Agenda 10/14/2025 Item #16K 9 (County Attorney to file a lawsuit on behalf of Collier County Board of County Commissioners against Sierra Underground Corp)10/14/2025
Item # 16.K.9
ID# 2025-3721
Executive Summary
Recommendation to authorize the County Attorney to file a lawsuit on behalf of the Collier County Board of County
Commissioners against Sierra Underground Corp. for $14,235.38 in damages caused to a County-owned sewer lateral
line and orange conduit on two separate occasions and locations.
OBJECTIVE: To recover the money spent to repair a sewer lateral line and orange conduit damaged by a negligent
excavation contractor.
CONSIDERATIONS: Sierra Underground Corp. was performing excavations to install cable tv lines when they struck
the County’s owned and maintained sewer lateral line and orange conduit causing damage to the County for repairs on
the following dates and properties:
April 11, 2022 (1430 Serenity Circle in Sterling Oaks); and
March 22, 2023 (4425 Dover Court and High Street in Kensington).
The County had to hire an emergency contractor and utilize staff resources to restore the County’s lateral line and
orange conduit and incurred $14,235.38 in damages. Sierra Underground Corp. has been contacted by the County’s
third-party adjuster Johns Eastern Company, as well as by the County Attorney’s Office, several times with no response.
The County seeks approval from the Board of County Commissioners (Board) to file a lawsuit in county court to
recover the damages. Attached is a draft copy of the complaint, along with corresponding backup materials documenting
the damage and amounts thereof.
By filing this lawsuit to recover damages, the County puts contractors on notice that they will be held responsible for
negligent actions resulting in damage to public utilities in Collier County.
FISCAL IMPACT: The cost to file and serve a Complaint is approximately $415.00 and funds are budgeted and
available in the Risk Management Property & Casualty (Fund 5016)
GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this item.
LEGAL CONSIDERATIONS: This item has been approved as to form and legality and requires a majority vote for
Board approval. – CLD
RECOMMENDATIONS: To authorize the County Attorney to file a lawsuit on behalf of the Collier County Board of
County Commissioners against Sierra Underground Corp. for $14,235.38 in damages caused to a County-owned sewer
lateral line and orange conduit on two separate occasions and locations.
PREPARED BY: Courtney L. DaSilva, Assistant County Attorney
ATTACHMENTS:
1. Complaint DRAFT Sierra
2. Sierra Underground Back Up 2
Page 5610 of 6526
#43
Draft Complaint 022124 Page 1 of 9
IN THE COUNTY COURT OF THE TWENTIETH JUDICIAL CIRCUIT
IN AND FOR COLLIER COUNTY, FLORIDA
CIVIL ACTION
BOARD OF COUNTY COMMISSIONERS
OF COLLIER COUNTY, FLORIDA, a
political subdivision of the State of Florida,
Plaintiff,
vs. Case No.: _____________________
SIERRA UNDERGROUND CORP., a
Florida Profit Corporation,
Defendant.
_____________________________________/
COMPLAINT
Plaintiff BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY,
FLORIDA (“COUNTY”), by and through its undersigned counsel, sues Defendant, SIERRA
UNDERGROUND CORP. (“SIERRA”), a Florida Profit Corporation, and states as follows:
NATURE OF CLAIMS, THE PARTIES, JURISDICTION, AND VENUE
1. The COUNTY’S claims stem from SIERRA’S damage to the COUNTY’s personal
property, specifically a water lateral line and an orange conduit line, owned, operated, and
maintained by the COUNTY, and the resulting cost of repair incurred by the COUNTY.
2. This Court has jurisdiction over this matter, as it is an action to recover damages in
excess of $8,000.00 but less than $50,000.00.
3. The COUNTY, as the governing body for Collier County, Florida, a political
subdivision of the State of Florida, and as the ex-officio governing board of the Collier County
Water-Sewer District, an independent special district created by the Florida Legislature, is the
Page 5611 of 6526
#43
Draft Complaint 022124 Page 2 of 9
owner of the personal property that is the subject of this litigation and is thus authorized to bring
this action.
4. SIERRA is a Florida profit corporation organized under the laws of Florida, with
its principal place of business at 227 SE 46th Terrace, Cape Coral, Florida 33904, in Lee County,
Florida, and is authorized to and does conduct business throughout the State of Florida, including
in Collier County.
5. Venue is proper in Collier County, Florida, pursuant to Section 47.051, Florida
Statutes, because (i) this is an action against a domestic corporation, (ii) Collier County is where
the instant cause of action accrued, (iii) Collier County is where the property in litigation is located,
and (iv) the amounts due to the COUNTY are due in Collier County.
FACTUAL ALLEGATIONS
6. In 1993, the Florida Legislature enacted the “Underground Facility Damage
Prevention and Safety Act,” Chapter 556, Florida Statutes (“the Act”), to prevent injury to persons
or property and the interruption of services resulting from damage to an undergrou nd facility
caused by excavation or demolition operations. Fla. Stat. § 556.101(3)(a).
7. The Act created a not-for-profit corporation called Sunshine State One-Call of
Florida, Inc. (“the Corporation”), and requires the Corporation to maintain a free-access
notification system (the “One-Call System” or “System”) which excavators can use to notify
owners of underground facilities of planned excavation or demolition activities. See Fla. Stat. §§
556.103, 556.104.
8. The Corporation is comprised of the owners of underground facilities in the State
of Florida, which are called “member operators” by the Act. Fla. Stat. § 556.104.
9. The COUNTY is a “member operator” under the Act.
Page 5612 of 6526
#43
Draft Complaint 022124 Page 3 of 9
10. Under the Act, “excavators” and “excavating contractors” are required to notify the
System and provide information about a planned excavation at least two full business days before
beginning any excavation. Fla. Stat. § 556.105(1). The System then notifies member operators
with underground facilities near the planned excavation, who are required to “identify the
horizontal route by marking to within 24 inches born the outer edge of either side of the
underground facility by the use of stakes, paint, flags, or other suitable means within two full
business days after the time the notification is received” from the System. Fla. Stat. § 556.105(5)
(emphasis added).
11. SIERRA is an “excavator” and/or “excavating contractor” under the Act.
12. On August 24, 2021, SIERRA was installing Cable TV Lines at 1430 through 1617
Serenity Circle at Sterling Oaks Drive in Collier County, Florida.
13. On March 22, 2023, SIERRA was installing Cable TV Lines at 4425 Dover Court
and High Street in Kensington in Collier County, Florida.
14. Hereinafter, 1430 through 1617 Serenity Circle and 4425 Dover Court and High
Street will collectively be referred to as the “Properties.”
15. SIERRA provided notices of planned excavations at the Properties through the
System as required by the Act (the “Notice”).
16. The COUNTY received these Notices and marked with flags and paint the
horizontal route of the COUNTY’S underground facilities throughout the boring areas at the
Properties on the dates prior to SIERRA’S excavations.
