Ordinance 97-04 AN ORDINANCE AMENDING ORDINANCE NUMBER 91-102
THE COLLIER COUNTY LAND DEVELOPMENT CODE WHICH
INCLUDES THE COMPREHENSIVE ZONING REGULATIONS ~-
FOR THE UNINCORPORATED AREA OF COLLIER COUNTY,
FLORIDA BY AMENDING THE OFFICIAL ZONING ATLAS '2
MAP NUMBER 9628S; BY CHANGING Tile ZONING
CLASSIFICATION OF THE HEREIN DESCRIBED REAL - :
PROPERTY FROM RMF-12 TO "PUD" PLANNED UNIT ~
DEVELOPMENT KNOWN AS JACARANDA CENTER PUD TOur
ESTABLISH A PROFESSIONAL OFFICE COMPLEX AND :.;
LOW INTENSITY COMMERCIAL DISTRICT FOR ~.",
PROPERTY LOCATED ON THE NORTHEAST CORNER OF
GOLDEN GATE PARKWAY AND 55TH STREET S.W. IN
SECTION 28, TOWNSHIP 49 SOUTH, RANGE 26 EAST,
COLLIER COUNTY, FLORIDA, CONSISTING OF 1.5+
ACRES; AND BY PROVIDING AM EFFECTIVE DATE.
WHEREAS, William L. Hoover, AICP, of Hoover Planning
Shoppe, representing Robert M. and William H. Davidsen,
Darryl J. and,Camel J. Damico, Lisa C. and Leonard L.
Swirda, Janice Sweeney, Virgil L. Cottongin and Sid A.
Skidmore, petitioned the Board of County Commissioners to
change the zoning classification of the herein described real
property;
NOW, THEREFORE BE IT ORDAINED by the Board of County
Commissioners of Collier County, Florida:
SECTION ONE:
The zoning classification of the herein described real
property located in Section 28, Township 49 South, Range 26
East, Collier County, Florida, is changed from "RMF-12" to
"PUD" Planned Unit Development in accordance with the
Jacaranda Center PUD Document, attached hereto as Exhibit "A"
and incorporated by reference herein. The Official Zoning
Atlas Map Number 9628S, as described in Ordinance Number
91-102, the Collier County Land Development Code, is hereby
amended accordingly.
SECTION TWO:
This Ordinance shall become effective upon filing with
the Department of State.
-1-
PASSED AND DULY ADOPTED by the Board of County
Commissioners of Collier County, Florida, this ./~/ day of
~-~z-~/ , 1997.
e: BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY, FLORIDA
. . :.. ...
: ' · c? . ' / ' ' ' CHAIRMAN
"'-./~ ]~PRjVED A~'~TQ': FYORM This ordlnnnc~
S
ASSISTANT COUNTY ATTORNEY
PUD-96-5 ORDINANCE/16757
-2-
JACIkRANDA CENTER
A PLANNED UNIT DEVELOPMENT
PREPARED FOR:
RAICHERT, DAMICO, SWTRDA, SWEENEY, COTTONGIM & SKIDMORE
CIO ATTORNEY DAVID RYNDERS
305 WEDGE DRIVE
NAPLES, FL 34103
PREPARED BY:
WILUAM I_ HOOVER, AICP
HOOVER PLANNING SHOPPE
2223 TRADE CENTER WAY
NAPLES, FL 34109
and
MICHAEL J. LANDY, P.E.
BUTLER ENGINEERING, INC.
2223 TRADE CENTER WAY
NAPLES, FLORIDA 34109
DATE FILED February 16, 19S6
DATE REVISED December 5. 1996~
DATE REVT~NED BY CCPC Decembar 5, 1996.
