Loading...
Agenda 10/14/2025 Item #16K 9 (County Attorney to file a lawsuit on behalf of Collier County Board of County Commissioners against Sierra Underground Corp)10/14/2025 Item # 16.K.9 ID# 2025-3721 Executive Summary Recommendation to authorize the County Attorney to file a lawsuit on behalf of the Collier County Board of County Commissioners against Sierra Underground Corp. for $14,235.38 in damages caused to a County-owned sewer lateral line and orange conduit on two separate occasions and locations. OBJECTIVE: To recover the money spent to repair a sewer lateral line and orange conduit damaged by a negligent excavation contractor. CONSIDERATIONS: Sierra Underground Corp. was performing excavations to install cable tv lines when they struck the County’s owned and maintained sewer lateral line and orange conduit causing damage to the County for repairs on the following dates and properties: April 11, 2022 (1430 Serenity Circle in Sterling Oaks); and March 22, 2023 (4425 Dover Court and High Street in Kensington). The County had to hire an emergency contractor and utilize staff resources to restore the County’s lateral line and orange conduit and incurred $14,235.38 in damages. Sierra Underground Corp. has been contacted by the County’s third-party adjuster Johns Eastern Company, as well as by the County Attorney’s Office, several times with no response. The County seeks approval from the Board of County Commissioners (Board) to file a lawsuit in county court to recover the damages. Attached is a draft copy of the complaint, along with corresponding backup materials documenting the damage and amounts thereof. By filing this lawsuit to recover damages, the County puts contractors on notice that they will be held responsible for negligent actions resulting in damage to public utilities in Collier County. FISCAL IMPACT: The cost to file and serve a Complaint is approximately $415.00 and funds are budgeted and available in the Risk Management Property & Casualty (Fund 5016) GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this item. LEGAL CONSIDERATIONS: This item has been approved as to form and legality and requires a majority vote for Board approval. – CLD RECOMMENDATIONS: To authorize the County Attorney to file a lawsuit on behalf of the Collier County Board of County Commissioners against Sierra Underground Corp. for $14,235.38 in damages caused to a County-owned sewer lateral line and orange conduit on two separate occasions and locations. PREPARED BY: Courtney L. DaSilva, Assistant County Attorney ATTACHMENTS: 1. Complaint DRAFT Sierra 2. Sierra Underground Back Up 2 Page 5610 of 6526 #43 Draft Complaint 022124 Page 1 of 9 IN THE COUNTY COURT OF THE TWENTIETH JUDICIAL CIRCUIT IN AND FOR COLLIER COUNTY, FLORIDA CIVIL ACTION BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, a political subdivision of the State of Florida, Plaintiff, vs. Case No.: _____________________ SIERRA UNDERGROUND CORP., a Florida Profit Corporation, Defendant. _____________________________________/ COMPLAINT Plaintiff BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA (“COUNTY”), by and through its undersigned counsel, sues Defendant, SIERRA UNDERGROUND CORP. (“SIERRA”), a Florida Profit Corporation, and states as follows: NATURE OF CLAIMS, THE PARTIES, JURISDICTION, AND VENUE 1. The COUNTY’S claims stem from SIERRA’S damage to the COUNTY’s personal property, specifically a water lateral line and an orange conduit line, owned, operated, and maintained by the COUNTY, and the resulting cost of repair incurred by the COUNTY. 2. This Court has jurisdiction over this matter, as it is an action to recover damages in excess of $8,000.00 but less than $50,000.00. 3. The COUNTY, as the governing body for Collier County, Florida, a political subdivision of the State of Florida, and as the ex-officio governing board of the Collier County Water-Sewer District, an independent special district created by the Florida Legislature, is the Page 5611 of 6526 #43 Draft Complaint 022124 Page 2 of 9 owner of the personal property that is the subject of this litigation and is thus authorized to bring this action. 4. SIERRA is a Florida profit corporation organized under the laws of Florida, with its principal place of business at 227 SE 46th Terrace, Cape Coral, Florida 33904, in Lee County, Florida, and is authorized to and does conduct business throughout the State of Florida, including in Collier County. 5. Venue is proper in Collier County, Florida, pursuant to Section 47.051, Florida Statutes, because (i) this is an action against a domestic corporation, (ii) Collier County is where the instant cause of action accrued, (iii) Collier County is where the property in litigation is located, and (iv) the amounts due to the COUNTY are due in Collier County. FACTUAL ALLEGATIONS 6. In 1993, the Florida Legislature enacted the “Underground Facility Damage Prevention and Safety Act,” Chapter 556, Florida Statutes (“the Act”), to prevent injury to persons or property and the interruption of services resulting from damage to an undergrou nd facility caused by excavation or demolition operations. Fla. Stat. § 556.101(3)(a). 