17. The utilities marked by the COUNTY in response to the Notices included a
COUNTY owned and maintained Lateral Line, which was marked with flags and spray paint in
Page 5613 of 6526
#43
Draft Complaint 022124 Page 4 of 9
accordance with the “Uniform Color Code for Utilities” of the American Public Works
Association.
18. While performing their installation of Cable TV lines at the Properties, SIERRA
bored through the COUNTY’S Sewer Lateral Line and an Orange Conduit Line (the “Lateral
Lines”) that resulted in area household sewers to back up.
19. Specifically, the COUNTY discovered damage to the COUNTY’s Orange Conduit
Line at 1430 Serenity Circle in Sterling Oaks on April 11, 2022.
20. In addition, the COUNTY discovered damage to the COUNTY’s Sewer Lateral at
4425 Dover Court in Kensington on March 22, 2023.
21. As a result, the COUNTY incurred $14,235.38 in damages to repair its Lateral
Lines.
22. “If any excavator fails to discharge a duty imposed by [the Act], the excavator, if
found liable, is liable for the total sum of the losses to all parties involved as those costs are
normally computed.” Fla. Stat. § 556.106(2)(b).
23. On January 23, 2024, the COUNTY sent a demand letter to SIERRA for
reimbursement of the repair costs to the COUNTY-owned Lateral Lines at the Properties. To date,
SIERRA failed and refused to reimburse the COUNTY.
24. All conditions precedent to the relief demanded herein have been performed or
waived.
COUNT I –NEGLIGENCE
Breach of the duty to identify and protect underground facilities within the Tolerance Zone of
SIERRA’S excavation.
25. The COUNTY re-alleges and incorporates by reference its allegations in
paragraphs 1–24, as if fully set forth herein.
Page 5614 of 6526
#43
Draft Complaint 022124 Page 5 of 9
26. The Act imposes a duty on excavators to use increased caution to identify and
protect underground facilities when an excavation is to take place within a “tolerance zone.” Fla.
Stat. § 556.105(5)(c). “The protection requires hand digging, pot holing, soft digging, vacuum
excavation methods, or similar procedures to identify underground facilities.” Id.
27. The Act defines “tolerance zone” as “24 inches from the outer edge of either side
of the exterior surface of a marked underground facility.” Fla. Stat. § 556.102(15).
28. SIERRA’s excavation activities at the Properties were within the “tolerance zone”
of the COUNTY’s Lateral Lines.
29. SIERRA knew or should have known that its excavation was within the “tolerance
zone” of the COUNTY’s Lateral Lines and the Notices Area, of which the COUNTY’s Lateral
Lines was marked.
30. SIERRA had a duty to use increased caution to identify and protect the COUNTY’s
Lateral Lines.
31. SIERRA breached the aforementioned duty by failing to use increased caution to
identify and protect the COUNTY’s Lateral Lines before proceeding with its excavation activities
at the Properties.
32. The COUNTY’s damaged Lateral Lines were the direct, proximate, and foreseeable
result of SIERRA’s breach of its duty.
33. As a result of SIERRA’s negligence, the COUNTY incurred monetary damages
including, but not limited to, the $14,235.38 incurred to repair the damaged Lateral Lines, and
other direct and consequential damages.
34. SIERRA is liable to the COUNTY for the total sum of the losses incurred by the
COUNTY as a result of SIERRA’S negligence. Fla. Stat. § 556.106(2)(b).
Page 5615 of 6526
#43
Draft Complaint 022124 Page 6 of 9
WHEREFORE, the COUNTY demands judgment against SIERRA for damages, together
with prejudgment interest and costs, and for such other or further relief as this Court deems
equitable and just under the circumstances.
COUNT II – NEGLIGENCE
Breach of the duty to perform an excavation in a careful and prudent manner and to exercise due
care in the performance of work.
35. The COUNTY re-alleges and incorporates by reference its allegations in
paragraphs 1–24, as if fully set forth herein.
36. “Obtaining information as to the location of an underground facility from the
member operator as required by this chapter does not excuse any excavator from performing an
excavation or demolition in a careful and prudent manner, based on accepted engineeri ng and
construction practices, and it does not excuse the excavator from liability for any damage or injury
resulting from any excavation or demolition.” Fla. Stat. § 556.106(2)(c).
37. The Act imposes a duty on excavators to perform excavations in a careful and
prudent manner, based on accepted engineering and construction practices. Fla. Stat. §
556.106(2)(c).
38. SIERRA had a duty to perform an excavation at the Properties in a careful and
prudent manner based on accepted engineering and construction practices.
39. SIERRA breached the aforementioned duty by failing to perform its excavation in
a careful and prudent manner based on accepted engineering and construction practices.
40. The COUNTY’s damaged Lateral Lines were the direct, proximate, and foreseeable
result of SIERRA’s breach of its duty.
Page 5616 of 6526
#43
Draft Complaint 022124 Page 7 of 9
41. As a result of SIERRA’S negligence, the COUNTY incurred monetary damages
including, but not limited to, the $14,235.38 incurred to repair the damaged Lateral Lines, and
other direct and consequential damages.
42. SIERRA’s receipt of information as to the location of the COUNTY’S Lateral
Lines does not excuse SIERRA from the duty to perform its excavation in a careful and prudent
manner, based on accepted engineering and construction practices, and it does not excuse SIERRA
from liability for the damage caused to the COUNTY’s Lateral Lines. Fla. Stat. § 556.106(2)(c).
43. SIERRA is liable to the COUNTY for the total sum of the losses incurred by the
COUNTY as a result of SIERRA’S negligence. Fla. Stat. § 556.106(2)(b).
WHEREFORE, the COUNTY demands judgment against SIERRA for damages, together
with prejudgment interest and costs, and for such other or further relief as this Court deems
equitable and just under the circumstances.
COUNT III – NEGLIGENCE
Breach of the common law duty to exercise due care in the performance of work.
44. The COUNTY re-alleges and incorporates by reference its allegations in
paragraphs 1–24, as if fully set forth herein.
45. SIERRA had a duty to exercise due care in the performance of its excavation at the
Properties which required SIERRA to exercise the degree of care that a reasonably careful
excavator would use under like circumstances.
46. SIERRA breached its duty to exercise due care in the performance of its excavation
at the Properties in the following ways:
a. SIERRA failed to identify and protect marked underground facilities within
the tolerance zone (i.e., 24-inches) of its excavation.
Page 5617 of 6526
#43
Draft Complaint 022124 Page 8 of 9
b. SIERRA failed to comply with its Drilled Shaft Installation Plan by failing
to hand dig the shaft as required to verify no underground utilities conflict with its
excavation at the Properties.
c. SIERRA failed to contact the COUNTY when SIERRA did not find the
COUNTY’s Lateral Main during its hand dig.
d. SIERRA assumed it was clear of marked underground utilities without
identifying and protecting all utilities marked in conflict with its excavation at the
Properties.
