Loading...
HEX Final Decision #2026-29Page 1 of 7 HEX NO. 2026-29 HEARING EXAMINER DECISION DATE OF HEARING. April 9, 2026 PETITION. Petition No. BD-PL20250006004 (Schulte Dock) - 733 Palm Point Drive - Request for a 5-foot boat dock extension, over the maximum 20 feet allowed by Section 5.03.06.E.1 of the Collier County Land Development Code (LDC) for waterways 100 feet or greater in width, to construct a new dock facility that will protrude a total of 25 feet into a waterway that is 345± feet wide. The subject property is located at 733 Palm Point Drive, AKA: Lot 1, Goodland Shores, in Section 18, Township 52 South, Range 27 East, Collier County, Florida. GENERAL PURPOSE FOR THE PETITION. The proposed dock facility would be a 4-foot-wide access or gangway leading to a 4- to 6-foot- wide shore parallel dock with a single slip, including a 14-foot by 14-foot boat lift for a 40-foot vessel. The required 15-foot side/riparian setbacks are satisfied on both sides of the dock facility. STAFF RECOMMENDATION. Approval with conditions. FINDINGS. 1. The Hearing Examiner has jurisdiction over this Petitioner pursuant to Sec. 2-87(4) of the Collier County Code of Ordinances, Sec. 8.10.00 of the Land Development Code, and Chapter 9 of the County Administrative Code. 2. The public hearing for this Petition was properly noticed and conducted in accordance with all County and state requirements. 3. The public hearing was conducted electronically and in-person in accordance with Emergency/Executive Order 2020-04. 4. The public hearing was conducted in the following manner: the County Staff presented the Petition followed by the Petitioner and/or Petitioner’s representative, public comment and then rebuttal by the Petitioner and/or Petitioner’s representative. There were no objections at the public hearing. 5. The Hearing Examiner disclosed having reviewed the record for the petition and having no ex parte communications. Page 2 of 7 6. In accordance with LDC Section 5.03.06.H., the Collier County Hearing Examiner shall approve, approve with conditions, or deny a dock facility extension request based on certain criteria. In order for the Hearing Examiner to approve this request, at least four of the five primary criteria and four of the six secondary criteria must be met.1 Primary Criteria: 1. Whether the number of dock facilities and/or boat slips proposed is appropriate in relation to the waterfront length, location, upland land use and zoning of the subject property. Consideration should be made of property on unbridged barrier islands, where vessels are the primary means of transportation to and from the property. (The number should be appropriate; typical single-family use should be no more than two slips; typical multi-family use should be one slip per dwelling unit; in the case of unbridged barrier island docks, additional slips may be appropriate.) The record evidence and testimony from the public hearing reflects that this criterion has been met. The applicant’s agent stated: “The subject property is zoned for a single- family residential unit, which warrants no more than 2 slips per CC-LDC. The proposed docking facility consists of installing one boatlift to accommodate a 40-foot LOA vessel.” Zoning staff concurred. 