uses to serve the nearby community, along with senior housing in the form of an Assisted Living Facility, Continuing Care Retirement Center, or other similar housing for the elderly. Development intensity for this Subdistrict shall be limited to a maximum of 74,000 square feet of gross leasable area for financial institutions, schools, professional, medical and general offices, adult and child day care, personal and business services, and a maximum of 20,000 square feet for the clubhouse facility, all of which uses are allowed by right or by conditional use in the C-1 Zoning District, as identified in the Collier County Land Development Code, Ordinance No. 04- 41, as amended. Uses will be further evaluated at the time of rezoning of each parcel to ensure compatibility with surrounding properties. Any senior housing facility is not subject to this square footage limitation but must meet all other provisions in the Collier County Land Development Code, Ordinance No. 04-41, in effect as of the effective date of this amendment. The development of this Subdistrict shall be governed by the following criteria: a. Rezones are encouraged to be in the form of a Planned Unit Development and must -- contain development standards to ensure that all uses will be compatible with neighboring residential and institutional uses. b. An Orange Blossom Drive - Airport Road intersection improvements plan sufficient to accommodate proiect traffic and additional backoround failures throuoh intersection desion. must be approved prior to any development order approval. A development order shall not be approved unless it is made subiect to a Development Contribution Agreement with the Collier County Board of County Commissioners reouirino the propertv owner of each parcel to pay a proportionate share of the cost of improvements to Orange Blossom Drive and the intersection of Orange Blossom Drive and Airport Road, as mitigation for their impacts to the intersection and local street network. Construction per the approved Orange Blossom Drive - Airport Road intersection improvements plan must commence prior to the issuance of a buildino permit for a parcel and be completed prior to the issuance of any certificate of occupancy. c. /\11 JlrinsiJlal buildings shall bo sot bacl'. a minimum of one (1) foot from tho SubElistrict bounElaries for each foot of building height. rSinole underline I single strike threugR entries denole August 29 CCPC consensus action for formal Adoption consideration on September 18.] -3- .-.--.-" _"_._.__~_w~_ .- -"-~~._.,_.__...~--- ....._,--',-- --.~~,,~._---_.- c. Parcel 1 This approximately 5-acre parcel is located on the southwest corner of Orange Blossom Drive and Airport Road. This parcel is limited to a maximum of 34,000 square feet of gross leasable area for financial institutions, schools, professional, medical and general offices, and personal and business services, in addition to a maximum of 20,000 square feet for the clubhouse facility. Parcel 1 is governed by the additional following critcria reouirements: i. Pedestrian interconnections to access Parcel 2 and property immediately to the west must be pursued by the property owner, and incorporated into the overall site design. ii. Vehicular interconnection with Parcel 2 must be secured with a formal commitment. and is required when it becomes available, particularly to provide southbound traffic direct egress onto Airport Road. Traffic and f3arl(ing Vehicular use areas, buildings and structures, landscape buffering and open areas space, and other uses shall be designed in such a manner that does not impede or interfere with access to or from the adjacent parcel to the south. iii. Discontinuing any use of, and physically closing off, The existing easternmost vehicular access drive onto Orange Blossom Drive must bo complotcd shall be removed or permanentlv closed-off by the property owner seforo prior to the issuance of anY certificate of occupancy can bo isslJod for any further development or redevelopment of the site. iv. Development within Parcel 1 shall have common site, signage and building architectural elements, including on-site directional signs assisting motorists toward southbound egress through Parcel 2 onto Airport Road. 'I. Tho intensity of usos within Pursel 1 sRall so limited sy the maximum Trip GenoFation equi'/alent to 171 total PM f3oal\ net new trif3s, as cnumemtes sy tRe TR Tr-ansJlertation Consultants, Inc. Traffic ImJlact Statement sated July 21, 2908. d. Parcel 2 This approximately 5-acre parcel is located on the west side of Airport Road, approximately 330 feet south of the intersection of Airport Road and Orange Blossom Drive. This parcel is limited to a maximum of 40,000 square feet of gross leasable area for financial institutions, professional, medical and general offices, adult and child day care, personal and business services, and an Assisted Living Facility, Continuing Care Retirement Center, or other similar housing for the elderly. Parcel 2 is governed by the additional following critoria re~uirements: rSinale underline / single strike IRreugh entries denote August 29 CCPC consensus action for formal Adoption consideration on September 18.] - 4- i. Pedestrian interconnections to access Parcel 1 and properties immediately to the south and to the west must be pursued by the property owner, and incorporated into the overall site design. ii. Vehicular interconnection with Parcel 1 must be secured with a formal commitment. and is required when it becomes available, particularly to provide eastbound traffic direct egress onto Orange Blossom Drive. Traffio and parking Vehicular use areas, buildings and structures, landscape buffering and open areas space, and other uses shall be designed in such a manner that does not impede or interfere with access to or from the adjacent parcel to the north. iii. .'\11 prinoipal buildings shall bo sot baok a minimum of fif4een (Hi) feet. Commoroial, professional and !,jeAoral offioes, or other uses shall bo limited to three stories. iv. Development within Parcel 2 shall have common site, signage and building architectural elements, including on-site directional signs assisting motorists toward northbound egress through Parcel 1 onto Orange Blossom Drive. v. Tho intensity of uses within Parcel 2 shall bo limited by the maximum Trip Goneration equivalent to 203 total PM poal~ net new trips, as enumerated by tho TR Transportation Consultants, 11'10. Traffio Impaot Statement datod July 21, 2008. Policy 1.1 [Page 12] ,,-- The URBAN Future Land Use Designation shall include Future Land Use Districts and Subdistricts for: C. URBAN - COMMERCIAL DISTRICT 11. Orange BlossomlAirport Crossroads Commercial Subdistrict . add the new Subdistrict in the FLUE policy that lists all Designations/Districts/Subdistricts. FUTURE LAND USE MAP SERIES [added next in order] Orange Blossom/Airport Crossroads Commercial Subdistrict . include a new inset map depicting the Subdistrict, in addition to revision to the Countywide FLUM. Do NOT number the inset map, only provide map title. rSinale underline / siRllle stril,e threUllh entries denote August 29 CCPC consensus action for formal Adoption consideration on September 18.] - 5- ----- --".--.---'.'. ."",~-"._--',...,._. -------- I. URBAN DESIGNATION [Page 27] Orange BlossomlAirport Crossroads Commercial Subdistrict . add name of that inset map in FLUE text where various Subdistricts that allow non- residential uses are listed (in FLUE, Urban Designation, l(b)(12), p. 27). FUTURE LAND USE MAP SERIES [Page 124] Orange BlossomlAirport Crossroads Commercial Subdistrict add name of that inset map in the FLUE where FLUM Series is listed. [Planning Commissioners: Please note that the CP-2006-7 agent is not in full agreement with the revisions appearing above, and has prepared a memo to that effect with his version suggesting alternative revisions. Not all of the agent's suggested revisions were part of the August 29 CCPC motion and decision. and as a consequence, the proposed Subdistrict provisions appearing above do not include them. This memo, provided by Robert Duane, AICP is included as part of the supplemental materials provided to you for your September 18 Adoption hearing.] G:\ComprehensiveIComp. Planning GMP DATAIComp. Plan Amendmenls\2006 Cycle Petitions\CP-2006-7c FLUE combining 06-7 & 06-8 SubdistriclslStaff Reports\Supplemenlal cepe Adoption Staff Report - for 06-7c fSinele underline I sin!jle stril<e thro~!jh entries denote August 29 CCPC consensus action for formal Adoption consideration on September 18.] - 6- - HNI MEMORANDUM HOLE MONTES ENGINEERS, PlANNERS. SURVEYORS To: Corby Schmidt cc: Ren Morani Richard Yovanovich, Esquire Robert L. Price, PE From: Robert L. Duane, A.I.C.P. Date: September 9, 2008 Subject: CP-2006-7 Italian American Clubhouse HM File No. 2006.019 Attached is your most recent informal draft with our suggested revisions (which are in italics, added language is underlined, deleted language is stricken-through) regarding the Orange Blossom Drive/Airport Road crossroads subdistrict. C V~b'ln Comme~ci'll District Ip'lge 63) 11. O~qnge Blossom/Ai~port (wsswqds (omme~ciqI5ubdistrid Revised: socia! and fl-atema! c,c:st!.?g institution'll uses. to this paragraph to reflect CCPC discussions. . Deleted language in paragraph (b.) below, (strike through/italics) pertaining to additional background facilities through the intersection. The rationale is that the property owners shall be responsible for their fair share. The county should be responsible for providing capacity for additional background traffic. . Added language in paragraph (b.) (underline/italics) that the clubhouse can proceed prior to the initiation or completion of improvements to the intersection of Orange Blossom Drive and Airport Road. The office building, however, would need to have improvements initiated before construction would commence. . The rationale is that the Italian American Clubhouse is an existing use and they need to replace the existing facility as soon as practical to carryon the function of the clubhouse and the community at large. . Additional language has been added to paragraph (b.) that the property owners can initiate their improvements on their own. This was part of the CCPC motions. G:\Comprehensive\Comp. Planning GMP DAT A\Comp. Plan Amendments\2006 Cycle Petitions\CP-2006-7c FLUE combining 06-7 & 06-8 Subdistricts\Supplemental Adoption Materials\CS 080909 memo accompanying subdistrict.doc --.- ,~,,-,-,,-,'''''<<~.''-'-'-- ..-.,,------....-.-- -~-~---- b. An Oronge Blossom Dflve - AIrport Rood intersectIon Impwvements pion suFFicIent to occommodate pWlect haltic. J::d :;dJd:6YiJ/ !Y:df!:es:;J .0:i,..:c:; tf:liS~Y/1 ::';f(':"xf:a;; dcs:y':;. l'llii!2f .17:: Jfrcw&! "':0: te :;::;. ,f{xciCp''''':lt 3:4/('1 :;fp:m-:;/ A development orqer sholl not be opproved unless sublect to a Development ConhIbutIon Agreement with the Collier County Board of County CommISSIoners re'1l11f1ng the property owner of each parcel to p"y 0 proportIonote sh"re oFthe cost oFImprovements to Oronge Blossom Drive ;lnd the IntersectIon of Oronge Blossom DrIve ond AIrport ROod. "s mItIgotIon For theIr Imp"cts to the Intersection ond locol sheet network. ConshuctIon per the opprovcd Oronge Blossom Dflve - Airport Rood IntersectIon Improvements pion must commence pflOl to the Issuance of a buildIng permit For a parcel and be completed pflor to the ISsuonce of "ny certihcote of occuponcy. floweve/ tlg; COlJstructlO1J of tile 20.0.0.0. 5'1UJte lOot dub/lousc does lIot te'lwi-e tlic COllstructlO1J Ot tllc //JIt;jt;OII of tlic OtJI1<jC Blossom Dnve/A/tood ROJJ mtc/5cctlOlJ /mO!ovcmcIJfs /" JJdtf/oll tliC NO/lCdv OWllet mJV cOllstruct tile /mowvcme"ts OIJ hclMlfoftlle COUll tv Jlld he tellnhw~cd Itom JII N~/ec6 uttI/Zillg tlic /f77pWVcmcllt5. [NOTE: THIS SUBSECTION IS ALSO THE ENTRY LI KEL Y TO REPLACE THE 2 SPECIFIC "TRIP GENERATION" ENTRIES IN THE ORC RESPONSE.] G:\Comprehensive".Comp. Planning GMP DA T A\Comp. Plan Amendments\2006 Cycle Petitions\CP-2006- 7c FLUE combining 06-7 & 06-8 Subdistricts\Supplemental Adoption Matenals\CS 080909 memo accompanying suhdistrictdoc FISHKIND & ASSOCIATES .... ... .. . MEMORANDUM TO: Mr. Mark Strain Chairman Collier County Planning Commission FROM: G. Russell Weyer G. Russell Digitally signed by G, Russell Weyer DN: cn=G. Russell Weyer. c=us, Senior Associate Weyer o=Fishkind & Associates, Inc., email=russw@fishkind.com Date: 2008.09.09 15:47:59 -04'00' SUBJECT: Explanation of 2.0 allocation ratio DATE: September 9, 2008 VIA: Corby Schmidt, Principal Planner, Collier County Comprehensive Planning At your request. the following is an explanation of the 2.0 allocation ratio used in the data and analysis reports we provide to the County during Comprehensive Plan land use changes. The explanation begins with the data and analysis requirements in Rule 9J-5 (2). The rule states the following (with our emphasis added): "(2) Data and Analyses Requirements. (a) All goals, objectives, policies, standards, findings and conclusions within the comprehensive plan and its support documents, and within plan amendments and their support documents, shall be based upon relevant and appropriate data and the analyses applicable to each element. To be based on data means to react to it in an appropriate way and to the extent necessary indicated by the data available on that particular subject at the time of adoption of the plan or plan amendment at issue. Data or summaries thereof shall not be subject to the compliance review process. However, the Department will review each comprehensive plan for the purpose of determining whether the plan is based on the data and analyses described in this chapter and whether the data were collected and applied in a professionally acceptable manner. All tables, charts, graphs, maps, figures and data sources, and their limitations, shall be clearly described where such data occur in the above documents. Local governments are encouraged to use graphics and other techniques for making support information more readily useable by the public. ---..---..---....... -...., -,~,,,... (b) This chapter shall not be construed to require original data collection by local government; however, local governments are encouraged to utilize any original data necessary to update or refine the local government comprehensive plan data base so long as methodologies are professionally accepted. (c) Data are to be taken from professionally accepted existing sources, such as the United States Census, State Data Center, State University System of Florida, regional planning councils, water management districts, or existing technical studies. The data used shall be the best available existing data, unless the local government desires original data or special studies. Where data augmentation, updates, or special studies or surveys are deemed necessary by local government, appropriate methodologies shall be clearly described or referenced and shall meet professionally accepted standards for such methodologies. Among the sources available to local governments are those identified in "The Guide to Local Comprehensive Planning Data Sources" published by the Department in 1989. Among the sources of data for preliminary identification of wetland locations are the National Wetland Inventory Maps prepared by the U.S. Fish and Wildlife Service. (d) Primary data sources such as United States Census reports, other government data documents, local computerized data, and original map sheets used to compile required maps need not be printed in their entirety within either the support documents or the comprehensive plan. Summaries of support documents shall be submitted to the Department along with the comprehensive plan at the time of compliance review to aid in the Department's determination of compliance and consistency. As a local alternative to providing data and analyses summaries, complete data and analyses sufficient to support the comprehensive plan may be submitted to the Department at the time of compliance review. The Department may require submission of the complete or more detailed data or analyses during its compliance review if, in the opinion of the Department, the summaries are insufficient to determine compliance or consistency of the plan. (e) The comprehensive plan shall be based on resident and seasonal population estimates and projections. Resident and seasonal population estimates and projections shall be either those provided by the University of Florida, Bureau of Economic and Business Research, those provided by the Executive Office of the Governor, or shall be generated by the local government. If the local government chooses to base its plan on the figures provided by the University of Florida or the Executive Office of the Governor, medium range projections should be utilized. If the local government chooses to base its plan on either low or high range projections provided by the University of Florida or the Executive Office of the Governor, a detailed description of the rationale for such a choice shall be included with such projections," A variety of studies are used when we undertake a needs analysis within the State of Florida. They are basically broken down into three categories depending on the type of land use being studied. They are residential needs analysis, commercial needs analysis and a peculiar needs analysis that economically does not fit the standard residential and commercial models. Our analysis has evolved over time with input primarily coming from County Staff with regard to the analysis at hand. In looking at comprehensive plan changes, we first must collect the data that goes into the analysis. That data includes population estimates, existing inventory, approved inventory and potential inventory. With regard to population estimates, we generally try to use the population data that is used by the County when and where it is available. Our second source is the population data from the Bureau of Economic and Business Research (BEBR) at the University of Florida. Our third source is I-Site, Site Selection Software, produced by GeoVue, Inc. These estimates and projections are compiled by Applied Geographic Solutions, Inc. AGS uses historic Census data from 1970, 1980, 1990, and 2000; USPS and commercial source ZIP+4 level delivery statistics; Census Bureau population estimates and projections at varying levels of geographic detail; Internal Revenue Service statistics on tax filers and year-to-year migration; as well as the Census Bureaus Current Population Survey, The next required data set pertains to the particular land use we are analyzing. We primarily utilize the Collier County Property Appraiser data to determine the existing inventory of that particular land use, the approved inventory of that land use and finally all of the lands on the Future Land Use Map that have potential for that particular land use. We have also used data sources provided by Collier County staff such as the commercial inventory list and the planned unit development list. We then use a variety of models from retail demand gravity models to office employment demand models to determine the current and future demand for the land use type in the designated market area. The future demand generally looks out to the Comprehensive Plan's horizon year, which is currently either 2030 or 2035 depending on the jurisdiction's comprehensive plan and growth management plan horizon year requirements. It is at this point of the analysis that has caused an anomaly in determining a true economic supply and demand result. On the supply side, it is relatively easy to determine the amount of existing and approved supply from the property appraiser data. The difficulty lies in the vacant non-approved potential lands. The staff has required us to take all of those lands that have a commercial or residential overlay on them and include them as supply by putting a floor area ratio figure to the acreage. The issue becomes apparent when all of the lands that are not in the existing or approved category are included in the particular land use analysis. By putting all of the potential lands in the supply category, the assumption is that all of that land would be developed as that particular land use and nothing else. For example in the case of the Airport-Corradi parcel, there were 117 potential commercial parcels totaling 270.68 acres in the 20 minute drive time market (Table 1 on the next page). Those parcels represent a potential of 1,469,723 square feet of office space. >> -",,- ".=--_.