Loading...
Backup Documents 08/26/2025 Item #16F 1 (Absentia 08/12/2025 Item #16C 3) 16C 3 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. ** ROUTING SLIP** Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2 3. County Attorney Office County Attorney Office 4. BCC Office Board of County Commissioners Xy Mk/ Sig ,5. Minutes and Records Clerk of Courts OfficeI P /v� .- PRIMARY CONTACT INFORMATIO 96/023— Normally the primary contact is the person who created/prepared the Executive Summary Primary contact information is needed in the event one of the addressees above may need to contact staff for additional or missing information. Name of Primary Staff Liz Gosselin/PUD-EPMD Phone Number 239-252-1037 Contact/Department Agenda Date Item was 08/12/2025 Agenda Item Number 16.C.3 Approved by the BCC Type of Document(s) Change Order Number of Original Attached Documents Attached _ PO number or account number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature(instead of stamp)? L.G. 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information (Name; Agency; Address;Phone)on an attached sheet. 3. Original document has been signed/initialed for legality. (All documents to be signed by L.G the Chairman,with the exception of most letters, must be reviewed and signed by the Office of the County Attorney.) 4. All handwritten strike-through and revisions have been initialed by the County Attorney L.G. Office and all other parties except the BCC Chairman and the Clerk to the Board. 5. The Chairman's signature line date has been entered as the date of BCC approval of the document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip should be provided to the County Attorney Office at the time the item is uploaded to the agenda. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 08/12/2025 and all changes made during L.G. N/A is not the meeting have been incorporated in the attached document. The County Attorney an option for Office has reviewed the changes,if applicable. this line.-- 9. Initials of attorney verifying that the attached document is the version approved by the L.G. N/A is not BCC,all changes directed by the BCC have been made,and the document is ready for the an option for Chairman's signature. this line. 1:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04;Revised 1.26.05;2.24.05; 11/30/12;4/22/16;9/10/21 16C 3 Col:Lier Co>.snty Procurement Services Change Order Form Contract# 23-81 15 CO# 3 PO# 4500225907 Project#: 70253.7, 70243 &51029.12.5 -IS Project Name: Golden Gate City Transmission Water Main Improvements - Phase 1 B Contractor/Consultant Name; Metro Equipment Services, Inc. Select One: El Contract Modification (Construction or Project Specific) ❑ Work Order Modification Project Manager Name: Liz Gosselin Division Name: Engineering and Project Management Original Contract/Work Order Amount $13.983,979.70 08/08/23;118 Original BCC Approval Date; Agenda Item# Current BCC Approved Amount $13,784,850.56 8/13/24;16C5 Last BCC Approval Date;Agenda Item# Current Contract/Work Order Amount $13,784,850,58 8i46f25 8/19/25 SAP Contract Expiration Date(MASTER) Dollar Amount of this Change $0.00 -1.42e/0 Total%Change from Original Amount Revised Contract/Work Order Total $13,784,850.58 0.00% %Change from Current BCC Approved Amount Total Cumulative Changes -$199,129.12 0.00% %Change from Current Amount /26/25 Notice to Proceed 10/30/2023 Original NTP 600 Original Final 6/21/2025 Last Final S1..tA/7n75 Date #of Days Completion Date _ Approved Date 12/15/25 Q61[OTZb #of Days Added 111 Revised Final Date t9/1 /2O�5 1 Current Substantial Completion Date 06,,1 r;z�vz� (includes this change) (if applicable) Provide responses after each question in box below (Responses should be brief and specific). Attach additional information and/or documentation from the Design Professional and/or Contractor, if needed, with your submission of this Change Order and complete summary on next page. Check all that apply to this Change Order request: 0 Add Time; ❑Add funds; El Use of Allowance; ❑ Modify/Delete existing Task(s);❑Add new Task(s); 191 Reallocate funds; ❑ Other(must be explained in detail below) Change Order#3 is for the use the allowances,quantity adjustments for several pay items,and to add 111 days to the contract time to account for weather delays.unforeseen conditions and work directives.Change Order#3 sets a new substantial completion dale of 10/06/2025.This proposed change order aligns with the original scope,terms and conditions of the Agreement to install the 24-Inch and 30-inch transmission water mains within Golden Gate City. The County's Engineer of Record,Johnson Engineering,confirmed the unforeseen condition associated with the work directives described below,reviewed the proposed costs,and conducted an independent cost analysis associated with this change order confirming that the costs associated with the work are reasonable. 