DATE APPROVED BY BCC 1/14/97
ORDINANCE NUMBER 9'7-4
TABLE OFCONTENTS
PAGI~
TABLE OF CONTENTS i
LIST OF EXHIBITS ' ii
STATEMENT OF CdMPLIANCE 1
SECTION I PROPERTY OWNERSHIP AND DESCRIPTION 2
SECTION II PROJECT DEVELOPMENT REQUIREMENTS 4
SECTION III COMMERCIAL AREAS PLAN 6
SECTION IV DEVELOPMENT COMMITMENTS 12
LIST OF EXHIBITS
EXHIBIT A PUD MASTER PLAN/WATER MANAGEMENT PLAN
EXHIBIT B VICINITY MAP
EXHIBIT C SURVEYrrOPOFcXISTING LAND USE
EXHIBIT D ,~,ERIAL PHOTOGRAPH/SOILS MAP
EXHIBIT E ~ERV1CES AND SHOPPING FACILITIES MAP
EXHIBIT F ,~;IMILAR ARCHITECTURAL STYLES
EXHIBIT G SIMILAR ARCHITECTURAL STYLES
ii
STATEMENT OF COMPUANCE
The development of approximately 1.5 acres of property in Collier County. as a
Planned Unit Development to be knov, f~ as Jacaranda Center PUD will be in
compliance with the planning goals and objectives of Collier County as set fodh in the
Collier County Growth Management Plan and the Golden Gate Area Master Plan. The
commercial facilities of the Parkway Promenade PUD will be consistent with the growth
policies, land development regulations, and applicable comprehensive planning
objectives for the foil,owing reasons:
1. The subject property is within the Golden Gate Pad<way Professional Office
Commercial qistrict Land Use Designation as identified on the Golden Gate
Area Future :Land Use Map as described in the Land Use Designation
Description S~ction of the Golden Gate Area Master Plan. The Golden Gate
Area Master Plan permits commercial land uses in this area.
2. The subject properly is located at the northeast comer of the intersection
between Golden Gate Parkway and 55th Street Southwest. This strategic
location allows the site superior access for the location of low intensity
commercial and professional office land uses, as permitted by the Golden Gate
Area Master Plan.
3. The subject property's location in relation to existing or proposed community
facilities and services permits the development's intensity of land uses as
required in Objective 2 of the Future Land Use Element.
4. The project development is compatible and complementary to existing and future
surrounding land uses as required in Policy 5.4 of the Future Land Use Element.
5. The project development will assist in enhancing quality of life by improving the
aesthetics of the project's neighborhood as described in Objective 1.4 of the
Golden Gate Area Master Plan.
6. The project development is planned to protect the functioning of natural drainage
features and natural groundv, rater aquifer recharge areas as described in
Objective 1.5 of the Drainage Sub-Element of the Public Facilities Element.
7. The project shall be in compliance with ell applicable County regulations
including the Growth Management Plan.
8. All final local development orders for this project are subject to Division 3.15,
Adequate Public Facilities, of the Collier County Land Development Code as set
forth in Policy 1.2.1 of the Golden Gate Area Master Plan.
1
SECTION I
PROPERTY OWNERSHIP AND DESCR|PTION
1.1 P~JRP0SE
The purpose 'of this Sealion is to set forth the location and ownership of the
property. and ,to describe the existing conditions of the properly proposed to be
developed under the project name of Jacaranda Center PUD.
1.2 LEGAL DESCR!PT!ON
The subjed property being 1.5 acres, and located in Section 28, Township 49
South, and Range 26 East, is described as:
Lots 28 -31, inclusive and the southerly 1/'2 of the vacated 20 foot alley. Block
219, Golden Gate Unit 6, as recorded in Plat Book 5. Pages 124 through 134, of
the Public Records of Collier County, Florida.
1.3 PR.0PER. Ty OWNERSHIP
The subject property is owned by Davidsons, Damico, Swirda. Sweeney,
Cottongim. and Skidmore, more specifically described below as:
Lot 28, by Leonard and Wanda Raiched, 5349 Golden Gate Parkway Suite B,
Naples, Florida 34116. Lot 29, 1/2 by Darryl J. and Carmel J. Damico, 2121
C.R. 951. Suite 103. Naples, Florida 34116 and 1/2 by Leonard L. and Lisa C.