- Table 1. Current Supply of Vacant, Potential, and Existing Commercial-Office Space in Project's Market Existing # of Parcels 340 Acres 457.97 Square Feet 2.549,138 Vacant # of Parcels 523 Acres 1092.59 ~uare Feet 6,075.006 ,- Potential # of Parcels 117 Acres 270.68 Square Feet* 1,469,723 Total # of Parcels 980 Acres 1821.24 Square Feet 10.093,867 Source: Collier County Property AppraIser *Assumed 5,430 square feet per acre based on market average The flaw in that representation is all of those vacant approved parcels and parcels designated by the FLUM as having the potential to be developed as office in reality also have a potential to be retail space or some other commercial use. The same parcels are also counted as competing supply when a commercial needs analysis is performed for another commercial use. Essentially they are double counted in both analyses when they will actually be developed as the market demand dictates. A general economic principal states that all markets are efficient and that supply for the most part is generated as demand dictates. It is a rare situation where supply generates demand. In response to this conundrum, Dr. Hank Fishkind developed the allocation ratio as a means to offset some of the potential lands being developed as other uses, The allocation ratio measures the amount of additional acreage required in relation to the directly utilized acreage to assure proper market functioning in the sale, usage and allocation of land. The additional acreage is required in order to maintain market level pricing and to account for the likelihood that certain lands will not be placed on the market for sale during the forecast horizon, or may be subject to future environmental or other constraints, Thus, the lands allocated in the FLUM should be considerably greater than those that will actually be used or developed. Basic economic principals have shown that markets are efficient in terms of supply and demand and the ultimate lack of available office space choices creates an impediment to the market functioning properly. One must also consider that not all of the office/commercial designation in the future land use map will be developed as such since the owners of those properties will only develop the land with uses that respond to market demand. - The increased acres will maintain flexibility within the comprehensive plan, keep prices reasonable by not constraining land supply, and compensate for lands which may be unavailable for sale or subject to environmental or other development constraints. Growth management practices have suggested that the greater the time horizon of the comprehensive plan, the greater the allocation ratio needed to maintain flexibility of the comprehensive plan. Other factors that influence the residential acreage allocation ratio are the nature and speed of the developing area and the area's general exposure to growth trends in the market. Fishkind believes that to ensure proper flexibility in the comprehensive plan of a rapidly growing county like Collier, a commercial allocation ratio in the range of 2.0 is necessary to maintain planning flexibility and to account for the double counting of land uses. Although the allocation ratio figure has fluctuated over time depending who is reviewing the amendment at the state level, Fishkind's recent experience with the Florida Department of Community Affairs indicates that the DCA has seen and approved allocation ratios in the 1,8 to 2.4 range and in some cases even larger allocation ratios for longer forecast horizons. Otherwise, if allocation ratios are not used in the analysis, then an appropriate breakdown of the potential lands between the various land use types needs to be undertaken in order to more accurately analyze the need for a comprehensive land use change. -- . "_'~_.rn ..".. -- ,.,.-,'" ~_._-~--- ORDINANCE NO. 08- - AN ORDINANCE AMENDING ORDINANCE NO. 89-05, AS AMENDED, THE COLLIER COUNTY GROWTH MANAGEMENT PLAN FOR THE UNINCORPORATED AREA OF COLLIER COUNTY, FLORIDA BY PROVIDING FOR AN AMENDMENT TO THE FUTURE LAND USE ELEMENT AND FUTURE LAND USE MAP AND MAP SERIES, PROVIDING FOR SEVERABILITY AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, Collier County, pursuant to Section 163.3161, et. seo., Florida Statutes, the Florida Local Government Comprehensive Planning and Land Development Regulation Act, was required to prepare and adopt a comprehensive plan; and WHEREAS, the Collier County Board of County Commissioners adopted the Collier County Growth Management Plan on January 10, 1989; and WHEREAS, the Local Government Comprehensive Planning and Land Development Regulation Act of 1985 provides authority for local governments to amend their respective comprehensive plans and outlines certain procedures to amend adopted comprehensive plans pursuant to Sections 163.3184 and 163.3187, Florida Statutes; and WHEREAS, Robert L. Duane of Hole Montes and Associates requested an amendment to the Future Land Use Element and the Future Land Use Map and Map Series to change the Future Land Use Map (FLUM) designation from the Urban Residential Subdistrict to part of a new subdistrict entitled the Orange Blossom/Airport Crossroads Commercial Subdistrict, within the Urban Commercial District, and to make a corresponding text change to allow for a 20,000 square foot clubhouse, and up to 34,000 square feet of gross leasable area for financial institutions, schools, professional and medical offices, and personal and business services consistent with the General Office (C-1) Zoning District of the Collier County Land Development Code, for property located at the southwest corner of Airport-Pulling Road (CR 31) and Orange Blossom Drive, in Section 2, Township 49 South, Range 25 East, Collier County, Florida consisting of 5:t acres; and WHEREAS, Collier County did submit this Growth Management Plan amendment to the Department of Community Affairs for preliminary review on May 12,2008; and WHEREAS, the Department of Community Affairs did review the amendment to the Future Land Use Element and Future Land Use Map and Map series, to the Growth Management Plan and transmitted its findings in writing to Collier County within the time provided by law; and Words underlined are additions; words struck thrslJgh are deletions 1 ,"V, --;--"- ".-.---- WHEREAS, Collier County has 60 days from receipt of the Objections, Recommendations, and Comments Report from the Department of Community Affairs to adopt, adopt with changes or not adopt the proposed amendment to the Growth Management Plan; and WHEREAS, the Board of County Commissioners of Collier County did take action in the manner prescribed by law and did hold a public hearing concerning the adoption of this amendment to the Future Land Use Element and Future Land Use Map and Map Series to the Growth Management Plan on October 14, 2008; and WHEREAS, Collier County has gathered and considered additional information, data and analysis supporting adoption of this amendment, including the following: the Collier County Staff Report; the document entitled Collier County Growth Management Plan amendment, and other documents, testimony and information presented and made a part of the record at the meeting of the Collier County Planning Commission held on August 19, 2008, August 29,2008 and September 18, 2008, and the Collier County Board of County Commissioners held on October 14, 2008; and WHEREAS, all applicable substantive and procedural requirements of law have been met. NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, thaI: SECTION ONE: ADOPTION OF AMENDMENT TO THE GROWTH MANAGEMENT PLAN The Board of County Commissioners hereby adopts this amendment to the Future Land Use Element and Future Land Use Map and Map Series, in accordance with Section 163.3184, Florida Statutes. The text and maps of the amendment are attached hereto as Exhibit "A" and are incorporated by reference herein. SECTION TWO: SEVERABILITY. If any phrase or portion of this Ordinance is held invalid or unconstitutional by any court of competent jurisdiction, such portion shall be deemed a separate, distinct and independent provision and such holding shall not affect the validity of the remaining portion. Words underlined are additions; words strllsJ\ threllgh are deletions 2 SECTION THREE: EFFECTIVE DATE. The effective date of this amendment shall be the date a final order is issued by the Department of Community Affairs or Administration Commission finding the amendment in compliance in accordance with Section 163.3184, Florida Statutes, whichever occurs earlier. No development orders, development permits, or land uses dependent on this amendment may be issued or commence before it has become effective. If a final order of noncompliance is issued by the Administration Commission, this amendment may nevertheless be made effective by adoption of a Resolution affirming its effective status, a copy of which Resolution shall be sent to the Department of Community Affairs, Bureau of local Planning, 2555 Shumard Oaks Blvd., 3rd Floor, Tallahassee, Florida 32399-2100. PASSED AND DULY ADOPTED by the Board of County Commissioners of Collier County, Florida this _ day of ,2008. ATTEST: BOARD OF COUNTY COMMISSIONERS DWIGHT E. BROCK, Clerk COLLIER COUNTY, FLORIDA BY: TOM HENNING, CHAIRMAN Approved as to form and legal suffiency: Marjorie M. Student-Stirling Assistant County Attorney Petition CP-2006-7- Future Land Use Element and Future Land Use Element Future Land Use Map and Map Series Words underlined are additions; words struck through are deletions 3 ..-.. ""-_....~.._., ----...- _._--~-- ORDINANCE NO. 08-_ AN ORDINANCE AMENDING ORDINANCE NO. 89-05, AS AMENDED, THE COLLIER COUNTY GROWTH MANAGEMENT PLAN FOR THE UNINCORPORATED AREA OF COLLIER COUNTY, FLORIDA BY PROVIDING FOR AN AMENDMENT TO THE FUTURE LAND USE ELEMENT AND FUTURE LAND USE MAP AND MAP SERIES, PROVIDING FOR SEVERABILITY AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, Collier County, pursuant to Section 163.3161, et. seo., Florida Statutes, the Florida Local Government Comprehensive Planning and Land Development Regulation Act, was required to prepare and adopt a comprehensive plan; and WHEREAS, the Collier County Board of County Commissioners adopted the Collier County Growth Management Plan on January 10, 1989; and WHEREAS, the Local Government Comprehensive Planning and Land Development Regulation Act of 1985 provides authority for local governments to amend their respective comprehensive plans and outlines certain procedures to amend adopted comprehensive plans pursuant to Sections 163.3184 and 163.3187, Florida Statutes; and WHEREAS, Dwight Nadeau of RWA, Inc., requested an amendment to the Future Land - Use Element and the Future Land Use Map and Map Series to change the Future Land Use Map (FLUM) designation from the Urban Residential Subdistrict to part of a new subdistrict entitled the Orange Blossom/Airport Crossroads Commercial Subdistrict, within the Urban Commercial District, and to make a corresponding text change to allow for up to 40,000 square feet of gross leasable area for financial institutions, professional and medical offices. adult and child day care. personal and business services, and senior housing in the form of an assisted living facility and/or continuing care retirement center, or other similar housing for the elderly, consistent with General Office (C-1) Zoning District of the Collier County Land Development Code. for property located on the west side of Airport-Pulling Road (CR 31), 330 feet south of Orange Blossom Drive and immediately south of the Italian American Club, in Section 2, Township 49 South, Range 25 East, Collier County, Florida consisting of 5:t acres; and WHEREAS, Collier County did submit this Growth Management Plan amendment to the Department of Community Affairs for preliminary review on May 12, 2008; and WHEREAS, the Department of Community Affairs did review the amendment to the Future Land Use Element and Future Land Use Map and Map series, to the Growth Management Plan and transmitted its findings in writing to Collier County within the time - provided by law; and Words underlined are additions; words struck through are deletions 1 .-- -_.- ...._-~._-,."".."~"'-- ---~"..~' --." WHEREAS, Collier County has 60 days from receipt of the Objections, Recommendations, and Comments Report from the Department of Community Affairs to adopt, adopt with changes or not adopt the proposed amendment to the Growth Management Plan; and WHEREAS, the Board of County Commissioners of Collier County did take action in the manner prescribed by law and did hold a public hearing concerning the adoption of this amendment to the Future land Use Element and Future land Use Map and Map Series to the Growth Management Plan on October 14, 2008; and WHEREAS, Collier County has gathered and considered additional information. data and analysis supporting adoption of this amendment, including the following: the Collier County Staff Report; the document entitled Collier County Growth Management Plan amendment, and other documents, testimony and information presented and made a part of the record at the meeting of the Collier County Planning Commission held on August 19, 2008, September 29, 2008 and September 18, 2008, and the Collier County Board of County Commissioners held on October 14, 2008; and WHEREAS. all applicable substantive and procedural requirements of law have been met. NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that: SECTION ONE: ADOPTION OF AMENDMENT TO THE GROWTH MANAGEMENT PLAN The Board of County Commissioners hereby adopts this amendment to the Future land Use Element and Future land Use Map and Map Series, in accordance with Section 163.3184, Florida Statutes. The text and maps of the amendment are attached hereto as Exhibit "A" and are incorporated by reference herein. SECTION TWO: SEVERABILITY. If any phrase or portion of this Ordinance is held invalid or unconstitutional by any court of competent jurisdiction, such portion shall be deemed a separate, distinct and independent provision and such holding shall not affect the validity of the remaining portion. Words underlined are additions; words ~tru61( thro~~h are deletions 2 SECTION THREE: EFFECTIVE DATE. The effective date of this amendment shall be the date a final order is issued by the Department of Community Affairs or Administration Commission finding the amendment in compliance in accordance with Section 163.3184, Florida Statutes, whichever occurs earlier. No development orders, development permits, or land uses dependent on this amendment may be issued or commence before it has become effective. If a final order of noncompliance is issued by the Administration Commission, this amendment may nevertheless be made effective by adoption of a Resolution affirming its effective status, a copy of which Resolution shall be sent to the Department of Community Affairs, Bureau of local Planning, 2555 Shumard Oaks Blvd., 3rd Floor, Tallahassee, Florida 32399-2100. PASSED AND DULY ADOPTED by the Board of County Commissioners of Collier County, Florida this day of ,2008. ATTEST: BOARD OF COUNTY COMMISSIONERS DWIGHT E. BROCK, Clerk COLLIER COUNTY, FLORIDA BY: TOM HENNING, CHAIRMAN Approved as to form and legal suffiency: Marjorie M. Student-Stirling Assistant County Attorney Petition CP-2006-B - Future Land Use Element and Future Land Use Element Future Land Use Map and Map Series Words underlined are additions; words struGl\ lhrou€lh are deletions 3 --.- ._-".."" -"'~--".- "--."...-----.-. -._-- Exhibit A CP-2006-7/CP-2006-8 C. Urban Commercial District [Page 63] 11. Oranae Blossom/Airport Crossroads Commercial Subdistrict This Subdistrict consists of two parcels comprisino approximatelv 10 acres and is located on the southwest corner of Oranoe Blossom Drive and Airport Road. This Subdistrict allows for existino institutional uses. such as the Italian American Club clubhouse or another fraternal or civic association. future institutional uses for a school. and limited commercial. professional and oeneral offices. and similar uses to serve the nearbv communitv. alono with senior housino in the form of an Assisted Livina Facilitv. Continuino Care Retirement Center, or other similar housina for the elderlv. Development intensitv for this Subdistrict shall be limited to a maximum of 74.000 souare feet of oross leasable area for financial institutions. schools. professional. medical and oeneral offices. adult and child dav care. personal and business services. and a maximum of 20.000 souare feet for the clubhouse facilitv. all of which uses are allowed bv rioht or bv conditional use in the C-1 Zonino District. as identified in the Collier Countv Land Development Code. Ordinance No. 04- 41. as amended. Uses will be further evaluated at the time of rezonino of each parcel to ensure compatibilitv with surroundino properties. Anv senior housino facilitv is not subiect to this souare footaoe limitation but must meet all other provisions in the Collier Countv Land - Development Code. Ordinance No. 04-41. in effect as of the effective date of this amendment. The development of this Subdistrict shall be ooverned bv the followino criteria: a. Rezones are encouraoed to be in the form of a Planned Unit Development and must contain development standards to ensure that all uses will be comoatible with neiohborino residential and institutional uses. b. An Oranoe Blossom Drive - Airport Road intersection improvements plan sufficient to accommodate proiect traffic and additional backoround failures throuoh intersection desion. must be approved prior to any development order approval. A development order shall not be approved unless it is made subiect to a Development Contribution Aoreement with the Collier Countv Board of Countv Commissioners reouirino the propertv owner of each parcel to pav a proportionate share of the cost of improvements to Oranoe Blossom Drive and the intersection of Oranoe Blossom Drive and Airport Road. as mitioation for their impacts to the intersection and local street network. Construction per the approved Oranoe Blossom Drive - Airport Road intersection improvements plan must commence prior to the issuance of a buildino permit for a parcel and be completed prior to the issuance of anv certificate of occupancv. c. Parcel 1 This approximatelv 5-acre parcel is located on the southwest corner of Oranoe Blossom Drive and Airport Road. This parcel is limited to a maximum of 34.000 souare feet of oross leasable area for financial institutions. schools. professional. medical and oeneral offices. - 1 - ----~" ~~-'-- '^~----._~..~...- _m_._ --~ .. _,__'M~'_'__'_ .-.-._"._--,~~-- Exhibit A CP-2006-7/CP-2006-8 and personal and business services. in addition to a maximum of 20.000 s~uare feet for the clubhouse facilitv. Parcel 1 is aoverned bv the additional followino reouirements: i. Pedestrian interconnections to access Parcel 2 and propertv immediatelv to the west must be pursued bv the propertv owner. and incorporated into the overall site desion. ii. Vehicular interconnection with Parcel 2 must be secured with a formal commitment. and is re~uired when it becomes available. particularlv to provide southbound traffic direct eoress onto Airport Road. Vehicular use areas. buildinos and structures, landscape bufferino and open space. and other uses shall be desioned in such a manner that does not impede or interfere with access to or from the adiacent parcel to the south. iii. The existino easternmost vehicular access drive onto Oranae Blossom Drive shall be removed or permanentlv closed-off bv the propertv owner prior to the issuance of anv certificate of occupancv for anv further development or redevelopment of the site. iv. Development within Parcel 1 shall have common site. sionaoe and buildino architectural elements. includina on-site directional sions assistino motorists toward southbound eoress throuoh Parcel 2 onto Airport Road. d. Parcel 2 This approximatelv 5-acre parcel is located on the west side of Airport Road. approximatelv 330 feet south of the intersection of Airport Road and Oranoe Blossom Drive. This parcel is limited to a maximum of 40.000 square feet of oross leasable area for financial institutions. professional. medical and oeneral offices. adult and child dav care. personal and business services. and an Assisted Livino Facilitv. Continuino Care Retirement Center. or other similar housino for the elderlv. Parcel 2 is ooverned bv the additional followino re~uirements: i. Pedestrian interconnections to access Parcel 1 and properties immediatelv to the south and to the west must be pursued bv the propertv owner. and incorporated into the overall site desion. ii. Vehicular interconnection with Parcel 1 must be secured with a formal commitment. and is re~uired when it becomes available. particularlv to provide eastbound traffic direct eoress onto Oranoe Blossom Drive. Vehicular use areas. buildinas and structures. landscape bufferino and open space. and other uses shall be desioned in such a manner that does not impede or interfere with access to or from the adiacent parcel to the north. IIi. Development within Parcel 2 shall have common site. sionaoe and buildino architectural elements. includino on-site directional sions assistino motorists toward northbound eoress throuoh Parcel 1 onto Oranoe Blossom Drive. - 2- Exhibit A CP-2006-7/CP-2006-8 Policy 1.1 [Page 12] The URBAN Future Land Use Designation shall include Future Land Use Districts and Subdistricts for: C. URBAN - COMMERCIAL DISTRICT 11. Oranae BlossomlAirport Crossroads Commercial Subdistrict . add the new Subdistrict in the FLUE policy that lists all Designations/Districts/Subdistricts. FUTURE LAND USE MAP SERIES [added next in order] Oranae Blossom/Airport Crossroads Commercial Subdistrict . include a new inset map depicting the Subdistrict, in addition to revision to the Countywide FLUM. Do NOT number the inset map. only provide map title. I. URBAN DESIGNATION [Page 27] Oranae BlossomlAirport Crossroads Commercial Subdistrict . add name of that inset map in FLUE text where various Subdistricts that allow non- residential uses are listed (in FLUE, Urban Designation, l(b)(12), p. 27). FUTURE LAND USE MAP SERIES [Page 124] Oranae Blossom/Airport Crossroads Commercial Subdistrict add name of that inset map in the FLUE where FLUM Series is listed. -3- ~--.