Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Backup Documents 06/24/2025 Item #16F 3
ORIGINAL DOCUMENTS CHECKLIST&ROUTING SLIP TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO 16 F 3 THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW**ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s)(List in routing order) Office Initials Date 1. County Attorney's Office County Attorney Office 2. BCC Office Board of County Commissioners Chairman �2 6/ 41? 3. Minutes and Records Clerk of Court's Office (! q,d7 PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addresses above,may need to contact staff for additional or missing information. Name of Primary Staff Bendisa E.Miller,Facilities Division Phone 239-252-8440 Contact/Department Number Bendisa.Miller@colliercountyfl.gov Email Agenda Date Item was June 24,2025 Agenda Approved by the BCC Item 16.F.3 Number Type of Document Attached Recommendation to approve Change Order No.20 Number of reallocating$50,000 from the building permit fees Original 1 and$34,785.76 from P&P Bonds,and ratify Documents administrative approval of ninety days to the Attached Substantial Completion and allowing for the utilization of$98,350.34 of the Contingency funding for Purchase Order No.4500229878,under Agreement No.21-7883-ST with O-A-K/Florida, Inc.,d/b/a Owen-Ames-Kimball Company,for the Main Campus Upgrades,and authorize the Chair to sign the attached Change Order.(Project No. 50214) PO number or account The Facilities Division is requesting a completed copy number if the document is to be recorded INSTRUCTIONS&CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is appropriate. Yes N/A(Not (Initial) Applicable) 1. Does the document require the chairman's original signature? N/A 2. Does the document need to be sent to another agency for additional signatures? If yes,provide the Contact N/A Information(Name,Agency,Address,Phone)on an attached sheet. 3. The original document has been signed/initialed for legal sufficiency. (All documents to be signed by the Chairman,except for most letters,must be reviewed and signed by the Office of the County Attorney. BEM 4. All handwritten strikethroughs and revisions have been initialed by the County Attorney's Office and all N/A other parties except the BCC Chairman and the Clerk to the Board. 5. The Chairman's signature line date has been entered as the date of BCC approval of the document or the BEM final negotiated contract date,whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip should be N/A provided to the County Attorney's Office at the time the item is input into SIRE. Some documents are time-sensitive and require forwarding to Tallahassee within a certain time frame,or the BCC's actions are nullified. Be aware of your deadlines! 8. The BCC approved the document on June 24,2025,and all changes made during the meeting have N/A is not an been incorporated in the attached document. The County Attorney's Office has reviewed the sa.06 option for this changes,if applicable. line. 9. Initials of attorney verifying that the attached document is the version approved by the BCC,all changes N/A is not an directed by the BCC have been made,and the document is ready for the Chairman's signature. fa74A7 option for this line. I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 1 6 F 3 Co icr County Procurement Services Change Order Form Contract# 21-7883-ST CO#20 PO# 4500229878 Project#: 50214.2 Project Name: First Amendment for Main Campus Upgrades Contractor/Consultant Name: O-A-K/Florida Inc. Select One:❑ Contract Modification(Construction or Project Specific) ❑Work Order Modification Project Manager Name: Tim Rygiel-PMP,CFM,Project Manager Ill Division Name:I Facilities Management Original Contract/Work Order Amount $17,648,689.97 1/9/2024 11G Original BCC Approval Date;Agenda Item# Current BCC Approved Amount $17,648,689 97 12/10/2024 16F12 Last BCC Approval Date;Agenda Item# Current Contract/Work Order Amount $16,647,919.80 7/30/2025 SAP Contract Expiration Date(MASTER) Dollar Amount of this Change -5.67% Total%Change from Original Amount Revised Contract/Work Order Total $16,647,919.80 0.00% %Change from Current BCC Approved Amount Total Cumulative Changes -$1,000,770.17 0.00% %Change from Current Amount Notice to Proceed f 2-19-2024 1 Original NTP 485 lOriginal Final [6-18-2025 Last Final 7-30-2025 Date L #of Days ! Completion Date Approved Date #of Days Added 90 Revised Final Date 10 28 2025 I Current Substantial Completion Date 5-31-2025 (includes this change) I (if applicable) Provide responses after each question in box below (Responses should be brief and specific). Attach additional information and/or documentation from the Design Professional and/or Contractor, if needed, with your submission of this Change Order and complete summary on next page. Check all that apply to this Change Order request:❑Q Add Time; ❑Add funds; 0 Use of Allowance; ❑ Modify/Delete existing Task(s);❑Add new Task(s);0 Reallocate funds;❑Other(must be explained in detail below) 1.) Detail of change/s to be made through this Change Order. This change order will add 90 days to the current substantial completion date moving it to 8/29/2025, utilize $98,350.34 of the Contingency leaving a balance of$74,751.14, and reallocate $50,000 from the Building Permit Fees and $34,785.76 from P&P Bonds as shown on the revised Schedule of Values for the Work Directive listed below. WD#27 $183,136.10- Issued to provide additional work due to the shortage of County supplied bus duct. 2.) If this Change Order is currently under a Stop Work, please identify the date issued and number of days remaining or "N/A" if not applicable. N/A 3.) Explain why this change was not included in the original contract/Work Order. WD#27 - Due to a shortage of the County supplied bus duct procured from Graybar/Schneider Electric, additional work from multiple trades to provide temporary power, mechanical, and structural work are necessary to maintain the operation of the new chiller plant until the shorted items arrive and complete the project. 