Loading...
Agenda 08/26/2025 Item #16B 4 (Resolution - The condemnation of fee simple interests in land necessary for construction of stormwater ponds for the expansionof the Wilson Blvd to 4-lands)8/26/2025 Item # 16.B.4 ID# 2025-2217 Executive Summary Recommendation to approve and adopt a Resolution authorizing the condemnation of those fee simple interests in land necessary for the construction of stormwater ponds required for the expansion of Wilson Boulevard from two lanes to four lanes between Golden Gate Boulevard and Immokalee Road. (Project No. 60229). Estimated fiscal impact: $2.5 million. OBJECTIVE: To acquire the land necessary for the construction of stormwater ponds for the widening of Wilson Boulevard between Golden Gate Boulevard and Immokalee Road, Project No. 60249 (the Project). CONSIDERATIONS: The Project will expand the subject segment of Wilson Boulevard from two lanes to four lanes, provide sidewalks, a shared-use pathway, bike lanes, drainage and related improvements. Construction is not scheduled in the County’s Five-Year Work Program. However, the availability of undeveloped five-acre pond site properties on the Project corridor is limited and will decrease with future development. If the County is required in the future to select less desirable pond sites due to preferred sites being developed, acquisition, design, construction and maintenance costs will increase. Accordingly, it is in the County’s best interest to acquire these pond sites now. Prior to initiating eminent domain proceedings, Section 73.015, Florida Statutes, requires a condemning authority to attempt to negotiate in good faith with the fee owners of the properties to be acquired; provide them with a written offer, and, if requested, a copy of the appraisal report upon which an offer is based; and attempt to reach an agreement regarding the amount of compensation to be paid for the parcel. The adoption of the attached resolution will provide staff with the Board’s authorization to make purchase offers based upon the appraised value of the proposed pond sites, as determined by state-certified real estate appraisers, consistent with the requirements of Section 73.015, Florida Statutes. Purchase agreements will then be presented to the Board for approval. Condemnation proceedings will only be filed where agreements cannot be negotiated or where parcels cannot be closed due to title issues. The Board’s professional Transportation Engineering Division staff and consultants have considered various factors during the design of the Project, including alternative alignments; public health, safety and welfare; long range planning needs; environmental impacts; and cost. The attached Pond Siting Report, dated June 16, 2025, was prepared by Jacobs, the County’s engineering design consultants and is incorporated into this Executive Summary. Staff recommends that with the Board’s review of the Pond Siting Report, this Executive Summary and the back-up documentation, and approval of the proposed Resolution, the Board finds that fee simple interests in the land as depicted in the legal descriptions attached to the Condemnation Resolution represent the most feasible location for construction of the pond sites required as part of the Project. Staff further recommends that the Board make a finding that it is necessary to acquire, by condemnation, the fee simple interests in land specified on each legal description attached to the Condemnation Resolution. In addition to the direct cost of the fee simple parcels required for construction of the ponds, the County is also required, where applicable, to pay all expenses for title work, real estate appraisals, and those expenses related to condemnation, when necessary, such as property owner attorney fees and expert witness fees, as required by Sections 73.091 and 73.092, Florida Statutes. These costs are included in the estimated fiscal impact below. To the extent settlements are achieved in lieu of litigation, these costs will be reduced significantly. This item is consistent with the Collier County strategic plan objective to design and maintain an effective transportation system to reduce traffic congestion and improve the mobility of our residents and visitors. FISCAL IMPACT: The fiscal impact associated with this item is estimated to be $2.5million. The primary funding source for the acquisition of right of way is through Road Impact Fee District Fund (3094), Wilson Boulevard from Golden Gate Boulevard to Immokalee Road Project (60229). Should impact fees not be sufficient, the secondary funding source will be Road Construction Gas Tax Fund (3083) and Transportation Capital Fund (3081). GROWTH MANAGEMENT IMPACT: This recommendation is consistent with the Long-Range Transportation Plan and Objective 1 of the Transportation Element of the Collier County Growth Management Plan to maintain the major roadway system at an acceptable Level of Service. Page 1639 of 4682 8/26/2025 Item # 16.B.4 ID# 2025-2217 LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires a majority vote for Board approval. – CMG RECOMMENDATIONS: 1. Approve the attached Condemnation Resolution; 2. Authorize the Board’s Chairman to execute same on behalf of the Board; and 3. Authorize any budget amendments that may be necessary to implement the collective will of the Board as evidenced by the adoption of the attached Resolution and the approval of this Executive Summary. PREPARED BY: Michelle L. Sweet, ROW Coordinator, ROW Acquisition, Operations and Performance Management Division. ATTACHMENTS: 1. Project Location Map 2. Pond Siting Report 3. Presentation-Condemnation Resolution-60229 Wilson Blvd 4. Condemnation Resolution Page 1640 of 4682 PROJECT LOCATION MAP Page 1641 of 4682 Pond Siting Report Wilson Boulevard Widening Design Golden Gate Boulevard to Immokalee Road June 16, 2025 Page 1642 of 4682 Table of Contents Introduction ........................................................................................................................................................................ 3 Background ......................................................................................................................................................................... 3 Design Criteria .................................................................................................................................................................... 4 Existing Drainage Patterns .............................................................................................................................................. 5 Proposed Drainage Patterns ........................................................................................................................................... 6 Basin 1 Pond Site Requirements .................................................................................................................................... 9 Basin 2 Pond Site Requirements ................................................................................................................................. 12 Basin 3 Pond Site Requirements ............................................................................................................................... ...15 Basin 4 Pond Site Requirements ............................................................................................................................... ...21 Basin 5 Pond Site Requirements ............................................................................................................................... ...24 Basin 6 Pond Site Requirements ............................................................................................................................... ...29 Evaluation Factors .......................................................................................................................................................... 33 Appendices Appendix A: Wilson Boulevard Potential Pond Sites Exhibit ............................................................................... 41 Appendix B: Basin 3A and 3B Map and Photo Package ........................................................................................ 42 Appendix C: Pond Site 4-2 Map and Photo Package ............................................................................................. 43 Appendix D: Pond Site 5-2 (Wet) Map and Photo Package ................................................................................. 44 Appendix E: Wilson Boulevard Corridor ROW Impacts Exhibit ............................................................................ 45 Appendix F: Pond Siting Report – Wilson Boulevard Corridor Study (2022) ................................................... 46 Page 1643 of 4682 Pond Siting Report Jacobs Engineering Group Inc.3 Introduction This Pond Siting Report has been prepared to provide the background and supplemental information necessary for the County acquisition of parcels for the purpose of constructing and maintaining stormwater treatment pond sites for the Wilson Boulevard Widening Project, which will widen Wilson Boulevard from an existing 2-lane rural facility to a 4-lane urban facility from Golden Gate Boulevard to Immokalee Road. Background The Collier MPO 2040 Long Range Transportation Plan identified this existing 2-lane rural section of Wilson Boulevard (from Golden Gate Blvd to Immokalee Rd) in the Needs Plan (Needs Rank 51) as a 4-lane urban typical section. The Collier MPO 2045 Long Range Transportation Plan identified this existing 2-lane rural section of Wilson Boulevard (from Golden Gate Blvd to Immokalee Rd) in the Existing Plus Committed (E+C) Roadway Project network (Map ID 100) as a 4-lane urban typical section. In 2022, Collier County initiated the Wilson Boulevard Corridor Study (Study) to evaluate future corridor improvements to widen Wilson Boulevard North (Wilson Boulevard), from Golden Gate Boulevard (CR 876) to Immokalee Road (CR 846) from a two-lane undivided facility to a four- lane divided roadway with curb and gutter with a “closed” (stormwater inlets, pipes, ponds) drainage system. As part of the Study, a preliminary Pond Siting Report (see Appendix F) was prepared which evaluated the stormwater recommendations and options for Collier County on the type, design, and location of the stormwater management facilities for the proposed improvements. The preliminary Pond Siting Report identified a minimum of 6 drainage basins required for the Pond Siting Report Wilson Boulevard Widening Design: (Basins 1 - 6) Date: June 16, 2025 Jacobs 5811 Pelican Bay Boulevard Suite 305 Naples, FL 34108 Contact: Bill Gramer, PE, AICP Email: Bill.Gramer@jacobs.com Mobile: 239.860.4922 www.jacobs.com Project name:Design Services for Wilson Blvd Widening Contract No.:22-8006 Purchase Order No.: 4500225624 Client:Collier County – Dennis McCoy, PE (PM) Prepared by:Jacobs Page 1644 of 4682 Pond Siting Report Jacobs Engineering Group Inc.4 project, with a combination of wet and dry ponds needed. Please refer to Appendix F for all relevant basin and pond volume requirements and calculations. In August 2023, Collier County entered into a service agreement with Jacobs Engineering Group (Jacobs) for the Design Services for Wilson Blvd Widening (Contract No. 22-8006, Project No. 60229). As part of the design process, a Final Pond Siting Report will be prepared and delivered (typically after 30% submittal). However, due to continuous development along the project corridor, multiple potential pond sites are becoming unavailable. To expedite obtaining the required pond sites for the widening project, Jacobs had begun evaluating and identifying potential pond sites on a basin-by-basin basis that meet the project design criteria. Four previous technical memorandums have been provided to the County that focused on a single basin and its necessary parcel acquisition(s): Basin 1 Technical Memorandum (sent March 12, 2024) – Pond Site obtained Basin 2 Technical Memorandum (sent January 29, 2024) –Pond Site obtained Basin 4 Technical Memorandum (sent July 26, 2024) Basin 5 Technical Memorandum (sent July 26, 2024) This Pond Siting Report provides a pond site evaluation for Basin 3 and Basin 6, as well as consolidates the information from the four previous memos into one document for streamlined access and documentation. Note: Basin 6 (from 22nd Ave NW/NE to Immokalee Road) will be included in this pond siting report, but no recommendation will be made at this time.The Immokalee Road 8-Lane Widening project and the planned St. John Paul II Parish (approximately 42 acres) development at the southwest corner of Wilson Boulevard and Immokalee Road will reconfigure the existing Immokalee Road Pond 7. It is anticipated that this pond will be reconstructed and utilized as a joint-use pond for the Church Site, the planned 8-lane widening of Immokalee Road and the widening improvements to Wilson Boulevard located within Basin 6. The agreement with the County and the proposed Church for a redesigned joint-use Pond 7 has not been finalized at this time. Therefore, if an agreement cannot be reached,an additional parcel will be required for a pond site in the future for Basin 6. This will require an addendum to this Pond Siting Report identifying the preferred pond site. An overall site area map exhibit of Wilson Boulevard Potential Pond Sites is provided in Appendix A. Design Criteria The existing Wilson Boulevard corridor drains to the Cypress and Corkscrew Canals within the North Golden Gate Basin (Water Basin Identification (WBID) 3278S), which is in the Big Cypress area of Collier County and within the jurisdiction of the South Florida Water Management District (SFWMD). The preliminary design of stormwater management systems for this project Page 1645 of 4682 Pond Siting Report Jacobs Engineering Group Inc.5 is regulated by the rules and criteria set forth by SFWMD and the Florida Department of Environmental Protection (FDEP). This section outlines the requirements to meet water quality and quantity standards. North Golden Gate Sub-Basin (WBID 3278S) is impaired for dissolved oxygen, with total nitrogen as the causative pollutant. Although there is not a current Total Maximum Daily Load or Basin Management Action Plan established, additional protective measures must be incorporated into the project improvements to provide reasonable assurance that the proposed discharge will not cause or contribute to violations of state water quality standards. Retention, detention, or a combination of both in the overall system have the following volumetric requirements: Wet detention volume provided for the greater of the first 1 inch of runoff over the drainage area or 2.5 inches of runoff over the impervious area (excluding water bodies) Dry detention volume provided equal to 75 percent of referenced amounts for wet detention Retention volume provided equal to 50 percent of the referenced amounts for wet detention Additional protective measures required by SFWMD include a site-specific pollutant loading analysis and an additional 50 percent water quality treatment volume. Existing Drainage Patterns The existing Wilson Boulevard typical section is a two-lane undivided rural roadway. Runoff from the roadway drains to roadside ditches that ultimately discharge to the nearby canals, directly or via side streets. Approximate onsite basin divides were developed based on canal locations, drainage structures, 12-digit hydrologic unit sub-basin maps, 2-foot LIDAR1 contour elevations, and the Collier County Stormwater Management Facilities GIS database. Basins 1 and 2 (from Golden Gate Boulevard to Cypress Canal) Wilson Boulevard, from Golden Gate Boulevard to Cypress Canal, is within the Curry Island Drain sub-basin and generally drains north to the Cypress Canal. Although some adjacent properties appear to include depressional or wetland areas, the roadside ditches provide continuous conveyance within the existing ROW to the Cypress Canal. According to LIDAR contours, existing Wilson Boulevard elevations range between 12 and 14 feet. Page 1646 of 4682 Pond Siting Report Jacobs Engineering Group Inc.6 Basins 3, 4, 5, and 6 (from Cypress Canal to Immokalee Road) North of the Cypress Canal to Immokalee Road, Wilson Boulevard is located along the boundary between two sub-basins, Curry Island Drain (to Curry Canal) to the west and Horsepen Slough (to Corkscrew Canal) to the east. Wilson Boulevard is approximately 1 mile east of Curry Canal and 3/8 of a mile west of Corkscrew Canal. To minimize impacts to existing residential driveways and reduce costs, the Corkscrew Canal will be proposed (to SFWMD) as the preferred outfall canal for basins 3, 4, 5, and 6. In this segment, Wilson Boulevard is traversed by nine side streets (10th Avenue to 24th Avenue) that extend west and east, terminating at the Curry and Corkscrew Canals, respectively. Because there are no existing side drains at the traversing side streets that would continue conveyance along Wilson Boulevard north-south, each side street crossing serves as a natural drainage divide and discharge point and conveys water to the west and east into their respective canals. For purposes of this evaluation, Wilson Boulevard from Cypress Canal to Immokalee Road was sub-divided into four basins, with divides at 14th Avenue, 18th Avenue, and 22nd Avenue. Basin 3 (from Cypress Canal to 14th Avenue) The existing Wilson Boulevard profile contains primarily flat slopes in this area and has an elevation near 12 feet. Basin 4 (from 14th Avenue to 18th Avenue) The existing Wilson Boulevard profile contains primarily flat slopes in this area and has elevations between 12 and 12.5 feet. Basin 5 (from 18th Avenue to 22nd Avenue) The existing Wilson Boulevard profile contains primarily flat slopes in this area and has elevations between 12 and 13 feet. Basin 6 (from 22nd Avenue to Immokalee Road) North of 22nd Avenue, the existing Wilson Boulevard profile elevations increase from 13 to 14 feet near 24th Avenue, and up to 15 feet at the tie-in with Immokalee Road. Proposed Drainage Patterns The Wilson Boulevard proposed typical section consists of four 11-foot-wide lanes with 5-foot- wide bike lanes, curb and gutter, a 6-foot-wide sidewalk on the west side of the road, a 10-foot- wide pathway on the east side of the road, a 22-foot-wide grassed median, and grassed ditches on each exterior of the road for a total 165-foot proposed ROW Easement (ROW) width. The proposed exterior ditches would maintain existing offsite drainage patterns within the ROW by Page 1647 of 4682 Pond Siting Report Jacobs Engineering Group Inc.7 maintaining the hydraulic connections to the existing side street ditches. Runoff from the proposed roadway would drain to a closed storm sewer system along the proposed curb and gutter and conveyed to the proposed pond sites for water quality treatment and water quantity attenuation. The ponds will also serve as floodplain mitigation. Where feasible, two or more potential pond sites were identified within each basin based on a variety of factors including basin-specific estimated storage volume requirements, environmental conditions, soil conditions, site elevations (GIS contour elevations), discharge points, tailwater conditions, and physical impacts to existing infrastructure. Note: Sites that would impact occupied residential properties or public water supply wellheads were removed from consideration. Appendix A includes the proposed basin divides and potential pond site locations. Basin 1 (from Golden Gate Boulevard to 0.55 miles north along Wilson Blvd N) Proposed pond sites for Basin 1 would outfall north directly to the Cypress Canal. Two potential pond sites were identified for Basin 1 in the Study to avoid impacts to numerous water supply wells and minimize distance to the canal. Piped conveyance systems to and from the potential Basin 1 pond sites would be located within the Wilson Boulevard ROW. Basin 2 (from 0.55 miles south of Cypress Canal to Cypress Canal) Proposed pond sites for Basin 2 would outfall north directly to the Cypress Canal. Four potential pond sites were identified for Basin 2 in the Study to avoid impacts to numerous water supply wells and minimize distance to the canal. Piped conveyance systems to the potential Basin 2 pond sites would be located within the Wilson Boulevard ROW and/or easements should the location of the proposed ponds not be adjacent to Wilson Boulevard. The Pond 2 outfall pipes to the Cypress Canal will be located within the Wilson Boulevard ROW. Basin 3 (from Cypress Canal to 14th Avenue) Depending on the pond site location, Basin 3 could outfall directly south to the Cypress Canal or east to the Corkscrew Canal. Three potential pond sites were identified in the Study. Piped conveyance systems to the potential Basin 3 pond sites would be located within the Wilson Boulevard ROW, and possibly along easements within the side streets should the location of the proposed ponds not be adjacent to Wilson Boulevard. The Pond 3 outfall conveyance pipes could be located either within proposed Wilson Boulevard ROW or within easements along 10th Avenue NE to Cypress Canal or 12th Avenue NE to Corkscrew Canal. Page 1648 of 4682 Pond Siting Report Jacobs Engineering Group Inc.8 Basin 4 (from 14th Avenue to 18th Avenue) Proposed pond sites for Basin 4 outfall directly to the Corkscrew Canal. Two potential pond sites were identified in the Study along the Cypress Canal and side streets, away from the public water supply wells. Depending on the pond site location, piped conveyance systems to and from the potential Basin 4 pond sites would be located within the Wilson Boulevard ROW and possibly along easements within either 16th Avenue NE to the Corkscrew Canal or Jung Boulevard E to the Corkscrew Canal. Basin 5 (from 18th Avenue to 22nd Avenue) Proposed pond sites for Basin 5 outfall directly to the Corkscrew Canal. Five potential pond sites (both wet and dry) were identified in the Study along Wilson Boulevard and side streets. Depending on the pond site location, piped conveyance systems to the potential Basin 5 pond sites would be located within the Wilson Boulevard ROW and possibly along easements within the nearby side streets. The Pond 5 outfall pipes would be located within easements either along 18th Avenue NE to Corkscrew Canal or 20th Avenue NE to Corkscrew Canal. Basin 6 (from 22nd Avenue to Immokalee Road) Proposed pond sites for Basin 6 outfall directly to the Corkscrew Canal. Four potential pond (both wet and dry) sites were identified in the Study along Wilson Boulevard and side streets, away from the Immokalee Road frontage. Depending on the pond site location, piped conveyance systems to the potential Basin 6 pond sites would be located within the Wilson Boulevard ROW and possibly along easements within the nearby side streets. The Pond 6 outfall pipes would be located within easements either along 22nd Avenue NE to Corkscrew Canal, 24th Avenue NE to Corkscrew Canal. Note: If a joint-use Pond 7 is deemed feasible, discharge will be to the Cocohatchee Canal through the existing outfall pipe. Page 1649 of 4682 Pond Siting Report Jacobs Engineering Group Inc.9 Basin 1 From Golden Gate Blvd to approximately 0.55 miles north of Golden Gate Blvd along Wilson Blvd Attachment 1: Wilson Boulevard Potential Pond Sites Exhibit (Basin 1) Wilson BlvdGolden GateBlvdPage 1650 of 4682 Pond Siting Report Jacobs Engineering Group Inc.10 Basin 1 Pond Site Requirements Basin 1 limits: From Golden Gate Blvd to approximately 0.55 miles north of Golden Gate Blvd along Wilson Blvd. Based on the Design Criteria and the amount of needed treatment and attenuation for the proposed amount of impervious area, the need for an approximate 4 Acre Pond Site has been identified for Basin 1. The proposed pond sites for Basin 1 would outfall north directly to the Cypress Canal. Two potential pond sites were identified for Basin 1 to avoid impacts to numerous water supply wells and minimize distance to the canal. The preferred pond site from the Study is no longer viable due to development. An additional alternative was identified during design. Piped conveyance systems to the potential Basin 1 pond sites would be located within the Wilson Boulevard ROW. The Pond 1 outfall pipes to the Cypress Canal may be located within the Wilson Boulevard ROW. Recommendation Jacobs identified 2 viable options for Basin 1 (see Attachment 1): • Pond Site 1-1: Consisting of Parcel Numbers 246 and 247 (Total 4.52 Acres) • Pond Site 1-3: Consisting of Parcel Numbers 241 and 242 (Total 4.51 Acres) Pond Site 1-3 was selected as the preferred alternative due to less anticipated wetland impacts. Additionally, the two tracts comprising Pond Site 1-3 are controlled entirely by one person who owns one of the tracts and controls the trust that owns the second tract, whereas Pond Site 1-1 consists of two owners. The parcels identified for Pond Site 1-3 are required for a stormwater pond in Basin 1, and Jacobs requested the County acquire these parcels to accommodate the stormwater treatment and attenuation needed for the Wilson Boulevard Widening Project. Note: The County has acquired the parcels for Pond Site 1-3. Page 1651 of 4682 Pond Siting Report Jacobs Engineering Group Inc.11 Parcel No. 37280400008 (241) Property Appraiser: Parcel No. 37280360009 (242) Property Appraiser: Page 1652 of 4682 Pond Siting Report Jacobs Engineering Group Inc.12 Basin 2 From Approximately 0.55 miles south of Cypress Canal to Cypress Canal. Attachment 2: Wilson Boulevard Potential Pond Sites Exhibit (Basin 2) Wilson Blvd Cypress Canal1st St NW Page 1653 of 4682 Pond Siting Report Jacobs Engineering Group Inc.13 Basin 2 Pond Site Requirements Basin 2 limits: Approximately 0.55 miles south of Cypress Canal to Cypress Canal. Based on the Design Criteria and the amount of needed treatment and attenuation for the proposed amount of impervious area, the need for an approximate 4 Acre Pond Site has been identified for Basin 2. The proposed pond sites for Basin 2 would outfall directly to the Cypress Canal. Four potential pond sites were identified for Basin 2 in the Study to avoid impacts to numerous water supply wells and minimize distance to the canal. Two of those proposed pond sites are no longer available due to development. Piped conveyance systems to the potential Basin 2 pond sites would be located within the Wilson Boulevard ROW. The Pond 2 outfall pipes to the Cypress Canal may be located within the Wilson Boulevard ROW. Recommendation Jacobs identified 2 viable options for Basin 2 (see Attachment 2): • Pond Site 2-1: Consisting of Parcel Numbers 290RDUE2 and 292RDUE1 (Total 4.52 Acres) • Pond Site 2-2: Consisting of Parcel Numbers 278 and 279 (Total 4.31 Acres) Pond Site 2-2 was selected as the preferred alternative due to reduced anticipated wetland impacts. Additionally, Pond Site 2-2 is owned entirely by a single owner, whereas Pond Site 2-1 consists of two owners (a “lot split” request has been filed for parcel 290RDUE2, Application No. PL20230000853). The parcels identified for Pond Site 2-2 are required for a stormwater pond in Basin 2, and Jacobs requested the County acquire these parcels to accommodate the stormwater treatment and attenuation needed for the Wilson Boulevard Widening Project. Note: The County has acquired the requested parcels for Pond Site 2-2. Page 1654 of 4682 Pond Siting Report Jacobs Engineering Group Inc.14 Parcel No. 37118720106 (278) Property Appraiser: Parcel No. 37118720009 (279) Property Appraiser Page 1655 of 4682 Pond Siting Report Jacobs Engineering Group Inc.15 Basin 3 From Cypress Canal to 14th Ave NW/NE Attachment 3: Wilson Boulevard Potential Pond Sites Exhibit (Basin 3) Wilson Blvd Page 1656 of 4682 Pond Siting Report Jacobs Engineering Group Inc.16 Basin 3 Pond Site Requirements Basin 3 limits: Wilson Blvd N from Cypress Canal to 14th AVE NW/NE. Due to the construction of Vanderbilt Beach Road Extension (VBRX) and the existing drainage trunklines which cross Wilson Boulevard, Basin 3 has been split into two subbasins: Basin 3A (from Cypress Canal to VBRX) and Basin 3B (from VBRX to 14th Ave NW/NE). Basin 3A Basin 3A limits are from Cypress Canal to VBRX. Two potential pond sites were identified for what is now Basin 3A in the Study to avoid impacts to numerous water supply wells and minimize distance to the canal. A third option was explored for this Pond Siting Report: Expanding the VBRX Wet Pond 3BN to Parcel 315. Jacobs recommends routing the water into the southern VBRX Wet Pond 3BS. VBRX Wet Pond 3BS and Wet Pond 3BN are connected with an equalizer pipe (see Figure 3-1). These wet ponds are near their capacity; therefore, Jacobs recommends acquiring Parcel 315 just north of the northern pond (Wet Pond 3BN) to expand the Wet Pond 3BN’s treatment and attenuation capacities. The existing discharge pipes from VBRX will be utilized for these ponds which will result in significant cost savings for the project. Note: A permit modification to the VBRX project will be required. Wet Pond 3BS Wet Pond 3BN Figure 3-1 Page 1657 of 4682 Pond Siting Report Jacobs Engineering Group Inc.17 Based on the Design Criteria and the amount of needed wet detention and dry detention pre- treatment and attenuation for the proposed amount of impervious area, the need for an approximate 3 acre wet or dry pond site has been identified for Basin 3A. Recommendation – Basin 3A Jacobs identified 3 viable options for Basin 3A (see Attachment 3): Basin 3A Pond Site 3-1: (Total 4.53 Acres) Basin 3A Pond Site 3-2: Consisting of Parcel Number 295 (Total 4.38 Acres) Basin 3A VBRX Pond 3BN Expansion: Consisting of Parcel No. 37549320007 (Parcel 315) (Total 2.5 Acres) Basin 3A VBRX Pond 3BN Expansion (Parcel 315) was selected as the alternative due to reduced anticipated wetland impacts, the cost savings by utilizing an already constructed discharge pipe (from VBRX), and the increased amount of stormwater storage achieved by expanding an existing pond versus constructing a new pond with berms, slope tie-downs, etc. This parcel is located along Wilson Boulevard and adjacent to an existing pond. Additionally, no permits have been filed recently to construct residential homes on this parcel. The parcel identified for Basin 3A is required for wet detention stormwater ponds in Basin 3, and at this time Jacobs is requesting the County acquire this parcel to accommodate the stormwater treatment and attenuation needed for the Wilson Boulevard Widening Project. Parcel 37549320007 (315) Property Appraiser: Page 1658 of 4682 Pond Siting Report Jacobs Engineering Group Inc.18 Basin 3B Basin 3B limits are from VBRX to 14th Ave NW/NE. The proposed expanded VBRX wet ponds system will be unable to treat and attenuate both Basin 3A and Basin 3B. Therefore, Jacobs identified the need for an additional parcel for a stormwater treatment pond. Based on the Design Criteria and the amount of needed wet detention and dry detention pre- treatment and attenuation for the proposed amount of impervious area, the need for an approximate 3-acre wet or dry pond site has been identified for Basin 3B. The proposed pond sites for Basin 3B would outfall directly to the Corkscrew Canal. Jacobs will explore the possibility of utilizing the existing VRBX discharge pipes to the Corkscrew Canal, which may result in significant cost savings. One potential pond site (Pond Site 3-3) was identified for what is now designated Basin 3B during the Corridor Study. A permit for constructing a single-family residence was issued on December 31, 2024 (PRFH20240937730) on one of the parcels for the proposed pond site. As a result, Jacobs identified an alternative pond site (Pond Site 3-4) at the northeastern parcel at the intersection of VBRX and Wilson Blvd. Piped conveyance systems to the potential Basin 3B pond site as well as outfall pipes to the Corkscrew Canal would be located within the Wilson Blvd ROW and VBRX ROW (existing discharge pipe). Recommendation – Basin 3B Jacobs identified 1 viable option for Basin 3B (see Attachment 3): Basin 3B Pond Site 3-4: Consisting of Parcel Numbers 37490400102 (Parcel 313) (Majority of which County acquired for VBRX project) and Parcel No. 37490400005 (Parcel 314) (Approx. 