2. Whether the water depth at the proposed site is so shallow that a vessel of the general length, type, and draft as that described in the petitioner’s application is unable to launch or moor at mean low tide (MLT). (The petitioner’s application and survey should establish that the water depth is too shallow to allow launching and mooring of the vessel(s) described without an extension.) The record evidence and testimony from the public hearing reflects that this criterion has been met. The applicant’s agent stated: “The boat dock extension is necessary to extend out past the existing rip-rap shoreline bank that was recently refurbished within the historical footprint. The subject property is located within the Rookery Bay Aquatic Preserve, which limits the overall allowed protrusion to 25 feet, even though we are still within limited water depths at that point and well within the allowed 25% width of the waterway. Based on the existing rip-rap shoreline, we are limited to bringing the dock any further landward.” Zoning staff concurred. 3. Whether the proposed dock facility may have an adverse impact on navigation within an adjacent marked or charted navigable channel. (The facility should not intrude into any marked or charted navigable channel thus impeding vessel traffic in the channel.) The record evidence and testimony from the public hearing reflects that this criterion has been met. The applicant’s agent stated: “The proposed docking facility is located 1 The Hearing Examiner’s findings are italicized. Page 3 of 7 on an unmarked man-altered waterway; therefore, the entire waterway provides safe navigation between the two shorelines. As proposed, the docking facilities should not, in our opinion, have any new impact on the existing navigation on the subject waterway.” Zoning staff concurred. 4. Whether the proposed dock facility protrudes no more than 25 percent of the width of the waterway and whether a minimum of 50 percent of the waterway width between dock facilities on either side is maintained for navigability. (The facility should maintain the required percentages.) The record evidence and testimony from the public hearing reflects that this criterion has been met. The applicant’s agent stated: “The approximate waterway width varies from the south to the north side, but on average, the width is labeled as being 345-feet wide. Based on the proposed dock’s overall protrusion, the dock will only protrude out into the waterway approximately 8%, which is well within the allowed 25%.” Zoning staff added that there is no dock facility on the opposite shoreline, thus the distance between the subject dock and the opposite MHWL is 343 feet. 5. Whether the proposed location and design of the dock facility is such that the facility would not interfere with the use of neighboring docks. (The facility should not interfere with the use of legally permitted neighboring docks.) The record evidence and testimony from the public hearing reflects that this criterion has been met. The applicant’s agent stated: “The proposed docking facility design and slip layout has taken each existing and potential future adjacent docking facility into consideration to avoid any potential impacts. As proposed, we are confident that there will not be any new impacts to neighboring docks nor their existing ingress/egress to their existing slips/boatlift. Additionally, as proposed, the dock will provide much larger setbacks from the riparian lines than the required 15 feet.” Zoning staff concurred. Secondary Criteria: 1. Whether there are special