7. The Act created a not-for-profit corporation called Sunshine State One-Call of Florida, Inc. (“the Corporation”), and requires the Corporation to maintain a free-access notification system (the “One-Call System” or “System”) which excavators can use to notify owners of underground facilities of planned excavation or demolition activities. See Fla. Stat. §§ 556.103, 556.104. 8. The Corporation is comprised of the owners of underground facilities in the State of Florida, which are called “member operators” by the Act. Fla. Stat. § 556.104. 9. The COUNTY is a “member operator” under the Act. Page 5612 of 6526 #43 Draft Complaint 022124 Page 3 of 9 10. Under the Act, “excavators” and “excavating contractors” are required to notify the System and provide information about a planned excavation at least two full business days before beginning any excavation. Fla. Stat. § 556.105(1). The System then notifies member operators with underground facilities near the planned excavation, who are required to “identify the horizontal route by marking to within 24 inches born the outer edge of either side of the underground facility by the use of stakes, paint, flags, or other suitable means within two full business days after the time the notification is received” from the System. Fla. Stat. § 556.105(5) (emphasis added). 11. SIERRA is an “excavator” and/or “excavating contractor” under the Act. 12. On August 24, 2021, SIERRA was installing Cable TV Lines at 1430 through 1617 Serenity Circle at Sterling Oaks Drive in Collier County, Florida. 13. On March 22, 2023, SIERRA was installing Cable TV Lines at 4425 Dover Court and High Street in Kensington in Collier County, Florida. 14. Hereinafter, 1430 through 1617 Serenity Circle and 4425 Dover Court and High Street will collectively be referred to as the “Properties.” 15. SIERRA provided notices of planned excavations at the Properties through the System as required by the Act (the “Notice”). 16. The COUNTY received these Notices and marked with flags and paint the horizontal route of the COUNTY’S underground facilities throughout the boring areas at the Properties on the dates prior to SIERRA’S excavations. 17. The utilities marked by the COUNTY in response to the Notices included a COUNTY owned and maintained Lateral Line, which was marked with flags and spray paint in Page 5613 of 6526 #43 Draft Complaint 022124 Page 4 of 9 accordance with the “Uniform Color Code for Utilities” of the American Public Works Association. 18. While performing their installation of Cable TV lines at the Properties, SIERRA bored through the COUNTY’S Sewer Lateral Line and an Orange Conduit Line (the “Lateral Lines”) that resulted in area household sewers to back up. 19. Specifically, the COUNTY discovered damage to the COUNTY’s Orange Conduit Line at 1430 Serenity Circle in Sterling Oaks on April 11, 2022. 20. In addition, the COUNTY discovered damage to the COUNTY’s Sewer Lateral at 4425 Dover Court in Kensington on March 22, 2023. 21. As a result, the COUNTY incurred $14,235.38 in damages to repair its Lateral Lines. 22. “If any excavator fails to discharge a duty imposed by [the Act], the excavator, if found liable, is liable for the total sum of the losses to all parties involved as those costs are normally computed.” Fla. Stat. § 556.106(2)(b). 23. On January 23, 2024, the COUNTY sent a demand letter to SIERRA for reimbursement of the repair costs to the COUNTY-owned Lateral Lines at the Properties. To date, SIERRA failed and refused to reimburse the COUNTY. 24. All conditions precedent to the relief demanded herein have been performed or waived. COUNT I –NEGLIGENCE Breach of the duty to identify and protect underground facilities within the Tolerance Zone of SIERRA’S excavation. 25. The COUNTY re-alleges and incorporates by reference its allegations in paragraphs 1–24, as if fully set forth herein. Page 5614 of 6526 #43 Draft Complaint 022124 Page 5 of 9 26. The Act imposes a duty on excavators to use increased caution to identify and protect underground facilities when an excavation is to take place within a “tolerance zone.” Fla. Stat. § 556.105(5)(c). “The protection requires hand digging, pot holing, soft digging, vacuum excavation methods, or similar procedures to identify underground facilities.” Id. 27. The Act defines “tolerance zone” as “24 inches from the outer edge of either side of the exterior surface of a marked underground facility.” Fla. Stat. § 556.102(15). 28. SIERRA’s excavation activities at the Properties were within the “tolerance zone” of the COUNTY’s Lateral Lines. 29. SIERRA knew or should have known that its excavation was within the “tolerance zone” of the COUNTY’s Lateral Lines and the Notices Area, of which the COUNTY’s Lateral Lines was marked. 30. SIERRA had a duty to use increased caution to identify and protect the COUNTY’s Lateral Lines. 31. SIERRA breached the aforementioned duty by failing to use increased caution to identify and protect the COUNTY’s Lateral Lines before proceeding with its excavation activities at the Properties. 32. The COUNTY’s damaged Lateral Lines were the direct, proximate, and foreseeable result of SIERRA’s breach of its duty. 33. As a result of SIERRA’s negligence, the COUNTY incurred monetary damages including, but not limited to, the $14,235.38 incurred to repair the damaged Lateral Lines, and other direct and consequential damages. 