<'-'-'-----""- _._.~^_.." ."_,,u___._~_..., ., .----- EXHIBIT A PETITION CP-2006-07/CP-2006-0B '1 ORA~GE BLOSSOM/AIRPORT CROSSROADS COMMERCIAL SUBDISTRICT -- -----.1 ~!'.~!.> COLLIER COl!NTY, FLOlllllA ' I I , I I I 1 ,- 'l . 1,- 1 j , ~ - 11 , >'1 I , I -'-j . "[1"]" II-~'J' I TfTI',- J _.11... ..' ,.- III,I,~r~'1~1! LI~?~JIi~ !!IaIlli~~!II,W .'I,~~t I 'I A~-~O~-",'-~ II ,1--:-__ JmLf:J~1 III J,lJ'] L_c..Llj,"_---llpI--- __._u illL~ll~~"'. ~ I J ...:~I)m1r I.. !)J~. D'..~.!L...'j-.'~.I.IJ~j 1,.1. : Jl ~iJj 1111 ~.-~ \.\]-c:~. rdp.--Jr ~ - 1'1':1 c I lie, ~.,-____ _ ,f-f,I----,,':'-- ,~ ~-- Jf-. ~ ~=r-~ ~~~I~ I '1", I I :1 I' ',', ' [['--r", ijl I 'I ',', _ __.::::::L"':',_LJ '_----- ,: I ( " -...II~ iT J..\-~_I- ._-- 'I" ""'J'" I" 1 I ~r~;--~I 1 f J J ,- 1- 1 II I I -.. :, ':--f -1 f ~~, h-..'r ".'.' II '. - ,- l , I I' " -', j ~ f L I, '/ J ' Ir,,~T]tit~+=. I_I I J f' .:-'1 _ ~'_ I .. ' .. __ _. _"J,CD,',""L ~ u__-~"' '''''.''~_''''" .~.- J- 1_. ..-~ ! I-=-LEGEND . _-11 I .___._w.. . . -------- - - I ~__.._ ,.'-'--"~- ,_ ",'_f;'~)I'''TRIC' o<.A" -": ' f-+U-'ARfD 8Y; C'V,PhCSAt,1J T~-CfH"-:;A;_ j,"f ;I'~T :~[C-'G" - -- I COVM'.~,,, l[HOPM'N' M" [",po'.,e,'" ,LRW" '''!I'C'''N . -.= I I II, [;AT[ C-i/2CC;'1 I'lL" [;;:0 2C{)6-oJ/':J.JW~, ._~~~':' ,------- ---------::-:=~_____ _ ______ I _.,.._.,.,~-... -' ----.--...--"',- .._.~._-_.~...., --- co T 48 S T 47 S Tm T 48 S --T-- T 49 S ---~-- T 50 S T 51i'---- T 52 S T 53 S o ~[1- I I I ' [' -~T1 ' ;.. : . W !iiI,,, ~ ~ ' I ~ ~ ~ : :~"~-i~;"~! ;i.~L:" cL I ~I~' H,'!" ).",;, g ; i a! .,. ; " ;. III ;, ;1'1'" , ;1:;; '!~I I I 9 : : ; -= ~:; i ~' ~: ~~ 'i~ ~ ~ - ~ ; i ~ i ~ ~ ~ i I <0 ~ ~ .. ::. ~""I ' , .' ", ,,: .. I . ~. '-~ - -- "'''''' '"" ~ -- ~; ~ i;ji ~ i ~Hn a ~ U~ OW~ tl [J..c.!.c .iJl.!RlI , /..."" ~ ~ , . z .. ~ ,- II"> o ..,' II: i= "'" ~. ' I F i i I UJ ~" 0.... ~;: ~ ;: ~ d) ~ ~i ~ i i ~ \ aa~-,'~~ ~t." w w " i ;; n;~ ,: ;1 !j I, 'I ~ ~ !..'<"~'f~":<." "';::~_'!~.>! ... CO> : ~q;i; ~ ~~ ~~ ~i ~ ,; ~I ~ < ~ II: a:: y,,~ ,0 ~~ 1< ~~ ~~ ~i3 I ! ,.Q ~ ~ i . 'I ",' '''' <0' , , ,. I Iii.. H .-~ .fI. I ~=-~ I ..~ ~ :i 9 i' I w ~ ~ ~~" : . , ~ 0 -~ ~ ,., :;~l!: I .,1: ~"fl ,= I, '" ! ,c' g- il'i, 5 1 . ! : ~!!' I i ill ~, ~ ; ~ ~ I w ~ ~:I ~ ; ~ i :; W - 'lL',."""';' . ... ~!' I ) ~ CO> '" I ",) W,", ILl ~~ ~ . a:; -' i I = ~ . .~. "' I ~.."".....~ ~ ~~-_./ w !::: w ,',- c co c:I / .., - ~ . ~ II: _ i ! II: LU -' --- . "n ~...__~-+--- w w ' " : en ... ,___n__ N N ' '" 1 II: II: ~i i ! I ' I , w ~ ~ ~ N N = = w ... w ~ C ~ = :IE i ~ = . ~ ..... III It ~ en"C .. ::> f&I ='~ ~ ~ ;; u:::... ... N CII ~ j ~ ... ... c" ~ -- ... N I Z 5 ~ ~ I- b~ N =IC~ ~ z UL.Uwc.b ~ 0: o.......!..g ~1-8g N ~ % ~ l:C(f.jNN ..... () ~ ~ :::) d.d... 0 a: ~ 5 _~VJ tltl. .,; :::::I .. P ..-- ~~ ~ ~ ~ ~ w It> :::::t -~ .# It> N u.... . i CO N = " '..' '..' J. MeX = ,~~, " G'uJ f 0 S It 1 S Lt 1 S 6t 1 S 05 1 S lS 1 S ZS 1 S ES 1 .., "__.._ .__._0"_...... '_..~'_~ -....- ,.--- 13881 PLANTATION ROAD, SUITE 11 FORT MYERS, FL 33912-4339 OFFICE 239.278.3090 R TRANSPORTATION FAX 239.278.1906 CONSULTANTS,INC. TRAFFIC ENGINEERING TRANSPORTATION PLANNING '.-. SIGNAL SYSTEMS/DESIGN September 10, 2008 Mr. Robert Duane, AICP Hole Montes, Inc. 950 Encore Way Naples, FL 34110 RE: Italian American Plaza and Clubhouse District & Airport Road/Orange Blossom Drive Commercial Subdistrict Dear Mr. Duane: At the Adoption hearing for the above referenced Comprehensive Plan Amendments, the Collier County Planning Commission raised concerns from the Florida Department of Transportation in regards to the traffic generated by the proposed Amendments that will impact 1-75. Due to the location of the proposed Amendments at the southwest corner of the intersection of Airport Pulling Road and Orange Blossom Drive, the nearest interchange to 1-75 would be either via Immokalee Road to the north or via Pine Ridge Road to the south of the subject parcels. These interchanges are approximately 4.5 miles .-", and 3.5 miles from the subject parcels, respectively. Based on the uses currently projected on each site for worst case analysis, it is very unlikely that a significant amount of traffic, if any, will impact 1-75 from these developments. Medical Office and bank uses will attract the majority of its patrons from the neighboring residential communities and not from 1-75. If you have any additional questions, please do not hesitate to contact me. Sincerely, ~~~ ~~~ Robert L. Price, PE Ted B. Treesh Senior Transportation Consultant President ~,-,-- O__._.".'H____ -'---"--~-----'-~~"- -'"'''-~--'._.__....'''-''' -- .------.--,- 13881 PLANTATION ROAD, SUITE 11 FORT MYERS, FL 33912-4339 OFFICE 239.278.3090 R TRANSPORTATION FAX 239.278.1906 CONSULTANTS,INC. TRAFFIC ENGINEERING TRANSPORTATION PLANNING SIGNAL SYSTEMS/DESIGN TO: Mr. Michael Greene Collier County Transportation Planning FROM: Robert L. Price, PE Senior Transportation Consultant Ted B. Treesh President DATE: September 9, 2008 RE: Airport-Pulling Rd @ Orange Blossom Dr Intersection Improvements .--- Traffic Projections Collier County, Florida TR Transportation Consultants, Inc. has been retained by the Developers of the Italian American Club Comprehensive Plan and the Westminster PUD to assess the necessary future lane arrangements at the intersection of Airport-Pulling Road/Orange Blossom Drive to accommodate future growth, specifically planned and/or approved projects that are in the general vicinity of the subject intersection. Figure 1 indicates the location of the subject intersection as well as the developments that were accounted for as a part of this analysis. Also indicated within Figure 1 are the intensities of each development. In order to perform the requested analysis, TR Transportation has completed a 2013 analysis at this location. The traffic projections in this memorandum will be utilized to perform the needs analysis for the intersection. The 2013 traffic projections are based on A.M. and P.M. peak hour turning movement counts performed by TR Transportation. Existinl!: Traffic Data A turning movement count was conducted at the intersection of Airport Pulling Road/Orange Blossom Drive during the A.M. and P.M. peak hours (7AM-9AM & 4PM- 6PM) on January 8, 2008. Furthermore, upon the request of the Collier County Transportation Planning Department, turning movement counts were also performed at .,.- the nearest signalized intersection to the north (Emerald Lakes Drive/Old Groves Road) --..-- ----,----.....-- .- -~_..,._._._...~ - -.----"- R TRANSPORTATION CONSULTANTS,INC. Figure 1 -.----.,,----- -- Mr. Michael Greene R TRANSPORTATION Collier County Transportation Planning CONSULTANTS, INC. Airport Pulling Rd @ Orange Blossom Dr Improvements September] 0, 2008 -, Page 3 and south (.I & C Boulevard/Fountain View Circle) of Orange Blossom Drive on Airport Pulling Road on May 7, 2008 and May 8, 2008. These turning movement counts were adjusted for peak season traffic conditions based on the information contained within the 2007 Peak Season Factor Category spreadsheet within the 2007 FDOT Traffic Information CD as can be found in the Appendix of this document. The January 8, 2008 count was adjusted by a peak season correction factor of 1.12 while the May 7'h and May 8th counts were adjusted by a peak season correction factor of 1.] 7. The turning movement count results can be found within the Appendix of this document for reference. Additionally, a graphical representation of the 2008 peak season turning movement counts is shown in Figure 2. A peak hour factor (PHF) was calculated based on the results of the turning movement counts performed at the various intersections. The appropriate PHF's will be utilized throughout the remainder of the intersection analysis. A separate PHF was calculated for each intersection based on both the AM and PM peak hours in accordance with the calculation indicated below for Airport Pulling Road and Orange Blossom Road in the AM peak hour. PHF= Highest Hourly Volume '-'. 4 * Highest 15 Minute Volume PHF = 2,999 vehicles = 2,999 vehicles AM 4 * 790 vehicles 3,160 vehicles PHF~M = 0.949 In addition to the peak hour factor, a 2% truck percentage was assumed in order to account for heavy vehicles at the intersection. Table 1 indicates the resultant peak hour factors and the truck percentage utilized at each intersection as a pati of the proposed analysis. rovements Airport Pulling Rd @ Old 0.926 0.893 2% Groves Rd/Emerald Lakes Dr Airport Pulling Rd @ Orange 0.949 0.979 2% Blossom Dr Airport Pulling Rd @ J&C 0.962 0.861 2% Blvd/Fountain View Cir ~ .-....--- --,-. .--.----,.-.. -~.__._.....-- '"--.. __._0' l') z N :::i --' w*, :J 0. f- er: o 0 0. <( g:; 0 <( er: S r-- INIsl ~ ~ -~ D ~;g ~ "-31 (29) ,<--O'?' ~~;; +13 (13) ,,!,X-S ., + ~ +,97 (106) 0,<--0 0\'-<) ..\0 (71) 56..1' ~ t ~ 9:' (7)2+ 8;:':~ ,.., <:;) (52) 64"\. :::'~N 0 <JJ '"- ~",r-- 0 .;f mN- '" -'" 0 LL "v ~ <:;) <i' $ - <<; ~ ..,. -~ '" . 010.._... ~"'''' "- ;;;..,.~ 84 (109) ;'!: ~.~ +180 (119) ORANGE BLOSSOM ., + ~ +,303 (152) ROAD (180) 95..1' ~ t ~ (400)253+ 8~;;1; (289) 205 "\. :::.':::.'" ~..,.r-- m",..,. -r--- ~ ;::- m ~ c:o~__ r--",N "- ~~ ~ 39 (34) ;;;____~ +7(4) J&C BOULEVARD ., + ~ +,49 (38) FOUNTAIN VIEW CIRCLE (306) 144..1' ~ t ~ (9)4+ ~f6~ (205) 109"\. :::.~;::- ..,.m..,. ..,.m- -r-- ~ LEGEND + 000 WEEKDAY AM PEAK HOUR TRAFFIC +(000) WEEKDAY PM PEAK HOUR TRAFFIC R TRANSPORTATION 2008 PEAK SEASON TURNING MOVEMENTS CONSULTANTS,INC. ORANGE BLOSSOM ROAD INTERSECTION IMPROVEMENTS Figure 2 Mr. Michael Greene R TRANSPORTATION Collier County Transportation Planning CONSULTANTS, INC. Airport Pulling Rd @ Orange Blossom Dr Improvements -, September 10, 2008 Page 5 Future Development Traffic In order to determine the 2013 buildout turning movements at the subject intersection, the projected traffic to be generated as a part of the various developments in the vicinity of the Airport-Pulling Road/Orange Blossom Drive intersection was combined based on the information contained within the Traffic Impact Studies obtained for each project. The various projects for which the traffic was accounted can be found within Figure I contained previously in this document. A brief description of each development and the approved parameters associated with those developments are included below, listed from west to east. Savannah Place RPUD is a 6.82-acre parcel located on the south side of Orange Blossom Drive approximately y, mile to the west of Airport Pulling Road. This development is currently being reviewed for a potential re-zoning that would allow for up to 20 single family dwelling units. The TIS performed for this re-zoning application by Q. Grady Minor & Associates, P A was obtained in order to account for the traffic generated as a result of this development. Attached in the Appendix of this document is supporting documentation such as the trip generation and traffic distribution contained within the re-zoning TIS for the Savannah Place RPUD. This information was utilized in order to perform an assignment of the Savannah Place RPUD trips to the subject ,- intersection as well as the signalized intersection on Airport Pulling Road to the north and south of Orange Blossom Drive. Access to Orange Blossom Drive was shown via a single, full access location along the frontage of the Savannah Place RPUD. Figurc 3 was created to illustrate the Savannah Place RPUD traffic accounted for at the area intersections as a part of the proposed needs analysis at the Airport Pulling Road/Orange Blossom Drive intersection. Italian American Plaza & Clubhousc District is a 5-acre parcel located in the southwest corner of the intersection of Airport Pulling Road and Orange Blossom Drive. This development is currently being reviewed for a potential Comprehensive Plan Amendment that would allow for a 20,000 square foot fraternal lodge/organization, 22,500 square feet of general office space, 7,500 square feet of medical office space, and a 4,000 square foot drive-in bank. TR Transportation Consultants performed the TIS for this Comprehensive Plan Amendment. As such, the trip generation projections from the TIS for the Italian American Plaza & Clubhouse District have been attached in the Appendix of this document for reference. Access to the subject property was proposed via two (2) locations, An existing full access to Orange Blossom Drive was shown in addition to a right-inlright-out access to Airport Pulling Road via a cross access through a neighboring parcel to the south of the subject site. Figure 4 has been created to illustrate the Italian American Plaza & Clubhouse District tratIic at the area intersections analyzed as a part of this needs analysis Airport Road/Orangc Blossom Commercial Subdistrict is a 5-acre parcel located on ,..... the west side of Airport Pulling Road to the south of the Italian American Plaza & Clubhouse District. This development is currently being reviewed for a potential -"., .- ~'-'-- -- "~--~-"-- (') z N :J ..J w*, :J 0. f- 0:: 00 0. <t 9:: 0 <t 0:: S t INTS.I 20% + <(--O'r\! aNa ~o (0) ;;;::--;; +0 (0) ,:{vc.., ., + ~-I'"O(O) 0<(--0 .::,,0 (O)O;~ t ~ O'v\! 9? (0) 0 + ;:,::',;:, '" Q (0) o"\. 2.C'!.2. 0 0' '" 0 ;f "' 0 LL V Q i" t .f 20% '<) + NOO ~o (0) ;::--;;;; +1 (4) ORANGE BLOSSOM -1'"4(10) ., + ~ -I'" 0 (0) ROAD (6) :"il~ ! +60%+ (2)3;~ t ~ +20%+ ! ~ (2)4+ ::.;:,;:, II~~ (1) 3 "\. ~2.2. t 20% + 0;::-0 ~o (0) ;;;;;-;; +0 (0) J&C BOULEVARD ., + ~ -I'" 0 (0) FOUNTAIN VIEW CIRCLE (O)O;~ t ~ (0) 0 + ;:,::.;:, (0) 0 "\. 2.~2. t 20% + LEGEND +20%+ PERCENT DISTRIBUTION + 000 WEEKDAY AM PEAK HOUR TRAFFIC +(000) WEEKDAY PM PEAK HOUR TRAFFIC R SAVANNAH PLACE RPUD TRANSPORTATION SITE TRAFFIC ASSIGNMENT CONSULTANTS,INC. ORANGE BLOSSOM ROAD INTERSECTION IMPROVEMENTS Figure 3 19 N z ::i w*, -' ::;) n. tr 00 <Xl n. <( c:f 0 -~- ({)~O <( a: -N- t 35% -+ O-;':!; 0- -\.. 0 (0) ;;g;; +0 (0) ~ + ~+O(O) .;".0 (0) 0..J' ~ t ~ , __ J i d:' (0) 0+ ~~~ L_ ___ '" () (0) 0"" 2-~ 2- 0 <fl C0 '" 0 .f N_ '" -0 0 "V r--- u. () NO ~ ~+ ~ -- (36) 8"" it) ORANGE BLOSSOM ROAD +20%+ +10%+ - - t 35% + iO;;) 0- -\..0 (0) ;=-~;; +0 (0) J&C BOULEVARD ~ + ~ -r 0 (0) FOUNTAIN VIEW CIRCLE +5%+ (4)4..J'~ t ~ (0)0+ ~~~ (0) 0"" 2-0-2- t ~ 30% + LEGEND .- +20%+ PERCENT DISTRIBUTION + 000 WEEKDAY AM PEAK HOUR TRAFFIC +(000) WEEKDAY PM PEAK HOUR TRAFFIC R ITALIAN AMERICAN PLAZA AND CLUBHOUSE DISTRICT TRANSPORTATION NET NEW SITE TRAFFIC ASSIGNMENT CONSULTANTS, INC. ORANGE BLOSSOM ROAD INTERSECTION IMPROVEMENTS Figure 4 -~----"".--,---"'-" _,,"~,_,"_---=-~^o'>" . -""'.,~---,,"-~^-_" _.,---~ Mr. Michael Greene R TRANSPORTATION Collier County Transportation Planning CONSULTANTS, INC. Airport Pulling Rd @ Orange Blossom Dr Improvements September 10,2008 Page X Comprehensive Plan Amendment that would allow for a maximum development intensity of 6,000 square feet of general office space, 30,000 square feet of medical office space, and a 4,000 square foot drive-in bank 1'01' a total development floor area on the site of 40,000 square feel. TR Transportation Consultants performed the TIS tar this Comprehensive Plan Amendment. As such, the trip generation projections Ii-om the TIS far the Airport Road/Orange Blossom Commercial Subdistrict have been attached in the Appendix of this document far reference. Access to the subject property was proposed via two (2) locations. Interconnection to an existing full access to Orange Blossom Drive through the Italian American Plaza & Clubhouse District was shown in addition to a new right-inlright-out access to Airport Pulling Road along thc projcct Il'ontage. Figure 5 has been created to illustrate the Airport Road/Orange Blossom Commcrcial Subdistrict traffic at the area intersections analyzed as a part of this needs analysis Sao Grato is a mixed use development located on thc west side of Airport Pulling Road to the north of Orange Blossom Drivc. The PUD on the subject site is approved far the development of a maximum of 343 multi-family dwelling units in addition to 97,070 square feet of office floor area and 74,230 square feet of retail space. However, the SOP submittal approved on the site in 2006 indicates maximum development parameters of 251 multi-family dwelling units in addition to 97,070 square feet of mixed office floor area and 74,230 square feet of retail space. The TIS perf'ormcd by Vanasse Daylor was obtained in order to determine the tratIic projections associated with the Sao Grato parcel. As such, the trip generation projcctions and project traffic distribution have been attached to the end of this document far refercnce. Access to the Sao Grato development was shown via two (2) locations to Airport Pulling Road via a directional left-in/right- in/right-out as well as a separate right-in/right-out only access driveway. Figurc 6 was created to indicate the net new project tramc assignment to the various intcrsection analyzed as a part of this document tar thc Sao Grato development. Logvicw Ccntcr PlJD is a proposed 15-aere mixed use development in the northeast and southeast corner of the intcrscction of Airport Pulling Road and Orangc Blossom Drive. The Longvicw Center was reviewed tor a PUD re-zoning in 2002. Currently, development parameters are not known for the Longview Centcr PUD, but the 2002 TIS perf'ormed tar the re-zoning was utilized in order to assume a realistic set of development parameters for each parcel at the rcqucst of Collier County. As such, thc 5-acre parcel on the north side of Orange Blossom Drive was assumcd to consist of 19,000 squarc fect of office space in addition to 22.150 square feet of retail shops The 10-acre parcel in the southeast corner of the intersection of was analyzed to consist of a 15-unit multi-family home complex as well as 51,000 square feet of office space and 50,000 square feet of retail development. The TIS perf'ormed by Vanasse Daylor ti'om May of 2002 was obtained, and supporting documcntation li'om that TIS has been attached to the end of this document lor reference. Access was assumed to Orange Blossom Drive tar both thc north parcel and the south parcel via a full access. Figurc 7 reflects thc site traffic assignmcnt of the Longvicw Center PUD-North Parcel to thc subject intersections, and Figurc 8 indicates the site traffic assignment of the Longvicw Ccnter PUD-South Parcel. c.9 N z :::i W*E --' =' 0.. f- er ~ 00 0.. <( Q:;O S <( er t INTS.I 35% -+ o-~ 0- "-0 (0) ;;~;; +0 (0) ~ + ~..rO(O) .~ ----- ---- <:;) ,,:{"'S ~0 (0) 0 j' ~ t ~ O~~O\>-<:;) I Ii? (0) 0+ ;'.;:;'. ",,0 (38) 8 ~ <) (0) 0 "\. 2-~ 2- I 0 i' r--' 0 ;f '" 0 "- "V t -----. ------ - ._~..- ~_.~- -~_.._-- <) j" 35% # + <<; ORANGE BLOSSOM ROAD +15%+ . +20%+ -, I~! L':" t 30% + o-~o- "-0 (0) ;;:;;; +0 (0) J&C BOULEVARD ~ + ~..r 0 (0) FOUNTAIN VIEW CIRCLE (0)0j'~ t ~ (0) 0+ ;'.~;'. (0) O"\. 2-g: 2- LEGEND +20%+ PERCENT DISTRIBUTION ~ + 000 WEEKDAY AM PEAK HOUR TRAFFIC +(000) WEEKDAY PM PEAK HOUR TRAFFIC R AIRPORT ROAD/ ORANGE BLOSSOM COMMERCIAL SUBDISTRICT TRANSPORTATION NET NEW SITE TRAFFIC ASSIGNMENT (ONSULTANTS,INC. ORANGE BLOSSOM ROAD INTERSECTION IMPROVEMENTS Figure 5 -'.-...-.-. ~..._"""...,__~b.,..__ "'-,_.....,~--~.._--- _.'-.._~"- c.9 z N ..J ..J w*, ::J 0. f- [( 00 0. <( Q"; 0 <( [( S IN.TS.I o-~ 0- '\.. 0 (0) 5) <(--0'<"' ;;~;; +0 (0) ,.!,,<-S ~ + ~-r0(0) 0<(--0 co~ 0"<) t---C") ;:,,0 (O)O;~ t,. ~~ d? (0) 0+ ::.~::. (277)91" ~! '" () (?)O~, S~S 0 <:J ,... NU') 0 ~ ~ I ~~ '" I ~N 0 I C")U') U. 'V () I O)~ ~ ~~ , I $' ! ! tff I -.--!t-N' I I (QtO..q- LO , \ ~~"'-:::. ' 41 (39) ~~~ C").J +0 (0) ORANGE BLOSSOM I ~ + ~ "U- -r0 (0) ROAD \ (27)21;~ t,. _i2 (0) 0+ ::.:is::. -qt--- ~~ (O)O~ SRS ~~ C")O) - ~~ (156) 57i \ ! ;c' [6 i2 '\..2 (6) :;g;:::- +0 (0) J&C BOULEVARD ~ + ~ -r0 (0) FOUNTAIN VIEW CIRCLE (16)6;~ t,. (0) 0+ ::.~::. (O)O~ S~S LEGEND +20%+ PERCENT DISTRIBUTION + 000 WEEKDAY AM PEAK HOUR TRAFFIC +(000) WEEKDAY PM PEAK HOUR TRAFFIC R SAO GRATO SOP TRANSPORTATION SITE TRAFFIC ASSIGNMENT CONSULTANTS,INC. ORANGE BLOSSOM ROAD INTERSECTION IMPROVEMENTS Figure 6 ~ z :::i .