1.)Detail of change/s to be made through this Change Order! QUANTITY ADJUSTMENT FOR PAY ITEMS:This change allows to Increase/decrease/remove quantities for several pay items and the use of the Stormwater Drainage Allowance in the amount of$39,607.00 to account for quantities adjustments needed throughout the ongoing construction. TIME EXTENSION DUE TO WEATHER DELAYS:This change adds twenty-five(25)days as follows:ten(10)full days due to rain on March 6,March 22,June 11,June 12,June 13,June 14,July 22,July 23,July 31,August 28 and September 3,2024;three(3)full days due to Tropical Storm Debby.five(5)full days due to Hurricane Helene and seven(7)full days due to Hurricane Milton. TIME EXTENSION DUE TO FINALIZING PIGGING AND FLUSHING PLAN:This change adds sixty(60)days to account for required time to properly review and approve the pigging and flushing plan.As part of the project,the Contractor needs to pig and full bore flush the entire new transmission mains to meet regulatory requirements.The contractor submitted a pigging and flushing plan that was reviewed by the County several times to ensure the proper availability of water sources and to minimize disruption to the existing neighborhoods while flushing. WORK DIRECTIVE#5:The project requires the vertical deflection of the existing 14-inch force main to accommodate the installation of the new transmission water main pipeline.It was discovered that the existing force main valves were not operable and the force main could not be shut down to perform the deflection.A Ilne stop reinsertion is required to shut down the force main so the deflection can be completed.The work directive authorizes the use of$51,654.64 under Pay Item No.40 General Allowance based on the contractors Time and Materials quote and addsl4 days to the contract time.Using a line stop insertion to stop the wastewater flows will allow to complete the force main deflection timely with a small Impact to the neighborhood and provides the regulatory separation between potable water and non-potable water lines which benefits the public by protecting the potable water supply from potential contaminants. WORK DIRECTIVE#6:The project requires a vertical deflection of the existing 8-Inch water main near the Intersection of 29th Place SW and 55th Terrace,which was discovered to be Inside a casing pipe and unrestrained.This portion of water main inside the casing must be removed and replaced with new 8-Inch PVC material to allow the contractor to Install proper restraints for the vertical deflection.This work directive authorizes the use of$17,871.70 under Pay Item No.40 General Allowance based the contractors Time and Materials quote and acids 2 days to the contract time.Removing and replacing a portion of the existent water main and installing the proper restrains benefits the public by ensuring operation and potable water supply reliability. WORK DIRECTIVE#7:The project requires a vertical deflection of the existing 10-inch water main crossing 55th Terrace SW north of the Intersection of 55th Terrace SW and 26th Ave SW;however,it was discovered that it dead ends and is capped on the east side of the intersection,and does not provide water service to any customers.The contractor is directed to disconnect and remove a portion of the existing 10-inch water main that conflicts with the proposed transmission water main.This work directive authorizes the use of $24,873.13 under Pay Item No.40 the General Allowance based the contractors Time and Materials quote and adds 1 day to the contract time.Removing a portion of the inactive water main benefits the public by eliminating abandoned Infrastructure from County's right-of-way. WORK DIRECTIVE#8:The project requires a connection from the new water main deflection along Coronado Pkwy to an existing water main near the Planet Fitness entrance.It was discovered that the existing water main In this location Is encased In concrete.The plans to conned to this existing water main needs to be revised.The contractor was directed to perform exploratory excavation to determine the limits of concrete encasement and if the existing mains are restrained.This work directive authorizes the use of$14.722.79 under Pay Item No.40 the General Allowance based the contractors Time and Materials quote and adds 1 day to the contract time. Providing the proper connection to the existing water main and Installing the proper restraints benefits the public by ensuring operation and potable water supply reliability. Page 1 of 4 Change Order Form(2023_ver.1) CSC 3 Page 1 Continued Contract#23-8115 / COS 3 /P0#4500225907 / Project#:70253&51029/ Project Name: GGC Water Main Improvements-Phase 113/Contractor:Metro Equipment services,Inc. WORK DIRECTIVE tf9' the project includes installing the transmission water mains via open cut construction methods which requires dewatering operations to keep the ground water level below the invert of the pipe.A potential contamination site was discovered during the review of the dewatering permit application along