34. SIERRA is liable to the COUNTY for the total sum of the losses incurred by the COUNTY as a result of SIERRA’S negligence. Fla. Stat. § 556.106(2)(b). Page 5615 of 6526 #43 Draft Complaint 022124 Page 6 of 9 WHEREFORE, the COUNTY demands judgment against SIERRA for damages, together with prejudgment interest and costs, and for such other or further relief as this Court deems equitable and just under the circumstances. COUNT II – NEGLIGENCE Breach of the duty to perform an excavation in a careful and prudent manner and to exercise due care in the performance of work. 35. The COUNTY re-alleges and incorporates by reference its allegations in paragraphs 1–24, as if fully set forth herein. 36. “Obtaining information as to the location of an underground facility from the member operator as required by this chapter does not excuse any excavator from performing an excavation or demolition in a careful and prudent manner, based on accepted engineeri ng and construction practices, and it does not excuse the excavator from liability for any damage or injury resulting from any excavation or demolition.” Fla. Stat. § 556.106(2)(c). 37. The Act imposes a duty on excavators to perform excavations in a careful and prudent manner, based on accepted engineering and construction practices. Fla. Stat. § 556.106(2)(c). 38. SIERRA had a duty to perform an excavation at the Properties in a careful and prudent manner based on accepted engineering and construction practices. 39. SIERRA breached the aforementioned duty by failing to perform its excavation in a careful and prudent manner based on accepted engineering and construction practices. 40. The COUNTY’s damaged Lateral Lines were the direct, proximate, and foreseeable result of SIERRA’s breach of its duty. Page 5616 of 6526 #43 Draft Complaint 022124 Page 7 of 9 41. As a result of SIERRA’S negligence, the COUNTY incurred monetary damages including, but not limited to, the $14,235.38 incurred to repair the damaged Lateral Lines, and other direct and consequential damages. 42. SIERRA’s receipt of information as to the location of the COUNTY’S Lateral Lines does not excuse SIERRA from the duty to perform its excavation in a careful and prudent manner, based on accepted engineering and construction practices, and it does not excuse SIERRA from liability for the damage caused to the COUNTY’s Lateral Lines. Fla. Stat. § 556.106(2)(c). 43. SIERRA is liable to the COUNTY for the total sum of the losses incurred by the COUNTY as a result of SIERRA’S negligence. Fla. Stat. § 556.106(2)(b). WHEREFORE, the COUNTY demands judgment against SIERRA for damages, together with prejudgment interest and costs, and for such other or further relief as this Court deems equitable and just under the circumstances. COUNT III – NEGLIGENCE Breach of the common law duty to exercise due care in the performance of work. 44. The COUNTY re-alleges and incorporates by reference its allegations in paragraphs 1–24, as if fully set forth herein. 45. SIERRA had a duty to exercise due care in the performance of its excavation at the Properties which required SIERRA to exercise the degree of care that a reasonably careful excavator would use under like circumstances. 46. SIERRA breached its duty to exercise due care in the performance of its excavation at the Properties in the following ways: a. SIERRA failed to identify and protect marked underground facilities within the tolerance zone (i.e., 24-inches) of its excavation. Page 5617 of 6526 #43 Draft Complaint 022124 Page 8 of 9 b. SIERRA failed to comply with its Drilled Shaft Installation Plan by failing to hand dig the shaft as required to verify no underground utilities conflict with its excavation at the Properties. c. SIERRA failed to contact the COUNTY when SIERRA did not find the COUNTY’s Lateral Main during its hand dig. d. SIERRA assumed it was clear of marked underground utilities without identifying and protecting all utilities marked in conflict with its excavation at the Properties. 47. The COUNTY’s damaged Lateral Lines were the direct, proximate, and foreseeable result of SIERRA’s breaches described above. 48. As a result of SIERRA’S negligence, the COUNTY has incurred monetary damages including, but not limited to, the $14,238.38 incurred to repair the damaged Lateral Line, and other direct and consequential damages. WHEREFORE, the COUNTY demands judgment against SIERRA for damages, together with prejudgment interest and costs, and for such other or further relief as this Court deems equitable and just under the circumstances. DEMAND FOR JURY TRIAL The COUNTY hereby demands a jury trial on all issues so triable. Dated this __ day of _____ 2025. Page 5618 of 6526 #43 Draft Complaint 022124 Page 9 of 9 Respectfully submitted, By: COURTNEY L. DASILVA, ESQ. Florida Bar No. 1032733 RONALD T. TOMASKO, ESQ. Florida Bar No. 1030999 Collier County Attorney’s Office 3299 East Tamiami Trail, Suite 800 Naples, Florida 34112-5746 Telephone: (239) 252-8400 Facsimile: (239) 252-6300 Counsel for Plaintiff COLLIER COUNTY courtney.dasilva@collier.gov