-J :::> n. f- 0:: o 0 n. <l: Q:; 0 <l: 0:: t 40% -+ ~_._- D o-gs 0- "- 0 (0) ~O'?' ;;~;; +0 (0) ",<v'":J ~-II ~ + ~","O(O) ~O I'\. \)0 00- 9 (50) ~'" ,:,,0 (0) 0..1' ~ t ~ 0'V ;;;;~ 1+2 (12) ~: 1C:8 (12) 9: (0) 0+ ;:,~;:, ~ + ~i+9 (~9) ~ ~ 0(0) '" 0 (0) 0 "\- 2-g 2- (0) 0..1' ~ t ~ (105) 72..1' 0 Jj .... 0 ;f (9) 7 + ;:,;:,~ (0)0+ '" 0 U. 'V (0) 0 "\- 2-2-~ 0 <i' t .f 40% 0 + ORANGE BLOSSOM +10%+ +10%+ ROAD -, t 40% + iD~ iD "-3 (4) ;::-;::-;::- +0(0) J&C BOULEVARD ~ + ~"'"O (0)+ 5% +FOUNTAIN VIEW CIRCLE +5%+ (5)4..1'~ t ~ (0) 0+ ;:,gj;:, (0) O"\- 2-iD2- t ~ 30% + LEGEND ~' +20%+ PERCENT DISTRIBUTION + 000 WEEKDAY AM PEAK HOUR TRAFFIC +(000) WEEKDAY PM PEAK HOUR TRAFFIC R LONGVIEW CENTER PUD NORTH PARCEL TRANSPORTATION SITE TRAFFIC ASSIGNMENT CONSULTANTS,INC. ORANGE BLOSSOM ROAD INTERSECTION IMPROVEMENTS Figure 7 ---_.._-- ..,~---^".. -->.,._,~_..,.~-_.....,~.".- .. ---~,-~_._---,"--- (,') N z ..J w*, ..J :J n. f- er: o 0 n. -< Q:; 0 S -< er: + INTS.I 40% <:) _+ ~O~ r--- '\.. S o~o 0 (0) 00.<(; ;;:15;; +0 (0) <:)0<(0 _ ., + ~..{"O (0) OV 000 '\..22 (96) .:,0 ; ~ + ~ ;;;;:15 +5 (24) +0 (0) (0) 0 ., + ~..{" 22 (96) ..{" 16 (22) 9:' (0) 0.... ;:.gj;:. "' Q (0) O"\- 2-N'2- (0) 0; ~ I+~. . (0) 0.... 1\ ~ 0 JJ r--- ~ (17) 15.... ::1;:':15(193) 144,,\- :15 ~ 0 ;f ro 0 (O)O"\- 90- I!_m LL " Q ,--r-- 1m N ~ + ~~- $' - ~ 40% tf + ORANGE BLOSSOM + 10%.... ROAD + 10%.... + 40% + ~ ~ ~ '\..7 (8) ;;;-~;;;- +0(0) J&C BOULEVARD ., + ~..{"O (0) FOUNTAIN VIEW CIRCLE (8}7;~ + ~ (0) 0.... ;:.~;:. (0) 0 "\- 2-~ 2- + - 30% + LEGEND +20%.... PERCENT DISTRIBUTION + 000 WEEKDAY AM PEAK HOUR TRAFFIC +(000) WEEKDAY PM PEAK HOUR TRAFFIC LONGVIEW CENTER PUD SOUTH PARCEL ~ TRANSPORTATION SITE TRAFFIC ASSIGNMENT CONSULTANTS, INC.ORANGE BLOSSOM ROAD INTERSECTION IMPROVEMENTS Figure 8 Mr. Michael Greene "k TRANSPORTATION Collier County Transportation Planning CONSULTANTS, INC. Airport Pulling Rd @ Orange Blossom Dr Improvements - September 10, 2008 Page 13 Grcek Orthodox Church is a vacant parcel on the north side of Orange Blossom Drive on the eastern boundary of the Longview Center development previously discussed within this document. Based on potential development parameters for the site, it was assumcd to consist of a maximum of 20 multi-family dwelling units. Currently, a TIS has not been performcd for this future development. As such, trip gencration calculations were performed based on Land Use Code 230 (Residential CondominiumlTownhouse) within the ITE Trip Generation Report, 7'1, Edition. Table 2 reflects thc trip generation of the potential development. Tablc 2 Trip Generation Grcek Orthodox Church Parcel ~~':f Access to the site was assumed via a single location to Orange Blossom Drive. Figure 9 ~' reflccts the distribution utilized for the analysis as well as the site traffic assignment to the various interscctions studied as a part ofthis document. Westminster is a currently vacant parcel on the north side of Orange Blossom Drive on the eastcrn boundary of the Grcck Orthodox Church parcel prcviously discussed within this document. The Developer of the Westminster development is currently in the process of gathering the necessary data to submit a PUD re-zoning application on the site. The PUD re-zoning will propose a 415 unit Continuing Care Retirement Community (CCRC) on the subject site. Currently, a TIS has not been performed for this future development. As such, trip generation calculations were performed based on Land Use Code 255 (CCRC) within the ITE Trip Generation Report,7lh Edition. Tablc 3 reflects the trip generation of the potential development. Table 3 Trip Gencration Westminster PUD (4]5 units) 75 55 Access to the sitc was assumed via a single location to Orange Blossom Drive. Figure ,,- 10 reflects the distribution utilized for the analysis as well as the site traffic assignment to the various intersections studied as a part of this document. .""-,._,_._".,-,". ~c_." .'-- ,,'-- 0 N z ...J w-*, ...J ::J Q. f- a:: 00 Q. <( g; 0 S <( a:: INTS.I \) 0<00 "-0 (0) ,<-O'r ,:tv'" I ; ;;;=-;; +0 (0) R-O , 0 00<0 "-4 (1) ~ + ~..r 0 (0) O'v\) ~~ I I (0) 0"" ~ t ~ ;;;;;=- +2 (1) ~N I :,,0 ~ + ~..r4(2) ~~~(2) tf' ( 0) 0.... :=.::':=. '" () (0) O~ 2.~2. (0) 0"" t ~ (9) 2 ",. 0 <fJ <--- (2) 0.... :=.:=.:::" 0 .t ro 0 (0) 0 ~ 2.2.:!. LL 'V () ~ t .f 30% <<; + I I ORANGE BLOSSOM +20%.... ROAD +20%.... t 30% + DND "-0 (0) ;;:;;; +0 (0) J&C BOULEVARD ~ + ~ ..r 0 (0) FOUNTAIN VIEW CIRCLE (0) 0"" ~ t ~ (0) 0.... :=.:::..:=. (0) 0 ~ 2.:!.2. LEGEND +20%.... PERCENT DISTRIBUTION + 000 WEEKDAY AM PEAK HOUR TRAFFIC +(000) WEEKDAY PM PEAK HOUR TRAFFIC GREEK ORTHODOX CHURCH R TRANSPORTATION SITE TRAFFIC ASSIGNMENT CONSULTANTS,INC. ORANGE BLOSSOM ROAD INTERSECTION IMPROVEMENTS Figure 9 o N ~ W*E 00 0.. <{ - a:O ~ a: S t INTS.I 30% 5) _+ ~O~ a~ a -\.0 (0) o,"'v'? ;;~;; +0 (0) 0~ ., + ~,("o (0) O-v\! ~'<; (0)0.J'~ t ~ 9? (0) 0+ ;:,~;:, :3 00 (0) 0, s~s c-- '<; .. - g ;f- a "v u. 0 ~ t .$I 30% ({; + iO .. r:::-:::::. --I aae:. '-8(17) :!.~ I ;;;;~ +5(12) I ~:; 1-\.10(11) ORANGE BLOSSOM +20%+ ., + ~,("9 (18) LK ~ *,0 (QLJ ROAD (O)o.J'~t~ (44)38.J' +20%+ (11) 10+ ;:,;:,~ (0) 0+ _ (0) o~ SS~ t 30% + a~ a -\.0 (0) ;;;;;; +0 (0) J&C BOULEVARD ., + ~,("o (0) FOUNTAIN VIEW CIRCLE (0)0.J'~ t ~ (0) 0+ ;:,~;:, (O)O~ s~s LEGEND +20%+ PERCENT DISTRIBUTION _ + 000 WEEKDAY AM PEAK HOUR TRAFFIC +(000) WEEKDAY PM PEAK HOUR TRAFFIC R WESTMINSTER TRANSPORTATION SITE TRAFFIC ASSIGNMENT CONSULTANTS, INC. ORANGE BLOSSOM ROAD INTERSECTION IMPROVEMENTS Figure 10 ~---_.'._--'--- ..- ....,.,---. ..--.- ..-.-- Mr. Michael Greene R TRANSPORTATION Collicr County Transportation Planning CONSULTANTS, INC. Airport Pulling Rd @ Orange Blossom Dr Improvements September 10,2008 Page 16 The traffic generated by all of the devclopmcnts described as a part of this report and illustrated within Figures 3 through 10 were then combined in order to determine the total development traffic assumed as a part of this analysis. It should bc noted that, for each project that was assumed to consist of retail development, the assignments at the project entrances indicate total trip gcncration while the assignments to the intersections external to the developments indicate only net new trips after a reduction for pass-by traffic. Figure 11 reflects the combination of the developmcnt rclatcd traffic as illustrated within Figures 3 through 10. Annual Growth Rate (AGR) Calculations In order to obtain thc 2013 background tratTic volumes to be utilized for the proposed needs analysis. it was necessary to obtain annual growth rates for Airport Pulling Road. Orangc Blossom Road, and J&C Boulevard. The annual growth rates were calculated by utilizing the historical traffic data li'om the Collier County Average Daily Trame Report. The growth rates were calculated based on the tratTic volumes dating back to 2002 on these roadways. Based on the historical traffic data. all roadways except for Orange Blossom Drive are shown to have declining traffic conditions since 2002. As such, a minimum annual growth rate of 2.0% was assumed for these roadways. Furthermore, a 2.0% annual growth rate was also assumed for thc side street approaches. However, the annual growth rate for Orange Blossom Drivc was shown to be 4.13%. A sample calculation utilized to determine the annual growth rate is indicated below. Additionally, Table 4 indicates the annual growth rate for all approaches at the subject intersection. It should be noted that thc same annual growth rate was assumed for Coon Road as Slater Road due to the lack of historical traffic inf(JrInation on Coon Road. I Table 4 (2007 A DT roo",o", Annual Growth Rates AGR = -I ()/'UlJgc W'JI,I(JIII 2002 ADT Airport Rd (Ii) Orange Blossom Dr I RO!lqway AGR AGR =(11,446veh)'_1 ___Airport Pulling Road 2.00% Orange /!/os.\oI!l 9,348 veh J & C Boulevard 2.00% AGR =0.0413, or 4.13% Orange Blossom D~ive 4.13% ()ronge HlO.\\OIII u'_ 2013 Background Turning Movements The 2008 peak season, peak hour turning movements indicated within Figure 2 previously in this document were factored by the aforemcntioncd annual growth rates compounded annually over a tive (5) year period in ordcr to projcct the 2008 turning movements to 2013 traffic conditions, The annual growth rates for each approach were factored by all turning movements entering the intersection ti'om the respective approach <.9 z N :::; ..J w*, ::> 0.. l- n:: ~ 00 0.. 4: ~ 0 4: n:: S INTS.I ;;;:- "- O,?,Q o-~ 0- '\..0 (0) ~ ;;~;; +0 (0) N<V'" ., +- ~-I"O(O) 0<<.0 ~0 (O)o.l'~ t ~ O\,-Q !.i? (0) 0+ ;:.~;:. "' () (0) O"\. !2-:!2- 0 {J ,... 0 f m "' C0 0 LL "v () cj' .f I.;; ____ID ___ ___",,"co N NN"- LO ~ ~::.;; ::. 84 (203) ~~~ tt +27 (63) ORANGE BLOSSOM ., +- ~ -1"60(176) ROAD (110)41.1'~ t ~ -, (77) 45+ [;; ~ 8 (1) 3"\. --~ mo_ "'''-C0 ~~N ~ _N m<D_ '\.. ~~~ 12 (18) ;:;;S;;;- +0 (0) J&C BOULEVARD ., +- ~-I"O(O) FOUNTAIN VIEW CIRCLE (33) 21 .I' ~ t ~ (0) 0 + ;:.[:::;:. (0) O"\. !2-:!2- m ~ - LEGEND + 000 WEEKDAY AM PEAK HOUR TRAFFIC +(000) WEEKDAY PM PEAK HOUR TRAFFIC R TRANSPORTATION DEVELOPMENT TRAFFIC SUMMARY CONSULTANTS, INC. ORANGE BLOSSOM ROAD INTERSECTION IMPROVEMENTS Figure 11 -_._-"--,~ --.-.-..- ~"-"'--'~~-'-'-"~ - ---,-"---~"--.._-,~-~- Mr. Michael Grcene R TRANSPORTATION Collier County Transportation Planning CONSULTANTS, INC. Airport Pulling Rd @ Orange Blossom Dr Improvements September 10, 2008 Page 18 based on the calculation ret1ected below. A sample calculation is indicated below for reference. 2013 Turning Movement = 2008 Turning Movement * (I + AGR )l'0IH008) 2013 1M = 1,264 vehicles * (1 +0.0200)(5) = 1,396 vehicles All turning movements at thc intersection were factored by the appropriate annual growth ratc in accordance with this calculation in order to dctermine the 2013 background turning movements at thc Airport-Pulling Road/Orange Blossom Drive intersection. Thc resultant 2013 background turning movements are shown graphically in Figure 12. 2013 Buildout Traffic In order to obtain the 2013 buildout turning movements at the intersection of Airp0l1- Pulling Road/Orange Blossom Drive for the future needs analysis at this location, the 2013 background turning movcmcnts indicated within Figure 12 and the combined tratllc from thc various planncd developments in the area shown within Figure 11 were combined. The resultant 2013 buildout turning movements arc illustrated in Figure 13 for reference. It should be noted that the annual growth rates are intended to account for the tratllc generated by the various devclopments described within this document. However, in order to pcrform a conscrvative analysis. an annual growth rate was utilizcd to project the 2013 background traffic in addition to adding the development related traffic. As such, there is some "double counting" of future traffic within the projections of this document in order to pcrform a conscrvativc analysis at the subject intersection. Intersection Needs Analvsis The 2013 buildout turning movements indicated within this mcmorandum have preliminarily been inputted into the SYNCHRO software in order to determine the lane arrangements necessary at the Airport-Pulling Road/Orange Blossom Drive intersection after the development of the various proposed developments. Several meetings with Staff have been held in order to discuss the parameters of the SYNCHRO modeling. At this point, the direction received from Staff was to move forward with the design of an additional lane in the westbound dircction on Orange Blossom Drive. and additional lane in the eastbound direction on Orange Blossom Drive, and the addition of a U-turn median opening on Airport Pulling Road in advance of the Orange Blossom Drive intersection in ordcr to remove these U-turning trips from the intersection. Extension of several turn lanes are also proposed as a result of this analysis. As such, the attached preliminary design has been created to illustratc thc proposed improvements at the intersection. (j z N -' w*, -' ~ 0.. J- et .- 00 0.. <( Q:: 0 <( et S '" INTSI '" "'- N:N , ~ ~m ~ 34 (32) ",0 ;;::;:> +14 (14) ,,<vCj ., -+ ~..{"107(117) 0",0 0\,-0 ~0 (78)62;~ t ~ 92 (8)2+ ~~~ <'? Q (57) 71",\- ~ 0,_ a tfJ o"--~ '" a ;f 0-- <0 ~'" a "v _m LL Q r-- ri' ~ ,f 0- '-<I <0 _N a) . M:S...-.. ~<oN , ;;-r--~ 103(133) ~ :.;? +220 (146) ORANGE BLOSSOM ., -+ ~ ..("371 (186) ROAD (220) 116;~ t ~ - (490) 310+ ~tg~ (354) 251",\- ::.~;:;:- "''''N O~'" 80)_- ~ N N '" -.,..: m__ a)",r-- , :;~!!2- 43 (38) ~.,..:~ +8 (4) J&C BOULEVARD ., -+ ~ ..{" 54 (42) FOUNTAIN VIEW CIRCLE (338) 159;~ t ~ (10)4+ ~~g (226) 120",\- ::.;:.u;- m '" "'-- _<0 a) m ~ LEGEND --. + 000 WEEKDAY AM PEAK HOUR TRAFFIC +(000) WEEKDAY PM PEAK HOUR TRAFFIC R TRANSPORTATION 2013 BACKGROUND TURNING MOVEMENTS CONSULTANTS, INC.ORANGE BLOSSOM ROAD INTERSECTION IMPROVEMENTS Figure 12 .---- ~---_.- "~,~--~-,,- -,----_.~._--.-_._._.._,._---- ~ z ~ ~ :::J n. f- er: 00 n. <( ~ 0 <( er: S I'-- INISI 0 '" -~- ~ N ~ N "- O?' ::!.(l)::!. 34 (32) ~ ;;: ~~ +14 (14) 0.X--S ." .. ~ + 107(117) 0<<--0 0"<) ,:0.0 (78)62;~ t ~ 9? (8) 2+ ;!a;fj '" Q (57) 71 "\. ~ ~_- 0 {J o~~ '" 0 .f 0-- <0 ~C"l 0 ~O) LL "v ~ Q ~ ~ $' ..,- <<I eo _C"l_ o r"-OO --- ffi__t-- N ~ N'" "- ;::;<0;; ~ 187 (336) m"<'t(O (") ...- ~~. ~ ~ 247 (209) ORANGE BLOSSOM ." .. ~ +431 (362) ROAD (330) 157;~ t ~ (567) 355 + ;::: gs ~ (355) 254 "\. ::::.~::::. 0..,-1'-- oeo..,- =- Ol~ ~ ~ ~ eo -'" eo - N=:"_ ~O)N "- ;;:;- C"l ~ 55 (56) ~ ~.~ +8 (4) J&C BOULEVARD ." .. ~ + 54 (42) FOUNTAIN VIEW CIRCLE (371) 180;~ t ~ (10)4+ &1:;:;~ (226) 120 "\. ::::'~'"' 0) ..,- ..,--- ~I'-- I'-- ~ ~ LEGEND + 000 WEEKDAY AM PEAK HOUR TRAFFIC +(000) WEEKDAY PM PEAK HOUR TRAFFIC R TRANSPORTATION 2013 BUILD-OUT TRAFFIC CONDITIONS CONSULTANTS, INC. ORANGE BLOSSOM ROAD INTERSECTION IMPROVEMENTS Figure 13 Mr. Michael Greene R TRANSPORTATION Collier County Transportation Planning CONSULTANTS, INC. Airport Pulling Rd @ Orange Blossom Dr Improvements September 10, 2008 Pagc 2] Based on the attached plan, both the eastbound approach and the westbound approach to Airport Pulling Road on Orange Blossom Drive will consist of dual left turn lanes, a single through lane, and a separate right turn lane. A preliminary cost estimate was also created in order to ret1ect the potential costs necessary to perform the intersection improvements currently projected as a part of this analysis. This cost estimate has been attached to the end of this document for reference. Upon Staff approval of the projections contained within this document, the SYNCHRO files will be finalized, and a final report will be completed. A t such time, another meeting will be held with Staff to go through the finalized SYNCHRO model in order to discuss the necessary improvements. Should you have any questions or concerns about the data contained within this document, please do not hesitate to contact me. Appendix/Attachments -,.,._-- ._---,~_.- -...---. ,- .-.'- APPENDIX ..'''- "-,. ~",> ~,-,...^" TURNING MOVEMENT COUNT RESULTS ~ TRANSPORTATION DATE: May 7, 2008 DAY: WEDNESDAY CONSULTANTS,INC. COUNT TIME: 7:00 AM - 9:00 AM 15 MINUTE SUMMARY OF INDIVIDUAL MOVEMENTS AIRPORT PULLING ROAD & OLD GROVES ROAD I EMERALD LAKE DRIVE I AIRPORT PULLING ROAD II OLD GROVES ROAD I EMERALD LAKE DRIVE I INTER- 15MlN BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL lEFT THRU RIGHT TOTAL TOTAL 7:00AM 13 125 1 139 0 232 2 234 4 1 18 23 7 3 2 12 408 7:15AM 5 168 6 179 1 198 1 200 6 0 5 11 19 1 6 26 416 7:30AM 9 165 7 181 1 246 5 252 9 0 7 16 24 2 5 31 480 7:45AM 21 225 8 254 3 321 3 327 13 2 10 25 29 2 9 40 646 8:00AM 25 206 7 236 0 23' 5 239 17 0 , 21 30 , 9 43 541 8:15AM 22 231 6 259 3 279 14 296 9 0 26 35 11 3 2 18 606 8:30AM 24 208 5 237 2 295 11 308 11 0 17 28 17 3 6 28 601 8:45AM 27 210 13 250 4 302 10 316 13 1 20 34 30 , 6 40 640 TOTAL: 146 1,538 53 1,737 14 2,107 51 2,172 82 4 107 193 167 22 47 236 4,338 HOURLY SUMMARY OF INDIVIDUAL MOVEMENTS AIRPORT PULLING ROAD & OLD GROVES ROAD I EMERALD LAKE DRIVE HOUR t AIRPORT PULLING ROAD II OLD GROVES ROAD I EMERALD LAKE DRIVE I INTER- BEGIN NORTHBOUND I LEFT SOUTHBOUND II EASTBOUND II WESTBOUND I SECTION --., LEFT THRU RIGHT TOTAL THRU RIGHT I TOTAL THRU RIGHT I TOTAL LEFT THRU RIGHT I TOTAL LEFT TOTAL 7:00AM 48 683 22 753 5 997 11 1,013 32 3 40 75 79 8 22 109 1,950 7:15AM 60 764 28 852 5 999 14 1,018 45 2 26 73 102 9 29 140 2,083 7:30AM 77 827 28 932 7 1,080 27 1,114 48 2 47 97 94 11 25 130 2,273 7:45AM 92 870 26 986 8 1,129 33 1,170 50 2 57 109 87 12 28 127 2,394 8:00AM 98 855 31 984 9 1,110 40 1,159 50 1 67 118 86 14 25 127 2,388 I PEAK HOUR SUMMARY I HOUR I AIRPORT PULLING ROAD II OLD GROVES ROAD I EMERALD LAKE DRIVE I INTER~ BEGIN NORTHBOUND SOUTHBOUND EASTBOUND II WESTBOUND SECTION LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT I TOTAL II TOTAL 17:45AMI 92 870 26 988-11 8 1,129 33 1,170T 50 2 57 109 87 12 28 127 2,394 PEAK SEASON, PEAK HOUR SUMMARY (PSCF = 1.12 ) HOUR I AIRPORT PULLING ROAD II OLD GROVES ROAD I EMERALD LAKE DRIVE I lNTER- BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL II LEFT THRU RIGHT I TOTAL II TOTAL I 7:45 AMI 103 974 29 1,10flr 9 1,264 37 1,310 56 2 64 122 97 13 31 142 II 2,681 - -... -- ~- .~~-- _..---- ,--,. R TRANSPORTATION DATE: May 7, 2008 DAY: WEDNESDAY CONSULTANTS,INC. COUNT TIME: 7:00 AM . 9:00 AM PEAK HOUR: 7:45 AM . 8:45 AM INTERSECTION: AIRPORT PULLING ROAD & OLD GROVES ROAD I EMERALD LAKE DRIVE AIRPORT PULLING ROAD 2,372 88% t I 1,310 1,062 N . t 37 1,264 9 .J . '-t OLD GROVES ROAD I EMERALD LAKE DRIVE t. 31 .... .... 13 .... 153 .... .1 r 97 142 56 .... 276 10% .... 2 ... 183 .... 7% 122 64 "' 40 ~ t ,. 103 974 29 ~ Totallnlersection Traffic Percents (%) represent movement volumes 2,681 divided by the total interseclion traffic . t 1.426 1,107 t 2,532 94% '-', R TRANSPORTATION DATE: May 7, 2008 DAY: WEDNESDAY CONSULTANTS,INC. COUNT TIME: 4:00 PM - 6:00 PM 15 MINUTE SUMMARY OF INDIVIDUAL MOVEMENTS AIRPORT PULLING ROAD & OLD GROVES ROAD I EMERALD LAKE DRIVE I AIRPORT PULLING ROAD II OLD GROVES ROAD I EMERALD LAKE DRIVE I INTER- 15MIN BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL 4:00 PM 17 335 19 371 7 262 11 280 20 1 16 37 23 4 4 31 719 4:15PM 14 334 26 374 9 267 2 278 18 3 9 30 36 9 6 51 733 4:30PM 14 334 20 368 11 229 10 250 19 4 11 34 22 1 6 29 681 4:45 PM 17 310 14 341 22 218 10 250 20 6 6 32 30 5 4 39 662 5:00 PM 9 361 22 392 3 258 11 272 20 1 12 33 14 1 9 24 721 5:15 PM 26 419 18 483 17 267 8 292 16 2 11 29 24 2 4 30 814 5:30PM 23 332 10 365 6 223 6 235 12 1 10 23 30 5 9 44 667 5:45PM 23 339 14 376 8 249 9 266 15 2 13 30 27 4 4 35 707 TOTAL: 143 2,764 143 3,050 83 1,973 67 2,123 140 20 88 248 206 31 48 283 5,704 HOURLY SUMMARY OF INDIVIDUAL MOVEMENTS AIRPORT PULLING ROAD & OLD GROVES ROAD t EMERALD LAKE DRIVE HOUR AIRPORT PULLING ROAD I OLD GROVES ROAD I EMERALD LAKE DRIVE I INTER- .- NORTHBOUND SOUTHBOUND TOTAL 1 LEFT EASTBOUND II WESTBOUND I SECTION BEGIN LEFT THRU RIGHT TOTAL LEFT THRU RIGHT THRU RIGHT I TOTAL THRU RIGHT I TOTAL LEFT TOTAL 4:00 PM 62 1,313 79 1.454 49 976 33 1,058 77 14 42 133 111 19 20 150 2,795 4:15PM 54 1,339 82 1,475 45 972 33 1,050 77 14 38 129 102 16 25 143 2,797 4:30 PM 66 1,424 74 1,564 53 972 39 1,064 75 13 40 128 90 9 23 122 2,878 4:45PM 75 1.422 64 1,561 48 966 35 1,049 68 10 39 117 98 13 26 137 2,864 5:00 PM 81 1,451 64 1,596 34 997 34 1,065 63 6 48 115 95 12 26 133 2,909 PEAK HOUR SUMMARY HOUR AIRPORT PULLING ROAD OLD GROVES ROAD I EMERALD LAKE DRIVE I INTER- BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND II SECTION LEFT THRU RIGHT TTOT AL II LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL II LEFT THRU RIGHT TOTAL II TOTAL I 5:00 PMI 81 1,451 64 I 1,596 34 997 34 1 1,065 63 6 48 115 95 12 26T 133 II 2,909 PEAK SEASON, PEAK HOUR SUMMARY (PSCF = 1.12) HOUR AIRPORT PULLING ROAD I OLD GROVES ROAD I EMERALD LAKE DRIVE I INTER- BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION LEFT THRU RIGHT TOTAL LEFT THRU RIGHT I TOTAL LEFT THRU RIGHT I TOTAL II LEFT THRU RIGHT TOTAL TOTAL I 5:00 PMI 91 1,625 72 11,788 II 38 1,117 38 1,193 71 7 52 I 129 106 13 29 149 3,258 - ..._--, .... R TRANSPORTATION DATE: May 7. 2008 DAY: WEDNESDAY CONSULTANTS,INC. COUNT TIME: 4:00 PM - 6:00 PM PEAK HOUR: 5:00 PM .6:00 PM INTERSECTION: AIRPORT PULLING ROAD & OLD GROVES ROAD I EMERALD LAKE DRIVE AIRPORT PULLING ROAD 2,918 90'% t I 1,193 1,725 N . t 38 1,117 38 .,J I \,. OLD GROVES ROAD I EMERALD LAKE DRIVE '- 29 .... ... 13 .... 142 .... j r 106 149 71 .... 271 8% .... ... 265 7 .... 8% 129 52 "\ 116 ., t ,. 91 1,625 72 ~ Total Intersection Traffic Percents (%) represent movement volumes 3,258 divided by the lolal intersection traffic . t 1,275 1,788 t 3,062 94% - R TRANSPORTATION DATE: January 8, 2008 DAY: TUESDAY CONSULTANTS,INC. COUNT TIME: 7:00 AM. 9:00 AM 15 MINUTE SUMMARY OF INDIVIDUAL MOVEMENTS AIRPORT ROAD & ORANGE BLOSSOM ROAD I AIRPORT ROAD II ORANGE BLOSSOM ROAD I INTER. 