3 Acres) Basin 3B Pond Site 3-4 was selected due to the elimination of the viability of Pond Site 3-3 due to the recently issued construction permit. Additionally, this parcel site is located near a major intersection (Wilson Blvd and VBRX), where a pond site is preferred versus the construction of a home due to access and safety reasons. Jacobs will explore the possibility of utilizing the existing outfall pipe from the VBRX project for Wet Pond 3BS and 3BN, potentially saving the County money. The parcels identified for Basins 3B are required for wet detention and/or dry detention stormwater ponds in Basin 3, and at this time Jacobs is requesting the County acquire these parcels to accommodate the stormwater treatment and attenuation needed for the Wilson Boulevard Widening Project. Page 1659 of 4682 Pond Siting Report Jacobs Engineering Group Inc.19 Parcel 37490400005 (Parcel 314) Property Appraiser: Field visits were conducted on the properties for Basins 3A and 3B, and the map and photo package is appended at the end of this report (see Appendix B). Page 1660 of 4682 Pond Siting Report Jacobs Engineering Group Inc.20 ROW Map: Vanderbilt Beach Road Extension Project (May 08, 2023) Parcel 37490400102 (Parcel 313) Property Appraiser The County acquired a road right of way, drainage & utility easement over the southerly 100’ of this property for the VBRX project. The entire property, as well as the parcel just north, are currently owned by the same owner. See below ROW map from the VBRX project. Page 1661 of 4682 Pond Siting Report Jacobs Engineering Group Inc.21 Basin 4 From 14th Ave NW/NE to 18th Ave NW/NE Attachment 4: Wilson Boulevard Potential Pond Sites Exhibit (Basin 4) Wilson Blvd 450POND Page 1662 of 4682 Pond Siting Report Jacobs Engineering Group Inc.22 Basin 4 Pond Site Requirements Basin 4 limits: Wilson Blvd N from 14th AVE NW/NE to 18th AVE NW/NE. Based on the above Design Criteria and the amount of needed treatment and attenuation for the proposed amount of impervious area, the need for an approximate 4-acre wet pond site has been identified for Basin 4. The proposed pond site for Basin 4 would outfall directly to the Corkscrew Canal along a side street. Two potential pond sites were identified for Basin 4 during the Corridor Study to avoid impacts to numerous water supply wells and minimize distance to the canal; however, both of those sites are no longer viable due to recent permits filed for construction of a new home or lot split permit requests. As a result, potential alternative sites were evaluated, and one feasible site (Pond Site 4-2 (450POND): Parcel Number 37742200005)was identified for this pond siting report. Piped conveyance systems to the potential Basin 4 pond site would be located within the Wilson Boulevard ROW and either the Jung Blvd E or 18th AVE NE ROW. The Pond 4 outfall pipes to the Corkscrew Canal may be located within either the Jung Blvd E ROW or the 18th AVE NE ROW. An environmental field review indicated the presence of significant gopher tortoise burrows/activity on Pond Site 4-2. Multiple field visits were conducted on the properties, and the Pond Site 4-2 map and photo package is appended at the end of this report (see Appendix C). A cost analysis of the anticipated gopher tortoise mitigation was conducted. Our gopher tortoise mitigation costs findings are summarized below: Gopher Tortoise Mitigation ($6,000/Tortoise, assuming 50% occupancy): o Encountered 33 Potentially Occupied Adult Burrows (round up to 34 whole burrows) o Pond Site 4-2 Cost Estimate =$102,000 (34*6,000*.5 = $102,000) Recommendation Jacobs identified 1 viable option for Basin 4 (see Attachment 4): • Pond Site 4-2 (450POND): Parcel Number 37742200005 (Total 4.65 Acres excluding Jung Blvd E and 18th AVE NE ROW) Pond Site 4-2 was selected as the preferred pond site due to its availability and elimination of all previous alternatives. Additionally, no permits have been filed recently to construct residential homes on this parcel. Gopher Tortoise mitigation is anticipated with this parcel. Page 1663 of 4682 Pond Siting Report Jacobs Engineering Group Inc.23 The parcel identified for Pond Site 4-2 is required for a stormwater pond in Basin 4, and at this time Jacobs is requesting the County acquire this parcel to accommodate the stormwater treatment and attenuation needed for the Wilson Boulevard Widening Project. Parcel 37742200005 (450POND) Property Appraiser: Page 1664 of 4682 Pond Siting Report Jacobs Engineering Group Inc.24 Basin 5 From 18th Ave NW/NE to 22nd Ave NW/NE Attachment 5: Wilson Boulevard Potential Pond Sites Exhibit (Basin 5) Wilson Blvd 451POND 452POND WET POND DRY POND Page 1665 of 4682 Pond Siting Report Jacobs Engineering Group Inc.25 Basin 5 Pond Site Requirements Basin 5 limits: Wilson Blvd N from 18th AVE NW/NE to 22nd AVE NW/NE. Based on the above Design Criteria and the amount of needed wet detention and dry detention pre-treatment and attenuation for the proposed amount of impervious area, the need for an approximate 4-acre wet pond site and approximate 2-acre dry pond site has been identified for Basin 5. The proposed pond sites for Basin 5 would outfall directly to the Corkscrew Canal. Five potential pond sites were identified for Basin 5 during the Corridor Study to avoid impacts to numerous water supply wells and minimize distance to the canal. However, one of those sites are no longer viable (Pond Site 5-1) due to development, and another potential pond site’s (Pond Site 5-4) size has been reduced by half due to development. The preferred alternative from the Corridor Study (Pond Site 5-2, consisting of a 5.28-acre wet pond site and a 2.18-acre dry pond site) was selected for this Pond Siting Report. Piped conveyance systems to the potential Basin 5 pond sites as well as outfall pipes to the Corkscrew Canal would be located within the Wilson Boulevard ROW and the 18th AVE NE ROW. An environmental field review indicated the presence of significant gopher tortoise burrows/activity on Pond Site 5-2 (Wet, Parcel Numbers: 37742280009 (451POND) & 37743480002 (452POND)). Multiple field visits were conducted on the properties, and the Pond Site 5-2 (Wet) map and photo package is appended at the end of this report (see Appendix D). A cost analysis of the anticipated gopher tortoise mitigation was conducted. Our anticipated gopher tortoise mitigation costs findings are summarized below: Gopher Tortoise Mitigation ($6,000/Tortoise, assuming 50% occupancy): o Encountered 41 Potentially Occupied Adult Burrows (round up to 42 whole burrows) o Pond Site 5-2 (Wet) Cost Estimate =$126,000 (42*6,000*.5 = $126,000) Recommendation Jacobs identified 2 dry pond options and 2 wet pond options to accommodate both wet detention and dry detention pre-treatment for Basin 5 (see Attachment 1): Pond Site 5-2 (Dry): Consisting of Parcel Number: 37740280001 (368POND) (Total 2.18 Acres excluding Wilson Blvd and 18th AVE NE ROW) Pond Site 5-2 (Wet): Consisting of Parcel Numbers: 37742280009 (451POND) (Total 2.64 Acres excluding 18th AVE NE ROW), and 37743480002 (452POND) (Total 2.64 Acres excluding 18th AVE NE ROW) Pond Site 5-3 (Wet): Consisting of Parcel Numbers 376 and 377 Pond Site 5-4 (Dry): Consisting of Parcel Number 397 Page 1666 of 4682 Pond Siting Report Jacobs Engineering Group Inc.26 Note:Pond Site 5-3 (Wet) would have substantial impacts to forested freshwater wetlands, Class III Waters, and require additional floodplain compensation based on field visits and a review of adjacent single-family construction permits filed for the northern (parcel 380) and southern (parcel 373) neighboring parcels (County permit no. PRFH20220418388 and PRFH20230836105). Jacobs did not recommend the alternative Pond Site 5-3 (Wet), due to the significant costs of anticipated wetland mitigation, anticipated floodplain compensation, and additional costs associated with additional outfall pipes. Note: Pond Site 5-2 (Dry) is needed to achieve the needed dry detention treatment and attenuation requirements. Pond Site 5-2 (Dry) was selected over Pond Site 5-4 (Dry) due to the proximity of Pond Site 5-2 (Wet) pond site, thus saving money on discharge pipes. Both Pond Sites 5-2 (Dry) and Pond Site 5-4 (Dry) would require some wetland mitigation. We anticipate Pond Sites 5-2 (Wet) will share a drainage outfall pipe down 18th AVE NE with Pond Site 5-2 (Dry) as well as with Pond Site 4-2, and all three ponds will share 1 single outfall pipe to the Canal, minimizing impacts to residential driveways and existing infrastructure, thus saving the County money on construction. The parcels identified for Pond Site 5-2 (Wet) (451POND and 452POND) and Pond Site 5-2 (Dry) (368POND) are required for both a wet detention and dry detention stormwater pond in Basin 5, and at this time Jacobs is requesting the County acquire these parcels to accommodate the stormwater treatment and attenuation needed for the Wilson Boulevard Widening Project. Pond Site 5-3: Forested freshwater wetlands, Class III Waters Page 1667 of 4682 Pond Siting Report Jacobs Engineering Group Inc.27 Parcel 37740280001 (368POND) Property Appraiser (Pond 5-2 (Dry)): Parcel 37742280009 (451POND) Property Appraiser (Pond 5-2 (Wet)): Page 1668 of 4682 Pond Siting Report Jacobs Engineering Group Inc.28 Parcel 37743480002 (452POND) Property Appraiser (Pond 5-2 (Wet)): Page 1669 of 4682 Pond Siting Report Jacobs Engineering Group Inc.29 Basin 6 From 22nd Ave NW/NE to Immokalee Road Attachment 6: Wilson Boulevard Potential Pond Sites Exhibit (Basin 6) Wilson Blvd Page 1670 of 4682 Pond Siting Report Jacobs Engineering Group Inc.30 Basin 6 Pond Site Requirements Basin 6 limits: Wilson Blvd N from 22nd AVE NW/NE to Immokalee Road. Based on the above Design Criteria and the amount of needed treatment and attenuation for the proposed amount of impervious area, the need for an approximate 3 to 4-acre wet pond site has been identified for Basin 6, with the potential for dry detention treatment. The intent of this Pond Siting Report is to identify the alternative pond sites in Basin 6; however, Jacobs is not recommending to the County to acquire any pond site at this time due to the planned Immokalee Road 8-Lane Widening project and the planned St. John Paul II Parish (approximately 42 acres) development at the southwest corner of Wilson Boulevard and Immokalee Road. These projects are evaluating the feasibility of reconfiguring the existing Immokalee Road Pond 7 as a joint-use pond for the Church Site, the planned 8-lane widening of Immokalee Road and the improvements to Wilson Boulevard in Basin 6. If a joint-use Pond 7 is deemed feasible, discharge will be to the Cocohatchee Canal through the existing 48” outfall pipe. Note: The agreement with the County and the proposed Church for a redesigned joint-use Pond 7 has not been finalized at this time. Therefore, if an agreement cannot be reached,an additional parcel(s) will be required for a pond site in the future for Basin 6. This will require an addendum to this Pond Siting Report identifying the preferred pond site. If needed for the Widening Project, the recommended pond site for Basin 6 would outfall directly to the Corkscrew Canal along a side street. Three potential pond sites (one dual pond site) were identified for Basin 6 during the Corridor Study to avoid impacts to numerous water supply wells and minimize distance to the canal. At this time, all parcels for the three alternatives remain undeveloped and available for potential pond sites and no permits have been filed on the four parcel sites for construction of a single-family home. Piped conveyance systems to the potential Basin 6 pond site would be located within the Wilson Boulevard ROW and either 22nd AVE NE ROW or 24th AVE NE ROW. The Pond 6 outfall pipes to the Corkscrew Canal may be located within either 22nd AVE NE ROW or 24th AVE NE ROW. Recommendation At this time, Jacobs does not recommend acquiring any potential pond site(s) in Basin 6 until further exploration of the feasibility of utilizing the future redesigned Pond 7 from the Immokalee Road 8-Lane Widening Project and St. John Paul II Parish Church Development. When/if a pond site must be recommended for Basin 6, an addendum to this Pond Siting Report will be provided to the County which recommends the preferred alternative. Page 1671 of 4682 Pond Siting Report Jacobs Engineering Group Inc.31 Parcel 37740880003 (Parcel 404) Property Appraiser: Parcel 37741760009 Property Appraiser: Page 1672 of 4682 Pond Siting Report Jacobs Engineering Group Inc.32 Parcel 37741440002 (Parcel 424) Property Appraiser: Parcel 37743920009 Property Appraiser: Page 1673 of 4682 Pond Siting Report Jacobs Engineering Group Inc.33 ROW Acquisition: Evaluation Factors Project Purpose and Need The primary purpose of the Wilson Boulevard widening project is to address population growth, traffic congestion and lack of system connectivity in the Golden Gate Estates and eastern Collier County areas. The project is needed to increase capacity along Wilson Boulevard and to improve overall traffic circulation and connectivity in the Golden Gate Estates and eastern Collier County areas. Regional Location Map Gulf of America Page 1674 of 4682 Pond Siting Report Jacobs Engineering Group Inc.34 Project Location Map The following factors were considered prior to recommending the proposed project improvements and determining the preferred typical section and needed ROW easements for the roadway widening as well as the stormwater management: 1.Alternative Alignments Capacity Need The project is needed to relieve existing and future traffic congestion along Wilson Boulevard, particularly between Immokalee Road, the Vanderbilt Beach Road Extension (VBRX) (under construction), and Golden Gate Boulevard. Wilson Boulevard will function as an arterial north- south collector in Golden Gate Estates area. While Wilson Boulevard currently operates at an acceptable level of service (LOS), the 2021 AUIR notes that Wilson Boulevard has experienced a 10% to 20% increase in peak hour directional traffic volume since 2020. Furthermore, preliminary traffic modeling indicates that, without the proposed improvements, Wilson Page 1675 of 4682 Pond Siting Report Jacobs Engineering Group Inc.35 Boulevard will be failing by 2045 in the segment between the future VBRX and Immokalee Road. The VBRX project extends Vanderbilt Beach Road from Collier Boulevard (CR 951) to 16th Street Northeast and includes a new intersection at Wilson Boulevard (construction of VBRX is estimated to be completed by 2026). The VBRX project provides additional east-west connectivity and capacity in eastern Collier County and Golden Gate Estates area. VBRX is expected to help relieve traffic congestion in the area, particularly along Golden Gate Boulevard and the already congested Immokalee Road, which is a regional east-west facility that carries traffic from eastern Collier County to I-75 and Naples. When the VBRX project is complete, traffic along Wilson Boulevard is expected to increase as travelers use the facility to access VBRX as an alternative east-west route in the area. System Connectivity Need The project is needed to improve the overall traffic network and system connectivity in the Golden Gate Estates and eastern Collier County area. Mobility in eastern Collier County is constrained by conservation lands in the northeastern and southeastern parts of the County. The area also is constrained by a canal system (South Florida Water Management District [SFWMD] Golden Gate Canal Basin) created in Collier County during the 1960s to drain the lands for residential development. The development resulted in residential lots that are 1 to 5 acres in size and are connected by a coarse grid of roads with few connecting cross streets, and a canal system that traverses the residential grid. Most of the roadways in eastern Collier County and Golden Gate Estates dead end at the canals, reducing overall mobility in the area. North-South Roadway Alternatives Currently, there are no north-south roadways east of Collier Boulevard that are wider than two lanes in eastern Collier County today. Wilson Boulevard would be the first four-lane roadway east of Collier Boulevard (approximately 5 miles to the east) and will provide additional north- south capacity and connectivity in the area. The recent shoulder improvements and bridge addition on 8th St NE provided connectivity improvements in the area from Randall Boulevard to Golden Gate Boulevard, but did not increase overall capacity. The planned shoulder improvements and bridge addition on 16th St NE will provide connectivity improvements in the area from Randall Boulevard to Golden Gate Boulevard but will not increase overall capacity. The planned 4-lane widening of Everglades Boulevard from Oil Well Road to future VBRX (Phase II) will increase capacity and improve connectivity in the area. All of these roadway improvements have been considered during the preparation of the Wilson Boulevard Corridor Study. The proposed roadway improvements are identified in the 2045 LRTP. Wilson Boulevard Corridor Study A corridor study was performed in 2022 (Wilson Boulevard Corridor Study) to evaluate alternatives to widen Wilson Boulevard North (Wilson Boulevard), from Golden Gate Boulevard (CR 876) to Immokalee Road (CR 846) from a two-lane undivided, rural facility to a four-lane divided, urban roadway with curb and gutter with a “closed” (stormwater inlets, pipes, ponds) Page 1676 of 4682 Pond Siting Report Jacobs Engineering Group Inc.36 drainage system. The full version of the original study is available for review under the Collier County Transportation Planning Section’s past studies at: https://www.colliercountyfl.gov/government/transportation-management-services/capital- project-planning-impact-fees-and-program-management/transportation-planning- section/planning-studies Wilson Boulevard is located within a roadway easement that is 100 feet wide (50 feet on either side of the plat centerline). Wilson Boulevard is approximately 27 feet wide, and was constructed east of the center plat line, leaving approximately 18 feet of existing roadway easement available to the east of the roadway and approximately 55 feet available to the west of the roadway. A typical section analysis was performed to identify a typical section that addresses the project’s purpose and need and meets design criteria, but minimizes impacts to resources in the project area, including numerous residential properties and driveways, non-residential properties, environmentally sensitive areas, and the Collier County Public Utilities Department water supply production wells and associated infrastructure. Various typical section widths (between 160 feet to 200 feet wide) were evaluated. The analysis revealed that a typical section width of 165 feet met the project needs with the least amount of impacts along the project corridor, with 80 feet required to the west of the center plat line, and 85 feet east of the center plat line (typical). Excerpt from the Wilson Boulevard Corridor ROW Impacts Exhibit (Appendix E) Page 1677 of 4682 Pond Siting Report Jacobs Engineering Group Inc.37 The above excerpt from the Wilson Boulevard Corridor ROW Impacts Exhibit illustrates the various corridor widths that were evaluated. The impacts to neighboring homes and well houses/vaults were evaluated at varying ROW widths (in five-foot intervals). The intent for establishing the alignment was to provide a “line of best fit” and minimize/equalize impacts to both the western and eastern parcels, whenever possible. Please refer to Appendix E to view the entire Wilson Boulevard Corridor ROW Impacts Exhibit. Note: An additional 5 feet is required on the eastern side to accommodate the 10-foot-wide pathway and to avoid impacts to the existing public utility wells located on the west side of the corridor. 2.Safety Factors A preliminary review of crash data indicates the highest crash locations within the study area were at the two major intersections, Golden Gate Boulevard and Immokalee Road. Additionally, no lighting exists along the project corridor. Safety enhancements proposed include lighting at the intersections and all cross streets to improve nighttime visibility for motorists, pedestrians, and bicyclists. Currently, there are no bicycle lanes or sidewalks along Wilson Boulevard within the project limits, forcing bicyclists and pedestrians, along with transit users, to share the road shoulder with motorists. The proposed improvements are anticipated to increase pedestrian and bicyclist safety by adding a sidewalk (6-feet), a shared-use path (10-feet), and bike lanes (5- foot) to reduce conflicts between motorists, pedestrians, bicyclists, and transit users. Further, the improvements include the addition of a raised median (22 foot wide) and turning lanes (right turn lanes and median left turn lanes) at cross streets along Wilson Boulevard to help reduce conflict points associated with left turns from residential properties and businesses along the project corridor, and to reduce conflict points at the intersections. Page 1678 of 4682 Pond Siting Report Jacobs Engineering Group Inc.38 Enhancing Emergency Access An increasing number of residents in northeastern Collier County are in a relatively isolated area of Collier County and have access to a limited roadway network for emergency evacuations related to hurricanes and brush fires. The proposed improvements provide additional capacity for emergency evacuations. Furthermore, the proposed improvements will improve north-south mobility and connectivity along the project corridor, enhancing access and reducing travel time for emergency responders. Improving Multimodal Mobility One Collier Area Transit (CAT) bus route runs along the project corridor (Route 19) and is served by six bus stops. The lack of sidewalks and bike lanes along the project corridor, as well as the lack of bus stop pads, make transit use in the area challenging. The addition of sidewalks, a shared-use path, bicycle lanes, and bus stop pads will provide a user-friendly experience that promotes walking, bicycling, and transit use within the project area. Additionally, within the project limits, Immokalee Road and Golden Gate Boulevard include pedestrian and bicycle facilities, and similar facilities are being constructed as part of the VBRX project. The addition of pedestrian and bicycle facilities on Wilson Boulevard will improve connectivity and multimodal mobility options from Wilson Boulevard to other major facilities in the area. Improving Congestion and Traffic Operations The widening of Wilson Boulevard will improve congestion, traffic operations, and safety on the nearby existing north-south parallel roadway arterial collectors (Collier Boulevard, 8th St NE, 16th St NE (planned bridge and shoulder improvements), Everglades Boulevard (planned 4-lane widening), and Desoto Boulevard) by redirecting traffic away from those congested roadways in the Golden Gate Estates. Since Collier Boulevard (6-lane), Wilson Boulevard (2-lane), 8th St NE (2-lane), Everglades Boulevard (2-lane), and Desoto Boulevard (2-lane) are currently the only 5 major north-south arterials serving the Golden Gate Estates, this roadway widening will improve access during evacuation as well as response times for the area's Emergency Services, especially when the Vanderbilt Beach Road Extension construction is completed. Safety considerations and design criteria includes: Alignments (Horizontal and Vertical) are based on Florida Department of Transportation (FDOT) Criteria Vertical profile will mitigate flooding of the roadway during storm events A 22-foot median will be provided Turn lanes will be provided at all cross-street intersections Sight Distance criteria will be met or exceeded throughout the corridor Signing and pavement markings are based on FDOT and Collier County guidelines Page 1679 of 4682 Pond Siting Report Jacobs Engineering Group Inc.39 A 10-foot multi-use pathway will be provided along the east side of Wilson Boulevard, and a 6-foot sidewalk will be provided along the west side of Wilson Boulevard to provide for safe circulation of pedestrian and bike traffic 5-foot bike lanes will be provided along Wilson Boulevard Lighting will be provided at all intersections, the entire corridor may be lit pending public feedback Collier County Public Schools bus pads are planned at every cross street 3.Long Range Planning Factors The Collier Metropolitan Planning Organization (MPO) and Collier County Transportation Planning division have been planning the widening of Wilson Boulevard for many years. Past planning activities are as follows: The Collier MPO 2035 Long Range Transportation Plan (adopted December 2010) identified this existing 2-lane rural section of Wilson Boulevard (from Golden Gate Blvd to Immokalee Rd) in the Needs Plan as a 4-lane urban typical section. The Collier MPO 2040 Long Range Transportation Plan (adopted December 2015) identified this existing 2-lane rural section of Wilson Boulevard (from Golden Gate Blvd to Immokalee Rd) in the Needs Plan (Needs Rank 51) as a 4-lane urban typical section. The Collier MPO 2045 Long Range Transportation Plan (adopted December 2020) identified this existing 2-lane rural section of Wilson Boulevard (from Golden Gate Blvd to Immokalee Rd) in the Existing Plus Committed (E+C) Roadway Project network (Map ID 100) as a 4-lane urban typical section. The Collier MPO 2050 Long Range Transportation Plan (Draft, due December 2025) identifies this existing 2-lane rural section of Wilson Boulevard (from Golden Gate Blvd to Immokalee Rd) in the Existing Plus Committed (E+C) Roadway Project network as a 4-lane urban typical section. 4.Environmental Factors The alternatives analysis considered environmental factors such as wetlands, panther habitat, gopher tortoise impacts, etc. The historic hydrology in the regional area has been impacted by the drainage network of nearby canals, including Curry, Cypress and Corkscrew Canals. The canals have severed historical sheet flow and severely altered the hydroperiod of wetlands in the area due to the existing Wilson Boulevard roadway. Roads and roadside ditching have also altered historical wetlands in the area, isolating their hydrologic connection. Wetlands and Surface Waters Preliminary desktop analysis indicates potential impacts to adjacent wetlands within the proposed ROW easement footprint. These potential impacts are associated with existing hydric soil. Mitigation would be required should field investigations indicate the presence of wetlands Page 1680 of 4682 Pond Siting Report Jacobs Engineering Group Inc.40 within the limits of construction. The amount of mitigation required for direct and secondary impacts will be determined by the permitting agencies. Additional wetland and surface water impacts from the project pond sites will be determined based on the pond sites identified and acquired during the design phase. During the evaluation of feasible pond sites, impacts to existing wetlands will be considered when analyzing preferred alternative pond sites in an effort to minimize impacts to wetlands. Other minor surface water impacts associated with the bridge replacement and widening at the Cypress Canal are anticipated. Additionally, widening the roadway and extending the length of the existing bridge culvert at the Cocohatchee Canal is anticipated to result in temporary surface water impacts. A natural resources evaluation is recommended during the design phase to assess potential impacts to wetlands and to facilitate coordination and concurrence with the permitting agencies. Protected Species and Habitat Based on the review of available information from the Florida Fish and Wildlife Conservation Commission (FWC) and USFWS in relation to the potential habitat impacts that may be associated with the proposed project, potential federal and state-listed/protected species (including protected non-listed wildlife species) were identified that may occur in the project vicinity. A Florida Natural Areas Inventory (FNAI) Tracking List was obtained for the project area, as well as an IPaC report. Wilson Boulevard, north of the Cypress Canal, is located within the Secondary Panther Zone. Impacts are anticipated and will be mitigated for clearing of lands for the project area (additional widening) and pond sites. Impacts from the Cypress Canal Bridge will be negligible to the man-made canal, and the proposed bridge will include wildlife shelves to facilitate wildlife connectivity. Best management practices will be followed during construction, such as floating turbidity barriers to minimize turbidity within the existing canals. 5.Costs of Competing Alternatives Costs to construct this project have been carefully considered in the analysis during the planning and design stages of this project. During the Alignment Alternatives Analysis, the preferred alignment was chosen to minimize construction costs, environmental impacts, ROW acquisition and residential and business displacement to the greatest extent practicable. The preferred alignment was chosen based on the best combination of those factors. The design process only considers and includes those elements essential to the purpose of the project, thereby maintaining the costs in the Capital Improvement Program and insuring a financially feasible construction project. The current estimate of Probable Cost is $95M (FY25). As the project progresses through the design and permitting, the overall project costs will become more defined and developed. Page 1681 of 4682 Pond Siting Report Jacobs Engineering Group Inc.41 Appendix A Wilson Boulevard Potential Pond Sites Exhibit Page 1682 of 4682 426RDUE 423RDUE 420RDUE 416RDUE415RDUE412RDUE411RDUE 406RDUE 405RDUE401RDUE 400RDUE 399RDUE 396RDUE 395RDUE392RDUE 391RDUE 390RDUE 386RDUE 385RDUE382RDUE 381RDUE 380RDUE 377RDUE376RDUE 372RDUE 371RDUE 367RDUE 366RDUE365RDUE 362RDUE 358RDUE 357RDUE355RDUE353RDUE350RDUE349RDUE346RDUE345RDUE 341RDUE 340RDUE 339RDUE 338RDUE 335RDUE334RDUE330RDUE329RDUE325RDUE323RDUE322RDUE 320RDUE 316RDUE312RDUE311RDUE307RDUE304RDUE303RDUE 300RDUE 299RDUE 298RDUE 295RDUE 293RDUE 289RDUE 288RDUE 285RDUE 282RDUE 275RDUE1 271RDUE 272RDUE266RDUE265RDUE 262RDUE261RDUE 260RDUE 259RDUE 256RDUE 255RDUE 254RDUE 251RDUE 250RDUE 249RDUE 248RDUE 245RDUE 244RDUE243RDUE240RDUE239RDUE 236RDUE 235RDUE 234RDUE 233RDUE 229RDUE228RDUE 226RDUE 165RDUE 373RDUE 291RDUE 427RDUE425RDUE 424RDUE 422RDUE421RDUE 419RDUE 418RDUE 417RDUE 414RDUE 413RDUE 410RDUE 409RDUE 408RDUE 407RDUE 404RDUE 403RDUE 402RDUE 398RDUE 397RDUE 394RDUE393RDUE 389RDUE 388RDUE 387RDUE 384RDUE383RDUE 379RDUE 378RDUE375RDUE374RDUE 370RDUE369RDUE364RDUE 363RDUE 361RDUE 360RDUE 359RDUE 356RDUE354RDUE 352RDUE 351RDUE 348RDUE347RDUE344RDUE 343RDUE 342RDUE 337RDUE 336RDUE 333RDUE 332RDUE 331RDUE 328RDUE 327RDUE326RDUE324RDUE 321RDUE 319RDUE 318RDUE 317RDUE306RDUE305RDUE302RDUE 301RDUE 297RDUE296RDUE294RDUE 292RDUE1 290RDUE2 287RDUE286RDUE284RDUE283RDUE281RDUE280RDUE277RDUE 276RDUE 274RDUE 273RDUE270RDUE 269RDUE 268RDUE 267RDUE 264RDUE 263RDUE258RDUE257RDUE 253RDUE 252RDUE 247RDUE246RDUE 237RDUE 232RDUE 231RDUE 230RDUE 227RDUE164RDUE 118RDUE 119RDUE 133RDUE 132RDUE 129RDUE 128RDUE1 126RDUE 125RDUE 124RDUE 123RDUE 122RDUE 121RDUE 167RDUE 168RDUE 169RDUE 170RDUE 171RDUE 172RDUE 174RDUE 175RDUE 176RDUE 177RDUE 178RDUE 179RDUE 180RDUE 181RDUE 182RDUE 183RDUE 130RDUE 173RDUE 120RDUE 166RDUE 131RDUE 145RDUE 146RDUE 147RDUE 148RDUE 149RDUE 150RDUE 151RDUE 152RDUE 153RDUE 154RDUE 155RDUE 156RDUE 157RDUE 158RDUE 159RDUE 160RDUE 161RDUE 162RDUE 163RDUE 225RDUE 224RDUE 223RDUE 222RDUE 221RDUE 220RDUE 219RDUE 218RDUE 217RDUE 216RDUE 215RDUE 214RDUE 213RDUE 212RDUE 211RDUE 210RDUE 209RDUE 208RDUE 207RDUE 206RDUE 292RDUE2 127RDUE 128RDUE2 290RDUE1 275RDUE2 2nd ST NE Golden Gate BLVD E2nd ST NW Randall BLVD4th ST NW 3rd ST SW Wilson BLVD N 1st ST SW Wilson BLVD S 2nd ST SE 4th ST SE 12th AVE NE10th AVE NEJung BLVD E14th AVE NE16th AVE NE20th AVE NE18th AVE NE22nd AVE NE24th AVE NEGolden Gate BLVD W24th AVE NE16th AVE NE18th AVE NE10th AVE NE12th AVE NEJung BLVD E20th AVE NE22nd AVE NE14th AVE NEImmokalee RD24th AVE NW22nd AVE NW20th AVE NW18th AVE NWJung BLVD W16th AVE NW14th AVE NW12th AVE NW10thAVE NW2nd ST NE 4th ST NE 1st ST NW 3rd ST NW 50 Wilson BLVD S 322 Golden Gate BLVD W 105 1st ST SW 30 Golden Gate BLVD W 140 Golden Gate BLVD W 50 Wilson BLVD S 50 Wilson BLVD S 78 4th ST SE 202 Golden Gate BLVD W 326 Golden Gate BLVD E 448 Golden Gate BLVD W 230 Golden Gate BLVD W 130 Golden Gate BLVD E 450 Golden Gate BLVD W 50 Wilson BLVD S 176 Golden Gate BLVD W 352 Golden Gate BLVD E 442 Golden Gate BLVD W 444 Golden Gate BLVD W 104 3rd ST SW 130 Golden Gate BLVD W 120 Golden Gate BLVD W 160 Golden Gate BLVD E 69 4th ST SE 440 Golden Gate BLVD E 170 Golden Gate BLVD E 70 Golden Gate BLVD E 261 Golden Gate BLVD W 545 Golden Gate BLVD W 221 Golden Gate BLVD W 91 3rd ST NW 343 Golden Gate BLVD E 241 Golden Gate BLVD W 411 Golden Gate BLVD W 165 Golden Gate BLVD W 23 Golden Gate BLVD E 171 Golden Gate BLVD W 383 Golden Gate BLVD W 21 Golden Gate BLVD E 121 Golden Gate BLVD W 521 Golden Gate BLVD W 90 3rd ST NW 441 Golden Gate BLVD E 353 Golden Gate BLVD E 341 Golden Gate BLVD E 121 Golden Gate BLVD E 141 Golden Gate BLVD E 331 Golden Gate BLVD W 261 Golden Gate BLVD E 321 Golden Gate BLVD W 371 Golden Gate BLVD W 391 Golden Gate BLVD W 265 Golden Gate BLVD W 141 Golden Gate BLVD W 181 Golden Gate BLVD W 361 Golden Gate BLVD E 231 Golden Gate BLVD E 73 Wilson BLVD N 161 Golden Gate BLVD E 91 Golden Gate BLVD E 105 2nd ST NE 106 2nd ST NE 305 Golden Gate BLVD E 80 4th ST NE 81 Golden Gate BLVD E 77 Golden Gate BLVD W 78 Wilson BLVD N 96 4th ST NE 85 Wilson BLVD N 111 3rd ST NW 110 1st ST NW 115 2nd ST NE 110 3rd ST NW 108 4th ST NE 120 2nd ST NE 120 Wilson BLVD N 145 3rd ST NW 125 2nd ST NE 120 4th ST NE 140 3rd ST NW 135 4th ST NE 131 1st ST NW 151 3rd ST NW 130 1st ST NW 140 2nd ST NE 150 3rd ST NW 141 1st ST NW 130 Wilson BLVD N 140 4th ST NE 160 3rd ST NW 160 1st ST NW 161 2nd ST NE 171 3rd ST NW 161 1st ST NW 170 3rd ST NW 170 Wilson BLVD N 171 4th ST NE 171 Wilson BLVD N 171 2nd ST NE 170 2nd ST NE 181 Wilson BLVD N 180 3rd ST NW 181 3rd ST NW 190 Wilson BLVD N 181 1st ST NW 191 4th ST NE 190 1st ST NW 191 2nd ST NE 221 1st ST NW 211 3rd ST NW 210 3rd ST NW 220 1st ST NW 223 2nd ST NE 209 4th ST NE 220 2nd ST NE 210 4th ST NE 240 5th ST NW 230 3rd ST NW 231 3rd ST NW 231 1st ST NW 230 1st ST NW 241 2nd ST NE 243 4th ST NE 240 2nd ST NE 259 Wilson BLVD N 260 3rd ST NW 261 3rd ST NW 270 3rd ST NW 261 2nd ST NE 260 2nd ST NE 270 1st ST NW 260 4th ST NE 280 2nd ST NE 290 3rd ST NW 255 1st ST NW 281 2nd ST NE 280 1st ST NW 280 4th ST NE 290 2nd ST NE 311 Wilson BLVD N 321 3rd ST NW 321 1st ST NW 320 3rd ST NW 314 Wilson BLVD N 310 4th ST NE 321 4th ST NE 320 2nd ST NE 321 Wilson BLVD N 326 4th ST NE 331 Wilson BLVD N 345 3rd ST NW 340 3rd ST NW 331 2nd ST NE 331 1st ST NW 340 Wilson BLVD N 340 1st ST NW 371 1st ST NW 361 3rd ST NW 360 3rd ST NW 361 Wilson BLVD N 360 Wilson BLVD N 365 2nd ST NE 371 4th ST NE 360 4th ST NE 375 Wilson BLVD N 391 3rd ST NW 380 Wilson BLVD N 390 3rd ST NW 381 4th ST NE 380 2nd ST NE 381 Wilson BLVD N 380 4th ST NE 385 2nd ST NE 411 Wilson BLVD N 411 2nd ST NE 410 2nd ST NE 421 4th ST NE 440 Wilson BLVD N 420 1st ST NW 420 3rd ST NW 431 1st ST NW 430 1st ST NW 435 2nd ST NE 440 2nd ST NE 441 4th ST NE 440 1st ST NW 430 4th ST NE 461 1st ST NW 460 Wilson BLVD N 461 2nd ST NE 461 3rd ST NW 460 3rd ST NW 462 1st ST NW 471 1st ST NW 471 4th ST NE 470 Wilson BLVD N 471 2nd ST NE 466 2nd ST NE 483 1st ST NW 490 3rd ST NW 480 1st ST NW 481 2nd ST NE 484 2nd ST