ronald.tomasko@collier.gov juanita.garcia@collier.gov Page 5619 of 6526 INVOICE 77890To : Invoice #: Date: Application #: Naples ,FL 34112-5749 Contract : Collier County Board of County Commissioners 05/03/22 1 Attn: Accounts Payable Quality Enterprises USA, Inc. 3494 Shearwater St Naples, FL 34117 3299 Tamiami Trail E Ste 700 14622-10 E - Sewer Lateral Repair - Serenity Circle Invoice Due Date: Payment Terms: 06/02/22 Net 30 Days Contract Item Quantity JTD Unit Price U/M Total To Date 7,004.861 E - Sewer Lateral Repair - Serenity Circle LS 1.000 7,004.86 7,004.86Total To Date : 0.00Plus Sales Tax : Less Retainage : Less Previous Applications : 7,004.86Total Due This Invoice : 0.00 0.00 Page 1 of 1 Page 5620 of 6526 Total Reg Hours Total OT Hours QE Employee Type Total Reg Hours Total OT Hours 1 Mechanic 2 Administrative 4.5 4.5 4.5 13.5 Total Reg. Hrs Total OT Hours 6.5 4.5 DAILY REPORT OF CONSTRUCTION Inspector: Superintendent/Foreman: Pablo Perez/Armando RamirezDate: 4/11/22 Job Name: Serenity Circle Sewer Lateral Repair CONTRACTOR(S) EQUIPMENT (ACTIVE OR IDLE) PROBLEMS/DELAYS: Home Depot pipe material Ace Hardware Pipe Material Truck with Hand Tools Pickup Truck Equipment Operator Laborer Ferguson pipe material CONTRACTOR(S) CREW AND HOURS Equipment Description QE Employee Type SUBCONTRACTORS & MATERIALS Project Manager Superintendent Foreman Corporate Officer Accidents: No Yes See Accident Report Dated:_______________ WORK PERFORMED Repaired damaged 4" sewer lateral Day of Week : Monday Start Time: 5:00pm End Time: 9:30pm x Page 5621 of 6526 Job # Date 4/11/22 (5:00pm-9:30pm) ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personnel Corporate Officer HR $150.00 $195.00 1 $150.00 $0.00 $150.00 Project Manager HR $125.00 $162.50 2 $0.00 $325.00 $325.00 Superintendent HR $85.00 $110.50 4.5 $0.00 $497.25 $497.25 Foreman HR $85.00 $110.50 4.5 $0.00 $497.25 $497.25 Mechanic, Equipment & Truck Operator HR $75.00 $97.50 4.5 $0.00 $438.75 $438.75 Laborer HR $55.00 $71.50 13.5 $0.00 $965.25 $965.25 Administrative HR $75.00 $97.50 $0.00 $0.00 $0.00 Equipment Excavator > Cat 349 HR $250.00 $0.00 $0.00 $0.00 Excavator > Cat 320 HR $200.00 $0.00 $0.00 $0.00 Excavator <Cat 320 HR $150.00 $0.00 $0.00 $0.00 Excavator w/hammer/Epiroc HR $350.00 $0.00 $0.00 $0.00 Excavator w/side grip vibratory hammer HR $350.00 $0.00 $0.00 $0.00 Wheel Loader >Cat 962 HR $225.00 $0.00 $0.00 $0.00 Wheel Loader >Cat 938 HR $175.00 $0.00 $0.00 $0.00 Wheel Loader <Cat 938 HR $150.00 $0.00 $0.00 $0.00 Bull Dozer HR $175.00 $0.00 $0.00 $0.00 Motor Grader HR $175.00 $0.00 $0.00 $0.00 Soil/Stone Roller HR $125.00 $0.00 $0.00 $0.00 Telehandler HR $125.00 $0.00 $0.00 $0.00 Manlift HR $125.00 $0.00 $0.00 $0.00 Forklift HR $100.00 $0.00 $0.00 $0.00 Broom Tractor HR $95.00 $0.00 $0.00 $0.00 Milling Machine HR $685.00 $0.00 $0.00 $0.00 Skid steer with milling head (bump grinder)HR $150.00 Asphalt/Mat.Shuttle Buggy HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver Weiler 385 HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver Cat 1055 HR $575.00 $0.00 $0.00 $0.00 Asphalt Roller HR $125.00 $0.00 $0.00 $0.00 Off Road Dump HR $250.00 $0.00 $0.00 $0.00 Crane >130 ton HR $1,500.00 $0.00 $0.00 $0.00 Crane >30 ton HR $500.00 $0.00 $0.00 $0.00 Crane <30 ton HR $250.00 $0.00 $0.00 $0.00 Vibratory Hammer HR $400.00 $0.00 $0.00 $0.00 Concrete Crusher HR $685.00 $0.00 $0.00 $0.00 Screener HR $375.00 $0.00 $0.00 $0.00 Push Boat HR $275.00 $0.00 $0.00 $0.00 Sectional/Hopper Barge HR $175.00 $0.00 $0.00 $0.00 Drone Lidar Photogrammetry HR $350.00 $0.00 $0.00 $0.00 Directional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0.00 Directional Drill AA 440 HR $4,000.00 $0.00 $0.00 $0.00 Lowboy/Tractor HR $175.00 $0.00 $0.00 $0.00 Dump Truck/Roll Off HR $95.00 $0.00 $0.00 $0.00 Water Truck/Trailer HR $125.00 $0.00 $0.00 $0.00 Tack/Prime Truck/Trailer HR $150.00 $0.00 $0.00 $0.00 Lube/Mechanics Truck HR $125.00 $0.00 $0.00 $0.00 Truck with Hand Tools HR $95.00 4.5 $427.50 $0.00 $427.50 Pickup HR $40.00 6.5 $260.00 $0.00 $260.00 Camera Truck HR $400.00 $0.00 $0.00 $0.00 Vacuum Truck HR $475.00 $0.00 $0.00 $0.00 Small Equipment Air Compressor with Hammer HR $60.00 $0.00 $0.00 $0.00 Concrete Saw HR $60.00 $0.00 $0.00 $0.00 Plate Compactor HR $60.00 $0.00 $0.00 $0.00 Trench Box 16' x 10' HR $50.00 $0.00 $0.00 $0.00 Stone Box HR $50.00 $0.00 $0.00 $0.00 Steel (Road) Plate HR $50.00 $0.00 $0.00 $0.00 Wellpoint System HR $250.00 $0.00 $0.00 $0.00 3” Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0.00 6" Hydraulic Pump HR $150.00 $0.00 $0.00 $0.00 12" Hydraulic Pump HR $200.00 $0.00 $0.00 $0.00 Cut Off Saw HR $20.00 $0.00 $0.00 $0.00 Light Set HR $50.00 $0.00 $0.00 $0.00 Generator/Welder HR $50.00 $0.00 $0.00 $0.00 Generator 70kw HR $125.00 $0.00 $0.00 $0.00 Generator 125kw HR $150.00 $0.00 $0.00 $0.00 MOT HR $150.00 $0.00 $0.00 $0.00 Fusing Machine 2-16”HR $150.00 $0.00 $0.00 $0.00 Fusing Machine 18”-42”HR $300.00 $0.00 $0.00 $0.00 Tap Machine - small (3/4" - 3") each tap EA $750.00 $0.00 $0.00 $0.00 Tap Machine - large (4" - 12") each tap EA $1,000.00 $0.00 $0.00 $0.00 Pipe Trenchless Piercing tool HR $250.00 $0.00 $0.00 $0.00 Pipe Ramming HR $625.00 $0.00 $0.00 $0.00 Material Disposal Fee (concrete, asphalt, debris, etc)PER LOAD $500.00 $0.00 $0.00 $0.00 Ferguson Pipe Material ($165.82 x 1.1) + ($11.60)$194.00 Home Depot Pipe Material ($18.58 x 1.1) + $1.30 $21.74 Home Depot Pipe Material ($9.91 x 1.1) + $0.64 $11.54 Ace Hardware Pipe Material ($5.99 x 1.1) + $0.39 $6.98 Grand Total:$3,795.26 10% MARK UP ON MATERIAL 15% MARK UP ON SUBCONTRACTORS REV. 3/17/2021 QUALITY ENTERPRISES USA, INC. Emergency Repair Work for Rates Collier County - Board of County Commissioners If work is performed other than Monday through Friday, 7:00am - 4:00 pm, excluding holidays, OT Rates will be used for Personnel. These rates also apply for travel time necessary to mobilize and demobilize to and from work. Under Contract #20-7800 Page 5622 of 6526 Deliver To: From: Comments: EMAIL DUPLICATE INVOICE **FLOCAP CUST** FEL-FT. MYERS WATERWORKS #127 Rony Alvarado PO BOX 100286 ATLANTA, GA 30384-0286 Invoice Number Customer Page Please Contact With Questions: 239-433-0555 1552258 46181 1 Please refer to Invoice Number when making payment and remit to: Sold To:Ship To: TOTAL DUE ---> FEL-FT. MYERS WATERWORKS #127 PO BOX 100286 ATLANTA, GA 30384-0286 QUALITY ENTERPRISES USA INC 3494 SHEARWATER STREET PS 30501 REHAB NAPLES, FL 34117 COUNTER PICK UP 3801 PROSPECT AVE NAPLES, FL 34104 177.42 Ship Whse Sell Whse Tax Code Customer Order Number Sales Person Job Name Invoice Date Batch 136 136 FL2COL .TAE PS 305.01 REHAB 04/12/2022 86390 ALL ACCOUNTS ARE DUE AND PAYABLE PER THE CONDITIONS AND TERMS OF THE ORIGINAL INVOICE. ALL PAST DUE AMOUNTSARE SUBJECT TO A SERVICE CHARGE AT THE MAXIMUM RATE ALLOWED BY STATE LAW PLUS COSTS OF COLLECTION INCLUDINGATTORNEY FEES IF INCURRED. FREIGHT TERMS ARE FOR OUR DOCK UNLESS OTHERWISE SPECIFIED ABOVE. COMPLETE TERMS ANDCONDITIONS ARE AVAILABLE UPON REQUESTGOVT BUYERS: ALL ITEMS QUOTED ARE OPEN MARKETUNLESS NOTED OTHERWISE.OR CAN BE VIEWED ON THE WEB AT https://www.ferguson.com/content/website-info/terms-of-sale LEAD LAW WARNING: IT IS ILLEGAL TO INSTALL PRODUCTS THAT ARE NOT "LEAD FREE" IN ACCORDANCE WITH US FEDERAL OROTHER APPLICABLE LAW IN POTABLE WATER SYSTEMS ANTICIPATED FOR HUMAN CONSUMPTION. PRODUCTS WITH *NP IN THEDESCRIPTION ARE NOT LEAD FREE AND CAN ONLY BE INSTALLED IN NON-POTABLE APPLICATIONS. BUYER IS SOLELYRESPONSIBLE FOR PRODUCT SELECTION.COVID-19 ORDER: ANY REFERENCE TO OR INCORPORATION OF EXECUTIVE ORDER 14042 AND/OR THE EO-IMPLEMENTING FEDERALCLAUSES (FAR 52.223-99 AND/OR DFARS 252.223-7999) IS EXPRESSLY REJECTED BY SELLER AND SHALL NOT APPLY AS SELLER IS AMATERIALS SUPPLIER AND THEREFORE EXEMPT UNDER THE EXECUTIVE ORDER. Ordered Shipped Item Number Description Unit Price UM Amount 2 2 MUL067474 4 PVC HW SWR GXG REP COUP 34.820 EA 69.64 14 14 SDR26HWSPP14 4X14 SDR26 HW PVC GJ SWR PIPE 4.870 FT 68.18 1 1 PSLUBXL1G 1 GAL 8 LB PIPE JT LUB NSF NEW FORM 28.000 EA 28.00 Invoice Sub-Total 165.82 Tax Total Amt 11.60 177.42 TOTAL DUE --->177.42 Page 5623 of 6526 Page 5624 of 6526 Page 5625 of 6526 Total Reg Hours Total OT Hours QE Employee Type Total Reg Hours Total OT Hours 1 Mechanic 1 Administrative 2 2 4 Total Reg. Hrs Total OT Hours 3 2 DAILY REPORT OF CONSTRUCTION Inspector: Superintendent/Foreman: Pablo Perez/Jorge RamirezDate: 4/14/22 Job Name: Serenity Circle Sewer Lateral Repair CONTRACTOR(S) EQUIPMENT (ACTIVE OR IDLE) PROBLEMS/DELAYS: Truck with Hand Tools Pickup Truck Equipment Operator Laborer 3CY of concrete CONTRACTOR(S) CREW AND HOURS Equipment Description QE Employee Type SUBCONTRACTORS & MATERIALS Project Manager Superintendent Foreman Corporate Officer Accidents: No Yes See Accident Report Dated:_______________ WORK PERFORMED Formed and poured section of sidewalk Day of Week : Thursday Start Time: 8:00am End Time: 10:00am Placed 3CY of concrete for sidewalk x Page 5626 of 6526 Job # Date 4/14/2022 (8:00am-10:00am) ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personnel Corporate Officer HR $150.00 $195.00 1 $150.00 $0.00 $150.00 Project Manager HR $125.00 $162.50 1 $125.00 $0.00 $125.00 Superintendent HR $85.00 $110.50 2 $170.00 $0.00 $170.00 Foreman HR $85.00 $110.50 2 $170.00 $0.00 $170.00 Mechanic, Equipment & Truck Operator HR $75.00 $97.50 $0.00 $0.00 $0.00 Laborer HR $55.00 $71.50 4 $220.00 $0.00 $220.00 Administrative HR $75.00 $97.50 $0.00 $0.00 $0.00 Equipment Excavator > Cat 349 HR $250.00 $0.00 $0.00 $0.00 Excavator > Cat 320 HR $200.00 $0.00 $0.00 $0.00 Excavator <Cat 320 HR $150.00 $0.00 $0.00 $0.00 Excavator w/hammer/Epiroc HR $350.00 $0.00 $0.00 $0.00 Excavator w/side grip vibratory hammer HR $350.00 $0.00 $0.00 $0.00 Wheel Loader >Cat 962 HR $225.00 $0.00 $0.00 $0.00 Wheel Loader >Cat 938 HR $175.00 $0.00 $0.00 $0.00 Wheel Loader <Cat 938 HR $150.00 $0.00 $0.00 $0.00 Bull Dozer HR $175.00 $0.00 $0.00 $0.00 Motor Grader HR $175.00 $0.00 $0.00 $0.00 Soil/Stone Roller HR $125.00 $0.00 $0.00 $0.00 Telehandler HR $125.00 $0.00 $0.00 $0.00 Manlift HR $125.00 $0.00 $0.00 $0.00 Forklift HR $100.00 $0.00 $0.00 $0.00 Broom Tractor HR $95.00 $0.00 $0.00 $0.00 Milling Machine HR $685.00 $0.00 $0.00 $0.00 Skid steer with milling head (bump grinder)HR $150.00 Asphalt/Mat.Shuttle Buggy HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver Weiler 385 HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver Cat 1055 HR $575.00 $0.00 $0.00 $0.00 Asphalt Roller HR $125.00 $0.00 $0.00 $0.00 Off Road Dump HR $250.00 $0.00 $0.00 $0.00 Crane >130 ton HR $1,500.00 $0.00 $0.00 $0.00 Crane >30 ton HR $500.00 $0.00 $0.00 $0.00 Crane <30 ton HR $250.00 $0.00 $0.00 $0.00 Vibratory Hammer HR $400.00 $0.00 $0.00 $0.00 Concrete Crusher HR $685.00 $0.00 $0.00 $0.00 Screener HR $375.00 $0.00 $0.00 $0.00 Push Boat HR $275.00 $0.00 $0.00 $0.00 Sectional/Hopper Barge HR $175.00 $0.00 $0.00 $0.00 Drone Lidar Photogrammetry HR $350.00 $0.00 $0.00 $0.00 Directional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0.00 Directional Drill AA 440 HR $4,000.00 $0.00 $0.00 $0.00 Lowboy/Tractor HR $175.00 $0.00 $0.00 $0.00 Dump Truck/Roll Off HR $95.00 $0.00 $0.00 $0.00 Water Truck/Trailer HR $125.00 $0.00 $0.00 $0.00 Tack/Prime Truck/Trailer HR $150.00 $0.00 $0.00 $0.00 Lube/Mechanics Truck HR $125.00 $0.00 $0.00 $0.00 Truck with Hand Tools HR $95.00 2 $190.00 $0.00 $190.00 Pickup HR $40.00 3 $120.00 $0.00 $120.00 Camera Truck HR $400.00 $0.00 $0.00 $0.00 Vacuum Truck HR $475.00 $0.00 $0.00 $0.00 Small Equipment Air Compressor with Hammer HR $60.00 $0.00 $0.00 $0.00 Concrete Saw HR $60.00 $0.00 $0.00 $0.00 Plate Compactor HR $60.00 $0.00 $0.00 $0.00 Trench Box 16' x 10' HR $50.00 $0.00 $0.00 $0.00 Stone Box HR $50.00 $0.00 $0.00 $0.00 Steel (Road) Plate HR $50.00 $0.00 $0.00 $0.00 Wellpoint System HR $250.00 $0.00 $0.00 $0.00 3” Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0.00 6" Hydraulic Pump HR $150.00 $0.00 $0.00 $0.00 12" Hydraulic Pump HR $200.00 $0.00 $0.00 $0.00 Cut Off Saw HR $20.00 $0.00 $0.00 $0.00 Light Set HR $50.00 $0.00 $0.00 $0.00 Generator/Welder HR $50.00 $0.00 $0.00 $0.00 Generator 70kw HR $125.00 $0.00 $0.00 $0.00 Generator 125kw HR $150.00 $0.00 $0.00 $0.00 MOT HR $150.00 $0.00 $0.00 $0.00 Fusing Machine 2-16”HR $150.00 $0.00 $0.00 $0.00 Fusing Machine 18”-42”HR $300.00 $0.00 $0.00 $0.00 Tap Machine - small (3/4" - 3") each tap EA $750.00 $0.00 $0.00 $0.00 Tap Machine - large (4" - 12") each tap EA $1,000.00 $0.00 $0.00 $0.00 Pipe Trenchless Piercing tool HR $250.00 $0.00 $0.00 $0.00 Pipe Ramming HR $625.00 $0.00 $0.00 $0.00 Material Disposal Fee (concrete, asphalt, debris, etc)PER LOAD $500.00 $0.00 $0.00 $0.00 Concrete Material ($336 x 1.10) +$40+$25+$150 $584.60 Grand Total:$1,729.60 10% MARK UP ON MATERIAL 15% MARK UP ON SUBCONTRACTORS REV. 3/17/2021 QUALITY ENTERPRISES USA, INC. Emergency Repair Work for Rates Collier County - Board of County Commissioners If work is performed other than Monday through Friday, 7:00am - 4:00 pm, excluding holidays, OT Rates will be used for Personnel. These rates also apply for travel time necessary to mobilize and demobilize to and from work. Under Contract #20-7800 Page 5627 of 6526 Date Job # State FL Zip Terms Project: Remit Payment to:3494 Shearwater Street Naples, FL 34117 Serenity Cir. (239) 435-7200 3K PSI REGULAR MIX Fuel Surcharge Environmental Surcharge Short Load Surcharge TOTAL DUE Job #14622-10 20002 $25.00 $40.00 $25.00 $150.00 $150.00 $ 551.00 Due Upon Receipt E- Sewer Lateral Repair Name Quality Enterprises USA Inc.May 3, 2022 Attn: 3494 Shearwater St. Naples 34117 Matt Casey Description City Address 3.00 TOTAL $336.00$112.00/ cy PriceQty 1.00 1.00 $40.00 1.00 INVOICE #77105 Concrete Ready-Mix Past Due Accounts are subject to a Finance Charge of 2% per month Page 5628 of 6526 Total Reg Hours Total OT Hours QE Employee Type Total Reg Hours Total OT Hours 1 Mechanic 1 Administrative 1 2 2 2 6 Total Reg. Hrs Total OT Hours 3 2 Accidents: No Yes See Accident Report Dated:_______________ WORK PERFORMED Stripped forms from sidewalk Day of Week : Friday Start Time: 2:00pm End Time: 4:00pm Cleaned up site Equipment Operator Laborer CONTRACTOR(S) CREW AND HOURS Equipment Description QE Employee Type SUBCONTRACTORS & MATERIALS Project Manager Superintendent Foreman Corporate Officer CONTRACTOR(S) EQUIPMENT (ACTIVE OR IDLE) PROBLEMS/DELAYS: Truck with Hand Tools Pickup Truck DAILY REPORT OF CONSTRUCTION Inspector: Superintendent/Foreman: Pablo Perez/UrielDate: 4/22/22 Job Name: Serenity Circle Sewer Lateral Repair x Page 5629 of 6526 Job # Date 4/22/22 (2:00pm-4:00pm) ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personnel Corporate Officer HR $150.00 $195.00 1 $150.00 $0.00 $150.00 Project Manager HR $125.00 $162.50 1 $125.00 $0.00 $125.00 Superintendent HR $85.00 $110.50 2 $170.00 $0.00 $170.00 Foreman HR $85.00 $110.50 2 $170.00 $0.00 $170.00 Mechanic, Equipment & Truck Operator HR $75.00 $97.50 2 $150.00 $0.00 $150.00 Laborer HR $55.00 $71.50 6 $330.00 $0.00 $330.00 Administrative HR $75.00 $97.50 1 $75.00 $0.00 $75.00 Equipment Excavator > Cat 349 HR $250.00 $0.00 $0.00 $0.00 Excavator > Cat 320 HR $200.00 $0.00 $0.00 $0.00 Excavator <Cat 320 HR $150.00 $0.00 $0.00 $0.00 Excavator w/hammer/Epiroc HR $350.00 $0.00 $0.00 $0.00 Excavator w/side grip vibratory hammer HR $350.00 $0.00 $0.00 $0.00 Wheel Loader >Cat 962 HR $225.00 $0.00 $0.00 $0.00 Wheel Loader >Cat 938 HR $175.00 $0.00 $0.00 $0.00 Wheel Loader <Cat 938 HR $150.00 $0.00 $0.00 $0.00 Bull Dozer HR $175.00 $0.00 $0.00 $0.00 Motor Grader HR $175.00 $0.00 $0.00 $0.00 Soil/Stone Roller HR $125.00 $0.00 $0.00 $0.00 