Santa Barbara Blvd,north of Radio Road,within the project corridor.The contractor was directed to proceed with testing the ground water to determine which type of additional dewatering permit would be required to dewater in this area.This work directive authorizes the use of$7,910.95 under Pay Item No,40 the General Allowance based the contractors Time and Materials quote and adds 1 day to the contract time,Identifying potential contaminants along the project corridor ensures that the proper permits and construction methods are in place during the installation of the new transmission water main and benefits the public by protecting the new potable supply infrastructure. WORK DIRECTIVE 4113:The project requires the 24-inch transmission water main to cross Coronado Parkway;however,four(4)existing irrigation and electrical conduits whose elevations and exact locations are unknown and potentially in conflict with transmission water main,were discovered along Coronado Pkwy crossing and in the path of the new transmission water main.An existing 6-Inch water main was also discovered at this intersection,which was unknown.The contractor is directed to perform exploratory excavation to locate the horizontal and vertical locations of the existing conduits and 6-inch water main at this intersection.This exploratory work will enable the team to make necessary design adjustments orior to open cutting the road,which will minimize the duration of road closure.This work directive authorizes the use of $29,589.40 under Pay Item No.40 the General Allowance based the contractors Time and Materials quote and adds 2 days to the contract time.Identifying the horizontal and vertical locations of the potential existing conflicts prior to fully open cut the road benefits the public by maximizing uninterrupted access for local traffic and emergency vehicles. - WORK DIRECTIVE#15:The project required the 24--inch water main to cross Coronado Parkway;however,four(4)existing irrigation and electrical conduits and 6-inch water main were discovered along Coronado Pkwy crossing from center median to center median at the intersection with Lucerne Road and are in conflict with the new 24 inch water main.The contractor was directed to install the new 24-inch water main pipeline approximately 1 foot deeper than originally planned,so that the new transmission water main can cross underneath these unforeseen existing facilities.This work directive authorizes the use of S12,269.34 under Pay Item No.40 the General Allowance based the contractors Time and Materials quote and adds 2 days to the contract time.Installing the new transmission water main 1.2-inches deeper than per original plans provides adequate separation from non-potable water lines benefits the public by protecting the potable water supply from potential contaminants. WORK DIRECTIVE#19:The project requires the installation of the 24-inch water main along Lucerne Road and 23rd CT SW;however,a buried fiber optic cable was discovered to be in the direct path of the new transmission water main.The fiber optic cable was installed after the design was finalized.The-Contractor Is directed to temporarily move the fiber optic cable out of the water main path so that the new transmission water main can be installed.This work directive authorizes the use of $23,735.43 under Pay Item No,40 General Allowance based the contractors Time and Materials quote and adds 2 days to the contract time.Temporally moving the live fiber optic cable out of the construction path benefits the public by avoiding service interruptions the rerd -Isidents arid businesses. WORK DIRECTIVE#23:The project required the installation of new stormwater facilities crossing 3,e, CT SW;however,the existing 8-inch water main was discovered to he installed via directional drill which makes its elevation deeper than anticipated,and is in direct conflict with the new stormwater pipe crossing.The Contractor was directed to shift the location of the stormwater structure K-09 approximately 10 feet to the east and to use 18-inch RCP material in lieu of 24-inch RCP material for the road crossing to provide vertical clearance between the existing water main and proposed stormwater pipeline.This work directive authorizes the use.of$13,734.03 under Pay Item No.41 Stormwater Drainage Allowance based on the contractor's Time and Materials quote and adds 1 day to the contract time.Relocating the stormwater infrastructure eliminates the need for the deflection of the existing water main which requires scheduling a water outage and benefits the public by providing uninterrupted potable water service. 