NE 488 Wilson BLVD N 491 4th ST NE 510 1st ST NW 496 Wilson BLVD N 519 2nd ST NE 505 1st ST NW 520 2nd ST NE 511 4th ST NE 500 3rd ST NW 521 3rd ST NW 530 1st ST NW 523 1st ST NW 532 2nd ST NE 500 Wilson BLVD N 531 2nd ST NE 541 4th ST NE 530 4th ST NE 557 Wilson BLVD N 555 3rd ST NW 560 Wilson BLVD N 560 4th ST NE 561 2nd ST NE 541 1st ST NW 561 4th ST NE 580 5th ST NW 542 1st ST NW 570 4th ST NE 545 1st ST NW 580 3rd ST NW 590 Wilson BLVD N 581 2nd ST NE 581 4th ST NE 580 4th ST NE 620 3rd ST NW 561 1st ST NW 610 2nd ST NE 611 2nd ST NE 620 Wilson BLVD N 611 4th ST NE 610 4th ST NE 581 1st ST NW 640 3rd ST NW 640 Wilson BLVD N 630 2nd ST NE 631 2nd ST NE 643 4th ST NE 660 3rd ST NW 661 3rd ST NW 621 1st ST NW 660 Wilson BLVD N 671 4th ST NE 661 2nd ST NE 671 Wilson BLVD N 670 1st ST NW 681 3rd ST NW 641 1st ST NW 680 Wilson BLVD N 670 2nd ST NE 691 4th ST NE 691 2nd ST NE 680 4th ST NE 710 3rd ST NW 683 1st ST NW 710 Wilson BLVD N 727 2nd ST NE 731 3rd ST NW 700 4th ST NE 720 1st ST NW 730 2nd ST NE 740 3rd ST NW 741 2nd ST NE 714 Wilson BLVD N 741 4th ST NE 742 4th ST NE 711 1st ST NW 760 1st ST NW 760 2nd ST NE 751 4th ST NE 760 4th ST NE 766 Wilson BLVD N 775 3rd ST NW 770 2nd ST NE 771 2nd ST NE 780 2nd ST NE 741 1st ST NW 830 3rd ST NW 781 4th ST NE 780 4th ST NE 821 3rd ST NW 810 2nd ST NE 841 1st ST NW 810 4th ST NE 811 2nd ST NE 811 4th ST NE 820 2nd ST NE 820 1st ST NW 820 4th ST NE 855 1st ST NW 834 Wilson BLVD N 839 2nd ST NE 840 2nd ST NE 840 4th ST NE 845 4th ST NE 882 3rd ST NW 865 1st ST NW 867 2nd ST NE 881 3rd ST NW 875 Wilson BLVD N 870 1st ST NW 860 5th ST NW 880 Wilson BLVD N 888 3rd ST NW 880 2nd ST NE 883 2nd ST NE 920 Wilson BLVD N 380 10th AVE NW 940 Wilson BLVD N 180 10th AVE NE 360 10th AVE NW 140 10th AVE NW 162 10th AVE NE 120 10th AVE NW 180 10th AVE NW 961 Wilson BLVD N 230 10th AVE NE 282 10th AVE NW 280 10th AVE NE 210 10th AVE NE 324 10th AVE NW 164 10th AVE NW 424 10th AVE NE 446 10th AVE NE 981 Wilson BLVD N 100 10th AVE NE 991 Wilson BLVD N 212 10th AVE NW 85 10th AVE NW 105 10th AVE NE 411 10th AVE NW 141 10th AVE NW 311 10th AVE NW 123 10th AVE NW 141 10th AVE NE 131 10th AVE NE 183 10th AVE NE 261 10th AVE NW 231 10th AVE NE 231 10th AVE NW 161 10th AVE NW 211 10th AVE NW 361 10th AVE NW 181 10th AVE NW 121 10th AVE NE 111 10th AVE NE 383 10th AVE NW 211 10th AVE NE 281 10th AVE NW 1041 Wilson BLVD N 441 10th AVE NE 1040 Wilson BLVD N 285 10th AVE NE 165 10th AVE NE 421 10th AVE NE 391 10th AVE NE 265 10th AVE NE 1060 Wilson BLVD N 461 10th AVE NE 1082 Wilson BLVD N 1081 Wilson BLVD N 400 12th AVE NW 210 12th AVE NW 280 12th AVE NW 340 12th AVE NW 1160 Wilson BLVD N 310 12th AVE NW 190 12th AVE NW 160 12th AVE NW 370 12th AVE NW 160 12th AVE NE 120 12th AVE NE 260 12th AVE NW 180 12th AVE NE 120 12th AVE NW 362 12th AVE NE 240 12th AVE NW 280 12th AVE NE 140 12th AVE NW 1170 Wilson BLVD N 330 12th AVE NE 310 12th AVE NE 390 12th AVE NW 390 12th AVE NE 260 12th AVE NE 104 12th AVE NW 341 12th AVE NW 95 12th AVE NE 105 12th AVE NW 105 12th AVE NE 191 12th AVE NW 145 12th AVE NW 405 12th AVE NW 311 12th AVE NW 255 12th AVE NW 431 12th AVE NW 119 12th AVE NW 1245 Wilson BLVD N 161 12th AVE NW 281 12th AVE NW 231 12th AVE NE 261 12th AVE NW 415 12th AVE NW 143 12th AVE NE 271 12th AVE NE 441 12th AVE NE 257 12th AVE NW 311 12th AVE NE 211 12th AVE NE 333 12th AVE NE 411 12th AVE NE 361 12th AVE NE 1271 Wilson BLVD N 435 12th AVE NW 1270 Wilson BLVD N 1295 Wilson BLVD N 1321 Wilson BLVD N 1320 Wilson BLVD N 1340 Wilson BLVD N 280 14th AVE NW 362 14th AVE NW 320 14th AVE NE 390 14th AVE NW 130 14th AVE NW 250 14th AVE NW 190 14th AVE NW 160 14th AVE NE 420 14th AVE NE 190 14th AVE NE 1370 Wilson BLVD N 330 14th AVE NW 152 14th AVE NW 130 14th AVE NE 360 14th AVE NE 410 14th AVE NW 256 14th AVE NW 276 14th AVE NE 288 14th AVE NE 112 14th AVE NE 240 14th AVE NE 348 14th AVE NE 180 14th AVE NE 120 14th AVE NE 260 14th AVE NW 440 14th AVE NE 1380 Wilson BLVD N 1381 Wilson BLVD N 90 14th AVE NW 390 14th AVE NE 460 14th AVE NE 100 14th AVE NE 95 14th AVE NW 361 14th AVE NW 107 14th AVE NE 231 14th AVE NW 341 14th AVE NW 331 14th AVE NW 121 14th AVE NW 389 14th AVE NE 421 14th AVE NW 317 14th AVE NW 411 14th AVE NE 423 14th AVE NE 183 14th AVE NE 121 14th AVE NE 131 14th AVE NE 289 14th AVE NE 355 14th AVE NE 345 14th AVE NE 367 14th AVE NE 263 14th AVE NW 277 14th AVE NE 1441 Wilson BLVD N 471 14th AVE NE 431 14th AVE NE 211 14th AVE NW 1460 Wilson BLVD N 161 14th AVE NE 1471 Wilson BLVD N 1474 Wilson BLVD N 1481 Wilson BLVD N 235 14th AVE NE 1482 Wilson BLVD N 1485 Wilson BLVD N 1511 Wilson BLVD N 1510 Wilson BLVD N 1541 Wilson BLVD N 1544 Wilson BLVD N 130 16th AVE NW 460 16th AVE NE 196 16th AVE NE 170 16th AVE NW 430 16th AVE NE 410 16th AVE NW 284 16th AVE NE 262 16th AVE NE 1560 Wilson BLVD N 330 16th AVE NE 360 16th AVE NW 328 16th AVE NW 260 16th AVE NW 310 16th AVE NW 410 16th AVE NE 366 16th AVE NE 350 16th AVE NE 130 16th AVE NE 110 16th AVE NW 120 16th AVE NE 210 16th AVE NE 110 16th AVE NE 388 16th AVE NE 240 16th AVE NW 140 16th AVE NE 1580 Wilson BLVD N 1591 Wilson BLVD N 107 16th AVE NW 321 16th AVE NW 275 16th AVE NE 411 16th AVE NE 99 16th AVE NE 311 16th AVE NE 337 16th AVE NE 361 16th AVE NE 461 16th AVE NE 431 16th AVE NE 290 Jung BLVD W 260 Jung BLVD W 410 Jung BLVD W 130 Jung BLVD W 380 Jung BLVD W 320 Jung BLVD W 1677 Wilson BLVD N 240 Jung BLVD W 220 Jung BLVD W 360 Jung BLVD W 190 Jung BLVD W 108 Jung BLVD E 164 Jung BLVD W 110 Jung BLVD W 140 Jung BLVD E 90 Jung BLVD E 230 Jung BLVD E 70 Jung BLVD E 260 Jung BLVD E 210 Jung BLVD E 95 Jung BLVD E 1711 Wilson BLVD N 275 Jung BLVD W 133 Jung BLVD W 321 Jung BLVD W 205 Jung BLVD W 361 Jung BLVD W 231 Jung BLVD E 209 Jung BLVD E 165 Jung BLVD W 1730 Wilson BLVD N 111 Jung BLVD E 1741 Wilson BLVD N 461 Jung BLVD E 441 Jung BLVD E 1740 Wilson BLVD N 180 18th AVE NW 1761 Wilson BLVD N 220 18th AVE NW 402 18th AVE NW 1760 Wilson BLVD N 420 18th AVE NE 360 18th AVE NE 320 18th AVE NW 380 18th AVE NW 388 18th AVE NE 130 18th AVE NW 280 18th AVE NW 1771 Wilson BLVD N 430 18th AVE NE 340 18th AVE NE 120 18th AVE NE 106 18th AVE NE 91 18th AVE NW 311 18th AVE NW 231 18th AVE NW 113 18th AVE NW 371 18th AVE NW 341 18th AVE NE 135 18th AVE NW 463 18th AVE NE 181 18th AVE NW 169 18th AVE NW 161 18th AVE NE 1831 Wilson BLVD N 321 18th AVE NW 359 18th AVE NE 1830 Wilson BLVD N 115 18th AVE NE 431 18th AVE NE 261 18th AVE NE 331 18th AVE NW 411 18th AVE NE 291 18th AVE NE 171 18th AVE NE 321 18th AVE NE 141 18th AVE NE 441 18th AVE NE 1841 Wilson BLVD N 391 18th AVE NE 1840 Wilson BLVD N 221 18th AVE NE 1861 Wilson BLVD N 221 18th AVE NW 241 18th AVE NE 1860 Wilson BLVD N 1867 Wilson BLVD N 1899 Wilson BLVD N 1920 Wilson BLVD N 410 20th AVE NE 420 20th AVE NW 180 20th AVE NE 1940 Wilson BLVD N 140 20th AVE NW 240 20th AVE NW 320 20th AVE NW 1959 Wilson BLVD N 280 20th AVE NW 374 20th AVE NW 1960 Wilson BLVD N 240 20th AVE NE 260 20th AVE NE 310 20th AVE NE 220 20th AVE NW 340 20th AVE NW 220 20th AVE NE 260 20th AVE NW 280 20th AVE NE 1971 Wilson BLVD N 390 20th AVE NW 170 20th AVE NE 440 20th AVE NE 384 20th AVE NE 140 20th AVE NE 360 20th AVE NE 120 20th AVE NE 330 20th AVE NE 106 20th AVE NW 108 20th AVE NE 107 20th AVE NW 377 20th AVE NW 2020 Wilson BLVD N 121 20th AVE NE 291 20th AVE NW 273 20th AVE NW 181 20th AVE NW 261 20th AVE NW 281 20th AVE NW 167 20th AVE NE 221 20th AVE NE 321 20th AVE NW 375 20th AVE NW 141 20th AVE NE 467 20th AVE NE 161 20th AVE NW 191 20th AVE NE 2040 Wilson BLVD N 441 20th AVE NE 281 20th AVE NE 261 20th AVE NE 2045 Wilson BLVD N 415 20th AVE NE 361 20th AVE NE 373 20th AVE NE 321 20th AVE NE 339 20th AVE NW 111 20th AVE NW 239 20th AVE NE 2061 Wilson BLVD N 2060 Wilson BLVD N 141 20th AVE NW 2071 Wilson BLVD N 2081 Wilson BLVD N 2082 Wilson BLVD N 2175 Wilson BLVD N 2130 Wilson BLVD N 2179 Wilson BLVD N 180 22nd AVE NW 170 22nd AVE NE 160 22nd AVE NW 2187 Wilson BLVD N 330 22nd AVE NE 2160 Wilson BLVD N 420 22nd AVE NE 290 22nd AVE NW 270 22nd AVE NW 250 22nd AVE NW 110 22nd AVE NE 2191 Wilson BLVD N 110 22nd AVE NW 2170 Wilson BLVD N 182 22nd AVE NE 140 22nd AVE NE 360 22nd AVE NW 160 22nd AVE NE 470 22nd AVE NE 130 22nd AVE NW 370 22nd AVE NW 312 22nd AVE NE 390 22nd AVE NE 360 22nd AVE NE 440 22nd AVE NE 218 22nd AVE NE 234 22nd AVE NE 280 22nd AVE NE 90 22nd AVE NW 430 22nd AVE NE 95 22nd AVE NE 391 22nd AVE NW 321 22nd AVE NW 2211 Wilson BLVD N 231 22nd AVE NW 2222 Wilson BLVD N 331 22nd AVE NW 411 22nd AVE NE 311 22nd AVE NW 421 22nd AVE NE 243 22nd AVE NE 231 22nd AVE NE 341 22nd AVE NW 359 22nd AVE NE 181 22nd AVE NE 2230 Wilson BLVD N 361 22nd AVE NW 463 22nd AVE NE 211 22nd AVE NW 165 22nd AVE NE 371 22nd AVE NW 2231 Wilson BLVD N 431 22nd AVE NE 293 22nd AVE NW 245 22nd AVE NE 381 22nd AVE NE 2240 Wilson BLVD N 311 22nd AVE NE 2275 Wilson BLVD N 2280 Wilson BLVD N 2281 Wilson BLVD N 2308 Wilson BLVD N 2311 Wilson BLVD N 2310 Wilson BLVD N 2335 Wilson BLVD N 2330 Wilson BLVD N 220 24th AVE NE 130 24th AVE NE 240 24th AVE NW 220 24th AVE NW 292 24th AVE NW 330 24th AVE NE 162 24th AVE NW 270 24th AVE NW 310 24th AVE NW 360 24th AVE NW 190 24th AVE NW 168 24th AVE NE 380 24th AVE NW 110 24th AVE NW 192 24th AVE NE 260 24th AVE NW 80 24th AVE NW 50 24th AVE NW 372 24th AVE NE 460 24th AVE NE 392 24th AVE NE 122 24th AVE NE 244 24th AVE NE 90 24th AVE NE 111 24th AVE NW 407 24th AVE NW 131 24th AVE NE 373 24th AVE NE 171 24th AVE NE 191 24th AVE NE 461 24th AVE NE 441 24th AVE NE 241 24th AVE NE 391 24th AVE NE 411 24th AVE NE 191 24th AVE NW 391 24th AVE NW 121 24th AVE NE 361 24th AVE NW 12540 Immokalee RD 13260 Immokalee RD 13250 Immokalee RD 12802 Immokalee RD 13260 Immokalee RD 13260 Immokalee RD 13246 Immokalee RD 13062 Immokalee RD 384 Randall BLVD 13260 Immokalee RD 384 Randall BLVD 384 Randall BLVD 13240 Immokalee RD 2425 2nd ST NW 13260 Immokalee RD 13245 Immokalee RD POND SITE 6-1 4.25 AC POND SITE 3-1 4.53 AC POND SITE 3-3 4.84 AC POND SITE 4-2 4.65 AC POND SITE 5-2 5.28 AC 6-3 1.92 AC POND SITE 6-3 2.57 AC POND SITE 3-2 4.38 AC POND SITE 1-1 4.52 AC POND SITE 2-1 4.52 AC POND SITE 3-4 3.48 AC POND SITE 2-2 4.31 AC POND SITE 5-4 2.48 AC 5-2 2.18 AC POND SITE 5-3 4.49 AC POND SITE 1-3 4.51 AC POND SITE 6-2 3.83 AC Basin 1 Basin 2 Basin 3 Basin 4 Basin 5 Basin 6Well House 11 Well Vault 12 Well Vault 13 Well House 14 Well Vault 15 Well Vault 16 Well Vault 37 Well Vault 32 Well Vault 31 Well House 34 Legend Potential Pond Site Parcel Line Basins Identified Parcel Count Well House/Vault 100 ft Well House Buffer Roadway Elevation Low Point High Point 0 1,000 2,000500 Feet ¯Wilson Boulevard Potential Pond Sites Exhibit Original Print Size: 96" x 36"VBRXVBRX238RDUE 241POND 242POND 278POND 279POND 368POND314POND313POND 310RDUE309RDUE 308RDUE 315POND 450POND 451POND 452POND WET POND DRY POND Page 1683 of 4682 Pond Siting Report Jacobs Engineering Group Inc.42 Appendix B Basin 3A and 3B Map and Photo Package Page 1684 of 4682 Wilson Boulevard Widening Habitat Classification Survey Collier County, Florida \\DC1VS01\GISPROJ\C\COLLIERCOUNTY\WILSON_BLVD\MAPFILES\VANDERBILT_PHOTOLOG\VANDERBILT_PHOTOLOG.APRX VICINITY MAP Notes: Surveyors: Felicia Kirby Survey Date: 4/16/2025 Wilson BLVD N12th A VE N E 12th A VE NW 19 32 33 34 35 36 37 38 39 40 41 4243 44 45 46 47 48 49 5051 52 53 54 55 Wilson Blvd NGolden Gate Blvd W Golden Gate Blvd E Immokalee Rd LEGEND Observation Point Survey Area Service Layer Credits: World Imagery: Earthstar Geographics Aerial imagery: Collier County, 2025 $0 225 450112.5 Feet 1:2,700 1 inch = 225 feet Page 1685 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 3:18 PM AGAWINAM Notes: 4/16/2025Date: 19ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 19 Wilson Boulevard Widening Habitat Classification Survey Page 1686 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 3:16 PM AGAWINAM Notes: 4/16/2025Date: 32ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 32 Wilson Boulevard Widening Habitat Classification Survey Page 1687 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 2:10 PM AGAWINAM 4/16/2025Date: 33ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 33 Wilson Boulevard Widening Habitat Classification Survey Notes: Page 1688 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 2:39 PM AGAWINAM 80% fern understory 6” 10YR 5/1 no signs of hydrology. 5% stressed and dead cypress.Notes: 4/16/2025Date: 34ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 34 Wilson Boulevard Widening Habitat Classification Survey Page 1689 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 2:10 PM AGAWINAM Cabbage palm fluccsNotes: 4/16/2025Date: 35ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 35 Wilson Boulevard Widening Habitat Classification Survey Page 1690 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 2:10 PM AGAWINAM 4/16/2025Date: 36ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 36 Wilson Boulevard Widening Habitat Classification Survey Notes: Page 1691 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 2:40 PM AGAWINAM Area of fernsNotes: 4/16/2025Date: 37ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 37 Wilson Boulevard Widening Habitat Classification Survey Page 1692 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 2:40 PM AGAWINAM Stressed and leaning cypress. Pine cabbage palm. No hydrology no soilsNotes: 4/16/2025Date: 38ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 38 Wilson Boulevard Widening Habitat Classification Survey Page 1693 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 2:53 PM AGAWINAM Canopy Cypress 30, cabbage palm 30, pine 20 percent 40 % organic nodules 3/1 first 1”. 4/1 3” then 5/2 3”-6”. Roots up to 6”Notes: 4/16/2025Date: 39ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 39 Wilson Boulevard Widening Habitat Classification Survey Page 1694 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 2:47 PM AGAWINAM Pine sabal palm with bracken fernNotes: 4/16/2025Date: 40ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 40 Wilson Boulevard Widening Habitat Classification Survey Page 1695 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 2:10 PM AGAWINAM 4/16/2025Date: 41ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 41 Wilson Boulevard Widening Habitat Classification Survey Notes: Page 1696 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 2:11 PM AGAWINAM 4/16/2025Date: 42ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 42 Wilson Boulevard Widening Habitat Classification Survey Notes: Page 1697 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 2:11 PM AGAWINAM 4/16/2025Date: 43ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 43 Wilson Boulevard Widening Habitat Classification Survey Notes: Page 1698 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 2:11 PM AGAWINAM 4/16/2025Date: 44ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 44 Wilson Boulevard Widening Habitat Classification Survey Notes: Page 1699 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 2:11 PM AGAWINAM 4/16/2025Date: 45ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 45 Wilson Boulevard Widening Habitat Classification Survey Notes: Page 1700 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 3:01 PM AGAWINAM Notes: 4/16/2025Date: 46ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 46 Wilson Boulevard Widening Habitat Classification Survey Page 1701 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 2:12 PM AGAWINAM 4/16/2025Date: 47ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 47 Wilson Boulevard Widening Habitat Classification Survey Notes: Page 1702 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 2:40 PM AGAWINAM 4/16/2025Date: 48ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 48 Wilson Boulevard Widening Habitat Classification Survey Notes: Page 1703 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 2:40 PM AGAWINAM 10YR 5/1 and 3/1 mix first 3” , 4/1 3”-6” Stand of toothed fernNotes: 4/16/2025Date: 49ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 49 Wilson Boulevard Widening Habitat Classification Survey Page 1704 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 2:12 PM AGAWINAM Pine 10% cabbage palm 90 %Notes: 4/16/2025Date: 50ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 50 Wilson Boulevard Widening Habitat Classification Survey Page 1705 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 2:12 PM AGAWINAM Fluccs cabbage palmNotes: 4/16/2025Date: 51ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 51 Wilson Boulevard Widening Habitat Classification Survey Page 1706 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 2:12 PM AGAWINAM 4/16/2025Date: 52ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 52 Wilson Boulevard Widening Habitat Classification Survey Notes: Page 1707 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 2:13 PM AGAWINAM Oak cabbage palm and pine with understory of sabal palmNotes: 4/16/2025Date: 53ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 53 Wilson Boulevard Widening Habitat Classification Survey Page 1708 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 1:40 PM AGAWINAM BoatNotes: 4/16/2025Date: 54ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 54 Wilson Boulevard Widening Habitat Classification Survey Page 1709 of 4682 \\dc1vs01\GISProj\C\CollierCounty\Wilson_Blvd\MapFiles\Vanderbilt_PhotoLog\Vanderbilt_PhotoLog.aprx PhotoLog 4/21/2025 2:48 PM AGAWINAM Sword fern understory cabbage palm canopy 5/1 with 2/1 organic nodules 4” then 4/2 to 6” deep. Roots to 6”Notes: 4/16/2025Date: 55ID: DATA LOCATION Wilson BLVD N12th A VE N W 12th A V E N E 55 Wilson Boulevard Widening Habitat Classification Survey Page 1710 of 4682 Pond Siting Report Jacobs Engineering Group Inc.43 Appendix C Pond Site 4-2 Map and Photo Package Page 1711 of 4682 Jung BLVD E 18th AVE NE 1 2 3 4 5 6 7 89 10 11 12 131415 16 17 18 19 20 21 22 232425 26 27 28 29 30 31 32 3334 3536 37 38 39 40 4142 43 4445 46 47 48 49 State of Florida, Maxar, Microsoft ¯ 0 50 10025 Feet Abandoned Burrow Right-of-Way Inactive Juvenile Burrow Inactive Burrow Active (maybe juvenile) Burrow Active Juvenile Burrow Active Burrow Legend GOPHER TORTOISE SURVEY MAP Basin 4 (Pond Site 4-2) Surveyors: Felicia Kirby, Vanessa Davis Survey Dates: 8/28/2024 and 8/29/2024 Survey Notes: Pedestrian transects were performed east to west approximately every 8-15 feet based on visibility. The site experienced rain events within 24 hours of each survey. Page 1712 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 1 Notes: Active Gopher Tortoise Burrow. Signs of activity. Photo Date: 8/28/2024 Page 1713 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 2 Notes: Burrow, looks abandoned, cob webs at entrance. Small size. Photo Date: 8/28/2024 Page 1714 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 3 Notes: Active Gopher Tortoise Burrow, Large Photo Date: 8/28/2024 Page 1715 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 4 Notes: Burrow, anticipated active, just rained last night but likely active. Photo Date: 8/28/2024 Page 1716 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 5 Notes: Juvenile burrow, looks abandoned due to vegetation and lack of track marks Photo Date: 8/28/2024 Page 1717 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 6 Notes: Active Gopher Tortoise Burrow, large Photo Date: 8/28/2024 Page 1718 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 7 Notes: Active Gopher Tortoise Burrow, large Photo Date: 8/28/2024 Page 1719 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 8 Notes: Burrow, anticipated active just hasn’t come out today after rainstorm Photo Date: 8/28/2024 Page 1720 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 9 Notes: Active Gopher Tortoise Burrow, medium size. Signs of activity today Photo Date: 8/28/2024 Page 1721 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 10 Notes: Abandoned juvenile burrow Photo Date: 8/28/2024 Page 1722 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 11 Notes: Active gopher tortoise burrow, large Photo Date: 8/28/2024 Page 1723 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 12 Notes: Active small, likely juvenile burrow Photo Date: 8/28/2024 Page 1724 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 13 Notes: Abandoned burrow Photo Date: 8/28/2024 Page 1725 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 14 Notes: Active gopher tortoise burrow, large. Signs of activity today. Photo Date: 8/28/2024 Page 1726 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 15 Notes: Active gopher tortoise burrow, large Photo Date: 8/28/2024 Page 1727 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 16 Notes: Active gopher tortoise burrow, medium size Photo Date: 8/28/2024 Page 1728 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 17 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Page 1729 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 18 Notes: Possible burrow. If not one is anticipated around this are Photo Date: 8/29/2024 Page 1730 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 19 Notes: Abandoned juvenile burrow Photo Date: 8/29/2024 Page 1731 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 20 Notes: Looked abandoned but trails show someone is nearby Photo Date: 8/29/2024 Page 1732 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 21 Notes: Active gopher tortoise burrow Photo Date: 8/29/2024 Page 1733 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 22 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Page 1734 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 23 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Page 1735 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 24 Notes: Small active burrow Photo Date: 8/29/2024 Page 1736 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 25 Notes: Active gopher tortoise burrow, small Photo Date: 8/29/2024 Page 1737 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 26 Notes: Active burrow under hedges, likely in neighbors property Photo Date: 8/29/2024 Page 1738 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 27 Notes: Smaller burrow, looks abandoned Photo Date: 8/29/2024 Page 1739 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 28 Notes: Active gopher tortoise burrow Photo Date: 8/29/2024 Page 1740 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 29 Notes: Active gopher tortoise burrow. Signs of activity. Photo Date: 8/29/2024 Page 1741 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 30 Notes: Small burrow, maybe juvenile Photo Date: 8/29/2024 Page 1742 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 31 Notes: Very small burrow Photo Date: 8/29/2024 Page 1743 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 32 Notes: Active burrow Photo Date: 8/29/2024 Page 1744 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 33 Notes: Abandoned burrow with shell of dead tortoise Photo Date: 8/29/2024 Page 1745 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 34 Notes: Burrow not sure if active Photo Date: 8/29/2024 Page 1746 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 35 Notes: Abandoned burrow Photo Date: 8/29/2024 Page 1747 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 36 Notes: Juvenile gopher tortoise burrow. Potentially occupied Photo Date: 8/29/2024 Page 1748 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 37 Notes: Potential burrow, however may not be anything Photo Date: 8/29/2024 Page 1749 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 38 Notes: Large burrow Photo Date: 8/29/2024 Page 1750 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 39 Notes: Potentially occupied burrow, inactive Photo Date: 8/29/2024 Page 1751 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 40 Notes: Gopher tortoise burrow, large Photo Date: 8/29/2024 Page 1752 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 41 Notes: Occupied burrow, large Photo Date: 8/29/2024 Page 1753 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 42 Notes: Large occupied burrow. Signs of recent activity. Photo Date: 8/29/2024 Page 1754 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 43 Notes: Occupied burrow Photo Date: 8/29/2024 Page 1755 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 44 Notes: Large active burrow Photo Date: 8/29/2024 Page 1756 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 45 Notes: Potential juvenile, inactive Photo Date: 8/29/2024 Page 1757 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 46 Notes: Juvenile burrow Photo Date: 8/29/2024 Page 1758 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 47 Notes: Abandoned collapsed burrow Photo Date: 8/29/2024 Page 1759 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 48 Notes: Occupied burrow Photo Date: 8/29/2024 Page 1760 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742200005 Basin 4: Pond Site 4-2 LOCATION ID: 49 Notes: Occupied burrow. Signs of activity. Photo Date: 8/29/2024 Page 1761 of 4682 Pond Siting Report Jacobs Engineering Group Inc.44 Appendix D Pond Site 5-2 (Wet) Map and Photo Package Page 1762 of 4682 18th AVE NE 1 23 4 56 7 8 9 1011 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 3637 38 39 4041 42 43 44 45 46 State of Florida, Maxar, Microsoft ¯ 0 50 10025 Feet Right-of-Way Inactive Juvenile Burrow Inactive Burrow Active (maybe juvenile) Burrow Active Juvenile Burrow Active Burrow Legend GOPHER TORTOISE SURVEY MAP Basin 5 (Pond Site 5-2) Surveyors: Felicia Kirby, Vanessa Davis Survey Dates: 8/27/2024 and 8/29/2024 Survey Notes: Pedestrian transects were performed east to west approximately every 8-10 feet based on visibility. The site experienced rain events within 24 hours of each survey. Limits Not Surveyed Parcel No. 37742280009 Parcel No. 37743480002 Page 1763 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 1 Notes: Active Gopher Tortoise Burrow Photo Date: 8/27/2024 Page 1764 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 2 Notes: Gopher Tortoise Burrow, looks active Photo Date: 8/27/2024 Page 1765 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 3 Notes: Active Gopher Tortoise Burrow Photo Date: 8/27/2024 Page 1766 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 4 Notes: Active Gopher Tortoise Burrow Photo Date: 8/27/2024 Page 1767 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 5 Notes: Active Gopher Tortoise Burrow Photo Date: 8/27/2024 Page 1768 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 6 Notes: Active Gopher Tortoise Burrow Photo Date: 8/27/2024 Page 1769 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 7 Notes: Active Gopher Tortoise Burrow, Gopher Tortoise in Burrow Photo Date: 8/27/2024 Page 1770 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 8 Notes: Active Gopher Tortoise Burrow Photo Date: 8/27/2024 Page 1771 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 9 Notes: Active Gopher Tortoise Burrow Photo Date: 8/24/2024 Page 1772 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 10 Notes: Small gopher tortoise burrow, may be considered juvenile Photo Date: 8/27/2024 Page 1773 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 11 Notes: Active gopher tortoise burrow Photo Date: 8/27/2024 Page 1774 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 12 Notes: Active gopher tortoise burrow, large Photo Date: 8/27/2024 Page 1775 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 13 Notes: Active gopher tortoise burrow Photo Date: 8/27/2024 Page 1776 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 14 Notes: Active gopher tortoise burrow Photo Date: 8/27/2024 Page 1777 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 15 Notes: Active gopher tortoise burrow Photo Date: 8/27/2024 Page 1778 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 16 Notes: Active gopher tortoise burrow Photo Date: 8/27/2024 Page 1779 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 17 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Page 1780 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 18 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Page 1781 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 19 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Page 1782 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 20 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Page 1783 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 21 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Page 1784 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 22 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Page 1785 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 23 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Page 1786 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 24 Notes: Active gopher tortoise burrow, large. Small burrow adjacent. Photo Date: 8/29/2024 Page 1787 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 25 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Page 1788 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 26 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Page 1789 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 27 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Page 1790 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 28 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Page 1791 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 29 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Page 1792 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 30 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Page 1793 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 31 Notes: Active gopher tortoise burrow, large Photo Date: 8/29/2024 Page 1794 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 32 Notes: Occupied burrow Photo Date: 8/29/2024 Page 1795 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 33 Notes: Occupied burrow Photo Date: 8/29/2024 Page 1796 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 34 Notes: Occupied burrow Photo Date: 8/29/2024 Page 1797 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 35 Notes: Unoccupied burrow, looks inactive Photo Date: 8/29/2024 Page 1798 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 36 Notes: Large occupied burrow Photo Date: 8/29/2024 Page 1799 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 37 Notes: Occupied, not sure if this is another entrance to the same burrow Photo Date: 8/29/2024 Page 1800 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 38 Notes: Large burrow Photo Date: 8/29/2024 Page 1801 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 39 Notes: Occupied burrow Photo Date: 8/29/2024 Page 1802 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 40 Notes: Pine needles indicate no gopher tortoise was out today, possibly inactive burrow Photo Date: 8/29/2024 Page 1803 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 41 Notes: Occupied burrow, may be juvenile or just above juvenile Photo Date: 8/29/2024 Page 1804 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 42 Notes: Large occupied burrow Photo Date: 8/29/2024 Page 1805 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 43 Notes: Large active burrow Photo Date: 8/29/2024 Page 1806 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 44 Notes: Large active burrow Photo Date: 8/29/2024 Page 1807 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 45 Notes: Occupied burrow Photo Date: 8/29/2024 Page 1808 of 4682 Wilson Blvd Widening Gopher Tortoise Survey Parcel No. 37742280009 Basin 5: Pond Site 5-2 LOCATION ID: 46 Notes: Occupied burrow Photo Date: 8/29/2024 Page 1809 of 4682 Pond Siting Report Jacobs Engineering Group Inc.45 Appendix E Wilson Boulevard Corridor ROW Impacts Exhibit Page 1810 of 4682 POT STA. 20+00.0020 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 POT STA. 189+66.22WILSON BLVD WILSON BLVD VANDERBILT BEACH RD (CR-862)VANDERBILT BEACH RD (CR-862)12TH AVE NW10TH AVE NWWilson Blvd IMMOKALEE ROAD24TH AVE NW22TH AVE NW20TH AVE NW18TH AVE NWJUNG BLVD W16TH AVE NW14TH AVE NW14TH AVE NW12TH AVE NW10TH AVE NWGOLDEN GATE BLVD W/E85' 90' 95' 100' 85' 90' 95' 100' 85' 90' 95' 100' 85' 90' 95' 100' CORRIDOR 160' ROW 60' - 50' FROM EDGE OF 160' CORRIDOR 50' - 40' FROM EDGE OF 160' CORRIDOR 40' - 30' FROM EDGE OF 160' CORRIDOR 30' - 20' FROM EDGE OF 160' CORRIDOR 20' - 0' FROM EDGE OF 160' CORRIDOR PROPERTY BOUNDARIES OBTAINED BY CCPANFeet 200400WELL HOUSE OFFSET 71' WELL HOUSE OFFSET 61'WELL HOUSE OFFSET 61'WELL HOUSE OFFSET 53' WELL HOUSE OFFSET 58'WELL HOUSE OFFSET 61' GAS STATION OFFSET 71' OFFSET: 132-80 = 52' OFFSET: 113-80 = 33' OFFSET: 129-80 = 49' OFFSET: 132-80 = 52' OFFSET: 113-80 = 33' OFFSET: 125-80 = 45'OFFSET: 128-80 = 48'OFFSET: 123-80 = 43' OFFSET: 107-80 = 27' OFFSET: 110-80 = 30' OFFSET: 124-80 = 44' OFFSET: 128-80 = 48' OFFSET: 124-80 = 44' OFFSET: 108-80 = 28' OFFSET: 112-80 = 32' OFFSET: 118-80 = 38' OFFSET: 129-80 = 49' OFFSET: 81-1 = 1' OFFSET: 131-80 = 51' Page 1811 of 4682 Pond Siting Report Jacobs Engineering Group Inc.46 Appendix F Pond Siting Report –Wilson Boulevard Corridor Study (2022) Page 1812 of 4682 Memorandum 5801 Pelican Bay Boulevard Suite 505 Naples, FL 34108 United States T +1.239.596.1715 F +1.239.596.2579 www.jacobs.com PPS1105211510SWF 1 Subject Preliminary Pond Siting Analysis Project Name Wilson Boulevard Corridor Study Attention Lorraine Lantz, AICP From Angela Shepard, P.E. Date December 7, 2021 1. Introduction Collier County initiated the Wilson Boulevard Corridor Study to evaluate future corridor improvements to widen Wilson Boulevard North (Wilson Boulevard), from Immokalee Road (CR 846) to Golden Gate Boulevard (CR 876), from a two-lane undivided facility to a four-lane divided roadway with curb and gutter. This memorandum documents the preliminary pond siting evaluation of stormwater recom- mendations and options for Collier County on the type, design, and location of the stormwater management facilities for the proposed improvements. The analysis consisted of the following:  Calculate the probable pervious and impervious areas associated with the project improvements  Calculate the preliminary treatment requirements of the proposed improvements with considerations for discharge points and whether the receiving water bodies are impaired  Assess soils and land use information and define potential drainage basins along the 3.22-mile-long corridor  Identify potential pond site locations and sizes based on estimated water quality and water quantity requirements  Assess impacts for each option All elevations used in calculations and maps in this document are based on the North American Vertical Datum of 1998 (NAVD), unless specified otherwise. Any supporting data based on the National Geodetic Vertical Datum of 1929 (NGVD) was converted using the following equation: NAVD = NGVD – 1.3’ 2. Design Criteria The Wilson Boulevard corridor drains to the Cypress and Corkscrew Canals within the North Golden Gate Basin, Water Basin Identification (WBID) 3278S, which is in the Big Cypress area of Collier County and within the jurisdiction of the South Florida Water Management District (SFWMD). The preliminary design of stormwater management systems for this project is regulated by the rules and criteria set forth by Page 1813 of 4682 Preliminary Pond Siting Analysis PPS1105211510SWF 2 SFWMD and the Florida Department of Environmental Protection (FDEP). This section outlines the requirements to meet water quality and quantity standards. The project area does not traverse or discharge to any designated Outstanding Florida Water (OFW) as defined in Chapter 62-302 of the Florida Administrative Code (FAC). All other water traversed by this proposed study area have been designated Class III waters. North Golden Gate Sub-Basin (WBID 3278S) is impaired for dissolved oxygen, with total nitrogen as the causative pollutant. Although there is not a current Total Maximum Daily Load or Basin Management Action Plan established, additional protective measures must be incorporated into the project improvements to provide reasonable assurance that the proposed discharge will not cause or contribute to violations of state water quality standards. Additional protective measures required by SFWMD include a site-specific pollutant loading analysis and an additional 50 percent water quality treatment volume. 