Backup Documents 02/24/2026 Item #17C ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP .7
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE
Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office
at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later
than Monday preceding the Board meeting.
**NEW** ROUTING SLIP
Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the
exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office.
Route to Addressee(s) (List in routing order) Office Initials Date
1.
2.
3 County Attorney Office County Attorney Office �/j\ S J L
4. BCC Office Board of County
Commissioners 1✓1( 12y I /5/ 2/z7
5. Minutes and Records Clerk of Court's Office
PRIMARY CONTACT INFORMATION
Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees
above,may need to contact staff for additional or missing information.
Name of Primary Staff Kathy Crotteau/County Attorney Office& Phone Number 252-6052(Kathy)
Contact/ Department Rich Henderlong/Zoning-LDC 252-2464(Rich)
Agenda Date Item was February 24,2026 Agenda Item Number 1.93 '7C
Approved by the BCC
Type of Document Ordinance Number of Original
Attached Documents Attached
PO number or account
number if document is
to be recorded
INSTRUCTIONS & CHECKLIST
Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not
appropriate. (Initial) Applicable)
1. Does the document require the chairman's original signature?
2. Does the document need to be sent to another agency for additional signatures? If yes, N/A
provide the Contact Information(Name;Agency;Address;Phone)on an attached sheet.
3. Original document has been signed/initialed for legal sufficiency. (All documents to be KC
signed by the Chairman,with the exception of most letters,must be reviewed and signed
by the Office of the County Attorney.
4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A
Office and all other parties except the BCC Chairman and the Clerk to the Board
5. The Chairman's signature line date has been entered as the date of BCC approval of the KC
document or the final negotiated contract date whichever is applicable.
6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's KC
signature and initials are required.
7. In most cases(some contracts are an exception),the original document and this routing slip KC
should be provided to the County Attorney Office at the time the item is input into SIRE.
Some documents are time sensitive and require forwarding to Tallahassee within a certain
time frame or the BCC's actions are nullified. Be aware of your deadlines!
8. The document was approved by the BCC on 2-24-26 and all changes made during 0_/ , N/A is not
the meeting have been incorporated in the attached document. The County an option for
Attorney's Office has reviewed the changes,if applicable. this line.
9. Initials of attorney verifying that the attached document is the version approved by the V N/A is not
BCC,all changes directed by the BCC have been made,and the document is ready for the an option for
Chairman's signature. this line.
I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12
17C
ORDINANCE NO. 26 — 09
AN ORDINANCE AMENDING ORDINANCE NUMBER 04-41, AS
AMENDED, THE COLLIER COUNTY LAND DEVELOPMENT CODE,
WHICH INCLUDES THE COMPREHENSIVE LAND REGULATIONS FOR
THE UNINCORPORATED AREA OF COLLIER COUNTY, FLORIDA, TO
ADD A FLOATING SOLAR FACILITY AS A PERMITTED USE IN
CERTAIN NON-RESIDENTIAL ZONING DISTRICTS AND TO
ESTABLISH REGULATIONS FOR FLOATING SOLAR FACILITIES, BY
PROVIDING FOR: SECTION ONE, RECITALS; SECTION TWO,
FINDINGS OF FACT; SECTION THREE, ADOPTION OF AMENDMENTS
TO THE LAND DEVELOPMENT CODE, MORE SPECIFICALLY
AMENDING THE FOLLOWING: CHAPTER ONE — GENERAL
PROVISIONS, INCLUDING SECTION 1.08.02 DEFINITIONS; CHAPTER
TWO — ZONING DISTRICTS AND USES, INCLUDING SECTION 2.03.01
AGRICULTURAL DISTRICTS, SECTION 2.03.03 COMMERCIAL
ZONING DISTRICTS, SECTION 2.03.04 INDUSTRIAL ZONING
DISTRICTS, SECTION 2.03.05 CIVIC AND INSTITUTIONAL ZONING
DISTRICTS; CHAPTER FIVE — SUPPLEMENTAL STANDARDS FOR
SPECIFIC USES, BY ADDING A NEW SECTION 5.05.17 FLOATING
SOLAR FACILITIES; SECTION FOUR, CONFLICT AND SEVERABILITY;
SECTION FIVE, INCLUSION IN THE COLLIER COUNTY LAND
DEVELOPMENT CODE; AND SECTION SIX, EFFECTIVE DATE.
(PL20250000235)
Recitals
WHEREAS, on October 30, 1991, the Collier County Board of County Commissioners
adopted Ordinance No. 91-102, the Collier County Land Development Code (hereinafter LDC),
which was subsequently amended; and
WHEREAS, the Collier County Board of County Commissioners (Board) on June 22,
2004, adopted Ordinance No. 04-41, which repealed and superseded Ordinance No. 91-102, as
amended, the Collier County Land Development Code, which had an effective date of October
18, 2004; and
WHEREAS, on March 18, 1997, the Board adopted Resolution 97-177 establishing local
requirements and procedures for amending the LDC; and
WHEREAS, all requirements of Resolution 97-177 have been met; and
[04-CMD-01077/2003608/1]86 12/10/25
PL20250000235 Floating Solar Facilities
Page 1 of 15
Words struck through are deleted,words underlined are added
17C
WHEREAS, the Collier County Planning Commission, sitting as the land planning
agency, did hold an advertised public hearing on December 4, 2025, and reviewed the proposed
amendments for consistency with the Comprehensive Plan and did recommend approval; and
WHEREAS, the Board of County Commissioners, in a manner prescribed by law, did hold
an advertised public hearing on February 24, 2026, and did take action concerning these
amendments to the LDC; and
WHEREAS, the subject amendments to the LDC are hereby determined by this Board to
be consistent with and to implement the Collier County Growth Management Plan as required by
Subsections 163.3194 (1) and 163.3202 (1), Florida Statutes; and
WHEREAS, this ordinance is adopted in compliance with and pursuant to the Community
Planning Act (F.S. § 163.3161 et seq.), and F.S. § 125.01(1)(t) and (1)(w); and
WHEREAS, this ordinance is adopted pursuant to the constitutional and home rule
powers of Fla. Const. Art. VIII, § 1(g); and
WHEREAS, all applicable substantive and procedural requirements of the law have
otherwise been met.
NOW, THEREFORE BE IT ORDAINED by the Board of County Commissioners of Collier
County, Florida, that:
SECTION ONE: RECITALS
The foregoing Recitals are true and correct and incorporated by reference herein as if
fully set forth.
SECTION TWO: FINDINGS OF FACT
The Board of Commissioners of Collier County, Florida, hereby makes the following
findings of fact:
1. Collier County, pursuant to § 163.3161, et seq., F.S., the Florida Community
Planning Act (herein after the "Act"), is required to prepare and adopt a comprehensive plan.
2. After adoption of the Comprehensive Plan, the Act and in particular §
163.3202(1). F.S., mandates that Collier County adopt land development regulations that are
consistent with and implement the adopted comprehensive plan.
3. Section 163.3201, F.S., provides that it is the intent of the Act that the adoption
and enforcement by Collier County of land development regulations for the total unincorporated
[04-CMD-01077/2003608/1186 12/10/25
PL20250000235 Floating Solar Facilities
Page 2 of 15
Words struck through are deleted,words underlined are added
17C
area shall be based on, be related to, and be a means of implementation for, the adopted
comprehensive plan.
4. Section 163.3194(1)(b), F.S., requires that all land development regulations
enacted or amended by Collier County be consistent with the adopted comprehensive plan, or
element or portion thereof, and any land regulations existing at the time of adoption which are
not consistent with the adopted comprehensive plan, or element or portion thereof, shall be
amended so as to be consistent.
5. Section 163.3202(3), F.S., states that the Act shall be construed to encourage the
use of innovative land development regulations.
6. On January 10, 1989, Collier County adopted the Collier County Growth
Management Plan (hereinafter the "Growth Management Plan" or "GMP") as its comprehensive
plan pursuant to the requirements of§ 163.3161 et seq., F.S.
7. Section 163.3194(1)(a), F.S., mandates that after a comprehensive plan, or
element or portion thereof, has been adopted in conformity with the Act, all development
undertaken by, and all actions taken in regard to development orders by, governmental agencies
in regard to land covered by such comprehensive plan or element shall be consistent with such
comprehensive plan or element as adopted.
8. Pursuant to § 163.3194(3)(a), F.S., a development order or land development
regulation shall be consistent with the comprehensive plan if the land uses, densities or
intensities, and other aspects of development are compatible with, and further the objectives,
policies, land uses, densities, or intensities in the comprehensive plan and if it meets all other
criteria enumerated by the local government.
9. Section 163.3194(3)(b), F.S., states that a development approved or undertaken
by a local government shall be consistent with the comprehensive plan if the land uses, densities
or intensities, capacity or size, timing, and other aspects of development are compatible with,
and further the objectives, policies, land uses, densities, or intensities in the comprehensive plan
and if it meets all other criteria enumerated by the local government.
10. On October 30, 1991, Collier County adopted the Collier County Land
Development Code, which became effective on November 13, 1991. The Land Development
Code adopted in Ordinance 91-102 was recodified and superseded by Ordinance 04-41.
11. Collier County finds that the Land Development Code is intended and necessary
to preserve and enhance the present advantages that exist in Collier County; to encourage the
most appropriate use of land, water and resources consistent with the public interest; to
overcome present handicaps; and to deal effectively with future problems that may result from
[04-CMD-01077/2003608/1]86 12/10/25
PL20250000235 Floating Solar Facilities
Page 3 of 15
Words struck through are deleted,words underlined are added
17C
the use and development of land within the total unincorporated area of Collier County and it is
intended that this Land Development Code preserve, promote, protect and improve the public
health, safety, comfort, good order, appearance, convenience and general welfare of Collier
County; to prevent the overcrowding of land and avoid the undue concentration of population; to
facilitate the adequate and efficient provision of transportation, water, sewerage, schools, parks,
recreational facilities, housing and other requirements and services; to conserve, develop, utilize
and protect natural resources within the jurisdiction of Collier County; to protect human,
environmental, social and economic resources; and to maintain through orderly growth and
development, the character and stability of present and future land uses and development in
Collier County.
12. It is the intent of the Board of County Commissioners of Collier County to
implement the Land Development Code in accordance with the provisions of the Collier County
Comprehensive Plan, Chapter 125, Fla. Stat., and Chapter 163, Fla. Stat., and through these
amendments to the Code.
SECTION THREE: ADOPTION OF AMENDMENTS TO THE LAND DEVELOPMENT CODE
SUBSECTION 3.A. AMENDMENTS TO SECTION 1.08.02 DEFINITIONS
Section 1.08.02 Definitions, of Ordinance 04-41, as amended, the Collier County Land
Development Code, is hereby amended to read as follows:
Section 1.08.02 Definitions
Fire station services, ancillary: Fire protection activities imperative to carry out the purposes of a
government establishment primarily engaged in firefighting, such as fire training camps, but
which is not required to be located at a fire station for that fire station to serve its function.
However, services designed to repair any firefighting equipment is not an ancillary fire station
service.