4.) Describe the impact if this change is not processed. WD#27 - The contractor will not achieve substantial completion due to delays created from County supplied equipment . HVAC operations will cease in all building on the main campus supplied by the chiller plant until the delayed items arrive and are installed. The project will not be completed as planned. Page 1 of 4 Change Order Form(2023_ver.1) CA(,) 16F3 Co .tier County Procurement Services Change Order Form Contract# 21-7883-ST Co# 20 PO# 4500229878 Project#: 50214.2 Project Name: First Amendment for Main Campus Upgrades Contractor/Consultant Name: O-A-K/Florida Inc. Change Order/Amendment Summary (If additional spaces needed,attached a separate Summary page to this amendment request) COST TIME CO# AMD# Description Additive Deductive Days Total New Justification + Added Time Direct Material To provide cost savings to 1 I Purchase $(391,878.82) the County in the amount of $22,181.82 Direct Material To provide cost savings to 2 Purchase $(335,349.02) the County in the amount of $18,982.02 Direct Material To provide cost savings to 3 Purchase $(267,798.40) the County in the amount of $15,148.40 Adds 7 days to the If this change order is not contract time and processed,the project will not be in 4 uses $11,219.01 of 7 492 compliance with the LDC and Certificate of Completion cannot be the Contingency. obtained. Adds 5 days to the If this change order is not contract time and processed the new system 5 uses $6,473.50 of 5 497 will not operate properly. the Contingency. Administrative change to If this change order is not processed the acknowledge the Schedule of Values will not reflect the 6 subcontractor substitution and transfer of work from the original reconciliation of the Schedule subcontractor to the substitute contractor. of Values. Deductive changeal 1 If this change order is not order to correct errors $(26,622.75) processed there would be an made on the GMP. overpayment on the payment and performance bonds. Adds 10 days to the If this change order is not processed,all Contrac time and required changes would not be 8 uses$42,329.74 of 10 507 accounted for posing safety risks, in-continuity,and inability to complete the Contingency. the project. I]Check here if additional summary page/s are attached to this Change Order Page 2 of 4 Change Order Form(2023_ver.1) 16F' Crier County Procurement Services Change Order Form Contract# 21-7883-ST CO#20 PO# 4500229878 Project#: 50214.2 Project Name: First Amendment for Main Campus Upgrades Contractor/Consultant Name: O-A-K/Florida Inc. Change Order/Amendment Summary (If additional spaces needed,attached a separate Summary page to this amendment request) COST TIME CO# AMD# Description Additive Deductive Days Total New J Justification (+) (:) Added i Time Administrative change to If this change order is not processed acknowledge the the Schedule of Values will not reflect 9 subcontractor substitution and reconciliation of the Schedule the transfer of work from the original of Values under WD#11. subcontractor to the substitute subcontractor. Utilizes $8,467.50 If this change order is not processed, of the Contingency. scope elimination and required changes 10 g y would not be accounted for as well as not being in compliance with the current Collier County Standards. Utilizes $17,977.30 If this change order is not processed the new fuel storage tank and generators would 11 of the Contingency. not meet the Hazmat requirements and the PH balance of the water would be detrimental to the new equipment being installed. Adds 5 days to the If this change is not processed,the contract and reconcile calculation errors on change order 12 calculation errors from 5 I 512 #10 and the weather delays due to CO#10 increasing the Hurricane Milton would not be allowance by$20.41. recognized. Adds 15 days to Time is being added to allow for the Contract. schedule disruption caused by a 13 15 527 companion Collier County project to replace the transformers in Building K. Utilizes $55,338.10 This change order uses the 14 of the Contingency. Contingency for issued WD#16 through WD#20. Utilizes $24,931.50 This change is being issued to 15 of the Contingency, I paint the louvered rooftop screen wall and remaining existing louvers on Building K. Utilizes$126,258.00 This change is being issued to 16 of the Contingency. provide Nalco sand filtration unit for main campus chilled water loop. ❑✓ Check here if additional summary page/s are attached to this Change Order Page 2 of 4 Change Order Form(2023_ver.1) 