15 MIN BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL 7:00AM 37 146 26 209 6 248 14 268 9 23 102 134 52 16 11 79 690 7:15AM 23 149 17 189 4 236 18 258 10 43 39 92 63 25 15 103 642 7:30AM 19 150 22 191 11 265 28 304 16 75 43 134 61 28 11 100 729 7:45AM 15 153 15 183 11 292 23 326 13 74 35 122 75 38 22 135 766 8:00AM 24 196 17 237 7 251 33 291 34 42 43 119 70 49 24 143 790 8:15AM 30 163 18 211 2 257 40 299 18 25 54 97 53 39 15 107 714 8:30AM 27 155 13 195 15 282 37 334 21 31 33 85 38 50 11 99 713 8:45AM 33 142 5 180 8 259 34 301 27 30 51 108 41 24 11 76 665 TOTAL: 208 1,254 133 1,595 64 2,090 227 2,381 148 343 400 891 453 269 120 842 5,709 HOURLY SUMMARY OF INDIVIDUAL MOVEMENTS AIRPORT ROAD & ORANGE BLOSSOM ROAD - AIRPORT ROAD ORANGE BLOSSOM ROAD INTER- HOUR BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL 7:00AM 94 598 80 772 32 1,041 83 1,156 48 215 219 482 251 107 59 417 2,827 7:15AM 81 648 71 800 33 1,044 102 1,179 73 234 160 467 269 140 72 481 2,927 7:30AM 88 662 72 822 31 1,065 124 1,220 81 216 175 472 259 154 72 485 2,999 7:45AM 96 667 63 826 35 1,082 133 1,250 86 172 165 423 236 176 72 484 2,983 8:00AM 114 656 53 823 32 1,049 144 1,225 100 128 181 409 202 162 61 425 2,882 II PEAK HOUR SUMMARY I AIRPORT ROAD ORANGE BLOSSOM ROAD .. INTER- HOUR BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION LEFT THRU RIGHT TOT ALII LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL II LEFT THRU RIGHT TOTAL TOTAL 17:30 AMI 88 662 72 T 822 n 31 1,065 124 1,220 81 216 175 472 259 154 72 485 2,999 PEAK SEASON, PEAK HOUR SUMMARY (PSCF = 1.17 ) HOUR I AIRPORT ROAD I ORANGE BLOSSOM ROAD INTER- BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION LEFT THRU RIGHT I TOTAL LEFT THRU RIGHT I TOTAL II LEFT THRU RIGHT TOTAL II LEFT THRU RIGHT TOTAL TOTAL I 7:30 AMI 103 775 84 962 36 1,246 145 1.427 95 253 205 I 552 II 303 180 84 567 3,509 _. "__'h_ ,-..-" .-- ,,,-.. -,.~ ,- ,- R TRANSPORTATION DATE: January 8. 2008 DAY: TUESDAY CONSULTANTS,INC. COUNT TIME: 7:00 AM - 9:00 AM PEAK HOUR: 7:30 AM. 8:30 AM INTERSECTION: AIRPORT ROAD & ORANGE BLOSSOM ROAD AIRPORT ROAD 2,381 68% t I 1,427 954 N . t 145 1,246 36 .J . ~ ORANGE BLOSSOM ROAD 1- 84 .... ... 180 ~ 428 ..... J r 303 567 95 ..... 980 28% ~ 253 ... 941 ~ 27% 552 205 " 373 ... t ,. 103 775 84 ~ Total Intersection Traffic Percents (%) represent movement volumes 3,509 divided by the total intersection traffic . t 1,754 962 t 2,716 77% ~ TRANSPORTATION DATE: January 8, 2008 DAY: TUESDAY CONSULTANTS,INC. COUNT TIME; 4:00 PM . 6:00 PM 15 MINUTE SUMMARY OF INDIVIDUAL MOVEMENTS AIRPORT ROAD & ORANGE BLOSSOM ROAD I AIRPORT ROAD II ORANGE BLOSSOM ROAD I INTER- 15MIN BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL 4:00 PM 42 320 84 446 9 274 30 313 35 53 67 155 47 20 13 80 994 4:15PM 55 351 69 475 14 256 25 295 35 87 50 172 43 25 19 87 1,029 4:30 PM 43 357 95 495 19 244 22 285 42 72 57 171 23 19 23 65 1,016 4:45 PM 54 370 88 512 22 279 26 327 37 58 51 146 24 16 27 67 1,052 5:00 PM 50 367 137 554 14 227 19 260 41 91 57 189 34 29 17 80 1,083 5:15 PM 64 406 67 537 18 240 33 291 39 90 63 192 32 20 28 80 1,100 5:30PM 67 339 114 520 17 229 29 275 37 103 76 216 40 37 21 98 1,109 5:45PM 48 329 98 475 11 263 22 296 34 81 68 183 31 25 21 77 1,031 TOTAL: 423 2,839 752 4,014 124 2,012 206 2,342 300 635 489 1,424 274 191 169 634 8,414 HOURLY SUMMARY OF INDIVIDUAL MOVEMENTS AIRPORT ROAD & ORANGE BLOSSOM ROAD .- HOUR AIRPORT ROAD ORANGE BLOSSOM ROAD INTER- BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION LEFT THRU RIGHT TOTAL lEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL 4:00PM 194 1,398 336 1,928 64 1,053 103 1,220 149 270 225 644 137 80 82 299 4,091 4:15PM 202 1,445 389 2,036 69 1,006 92 1,167 155 308 215 678 124 89 86 299 4,180 4:30PM 211 1,500 387 2,098 73 990 100 1,163 159 311 228 698 113 84 95 292 4,251 4:45PM 235 1,482 406 2,123 71 975 107 1,153 154 342 247 743 130 102 93 325 4,344 5:00 PM 229 1,441 416 2,086 60 959 103 1,122 151 365 264 780 137 111 87 335 4,323 I PEAK HOUR SUMMARY I HOUR I AIRPORT ROAD I ORANGE BLOSSOM ROAD INTER- BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION LEFT THRU RIGHT TOTAL LEFT THRU RIGHT I TOTAL II LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL 14:45PMI 235 1,482 406 2,123-11 71 975 107 1,153 154 342 247 1 74311130 102 93 325 4,344 PEAK SEASON, PEAK HOUR SUMMARY (PSCF = 1.17) HOUR I AIRPORT ROAD II ORANGE BLOSSOM ROAD I INTER- BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT I TOTAL LEFT THRU RIGHT TOTAL TOTAL 14:45 PMI 275 1,734 475 2,484 83 1,141 125 1,349 180 400 289 869 152 119 109 I 380 5,082 -..-. ,-~. -- ~ TRANSPORTATION DATE: January 8, 2008 DAY: TUESDAY CONSULTANTS,INC. COUNT TIME: 4:00 PM - 6:00 PM PEAK HOUR: 4:45 PM . 5:45 PM INTERSECTION: AIRPORT ROAD & ORANGE BLOSSOM ROAD AIRPORT ROAD 3,372 66%, t I 1,349 2,023 N . t 125 1,141 83 .J . '- ORANGE BLOSSOM ROAD 1- 109 .... ... 119 ... 519 ..... oJ r 152 380 180 .... 1.389 1,338 27% ... 400 ... .... 26% 869 289 "\ 958 .... t ,. 275 1,734 475 ~ Tolallnlersection Traffic Percents (%) represent movement volumes 5,082 divided by the total intersection traffic . t 1.582 2.484 t 4.066 80% - R TRANSPORTATION DATE: May 8, 2008 OAY, THURSDAY CONSULTANTS,INC. COUNT TIME: 7:00 AM . 9:00 AM 15 MINUTE SUMMARY OF INDIVIDUAL MOVEMENTS AIRPORT PULLING ROAD & FOUNTAIN VIEW CIRCLE t J AND C BOULEVARD I AIRPORT PULLING ROAD II FOUNTAIN VIEW CIRCLE I J AND C BOULEVARD I INTER- 15MIN BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL 7:00AM 25 198 7 230 0 294 35 329 28 2 12 42 7 1 11 19 620 7:15AM 21 155 0 176 2 276 19 297 27 0 17 44 6 0 7 13 530 7:30AM 44 184 3 231 2 218 61 281 38 1 15 54 8 3 10 21 587 7:45AM 32 202 6 240 1 252 39 292 29 0 19 48 11 5 7 23 603 8:00AM 25 203 4 232 5 233 43 281 31 2 20 53 10 1 8 19 585 8:15AM 39 228 8 275 2 219 38 259 31 1 18 50 11 0 9 20 604 8:30AM 27 224 6 257 3 230 37 270 38 1 40 79 12 0 11 23 629 8:45AM 43 214 5 262 2 206 42 250 30 2 37 69 13 1 4 18 599 TOTAL: 256 1,608 39 1,903 17 1,928 314 2,259 252 9 178 439 78 11 67 156 4,757 HOURLY SUMMARY OF INDIVIDUAL MOVEMENTS AIRPORT PULLING ROAD & FOUNTAIN VIEW CIRCLE I J AND C BOULEVARD - HOUR AIRPORT PULLING ROAD FOUNTAIN VIEW CIRCLE f J AND C BOULEVARD INTER- BEGIN NORTHBOUND SOUTHBOUND EASTBOUND TOTAL I WESTBOUND I SECTION LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT lEFT THRU RIGHT I TOTAL TOTAL 7:00AM 122 739 16 877 5 1,040 154 1,199 122 3 63 188 32 9 35 76 2,340 7:15AM 122 744 13 879 10 979 162 1,151 125 3 71 199 35 9 32 76 2,305 7:30AM 140 817 21 978 10 922 181 1,113 129 4 72 205 40 9 34 83 2,379 7:45AM 123 857 24 1,004 11 934 157 1,102 129 4 97 230 44 6 35 85 2,421 8:00AM 134 869 23 1,026 12 888 160 1,060 130 6 115 251 46 2 32 80 2,417 I PEAK HOUR SUMMARY I HOUR AIRPORT PULLING ROAD FOUNTAIN VIEW CIRCLE I J AND C BOULEVARD INTER- BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION LEFT THRU RIGHT TOTAL II LEFT THRU RIGHT I TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL 17:45AMI 123 857 24 1,004 11 934 157 1,102 129 4 97 230 44 6 35 85 2,421 PEAK SEASON, PEAK HOUR SUMMARY (PSCF = 1.12) HOUR AIRPORT PULLING ROAD FOUNTAIN VIEW CIRCLE J J AND C BOULEVARD INTER- BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION LEFT THRU RIGHT TOTAL II LEFT THRU RIGHT TOTAL LEFT THRU RIGHT I TOTAL II LEFT THRU RIGHT I TOTAL TOTAL 17:45AMI 138 960 27 1,124 II 12 1,046 176 1,234 144 4 109 258 49 7 39 95 2,712 ------- _.---- -"---~"---- --',-- ~_____m R TRANSPORTATION DATE: May 8, 2008 DAY: THURSDAY CONSULTANTS,INC. COUNT TIME: 7:00 AM. 9:00 AM PEAK HOUR: 7:45 AM . 8:45 AM INTERSECTlqN: AIRPORT PULLING ROAD & FOUNTAIN VIEW CIRCLE I J AND C BOULEVARD AIRPORT PULLING ROAD 2,378 88% t I 1,234 1,144 N . t 176 1,046 12 .J . ~ 'OUNTAIN VIEW CIRCLE I J AND C BOULEVARD 1- 39 ... ... 7 ... 320 ..... J r 49 95 144 ..... 578 21% .... ... 139 4 5% .... 258 109 ~ 44 ~ t ,. 138 960 27 Note: Tolallntersection Traffic Percents (%) represent movement volumes 2.712 divided by the total intersection traffic . t 1,204 1,124 t 2,328 86% .- ~ TRANSPORTATION DATE: May 8, 2008 DAY: THURSDAY CONSULTANTS,INC. COUNT TIME: 4:00 PM - 6:00 PM 15 MINUTE SUMMARY OF INDIVIDUAL MOVEMENTS AIRPORT PULLING ROAD & FOUNTAIN VIEW CIRCLE t J AND C BOULEVARD I AIRPORT PULLING ROAD II FOUNTAIN VIEW CIRCLE I J AND C BOULEVARD I tNTER- 15 MIN BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION LEFT THRU RIGHT TOTAL lEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL 4:00PM 24 372 10 406 11 265 38 314 69 0 49 118 8 2 5 15 853 4:15PM 15 328 16 359 8 219 23 250 70 1 47 118 9 1 8 18 745 4:30 PM 18 370 7 395 10 239 10 259 80 2 52 134 8 1 4 13 801 4:45 PM 14 368 7 389 7 246 20 273 74 1 49 124 6 3 7 16 802 5:00PM 11 331 9 351 10 225 9 244 67 3 46 116 10 0 6 16 727 5:15 PM 10 480 12 502 11 331 24 366 57 3 45 105 6 1 8 15 988 5:30 PM 4 427 9 440 18 267 19 304 75 1 43 119 12 0 9 21 884 5:45PM 8 345 18 371 13 259 23 295 68 2 44 114 4 0 4 8 788 TOTAL: 104 3,021 88 3,213 88 2,051 166 2,305 560 13 375 948 63 8 51 122 6,588 HOURLY SUMMARY OF INDIVIDUAL MOVEMENTS AIRPORT PULLING ROAD & FOUNTAIN VIEW CIRCLE I J AND C BOULEVARD - AIRPORT PULLING ROAD FOUNTAIN VIEW CIRCLE f J AND C BOULEVARD INTER- HOUR NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION BEGIN LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL 4:00PM 71 1,438 40 1,549 36 969 91 1,096 293 , 197 494 31 7 24 62 3,201 4:15PM 58 1,397 39 1,494 35 929 62 1,026 291 7 194 492 33 5 25 63 3,075 4:30 PM 53 1,549 35 1,637 38 1,041 63 1,142 278 9 192 479 30 5 25 60 3,318 4:45 PM 39 1,606 37 1,682 46 1,069 72 1,187 273 8 183 464 34 4 30 68 3,401 5:00 PM 33 1,583 48 1,664 52 1,082 75 1,209 267 9 178 454 32 1 27 60 3,387 PEAK HOUR SUMMARY HOUR AIRPORT PULLING ROAD I FOUNTAIN VIEW CIRCLE I J AND C BOULEVARD I INTER- BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION LEFT THRU RIGHT TOTAL LEFT THRU RIGHT 1 TOTAL II LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL 14:45 PMI 39 1,606 37 1,68ill 46 1,069 72 1,187 273 8 183 464 II 34 4 30 68 3,401 PEAK SEASON, PEAK HOUR SUMMARY (PSCF = 1.12) HOUR AIRPORT PULLING ROAD I FOUNTAIN VIEW CIRCLE I J AND C BOULEVARD I INTER- BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION LEFT THRU RIGHT TOTALlI LEFT THRU RIGHT TOTAL II LEFT THRU RIGHT 1 TOTAL II LEFT THRU RIGHT TOTAL TOTAL 14:45 PMl 4' 1,799 41 1,884 52 1,197 81 1,329 II 306 9 205 520 38 4 34 76 II 3,809 '"~- "-_,___'0_- .-.,,-<< ,-"- ,~..~.- -,-... -.-- R TRANSPORTATION DATE: May 8, 2008 DAY: THURSDAY CONSULTANTS,INC. COUNT TIME: 4:00 PM - 6:00 PM PEAK HOUR: 4:45 PM . 5:45 PM INTERSECTION: AIRPORT PULLING ROAD & FOUNTAIN VIEW CIRCLE I J AND C BOULEVARD AIRPORT PULLING ROAD 3,468 91% t I 1,329 2,138 N . t 81 1,197 52 .J . '* 'OUNTAIN VIEW CIRCLE I J AND C BOULEVARD '- 34 ~ ... 4 .... 129 .... J r 38 76 306 .... 648 17% ... -. 178 9 5% .... 520 205 " 102 ~ t ,. 44 1,799 41 Nole" Tolallntersection Traffic Percents (%) represent movement volumes 3,809 divided by the lotal intersection traffic . t 1,440 1,884 t 3.324 87% 2007 FDOT TRAFFIC INFORMATION .~ CD - PEAK SEASON CORRECTION FACTORS -- " ',,-" ---._.-,-< ""'_.~,._.__.. . .,,- " " " " " " " " " " " " " " " " " " " " " H " J H ~ " " 00 " " ~ 0 " W II "- II >, ~~IIW~mWryNm~~w~~rorlnryWON~WOry~WWWWW~mmONrywro~~WryMrl~~NMry~Wo~m ,.. UUllNrlOOOOmmmmmmmOOOOrlrlrlrlNNNNNNNNNNNMMMMMMMMMMMNNNNNNNNrlO o Ul II ~ ~~llrlrlrlrlrlrlOOOOOOOrlrlrlrlrlrlrlrlrlrlrlrlrlrlrlrlrlrlrlrlrlrlrlrlrlrlrlrlrlr~rlrlrlrlrlrlrlrl,jrl " " 0 " "- " W " 0: " " " " ~ " " " 0 IIWOMrlrn~~ryMNrlM7wrumrlVWWrlMWmwruwwwmOUrlMmWW~~WmryNm~rymW~ooMruM "- IloommrorororowrororororororommmmooooOOOOOOrlrlrlrlrlrlrlrlrlrlrlrlrlOOoooooomm w '" " 0: Ul II r, rl 0 0 C) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 rl ,-j .--1 ,.1 " r.j rl ,---l rl ,--I rl rl rl rl rl rl rl rl rl rl rl r., ,,1 rl ,..~ rl r' rl rl rl rl 0 0 " " >,0 " HH " 0", " "''" II~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ W,.. 1100000000000000000000000000000000000000000000000000000 ~Z 1100000000000000000000000000000000000000000000000000000 .0 IINNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN UO II"""""""""""""""""""""""""", U IIWMO~MO~~MO~~rl~~rlW~NrnWNrnWMO~~rlOO~,IW~rlro~NmWMO~MO~~rlro~Nmrl " IIOrlNNOrlrlNOrlrlNMOrlNNO.~rlNOOrl~JMOrlNNOrlrlNODrlN~JOrlNNOrlrlNOOrlNNM 00: II"""""""""""""""""""""""""", ~" IlrlrlrlrlNNNNMMMMM~~~~~~~~wwwww~~~~wro=rommmmmOODO,jrlrlrlNNNNNN UH IIOOOOOOOOOODOOOOOOOODODOOODUUUUUUDOUOUOOrlrlrlrlrlrlrlrlrlrlrlrlrlrl mH " r" H ~ " 0 ill " CU ~II~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ ~r-~~r-~~-[-r-r-~ r- r- ~ r- r- ~ r- r- r- 0 ~IIOOOOOOOOOOOOOODOOOOOOOOOOOOOOOOOUOOOOOOOOOOOOOOOOOO00 0 01100000000000000000000000000000000000000000000000000000 rou IINNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN ill 0 II'''""""""""""""""""""""""", " mM Ilrlr-~rl=ryrlm~ryrlmLnrlm~NrnWMDr-Mor-VrlmLnNm~r~mWNmWMor-ryrlmVrlm~NmWMD 0 0 II00rlNNOrlrlNDrlrlNOOrlNNOrlNNOrlrlNOOrlNNOrlrlNOOrlNMOrlNNOrlrlNOOrlNM ro ~ II"""""""""""""""""""""""""", ''I ro IlrlrlrlrlrlNNNNMMMMV~7vv~~~~WWWW~r-~~~wruwwmmmmmOOOOrlrlrlrlNNNNN W ~ Q) >, II 000 <=> 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 noD n 0 ,.j rl ,.1 rl ,.., rl rl rl rl rl rl rl rl '0 0 ~ H " 0 " -, rl ~ 0' " ro o w ~ " ill ill U~ ill II rl ('I rYl ry Ul '-.l) r- m 0) CJ rl N M ~ U') \D [-- en 0\ (-, rl ,"'1 '-'-1 '---r Ln \D 1- CD (l) () rl '" ,-,-:. ''J' In lD (-- en 01 C) rl <'I fYl ~:r Ln W [- W 0'\ 0 rl ('I (,'] ~ 1)' N . 0)11 t rlrlrlrlrlrlrlrlrlrlNNNN~JNNNNNMMMMMMMMMM~q~~VV7ryVVLnLnLnLn ro u 3: II ' -l< -I< -< -I< -l< -I< t -l< 1'. t -I< t I' ,~ ~ ,,~.- SUPPORTING DOCUMENTS FOR - PLANNED DEVELOPMENTS TAKEN INTO ACCOUNT ~,,~ .._-~--~---_._' - - -,..-...-.- ~---- -- SA V ANNAH PLACE RPUD 1.0 INTRODUCTION The proposed Savannah Place RPUD is a request for Residential PUD zoning approval of approximately 6.82", acres for up to 20 Single Family dwelling units. The project site is located on the south side of Orange Blossom Drive approximately y, mile west of Airport Road in Section 2, Township 49 South, Range 25 East, Collier County, Florida. For project location please refer to Figure 1, Location Map. TIle project will have a single entrance to be located on Orange Blossom Drive. Project build out is projected to be 2010. 2.0 SCOPE The following aualyses are included in this report: 1. Trip Generation Calculations (at build out) presented For Peak Season Daily Traffic (PSDT) including the Respective Peak Hour Volumes. 2. Trip Assignment within the Radius of Development Influence (RDI). 3. Discussion of Irnpacts to Roadways within the RDI. -" 3.0 TRIP GENERATION The 7th Edition Trip Generation published by the Institute of Transportation Engineers (ITE) is used for trip generation calculations provided in this report. Please refer to Tables 1 through 12. The trip generation for the previously approved use is estimated to be 87 trip ends for daily traffic volume, 12 trip ends during the AM peak hour and 12 trip ends for the PM peak hour. The trip generation for the proposed use is estimated to be 237 trip ends for daily traffic volume, 23 trip ends during the AM peak hour and 25 trip ends for the PM peak hour. This results in a net increase in trip generation of 150 trip ends for daily traffic volume, 11 trip ends during the AM peak hour and 13 trip ends for the PM peak hour. Please refer to the DISCUSSION section for details concerning the effects of thesc traffic volumes on the level of service for roadway links within the RDI. 4.0 TRIP ASSIGNMENT AND SIGNIFICANCE TEST The project directional distribution of traffic to and from Savannah Place RPUD is presented on Figure 2 and Table 13. When traffic is distributed to the accessed, adjacent and subscquent links, trip generation volumes are below 2% of the service capacity of the surrounding roadways (see Table 14). No roads meet the significance test. F:\PROJ _ PLANNING DOCS\Savannah Place PUmSPUDR\Drafts\TRAt'FIC J}...1PACT STATEMENT.doc -2. -.-- ..".".~~~ ---.- ._^~. -- FIGURE 2 AM and PM Peak Hour Traffic Distribution N 1 [1] 1 [1] W*E 1 [1] - 1 [1] 1 [1] VANDERBIL BEACH ROAD 1 [1] ~ . 1 [1] ~ . " ~ . 1~1k ~ ~ RIDGE " .9 ~ I ROAD . ~ ~ 0 ., " 31 75 . " ~ !S! " ~ . 1 [1] 1 [1] 1i3 i '" 0 ~ "" ~ <ll 8 <:> ..., I :;;;: ~ , ~ ::;, ~ 0 is " . ~GOLDEN , ...... 0 GA PARKWA Y a , :s f CC> 1 ~ LEGEND' 0 XX [XX] = AM [PM] PEAK HOUR TRAFFIC DISTRIBU1l0N 0 z z 'I .. SAVANNAH PLACE pun II; QWlllt1!tnF.VnDPY.ll lII3JGnDn Q. GRADY IlJNOR AlID JSSOC1ll'CS, P.! a STEnt:JlJ.~,DlU.'I1ln ~ ClYI1~P/tIllS.wm~.1'l..UIlmlS ~ IA~'oO<<.fE .IJ'I'.Jl(I~ _ 1I1.,.". Uf TIS FlGURE 2 Cl~WA.OIt+5IO'CI)Dt: -, , , --.--- ,,~ 1ILI_~~ l1IUlroIQlMtIBn 1.1 ~~ --.................- flllllUAAl.ZOOlI F:\PROJ - PLANNING DOCS\Savannah Place PUD\SPUDR\Drafts\TRAFFIC IMPACT STATEMENT.doc .5. .- FIGURE 3 AM & PM Peak Hour Flow by Direction IMMOKAL "" j ~ j "" N w*e "'0< "'''' aa aa 0;': a.;..: ;9"'- H H AMO:PM1- I I __AM1:PI,lO j 0<", ..a 0';":; VANDERBILT BEACH << I ROAD I N_ "", aa .:.:,!.J I I ~~ ~ I ~ _N 0_ "'''' ",,,, aa .... N';": ;':0 . H ~ H ~ I , - ~ "" ~ RIDGE . ~ ~ ~ .. e: ~ I 75 <5 ~ ~ Si ~ I I <is ~ "" ~ 0_ 0_ "", ",,,, ~ '" ~ ..a aa ~ ~ '-" .;..:oti .;..:6 8 ,,'" H ~ <<<< ~ ~ X I I ~ " . ~ :::, ~ ~ ~ L... . " GOLDEN GA PARKWA Y . i :5 "-" < ~ ~ g lEGEND" ~ AMX, PMX-- AM AND PM PEAK HOUR flOW BY DISTRIBUTION " z z ~ .. SAVANNAH PLACE PUP . n'lO'Wv.~/"r.vII!"''fPl>:l1 DaI<lllED.'" Q. GRlDY lIIl!OR JIID J.'lSOCIAI'Ill. P.! o S't'EI'KH.l.1.OOCWOOD. Dillion CMLDlClII!J:RS.. UlllIsotVlMIl!I. PUJIlIEllS g >>"nJ:'J!fWHI,l( j.l'p)lOftl> _1IJ..1!l.D'J 11$ FIGURE 3 Ci II~WAD1lH1ilOllCOl>l: !m.,_........ ~, ",. ,,~ ~.- .~ .......-.............:'.:=f;::':'.:=:' r[iilFllM~Y. 21D1 M-O-OC' lIUnlIaWUBD.l" 1 - F:\PROJ- PLANNING DOCS\Savannah Place PUD\SPUDR\Dmfts\TRAFFIC llvIPACT STATEMENT.doc .6. -~.~.- -_._.~-' _....__._-,-~"'--- ITALIAN AMERICAN PLAZA & CLUBHOUSE DISTRICT R TRANSPORTATION -- CONSULTANTS, INC. Tablc 1 Existing Allowablc Usc Italian Amcrican Plaza and Clubhousc District & Ail'port Road/Oran c Blossom Commercial Subdistrict Ii , . ~i As a part of this submittal, the Growth Management Plan Amendment for the 5-acre Italian American Club site will approve a maximum of 54,000 square feet of floor area. More specifically, the site will consist of a 20,000 square foot Italian American Club Chapter in addition to 34,000 square feet of commercial uscs. The proposed Growth Management Plan Amendment on the Airport Road/Orange Blossom Commercial Subdistrict will allow a maximum of 40,000 square feet of commcrcial floor area on the 5-acre subject site. In order to perform a worst case analysis in relation to the proposed Growth Management Plan Amendments, the subject parcels were analyzed based on the .~., uses indicated within Tablc 2. Tablc 2 Propos cd Maximum Intensities Italian Amcrican Plaza and Clubhouse District & Air ort Road/Oran c Blossom Commcrcial Subdistrict Italian American Club 20,000 s uare feet Italian American Plaza General Office 22,500 square feet and Clubhouse District Medical Office 7,500 square feet Drive-In Bank 4,000 square feet Total Floor Area 54,000 square feet General Office 6,000 square feet Airport Road/Orange Medical Office 30,000 square feel Blossom Commercial Drive-In Bank 4,000 square feet Subdistrict Total Floor Area 40,000 square feet The Developer's of both subject parcels have agreed to provide vehicular intercOlmection between the two (2) sites in order to limit the required access points and provide better on-site traffic circulation. As such, a full site access driveway is shown to Orange Blossom Road along the western boundary of the Italian American Club site, and a right- Page 5 -,'.". ---... __m '.- -- R TRANSPORTATION CONSULTANTS, INC. in/right -out access driveway IS shown to Airport Pulling Road on the Airport Road/Orange Blossom Commercial Subdistrict site. IV. TRIP GENERATION Trip generation calculations were performed for the existing allowable uses in addition to the proposed uses as a part of the Growth Management Plan Amendments on the site. Thc resultant trip generation !tl!" each use was determined by refcrencing the Institute of Transportation Engineer's (ITE) report, titled Trip Generation, 7'10 Edition. Land Use Code 230 (Residential Condominium/Townhouse) was utilized for trip generation of the existing allowable uses on the subject parcels. For the Italian American Club site, Land Use Code 591 (Lodge/Fratemal Organization), Land Use Code 710 (General Office Building), Land Use Code 720 (Medical/Dental Office Building), and Land Use Code 912 (Drive-in Bank) were utilized for trip generation purposes. For the Airport Road/Orange Blossom Commercial Subdistrict, Land Use Code 710 (General Office Building), Land Use Code 720 (Medical/Dental Office Building), and Land Use Code 912 (Drive-in Bank) were utilized in ordcr to perfonn the trip generation calculations.. Table 3 indicates thc trip generation of the permittcd residential uses on the subject parcels in accordance with the existing Growth Management Plan designation. As the sites arc two separate parcels, it was assumed that they could develop as scparate residential projects, so trip generation was calculated separately for each parcel based on 15 dwelling units rather than a combined 30 dwelling units. --...