Telehandler HR $125.00 $0.00 $0.00 $0.00 Manlift HR $125.00 $0.00 $0.00 $0.00 Forklift HR $100.00 $0.00 $0.00 $0.00 Broom Tractor HR $95.00 $0.00 $0.00 $0.00 Milling Machine HR $685.00 $0.00 $0.00 $0.00 Skid steer with milling head (bump grinder)HR $150.00 Asphalt/Mat.Shuttle Buggy HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver Weiler 385 HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver Cat 1055 HR $575.00 $0.00 $0.00 $0.00 Asphalt Roller HR $125.00 $0.00 $0.00 $0.00 Off Road Dump HR $250.00 $0.00 $0.00 $0.00 Crane >130 ton HR $1,500.00 $0.00 $0.00 $0.00 Crane >30 ton HR $500.00 $0.00 $0.00 $0.00 Crane <30 ton HR $250.00 $0.00 $0.00 $0.00 Vibratory Hammer HR $400.00 $0.00 $0.00 $0.00 Concrete Crusher HR $685.00 $0.00 $0.00 $0.00 Screener HR $375.00 $0.00 $0.00 $0.00 Push Boat HR $275.00 $0.00 $0.00 $0.00 Sectional/Hopper Barge HR $175.00 $0.00 $0.00 $0.00 Drone Lidar Photogrammetry HR $350.00 $0.00 $0.00 $0.00 Directional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0.00 Directional Drill AA 440 HR $4,000.00 $0.00 $0.00 $0.00 Lowboy/Tractor HR $175.00 $0.00 $0.00 $0.00 Dump Truck/Roll Off HR $95.00 $0.00 $0.00 $0.00 Water Truck/Trailer HR $125.00 $0.00 $0.00 $0.00 Tack/Prime Truck/Trailer HR $150.00 $0.00 $0.00 $0.00 Lube/Mechanics Truck HR $125.00 $0.00 $0.00 $0.00 Truck with Hand Tools HR $95.00 2 $190.00 $0.00 $190.00 Pickup HR $40.00 3 $120.00 $0.00 $120.00 Camera Truck HR $400.00 $0.00 $0.00 $0.00 Vacuum Truck HR $475.00 $0.00 $0.00 $0.00 Small Equipment Air Compressor with Hammer HR $60.00 $0.00 $0.00 $0.00 Concrete Saw HR $60.00 $0.00 $0.00 $0.00 Plate Compactor HR $60.00 $0.00 $0.00 $0.00 Trench Box 16' x 10' HR $50.00 $0.00 $0.00 $0.00 Stone Box HR $50.00 $0.00 $0.00 $0.00 Steel (Road) Plate HR $50.00 $0.00 $0.00 $0.00 Wellpoint System HR $250.00 $0.00 $0.00 $0.00 3” Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0.00 6" Hydraulic Pump HR $150.00 $0.00 $0.00 $0.00 12" Hydraulic Pump HR $200.00 $0.00 $0.00 $0.00 Cut Off Saw HR $20.00 $0.00 $0.00 $0.00 Light Set HR $50.00 $0.00 $0.00 $0.00 Generator/Welder HR $50.00 $0.00 $0.00 $0.00 Generator 70kw HR $125.00 $0.00 $0.00 $0.00 Generator 125kw HR $150.00 $0.00 $0.00 $0.00 MOT HR $150.00 $0.00 $0.00 $0.00 Fusing Machine 2-16”HR $150.00 $0.00 $0.00 $0.00 Fusing Machine 18”-42”HR $300.00 $0.00 $0.00 $0.00 Tap Machine - small (3/4" - 3") each tap EA $750.00 $0.00 $0.00 $0.00 Tap Machine - large (4" - 12") each tap EA $1,000.00 $0.00 $0.00 $0.00 Pipe Trenchless Piercing tool HR $250.00 $0.00 $0.00 $0.00 Pipe Ramming HR $625.00 $0.00 $0.00 $0.00 Material Disposal Fee (concrete, asphalt, debris, etc)PER LOAD $500.00 $0.00 $0.00 $0.00 Grand Total:$1,480.00 10% MARK UP ON MATERIAL 15% MARK UP ON SUBCONTRACTORS REV. 3/17/2021 QUALITY ENTERPRISES USA, INC. Emergency Repair Work for Rates Collier County - Board of County Commissioners If work is performed other than Monday through Friday, 7:00am - 4:00 pm, excluding holidays, OT Rates will be used for Personnel. These rates also apply for travel time necessary to mobilize and demobilize to and from work. Under Contract #20-7800 Page 5630 of 6526 COLLIER COUNTY UTILITY DAMAGE INVESTIGATION REPORT EVENT INFORMATION INVESTIGATED BY: Jory Bekich DATE OF INCIDENT: 3/22/23 TIME OF INCIDENT: 12:00 PM ADDRESS: 4360 Kensington High St. CROSS STREET: Dover Ct CONTRACTOR NAME: Sierra Underground CONTACT PHONE: 239-357-3057 CONTACT NAME: Ricelo Sierraa TICKET INFORMATION TICKET NUMBERS: 052308628 /055304369 Choose an item. Choose an item. TICKET DUE DATE: 2/28/23 TICKET EXPIRATION: 3/27/23 WAS THE TICKET VALID: YES LAST RESPONSE CODE: 2E - MARKED - PER WHITE LINE WAS 811 NOTIFIED: YES IF NO, ARE THEY EXEMPT: Choose an item. FACILITY AND EXCAVATION INFORMATION TYPE OF DAMAGE: UNDERGROUND DAMAGE FACILITY DAMGED: SEWER TYPE OF FACILITY: GATHERING CROSS BORE: YES DEPTH OF DAMAGE: 18" - 36" TYPE OF EXCAVATOR: CONTRACTOR EXCAV EQUIPMENT: BORING TYPE OF WORK: ELECTRIC TYPE OF LOCATOR: FACILITY OWNER WHITE LINED: YES RIGHT OF WAY: COUNTY ROAD MEMBER OPERATOR: Choose an item. DOWNTIME, INTERUPTION AND RESTORATION EXCAVATOR DOWN TIME: UNKNOWN IF YES, HOW MUCH: Choose an item. DOWN TIME COST: Choose an item. SERVICE INTERUPTION: YES INTERUPTION DURATION: N/A CUSTOMERS AFFECTED: 0 EST COST OF REPAIRS: UNKNOWN ROOT CAUSE ROOT CAUSE: EXCAVATOR DUG PRIOR TO VERIFYING MARKS BY TEST-HOLE (POT-HOLE) WERE UTILITIES SPOTTED: NO WAS CONT 556 COMPLIANT: NO WHO LOCATED: PAUL CARBONE DIRT NUMBER: Choose an item. CITATION ISSUED: NO CITATION #: Choose an item. FIELD OBSERVATIONS: Upon completing the investigation into ticket number 055304369, all Collier County Utilities were located but Sierra Underground failed to spot utilities which resulted in a damage to our Wastewater Collection System. PREPARED BY: Jory Bekich DATE PREPARED: 3/22/23 Page 5631 of 6526 Page 5632 of 6526 Page 5633 of 6526 Page 5634 of 6526 Page 5635 of 6526 Page 5636 of 6526 Page 5637 of 6526 Page 5638 of 6526 CPW592 26214 CALL SUNSHINE 02/21/23 21:15:58ET 052308628-000 GRID Ticket : 052308628 Rev:000 Taken: 02/21/23 21:15ET State: FL Cnty: COLLIER GeoPlace: NAPLES CallerPlace: NAPLES Subdivision: Address : 4360 Street : KENSINGTON HIGH ST Cross 1 : DOVER CT Within 1/4 mile: Y