47. The COUNTY’s damaged Lateral Lines were the direct, proximate, and foreseeable
result of SIERRA’s breaches described above.
48. As a result of SIERRA’S negligence, the COUNTY has incurred monetary
damages including, but not limited to, the $14,238.38 incurred to repair the damaged Lateral Line,
and other direct and consequential damages.
WHEREFORE, the COUNTY demands judgment against SIERRA for damages, together
with prejudgment interest and costs, and for such other or further relief as this Court deems
equitable and just under the circumstances.
DEMAND FOR JURY TRIAL
The COUNTY hereby demands a jury trial on all issues so triable.
Dated this __ day of _____ 2025.
Page 5618 of 6526
#43
Draft Complaint 022124 Page 9 of 9
Respectfully submitted,
By:
COURTNEY L. DASILVA, ESQ.
Florida Bar No. 1032733
RONALD T. TOMASKO, ESQ.
Florida Bar No. 1030999
Collier County Attorney’s Office
3299 East Tamiami Trail, Suite 800
Naples, Florida 34112-5746
Telephone: (239) 252-8400
Facsimile: (239) 252-6300
Counsel for Plaintiff COLLIER COUNTY
courtney.dasilva@collier.gov
ronald.tomasko@collier.gov
juanita.garcia@collier.gov
Page 5619 of 6526
INVOICE
77890To : Invoice #:
Date:
Application #:
Naples ,FL 34112-5749
Contract :
Collier County Board of County Commissioners
05/03/22
1
Attn: Accounts Payable
Quality Enterprises USA, Inc.
3494 Shearwater St
Naples, FL 34117
3299 Tamiami Trail E Ste 700
14622-10 E - Sewer Lateral Repair - Serenity Circle
Invoice Due Date:
Payment Terms:
06/02/22
Net 30 Days
Contract Item
Quantity
JTD
Unit
Price U/M
Total
To Date
7,004.861 E - Sewer Lateral Repair - Serenity Circle LS 1.000 7,004.86
7,004.86Total To Date :
0.00Plus Sales Tax :
Less Retainage :
Less Previous Applications :
7,004.86Total Due This Invoice :
0.00
0.00
Page 1 of 1
Page 5620 of 6526
Total Reg
Hours
Total OT
Hours QE Employee Type Total Reg
Hours
Total OT
Hours
1 Mechanic
2 Administrative
4.5
4.5
4.5
13.5
Total Reg.
Hrs
Total OT
Hours
6.5
4.5
DAILY REPORT OF CONSTRUCTION
Inspector: Superintendent/Foreman: Pablo Perez/Armando RamirezDate: 4/11/22
Job Name: Serenity Circle Sewer Lateral Repair
CONTRACTOR(S) EQUIPMENT (ACTIVE OR IDLE)
PROBLEMS/DELAYS:
Home Depot pipe material
Ace Hardware Pipe Material
Truck with Hand Tools
Pickup Truck
Equipment Operator
Laborer
Ferguson pipe material
CONTRACTOR(S) CREW AND HOURS
Equipment Description
QE Employee Type
SUBCONTRACTORS & MATERIALS
Project Manager
Superintendent
Foreman
Corporate Officer
Accidents: No Yes See Accident Report Dated:_______________
WORK PERFORMED
Repaired damaged 4" sewer lateral
Day of Week : Monday Start Time: 5:00pm End Time: 9:30pm
x
Page 5621 of 6526
Job #
Date 4/11/22 (5:00pm-9:30pm)
ST HOURLY OT HOURLY ST OT ST OT
UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL
Personnel
Corporate Officer HR $150.00 $195.00 1 $150.00 $0.00 $150.00
Project Manager HR $125.00 $162.50 2 $0.00 $325.00 $325.00
Superintendent HR $85.00 $110.50 4.5 $0.00 $497.25 $497.25
Foreman HR $85.00 $110.50 4.5 $0.00 $497.25 $497.25
Mechanic, Equipment & Truck Operator HR $75.00 $97.50 4.5 $0.00 $438.75 $438.75
Laborer HR $55.00 $71.50 13.5 $0.00 $965.25 $965.25
Administrative HR $75.00 $97.50 $0.00 $0.00 $0.00
Equipment
Excavator > Cat 349 HR $250.00 $0.00 $0.00 $0.00
Excavator > Cat 320 HR $200.00 $0.00 $0.00 $0.00
Excavator <Cat 320 HR $150.00 $0.00 $0.00 $0.00
Excavator w/hammer/Epiroc HR $350.00 $0.00 $0.00 $0.00
Excavator w/side grip vibratory hammer HR $350.00 $0.00 $0.00 $0.00
Wheel Loader >Cat 962 HR $225.00 $0.00 $0.00 $0.00
Wheel Loader >Cat 938 HR $175.00 $0.00 $0.00 $0.00
Wheel Loader <Cat 938 HR $150.00 $0.00 $0.00 $0.00
Bull Dozer HR $175.00 $0.00 $0.00 $0.00
Motor Grader HR $175.00 $0.00 $0.00 $0.00
Soil/Stone Roller HR $125.00 $0.00 $0.00 $0.00
Telehandler HR $125.00 $0.00 $0.00 $0.00
Manlift HR $125.00 $0.00 $0.00 $0.00
Forklift HR $100.00 $0.00 $0.00 $0.00
Broom Tractor HR $95.00 $0.00 $0.00 $0.00
Milling Machine HR $685.00 $0.00 $0.00 $0.00
Skid steer with milling head (bump grinder)HR $150.00
Asphalt/Mat.Shuttle Buggy HR $375.00 $0.00 $0.00 $0.00
Asphalt Paver Weiler 385 HR $375.00 $0.00 $0.00 $0.00
Asphalt Paver Cat 1055 HR $575.00 $0.00 $0.00 $0.00
Asphalt Roller HR $125.00 $0.00 $0.00 $0.00
Off Road Dump HR $250.00 $0.00 $0.00 $0.00
Crane >130 ton HR $1,500.00 $0.00 $0.00 $0.00
Crane >30 ton HR $500.00 $0.00 $0.00 $0.00
Crane <30 ton HR $250.00 $0.00 $0.00 $0.00
Vibratory Hammer HR $400.00 $0.00 $0.00 $0.00
Concrete Crusher HR $685.00 $0.00 $0.00 $0.00