Swirda and Janice Sweeney. P.O. Box 8532, Naples. Florida 33941. Lot 30 by
Cottongim Realty and Development Company Trust, Attention: Virgil L.
Cottongim, President. 2301 C.R. 951, Naples, Florida 34116. Lot 31 by Sid A.
Skidmore, 4226 Ellington Avenue, Western Springs, Illinois 60558.
1.4 GENERAL DESCRIPTION OF PROPERTY AREA
A. The subject property is located at the northeast corner of the intersection
between Golden Gate Parkway and 55th Street Southwest, in Golden
Gate City (unincorporated Collier County), Florida.
B. The 3 western lots are currently vacant. The eastern lot has a 2-unit
condominium, that the property owners currently reside at. The entire
project site currently has RMF-12 Zoning end is proposed to be rezoned
to PUD.
2
1.5 PHYS.!CAL DE${~RIP.TION
The project site is located within the Main Golden Gate Canal Sub-Basin. Water
from the site would flow south via a system of pipes and small canals to the Main
Golden Gate Canal, southerly into the Gordon River, and finally into Naples Bay.
Water Management for the proposed project is planned to be "water quality
treatment". '
Elevations within the project site range from 9.3 feet to 12.2 feet, with a majority
of the site between 10 and 12 feet. All of the site is within Flood Zone "X" per
Flood Insuranere Rate Map Panel#120067 0415 D.
the subject property Is Urban Land Ma~lancha Limestone Substr~um Boca
Complex. The lots have been previously filled and the project is composed
mostly of grass and weeds.
1.6 PRO,,IE(~T DESCRIPTION
The Jacaranda Center PUD will include a mixture of professional offices and
low-intensity commercial uses. The Jaceranda Center PUD intends to establish
guidelines and standards to ensure a high and consistent level of quality for
proposed features and facilities. Uniform guidelines and standards will be
created for such features and facilities as landscaping, signage, lighting,
roadway treatments, fences and buffers.
The Master Plan is iljustrated graphically on Exhibit "A". PUD Master Plan. A
Land Use Summary indicating approximate land use acreage is shown on the
plan.
1.7 ..S.H_ORT TITLE
This Ordinance shall be known and cited as the "Jacaranda Center Planned Unit
Development Ordinance".
e
3
SECTION II
PROJECT DEVELOPMENT REQUIREMENTS
2.1 pURPOSE
The purpose of this Sealion is to delineate and generally describe the project
plan of dev~Jtopment, relationships to applicable County ordinances, the
respedive land uses of the tracts included in the project, as well as other project
relationships.
2.2 GENERAL
A. Regula!ions for development of Jacaranda Center shall be in accordance
with the contents of this document; Golden Gate Parkway Professional
Office Commercial Overlay District, PUD-Planned Unit Development
District, and other applicable sections and parts of the Collier County
Land Development Code in effect at the time of building permit
application. VVhere these regulations fail to provide de~,elopmental
standards, then the provisions of the most similar district in the Collier
County Land Development Code shall apply.
B. Unless otherwise noted, the definitions of all terms shall be the same as
the definitions set forth in the Collier County Land Development Code in
effect at the time of building permit application.
C. All conditions imposed and graphic material presented depicting
restrictions for the development of Jacaranda Center shall become part of
the regulations which govern the r~ianner in which the PUD site may be
developed.
D. Unless specifically waived through any variance or waiver provisions from
any other applicable regulations, the provisions of those regulations not
otherwise provided for in this PUD remain in full force and effect.
E. Development permitted by the approval of this petition will be subjed to a
concurrency review under the provisions of Division 3.15 Adequate Public
Facilities of the Collier County Land Development Code at the earliest, or
next, to occur of either Final Site Development Plan approval, Final Plat
approval, or building permit issuance applicable to this development.
