Loading...
Resolution 1996-575 9 A RBSOLOTIO. .0. "-~5 A RESOLUTION BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, AUTHORIZING THE ACQUISITION BY GIFT, PURCHASE OR CONDEMNATION OF TEMPORARY EASEMENTS ON THREE PROPOSED SITES AND THE INGRESS/EGRESS TEMPORARY EASEMENT TO ONE SITE TO PERFORM WALK-THROUGH SURVEYS, FIELD SURVEY ELEVATIONS, SOIL BORINGS AND GROUND PENETRATING RADAR TRANSECTS AND OTHER ON-SITE INVESTIGATIVE DATA ON THE THREE PROPOSED LANDFILL AND MATERIALS RECOVERY FACILITY SITES. WHEREAS, the Board of County Commissioners adopted Ordinance No. 89-5, and on May 25, 1993, and adopted Collier County Ordinance No. 93-24, amending Ordinance No. 89-5 by amending the Public Facilities Element, Solid Waste Subelement of the Collier County Growth Management Plan which sets forth the investigation of new expansion locations and the policy for the design of the new solid waste landfill; and WHEREAS, the Board of County Commissioners on May 16, 1995, adopted ReSOlution No. 95-333 creating the Collier County Landfill Citizens Advisory Committee to develop criteria to review various locations within Collier County and make recommendations to the Board of County Commissioners as to the recommended locations/ sites for the proposed new landfill and materials recovery facility site; and WHEREAS, the Board of County Commissioners on June 20, 1995 entered into a Professional Services Agreement with Dufresne- Henry, Inc. for professional engineering services concerning certain design services for Site Assessments for a Landfill Disposal and Materials Recovery Facility, as the County's Engineering Consultants; and WHEREAS, the County's Engineering Consultants and the Collier County Landfill Citizens Advisory Committee have reviewed various locations in Collier County and have recommended three (3) proposed locations/sites for the new landfill and materials recovery facility site as being preferable among the many sites studied and evaluated; and 1 9 A "4 WHEREAS, it is necessary for the County Staff and the County's Engineering Consultants to obtain an on-site assessment of ecological resources, observations of existing surface water management systems, survey data and other information to document adjacent land uses, survey data for permitted on-site water wells, field survey elevations of water control structures, soil boring data, ground penetrating radar transects, and other related on-site investigative information in order to make final professional recommendations as to the best suitable location(s) for the ne~ landfill and materials recovery facility site. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that the Board determines that the three (3) temporary easements identified herein as sites A, Land U, and the ingress/egress temporary easement to site U are necessary for the public purpose of protecting the health, safety and welfare of the citizens of Collier County. BE IT FURTHER RESOLVED that the Board herein determines that temporary easements for duration of 30 day periods respectively on each of the three (3) proposed locations are reasonably necessary and required to obtain data and information required for it to make a final determination and properly informed decision as to the most suitable location for the new landfill and materials recovery facility site. AND IT IS FURTHER RESOLVED that the Board has considered alternative sites' availability factors, long range planning factors, aesthetic factors, environmental factors, safety factors and cost factors relating to a new landfill and materials recovery facility site and the three (3) presently recommended proposed locations. Having considered these factors, the Board has determined the interests that need 'to be acquired are temporary easements for a 30 day period on each of the three (3) proposed locations identified as Site A, Site L and site U, as described ~ A herein, plus the ingress/egress temporary easement to Site U, also described herein, and said easements are reasonably necessary and in the best interest of Collier County. AND IT IS FURTHER RESOLVED that the selection process for a new landfill and materials recovery facility 10cationCs) is in accordance with the County's long range planning goals and objectives of the Growth Management Plan for Collier County. The Board has reviewed Sites A, Land U for safety considerations, cost factors relating to the economic feasibility, alternative locations, environmental factors affecting the surrounding areas and the permitability as a landfill for these locations. Based upon these reviews the Board has determined that Sites A, Land U are the best proposed locations to further do investigative work for the possible siteCs) of the new landfill and materials recovery facility. AND IT IS FURTHER RESOLVED that the acquisition of these three (3) temporary easements on sites A, Land U to obtain data and information for the selection of the best suitable location of the new landfill and materials recovery facility site is consistent with the County Growth Management Plan. AND IT IS FURTHER RESOLVED that the County Staff and the County's contracted professionals are hereby authorized and directed to acquire by gift, purchase or condemnation in accordance with the provisions of Chapters 73, 74 and 127, Florida Statutes, said temporary easements plus the ingress/egress temporary easement for a 30 day period respectively, over the following described parcels: Temporary Easement for Site A described as the Eastern half of Section 1, Township 46 South, Range 28 East; all land lying north Of S.R. 82 in the northeast quarter of Section 12, Township 46 South, Range 28 East; all of Section 6, Township 46 South, Range 29 East; and all land lying north of S.R. 82 right-of-way in Section 7, Township 46 South, Range 29 East, Collier County, Florida, and Temporary Easement for Site L described as the Eastern half Of Section 18, TownShip 48 South, Range 29 East; all of Section 17, Township 48 South, Range 29 East; and the western 1/4 of Section 16, Township 48 South, R~nge 29 East, Collier 3 , , " .. .' '~....~',; . >, : ~. .0' :..., < 9 A County, Florida, and Temporary Easement for Site U described as all of Sections 10 and 15, Township 51 South, Range 27 East, Collier County, Florida, and The ingress/egress temporary easement to site U described in Exhibit "A" attached hereto and incorporated here. AND IT IS FURTHER RESOLVED that the Temporary Easements over and across sites A, Land U are to be for the limited purposes of: a) obtaining an on-site assessment of ecological resources; b) observing existing surface water management systems; c) collecting field survey data and other information to document adjacent land uses; d) collecting field survey data on permitted on-site water wells; e) collecting field survey elevation data of water control structures; f) performing soil borings; and g) performing ground penetrating radar transacts. BE IT FURTHER RESOLVED that no mobile homes are located on the property interests sought to be acquired and therefore it will not be necessary to remove any mobile homes from the property or relocate any mobile homes from the property where the temporary easements are to be acquired. This Resolution adopted this /0 day of Qd-'" . Lo~ , 1996, ,after motion, second and majority vote. "" ATTEST:" DWIGHt:!..' BROCK, CLERK . ! - ~ BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA ,~~ ~ '1~>it..,J~, > s;,,~ , . , ,: j(" - . . . )':-' Approved '~,.to form and "legal sufficiency: CHAIRMAN BY: ~~ ~ ' :t v C. We ge / 1fj ~ county Attorney ... .' OF"lCRtP'llON OF' A S1R1P P ARen L'l'lNe IN SEC'llONS 21 AND 22. 