2.)If this Change Order is currently under a Stop Work,please identify the date issued and number of days remaining or"N/A"if not applicable. N/A 3.)Explain why this change was not Included in the original contract/Work Order. QUANTITY ADJUSTMENT FOR PAY ITEMS:The adjustment to the quantities are a result of design modifications made during or-going construction. TIME EXTENSION DUE TO WEATHER DELAYS:This change was not included in the original contract because it was unknown the extent of the duration of heavy rain events and severe tropical weather impacting the project area. TIME EXTENSION DUE TO FINALIZING THE PIGGING AND FLUSHING PLAN:This change was not included in the original contract because staff did not anticipate the Contractor submitting several plan revisions addressing staff's comments regarding water sources,flushing discharge locations and minimizing flooding impacts to the neighborhood. WORK DIRECTIVE#5.It was discovered during on-going construction that the existing force main valves do not operate. WORK DIRECTIVE#6:It was discovered during on-going construction that the existing water main was inside a casing pipe and is not retrained. WORK DIRECTIVE#7:It was discovered during on-going construction that the existing water main dead ends at this location and was not an active line. WORK DIRECTIVE#8:It was discovered during on-going construction that the existing water main was encased in concrete. WORK DIRECTIVE#9:It was discovered during on-going construction that there is potential contamination in the project corridor. WORK DIRECTIVE#13:It was discovered during ongoing construction that there were unmarked existing conduits and a water main pipe in potential conflict with the new transmission water main crossing Coronado Pkwy. WORK DIRECTIVE#15:It was discovered during on-going construction that unmarked existing conduits and a existing 8-inch water main were in conflict with the new transmission water main. WORK DIRECTIVE#19:It was discovered during on-going construction that there were live fiber optic cables in the path of the new transmission water main. WORK DIRECTIVE#23;It was discovered during on-going construction that the existing 8-inch water main was installed via directional drill,and due to its depth,it creates a conflict with the new stormwater pipe crossing. 4.)Describe the impact if this change is not processed. QUANTITY ADJUSTMENT FOR PAY ITEMS:If this quantity adjustment change is not processed,the contractor would not be able to be reimbursed for the adjusted quantities that were a result of necessary design changes made during construction. TIME EXTENSION DUE TO WEATHER DELAYS:If this change is not processed,the contractor will not be able to complete the project within the final completion date at no fault of their own. TIME EXTENSION DUE TO FINALIZING THE PIGGING AND FLUSHING PLAN:If this change is not processed,the contractor will not be able to properly pig and flush to obtain the regulatory certifications for this project within the final completion date. WORK DIRECTIVE#5:If this change is not processed.the force main could not be deflected and water main pipeline could not be Installed due to the conflict with the force main. WORK DIRECTIVE#6:The water main deflection could not be completed and could not be restrained as required. WORK DIRECTIVE#7:The new transmission water main would need to be deflected under an non-active water main line. WORK DIRECTIVE#8:The Contractor would not able to properly modify the connection to the existing water main and ensure that is properly restrained. WORK DIRECTIVE#9:The Contractor would not be able determine if there are potential contaminants that would affect the dewatering permit. WORK DIRECTIVE#13:The Contractor would not be able to determine if the unforeseen conduits and water main are in conflict with the new transmission water main WORK DIRECTIVE tt15:The new transmission water main could not be vertical deflected to achieved the required separation from the unforeseen irrigation main and electrical conduits and the 6-inch water main. WORK DIRECTIVE#19:The new transmission water main would be in direct conflict with the unforeseen live fiver optic cables. WORK DIRECTIVE#23:The required vertical separation between the existing 8-inch water main and the new stormwater pipe crossing could not be achieved. 16C 3 Work Pirec iv_es.endAROVVa.n.oesLgLQ.Akd._owf Work Directives per CO#3 Allowance Use Allowance Balance I. General Stormwater Beginning General Allowance S300,000.00 WI)0.5 S51,654.64 $ - Previous Draws from General Allowance $0.00 {` WD#6 S17,871.70 $ - CO#3 Draw ($1 K2,('27.39) WD#7 S24,873.13 $ � - 1 General Allowance Balance $1 17.372.61 WD#8 , . S14,722.79 ' $ - WE)#9 S7,910.95 $ - Beginning Stormwater Allowance $300,000.00 WD#13 S29,589.40 j $ - Precious Draws from Stormwater Allowance $0.00 • ti • WD 415 S12,269.34 $ - CO#3 Draw . . ($53,341.03) • WD#19 ` S23,735.43- $ - Stormwater Allowance Balance S246,658.97 WD#23 I $ - $13,734.03 Quantity Adjustment per Allowance Use CO#3 General Stormwater ------ --- -- __..........