conditions not involving water depth, related to the subject property or waterway, that justify the proposed dimensions and location of the proposed dock facility. (There must be at least one special condition related to the property; these may include type of shoreline reinforcement, shoreline configuration, mangrove growth, or seagrass beds.) The record evidence and testimony from the public hearing reflects that this criterion been met. The applicant’s agent stated: “The subject property shoreline and associated plated property is unique in that there is a significant amount of filled land between the MHWL and the plated property line. With the recently acquired Quit Claim Deed, the new property line is also per the legal description, now the property line, therefore the dock protrusion will be taken from that point. This and the overall top of rip-rap Page 4 of 7 elevation being at 5.0’ NAVD increases the proposed dock protrusion for the dock to reach adequate depths.” Zoning staff concurred. 2. Whether the proposed dock facility would allow reasonable, safe access to the vessel for loading/unloading and routine maintenance, without the use of excessive deck area not directly related to these functions. (The facility should not use excessive deck area.) The record evidence and testimony from the public hearing reflects that this criterion has been met. The applicant’s agent stated: “The proposed docking facility has been fully minimized to meet the state aquatic preserve rules and still provide sufficient deck area for routine maintenance, safe access, as well as recreational activities like fishing, plus storage. The total over-water square footage is 270 square feet.” Zoning staff concurred. 3. For single-family dock facilities, whether the length of the vessel or vessels in combination described by the petitioner exceeds 50 percent of the subject property’s linear waterfront footage. (The applicable maximum percentage should be maintained.) The record evidence and testimony from the public hearing reflects that this criterion has been met. The applicant’s agent stated: “The proposed docking facility has been designed to moor one vessel, approximately 40 feet in length. The subject property’s shoreline length is approximately 154 feet, therefore leaving more than 50% open as required.” Zoning staff concurred. 4. Whether the proposed facility would have a major impact on the waterfront view of neighboring property owners. (The facility should not have a major impact on the view of a neighboring property owner.) The record evidence and testimony from the public hearing reflects that this criterion has been met. The applicant’s agent stated: “The existing on-site conditions consist of a newly refurbished riprap and some vegetated natural mangroves along the shoreline. The vegetation removal has already significantly increased the view of both adjacent properties to the waterway, as well as the subject property. As such, both adjacent neighboring properties have docks or will have docks, being consistent with the other properties in this area. Finally, as proposed, the dock has been designed to be construed well within the designated setbacks and limited overall protrusion out into the waterway. Based on this, it is our opinion that there are no new impacts to either adjacent property owner.” Zoning staff concurred. 