4
2.3 DESCRIPTION OF PROJECT P.LAN AND PROPOSED LAND USES
A. The project Master Plan, including the cross-access easement across the
subject pre-perty. is iljustrated graphically by Exhibit "A", PUD Master
Plan.
B. Minor modifications to Exhibit "A", may be permitted at the time of Site
DevetolSment Plan approval, subject to the provisions of Section 2.7.3.5 of
the Collier County Land Development Code or as otherwise permitted by
this PUD Document.
C. In addition to the various areas and specific items shown in Exhibit "A".
easeme, nts such, as (utility, private, semi-public, etc.) shall be established
and/or v. acated within or along the four (4) lots, as may be necessary.
2.4 RELATED PROJECT PLAN APPROVA.L. REQUIREMENTS
A. Exhibit "A", PUD Master Plan, constitutes the required PUD Development
Plan. Any division of the property and the development of the land shall
be in compliance with the Subdivision Regulations and the platting laws of
the State of Florida.
B. The provisions of Division 3.3, Site Development Plans of the Land
Development Code, when applicable, shall apply to the development of all
platted tracts, or parcels of land as provided in said Division 3.3 prior to
the issuance of a building permit or other development order.
C. Appropriate instruments will be provided at the time of infrastructural
improvements regarding any dedications and the methodology for
providing perpetual maintenance of common facilities.
2.5 AMENDMENTS TO PUD DOCUMENT OR PUD MAST_ER PLAN
Amendments may be made to the PUD as provided in Section 2.7.3.5 of the
Land Development Code.
5
SECTION III
COMMERCIAL AREAS PLAN
3.1 PURP0,SE
The purpose of this Section is to identify specific development standards for the
entire site as ~hown on Exhibit "A", PUD Master Plan.
3.2 GENERAL DI~SCRIPTION
Areas design~lted on the PUD Master Plan are intended to provide professional
offices and Ioy/intensity commercial land uses. The 1.5 acre site is located at
the northeast .comer of the intersection between Golden Gate Parkway and 55th
Street Southwest. It is also within the Golden Gate Parkway Professional Office
Commercial District.
3.3 PERMITrED USES
No building, structure or part thereof, shall be erected, altered or used, or land
used. in whole or part. for other than the following:
A. Permitted Principal Uses and Structures:
1. Accounting, Auditing, and Bookkeeping Services (group 8721 ).
2. Business Services (groups 7311, 7313. 7322-7331. 7335-7338,
7361, 7371, 7374-7376. 7379).
3. Depository Institutions (6021-6062).
4. Eating Places [group 5812 (except carry-out restaurants; contract
feeding; dinner theaters; drive-in and drive-through restaurants;
fast food restaurants; restaurants, carry-out; restaurants, fast-food;
submarine sandwich shops)].
6. Health Services (groups 8011 .-8049).
7. Holding and Other Investment Offices (groups 6712-6799).
6
8. Insurance Carrier, Agents and Brokers (groups 6311-6399, 6411 ).
9. Legal Services (group 8111 ).
10. Management and Public Relations Services (groups 8741-8743,
8748).
11. Membership Organizations (groups 8611, 8621 ).
12. I~useums and Art Galleries (group 8412).
13. N, ondepository Credit Institutions (groups 6141-6163).
14. ~ersonal Services (groups 7221. 7291 ).
15. Public Administration (groups 9111-9199, 9229, 9311, 9411-9451,
9511-9532. 9611-9661 ).
16. Real Estate (groups 6512-6514, 6519, 6531-6553).
17. Research, Development and Testing Services (group 8732).
18. Security and Commodity Brokers, Dealers, Exchanges, and
Services (groups 6211-6289).
19. Transportation Services (group 4724).
20. Veterinary Services [group 0742 (excluding outside kenneling)].
21. Any other commercial use or professional service which is
comparable in nature with the foregoing uses.