Floating solar facility: A solar facility as defined in Section 163.32051(2), Florida Statutes, as
amended, which is located on wastewater treatment ponds, abandoned limerock mine areas,
stormwater treatment ponds, reclaimed water ponds, or other water storage reservoirs. A solar
floating facility does not require any significant modification of drainage, flora or fauna, littoral
zone and dissolved oxygen for aquatic species survival at the site.
[04-CMD-01077/2003608/1]86 12/10/25
PL20250000235 Floating Solar Facilities
Page 4 of 15
Words struck through are deleted,words underlined are added
17C
Flood: A general and temporary condition of partial or complete inundation of normally dry land
area from the overflow of inland or tidal waters or the unusual and rapid accumulation or runoff of
surface waters from any source.
* * * * * * * * * * * *
Sidewalk: That portion of a right-of-way or cross or crosswalk, paved or otherwise surfaced,
intended for pedestrian use and also bicycle use. (See Chapters 4 and 10)
Solar facility: A production facility for electric power as defined in Section 163.3205(2), Florida
Statutes, which:
a. Uses photovoltaic modules to convert solar energy to electricity that may be
stored on site, delivered to a transmission system, and consumed primarily offsite;
and
b. Consists principally of photovoltaic modules, a mounting or racking system, power
inverters, transformers, collection systems, battery systems, fire suppression
equipment, and associated components; and
c. May include accessory administration or maintenance buildings, electric
transmission lines, substations, energy storage equipment, and related accessory
uses and structures.
Solid waste: Garbage, refuse, yard trash, clean debris, white goods, special waste, ashes, or
other discarded material, including solid, liquid, semisolid, or contained gaseous material
resulting from domestic, industrial, commercial, mining, agricultural, or governmental operations.
* * * * * * * * * * * * *
SUBSECTION 3.B. AMENDMENTS TO SECTION 2.03.01 AGRICULTURAL DISTRICTS
Section 2.03.01 Agricultural Districts, of Ordinance 04-41, as amended, the Collier County Land
Development Code, is hereby amended to read as follows:
Section 2.03.01 Agricultural Districts
A. Rural Agricultural District (A). The purpose and intent of the rural agricultural district (A) is
to provide lands for agricultural, pastoral, and rural land uses by accommodating
traditional agricultural, agricultural related activities and facilities, support facilities related
to agricultural needs, and conservation uses. Uses that are considered compatible to
agricultural uses that would not endanger or damage the agricultural, environmental,
potable water, or wildlife resources of the County, are permissible as conditional uses in
the A district. The A district corresponds to and implements the Agricultural/Rural land
use designation on the future land use map of the Collier County GMP, and in some
instances, may occur in the designated urban area. The maximum density permissible in
the rural agricultural district within the urban mixed-use district shall be guided, in part, by
the density rating system contained in the future land use element of the GMP. The
maximum density permissible or permitted in district A shall not exceed the density
[04-CMD-0 1077/2003608/1 I86 12/10/25
PL20250000235 Floating Solar Facilities
Page 5 of 15
Words struck through are deleted,words underlined are added
17C
permissible under the density rating system. The maximum density permissible in the A
district within the agricultural/rural district of the future land use element of the Collier
County GMP shall be consistent with and not exceed the density permissible or permitted
under the agricultural/rural district of the future land use element.
1. The following subsections identify the uses that are permissible by right and the
uses that are allowable as accessory or conditional uses in the rural agricultural
district (A).
* * * * * * * * * * * * *
c. Conditional uses. The following uses are permitted as conditional uses in
the rural agricultural district (A), subject to the standards and procedures
established in LDC section 10.08.00 and the Administrative Code.
* * * * * * * * * * * * *
27. Ancillary plants.
28. Floating solar facility, subject to LDC section 5.05.17.
SUBSECTION 3.C. AMENDMENTS TO SECTION 2.03.03 COMMERCIAL ZONING DISTRICTS
Section 2.03.03 Commercial Zoning Districts, of Ordinance 04-41, as amended, the Collier
County Land Development Code, is hereby amended to read as follows:
Section 2.03.03 Commercial Zoning Districts
A. Commercial Professional and General Office District (C-1). The purpose and intent of the
commercial professional and general office district C-1 is to allow a concentration of office
type buildings and land uses that are most compatible with, and located near, residential
areas. Most C-1 commercial, professional, and general office districts are contiguous to,
or when within a PUD, will be placed in close proximity to residential areas, and,
therefore, serve as a transitional zoning district between residential areas and higher
intensity commercial zoning districts. The type of office uses permitted are those that do
not have high traffic volumes throughout the day, which extend into the evening hours.
They will have morning and evening short-term peak conditions. The market support for
these office uses should be those with a localized basis of market support as opposed to
office functions requiring inter-jurisdictional and regional market support. Because office
functions have significant employment characteristics, which are compounded when
aggregations occur, certain personal service uses shall be permitted, to provide a
convenience to office-based employment. Such convenience commercial uses shall be
made an integral part of an office building as opposed to the singular use of a building.
Housing may also be a component of this district as provided for through conditional
use approval.
1. The following uses, as identified with a number from the Standard Industrial
Classification Manual (1987), or as otherwise provided for within this section are
permissible by right, or as accessory or conditional uses within the C-1
commercial professional and general office district.
[04-CMD-01077/2003608/1]86 12/10/25
PL20250000235 Floating Solar Facilities
Page 6 of 15
Words struck through are deleted,words underlined are added
17C
* * * * * * * * * * * * *
c. Conditional uses. The following uses are permissible as conditional uses in
the (C-1) commercial professional and general office district, subject to the
standards and procedures established in LDC section 10.08.00.
* * * * * * * * * * * * *
15. Veterinary services (0742, excluding outdoor kenneling).
16. Floating solar facility, subject to LDC section 5.05.17.
* * * * * * * * * * * *
B. Commercial Convenience District (C-2). The purpose and intent of the commercial
convenience district (C-2) is to provide lands where commercial establishments may be
located to provide the small-scale shopping and personal needs of the surrounding
residential land uses within convenient travel distance except to the extent that office uses
carried forward from the C-1 district will expand the traditional neighborhood size.
However, the intent of this district is that retail and service uses be of a nature that can be
economically supported by the immediate residential environs. Therefore, the uses should
allow for goods and services that households require on a daily basis, as opposed to those
goods and services that households seek for the most favorable economic price and,
therefore, require much larger trade areas. It is intended that the C-2 district implements
the Collier County GMP within those areas designated agricultural/rural;
estates neighborhood center district of the Golden Gate Master Plan; the neighborhood
center district of the Immokalee Master Plan; and the urban mixed use district of the future
land use element permitted in accordance with the locational criteria for commercial and
the goals, objectives, and policies as identified in the future land use element of the Collier
County GMP. The maximum density permissible in the C-2 district and the urban mixed
use land use designation shall be guided, in part, by the density rating system contained in
the future land use element of the Collier County GMP. The maximum density permissible
or permitted in a district shall not exceed the density permissible under the density rating
system.
1. The following uses, as identified with a number from the Standard Industrial
Classification Manual (1987), or as otherwise provided for within this section are
permissible by right, or as accessory or conditional uses within the C-2
commercial convenience district.
* * * * * * * * * * * * *
c. Conditional uses. The following uses are permissible as conditional uses in
the commercial convenience district (C-2), subject to the standards and
procedures established in LDC section 10.08.00.
* * * * * * * * * * * * *
2. Educational services (8211, 8222).
3. Floating solar facility, subject to LDC section 5.05.17.
3-4. Homeless shelters.
[04-CMD-01077/2003608/1]86 12/10/25
PL20250000235 Floating Solar Facilities
Page 7 of 15
Words struck through are deleted,words underlined are added
17C
(remainder of list to be renumbered}
C. Commercial Intermediate District (C-3). The purpose and intent of the commercial
intermediate district (C-3) is to provide for a wider variety of goods and services intended
for areas expected to receive a higher degree of automobile traffic. The type and variety
of goods and services are those that provide an opportunity for comparison shopping,
have a trade area consisting of several neighborhoods, and are preferably located at the
intersection of two-arterial level streets. Most activity centers meet this standard. This
district is also intended to allow all of the uses permitted in the C-1 and C-2 zoning
districts typically aggregated in planned shopping centers. This district is not intended to
permit wholesaling type of uses, or land uses that have associated with them the need for
outdoor storage of equipment and merchandise. A mixed-use project containing a
residential component is permitted in this district subject to the criteria established herein.
The C-3 district is permitted in accordance with the locational criteria for commercial and
the goals, objectives, and policies as identified in the future land use element of the
Collier County GMP. The maximum density permissible in the C-3 district and the urban
mixed use land use designation shall be guided, in part, by the density rating system
contained in the future land use element of the Collier County GMP. The
maximum density permissible or permitted in the C-3 district shall not exceed
the density permissible under the density rating system.
1. The following uses, as identified with a number from the Standard Industrial
Classification Manual (1987), or as otherwise provided for within this section are
permissible by right, or as accessory or conditional uses within the commercial
intermediate district (C-3).
* * * * * * * * * * * * *
c. Conditional uses. The following uses are permissible as conditional uses in
the commercial intermediate district (C-3), subject to the standards and
procedures established in LDC sections 4.02.02 and 10.08.00.
* * * * * * * * * * * * *
9. Fire protection (9224).
10. Floating solar facility, subject to LDC section 5.05.17.
4-0-11. Food stores with greater than 5,000 square feet of gross floor
area in the principal structure (groups 5411-5499).
(remainder of list to be renumbered}
* * * * * * * * * * * *
D. General Commercial District (C-4). The general commercial district (C-4) is intended to
provide for those types of land uses that attract large segments of the population at the
same time by virtue of scale, coupled with the type of activity. The purpose and intent of
the C-4 district is to provide the opportunity for the most diverse types of commercial
activities delivering goods and services, including entertainment and recreational
attractions, at a larger scale than the C-1 through C-3 districts. As such, all of the uses
[04-CM D-01077/2003608/1]86 12/10/25
PL20250000235 Floating Solar Facilities
Page 8 of 15
Words struck through are deleted,words underlined are added
17C
permitted in the C-1 through C-3 districts are also permitted in the C-4 district. The
outside storage of merchandise and equipment is prohibited, except to the extent that it is
associated with commercial activity conducted on-site such as, but not limited to,
automobile sales, marine vessels, and the renting and leasing of equipment. Activity
centers are suitable locations for the uses permitted by the C-4 district because most
activity centers are located at the intersection of arterial roads. Therefore, the uses in the
C-4 district can most be sustained by the transportation network of major roads. The C-4
district is permitted in accordance with the locational criteria for uses and the goals,
objectives, and policies as identified in the future land use element of the Collier County
GMP. The maximum density permissible or permitted in a district shall not exceed
the density permissible under the density rating system.
1. The following uses, as defined with a number from the Standard Industrial
Classification Manual (1987), or as otherwise provided for within this section are
permissible by right, or as accessory or conditional uses within the general
commercial district (C-4).
* * * * * * * * * * * * *
c. Conditional uses. The following uses are permitted as conditional uses in
the general commercial district (C-4), subject to the standards and
procedures established in LDC section 10.08.00.