2.1 Potential Permits The following permits are anticipated for this project:  National Pollutant Discharge Elimination System General Permit (FDEP)  Section 404 Individual Permit (FDEP)  Individual Environmental Resource Permit (ERP) (SFWMD) 2.2 SFWMD Attenuation/Water Quantity Criteria All basins within the study area are open basins. The SFWMD discharge rate criteria are as follows:  The offsite discharge rate is limited to rates not causing adverse impacts to off-site properties, and: – Historic discharge rates; or – Rates determined in previous Agency permit actions; or – Rates specified in SFWMD criteria.  A design storm event of 25-year frequency over 72 -hour duration shall be used to compute the discharge rates. – Stormwater attenuation for reconstruction of the existing roadway requires the proposed ponds attenuate the difference between the 25-year/72-hour pre- versus post-discharge rate. 2.3 Collier County Attenuation/Water Quantity Criteria The study area is within basins where the maximum allowable discharge rates were approved in 2016. It is anticipated these criteria will not apply because the Wilson Boulevard Corridor project involves the proposed reconstruction of an existing roadway. The 2016 discharge rates are as follows:  Cypress Canal Basin 0.06 cubic feet per second per acre (cfs/acre)  Corkscrew Canal Basin 0.04 cfs/acre 2.4 SFWMD ERP Treatment/Water Quality Criteria Retention, detention, or a combination of both in the overall system have the following volumetric requirements:  Wet detention volume provided for the greater of the first 1 inch of runoff over the drainage area or 2.5 inches of runoff over the impervious area (excluding water bodies) Page 1814 of 4682 Preliminary Pond Siting Analysis PPS1105211510SWF 3  Dry detention volume provided equal to 75 percent of referenced amounts for wet detention  Retention volume provided equal to 50 percent of the referenced amounts for wet detention 2.5 SFWMD Land Use and Coverage Criteria Projects having greater than 40 percent impervious area and that discharge directly to the Big Cypress area of Collier County are required to provide at least 0.5 inch of dry detention or retention pretreatment as part of the required retention/detention. Pursuant to subsection 62-555.312(3), FAC, stormwater retention and detention systems are classified as moderate sanitary hazards with respect to public and private drinking water wells. New stormwater treatment facilities are not allowed within 100 feet of a public drinking water well nor within 75 feet of a private drinking water well. However, per Collier County correspondence, a 300-foot-wide buffer to an existing public water supply well may also be required and has been applied as a constraint to this evaluation (Abbot, pers. comm. 2021). 2.6 SFWMD Wet Retention/Detention Area Dimensional Criteria (Measured at or from the Control Elevation)  Area: 0.5-acre minimum  Width: 100-foot minimum for linear areas in excess of 200 feet length; irregular-shaped areas may have narrower reaches but have to average at least 100 feet  Depth: minimum shallow, littoral area (portion of detention bodies shallower than 6 feet) must be the lesser of 20 percent of the wet detention area or 2.5 percent of the total of the detention area (including side slopes) plus the basin contributing area  Side slopes no steeper than 1:4 (vertical: horizontal) from top of bank out to a minimum depth of 2 feet below the control elevation 2.7 Floodplain/Floodway Involvement The Federal Emergency Management Agency flood insurance rate maps (FEMA 2005) for Collier County (Panel Numbers 12021C0240H and 12021C0430H) indicate the study area is located within Zones AE and Zone AH of the 100-year floodplain (base flood elevation ranges from EL 13 to EL 14 NAVD). SFWMD requires no net encroachment into the floodplain, between the average wet season water table and that encompassed by the 100-year event, which will adversely affect the existing rights of others. Because the proposed Wilson Boulevard roadway improvements are anticipated to reduce floodplain storage, the proposed stormwater pond sites and roadside swales will need to provide compensating storage to demonstrate no net decrease in floodplain storage. 2.8 Methodology to Meet Water Quantity (Attenuation) and Water Quality (Treatment) Criteria The methodology to meet water quantity and water quality criteria for the Wilson Boulevard study area is as follows:  Identify total pond storage requirements for each basin within the study area – Establish the preliminary treatment requirements of the proposed improvements Page 1815 of 4682 Preliminary Pond Siting Analysis PPS1105211510SWF 4 • Calculate the probable pervious and impervious areas associated with the project improvements and apply SFWMD criteria with an additional 50 percent to account for impaired receiving waterbody • Perform preliminary nutrient analysis to identify types of stormwater facilities and best management practices with sufficient nutrient removal efficiencies capable of meeting net improvement standards – Determine pre- and post-development runoff volumes from potential drainage basins along the 3.22-mile-long corridor and pond sites • Identify precipitation amount for the 25-year, 72-hour storm using the 3-Day Rainfall; 25-Year Return Period Isohyetal Maps referenced in Appendix C of the SFWMD ERP Applicant’s Handbook Volume II (SFWMD 2016) • Estimate the pre-development and post-development runoff, using Soil Conservation Service (SCS) Runoff Curve Number (CN) Method sited in Soil Conservation Service Technical Release 55 Method (NRCS 1986) and SFWMD ERP Applicant’s Handbook Volume II  Identify pond discharge points and existing tailwater conditions – Use simulated 25-year/5-day stage hydrographs for estimated normal water levels and peak stages of Cypress Canal and Corkscrew Canal – Include a positive drainage gradient above canal normal water levels for wet detention pond control elevations based on distance from discharge point  Identify stormwater pond sites – Review available geog raphic information system (GIS) data to identify vacant and undeveloped parcels outside the existing right-of-way (ROW) for potential pond sites • Avoid existing public water supply wells and associated 300-foot-wide buffer per County instruction • Avoid wetland and floodplain impacts, unless other alternative sites would affect residences, businesses, or public water supply wells • Evaluate potential pond sites for impacts to physical, environmental, and hydrologic impacts to determine the preferred pond site alternative – Use maximum treatment and attenuation estimates – Estimate site-specific storage height • For dry detention/retention, review available soils and GIS data to estimate seasonal high water table (SHWT) and set pond bottom elevation for minimum vertical clearance • For wet detention, set normal water level based on tailwater constraints • Set wet detention and dry retention/detention pond site berm elevations at or below minimum allowable proposed roadway profile elevations anticipated to be 2 to 3 feet above existing grade and check – Estimate required pond area (acres) • Required pond size (acres) based on storage height and required volumes • Include 15% contingency for preliminary information • Compare to identified sites parcel sizes (acres) Page 1816 of 4682 Preliminary Pond Siting Analysis PPS1105211510SWF 5 3. Existing Drainage Patterns The existing Wilson Boulevard typical section is a two-lane undivided rural roadway. Runoff from the roadway drains to roadside ditches that ultimately discharge to the nearby canals, directly or via side streets. Approximate onsite basin divides were developed based on canal locations, drainage structures, 12-digit hydrologic unit sub-basin maps, 2-foot LIDAR 1 contour elevations, and the Collier County Stormwater Management Facilities GIS database. 3.1 Basins 1 and 2 (from Golden Gate Boulevard to Cypress Canal) Wilson Boulevard, from Golden Gate Boulevard to Cypress Canal, is within the Curry Island Drain sub-basin and generally drains north to the Cypress Canal. Although some adjacent properties appear to include depressional or wetland areas, the roadside ditches provide continuous conveyance within the existing ROW to the Cypress Canal. According to LIDAR contours, existing Wilson Boulevard elevations range between 12 and 14 feet. 3.2 Basins 3, 4, 5, and 6 (from Cypress Canal to Immokalee Road) North of the Cypress Canal to Immokalee Road, Wilson Boulevard is located along the boundary between two sub-basins, Horsepen Slough (to Corkscrew Canal) to the east and Curry Island Drain (to Curry Canal) to the west. Wilson Boulevard is approximately 1 mile east of Curry Canal and 3/8 of a mile west of Corkscrew Canal. In this segment, Wilson Boulevard is traversed by nine side streets (10th Avenue to 24th Avenue) that extend east and west , terminat ing at the Curry and Corkscrew Canals, respectively. Because there are no existing side drains at the traversing side streets that would continue conveyance along Wilson Boulevard north-south, each side street crossing serves as a natural drainage divide and discharge point. For purposes of this evaluation, Wilson Boulevard from Cypress Canal to Immokalee Road was sub- divided into four basins, with divides at 14th Avenue, 18th Avenue, and 22nd Avenue. 3.2.1 Basin 3 (from Cypress Canal to 14th Avenue) The existing Wilson Boulevard profile contains primarily flat slopes in this area and has an elevation near 12 feet. 3.2.2 Basin 4 (from 14th Avenue to 18th Avenue) The existing Wilson Boulevard profile contains primarily flat slopes in this area and has elevations between 12 and 12.5 feet. 3.2.3 Basin 5 (from 18th Avenue to 22nd Avenue) The existing Wilson Boulevard profile contains primarily flat slopes in this area and has elevations between 12 and 13 feet. 3.2.4 Basin 6 (from 22nd Avenue to Immokalee Road) North of 22nd Avenue, the existing Wilson Boulevard profile elevations increase from 13 to 14 feet near 24th Avenue, and up to 15 feet at the tie-in with Immokalee Road. 1 LIDAR stands for light detection and ranging. Page 1817 of 4682 Preliminary Pond Siting Analysis PPS1105211510SWF 6 4. Proposed Drainage Patterns The Wilson Boulevard proposed typical section consists of four 11-foot -wide lanes with 5-foot -wide bike lanes, curb and gutter, a 6-foot -wide sidewalk on the west side of the road, a 10-foot -wide pathway on the east side of the road, a 22-foot -wide grassed median, and grassed ditches on each exterior of the road for a total 165-foot proposed ROW width. The proposed exterior ditches would maintain existing offsite drainage patterns within the ROW by maintaining the hydraulic connections to the existing side street ditches. Runoff from the proposed roadway would drain to a closed storm sewer system along the proposed curb and gutter and conveyed to the proposed pond sites for water quality treatment and water quantity attenuation. Where feasible, three or more potential pond sites were identified within each basin based on a variety of factors including site-specific estimated storage volume requirements, soils conditions, GIS contour elevations, discharge points, tailwater conditions, and physical impacts. However, sites that would impact occupied residential properties or public water supply wellheads were removed from consideration. Attachment 1 includes the proposed basin divides and potential pond site locations. 4.1 Basin 1 (from Golden Gate Boulevard to Station 66+30) Proposed pond sites for Basin 1 would outfall directly to the Cypress Canal. Two potential pond sites were identified for Basin 1 along the eastern side of Wilson Boulevard to avoid impacts to numerous water supply wells. Piped conveyance systems to and from the potential Basin 1 pond sites would be located within the Wilson Boulevard ROW because no other options (that is, public side streets) are available. 4.2 Basin 2 (from Station 66+30 to Cypress Canal) Proposed pond sites for Basin 2 would outfall directly to the Cypress Canal. Four potential pond sites were identified for Basin 2 to avoid impacts to numerous water supply wells and minimize distance to the canal. Piped conveyance systems to the potential Basin 2 pond sites would be located within the Wilson Boulevard ROW and/or easements should the location of the proposed ponds not be adjacent to Wilson Boulevard. The Pond 2 outfall pipes to the Cypress Canal may be located within the Wilson Boulevard ROW or within easements along 2nd Street NE to the Cypress Canal. 4.3 Basin 3 (from Cypress Canal to 14th Avenue) Depending on the pond site location, Basin 3 could outfall directly to either the Cypress Canal or Corkscrew Canal. Three potential pond sites were identified to avoid the future Vanderbilt Beach Road Extension facilities. Piped conveyance systems to the potential Basin 3 pond sites would be located within the Wilson Boulevard ROW , and possibly along easements within the side streets should the location of the proposed ponds not be adjacent to Wilson Boulevard. The Pond 3 outfall conveyance pipes could be located either within proposed Wilson Boulevard ROW or within easements along 10th Avenue NE to Cypress Canal or 12th Avenue NE to Corkscrew Canal. 4.4 Basin 4 (from 14th Avenue to 18th Avenue) Proposed pond sites for Basin 4 outfall directly to the Corkscrew Canal. Two potential pond sites were identified along the Cypress Canal and side streets, away from the public water supply wells. Depending on the pond site location, piped conveyance systems to and from the potential Basin 4 pond sites would be located within the Wilson Boulevard ROW and possibly along easements within either 16th Avenue NE to the Corkscrew Canal or Jung Boulevard E to the Corkscrew Canal. Page 1818 of 4682 Preliminary Pond Siting Analysis PPS1105211510SWF 7 4.5 Basin 5 (from 18th Avenue to 22nd Avenue) Proposed pond sites for Basin 5 outfall directly to the Corkscrew Canal. Four potential pond sites were identified along Wilson Boulevard and side streets. Depending on the pond site location, piped convey- ance systems to the potential Basin 5 pond sites would be located within the Wilson Boulevard ROW and possibly along easements within the nearby side streets. The Pond 5 outfall pipes would be located within easements either along 18th Avenue NE to Corkscrew Canal or 20th Avenue NE to Corkscrew Canal. 4.6 Basin 6 (from 22nd Avenue to Immokalee Road) Proposed pond sites for Basin 6 outfall directly to the Corkscrew Canal. Three potential pond sites were identified along Wilson Boulevard and side streets, away from the Immokalee Road frontage. Depending on the pond site location, piped conveyance systems to the potential Basin 6 pond sites would be located within the Wilson Boulevard ROW and possibly along easements within the nearby side streets. The Pond 6 outfall pipes would be located within easements either along 22nd Avenue NE to Corkscrew Canal or 24th Avenue NE to Corkscrew Canal. 4.7 Basin Summary Table 1 lists total dry pre-treatment and wet detention pond storage requirements estimated for each basin and pond site based on probable pervious and impervious areas associated with the project improvements and resulting required water quality and water quantity volumes. Attachment 2 includes site-specific basin calculations. Page 1819 of 4682 Preliminary Pond Siting Analysis PPS1105211510SWF 8 Table 1. Basin and Pond Volume Requirements Basin From Sta To Sta Length (feet) Pond Site ID Total Basin Area (acres) Impervious Area (acres) Water Quality Required (acre-feet) Water Quality +50% (acre-feet) 0.5” Dry Pre- treatment (acre-feet) Attenuation Required (acre-feet) Total Wet Pond Volume (acre-feet) 1 37+00 66+30 2,930 1-1 16.58 5.68 1.38 2.07 0.69 3.84 5.23 1-2 15.47 1.29 1.93 0.64 4.63 5.92 2 66+30 96+10 2,980 2-1 14.48 5.37 1.21 1.81 0.60 3.20 4.41 2-2 14.38 1.20 1.80 0.60 3.13 4.33 2-3 15.05 1.25 1.88 0.63 3.20 4.45 2-4 15.29 1.27 1.91 0.64 4.11 5.38 3 96+10 129+30 3,320 3-1 16.03 6.98 1.45 2.18 0.67 3.89 5.40 3-2 15.53 1.45 2.18 0.65 3.11 4.64 3-3 16.05 1.45 2.18 0.67 3.11 4.62 4 129+30 155+80 2,650 4-1 14.24 5.98 1.24 1.87 0.59 3.23 4.50 4-2 13.31 1.24 1.87 0.55 3.70 5.01 5 155+80 182+20 2,640 5-1 15.22 5.56 1.27 1.90 0.63 4.09 5.36 5-2 13.55 1.16 1.74 0.56 4.20 5.37 5-3 15.84 1.32 1.98 0.66 5.84 7.16 5-4 15.39 1.28 1.92 0.64 5.86 7.15 6 182+20 205+00 2,280 6-1 11.22 5.11 1.06 1.60 0.47* 3.44 5.04* 6-2 10.79 1.06 1.60 0.45* 3.07 4.66* 6-3 11.95 1.06 1.60 0.50 3.38 4.48 * In Basin 6, Sites 6-1 and 6-2 do not accommodate dry pre-treatment. Corresponding total wet pond volumes reflect the volume required without dry pre-treatment. Page 1820 of 4682 Preliminary Pond Siting Analysis 9 PPS1105211510SWF 5. Potential Pond Sites Table 2a through 2f summarizes the details and considerations related to each site within Basins 1 through 6, respectively. For pond sites to remain viable in cases where Available Parcel Area is less than Estimated Pond Area with 15% Contingency, additional roadway profile adjustments may be required and are described in the Comments, Advantages and Disadvantages. Attachment 3 provides calculations for pond size estimates. Attachment 4 provides additional supporting documentation. Table 2a. Potential Pond Sites Matrix – Basin 1 Factors Pond Site 1-1 Pond Site 1-2 1. Estimated Pond Area 5.5 4.4 2. Pond Area with 15% Contingency 6.3 5.0 3. Available Parcel Area (acre), excluding areas within 300 feet of public water supply well 5.8 4.9 4. Parcel ID 3728056003, 3728048002, 3728044000 37280800006, 37280920009, 37280760007 5. Land Use Vacant Residential, Wooded Vacant Residential, Wooded 6. Proximity to outfall 3,800 linear feet (LF) 2,500 LF 7. Proximity to farthest onsite basin extent 2,050 LF 3,300 LF 8. Accessibility Maintenance and pipes to/from Wilson Boulevard Maintenance and pipes to/from Wilson Boulevard 9. Easements Required N/A N/A 10. Soils; Estimated SHWT A/D, C/D; EL 11.0 A/D; EL 10.5 11. NWL / Dry Bot. EL EL 12.0 / EL 12.0 EL 11.2 / EL 11.5 12. Estimated Wetlands Impacts Direct Impact: 5.8 acres Secondary Impacts N/A 13. Public Water Supply Well Proximity 300-foot-wide protection zone within or adjacent to parcel 300-foot-wide protection zone within or adjacent to parcel 14. Private Well Proximity Potential Yes, pond site adjacent to developed property Yes, pond site adjacent to developed property 15. Permit Status in Collier County Growth Management Division (GMD) Public Portal N/A N/A 16. Comments, Advantages, Disadvantages Farther proximity to discharge point results in higher control elevation and larger pond footprint. May require an additional 0.5-foot elevation increase to proposed profile. Closer proximity to discharge point allows for control elevation to be lower resulting in smaller pond footprint required Ranking 2 1 Page 1821 of 4682 Preliminary Pond Siting Analysis PPS1105211510SWF 10 Table 2b . Potential Pond Sites Matrix – Basin 2 Factors Pond Site 2 -1 Pond Site 2 -2 Pond Site 2 -3 Pond Site 2-4 1. Estimated Pond Area 3.2 3.1 3.8 4.0 2. Pond Area with 15% Contingency 3.7 3.6 4.3 4.6 3. Available Parcel Area (ac), excluding areas within 300 feet of public water supply well 4.6 3.9 4.1 4.3 4. Parcel ID 37281280007 37281320006 37281400007 37118720106, 37118720009 5. Land Use Vacant Residential, Wooded Vacant Residential, Wooded Vacant Residential, Wooded Vacant Residential, Wooded 6. Proximity to outfall 675 LF 425 LF 50 LF 1,700 LF 7. Proximity to farthest onsite basin extent 2,200 LF 3,080 LF 3,400 LF 1,800 LF 8. Accessibility Maintenance and pipes to/from Wilson Boulevard to canal Maintenance and pipes to/from Wilson Boulevard Maintenance from 2nd Street NE, outfall directly adjacent to canal Maintenance and pipes to/from Wilson Boulevard to canal 9. Easements Required N/A N/A Yes; (for pipes from Wilson Blvd) N/A 10. Soils; Estimated SHWT A/D, B/D; EL 11.5 A/D; EL 11.5 A/D, B/D; EL 12.0 A/D; EL 11.5 11. NWL / Dry Bot. EL EL 10.2 / EL 12.5 EL 10.0 / EL 12.5 EL 9.8 / EL 13.0 EL 10.8 / EL 12.5 12. Estimated Wetlands Impacts N/A N/A N/A N/A 13. Public Water Supply Wells 300-foot-wide protection zone adjacent to parcel 300-foot-wide protection zone within parcel N/A 300-foot-wide protection zone adjacent to parcel 14. Private Well Proximity Potential Yes, pond site adjacent to developed property Yes, pond site adjacent to developed property N/A Yes, pond site adjacent to developed property 15. Permit Status in Collier County GMD Public Portal N/A N/A N/A N/A 16. Comments, Advantages, Disadvantages Single parcel, adjacent to Wilson Boulevard Single parcel, adjacent to Wilson Boulevard, smallest site required Single parcel adjacent to canal, requires pipe easement. May require an additional 0.5-foot increase to roadway profile. Multiple parcels centrally located. May require an additional 0.5-foot increase to roadway profile. Ranking 2 1 3 4 Page 1822 of 4682 Preliminary Pond Siting Analysis PPS1105211510SWF 11 Table 2c . Potential Pond Sites Matrix – Basin 3 Factors Pond Site 3 -1 Pond Site 3-2 Pond Site 3 -3 1. Estimated Pond Area 3.5 3.0 3.5 2. Pond Area with 15% Contingency 4.0 3.4 4.0 3. Available Parcel Area (ac), excluding areas within 300 feet of public water supply well 4.5 4.3 4.8 4. Parcel ID 37492000005 37549720005 37492200009, 37492240001 5. Land Use Vacant Residential, Wooded Vacant Residential, Wooded Vacant Residential, Wooded 6. Proximity to outfall 50 LF 50 LF 700 LF 7. Proximity to farthest onsite basin extent 3,400 LF 3,200 LF 3,050 LF 8. Accessibility Maintenance and pipes to/from 10th Avenue NE to canal Maintenance and pipes to/from Wilson Boulevard Maintenance and pipes to/from 12th Avenue NE to canal 9. Easements Required Yes (10th Avenue) N/A Yes (12th Avenue) 10. Soils; Estimated SHWT A/D, B/D; EL 11.5 B/D; EL 11.0 B/D, C/D; EL 11.5 11. NWL / Dry Bot. EL EL 9.8 / EL 12.5 EL 9.8 / EL 12.0 EL 10.4 / EL 12.5 12. Estimated Wetlands Impacts N/A N/A N/A 13. Public Water Supply Wells N/A N/A N/A 14. Private Well Proximity Potential Yes, pond site adjacent to developed property Yes, pond site adjacent to developed property N/A 15. Permit Status in Collier County GMD Public Portal N/A N/A N/A 16. Comments, Advantages, Disadvantages Single parcel adjacent to discharge point but farthest for conveyance to pond Single parcel adjacent to discharge point Multiple parcels, central location in basin Ranking 2 1 3 Page 1823 of 4682 Preliminary Pond Siting Analysis PPS1105211510SWF 12 Table 2d. Potential Pond Sites Matrix – Basin 4 Factors Pond Site 4 -1 Pond Site 4-2 1. Estimated Pond Area 4.2 3.3 2. Pond Area with 15% Contingency 4.8 3.8 3. Available Parcel Area (ac), excluding areas within 300 feet of public water supply well 4.5 4.2 4. Parcel ID 37492560008 37493440004, 37493440101 5. Land Use Vacant Residential, Wooded Vacant Residential, Wooded 6. Proximity to outfall 700 LF 50 LF 7. Proximity to farthest onsite basin extent 2,500 LF 3,100 LF 8. Accessibility Maintenance and pipes to/from along Jung Boulevard E and/or 16th Avenue NE Maintenance and pipes to/from along 16th Avenue NE 9. Easements Required Yes (Jung Boulevard E or 16th Avenue NE) Yes (16th Avenue NE) 10. Soils; Estimated SHWT B/D; EL 12.0 A/D; EL 11.5 11. NWL / Dry Bot. EL EL 10.4 / EL 13.0 EL 10.0 / EL 12.5 12. Estimated Wetlands Impacts N/A N/A 13. Public Water Supply Wells N/A N/A 14. Private Well Proximity Potential Yes, pond site adjacent to developed property N/A 15. Permit Status in Collier County GMD Public Portal N/A N/A 16. Comments, Advantages, Disadvantages Both sites are generally central to basin and are located along side streets to canal. May require an additional 0.5-foot elevation increase to proposed roadway profile. Both sites are generally central to basin and are located along side streets to canal; site 4-2 is adjacent to canal Ranking 2 1 Page 1824 of 4682 Preliminary Pond Siting Analysis PPS1105211510SWF 13 Table 2e. Potential Pond Sites Matrix – Basin 5 Factors Pond Site 5-1 Pond Site 5-2 Pond 5-3 Pond 5-4 1. Estimated Pond Area 5.2 2.6 (wet) 1.0 (dry) 5.8 5.4 2. Pond Area with 15% Contingency 6.0 3.0 (wet) 1.1 (dry) 6.7 6.2 3. Available Parcel Area (ac), excluding areas within 300 feet of public water supply well 4.1 5.2 (wet) 2.2 (dry) 4.9 5.0 4. Parcel ID 37598680002, 37598720001 37740280001 (dry), 37743480002 and 3774228009 (wet) 3759840004, 37598480008 37740760000, 37740840001 5. Land Use Vacant Residential, Wooded Vacant Residential, Wooded Vacant Residential, Wooded Vacant Residential, Wooded 6. Proximity to outfall 2,200 LF 500 LF 2,600 LF 2,500 LF 7. Proximity to farthest onsite basin extent 1,400 LF 2,700 LF 2,050 LF 2,000 LF 8. Accessibility Maintenance and pipes to/from Wilson Boulevard and 20th Avenue NE Maintenance and pipes to/from Wilson Boulevard and 18th Avenue NE Maintenance and pipes to/from Wilson Boulevard and 20th Avenue NE Maintenance and pipes to/from Wilson Boulevard and 20th Avenue NE or 22nd Avenue NE 9. Easements Required Yes (20th Avenue NE) Yes (18th Avenue NE) Yes (20th Avenue NE) Yes (20th Avenue NE or 22nd Avenue NE) 10. Soils; Estimated SHWT B/D; 12.0 A/D, B/D; 12.5 (wet) A/D; 11.5 (dry) A/D, B/D; 11.5 A/D; 11.0 11. NWL / Dry Bot. EL EL 11.3 / EL 13.0 EL 10.2 / EL 12.5 EL 11.5 / EL 12.5 EL 11.4 / EL 12.0 12. Estimated Wetlands Impacts N/A Direct Impact: 2.2 ac Secondary Impacts Direct Impact: 4.9 ac Secondary Impacts Direct Impact: 3 ac Secondary Impacts 13. Public Water Supply Wells N/A N/A N/A N/A 14. Private Well Proximity Potential Yes, pond site adjacent to developed property Yes, pond site adjacent to developed property N/A Yes, pond site adjacent to developed property 15. Permit Status in Collier County GMD Public Portal PRBD20140514836, (2014), house demolition, complete N/A N/A PRROW200210836837, PRROW20210627487, Cancelled, abandoned 16. Comments, Advantages, Disadvantages Multiple parcels, too small for pond needs. May be used in tandem with another site and/or additional 1 to 2-feet elevation increase for proposed profile. Split dry pre- treatment and wet sites are located in series without need for additional pipes. Wetland impacts at dry pond site Impacts to high quality wetlands. Multiple parcels, centrally located, but additional pipe required and too small for pond needs. May need additional 1 to 2-feet elevation increase to proposed profile. Multiple parcels, too small for pond needs. May be used in tandem with another site and/or additional 1 to 2-feet elevation increase for proposed profile. Ranking 3 1 4 2 Page 1825 of 4682 Preliminary Pond Siting Analysis PPS1105211510SWF 14 Table 2f . Potential Pond Sites Matrix – Basin 6 Factors Pond Site 6-1 Pond Site 6-2 Pond Site 6-3 1. Estimated Pond Area 2.6 2.2 2.4 (wet) 0.9 (dry) 2. Pond Area with 15% Contingency 3.0 2.5 2.7 (wet) 1.1 (dry) 3. Available Parcel Area (ac), excluding areas within 300’ of public water supply well 4.0 3.9 2.6 (wet) 2.0 (dry) 4. Parcel ID 37741440002 37743920009 37741760009 (wet), 37740880003 (dry) 5. Land Use Vacant Residential, Wooded Vacant Residential, Wooded Vacant Residential, Wooded 6. Proximity to outfall 1,400 LF 50 LF 1,150 LF 7. Proximity to farthest onsite basin extent 1,400 LF 3,050 LF 2,300 LF 8. Accessibility Maintenance and pipes to/from Wilson Boulevard and 24th Avenue NE Maintenance and pipes to/from Wilson Boulevard and 24th Avenue NE Maintenance and pipes to/from Wilson Bo ulevard and 22 nd Avenue NE 9. Easements Required Yes (24th Avenue NE) Yes (24th Avenue NE) Yes (22nd Avenue NE) 10. Soils; Estimated SHWT A/D and B/D; EL 13.0 A/D; EL 13.5 A/D; EL 12.0 11. NWL / Dry Bot. EL EL 10.8 / N/A EL 10.0 / N/A EL 10.6 / EL 13.0 12. Estimated Wetlands Impacts Direct Impact: 1.5 acres Secondary Impacts N/A Direct Impact: 0.7 acres (south) Secondary Impacts 13. Public Water Supply Wells N/A N/A N/A 14. Private Well Proximity Potential N/A Yes, pond site adjacent to developed property Yes, pond site adjacent to developed property 15. Permit Status in Collier County GMD Public Portal N/A N/A N/A 16. Comments, Advantages, Disadvantages Single parcel, high ground elevations relative to roadway; not able to provide dry pre- treatment; requires tandem pond and/or overtreatment in other basins Single parcel, high ground elevations relative to roadway; not able to provide dry pre- treatment; requires tandem pond and/or overtreatment in other basins Split dry pre-treatment and wet sites are located in series without need for additional pipes. Wetland impacts at dry pond site Ranking 3 2 1 Page 1826 of 4682 Preliminary Pond Siting Analysis PPS1105211510SWF 15 6. Recommended Pond Site Locations Based on the considerations from Tables 2a through 2f, the following pond site locations are recommended for the Wilson Boulevard Corridor improvements. 6.1 Basin 1 Pond Site 1-2 has an estimated area of 5.0 acres and is located within Parcels 37280800006, 37280920009, and 37280760007. No wetland impacts are anticipated at this location. Piped conveyance systems to and from Pond Site 1-2 would be located within the proposed Wilson Boulevard ROW. 6.2 Basin 2 Pond Site 2-2 has an estimated area of 3.6 acres and is located within Parcel 37281320006. No wetland impacts are anticipated at this location. Piped conveyance systems to and from Pond Site 2-2 would be located within the proposed Wilson Boulevard ROW. 6.3 Basin 3 Pond Site 3-2 has an estimated area of 3.4 acres and is located adjacent to the Cypress Canal within Parcel 37549720005. There are no anticipated wetland impacts at this location. Piped conveyance systems to Pond Site 3-2 would be located within the proposed Wilson Boulevard ROW. 6.4 Basin 4 Pond Site 4-2 has an estimated area of 3.8 acres and is located adjacent to Corkscrew Canal within Parcel 37493440004. There are no anticipated wetland impacts at this location. Piped conveyance systems to Pond Site 4-2 would be located within the proposed Wilson Boulevard ROW and along 16th Avenue NE. 6.5 Basin 5 Pond Site 5-2 has an estimated area of 4.1 acres and is located along 18th Avenue NE within Parcels 37740280001, 37743480002, and 3774228009. Although 2.2 acres of wetland impacts are anticipated, Pond Site 5-2 is the only alternative that accommodates both wet detention and dry detention pre- treatment without raising the roadway profile more than anticipated 2 to 3 feet. Piped conveyance systems to Pond Site 5-2 would be located within the proposed Wilson Boulevard ROW and along 18th Avenue NE. 6.6 Basin 6 Pond Site 6-3 has an estimated area of 3.8 acres and is located along 22nd Avenue NE within Parcels 37741760009 and 37740880003. Although 0.7 acres of wetland impacts are anticipated at the site located on the south side of 22nd Avenue NE, Pond Site 6-3 is the only alternative that accommodates the anticipated proposed roadway profile. Piped conveyance systems to Pond Site 6-3 would be located within the proposed Wilson Boulevard ROW and along 22nd Avenue NE. 7. Design Phase Considerations Potential pond sites and size estimates in this memorandum are preliminary and require additional evaluation during the design phase including wetland delineation, geotechnical borings, and topographic survey. Although a 15% contingency has been included for pond site sizes, a pond site-re-evaluation is Page 1827 of 4682 Preliminary Pond Siting Analysis PPS1105211510SWF 16 recommended shortly before right-of-way acquisition occurs in subsequent design phases. Additional design considerations are described but not limited to the following sections. 7.1 Basin Divides and Conveyance Limitations Preliminary onsite drainage basins were estimated based on existing drainage patterns, canal locations, and anticipated conveyance system length limitations. During the design phase, adjustments to drainage basins may be required to optimize the stormwater conveyance systems to selected pond sites. 