Backup Documents 08/26/2025 Item #16F 1 (Absentia 07/22/2025 Item #16F4) ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 1 6 F 4
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE
Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office
at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later
than Monday preceding the Board meeting.
**NEW** ROUTING SLIP
Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the
exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office.
Route to Addressee(s) (List in routing order) Office Initials Date
1. County Attorney Office County Attorney Office I/4 u
2. BCC Office Board of County �
Commissioners Chairman W< ij/51 Cl /5
3. Minutes and Records Clerk of Court's Office 441
PRIMARY CONTACT INFORMATION
Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees
above,may need to contact staff for additional or missing information.
Name of Primary Staff Sara.Schneeberger, Facilities Division Phone 239-252-5013
Contact/ Department Number Sara.Schneeberger@colliercountyfl.gov
Email
Agenda Date Item was July 22,2025—In Absentia Agenda
Approved by the BCC Item 16.F.4
Number
Type of Document Recommendation to ratify Number of
Attached administratively approved Change Order Original 1
No.4 for a 100-day time extension for the Documents
Collier County Jail Fire Alarm Attached
Replacement"project under Agreement
No. 22-8018 with National Security Fire
Alarm Systems, LLC. (Project No.
50237)
PO number or account Facilities Division is requesting a
number if document is completed copy
to be recorded
INSTRUCTIONS & CHECKLIST
Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not
appropriate. (Initial) Applicable)
1. Does the document require the chairman's original signature? N/A
2. Does the document need to be sent to another agency for additional signatures? If yes, N/A
provide the Contact Information(Name; Agency;Address; Phone)on an attached sheet.
3. Original document has been signed/initialed for legal sufficiency. (All documents to be
signed by the Chairman,with the exception of most letters,must be reviewed and signed SS
by the Office of the County Attorney.
4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A
Office and all other parties except the BCC Chairman and the Clerk to the Board
5. The Chairman's signature line date has been entered as the date of BCC approval of the SS
document or the final negotiated contract date whichever is applicable.
6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's ,�y�
signature and initials are required. �f(�
7. In most cases(some contracts are an exception),the original document and this routing slip N/A
should be provided to the County Attorney Office at the time the item is input into SIRE.
Some documents are time sensitive and require forwarding to Tallahassee within a certain
time frame or the BCC's actions are nullified. Be aware of your deadlines!
I: Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12
8. The document was approved by the BCC on July 22,2025—In Absentia N/A is not
and all changes made during the meeting have been incorporated in the attached �pf�i�� an Option for
document. The County Attorney's Office has reviewed the changes, if applicable. ��ll''�� this�l%t'te
9. Initials of attorney verifying that the attached document is the version approved by the 2f is not
Y
BCC, all changes directed by the BCC have been made, and the document is ready for the S1Q�n an option 1d
Chairman's signature. thiS•line,
16F 4
I.Forms/County Forms/BCC Forms!Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised l l/30/12
18F 4
Cctffer Count.'
..•� .. .� ..,. Procurement Services Change Order Form
Contract# 22-8018 CO# 04 PO# 4500223988 Project#: 50237.1
Project Name: Collier County Jail Fire Alarm Replacement
Contractor/Consultant Name: National Security Fire Alarm Systems, LLC
Select One:0 Contract Modification (Construction or Project Specific) ❑Work Order Modification
Project Manager Name: Tim Rygiel, PMP CFM Division Name: I Facilities Management
j Original Contract/Work Order Amount 81,671,000.00 2/28/20231603 Original BCC Approval Date;Agenda Item#
Current BCC Approved Amount $1.671.000.00 4/8/2025 16F6 Last BCC Approval Date;Agenda Item#
Current Contract/Work Order Amount 31,671,000.00 8/21/2025 SAP Contract Expiration Date(MASTER)
Dollar Amount of this Change 0.00% Total %Change from Original Amount
Revised Contract/Work Order Total $1,671,000.00 0.00% % Change from Current BCC Approved Amount
Total Cumulative Changes $0.00 0.00% %Change from Current Amount
Notice to Proceed 4/3/2023 Original NTP 425 Original Final 6/1/2024 Last Final 8/2112025
Date #of Days Completion Date Approved Date
#of Days Added 100 Revised Final Date 11/29/2025 Current Substantial Completion Date 7/22/2025
, (includes this change) (if applicable)
Provide responses after each question in box below (Responses should be brief and specific). Attach additional information and/or
documentation from the Design Professional and/or Contractor, if needed, with your submission of this Change Order and complete
summary on next page. Check all that apply to this Change Order request: ❑Q Add Time; ❑Add funds; ❑ Use of Allowance;
❑ Modify/Delete existing Task(s);❑Add new Task(s); ❑ Reallocate funds; ❑ Other(must be explained in detail below)
1.) Detail of change/s to be made through this Change Order.
This change order will add 100 days to the contract time providing a new substantial completion date of
10/30/2025.
2.) If this Change Order is currently under a Stop Work, please identify the date issued and number of
days remaining or "N/A" if not applicable.
N/A
3.) Explain why this change was not included in the original contract/Work Order.
This change is needed to allow time to complete additional separate projects at the Jail Facility. The
completion of the additional companion projects is required before the fire alarm project can obtain
certification by the Greater Naples Fire District.
4.) Describe the impact if this change is not processed.
If this change is not processed, the contractor will not be able to obtain final certification from the
Greater Naples Fire District by the substantial completion date due in no fault of the contractor.