- - - Page 6 R. TRANSPORTATION ~- CONSULTANTS, INC. Table 3 Existing Allowable Trip Generation Italian American Plaza and Clubhouse District & Air ort Road/Oran c Blossom Commercial Subdistrict Italian American Multi-Family 2 9 11 9 4 13 128 Club Site (15 dwelling units) Airport/Orange Multi-Family 2 9 II 9 4 13 128 Blossom Site (15 dwelling units) Total Trips 4 18 22 18 8 26 256 Table 4 indicates tbe trip generation of the proposed Italian American Plaza and Clubhouse District based on the uscs listed within Table 2. It should be noted that the average rate was utilized for the PM peak hour calculation for the General Oftice use and the daily calculation for the Medical Office use. - Lodge/Fraternal Organization 3 3 6 9 9 18 174 (20,000 s . ft.) General Office 50 7 57 6 28 34 424 (22,500 s . ft.) Medical Office 15 4 19 8 20 28 270 (7,500 s . ft.) Drive-In Bank 28 21 49 91 92 183 986 (4,000 sq. ft.) Total Tri s 96 35 131 114 149 263 1,854 Table 5 indicates thc trip generation of the proposed Airport Road/Orange Blossom Commercial Subdistrict in accordance with the uses listed within Table 2. It should be noted that the average rate was utilized for the PM peak hour trip generation calculation "'"-, of the General Office use and the daily calculation of the Medical Office use. Page 7 .,.._.,,-~' >~""- ---- R TRANSPORTATION CONSULTANTS, INC. Table 5 Airport Road/Orange Blossom Commercial Subdistrict Pro osed Maximum Tri Generation General Office ]7 3 20 2 7 9 152 (6,000 sq. ft.) --- Medical Office 59 15 74 28 75 103 1,084 (30,000 sq. ft.) Drive-In Bank 28 21 49 91 92 183 986 (4,000 sq. ft.) Total Trips 104 39 143 121 174 295 2,222 ITE estimates that a comparable Drive-in Bank use, such as those proposed on the two subject sites, may attract a significant amount of its traffic from vehicles already traveling the adjoining roadway system. This traffic, called "pass-by" traffic, reduces the development's overall impact on the surrounding roadway system but does not decrease the actual driveway volumes. Collier County allows a maximum "pass-by" traffic reduction of 50% for bank uses. Table 6 summarizes the pass-by reduction. Table 7 summarizes the Italian American Club development traffic and the breakdown between the total project trips and the net new trips the development is anticipated to generate after the pass-by reduction is applied. It should be noted that the driveway volumes are not reduced as a result of the "pass-by" reduction, only the traffic added to the surrounding streets and intersections. Table 8 reflects the 50% pass-by reduction for the Airport Road/Orange Blossom Commercial Subdistrict. Table 6 Pass-by Trip Reduction Factor osed Growtb Mana ement Plan Amendments Page 8 R TRANSPORTATION ~ CONSULTANTS, INC. Table 7 Trip Generation - New Trips Italian American Plaza and Clubhouse District ~-:;~~-~. ,~'---~~~"~~;;(~li~k1~Y-:'~NJ[ii;.;;-;I~~;:':P\~:~~1i~~cii,-?]1J.lr6~n;;f1~~-ij'll} I~' 1('; H f.ynWO lll~t 'I n~~\ ~'~_ (~~~-,~~lr~~jt __~~:_~L!~- ~L- ~~);L l~: lh~rWt~lft~~I~ . Total Trips 96 35 131 114 149 263 1,854 Less Bank Pass-by -12 -12 -24 -46 -46 -92 -493 (50% of Bank Trips) New Traffic 84 23 107 68 103 171 1,361 (Total Trins - Pass-by Traffic) Table 8 Trip Generation - New Trips ort Road/Oran e Blossom Commercial Subdistrict Total Tri s 104 39 143 121 174 295 2,222 ....-. Less Bank Pass-by -12 -12 -24 -46 -46 -92 -493 (50% of Bank Trips) New Traffic 92 27 119 75 128 203 1,729 (Total Tri s - Pass-b Traffic) V. TRIP DISTRIBUTION The total trips generated as a result of the proposed Growth Management Plan Amendments indicated within Tables 4 & 5 were then assigned to the surrounding roadway system based on the anticipated routes the drivers will utilize to approach the site. Additionally, these trips were assigned to the site access driveways and the Airport- Pulling Road/Orange Blossom Drive intersection based on the anticipated traffic patterns available as a result of the proposed access configuration. The resultant site traffic assignment and distribution of the Italian American Plaza and Clubhouse District is indicated in Figure 3. Additionally, Figure 4 reflects the site traffic assignment and distribution ofthe Airport Road/Orange Blossom Commercial Subdistrict. - Page 9 - - ---<"',., ".., ...,...... ----- ~ t N ~35'10 -* (.9 + ~ W E ...J ...J ::J Q. b:: S ~ INTSI 0:: <( ~o- ... ;:> 80- '-0 (0) +0 (0) ;;;-~;; +5 (6) ORANGE BLOSSOM DRIVE .r47 (56) ., + ~.r5 (5) +20%+ (2~0))1~-If 7' (52) 12~~ t ~ +10%+ "'\- ':::.~ (15)4.+l ~~~ II g 0 (0) o"'\f ~ 2-2- II ITALIAN AMERICAN CLUB SITE I I PROPOSED I i I ~ERrNNECTION I ~~-~~--~~1 I I ~I o I AIRPORT ROAD/ ORANGE BLOSSOM '" I COMMERCIAL SUBDISTRICT ., -- I (52) 12"\l ! '" I I ~ L__________~ t 35% + LEGEND +20%+ PERCENT DISTRIBUTION + 000 WEEKDAY AM PEAK HOUR TRAFFIC +(000) WEEKDAY PM PEAK HOUR TRAFFIC l:. TRANSPORTATION SITE TRAFFIC ASSIGNMENT K CONSULTANTS, INC. ITALIAN AMERICAN PLAZA & CLUBHOUSE DISTRICT Figure 3 ~ AIRPORT ROAD/ORANGE BLOSSOM ,,~.- DRIVE COMMERCIAL SUBDISTRICT -.-.. .--. --.- R TRANSPORTATION CONSULTANTS, INC. Table 1 Existing Allowablc Use Italian American Plaza and Clubhouse District & Airport Road/Oran e Blossom Commercial Subdistrict L As a part of this submittal, the Growth Management Plan Amendment for the 5-acre Italian American Club site will approve a maximum of 54,000 square feet of floor area. More specifically, the site will consist of a 20,000 square foot Italian American Club Chapter in addition to 34,000 square feet of commercial uses. The proposed Growth Management Plan Amendmcnt on the Airport Road/Orange Blossom Commercial Subdistrict will allow a maximum of 40,000 square feet of commercial floor area on the 5-acre subject site. In order to perform a worst case analysis in relation to the proposed Growth Management Plan Amendments, the subject parcels were analyzed based on the uses indicated within Table 2. Table 2 Proposed Maximum Intensities Italian Amcrican Plaza and Clubhouse District & Air ort Road/Oran e Blossom Commercial Subdistrict .'1' , ',' '1:j. Italian American Club 20,000 s uare feet Italian American Plaza Gencral Officc 22,500 s uare feet and Clubhouse District Medical Office 7,500 squarc feet Drive-In Bank 4,000 square feet Total Floor Area 54,000 s uare feet Gencral Officc 6,000 square feet Airport Road/Orange Medical Office 30,000 s uarc feet Blossom Commercial Drive-In Bank 4,000 square feet Subdistrict Total Floor Area 40,000 square feet The Developer's of both subject parcels have agreed to provide vehicular interconnection between the two (2) sites in order to limit the required access points and provide better on-site traffic circulation. As such, a full site access driveway is shown to Orange Blossom Road along the western boundary of the Italian American Club site, and a right- ----.--. --.~_.- -.---- ---.----,.---------..--,,--------...--- Pagc 5 R TRANSPORTATION .~ CONSULTANTS, INC. in/right-out access driveway IS shown to Airport Pulling Road on the Airport Road/Orange Blossom Commercial Subdistrict site. IV. TRIP GENERATION Trip generation calculations were performed for the existing allowable uses in addition to the proposed uses as a part of the Growth Managemcnt Plan Amendments on the site. The resultant trip generation for each use was determined by referencing the Institute of Transportation Engineer's (ITE) report, titled Trip Generation, 7th Edition. . Land Use Code 230 (Residential Condominium/Townhouse) was utilized for trip generation of the existing allowable uses on the subject parcels. For the Italian American Club site, Land Use Code 591 (Lodge/Fraternal Organization), Land Use Code 710 (General Office Building), Land Use Code 720 (Medical/Dental Office Building), and Land Use Code ,^-. 912 (Drive-in Bank) were utilized for trip generation purposes. For the Airport Road/Orange Blossom Commercial Subdistrict, Land Use Code 710 (General Office Building), Land Use Code 720 (Medical/Dental Office Building), and Land Use Code 912 (Drive-in Bank) were utilized in order to perform the trip generation calculations. Table 3 indicates the trip generation of the permitted residential uses on the subject parcels in accordance with the existing Growth Management Plan designation. As the sites are two separate parcels, it was assumed that they could develop as separate residential projects, so trip generation was calculated separately for each parcel based on 15 dwelling units rather than a combined 30 dwelling units. Page 6 _.'"N"'._ .-.-..",. ----. .-.. R TRANSPORTATION CONSULTANTS, INC. Tablc 3 Existing Allowable Trip Generation Italian Amcrican Plaza and Clubhouse District & Air ort Road/Oran e Blossom Commercial Subdistrict Italian American Multi-Family 2 9 II 9 4 13 128 Club Site (IS dwelling units) .-- Airport/Orange Multi-Family 2 9 11 9 4 13 128 Blossom Site (15 dwelling units) Total Trips 4 18 22 18 8 26 256 Table 4 indicates the trip generation of the proposed Italian American Plaza and Clubhouse District based on the uses listed within Table 2. It should be noted that the average rate was utilized for the PM peak hour calculation for the General Office use and the daily calculation for the Medical Office use. Table 4 Italian American Plaza and Clubhouse District Pro osed Maximum Tri Generation " Lodge/Fraternal Organization 3 3 6 9 9 18 174 (20,000 s . ft.) General Office 50 7 57 6 28 34 424 (22,500 s . ft.) Medical Office 15 4 19 8 20 28 270 (7,500 s . fl.) Drive-In Bank 28 21 49 91 92 183 986 (4,000 sq. ft.) Total Trips 96 35 131 114 149 263 1,854 Table 5 indicates the trip generation of the proposed Airport Road/Orange Blossom Commercial Subdistrict in accordance with the uses listed within Table 2. It should be noted that the average rate was utilized for the PM peak hour trip generation calculation of the General Office use and the daily calculation of the Medical Office use. .- -_.~-~ - _. Page 7 R TRANSPORTATION .,.~. CONSULTANTS, INC. Table 5 Airport Road/Orange Blossom Commercial Subdistrict Pro osed Maximum Tri Generation General Office 17 3 20 2 7 9 152 (6,000 s . ft.) ~- Medical Office 59 15 74 28 75 103 1,084 (30,000 s . ft.) Drive-In Bank 28 21 49 91 92 183 986 (4,000 sq. ft.) Total Trips 104 39 143 121 174 295 2,222 ITE estimates that a comparable Drivc-in Bank usc, such as thosc proposed on the two subject sites, may attract a significant amount of its traffic from vehicles already traveling the adjoining roadway system. This traffic, called "pass-by" traffic, reduces the development's overall impact on the surrounding roadway system but does not decrease - the actual driveway volumes. Collier County allows a maximum "pass-by" traffic reduction of 50% for bank uses. Tablc 6 summarizes the pass-by reduction. Table 7 summarizes the Italian American Club development traffic and the breakdown between the total project trips and the net new trips the development is anticipated to generate after the pass-by reduction is applied. It should be noted that the driveway volumes are not reduced as a result of the "pass-by" reduction, only the traffic added to the surrounding streets and intersections. Table 8 reflects the 50% pass-by reduction for the Airport Road/Orange Blossom Commercial Subdistrict. Table 6 Pass-by Trip Reduction Factor osed Growth Mana ement Plan Amendments Page 8 -- -_._--_.__.._,~"'^ - -~_.,_...---_. -"-,---~ R TRANSPORTATION CONSULTANTS, INC. Tablc 7 Trip Generation - New Trips Italian American Plaza and Clubhousc District r:-' . ,,-- ..=-=-_~o_ " --==-- Ir-. - - - -- ~ ~ --r ~- -- ------~ ----~f--;;=--~-~- '-~ \""thlr\'t:l~~' ,\ ',if ;r"\~ll, Illl)~ , ,',I ,nd[lit~l\\ IP '0-11. ~" I~\ 1,:( ,!II' liJ\,~Py~ : I I ,: ~ ~ I ,I II ". t I ' , , I, I , \" ,\,,1)1 , " , " , . I. Total Trips 96 35 131 114 149 263 1,854 ._, Less Bank Pass-by -12 -12 -24 -46 -46 -92 -493 (50% of Bank Trios) New Traffic 84 23 107 68 103 171 1,361 (Total Tring - Pass-by Traffic) Table 8 Trip Generation - New Trips A' tR d/O BI C . IS bd't . t I~i,;~~~;:r;~~~~ -} ~~\~~ ",'~!:;lJ"- ',\ ~'I Hl'~~~I::\,~;~(~-I-S"';,ji,:!J~Y II~o~\'jl'IrI":~f:~~,~-:~~m};J;;~ ,~:'~I~~I'~I'~~''to 4:j~ r'l "I' '_ ^ ~ J ~-' ' ~a~ 1>' \;' . r r I I 'r~) <"'~1\'J)' ~~ 'i4~&~\', t I ''. '." - [ll i I ((1~iaJ, , II ~'&~ti ' :110', l~I)H(' , hIW,i,l. \ I' ~',/ j I Total Trips 104 39 143 121 174 295 2,222 Less Bank Pass-by -12 -12 -24 -46 -46 -92 -493 (50% of Bank Trips) New Traffic 92 27 119 75 128 203 1,729 (Total Trins - Pass-by Traffic) V. TRIP DISTRIBUTION The total trips generated as a result of the proposed Growth Management Plan Amendments indicated within Tables 4 & 5 were then assigned to the surrounding roadway system based on the anticipated routes the drivers will utilize to approach the site. Additionally, these trips were assigned to the site access driveways and the Airport- Pulling Road/Orange Blossom Drive intersection based on the anticipated traffic patterns available as a result of the proposed access configuration. The resultant site traffic assignment and distribution of the Italian American Plaza and Clubhouse District is indicated in Figurc 3. Additionally, Figure 4 reflects the site trat1ie assignment and distribution of the Airp0l1 Road/Orange Blossom Commercial Subdistrict. ._- Page 9 Si t N ~35'10 * - ~ + _ W E ...J ...J ::;) 0- t;: S i2 INTSI a:: =< a;-;;'; 0- '\.. 0 (0) + 0 (0) ;:::-~;;' +8 (10) ORANGE BLOSSOM DRIVE --1"46 (55) ., + ~ --1"13 (14) +15%+ (1~O))1~:t" 7 (61) 13~ ~ t ~ +20%+ CD ~ (35) 8 ~ 0 0 ~N M__ II CD - (0) O"'\l _0 0 Nill- m-- _~ e II ITALIAN AMERICAN CLUB SITE I _ I PROPOSED I ..:= I ~ERCINNECTION I ~- - -- -~ - --1 I I ~J I AIRPORT ROAD! ORANGE BLOSSOM ~;;'I COMMERCIAL SUBDISTRICT ., + -- I (52) 12~ ! '" I I ~ l___________-.J t 30% + _. LEGEND +20%+ PERCENT DISTRIBUTION + 000 WEEKDAY AM PEAK HOUR TRAFFIC +(000) WEEKDAY PM PEAK HOUR TRAFFIC SITE TRAFFIC ASSIGNMENT 1: TRANSPORTATION AIRPORT ROAD! ORANGE BLOSSOM DRIVE COMMERCIAL SUBDISTRICT K CONSULTANTS, INC. Figure 4 --. ..-..- -,..._.,,--.~-~_._-~-.~. - >.~_..".~ ..._- SAO GRATO SDP .-. PROJECTED TRAFFIC TRIP GENERATION Site-generated trips were estimated using Institute of Transportation Engineers (ITE) Trin Generation (7\1> Edition), in accordance with cUlTent Collier County policy. The following trip generation fonnulas were used: Multi.family (LU 230): General Office Building (LU 710) . ADT: Ln (T) = 0.85 Ln (X) + 2.55 ADT: Ln (T) = 0.77 Ln (X) + 3.65 AM Peak Hour: Ln (T) = O,BO Ln (X) + 0.26 AM Peak Hour: Ln (T) = 0.80 Ln (X) + 1.55 PM Peak Hour: Ln (T) = 0.82 Ln (X) + 0.32 PM Peak Hour: (T) = 1.12 (X) + 78.81 Shopping Center (LU 820): Medical Office (LU 720): ADT: Ln(T) = 0.65 Ln(X ) + 5.83 ADT: T = 40.89(X) - 214.97 AM Peak Hour: Ln(T) = 0.60 Ln(X ) + 2.29 AM Peak Hour: T = 2.48(X) PM Peak Hour: Ln(T) = 0.66 Ln(X) + 3.40 PM Peak Hour: Ln(T) = 0.93 Ln(X) + 1.47 PASS-BY T= Ln (T) =-0.291 Ln (X) + 5.00 I .- Since the proposed development will have dissimilar land uses, a percentage of the site- generated traffic will be captured by the land uses inside the development and not be introduced to the external roadway network. 1ntemal capture trips were estimated using rate and summary sheets shown in the ITE Trip Generation Handbook An ITE Recommended Practice (see Appendix). In addition, the retail land use will capture pass-by from the adjacent traffic stream on AirpOli-Pulling Road. The ITE Trip Generation Handbook An ITE Recommended Practice was used to determine a 43% Pass-By Capture reduction (see Appendix). The increase in through traffic on Airport-Pulling Road using 25% Pass-By reduction is marginal compared to its high Remaining Capacity (J 103). A 43% Pass-By Capture reduction was used in the analyses of this report as supported by The 1TE Trip Generation Handbook An ITE Recommended Practice. Table 1 summarizes the trip generation estimates for this development. - Sao Grato SOP TIS 6 1:\Projem\806\80&85\ T nff;c\Upd~te Sep 05\806BST AIQ06.doc .- ..~.~-, TABLE 1 Site-generated Trip Estimates WKOY AM Pe~k PH Peak J,..alliLV~J~_ QIT lJ_!lit lli.ib' LO..1al ~l!LCI bLt IJ.,til.l .lll.t.IT E;.;it. Shopping Center (lU 820) 7-1.230 SF S,S9S III 60 \I 514 W 167 Internal Capture (Daily/PM) .74 .ll .<2 Pass.by DedllClion 43% .187 -94 .94 Net External Primary Trips for Commercial Use 253 III III General Office (LU lIO): Footage 72,802 SF 1,045 146 116 18 160 l7 III IncernalCapwre (Daily/PM) -17 .9 ., Net External Primary Trips for General Office Use "3 IB Il5 Medical Office (LU 720)" 24,268 SF 777 60 47 Il B4 JJ 61 Internal Capture (Daily/PM) .IS .6 .7 Net External Primary Trips for Medicil.1 Office Use 69 I! 54 Multi-Family (LU 230): lSI DU 1..ol03 108 18 90 128 86 <2 Internal Capture (Daily/PM) -52 .30 ." Net External Primary Trips for Residential Use 76 56 lO Net Externa] Primary Trips 5" JlO l31 The pass-by deduction was evaluated for reasonableness using the FDOT "10% Rule". The pr()jected background traffic on A irport-Puliing Road in front of the site is approximately 5249 vph. One-tenth of this estimate is 525 vph. The pass-by estimate is 187 vph. which is less than 10% of the projected background traffic volume. TRIP DISTRIBUTION AND ASSIGNMENT The pattern of site traffle distribution is based on locations of generators in the area surrounding the project and engineering judgment. Table 2 presents the assumed distribution. Exhibit 3, 4, and 5 graphically presents the same data, showing distribution of Residential, Commercial and Office land lise, respectively. S~O GOlO SOP TIS 7 1:\PrOicm\a06\80GSS\TI~rn(\Updi'tc Scp OS\El06BS T AIOO6_doc TABLE 2 Site generated Trip Distribution T raffle Distribution Un~ From To Residential Commerc. Office Orange Blossom Drive Goodlette-Frank Rd Airport-Pulling Road 15% 10% 10% Orange Blossom Drive Airport-Pull\ng Road Bridgewater Bay Blvd 10% 20% 20% Ot"ange Blossom Drive Bridgewater Bay Blvd Livingston Rd 10% 20% 20% Airport-Pulling Road Vanderbilt Beach Rd Project Access 40% 40% 50% Airport-Pulling Road Proieer Access Orange Blossom Drive 60% 6P% 50% Airport-Pulling Road Orange Blossom Drive J&C Blvd 35% 30% 20% Airport-Pulling Road lmmokalee Rd Vanderbilt Beach Rd 10% 15% 20% Airport.Pulling Road J&C Blvd Naples Blvd 30% 15% 20% Airport-Pulling Road Naples Blvd Pine Ridge Rd 25% 0% 20% Airport.Pulling Road Pine Ridge Rd Golden Gate Pkwy 15% 0% \0% Goodlette-Frank Rd Orange Blossom Drive Pine Ridge Rd iO% 0% 5% Goodlette~Frank Rd Vanderbilt Beach Rd Orange Blossom Drive 5% 0% 5% Livingston Rd Orange Blossom Drive Pine Ridge Rd 5% 10% 10% Livingston Rd Vanderbilt Beach Rd Orange Blossom Drive 5% 10% 10% Vanderbilt Beacb Rd US 4\ Airport.Pulling Road 15% 10% 10% Vanderbilt Beach Rd AJrport.Pulling Road Logan Boulevard 15% 5% 20% Pine Ridge Road Shirley Street Airport-Pulling Road 5% 0% 5% Pine Ridge Road Airport-Pulling Road 1.75 5% 0% S% I The trip distribution percentages of each land use were applied to the site-generated traffic volumes to detenuine the site-generated vehicle trip assignment. The proposed commercial retail use is of a "neighborhood" nature rather than "regional" in scope. For this reason, the area of influences will likely be confined to residential developments along Orange Blossom east and west of Airport-Pulling Road. Thc radius of influence was assumed to be not higher than 1.5 miles from the site. Exhibits 6 and 7 presents the proposed entering and exiting traffic of AM & PM peak Hours respectively. Pass-by deductions are shown in Exhibit 8. Net entcring and exiting traffic in the PM Peak Hours, including Pass-By trips at the Project Access points on Airport Pulling Road arc presented in Exhibit 9. These exhibits also include the Vanderbilt Beach Road & Airport-Pulling Road intersection as well as the AilVOIi-Pulling Road & Orange BJossom Drive intersection, among other intersections ncar the project site. The PM Peak Hour traffic characteristics were studied because the site-related land usc peak -- hour typically occurs in thc PM Peak Hour of the adjaccnt strect traffic. Sao Gr~to SOP TIS 8 l:\Proicm\806\80685\Tnffic\Upd~te Sep 05\806851 AIOO&.doc --- _.........~..- -.._-.-..~-~. -.-- LONGVIEW CENTER pun INTRODUCTION The Longview Center Parcel IS located on the east side of the Airport Pulling Road/Orange Blossom Drive intersection in Collier County (see Exhibit I Location Map). The site is approximately 15 acres in size with approximately 5 acres on the northeast corner of the intersection and approximately 10 acres on the southeast corner of the intersection. There is an existing single access point onto Orange Blossom Drive from each parcel. Currently, the 5 and 10-acre parcels are being used as plant nurseries. The current Future Land Use for the site is Orange Blossom Mixed Use Sub District and the site is within the TraffIC Congestion Zone. The project will contain two phases. Phase I will include 22, I 50 square foot of retail shops and 19,000 square foot of office space. Phase I is projected to be complete prior to the 2005 Peak Season. Phase" (the south parcel) will include 50,000 square foot of -. retail shops, 51,000 square foot office space and 15 multi-family dwelling units. Phase" is projected to be complete prior to the 2008 Peak Season. The purpose of this study is to provide the technical traffic analysis in support of the Rezone. Both AM and PM Peak Hour Volumes were analyzed. I :\P roj e cts V\rch ive \00 cs \P ro jects \804 \8047 8-P u II i ng\Ora ng e BIos som \ T ra ffi c\804 7 8- TIS _ doc 2 "'''..