7.2 Proposed Roadway Profile Because of a variety of factors, potential pond site storage estimates are based on anticipated project improvements to Wilson Boulevard including raising the proposed roadway elevations approximately 2 to 3 feet higher than existing elevations. During the design phase, proposed roadway profile elevations will need to be optimized to minimize required ROW , promote efficient stormwater conveyance, and ensure peak design high water stages do not encroach into travel lanes. Additional feasibility considerations during the design phase will be needed to ensure stormwater conveyance systems are accommodated in proposed dry pre-treatment systems. Because of high groundwater tables along the corridor, sump conditions may be required. 7.3 Proposed Roadside Swales The proposed typical section includes approximately 30 feet on each side between the back of sidewalk or pathway to the proposed Wilson Boulevard ROW. These exterior areas of the corridor are occupied by proposed swales to maintain existing offsite drainage patterns. During the design phase, these areas could be considered for floodplain compensation and/or dry pre-treatment, pending refinements to offsite drainage area delineation, calculated pond storage, and stormwater conveyance systems. 7.4 Floodplain Impacts and Compensation During the design phase, the total volume of floodplain storage impacts from Wilson Boulevard proposed roadway improvements will be determined and compared to proposed floodplain compensation volumes provided within Wilson Boulevard ROW and stormwater ponds. If net floodplain storage is decreased, further floodplain analysis and evaluation of Big Cypress Basin watershed resources may be required to demonstrate the project will not adversely affect the existing rights of others. 7.5 Geotechnical Considerations In addition to the geotechnical information needed for pond design such as soil permeability, water table conditions and depth to any confining layer, a seepage and slope stability analysis should be considered where proposed ponds maintain water levels above existing ground. 7.6 Pond Site Parcel Availability Status As described in the Section 2.8, vacant and undeveloped parcels are considered candidates for potential pond sites. During the project’s ROW acquisition phase, all pond site properties should be reviewed for pending permit applications in the Collier County GMD Public Portal. Page 1828 of 4682 Preliminary Pond Siting Analysis PPS1105211510SWF 17 7.7 Project Limits The Preliminary Pond Siting Analysis is based on study limits from Golden Gate Boulevard to Immokalee Road. During the design phase, project limits may extend north and south to provide taper areas that tie the additional lanes to existing conditions. Although additional roadway improvements are anticipated to be minor, additional stormwater accommodations may be necessary to meet water quantity and water quality requirements. 8. References Abbot, Alicia E.I., PMP, Collier County Government. 2021. Personal communication email with Recipient Bill Gramer, Jacobs Engineering Group. September. Collier County Property Appraiser. 2021. Property Summary. https://www.collierappraiser.com/ Collier County, Florida. 2021. ALLOWABLE POST-DEVELOPMENT DISCHARGE FORMULAS FOR COLLIER COUNTY CANALS (Code of Ordinances. Chapter 90. ARTICLE II. DIVISION 2. Sec. 90-41). October. Federal Emergency Management Agency (FEMA). 2005. Flood Insurance Rate Maps for Collier County, Florida (Panel Numbers 12021C0240H and 12021C0430H). November. Florida Department of Environmental Protection (FDEP). 2021. Comprehensive Verified List. June. https://floridadep.gov/sites/default/files/Comprehensive-Verified-List_06212021.xlsx Florida Department of Transportation (FDOT). 2022. Drainage Design Guide. January. Jacobs Engineering Group Inc. (Jacobs). 2019. Final Pond Siting Report, Immokalee Road (CR 846) at Randall Boulevard Intersection. May. Jacobs Engineering Group Inc. (Jacobs). 2021. Drainage & Permitting Technical Memorandum, Vanderbilt Beach Road Extension from Collier Boulevard to 16th Street. June. South Florida Water Management District (SFWMD). 2010. Canals in South Florida: A Technical Support Document. April. https://www.sfwmd.gov/sites/default/files/documents/canalssfl_appendixa-c.pdf South Florida Water Management District (SFWMD). 2016. ENVIRONMENTAL RESOURCE PERMIT APPLICANT’S HANDBOOK. May 22. South Florida Water Management District (SFWMD). 2018. Map: Works of the Big Cypress Basin. April. https://www.sfwmd.gov/sites/default/files/documents/map_works_of_the_bcb.pdf United States Department of Agriculture Natural Resources Conservation Service (NRCS). 1986. Urban Hydrology for Small Watersheds. Technical Release 55. June. Page 1829 of 4682 Attachment 1 Proposed Basin Divides and Potential Pond Sites Page 1830 of 4682 Source: Collier CountyIm mokalee Rd.Wilson Blvd. Wilson Blvd.Source: Colli er CountyGolden Gate Blvd. W.POT STA. 36+00.0040 45 50 55 60 65 70 75 80 85 90 95 PI STA. 96+39.00POT STA. 099+99.99100 105 110 115 120 125 130 135 140 145 PI STA. 149+19.00150 155 160 165 170 175 180 185 190 195 200 205 POT STA. 205+82.12SITE 1-1 POND SITE 1-2 POND 2-3 SITE POND SITE 3-1 POND SITE 3-3 POND SITE 4-2 POND SITE 4-1 POND SITE 5-2 POND 5-1 SITE POND SITE 6-3 POND SITE 6-2 POND 6-1 SITE POND 6-3 BASIN 1 BASIN 2 BASIN 3 BASIN 4 BASIN 5 BASIN 6 24TH AVE NWIMMOKALEE RD (CR 846)22ND AVE NW20TH AVE NW18TH AVE NWJUNG BLVD W16TH AVE NW14TH AVE NW12TH AVE NW10TH AVE NW1ST ST NW 2ND ST NE 1ST ST NW GOLDEN GATE BLVD2-1 SITE POND 2-2 SITE POND 2-4 SITE POND SITE 5-4 POND 5-2CYPRESS CANALCORKSCREW CANAL 3-2 SITE POND 5-3 SITE POND N0 100 500 Feet EL 14EL 14 EL 12 EL 10 EL 14 EL 12 EL 12 EL 14 EL 12 EL 14 EL 12 EL 14 EL 14EL 14 EL 16 EL 14 EL 12 EL 12 EL 12 EL 12 EL 14 EL 12 EL 12 2ND ST NE RECOMMENDED POND SITE POTENTIAL POND SITE BASIN (ROW) AREA LEGEND 100'-WIDE BUFFER TO PUBLIC WATER SUPPLY WELL 300'-WIDE BUFFER TO PUBLIC WATER SUPPLY WELL 2' LIDAR CONTOUR POTENTIAL EASEMENT EL 12 EL 12 EL 14 EL 14EL 12 EL 16 EL 12 EL 12 EL 12 EL 14 EL 12 EL 12 EL 8EL 8EL 8 8 EL 8 EL EL 8 EL 8 EL 8 EL 8 EL 8 EL 14 EL 14 EL 14 EL 12 EL 12 EL 14 EL 14 EL 14 EL 14 EL 12 12 EL 12 EL 14 EL EL 14 EL 14 EL 14 EL 14 EL 14 EL 12 EL 12 EL 10 EL 14EL 14 EL 14 EL 14 EL 14 EL 14 12 EL EL 14 EL 14 EL 12 EL 14 EL 12 EL 12 EL 14 12 EL 12 EL EL 14 EL 14 EL 14 EL 14 EL 14 EL 14 EL 14 EL 14 EL 12 EL 12 EL 14 EL 12 EL 14 EL 14 EL 14 EL 14 EL 14 EL 12 EL 12 EL 12 EL 12 EL 14 EL 12 EL 10 EL 12 GIS PROPERTY LINES Page 1831 of 4682 Attachment 2 Basin Calculations Page 1832 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:Basin Water Quality and Quantity Calculations MADE BY:AS 11/16/21 BASIN DESIGNATION:Basin 1-1 CHECKED BY:DL 11/17/21 From STA 37+00. To STA 66+30.2,930 LF Typical Section ROW 165 LF Water Quality 11.10 ac Treated Paved Area =5.68 ac Pond Site Area =5.48 ac 51% Total (ROW + Pond) Basin Area =16.58 ac A.1.0 " Over Total Basin Area =1.38 Ac-Ft B.2.5 " Over Treated Paved Area =1.18 Ac-Ft 1.38 Ac-Ft C.50%Additional Treatment Volume for Impaired Waterbody 2.07 Ac-Ft D.0.5 0.69 Ac-Ft E.20%of Wet Detention Area =0.66 ac F.2.5%of Wet Detention and Drainage Basin Areas =0.41 ac Water Quantity SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 102, Boca fine sand-Urban A/D 49 3.99 195.3 128, Pineda fine sand, limestone C/D 79 1.33 104.9 102, Boca fine sand-Urban A/D 25 3.03 75.7 128, Pineda fine sand, limestone C/D 70 1.01 70.6 102 and 105 A/D and C/D 48 4.48 212.8 100 1.00 100.0 98 1.75 171.4 TOTALS 16.58 930.7 56.1 SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 102, Boca fine sand-Urban A/D 39 4.06 158.5 128, Pineda fine sand, limestone C/D 74 1.35 100.2 A/D and C/D 57 2.16 122.0 100 3.32 332.0 98 5.68 556.7 TOTALS 16.58 1269.4 COMPOSITE CN 76.6 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S -------------------------------->S = ( 1000 / CN ) - 10 (inches) 2) DETERMINE RUNOFF - R -------------------------------->R = ( P - 0.2*S)^2 / ( P + 0.8*S ) (inches) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R) -------------------------------->V(R) = ( R / 12)*BASIN AREA (acres-feet) P S R V(R) (in) (in) (in) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE)5.10 7.81 1.10 1.52 FDOT Storm Drain 3 yr / 24 hr (POST)5.10 3.06 2.67 3.69 2.16 SFWMD Open Basin 25 yr / 72 hr (PRE)10.50 7.81 4.77 6.59 SFWMD Open Basin 25 yr / 72 hr (POST)10.50 3.06 7.55 10.43 3.84 0.69 5.23 Min Littoral Shelf Area = Impervious (Paved parking, roads, etc.) PRE-DEVELOPED CONDITION Open Spaces (Good Condition) BASIN RUNOFF CURVE NUMBER WORKSHEET Wood or Forest Land (Good Cover) Wood or Forest Land (Good Cover) Open Spaces (Fair Condition) Open Spaces (Fair Condition) Dry Detention or Retention Pre-Treatment Volume (ac-ft) " Required Dry Detention or Retention Pre-Treatment as part of Required Treatment Volume Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3 yr / 24 hr Attenuation Volume (ac-ft) Agency Design Storm Frequency Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) Open Spaces (Good Condition) Basin LengthBasin Location and Size COMPOSITE CN Open Spaces (Good Condition, Pond Site) Impervious (Open Water, Pond Site) Pond Site Area Wetlands Typical Section ROW x Basin Length = Basin ROW Area =Paved Area ÷ Basin (ROW Area) = Percent Impervious = Impervious (Paved parking, roads, etc.) POST-DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET Pond Site Area Wood or Forest Land Page 1833 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:Basin Water Quality and Quantity Calculations MADE BY:AS 11/16/21 BASIN DESIGNATION:Basin 1-2 CHECKED BY:DL 11/17/21 From STA 37+00. To STA 66+30.2,930 LF Typical Section ROW 165 LF Water Quality 11.10 ac Treated Paved Area =5.68 ac Pond Site Area =4.37 ac 51% Total (ROW + Pond) Basin Area =15.47 ac A.1.0 " Over Total Basin Area =1.29 Ac-Ft B.2.5 " Over Treated Paved Area =1.18 Ac-Ft 1.29 Ac-Ft C.50%Additional Treatment Volume for Impaired Waterbody 1.93 Ac-Ft D.0.5 0.64 Ac-Ft E.20%of Wet Detention Area =0.47 ac F.2.5%of Wet Detention and Drainage Basin Areas =0.39 ac Water Quantity SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 102, Boca fine sand-Urban A/D 49 3.99 195.3 128, Pineda fine sand, limestone C/D 79 1.33 104.9 102, Boca fine sand-Urban A/D 25 3.03 75.7 128, Pineda fine sand, limestone C/D 70 1.01 70.6 102, Boca fine sand-Urban A/D 25 4.37 109.3 98 1.75 171.4 TOTALS 15.47 727.2 47.0 SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 102, Boca fine sand-Urban A/D 39 4.06 158.5 128, Pineda fine sand, limestone C/D 74 1.35 100.2 102, Boca fine sand-Urban A/D 39 2.02 78.8 100 2.35 235.0 98 5.68 556.7 TOTALS 15.47 1129.2 COMPOSITE CN 73.0 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S -------------------------------->S = ( 1000 / CN ) - 10 (inches) 2) DETERMINE RUNOFF - R -------------------------------->R = ( P - 0.2*S)^2 / ( P + 0.8*S )(inches) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R) -------------------------------->V(R) = ( R / 12)*BASIN AREA (acres-feet) Agency Design Storm Frequency P S R V(R) (in) (in) (in) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE)5.10 11.27 0.57 0.74 FDOT Storm Drain 3 yr / 24 hr (POST)5.10 3.70 2.36 3.04 2.30 SFWMD Open Basin 25 yr / 72 hr (PRE)10.50 11.27 3.48 4.49 SFWMD Open Basin 25 yr / 72 hr (POST)10.50 3.70 7.08 9.12 4.63 0.64 5.92 Min Littoral Shelf Area = Dry Detention or Retention Treatment Volume (ac-ft) " Required Dry Detention or Retention Pre-Treatment as part of Required Treatment Volume Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) Open Spaces (Good Condition) Wood or Forest Land (Good Cover) Impervious (Open Water, Pond Site) Impervious (Paved parking, roads, etc.) PRE-DEVELOPED CONDITION Required 25 yr / 72 hr Attenuation Volume (ac-ft) Impervious (Paved parking, roads, etc.) POST-DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET Pond Site Area Wood or Forest Land BASIN RUNOFF CURVE NUMBER WORKSHEET Typical Section ROW x Basin Length = Basin ROW Area = 3 yr / 24 hr Attenuation Volume (ac-ft) Paved Area ÷ Basin (ROW Area) = Percent Impervious = Open Spaces (Good Condition, Pond Site) Basin LengthBasin Location and Size COMPOSITE CN Open Spaces (Good Condition) Wood or Forest Land (Good Cover) Open Spaces (Fair Condition) Open Spaces (Fair Condition) Page 1834 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:Basin Water Quality and Quantity Calculations MADE BY:AS 11/16/21 BASIN DESIGNATION:Basin 2-1 CHECKED BY:DL 11/17/21 From STA 66+30. To STA 96+10.2,980 LF Typical Section ROW 165 LF Water Quality 11.29 ac Treated Paved Area =5.37 ac Pond Site Area =3.19 ac 48% Total (ROW + Pond) Basin Area =14.48 ac A.1.0 " Over Total Basin Area =1.21 Ac-Ft B.2.5 " Over Treated Paved Area =1.12 Ac-Ft 1.21 Ac-Ft C.50%Additional Treatment Volume for Impaired Waterbody 1.81 Ac-Ft D.0.5 0.60 Ac-Ft E.20%of Wet Detention Area =0.22 ac F.2.5%of Wet Detention and Drainage Basin Areas =0.36 ac Water Quantity SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 102, Boca fine sand-Urban A/D 49 4.05 198.6 110, Hallandale fine sand B/D 69 1.35 93.2 102, Boca fine sand-Urban A/D 25 3.08 77.0 110, Hallandale fine sand B/D 55 1.03 56.4 102 and 110 A/D, B/D 40 3.19 127.6 98 1.78 174.3 TOTALS 14.48 727.2 50.2 SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 102, Boca fine sand-Urban A/D 39 4.44 173.1 110, Hallandale fine sand B/D 61 1.48 90.2 102 and 110 A/D, B/D 50 2.09 104.3 100 1.11 110.5 98 5.37 526.3 TOTALS 14.48 1004.4 COMPOSITE CN 69.4 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S -------------------------------->S = ( 1000 / CN ) - 10 (inches) 2) DETERMINE RUNOFF - R -------------------------------->R = ( P - 0.2*S)^2 / ( P + 0.8*S ) (inches) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R) -------------------------------->V(R) = ( R / 12)*BASIN AREA (acres-feet) Agency Design Storm Frequency P S R V(R) (in) (in) (in) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE)5.10 9.91 0.75 0.90 FDOT Storm Drain 3 yr / 24 hr (POST)5.10 4.41 2.06 2.49 1.59 SFWMD Open Basin 25 yr / 72 hr (PRE)10.50 9.91 3.94 4.75 SFWMD Open Basin 25 yr / 72 hr (POST)10.50 4.41 6.59 7.95 3.20 0.60 4.41 Paved Area ÷ Basin (ROW Area) = Percent Impervious = Min Littoral Shelf Area = Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3 yr / 24 hr Attenuation Volume (ac-ft) Impervious (Paved parking, roads, etc.) POST-DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET Dry Detention or Retention Treatment Volume (ac-ft) " Required Dry Detention or Retention Pre-Treatment as part of Required Treatment Volume Pond Site Area Wood or Forest Land Open Spaces (Good Condition, Pond Site) Impervious (Open Water, Pond Site) Wood or Forest Land (Good Cover) Open Spaces (Fair Condition) Open Spaces (Fair Condition) Typical Section ROW x Basin Length = Basin ROW Area = Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) Open Spaces (Good Condition) Basin LengthBasin Location and Size COMPOSITE CN Impervious (Paved parking, roads, etc.) PRE-DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET Wood or Forest Land (Good Cover) Open Spaces (Good Condition) Page 1835 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:Basin Water Quality and Quantity Calculations MADE BY:AS 11/16/21 BASIN DESIGNATION:Basin 2-2 CHECKED BY:DL 11/17/21 From STA 66+30. To STA 96+10.2,980 LF Typical Section ROW 165 LF Water Quality 11.29 ac Treated Paved Area =5.37 ac Pond Site Area =3.09 ac 48% Total (ROW + Pond) Basin Area =14.38 ac A.1.0 " Over Total Basin Area =1.20 Ac-Ft B.2.5 " Over Treated Paved Area =1.12 Ac-Ft 1.20 Ac-Ft C.50%Additional Treatment Volume for Impaired Waterbody 1.80 Ac-Ft D.0.5 0.60 Ac-Ft E.20%of Wet Detention Area =0.20 ac F.2.5%of Wet Detention and Drainage Basin Areas =0.36 ac Water Quantity SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 102, Boca fine sand-Urban A/D 49 4.05 198.6 110, Hallandale fine sand B/D 69 1.35 93.2 102, Boca fine sand-Urban A/D 25 3.08 77.0 110, Hallandale fine sand B/D 55 1.03 56.4 102 and 110 A/D, B/D 40 3.09 123.6 98 1.78 174.3 TOTALS 14.38 723.2 50.3 SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 102, Boca fine sand-Urban A/D 39 4.44 173.1 110, Hallandale fine sand B/D 61 1.48 90.2 102 and 110 A/D, B/D 50 2.09 104.5 100 1.00 100.0 98 5.37 526.3 TOTALS 14.38 994.1 COMPOSITE CN 69.1 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S -------------------------------->S = ( 1000 / CN ) - 10 (inches) 2) DETERMINE RUNOFF - R -------------------------------->R = ( P - 0.2*S)^2 / ( P + 0.8*S ) (inches) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R) -------------------------------->V(R) = ( R / 12)*BASIN AREA (acres-feet) Agency Design Storm Frequency P S R V(R) (in) (in) (in) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE)5.10 9.88 0.75 0.90 FDOT Storm Drain 3 yr / 24 hr (POST)5.10 4.46 2.04 2.45 1.55 SFWMD Open Basin 25 yr / 72 hr (PRE)10.50 9.88 3.95 4.73 SFWMD Open Basin 25 yr / 72 hr (POST)10.50 4.46 6.56 7.86 3.13 0.60 4.33 Paved Area ÷ Basin (ROW Area) = Percent Impervious = Min Littoral Shelf Area = Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3 yr / 24 hr Attenuation Volume (ac-ft) Impervious (Paved parking, roads, etc.) POST-DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET Dry Detention or Retention Treatment Volume (ac-ft) " Required Dry Detention or Retention Pre-Treatment as part of Required Treatment Volume Pond Site Area Wood or Forest Land Open Spaces (Good Condition, Pond Site) Impervious (Open Water, Pond Site) Wood or Forest Land (Good Cover) Open Spaces (Fair Condition) Open Spaces (Fair Condition) Typical Section ROW x Basin Length = Basin ROW Area = Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) Open Spaces (Good Condition) Basin LengthBasin Location and Size COMPOSITE CN Impervious (Paved parking, roads, etc.) PRE-DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET Wood or Forest Land (Good Cover) Open Spaces (Good Condition) Page 1836 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:Basin Water Quality and Quantity Calculations MADE BY:AS 11/16/21 BASIN DESIGNATION:Basin 2-3 CHECKED BY:DL 11/17/21 From STA 66+30. To STA 96+10.2,980 LF Typical Section ROW 165 LF Water Quality 11.29 ac Treated Paved Area =5.37 ac Pond Site Area =3.76 ac 48% Total (ROW + Pond) Basin Area =15.05 ac A.1.0 " Over Total Basin Area =1.25 Ac-Ft B.2.5 " Over Treated Paved Area =1.12 Ac-Ft 1.25 Ac-Ft C.50%Additional Treatment Volume for Impaired Waterbody 1.88 Ac-Ft D.0.5 0.63 Ac-Ft E.20%of Wet Detention Area =0.19 ac F.2.5%of Wet Detention and Drainage Basin Areas =0.38 ac Water Quantity SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 102, Boca fine sand-Urban A/D 49 4.05 198.6 110, Hallandale fine sand B/D 69 1.35 93.2 102, Boca fine sand-Urban A/D 25 3.08 77.0 110, Hallandale fine sand B/D 55 1.03 56.4 102 and 131 A/D and B/D 40 3.76 150.4 98 1.78 174.3 TOTALS 15.05 750.0 49.8 SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 102, Boca fine sand-Urban A/D 39 4.44 173.1 110, Hallandale fine sand B/D 61 1.48 90.2 102 and 131 A/D and B/D 50 2.79 139.5 100 0.97 97.0 98 5.37 526.3 TOTALS 15.05 1026.1 COMPOSITE CN 68.2 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S -------------------------------->S = ( 1000 / CN ) - 10 (inches) 2) DETERMINE RUNOFF - R -------------------------------->R = ( P - 0.2*S)^2 / ( P + 0.8*S )(inches) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R) -------------------------------->V(R) = ( R / 12)*BASIN AREA (acres-feet) Agency Design Storm Frequency P S R V(R) (in) (in) (in) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE)5.10 10.06 0.72 0.91 FDOT Storm Drain 3 yr / 24 hr (POST)5.10 4.66 1.97 2.47 1.56 SFWMD Open Basin 25 yr / 72 hr (PRE)10.50 10.06 3.88 4.87 SFWMD Open Basin 25 yr / 72 hr (POST)10.50 4.66 6.43 8.06 3.20 0.63 4.45 Dry Detention or Retention Treatment Volume (ac-ft) " Required Dry Detention or Retention Pre-Treatment as part of Required Treatment Volume Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) Open Spaces (Good Condition) Basin LengthBasin Location and Size COMPOSITE CN Impervious (Paved parking, roads, etc.) PRE-DEVELOPED CONDITION Impervious (Open Water, Pond Site) Wood or Forest Land (Good Cover) Open Spaces (Fair Condition) Open Spaces (Fair Condition) BASIN RUNOFF CURVE NUMBER WORKSHEET Wood or Forest Land (Good Cover) Open Spaces (Good Condition) Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3 yr / 24 hr Attenuation Volume (ac-ft) Typical Section ROW x Basin Length = Basin ROW Area =Paved Area ÷ Basin (ROW Area) = Percent Impervious = Min Littoral Shelf Area = Impervious (Paved parking, roads, etc.) POST-DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET Pond Site Area Wood or Forest Land Open Spaces (Good Condition, Pond Site) Page 1837 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:Basin Water Quality and Quantity Calculations MADE BY:AS 11/16/21 BASIN DESIGNATION:Basin 2-4 CHECKED BY:DL 11/17/21 From STA 66+30. To STA 96+10.2,980 LF Typical Section ROW 165 LF Water Quality 11.29 ac Treated Paved Area =5.37 ac Pond Site Area =4.00 ac 48% Total (ROW + Pond) Basin Area =15.29 ac A.1.0 " Over Total Basin Area =1.27 Ac-Ft B.2.5 " Over Treated Paved Area =1.12 Ac-Ft 1.27 Ac-Ft C.50%Additional Treatment Volume for Impaired Waterbody 1.91 Ac-Ft D.0.5 0.64 Ac-Ft E.20%of Wet Detention Area =0.35 ac F.2.5%of Wet Detention and Drainage Basin Areas =0.38 ac Water Quantity SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 102, Boca fine sand-Urban A/D 49 4.05 198.6 110, Hallandale fine sand B/D 69 1.35 93.2 102, Boca fine sand-Urban A/D 25 3.08 77.0 110, Hallandale fine sand B/D 55 1.03 56.4 102, Boca fine sand-Urban A/D 25 4.00 100.0 98 1.78 174.3 TOTALS 15.29 699.6 45.8 SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 102, Boca fine sand-Urban A/D 39 4.44 173.1 110, Hallandale fine sand B/D 61 1.48 90.2 102, Boca fine sand-Urban A/D 39 2.23 87.0 100 1.77 177.0 98 5.37 526.3 TOTALS 15.29 1053.6 COMPOSITE CN 68.9 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S -------------------------------->S = ( 1000 / CN ) - 10 (inches) 2) DETERMINE RUNOFF - R -------------------------------->R = ( P - 0.2*S)^2 / ( P + 0.8*S )(inches) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R) -------------------------------->V(R) = ( R / 12)*BASIN AREA (acres-feet) Agency Design Storm Frequency P S R V(R) (in) (in) (in) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE)5.10 11.85 0.51 0.65 FDOT Storm Drain 3 yr / 24 hr (POST)5.10 4.51 2.02 2.58 1.93 SFWMD Open Basin 25 yr / 72 hr (PRE)10.50 11.85 3.31 4.21 SFWMD Open Basin 25 yr / 72 hr (POST)10.50 4.51 6.53 8.32 4.11 0.64 5.38 Impervious (Open Water, Pond Site) Impervious (Paved parking, roads, etc.) POST-DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET Pond Site Area Wood or Forest Land Open Spaces (Good Condition, Pond Site) Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) Open Spaces (Good Condition) Basin LengthBasin Location and Size COMPOSITE CN Impervious (Paved parking, roads, etc.) PRE-DEVELOPED CONDITION Open Spaces (Good Condition) Wood or Forest Land (Good Cover) Open Spaces (Fair Condition) Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3 yr / 24 hr Attenuation Volume (ac-ft) Typical Section ROW x Basin Length = Basin ROW Area =Paved Area ÷ Basin (ROW Area) = Percent Impervious = Min Littoral Shelf Area = Dry Detention or Retention Treatment Volume (ac-ft) " Required Dry Detention or Retention Pre-Treatment as part of Required Treatment Volume Open Spaces (Fair Condition) BASIN RUNOFF CURVE NUMBER WORKSHEET Wood or Forest Land (Good Cover) Page 1838 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:Basin Water Quality and Quantity Calculations MADE BY:AS 11/16/21 BASIN DESIGNATION:Basin 3-1 CHECKED BY:DL 11/17/21 From STA 96+10. To STA 129+30.3,320 LF Typical Section ROW 165 LF Water Quality 12.58 ac Treated Paved Area =6.98 ac Pond Site Area =3.45 ac 56% Total (ROW + Pond) Basin Area =16.03 ac A.1.0 " Over Total Basin Area =1.34 Ac-Ft B.2.5 " Over Treated Paved Area =1.45 Ac-Ft 1.45 Ac-Ft C.50%Additional Treatment Volume for Impaired Waterbody 2.18 Ac-Ft D.0.5 0.67 Ac-Ft E.20%of Wet Detention Area =0.24 ac F.2.5%of Wet Detention and Drainage Basin Areas =0.40 ac Water Quantity SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 102, Boca fine sand-Urban A/D 49 2.41 118.0 110 and 131, Hallandale and Riviera fine sand B/D 69 3.61 249.3 102, Boca fine sand-Urban A/D 25 1.83 45.7 110 and 131, Hallandale and Riviera fine sand B/D 55 2.74 150.9 102, Boca fine sand-Urban A/D 25 3.45 86.3 98 1.98 194.2 TOTALS 16.03 844.4 52.7 SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 102, Boca fine sand-Urban A/D 39 2.24 87.2 110, Hallandale fine sand B/D 61 3.36 204.7 102, Boca fine sand-Urban A/D 39 2.25 87.8 100 1.20 120.0 98 6.98 684.3 TOTALS 16.03 1184.0 COMPOSITE CN 73.9 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S -------------------------------->S = ( 1000 / CN ) - 10 (inches) 2) DETERMINE RUNOFF - R -------------------------------->R = ( P - 0.2*S)^2 / ( P + 0.8*S )(inches) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R) -------------------------------->V(R) = ( R / 12)*BASIN AREA (acres-feet) Agency Design Storm Frequency P S R V(R) (in) (in) (in) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE)5.10 8.98 0.89 1.19 FDOT Storm Drain 3 yr / 24 hr (POST)5.10 3.54 2.43 3.25 2.06 SFWMD Open Basin 25 yr / 72 hr (PRE)10.50 8.98 4.28 5.72 SFWMD Open Basin 25 yr / 72 hr (POST)10.50 3.54 7.20 9.61 3.89 0.67 5.40 Typical Section ROW x Basin Length = Basin ROW Area =Paved Area ÷ Basin (ROW Area) = Percent Impervious = Min Littoral Shelf Area = 3 yr / 24 hr Attenuation Volume (ac-ft) Required 25 yr / 72 hr Attenuation Volume (ac-ft) Impervious (Paved parking, roads, etc.) POST-DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET Pond Site Area Wood or Forest Land Open Spaces (Good Condition, Pond Site) Impervious (Open Water, Pond Site) Wood or Forest Land (Good Cover) Open Spaces (Fair Condition) Open Spaces (Fair Condition) BASIN RUNOFF CURVE NUMBER WORKSHEET Wood or Forest Land (Good Cover) Open Spaces (Good Condition) Dry Detention or Retention Treatment Volume (ac-ft) " Required Dry Detention or Retention Pre-Treatment as part of Required Treatment Volume Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) Open Spaces (Good Condition) Basin LengthBasin Location and Size COMPOSITE CN Impervious (Paved parking, roads, etc.) PRE-DEVELOPED CONDITION Page 1839 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:Basin Water Quality and Quantity Calculations MADE BY:AS 11/16/21 BASIN DESIGNATION:Basin 3-2 CHECKED BY:DL 11/17/21 From STA 96+10. To STA 129+30.3,320 LF Typical Section ROW 165 LF Water Quality 12.58 ac Treated Paved Area =6.98 ac Pond Site Area =2.96 ac 56% Total (ROW + Pond) Basin Area =15.53 ac A.1.0 " Over Total Basin Area =1.29 Ac-Ft B.2.5 " Over Treated Paved Area =1.45 Ac-Ft 1.45 Ac-Ft C.50%Additional Treatment Volume for Impaired Waterbody 2.18 Ac-Ft D.0.5 0.65 Ac-Ft E.20%of Wet Detention Area =0.20 ac F.2.5%of Wet Detention and Drainage Basin Areas =0.39 ac Water Quantity SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 102, Boca fine sand-Urban A/D 49 2.41 118.0 110 and 131, Hallandale and Riviera fine sand B/D 69 3.61 249.3 102, Boca fine sand-Urban A/D 25 1.83 45.7 110 and 131, Hallandale and Riviera fine sand B/D 55 2.74 150.9 110 , Hallandale fine sand B/D 55 2.96 162.7 98 1.98 194.2 TOTALS 15.53 920.8 59.3 SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 102, Boca fine sand-Urban A/D 39 2.24 87.2 110 and 131, Hallandale and Riviera fine sand B/D 61 3.36 204.7 110, Hallandale fine sand B/D 61 1.95 119.1 100 1.01 100.6 98 6.98 684.3 TOTALS 15.53 1195.9 COMPOSITE CN 77.0 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S -------------------------------->S = ( 1000 / CN ) - 10 (inches) 2) DETERMINE RUNOFF - R -------------------------------->R = ( P - 0.2*S)^2 / ( P + 0.8*S )(inches) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R) -------------------------------->V(R) = ( R / 12)*BASIN AREA (acres-feet) Agency Design Storm Frequency P S R V(R) (in) (in) (in) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE)5.10 6.87 1.31 1.70 FDOT Storm Drain 3 yr / 24 hr (POST)5.10 2.99 2.71 3.50 1.81 SFWMD Open Basin 25 yr / 72 hr (PRE)10.50 6.87 5.21 6.74 SFWMD Open Basin 25 yr / 72 hr (POST)10.50 2.99 7.61 9.85 3.11 0.65 4.64 Typical Section ROW x Basin Length = Basin ROW Area =Paved Area ÷ Basin (ROW Area) = Percent Impervious = Min Littoral Shelf Area = 3 yr / 24 hr Attenuation Volume (ac-ft) Required 25 yr / 72 hr Attenuation Volume (ac-ft) Dry Detention or Retention Treatment Volume (ac-ft) " Required Dry Detention or Retention Pre-Treatment as part of Required Treatment Volume Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) Open Spaces (Good Condition) Basin LengthBasin Location and Size COMPOSITE CN Impervious (Paved parking, roads, etc.) PRE-DEVELOPED CONDITION Open Spaces (Good Condition, Pond Site) Impervious (Open Water, Pond Site) Wood or Forest Land (Good Cover) Open Spaces (Fair Condition) Open Spaces (Fair Condition) BASIN RUNOFF CURVE NUMBER WORKSHEET Wood or Forest Land (Good Cover) Open Spaces (Good Condition) Impervious (Paved parking, roads, etc.) POST-DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET Pond Site Area Wood or Forest Land Page 1840 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:Basin Water Quality and Quantity Calculations MADE BY:AS 11/16/21 BASIN DESIGNATION:Basin 3-3 CHECKED BY:DL 11/17/21 From STA 96+10. To STA 129+30.3,320 LF Typical Section ROW 165 LF Water Quality 12.58 ac Treated Paved Area =6.98 ac Pond Site Area =3.48 ac 56% Total (ROW + Pond) Basin Area =16.05 ac A.1.0 " Over Total Basin Area =1.34 Ac-Ft B.2.5 " Over Treated Paved Area =1.45 Ac-Ft 1.45 Ac-Ft C.50%Additional Treatment Volume for Impaired Waterbody 2.18 Ac-Ft D.0.5 0.67 Ac-Ft E.20%of Wet Detention Area =0.25 ac F.2.5%of Wet Detention and Drainage Basin Areas =0.40 ac Water Quantity SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 102, Boca fine sand-Urban A/D 49 2.41 118.0 110 and 131, Hallandale and Riviera fine sand B/D 69 3.61 249.3 102, Boca fine sand-Urban A/D 25 1.83 45.7 110 and 131, Hallandale and Riviera fine sand B/D 55 2.74 150.9 131 and 128 B/D and C/D 63 3.48 217.2 98 1.98 194.2 TOTALS 16.05 975.3 60.8 SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 102, Boca fine sand-Urban A/D 39 2.24 87.2 110, Hallandale fine sand B/D 61 3.36 204.7 131 and 128 B/D and C/D 68 2.21 149.3 100 1.26 126.3 98 6.98 684.3 TOTALS 16.05 1251.9 COMPOSITE CN 78.0 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S -------------------------------->S = ( 1000 / CN ) - 10 (inches) 2) DETERMINE RUNOFF - R -------------------------------->R = ( P - 0.2*S)^2 / ( P + 0.8*S ) (inches) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R) -------------------------------->V(R) = ( R / 12)*BASIN AREA (acres-feet) Agency Design Storm Frequency P S R V(R) (in) (in) (in) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE)5.10 6.46 1.41 1.89 FDOT Storm Drain 3 yr / 24 hr (POST)5.10 2.82 2.80 3.74 1.85 SFWMD Open Basin 25 yr / 72 hr (PRE)10.50 6.46 5.41 7.24 SFWMD Open Basin 25 yr / 72 hr (POST)10.50 2.82 7.74 10.35 3.11 0.67 4.62 3 yr / 24 hr Attenuation Volume (ac-ft) Required 25 yr / 72 hr Attenuation Volume (ac-ft) Dry Detention or Retention Treatment Volume (ac-ft) " Required Dry Detention or Retention Pre-Treatment as part of Required Treatment Volume Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) Open Spaces (Good Condition) Wood or Forest Land (Good Cover) Impervious (Open Water, Pond Site) Impervious (Paved parking, roads, etc.) PRE-DEVELOPED CONDITION Min Littoral Shelf Area = Impervious (Paved parking, roads, etc.) POST-DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET Pond Site Area Wood or Forest Land Typical Section ROW x Basin Length = Basin ROW Area =Paved Area ÷ Basin (ROW Area) = Percent Impervious = Open Spaces (Good Condition, Pond Site) Basin LengthBasin Location and Size COMPOSITE CN Open Spaces (Good Condition) Wood or Forest Land (Good Cover) Open Spaces (Fair Condition) Open Spaces (Fair Condition) BASIN RUNOFF CURVE NUMBER WORKSHEET Page 1841 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:Basin Water Quality and Quantity Calculations MADE BY:AS 11/16/21 BASIN DESIGNATION:Basin 4-1 CHECKED BY:DL 11/17/21 From STA 129+30. To STA 155+80.2,650 LF Typical Section ROW 165 LF Water Quality 10.04 Ac Treated Paved Area =5.98 ac Pond Site Area =4.20 ac 60% Total (ROW + Pond) Basin Area =14.24 ac A.1.0 " Over Total Basin Area =1.19 Ac-Ft B.2.5 " Over Treated Paved Area =1.24 Ac-Ft 1.24 Ac-Ft C.50%Additional Treatment Volume for Impaired Waterbody 1.87 Ac-Ft D.0.5 0.59 Ac-Ft E.20%of Wet Detention Area =0.25 ac F.2.5%of Wet Detention and Drainage Basin Areas =0.36 ac Water Quantity SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 113 and 125,Holopaw and Oldsmar fine sand A/D 49 2.64 129.5 131 Riviera fine sand B/D 69 2.16 149.2 113 and 125,Holopaw and Oldsmar fine sand A/D 25 2.01 50.2 131 Riviera fine sand B/D 55 1.64 90.3 131 Riviera fine sand B/D 55 4.20 230.9 98 1.58 155.0 TOTALS 14.24 805.2 56.6 SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 113 and 125,Holopaw and Oldsmar fine sand A/D 39 2.23 87.1 131 Riviera fine sand B/D 61 1.83 111.5 131 Riviera fine sand B/D 61 2.93 178.5 100 1.27 127.2 98 5.98 585.6 TOTALS 14.24 1089.9 COMPOSITE CN 76.6 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S -------------------------------->S = ( 1000 / CN ) - 10 (inches) 2) DETERMINE RUNOFF - R -------------------------------->R = ( P - 0.2*S)^2 / ( P + 0.8*S )(inches) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R) -------------------------------->V(R) = ( R / 12)*BASIN AREA (acres-feet) Agency Design Storm Frequency P S R V(R) (in) (in) (in) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE)5.10 