B. Accessory Uses:
1. Uses and structures that are accessory and incidental to the
Permitted Uses within this PUD Document.
3.4 DEVELOPMENT $TANDARD,~
A. Minimum Lot Area:
Ten thousand (10,000) square feet.
7
B, Minimum Lot VV~dth:
One hundred (100) feet.
C. Minimum yards:
(1) Principal structures:
(~a) Front Yards Along Golden Gate Pardray - Forty (40) feet,
except for the existing structure on Lot 28 which shall be
thirty. one (31) feet.
Front Yard Along 55th Street SW - Twenty-five (25) feet,
(c) Side Yards Between Tw~ (2) Lots VV~thin the PUD - Ten (10)
feet unless attached.
(d) Side Yard Along Eastern PUD Boundary - Ten (10) feet.
(e) Rear and Side Yards Along Northern PUD Boundary -
Twenty-five (25) feet,
(2) Accessory Structures:
(a) · Setbacks shall be as required by' Division 2.6.2 of the Land
Development Cede in effect at time of building permit
application, except small, architecturally designed canopies,
intended to provide shelter from the sun and rain for
pedestrians within Pedestrian Pockets, shall be setback ten
(10) feet from all external boundaries of the PUD.
D. Distance Between Principal ~tructures:
Twenty (20) feet unless attached.
E. Minimum Floor Area:
One thousand (1,000) square feet for the principal structure on the first
habitable floor.
F. ,Maximum ~
8
For prindpal structures twenty-five (25) feet plus ten (10) feet for any
parking beneath the structures.
G. Off-Street Parking and Loadin~l Requirements:
(1) As required by Division 2.3 of the Land Development Code in
effect at the time of building permit application.
(2) ~;hared parking shall be allowed per Section 2.3.5 of the Land
Development Code. In Section 2.3.5.6.7 the proposal would need
to be consistent with the Golden Gate Area Master Plan instead of
t,he Future Land Use Element.
H. OPen Sbace Requirements:
A minimum of thirty (30) percent open space, as described in Section
2.2.20.3.5 of the Land Development Code, shall be required for each
parcel of land at lhe time of Site Development Plan approval for such
pcrcel.
I. LandScapin.q and Bufferin.q Requirements;
(1) A ten (10) foot wide Buffer "X" shall be constructed around the
perimeter of the entire PUD, excluding driveways and sidewalks
perpendicular to the adjacent road right-of-ways. Additionally, if a
cross-access easement is extended onto Lot 27 (abutting lot to the
east of the subject PUD) such Buffer "X" may be eliminated on Lot
28 adjacent to the vehicular use area on Lot 28. Such Buffer "X"
shall require one (1) shade tree per every twenty (20) linear feet
and a double hedge row along its entirety, except along the
eastern boundary of the PUD where hedge rows are not required.
Along the northern boundary of the PUD a fence or wall shall be
constructed, that is at least six (6) feet in height with a single
hedge row on each side of the fence or wall. Fences and walls
shall meet the requirements of Section 2.6.11 of the Land
Development Code. Such fences shall be wooden, be at least 95%
opaque, and be designed and maintained to provide an attractive
appearance on both sides. Such walls shall be architecturally
finished, painted, and maintained on both sides. Twenty-five (25)
percent of such shade trees shall be a minimum of ten (10) feet in
height, with a four (4) foot spread, and a one and three-quarter
(1.75) inch callper at time of planting, that will have a minimum
canopy of F~een (15) feet at time of maturity. The remaining shade
trees shall be a minimum of eight (8) feet in height, with a three (3)
9
foot spread, a caliper of one and one-half (1.5) inches at time of
planting, that will have a minimum canopy of fifteen (15) feet at
maturity. All shrubs shall meet the requirements for shrubs as
described in Section 2.4.4 of the Land Development Code.
(2) Buffering shall not be required between lots internal to the PUD.