Screener HR $375.00 $0.00 $0.00 $0.00
Push Boat HR $275.00 $0.00 $0.00 $0.00
Sectional/Hopper Barge HR $175.00 $0.00 $0.00 $0.00
Drone Lidar Photogrammetry HR $350.00 $0.00 $0.00 $0.00
Directional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0.00
Directional Drill AA 440 HR $4,000.00 $0.00 $0.00 $0.00
Lowboy/Tractor HR $175.00 $0.00 $0.00 $0.00
Dump Truck/Roll Off HR $95.00 $0.00 $0.00 $0.00
Water Truck/Trailer HR $125.00 $0.00 $0.00 $0.00
Tack/Prime Truck/Trailer HR $150.00 $0.00 $0.00 $0.00
Lube/Mechanics Truck HR $125.00 $0.00 $0.00 $0.00
Truck with Hand Tools HR $95.00 4.5 $427.50 $0.00 $427.50
Pickup HR $40.00 6.5 $260.00 $0.00 $260.00
Camera Truck HR $400.00 $0.00 $0.00 $0.00
Vacuum Truck HR $475.00 $0.00 $0.00 $0.00
Small Equipment
Air Compressor with Hammer HR $60.00 $0.00 $0.00 $0.00
Concrete Saw HR $60.00 $0.00 $0.00 $0.00
Plate Compactor HR $60.00 $0.00 $0.00 $0.00
Trench Box 16' x 10' HR $50.00 $0.00 $0.00 $0.00
Stone Box HR $50.00 $0.00 $0.00 $0.00
Steel (Road) Plate HR $50.00 $0.00 $0.00 $0.00
Wellpoint System HR $250.00 $0.00 $0.00 $0.00
3” Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0.00
6" Hydraulic Pump HR $150.00 $0.00 $0.00 $0.00
12" Hydraulic Pump HR $200.00 $0.00 $0.00 $0.00
Cut Off Saw HR $20.00 $0.00 $0.00 $0.00
Light Set HR $50.00 $0.00 $0.00 $0.00
Generator/Welder HR $50.00 $0.00 $0.00 $0.00
Generator 70kw HR $125.00 $0.00 $0.00 $0.00
Generator 125kw HR $150.00 $0.00 $0.00 $0.00
MOT HR $150.00 $0.00 $0.00 $0.00
Fusing Machine 2-16”HR $150.00 $0.00 $0.00 $0.00
Fusing Machine 18”-42”HR $300.00 $0.00 $0.00 $0.00
Tap Machine - small (3/4" - 3") each tap EA $750.00 $0.00 $0.00 $0.00
Tap Machine - large (4" - 12") each tap EA $1,000.00 $0.00 $0.00 $0.00
Pipe Trenchless Piercing tool HR $250.00 $0.00 $0.00 $0.00
Pipe Ramming HR $625.00 $0.00 $0.00 $0.00
Material
Disposal Fee (concrete, asphalt, debris, etc)PER LOAD $500.00 $0.00 $0.00 $0.00
Ferguson Pipe Material ($165.82 x 1.1) + ($11.60)$194.00
Home Depot Pipe Material ($18.58 x 1.1) + $1.30 $21.74
Home Depot Pipe Material ($9.91 x 1.1) + $0.64 $11.54
Ace Hardware Pipe Material ($5.99 x 1.1) + $0.39 $6.98
Grand Total:$3,795.26
10% MARK UP ON MATERIAL
15% MARK UP ON SUBCONTRACTORS
REV. 3/17/2021
QUALITY ENTERPRISES USA, INC.
Emergency Repair Work for Rates
Collier County - Board of County Commissioners
If work is performed other than Monday through Friday, 7:00am - 4:00 pm, excluding holidays, OT Rates will be used for Personnel. These rates also apply for travel time
necessary to mobilize and demobilize to and from work.
Under Contract #20-7800
Page 5622 of 6526
Deliver To:
From:
Comments:
EMAIL DUPLICATE INVOICE
**FLOCAP CUST**
FEL-FT. MYERS WATERWORKS #127 Rony Alvarado
PO BOX 100286
ATLANTA, GA 30384-0286
Invoice Number Customer Page
Please Contact With Questions:
239-433-0555
1552258 46181 1
Please refer to Invoice Number when making payment and remit to:
Sold To:Ship To:
TOTAL DUE --->
FEL-FT. MYERS WATERWORKS #127
PO BOX 100286
ATLANTA, GA 30384-0286
QUALITY ENTERPRISES USA INC
3494 SHEARWATER STREET
PS 30501 REHAB
NAPLES, FL 34117
COUNTER PICK UP
3801 PROSPECT AVE
NAPLES, FL 34104
177.42
Ship Whse Sell Whse Tax Code Customer Order Number Sales Person Job Name Invoice Date Batch
136 136 FL2COL .TAE PS 305.01 REHAB 04/12/2022 86390
ALL ACCOUNTS ARE DUE AND PAYABLE PER THE CONDITIONS AND TERMS OF THE ORIGINAL INVOICE. ALL PAST DUE AMOUNTSARE SUBJECT TO A SERVICE CHARGE AT THE MAXIMUM RATE ALLOWED BY STATE LAW PLUS COSTS OF COLLECTION INCLUDINGATTORNEY FEES IF INCURRED. FREIGHT TERMS ARE FOR OUR DOCK UNLESS OTHERWISE SPECIFIED ABOVE. COMPLETE TERMS ANDCONDITIONS ARE AVAILABLE UPON REQUESTGOVT BUYERS: ALL ITEMS QUOTED ARE OPEN MARKETUNLESS NOTED OTHERWISE.OR CAN BE VIEWED ON THE WEB AT https://www.ferguson.com/content/website-info/terms-of-sale
LEAD LAW WARNING: IT IS ILLEGAL TO INSTALL PRODUCTS THAT ARE NOT "LEAD FREE" IN ACCORDANCE WITH US FEDERAL OROTHER APPLICABLE LAW IN POTABLE WATER SYSTEMS ANTICIPATED FOR HUMAN CONSUMPTION. PRODUCTS WITH *NP IN THEDESCRIPTION ARE NOT LEAD FREE AND CAN ONLY BE INSTALLED IN NON-POTABLE APPLICATIONS. BUYER IS SOLELYRESPONSIBLE FOR PRODUCT SELECTION.COVID-19 ORDER: ANY REFERENCE TO OR INCORPORATION OF EXECUTIVE ORDER 14042 AND/OR THE EO-IMPLEMENTING FEDERALCLAUSES (FAR 52.223-99 AND/OR DFARS 252.223-7999) IS EXPRESSLY REJECTED BY SELLER AND SHALL NOT APPLY AS SELLER IS AMATERIALS SUPPLIER AND THEREFORE EXEMPT UNDER THE EXECUTIVE ORDER.