6F3 colte-r County Procurement Services Change Order Form Contract# 21-7883-ST Co# 20 PO# 4500229878 Project#: 50214,2 Project Name: First Amendment for Main Campus Upgrades Contractor/Consultant Name: O-A-K/Florida Inc. Change Order/Amendment Summary (If additional spaces needed,attached a separate Summary page to this amendment request) COST CO# AMD# Description Additive Deductive Days Total New Justification + Added Time Add unused DMP The Direct Material Purchase 7 funds from CO#1 20,878.82 order to Trane for the New 1Chiller Plant was not used in its entirety. Utilizes $10,743.70 This change is being issued to of the Contingency. replace two existing hose bibbs, 18 add one new hose bibb and add lighting at rooftop chillers. This change is being issued to relocate Utilizes $4,439.60 the HVAC equipment/ductwork in 19 of the Contingency. conflict with electrical bus duct and clean and repair existing trench and cutouts at the generator yard. Add 90 days to the contract, This change is being issued to utilize$98,350.34 of the provide additional work due to the 20 Contingency and reallocate$50,000 from the Building 90 617 shortage of County supplied bus Permit Fees and$34,785.76 duct. from P&P Bonds for WD#27. 11 ❑Check here if additional summary page/s are attached to this Change Order Page 2 of 4 Change Order Form(2023_ver.1) 6F3 COIL County Procurement Services Change Order Form Contract# 21-7883-ST co#20 PO# 4500229878 Project#: 50214.2 Project Name: First Amendment for Main Campus Upgrades Contractor/Consultant Name: O-A-K/Florida Inc. Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above, as fully as if the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Contractor/Consultant/Design Professional signature below must be from an authorized person/officer/director of the Company or listed as the qualified licensed Professional "Project Coordinator"or Design/Engineer Professional under the agreement. Signature authority of person signing will be verified through the contract OR through the Florida Department of State, Division of Corporations(Sunbiz) website(https://dos.myflorida.com/sunbiz/search!). If the person signing is not listed, we will require signature authority by one of the listed officers/directors of the company giving that person signature authority. RygielTimothy Digitally signed by RygielTimothy Prepared by: Y9 Y Date:2025.04.22 13:00:23-04'00' Date Signature-Division Project Manager Tim Rygiel PMP,CFM, Project Manager Ill, Facilities Management Printed Name Kevin T Griffith Digitally signed by Kevin T Griffith Accepted by: Date:2025.04.22 13:11:59-04'00' Date: Signature-Design/Engineer Professional(if applicable) K,Todd Griffith, PE, SVP-Director of SWFL Division, Matern Professional Engineering, Inc. Printed Name/Title/Company Name Matthew Zwack Digitally signed by Matthew Zwack Accepted by: Date:2025.04.24 09:58:56-04'00' Date: Signature-Contractor/ConsultantNendor Matthew Zwack, President, O-A-K/Florida, Inc. Printed Name/Title/Company Name Approved by: Date: Signature-Division Manager or Designee(Optional) Printed Name Delon Brian Digitally signed by DelonyBrian Approved by: Date:2025.04.17 13:06:45-04'00' Date: Signature-Division Director or Designee(Optional) Brian DeLony PE, Division Director, Facilities Management Printed Name Approved by. Date: Signature-Division Administrator or Designee(Optional) Printed Name Page 3 of 4 Change Order Form(2023_ver.1) 16F3 Cot:r County Procurement Services Change Order Form Contract# 21-7883-ST Co#20 PO#4500229878 Project#: 50214.2 Project Name: First Amendment for Main Campus Upgrades Contractor/Consultant Name: 0-A-K/Florida Inc. FOR PROCURMENT USE ONLY FY 25 CHO Request# 668 BowdenStephanie Digitally signed by BowdenStephanie Approved by: Date:2025.05.22 16:33:06-04'00' Signature-Procurement Professional Signature/Date Approved by: Signature-Procurement Manager/Director(OPTIONAL) APPROVAL TYPE: ❑ Administrative El Administrative-BCC Report ® BCC Stand-Alone ES (BCC Approval Required) BCC APPROVAL ATTEST: Crystal K. Kinzel, Clerk of the Circuit Court BOARD OF COUNTY COMMISSIONERS and Comptroller COLLIER OUNTY, FLORIDA z/v By: � By r .Aroe4Saarn. �, Burt L. Saunders i nI _. ; ^ Chairman Dated ` � -a '' 441,-8S to W laln1, Date: 30/Z5 �,; ��;p, nttire only,. Agenda# /6 3 rys prm d Le Deputy County A omey Spit � .--1;d4/ L Print Name Page 4 of 4 Change Order Form(2023_ver.1) k 16F3 Facilities Management Division WORK DIRECTIVE #27 CONTRACT#/PROJECT NAME:21-7883-ST/Main Campus Upgrades-New Chiller Plant CHANGE DATE OF ISSUANCE:4/16/2025 EFFECTIVE DATE:4/16/2025 OWNER:Collier County Board of Commissioners PROJECT#:50214.2 CONTRACTOR:O-A-K Florida,Inc.d/b/a Owen-Ames-Kimball Company DESIGN PROFESSIONAL:Matem Engineering You are directed to proceed promptly with the following change(s): Description:Additional work due to bus duct delay. Purpose of Work Directive:To provide the necessary work from all trades to maintain operation of the new chiller plant due to missing items from Collier County supplied bus duct from Graybar/Schneider Electric.Including,but not limited to,temporary power,mechanical and structural work. Attachments: If a claim is made that the above change(s)have affected Contract Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the changes(s). Method