(3) /t minimum of ten (10) percant of the gross vehicular use area shall
b,e landscaped to provide visual relief. Required trees within the
Parking Lot (Intemal) Landscaping Areas shall be one (1) tree per
seventy-five (75) square feet of Internal Landscaping Areas.
T, hese trees shall be a minimum of eight (8) feet in height with a
m, inimum caliper of one and one-half (1.5) inches at time of
p. lanting and have a minimum canopy of fifteen (15) feet at
maturity. All other requirements of Section 2.4.5 of the Land
Development Code shall apply.
(4) For building perimeter landscaping, each building shall have one
(1) tree. four (4) shrubs, and twenty (20) square feet of planting
area for each two hundred (200) square feet of first floor building
area. These trees and plantings shall be planted in the areas
adjacent to such buildings. The trees shall be a minimum of eight
(8) feet in height with a minimum caliper of one and one-half (1.5)
inches at time of planting and have a minimum canopy of fifteen
(15). feet at time of maturity. Planting areas shall consist of
landscaped areas, raised planters or planter boxes with a minimum
of one (1) flower or shrub for each ten (10) square feet of planting
area.
(5) At the time of Preliminary Site Development Plan Application, the
site plan shall show a Front Pedestrian Pocket for each platted lot,
plus any fraction greater than one-half (1/2) of a platted lot, located
within such application. Additionally, such site plan shall show a
Rear Pedestrian Pocket for each platted lot with a principal
structure located on such application.
(a) Front Pedestrian Pockets, at a minimum, shall provide the
following: two (2) park benches; two (2) trees and six (6)
shrubs that are not counted towards any other landscaping
requirements; a brick, paver block or Bomanite (brick or
stone design) sidewalk leading from the sidewalk along
Golden Gate PadG. vay; and one (1) architecturally designed
light post not exceeding sixteen (16) feet in height; all
10
located within a minimum area of four hundred (400) square
feet. The areas not utilized for these requirements, or similar
pedestrian amentiles, shall be landscaped. The trees shall
be a minimum of eight (8) feet in height with a minimum
caliper of one and one-half (1.5) inches at time of planting,
that will have a minimum canopy of frrteen (15) feet at
maturity.
(,b) Rear Pedestrian Pockets, at a minimum, shall provide the
following: two (2) park benches; two (2) trees and six (6)
shrubs that are not courtled towards any other landscaping
, requirements; a brick, paver block or Bomanite (brick or
! stone design) sidewalk leading from the adjacent building to
'; the park benches; and one (1) architecturally designed light
fixture attached to the building or on an architecturally
designed light post not exceeding sixteen (16) feet in height;
all located within a minimum area of three hundred (3(X))
square feet. The areas not utilized for these requirements,
or similar pedestrian amentries, shall be landscaped. Such
minimum area shall be located adjacent to a building. The
trees shall be a minimum of eight (8) feet in height with a
minimum caliper of one and one-half (1.5) inches at time of
planting, that will have a minimum canopy of fifteen (15) feet
at maturity.
(6) Architecturally designed lighting, not exceeding sixteen (16) feet in
height, shall be provided along the rear of the lots, without creating
glare on adjacent residential properties.
J. Signs
(1) A project sign for the entire project shall be limited to one (1) sign not to
exceed twenty (20) square feet and six (6) feet in height. Ihat is setback a
minimum of fifteen (15) feet from the right-of-way. No flashing or
mechanical signs shall be allowed.
(2) Wall, mansard. canopy or awning signs are permitted, as provided in
Section 2.5.8. 1.3 of the Land Development Code.
(3) Exceptions to these sign restrictions are those signs permitted under
Section 2.5.5 Signs Exempt From Permitting of the Land Development
Code.