* * * * * * * * * * * * *
10. Fishing, hunting and trapping (0912-0919).
11. Floating solar facility, subject to LDC section 5.05.17.
12. Fuel dealers (5983-5989).
{remainder of list to be renumbered}
* * * * * * * * * * * *
E. Heavy Commercial District (C-5). In addition to the uses provided in the C-4 zoning district,
the heavy commercial district (C-5) allows a range of more intensive commercial uses and
services which are generally those uses that tend to utilize outdoor space in the conduct of
the business. The C-5 district permits heavy commercial services such as full-service
automotive repair, and establishments primarily engaged in construction and specialized
trade activities such as contractor offices, plumbing, heating and air conditioning services,
and similar uses that typically have a need to store construction associated equipment and
supplies within an enclosed structure or have showrooms displaying the building material
for which they specialize. Outdoor storage yards are permitted with the requirement that
such yards are completely enclosed or opaquely screened. The C-5 district is permitted in
accordance with the locational criteria for uses and the goals, objectives, and policies as
identified in the future land use element of the Collier County GMP.
1. The following uses, as identified with a number from the Standard Industrial
Classification Manual (1987), or as otherwise provided for within this section are
[04-CMD-01077/2003608/1]86 12/10/25
PL20250000235 Floating Solar Facilities
Page 9 of 15
Words,truck through are deleted,words underlined are added
17C
permissible by right, or as accessory or conditional uses within the heavy
commercial district (C-5).
* * * * * * * * * * * * *
c. Conditional uses. The following uses are permissible as conditional uses in
the heavy commercial district (C-5), subject to the standards and
procedures established in LDC section 10.08.00.
* * * * * * * * * * * * *
5. Farm product raw materials (5153-5159).
6. Floating solar facility, subject to LDC section 5.05.17.
67. Fuel dealers (5983-5989).
(remainder of list to be renumbered}
* * * * * * * * * * * *
SUBSECTION 3.D. AMENDMENTS TO SECTION 2.03.04 INDUSTRIAL ZONING DISTRICTS
Section 2.03.04 Industrial Zoning Districts, of Ordinance 04-41, as amended, the Collier County
Land Development Code, is hereby amended to read as follows:
Section 2.03.04 Industrial Zoning Districts
A. Industrial District (I). The purpose and intent of the industrial district (I) is to provide lands
for manufacturing, processing, storage and warehousing, wholesaling, and distribution.
Service and commercial activities that are related to manufacturing, processing, storage
and warehousing, wholesaling, and distribution activities, as well as commercial uses
relating to automotive repair and heavy equipment sales and repair are also permissible
in the I district. The I district corresponds to and implements the industrial land use
designation on the future land use map of the Collier County GMP.
1. The following uses, as identified within the Standard Industrial Classification
Manual (1987), or as otherwise provided for within this section, are permitted as a
right, or as accessory or conditional uses within the industrial district (I).
* * * * * * * * * * * * *
c. Conditional uses. The following uses are permitted as conditional uses in
the industrial district (I), subject to the standards and procedures
established in LDC section 10.08.00.
* * * * * * * * * * * * *
5. Fabricated metal products (3482-3489).
[04-CMD-01077/2003 608/1]86 12/10/25
PL20250000235 Floating Solar Facilities
Page 10 of 15
Words struck through are deleted,words underlined are added
17C
6. Floating solar facility, subject to LDC section 5.05.17.
6-7. Food and kindred products (2011 and 2048 including slaughtering
plants for human and animal consumption).
{remainder of list to be renumbered}
B. Business Park District (BP). The purpose and intent of the business park district (BP) is to
provide a mix of industrial uses, corporate headquarters offices and
business/professional offices which complement each other and provide convenience
services for the employees within the district; and to attract businesses that create high
value added jobs. It is intended that the BP district be designed in an attractive park-like
environment, with low structural density and large landscaped areas for both the
functional use of buffering and enjoyment by the employees of the BP district. The BP
district is permitted by the urban mixed use, urban commercial, and urban-industrial
districts of the future land use element of the Collier County GMP.
1. The following uses, as identified within the latest edition of the Standard Industrial
Classification Manual, or as otherwise provided for within this section, are
permitted as of right, or as uses accessory to permitted primary or secondary
uses, or are conditional uses within the business park district.
* * * * * * * * * * * * *
d. Conditional uses:
1. Ancillary plants.
2. Floating solar facility, subject to LDC section 5.05.17.
2- 3. Mobile food dispensing vehicle(s), permanent, subject to LDC
section 5.05.16.
3:4. Vehicle racing - applicable to the Immokalee Regional Airport only.
* * * * * * * * * * * * *
SUBSECTION 3.E. AMENDMENTS TO SECTION 2.03.05 CIVIC AND INSTITUTIONAL
ZONING DISTRICTS
Section 2.03.05 Civic and Institutional Zoning Districts, of Ordinance 04-41, as amended, the
Collier County Land Development Code, is hereby amended to read as follows:
Section 2.03.05 Civic and Institutional Zoning Districts
[04-CMD-01077/2003608/1186 12/10/25
PL20250000235 Floating Solar Facilities
Page 11 of 15
Words struck through are deleted, words underlined are added
17C
A. Public Use District (P). The purpose and intent of public use district (P) is to
accommodate only local, state and federally owned or leased and operated government
facilities that provide essential public services. The P district is intended to facilitate the
coordination of urban services and land uses while minimizing the potential disruption of
the uses of nearby properties.
* * * * * * * * * * * *
4. The following uses are permitted as of right, or as accessory or conditional uses,
in the public use district (P).
a. Permitted uses.
* * * * * * * * * * * * *
7. Fairgrounds.
8. Floating solar facility, subject to LDC section 5.05.17.
8 9. Libraries.
{remainder of list to be renumbered)
* * * * * * * * * * * *
B. Community Facility District (CF). The purpose and intent of (CF) district is to implement
the GMP by permitting nonresidential land uses as generally identified in the urban
designation of the future land use element. These uses can be characterized as public
facilities, institutional uses, open space uses, recreational uses, water-related or
dependent uses, and other such uses generally serving the community at large. The
dimensional standards are intended to insure compatibility with existing or future nearby
residential development. The CF district is limited to properties within the urban mixed
use land use designation as identified on the future land use map.
1. The following uses are permitted as of right, or as accessory or conditional uses,
in the community facility district (CF).
* * * * * * * * * * * * *
c. Conditional uses. The following uses are permitted as conditional uses in
the community facility district (CF), subject to the standards and
procedures established in LDC section 10.08.00:
* * * * * * * * * * * * *
4. Community centers.
5. Floating solar facility, subject to LDC section 5.05.17.
[04-CMD-01077/2003608/1186 12/10/25
PL20250000235 Floating Solar Facilities
Page 12 of 15
Words str"c�`vcrack thro g i are deleted,words underlined are added
17C
5-6. Golf driving ranges.
{remainder of list to be renumbered}
* * * * * * * * * * * *
SUBSECTION 3.F. ADDITION OF NEW SECTION 5.05.17 FLOATING SOLAR FACILITIES
Section 5.05.17 Floating Solar Facilities, of Ordinance 04-41, as amended, the Collier County
Land Development Code, is hereby added to read as follows:
5.05.17 Floating Solar Facilities
A. Unless a waiver is approved in accordance with LDC section 5.05.17.B, a floating solar
facility must comply with all of the following requirements:
1. Placement location, coverage area and setbacks.
a. Floating solar facilities shall be located on wastewater treatment ponds,
abandoned limerock mine areas, stormwater treatment ponds, reclaimed
water ponds, or other water storage reservoirs. They shall not be in, on,
over, or upon, Wellfield Risk Management Special Treatment Overlay
Zones, aquatic preserves or environmentally protected lands that are
conservation and/or preservations designated lands, or an Everglades
Agricultural Area reservoir project if the floating solar facilities will have a
negative impact on that project.
b. The floating solar facility coverage area shall be contained within the lot or
parcel under unified control, on an impounded or controlled water body
with a water depth of six feet or more beneath the water surface coverage
area (measured above the dry season water table). The water surface
coverage area shall be limited to no greater than 60 percent. For a water
surface coverage area that exceeds 30 percent and up to 60 percent, a
project site-specific environmental assessment report of the ecological,
biological, and physical impacts shall be approved by the County Manager
or designee. A littoral shelf area of 30 percent or more shall be
established, planted, and contained within the water body. The installation
shall comply with the requirements set forth in LDC section 3.05.10, except
that the littoral shelf planting area shall be at least 30 percent or more.
c. Setbacks, landscaping and buffer standards shall apply pursuant to LDC
section 4.02.03, LDC section 4.06.02, and LDC section 4.06.05. Buffer and
landscaping requirements shall be in conformance with the underlying
zoning district.
d. The installation, when proposed on stormwater conveyance, retention, or
detention areas, shall not interfere with stormwater management
infrastructure and the volume and quantity of water flow.
[04-CMD-01077/2003608/1]86 12/10/25
PL20250000235 Floating Solar Facilities
Page 13 of 15
Words struck through are deleted,words underlined are added
17C
e. Power and communication lines running from the bank of land to
interconnect with any building, transformer or inverter shall be buried
underground.
2 Water quality control. A water quality survey shall be required to establish
baseline pre-development water quality conditions with the exception for
wastewater treatment ponds to ensure compliance with the State of Florida's
water quality standards (F.A.C. 62-302) and provide reasonable assurance that
stormwater management systems containing a floating solar facility which
discharge to the County's MS4 or waters of the state meet the standards. Long
term water quality monitoring shall be submitted one year after post installation
and annually thereafter to assess the effects on water quality, aqua flora and
fauna, and the corrosion environment from leaching materials. The floating solar
facility system shall be properly anchored and the water not energized.
3. Maintenance and Inspection. To prevent the occurrence of damage and
breakdown of the facility, a maintenance plan shall be submitted at the time of
Site Development Plan approval and an inspection report filed with the County
Manager or designee one year after the facility is permitted and operational, and
every three years thereafter.
4 Glare. Floating solar facilities shall not produce reflective glare that could affect or
impair aircraft traffic control or vehicular traffic. If a reflector to enhance production
is utilized, it shall control and minimize the glare to adjacent and abutting
properties.
5. Building permits. Permits shall be obtained for the construction of any structures
and other improvements to the extent required by the Florida Building Code and
National Electrical Code.
B. An applicant may request a waiver for approval of one or more of the provisions of LDC
section 5.05.17 A. through a Conditional Use request.
* X X X X X X K X * X X X
SECTION FOUR: CONFLICT AND SEVERABILITY
In the event that any provisions of this ordinance should result in an unresolved conflict
with the provisions of the Land Development Code (LDC) or Growth Management Plan (GMP),
the applicable provisions of the LDC or GMP shall prevail. In the event this Ordinance conflicts
with any other Ordinance of Collier County or other applicable law, the more restrictive shall
apply. If any phrase or portion of this Ordinance is held invalid or unconstitutional by any court of
competent jurisdiction, such portion shall be deemed a separate, distinct and independent
provision and such holding shall not affect the validity of the remaining portion.