'IOYtNSHIP 51 SOUTH, RANG( 27 EAST, COLLIER COUNTY, FLORIDA: BEGINNING AT THE COMMON CORNER OF' SEC'llONS 15, 18, 21, AND 22. TOVlNSHIP 51 SOUTH, RANG( 27 EAST, RUN SOUTH 89'5'00' ~ 15,03 FEET ALONG THE NORlli UN[ OF' SAlO SEC'llON 21: lliENCE SOUlli 04"04'42" EAST 2898.84 FEET ALONG A UNE RUNNING 15 FEET ~ OF AND PARALLEL TO THE EAST UNE OF lliE NORTHEAST 1/4 OF SAlO SEC'llON 21: lliENCE SOUTH 04'00'45" EAST 1920.93 FEET ALONG A UNE RUNN1NG 15 FEET ~ OF AND PARALLEL TO lliE EAST UN[ OF THE SOUTHEAST 1/4 OF SAID SECTION 21: lliENCE SOUlli 82'4'56" M:ST 280.42 FEET: lliENCE SOUTH 84'35'42" M:ST 417.25 FEET: THENCE SOUlli 83'20'15" M:ST 832.07 FEET: THENCE SOUlli 5757"39" M:ST 99,98 FEET: lliEIICE SOUTH 44'38'33" M:ST 75.28 FEET TO A POINT OF' INTERSEC'llON \I1lli lliE NORTHEASTERLY RIGHT-Of-WAY UNE OF' U.s. 41 (TAllIAllI TRAIL): THENCE SOUTH 54-:;2'51" EAST 30.42 fEET ALONe SAlO RIGHT-OF-WAY UNE: lliENCE NORTH 44'38'33" EAST 66,73 FEET: lliENCE NORlli 5757"39" EAST 95.08 FEET: lliENCE NORlli 63'20'15' EAST 830.33 FEET: THENCE NORTH 84'35'42" EAST 417,54 FEET: THENCE NORTH 82'4'56" EAST 284,23 FEET TO A POINT OF' INTERSEC'llON \I1lli THE EAST UNE OF lliE SOUTHEAST 1/4 OF SAID SECTION 21: lliENCE NORlli 04'00'45' M:ST 1947,10 FEET ALONG SAID EAST UNE TO THE EAST 1/4 CORNER OF SEC'llON 21: lliENCE NORTH 811"40'25" EAST 15.02 FEET: THENCE NORlli 04'04'42" M:ST 2897,92 FEET ALONG A UNE RUNNING 15 FEET EAST OF AND PARALLEL TO lliE M:ST UNE OF lliE NORlli~ 1/4 OF SAID SECTION 22 TO lliE NORTH UNE Of SAlO SEC'llON 22: lliENCE SOUTH 88'50'54" M:ST 15.02 ALONG THE SAID NORlli UN[ TO THE COMMON"CORNER OF' SEC'llONS 15, 18, 21, ANO 22 AND lliE POINT OF BEGINNING. CONTAINING 154,920.6 Sq. Ft. "'ORE OR LESS N OIRECTlON OIST ANCE L1 S 54-:;251 E 30.42 L2 N 44'38 33 E 68.73 l3 S 44'38 33 W 75,28 L4 S 57'5739 W 99,98 L5 N 57"5739 E 95.08 L8 S 82'456 W 280.42 L7 N 62'456 E 284.23 L8 S 88'50 54 W 15,02 L9 S 891500 W 15,03 .;.... ~"'l.di.o1' s ~ ~~ , ~o.~"S .; ~ Eo :'].d' " (,~ "- ~ "- .~ 11, oilo~ 'q.. "- '1I:t,. "- SKETCH OF DESCRIPTION FOR COWER COUNTY 'THIS IS NOT A SURVEY! -16- -15- Palm OF BEGINNING --- -21- M I I ~ \ N .. .; .- .. .. " .. ,.. ,.. ... ...... ;;j z ~ ~ '" N ',.. '" .. .. z -.. '.. :J ~ P .... .. ~ 0 0 SCAU> ," - 3tIO' '" 111 :z ,.... 5"'1.. &'~1 ').s S u ., . 1~. ~ .,~.'). ~. " E'/4 COR. SEC. 21 N 88'40'25" E 2' 115.00' I 'I ..'" I .........;.-, -"'.. ll!:"d ... ~li: o ~- !j1111 :J .... B ~ \ PREP AREa BY>, ~:;.~:..., !'-.' WILKISON & ASSOCIATES INC.. CONSULTING ENGINEERS AND SURVEYORS 3506 EXCHANGE AVE. NAPLES, Ft.A. 33942 (941) 843-2404 FAX NO. (941) 843-5173 RLE: TOllOESC1.0WG / / 182 PROJ. 19534 11 15 98 32-34 oIiW 139Oll!51-L-21 DESCRIPTION OF A SlRIP PARGa LYING IN lHE SOUlHWEST 1/4 OF SECTION 22, TO~SHIP 51 SOUlH, RANGE 27 EAST, COWER COUNTY, flORIDA: COI.IlAENClNG AT lHE COI.IlAON CORNER OF SECTIONS 15, 16, 21, AND 22 RUN SOUlH 04"(}4'42" EAST ALONG lHE ~ST UNE OF lHE NORlHWEST 1/4 OF SAID SECTION 22 TO lHE WEST 1/4 CORNER OF SAID SECTION 22 AND lHE POINT OF BEGINNING' lHENCE SOUlH 04'00'45" EAST 1947.10 FEET ALONG lHE ~ST UNE OF lHE SOUlHWEST 1/4 OF SAID SECTION 22; lHENCE NORlH 62'4'56" EAST 16.39 FEET; lHENCE NORlH 04'00'45" ~ST 1989.80 FEET ALONG A UNE lHAT RUNS 15 FEET EAST OF AND PAR.A.LLEL TO lHE SAID WEST UNE OF lHE SOUlHWEST 1/4 OF SECTION 22; lHENCE SOUlH 88'40'25" ~ST 15.02 FEET ALONG lHE EAST-~ST 1/4 UNE OF SAID SECTION 22 TO lHE POINT OF BEGINNING. N SCAU:: ,. .. 300" CONTAINING 29,157,2 Sq. Ft. MORE OR LESS. -16- : -15- _ _ - -F~- OF COlIMENCDlENT. -21- \\\ -22- 1\1 1\\ ~ \ ~t\ ~ .. '\ ~ \ ~ .. ~ "'I \:\ POINT OF fIlE- '_10 Wl/4COR. SEe. 22 15.00' \~ . ~~ ~~ ~ ~~ ~ ~:z ~ \: j 'i -/ .. :n . ~~ ~~ co "'- I I \ PREPARED 8Y: :', ,', . \.. . .'<;,i~' . , ,~j~:~/r,;':;[&'~:, SKETCH OF DESCRIPTION FOR COWER COUNTY lHlS IS NOT A SURVEY! FllE: TOI.lOESC2.OWG 11/15/ge 111232_" PROJ.: ~ oNW 139Oll/!lI-L-22 .. ..,.', N_...C".".~.'_'_'''~;''"" ,. "''^''.,,,.~,,,.,, ~~,~._.~.. .",.. . ",".'n"._~....."~_.,.~.~"...,....... .~,_.~,~. ....