Ordered Shipped Item Number Description Unit Price UM Amount
2 2 MUL067474 4 PVC HW SWR GXG REP COUP 34.820 EA 69.64
14 14 SDR26HWSPP14 4X14 SDR26 HW PVC GJ SWR PIPE 4.870 FT 68.18
1 1 PSLUBXL1G 1 GAL 8 LB PIPE JT LUB NSF NEW FORM 28.000 EA 28.00
Invoice Sub-Total 165.82
Tax
Total Amt
11.60
177.42
TOTAL DUE --->177.42
Page 5623 of 6526
Page 5624 of 6526
Page 5625 of 6526
Total Reg
Hours
Total OT
Hours QE Employee Type Total Reg
Hours
Total OT
Hours
1 Mechanic
1 Administrative
2
2
4
Total Reg.
Hrs
Total OT
Hours
3
2
DAILY REPORT OF CONSTRUCTION
Inspector: Superintendent/Foreman: Pablo Perez/Jorge RamirezDate: 4/14/22
Job Name: Serenity Circle Sewer Lateral Repair
CONTRACTOR(S) EQUIPMENT (ACTIVE OR IDLE)
PROBLEMS/DELAYS:
Truck with Hand Tools
Pickup Truck
Equipment Operator
Laborer
3CY of concrete
CONTRACTOR(S) CREW AND HOURS
Equipment Description
QE Employee Type
SUBCONTRACTORS & MATERIALS
Project Manager
Superintendent
Foreman
Corporate Officer
Accidents: No Yes See Accident Report Dated:_______________
WORK PERFORMED
Formed and poured section of sidewalk
Day of Week : Thursday Start Time: 8:00am End Time: 10:00am
Placed 3CY of concrete for sidewalk
x
Page 5626 of 6526
Job #
Date 4/14/2022 (8:00am-10:00am)
ST HOURLY OT HOURLY ST OT ST OT
UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL
Personnel
Corporate Officer HR $150.00 $195.00 1 $150.00 $0.00 $150.00
Project Manager HR $125.00 $162.50 1 $125.00 $0.00 $125.00
Superintendent HR $85.00 $110.50 2 $170.00 $0.00 $170.00
Foreman HR $85.00 $110.50 2 $170.00 $0.00 $170.00
Mechanic, Equipment & Truck Operator HR $75.00 $97.50 $0.00 $0.00 $0.00
Laborer HR $55.00 $71.50 4 $220.00 $0.00 $220.00
Administrative HR $75.00 $97.50 $0.00 $0.00 $0.00
Equipment
Excavator > Cat 349 HR $250.00 $0.00 $0.00 $0.00
Excavator > Cat 320 HR $200.00 $0.00 $0.00 $0.00
Excavator <Cat 320 HR $150.00 $0.00 $0.00 $0.00
Excavator w/hammer/Epiroc HR $350.00 $0.00 $0.00 $0.00
Excavator w/side grip vibratory hammer HR $350.00 $0.00 $0.00 $0.00
Wheel Loader >Cat 962 HR $225.00 $0.00 $0.00 $0.00
Wheel Loader >Cat 938 HR $175.00 $0.00 $0.00 $0.00
Wheel Loader <Cat 938 HR $150.00 $0.00 $0.00 $0.00
Bull Dozer HR $175.00 $0.00 $0.00 $0.00
Motor Grader HR $175.00 $0.00 $0.00 $0.00
Soil/Stone Roller HR $125.00 $0.00 $0.00 $0.00
Telehandler HR $125.00 $0.00 $0.00 $0.00
Manlift HR $125.00 $0.00 $0.00 $0.00
Forklift HR $100.00 $0.00 $0.00 $0.00
Broom Tractor HR $95.00 $0.00 $0.00 $0.00
Milling Machine HR $685.00 $0.00 $0.00 $0.00
Skid steer with milling head (bump grinder)HR $150.00
Asphalt/Mat.Shuttle Buggy HR $375.00 $0.00 $0.00 $0.00
Asphalt Paver Weiler 385 HR $375.00 $0.00 $0.00 $0.00
Asphalt Paver Cat 1055 HR $575.00 $0.00 $0.00 $0.00
Asphalt Roller HR $125.00 $0.00 $0.00 $0.00
Off Road Dump HR $250.00 $0.00 $0.00 $0.00
Crane >130 ton HR $1,500.00 $0.00 $0.00 $0.00
Crane >30 ton HR $500.00 $0.00 $0.00 $0.00
Crane <30 ton HR $250.00 $0.00 $0.00 $0.00
Vibratory Hammer HR $400.00 $0.00 $0.00 $0.00
Concrete Crusher HR $685.00 $0.00 $0.00 $0.00
Screener HR $375.00 $0.00 $0.00 $0.00
Push Boat HR $275.00 $0.00 $0.00 $0.00
Sectional/Hopper Barge HR $175.00 $0.00 $0.00 $0.00
Drone Lidar Photogrammetry HR $350.00 $0.00 $0.00 $0.00
Directional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0.00
Directional Drill AA 440 HR $4,000.00 $0.00 $0.00 $0.00
Lowboy/Tractor HR $175.00 $0.00 $0.00 $0.00
Dump Truck/Roll Off HR $95.00 $0.00 $0.00 $0.00
Water Truck/Trailer HR $125.00 $0.00 $0.00 $0.00
Tack/Prime Truck/Trailer HR $150.00 $0.00 $0.00 $0.00
Lube/Mechanics Truck HR $125.00 $0.00 $0.00 $0.00
Truck with Hand Tools HR $95.00 2 $190.00 $0.00 $190.00
Pickup HR $40.00 3 $120.00 $0.00 $120.00
Camera Truck HR $400.00 $0.00 $0.00 $0.00
Vacuum Truck HR $475.00 $0.00 $0.00 $0.00
Small Equipment
Air Compressor with Hammer HR $60.00 $0.00 $0.00 $0.00
Concrete Saw HR $60.00 $0.00 $0.00 $0.00
Plate Compactor HR $60.00 $0.00 $0.00 $0.00
Trench Box 16' x 10' HR $50.00 $0.00 $0.00 $0.00
Stone Box HR $50.00 $0.00 $0.00 $0.00
Steel (Road) Plate HR $50.00 $0.00 $0.00 $0.00
Wellpoint System HR $250.00 $0.00 $0.00 $0.00
3” Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0.00
6" Hydraulic Pump HR $150.00 $0.00 $0.00 $0.00
12" Hydraulic Pump HR $200.00 $0.00 $0.00 $0.00
Cut Off Saw HR $20.00 $0.00 $0.00 $0.00
Light Set HR $50.00 $0.00 $0.00 $0.00
Generator/Welder HR $50.00 $0.00 $0.00 $0.00
Generator 70kw HR $125.00 $0.00 $0.00 $0.00
Generator 125kw HR $150.00 $0.00 $0.00 $0.00
MOT HR $150.00 $0.00 $0.00 $0.00
Fusing Machine 2-16”HR $150.00 $0.00 $0.00 $0.00
Fusing Machine 18”-42”HR $300.00 $0.00 $0.00 $0.00
Tap Machine - small (3/4" - 3") each tap EA $750.00 $0.00 $0.00 $0.00
Tap Machine - large (4" - 12") each tap EA $1,000.00 $0.00 $0.00 $0.00
Pipe Trenchless Piercing tool HR $250.00 $0.00 $0.00 $0.00
Pipe Ramming HR $625.00 $0.00 $0.00 $0.00
Material
Disposal Fee (concrete, asphalt, debris, etc)PER LOAD $500.00 $0.00 $0.00 $0.00
Concrete Material ($336 x 1.10) +$40+$25+$150 $584.60
Grand Total:$1,729.60
10% MARK UP ON MATERIAL
15% MARK UP ON SUBCONTRACTORS
REV. 3/17/2021
QUALITY ENTERPRISES USA, INC.