~ ,..-.- TRAFFIC GENERATION Consistent with the current policy of Collier County, project trip generation was based on ITE Trip Generation (6th Edition). The following trip generation formulas were used: Multi-family (LU 230): ADT: Ln(T) = 0.850 Ln(X) + 2.564 AM Peak Hour: Ln(T) = 0.790 Ln(X) + 0.298 PM Peak Hour: Ln(T) = 0.827 Ln(X) + 0.309 Shopping Center (LU 820): ADT: Ln(T) = 0.643 Ln(X ) + 5.866 AM Peak Hour: Ln(T) ~ 0.596 Ln(X ) + 2.329 PM Peak Hour: 1,n(T) = 0.660 Ln(X) + 3.403 General Office Building (LU 71 0) ADT: Ln (T) = 0.768 Ln (X) + 3.654 AM Peak Hour: Ln (1') = 0.797 Ln (X) + 1.558 PM Peak Hour: T = 1.49(X) The above equations were used with the land use data provided to generate the estimated trip generations for the project as shown in Table IA. However, since the proposed land use includes mixed uses, there will be a percentage of the traffic generated that will be attracted internally to other land uses within the development. This internal capture was determined utilizing the rates and summary sheet shown in the ITE Trip Generation Handbook (see Appendix A). In addition, the retail land use will experience pass-by capture from the people that are projected to be traveling along Airport Pulling Road and Orange Blossom Drive. Page 103 from the lTE Trip Generation Handbook was used to determine the percentage of Pass-By Capturc and Internal Capture (sec Appendix A). The resultant projected trip generation has been adjusted for the PM Peak Hour and is I :\Projects\Archive\Docs\Projecls\804\804 7 8-Pulling\Orange Blossom\ Traffic\804 78- TIS_doc 3 _~u_, shown in Table lB. See Appendix A for the Internal Capture Summary worksheet, which was used to determine the internal capture rate. Table 1A PROJECT TRIP GENERATION-(PHASE I ONLY) 2005 AM PM Land Use ADT Peak Enter Exit Peak Enter Exit Office (LU 710): 19,000 SF 371 50 44 6 28 5 23 Retail (LU 820): 22,150 SF 2,586 65 40 25 232 111 121 Totals 2,957 115 83 31 261 116 144 PROJECT TRIP GENERATION-(PHASE II ONLY) 2008 AM PM Land Use ADT Peak Enter Exit Peak Enter Exit Multi-Family (LU 230): 15 DU 130 11 2 9 13 9 4 Office (LU 710): 51,000 SF 791 109 96 13 76 13 63 Retail (LU 820): 50,000 SF 4,365 106 64 41 397 191 207 Totals 5,286 226 162 64 486 212 274 TOTAL OF PHASE I & II 8,243 341 246 95 747 329 418 Table 1 B PROJECT PM PEAK HOUR TRIP GENERATION WITH ADJUSTMENTS (PHASE I ONLY) 2005 PM Land Use Peak Enter Exit Office (LU 710): 19,000 SF 28 5 23 Mixed Use Internal Capture .4 .2 .2 Retail (LU 820): 22,150 SF 232 111 121 Mixed Use Internal Capture .4 .2 .2 Passby Capture 43% .98 .47 .51 Totals 154 65 89 PROJECT PM PEAK HOUR TRIP GENERATION WITH ADJUSTMENTS (PHASE II ONLY) 2008 PM land Use Peak Enter Exit Multi-Family (LU 230): 15 DU 13 9 4 Mixed Use Internal Capture .5 .3 .2 Office (LU 710): 51,000 SF 76 13 63 Mixed Use Internal Capture .9 .4 .5 Retail (LU 820): 50,000 SF 397 191 207 Mixed Use Internal Capture .23 .11 .12 Passby Capture 43% -161 .77 .84 Totals 288 117 171 ,-,--- TOTAL OF PHASE I & II 443 182 260 I :\Projects\Archive\Docs\Projects\804 \804 7 8-Putling\Orange Blossom\ T raffic\804 78- TI S.doc 4 ._,-, "~~-- .- ...-- AREA OF INFLUENCE The existing roadway network in the area of the project is shown on Exhibit l. We have analyzed the roadways in the area of the project within 5 miles of the project in accordance with Collier County TIS guidelines. ADJACENT ROADWAY NETWORK Airport Pulling Road Airport Pulling Road in the vicinity of the project is currently under construction to be expanded into a six lane divided arterial. It is under county jurisdiction. It will have a speed limit of 45 mph when completed. Orange Blossom Drive Orange Blossom Drive in the vicinity of the project is a two lane undivided collector. It is under county jurisdiction. The posted speed limit is 35 mph. COMMITTED ROAD IMPROVEMENTS Roadway improvements that are currently under construction or scheduled for construction within the next three years were considered to be a committed improvement. These were identified in the Collier County Transportation Improvement Plan and FOOT Adopted Work Programs for Collier County, Fiscal Y car 2000/2001-2005/2006. Road improvements are committed for construction in order to help alleviate current area road deficiencies and support ti.lture area development. Construction on Airport Pulling Road to expand it to six-lanes from Pine Ridge Road to Vanderbilt Beach Road has recently stalled. Other committed improvements in the area include: A) the four-lane expansion of Goodlette-Frank Road from Pine Ridge Road to Vanderbilt Beach Road by J :\ProjectslArchive\Docs\Projects\804\804 7 8-Pulling\Orang e Blossom\ T raffic\804 78- TIS ,doc 5 -. year 2004; B) the construction of Livingston Road trom Radio Road to Immokalee Road as a six-lane arterial and from Immokalee Road into Lee County as a four-lane arterial during year 2003; C) the six-lane expansion of Pine Ridge Road from Airport Pulling Road past 1-75 which is currently under construction; and D) the four-lane expansion of Vanderbilt Beach Road from Airport Pulling Road to Logan Boulevard in year 2002, TRIP DISTRIBUTION AND ASSIGNMENT The pattern of site traffic distribution is based upon locations of generators and attractors in the arca of the project. The traffic distribution for the project was discussed and approved in a methodology meeting with Collier County Transportation Planning and is shown in Table 2. Table 2 TRAFFIC DISTRIBUTION-PM PEAK HOUR (NEW TRIPS) ". Land Use Traffic Distribution Orange Blossom east of Project 10% Orange Blossom west of Project 10% Airport north of Orange Blossom 40% Airport south of Orange Blossom 40% .~. I :\Proje cts \Archive \00 cs\Proj ects\804 \8 04 7 8- Pu II i ng\Ora ng e Blosso m \ T ra ffic\804 7 8 - TIS. d oc 6 .-. _..~_.. "._._-"._~--_.~ .... ANNUAL GROWTH RATE PROJECTIONS ~~". ANNUAL GROWTH RATE CALCULATIONS 2002 2007 ANNUAL COUNT BAS E YR TRAFFIC YRS OF GROWTH ROADWAY SEGMENT STA# TRAFFIC VOLUME GROWTH RATE Airport Pulling Road N. of Orange Blossom Or. 599 45664 36027 5 2.00% S. of Orange Blossom Or 503 44288 39679 5 2.00% J&CBlvd W. of Airport Rd 631 12040 10222 5 2.00% Orange Blossom Dr W. of Airport Rd 647 9348 11446 5 4.13% E. of Airport Rd 647 9348 11446 5 4.13% W. of Livingston Rd 647 9348 11446 5 4.13% Side Street Approaches -- -- 2.00% 1 All traffic volumes were taken from the 2007 Collier County Average Daily Traffic Report , In instances where the historical data indicates a reduction in traffic, a minimum annual growth rate of 20% was assumed. .- SAMPLE GROWTH RATE CALCULATION 2007 ADT ^(1fYrs of Growth) Annual Growth Rate (AGR) - -1 Base Year ADT 11446 ^(1I5) AGR (Orange Blossom Dr) -1 9348 AGR (Orange Blossom Or) = 4.13% ,."~, ---~ .,,-~,.... ----.~--" -- PROPOSED DRAFT INTERSECTION DESIGN I ~ I Q ~ 'I ~ :\ II ~ :.' ~ i : ~'t 5 i"m :to '" ~ ~ I-::i .... ~ . '" 0 - '1 ::3...: I ,: I ~ ~ ill ~ i ~ l ~ ~': ,,' " : ~ I g 8 i iil ~ ~ I _ g: '" - ':l; ..J I _--.-- _ ~ I >- - i!. 1 I i~ ........-: 15 'i' ~ ~ I ~ --@ , ii ~ ~ 1 > -- : It ' nl! "- '! ... w W W i!i ':; " ~ ~ ~ ii' ~ ~ ':< .. ...! ' , o Jill.. 0. >- _~ ~ ___ ~ ~ ..*:~ ~ ~ ~ ~~~~ ~ ~ ' : " ~ . ~ ~~i'!~ '" 0 z ~ fi ~ ~ g: Q :!:: :!:: c ~ ~o I- o~ UC/J m ~ DrnJ"'" 'I' zo wI- \zz w 'lJ-~.:. I ..: 5<( Ct U>z ~~ ~h 1'1 . ~~ . ffiw ~~ ~5 I- I-ilj ~~ 2:-z m:=!!:> o-t:! a:: J: 0 "~ . ~. ><fila: ~~~I'., ~ ~t w"'~ 5a::~ II ..~ ...: 5~ 0_ IDO>: , 'I DC VI-.J 0- ~~w .~! ~ ~<( 0 3!l.-';g I ~ jI;~ m z S~ D:: Vl8< ...: ~~ f t ... lj IDE c.. '-'0-' I DC -iI II llJi, ". WO aDz I ~ ~;;l> ......0 <<0:: I .. _ l!! ~<( Oz. I "> . :.: ll::a:; lj I ~ !f o. ~O ~.t ~.:, 9 >020" O~ 3~~ . _~_ -:-_~ ;;~., .! 0 0 , > "L 'c'~, .u "~Z : 0 '., ,,' ,~", '~"g .l-G~ o~Sw I ~ : I" : ~~~ Jj~~,-,~ 0::0><: W...JZ ... ;:' '~2. :?:!!::!-.;~ OO-W UlZ ~ ,_I I o~~ O>""'~g ~ ~ ~ ~ ~ z, ,: , I; " , -'7' I" , o ~" <.. OZF., ~ ']"1' , -----'T < Wl-Z .3 D::t:!!!!=> '",11 i~' ~_ U1WCl:: .... a.xxF I" -- '11' O~~ 11\ wW J ~ ________- I ';' ..,. I ~~~ -- - --- ---~- ) /_1. . -..>\t 'tJ - ---- .-T-- ._ . ~3_' - .~-'--.' /-1 -~CC" . .....t n i >- -.-.-- +- ----'.. ._ __ .~".0~j~;~~~1~~;~;::c::51~ ~:c:::=::==::::- .\ I~I - --Ci .:-_:~ ..i..-- ....cc..c_______ __ " . ,~ IX I ' "".... .- - _ j _-',-..1-> , .i""" , ----.~-:-.,-.i!,.--~~~:r" \-~:r-'-~~-:~-=~~-:=-l:n-! ' _. - :.:,:I~ I- ----------- - ~ Ii II ::, I ~ ~ ~ -4 , : > '" ::! " , . I lit: : IliII, II . _ ,~ q I :i : II II ij, ...."U >: ~,,~.. ~ I !~ ill,. n~!. ~ ~ _ ',,1:,1,,1' "- ~u '!I II' ,., J:':! ~iS'; i!. ~ ~ .0 r'" Z < ::>... :l "I II IT 'I W < I ... 1,_ <', :::;: 0 e. , o~ ,..~ "11 ~ ~. .,j 1( Q I U !~ II I 0 III !i:! _ '0 II, II". a::: 1Il:t-! h' ~ ;;e 't! II Il- '< """ >< 1 "', " '0 ~]" :>..: ":: ": II, , ~~ o.g i'ilO o 1"'1 "~ ,. I '>' za AI!" AI@g U I~, II,' I~ 0<( Oild~ ~ ~ ~1 ::,~ I ~ ~'Z! 2 lit: 0;;:' g "I II! ~ VI<( v:zli' ~ "":!7 "1 II 'I <(.J ....<0 A..... III II' w Sl!!VIX y= I',~, :' '-'~ :s::iii!"': Ml dd I "I ,I " Ml I I",,:: I ~: ~ ~ s 0 ;-J L ,,'" ",. a., z" d '" I \' W ...... '" I IN "\ :::;:0'" :1:::2 ~ G= -- - ~ I~ \\ 'I 0 -' e: @g - W (III',' ',I 't ~<i! ~;::< ~ A ~~- - -' ~ ~ :~i \\ 35 0=", g::t --~- IT' 1. ___ a:JF.... u ~ ---- ~.: L~""., , w6. ~ ~.. F_ ~ ~ I:~ :: ~ S! t3 III ..... :< B I:: , ,::,. ~ ~ 8 ~ "-----"-.- VI II!III: II I o. III Y --- --;,; \:1 " ':: I 0 ?, - \1 ~I~'\::I " ~ - -'- . ~ :i"l~: Il'."l ~ ,,~u l.'l 0._ - ~--,: '0 . I .____'\ ;!~ ~-~ - - - "II : ~:.~~=---_==i-~~ [I o " "'r----- .-0 a::: I, , Cl ,-< wwt;( I 0 " '. ~ a:::Ua::: - "I '. .... t ~Z0 .--~\l I'" I" ~: ~!9~ :::1<(0 '1,'-., 11,;, I,: :O:llI: ~~< ," 'II, ," ~"~ , ~Vl 1 !,:-.'j ::', I:,' ~ "" 13<1:l <l1l-1]; 9 1,1,,:1,: . ._"._",""","''''" " ;~_ ,. ,.".,.~" """"~, ~,ro~ ~~"' ~ ...", ...,~. --- . _._,~,-- .--- PROPOSED DRAFT COST ESTIMATE ~ 00 0' O! 00' 00: 00'0:0' 0 ~ 0 0 0 ~ 0 0 MOOD 0 ~ 0 0100010' 01 0000: ~ 0 0 ~I ~ ~ ~! q q 0 qi qlq! q ~, q,o q ~ qiq' ~ q q,q q ~,q q q q q q q q q ~i O 00 00 NiO' D,N 0 0,0' 0 0 ~; 0100 ~,~! ~ ~! ~ ~ Ol~~m 0010 0 Ol'~ 0 0 0 010 ~ 00 0 O,~, N ~'~I 00 m 0 m,M ~ ~ 0 NI~; ~ ~ N'D,WI M ~ 0 ~',O N 0 ~,o N 0 ~ o 00 0 0, ~ ~ ~: ~ moo 01' ~I ~ ~ ~ M ~ ~ ~ N1miN ~ - 00 0 0010 00 0 ~Ioo,~' 0 ~ ~ ~'~~!~' ~~, ~' ~ d~! i! ~ ~ ~ ~ ~ ~ ~,S! ~ ~ ~ ~:~ ~i~~' m ~I~'~! g g, _ ~ _ w _' w, ~ ,_ _' '" -: - - -i _ "" - - - -, - "" -i~ o I ' ~ ' ' o 0 0 0 0 0 0: 01 0 0' 0 0 o~ 0 0, 0 ~ 0, 0: 0 0 0; 0 0 ~ 0 0 0' 0 0; 0 0: 0 0 ~ b ~ b ~ ~! ~ ~ ~ 6 6 ~: b ~ b ~: 0 ~ ~: ~ 0 ~ ~i ~ ~'~ b, b ~ ~l b ~ 6 b ~, W NOD _. 0' ~ _ 0 0 ~I n M "" ~ ~ ~ "" ~' ~ "" N! N, ~'M W 0 ~ w ~ 0 ..,., N ~ ~! O "" 0 0 '0 "" ~ 0 W' "" _ '" _ "" "" "" "" "" ..,., ..,., "" 0 - -, "" 0 ~ "" "" .. ci ci ~ ~ M' ~ ' ~ '" .. u ;t l,{). '<t "" ..,., "" w <ft' ...J I- I- "": '" <:( _ 0 b z ~ ~ ::> m m ,=> => !V) Vl r: " o ~i 0 0 0' 0 0 0> 0 0 0 0 0 <t: 0 0 0 0 0 0 0 <:> 0' ~ Ni Vl Vl ~ ~ ~ ~,8' g ~ b g ~ ~ g ~ ~ ~ ~ ~'~ ~ ~ 0 g g ~ ~! g g ~ ~ g ~ ~ ~ ~ mow ~ N 0 0 ~ N m: ~ ~ ~,~. ~ ~ ~ w ~ ~ ~ n ~ o! ~ ~ N ~ N g ~ ~ OJ ~ ~ ~ ~ ~ ~ g g' g g ~ m ~ ~ m ~ ~ ~ ~ ~ o ~ Z o i= o ob ~ ~ ~~~:! ~;;';~ w 0 co I'- I'- I'- I'- ~ en lk:f-- wen .....0 Z Zu ::> - 0 w U. lD (") '" 0 I'- I'- I'- I'- <:0 > 0 "T" 0 N I~ ro ~ ~,~ ~ I'- .... 0 (") ~ ~ ~i ~ ~ OCZ ~ . 00 15 _ '" :;:Z ~ o ii: ~ ~ en 0 0 ' 0>. ~ I'- I'- ~ I'- 1'-: ~ ro >< en lD ~ ~ N,~' ~,,~ I'- ~ m ~ ~ ~ ~I (") '" ro I'- 0> ~ 0 DOE o > ~ ~ D,;1;, ~ [6 ~ ~ (') ~ ~- ~ ~-; ~- ;1; ~ ~ m ~ M 0, :;}:, N ~ ~ ...J c::: en ~ []J <C w iD .-'Z S I g;, Z 5;; <: ~ If}. (': ..J 0 N,. f;j' '" ~;<;i ~ ~ 15 ~ ~ g gl g 2 ~, ~ N <0 g ~ c; <t w ~ I;} wi 0 ~ ~ M ~ ~ r_ I'- I'- r-_I ~ w ~ ~ ~ -= c::: c::: en " '" o ~ < J ~ O '" ',! 5 .~ ~ z~ ~ <(en 1--, ' , 0 >- -z u..,' (/) (/) u.. U >- >- <:( <( >- u.. IJ..., IJ... u.. >- >- >- >- >- >- >- >- u.. IJ... u.. <( IJ... U. U. <( >-, lJ.. <( >- ~ o ....J (J) J ~ ...J ~ <( (/) (/) W W 0 ~ ~ ~ ~ U (/) (J) (/)! (/)1 (J) (J) (J) ...J ...J ...J ill ...J ...J ...J W, (fl'...J W (/) - <C<( ~ =' - ~ o z ~ ~ c::: <( ~ C> u I " ~ ~ "'. ~ ...J U. j 0 ...J <(:< ~ ::> lk: ,il 0 ~..... ~ G ....... ~ lk: 'l";j 0 o 'J Ui ~! ~, ~ c::: >;j -~' ::. <( 'W ~ ft E ft 0 ~ o C9' - t;~ w~: ~ co L ~ <(' 0 '\l u. ere: '!.. 2- id ~ ~ ~ ~ a3 c', <i. >- <[ W S s t:., a: ~ 2: ~ wi cr:,O _ w _ r- r- <: gi ~ LU I;:t: r- ~ ~ u.., ffi ffi ill (/) LU ~ I::t:: rfi . 0..' if! > > (fl LU ~ _ ~ ~ 2: Q ~ ~~' >-' ~ ~ -' ~ tu > (fl >0 (9, LU ~, ~ .. ---;- I::: - t:. u u 10 0 , 0:: <( r- , 0, (J) <( O::j (/), (J) ...J, QI cr: 0::: 0::: 0.. M ::o! ~I U 0.. ~ 0.. Z' Zl 0.. (9' LU W <(j _, w W,W 0 ~ r ~ ""w == Z f- Z W <( <(I r- m a.. 0..' I, I f- cr: a: $:1 $: ~ <[ ro -" o w 0 ~ _ Q..' m - ...J ~ >- >-1 a.. f- f- 0 0 w' w ~ ere ~ ~ ~ rn ~ ~ ~ U ~ 2: ~'I a:, ~ <[ ~ f- f- ~ ~ ~ ~ ~ (/) (/) ~, 0 ~ ~ ....... -. U. r- _ ,~ ~ 0 "" Q.. ~'"" I , - - ,~'-' r-I ="'" Z Z ~ == ~ ~ <( r- m '-' ~ f- (1)' ~ 0 0 ~ Q.. (1)' W W (9'~' 0 cr:, cr: LU ~ ~ <:( ~ ~ I- (:) ere ~ (1) Z ~'f- 0::' <[ cr: W (/)' LU r- f-' 21 ...JI z <:(j <( ...J 0::, cr:1 0 I W (/) _ Z f- ~ i:2 f=1 (.'): 0' ~ ~ ~ w ~ 9 <( a.. tJS :f Ifi i=, <( <( fu' fu ~ ~i~' i= 2, <i. ~ ~o <( u.., Z' (9 ~ z' m ~,(9 ~'h' W S (9 ~ <(:0 0 ~ S m (/) (J) If) (/) (/) ~I ~~, m ~ m ~i ~ ~ 0' Q i= Q ~I:f ~! N 5, ~ ~,~i Z (1): 6: 6 ~,~ ~ z, z, QI w w 0 (fl' ~ ~, S ~ 5 ffi 6 0 f- ~: u.. ~ I::: ~' z a.. ~ 5' u.. ~i~! Q t5, 0 01 IJ...I ~ U: 5' 51 if ~ ~,~ ~ <[ 5 ~ ffi, ~ _ 2 i= ~ ~I (9 ~, ~, ~, ~ Q ~ ~ 0 ~,~ ~ r- 0 ~. ~: 0 ~ ~' w' W t : W'I ~: <i. f-' i:2' ~ ~ <[ ~ z' I z <(', wi w w f- W W W <( LU ~ cr: f-i r-' >- W W 2: 2 'r r ~ 0 (9 ,(/) - u o z _, w 0, _ >, > > > <( > > > > > 0 ~ W,...J,...J 5 ~'cr: w w, jl ro ~ ~,w: z j' cr: a.. 0 W 3 ~i ~ ~ ~ 0' 0 0 0 ~ 0 0 0 0 0 ~ w ~,~! ~ ~,u, u 0 01 <(' ~ ~: Q.. ~'Q <:( 0 <[ q ~ ...J m _ <[ w' 2 2 2 2 0 2' 2 2 2 21...J <( ~ Q.. ~ wI Z z > 5' ~ ~ ~ 0 w 0' r- >- cr: 0 _ <( o! <( r- ...JI W W w, w x w W W W W ~ f- b (J) (J)' > 0 0 > > ~ 0 0 ~ ~ 0' (/) <( ~ o I::: 2' 2,(J), u ere, cr:, 0::1 ~ W a: 0:: cr: cr:1 cr:: 2 (/) ~ <( ~'O U 0 ~ ~ Z, ~ cr: W 21 (/) Z, I ~ .-.- _..__.__._~<.~~" -"'--~--- ...._~_.-- f- a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ~ ~ 0 I I , I &; o 0'0 OJ 0, 00'0'0010000 lJ) 0 0 0 0 0 0 0 0 0 0 0 o 0 ~ 0 0 0 0 N N ~ 0,0000,00 O'O'OiO. 000 0 0 0 0 0 0 0 ~ 0 ~ ro '" o ci ....; ro ro m ~ 00 ,..<' oi 000000' ci 0 0 0 0'0,00 ~ ~ 0; Lrl ~ 0 ~ 0 ~ M o 0 ~ ~ 0 ~ ",I .... o 0 0 0 0 0 01 0 0 0 0 0, 0 0 (J M ~ ~ ~ N 0 N ;;: M N ~ N ~ ~ ~ ~ ~ ~ N ~ ~ ~ ~i~'3, d ~ ~I~:ci, ~I 2 ~~, d ~ ;ii V! ~. ro ~. ~ ~ ~. .-0' N- -b'l- N' ~ ~ ~ :'i N' m '..- -' ~ - ;;: -' ~ ~ ~ ," ~ N N,N! .-oIN,N -b'l- _ N'_,M _ ~ ;:: - V! -b'l-; -b'l-' _I ~ V! _ I _, ~ .;~ 0 'yj f- J , 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ~ ~ 0 0 0 0 0 0 0 0 0 o! 0 0 0 f- ~ 0 0 0 0 0 0 0 0 0 0 0 " 0 0 0 0 N N 0 0 0 0 0 0 0 0 0 0' 0 0 0 0 0 ~ ;;; ~ '" ," 0 N 0 0 0 M N . M ;;; ;;; 81 g' 8 0 0 0 0 0 0 0 0 0 0 lJ) ~ ;;; ~ N N ~ ~ ;;; ~ 0 ~ ~ '" ~ ~ 0 g, :5 ~_i 8, 0 0 0 0 0 0 N W ~ ~ ;;; 0 0 ~ 0 a a ?J"" ~ ~ ~ ,,; ,,; a oj 0 N ;;;0' ~, g .....:, <5 ~ ~ (J ~ ~ N N ~ ~ " ~ ~I ~ ;;; ~ ~ ~ ~ ~ ~ ~ f- ~ ~ ~ z 0 0 0 ~ ~ ~ I OJ m m m 0 0 0 }: " a " ! ~ N i, 0 0 0 0 0 " 0 0 0 0 0 t Ii 0 0 0 0 0 0 0 0 0 0 0 0 " 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 -' 0 0 0 0 ~, 0 0 0 0 M 0 0 0 0 a . N N a ;;; 11;,- 0 "l 0 0 0 0 0, 0 "l 0: 0 0 0 ;:: m M 0 ;: 0 ~ " a 0 M 0 m ~ 0 m 0 N N ~ 0 " ,e M N ~ M M N 0 N N m a 1'. ~ N M m M .- N . - ~U 2 .,,- llZ Z 0 i= 0 0 . . U M 10 ., ~ 0 0 " '" " 0 N W " . " 0 C/l 0::1- WC/l Z 1-0 ~u OJ WlL 0 0 0 ~ 0 ~ '" '0 ~ >0 J: '" ~ a N . M ii::z f- OJ 00 0 ::<2': m 00: Z ~ OJ >< C/lo 0 0 C N ,-, N " N E 0 " ~ ~ ,. a ~ - M ~ C/l>- '" :g 0 0 " . " m ~ " " ~ " ~ . ~ 0 f- oj 0 00:: " lJ) 0 -'00: w m OOz ., m w_ Z Cl::< ;;) 0 z::::; 0 0 ~ " m a a 0 " ~ " ~, ~ oO:w ~ i: a m M a '" 0 0::0:: 3 lJ) ~ 00.. ~ 5 OC/l '~'.i f" z_ < 00:C/l f- ., a ~ " " 0 0 " " ~ 0 0 0 0 " ", " ~ ]5 0>- z " " ", " " " " < " " "0 " " " "' a 0 .~ 0 '" a ,< "' a w '" 0 0 0 0 0 0 -~ 0 w a a " ~ ~ 0 a a a a ~ 00:-' ,- OJ 000: ~ o::~ j::' , " ,g ClU " .. z- z " ~ _lL [j N ~ " m -'lL Ci 0 a S < m -'00: 0 z co m ro ::>0:: z co ~ 0 Q.I- " cr < 0 0 " 0 I cr ~ ~ I- a ~ u "i- z " ~ " N is 0:: -- ~ Ci 0 cr " " ~ w " 0 " " z . Q. ~ z ~ 0:: " w w w ~ W in ~ " " " I " a ~ ;;: u 0 0 0 u 0 ! m m m " m Z iii ~ ! ~ '" " '2 " Z "' ~ ~ u u u '" u W a a u ~ z " ~ u 0 0 z a ~ ~ cr 3 3 3 3 " 0 ,- z 0 ~ Ci w rn 1 m m m ~ m j; " 0 0 m a 0 0; W U:I W j W g S ~ S g " cr " ~ ~ ~ ~ ~ 0 " a ,- " 0 ~ I I I I 0 0 ~ m - 0 0 ~ " .j) ~ ~ ?, ~ w ~ a 0 a a z " m m } 0 c. c. " 0 < ~ -- 0 0 0 "J o ~ z ;:: "' u a 0 - ~ cr " ~ > N U U U U U U ~ ~ a "' ~ a -- C ~ ~ ;:: ~ ~ ~ ~ u cr a u " o Z 0 in " 0 " 0 ~ ~ w ~ m m m m m :; cr "' cr a ~ ~ I- 0 ~ 3 ~ cr "' ~ ~ " u m cr z m 3 < " 3 3 < s s ~ "' a "' a ~ ,< " ~ I 0 0 0 a 0 z S 0 ~ ~ 0 0: ~ -, 0 s ~ ~ ~ ~ ~ " m 0 ~ > -- m a ,< u m ~ 0 0 0 0 0 0 0 ~ ~ "- < Z Q cr < ~ 0 0 z ~ -- 0 " -- " ~ " " " '" a " u " " a z u a W a 0 S "' ~ m " '" z " cr cr cr " cr cr cr S u u z 0 0 ~ -' m z S " a < " a ~ a "' '!! a "' a u :; I " " 0 0 j' W ~ ~ " " Ci I ~ 0 :; I- -- Z Z U 0 " 0 m " a I I I I Z " '" < m > ~ a ~ cr m Z w "' I ':: r ;:: r r r I- ~ " " a ~ e' " "' i5 ~ ~ I- a " > " ~ 0 0 S w m z '" a ~ "' > ~ ~ cr " " m ~ w ci ci a "i W " m -- m ~ z > 0 0 " m m < " ~ ~ " a S 0 ~ ~ ~ " ~ ~, u 0 0 0 > ~ z 0 < ~ ~ m " f- m >- ~ ~ l- X a " " 0 " " ~ ~ ~ ~ ~ ii' 0 < " 0 N ~ I Ci " u a m z z z a > ~ " cr ~ u u m ~ ~ ~ x z a z U. a C "' a a z cr "' ~ ,- I- I- ~ ~ ~ iY " ~ ~ I- cr 0 Z ~ m cr ~ ~ m m ~ m u -- ~ a ...i a I- ~ " a cr > " ~ ~ u ~ m < I U U U U U u a " ,- ~ ~ " 0 m 0 " ~ 0 a ~ " a a a " ~ W I- U Z a a X I- Z "' 0 z u ~ 0 z " -- >, > > '" 0 '" -- ~ ~ " ~ ~ c: c: a ~ a a " " ~ 0 z " a z .. ~ 0 0 z < < ,< ~ m ~ ~ " ~ " ~ 0 0 a 0 " a i= 0 ~ ~ " u a > r z a < " < ~ a ~ a a ~ in w ~ ~ "' "' ~ c 0 ~ cr ~ z 0 z cr cr cr cr cr cr ~ cr ~ I l- I- " ~ ~ a a "' "' ~ 0 a u " 0 < " I- < Q (J > m < > > > " 0 u " Ci ~ ~ ,.. ~ ~ ~ u 0 -, > < u 0 u 0 u ~ u 0 W 0 m 0 0 0 u a .2 u a 0 0 0 0 0 0 " ~ 0 ~ ~ " " "' -- a " " 0 " 0 u, 0 ~ 0 0 0 0 OC ~ a " 2 " " 0 r ~ > a 0 ~ ~ ~ ~ ~ ~ 0 z " m ~ 0 ~ 0 z 0 0 0 u "' cr Ci, a w a "' w a < " ~ 0 "' " m w < cr w m w " a a w 0 " I- 35, D:::, 0::; ct " " " " L 13 " m m ~ ~ m m "' in z ~ ~ I- ~ Z " '" '" " " 11 .... a a 0 ~ ~ N M (/) a a 0 m ~ .....; ..... ~ 0 0 0 .; oj' ai oj r:Q M a ~ ~ ~ ~ N ~ ~ <.l a ~ ~ ~: ~ ~-I ~ ~- ...J N' tf'I- N ~ ~ ~ ~, m ~ ~ g :;: ~, 0 N ~ -'.... . ~ ~ .... a a .... a 0 Z a a C (/) a ~ 0 0 a ~ ~ ~ <.l N C .. . u ~ ~ (/J ....I, Ul 0 .... ~ w ~ ~ ~ z 0 Ui I- (/J 0 ~ .:...;, Z 0 Z z ::> m .. Ul I- :::: ~ ~ 15 {j CO Z ~ ~, ~ ~ I- Z ::l 0 " - (/J t= 'J, r:: !.i ~ o ~ 'I u ~ 0 ~ \~ ...J 0 ~ ~, z <( a ~ ~, ~ .... ~ 0 .''1 0 ~ ~ .... ~ ~ z 0 ~ Z u ~' 0 ~ ~ ;:: ~ z U 0 W u (f) 0 z IX:f- ~ W(f) z f-O Z " in' ~u ::> w wu.. 0 0 III " >0 J: ~ OCZ .... ::> ~ 00 ~ 0 ~ :;oz ,n ~ 0- Z (f)1l. ::> . (f)0 0 x III - E 0>- .... ~ --,IX: (/) 10<( UJ 0 -- " rn , Z . 0 ::> "j . :....... 0 ~ i <(W III IX: IX: .... Oil. (/) '5 <( ~ O' '" t 0 z(f) e- <(Ui .... ~ 0>- z ~ ~ )5 <(--' ::> w ~ . 0; 0<( ~ IX:~ ~ ~ Clu u ~ z- ro _u.. ~ --'u.. 0 --'<( 8 ::JIX: 0 0 ll.f- 0 .... ~ IX: ~ 0 ~ Il. . IX: ~ <( ~ " E "' ~ 0 E . } :;; ~ ~ S w i ...J ~ UJ 0 ~ > ~ C2 ~, ~ I C2 W :;; - .... ~, ~i ~ U. ~ 0 ~ ~ m z ~ " . 0 ~ 0, " w j . i= ~ ~ ~ ~ <.l ~ " UJ gl ~I 0 9 a: ~ rr u (5 ~, 5: ---.-.--.. ,"--~ .,,-~ ._-- ---_._--....,.._-_._..._-."~.- TRIP GENERATION EQUATIONS - TRIP GENERATlON EQUATlONS AIRPORT ROAD/ORANGE BLOSSOM DRIVE INTERSECTlON IMPROVEMENTS lTE TRIP GENERA TlON REPORT, ih EDITION - Land Use Weekday AM Peak Hour Weekday PM Peak Hour Residential Ln (T) c_ 0,80 Ln (X) + 0.26 tn (T) ~ 0,82 Ln (X) + 0.32 Condo/Townhouse I I (LUe 230) 17% in 83% out 33% in 67% out T = Trips, X = dwellinu units eeRe 1-- T-O,18(X) T.- 0,18 (X) + 39,13 (LUe 255) 64% in I 34% out 48% in I 52% out T ~ Trips, X ~ dwelling units - -- ----- _.,_....._'._ ~.u...~._^ --.. ._-.-._--,,----- 00 010' 0 oio 0 00'10 0 o'l~ olo,o'l~ 010 MIO 0 010 ~OIO ~ ~IO~, 0, ~I~'~' ~I ~I ~ ~. ~I ~ ~,~' 01' ~ ~I ~,~'I ~ ~'Ol' ~,~ ~'I ~,~ ~ g g g.gl~ ~ ~I~ g,gi~lg ~,~IR:~ 8 ~ ~'R ~ ~:Ig ~~I~ g ~ u ~'~ ql q~' ~I~ ~, ~:qiq q' ~.~ ~ * ~:~ ~ ~ ~ ~ ~ ~'~ ~Iq,~ ~ ~I~ ~',~,'~I~' ~~I*I~I~ ~I*I ~'~I . ~I,~ ~I~,,~I'~ ~ ~I,~I~;~I;~ is * '" * "'I "*,1' I , "*1 * '*,1 ' * * * *, *, * *,'1 * * 1 * ~ I' , I. : L I I I'. h I --I ._u,_n'I' I'.."-l, "']'Uj '."'1. 1-"+,, Lt'-,r'-" -I.....~.T- 8' 81' g g' g,g' g 8: g' 81 g 8,8181 g,g ~,g g g g, 8: g 8: ~gl g o ci 0 N~ ci ~ n,o 0 0 ~ d ~ ON ~ ~ ~I ~ ~ ~;~ ~,~\~ 0: 0 ~ N' 0,01"'101,_1", 01 01 ~ ~ ~I'" -, -I -",I - -I'" NINI - ~I~I 0' ~ 6 wI.. q q q:w I ~ q W ww WI'" "'I "'Iw ;W w, wl,w w:,Q '" u ..J 0 0 '" I - ~ I . , , ' ~I !:: ',~ ~I a "'I ,'" '" I I' I 'I I I I I'" 5 18 I I I I I, " ' I' I, I I I" ' I <Xl "I' 'I' ' :::> I . I' I ']' ~ ~f ;"rl' i ,_u i-TI..n, 1"1--+ 1 ,I"-r "I I-I , I~ O ~, '0 101 0' .010 ",10 10 010 01"" 0 010 01 I 0 ~: !~' ro 01 ~ 0:0 ~ 0 0 ~,o' 0 . ~ ~,~ ~ ~ 0: ~i 0 0 0 0 ~ N, 00 ~,~ ~ .' ~;Ol 0 ~ ..0 ~ . 0'''''' I 0 ~ . m .0 0' . c I ..J,..JI ",I ' sl~' 'I I 001 ~IN ~I ,,"'I~' ~I~' "'I ~ ml ~I ~'~I ,I ~ ~ : ~,o ~ NI""', N vie ..,....' NI m! v, M, 01 0 010 0 ~ v. ~'m M ..