of determining change in Contract Price: Method of determining change in Contract Times: ❑ Unit Prices ® Contractor's records ® Lump Sum ❑ Engineer's record ❑ Other T&M NTE El Other Estimated increase (decrease) in Contract Price Estimated change in Contract Time: 90 Days RECOMMENDED: AUTHORIZED: RygielTimothy Digitally signed by Date:202 0411613:53:Ryg'elTimo18-04'0'Y Tim Rygiel PMP,CFM,Project Manager III Owner's Representative 16F 3 nwen Awes Kit Owen-Ames-Kimball Company 11941 Fairway Lakes Drive,Fort Myers,Florida 33913-8338 Voice 239-561-4141 " Fax 239-561-1996 RFCO#27 April 10th,2025 Tim Rygiel Project Manager III Collier County Board of County Commissioners 3327 Tamiami Trail E. Naples,FL 34112 Re: 21-7883-ST MAIN CAMPUS UPGRADES(MCU) Job#4020 Dear Tim: As a result of the shortage of Collier County supplied bus duct,we are recognizing additional costs and time as listed below. Nauti Electric change order#12 dated 4/9/25 $ 41,850.00 B&I Contractors change order#9 dated 4/9/25 $ 21,731.00 Commercial Concrete Systems quote dated 4/01/25 $ 9,020.00 Owen-Ames-Kimball General Conditions dated 4/01/25 $103,275.00 Owen-Ames-Kimball Overhead(5%) $ 3,630.05 Owen-Ames-Kimball Profit(5%) $ 3,630.05 Total Change Order Amount Request $183,136.10 THIS IS A CHANGE IN THE SCOPE OF THE.WORK. ADDITIONAL DAYS REQUESTED:90 DAYS(New Substantial Completion date of 8/29/25) Respectfully submitted, ✓3'Uan:Nip& Brian Filipek Project Manager 16F3 E1edric Inc. Electrical Proposal April 9, 2025 Collier K1 Chiller Project PCO - 12 We are pleased to submit our proposal for the above-mentioned project. Quote is based on the scope provided. Cause:Temporary Power requirements due to delay in bus duct Temporary Chiller Power: $19,775.00 Miscellaneous Equipment Temporary: $ 4,975.00 Demo &Reroute Once Permanent Power Established: $17,100.00 Scope: 1. Temporary Chiller Power at Roof: a. Pull Owner supplied &contractor owned cabling from temporary power source to roof to supply (3) chillers with power. b. Install 4 sections of cable tray to support cabling as required. 2. Miscellaneous Equipment Power: a. Provide &install power connections from temporary power source for the following equipment- these will be switched to permanent power source once final power is established: i. 6 Air Handling Units ii. Sump Pumps iii. Lighting- Interior &Exterior iv. BAS Panels b. Drill additional holes as required to route power conductors. c. (12) additional circuits required for the temporary connections above. License#: EC13007655 Phone: 239-471-2750 Email: ggranger@nautielectricinc.com iri Ftndus on Facebook 16F3 E1eddrj 3. Demo &Reroute temporary: a. Demo temporary chiller feeds b. Demo supports&tray for temporary chiller feeds. c. Demo &reroute Miscellaneous equipment power feeds to permanent locations. Exclusion: 1. Painting&patching of existing finishes. 2. Any additional temporary power requirements not specifically listed above. Respectfully Submitted, 04le t Ovirget' C7 George L. Granger Jr. President Nauti Electric Inc. License#: EC13007655 Phone: 239-471-2750 Email: ggranger@nautielectricinc.com rinduxon Faceboak CAC 16F 3 Pending Change Order Page 1 ELM ! CONTRACTORS DATE: 4/09/2025 TO: Brian Filipek Owen Ames Kimball Company 11941 Fairway Lakes Drive Fort Myers, FL 33913 RE: 4438-Collier County-New Chiller Plant Building K-1 - HVAC PCO#: 9, Bus Duct Delay Remobilization Costs Brian, We are submitting a pending change order(PCO)for our costs relating to the changes indicated on the above referenced documents regarding our scope of work as generally described as follows and attached: 1. Remobilization of Insulation (includes repairs after removal of temporary power) +$2,200 2. Remobilization of B&I and Daikin for chiller startups $14,031 3. Remobilization of controls for final programming +$5,500 The price for this pending change order is $21,731.00 as outlined in the attached detail cost breakdown sheets. This proposal is valid for fourteen (14) days and is subject to escalation thereafter. This work will proceed only after receipt of written approval of PCO. B & I Contractors, Inc. requests an extension of(10)working day(s)to its contract to perform this change. We respectfully exclude shift work, overtime labor, plumbing, electrical,painting, cutting/patching and any other items that are not mentioned in this proposal. Exclusions also include those listed in our original contract. Please approve at your earliest convenience. Sincerely, James Martin Project Manager Accepted(Signature) Date(Acceptance) it$F3 COMMERCIAL NCRETE SYSTEMS , INC . R'_'1'T-4 1 LOR RD..101 V APLR'FLOE WA 31109 PH T 9-302.1101 FLY 39-30-110$ Owens-Ames-Kimball Company April 1, 2025 11941 Fairway Lakes Drive. Ft. Myers, FL33913 (239) 561-4141 Attn: Brian The following is our proposal for Collier CEP. All labor, Material and Equipment are figured for this project and scope as follows. Infill pipe openings when piping is removed from the interior of building. We have figured 3 men about one weeks' worth of work including materials. Total $9,020.00 SUBMITTED BY Poe A14201 drichard@commercialconcretesystems.com General Manager COMMERCIAL CONCRETE SYSTEMS LLC 16F3 OWEN-AMES-KIMBALL COMPANY-ITEMIZED GENERAL CONDITIONS PROJECT: Collier County New Chiller Plant Building K-1 DATE: 4.1.25 