Emergency Repair Work for Rates
Collier County - Board of County Commissioners
If work is performed other than Monday through Friday, 7:00am - 4:00 pm, excluding holidays, OT Rates will be used for Personnel. These rates also apply for travel time
necessary to mobilize and demobilize to and from work.
Under Contract #20-7800
Page 5627 of 6526
Date
Job #
State FL Zip Terms
Project:
Remit Payment to:3494 Shearwater Street
Naples, FL 34117 Serenity Cir.
(239) 435-7200
3K PSI REGULAR MIX
Fuel Surcharge
Environmental Surcharge
Short Load Surcharge
TOTAL DUE
Job #14622-10
20002
$25.00
$40.00
$25.00
$150.00 $150.00
$ 551.00
Due Upon Receipt
E- Sewer Lateral Repair
Name Quality Enterprises USA Inc.May 3, 2022
Attn:
3494 Shearwater St.
Naples 34117
Matt Casey
Description
City
Address
3.00
TOTAL
$336.00$112.00/ cy
PriceQty
1.00
1.00 $40.00
1.00
INVOICE #77105
Concrete Ready-Mix
Past Due Accounts are subject to a Finance Charge of 2% per month
Page 5628 of 6526
Total Reg
Hours
Total OT
Hours QE Employee Type Total Reg
Hours
Total OT
Hours
1 Mechanic
1 Administrative 1
2
2
2
6
Total Reg.
Hrs
Total OT
Hours
3
2
Accidents: No Yes See Accident Report Dated:_______________
WORK PERFORMED
Stripped forms from sidewalk
Day of Week : Friday Start Time: 2:00pm End Time: 4:00pm
Cleaned up site
Equipment Operator
Laborer
CONTRACTOR(S) CREW AND HOURS
Equipment Description
QE Employee Type
SUBCONTRACTORS & MATERIALS
Project Manager
Superintendent
Foreman
Corporate Officer
CONTRACTOR(S) EQUIPMENT (ACTIVE OR IDLE)
PROBLEMS/DELAYS:
Truck with Hand Tools
Pickup Truck
DAILY REPORT OF CONSTRUCTION
Inspector: Superintendent/Foreman: Pablo Perez/UrielDate: 4/22/22
Job Name: Serenity Circle Sewer Lateral Repair
x
Page 5629 of 6526
Job #
Date 4/22/22 (2:00pm-4:00pm)
ST HOURLY OT HOURLY ST OT ST OT
UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL
Personnel
Corporate Officer HR $150.00 $195.00 1 $150.00 $0.00 $150.00
Project Manager HR $125.00 $162.50 1 $125.00 $0.00 $125.00
Superintendent HR $85.00 $110.50 2 $170.00 $0.00 $170.00
Foreman HR $85.00 $110.50 2 $170.00 $0.00 $170.00
Mechanic, Equipment & Truck Operator HR $75.00 $97.50 2 $150.00 $0.00 $150.00
Laborer HR $55.00 $71.50 6 $330.00 $0.00 $330.00
Administrative HR $75.00 $97.50 1 $75.00 $0.00 $75.00
Equipment
Excavator > Cat 349 HR $250.00 $0.00 $0.00 $0.00
Excavator > Cat 320 HR $200.00 $0.00 $0.00 $0.00
Excavator <Cat 320 HR $150.00 $0.00 $0.00 $0.00
Excavator w/hammer/Epiroc HR $350.00 $0.00 $0.00 $0.00
Excavator w/side grip vibratory hammer HR $350.00 $0.00 $0.00 $0.00
Wheel Loader >Cat 962 HR $225.00 $0.00 $0.00 $0.00
Wheel Loader >Cat 938 HR $175.00 $0.00 $0.00 $0.00
Wheel Loader <Cat 938 HR $150.00 $0.00 $0.00 $0.00
Bull Dozer HR $175.00 $0.00 $0.00 $0.00
Motor Grader HR $175.00 $0.00 $0.00 $0.00
Soil/Stone Roller HR $125.00 $0.00 $0.00 $0.00
Telehandler HR $125.00 $0.00 $0.00 $0.00
Manlift HR $125.00 $0.00 $0.00 $0.00
Forklift HR $100.00 $0.00 $0.00 $0.00
Broom Tractor HR $95.00 $0.00 $0.00 $0.00
Milling Machine HR $685.00 $0.00 $0.00 $0.00
Skid steer with milling head (bump grinder)HR $150.00
Asphalt/Mat.Shuttle Buggy HR $375.00 $0.00 $0.00 $0.00
Asphalt Paver Weiler 385 HR $375.00 $0.00 $0.00 $0.00
Asphalt Paver Cat 1055 HR $575.00 $0.00 $0.00 $0.00
Asphalt Roller HR $125.00 $0.00 $0.00 $0.00
Off Road Dump HR $250.00 $0.00 $0.00 $0.00
Crane >130 ton HR $1,500.00 $0.00 $0.00 $0.00
Crane >30 ton HR $500.00 $0.00 $0.00 $0.00
Crane <30 ton HR $250.00 $0.00 $0.00 $0.00
Vibratory Hammer HR $400.00 $0.00 $0.00 $0.00
Concrete Crusher HR $685.00 $0.00 $0.00 $0.00
Screener HR $375.00 $0.00 $0.00 $0.00
Push Boat HR $275.00 $0.00 $0.00 $0.00
Sectional/Hopper Barge HR $175.00 $0.00 $0.00 $0.00
Drone Lidar Photogrammetry HR $350.00 $0.00 $0.00 $0.00
Directional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0.00
Directional Drill AA 440 HR $4,000.00 $0.00 $0.00 $0.00
Lowboy/Tractor HR $175.00 $0.00 $0.00 $0.00
Dump Truck/Roll Off HR $95.00 $0.00 $0.00 $0.00
Water Truck/Trailer HR $125.00 $0.00 $0.00 $0.00
Tack/Prime Truck/Trailer HR $150.00 $0.00 $0.00 $0.00