Locat: START ON FRONT OF 4360 KENSINGTON HIGH ST AND GO SOUTH 790 FT APPROX. ALONG THE WEST SIDE OF KENSINGTON HIGH ST, FOLLOW WHITE LINE. (PRINT AND WHITE LINE PICTURES ATTACHED) : Remarks : *** LOOKUP BY MANUAL *** *** Attachments can be seen at https://exactix.sunshine811.com/viewticket/FL811/9Enlylay7RGzJxIGibrXIQ : Grids : 2611A8145D 2612D8145D Work date: 02/23/23 Time: 23:59ET Hrs notc: 040 Category: 3 Duration: 10 DAYS Due Date : 02/23/23 Time: 23:59ET Exp Date : 03/23/23 Time: 23:59ET Work type: CATV INSTALLATION Boring: Y White-lined: Y Ug/Oh/Both: U Machinery: Y Depth: 36 IN Permits: U N/A Done for : MASTEC Company : SIERRA UNDERGROUND CORP Type: CONT Co addr : 12570 METRO PKWY City : FT MYERS State: FL Zip: 33966 Caller : MAYLIA NUNEZ Phone: 239-357-3057 Contact : RICELO SIERRA Phone: 239-357-3057 BestTime: 7-5 Email : MAYLIA@SIERRAUNDERGROUNDCORP.COM Submitted: 02/21/23 21:15ET Oper: MAY Chan: WEB Mbrs : CNTL01 CON762 CPW592 CTV413 FPLCLR Ticket Hyperlinks: https://exactix.sunshine811.com/viewticket/FL811/9Enlylay7RGzJxIGibrXIQ 2/21/2023 9:15:58 PM: Received DETAILS: Ticket received for registration code CPW592 2/21/2023 9:15:58 PM: Assigned DETAILS: Assigned to Paul Carbone by auto process NOTE: Auto Processed per Responsibility Area Page 5639 of 6526 2/21/2023 9:15:58 PM: Ticket Queued DETAILS: Ticket queued for delivery 2/21/2023 9:16:01 PM: Ticket Delivered DETAILS: Ticket successfully sent to WWTS-IRTHNET@colliercountyfl.gov 2/23/2023 6:43:27 AM: Re-Assigned DETAILS: Re-Assigned from Paul Carbone to Stephen Chandler by Stephen Chandler 2/23/2023 1:05:40 PM: Responded DETAILS: 3M: added by Stephen Chandler, Locate Time: 2/23/2023 1:03:48 PM NOTE: Too many white lines. Exactic shows a red line and a green line. Which 1 are you using 2/23/2023 1:05:41 PM: Positive Response to Center Queued DETAILS: Positive Response to Center queued for delivery 2/23/2023 1:05:51 PM: Positive Response to Center Delivered DETAILS: Positive Response to Center successfully sent CPW592 13828 CALL SUNSHINE 02/24/23 13:45:20ET 055304369-000 GRID Ticket : 055304369 Rev:000 Taken: 02/24/23 13:45ET State: FL Cnty: COLLIER GeoPlace: NAPLES CallerPlace: NAPLES Subdivision: Address : 4360 Street : KENSINGTON HIGH ST Cross 1 : DOVER CT Within 1/4 mile: Y Locat: START ON FRONT OF 4360 KENSINGTON HIGH ST AND GO SOUTH 790 FT APPROX. ALONG THE WEST SIDE OF KENSINGTON HIGH ST (AND CROSSING DOVER CT), FOLLOW WHITE LINE. (PRINT AND WHITE LINE PICTURES ATTACHED) : Remarks : WE ARE GOING STRAIGHT SOUTH ON THE WEST SIDE OF KENSINGTON HIGH ST, WE ONLY NEED TO CROSS DOVER CT ONCE. THE CORRECT WHITE LINE IS THE ONE THAT GOES SOUTH AND NOT THE ONE ON DOVER CT. *** LOOKUP BY MANUAL *** *** Attachments can be seen at https://exactix.sunshine811.com/viewticket/FL811/LJvvWXO07RGwaRIGibrXIQ : Grids : 2611A8145D 2612D8145D Work date: 02/28/23 Time: 23:59ET Hrs notc: 058 Category: 3 Duration: 10 DAYS Due Date : 02/28/23 Time: 23:59ET Exp Date : 03/27/23 Time: 23:59ET Work type: CATV INSTALLATION Boring: Y White-lined: Y Ug/Oh/Both: U Machinery: Y Depth: 36 IN Permits: U N/A Done for : MASTEC Page 5640 of 6526 Company : SIERRA UNDERGROUND CORP Type: CONT Co addr : 12570 METRO PKWY City : FT MYERS State: FL Zip: 33966 Caller : MAYLIA NUNEZ Phone: 239-357-3057 Contact : RICELO SIERRA Phone: 239-357-3057 BestTime: 7-5 Email : MAYLIA@SIERRAUNDERGROUNDCORP.COM Submitted: 02/24/23 13:45ET Oper: MAY Chan: WEB Mbrs : CNTL01 CON762 CPW592 CTV413 FPLCLR Ticket Hyperlinks: https://exactix.sunshine811.com/viewticket/FL811/LJvvWXO07RGwaRIGibrXIQ 2/24/2023 1:45:20 PM: Received DETAILS: Ticket received for registration code CPW592 2/24/2023 1:45:20 PM: Assigned DETAILS: Assigned to Paul Carbone by auto process NOTE: Auto Processed per Responsibility Area 2/24/2023 1:45:20 PM: Ticket Queued DETAILS: Ticket queued for delivery 2/24/2023 1:45:31 PM: Ticket Delivered DETAILS: Ticket successfully sent to WWTS-IRTHNET@colliercountyfl.gov 2/28/2023 8:27:59 AM: Responded DETAILS: 2E: added by Paul Carbone, Locate Time: 2/28/2023 8:27:59 AM NOTE: sewer gravity, sewer laterals 2/28/2023 8:28:00 AM: Positive Response to Center Queued DETAILS: Positive Response to Center queued for delivery 2/28/2023 8:28:12 AM: Positive Response to Center Delivered DETAILS: Positive Response to Center successfully sent Page 5641 of 6526 Page 5642 of 6526 Page 5643 of 6526 Page 5644 of 6526 Page 5645 of 6526 Page 5646 of 6526 Page 5647 of 6526 Page 5648 of 6526 Page 5649 of 6526 Page 5650 of 6526 Page 5651 of 6526 Page 5652 of 6526 Page 5653 of 6526 Page 5654 of 6526 Page 5655 of 6526 Page 5656 of 6526 Page 5657 of 6526 Page 5658 of 6526 Page 5659 of 6526 Page 5660 of 6526 Page 5661 of 6526 Page 5662 of 6526 Page 5663 of 6526 Page 5664 of 6526 Page 5665 of 6526 Page 5666 of 6526 Page 5667 of 6526 Page 5668 of 6526 Page 5669 of 6526 Page 5670 of 6526 Page 5671 of 6526 Page 5672 of 6526 Page 5673 of 6526 Page 5674 of 6526 Page 5675 of 6526 Page 5676 of 6526 Page 5677 of 6526 Page 5678 of 6526 Page 5679 of 6526 Page 5680 of 6526 Page 5681 of 6526 Page 5682 of 6526 Page 5683 of 6526 Page 5684 of 6526 Page 5685 of 6526 Page 5686 of 6526 Page 5687 of 6526 Page 5688 of 6526 Page 5689 of 6526 Page 5690 of 6526 Page 5691 of 6526