11
SECTION N
DEVELOPMENT COMMITMENTS
4.1 PURPOSE
The purpose Of this Sealion is to set fodh the regulations for the development of
this projed. ,
4.2 GENERAL
All facilities '!shall be constructed in stdd accordance with Final Site
Development .~lans, Final Subdivision Plans and all applicable State and local
laws, codes, and regulations applicable to this PUD. Except where spedtic. ally
noted or stated otherwise, the standards and specifications of the official County
Land Development Cede shall apply to this project even if the land within the
PUD is not to be platted. The developer, his successor and assigns shall be
responsible for the commitments outlined in this document.
The developer, his successor or assignee shall agree to follow the PUD Master
Plan and the regulations of this PUD as adopted and any other conditions or
modifications as may be agreed to in the rezoning of the property. In addition,
the developer will agree to convey to any successor or assignee in title any
commitments within this agreement.
4.3 pUD MASTER PLAN
A. Exhibit "A", PUD Master Plan iljustrates the proposed development and is
conceptual in nature. Proposed area, lot or land use boundaries or
spedal land use boundaries shall not be construed to be final and may be
varied at any subsequent approval phase such as Final Platting or Site
Development Plan approval. Subject to the provisions of Section 2.7.3.5
of the Collier County Land Development Code, amendments may be
made from time to time.
B. All necessary easements, dedications, or other instruments shall be
granted to insure the continued operation and maintenance of all service
utilities and all common areas in the projed.
12
4.4 SCHEDULE OF DEVELOPMENT/MONITORING RE, POInT
A Site Development Plan shall be submitted per County regulations in effect at
time of sile plan submittal. The project is proposed to be completed in four (4)
phases.
A. The landowners shall proceed and be governed according to the time
limits pursuant to Section 2.7.3.4 of the Land Development Code.
B. Monito~in~ Repod: An annual monitoring report shall be submitted
pursuant to Section 2.7.3.6 of the Collier County Land Development
Code.
4.5 ENGINEERIN~
This project shall be required to meet all County Ordinances in effect at the time
final construction documents are submitted for development approval.
4.6 WATER MANAGEMENT
In accordance with the rules of the South Florida Water Management District
(SFWMD) Chapters 40E-4 and 40E-40, this project shall be designed for water
quality. Collier County Ordinance No. 90-10 requires a minimum of one (1) inch
of water quality pre-treatment over the entire site.
4.7 UTILITIES
A. Availability letters and construction plan approval from Florida Cities shall
be provided prior to Final Subdivision Plat or Site Development Plan
approval.
B. The existing structure on Lot 28 shall be connected to public sewer prior
to the owner obtaining Certificate of Occupancy for any conversion of this
structure from the current residential use 1o a commercial or office type
use. Within the earlier of three (3) years from the date of approval of this
PUD by the Board of County Commissioners or simultaneously with the
timing that public water mains are constructed on the northern side of
Golden Gate Parkway adjacent to any lot within the Jacaranda Center
PUD (whichever is earlier), and such water is available 1o the Lot 28
structure per Florida Cities Utilities. the owners of Lot 28 shall convert
their internal water supply from their existing private walls to public water,
if the Lot 28 structure is being utilized for commercial or office uses.
13
4.8 TRAFFI(;;
A. The applicant simll install artedal level street lighting at the project
entrance during construction of the commercial access that serves the
PUD. If the timing of the commercial access construction is such that the
County will be making improvements to Golden Gate Parkway, which
improvements include street lighting, prior to such commercial access
constru,ction, the applicant shall be relieved of this requirement.
B. County Ordinance 93-64, Work Within the Right-of-Way, requires that all
comme,rcial accesses on multi-lane divided roadways provide right turn
lanes into the development. In concert with that Ordinance requirement,
this Di~Jjsion will require a right turn lane into the site, located within the
right-of'way, prior to granting the first Certificate of Compliance on any
commercial building that this access will serve.
C. Based upon public safety considerations as identified by the County
Traffic Engineer, the applicant has requested that staff permit a larger
curb radius to radiitare traffic entering the main roadway, in lieu of
providing an acceleration lane. The final design parameters of this curb
radius will be determined at the Site Development Plan (SDP) stage.