LOCATION: 3335 Tamiami Trail East, Naples FL 34112 BY BF NOTE: LABOR BURDEN:; 0.65 START DATE.''' 6/1/2025 FINISH DATE: 8/29/2025 DURATION: 3.00 MONTHS GENERAL CONDITIONS Cost Code Description Quantity Unit Mat'I U P Lab.U P Mat.Cost Lab.Cost 00.00700 Temp fencing&gates LS 33,500.00 $0 $0 • 00.00700 IStair Scaffolding System Mo 3,200.00 $0 $0 00.00520 Field office-Contractor** Mo 1,000.00 00.00520 Field office move in/out Ea 2,750.00 00.00520 Alum stairs Mo 200.00 $0 ' $0 00.00315 Field Office technology Mo 950.00 $0 $0 00.00315 Field Office equipment Mo 450.00 $0 $0 00.00523 Field office supplies 0.5 Mo 500.00 $250 ' $0 00.00510 Project sign Ea 1,800.00 $0 $0 00.00524 Jobsite phone expense 3 Mo 475.00 ! $1,425 $0 I 00.00525 Storage Containers Mo 800,00 $0 $0 00.00580 Fire prot/fire extinguisher Mo 150.00 $0 $0 00.00780 Small tools&equipment Mo 1,800.00 $0 $0 00.00780 Street Sweeper Truck Mo 1,300.00 $0 $0 00.00780 Misc material expense 1 Mo 1,400.00 $1,400 $0 00.00510 Safety&security signage Mo 350.00 ! $0 $0 01.00515 Safety&first aid exp. Mo 550.00 l $0 $0 00.00600 Dumpsters&Fees 1 Mo 2,250.00 $2,250 $0 00.00610 Progressive cleanup Mo 3,400.00 $0 $0 00.00805 Man/material hoist Mo 3,000.00 $0 $0 00.00779 Temp Generator Mo 1,500.00 $0 ' $0 00.00779 I Generator fuel&maint.** Mo 1,200.00 $0 $0 00.00910 Punch listing expenses Ls 15,000.00 $0 i $0 1 00.00951 'Temp water hookup Ea 1,500.00 $0 j $0 00.00540 Temp elect. hookup Ea 2,500.00 $0 a $0 00.00521 Temp toilets 3 Mo 1,050.00 $3,150 j $0 00.00400 General Superintendent 5.00 Wk 0.00 5,200.00 $26,000 00.00400 Superintendent Wk 0.00 4,400.00 $0 00.00400 Ast. Superintendent 13.00 Wk 0.00 3,000.00 $39,000 SUBTOTALI $8,475 $65,000 TOTAL GC'S $73,475 Page 1 of 2 16F3 GENERAL REQUIREMENTS Cost Code Description Quantity Unit Mat'I U P Lab.U P Mat.Cost Lab.Cost 00.00210 Senior Project Manager Wk 0.00 5,600.00 $0 $0 00.00210 Project Manager 9 5 Wk 0 00 4,400.00 1 $0 $22,000 00.00210 Project Engineer Wk 0.00 3,000.00 $0 : $0 00.00240 Accounting 1 Wk 0.00 1,800 00 $0 $1,80000 00.00240 BIM COORDINATION LS 0.00 40,000.00 $0 $0 00.00350 Travel/Truck/Fuel 3 Mo 2,000.00 $6,000 $0 00.00345 Jobsite aerial photos Mo 350.00 00.00340 OAK Survey&layout LS 12,000.00 --- $0I $0 00.00350 Travel/Subsistence - $0 Wk 300.00 $0 00.00330 iBlueprints/spec reprod. Set 500,00 $0 $0 00.00330 As-built expense 00.00325 !Postage&shipping Mo 175.00 SUBTOTAL! $6,000 $23,800 TOTAL GR'S $29,800 GENERAL CONDITIONS 1 $73,475 GENERAL REQUIREMENTS) $29,800 TOTAL $ 103,275,00. Total cost per month I $ 34,425.00 Page 2 of 2 16F3 ►Owen V11mball Building Since 1891 ATrACI-IMENT 2-SCHEDULE OF VALUES COLLIER COUNTY-NEW CHILLER PLANT BUILDING K PROJECT.COLLIER COUNTY-NEW CHILLER PLANT BUILDING K REVISED DATE: LOCATION.3335 Taman Trail East,Naples FL 34112 DATE: 10.26.23 411812025 ARCHrENG Matern Engineering I RG kchitects Inc. ESTIMATOR.PRECON Team 'LAND DATE.7/12/23 7/18/23 S/12/23 PROJECT SIZE SF 8.232 PREVIOUS REQUESTED DIVISIONS BIDDER I QTY COST CHANGE ORDERS TRANSFERS TRANSFER REVISED 30V DIV 01 00 00:GENERAL CONDITIONS 1 3eneral Conditions Owen-Ames-Kimball $688.250.00 $73,475.00 5761.725.00 3c',nral Requirements Owen-Ames-Kimball $470.550.00 -$40,000.00 $29,800.00 $460,350.03 DIV 01 74 23-FINAL CLEANING: Cleaning of entire new addition including all equipment,electrical room and all equipment, Pristine Cleaning $10,344.40 $10,344.40 washing epoxy floors,Storefront and Sidewalk Washing. _Included Spill Cleaning prior to Tenant Occupancy Included DIV 02 00 00:EXISTING CONDITIONS __-- -- 02 20 00 Surveying 0 Grady Minor $.34,250.011 $34,280.00 02 30 00-Subsurface Investigation Allowance $7,500.00 $7,500.00 02 32 16-Materials Testing H2R Corp $34.550.90 $34,550.00 02 41 00-Selective Demotion WSldcat Demolition $115,525.00 $11,275.00 $126,800.00 Pump Room Slab removal chain-link fence,railings ramps,sidewalk Included ON 03 30 00:CONCRETE 8 MASONRY Concrete B Masonry for pumproom,flood walls,rim/curbs Commercial Concrete Systems $1,009.271.01 $5,091,00 59.020.00 S1,023,38264 CIP Walls,Housekeeping Pads Included 03 41 13-Precast Concrete Hollow Care Planks-Supply and Install American Precast LLC S32,475.00 S32,475.00 DIV 05:METALS 0512 00-STRUCTURAL STEEL: Szvawal Steel,Decking,Columns,Beams,base plates,steel flanges,supports. East Coast Metal Structures $411,912.00 -S3,387,03 5408,524.97 Shap Drawings,Anchor Bolts,Embeds Included 05 70 00-DECORATIVE METALS: Alurnir;um Railings,Ship ladder,Guardrails,Handrails,wall mounted rails,Crating,catwalk East Coast Metal Structures $118898.00 S8,135.00 $127,033,00 Simnel Bollards,shop drawings,included. Included 16F3 oven-AmaaJ(immrr Company 219.561-4141 DIV 06:CARPENTRY ROUGH&FINISHED CARPENTRY: Lee Drywall,Inc $166,011,73 $166,011.73 Plywood cheating.temporary g--aadrailc at existing bldg.