[04-CM D-01077/2003608/1]86 12/10/25
PL20250000235 Floating Solar Facilities
Page 14 of 15
Words struck through are deleted,words underlined are added
1 7 C
SECTION FIVE: INCLUSION IN THE COLLIER COUNTY LAND DEVELOPME
NT CODE
The provisions of this Ordinance shall become and be made a part of the
Development Code of Collier County, Florida. The sections of the OrdinanceLand
renumbered or re-lettered to accomplish such, and the word "ordinance" may be changeyd
be
"section," "article," or any other appropriateged to
word.
SECTION SIX: EFFECTIVE DATE
This Ordinance shall become effective upon filing with the Florida Department of State
.
PASSED AND DULY ADOPTED by the Board of County Commissioners of Collier
County, Florida, this Jday of Fib v' art,
� , 2026.
ATTEST:
CRYSTAL ,I�`;�INZEL, CLERK BOARD OF COUNTY COMMISSIONERS
C OF COLLIER COUNTY FLORIDA
1,0
`, �.• ^y;�' Deputy Clerk By.
Dan Kowal hairman
Approved as to form and legality:
hits ordinance
Secretary of t-,te's (rr ice tf,c:
> day ofy7o6
and acknowledgem.rr~ of that
Heidi F. Ashton-Cicko fiiin received this _ Kati
Managing Assistant County Attorney of 1-ebcua�l, 2p2
By--_ k
04-CMD-01077/2086 !)oo_ ,�td Ctazr2
[04-CMD-01 077/2003608/1]86 12/10/25
PL20250000235 Floating Solar Facilities
Page 15 of 15
Words str-lic-k--threttgft are deleted,words undue are added
If
l�. t u u \I r,f 1 / C
-:i
; -,AO ,1:.
FLORIDA DEPARTMENT Of STATE
RON DESANTIS CORD BYRD
Governor Secretary of State
February 27, 2026
Crystal K. Kinzel
Clerk of Court
Collier County
3329 Tamiami Trail E, Suite #401
Naples, FL 34112
Dear Crystal Kinzel,
Pursuant to the provisions of Section 125.66, Florida Statutes, this will acknowledge receipt of your
electronic copy of Collier County Ordinance No. 26-09, which was filed in this office on February 27,
2026.
Sincerely,
Alexandra Leijon
Administrative Code and Register Director
AL/dp
R. A. Gray Building • 500 South Bronough Street • Tallahassee, Florida 32399-0250
Telephone: (850) 245-6270
C
Martha S. Vergara
From: Ailyn Padron <Ailyn.Padron@collier.gov>
Sent: Tuesday, January 27, 2026 1:49 PM
To: Minutes and Records; Legal Notice
Cc: Richard Henderlong; Eric Johnson;Wanda Rodriguez; Kathynell Crotteau
Subject: FW: 2/24/26 BCC-Ad Request for Floating Solar Facilities (LDCA) *2nd BCC Hearing*
(PL20250000235)
Attachments: Ad Request.pdf; Ordinance - PL20250000235 Floating Solar Facilities - 12.10.25.pdf; RE:
2/24/26 BCC- Ad Request for Floating Solar Facilities (LDCA) (PL20250000235)
Good afternoon, M&R,
Please post the attached Ad Request on the Collier Legal Notices webpage. The Ad will need to be advertised no later
than February 4th and run through the hearing date. Staff is approval is attached; CAO approval is below.
Please let me know if you have any questions.
Thank you.
Ailyn Padron
Management Analyst I
Zoning
(401 Office:239-252-5187
Collier Coun
2800 Horseshoe Dr.
Naples, Florida 34104 irs poi � CIAilvn.Padron aC�collier.gov
My email address has changed. Effective immediately, please update your contact
list to use this new address: Ailvn.Padron(a�collier.gov
From:Wanda Rodriguez<Wanda.Rodriguez@collier.gov>
Sent:Tuesday,January 27, 2026 11:11 AM
To:Ailyn Padron<Ailyn.Padron@collier.gov>; GMDZoningDivisionAds<GMDZoningDivisionAds@collier.gov>
Cc: Kathynell Crotteau<Kathynell.Crotteau@collier.gov>
Subject: re: 2/24/26 BCC-Ad Request for Floating Solar Facilities(LDCA) *2nd BCC Hearing* (PL20250000235)
Ailyn,
Attorney approval is below.
"Wanda Rodriguez, MCP, CPN1
Office of the County .attorney 17 C
(239) 252-8400
LERT I FIEO
11 (1 �
® PI,ORI D S EING
r '. /�1/Iy1�'N•'M■�11rp1/Y11YM/1�I�y��/m COWER COUNTY' n program qtl
Certifed Public Manager '/wSINwyE
My email address has changed. Effective immediately, please update your contact list to use this new
address: wanda.rodriguezAcollier.gov
From: Heidi Ashton <Heidi.Ashton@collier.gov>
Sent:Tuesday,January 27, 2026 11:03 AM
To: Wanda Rodriguez<Wanda.Rodriguez@collier.gov>
Cc: Kathynell Crotteau<Kathynell.Crotteau@collier.gov>
Subject: FW: for your approval: 2/24/26 BCC-Ad Request for Floating Solar Facilities (LDCA) *2nd BCC Hearing*
(PL20250000235)
Wanda,
Approved. Thank you!
Heidi Ashton-Cicko
Managing Assistant County Attorney
2800 North Horseshoe Drive, Suite 301
Naples, FL 34104
(239) 252-8773
Note new email: heidi.ashton@collier.gov
From: Kathynell Crotteau <Kathynell.Crotteau@collier.gov>
Sent:Tuesday,January 27, 2026 11:01 AM
To: Heidi Ashton <Heidi.Ashton@collier.gov>
Subject: FW:for your approval: 2/24/26 BCC-Ad Request for Floating Solar Facilities(LDCA) *2nd BCC Hearing*
(PL20250000235)
Heidi:
The ad request is correct per the 12-10-25 TO ordinance title.
.xatfiy Crotteau, legal.sssistant/Paralegal
Office of the Collier County Attorney
2800 North Horseshoe Drive,Suite 301
Naples, FL 34104
Phone: (239)252-6052
From: Heidi Ashton <Heidi.Ashton(a collier.gov>
Sent:Tuesday,January 27, 2026 10:38 AM
2
To: Kathynell Crotteau <Kathynell.Crotteau@collier.gov> 1 7 t
Subject: FW:for your approval: 2/24/26 BCC-Ad Request for Floating Solar Facilities (LDCA) *2nd BCC Hearing*
(PL20250000235)
Kathy,
Please check the title. Thank you!
Heidi Ashton-Cicko
Managing Assistant County Attorney
2800 North Horseshoe Drive, Suite 301
Naples, FL 34104
(239) 252-8773
Note new email: heidi.ashton@collier.gov
From: Wanda Rodriguez<Wanda.Rodriguez@collier.gov>
Sent:Tuesday,January 27, 2026 10:29 AM
To: Heidi Ashton <Heidi.Ashton@collier.gov>
Cc: Kathynell Crotteau <Kathynell.Crotteau@collier.gov>
Subject:for your approval: 2/24/26 BCC-Ad Request for Floating Solar Facilities (LDCA) *2nd BCC Hearing*
(PL20250000235)
Heidi,
For your approval. This will be the second hearing of this item.
'Wanda Rodriguez, .ACP, CT,M
Office of the County .Attorney
(239) 252-8400
LERTIF/pt,
A
Floa
9? vs.ox�oe a COWER coup(ACP y 1P �t /WyWWll\I}lylyly
NCECertified Public Manager
rlr+6law tsw.q
My email address has changed. Effective immediately, please update your contact list to use this new
address: wanda.rodriguez(c�collier.gov
From:Ailyn Padron<Ailyn.Padron@collier.gov>
Sent: Friday,January 23, 2026 1:12 PM
To:Wanda Rodriguez<Wanda.Rodriguez@collier.gov>
Cc: Richard Henderlong<Richard.Henderlong@collier.gov>; Eric Johnson <Eric.Johnson@collier.gov>; Kathynell Crotteau
<Kathynell.Crotteau@collier.gov>
Subject: 2/24/26 BCC-Ad Request for Floating Solar Facilities (LDCA) *2nd BCC Hearing* (PL20250000235)
Good afternoon, Wanda,
3
17C
Attached is the *Web* Ad Request, Ordinance, and approval for the referenced petition.The ad will need to be
advertised no later than February 4th and run through the hearing date.
Please let me know if you have any questions.
Thank you.
Ailyn Padron
Management Analyst I
Zoning
Office:239-252-5187
Collier Coun
2800 Horseshoe Dr.
Naples, Florida 34104 O
Ailyn.Padron a(�collier.gov
My email address has changed. Effective immediately, please update your contact
list to use this new address: Ailyn.Padronna collier.gov
Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a
public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing.
4
17C
Martha S. Vergara
From: Richard Henderlong <Richard.Henderlong@collier.gov>
Sent: Friday,January 23, 2026 12:08 PM
To: Ailyn Padron
Cc: Eric Johnson
Subject: RE: 2/24/26 BCC- Ad Request for Floating Solar Facilities (LDCA) (PL20250000235)
Follow Up Flag: Follow up
Flag Status: Flagged
Ailyn, Good to go! Thanks
Richard Henderlong
Planner Ill
Zoning
Office:239-252-2464
Collier Coun
2800 North Horseshoe Drive
Naples, Florida 34104 gil
—, � CBRichard.Henderlonc a�collier.gov �J
My email address has changed. Effective immediately, please update your contact
list to use this new address: Richard.Henderlonq@collier.gov
From:Ailyn Padron<Ailyn.Padron@collier.gov>
Sent: Friday,January 23, 2026 11:35 AM
To: Richard Henderlong<Richard.Henderlong@collier.gov>
Cc: Eric Johnson <Eric.Johnson@collier.gov>
Subject: 2/24/26 BCC-Ad Request for Floating Solar Facilities (LDCA) (PL20250000235)
Good morning, Rich,
Attached is the *Web* Ad Request and Ordinance for your petition. Please let me know if you approve and/or if changes
are needed by end of day.
Please let me know if you have any questions.
Thank you.
1
Ailyn Padron 1 7 C
Management Analyst I
Zoning
Office:239-252-5187
4r��`
Collier Coun
2800 Horseshoe Dr.
Naples, Florida 34104 I� �
Ailyn.Padroncollier.gov
My email address has changed. Effective immediately, please update your contact
list to use this new address: Ailvn.Padron(c�collier.gov
Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a
public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing.