E. A 'fair share' contribution toward a traffic signal system shall be provided
by the developer if and when such signal system is warranted nearby the
project entrance or at such other location as to create a direct benefit to
the subject property. Warrants for the installation of a signal system shall
be solely determined by the County. The County shall own, operate and
maintain such signal system.
F. This project shall be classified as CategoW 2I, Office: 50,000 square feet
or less, for road impact fee purposes. Howaver, if any podion of the
space is to be used as a medical office or clinic, then that portion shall be
assessed as Category 26, Medical Office.
4.9 PLANNING
A. During the Site Development Plan review process the developer shall
provide architectural. drawings indicating that all proposed buildings will
have a similar architectural style with Exhibits "F" or "G" of this PUD
Document. Such architectural drawings shall also show that these
buildings will have stucco except for decorative trim, pastel colors, and tile
roofs. In instances where tile roofs are not provided, decorative parapet
14
walls shall be constructed above the roof line. The existing structure on
Lot 28 shall have a new tile roof or a simulated tile roof, whose material is
acceptable to the Development Services Director. installed within three
(3) years from the date that the next commercial building permit is issued
within the PUD, or when a new roof is installed upon the structure,
whichever is sooner.
B. The e~isting residential structure on Lot 28 shall be converted to a
professional office or light commercial land use through the Site
Development Plan process, as described in Division 3.3 of the Land
Development Code, within three (3) years from the date that the next
commercial building permit is issued within the PUD for a commercial or
office building or when the owner(s) convert the existing residential
structu~:e into a commercial/office use, whichever comes first. The
conversion shall bring the site and building into compliance with the
architectural and site design standards set forth heroin, except for the
temporary tile roof deferment described in Section 4.9A. of this PUD
Document. Additionally. all residential structures remaining after
eighteen (18) months from the date of this next commercial building
permit date of issuance, shall be modified before this eighteen (18) month
period elapses. Such medi~cetion shall include: a six (6) foot high
opaque buffer around all trash storage areas, a fresh coat of exterior
building paint to color coordinate the existing building with the new
office/light commercial building, and the planting of an additional six (6)
trees and. a hedge row around the existing parking lot. These
improvements shall be provided by the owner of the existing residential
building. Such additional trees shall be a minimum of eight (8) feet in
height, with a minimum celiper of one and one-half (1.5) inches at time of
planting, that will have a minimum canopy of f~een (15) feet at maturity.
Such shrubs shall be a minimum of two (2) feet in height at time of
planting.
C. Pursuant to Section 2.2.25.8.1 of the Land Development Code, if during
the course of site clearing, excavation or other construction activity a
historic or archaeological arttract is found, all development within the
minimum area necessary to protect the discovery shall be immediately
stopped and the Collier County Compliance Services Department
O contacted.
15
EXHIBIT "B"
V/CINI TY MAP
N
% d o .5
w E , I ~ ,' I
s Mile
Pinft Rid9~
¢reen Bl~ ....
.
Oo~s
EXHIBIT "D"
AERIAL PHOTOGRAPH/SOILS MAP
SERVICES AND SHOPPING FACILITIES MAP
EXHIBIT "F"
EXHIBIT "G"
I
f.l':" . .~) *.,~11 KI ,Kk" PUMPS
STATE OF FLORIDA)
COUNTY OF COLLIER)'
I, DWIGHT E. BROCK, Clerk of Courts in and for the Twentieth
Judicial Circuit, qollier County, Florida, do hereby certify that the
foregoing is a tru~ copy of:
ORDINANCE NO. 97-4
Which was adopted by the Board of County Commissioners on the 14th day
of January, 1997, during Regular Session.
WITNESS my hand and the official seal of the Board of County
Commissioners of Collier County, Florida, this 15th day of January,
1997.