Page 1 of 4
Change Order Form (2023_ver.1)
16F 4
GU Y Coi4nty
,,,,--.N— - ,... ,� ---., Procurement Services Change Order Form
Contract# 22-8018 cots04 PO# 4500223988 Project#: 50237.1
Project Name: Collier County Jail Fire Alarm Replacement
Contractor/Consultant Name: National Security Fire Alarm Systems, LLC
Change Order/Amendment Summary
(If additional spaces needed,attached a separate Summary page to this amendment request)
COST TIME
CO# AMD# Description Additive rbeductive Days Total New Justification
(+) 1 (-) Added Time
During shop draw.ny review.Oreater Naples fire
Adds 180 days Department alerted us to an egress issue at Inc Jail
providing a new complex.This issue is Indirectly related to the Foe
1 180 605 Alarm System and requires additional work Mal will
substantial completion nerd to be resolved prior to approval of the new Fire
Alarm System by the Greater Naples Fire inspector.
date of 10/29/2024.
Utilize $46,160 of the If this change is not approved,the
Fire Department inspections
2 Owner's Allowance required for the new alarm system
leaving a balance of will not be approved and the project
$53,840. will not be completed.
•
This change is needed to allow time to I
Adds 120 days complete additional separate projects at the
providing a new 1 20 725 Jail Facility.The completion of the
3 I substantial completion additional projects is required before the fire
alarm project can obtain certification by the
date of 7/22/2025. Greater Naples Fire District.
Adds 100 days This change is needed to allow time to
complete additional separate projects at the
providing a new Jail Facility.The completion of the additional
4 substantial completion 1 00 825 companion projects is required before tho fire
alarm project can obtain certification by the
date of 10/30/2025. Greater Naples Fire District.
I I
.
it
❑Check here if additional summary page/s are attached to this Change Order
Page 2 of 4
Change.Order Form (2023_ver.1)
1 6 F 4
Cot.ticr County
Procurement Services Change Order Form
Contract# 22-8018 CO# 04 PO# 4500223988 Project#: 50237.1
Project Name: Collier County Jail Fire Alarm Replacement
contractor/consultant Name: National Security Fire Alarm Systems, LLC
Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be
subject to all the same terms and conditions as contained in the contract/work order indicated above,as fully as if
the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final
settlement of any and all claims of the Contractor/Vendor/Consultant/Design Professional arising out of or related
to the change set forth herein, including claims for impact and delay costs.
Contractor/Consultant/Design Professional signature below must be from an authorized person/officer/director of
the Company or listed as the qualified licensed Professional "Project Coordinator"or Design/Engineer Professional
under the agreement. Signature authority of person signing will be verified through the contract OR through the
Florida Department of State, Division of Corporations (Sunbiz) website (https://dos.rnvflorida.com/Sunbiz/search/Z,
If the person signing is not listed, we will require signature authority by one of the listed officers/directors of the
company giving that person signature authority.
R ielTimoth Digitally signed by RygielTimothy
Prepared by J J Date:2025.06.10 17:26:12-04'00' Date
Signature-Division Project Manager
Tim Rygiel PMP, CFM, Project Manager III, Facilities Management
Printed Name
Victor J Latavish, Architect Digitally signed by1 Vic14:3/tor J38 Lat04'avish,00 Architect
Accepted by: Dace:2025.06.1 ' Date
Signature- Design/Engineer Professional (if applicable)
Victor Latavish, AIA,Victor J. Latavish, Architect, P.A.
Printed Name/Title/Company Name
Digitally signed by Christopher Morra Jr
Christopher Morra Jr
Accepted by: Date:2025.06.25 09:55:26-04'00' Date:
Signature-Contractor/Consultant/Vendor
Christopher Morra, President, National Security Fire Alarm Systems, LLC
Printed Name/Title/Company Name
Approved by: Date:
Signature-Division Manager or Designee(Optional)
Printed Name
Approved by: De1onyBrlan
Digitally signed by DelonyBrian
Date.2025.06.10 17:24:23-04'00' Date.
Signature-Division Director or Designee (Optional)
Brian DeLony PE, Division Director, Facilities Management
Printed Name
Approved by: Date:
Signature-Division Administrator or Designee (Optional)
Printed Name
Page 3 of 4
Change Order Form (2023_ver.1)
.
16F 4
Coer County
•„ -" Procurement Services Change Order Form
—
Contract# 22-8018 CO#4 PO# 4500223988 Project#: 50237.1
Project Name: Collier County Jail Fire Alarm Replacement
Contractor/Consultant Name: National Security Fire Alarm Systems, LLC
FOR PROCURMENT USE ONLY
FY 25 CHO Request# 705
Bowden Stephanie Digitally signed by Bowden5tephanie
Approved by: Date:2025.06.29 11:23:24-04'00'
Signature-Procurement Professional Signature/Date
Approved by:
Signature-Procurement Manager/Director(OPTIONAL)
APPROVAL TYPE:
El Administrative X] Administrative-BCC Report n BCC Stand-Alone ES (BCC Approval Required)
BCC APPROVAL
ATTEST:
Crystal K. { ifgel;Cle' t mC;the Circuit Court BOARD OF COUNTY COMMISSIONERS
and Comptroil&'r COLLIER COUNTY, FLORIDA
BY w.u.___' .. �1� // By:Agt.&,,egtfilloita
• •, 4' ry , Burt L. Saunders Chairman
Dated: ,•(lL itA), L L . 'y ` "IP• i
Most as to '•1nnan's
signature only Date: g1Z61z.5
(SEAL) Agenda# 16 Fit
Ap roved a t For nd L gality:
Deputy County Attorney
SCAA- k e i
Print Name
Page 4 of 4