2
I7C
NOTICE OF PUBLIC HEARING
NOTICE OF INTENT TO CONSIDER AN ORDINANCE
Notice is hereby given that a public hearing will be held by the Collier County Board of County
Commissioners (BCC) at 9:00 A.M. on February 24, 2026, in the Board of County Commissioners
Meeting Room,third floor, Collier Government Center, 3299 Tamiami Trail East,Naples,FL to consider:
AN ORDINANCE AMENDING ORDINANCE NUMBER 04-41, AS AMENDED, THE
COLLIER COUNTY LAND DEVELOPMENT CODE, WHICH INCLUDES THE
COMPREHENSIVE LAND REGULATIONS FOR THE UNINCORPORATED AREA OF
COLLIER COUNTY, FLORIDA, TO ADD A FLOATING SOLAR FACILITY AS A
PERMITTED USE IN CERTAIN NON-RESIDENTIAL ZONING DISTRICTS AND TO
ESTABLISH REGULATIONS FOR FLOATING SOLAR FACILITIES, BY PROVIDING
FOR: SECTION ONE, RECITALS; SECTION TWO, FINDINGS OF FACT; SECTION
THREE, ADOPTION OF AMENDMENTS TO THE LAND DEVELOPMENT CODE,
MORE SPECIFICALLY AMENDING THE FOLLOWING: CHAPTER ONE—GENERAL
PROVISIONS, INCLUDING SECTION 1.08.02 DEFINITIONS; CHAPTER TWO —
ZONING DISTRICTS AND USES, INCLUDING SECTION 2.03.01 AGRICULTURAL
DISTRICTS,SECTION 2.03.03 COMMERCIAL ZONING DISTRICTS,SECTION 2.03.04
INDUSTRIAL ZONING DISTRICTS, SECTION 2.03.05 CIVIC AND INSTITUTIONAL
ZONING DISTRICTS; CHAPTER FIVE — SUPPLEMENTAL STANDARDS FOR
SPECIFIC USES, BY ADDING A NEW SECTION 5.05.17 FLOATING SOLAR
FACILITIES; SECTION FOUR, CONFLICT AND SEVERABILITY; SECTION FIVE,
INCLUSION IN THE COLLIER COUNTY LAND DEVELOPMENT CODE; AND
SECTION SIX,EFFECTIVE DATE. [PL20250000235]
17C
N Collier county
1 Florida
SI
1-
Liki
11,
y
• ti - c _aeMoumes
A copy of the proposed Ordinance is on file with the Clerk to the Board and is available for inspection.All interested
parties are invited to attend and be heard.
All persons wishing to speak on any agenda item must register with the County Manager prior to presentation of the
agenda item to be addressed.Individual speakers will be limited to three(3)minutes on any item.The selection of any
individual to speak on behalf of an organization or group is encouraged.If recognized by the Chairman,a spokesperson
for a group or organization may be allotted ten (10)minutes to speak on an item. Written materials intended to be
considered by the Board shall be submitted to the appropriate County staff a minimum of seven(7)days prior to the
public hearing.All materials used in presentations before the Board will become a permanent part of the record.
As part of an ongoing initiative to encourage public involvement, the public will have the opportunity to provide
public comments remotely, as well as in person, during this proceeding. Individuals who would like to participate
remotely should register through the link provided within the specific event/meeting entry on the Calendar of Events
on the County website at www.collier.gov/Calendar-Events-directory after the agenda is posted on the County
website. Registration should be done in advance of the public meeting, or any deadline specified within the public
meeting notice.Individuals who register will receive an email in advance of the public hearing detailing how they can
participate remotely in this meeting. Remote participation is provided as a courtesy and is at the user's risk. The
County is not responsible for technical issues. For additional information about the meeting, please call Geoffrey
Willig at 252-8369 or email to Geoffrev.Willig@collier.gov.
Any person who decides to appeal any decision of the Board will need a record of the proceedings pertaining thereto
and therefore, may need to ensure that a verbatim record of the proceedings is made, which record includes the
testimony and evidence upon which the appeal is based.
If you are a person with a disability who needs any accommodation in order to participate in this proceeding,you are
entitled, at no cost to you, to the provision of certain assistance. Please contact the Collier County Facilities
Management Division, located at 3335 Tamiami Trail East, Suite 101,Naples,FL 34112-5356,(239)252-8380, at
17
least two(2)days prior to the meeting.Assisted listening devices for the hearing impaired are available in the Board
of County Commissioners Office.
BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY,FLORIDA
DAN KOWAL,CHAIRMAN
CRYSTAL K.KINZEL,
CLERK OF THE CIRCUIT COURT AND COMPTROLLER
DRAFT 12/10/25 '
ORDINANCE NO. 26 —
AN ORDINANCE AMENDING ORDINANCE NUMBER 04-41, AS
AMENDED, THE COLLIER COUNTY LAND DEVELOPMENT CODE,
WHICH INCLUDES THE COMPREHENSIVE LAND REGULATIONS FOR
THE UNINCORPORATED AREA OF COLLIER COUNTY, FLORIDA, TO
ADD A FLOATING SOLAR FACILITY AS A PERMITTED USE IN
CERTAIN NON-RESIDENTIAL ZONING DISTRICTS AND TO
ESTABLISH REGULATIONS FOR FLOATING SOLAR FACILITIES, BY
PROVIDING FOR: SECTION ONE, RECITALS; SECTION TWO,
FINDINGS OF FACT; SECTION THREE, ADOPTION OF AMENDMENTS
TO THE LAND DEVELOPMENT CODE, MORE SPECIFICALLY
AMENDING THE FOLLOWING: CHAPTER ONE — GENERAL
PROVISIONS, INCLUDING SECTION 1.08.02 DEFINITIONS; CHAPTER
TWO — ZONING DISTRICTS AND USES, INCLUDING SECTION 2.03.01
AGRICULTURAL DISTRICTS, SECTION 2.03.03 COMMERCIAL
ZONING DISTRICTS, SECTION 2.03.04 INDUSTRIAL ZONING
DISTRICTS, SECTION 2.03.05 CIVIC AND INSTITUTIONAL ZONING
DISTRICTS; CHAPTER FIVE — SUPPLEMENTAL STANDARDS FOR
SPECIFIC USES, BY ADDING A NEW SECTION 5.05.17 FLOATING
SOLAR FACILITIES; SECTION FOUR, CONFLICT AND SEVERABILITY;
SECTION FIVE, INCLUSION IN THE COLLIER COUNTY LAND
DEVELOPMENT CODE; AND SECTION SIX, EFFECTIVE DATE.
(PL20250000235)
Recitals
WHEREAS, on October 30, 1991, the Collier County Board of County Commissioners
adopted Ordinance No. 91-102, the Collier County Land Development Code (hereinafter LDC),
which was subsequently amended; and
WHEREAS, the Collier County Board of County Commissioners (Board) on June 22,
2004, adopted Ordinance No. 04-41, which repealed and superseded Ordinance No. 91-102, as
amended, the Collier County Land Development Code, which had an effective date of October
18, 2004; and
WHEREAS, on March 18, 1997, the Board adopted Resolution 97-177 establishing local
requirements and procedures for amending the LDC; and
WHEREAS, all requirements of Resolution 97-177 have been met; and
[25-LDS-00344/1989786/1]86 12/10/25
PL20250000235 Floating Solar Facilities
Page 1 of 15
Words struck through are deleted,words underlined are added
17
DRAFT 12/10/25
WHEREAS, the Collier County Planning Commission, sitting as the land planning
agency, did hold an advertised public hearing on December 4, 2025, and reviewed the proposed
amendments for consistency with the Comprehensive Plan and did recommend approval; and
WHEREAS, the Board of County Commissioners, in a manner prescribed by law, did hold
an advertised public hearing on , 2026, and did take action concerning these
amendments to the LDC; and
WHEREAS, the subject amendments to the LDC are hereby determined by this Board to
be consistent with and to implement the Collier County Growth Management Plan as required by
Subsections 163.3194 (1) and 163.3202 (1), Florida Statutes; and
WHEREAS, this ordinance is adopted in compliance with and pursuant to the Community
Planning Act (F.S. § 163.3161 etseq.), and F.S. § 125.01(1)(t) and (1)(w); and
WHEREAS, this ordinance is adopted pursuant to the constitutional and home rule
powers of Fla. Const. Art. VIII, § 1(g); and
WHEREAS, all applicable substantive and procedural requirements of the law have
otherwise been met.
NOW, THEREFORE BE IT ORDAINED by the Board of County Commissioners of Collier
County, Florida, that:
SECTION ONE: RECITALS
The foregoing Recitals are true and correct and incorporated by reference herein as if
fully set forth.
SECTION TWO: FINDINGS OF FACT
The Board of Commissioners of Collier County, Florida, hereby makes the following
findings of fact:
1. Collier County, pursuant to § 163.3161, et seq., F.S., the Florida Community
Planning Act (herein after the "Act"), is required to prepare and adopt a comprehensive plan.
2. After adoption of the Comprehensive Plan, the Act and in particular §
163.3202(1). F.S., mandates that Collier County adopt land development regulations that are
consistent with and implement the adopted comprehensive plan.
3. Section 163.3201, F.S., provides that it is the intent of the Act that the adoption
and enforcement by Collier County of land development regulations for the total unincorporated
[25-LDS-00344/1989786/1]86 12/10/25
PL20250000235 Floating Solar Facilities
Page 2 of 15
Words struck through are deleted,words underlined are added
I C
DRAFT 12/10/25
area shall be based on, be related to, and be a means of implementation for, the adopted
comprehensive plan.
4. Section 163.3194(1)(b), F.S., requires that all land development regulations
enacted or amended by Collier County be consistent with the adopted comprehensive plan, or
element or portion thereof, and any land regulations existing at the time of adoption which are
not consistent with the adopted comprehensive plan, or element or portion thereof, shall be
amended so as to be consistent.
5. Section 163.3202(3), F.S., states that the Act shall be construed to encourage the
use of innovative land development regulations.
6. On January 10, 1989, Collier County adopted the Collier County Growth
Management Plan (hereinafter the "Growth Management Plan" or "GMP") as its comprehensive
plan pursuant to the requirements of§ 163.3161 et seq., F.S.
7. Section 163.3194(1)(a), F.S., mandates that after a comprehensive plan, or
element or portion thereof, has been adopted in conformity with the Act, all development
undertaken by, and all actions taken in regard to development orders by, governmental agencies
in regard to land covered by such comprehensive plan or element shall be consistent with such
comprehensive plan or element as adopted.
8. Pursuant to § 163.3194(3)(a), F.S., a development order or land development
regulation shall be consistent with the comprehensive plan if the land uses, densities or
intensities, and other aspects of development are compatible with, and further the objectives,
policies, land uses, densities, or intensities in the comprehensive plan and if it meets all other
criteria enumerated by the local government.
9. Section 163.3194(3)(b), F.S., states that a development approved or undertaken
by a local government shall be consistent with the comprehensive plan if the land uses, densities
or intensities, capacity or size, timing, and other aspects of development are compatible with,
and further the objectives, policies, land uses, densities, or intensities in the comprehensive plan
and if it meets all other criteria enumerated by the local government.
10. On October 30, 1991, Collier County adopted the Collier County Land
Development Code, which became effective on November 13, 1991. The Land Development
Code adopted in Ordinance 91-102 was recodified and superseded by Ordinance 04-41.