&newaddition. Included Temp.guardrails at new pump room roof,temp guardrails at sump pits in new pump room. Included Muccllar pus Cmpenhy de potory doors,temp wash,temp lacks} Included Installation of doors,and associated hardware. Included Slushing HM door frames onto CMU walls. Included -0N 07:THERMAL&MOISTURE PROTECTION Dampproofing new foundation walls Included Damppreofing new CMU walls Included Weather Barrier behind metal panel -Included Bentonite Clay Water Proofing Included Weather Barrier at openings of new Pump Room Included Waterproofing below grade at exterior surfaces of the pipe pit per 14-S301 Included Combined Dampproofing and Waterproofing package Service Contracting Solutions S21.829.00 -$7,325.00 $14,504.00 DIV 07:ROOFING Single Ply(Kee)Roofing System with LWIC Crowther Roofing and Sheetmetal $325,865.75 $584.00 $326.449.75 Expansion joints,root bkn.king 5e into existing bu.Iding flashing drains,coping tape Included Lightning Protection Pads Crcwmer Roofing and Sheetmetal $5,481.00 $5,481.00 temporary mod-bit roofing over concrete deck. .Crowther Roots ng and Sheetmetal $58,895.38 $58,895.38 • DN 07:WALL&CEIUNG PANELS 07 42 13A01-ACM Wall Paneling system Claddng Systems Inc $119,200.00 $3,382.50 $122.582.50 Reynobond,0.20 Aluminum skins,4mm thick,foe rated core,route and return rainscreen Included system(per AFL11794)..manufacturers standard 2-coat colors Afi ceps,hat channels at 16.0C,shop drawings and sales taxes.freight Included 57 84 00•FIRESTOPPING Ckestoppinq for block walls MEP penetrations to reecated walls Wall Systems Contractors $5,605.00 $5605.00 07 92 00•JOINT SEALANTS: Joint Sealants at CMU to CMU joint Included Joint Sealants at Miscellaneous Locations Included Joint Sealants at new lowers included Joint Sealants at windows included Joint Sealants at new CMU to Exposes Structure ntluded Joint Sealants Stucco to Metal Panels included Joint Sealants al Control Joints Included Combined Joint Sealants Package Service ContractingSolutons $17,312.00 $17,312.00 07 0513-Expansion Control System Service Contracting Solutions $4,024 00 $4,024.00 DN 08:OPENINGS 0810 00-Doors,Frames 6 Hardware Supply Pinnacle Door and Hardware $97,300.00 $3,499.66 $100,799.66 088000-Glass&paring Precision Glass Solutions inc, $41,220.00 $8,820.00 $5G.040.00 • Page 2 ioF3. 33 nel-4141 o�am..xime.n Company DIV 09:FINISHES 092000•STUCCO , lot Stucco replacement cf etisrng betiding and generator enclosure(demo&new work)_ Lee Drywall S239,278.00 -$22,303.03 $216,974.97 Stucco for new Addition(wall between new addition and existing building alleyway) 'Lee Drywall S60,574.25 S14 763,65 S7,337.90 Extent(scatting xourtd new and existing budding for stucco and painting work. Lee 12rrout S63.836.20 $63,836,20 SWmo General labor Iobe tacked byCM --------- Aiewanee S75,080.00 $76000,00 09 30 00•FLOOR LEVELJNG ti EPDXY FINISHES G•tndlrrg off exitng finishes _ouaiy CarpetE Flooring S19,459,51 $19,459.51 ape and ling proposed electrical room prior to application of flooring finishes. chl0dr nano,.pump morn, y 9 Y- 9 nspea 9 wahy cape:a Flooring $86 424.49 S86,424.49 PAINTING: Service Con tractingSolutions S87,967.00 5280C11 al $115,968.00 Interim exposed structures ceilings,walls Painting(pump room.chiller roam.electrical room) included Exterior painarg n:a3 new staccp 5nsshes:Moidn^y R and g_en.encbsllre) included DIV 10:SPECIALTIES 10 00 00•SPECIALTIES: Fire Extinguisher and Cabinets Crowther Specialties $2,530.00 $1,540.00 $4,07000 I01400-Signage 12 Visual $5,308.00 $19,765.20 $25,073.20 ADA Compianl Room Id restrain,and project signs _Included 10 71 13.43.A02.PERFORATED ALUMINUM PANELS: Aluminum Fixed Sunscreens and associated attachments,engineering,fetishes Perfecxin Arctdtectural Systems S217,388,00 $217,388.00.. Manufactiuer-Perfection's Aluminum Canopy System 107119-FLOOD PANEL SYSTEM Material Orange Flood Canto',LLC S47,508.00 $47,508.00 installation engineering bathtub testing Orange Flood Control.LLC $72,760.00 $72.760.00 10 7316•PROTECTIVE COVERS Perfection Architectural Systems S42,365.00 $42,365.00 Includes Cantle BR5-36 Panels included 244'Frame e'Gutters Akxninum Pipes 1 Verel 7r Satmatirg Rigid Rdl Lock toe ascended Canceled included DIV 22 00 00:PLUMBING Complete Plumbing Package BM Contractors Inc $127,162.00 $2,818.00 $129,980.00 ON 23 00 00:HVAC Complete HVAC Package,mcL'd.oq BIM Coorcination BBl Contactors,Inc $3,984,000,00 -$510.933.40 $40,000.00 S21,731.00 $3.534,797.60 Stainless Steel Piping under TES Tank RAI Contractors,Inc $7,752.00 $7,752.00 237113-Thermal Storage Tank The CROM Corporation $2,719,433.00 -$17.43300 $2,702.000.00 DIV 26:ELECTRICAL _.....__ ELECTRICAL: Electrical Package inWding lightning protection system Nauti Electric Inc. $2,370,287.50 4295,314.05 S41,850.00 521 6.823,45 All low Voltage Systems Nau6 Electric Inc. $66,752.50 S1.5 31',$8 584.124.18 AJON3,CON0-Low Voltage Systems $2:416.18 $2,416.18 Tank Lighting Nauti Electric Inc. $60,000.00 560,000,0C Page 3 OV»rtame.u1nb.11compny ,......... DIV 31:EARTHWORK SITEWORK: Pavement Maintenance $8.97.565.87 -$11,275.00 $886,290,87 M3bllzatlen 8 General Reeulrements Included Earlhxorit .Included Site Concrete Included Asphalt Repair Indded 31 23 00-Nbralory Soils Modification Eafi Tack $143.000.00 $143.000.03 •Termite Controi/Soil Treatment •Narhuest Erter.ninatng $3.046,20 $3.046.20 DIV 32:EXTERIOR MPROVEMENT& i I ` Lendecape&Initiation 819 Tree.Inc. S114.795.00 $2282.10 $117.077,10 DIV 33:UTILITIES UNDERGROUNGUTUTIES: Stickler Brothers LS $729.475.00 $7,917.00 $737.392.00 Mat,Gzahan AA ta.reral Rea::ser-.e^ts. included Berm Drainage included Waiar Ul60es •'.nduded Fire Mlles included Sanitary Sexwage Utilise :ncbded Subtotal $16,041,967.42 $15,485,534.88 General Liab:L laser ance 0.59t 180.209.84 18020984 ao9ulon Insurance 0.0002 34.315.20 34315.29 Bldg.Penritfees 0.5% $80,208.84 450.000.00 330.209.84 9u90er'e Risk(neurones 0.0% 20.00 80.00 P BP Band 0.75% 3120314.78 •934,785.76 8415.529.00 Ceadmgency 3.0% $481.250.02 5292,974.24 -898,350.34 189,934.44 Subtotal I 516,803.276,16 145,775,733.28 CM Fee 5.0% 3840.413.81 324,512.81 $T,260.14 3872,188.52 TOTAL $17,648,689.97 S16,647,919.80 Pear 4 _ d Y. c c N- V P c g , 2 co c v a •_ `'c,, ,on 3 v • i ! 