5. Whether seagrass beds will be impacted by the proposed dock facility. (If seagrass beds are present, compliance with subsection 5.03.06.J of the LDC must be demonstrated.) Page 5 of 7 The record evidence and testimony from the public hearing reflects that this criterion has been met. The submerged resources survey provided indicates that no seagrass beds exist within 200 feet of the proposed dock. No seagrass beds will be impacted by the proposed dock facility. 6. Whether the proposed dock facility is subject to the manatee protection requirements of subsection 5.03.06(E)(11) of this Code. (If applicable, compliance with section 5.03.06(E)(11) must be demonstrated. The record evidence and testimony from the public hearing reflects that this criterion is not applicable. LDC Section 5.03.06.E.11 stipulates that “multi-slip docking facilities with 10 or more slips will be reviewed for consistency with the Manatee Protection Plan (MPP).” The proposed project is for a private single slip docking facility accessory to a single-family residence in Goodland. The proposed facility does not have more than 10 slips and so is not subject to review for consistency with the MPP. ENVIRONMENTAL EVALUATION. The record evidence and testimony from the public hearing reflects that the Environmental Planning Staff has reviewed this petition and has no objection to the granting of this request. The proposed docking facilities will be constructed waterward of the existing rip-rapped shoreline in Blue Hill Creek. The submerged resources survey provided by the applicant found no submerged resources in the area; Exhibit sheet page 10 of 10 provides an aerial with a note stating that no seagrasses were observed within 200 feet. The proposed docking facility will be placed in the ACSC/ST Overlay (Area of State Critical State Concern/Special Treatment). An ST permit will be required prior to approval of the building permit for the proposed docking facility. This project does not require an Environmental Advisory Council Board (EAC) review, because this project did not meet the EAC scope of land development project reviews as identified in Chapter 2, Article VIII, Division 23, Section 2-1193 of the Collier County Code of Laws and Ordinances. ANALYSIS. The subject waterfront property comprises 0.53 acres located within a Village Residential (VR) Zoning District and the Goodland Zoning Overlay (GZO) upon which a single-family residence is presently under construction per Building Permit No. PRFH20250418174, issued on August 8, 2025. The property has 154 feet of waterfrontage on a natural waterway, Blue Hill Creek, which is part of the Rookery Bay Aquatic Preserve on the SW side of Goodland. The shoreline consists of a newly refurbished rip-rap bank; the previously existing mangroves have been fully removed. Proposed is a 4-foot-wide access or gangway leading to a 4- to 6-foot-wide shore parallel dock with a single slip, including a 14-foot by 14-foot boat lift for a 40-foot vessel. The required 15- foot side/riparian setbacks are satisfied on both sides of the dock facility. Page 6 of 7 The Hearing Examiner concludes that there is enough competent, substantial evidence based on the review of the record that includes the Petition, application, exhibits, the County’s staff report, and comments and testimony from the Petitioner and/or their representative(s), County staff and anyone from the public, to approve the Petition for the boat dock. The boat