11. Collier County finds that the Land Development Code is intended and necessary
to preserve and enhance the present advantages that exist in Collier County; to encourage the
most appropriate use of land, water and resources consistent with the public interest; to
overcome present handicaps; and to deal effectively with future problems that may result from
[25-LDS-00344/1989786/1]86 12/10/25
PL20250000235 Floating Solar Facilities
Page 3of15
Words strut are deleted,words underlined are added
DRAFT 12/10/25 `
the use and development of land within the total unincorporated area of Collier County and it is
intended that this Land Development Code preserve, promote, protect and improve the public
health, safety, comfort, good order, appearance, convenience and general welfare of Collier
County; to prevent the overcrowding of land and avoid the undue concentration of population; to
facilitate the adequate and efficient provision of transportation, water, sewerage, schools, parks,
recreational facilities, housing and other requirements and services; to conserve, develop, utilize
and protect natural resources within the jurisdiction of Collier County; to protect human,
environmental, social and economic resources; and to maintain through orderly growth and
development, the character and stability of present and future land uses and development in
Collier County.
12. It is the intent of the Board of County Commissioners of Collier County to
implement the Land Development Code in accordance with the provisions of the Collier County
Comprehensive Plan, Chapter 125, Fla. Stat., and Chapter 163, Fla. Stat., and through these
amendments to the Code.
SECTION THREE: ADOPTION OF AMENDMENTS TO THE LAND DEVELOPMENT CODE
SUBSECTION 3.A. AMENDMENTS TO SECTION 1.08.02 DEFINITIONS
Section 1.08.02 Definitions, of Ordinance 04-41, as amended, the Collier County Land
Development Code, is hereby amended to read as follows:
Section 1.08.02 Definitions
Fire station services, ancillary: Fire protection activities imperative to carry out the purposes of a
government establishment primarily engaged in firefighting, such as fire training camps, but
which is not required to be located at a fire station for that fire station to serve its function.
However, services designed to repair any firefighting equipment is not an ancillary fire station
service.
Floating solar facility: A solar facility as defined in Section 163.32051(2), Florida Statutes, as
amended, which is located on wastewater treatment ponds, abandoned limerock mine areas,
stormwater treatment ponds, reclaimed water ponds, or other water storage reservoirs. A solar
floating facility does not require any significant modification of drainage, flora or fauna, littoral
zone and dissolved oxygen for aquatic species survival at the site.
[25-LDS-00344/1989786/1]86 12/10/25
PL20250000235 Floating Solar Facilities
Page 4 of 15
Words struck through are deleted,words underlined are added
17C
DRAFT 12/10/25
Flood: A general and temporary condition of partial or complete inundation of normally dry land
area from the overflow of inland or tidal waters or the unusual and rapid accumulation or runoff of
surface waters from any source.
* * * * * * * * * * * *
Sidewalk: That portion of a right-of-way or cross or crosswalk, paved or otherwise surfaced,
intended for pedestrian use and also bicycle use. (See Chapters 4 and 10)
Solar facility: A production facility for electric power as defined in Section 163.3205(2), Florida
Statutes, which:
a. Uses photovoltaic modules to convert solar energy to electricity that may be
stored on site, delivered to a transmission system, and consumed primarily offsite;
and
b. Consists principally of photovoltaic modules, a mounting or racking system, power
inverters, transformers, collection systems, battery systems, fire suppression
equipment, and associated components; and
c. May include accessory administration or maintenance buildings, electric
transmission lines, substations, energy storage equipment, and related accessory
uses and structures.
Solid waste: Garbage, refuse, yard trash, clean debris, white goods, special waste, ashes, or
other discarded material, including solid, liquid, semisolid, or contained gaseous material
resulting from domestic, industrial, commercial, mining, agricultural, or governmental operations.
* * * * * * * * * * * * *
SUBSECTION 3.B. AMENDMENTS TO SECTION 2.03.01 AGRICULTURAL DISTRICTS
Section 2.03.01 Agricultural Districts, of Ordinance 04-41, as amended, the Collier County Land
Development Code, is hereby amended to read as follows:
Section 2.03.01 Agricultural Districts
A. Rural Agricultural District (A). The purpose and intent of the rural agricultural district (A) is
to provide lands for agricultural, pastoral, and rural land uses by accommodating
traditional agricultural, agricultural related activities and facilities, support facilities related
to agricultural needs, and conservation uses. Uses that are considered compatible to
agricultural uses that would not endanger or damage the agricultural, environmental,
potable water, or wildlife resources of the County, are permissible as conditional uses in
the A district. The A district corresponds to and implements the Agricultural/Rural land
use designation on the future land use map of the Collier County GMP, and in some
instances, may occur in the designated urban area. The maximum density permissible in
the rural agricultural district within the urban mixed-use district shall be guided, in part, by
the density rating system contained in the future land use element of the GMP. The
maximum density permissible or permitted in district A shall not exceed the density
[25-LDS-00344/1989786/1]86 12/10/25
PL20250000235 Floating Solar Facilities
Page 5of15
Words strusk-tlifeugh are deleted,words underlined are added
i C
DRAFT 12/10/25
permissible under the density rating system. The maximum density permissible in the A
district within the agricultural/rural district of the future land use element of the Collier
County GMP shall be consistent with and not exceed the density permissible or permitted
under the agricultural/rural district of the future land use element.
1. The following subsections identify the uses that are permissible by right and the
uses that are allowable as accessory or conditional uses in the rural agricultural
district (A).
* * * * * * * * * * * * *
c. Conditional uses. The following uses are permitted as conditional uses in
the rural agricultural district (A), subject to the standards and procedures
established in LDC section 10.08.00 and the Administrative Code.
* * * * * * * * * * * * *
27. Ancillary plants.
28. Floating solar facility, subject to LDC section 5.05.17.
SUBSECTION 3.C. AMENDMENTS TO SECTION 2.03.03 COMMERCIAL ZONING DISTRICTS
Section 2.03.03 Commercial Zoning Districts, of Ordinance 04-41, as amended, the Collier
County Land Development Code, is hereby amended to read as follows:
Section 2.03.03 Commercial Zoning Districts
A. Commercial Professional and General Office District (C-1). The purpose and intent of the
commercial professional and general office district C-1 is to allow a concentration of office
type buildings and land uses that are most compatible with, and located near, residential
areas. Most C-1 commercial, professional, and general office districts are contiguous to,
or when within a PUD, will be placed in close proximity to residential areas, and,
therefore, serve as a transitional zoning district between residential areas and higher
intensity commercial zoning districts. The type of office uses permitted are those that do
not have high traffic volumes throughout the day, which extend into the evening hours.
They will have morning and evening short-term peak conditions. The market support for
these office uses should be those with a localized basis of market support as opposed to
office functions requiring inter-jurisdictional and regional market support. Because office
functions have significant employment characteristics, which are compounded when
aggregations occur, certain personal service uses shall be permitted, to provide a
convenience to office-based employment. Such convenience commercial uses shall be
made an integral part of an office building as opposed to the singular use of a building.
Housing may also be a component of this district as provided for through conditional
use approval.
1. The following uses, as identified with a number from the Standard Industrial
Classification Manual (1987), or as otherwise provided for within this section are
permissible by right, or as accessory or conditional uses within the C-1
commercial professional and general office district.
[25-LDS-00344/1989786/1]86 12/10/25
PL20250000235 Floating Solar Facilities
Page 6 of 15
Words etruck through are deleted,words underlined are added
DRAFT 12/10/25
* * * * * * * * * * * * *
c. Conditional uses. The following uses are permissible as conditional uses in
the (C-1) commercial professional and general office district, subject to the
standards and procedures established in LDC section 10.08.00.
* * * * * * * * * * * * *
15. Veterinary services (0742, excluding outdoor kenneling).
16. Floating solar facility, subject to LDC section 5.05.17.
* * * * * * * * * * * *
B. Commercial Convenience District (C-2). The purpose and intent of the commercial
convenience district (C-2) is to provide lands where commercial establishments may be
located to provide the small-scale shopping and personal needs of the surrounding
residential land uses within convenient travel distance except to the extent that office uses
carried forward from the C-1 district will expand the traditional neighborhood size.
However, the intent of this district is that retail and service uses be of a nature that can be
economically supported by the immediate residential environs. Therefore, the uses should
allow for goods and services that households require on a daily basis, as opposed to those
goods and services that households seek for the most favorable economic price and,
therefore, require much larger trade areas. It is intended that the C-2 district implements
the Collier County GMP within those areas designated agricultural/rural;
estates neighborhood center district of the Golden Gate Master Plan; the neighborhood
center district of the Immokalee Master Plan; and the urban mixed use district of the future
land use element permitted in accordance with the locational criteria for commercial and
the goals, objectives, and policies as identified in the future land use element of the Collier
County GMP. The maximum density permissible in the C-2 district and the urban mixed
use land use designation shall be guided, in part, by the density rating system contained in
the future land use element of the Collier County GMP. The maximum density permissible
or permitted in a district shall not exceed the density permissible under the density rating
system.
1. The following uses, as identified with a number from the Standard Industrial
Classification Manual (1987), or as otherwise provided for within this section are
permissible by right, or as accessory or conditional uses within the C-2
commercial convenience district.
* * * * * * * * * * * * *
c. Conditional uses. The following uses are permissible as conditional uses in
the commercial convenience district (C-2), subject to the standards and
procedures established in LDC section 10.08.00.
* * * * * * * * * * * * *
2. Educational services (8211, 8222).
3. Floatinq solar facility, subject to LDC section 5.05.17.
3-4. Homeless shelters.
[25-LDS-00344/1989786/1]86 12/10/25
PL20250000235 Floating Solar Facilities
Page 7 of 15
Words strut' h are deleted,words underlined are added
C
DRAFT 12/10/25
{remainder of list to be renumbered)
* * * * * * * * * * * *
C. Commercial Intermediate District (C-3). The purpose and intent of the commercial
intermediate district (C-3) is to provide for a wider variety of goods and services intended
for areas expected to receive a higher degree of automobile traffic. The type and variety
of goods and services are those that provide an opportunity for comparison shopping,
have a trade area consisting of several neighborhoods, and are preferably located at the
intersection of two-arterial level streets. Most activity centers meet this standard. This
district is also intended to allow all of the uses permitted in the C-1 and C-2 zoning
districts typically aggregated in planned shopping centers. This district is not intended to
permit wholesaling type of uses, or land uses that have associated with them the need for
outdoor storage of equipment and merchandise. A mixed-use project containing a
residential component is permitted in this district subject to the criteria established herein.
The C-3 district is permitted in accordance with the locational criteria for commercial and
the goals, objectives, and policies as identified in the future land use element of the
Collier County GMP. The maximum density permissible in the C-3 district and the urban
mixed use land use designation shall be guided, in part, by the density rating system
contained in the future land use element of the Collier County GMP. The
maximum density permissible or permitted in the C-3 district shall not exceed
the density permissible under the density rating system.
1. The following uses, as identified with a number from the Standard Industrial
Classification Manual (1987), or as otherwise provided for within this section are
permissible by right, or as accessory or conditional uses within the commercial
intermediate district (C-3).
* * * * * * * * * * * * *
c. Conditional uses. The following uses are permissible as conditional uses in
the commercial intermediate district (C-3), subject to the standards and
procedures established in LDC sections 4.02.02 and 10.08.00.