7.68 1.13 1.34 FDOT Storm Drain 3 yr / 24 hr (POST)5.10 3.06 2.67 3.16 1.82 SFWMD Open Basin 25 yr / 72 hr (PRE)10.50 7.68 4.83 5.73 SFWMD Open Basin 25 yr / 72 hr (POST)10.50 3.06 7.55 8.96 3.23 0.59 4.50 Min Littoral Shelf Area = Impervious (Paved parking, roads, etc.) Pond Site Area Wood or Forest Land Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3 yr / 24 hr Attenuation Volume (ac-ft) Open Spaces (Good Condition) Wood or Forest Land (Good Cover) Open Spaces (Fair Condition) Open Spaces (Fair Condition) Basin LengthBasin Location and Size COMPOSITE CN Dry Detention or Retention Treatment Volume (ac-ft) " Required Dry Detention or Retention Pre-Treatment as part of Required Treatment Volume BASIN RUNOFF CURVE NUMBER WORKSHEET Typical Section ROW x Basin Length = Basin ROW Area =Paved Area ÷ Basin (ROW Area) = Percent Impervious = Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) Open Spaces (Good Condition) Wood or Forest Land (Good Cover) Impervious (Open Water, Pond Site) Impervious (Paved parking, roads, etc.) PRE-DEVELOPED CONDITION Open Spaces (Good Condition, Pond Site) POST-DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET Page 1842 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:Basin Water Quality and Quantity Calculations MADE BY:AS 11/16/21 BASIN DESIGNATION:Basin 4-2 CHECKED BY:DL 11/17/21 From STA 129+30. To STA 155+80.2,650 LF Typical Section ROW 165 LF Water Quality 10.04 ac Treated Paved Area =5.98 ac Pond Site Area =3.27 ac 60% Total (ROW + Pond) Basin Area =13.31 ac A.1.0 " Over Total Basin Area =1.11 Ac-Ft B.2.5 " Over Treated Paved Area =1.24 Ac-Ft 1.24 Ac-Ft C.50%Additional Treatment Volume for Impaired Waterbody 1.87 Ac-Ft D.0.5 0.55 Ac-Ft E.20%of Wet Detention Area =0.22 ac F.2.5%of Wet Detention and Drainage Basin Areas =0.33 ac Water Quantity SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 113 and 125,Holopaw and Oldsmar fine sand A/D 49 2.64 129.5 131 Riviera fine sand B/D 69 2.16 149.2 113 and 125,Holopaw and Oldsmar fine sand A/D 25 2.01 50.2 131 Riviera fine sand B/D 55 1.64 90.3 102 Boca fine sand A/D 25 3.27 81.7 98 1.58 155.0 TOTALS 13.31 656.0 49.3 SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 113 and 125,Holopaw and Oldsmar fine sand A/D 39 2.23 87.1 131 Riviera fine sand B/D 61 1.83 111.5 102 Boca fine sand A/D 39 2.19 85.4 100 1.08 107.9 98 5.98 585.6 TOTALS 13.31 977.6 COMPOSITE CN 73.5 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S -------------------------------->S = ( 1000 / CN ) - 10 (inches) 2) DETERMINE RUNOFF - R -------------------------------->R = ( P - 0.2*S)^2 / ( P + 0.8*S )(inches) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R) -------------------------------->V(R) = ( R / 12)*BASIN AREA (acres-feet) Agency Design Storm Frequency P S R V(R) (in) (in) (in) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE)5.10 10.29 0.69 0.77 FDOT Storm Drain 3 yr / 24 hr (POST)5.10 3.61 2.40 2.66 1.89 SFWMD Open Basin 25 yr / 72 hr (PRE)10.50 10.29 3.81 4.22 SFWMD Open Basin 25 yr / 72 hr (POST)10.50 3.61 7.14 7.92 3.70 0.55 5.01 BASIN RUNOFF CURVE NUMBER WORKSHEET Wood or Forest Land (Good Cover) Open Spaces (Good Condition) Impervious (Paved parking, roads, etc.) POST-DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET Pond Site Area Wood or Forest Land Dry Detention or Retention Treatment Volume (ac-ft) " Required Dry Detention or Retention Pre-Treatment as part of Required Treatment Volume Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) Open Spaces (Good Condition) Basin LengthBasin Location and Size COMPOSITE CN Impervious (Paved parking, roads, etc.) PRE-DEVELOPED CONDITION Open Spaces (Good Condition, Pond Site) Typical Section ROW x Basin Length = Basin ROW Area =Paved Area ÷ Basin (ROW Area) = Percent Impervious = Min Littoral Shelf Area = Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3 yr / 24 hr Attenuation Volume (ac-ft) Impervious (Open Water, Pond Site) Wood or Forest Land (Good Cover) Open Spaces (Fair Condition) Open Spaces (Fair Condition) Page 1843 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:Basin Water Quality and Quantity Calculations MADE BY:AS 11/16/21 BASIN DESIGNATION:Basin 5-1 CHECKED BY:DL 11/17/21 From STA 155+80. To STA 182+20.2,640 LF Typical Section ROW 165 LF Water Quality 10.00 ac Treated Paved Area =5.56 ac Pond Site Area =5.22 ac 56% Total (ROW + Pond) Basin Area =15.22 ac A.1.0 " Over Total Basin Area =1.27 Ac-Ft B.2.5 " Over Treated Paved Area =1.16 Ac-Ft 1.27 Ac-Ft C.50%Additional Treatment Volume for Impaired Waterbody 1.90 Ac-Ft D.0.5 0.63 Ac-Ft E.20%of Wet Detention Area =0.45 ac F.2.5%of Wet Detention and Drainage Basin Areas =0.38 ac Water Quantity SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 113, Holopaw fine sand A/D 49 4.79 234.6 113, Holopaw fine sand A/D 25 3.64 90.9 117, Immokalee fine sand B/D 55 5.22 287.1 98 1.58 154.4 TOTALS 15.22 767.0 50.4 SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 113, Holopaw fine sand A/D 39 4.44 173.3 117, Immokalee fine sand B/D 61 2.99 182.6 100 2.23 222.6 98 5.56 544.6 TOTALS 15.22 1123.1 COMPOSITE CN 73.8 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S -------------------------------->S = ( 1000 / CN ) - 10 (inches) 2) DETERMINE RUNOFF - R -------------------------------->R = ( P - 0.2*S)^2 / ( P + 0.8*S ) (inches) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R) -------------------------------->V(R) = ( R / 12)*BASIN AREA (acres-feet) Agency Design Storm Frequency P S R V(R) (in) (in) (in) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE)5.10 9.84 0.76 0.96 FDOT Storm Drain 3 yr / 24 hr (POST)5.10 3.55 2.43 3.08 2.12 SFWMD Open Basin 25 yr / 72 hr (PRE)10.50 9.84 3.96 5.02 SFWMD Open Basin 25 yr / 72 hr (POST)10.50 3.55 7.18 9.11 4.09 0.63 5.36 Dry Detention or Retention Treatment Volume (ac-ft) " Required Dry Detention or Retention Pre-Treatment as part of Required Treatment Volume Min Littoral Shelf Area = Required 25 yr / 72 hr Attenuation Volume (ac-ft) Open Spaces (Good Condition, Pond Site) Impervious (Open Water, Pond Site) Open Spaces (Fair Condition) BASIN RUNOFF CURVE NUMBER WORKSHEET Paved Area ÷ Basin (ROW Area) = Percent Impervious = Impervious (Paved parking, roads, etc.) POST-DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET Pond Site Area Wood or Forest Land 3 yr / 24 hr Attenuation Volume (ac-ft) Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) Basin LengthBasin Location and Size COMPOSITE CN Impervious (Paved parking, roads, etc.) PRE-DEVELOPED CONDITION Open Spaces (Good Condition) Wood or Forest Land (Good Cover) Typical Section ROW x Basin Length = Basin ROW Area = Page 1844 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:Basin Water Quality and Quantity Calculations MADE BY:AS 11/16/21 BASIN DESIGNATION:Basin 5-2 CHECKED BY:DL 11/17/21 From STA 155+80. To STA 182+20.2,640 LF Typical Section ROW 165 LF Water Quality 10.0 ac Treated Paved Area =5.56 ac Pond Site Area =3.55 ac 56% Total (ROW + Pond) Basin Area =13.55 ac A.1.0 " Over Total Basin Area =1.13 Ac-Ft B.2.5 " Over Treated Paved Area =1.16 Ac-Ft 1.16 Ac-Ft C.50%Additional Treatment Volume for Impaired Waterbody 1.74 Ac-Ft D.0.5 0.56 Ac-Ft E.20%of Wet Detention Area =0.27 ac F.2.5%of Wet Detention and Drainage Basin Areas =0.34 ac Water Quantity SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 113, Holopaw fine sand A/D 49 4.79 234.6 113, Holopaw fine sand A/D 25 3.64 90.9 113, 125, 131, 120 A/D, B/D 30 3.55 106.4 98 1.58 154.4 TOTALS 13.55 586.3 43.3 SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 113, Holopaw fine sand A/D 39 4.44 173.3 113, 125, 131, 120 A/D, B/D 43 2.17 93.4 100 1.37 137.5 98 5.56 544.6 TOTALS 13.55 948.7 COMPOSITE CN 70.0 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S -------------------------------->S = ( 1000 / CN ) - 10 (inches) 2) DETERMINE RUNOFF - R -------------------------------->R = ( P - 0.2*S)^2 / ( P + 0.8*S ) (inches) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R) -------------------------------->V(R) = ( R / 12)*BASIN AREA (acres-feet) Agency Design Storm Frequency P S R V(R) (in)(in)(in)(ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE)5.10 13.10 0.39 0.45 FDOT Storm Drain 3 yr / 24 hr (POST)5.10 4.28 2.11 2.39 1.94 SFWMD Open Basin 25 yr / 72 hr (PRE)10.50 13.10 2.96 3.34 SFWMD Open Basin 25 yr / 72 hr (POST)10.50 4.28 6.68 7.54 4.20 0.56 5.37Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) COMPOSITE CN Impervious (Paved parking, roads, etc.) Dry Detention or Retention Treatment Volume (ac-ft) Typical Section ROW x Basin Length = Basin ROW Area =Paved Area ÷ Basin (ROW Area) = Percent Impervious = Min Littoral Shelf Area = Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3 yr / 24 hr Attenuation Volume (ac-ft) Open Spaces (Good Condition, Pond Site) Impervious (Open Water, Pond Site) BASIN RUNOFF CURVE NUMBER WORKSHEET Open Spaces (Good Condition) Wood or Forest Land (Good Cover) Open Spaces (Fair Condition) Impervious (Paved parking, roads, etc.) POST-DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET Pond Site Area Wood or Forest Land Basin LengthBasin Location and Size " Required Dry Detention or Retention Pre-Treatment as part of Required Treatment Volume PRE-DEVELOPED CONDITION Page 1845 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:Basin Water Quality and Quantity Calculations MADE BY:AS 11/16/21 BASIN DESIGNATION:Basin 5-3 CHECKED BY:DL 11/17/21 From STA 155+80. To STA 182+20.2,640 LF Typical Section ROW 165 LF Water Quality 10.00 ac Treated Paved Area =5.56 ac Pond Site Area =5.84 ac 56% Total (ROW + Pond) Basin Area =15.84 ac A.1.0 " Over Total Basin Area =1.32 Ac-Ft B.2.5 " Over Treated Paved Area =1.16 Ac-Ft 1.32 Ac-Ft C.50%Additional Treatment Volume for Impaired Waterbody 1.98 Ac-Ft D.0.5 0.66 Ac-Ft E.20%of Wet Detention Area =0.67 ac F.2.5%of Wet Detention and Drainage Basin Areas =0.40 ac Water Quantity SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 113, Holopaw fine sand A/D 49 4.79 234.6 113, Holopaw fine sand A/D 25 3.64 90.9 113, 120, 117 A/D and B/D 30 5.84 175.3 98 1.58 154.4 TOTALS 15.84 655.2 41.4 SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 113, Holopaw fine sand A/D 39 4.44 173.3 113, 120, 117 A/D and B/D 43 2.48 106.8 113, 120, 117 100 3.36 335.8 98 5.56 544.6 TOTALS 15.84 1160.5 COMPOSITE CN 73.3 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S -------------------------------->S = ( 1000 / CN ) - 10 (inches) 2) DETERMINE RUNOFF - R -------------------------------->R = ( P - 0.2*S)^2 / ( P + 0.8*S ) (inches) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R) -------------------------------->V(R) = ( R / 12)*BASIN AREA (acres-feet) Agency Design Storm Frequency P S R V(R) (in)(in)(in)(ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE)5.10 14.18 0.31 0.41 FDOT Storm Drain 3 yr / 24 hr (POST)5.10 3.65 2.38 3.14 2.73 SFWMD Open Basin 25 yr / 72 hr (PRE)10.50 14.18 2.69 3.55 SFWMD Open Basin 25 yr / 72 hr (POST)10.50 3.65 7.11 9.39 5.84 0.66 7.16 Impervious (Paved parking, roads, etc.) POST-DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET Pond Site Area Wood or Forest Land Basin LengthBasin Location and Size Dry Detention or Retention Treatment Volume (ac-ft) " Required Dry Detention or Retention Pre-Treatment as part of Required Treatment Volume Open Spaces (Good Condition) Wood or Forest Land (Good Cover) Open Spaces (Fair Condition) Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) COMPOSITE CN Impervious (Paved parking, roads, etc.) PRE-DEVELOPED CONDITION Open Spaces (Good Condition, Pond Site) Impervious (Open Water, Pond Site) BASIN RUNOFF CURVE NUMBER WORKSHEET Typical Section ROW x Basin Length = Basin ROW Area =Paved Area ÷ Basin (ROW Area) = Percent Impervious = Min Littoral Shelf Area = Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3 yr / 24 hr Attenuation Volume (ac-ft) Page 1846 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:Basin Water Quality and Quantity Calculations MADE BY:AS 11/16/21 BASIN DESIGNATION:Basin 5-4 CHECKED BY:DL 11/17/21 From STA 155+80. To STA 182+20.2,640 LF Typical Section ROW 165 LF Water Quality 10.00 ac Treated Paved Area =5.56 ac Pond Site Area =5.39 ac 56% Total (ROW + Pond) Basin Area =15.39 ac A.1.0 " Over Total Basin Area =1.28 Ac-Ft B.2.5 " Over Treated Paved Area =1.16 Ac-Ft 1.28 Ac-Ft C.50%Additional Treatment Volume for Impaired Waterbody 1.92 Ac-Ft D.0.5 0.64 Ac-Ft E.20%of Wet Detention Area =0.64 ac F.2.5%of Wet Detention and Drainage Basin Areas =0.38 ac Water Quantity SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 113, Holopaw fine sand A/D 49 4.79 234.6 113, Holopaw fine sand A/D 25 3.64 90.9 113 and 125 A/D 25 5.39 134.7 98 1.58 154.4 TOTALS 15.39 614.6 39.9 SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 113, Holopaw fine sand A/D 39 4.44 173.3 113, 120, 117 A/D 39 2.21 86.3 100 3.18 317.5 98 5.56 544.6 TOTALS 15.39 1121.7 COMPOSITE CN 72.9 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S -------------------------------->S = ( 1000 / CN ) - 10 (inches) 2) DETERMINE RUNOFF - R -------------------------------->R = ( P - 0.2*S)^2 / ( P + 0.8*S ) (inches) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R) -------------------------------->V(R) = ( R / 12)*BASIN AREA (acres-feet) Agency Design Storm Frequency P S R V(R) (in)(in)(in)(ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE)5.10 15.04 0.26 0.33 FDOT Storm Drain 3 yr / 24 hr (POST)5.10 3.72 2.35 3.01 2.69 SFWMD Open Basin 25 yr / 72 hr (PRE)10.50 15.04 2.49 3.20 SFWMD Open Basin 25 yr / 72 hr (POST)10.50 3.72 7.06 9.06 5.86 0.64 7.15 Impervious (Paved parking, roads, etc.) POST-DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET Pond Site Area Wood or Forest Land Basin LengthBasin Location and Size " Required Dry Detention or Retention Pre-Treatment as part of Required Treatment Volume Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) COMPOSITE CN Impervious (Paved parking, roads, etc.) PRE-DEVELOPED CONDITION Open Spaces (Good Condition, Pond Site) Impervious (Open Water, Pond Site) BASIN RUNOFF CURVE NUMBER WORKSHEET Dry Detention or Retention Treatment Volume (ac-ft) Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3 yr / 24 hr Attenuation Volume (ac-ft) Open Spaces (Good Condition) Wood or Forest Land (Good Cover) Open Spaces (Fair Condition) Typical Section ROW x Basin Length = Basin ROW Area =Paved Area ÷ Basin (ROW Area) = Percent Impervious = Min Littoral Shelf Area = Page 1847 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:CN and SCS Runoff Volume Calculation MADE BY:AS 11/16/21 BASIN DESIGNATION:Basin 6-1 CHECKED BY:DL 11/17/21 From STA 182+20. To STA 205+00.2,280 LF Typical Section ROW 165 LF Water Quality 8.64 ac Treated Paved Area =5.11 ac Pond Site Area =2.58 ac 59% Total (ROW + Pond) Basin Area =11.22 ac A.1.0 " Over Total Basin Area =0.93 Ac-Ft B.2.5 " Over Treated Paved Area =1.06 Ac-Ft 1.06 Ac-Ft C.50%Additional Treatment Volume for Impaired Waterbody 1.60 Ac-Ft D.0.5 0.47 Ac-Ft E.20%of Wet Detention Area =0.26 ac F.2.5%of Wet Detention and Drainage Basin Areas =0.28 ac Water Quantity SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 113, Holopaw fine sand A/D 49 2.48 121.6 117, Immokalee fine sand B/D 69 1.65 114.1 113, Holopaw fine sand A/D 25 1.88 47.1 117, Immokalee fine sand B/D 55 1.26 69.1 113, Holopaw fine sand A/D 25 2.58 64.5 98 1.36 133.4 TOTALS 11.22 549.8 49.0 SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 113, Holopaw fine sand A/D 39 2.12 82.5 117, Immokalee fine sand B/D 61 1.41 86.1 113, Holopaw fine sand A/D 39 1.27 49.4 100 1.31 131.4 98 5.11 500.7 TOTALS 11.22 850.1 COMPOSITE CN 75.8 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S -------------------------------->S = ( 1000 / CN ) - 10 (inches) 2) DETERMINE RUNOFF - R -------------------------------->R = ( P - 0.2*S)^2 / ( P + 0.8*S )(inches) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R) -------------------------------->V(R) = ( R / 12)*BASIN AREA (acres-feet) Agency Design Storm Frequency P S R V(R) (in) (in) (in) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE)5.10 10.40 0.68 0.63 FDOT Storm Drain 3 yr / 24 hr (POST)5.10 3.20 2.60 2.43 1.79 SFWMD Open Basin 25 yr / 72 hr (PRE)10.50 10.40 3.77 3.52 SFWMD Open Basin 25 yr / 72 hr (POST)10.50 3.20 7.45 6.96 3.44 0.00 5.04 Impervious (Paved parking, roads, etc.) POST-DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET Pond Site Area Wood or Forest Land Typical Section ROW x Basin Length = Basin ROW Area =Paved Area ÷ Basin (ROW Area) = Percent Impervious = Min Littoral Shelf Area = Open Spaces (Good Condition) Wood or Forest Land (Good Cover) Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) Basin LengthBasin Location and Size COMPOSITE CN Impervious (Paved parking, roads, etc.) PRE-DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET Open Spaces (Good Condition, Pond Site) Impervious (Open Water, Pond Site) Open Spaces (Good Condition) Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3 yr / 24 hr Attenuation Volume (ac-ft) Dry Detention or Retention Treatment Volume (ac-ft) " Required Dry Detention or Retention Pre-Treatment as part of Required Treatment Volume Open Spaces (Fair Condition) Open Spaces (Good Condition) Wood or Forest Land (Good Cover) Page 1848 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:CN and SCS Runoff Volume Calculation MADE BY:AS 11/16/21 BASIN DESIGNATION:Basin 6-2 CHECKED BY:DL 11/17/21 From STA 182+20. To STA 205+00.2,280 LF Typical Section ROW 165 LF Water Quality 8.64 ac Treated Paved Area =5.11 ac Pond Site Area =2.16 ac 59% Total (ROW + Pond) Basin Area =10.79 ac A.1.0 " Over Total Basin Area =0.90 Ac-Ft B.2.5 " Over Treated Paved Area =1.06 Ac-Ft 1.06 Ac-Ft C.50%Additional Treatment Volume for Impaired Waterbody 1.60 Ac-Ft D.0.5 0.45 Ac-Ft E.20%of Wet Detention Area =0.17 ac F.2.5%of Wet Detention and Drainage Basin Areas =0.27 ac Water Quantity SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 113, Holopaw fine sand A/D 49 2.48 121.6 117, Immokalee fine sand B/D 69 1.65 114.1 113, Holopaw fine sand A/D 25 1.88 47.1 117, Immokalee fine sand B/D 55 1.26 69.1 113 and 120 A/D 25 2.16 53.9 98 1.36 133.4 TOTALS 10.79 539.1 50.0 SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 113, Holopaw fine sand A/D 39 2.12 82.5 117, Immokalee fine sand B/D 61 1.41 86.1 113 and 120 A/D 39 1.28 50.1 100 0.87 87.1 98 5.11 500.7 TOTALS 10.79 806.4 COMPOSITE CN 74.7 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S -------------------------------->S = ( 1000 / CN ) - 10 (inches) 2) DETERMINE RUNOFF - R -------------------------------->R = ( P - 0.2*S)^2 / ( P + 0.8*S )(inches) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R) -------------------------------->V(R) = ( R / 12)*BASIN AREA (acres-feet) Agency Design Storm Frequency P S R V(R) (in) (in) (in) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE)5.10 10.02 0.73 0.66 FDOT Storm Drain 3 yr / 24 hr (POST)5.10 3.38 2.51 2.25 1.60 SFWMD Open Basin 25 yr / 72 hr (PRE)10.50 10.02 3.90 3.51 SFWMD Open Basin 25 yr / 72 hr (POST)10.50 3.38 7.31 6.57 3.07 0.00 4.66 Dry Detention or Retention Treatment Volume (ac-ft) " Required Dry Detention or Retention Pre-Treatment as part of Required Treatment Volume Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) Basin LengthBasin Location and Size COMPOSITE CN Impervious (Paved parking, roads, etc.) PRE-DEVELOPED CONDITION Open Spaces (Good Condition) Wood or Forest Land (Good Cover) BASIN RUNOFF CURVE NUMBER WORKSHEET Impervious (Paved parking, roads, etc.) POST-DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET Pond Site Area Wood or Forest Land Typical Section ROW x Basin Length = Basin ROW Area =Paved Area ÷ Basin (ROW Area) = Percent Impervious = Min Littoral Shelf Area = Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3 yr / 24 hr Attenuation Volume (ac-ft) Open Spaces (Good Condition, Pond Site) Impervious (Open Water, Pond Site) Open Spaces (Good Condition) Open Spaces (Good Condition) Wood or Forest Land (Good Cover) Open Spaces (Fair Condition) Page 1849 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:CN and SCS Runoff Volume Calculation MADE BY:AS 11/16/21 BASIN DESIGNATION:Basin 6-3 CHECKED BY:DL 11/17/21 From STA 182+20. To STA 205+00.2,280 LF Typical Section ROW 165 LF Water Quality 8.64 ac Treated Paved Area =5.11 ac Pond Site Area =3.31 ac 59% Total (ROW + Pond) Basin Area =11.95 ac A.1.0 " Over Total Basin Area =1.00 Ac-Ft B.2.5 " Over Treated Paved Area =1.06 Ac-Ft 1.06 Ac-Ft C.50%Additional Treatment Volume for Impaired Waterbody 1.60 Ac-Ft D.0.5 0.50 Ac-Ft E.20%of Wet Detention Area =0.21 ac F.2.5%of Wet Detention and Drainage Basin Areas =0.30 ac Water Quantity SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 113, Holopaw fine sand A/D 49 2.48 121.6 117, Immokalee fine sand B/D 69 1.65 114.1 113, Holopaw fine sand A/D 25 1.88 47.1 117, Immokalee fine sand B/D 55 1.26 69.1 113 and 120 A/D 25 3.31 82.8 98 1.36 133.4 TOTALS 11.95 568.0 47.5 SOIL SOIL AREA LAND-USE DESCRIPTION NAME GROUP CN (ac) PRODUCT 113, Holopaw fine sand A/D 39 2.12 82.5 117, Immokalee fine sand B/D 61 1.41 86.1 113 and 120 A/D 39 2.28 88.8 100 1.03 103.3 98 5.11 500.7 TOTALS 11.95 861.4 COMPOSITE CN 72.1 ESTIMATE OF RUNOFF VOLUME PROCEDURE TO DETERMINE RUNOFF VOLUME IS BASED ON THE SCS EQUATION AND IS AS FOLLOWS: 1) DETERMINE SOIL STORAGE - S -------------------------------->S = ( 1000 / CN ) - 10 (inches) 2) DETERMINE RUNOFF - R -------------------------------->R = ( P - 0.2*S)^2 / ( P + 0.8*S ) (inches) P = rainfall in inches 3) DETERMINE RUNOFF VOLUME - V(R) -------------------------------->V(R) = ( R / 12)*BASIN AREA (acres-feet) Agency Design Storm Frequency P S R V(R) (in) (in) (in) (ac-ft) FDOT Storm Drain 3 yr / 24 hr (PRE)5.10 11.03 0.60 0.60 FDOT Storm Drain 3 yr / 24 hr (POST)5.10 3.87 2.28 2.27 1.68 SFWMD Open Basin 25 yr / 72 hr (PRE)10.50 11.03 3.56 3.54 SFWMD Open Basin 25 yr / 72 hr (POST)10.50 3.87 6.96 6.93 3.38 0.50 4.48 Min Littoral Shelf Area = Open Spaces (Good Condition, Pond Site) Impervious (Open Water, Pond Site) Open Spaces (Good Condition) Open Spaces (Good Condition) Wood or Forest Land (Good Cover) Open Spaces (Fair Condition) Open Spaces (Good Condition) Wood or Forest Land (Good Cover) BASIN RUNOFF CURVE NUMBER WORKSHEET Impervious (Paved parking, roads, etc.) POST-DEVELOPED CONDITION BASIN RUNOFF CURVE NUMBER WORKSHEET Pond Site Area Wood or Forest Land Typical Section ROW x Basin Length = Basin ROW Area =Paved Area ÷ Basin (ROW Area) = Percent Impervious = Required 25 yr / 72 hr Attenuation Volume (ac-ft) 3 yr / 24 hr Attenuation Volume (ac-ft) Dry Detention or Retention Treatment Volume (ac-ft) " Required Dry Detention or Retention Pre-Treatment as part of Required Treatment Volume Wet Detention: Treatment Volume (Vt) + Estimated Peak Attenuation Volume (Vpost - Vpre) (ac-ft) Basin LengthBasin Location and Size COMPOSITE CN Impervious (Paved parking, roads, etc.) PRE-DEVELOPED CONDITION Page 1850 of 4682 Attachment 3 Pond Size Calculations Page 1851 of 4682 English Worksheet PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 POND DESIGNATION:CHECKED BY:DL 11/17/21 Pond Site Location = STA. 57+00, RT Pond Site Existing Ground Elevation = Varies 10.0 to 13.0 ft Pond Site Soil Type = Pond Site Estimated Depth to Groundwater = Varies 0.0 to 0.5 ft Estimated SHWT = 11.00 ft Distance to Discharge Point = 3800 LF Positive Drainage Gradient = 0.06%=2.3 ft. (vertical) Discharge Point NWL Estimation = 9.7 Discharge Point Peak Stage Estimation = 12.5 Minimum NWL = 12.0 ft. The pond(s) will be a combination of: Wet Detention and Dry Detention Storage Height (SH) = Minimum Existing Roadway Elevation =12.0 ft.12.0 ft. Minimum Proposed Roadway Elevation =14.5 ft.14.5 ft. Berm Elevation =14.5 ft.14.5 ft. Freeboard to DHW =1.0 ft.1.0 ft. Maximum DHW Elevation =13.5 ft.13.5 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL =12.0 ft.12.0 ft. Clearance to ESHWT =1.0 ft.1.0 ft. SH Available =1.5 ft.1.5 ft. Wet Detention Dry Detention Volume Peak (ac-ft) =5.23 0.69 Volume Peak (cf) =227626 30090 STEP NO. 4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS STEP NO. 2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) Boca fine sand (102, A/D) and Chobee, limestone substratum-Dania, ponded (105, C/D) c. Summary of Controlling Soils and Tailwater Conditions a. Check of Pond Site Conditions b. Check of Tailwater Conditions STEP NO. 3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT The Total Peak Storage Volume Required is: Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: Maximum DHW - Pond NWL Maximum DHW - Pond Bottom Cypress Canal R/W Requirement Estimate Pt. 1 Pond 1-1 filename: Pond 1-1.xls worksheet: RW REQUIREMENT PT.1 Page 1852 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 BASIN DESIGNATION:CHECKED BY:DL 11/17/21 Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims =1.1 6.0 SH =1.5 ft 1.5 ft L =399 ft 326 ft W =363 ft 54 ft Pond Area at Control/Bot EL =3.32 acres 0.41 acres Wet Detention Dry Detention Side slopes are 1:6 4 Length @ Top of SH =417 ft 338 ft Width @ Top of SH =381 ft 66 ft Pond Area at SH =3.64 acres 0.51 acres Volume Provided at SH = 5.23 ac-ft 0.69 ac-ft Volume Required = 5.23 ac-ft 0.69 ac-ft Wet Detention Dry Detention Side slopes are 1:4 4 Desired Maintenance Berm Widths =20 ft.15 ft. Length @ Outside Maintenance Berm =465 ft 376 ft Width @ Outside Maintennace Berm =429 ft 104 ft Minimum Pond Area Requirement =4.58 acres 0.90 acres Contingency =15%15% Pond Area Requirement =5.26 acres 1.04 acres TOTAL WET AND DRY POND AREA REQUIREMENT 6.30 acres 3 yr / 24 hr Attenuation Volume =2.16 ac-ft 12.5 Length Between Pond and Roadway Low Point =1750 ft.0.9 ft Roadway Low Point EL =14.5 HGL Clearance at Roadway Low Point =1.1 ft (OK) Length @ Bot of Littoral Area (2' below NWL) =375 Length @ Top of Littoral Area (ft) =411 Width @ Bot of Littoral Area (2' below NWL) =339 Width @ Top of Littoral Area (ft) =375 Bot of Littoral Area (2' below NWL) =2.92 Top of Littoral Area (1' above NWL) =3.54 acres Littoral Area Requirement (acres) =0.41 Littoral Area Provided (acres) =0.62 (OK) STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA STEP NO. 7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr 24 hr Pond EL = Energy Losses @ 0.05% = STEP NO. 6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS R/W Requirement Estimate Pt. 2 Pond 1-1 STEP NO. 5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) STEP NO. 4 - POND CONFIGURATION cont. Page 1853 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 POND DESIGNATION:CHECKED BY:DL 11/17/21 Pond Site Location = STA. 70+00, RT Pond Site Existing Ground Elevation = Varies 10.0 to 14.0 ft Pond Site Soil Type = Pond Site Estimated Depth to Groundwater = 0.5 ft. Estimated SHWT = 10.5 ft. Distance to Discharge Point = 2500 LF Positive Drainage Gradient = 0.06%=1.5 ft. (vertical) Discharge Point NWL Estimation = 9.7 Discharge Point Peak Stage Estimation = 12.5 Minimum NWL = 11.2 ft. The pond(s) will be a combination of: Wet Detention and Dry Detention Storage Height (SH) = Minimum Existing Roadway Elevation =12.0 ft.12.0 ft. Minimum Proposed Roadway Elevation =14.5 ft.14.5 ft. Berm Elevation =14.5 ft.14.5 ft. Freeboard to DHW =1.0 ft.1.0 ft. Maximum DHW Elevation =13.5 ft.13.5 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL =11.2 ft.11.5 ft. Clearance to ESHWT =0.7 ft.1.0 ft. SH =2.3 ft.2.0 ft. Wet Detention Dry Detention Volume Peak (ac-ft) =5.92 0.64 Volume Peak (cf) =257973 28075 STEP NO. 4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 Pond 1-2 b. Check of Tailwater Conditions STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS STEP NO. 2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) The Total Peak Storage Volume Required is: STEP NO. 3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT Boca fine sand (102, A/D) Maximum DHW - Pond Bottom Cypress Canal a. Check of Pond Site Conditions Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: Maximum DHW - Pond NWL c. Summary of Controlling Soils and Tailwater Conditions R/W Requirement Estimate Pt. 1 filename: Pond 1-2.xls worksheet: RW REQUIREMENT PT.1 Page 1854 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 BASIN DESIGNATION:CHECKED BY:DL 11/17/21 Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims =2.0 6.0 SH =2.3 ft 2.0 ft L =453 ft 262 ft W =226 ft 44 ft Pond Area at Control/Bot EL =2.35 acres 0.26 acres Side slopes are 1:6 4 Wet Detention Dry Detention Length @ Top of SH =480 ft 278 ft Width @ Top of SH =254 ft 60 ft Pond Area at SH =2.80 acres 0.38 acres Volume Provided at SH = 5.92 ac-ft 0.64 ac-ft Volume Required = 5.92 ac-ft 0.64 ac-ft Wet Detention Dry Detention Side slopes are 1:4 4 Desired Maintenance Berm Widths =20 ft.15 ft. Length @ Outside Maintenance Berm =528 ft.316 ft. Width @ Outside Maintennace Berm =302 ft.98 ft. Minimum Pond Area Requirement =3.66 acres 0.71 acres Contingency =15%15% Pond Area Requirement =4.21 acres 0.81 acres 5.02 acres 3 yr / 24 hr Attenuation Volume =2.30 ac-ft 12.0 Length Between Pond and Roadway Low Point =3000 ft.1.5 ft Roadway Low Point EL =14.5 HGL Clearance at Roadway Low Point =1.0 ft (OK) Length @ Bot of Littoral Area (2' below NWL) =429 Length @ Top of Littoral Area (ft) =465 Width @ Bot of Littoral Area (2' below NWL) =202 Width @ Top of Littoral Area (ft) =238 Bot of Littoral Area (2' below NWL) =1.99 Top of Littoral Area (1' above NWL) =2.54 acres Littoral Area Requirement (acres) =0.39 Littoral Area Provided (acres) =0.55 (OK) STEP NO. 7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr 24 hr Pond EL = Energy Losses @ 0.05% = STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA TOTAL WET AND DRY POND AREA REQUIREMENT R/W Requirement Estimate Pt. 2 Pond 1-2 STEP NO. 5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) STEP NO. 4 - POND CONFIGURATION cont. STEP NO. 6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS Page 1855 of 4682 English Worksheet PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 POND DESIGNATION:CHECKED BY:DL 11/17/21 Pond Site Location = STA. 88+00, RT Pond Site Existing Ground Elevation = 12.0 ft. Pond Site Soil Type = Pond Site Estimated Depth to Groundwater = Varies 0.5 to 1.0 ft. Estimated SHWT = 11.5 ft. Distance to Discharge Point = 675 LF Positive Drainage Gradient = 0.06%=0.4 ft. (vertical) Discharge Point NWL Estimation = 9.7 Discharge Point Peak Stage Estimation = 12.5 Minimum Wet Detention NWL = 10.2 ft. The pond(s) will be a combination of: Wet Detention and Dry Detention Storage Height (SH) = Minimum Existing Roadway Elevation =12.0 ft.12.0 ft. Minimum Proposed Roadway Elevation =14.5 ft.14.5 ft. Berm Elevation =14.5 ft.14.5 ft. Freeboard to DHW =1.0 ft.1.0 ft. Maximum DHW Elevation =13.5 ft.13.5 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL =10.2 ft.12.5 ft. Clearance to ESHWT =-1.3 ft.1.0 ft. SH =3.3 ft.1.0 ft. Wet Detention Dry Detention Volume Peak (ac-ft) =4.41 0.60 Volume Peak (cf) =192036 26277 Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: Maximum DHW - Pond NWL c. Summary of Controlling Soils and Tailwater Conditions R/W Requirement Estimate Pt. 1 Maximum DHW - Pond Bottom Cypress Canal b. Check of Tailwater Conditions STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS Pond 2-1 STEP NO. 4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 STEP NO. 2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) Boca fine sand-Urban (102, A/D) and Hallandale fine sand (110, B/D)a. Check of Pond Site Conditions STEP NO. 3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT The Total Peak Storage Volume Required is: filename: Pond 2-1.xls worksheet: RW REQUIREMENT PT.1 Page 1856 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 BASIN DESIGNATION:CHECKED BY:DL 11/17/21 Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims =2.0 2.0 SH =3.3 ft 1.0 ft L =311 ft 223 ft W =155 ft 112 ft Pond Area at Control/Bot EL =1.11 acres 0.57 acres Wet Detention Dry Detention Side slopes are 1:6 4 Length @ Top of SH =350 ft 231 ft Width @ Top of SH =195 ft 120 ft Pond Area at SH =1.57 acres 0.63 acres Volume Provided at SH = 4.410 ac-ft 0.602 ac-ft Volume Required = 4.409 ac-ft 0.603 ac-ft Wet Detention Dry Detention Side slopes are 1:4 4 Desired Maintenance Berm Widths =20 ft.15 ft. Length @ Outside Maintenance Berm =398 ft.269 ft. Width @ Outside Maintennace Berm =243 ft.158 ft. Minimum Pond Area Requirement =2.22 acres 0.97 acres Contingency =15%15% Pond Area Requirement =2.55 acres 1.12 acres 3.67 acres 3 yr / 24 hr Attenuation Volume =1.59 ac-ft 11.4 Length Between Pond and Roadway Low Point =1900 ft.1.0 ft Roadway Low Point EL =14.5 HGL Clearance at Roadway Low Point =2.2 ft (OK) Length @ Bot of Littoral Area (2' below NWL) =287 Length @ Top of Littoral Area (ft) =323 Width @ Bot of Littoral Area (2' below NWL) =131 Width @ Top of Littoral Area (ft) =167 Bot of Littoral Area (2' below NWL) =0.86 Top of Littoral Area (1' above NWL) =1.24 acres Littoral Area Requirement (acres) =0.22 Littoral Area Provided (acres) =0.38 (OK) R/W Requirement Estimate Pt. 2 Pond 2-1 STEP NO. 5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) STEP NO. 4 - POND CONFIGURATION cont. STEP NO. 6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS STEP NO. 7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr 24 hr Pond EL = Energy Losses @ 0.05% = STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA TOTAL WET AND DRY POND AREA REQUIREMENT Page 1857 of 4682 English Worksheet PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 POND DESIGNATION:CHECKED BY:DL 11/17/21 Pond Site Location = STA. 88+00, RT Pond Site Existing Ground Elevation = Varies 12 to 14 ft. Pond Site Soil Type = Pond Site Estimated Depth to Groundwater = Varies 0.5 to 1.0 ft. Estimated SHWT = 11.5 ft. Distance to Discharge Point = 425 LF Positive Drainage Gradient = 0.06%=0.3 ft. (vertical) Discharge Point NWL Estimation = 9.7 Discharge Point Peak Stage Estimation = 12.5 Minimum Wet Detention NWL = 10.0 ft. The pond(s) will be a combination of: Wet Detention