__.._— Water and Wastewater $ - $ - I Stormwater $ - $39,607.00 Totals S182,627.39 $53,341.03 I I6C 3 Cover county Procurement Services Change Order Form Contract# 23-8115 CO# 3 PO# 4500225907 Project#: 70253.7, 70243 & 51029 Project Name: Golden Gate City Transmission Water Main Improvements - Phase 1 B Contractor/Consultant Name: Metro Equipment Services, Inc. Change Order/Amendment Summary (If additional spaces needed, attached a separate Summary page to this amendment request) COST TIME CO# AMD# Description Additive Deductive Days Total New Justification (+) (-) Added i Time Voided Voided 1 Modification of The changes are necessary to modify the scopo and cost of the contract to contract bid schedule accommodate the HOD installation of the 2 (see attached Total ($199,12s.12 60� force main along 29th Place SE,and the Credit Breakdown) additional plug valves and force main piping. Additional Time and The use of Allowance for additional Materials Allowance O Time and Materials work is required 3 for unforeseen 111 711 due to unforeseen site conditions. 0 This change does not change the jarconditions. contract amount, • ❑ Check here if additional summary page/s are attached to this Change Order Page 2 of 4 Change Order Form (2023_ver.1) 16C 3 Colte-r Procurement Services Change Order Form Contract# 23-8115 CO#3 PO# 4500225907 Project#: 70253.7, 70243 & 51029 Project Name: Golden Gate City Transmission Water Main Improvements - Phase 1 B Contractor/Consultant Name: Metro Equipment Services. Inc. Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above, as fully as if the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Contractor/Consultant/Design Professional signature below must be from an authorized person/officer/director of the Company or listed as the qualified licensed Professional "Project Coordinator"or Design/Engineer Professional under the agreement. Signature authority of person signing will be verified through the contract OR through the Florida Department of State, Division of Corporations (Sunbiz) website (https://dos.myflorida.com%sunbiz/search/). If the person signing is not listed, we will require signature authority by one of the fisted officers/directors of the company giving that person signature authority. Mvr•c-r y(M.M�u GosselinLiz °w' ie•,y,,,.,. Prepared by: oWL.:115 51i u i Date: _ Signature-Division Project Manager Liz Gosselin,Project Manager II,EPMD KLA 5/30/25 Printed Name William H Saum Accepted by: 2025.05.30 15'00:50-04'00' Date: 5/30/2025 Signature- Design/Engineer Professional(if applicable) William H.Saum, P.E.,Senior Project Manager Printed Name/Title/Company Name Nico Serrano Digitally signed by Nice Serrano Accepted by: Date:2025.06.06 16:26:33-04'00' Date: Signature-Contractor/ConsultantNendor Nicolas Serrano,Project Manager,Metro Equipment Services,Inc. Printed Name/Title/Company Name BullertBenjamin Approved by Date: Signature-Division Manager or Designee(Optional) Benjamin N.Buliert,Superv,sor-Project Management-Engineering and Project Management Division Printed Name McLeanMatthew °" h Approved by Date: Signature-Division Director or Designee (Optional) Matthew McLean, Director,Engineering and Project Management Division Printed Name Approved by: _ Date --_--,--_-__ Signature-Division Administrator or Designee(Optional) Printed Name Page 3 of 4 Change Order Form (2023_ver.1) 1 6 C 3 Contract# 23-8115 CO#3 PO#4500225907 Project#: 70253, 70243 & 51029 Project Name: Golden Gate City Transmission Water Main Improvements-Phase 18 Contractor/Consultant Name: Metro Equipment Services, Inc. Additional Signatures: Digitally signed by Sotolsabel Sotolsabel 10:2404- 2 04001 Approved by: Date: Isabel Soto, Project Manager II,TMS lip CU,I ' Mn v,..'g mxpr4.ym.MOC.YC,.'.S . xn.l'aa,waun mn au.u. i Approved by: Date: Peter Hayden, Supervisor Project Manager,TMS Anthony Digitally signed by Anthony Khawaja P.E. Khawaja P.E. Date 2025.06.12 14:58:32 Approved by: oaoo Date: -, Jay Ahmed, P.E., Director,Transportation Engineering, TMS ScottTri n ity Digitally signed by Scot:53nity Date:2025.06.17 16:45:53 Approved by: oaoo Date: Trinity Scott, Department Head,TMS 4 � . 1 6 C 3 Co re-r County - � -- Procurement Services Change Order Form Contract# 23-8115 CO# 3 PO# 4500225907 Project#: 70253.7, 70243 & 51029 Project Name: Golden Gate City Transmission Water Main Improvements - Phase 1 B Contractor/Consultant Name: Metro Equipment Services, Inc. FOR PROCURMENT USE ONLY - � FY 25 CHO Request# 700 i -- ----� _ BowdenStephanie Digitally signed by BowdenStephanie 11 L Date:2025.06.24 10:55:03-04'00' Approved by: Signature-Procurement Processional Signature/Date Approved by _ Signature-Procurement Manager/Director(OPTIONAL) APPROVAL TYPE: fI Administrative El Administrative-BCC Report H! BCC Stand-Alone ES (BCC Approval Required) 1 BCC APPROVAL ATTEST Crystal K. Kiri' l�CFtpltoj,the Circuit Court BOARD OF COUNTY COMMISSIONERS and Comptr ,ter • "'"',� COLLIER COUNTY, FLORIDA gy . f By./441%,,Cr4401NA-- ' Burt L. Saunders Chairman gl ! l? `" UTG only Dale: 1 2���s-- (SEAL) Agenda # 16 C 3 _ pro ed as to Fp a Leg lity: DeputyCount Attorney y c<eilt p / �-w Li--- Print Name ti Page 4 of 4 f 40 / Change Order Form (2023_ver.1)