Lube/Mechanics Truck HR $125.00 $0.00 $0.00 $0.00
Truck with Hand Tools HR $95.00 2 $190.00 $0.00 $190.00
Pickup HR $40.00 3 $120.00 $0.00 $120.00
Camera Truck HR $400.00 $0.00 $0.00 $0.00
Vacuum Truck HR $475.00 $0.00 $0.00 $0.00
Small Equipment
Air Compressor with Hammer HR $60.00 $0.00 $0.00 $0.00
Concrete Saw HR $60.00 $0.00 $0.00 $0.00
Plate Compactor HR $60.00 $0.00 $0.00 $0.00
Trench Box 16' x 10' HR $50.00 $0.00 $0.00 $0.00
Stone Box HR $50.00 $0.00 $0.00 $0.00
Steel (Road) Plate HR $50.00 $0.00 $0.00 $0.00
Wellpoint System HR $250.00 $0.00 $0.00 $0.00
3” Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0.00
6" Hydraulic Pump HR $150.00 $0.00 $0.00 $0.00
12" Hydraulic Pump HR $200.00 $0.00 $0.00 $0.00
Cut Off Saw HR $20.00 $0.00 $0.00 $0.00
Light Set HR $50.00 $0.00 $0.00 $0.00
Generator/Welder HR $50.00 $0.00 $0.00 $0.00
Generator 70kw HR $125.00 $0.00 $0.00 $0.00
Generator 125kw HR $150.00 $0.00 $0.00 $0.00
MOT HR $150.00 $0.00 $0.00 $0.00
Fusing Machine 2-16”HR $150.00 $0.00 $0.00 $0.00
Fusing Machine 18”-42”HR $300.00 $0.00 $0.00 $0.00
Tap Machine - small (3/4" - 3") each tap EA $750.00 $0.00 $0.00 $0.00
Tap Machine - large (4" - 12") each tap EA $1,000.00 $0.00 $0.00 $0.00
Pipe Trenchless Piercing tool HR $250.00 $0.00 $0.00 $0.00
Pipe Ramming HR $625.00 $0.00 $0.00 $0.00
Material
Disposal Fee (concrete, asphalt, debris, etc)PER LOAD $500.00 $0.00 $0.00 $0.00
Grand Total:$1,480.00
10% MARK UP ON MATERIAL
15% MARK UP ON SUBCONTRACTORS
REV. 3/17/2021
QUALITY ENTERPRISES USA, INC.
Emergency Repair Work for Rates
Collier County - Board of County Commissioners
If work is performed other than Monday through Friday, 7:00am - 4:00 pm, excluding holidays, OT Rates will be used for Personnel. These rates also apply for travel time
necessary to mobilize and demobilize to and from work.
Under Contract #20-7800
Page 5630 of 6526
COLLIER COUNTY UTILITY DAMAGE INVESTIGATION REPORT
EVENT INFORMATION
INVESTIGATED BY: Jory Bekich
DATE OF INCIDENT: 3/22/23
TIME OF INCIDENT: 12:00 PM
ADDRESS: 4360 Kensington High St.
CROSS STREET: Dover Ct
CONTRACTOR NAME: Sierra Underground
CONTACT PHONE: 239-357-3057
CONTACT NAME: Ricelo Sierraa
TICKET INFORMATION
TICKET NUMBERS: 052308628 /055304369
Choose an item. Choose an item.
TICKET DUE DATE: 2/28/23
TICKET EXPIRATION: 3/27/23
WAS THE TICKET VALID: YES
LAST RESPONSE CODE: 2E - MARKED - PER
WHITE LINE
WAS 811 NOTIFIED: YES
IF NO, ARE THEY EXEMPT: Choose an item.
FACILITY AND EXCAVATION INFORMATION
TYPE OF DAMAGE: UNDERGROUND DAMAGE
FACILITY DAMGED: SEWER
TYPE OF FACILITY: GATHERING
CROSS BORE: YES
DEPTH OF DAMAGE: 18" - 36"
TYPE OF EXCAVATOR: CONTRACTOR
EXCAV EQUIPMENT: BORING
TYPE OF WORK: ELECTRIC
TYPE OF LOCATOR: FACILITY OWNER
WHITE LINED: YES
RIGHT OF WAY: COUNTY ROAD
MEMBER OPERATOR: Choose an item.
DOWNTIME, INTERUPTION AND RESTORATION
EXCAVATOR DOWN TIME: UNKNOWN
IF YES, HOW MUCH: Choose an item.
DOWN TIME COST: Choose an item.
SERVICE INTERUPTION: YES
INTERUPTION DURATION: N/A
CUSTOMERS AFFECTED: 0
EST COST OF REPAIRS: UNKNOWN
ROOT CAUSE
ROOT CAUSE: EXCAVATOR DUG PRIOR TO
VERIFYING MARKS BY TEST-HOLE (POT-HOLE)
WERE UTILITIES SPOTTED: NO
WAS CONT 556 COMPLIANT: NO
WHO LOCATED: PAUL CARBONE
DIRT NUMBER: Choose an item.
CITATION ISSUED: NO
CITATION #: Choose an item.
FIELD OBSERVATIONS: Upon completing the investigation into ticket number 055304369, all Collier
County Utilities were located but Sierra Underground failed to spot utilities which resulted in a damage
to our Wastewater Collection System.
PREPARED BY: Jory Bekich DATE PREPARED: 3/22/23
Page 5631 of 6526
Page 5632 of 6526
Page 5633 of 6526
Page 5634 of 6526
Page 5635 of 6526
Page 5636 of 6526
Page 5637 of 6526
Page 5638 of 6526
CPW592 26214 CALL SUNSHINE 02/21/23 21:15:58ET 052308628-000 GRID
Ticket : 052308628 Rev:000 Taken: 02/21/23 21:15ET
State: FL Cnty: COLLIER GeoPlace: NAPLES
CallerPlace: NAPLES
Subdivision:
Address : 4360
Street : KENSINGTON HIGH ST
Cross 1 : DOVER CT
Within 1/4 mile: Y
Locat: START ON FRONT OF 4360 KENSINGTON HIGH ST AND GO SOUTH 790 FT APPROX.