3 0 rct 9 4 ' m s G m 88 m L - .0 n q d E XI 3 £ m d o '° `a € s o t ( t d u o` .` Q N N m C p !. ! C _ t S 4 ~ a .I j a E !� y L ` = L E ti u y c a o a m q y 2 C c - '2 m 2 p C T1 GG 9 L € % C c uyWD.. ? Doc a v 2 , tcu ESQ A m 7. c i 'n , oc C 'ao i a W A a s C ! c « 7. L, O V .. 4 N 6 0 - I a E ao. .? 5 4'° M i a E ! -_N w ,yy F 0 C C o .. c p a 3 'n a > > n ♦� 0 1p. ° 1.1 O pa c a � ' 4, = 9 W E C-A - m `o E Y 0 0- c P °o O v ' u d ' Y a n E n- E .2 d L 3 � a O u 2' y u awi i - 3 Z a 0 r I- s I 3 ': rv ' r n a ^' ry N o rv' a a a ' `' e a ^' 7-1 � n m �e � ry � n ry ry n � � m � ry n v, n n � '. \ ,. f-, : ry ', 5 %b N N R :O ti 5 \N4. m .'1 A \ .-„ CO n CO\�.g fg LL gi' f 33r= a= LL � .iLELE ,E 'E. 3 W 'F. „ 3EE.E3F= LLLL Y. 3f § a-. 2 " LL W i.. . .' i- '0 .. 'n , ' e a n ' ry ''v v ' '0 a N n v 'n N ' v Q o rv < ry � ry m v, n o 3 3 o n ry N n -. m z��m - v.n n iv . te, rv� ry eaaa nnm�o���� oava a��5- .. .. •• n �� 5 > jvvoo13000cc coacc acooi0 co3LL 32 f 2 1E 1E 3 3 f 2 3 f f 2 f f f f f F f 2 f 3 3 3 F f f 3 3 2 2 2 2 3 3 2 2 m 4 ' a 2. i 0 ' ' . v > > > i > > >v i vv o $ .0 am E a -0N a v m m o 0 o a m m .. .. y � . m V .'1 ry n n . m . 2 . .n m 2 2 mom m .. v9i 'on 'n 'n 'n .n+ m � a '... ' s « m o C p - '., w Z '^ Y a o m '-` O « U ` E n m It e LL ' r 1 E 2 .2 = cEocYs c ca , ize2 - c ~ _ ` -a 2m T. r _ - nE ° - - = r , rc = c 0 E, m e u c\ E u co r c m`a' .g i v a. m c v ° a ' o c r = n a .&m , E _ _ n= c _ m , ° « 00 u v 3 c o f c p z , m n- 2 E . n ? " m e c o_ ` 3 Yi il l v y > _ m LL c M o 0 q '^ c ' o p . m w Y u° m q g > m w n E _ 0 0 0 3 0 0 i o N 0 E « o A m - ' c u c v c c E E N V 2 - E E E - • E v a E N a m.N E _ n _ i s.a c a` E _� - n 2 0 , '.. :.' oa a co �i ", w � g o ''n ¢ o > > � o � � ' o m � a s m� '_° C, m d o u p` m° '' m '° '� F c a o0 3 - n' I za .' mz � .. - r m 2 ,., 2 ry n n 2 ry 2 2 2 m '., m X 2 m .., M e . 4 4 4 . 16F3 8 _ m o ° 9 6 a C = c E .,i 6 m u O V d Y 3 . v O Atli 8 IJ N C 2 $ C ' m g c _ E 8 � a. E acta ° E & c a A- I ' c a C 2 � n ° 1En ° _ oag aov o _ m x n _o N i c 2 c c"c v o f c c u ° e v c 3 c B a u 3 Nc N T. 6 .. V e V SZVm9 a S bu K 1 .'lt, " - cM 1 A c. €Nm + Egru33 - w. d1 f a iz s . t ° •& , c 4aaabcroE ' Ea ^ a . ' 11l , ~E g Smc acE , , S ap0. WCEC ^ Eno a O1! F aW v sa u o � 1 a m `oc ' n d15a Ya tit" ° 11 ,T .s E ° k cErME 1 wrg2 , wC C 4iN C - U , N 2 . ES ooR 'it I o e Nn u , g oC f aaa EV , a . c 3 ea m ; L V C X Ye ► Es c 61 C al E . E o ,. C 'O U i O• toN d C Ti z � a a L• = M d . ' - u 3 1 v° a4/ o Z N- 2 a a s a� a r�i n < a 'ry e C n `�.... .t " �^ '^ \ n L'' a o N\ a n w m .i n n C.`$ N a m e .n . a a ' n n n ,` N N n m r N ,. ... .. \ C Nm`e�\ `� .ai °. \ nC i " a N n \r Pn P. , . Vi z. o o g o% \ •+ \\\ d m v. n i n T, a c c c m .. E N.� " \\ a d v v u Y v E 3 o u o 0 0 0 3 .'_' - - 2 - - i c � f � S F= � 3 � 3 f 3 f f f f � f � � .t f � LL 3 .� Y. LL f .� LL G ,'- LL LL i- � 3 r r LL � � f F F a a a . a n eav n a ry a \'°" < a ry n r N N n ry I C e ry N N N N N a a v e \ g \ 00 ry N .rv. O. N ,�. N J\N O O N N N N O .Ni aN m m \ .m �1 .i \ !OV *CO m m .N. N ... ,i \N N N......i •m-I .. \ N„ n ry d m m N .. H N .i .. \ .i .i .. .i e. .. .. N \+. .Z N O el v .. e 7, .. ? ,° n °° c n n , . . .....rn "' c a m m v '" o a a v a � o 0 o co o u w ° o u o o � o a a o 0 0 � fd .'_' u o 'r f LL LL Y. 2 3 LL 1E iE f f f 2 .2 .. LL 12 LL 1E .2 f 2 3 f f a 2 3 g 3 3 2 f f .H g f E 3 2 I C T n T T T v. u a 9 a 9 E : 'a > T T v. 9 E. E A E. E E q T E v. E > v. v.a > " �' u a 9 9 m 9 m 9 ,v ry y a V N N a V el ry m m O a N m a N a a P v. m a of el N a a el m rii a s v NI � .n n o m .. .ml CO n n n NI m m .n a m m n �n N .+ r N a m m m o e I x c E m I 8 5 d ''2 o li E C t E u o i ] - ., c _ S �j .. . e C C O. _ n E u w 4 c - c f u A F .'. a O m oo - E a' c - n E c c° ici .- m a c m m — A m N u m '= ¢ E : 3 .i a g c '�° c c° c 5 a c .n - I , _ u .n m v c c E c a, Q C _o m- ° w 'c `g d o `o 'c w - w - Z' E m o n r o .E c A 3 c u c o E _ u c E c c V LL c a 'a dN '. aE $ aE o w c m.. " g E a a a m au " cc E . fk '.oWa = oFina EN $ 88v . - coj- F w D n 3 i eEoZ ,aSaum3u F m -5 w u T. gA . F ? m mZ' 3S & w o m _ c s.octuqc .2 uoEE - G - Ec E am Eo ._ EGraG7. LL E _ oE "L p rYd _ > > > f a a ia ¢ a - 2 Y w . � � � g g i5 E . o o g 8 n z 2 m , _ V, o - o. E I 8 C 1 ,,, .,. N 3 3 3 ,.. 