- o Ii.... i .....; , I'..... '<:f, N ("). I.... M C"}. (") ("),""'" O'l N: VII ~: ..... ~ I ' , ,I 'I' ' 1 I I 1"'1 'I I I I -'-, '-+-t- ~ 0 ,1 "~, 1-, 1 I"-Te 1......1- 1-- " 5 I" I I 'I I I I I ' :J: Z 0 ,I' I I ' ' . I ' I ~ I- a: ' ,..... I,{') , eo" "f! ..,. '<t' ..,. ,N' X Wu C:::>", I' o,I~, ,'I"I'N 'I' N ,I ,,--1-1- "I~,;i;'~I' ' o r- J: '0, '..- ,f.Ol ~II'-,,..... I'- I . v, I ~ cnz I- 'i" ; 'I '" .,::>::> , I " " I I ' I " ' , E .....1- 0, , , ' , l' ' I I I I 0 ~ 8 :J: i- I '-I"Il" "Ir1i liT-- 1 1"+0'-1--i t ....-.lU u.. ~ 0 I I ~ I I '~ I 0 I I ~, ~ I ~ J I J ' I I ~ .0 0:: c:o , I 0 "!, 'I I ,." 1'-1' I co 'I ", "'I"', "'I '<t: '! I 1'--' .1 " " , ..... o :I: 01 I ~ - - - - - I -I I' 0 ~~ Z ~ I 'I I I, I I ' I ' I , ' " 1 t :z z 0 ' I~---r~+-c 11~~lu,Ln'ILL ~ o ii: z 'I '. I I I! I' , I' " I' I ' I ' , I 8- en ::> "I " ' I I ,= o ~ 0 I I~' n'N m ~ r-- 1'-' ~; 1'-' 1'-. r-- r--: 1'-, ~ ~'I'-' ~ en >- Vl", 'I' , '" ~'I' "'I;: , - ~I ' ~ ",I", ,I:>:, ~I ~', ~I ~'81'" ~ NI ' -' ~ ~ o '" ~ ~ m, 0, ~~' " I, ~ " m ~ ~I ~ ~I ~,~I' ~~. ~I '" I ~ ...J..... w ' "I I '1J ," en c:( $, ,I I Ii, I ! : , ' I I I, . ~ ~ ~ ~ ~I I..-c j-n!l-rt-~--! I -t-,t-~ I-..m-!-' 1-+- In ~ Z ...J ~ 0 N 'I N ~'NI' ~ 01' 01 ~I ,I ~I J ~I J 'I ",I ~ I I ' ~ ~w W"' 'I'~,""-:N("')........:r--,O!'IN '<t!"",,('():<D',~'NICQI' 'N,~"" ::>}- <D, 0 '<t..- , I f") '<t l,{), "I r-- 1"-01 t-- 1"'--, ','" ~ ,I' f- a:: :> Vl . I'" I I" '. '" g '7 ~ L_c-IJ.. _1 ' _-+_J-+ ..Lj __+--L u_ I zen <V5 f- 0>- Z ,,-, <...J ::> V) 0< a::~ C)u z- _ u.. ..iC ::lJ (J) -t ;0 l':!""<' ;:c ;s:: I m 1::tI 0 0 )> ::l ~LL. .LJ3Hla;'~,o';~ ~ ~ ~ ~. ~ ,~ li!l ,q ~ '~', 55 ::l z :;, e c, rJ 0 C? 0 '" ",- q "" "C O ...... ~ CD '" < Vl ..... - IN z: 0 a....... _ 0\ :j ,<n f:. ~ ~ 0 .:r:;!~ 0 -i ::2J I- f- " 0 "C -; mi, 'z " .... '" ~ NOI1VIN31110 z Z 0 'n,' ;U Z:~ " :::! "C U. V'l . '=' -:0 " ~. )> O'~ =0 0 0 c: o 0:: "tJ ,< ;ti .;: ~ en J m ~ Z := ._-'\. ~ ~. 19 :rn ;:~', CD ~ en ~ . '- ~ Z,ll 9NIllnd 11lOdlllV '~','" ~ . ~ ai', rm> i, ,:::! I I b < ~ ...."'" (Jl - C ')>' 0 I '" m .... m' ,-; I" ." 1-:: z I' Z! ,':: r 0'" Z ,m )> ~ 00 '0' 1-' (J); -; I'::' r m 'I'-J> .::'"' ~?; '" m 0 ~. I I 1(Jl '=<". I~ 'i" I~ I 'I'~ '0 :::0 I ~ W, ! 1"'0 ,::tJ :;:c ',.~,' I '~,',' 3 I -:-. I 'C1 )>, ,"I". ' .,' C Z ',~ l_:....J..n I L ~ L II, 1< (l;l, ______.n_ 010,0 010 0 0 00 00'10 0 01 01010 0 0 0'0'10. 0 0 010 0 ~ 0 0 0 010 0 0 00 0000 0 0 0 0,0 0'0'0 Ol~ O!O,OIO "'0 ol~!o 0 01010 01 0 00 0 0, ol~lol~1 ~,I 0IO'lo'~,1 ~I~' ~10 o NI 0 ~I O:N 0 ~ ~~, 0 ~ ~I O,~ O,~ _ MOO ~ _ ~IO ~ u 0'00 0 ~ OOI~'O~' M ~I~ ~ N, C'N'I _ M NI~!N ~I _ ~'~ ~I~ ~ ~,~ M M N 0 ~I ~ *I~ 00 ~ ~I~ ~i~ ~I ~ N:*IN.-tA-- ~ * <C N I * 1IT. Vl M \.0; ............ ...... _ ......' I 1IT ...... * -tA--1 ' ~ -lIT -tfl- *1 U1' I -{IT 'I o ,*1 I ~ , I o 01010 0 0 0 ~ 0 0' a 0 0 0 0 0 ~'o-o!ol Oi 0 0 0 ~ ~ ~ ~I ~, ~ 0, ~ ~ ~ ~ ~ 0 ~ ~ ~:~ ~I~' ~ ~,qi ~ ~ ~ ~ 0 N 0 0 ~ 0 0 ~ ~ ~ ~ ~ ~ N 0 0 0 M N! ~I M ~ ~'~ 0 ~ N1 ~ ~ ~ ~I~; W N N ~ ~I~, ~ olw~, ~,~'~ OY' ~ ~I 0 ~ ~IW N ~I I~ ~'W wI _ ~ I. Ih W -. 'WEI) I U ' ;), .:..i l:a! I !::: ~ ~ Z 0 Oi ::l ...... 1-' -, '" ~ ::> ::> V) U)+_ . --t-- _~ - ___ ---t--- _1___ i': 0 0 0 I I , I , o 01 , I ,0 ,0 0 I ,0 ' 01 0' 0' 01 0 0' 81' 0 ~I ~ 01 ~, g 0 ~ 0 ~, g OJ 0, ~ 01 0,' g ~ ~I~; ~ ~ ~ 6 . 0 ~ 0 0 01 0 0 0 O! . 01 01 MOO: ., m ~'.I N N ~ O:~' M' N .1 NOm M ~,~ 0' ~ ~,~ 0 ~OOI ml~' 0 00 0' N ~ .1 ~ !... N ~I ~ 0 ~, N' IN, M' m M' _I N o ~ , ~ _I I I,' ~ ,I n !_ Z I ___I ____ _---'- ___ o a ' _ z to- :r: Z:J V> ,... I- 0::: 0 0' 0 I I I " \,J a:...., a:J 'I (') .... 0 0 'i".... ~'''- lJ"'):! . W 0 -':r: .,.... '<tv "" N ~ ~ - l/l Z:J:J E c::: I- 0 0 W CI) Vl ~ 1-0 a ~ Zu Z ~ - :r:J OJ WLL.. I- 0 00 1.0 @ >0 c:: a:l ~Nr.o(D .....N O~ o I ~ ~ ~ a:Z Z ~ " C 0 ~ i .J :!: Z , I ';: 0- Cl I 0 c.. Z c. l/l 0 :J " l/l I- 0 ,co 0 0 0 g ,...- I I 00 (\.111.01 N <( >- \;? co l.C') M g "<t N 0 lJ"') 0 '1.0 ..,. '<tl M N co: ~ ....., c.o al' ~ N .....0 O ....... I- ,.... . '<t '<t U') - I .... I..... 00,..... 'N _ "'" W Vl I ..... III ~~ W .~ ca<( S ~ Z -_ _._n ~ We a , <! (.? 0::: Z I u Z :J t;:; :J 0 0 o!, I.() 0)1 'li <( w ~ ~ ~ ~ g' if) ~'I O'l ~ ~:2 ~ c::: c::: ;> t;; '" O c.. <! g w , 0 C I I ---+ _~__ ~ Z l/l ;: - z Coo 1-, I ~ M >- -u,u,!<!!>-u,<!>- <!<!ILLU, u"<!<!V)<!<!'<!i<!LLLLU,LLiu, >- ~ ..J 5 -'I -' WI C/) -'I W V) W WI ~I -' -'I w W <! wi w W W -'I ~ -' -' -' ~ O <( ~ Z , ~ ^" I' 0 ... <( I --- -- -19-- ! 2 (.?" Z'~ " Z =: I -1'-', 0 - u.. I ti - ;i,: ~' 'E ...J LL u:j 5: <(I .& ...J<( I zlU)'CC1' g =>c:::z I ~,~Ig,_ y 0.1- Q g5 I,O::'r-:~ ~ I- t; ~ ~' ~; ~I ~ ~ ^" UJ <! ~ ~-' _ u.. V') cr:: to ;-- ~, UJ ~ o c:: 1<( ..... CO I' N, z '- a.. U.J I fu i :::, :::: ::::' z .& "'" I- ,.... w, UJ W <( E u.. Z ""', ::>'::>.::>:t.,.. - - 0' I ~ ~ ~ 0 L' <( LW _, co co co' _ ", >~I ~ ~! ~ ~ - <!! u, ulu' 00 is [!: :51:5!:5::: ~ 2 !!' !!':!!'I S -;;; O :>; a..W,LU,W,O rn V'I 0: ~ t:l '=I!::: j !;O V) -1 V?I :r: II I w ~ o '" ~,uj~" ~ ~I ~ C V) c5 b:1 33 t:; a::!c G ~ ~I~ ~'~I~ ~ ro-,,__ "JrU,'..,.,'''''''.''..n....,~, ."<<" ,~.._:_"_'~_C'Y jt,- ,!;:..__. Q '~""""~": ,S::: J;A~~,,,,,--t;..,,,t I- S>." ~,~ 01 01010 01'010 0 0 0 0 810 01' 0 01010 I ~ ~'IN ~ M ~ ~I~'~ ~;~ ~ ~,~'~ ~I~ ~ ~I ~~, ~ ~ ~i ~ ~ ~ ~ ~! ~ ., _ _I ~ 0 010 0 0' 01000 010 0 0 0 0 0'0 ~ ~ ~ ~ M o ~ ~ ~' 8 8 g g'g g ~ g g ~ gl~ ~I g g~: ~ ! ~ ~ ~ ~ ~ ~ ~I;;(' ~I ;!:i'1 ~, ;!:i' ;ll ~I, ;( :;i ;i, iil'l :;i g' "'I t:1 g ;;( "', r;i 1 ~ ~I :;f ;i Ii '- ,~, ..,q.. .;ft- *1' * ..... ;.q.- I ;.q.- *1 N en ,.. 0 ..... N ~ I' '" I I 1"" 1 "''''fl''':''';;; j 'I-I' J ~-: h 1- .---I---'-r: --+ "'"' I 0 0 01 a 0 o~ol 0 0' 0 0 0 0, 0 0 I .. N N 000 0 0 0, 0 010 0 0 0 0 0 0 Z .,....:,....:' ci 0 ci ci 61 0 0 0 0 0 0 0 0 c:i 0 I I 0" t:;WlAl 00100010'0'0010'000 01,{); I I ;:=:..J<( 8 .., ~I' ~I ~: ~, :; ~I ~I ~ :; ~I' :;1 :;: ~I ~I'.... .:.; I' 1 'Iii ..I ~ 0>- ~I NNW ~I ~I~ w W. N;f>'7 ~ W <( , W ~ 0. ..... c:( b') f;I} ,1;1') 'WI "', I I- ' - <( I- _ I- Ii' 0 I- en 0 ~ ,0, I: I ' ' I g ..I z o. ~ z _ , f- "', '" 1:iS W f-I z <( I CO ! I, :J 0' (,!) CO a:: i' ! f;I) M"Cf)' I- Z ~ E 0 '"~ T ,+- .-"1-1 I 1---" I"'~'l d,- i::! >- " I, ' I, 0" f- f- 0 01 I, I' I' I, I U l!!l o~: 0' , 10,0 0,0 0 o. '0 000 0" ~ z ~<( ""I ~ ~'I~' 0 ~ 01~1 0 ~ ~ol 0, ~I' ~I ~I~ I ~I i i- gj ~ ...J \t), i.Ol C'1 ~ ..... ..... ...I!..... C") ..... ('f). I ~,"" I ~ 01 o ~ ~ " I !' 1 I l!!:l' i <( f- 'I 1 ' , ,I ' " ,~, I z --l ---'t- ~ ~ 1 +-' ~-- z 0 ,-~-' --t--:" I -f.-- : --1 ~I o Z 1 1 I I I >-, _ .' ~ I CJ) I- :J;: Zo I 'I' zl ~ ~ ~; ~ ~ ~I ~ ,i ' 'i ,I I , I 8 ~ l/) Z 1-1-- I I 1 0- ::> ::> 1 z E 0:: I- 0 ' <(, 0 l=! l/) Vl i I-~ II 1 -+- I - ~ 1 ~ z 0 ~ ,I ' , I~' '" - U :J;: ::> ' 1 ~ 1:, tU u.. ..... 0 0 l()1 I I I ! '?-i ~ .0 c:: CO NI co ....1 '<;f'j ..... 'I..... ll'll ~ ... o::r: ..... ..... I .....1 0 a: z Z f- ~' C, ::> ~ c 00 0 ,I ~- _ V'l I I I 0. 0 ::i: z 1 1 -.- 1--- 0. 0- 0 I 1"5 0. z '0- l/) 0 f- ::> ~ N' I 1 I ," o ll) 1,(')1 I I <( l/) >- ~ CO ~_ ~_, ' : ~ 1 ~, ~ ~ I - ~ -, - I ' 0 o ^" UJ t;; N, - ' - -I L4.o UJ I I ,~ m<( 5 ' ~ w z---, -~-- -1-,' ~ ;;;;; 0, I <( Cl oc: Z I 1 ' u z ::::i f- ::> 0 " I I 1 IE r2 W l:D 9 ll)! ll)j "'I..... .-.1 ...-i..... ,I I' ~ 5 -,' , f- a::: . t;; I O"l 00. ~ I I ~ o ' I' ,-' I I ~ ~ I q z_ <( l/) f-' 0>- Z- u..i u.. 1 ...J -I:....J <( <( ::> 1 Oz 0::<( ClU ~ u:: ,os ..Ju.. ..J <( .LJ3<110 ::::) 0:: Z a.. I- Q I- t:; gs ~ > NOI1\flN31\JO -t:l.. u.l . f- <i. ;0<1 9NIllnd .l\lOd\ll\f ~...~--""-_...~--"._---_.~..~....-.~--_._._"~ ._"".~.,-_._._.--- c ~-r <;:ou.nt;y SUPPLEMENTAL STAFF REPORT COLLIER COUNTY PLANNING COMMISSION FROM: COMMUNITY DEVELOPMENT & ENVIRONMENTAL SERVICES DIVISION, COMPREHENSIVE PLANNING DEPARTMENT DAVID WEEKS, AICP, PLANNING MANAGER HEARING DATE: SEPTEMBER 18, 2008 (continued from August 29,2008) SUBJECT: 2006 CYCLE OF GROWTH MANAGEMENT PLAN AMENDMENTS, PETITION CPSP-2006-13 ONLY (Adoption Hearing) ELEMENT: GOLDEN GATE AREA MASTER PLAN (GGAMP) ONLY-for this supplement CCPC ADOPTION RECOMMENDATION and COMMENTS: The CCPC discussed this petition at their August 29, 2008 hearing, and then continued it to September 18. There appeared to be consensus to recommend approval as Transmitted by BCC with one exception - the provision in the GGAMP pertaining to model homes in the Estates Designation (Golden Gate Estates). That provision is one of fhe exceptions to locational criteria for conditional uses, As approved for Transmittal by the BCC, it is intended to allow model homes - that have exhausted the three years allowance as a Temporary Use Permit - to be approved via the conditional use process and subject to the provisions of Section 5.04,04, Model Homes and Model Sales Centers, of the Land Development Code (LDC), However, the CCPC was concerned that major portions of Sec, 5,04,04 of the LDC (attached) might not be applicable - including the very requirement for conditional use approval - based upon the specific wording of Sec, 5,04,04B. where reference is made to "residential zoning districts," Staff has proposed the revisions noted below to specifically require conditional use approval and adherence to Sec. 5.04,04, e) Special Exceptions to Conditional Use Locational Criteria: [page 33] l. Temporary use (TU) permits for model homes, as defined in the Collier County Land Development Code, may be allowed anywhere within the Estates-Mixed Use District. Conditional use permits Jllllmittsa for the purpose of extending the time period for use of the structure as a model home shall RHJ<.IIwre9>o.ilJ'tod ,shilll b~e~su!Jj,,~LliJ th~j)J9.xi~n.sQf SeftiPl1-.:'iJ)A,Q4!t and,~,Qfthe_ColJ ieL~~YnlxJ&nd D~'>'c<jill1!).'!s.:ni.Co~ OrdinanceN oL12i:iL alU,l.m~ncl~e(LSucILCQnQj!jQ!1al!1s~~sh.all not be subject to the locational criteria of the Conditional Uses Subdistrict, and may be allowed anywhere within the Estates-Mixed Use District. Temporary Use peflllits for model homes shall have a duratioH ofthree (3) years from the date of llflproval. No 9ullseqHeHt issHaHee of a COHditioHall!se pelHlit shall lle for a duratioH exeeediHg two (2) years, The total time period for Temporary Use aHd COHditioHal Use peflllits together sHall Hot m(eeed five (5) yeam, Words underlined arc added; words .;tRlel( tlirel:lgk arc deleted-- as approved for Tmllsmittal by BCe. Words double llnd~line_c.l are added; words double l1tltU!h tll, ~f,h arc deleted - to address cepe concern at Adoption. cepe Adoption supplemental staff report CPSP-2006-13 G:\ComprehensiveIComp. Planning GMP DATA\Comp. Plan Amendments\2006 Cycle Petitions dwl9.10.08 1 ,- -.-,,"..., --..".---..., -. COLLIER COUNTY LAND DEVELOPMENT CODE 5,04,03 I. On-site temporary use of structures and equipment fo e building of roads, public utilities, and government projects, J. Off-site temporary parking on property wh' is located contiguous to the subject development, or would be contiguous except for a ro ay that is not designated as a collector or arterial in the P, with the written authorization of the property owner. K. Other on-site uses slmil o the foregoing uses and determined by the County Manager or designee apter 10. L. Proposed t porary structures identified above require the submission of a conceptual site plan that s the requirements of Chapter 10, 5.04.04 Model Homes and Model Sales Centers A. Model homes and model sales centers are intended to facilitate the sale of the modei design or of products similar in design to the model. Model homes and model sales centers shall be of a temporary nature and may be allowed in the following zoning districts: 1. Any residential zoning district or residential component of a PUD, in the estates zoning district, and in the agricuitural zoning district as part of a rural subdivision, by the issuance of a temporary use permit. 2. However, a model center as a permitted use within a PUD, and not located within a dwelling unit or a temporary structure, such as a trailer, shall not require a temporary use permit. B. Model homes and model sales centers located within residential zoning districts, or within a residential component of a PUD, shall be restricted to the promotion of a product or products permitted within the residential zoning district or PUD in which the model home or model saies center is located and further subject to the following: 1. Model homes shall only be permitted for dwellings that have not been previously used as a residence, 2. A model home or model sales center is not intended to allow the full scope of real estate activities and shall be restricted primarily to the sale and marketing of the model or products similar to the model. A model home shall not include offices for builders, contractors, developers, or similar activities, 3. Model homes may be "wet" or "dry," a. Model homes permitted as "dry" models (unoccupied by a sales office and/or representative) shall be limited to a conditional certificate of occupancy allowing the use of the structure as a model only, provided all required infrastructure is in place to service the unit. b. Model homes permitted as "wet" models (occupied by a sales office and/or representative) shall not be occupied until such time as all required infrastructure is available to service the unit and a permanent certificate of occupancy has been issued, LDC5:18 ...,- __ _"__'_'N_.__'~"__ ---,,_.-'0 ----. SUPPLEMENTAL STANDARDS 5.04,04 c. Transportation to and from unoccupied model homes shall be provided at a sales center, which also provides required parking and handicapped accommodations in accordance with section 5,04,04(C), d. Model homes occupied by a sales office and/or representative must have all required landscaping, parking, and handicapped access on site. e. A temporary use permit for a model home (occupied or unoccupied) shall be issued initially for a period of three (3) years, Extensions in excess of this period shall require submittal and approval of a conditional use petition in accordance with Chapter 10 of this Code, 4. Model sales centers may be iocated in either a temporary structure, usually a mobile home, or a permanent structure which is either a residential dwelling unit or a non-residential structure, Temporary use permits shall be issued as follows: a. A temporary use permit for a sales center in a temporary structure shall be issued initially for a period of three (3) years and may be renewed annually based upon demonstration of need, b. A temporary use permit for a sales center in a permanent structure which is a residential dwelling unit shall be issued initially for a period of three (3) years. Extensions in excess of this period shall require submittal and approval of a conditional use petition in accordance with Chapter 10 of this Code. c. A temporary use permit for a sales center in a permanent structure other than a residential dwelling unit shall be issued initially for a period of three (3) years and may be renewed annually on demonstration of need, 5. Temporary use permits for model homes or model sales centers to be located within a proposed single-family development prior to finai plat approval may be requested by the applicant and require: a. Administrative approval of a plat and construction plans showing all required infrastructure for the lot(s) on which the model home or model saies center is to be located, b. A site development plan (SDP) pursuant to Chapter 10, c. A maximum of five (5) models, or a number corresponding to ten (10) percent of the total number of platted lots, whichever is less, per platted, approved development shall be permitted prior to final plat approval as specified above, d. The applicant shall provide documentation that all required utilities will be available to the subject site, and, where required, shall depict such utilities in detail on the SDP. e. The parcels on which the models are tocated must abut a privately owned and maintained road, temporary in nature or permanently constructed to Collier County roadway standards. LDC5:19 COLLIER COUNTY LAND DEVELOPMENT CODE 5,04.04 f. The boundaries depicted on the preliminary subdivision plat shall be depicted on the SDP in order to ensure compliance with the applicable development standards in effect on the subject property, g. Final lot grading and drainage conveyance shall be in conformance with the master grading plan for the project as depicted on the preliminary subdivision plat submittal documents, 6. Temporary use permits for model units or units used for sales centers in multi-family projects shall not be issued prior to plat recordation and final approval of the project site development plan, 7. All other temporary use requests for mDdel homes shall require the submissiDn Df a cDnceptual plan which demDnstrates that provisiDns will be made to adequateiy address the requirements Df section 5,04.04(C), 8. TempDrary use permits fDr a mDdel sales center within an existing subdivision shall require a site plan as fDIlDws: a. In the case Df a permanent structure which is a dwelling unit, a site imprDvement plan (SIP) per sectiDn 10,02.04 Df this CDde; b. In the case of a permanent structure which is Dther than a dwelling unit, a site development plan (SOP); c. In the case of a tempDrary structure (mobile home or sales trailer), either a cDnceptual site plan (CSP) which addresses the requirements Df sectiDn 5,04,04(C), d. A SIP, depending Dn the extent Df the work required, 9. TempDrary use permits fDr model hDmes tD be IDcated within a prDpDsed single-family development may be approved fDllowing administrative approval Df a plat and construction drawings for all required infrastructure encDmpassing the lots Dn which the models are to be constructed pursuant to sectiDn 4.03,00, and a CSP which addresses the requirements Df section 5,04,04(C) of this CDde, UnDccupied (dry) model homes will be permitted Dnly in cDnjunction with an approved SOP fDr a mDdel sales center which provides adequate parking tD SUPPDrt the mDdel(s), 10. TempDrary use permits for occupied (wet) mDdel hDmes fDIlDwing subdivision apprDval shall require a CSP which addresses the requirements of sectiDn 5.04.04(C) Df this Code, TempDrary use permits for unDccupied mDdel hDmes fDllowing subdivision approval shall require a CSP and shall be issued Dnly in cDnjunctiDn with an approved SDP Dr SIP fDr a model sales center which provides adequate parking tD SUPPDrt the mDdel(s), C. All model home site plans shall adequately address the fDIlDwing standards: 1. Traffic circulatiDn and safety within the site as fDIlDws: All parking spaces shall be arranged in - a manner fDr cDnvenlent and safe access for vehicles and pedestrians, ND parking spaces shall be arranged tD cause vehicles tD be moved in Drder for Dther vehicles tD enter Dr exit a site, , LDC5:20 -",,-,.- .-.'.------ ~-,--- ,..--. .--- SUPPLEMENTAL STANDARDS 5,04,05 2. Minimum parking requirements: a. Four (4) parking spaces for the first model unit and one and one-half (1.5) spaces for each additional model unit (for dimensions see section 4.05,02 of this Code), b. One (1) paved parking space for disabied persons per parking lot shall be provided (included as part of the number of required parking spaces), aiong with a paved access aisle and barrier-free access to the unit (for dimensions, see section 4,05,07 of this Code), c. All parking spaces shall be constructed of a concrete, asphait, or other dustless material as may be approved by the County Manager or designee. driveways and handicapped spaces shall be paved. 3. Screening, buffering, and landscaping of the temporary use to reduce potential impacts on adjacent properties as required in section 4,06,00 and approval by the County Manager or designee as follows: a. One (1) canopy tree per thirty (30) linear feet around the perimeter of the vehicular use areas. b. A staggered double row of hedges between the right-of-way and the parking area and a single row of hedges to screen the driveway. 4. Vehicular use areas shall be set back a minimum of ten (10) feet from the property line, 5. Lighting, 6. Sanitary facilities, 7. Fire protection, B. Environmental impacts, 9. Stormwater management. 10. Any other requirements determined by the County Manager or designee to be necessary for the public health and safety, 5.04.05 Temp A. 1. In the case of te orary sales, such as grand openings, going out of business sales, special promotional sales, 0 ther simiiar uses (exclusive of garage sales, lawn sales, and similar private home sales), the nty Manager or designee may grant nonrenewable permits of up to fourteen (14) days duration, ch that during any calendar year the sum total of all permits for such events for that location s not exceed twenty-eight (28) days, A muiti-tenant building of ten (10) or more busines with annual leases may utilize a maximum of forty-two (42) days per caiendar year for te orary sales, Temporary use permits may be permitted for up to an additional four (4) weeks n approved by the ,BCC, Such special approval shall be subject to stipulations or additiona onstraints deemed necessary and LDC5:21