RESOLUTION 82-19 RE PETITION CCCL-Al-9C, BORAN, CRAIO, SCnRECK CON-
STRUCTION COMPANY, INC. REOUESTING A CCCL VARIANCE FOR PROPERTY KNOWN
AS SEA WINDS OF MARCO BEACH - ADOPTED WITH RTIPULATIONS SET FORTH IN
THE RESOLUTION
Legal notice having been published in the Naples Daily Nows on
January 24, 1982 and in the Marco Island Eagle on January 20, 1982, as
evidenced by Affidavits of Publication filed with the Clork, public
hearing was opened to consider Petition CCCL-Bl-9C, filed by Boran,
Craig, Scheck Construction Company, Inc. requesting a vari~nce from the
Coastal Construction Control Line for property located in Section 18,
TS2S, R26E, known as SeD Winds of Marco Island to permit tho erection
of temporary construction fencing 10 feet seaward of the &i:Otao1. f.::i",cd
CCC L .
County Environmentalist Benedict explained that tho fencing is
being built to k~ep the general public out of the construction area; to
SAt a seaward limit to potential construction related impact on the
natur~l systems and to provida aecurlty for the construction site. He
said the vllr~:e'I((' I...~~S not set 1!I precp~""1I"'" Fnr tho location of future
structures s~award of the CCCL on tho property, and that he has the
requirements within the resolution that tho fencing be removed
immediately upon complotion of the project; th~t any vegetation and/or
topography of any disturbed area will be restored to the natural,
pre-construction state, and th~t he be notified of the project
completion so that a final site inspection cftn be conducted.
Commissioner Wenzol moved, seconded by Commissioner Pistor and
carried unanimously, that the public hearing be closed. Commissioner
Pistor moved, seconded by Commissioner Kruse and carried un~nimously,
that R.solution 82-19 ro Petition CCCL-81-9C, be adopted with the
stipulations set forth in the Resolution.
BOOK 067 fACt' 400
P~90 5
--------~------------~------------___~~__4
BOOK 067 P^~t 401
February 9, 1982
RESOLUTION 82 - 19 .
RELATING TO PETITION NO. CCCL-Ol-9C FOR
A VARIANCE FROM THE COASTAL CONSTRUCTION
CONTROL LINE AS REQUIRED BY ORDINANCE
75-19.
WHEREAS, the peti tioner hlls requested 0. variance from
the Coastal Construction Control Line as required in Ordjn-
I1nce 75-19 for the purpose of erecting temporary construc-
tion fencing 10 feet seaward of the existing Coastal Con-
struction Contrl'"\l Line on the following described proper'ty:
LEGAL DESCRIPTIO~
A parcel of land, lying in Section 19, TownShip 52
South, Range 26 East, Collier County, Florida, and
being more particularly described as follows:
commencing at the intersection of the centerline of
South ColI ier Boulevard and Swallow Avenue as shown on
the Plat of Marco Beach Unit 10 as recorded in Plat
Rf)....k 6. Pages 74 thru 79, inclusive, of the Public
Records of Collier County, .:.'':',:):: "1;,: thence run N 01019'
53" E fllong the centerline of said South Collier boule-
vard a distance of 221.83 feet; thence N 05041107" W, Ii
distance of 50.0 feet to an iron pin, said iron pin
being on the Westerly Right-of Way line of said south
collier Boulevard and the POINT OF BE.';INNING of the
hereby described property; thence N 85041' 0711 W, a
distance of 531. 88 feet to an iron pin; thence N 850
41'07" W, a distance of 31 feet more or less to a point
being on the approximate Mean High Water Line (+1.5
contour) of the Gulf of Mexico as it now exists, said
point hereby designated Point "A"; thence return to the
POINT OF BEGINNING and run N 04018' 5311 E along the
Westerly Right-of-way Line of South Collier Boulevard a
distance of 249.0 feet to an iron pin; thence N 85041'
07" W a distance of 564.09 feet to an iron pin; thence
continue N 05041' 07" W a distance of 12 feet more or
less to a point being on the lIpproximate Mean of High
Water Line (+1.5 contour) of the Gulf of Mexico 8S it
now exists; thence run in a Southerly direction along
said Mean nigh Water Line (1.5 contour) a distance of
250 feet more or less to the o.forcmentioned Point "A"
and the POINT OF TERMINATION.
~nIEREAS, tho County Cnvironmento.list has roviewod ollid
petition and has prepared an Executive Summary rego.rding the
potition, and
~IEREAS, the Donrd of County Commissioneru has examined
the Executive Summary with its recommcndntionol
c=l
~~;~
~
--
iii'
fill
~:.:~"'J
...'.:1:,,"".
February 9, 1982
NOW, nJEREFORE, DE IT RESOLVED, by the Board of County
Commissionora of Collier County, Florida that Potition CCCL-
8l..9C bo granted subj ect to tho condi tiona Hated belo".
1. The granting of this petition is to permit th(i"
erection of temporary conGtruction fencing 10 feet;:..;:
seaward of the existing Coastal Construction;\, '..
Control Lino. Conatruction fencing shall be per-;,;:,!}:\.r:,\
mi tted seawa1'd of the Coastal Construction Control;-,:>, '
Line only in front of tho proposed building and in, ",.,
the area 30 feot to each side of said building.
2. Tho issuance of this variance does not set a pre-
cedence for the location of future structures in
the area seaward of the Coastal Construction
Control Line. It solely permits a temporary al-
teration to the site followed immediately by the
restoration of a natural, undisturbed site condi-
tion.
3. During construction every effort should be made to
minimi?o construction related impacts in the sen-
si tive zone seaward of the Coastal C"nst.t"J.c'tion
Control Line and landward of the temporary fenc-
ing.
4. No sand or fill material will be removed from the
variance area.
5. Sea oats and/or sea grape plants existing in the
variance area at a location where they will likely
be destroyed shall be transplanted seaward of tll0
variance area,
6. Hv equipment or cc~~:;,t!"'.1ct~.on material will be
stored seaward of the varlance area.
7.
Upon completion of this project, the temporary
fencing must be removed immediately.
Following removal of the temporary fencing, nat-
ural dune vegetation and/or topographic relief un-
avoidably damaged or altered during construction
shall be'restored to their natural state.
8.
9.
At the completion of area, restoration, the County
Environmentalist shall be notified and a site in-
spection shall be made to insure compliance with
the conditions of this Resolution.
The granting of this variance aha11 not be valid
unless the petitioner receiveu Q variance trom the
State Cabinet from the state RegUlations governing
tho Coastal Construction Control Line.
10.
BE
potition
Duu'd.
IT FURTHER RESOLVED that this Resolution ro1ating to
CCCL-91-9C 'be' r~cordcd . in . the minutes ot this
. <':'
,. ..t.:
i~";.'J::"
.;~!i,\(.i "
'oo~:~067 :rA~~:{OZ
February 9, 1982
commioaionor Pistol' offered tho foregoing
and moved its adoption, occondod by CommiosiDnor
and upon roll call tho vote wasl
rooolution
Kl'uSO
A~ESI Commissioners Pistol', Kruso, Wenzel, Drown and Wimer
NAYS: none
ABSENT AND NOT VOTING: None
ABSTENTION: None
DONE this 9th
day of Fobruarv
, 1982.
BOARD OF cOUNTY cOMMISSIONERS
COLLIER COUNTY, FLORIDA
MAB/na/117-BB
12/28/81
~
3
~,
I) ...
A~ v"...... t-t~
WIMER, CHAIHMAN
~
..