dock petition meets 5 of the 5 primary criteria and 5 of the 6 secondary criteria with one criterion being not applicable. The criteria are set forth in Section 5.03.06.H of the Land Development Code. DECISION. The Hearing Examiner hereby APPROVES Petition Number BD-PL20250006004, filed by Jeff Rogers of Turrell, Hall & Associates, Inc., representing the owner/applicant Julie Lynn Schulte, Trustee of the Julie Lynn Schulte Living Trust, with respect to the property described as located at 733 Palm Point Drive, AKA: Lot 1, Goodland Shores, in Section 18, Township 52 South, Range 27 East, Collier County, Florida, for the following: • To allow a 5-foot boat dock extension over the maximum permitted protrusion of 20 feet allowed by Section 5.03.06.E.1 of the Collier County Land Development Code (LDC) for waterways 100 feet or greater in width, to allow a new boat docking facility protruding a total of 25 feet into a waterway that is 345± feet wide, for the benefit of the subject property. Said changes are fully described in the Proposed Dock and Related Plans attached as Exhibit "A" and the Record Survey attached as Exhibit “B”, and are subject to the condition(s) set forth below. ATTACHMENTS. Exhibit A – Proposed Dock and Related Plans Exhibit B – Record Survey LEGAL DESCRIPTION. The subject property is located at 733 Palm Point Drive, AKA: Lot 1, Goodland Shores, in Section 18, Township 52 South, Range 27 East, Collier County, Florida. CONDITIONS. All other applicable state or federal permits must be obtained before commencement of the development. DISCLAIMER. Pursuant to Section 125.022(5) F.S., issuance of a development permit by a county does not in any way create any rights on the part of the applicant to obtain a permit from a state or federal agency and does not create any liability on the part of the county for issuance of the permit if the applicant fails to obtain requisite approvals or fulfill the obligations imposed by a state or federal agency or undertakes actions that result in a violation of state or federal law. Page 7 of 7 APPEALS. This decision becomes effective on the date it is rendered. An appeal of this decision shall be done in accordance with applicable ordinances, codes and law. RECORD OF PROCEEDINGS AND EXHIBITS: SEE CLERK OF COURT, MINUTES AND RECORDS DEPARTMENT. DECISIONS OF THE HEARING EXAMINER FOR VARIANCES, CONDITIONAL USES, AND BOAT DOCK EXTENSIONS SHALL BE NOTED ON THE ZONING MAP FOR INFORMATIONAL PURPOSES. April 23, 2026 Date Andrew Dickman, Esq., AICP Hearing Examiner EXHIBIT “A” STATE OF FLORIDACOUNTY AERIAL VICINITY MAPSTATE OF FLORIDACOUNTY AERIAL VICINITY MAPNOTES:<> THESE DRAWINGS ARE FOR PERMITTING PURPOSES ONLY AND ARE NOT INTENDED FOR CONSTRUCTION USE.SUBJECTPROPERTYSUBJECTPROPERTY<> LATITUDE:N 25.920999<> LONGITUDE:W -81.647423SITE ADDRESS:<> 733 PALM POINT DR GOODLAND, FL 34140Turrell, Hall & Associates, Inc.Email: tuna@thanaples.com3584 Exchange Ave. Naples, FL 34104-3732Marine & Environmental ConsultingPhone: (239) 643-0166Fax: (239) 643-6632REV#:CREATED:DRAWN BY:JOB NO.:SECTION-TOWNSHIP-RANGE-DESIGNED:p:\23124.00 kapusta - 733 palm point drive\CAD\PERMIT-COUNTY\23124-BDE-NORTH_733LOT.dwg LOCATION MAP 1/23/2026THESE DRAWINGS ARE FOR PERMITTING PURPOSES ONLY AND ARE NOT INTENDED FOR CONSTRUCTION USE.SE1.2.3.4.5.REV BY:DATE:CHK BY:CHANGED:SHEET NO.:RY NO. 5875JRRMJ01-13-2623124-1827733 PALM POINT DRLOCATION MAP52-------------------01 