and Dry Detention Storage Height (SH) = Minimum Existing Roadway Elevation =12.0 ft.12.0 ft. Minimum Proposed Roadway Elevation =14.5 ft.14.5 ft. Berm Elevation =14.5 ft.14.5 ft. Freeboard to DHW =1.0 ft.1.0 ft. Maximum DHW Elevation =13.5 ft.13.5 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL =10.0 ft.12.5 ft. Clearance to ESHWT =-1.5 ft.1.0 ft. SH =3.5 ft.1.0 ft. Wet Detention Dry Detention Volume Peak (ac-ft) =4.33 0.60 Volume Peak (cf) =188561 26096 Boca fine sand-Urban (102, A/D) and Hallandale fine sand (110, B/D) STEP NO. 2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) The Total Peak Storage Volume Required is: Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: Maximum DHW - Pond NWL c. Summary of Controlling Soils and Tailwater Conditions STEP NO. 3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT a. Check of Pond Site Conditions STEP NO. 4 - POND CONFIGURATION R/W Requirement Estimate Pt. 1 b. Check of Tailwater Conditions Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 Maximum DHW - Pond Bottom Cypress Canal Pond 2-2 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS filename: Pond 2-2.xls worksheet: RW REQUIREMENT PT.1 Page 1858 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 BASIN DESIGNATION:CHECKED BY:DL 11/17/21 Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims =2.0 2.5 SH =3.5 ft 1.0 ft L =296 ft 249 ft W =148 ft 99 ft Pond Area at Control/Bot EL =1.00 acres 0.57 acres Wet Detention Dry Detention Side slopes are 1:6 4 Length @ Top of SH =338 ft 257 ft Width @ Top of SH =190 ft 107 ft Pond Area at SH =1.47 acres 0.63 acres Volume Provided at SH = 4.33 ac-ft 0.60 ac-ft Volume Required = 4.33 ac-ft 0.60 ac-ft Wet Detention Dry Detention Side slopes are 1:4 4 Desired Maintenance Berm Widths =20 ft.15 ft. Length @ Outside Maintenance Berm =386 ft.295 ft. Width @ Outside Maintennace Berm =238 ft.145 ft. Minimum Pond Area Requirement =2.10 acres 0.98 acres Contingency =15%15% Pond Area Requirement =2.42 acres 1.13 acres 3.55 acres 3 yr / 24 hr Attenuation Volume =1.55 ac-ft 11.1 Length Between Pond and Roadway Low Point =2780 ft.1.4 ft Roadway Low Point EL =14.5 HGL Clearance at Roadway Low Point =2.1 ft (OK) Length @ Bot of Littoral Area (2' below NWL) =272 Length @ Top of Littoral Area (ft) =308 Width @ Bot of Littoral Area (2' below NWL) =124 Width @ Top of Littoral Area (ft) =160 Bot of Littoral Area (2' below NWL) =0.77 Top of Littoral Area (1' above NWL) =1.13 acres Littoral Area Requirement (acres) =0.20 Littoral Area Provided (acres) =0.36 (OK) 3 yr 24 hr Pond EL = Energy Losses @ 0.05% = STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA STEP NO. 6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS TOTAL WET AND DRY POND AREA REQUIREMENT R/W Requirement Estimate Pt. 2 Pond 2-2 STEP NO. 5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) STEP NO. 4 - POND CONFIGURATION cont. STEP NO. 7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES Page 1859 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 BASIN DESIGNATION:CHECKED BY:DL 11/17/21 Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims =1.2 1.0 SH =3.7 ft 0.5 ft L =225 ft 232 ft W =188 ft 232 ft Pond Area at Control/Bot EL =0.97 acres 1.23 acres Wet Detention Dry Detention Side slopes are 1:6 4 Length @ Top of SH =270 ft 236 ft Length @ Top of SH =232 ft 236 ft Pond Area at SH =1.44 acres 1.27 acres Volume Provided at SH = 4.45 ac-ft 0.63 ac-ft Volume Required = 4.45 ac-ft 0.63 ac-ft Wet Detention Dry Detention Side slopes are 1:4 4 Desired Maintenance Berm Widths =20 ft.15 ft. Length @ Outside Maintenance Berm =318 ft.274 ft. Width @ Outside Maintennace Berm =280 ft.274 ft. Minimum Pond Area Requirement =2.04 acres 1.72 acres Contingency =15%15% Pond Area Requirement =2.35 acres 1.97 acres 4.32 acres 3 yr / 24 hr Attenuation Volume =1.56 ac-ft 11.1 Length Between Pond and Roadway Low Point =3100 ft.1.6 ft Roadway Low Point EL =14.5 HGL Clearance at Roadway Low Point =1.9 ft (OK) Length @ Bot of Littoral Area (2' below NWL) =201 Length @ Top of Littoral Area (ft) =237 Width @ Bot of Littoral Area (2' below NWL) =164 Width @ Top of Littoral Area (ft) =200 Bot of Littoral Area (2' below NWL) =0.76 Top of Littoral Area (1' above NWL) =1.09 acres Littoral Area Requirement (acres) =0.19 Littoral Area Provided (acres) =0.33 (OK) Energy Losses @ 0.05% = STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA STEP NO. 4 - POND CONFIGURATION cont. STEP NO. 6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS TOTAL WET AND DRY POND AREA REQUIREMENT R/W Requirement Estimate Pt. 2 Pond 2-3 STEP NO. 5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) STEP NO. 7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr 24 hr Pond EL = Page 1860 of 4682 English Worksheet PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 POND DESIGNATION:CHECKED BY:DL 11/17/21 Pond Site Location = STA. 94+00, RT Pond Site Existing Ground Elevation = Varies 12 to 14 ft. Pond Site Soil Type = Pond Site Estimated Depth to Groundwater = Varies 0 to 0.5 ft. Estimated SHWT = 12.0 ft. Distance to Discharge Point = 50 LF Positive Drainage Gradient = 0.06%=0.03 ft. (vertical) Discharge Point NWL Estimation = 9.7 Discharge Point Peak Stage Estimation = 12.5 Minimum Wet Detention NWL = 9.8 ft. The pond(s) will be a combination of: Wet Detention and Dry Detention Storage Height (SH) = Minimum Existing Roadway Elevation =12.0 ft.12.0 ft. Minimum Proposed Roadway Elevation =14.5 ft.14.5 ft. Berm Elevation =14.5 ft.14.5 ft. Freeboard to DHW =1.0 ft.1.0 ft. Maximum DHW Elevation =13.5 ft.13.5 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL =9.8 ft.13.0 ft. Clearance to ESHWT =-2.2 ft.1.0 ft. SH =3.7 ft.0.5 ft. Wet Detention Dry Detention Volume Peak (ac-ft) =4.45 0.63 Volume Peak (cf) =193841 27312 Boca fine sand-Urban (102, A/D) and Riviera fine sand (131, B/D) Pond 2-3 STEP NO. 4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 STEP NO. 3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT The Total Peak Storage Volume Required is: STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS STEP NO. 2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) a. Check of Pond Site Conditions Maximum DHW - Pond Bottom Cypress Canal b. Check of Tailwater Conditions Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: Maximum DHW - Pond NWL c. Summary of Controlling Soils and Tailwater Conditions R/W Requirement Estimate Pt. 1 filename: Pond 2-3.xls worksheet: RW REQUIREMENT PT.1 Page 1861 of 4682 English Worksheet PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 POND DESIGNATION:CHECKED BY:DL 11/17/21 Pond Site Location = STA. 78+00, LT Pond Site Existing Ground Elevation = 12.0 ft. Pond Site Soil Type = Pond Site Estimated Depth to Groundwater = 0.5 ft. Estimated SHWT = 11.5 ft. Distance to Discharge Point = 1700 LF Positive Drainage Gradient = 0.06%=1.02 ft. (vertical) Discharge Point NWL Estimation = 9.7 Discharge Point Peak Stage Estimation = 12.5 Minimum Wet Detention NWL = 10.8 ft. The pond(s) will be a combination of: Wet Detention and Dry Detention Storage Height (SH) = Minimum Existing Roadway Elevation =12.0 ft.12.0 ft. Minimum Proposed Roadway Elevation =14.5 ft.14.5 ft. Berm Elevation =14.5 ft.14.5 ft. Freeboard to DHW =1.0 ft.1.0 ft. Maximum DHW Elevation =13.5 ft.13.5 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL =10.8 ft.12.5 ft. Clearance to ESHWT =-0.7 ft.1.0 ft. SH =2.7 ft.1.0 ft. Wet Detention Dry Detention Volume Peak (ac-ft) =5.38 0.64 Volume Peak (cf) =234328 27748 Boca fine sand-Urban (102, A/D) Pond 2-4 STEP NO. 4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 STEP NO. 3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT The Total Peak Storage Volume Required is: STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS STEP NO. 2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) a. Check of Pond Site Conditions Maximum DHW - Pond Bottom Cypress Canal b. Check of Tailwater Conditions Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: Maximum DHW - Pond NWL c. Summary of Controlling Soils and Tailwater Conditions R/W Requirement Estimate Pt. 1 filename: Pond 2-4.xls worksheet: RW REQUIREMENT PT.1 Page 1862 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 BASIN DESIGNATION:CHECKED BY:DL 11/17/21 Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims =1.5 2.7 SH =2.7 ft 1.0 ft L =340 ft 266 ft W =227 ft 99 ft Pond Area at Control/Bot EL =1.77 acres 0.60 acres Wet Detention Dry Detention Side slopes are 1:6 4 Length @ Top of SH =373 ft 274 ft Length @ Top of SH =259 ft 107 ft Pond Area at SH =2.22 acres 0.67 acres Volume Provided at SH = 5.38 ac-ft 0.64 ac-ft Volume Required = 5.38 ac-ft 0.64 ac-ft Wet Detention Dry Detention Side slopes are 1:4 4 Desired Maintenance Berm Widths =20 ft.15 ft. Length @ Outside Maintenance Berm =421 ft.312 ft. Width @ Outside Maintennace Berm =307 ft.145 ft. Minimum Pond Area Requirement =2.97 acres 1.04 acres Contingency =15%15% Pond Area Requirement =3.41 acres 1.19 acres 4.60 acres 3 yr / 24 hr Attenuation Volume =1.93 ac-ft 11.8 Length Between Pond and Roadway Low Point =1500 ft.0.8 ft Roadway Low Point EL =14.5 HGL Clearance at Roadway Low Point =2.0 ft (OK) Length @ Bot of Littoral Area (2' below NWL) =316 Length @ Top of Littoral Area (ft) =352 Width @ Bot of Littoral Area (2' below NWL) =203 Width @ Top of Littoral Area (ft) =239 Bot of Littoral Area (2' below NWL) =1.47 Top of Littoral Area (1' above NWL) =1.93 acres Littoral Area Requirement (acres) =0.35 Littoral Area Provided (acres) =0.46 (OK) STEP NO. 7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr 24 hr Pond EL = Energy Losses @ 0.05% = STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA TOTAL WET AND DRY POND AREA REQUIREMENT R/W Requirement Estimate Pt. 2 Pond 2-4 STEP NO. 5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) STEP NO. 4 - POND CONFIGURATION cont. STEP NO. 6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS Page 1863 of 4682 English Worksheet PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 POND DESIGNATION:CHECKED BY:DL 11/17/21 Pond Site Location = STA. 102+00, RT Pond Site Existing Ground Elevation = 12.0 ft. Pond Site Soil Type = Pond Site Estimated Depth to Groundwater = Varies 0 to 0.5 ft. Estimated SHWT = 11.5 ft. Distance to Discharge Point = 50 LF Positive Drainage Gradient = 0.06%=0.0 ft. (vertical) Discharge Point NWL Estimation = 9.7 Discharge Point Peak Stage Estimation = 12.5 Minimum Wet Detention NWL = 9.8 ft. The pond(s) will be a combination of: Wet Detention and Dry Detention Storage Height (SH) = Minimum Existing Roadway Elevation =12.0 ft.12.0 ft. Minimum Proposed Roadway Elevation =14.5 ft.14.5 ft. Berm Elevation =14.5 ft.14.5 ft. Freeboard to DHW =1.0 ft.1.0 ft. Maximum DHW Elevation =13.5 ft.13.5 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL =9.8 ft.12.5 ft. Clearance to ESHWT =-1.7 ft.1.0 ft. SH =3.7 ft.1.0 ft. Wet Detention Dry Detention Volume Peak (ac-ft) =5.40 0.67 Volume Peak (cf) =235326 29087 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS STEP NO. 4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: Maximum DHW - Pond NWL c. Summary of Controlling Soils and Tailwater Conditions R/W Requirement Estimate Pt. 1 The Total Peak Storage Volume Required is: Maximum DHW - Pond Bottom Cypress Canal b. Check of Tailwater Conditions STEP NO. 2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) Boca fine sand-Urban (102, A/D) and Riviera fine sand (131, B/D)a. Check of Pond Site Conditions STEP NO. 3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT Pond 3-1 filename: Pond 3-1.xls worksheet: RW REQUIREMENT PT.1 Page 1864 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 BASIN DESIGNATION:CHECKED BY:DL 11/17/21 Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims =1.5 2.3 SH =3.7 ft 1.0 ft L =280 ft 252 ft W =187 ft 110 ft Pond Area at Control/Bot EL =1.20 acres 0.63 acres Wet Detention Dry Detention Side slopes are 1:6 4 Length @ Top of SH =324 ft 260 ft Length @ Top of SH =231 ft 118 ft Pond Area at SH =1.72 acres 0.70 acres Volume Provided at SH = 5.40 ac-ft 0.67 ac-ft Volume Required = 5.40 ac-ft 0.67 ac-ft Wet Detention Dry Detention Side slopes are 1:4 4 Desired Maintenance Berm Widths =20 ft.15 ft. Length @ Outside Maintenance Berm =372 ft.298 ft. Width @ Outside Maintennace Berm =279 ft.156 ft. Minimum Pond Area Requirement =2.39 acres 1.06 acres Contingency =15%15% Pond Area Requirement =2.74 acres 1.22 acres 3.97 acres 3 yr / 24 hr Attenuation Volume =2.06 ac-ft 11.2 Length Between Pond and Roadway Low Point =3100 ft.1.6 ft Roadway Low Point EL =14.5 HGL Clearance at Roadway Low Point =1.7 ft (OK) Length @ Bot of Littoral Area (2' below NWL) =256 Length @ Top of Littoral Area (ft) =292 Width @ Bot of Littoral Area (2' below NWL) =163 Width @ Top of Littoral Area (ft) =199 Bot of Littoral Area (2' below NWL) =0.96 Top of Littoral Area (1' above NWL) =1.33 acres Littoral Area Requirement (acres) =0.24 Littoral Area Provided (acres) =0.38 (OK) 3 yr 24 hr Pond EL = Energy Losses @ 0.05% = STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA STEP NO. 6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS TOTAL WET AND DRY POND AREA REQUIREMENT R/W Requirement Estimate Pt. 2 Pond 3-1 STEP NO. 5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) STEP NO. 4 - POND CONFIGURATION cont. STEP NO. 7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES Page 1865 of 4682 English Worksheet PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 POND DESIGNATION:CHECKED BY:DL 11/17/21 Pond Site Location = STA. 98+00, LT Pond Site Existing Ground Elevation = Varies 12 to 14 ft. Pond Site Soil Type = Pond Site Estimated Depth to Groundwater = 1.0 ft. Estimated SHWT = 11.0 ft. Distance to Discharge Point = 50 LF Positive Drainage Gradient = 0.06%=0.0 ft. (vertical) Discharge Point NWL Estimation = 9.7 Discharge Point Peak Stage Estimation = 12.5 Minimum Wet Detention NWL = 9.8 ft. The pond(s) will be a combination of: Wet Detention and Dry Detention Storage Height (SH) = Minimum Existing Roadway Elevation =12.0 ft.12.0 ft. Minimum Proposed Roadway Elevation =14.5 ft.14.5 ft. Berm Elevation =14.5 ft.14.5 ft. Freeboard to DHW =1.0 ft.1.0 ft. Maximum DHW Elevation =13.5 ft.13.5 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL =9.8 ft.12.0 ft. Clearance to ESHWT =-1.2 ft.1.0 ft. SH =3.7 ft.1.5 ft. Wet Detention Dry Detention Volume Peak (ac-ft) =4.64 0.65 Volume Peak (cf) =202171 28193 Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 Maximum DHW - Pond Bottom Cypress Canal Pond 3-2 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS STEP NO. 2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) Hallandale fine sand (110, B/D)a. Check of Pond Site Conditions Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: Maximum DHW - Pond NWL c. Summary of Controlling Soils and Tailwater Conditions STEP NO. 3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT STEP NO. 4 - POND CONFIGURATION R/W Requirement Estimate Pt. 1 b. Check of Tailwater Conditions The Total Peak Storage Volume Required is: filename: Pond 3-2.xls worksheet: RW REQUIREMENT PT.1 Page 1866 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 BASIN DESIGNATION:CHECKED BY:DL 11/17/21 Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims =2.0 4.0 SH =3.7 ft 1.5 ft L =296 ft 259 ft W =148 ft 65 ft Pond Area at Control/Bot EL =1.01 acres 0.38 acres Wet Detention Dry Detention Side slopes are 1:6 4 Length @ Top of SH =340 ft 271 ft Length @ Top of SH =192 ft 77 ft Pond Area at SH =1.50 acres 0.48 acres Volume Provided at SH = 4.64 ac-ft 0.65 ac-ft Volume Required = 4.64 ac-ft 0.65 ac-ft Wet Detention Dry Detention Side slopes are 1:4 4 Desired Maintenance Berm Widths =20 ft.15 ft. Length @ Outside Maintenance Berm =388 ft.309 ft. Width @ Outside Maintennace Berm =240 ft.115 ft. Minimum Pond Area Requirement =2.14 acres 0.81 acres Contingency =15%15% Pond Area Requirement =2.47 acres 0.94 acres 3.40 acres 3 yr / 24 hr Attenuation Volume =1.81 ac-ft 11.2 Length Between Pond and Roadway Low Point =2900 ft.1.5 ft Roadway Low Point EL =14.5 HGL Clearance at Roadway Low Point =1.8 ft (OK) Length @ Bot of Littoral Area (2' below NWL) =272 Length @ Top of Littoral Area (ft) =308 Width @ Bot of Littoral Area (2' below NWL) =124 Width @ Top of Littoral Area (ft) =160 Bot of Littoral Area (2' below NWL) =0.77 Top of Littoral Area (1' above NWL) =1.13 acres Littoral Area Requirement (acres) =0.20 Littoral Area Provided (acres) =0.36 (OK) 3 yr 24 hr Pond EL = Energy Losses @ 0.05% = STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA STEP NO. 6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS TOTAL WET AND DRY POND AREA REQUIREMENT R/W Requirement Estimate Pt. 2 Pond 3-2 STEP NO. 5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) STEP NO. 4 - POND CONFIGURATION cont. STEP NO. 7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES Page 1867 of 4682 English Worksheet PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 POND DESIGNATION:CHECKED BY:DL 11/17/21 Pond Site Location = STA. 120+00, RT Pond Site Existing Ground Elevation = 12.0 ft. Pond Site Soil Type = Pond Site Estimated Depth to Groundwater = 0.5 ft. Estimated SHWT = 11.5 ft. Distance to Discharge Point = 700 LF Positive Drainage Gradient = 0.06%=0.4 ft. (vertical) Discharge Point NWL Estimation = 9.9 Discharge Point Peak Stage Estimation = 12.7 Minimum Wet Detention NWL = 10.4 ft. The pond(s) will be a combination of: Wet Detention and Dry Detention Storage Height (SH) = Minimum Existing Roadway Elevation =12.0 ft.12.0 ft. Minimum Proposed Roadway Elevation =14.5 ft.14.5 ft. Berm Elevation =14.5 ft.14.5 ft. Freeboard to DHW =1.0 ft.1.0 ft. Maximum DHW Elevation =13.5 ft.13.5 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL =10.4 ft.12.5 ft. Clearance to ESHWT =-1.1 ft.1.0 ft. SH =3.1 ft.1.0 ft. Wet Detention Dry Detention Volume Peak (ac-ft) =4.62 0.67 Volume Peak (cf) =201410 29133 Maximum DHW - Pond Bottom Corkscrew Canal b. Check of Tailwater Conditions Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: Maximum DHW - Pond NWL c. Summary of Controlling Soils and Tailwater Conditions R/W Requirement Estimate Pt. 1 The Total Peak Storage Volume Required is: STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS STEP NO. 2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) a. Check of Pond Site Conditions Riviera and Pineda fine sand (131, B/D and 128, C/D) Pond 3-3 STEP NO. 4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 STEP NO. 3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT filename: Pond 3-3.xls worksheet: RW REQUIREMENT PT.1 Page 1868 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 BASIN DESIGNATION:CHECKED BY:DL 11/17/21 Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims =2.0 2.5 SH =3.1 ft 1.0 ft L =332 ft 263 ft W =166 ft 105 ft Pond Area at Control/Bot EL =1.26 acres 0.64 acres Wet Detention Dry Detention Side slopes are 1:6 4 Length @ Top of SH =369 ft 271 ft Length @ Top of SH =203 ft 113 ft Pond Area at SH =1.72 acres 0.70 acres Volume Provided at SH = 4.62 ac-ft 0.67 ac-ft Volume Required = 4.62 ac-ft 0.67 ac-ft Wet Detention Dry Detention Side slopes are 1:4 4 Desired Maintenance Berm Widths =20 ft.15 ft. Length @ Outside Maintenance Berm =417 ft.309 ft. Width @ Outside Maintennace Berm =251 ft.151 ft. Minimum Pond Area Requirement =2.40 acres 1.07 acres Contingency =15%15% Pond Area Requirement =2.76 acres 1.23 acres 4.00 acres 3 yr / 24 hr Attenuation Volume =1.85 ac-ft 11.6 Length Between Pond and Roadway Low Point =2750 ft.1.4 ft Roadway Low Point EL =14.5 HGL Clearance at Roadway Low Point =1.5 ft (OK) Length @ Bot of Littoral Area (2' below NWL) =308 Length @ Top of Littoral Area (ft) =344 Width @ Bot of Littoral Area (2' below NWL) =142 Width @ Top of Littoral Area (ft) =178 Bot of Littoral Area (2' below NWL) =1.00 Top of Littoral Area (1' above NWL) =1.40 acres Littoral Area Requirement (acres) =0.25 Littoral Area Provided (acres) =0.40 (OK) 3 yr 24 hr Pond EL = Energy Losses @ 0.05% = STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA STEP NO. 4 - POND CONFIGURATION cont. STEP NO. 6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS TOTAL WET AND DRY POND AREA REQUIREMENT R/W Requirement Estimate Pt. 2 Pond 3-3 STEP NO. 5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) STEP NO. 7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES Page 1869 of 4682 English Worksheet PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 POND DESIGNATION:CHECKED BY:DL 11/17/21 Pond Site Location = STA. 146+00, RT Pond Site Existing Ground Elevation = 12.5 ft. Pond Site Soil Type = Pond Site Estimated Depth to Groundwater = 0.5 ft. Estimated SHWT = 12.0 ft. Distance to Discharge Point = 700 LF Positive Drainage Gradient = 0.06%=0.4 ft. (vertical) Discharge Point NWL Estimation = 9.9 Discharge Point Peak Stage Estimation = 12.7 Minimum Wet Detention NWL = 10.4 ft. The pond(s) will be a combination of: Wet Detention and Dry Detention Storage Height (SH) = Minimum Existing Roadway Elevation =12.0 ft.12.0 ft. Minimum Proposed Roadway Elevation =14.5 ft.14.5 ft. Berm Elevation =14.5 ft.14.5 ft. Freeboard to DHW =1.0 ft.1.0 ft. Maximum DHW Elevation =13.5 ft.13.5 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL =10.4 ft.13.0 ft. Clearance to ESHWT =-1.6 ft.1.0 ft. SH =3.1 ft.0.5 ft. Wet Detention Dry Detention Volume Peak (ac-ft) =4.50 0.59 Volume Peak (cf) =196200 25837 a. Check of Pond Site Conditions STEP NO. 4 - POND CONFIGURATION R/W Requirement Estimate Pt. 1 b. Check of Tailwater Conditions Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 Maximum DHW - Pond Bottom Corkscrew Canal Pond 4-1 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS STEP NO. 2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) The Total Peak Storage Volume Required is: Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: Maximum DHW - Pond NWL c. Summary of Controlling Soils and Tailwater Conditions STEP NO. 3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT Riviera fine sand (131, B/D) filename: Pond 4-1.xls worksheet: RW REQUIREMENT PT.1 Page 1870 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 BASIN DESIGNATION:CHECKED BY:DL 11/17/21 Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims =1.4 1.5 SH =3.1 ft 0.5 ft L =279 ft 293 ft W =199 ft 195 ft Pond Area at Control/Bot EL =1.27 acres 1.31 acres Wet Detention Dry Detention Side slopes are 1:6 4 Length @ Top of SH =316 ft 297 ft Length @ Top of SH =236 ft 199 ft Pond Area at SH =1.71 acres 1.36 acres Volume Provided at SH = 4.62 ac-ft 0.67 ac-ft Volume Required = 4.62 ac-ft 0.67 ac-ft Wet Detention Dry Detention Side slopes are 1:4 4 Desired Maintenance Berm Widths =20 ft.15 ft. Length @ Outside Maintenance Berm =364 ft.335 ft. Width @ Outside Maintennace Berm =284 ft.237 ft. Minimum Pond Area Requirement =2.37 acres 1.83 acres Contingency =15%15% Pond Area Requirement =2.73 acres 2.10 acres 4.83 acres 3 yr / 24 hr Attenuation Volume =1.82 ac-ft 11.6 Length Between Pond and Roadway Low Point =2200 ft.1.1 ft Roadway Low Point EL =14.5 HGL Clearance at Roadway Low Point =1.8 ft (OK) Length @ Bot of Littoral Area (2' below NWL) =255 Length @ Top of Littoral Area (ft) =291 Width @ Bot of Littoral Area (2' below NWL) =175 Width @ Top of Littoral Area (ft) =211 Bot of Littoral Area (2' below NWL) =1.02 Top of Littoral Area (1' above NWL) =1.41 acres Littoral Area Requirement (acres) =0.25 Littoral Area Provided (acres) =0.38 (OK) R/W Requirement Estimate Pt. 2 Pond 4-1 STEP NO. 5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) STEP NO. 4 - POND CONFIGURATION cont. STEP NO. 7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr 24 hr Pond EL = Energy Losses @ 0.05% = STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA STEP NO. 6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS TOTAL WET AND DRY POND AREA REQUIREMENT Page 1871 of 4682 English Worksheet PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 POND DESIGNATION:CHECKED BY:DL 11/17/21 Pond Site Location = STA. 139+00, RT Pond Site Existing Ground Elevation = Varies 12 to 14 ft. Pond Site Soil Type = Pond Site Estimated Depth to Groundwater = 0.5 ft. Estimated SHWT = 11.5 ft. Distance to Discharge Point = 50 LF Positive Drainage Gradient = 0.06%=0.0 ft. (vertical) Discharge Point NWL Estimation = 9.9 Discharge Point Peak Stage Estimation = 12.7 Minimum Wet Detention NWL = 10.0 ft. The pond(s) will be a combination of: Wet Detention and Dry Detention Storage Height (SH) = Minimum Existing Roadway Elevation =12.0 ft.12.0 ft. Minimum Proposed Roadway Elevation =14.5 ft.14.5 ft. Berm Elevation =14.5 ft.14.5 ft. Freeboard to DHW =1.0 ft.1.0 ft. Maximum DHW Elevation =13.5 ft.13.5 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL =10.0 ft.12.5 ft. Clearance to ESHWT =-1.5 ft.1.0 ft. SH =3.5 ft.1.0 ft. Wet Detention Dry Detention Volume Peak (ac-ft) =5.01 0.55 Volume Peak (cf) =218208 24154 Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: Maximum DHW - Pond NWL c. Summary of Controlling Soils and Tailwater Conditions R/W Requirement Estimate Pt. 1 Maximum DHW - Pond Bottom Corkscrew Canal b. Check of Tailwater Conditions STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS Pond 4-2 STEP NO. 4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 STEP NO. 2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) Boca fine sand (102, A/D)a. Check of Pond Site Conditions STEP NO. 3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT The Total Peak Storage Volume Required is: filename: Pond 4-2.xls worksheet: RW REQUIREMENT PT.1 Page 1872 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 BASIN DESIGNATION:CHECKED BY:DL 11/17/21 Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims =2.0 2.0 SH =3.5 ft 1.0 ft L =307 ft 235 ft W =153 ft 118 ft Pond Area at Control/Bot EL =1.08 acres 0.63 acres Wet Detention Dry Detention Side slopes are 1:6 4 Length @ Top of SH =349 ft 243 ft Length @ Top of SH =195 ft 126 ft Pond Area at SH =1.56 acres 0.70 acres Volume Provided at SH = 4.62 ac-ft 0.67 ac-ft Volume Required = 4.62 ac-ft 0.67 ac-ft Wet Detention Dry Detention Side slopes are 1:4 4 Desired Maintenance Berm Widths =20 ft.15 ft. Length @ Outside Maintenance Berm =397 ft.281 ft. Width @ Outside Maintennace Berm =243 ft.164 ft. Minimum Pond Area Requirement =2.22 acres 1.05 acres Contingency =15%15% Pond Area Requirement =2.55 acres 1.21 acres 3.76 acres 3 yr / 24 hr Attenuation Volume =1.89 ac-ft 11.4 Length Between Pond and Roadway Low Point =2800 ft.1.4 ft Roadway Low Point EL =14.5 HGL Clearance at Roadway Low Point =1.7 ft (OK) Length @ Bot of Littoral Area (2' below NWL) =283 Length @ Top of Littoral Area (ft) =319 Width @ Bot of Littoral Area (2' below NWL) =129 Width @ Top of Littoral Area (ft) =165 Bot of Littoral Area (2' below NWL) =0.84 Top of Littoral Area (1' above NWL) =1.21 acres Littoral Area Requirement (acres) =0.22 Littoral Area Provided (acres) =0.37 (OK) 3 yr 24 hr Pond EL = Energy Losses @ 0.05% = STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA STEP NO. 6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS TOTAL WET AND DRY POND AREA REQUIREMENT R/W Requirement Estimate Pt. 2 Pond 4-2 STEP NO. 5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) STEP NO. 4 - POND CONFIGURATION cont. STEP NO. 7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES Page 1873 of 4682 English Worksheet PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 POND DESIGNATION:CHECKED BY:DL 11/17/21 Pond Site Location = STA. 171+00, LT Pond Site Existing Ground Elevation = 13.0 ft. Pond Site Soil Type = Pond Site Estimated Depth to Groundwater = 1.0 ft. Estimated SHWT = 12.0 ft. Distance to Discharge Point = 2200 LF Positive Drainage Gradient = 0.06%=1.3 ft. (vertical) Discharge Point NWL Estimation = 9.9 Discharge Point Peak Stage Estimation = 12.7 Minimum Wet Detention NWL = 11.3 ft. The pond(s) will be a combination of: Wet Detention and Dry Detention Storage Height (SH) = Minimum Existing Roadway Elevation =12.0 ft.12.0 ft. Minimum Proposed Roadway Elevation =14.5 ft.14.5 ft. Berm Elevation =14.5 ft.14.5 ft. Freeboard to DHW =1.0 ft.1.0 ft. Maximum DHW Elevation =13.5 ft.13.5 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL =11.3 ft.13.0 ft. Clearance to ESHWT =-0.7 ft.1.0 ft. SH =2.2 ft.0.5 ft. Wet Detention Dry Detention Volume Peak (ac-ft) =5.36 0.63 Volume Peak (cf) =233281 27624 STEP NO. 3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT STEP NO. 4 - POND CONFIGURATION b. Check of Tailwater Conditions Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 The Total Peak Storage Volume Required is: STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS STEP NO. 2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) Immokalee fine sand (117, B/D) Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: Maximum DHW - Pond NWL c. Summary of Controlling Soils and Tailwater Conditions R/W Requirement Estimate Pt. 1 Maximum DHW - Pond Bottom Corkscrew Canal Pond 5-1 a. Check of Pond Site Conditions filename: Pond 5-1.xls worksheet: RW REQUIREMENT PT.1 Page 1874 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 BASIN DESIGNATION:CHECKED BY:DL 11/17/21 Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims =2.0 1.0 SH =2.2 ft 0.5 ft L =443 ft 233 ft W =219 ft 233 ft Pond Area at Control/Bot EL =2.23 acres 1.25 acres Wet Detention Dry Detention Side slopes are 1:6 4 Length @ Top of SH =469 ft 237 ft Length @ Top of SH =246 ft 237 ft Pond Area at SH =2.64 acres 1.29 acres Volume Provided at SH = 5.36 ac-ft 0.63 ac-ft Volume Required = 5.36 ac-ft 0.63 ac-ft Wet Detention Dry Detention Side slopes are 1:4 4 Desired Maintenance Berm Widths =20 ft.15 ft. Length @ Outside Maintenance Berm =517 ft.275 ft. Width @ Outside Maintennace Berm =294 ft.275 ft. Minimum Pond Area Requirement =3.48 acres 1.74 acres Contingency =15%15% Pond Area Requirement =4.01 acres 2.00 acres 6.00 acres > Site 5-1 3 yr / 24 hr Attenuation Volume =2.12 ac-ft 12.2 Length Between Pond and Roadway Low Point =1100 ft.0.6 ft Roadway Low Point EL =14.5 HGL Clearance at Roadway Low Point =1.8 ft (OK) Length @ Bot of Littoral Area (2' below NWL) =419 Length @ Top of Littoral Area (ft) =455 Width @ Bot of Littoral Area (2' below NWL) =195 Width @ Top of Littoral Area (ft) =231 Bot of Littoral Area (2' below NWL) =1.87 Top of Littoral Area (1' above NWL) =2.41 acres Littoral Area Requirement (acres) =0.38 Littoral Area Provided (acres) =0.54 (OK) R/W Requirement Estimate Pt. 2 Pond 5-1 STEP NO. 5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) STEP NO. 4 - POND CONFIGURATION cont. STEP NO. 7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr 24 hr Pond EL = Energy Losses @ 0.05% = STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA STEP NO. 6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS TOTAL WET AND DRY POND AREA REQUIREMENT Page 1875 of 4682 English Worksheet PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 POND DESIGNATION:CHECKED BY:DL 11/17/21 Pond Site Location = STA. 157+00, RT, 18th AVE NE Pond Site Existing Ground Elevation = Pond Site Soil Type = Pond Site Estimated Depth to Groundwater = Estimated SHWT = a. 11.5 b. 12.5 ft. Distance to Discharge Point = 500 LF Positive Drainage Gradient = 0.06%=0.3 ft. (vertical) Discharge Point NWL Estimation = 9.9 Discharge Point Peak Stage Estimation = 12.7 Minimum Wet Detention NWL = 10.2 ft. The pond(s) will be a combination of: Wet Detention and Dry Detention Storage Height (SH) = Minimum Existing Roadway Elevation =12.0 ft.12.0 ft. Minimum Proposed Roadway Elevation =14.5 ft.14.5 ft. Berm Elevation =14.5 ft.14.5 ft. Freeboard to DHW =1.0 ft.1.0 ft. Maximum DHW Elevation =13.5 ft.13.5 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL =10.2 ft.12.5 ft. Clearance to ESHWT =-2.3 ft.1.0 ft. SH =3.3 ft.1.0 ft. Wet Detention Dry Detention Volume Peak (ac-ft) =5.37 0.56 Volume Peak (cf) =234098 24586 Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: Maximum DHW - Pond NWL c. Summary of Controlling Soils and Tailwater Conditions R/W Requirement Estimate Pt. 1 Pond 5-2 b. Check of Tailwater Conditions a. Varies 0.5 to 1.0 ft b. Varies 0 to 0.5 ft STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS STEP NO. 4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 a (dry detention). Varies 12 to 14 b (wet detention). Varies 13 to 14 The Total Peak Storage Volume Required is: Maximum DHW - Pond Bottom Corkscrew Canal STEP NO. 2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) a. Holowpaw 113 and Oldsmar 125 (A/D) b. Riviera (131, B/D) and Malabar (120, A/D) a. Check of Pond Site Conditions STEP NO. 3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT filename: Pond 5-2.xls worksheet: RW REQUIREMENT PT.1 Page 1876 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 BASIN DESIGNATION:CHECKED BY:DL 11/17/21 Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims =2.0 3.0 SH =3.3 ft 1.0 ft L =346 ft 264 ft W =173 ft 88 ft Pond Area at Control/Bot EL =1.37 acres 0.53 acres Wet Detention Wet Detention Side slopes are 1:6 4 Length @ Top of SH =386 ft 272 ft Length @ Top of SH =213 ft 96 ft Pond Area at SH =1.88 acres 0.60 acres Volume Provided at SH = 5.38 ac-ft 0.56 ac-ft Volume Required = 5.37 ac-ft 0.56 ac-ft Wet Detention Dry Detention Side slopes are 1:4 4 Desired Maintenance Berm Widths =20 ft.15 ft. Length @ Outside Maintenance Berm =434 ft.310 ft. Width @ Outside Maintennace Berm =261 ft.134 ft. Minimum Pond Area Requirement =2.60 acres 0.95 acres Contingency =15%15% Pond Area Requirement =2.98 acres 1.09 acres 4.08 acres 3 yr / 24 hr Attenuation Volume =1.94 ac-ft 11.4 Length Between Pond and Roadway Low Point =2400 ft.1.2 ft Roadway Low Point EL =14.5 HGL Clearance at Roadway Low Point =1.9 ft (OK) Length @ Bot of Littoral Area (2' below NWL) =322 Length @ Top of Littoral Area (ft) =358 Width @ Bot of Littoral Area (2' below NWL) =149 Width @ Top of Littoral Area (ft) =185 Bot of Littoral Area (2' below NWL) =1.10 Top of Littoral Area (1' above NWL) =1.52 acres