* * * * * * * * * * * * *
9. Fire protection (9224).
10. Floating solar facility, subject to LDC section 5.05.17.
44-11. Food stores with greater than 5,000 square feet of gross floor
area in the principal structure (groups 5411-5499).
{remainder of list to be renumbered)
* * * * * * * * * * * *
D. General Commercial District (C-4). The general commercial district (C-4) is intended to
provide for those types of land uses that attract large segments of the population at the
same time by virtue of scale, coupled with the type of activity. The purpose and intent of
the C-4 district is to provide the opportunity for the most diverse types of commercial
activities delivering goods and services, including entertainment and recreational
attractions, at a larger scale than the C-1 through C-3 districts. As such, all of the uses
[25-LDS-00344/1989786/1186 12/10/25
PL20250000235 Floating Solar Facilities
Page 8 of 15
Words strue' rough are deleted,words underlined are added
DRAFT 12/10/25 17
permitted in the C-1 through C-3 districts are also permitted in the C-4 district. The
outside storage of merchandise and equipment is prohibited, except to the extent that it is
associated with commercial activity conducted on-site such as, but not limited to,
automobile sales, marine vessels, and the renting and leasing of equipment. Activity
centers are suitable locations for the uses permitted by the C-4 district because most
activity centers are located at the intersection of arterial roads. Therefore, the uses in the
C-4 district can most be sustained by the transportation network of major roads. The C-4
district is permitted in accordance with the locational criteria for uses and the goals,
objectives, and policies as identified in the future land use element of the Collier County
GMP. The maximum density permissible or permitted in a district shall not exceed
the density permissible under the density rating system.
1. The following uses, as defined with a number from the Standard Industrial
Classification Manual (1987), or as otherwise provided for within this section are
permissible by right, or as accessory or conditional uses within the general
commercial district (C-4).
* * * * * * * * * * * * *
c. Conditional uses. The following uses are permitted as conditional uses in
the general commercial district (C-4), subject to the standards and
procedures established in LDC section 10.08.00.
* * * * * * * * * * * * *
10. Fishing, hunting and trapping (0912-0919).
11. Floating solar facility, subject to LDC section 5.05.17.
12. Fuel dealers (5983-5989).
(remainder of list to be renumbered)
* * * * * * * * * * * *
E. Heavy Commercial District (C-5). In addition to the uses provided in the C-4 zoning district,
the heavy commercial district (C-5) allows a range of more intensive commercial uses and
services which are generally those uses that tend to utilize outdoor space in the conduct of
the business. The C-5 district permits heavy commercial services such as full-service
automotive repair, and establishments primarily engaged in construction and specialized
trade activities such as contractor offices, plumbing, heating and air conditioning services,
and similar uses that typically have a need to store construction associated equipment and
supplies within an enclosed structure or have showrooms displaying the building material
for which they specialize. Outdoor storage yards are permitted with the requirement that
such yards are completely enclosed or opaquely screened. The C-5 district is permitted in
accordance with the locational criteria for uses and the goals, objectives, and policies as
identified in the future land use element of the Collier County GMP.
1. The following uses, as identified with a number from the Standard Industrial
Classification Manual (1987), or as otherwise provided for within this section are
[25-LDS-00344/1989786/1]86 12/10/25
PL20250000235 Floating Solar Facilities
Page 9 of 15
Words stfttelE-threugh are deleted,words underlined are added
DRAFT 12/10/25 17 C
permissible by right, or as accessory or conditional uses within the heavy
commercial district (C-5).
* * * * * * * * * * * * *
c. Conditional uses. The following uses are permissible as conditional uses in
the heavy commercial district (C-5), subject to the standards and
procedures established in LDC section 10.08.00.
* * * * * * * * * * * * *
5. Farm product raw materials (5153-5159).
6. Floating solar facility, subject to LDC section 5.05.17.
67. Fuel dealers (5983-5989).
{remainder of list to be renumbered)
* * * * * * * * * * * *
SUBSECTION 3.D. AMENDMENTS TO SECTION 2.03.04 INDUSTRIAL ZONING DISTRICTS
Section 2.03.04 Industrial Zoning Districts, of Ordinance 04-41, as amended, the Collier County
Land Development Code, is hereby amended to read as follows:
Section 2.03.04 Industrial Zoning Districts
A. Industrial District (I). The purpose and intent of the industrial district (I) is to provide lands
for manufacturing, processing, storage and warehousing, wholesaling, and distribution.
Service and commercial activities that are related to manufacturing, processing, storage
and warehousing, wholesaling, and distribution activities, as well as commercial uses
relating to automotive repair and heavy equipment sales and repair are also permissible
in the I district. The I district corresponds to and implements the industrial land use
designation on the future land use map of the Collier County GMP.
1. The following uses, as identified within the Standard Industrial Classification
Manual (1987), or as otherwise provided for within this section, are permitted as a
right, or as accessory or conditional uses within the industrial district (I).
* * * * * * * * * * * * *
c. Conditional uses. The following uses are permitted as conditional uses in
the industrial district (I), subject to the standards and procedures
established in LDC section 10.08.00.
* * * * * * * * * * * * *
5. Fabricated metal products (3482-3489).
[25-LDS-00344/1989786/1]86 12/10/25
PL20250000235 Floating Solar Facilities
Page 10 of 15
Words struc'i-threugh are deleted,words underlined are added
C
DRAFT 12/10/25
6. Floatinq solar facility, subject to LDC section 5.05.17.
6-7. Food and kindred products (2011 and 2048 including slaughtering
plants for human and animal consumption).
{remainder of list to be renumbered)
* * * * * * * * * * * *
B. Business Park District (BP). The purpose and intent of the business park district (BP) is to
provide a mix of industrial uses, corporate headquarters offices and
business/professional offices which complement each other and provide convenience
services for the employees within the district; and to attract businesses that create high
value added jobs. It is intended that the BP district be designed in an attractive park-like
environment, with low structural density and large landscaped areas for both the
functional use of buffering and enjoyment by the employees of the BP district. The BP
district is permitted by the urban mixed use, urban commercial, and urban-industrial
districts of the future land use element of the Collier County GMP.
1. The following uses, as identified within the latest edition of the Standard Industrial
Classification Manual, or as otherwise provided for within this section, are
permitted as of right, or as uses accessory to permitted primary or secondary
uses, or are conditional uses within the business park district.
* * * * * * * * * * * * *
d. Conditional uses:
1. Ancillary plants.
2. Floating solar facility, subject to LDC section 5.05.17.
2 3. Mobile food dispensing vehicle(s), permanent, subject to LDC
section 5.05.16.
3-4. Vehicle racing - applicable to the Immokalee Regional Airport only.
* * * * * * * * * * * * *
SUBSECTION 3.E. AMENDMENTS TO SECTION 2.03.05 CIVIC AND INSTITUTIONAL
ZONING DISTRICTS
Section 2.03.05 Civic and Institutional Zoning Districts, of Ordinance 04-41, as amended, the
Collier County Land Development Code, is hereby amended to read as follows:
Section 2.03.05 Civic and Institutional Zoning Districts
[25-LDS-00344/1989786/1]86 12/10/25
PL20250000235 Floating Solar Facilities
Page 11 of 15
Words strtt^' r are deleted,words underlined are added
17C
DRAFT 12/10/25
A. Public Use District (P). The purpose and intent of public use district (P) is to
accommodate only local, state and federally owned or leased and operated government
facilities that provide essential public services. The P district is intended to facilitate the
coordination of urban services and land uses while minimizing the potential disruption of
the uses of nearby properties.
* * * * * * * * * * * *
4. The following uses are permitted as of right, or as accessory or conditional uses,
in the public use district (P).
a. Permitted uses.
* * * * * * * * * * * * *
7. Fairgrounds.
8. Floating solar facility, subject to LDC section 5.05.17.
8 9. Libraries.
(remainder of list to be renumbered)
* * * * * * * * * * * *
B. Community Facility District (CF). The purpose and intent of (CF) district is to implement
the GMP by permitting nonresidential land uses as generally identified in the urban
designation of the future land use element. These uses can be characterized as public
facilities, institutional uses, open space uses, recreational uses, water-related or
dependent uses, and other such uses generally serving the community at large. The
dimensional standards are intended to insure compatibility with existing or future nearby
residential development. The CF district is limited to properties within the urban mixed
use land use designation as identified on the future land use map.
1. The following uses are permitted as of right, or as accessory or conditional uses,
in the community facility district (CF).
* * * * * * * * * * * * *
c. Conditional uses. The following uses are permitted as conditional uses in
the community facility district (CF), subject to the standards and
procedures established in LDC section 10.08.00:
* * * * * * * * * * * * *
4. Community centers.
5. Floating solar facility, subject to LDC section 5.05.17.
[25-LDS-00344/1989786/1j86 12/10/25
PL20250000235 Floating Solar Facilities
Page 12 of 15
Words struckgh are deleted,words underlined are added
DRAFT 12/10/25
5-6. Golf driving ranges.
{remainder of list to be renumbered)
* * * * * * * * * * * *
SUBSECTION 3.F. ADDITION OF NEW SECTION 5.05.17 FLOATING SOLAR FACILITIES
Section 5.05.17 Floating Solar Facilities, of Ordinance 04-41, as amended, the Collier County
Land Development Code, is hereby added to read as follows:
5.05.17 Floating Solar Facilities
A. Unless a waiver is approved in accordance with LDC section 5.05.17.B, a floating solar
facility must comply with all of the following requirements:
1. Placement location, coverage area and setbacks.
a. Floating solar facilities shall be located on wastewater treatment ponds,
abandoned limerock mine areas, stormwater treatment ponds, reclaimed
water ponds, or other water storaqe reservoirs. They shall not be in, on,
over, or upon, Wellfield Risk Management Special Treatment Overlay
Zones, aquatic preserves or environmentally protected lands that are
conservation and/or preservations designated lands, or an Everglades
Agricultural Area reservoir project if the floating solar facilities will have a
negative impact on that project.
b. The floating solar facility coverage area shall be contained within the lot or
parcel under unified control, on an impounded or controlled water body
with a water depth of six feet or more beneath the water surface coverage
area (measured above the dry season water table). The water surface
coverage area shall be limited to no greater than 60 percent. For a water
surface coverage area that exceeds 30 percent and up to 60 percent, a
project site-specific environmental assessment report of the ecological,
biological, and physical impacts shall be approved by the County Manaqer
or designee. A littoral shelf area of 30 percent or more shall be
established, planted, and contained within the water body. The installation
shall comply with the requirements set forth in LDC section 3.05.10, except
that the littoral shelf planting area shall be at least 30 percent or more.
c. Setbacks, landscaping and buffer standards shall apply pursuant to LDC
section 4.02.03, LDC section 4.06.02, and LDC section 4.06.05. Buffer and
landscaping requirements shall be in conformance with the underlying
zoning district.
d. The installation, when proposed on stormwater conveyance, retention, or
detention areas, shall not interfere with stormwater management
infrastructure and the volume and quantity of water flow.