OF 10COLLIER COUNTYCOLLIER COUNTYGULF OF AMERICA8588288641MARCOISLANDEVERGLADESCITY9329846NAPLES90908399483783784129292983983992887846951862I-758486431856850846890896NESWKEY WESTTAMPAFT.MYERSMIAMINAPLESSUBJECTPROPERTY p:\23124.00 kapusta - 733 palm point drive\CAD\PERMIT-COUNTY\23124-BDE-NORTH_733LOT.dwg 1/23/2026NESW0100200400SCALE IN FEETTurrell, Hall & Associates, Inc.Email: tuna@thanaples.com3584 Exchange Ave. Naples, FL 34104-3732Marine & Environmental ConsultingPhone: (239) 643-0166Fax: (239) 643-6632REV#:CREATED:DRAWN BY:JOB NO.:SECTION-TOWNSHIP-RANGE-DESIGNED:p:\23124.00 kapusta - 733 palm point drive\CAD\PERMIT-COUNTY\23124-BDE-NORTH_733LOT.dwg 1952 AERIAL 1/23/2026THESE DRAWINGS ARE FOR PERMITTING PURPOSES ONLY AND ARE NOT INTENDED FOR CONSTRUCTION USE.SE1.2.3.4.5.REV BY:DATE:CHK BY:CHANGED:SHEET NO.:RY NO. 5875JRRMJ01-13-2623124-1827733 PALM POINT DR1952 AERIAL52-------------------02 OF 10PROPERTY BOUNDARY·SURVEY COURTESY OF:··SURVEY DATED:·THESE DRAWINGS ARE FOR PERMITTING PURPOSES ONLY AND ARE NOTINTENDED FOR CONSTRUCTION USE.·ALL WATER DEPTHS AND DREDGE ELEVATIONS ARE REFERENCED TO MLW·APPLICANT OWNED SHORELINE (APPX LF):·EXISTING OVERWATER STRUCTURE (APPX SF):·WIDTH OF WATERWAY, MHW TO MHW (APPX):·TIDAL DATUM:··MHW (NAVD)=··MLW (NAVD)=NOTES:"COASTAL ENGINEERING CONSULTANTS, INC."11-06-25-1.86'+0.54'151'0345'BLUE HILL CREEK 2.32.23.2- 4 . 1 4 -4.24-4.54-5 . 3 4 -5.24-5. 0 4 -5.24 -4.24-3.04-2.94-2.84-2.54-2.94-1.14-1.54-1.54-2.17-3.74 -2 . 9 4 -1.94-1 . 6 4 - 1 . 8 4 -1.44-2.64-2.34-3 . 1 4 -0.34-0.4-0.14-0.04-0.34-0.74-0.64-0.44-0.260.262.32.25.03.52.10.44.42.61.1-2.54.93.52.3-0.2-2.45.13.92.40.9-0.9-2.14.93.21.7-0.1-2.64.83.51.40.5-0.5-2.04.94.53.63.01.6-0.3-1.95.14.73.52.01.0-1.4-1.94.52.81.7-0.2-1.6-1.5-1.8p:\23124.00 kapusta - 733 palm point drive\CAD\PERMIT-COUNTY\23124-BDE-NORTH_733LOT.dwg 1/23/2026NESW0204080SCALE IN FEETTurrell, Hall & Associates, Inc.Email: tuna@thanaples.com3584 Exchange Ave. Naples, FL 34104-3732Marine & Environmental ConsultingPhone: (239) 643-0166Fax: (239) 643-6632REV#:CREATED:DRAWN BY:JOB NO.:SECTION-TOWNSHIP-RANGE-DESIGNED:p:\23124.00 kapusta - 733 palm point drive\CAD\PERMIT-COUNTY\23124-BDE-NORTH_733LOT.dwg EXISTING CONDITIONS 1/23/2026THESE DRAWINGS ARE FOR PERMITTING PURPOSES ONLY AND ARE NOT INTENDED FOR CONSTRUCTION USE.SE1.2.3.4.5.REV BY:DATE:CHK BY:CHANGED:SHEET NO.:RY NO. 5875JRRMJ01-13-2623124-1827733 PALM POINT DREXISTING CONDITIONS52-------------------03 OF 10PALM POINT DRPROPERTY BOUNDARYMHWLACCRETEDFILLEDLANDSMANGROVE FRINGERIPARIAN LINERIPARIAN LINESITE ADDRESS:,733 PALM POINT DRGOODLANDFL34140·SURVEY COURTESY OF:··SURVEY DATED:·THESE DRAWINGS ARE FOR PERMITTING PURPOSES ONLY AND ARE NOTINTENDED FOR CONSTRUCTION USE.·ALL WATER DEPTHS AND DREDGE ELEVATIONS ARE REFERENCED TO MLW·APPLICANT OWNED SHORELINE (APPX LF):·EXISTING OVERWATER STRUCTURE (APPX SF):·WIDTH OF WATERWAY, MHW TO MHW (APPX):·TIDAL DATUM:··MHW (NAVD)=··MLW (NAVD)=NOTES:"COASTAL ENGINEERING CONSULTANTS, INC."11-06-25-1.86'+0.54'154'0345'MANGROVES HAVE BEENREMOVED216'59'204'122'BLUE HILL CREEKEXISTINGRIPRAP11' 1.14.93.52.3-0.2-2.45.13.92.40.9-0.9-2.14.93.21.7-0.1-2.64.83.51.40.5-0.5-2.04.94.53.63.01.6-0.3-1.95.14.73.52.01.0-1.4-1.94.52. 81.7- 0 . 