Littoral Area Requirement (acres) =0.34 Littoral Area Provided (acres) =0.42 (OK) STEP NO. 6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS STEP NO. 7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr 24 hr Pond EL = Energy Losses @ 0.05% = STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA TOTAL WET POND AREA REQUIREMENT R/W Requirement Estimate Pt. 2 Pond 5-2 STEP NO. 5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) STEP NO. 4 - POND CONFIGURATION cont. Page 1877 of 4682 English Worksheet PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 POND DESIGNATION:CHECKED BY:DL 11/17/21 Pond Site Location = STA. 162+00 LT Pond Site Existing Ground Elevation = Varies 12 to 14 ft Pond Site Soil Type = Pond Site Estimated Depth to Groundwater = Estimated SHWT = 11.5 ft. Distance to Discharge Point = 2600 LF Positive Drainage Gradient = 0.06%=1.6 ft. (vertical) Discharge Point NWL Estimation = 9.9 Discharge Point Peak Stage Estimation = 12.7 Minimum Wet Detention NWL = 11.5 ft. The pond(s) will be a combination of: Wet Detention and Dry Detention Storage Height (SH) = Minimum Existing Roadway Elevation =12.0 ft.12.0 ft. Minimum Proposed Roadway Elevation =14.5 ft.14.5 ft. Berm Elevation =14.5 ft.14.5 ft. Freeboard to DHW =1.0 ft.1.0 ft. Maximum DHW Elevation =13.5 ft.13.5 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL =11.5 ft.12.5 ft. Clearance to ESHWT =0.0 ft.1.0 ft. SH =2.0 ft.1.0 ft. Wet Detention Dry Detention Volume Peak (ac-ft) =7.16 0.66 Volume Peak (cf) =311847 28753 and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 STEP NO. 3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT The Total Peak Storage Volume Required is: Pond 5-3 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS STEP NO. 2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) Corkscrew Canal STEP NO. 4 - POND CONFIGURATION Holowpaw 113 and Malabar 120 (A/D), Immokalee (117, B/D) a. Check of Pond Site Conditions Maximum DHW - Pond Bottom Volume = Length*Width*Height, where Volume is from Step No. 3, b. Check of Tailwater Conditions Varies 0.5 to 1.0 ft Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: Maximum DHW - Pond NWL c. Summary of Controlling Soils and Tailwater Conditions R/W Requirement Estimate Pt. 1 filename: Pond 5-3.xls worksheet: RW REQUIREMENT PT.1 Page 1878 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 BASIN DESIGNATION:CHECKED BY:DL 11/17/21 Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims =1.5 3.0 SH =2.0 ft 1.0 ft L =468 ft 286 ft W =312 ft 95 ft Pond Area at Control/Bot EL =3.36 acres 0.62 acres Wet Detention Wet Detention Side slopes are 1:6 4 Length @ Top of SH =492 ft 294 ft Length @ Top of SH =336 ft 103 ft Pond Area at SH =3.80 acres 0.70 acres Volume Provided at SH = 7.16 ac-ft 0.66 ac-ft Volume Required = 7.16 ac-ft 0.66 ac-ft Wet Detention Dry Detention Side slopes are 1:4 4 Desired Maintenance Berm Widths =20 ft.15 ft. Length @ Outside Maintenance Berm =540 ft.332 ft. Width @ Outside Maintennace Berm =384 ft.141 ft. Minimum Pond Area Requirement =4.77 acres 1.07 acres Contingency =15%15% Pond Area Requirement =5.48 acres 1.24 acres 6.72 acres 3 yr / 24 hr Attenuation Volume =2.73 ac-ft 12.3 Length Between Pond and Roadway Low Point =1750 ft.0.9 ft Roadway Low Point EL =14.5 HGL Clearance at Roadway Low Point =1.4 ft (OK) Length @ Bot of Littoral Area (2' below NWL) =444 Length @ Top of Littoral Area (ft) =480 Width @ Bot of Littoral Area (2' below NWL) =288 Width @ Top of Littoral Area (ft) =324 Bot of Littoral Area (2' below NWL) =2.94 Top of Littoral Area (1' above NWL) =3.58 acres Littoral Area Requirement (acres) =0.40 Littoral Area Provided (acres) =0.64 (OK) R/W Requirement Estimate Pt. 2 Pond 5-3 STEP NO. 5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) STEP NO. 7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr 24 hr Pond EL = Energy Losses @ 0.05% = STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA STEP NO. 4 - POND CONFIGURATION cont. STEP NO. 6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS TOTAL WET POND AREA REQUIREMENT Page 1879 of 4682 English Worksheet PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 POND DESIGNATION:CHECKED BY:DL 11/17/21 Pond Site Location = STA. 162+00 LT Pond Site Existing Ground Elevation = Varies 12 to 14 ft Pond Site Soil Type = Pond Site Estimated Depth to Groundwater = Estimated SHWT = 11.0 ft. Distance to Discharge Point = 2500 LF Positive Drainage Gradient = 0.06%=1.5 ft. (vertical) Discharge Point NWL Estimation = 9.9 Discharge Point Peak Stage Estimation = 12.7 Minimum Wet Detention NWL = 11.4 ft. The pond(s) will be a combination of: Wet Detention and Dry Detention Storage Height (SH) = Minimum Existing Roadway Elevation =12.0 ft.12.0 ft. Minimum Proposed Roadway Elevation =14.5 ft.14.5 ft. Berm Elevation =14.5 ft.14.5 ft. Freeboard to DHW =1.0 ft.1.0 ft. Maximum DHW Elevation =13.5 ft.13.5 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL =11.4 ft.12.0 ft. Clearance to ESHWT =0.4 ft.1.0 ft. SH =2.1 ft.1.5 ft. Wet Detention Dry Detention Volume Peak (ac-ft) =7.15 0.64 Volume Peak (cf) =311242 27929 and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: Maximum DHW - Pond NWL c. Summary of Controlling Soils and Tailwater Conditions R/W Requirement Estimate Pt. 1 The Total Peak Storage Volume Required is: Pond 5-4 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS a. Check of Pond Site Conditions STEP NO. 3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT STEP NO. 4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, b. Check of Tailwater Conditions Varies 0.5 to 1.0 ft STEP NO. 2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) Holowpaw 113 and Oldsmar 125 (A/D) Maximum DHW - Pond Bottom Corkscrew Canal filename: Pond 5-4.xls worksheet: RW REQUIREMENT PT.1 Page 1880 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 BASIN DESIGNATION:CHECKED BY:DL 11/17/21 Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims =1.6 4.0 SH =2.1 ft 1.5 ft L =465 ft 258 ft W =298 ft 64 ft Pond Area at Control/Bot EL =3.18 acres 0.38 acres Wet Detention Wet Detention Side slopes are 1:6 4 Length @ Top of SH =490 ft 270 ft Length @ Top of SH =323 ft 76 ft Pond Area at SH =3.63 acres 0.47 acres Volume Provided at SH = 7.15 ac-ft 0.64 ac-ft Volume Required = 7.15 ac-ft 0.64 ac-ft Wet Detention Dry Detention Side slopes are 1:4 4 Desired Maintenance Berm Widths =20 ft.15 ft. Length @ Outside Maintenance Berm =538 ft.308 ft. Width @ Outside Maintennace Berm =371 ft.114 ft. Minimum Pond Area Requirement =4.58 acres 0.81 acres Contingency =15%15% Pond Area Requirement =5.27 acres 0.93 acres 6.20 acres 3 yr / 24 hr Attenuation Volume =2.69 ac-ft 12.2 Length Between Pond and Roadway Low Point =1700 ft.0.9 ft Roadway Low Point EL =14.5 HGL Clearance at Roadway Low Point =1.5 ft (OK) Length @ Bot of Littoral Area (2' below NWL) =441 Length @ Top of Littoral Area (ft) =477 Width @ Bot of Littoral Area (2' below NWL) =274 Width @ Top of Littoral Area (ft) =310 Bot of Littoral Area (2' below NWL) =2.77 Top of Littoral Area (1' above NWL) =3.39 acres Littoral Area Requirement (acres) =0.38 Littoral Area Provided (acres) =0.62 (OK) 3 yr 24 hr Pond EL = Energy Losses @ 0.05% = STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA STEP NO. 6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS TOTAL WET POND AREA REQUIREMENT R/W Requirement Estimate Pt. 2 Pond 5-4 STEP NO. 5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) STEP NO. 4 - POND CONFIGURATION cont. STEP NO. 7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES Page 1881 of 4682 English Worksheet PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 POND DESIGNATION:CHECKED BY:DL 11/17/21 Pond Site Location = STA. 198+00, RT Pond Site Existing Ground Elevation = 14.0 ft. Pond Site Soil Type = Pond Site Estimated Depth to Groundwater = Varies 0.5 to 1 ft. Estimated SHWT = 13.0 ft. Distance to Discharge Point = 1400 LF Positive Drainage Gradient = 0.06%=0.8 ft. (vertical) Discharge Point NWL Estimation = 9.9 Discharge Point Peak Stage Estimation = 12.7 Minimum Wet Detention NWL = 10.8 ft. The pond(s) will be a combination of: Wet Detention (Dry Detention not feasible at estimated SHWT) Storage Height (SH) = Minimum Existing Roadway Elevation =12.0 ft. Minimum Proposed Roadway Elevation =15.0 ft. Berm Elevation =15.0 ft. Freeboard to DHW =1.0 ft. Maximum DHW Elevation =14.0 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL =10.8 ft. Clearance to ESHWT =-2.2 ft. SH =3.2 ft. Wet Detention Volume Peak (ac-ft) =5.04 Volume Peak (cf) =219459 a. Check of Pond Site Conditions STEP NO. 4 - POND CONFIGURATION R/W Requirement Estimate Pt. 1 b. Check of Tailwater Conditions Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 Corkscrew Canal Pond 6-1 STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS STEP NO. 2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) The Total Peak Storage Volume Required is: Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: Maximum DHW - Pond NWL c. Summary of Controlling Soils and Tailwater Conditions STEP NO. 3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT Holopaw fine sand (113, A/D) and Immokalee fine sand (117, B/D) filename: Pond 6-1.xls worksheet: RW REQUIREMENT PT.1 Page 1882 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 BASIN DESIGNATION:CHECKED BY:DL 11/17/21 Wet Detention L/W Ratio Based on Available Parcel Dims =3.0 SH =3.2 ft L =414 ft W =138 ft Pond Area at Control/Bot EL =1.31 acres Wet Detention Side slopes are 1:6 Length @ Top of SH =453 ft Length @ Top of SH =177 ft Pond Area at SH =1.84 acres Volume Provided at SH = 5.04 ac-ft Volume Required = 5.04 ac-ft Wet Detention Side slopes are 1:4 Desired Maintenance Berm Widths =20 ft. Length @ Outside Maintenance Berm =501 ft. Width @ Outside Maintennace Berm =225 ft. Minimum Pond Area Requirement =2.58 acres Contingency =15% Pond Area Requirement =2.97 acres 2.97 acres 3 yr / 24 hr Attenuation Volume =1.79 ac-ft 11.9 Length Between Pond and Roadway Low Point =1100 ft.0.6 ft Roadway Low Point EL =15.0 HGL Clearance at Roadway Low Point =2.5 ft (OK) Length @ Bot of Littoral Area (2' below NWL) =390 Length @ Top of Littoral Area (ft) =426 Width @ Bot of Littoral Area (2' below NWL) =114 Width @ Top of Littoral Area (ft) =150 Bot of Littoral Area (2' below NWL) =1.02 Top of Littoral Area (1' above NWL) =1.47 acres Littoral Area Requirement (acres) =0.26 Littoral Area Provided (acres) =0.45 (OK) R/W Requirement Estimate Pt. 2 Pond 6-1 STEP NO. 5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) STEP NO. 4 - POND CONFIGURATION STEP NO. 7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr 24 hr Pond EL = Energy Losses @ 0.05% = STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA STEP NO. 6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS TOTAL WET AND DRY POND AREA REQUIREMENT Page 1883 of 4682 English Worksheet PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 POND DESIGNATION:CHECKED BY:DL 11/17/21 Pond Site Location = STA. 198+00, RT Pond Site Existing Ground Elevation = 14.0 ft. Pond Site Soil Type = Pond Site Estimated Depth to Groundwater = 0.5 ft. Estimated SHWT = 13.5 ft. Distance to Discharge Point = 50 LF Positive Drainage Gradient = 0.06%=0.0 ft. (vertical) Discharge Point NWL Estimation = 9.9 Discharge Point Peak Stage Estimation = 12.7 Minimum Wet Detention NWL = 10.0 ft. The pond(s) will be a combination of: Wet Detention (Dry Detention not feasible at estimated SHWT) Storage Height (SH) = Minimum Existing Roadway Elevation =13.0 ft. Minimum Proposed Roadway Elevation =15.0 ft. Berm Elevation =15.0 ft. Freeboard to DHW =1.0 ft. Maximum DHW Elevation =14.0 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL =10.0 ft. Clearance to ESHWT =-3.5 ft. SH =4.0 ft. Wet Detention Volume Peak (ac-ft) =4.66 Volume Peak (cf) =203061 STEP NO. 4 - POND CONFIGURATION Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 STEP NO. 2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) Holopaw and Malabar fine sand (113 and 120, A/D)a. Check of Pond Site Conditions STEP NO. 3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT The Total Peak Storage Volume Required is: Corkscrew Canal b. Check of Tailwater Conditions STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS Pond 6-2 Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: Maximum DHW - Pond NWL c. Summary of Controlling Soils and Tailwater Conditions R/W Requirement Estimate Pt. 1 filename: Pond 6-2.xls worksheet: RW REQUIREMENT PT.1 Page 1884 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 BASIN DESIGNATION:CHECKED BY:DL 11/17/21 Wet Detention L/W Ratio Based on Available Parcel Dims =4.0 SH =4.0 ft L =390 ft W =97 ft Pond Area at Control/Bot EL =0.87 acres Wet Detention Side slopes are 1:6 Length @ Top of SH =438 ft Length @ Top of SH =145 ft Pond Area at SH =1.46 acres Volume Provided at SH = 4.66 ac-ft Volume Required = 4.66 ac-ft Wet Detention Side slopes are 1:4 Desired Maintenance Berm Widths =20 ft. Length @ Outside Maintenance Berm =486 ft. Width @ Outside Maintennace Berm =193 ft. Minimum Pond Area Requirement =2.16 acres Contingency =15% Pond Area Requirement =2.48 acres 2.48 acres 3 yr / 24 hr Attenuation Volume =1.60 ac-ft 11.4 Length Between Pond and Roadway Low Point =2750 ft.1.4 ft Roadway Low Point EL =15.0 HGL Clearance at Roadway Low Point =2.3 ft (OK) Length @ Bot of Littoral Area (2' below NWL) =366 Length @ Top of Littoral Area (ft) =402 Width @ Bot of Littoral Area (2' below NWL) =73 Width @ Top of Littoral Area (ft) =109 Bot of Littoral Area (2' below NWL) =0.62 Top of Littoral Area (1' above NWL) =1.01 acres Littoral Area Requirement (acres) =0.17 Littoral Area Provided (acres) =0.39 (OK) STEP NO. 7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr 24 hr Pond EL = Energy Losses @ 0.05% = STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA TOTAL WET AND DRY POND AREA REQUIREMENT R/W Requirement Estimate Pt. 2 Pond 6-2 STEP NO. 5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) STEP NO. 4 - POND CONFIGURATION STEP NO. 6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS Page 1885 of 4682 English Worksheet PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 POND DESIGNATION:CHECKED BY:DL 11/17/21 Pond Site Location = STA. 181+00 and STA 186+00, RT Pond Site Existing Ground Elevation = Varies 12 to 14 ft. Pond Site Soil Type = Pond Site Estimated Depth to Groundwater = 0.5 ft. Estimated SHWT = 12.0 ft. Distance to Discharge Point = 1150 LF Positive Drainage Gradient = 0.06%=0.7 ft. (vertical) Discharge Point NWL Estimation = 9.9 Discharge Point Peak Stage Estimation = 12.7 Minimum Wet Detention NWL = 10.6 ft. The pond(s) will be a combination of: Wet Detention Dry Detention Storage Height (SH) = Minimum Existing Roadway Elevation =13.0 ft.13.0 ft. Minimum Proposed Roadway Elevation =15.0 ft.15.0 ft. Berm Elevation =15.0 ft.15.0 ft. Freeboard to DHW =1.0 ft.1.0 ft. Maximum DHW Elevation =14.0 ft.14.0 ft. Proposed Wet Pond NWL / Dry Pond Bottom EL =10.6 ft.13.0 ft. Clearance to ESHWT =-1.4 ft.1.0 ft. SH =3.4 ft.1.0 ft. Wet Detention Dry Detention Volume Peak (ac-ft) =4.48 0.50 Volume Peak (cf) =195270 21684 STEP NO. 3 - TOTAL PEAK STORAGE VOLUME REQUIREMENT STEP NO. 4 - POND CONFIGURATION b. Check of Tailwater Conditions Volume = Length*Width*Height, where Volume is from Step No. 3, and, L = Length of Pond, W = Width of Pond and SH = Storage Height from Step No. 2 The Total Peak Storage Volume Required is: STEP NO. 1 - POND LOCATION, TYPE, AND TAILWATER CONDITIONS STEP NO. 2 - STORAGE HEIGHT ESTIMATE (BASED UPON SHWT AND TAILWATER) Holopaw fine sand (113, A/D) Based upon design criteria, a combination of Wet Detention and Dry Detention/Retention is required. Positive drainage from proposed pond to discharge point at canal is required. Treatment and the peak attenuation volumes are constrained to the storage height (SH) calculated as follows: Maximum DHW - Pond NWL c. Summary of Controlling Soils and Tailwater Conditions R/W Requirement Estimate Pt. 1 Maximum DHW - Pond Bottom Corkscrew Canal Pond 6-3 a. Check of Pond Site Conditions filename: Pond 6-3.xls worksheet: RW REQUIREMENT PT.1 Page 1886 of 4682 PROJECT TITLE:Wilson Boulevard: Golden Gate Boulevard to Immokalee Road SUBJECT:MADE BY:AS 11/16/21 BASIN DESIGNATION:CHECKED BY:DL 11/17/21 Wet Detention Dry Detention L/W Ratio Based on Available Parcel Dims =5.0 6.0 SH =3.4 ft 1.0 ft L =474 ft 347 ft W =95 ft 58 ft Pond Area at Control/Bot EL =1.03 acres 0.46 acres Wet Detention Wet Detention Side slopes are 1:6 4 Length @ Top of SH =515 ft 355 ft Length @ Top of SH =136 ft 66 ft Pond Area at SH =1.60 acres 0.54 acres Volume Provided at SH = 4.48 ac-ft 0.50 ac-ft Volume Required = 4.48 ac-ft 0.50 ac-ft Wet Detention Dry Detention Side slopes are 1:4 4 Desired Maintenance Berm Widths =20 ft.15 ft. Length @ Outside Maintenance Berm =563 ft.393 ft. Width @ Outside Maintennace Berm =184 ft.104 ft. Minimum Pond Area Requirement =2.37 acres 0.94 acres Contingency =15%15% Pond Area Requirement =2.73 acres 1.08 acres 3.81 acres 3 yr / 24 hr Attenuation Volume =1.68 ac-ft 11.9 Length Between Pond and Roadway Low Point =2000 ft.1.0 ft Roadway Low Point EL =15.0 HGL Clearance at Roadway Low Point =2.1 ft (OK) Length @ Bot of Littoral Area (2' below NWL) =450 Length @ Top of Littoral Area (ft) =486 Width @ Bot of Littoral Area (2' below NWL) =71 Width @ Top of Littoral Area (ft) =107 Bot of Littoral Area (2' below NWL) =0.73 Top of Littoral Area (1' above NWL) =1.19 acres Littoral Area Requirement (acres) =0.21 Littoral Area Provided (acres) =0.46 (OK) STEP NO. 6 - ACCOUNTING FOR THE POND SIDE SLOPES FROM (SH) TO MAINTENANCE BERMS AND BERM WIDTHS STEP NO. 7 - CHECK OF ESTIMATED STORM DRAIN SYSTEM 1' MIN HGL CLEARANCE AND ENERGY LOSSES 3 yr 24 hr Pond EL = Energy Losses @ 0.05% = STEP NO. 8 - CHECK OF ESTIMATED LITTORAL AREA TOTAL WET AND DRY POND AREA REQUIREMENT R/W Requirement Estimate Pt. 2 Pond 6-3 STEP NO. 5 - ACCOUNTING FOR THE POND SIDE SLOPES TO STORAGE HEIGHT (SH) STEP NO. 4 - POND CONFIGURATION Page 1887 of 4682 Attachment 4 Supporting Documentation Page 1888 of 4682 From:AbbottAlicia To:Gramer, Bill/SWF Cc:Shepard, Angela/ORL; Kirby, Felicia; LibbyPamela Subject:[EXTERNAL] RE: Stormwater Pond Setbacks Date:Wednesday, September 29, 2021 4:55:07 PM Attachments:image001.png From a CDM Smith e-mail dated April 27, 2018 “Under rule 62-555.312 a well cannot be sited closer than 50 feet from surface water. On the other hand, if the well goes in first, then the surface water feature must be sited at least 300 feet from the well to conform with ERP requirements.” Regards, Alicia Abbott E.I., PMP Project Manager Collier County Government Public Utilities Engineering & Project Management 3339 Tamiami Trail East, Suite 303 Naples, FL 34112 Phone: 239-252-5344 Cell: 239-877-3961 From: Gramer, Bill/SWF <Bill.Gramer@jacobs.com> Sent: Wednesday, September 29, 2021 10:16 AM To: AbbottAlicia <Alicia.Abbott@colliercountyfl.gov>; LibbyPamela <Pamela.Libby@colliercountyfl.gov> Cc: Shepard, Angela/ORL <Angela.Shepard@jacobs.com>; Kirby, Felicia <Felicia.Kirby2@jacobs.com> Subject: Stormwater Pond Setbacks EXTERNAL EMAIL: This email is from an external source. Confirm this is a trusted sender and use extreme caution when opening attachments or clicking links. Alicia, We are trying to locate potential ponds along Wilson Boulevard and as you would imagine the existing wells limit available sites. Can you please send me the County’s required Setbacks for Ponds Vs. Well Heads Pond Built First = Well Built First= SFWMD Criteria shows 100 ft from Public Wells and 75 Ft from Private Wells Page 1889 of 4682 The FDEP Wellfield Protection Act 500 ft Setback does not really address Stormwater facilities Thanks Bill Bill Gramer, P.E., AICP Vice President Transportation D 239-431-9222 M 239-860-4922 5801 Pelican Bay Blvd., Suite 505 Naples, Florida 34108 NOTICE - This communication may contain confidential and privileged information that is for the sole use of the intended recipient. Any viewing, copying or distribution of, or reliance on this message by unintended recipients is strictly prohibited. If you have received this message in error, please notify us immediately by replying to the message and deleting it from your computer. Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. Page 1890 of 4682 Wilson Bvld Corridor Study FDEP/DEAR, FDEP, DEAR, Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community, FDEP,DEAR Waterbody IDs (WBIDs) Group 1 Verified List WBIDs September 17, 2021 0 0.8 1.60.4 mi 0 1 20.5 km 1:36,112 Map created by Map Direct, powered by ESRI. undefined Florida Department of Environmental Protection makes no warranty,expressed or implied,or assumes any legal liability or responsibility for the accuracy,completeness,or usefulness of any information,apparatus,product,or process disclosed,or represents that its use would not infringe privately owned rights.Page 1891 of 4682 Page 1893 of 4682 Page 1894 of 4682 Page 1895 of 4682 #0 #0 #0 #0 #0 #0 #0 #0#0 #0 #0 #0 #0 #0 #0#0#0 #0 #0 #0#0 #0 #0 #0 #0#0 #0 #0 #0 #0 #0 #0 #0 #0 #0 "S "S"S kj kj #V G u l fo fM e x i c o C-1 Connector £¤41 Lee County Collier County Cocohatchee Canal CorkscrewCanalMerrittCanalGolden Gate Main Canal }BCB Field StationBCB Service Center Manatee Mitigation Area C-485 S-489GG MainFaka Union CanalMiller Canal951 CanalAirport Rd CanalCypress CanalHenderson CreekI-75 CanalFaka UnionOrange TreeCurry CanalGreen Canal GG Main S486 S487 S488HC2 GG7 FU1 HC1 FU2 FU3 GG1 GG2 AR1 GG3 GG4 AR2 FU5 GG5 FU6 GG6 FU7 FU4S I75W3 Cork2Cork3 Coco3Coco2Coco1 Coco4 I75W1 I75W2 Cork1 CR951S Curry 1 CR951 N MILLER1 MILLER2 MILLER3Cypress1 BCB \ SFWMD Facility and Infrastructure Map DISCLAIMER Any information, including but not limited to software and data, received from the South Florida Water Management District ("District") in fulfillment of a request is provided "AS IS" without warranty of any kind, and the District expressly disclaims all express and implied warranties, including but not limited to the implied warranties of merchantability and fitness for a particular purpose. The District does not warrant, guarantee, or make any representations regarding the use, or the results of the use, of the information provided to you by the District in terms of correctness, accuracy, reliability, timeliness or otherwise. The entire risk as to the results and performance of any information obtained from the District is entirely assumed by the recipient. This map is a conceptual tool utilized for project development only. This map is not self-executing or binding, and does not otherwise affect the interests of any persons including any vested rights or existing uses of real property. 0 2 4 Miles SFWMD_FI_Map_Mar_2019 UPDATED Mar 2019 Urban Collier County, Florida BIG CYPRESS BASINSFWMD2660 Horseshoe Dr. N.Naples, Florida 34104239-263-7615 µ Works of the Basin #0 BCB Structures Canal Reach Controlled, Operated and Maintained by BCB Canal Reach Maintained by BCB* Canal Overbank Controlled, Operated and Maintained by Collier County** *Note: Canal Reach Controlled and Operated by Collier County, subject to Limiting Conditions (3rd Amendment to Agreement C-11759, 02/09/2012) **Note: Canal Overbank Controlled and Operated by Collier County, subject to Limiting Conditions (3rd Amendment to Agreement C-11759, 02/09/2012) Works of the District #V S489 "S CERP Pump Stations Manatee Mitigation Area Tieback Levee Spreader Basins CERP Canals (CERP) Comprehensive Everglades Restoration Plan Page 1896 of 4682 Canals in South Florida Appendix C: Primary Water Management Features C-65 Table C‐22. BCB‐operated water control structures in the Big Cypress Basin.  Control Structure ID Type Crest Elevation (ft. NGVD) Net Length (feet) Top of Bank Elevation (ft. msl) Function Comments GG-1 Moveable crest weir with manually   operatedhydraulic flap gate   Crest elev.: Flap Up: +3.35;  Flap Down: +2.00  lgth=112 ft; top of bank: 9.5 ft  Flood Control & Salinity Control The Airport Road Canal (S.) Subbasin empties into the Main Golden Gate Canal a short distance upstream ofthis structure. GG-2 Fixed crest weir with 2 manually operated  bottom opening sluice gates   crest elev. : +5.00 ; sluice gate: ‐1 .00   lgth=105 ft; top of bank: 9.5 ft  Flood Control & Over- drainage Prevention Approx. 2 miles upstream ofGG-l near the 1-75 overpass. The 1-75 Canal Subbasin empties into the Main Golden Gate Canal a short distance upstream of this structure. GG-3 Fixed crest weir with 2 manually operated  bottom opening sluice gates  crest elev. : +7.50; sluice gate: ‐0.50   lgth=100 ft; top of bank: 13.0 ft  Flood Control & Over- drainage Prevention Approx. 6 miles upstream ofGG-2 at the eastern end of 1 7th Avenue S.W. (within the Golden Gate community) GG-4 Fixed crest weir with 2 manually operated  bottom opening sluice gates   crest elev: +9.50;  sluice gate: +2.50   lgth=100 ft; top of bank: 13.0 ft  Flood Control & Over- drainage Prevention Approx. 8.35 miles upstream of GG-3. Located 250 ft. east and 100 ft. south of the intersection of Golden Gate Boulevard and 8th Street N.E. in Golden Gate Estates. GG-5 Fixed crest weir with 2 manually operated  bottom opening sluice gates   crest elev: +10.50; sluice gate: +4.50   lgth=95 ft; top of bank: 15.0 ft  Flood Control & Over- drainage Prevention Approx. 4 miles upstream of GG-4. Located 500 ft north of the Randall Boulevard Bridge over the Golden Gate Canal in Golden Gate Estates. GG-6 Non‐operable fixed crest weir with Vee‐notch   crest elev: +12.10  lgth: 49 ft;  top of bank: 18.0 ft  Flood Control & Over- drainage Prevention Approx. 3.5 miles upstream of GG-5. This structure is approx. 2.5 downstream of the northerly terminus of the Main Golden Gate Canal. GG-7 Concrete sheetpile fixed crest weir with Vee‐n  otch equipped with flashboards.   crest elev: +13.1  lgth = 44 ft; top of bank: 16.3 ft (design flood elev.)  Seasonal Water level Control & Over-drainage Prevention Located on a side branch of the Main Golden Gate Canal near the northerly terminus of 2Oth Street N.E. off 47th Avenue N.E.. Cypress-i Fixed crest weir with 2 manually operated  bottom opening sluice gates   crest elev.: +9.50;  sluice gate: +2.50  lgth: 42 ft;  top of bank: 10.0 ft  Flood Control & Over-d rainage Prevention Located upstream of GG-3, at the north end of 25th Street N.W. from the intersection of Golden Gate Estates. I-75-1 Fixed crest weir w/roller gate and back  pumping facilities  Crest elev.: +6.20 gate: +1 .00  lgth: 96 ft;  top of bank: 10.0 ft  Flood Control & Over- drainage Prevention Located at 1-75 Canal Outfall to Main Golden Gate Canal System. I-75-2 Water elevation gauging station (fixed  concrete weir immediately upstream)  weir crest elev. += 8.00  lgth=71 .5;  top of bank: (unknown)  Data Collection 1-75 Canal at Pine Ridge Road I-75-3 Fixed crest weir with one bottom opening  and one top opening sluice gate ‐ manually  operated  crest: +iJ.OO   top gate: +10.00; bottom gate: +1.5  lgth: 23 ft;  top of bank: 9.0 ft  Flood Control & Over- drainage Prevention Approximately 2 miles downstream of the northern terminus of the I-75 Canal. CR-31S Amil gate with back pumping capabilities   Discharge Elev: +7.50 msl   wet season +8.50 msl   dry season Invert: ‐2.3’ msl   Size: D‐710;  top of bank: 10.4 ft  Flood Control & Over drainage Prevention Located on Airport-Pulling Road approximately 2000 ft north of Golden Gate Parkway (CR 886) CR-31N Amil gate with back pumping capabilities  Discharge Elev: +7.50 msl   wet season +8.50 msl   dry season Invert: +2.0’ msl  Size: D‐500;   top of bank: 10.2 ft  Flood Control & Over- drainage Prevention . Located on Airport-Pulling Road approx. one mile south ofGolden Gate Parkway (CR 886) HEN-1 Fixed crest weir with manually  operated slide gates (2) and one sluice gate  crest: +5.00; slide gates: +3.5 msl;  sluice gate: +0.5 msl;   top of bank: 7.0 ft  Salinity and Flood Control & Over-drainage Prevention North side of US-41 approx. 2000’ east of County Road 951 MERRITT-1 Adjustable crest weir (stoplog )   crest range: ‐4.9 to +9.0  lgth: 25 ft;  top of bank: 8.5 ft  Flood Control & Over- drainage Prevention Approx. 1 ‘/ miles west of the easterly end of Stewart Blvd. in Golden Gate Estates MILLER-I Fixed crest weir with manually  operated flashboards   crest: +3.90   lgth: 68 ft;  top of bank: 9.5 ft  Flood Control & Overdrainage Prevention West end of98th Avenue SE from intersection of Everglades Blvd in Golden Gate Estates, Six miles downstream of MILLER-2 Page 1897 of 4682 Big Cypress Basin: Simulated 25-Year/5-Day Stage Hydrographs Page 1898 of 4682 Page 1899 of 4682 Page 1900 of 4682 Page 1901 of 4682 Page 1902 of 4682 Page 1903 of 4682 Page 1904 of 4682 ENVIRONMENTAL RESOURCE PERMIT APPLICANT’S HANDBOOK VOLUME II Effective: MAY 22, 2016 $ Page 1906 of 4682 Page 1907 of 4682 Page 1908 of 4682 Page 1909 of 4682 Page 1910 of 4682 Page 1911 of 4682 Page 1912 of 4682 Page 1913 of 4682 Page 1914 of 4682 Page 1915 of 4682 Page 1916 of 4682 Page 1917 of 4682 Page 1918 of 4682 Page 1919 of 4682 Page 1920 of 4682 Page 1921 of 4682 Page 1922 of 4682 Page 1923 of 4682 Page 1924 of 4682 Page 1925 of 4682 Page 1926 of 4682 Page 1927 of 4682 Page 1928 of 4682 Page 1929 of 4682 Page 1930 of 4682 Page 1931 of 4682 Page 1932 of 4682 Page 1933 of 4682 Page 1934 of 4682 Page 1935 of 4682 Page 1936 of 4682 Page 1937 of 4682 Page 1938 of 4682 Page 1939 of 4682 Page 1940 of 4682 Transportation Management Services Department Transportation Engineering Division Recommendation to approve and adopt a Resolution authorizing the condemnation of those fee simple interests in land necessary for the construction of stormwater ponds required for the expansion of Wilson Boulevard from two lanes to four lanes between Golden Gate Boulevard and Immokalee Road. (Project No. 60229) 1 Condemnation Resolution Wilson Boulevard (Golden Gate Boulevard to Immokalee Road) Jay Ahmad, P.E Director, Transportation Engineering Page 1941 of 4682 Transportation Management Services Department Transportation Engineering Division 2 Project Location Map Page 1942 of 4682 Transportation Management Services Department Transportation Engineering Division 3 Pond Sites Exhibit Page 1943 of 4682 Transportation Management Services Department Transportation Engineering Division 4 Overall Proposed Improvements •Four lane widening from Golden Gate Blvd to Immokalee Rd. •Side street drainage improvements. •Replace bridge over Cypress Canal; widen or replace bridge box culvert over Cocohatchee Canal. •Curb, gutters, sidewalks, shared-use pathway, on-street bike lanes, bus stop enhancements, medians, drainage, raw water main & well house improvements. •Corridor or intersection lighting. Page 1944 of 4682 Transportation Management Services Department Transportation Engineering Division 5 Need for Improvements •Population Growth in Golden Gate Estates •Traffic congestion •Lack of system connectivity in Golden Gate Estates and eastern Collier County •Growth in Rural Land Stewardship Area •Meet Long Range Transportation Plan Page 1945 of 4682 Transportation Management Services Department Transportation Engineering Division 6 Considerations for Condemnation Resolution 1.Alternative Alignments 2.The Costs of Competing Alternatives 3.Public Health, Safety and Welfare 4.Long Range Planning 5.Environmental Impacts Page 1946 of 4682 Transportation Management Services Department Transportation Engineering Division 7 Alternative Alignments Page 1947 of 4682 Transportation Management Services Department Transportation Engineering Division 8 Right of Way Acquisition •Four pond sites already acquired/purchased •Authority requested to purchase/condemn seven additional pond sites •All pond site properties are presently unimproved •Construction not currently funded •Pond sites need to be acquired while properties remain undeveloped Page 1948 of 4682 Transportation Management Services Department Transportation Engineering Division 9 Condemnation Resolution Wilson Boulevard (Golden Gate Blvd to Immokalee Rd) Recommendation to approve and adopt a Resolution authorizing the condemnation of those fee simple interests in land necessary for the construction of stormwater ponds required for the expansion of Wilson Boulevard from two lanes to four lanes between Golden Gate Boulevard and Immokalee Road. (Project No. 60229). Estimated fiscal impact: $2.5million. Page 1949 of 4682 Page 1950 of 4682 Page 1951 of 4682 EXHIBIT “A” POND SITE PARCELS - WILSON BLVD PROJECT NO. 60229 (ALL INTERESTS TO BE ACQUIRED IN FEE SIMPLE) PARCEL 313POND: The South 165 feet of Tract 5, GOLDEN GATE ESTATES, UNIT NO. 18, according to the plat thereof recorded in Official Records Book 7, Pages 7 & 8, of the Public Records of Collier County, Florida. PARCEL 314POND: The North 165 feet of Tract 5, GOLDEN GATE ESTATES, UNIT NO. 18, according to the plat thereof recorded in Official Records Book 7, Pages 7 & 8, of the Public Records of Collier County, Florida. PARCEL 315POND: The South 150' of Tract 131, GOLDEN GATE ESTATES, Unit 19, according to the plat thereof, recorded in Plat Book 7, Pages 77 and 78, of the Public Records of Collier County, Florida. PARCEL 368POND: The South 180 feet of Tract No. 3, GOLDEN GATE ESTATES, UNIT NO. 23, according to the map or plat thereof as recorded in Plat Book 7, Pages 9 and 10, of the Public Records of Collier County, Florida. PARCEL 450POND: All of Tract 27, GOLDEN GATE ESTATES UNIT NO. 23, according to the plat thereof, as recorded in Plat Book 7, at pages 9 and 10, of the Public Records of Collier County, Florida. PARCEL 451POND: The East 180 feet of Tract No. 28, GOLDEN GATES ESTATES, UNIT NO. 23, according to the map or plat thereof, as recorded in Plat Book 7, Pages 9 and 10, of the Public Records of Collier County, Florida. PARCEL 452POND: The West 180 feet of Tract 43, GOLDEN GATE ESTATES, UNIT NO. 23, according to the plat thereof as recorded in Plat Book 7, Page 9, of the Public Records of Collier County, Florida. Page 1952 of 4682