[25-LDS-00344/1989786/1]86 12/10/25
PL20250000235 Floating Solar Facilities
Page 13 of 15
Words struck through are deleted,words underlined are added
DRAFT 12/10/25 °
e. Power and communication lines running from the bank of land to
interconnect with any building, transformer or inverter shall be buried
underground.
2 Water quality control. A water quality survey shall be required to establish
baseline pre-development water quality conditions with the exception for
wastewater treatment ponds to ensure compliance with the State of Florida's
water quality standards (F.A.C. 62-302) and provide reasonable assurance that
stormwater management systems containing a floating solar facility which
discharge to the County's MS4 or waters of the state meet the standards. Long
term water quality monitoring shall be submitted one year after post installation
and annually thereafter to assess the effects on water quality, aqua flora and
fauna, and the corrosion environment from leaching materials. The floating solar
facility system shall be properly anchored and the water not energized.
3. Maintenance and Inspection. To prevent the occurrence of damage and
breakdown of the facility, a maintenance plan shall be submitted at the time of
Site Development Plan approval and an inspection report filed with the County
Manager or designee one year after the facility is permitted and operational, and
every three years thereafter.
4 Glare. Floating solar facilities shall not produce reflective glare that could affect or
impair aircraft traffic control or vehicular traffic. If a reflector to enhance production
is utilized, it shall control and minimize the glare to adjacent and abutting
properties.
5. Building permits. Permits shall be obtained for the construction of any structures
and other improvements to the extent required by the Florida Building Code and
National Electrical Code.
B. An applicant may request a waiver for approval of one or more of the provisions of LDC
section 5.05.17 A. through a Conditional Use request.
SECTION FOUR: CONFLICT AND SEVERABILITY
In the event that any provisions of this ordinance should result in an unresolved conflict
with the provisions of the Land Development Code (LDC) or Growth Management Plan (GMP),
the applicable provisions of the LDC or GMP shall prevail. In the event this Ordinance conflicts
with any other Ordinance of Collier County or other applicable law, the more restrictive shall
apply. If any phrase or portion of this Ordinance is held invalid or unconstitutional by any court of
competent jurisdiction, such portion shall be deemed a separate, distinct and independent
provision and such holding shall not affect the validity of the remaining portion.
[25-LDS-00344/1989786/1]86 12/10/25
PL20250000235 Floating Solar Facilities
Page 14 of 15
Words strusli-through are deleted,words underlined are added
DRAFT 12/10/25 1 I C
SECTION FIVE: INCLUSION IN THE COLLIER COUNTY LAND DEVELOPMENT CODE
The provisions of this Ordinance shall become and be made a part of the Land
Development Code of Collier County, Florida. The sections of the Ordinance may be
renumbered or re-lettered to accomplish such, and the word 'ordinance" may be changed to
"section," "article," or any other appropriate word.
SECTION SIX: EFFECTIVE DATE
This Ordinance shall become effective upon filing with the Florida Department of State.
PASSED AND DULY ADOPTED by the Board of County Commissioners of Collier
County, Florida, this day of , 2026.
ATTEST: BOARD OF COUNTY COMMISSIONERS
CRYSTAL K. KINZEL, CLERK OF COLLIER COUNTY, FLORIDA
By: By:
, Deputy Clerk Dan Kowal, Chairman
Approved as to form and legality:
frAc-
Heidi F. Ashton-Cicko 12-10-25
Managing Assistant County Attorney
04-CMD-01077/
[25-LDS-00344/1989786/1}86 12/10/25
PL20250000235 Floating Solar Facilities
Page 15 of 15
Words struck through are deleted,words underlined are added
c
Martha S. Vergara
From: Richard Henderlong <Richard.Henderlong@collier.gov>
Sent: Friday,January 23, 2026 12:08 PM
To: Ailyn Padron
Cc: Eric Johnson
Subject: RE: 2/24/26 BCC- Ad Request for Floating Solar Facilities (LDCA) (PL20250000235)
Follow Up Flag: Follow up
Flag Status: Flagged
Allyn, Good to go! Thanks
Richard Henderlong
Planner III
Zoning
Office:239-252-2464
oll er Coun
2800 North Horseshoe Drive
Naples, Florida lonc 15
Richard.HenderlongCa)collier.gov
1
My email address has changed. Effective immediately, please update your contact
list to use this new address: Richard.Henderlongc collier.gov
From:Ailyn Padron<Ailyn.Padron@collier.gov>
Sent: Friday,January 23, 2026 11:35 AM
To: Richard Henderlong<Richard.Henderlong@collier.gov>
Cc: Eric Johnson <Eric.Johnson@collier.gov>
Subject: 2/24/26 BCC-Ad Request for Floating Solar Facilities (LDCA) (PL20250000235)
Good morning, Rich,
Attached is the *Web* Ad Request and Ordinance for your petition. Please let me know if you approve and/or if changes
are needed by end of day.
Please let me know if you have any questions.
Thank you.
i
Ailyn Padron 1 7 C
Management Analyst I
Zoning
Office:239-252-5187
Collier Coun
2800 Horseshoe Dr.
Naples, Florida 34104 � ��I xi, coAilyn.Padron aC�collier.gov
My email address has changed. Effective immediately, please update your contact
list to use this new address: Ailyn.Padron c( collier.gov
Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a
public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing.
2
° c Clerk of the Circuit Court and Comptroller - Crystal K. Kinzel
0.1
Collier County, Florida
* 3315 Tamiami Trail East, Ste. 102 - Naples, FL 34112-5324
o * Phone: (239) 252-2646
l> ti
lERCOUNf '-
Affidavit of Publication
COLLIER COUNTY STATE OF FLORIDA
Before the undersigned authority personally appeared
Jennifer Hansen, who on oath says that he or she is a
Deputy Clerk of the Circuit Court of Collier County,
Florida; that the attached copy of advertisement,
2/24/2026 BCC-Floating Solar Facilities (LDCA)
(PL20250000235)- Second BCC Hearing was published
on the publicly accessible website
https://notices.collierclerk.com as designated by Collier
County, Florida on 02/04/2026 until 02/26/2026.
Affiant further says that the website complies with all
legal requirements for publication in chapter 50, Florida
Statutes.
(Affi Si ature) / r
al
• '(Affiant.Printed dame)
Sworn to ain i subSvibed before me this 03/02/2026
r1 O n •. r
C9 C)
: p (SrrAtgL Kintel C rk of the Circuit Court&
'Ciotp€ lr• ;
• s s . ♦�M�
N:puty Cle�k►�Sig .ture) I
I , ' i�
(Deputy C erk Printed Na e) ate
tor
NOTICE OF PUBLIC HEARING
NOTICE OF INTENT TO CONSIDER AN ORDINANCE
Notice is hereby given that a public hearing will be held by the Collier County Board of County
Commissioners (BCC) at 9:00 A.M. on February 24, 2026, in the Board of County Commissioners
Meeting Room,third floor,Collier Government Center,3299 Tamiami Trail East,Naples,FL to consider:
AN ORDINANCE AMENDING ORDINANCE NUMBER 04-41, AS AMENDED, THE
COLLIER COUNTY LAND DEVELOPMENT CODE, WHICH INCLUDES THE
COMPREHENSIVE LAND REGULATIONS FOR THE UNINCORPORATED AREA OF
COLLIER COUNTY, FLORIDA, TO ADD A FLOATING SOLAR FACILITY AS A
PERMITTED USE IN CERTAIN NON-RESIDENTIAL ZONING DISTRICTS AND TO
ESTABLISH REGULATIONS FOR FLOATING SOLAR FACILITIES, BY PROVIDING
FOR: SECTION ONE, RECITALS; SECTION TWO, FINDINGS OF FACT; SECTION
THREE, ADOPTION OF AMENDMENTS TO THE LAND DEVELOPMENT CODE,
MORE SPECIFICALLY AMENDING THE FOLLOWING: CHAPTER ONE—GENERAL
PROVISIONS, INCLUDING SECTION 1.08.02 DEFINITIONS; CHAPTER TWO —
ZONING DISTRICTS AND USES, INCLUDING SECTION 2.03.01 AGRICULTURAL
DISTRICTS,SECTION 2.03.03 COMMERCIAL ZONING DISTRICTS,SECTION 2.03.04
INDUSTRIAL ZONING DISTRICTS, SECTION 2.03.05 CIVIC AND INSTITUTIONAL
ZONING DISTRICTS; CHAPTER FIVE — SUPPLEMENTAL STANDARDS FOR
SPECIFIC USES, BY ADDING A NEW SECTION 5.05.17 FLOATING SOLAR
FACILITIES; SECTION FOUR, CONFLICT AND SEVERABILITY; SECTION FIVE,
INCLUSION IN THE COLLIER COUNTY LAND DEVELOPMENT CODE; AND
SECTION SIX, EFFECTIVE DATE. [PL20250000235]
iC
N - cote County
Florida
/o•
' I.► r
1
am
wwFs
o
w nos" *�7..7
'VI;'f• "I.,
A copy of the proposed Ordinance is on file with the Clerk to the Board and is available for inspection.All interested
parties are invited to attend and be heard.
All persons wishing to speak on any agenda item must register with the County Manager prior to presentation of the
agenda item to be addressed.Individual speakers will be limited to three(3)minutes on any item.The selection of any
individual to speak on behalf of an organization or group is encouraged.If recognized by the Chairman,a spokesperson
for a group or organization may be allotted ten(10)minutes to speak on an item. Written materials intended to be
considered by the Board shall be submitted to the appropriate County staff a minimum of seven(7)days prior to the
public hearing.All materials used in presentations before the Board will become a permanent part of the record.
As part of an ongoing initiative to encourage public involvement, the public will have the opportunity to provide
public comments remotely, as well as in person, during this proceeding. Individuals who would like to participate
remotely should register through the link provided within the specific event/meeting entry on the Calendar of Events
on the County website at www.collier.gov/Calendar-Events-directory after the agenda is posted on the County
website. Registration should be done in advance of the public meeting, or any deadline specified within the public
meeting notice.Individuals who register will receive an email in advance of the public hearing detailing how they can
participate remotely in this meeting. Remote participation is provided as a courtesy and is at the user's risk. The
County is not responsible for technical issues. For additional information about the meeting, please call Geoffrey
Willig at 252-8369 or email to Geoffrey.Willig(a,collier.gov.
Any person who decides to appeal any decision of the Board will need a record of the proceedings pertaining thereto
and therefore, may need to ensure that a verbatim record of the proceedings is made, which record includes the
testimony and evidence upon which the appeal is based.
If you are a person with a disability who needs any accommodation in order to participate in this proceeding,you are
entitled, at no cost to you, to the provision of certain assistance. Please contact the Collier County Facilities
Management Division, located at 3335 Tamiami Trail East, Suite 101,Naples, FL 34112-5356,(239)252-8380,at
17C
least two(2)days prior to the meeting.Assisted listening devices for the hearing impaired are available in the Board
of County Commissioners Office.
BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY,FLORIDA
DAN KOWAL,CHAIRMAN
CRYSTAL K.KINZEL,
CLERK OF THE CIRCUIT COURT AND COMPTROLLER