2-1.6-1.5-1.8NESW0102040SCALE IN FEETTurrell, Hall & Associates, Inc.Email: tuna@thanaples.com3584 Exchange Ave. Naples, FL 34104-3732Marine & Environmental ConsultingPhone: (239) 643-0166Fax: (239) 643-6632REV#:CREATED:DRAWN BY:JOB NO.:SECTION-TOWNSHIP-RANGE-DESIGNED:p:\23124.00 kapusta - 733 palm point drive\CAD\PERMIT-COUNTY\23124-BDE-NORTH_733LOT.dwg PROPOSED DOCK-DIMENSIONS 1/23/2026THESE DRAWINGS ARE FOR PERMITTING PURPOSES ONLY AND ARE NOT INTENDED FOR CONSTRUCTION USE.SE1.2.3.4.5.REV BY:DATE:CHK BY:CHANGED:SHEET NO.:RY NO. 5875JRRMJ01-13-2623124-1827733 PALM POINT DRPROPOSED DOCK-DIMENSIONS52-------------------04 OF 10PROPERTYBOUNDARYMHWLRIPARIAN LINEFIXED DOCKRIPARIAN LINE14'X14'BOATLIFT25' OFFSET FROM MHWLMANGROVESHAVE BEENREMOVEDMANGROVESTO REMAINRIPRAPAA0610'PROPOSEDRAIL (26 LF)BLUE HILL CREEK1 4 '14'6'46'4'83'2 5 '·SURVEY COURTESY OF:··SURVEY DATED:·THESE DRAWINGS ARE FOR PERMITTING PURPOSES ONLY AND ARE NOTINTENDED FOR CONSTRUCTION USE.·ALL WATER DEPTHS AND DREDGE ELEVATIONS ARE REFERENCED TO MLW·APPLICANT OWNED SHORELINE (APPX LF):·EXISTING OVERWATER STRUCTURE (APPX SF):·WIDTH OF WATERWAY, MHW TO MHW (APPX):·TIDAL DATUM:··MHW (NAVD)=··MLW (NAVD)=NOTES:·PROPOSED OVERWATER STRUCTURE (APPX SF):·TOTAL OVERWATER STRUCTURE (APPX SF):·TOTAL PROTRUSION FROM MHWL:"COASTAL ENGINEERING CONSULTANTS, INC."11-06-25-1.86'+0.54'154'0345'27027025'40'1 3 '26'21'53'42'4'2 5 'ACCRETED/FILLED LANDSAPPROXIMATELY2,552 SF40' 2 . 3 2.23 . 2 -5.34- 5 . 2 4 - 5 . 0 4 -5.24-4.24-3.04-2.94-2.84-2.54- 2 . 9 4-1.14-1.54-1.54-2.17-3.74-2.94-1.94-1.64-1.84-1.44- 2 . 6 4 -2.34-0.14-0.04-0.34-0.74-0.64-0.44-0.260.262 . 3 2.21.14.93.52.3-0.2-2.45.13.92.40.9-0.9-2.14.93.21.7-0.1-2.64.83.51.40.5-0.5-2.04.94.53.63.01.6-0.3-1.95.14.73.52.01.0-1.4-1.94.52. 81.7- 0 . 2-1.6-1.5-1.8NESW0102040SCALE IN FEETTurrell, Hall & Associates, Inc.Email: tuna@thanaples.com3584 Exchange Ave. Naples, FL 34104-3732Marine & Environmental ConsultingPhone: (239) 643-0166Fax: (239) 643-6632REV#:CREATED:DRAWN BY:JOB NO.:SECTION-TOWNSHIP-RANGE-DESIGNED:p:\23124.00 kapusta - 733 palm point drive\CAD\PERMIT-COUNTY\23124-BDE-NORTH_733LOT.dwg PROPOSED DOCK-DEPTHS 1/23/2026THESE DRAWINGS ARE FOR PERMITTING PURPOSES ONLY AND ARE NOT INTENDED FOR CONSTRUCTION USE.SE1.2.3.4.5.REV BY:DATE:CHK BY:CHANGED:SHEET NO.:RY NO. 5875JRRMJ01-13-2623124-1827733 PALM POINT DRPROPOSED DOCK-DEPTHS52-------------------05 OF 10PROPERTYBOUNDARYMANGROVES HAVEBEEN REMOVEDMHWLRIPARIAN LINEFIXED DOCK14'X14' BOATLIFT25' OFFSET FROM MHWLMANGROVESTO REMAINPROPOSEDRAILBLUE HILL CREEKRIPRAP·SURVEY COURTESY OF:··SURVEY DATED:·THESE DRAWINGS ARE FOR PERMITTING PURPOSES ONLY AND ARE NOTINTENDED FOR CONSTRUCTION USE.·ALL WATER DEPTHS AND DREDGE ELEVATIONS ARE REFERENCED TO MLW·APPLICANT OWNED SHORELINE (APPX LF):·EXISTING OVERWATER STRUCTURE (APPX SF):·WIDTH OF WATERWAY, MHW TO MHW (APPX):·TIDAL DATUM:··MHW (NAVD)=··MLW (NAVD)=NOTES:·PROPOSED OVERWATER STRUCTURE (APPX SF):·TOTAL OVERWATER STRUCTURE (APPX SF):·TOTAL PROTRUSION FROM MHWL:"COASTAL ENGINEERING CONSULTANTS, INC."11-06-25-1.86'+0.54'154'0345'27027025'ACCRETED/FILLED LANDSAPPROXIMATELY2,552 SFRIPARIAN LINE -2.94-5.2403612SCALE IN FEETTurrell, Hall & Associates, Inc.Email: tuna@thanaples.com3584 Exchange Ave. Naples, FL 34104-3732Marine & Environmental ConsultingPhone: (239) 643-0166Fax: (239) 643-6632REV#:CREATED:DRAWN BY:JOB NO.:SECTION-TOWNSHIP-RANGE-DESIGNED:p:\23124.00 kapusta - 733 palm point drive\CAD\PERMIT-COUNTY\23124-BDE-NORTH_733LOT.dwg CROSS SECTION AA 1/23/2026THESE DRAWINGS ARE FOR PERMITTING PURPOSES ONLY AND ARE NOT INTENDED FOR CONSTRUCTION USE.SE1.2.3.4.5.REV BY:DATE:CHK