ALONG THE WEST SIDE OF KENSINGTON HIGH ST, FOLLOW WHITE LINE. (PRINT AND WHITE
LINE PICTURES ATTACHED)
:
Remarks : *** LOOKUP BY MANUAL ***
*** Attachments can be seen at
https://exactix.sunshine811.com/viewticket/FL811/9Enlylay7RGzJxIGibrXIQ
:
Grids : 2611A8145D 2612D8145D
Work date: 02/23/23 Time: 23:59ET Hrs notc: 040 Category: 3 Duration: 10 DAYS
Due Date : 02/23/23 Time: 23:59ET Exp Date : 03/23/23 Time: 23:59ET
Work type: CATV INSTALLATION Boring: Y White-lined: Y
Ug/Oh/Both: U Machinery: Y Depth: 36 IN Permits: U N/A
Done for : MASTEC
Company : SIERRA UNDERGROUND CORP Type: CONT
Co addr : 12570 METRO PKWY
City : FT MYERS State: FL Zip: 33966
Caller : MAYLIA NUNEZ Phone: 239-357-3057
Contact : RICELO SIERRA Phone: 239-357-3057
BestTime: 7-5
Email : MAYLIA@SIERRAUNDERGROUNDCORP.COM
Submitted: 02/21/23 21:15ET Oper: MAY Chan: WEB
Mbrs : CNTL01 CON762 CPW592 CTV413 FPLCLR
Ticket Hyperlinks: https://exactix.sunshine811.com/viewticket/FL811/9Enlylay7RGzJxIGibrXIQ 2/21/2023 9:15:58 PM: Received DETAILS: Ticket received for registration code CPW592
2/21/2023 9:15:58 PM: Assigned DETAILS: Assigned to Paul Carbone by auto process NOTE: Auto Processed per Responsibility Area
Page 5639 of 6526
2/21/2023 9:15:58 PM: Ticket Queued DETAILS: Ticket queued for delivery
2/21/2023 9:16:01 PM: Ticket Delivered DETAILS: Ticket successfully sent to WWTS-IRTHNET@colliercountyfl.gov
2/23/2023 6:43:27 AM: Re-Assigned DETAILS: Re-Assigned from Paul Carbone to Stephen Chandler by Stephen Chandler
2/23/2023 1:05:40 PM: Responded DETAILS: 3M: added by Stephen Chandler, Locate Time: 2/23/2023 1:03:48 PM NOTE: Too many white lines. Exactic shows a red line and a green line. Which 1 are you using
2/23/2023 1:05:41 PM: Positive Response to Center Queued DETAILS: Positive Response to Center queued for delivery
2/23/2023 1:05:51 PM: Positive Response to Center Delivered DETAILS: Positive Response to Center successfully sent
CPW592 13828 CALL SUNSHINE 02/24/23 13:45:20ET 055304369-000 GRID
Ticket : 055304369 Rev:000 Taken: 02/24/23 13:45ET
State: FL Cnty: COLLIER GeoPlace: NAPLES
CallerPlace: NAPLES
Subdivision:
Address : 4360
Street : KENSINGTON HIGH ST
Cross 1 : DOVER CT
Within 1/4 mile: Y
Locat: START ON FRONT OF 4360 KENSINGTON HIGH ST AND GO SOUTH 790 FT APPROX.
ALONG THE WEST SIDE OF KENSINGTON HIGH ST (AND CROSSING DOVER CT), FOLLOW WHITE
LINE. (PRINT AND WHITE LINE PICTURES ATTACHED)
:
Remarks : WE ARE GOING STRAIGHT SOUTH ON THE WEST SIDE OF KENSINGTON HIGH ST,
WE ONLY NEED TO CROSS DOVER CT ONCE. THE CORRECT WHITE LINE IS THE ONE THAT
GOES SOUTH AND NOT THE ONE ON DOVER CT.
*** LOOKUP BY MANUAL ***
*** Attachments can be seen at
https://exactix.sunshine811.com/viewticket/FL811/LJvvWXO07RGwaRIGibrXIQ
:
Grids : 2611A8145D 2612D8145D
Work date: 02/28/23 Time: 23:59ET Hrs notc: 058 Category: 3 Duration: 10 DAYS
Due Date : 02/28/23 Time: 23:59ET Exp Date : 03/27/23 Time: 23:59ET
Work type: CATV INSTALLATION Boring: Y White-lined: Y
Ug/Oh/Both: U Machinery: Y Depth: 36 IN Permits: U N/A
Done for : MASTEC
Page 5640 of 6526
Company : SIERRA UNDERGROUND CORP Type: CONT
Co addr : 12570 METRO PKWY
City : FT MYERS State: FL Zip: 33966
Caller : MAYLIA NUNEZ Phone: 239-357-3057
Contact : RICELO SIERRA Phone: 239-357-3057
BestTime: 7-5
Email : MAYLIA@SIERRAUNDERGROUNDCORP.COM
Submitted: 02/24/23 13:45ET Oper: MAY Chan: WEB
Mbrs : CNTL01 CON762 CPW592 CTV413 FPLCLR
Ticket Hyperlinks: https://exactix.sunshine811.com/viewticket/FL811/LJvvWXO07RGwaRIGibrXIQ 2/24/2023 1:45:20 PM: Received DETAILS: Ticket received for registration code CPW592
2/24/2023 1:45:20 PM: Assigned DETAILS: Assigned to Paul Carbone by auto process NOTE: Auto Processed per Responsibility Area
2/24/2023 1:45:20 PM: Ticket Queued DETAILS: Ticket queued for delivery
2/24/2023 1:45:31 PM: Ticket Delivered DETAILS: Ticket successfully sent to WWTS-IRTHNET@colliercountyfl.gov
2/28/2023 8:27:59 AM: Responded DETAILS: 2E: added by Paul Carbone, Locate Time: 2/28/2023 8:27:59 AM NOTE: sewer gravity, sewer laterals
2/28/2023 8:28:00 AM: Positive Response to Center Queued DETAILS: Positive Response to Center queued for delivery
2/28/2023 8:28:12 AM: Positive Response to Center Delivered DETAILS: Positive Response to Center successfully sent
Page 5641 of 6526
Page 5642 of 6526
Page 5643 of 6526
Page 5644 of 6526
Page 5645 of 6526
Page 5646 of 6526
Page 5647 of 6526
Page 5648 of 6526
Page 5649 of 6526
Page 5650 of 6526
Page 5651 of 6526
Page 5652 of 6526
Page 5653 of 6526
Page 5654 of 6526
Page 5655 of 6526
Page 5656 of 6526
Page 5657 of 6526
Page 5658 of 6526
Page 5659 of 6526
Page 5660 of 6526
Page 5661 of 6526
Page 5662 of 6526
Page 5663 of 6526
Page 5664 of 6526
Page 5665 of 6526
Page 5666 of 6526
Page 5667 of 6526
Page 5668 of 6526
Page 5669 of 6526
Page 5670 of 6526
Page 5671 of 6526
Page 5672 of 6526
Page 5673 of 6526
Page 5674 of 6526
Page 5675 of 6526
Page 5676 of 6526
Page 5677 of 6526
Page 5678 of 6526
Page 5679 of 6526
Page 5680 of 6526
Page 5681 of 6526
Page 5682 of 6526
Page 5683 of 6526
Page 5684 of 6526
Page 5685 of 6526
Page 5686 of 6526
Page 5687 of 6526
Page 5688 of 6526
Page 5689 of 6526
Page 5690 of 6526
Page 5691 of 6526