BY:CHANGED:SHEET NO.:RY NO. 5875JRRMJ01-13-2623124-1827733 PALM POINT DRCROSS SECTION AA52-------------------06 OF 10BLUEHILLCREEKFIXEDDOCKMHW = +0.54' NAVD88MLW =-1.86' NAVD88ALL PILES TO BE WRAPPEDFROM 12" ABOVE MHWL TO6" BELOW SUBSTRATE14' BOATLIFTMANGROVES HAVEBEEN REMOVEDWOODEN BORDER PLACEDAT ELEV= 5.5 NAVD885'6'STAIRS25' PROTRUSION FROM MHWLEXISTING RIPRAP NESW02550100SCALE IN FEETTurrell, Hall & Associates, Inc.Email: tuna@thanaples.com3584 Exchange Ave. Naples, FL 34104-3732Marine & Environmental ConsultingPhone: (239) 643-0166Fax: (239) 643-6632REV#:CREATED:DRAWN BY:JOB NO.:SECTION-TOWNSHIP-RANGE-DESIGNED:p:\23124.00 kapusta - 733 palm point drive\CAD\PERMIT-COUNTY\23124-BDE-NORTH_733LOT.dwg ST OVERLAY MAP 1/23/2026THESE DRAWINGS ARE FOR PERMITTING PURPOSES ONLY AND ARE NOT INTENDED FOR CONSTRUCTION USE.SE1.2.3.4.5.REV BY:DATE:CHK BY:CHANGED:SHEET NO.:RY NO. 5875JRRMJ01-13-2623124-1827733 PALM POINT DRST OVERLAY MAP52-------------------07 OF 10PROPERTYBOUNDARYFIXED DOCKBLUE HILL CREEKPALM POINT DRST OVERLAY NESW060120240SCALE IN FEETTurrell, Hall & Associates, Inc.Email: tuna@thanaples.com3584 Exchange Ave. Naples, FL 34104-3732Marine & Environmental ConsultingPhone: (239) 643-0166Fax: (239) 643-6632REV#:CREATED:DRAWN BY:JOB NO.:SECTION-TOWNSHIP-RANGE-DESIGNED:p:\23124.00 kapusta - 733 palm point drive\CAD\PERMIT-COUNTY\23124-BDE-NORTH_733LOT.dwg ADJACENT DOCKS 1/23/2026THESE DRAWINGS ARE FOR PERMITTING PURPOSES ONLY AND ARE NOT INTENDED FOR CONSTRUCTION USE.SE1.2.3.4.5.REV BY:DATE:CHK BY:CHANGED:SHEET NO.:RY NO. 5875JRRMJ01-13-2623124-1827733 PALM POINT DRADJACENT DOCKS52-------------------08 OF 10PROPERTYBOUNDARYBLUE HILL CREEKPALM POINT DR65'30'55'28'18'10'34'4'42'21 '38'20'71'47'27'14'17'18'19'25'22' 34' 31' 35' 35' 2 5 ' 25 ' 4.14.10.7-0.84.94.23.31.90.6-1.0-2.25.03.52.10.4-2.34.42.61.1-2.54.93.52.3-0.2-2.45.13.92.40.9-0.9-2.14.93.21.7-0.1-2.64.83.51.40.5-0.5-2.04.94.53.63.01.6-0.3-1.95.14.73.52.01.0-1.4-1.94.52.81.7-0. 2-1.6-1.5-1.8NESW050100200SCALE IN FEETTurrell, Hall & Associates, Inc.Email: tuna@thanaples.com3584 Exchange Ave. Naples, FL 34104-3732Marine & Environmental ConsultingPhone: (239) 643-0166Fax: (239) 643-6632REV#:CREATED:DRAWN BY:JOB NO.:SECTION-TOWNSHIP-RANGE-DESIGNED:p:\23124.00 kapusta - 733 palm point drive\CAD\PERMIT-COUNTY\23124-BDE-NORTH_733LOT.dwg WIDTH OF WATERWAY 1/23/2026THESE DRAWINGS ARE FOR PERMITTING PURPOSES ONLY AND ARE NOT INTENDED FOR CONSTRUCTION USE.SE1.2.3.4.5.REV BY:DATE:CHK BY:CHANGED:SHEET NO.:RY NO. 5875JRRMJ01-13-2623124-1827733 PALM POINT DRWIDTH OF WATERWAY52-------------------09 OF 10PROPERTYBOUNDARYBLUE HILL CREEK37 1 'PALM POINT DR34 3 ' NESW02550100SCALE IN FEETTurrell, Hall & Associates, Inc.Email: tuna@thanaples.com3584 Exchange Ave. Naples, FL 34104-3732Marine & Environmental ConsultingPhone: (239) 643-0166Fax: (239) 643-6632REV#:CREATED:DRAWN BY:JOB NO.:SECTION-TOWNSHIP-RANGE-DESIGNED:p:\23124.00 kapusta - 733 palm point drive\CAD\PERMIT-COUNTY\23124-BDE-NORTH_733LOT.dwg SUBMERGED RESOURCE SURVEY 1/23/2026THESE DRAWINGS ARE FOR PERMITTING PURPOSES ONLY AND ARE NOT INTENDED FOR CONSTRUCTION USE.SE1.2.3.4.5.REV BY:DATE:CHK BY:CHANGED:SHEET NO.:RY NO. 5875JRRMJ01-13-2623124-1827733 PALM POINT DRSUBMERGED RESOURCE SURVEY52-------------------10 OF 10PROPERTYBOUNDARYBLUE HILL CREEKNO SEAGRASSES WEREOBSERVED GROWINGWITHIN 200 FT OF THEPROPOSED PROJECTTRANSECT200'10'200'TYPICAL DIVE TRANSECTMHWL EXHIBIT “B”