3 3 2 ,° 3 ° 3 3 3 e 3 2 r r r n n FP. n g m M 2 g 1 g m g ° f i 1 6 F 3 s $ 3 N . a al r o w o `o m g 0 E L - = c O 2 a i x F s c ` � E .c o ppr c mt gt F — 6 U E R, OO 1 4 ; ri m • a6 m rn c rE oao wLA " of E . oA Ao 'E- g E0 . ` y„ .7 uv ao u ?O c ! r . i e . gli N^ , n P E FN QO 1 C ,E E' w R sf. 3 w; V q 1 L q r'. Yi al Q N N o ti ' a - c m a � � y " � i = - y R 4 _ a „.,4 ›, , , ..... m„ E ri! 5 c c I E7, 2 23 o elf U In Y W Q L - r N- A a R P. c w { m 4- a+ 7 `o E d CA m C _ a_ C 77 - y 0 > 7 _ i U O in o a l7 E Z, ECA u ma 01. a, v d E a AI V c m V aai N... 3 Z K I \ ,\/f v\f . %5\\ 0 m N .N m \N\ N N O� 0\ m \ N 1` %\ N ▪ N N N N T T T N V L,, T ,. T, m m m N u r n \\?m 0 \L V L Oc a T L vI ,\il T 1p O r a0 \\L O[ m W a O m \ \\ V V \ LL333fu ,E3LL ,. ,iLL3EY LLLL3LLLL 3 ,22LLLL32LLu33 .2LLLL : Ei3LLLL N m N ry N N \ H n '" ,7t a r a Z ry LL n n i s ti m T a ,\i1 "\i ,\n e c, m m m? m i .rv. .N. \. T m a s T w\i T ,\o n .m+ \+ .d. ,i a m ry c ° ° c [ o o c c ,-o 0 `o `o `o . . a w i o co w c `o `o o `o o `o o `o `; 0 00 E • E : T T > > > T > > E ,l, ,n T T T > T T T > �"Ta � L T ry � C 0 9 C V k V k 9 Sikki W N m , LA a' v v a, a o v P. c o c L n N 92 v 9 o V :-4 7 ,g ,wn o2 n ,9 o2 Np m N ti ry 7 H .�+ v ry o m ,n 2 c G L9 E 'o E E `a" a ¢' 9 m o u ~ c C o m o - u m 7, ' gg -12° u ry - c m' l� — 3 2 LL s % m a .. c 3 9 - m c a , n' ° „ " ,. _ w\ a G c Y o m E 8t'a QEEc vwrw _ c t§ 90 , - " d3 -mraF '6F w c Em 2 nIliE3 ` n o „o. c o = ar mu a a •nmaw ` vu o WVLLQLLm` a3 E ° uajcoEE o- E _ ' E - Ao «q ` @Ew = = = ▪ t wQ - � w gc " uqo uuaLL - � a f focori « - - - C s 10 C n P ; a ;, a a 2 g S 5 o B S o S o 0 o N m Q m N N N N N N N N N N ,a m m 2 2 \ 16 Fa Payment R.rtilanw Address: EC P.o.Bok 2wa.rwr,-Pon.,IN 4aoe, a �*+ Wkw i ACFH Old Nalonsi Bank Insurance Midwest ABAf°t/300°121AcrnuMIlO337y132 Fpay'hhps•J1tpkLnkersl4.opdVMflq tp --------- INVOICE -------- O-A-K/Florida, Inc. Invoice Date 01/19/24 11941 Fairway Lakes Dr. Invoice No. 498353 Fort Myers, FL 33913 Bill-To Code OWENAME Client Code OWENBON Inv Order No. 216*624191 Named Insured: Owen-Ames-Kimball Co./Florida Amount Remitted:$ Pleam naan w Poo win your Pte•K Make checks payable to:EPIC Insurance Midwest Effective Date Policy Period Coverage Description Transaction Amount 01/18/24 01/18/24 Travelers Casualty and Surety Company to Policy No. 107866199 12/18/25 *New - SUR Contract Bond 85,529.00 Collier County Chiller Plant Invoice Number: 498353 Amount Due: 85,529.00 QQ 21ila� PM ;?pprD guilt _I�C7. N 1-. VENOR GC JOB GL • 1Bodi t:c•tes *Premiums Due and Payable on Effective Date PZU01 Page: 1 ORIGINAL INVOICE 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Permit Application Status PRCS20230730983 Summary Application Number: PRCS20230730983 Application Type: Commercial Building Application Status: Inspections Commenced Property Owner's Full Name: COLLIER CNTY C/O REAL PROPERTY MANAGEMENT Category of Work: Addition Occupancy Code: Factory-Industrial (Low Hazard) Description of Work: Demolition of existing chillers and associated ice storage to be replaced with a new chiller system supported by a new thermal energy tank. The scope also includes new emergency power generators and related infrastructure. To support the new systems, site improvements will be needed, improvements, remodel, and addition will be required on Building K to support the new systems. Flood proofing is part of the scope to safeguard operations during storm events, The existing and new chillers systems as well as emergency power generation supports the entire campus, therefore phasing and continuity of systems is a critical part of the scope. REVO1REVO1 - A thermal energy storage tank is to be added to the Central Energy Plan as part of the upgrades to the campus's mechanical system. REV02- Submitting deferred submittals as agreed per TRC Worldwide Engineering letter dated 02/28/24. Please Note: The item "Pre- Engineered Exterior Aluminum Decorative Louvers" listed in TRC's letter is not applicable. No additional louvers are being supplied or installed. REVO3 -The original scope of work for this project entailed adding a new fire alarm system for the new pump room addition, and not altering the existing fire alarm system in Building K. Per the owners request (Collier County):The non-proprietary)CI fire alarm system in the existing Building K is past its useful life and not compatible with the new pump room nonproprietary Fire Lite system. Replacement of the existing system during construction is the most efficient and cost- effective method to bring the entire system into compliance with current Collier County standards. 3323 Tamiami TRL E K, (BLDG) , Naples ( ref. PL20230011586 ) Application Date: 07/25/2023 Issued Date: 03/11/2024 Expiration Date: 11/01/2025 1-2 Family or Comm: Commercial Locations Contacts Permits (Click to See Reviews) Permit Number: PRCS2023073098301 Permit Type: Building Permit Status: Inspections Commenced https://cvportal.colliercountyfl.gov/CityViewWeb/Permit/Status?permitld=565889 1/40 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal 1 Initial Submittal Status: Returned for Correction Final Type Review Complete 09/25/2023 09/06/2023 Floodplain Review Rejected 09/11/2023 09/05/2023 Structural Review Rejected 09/11/2023 09/01/2023 Plumbing and Handicap Review Approved 09/11/2023 08/31/2023 Engineering Review Rejected 09/11/2023 08/31/2023 Mechanical Review Rejected 09/11/2023 08/29/2023 Planning Review Rejected 09/11/2023 08/28/2023 Fire Review Approved 09/11/2023 08/21/2023 Utility Impact Fee Review- Commercial Complete-No Fees 09/11/2023 08/21/2023 Impact Fee Review- Commercial Complete-No Fees 09/11/2023 08/21/2023 Electrical Review Approved 09/11/2023 08/21/2023 Architectural Review Rejected 09/11/2023 08/21/2023 2 Re-Submittal Status: Returned for Correction Final Type Review Complete 12/13/2023 11/27/2023 Planning Review Rejected 11/29/2023 11/22/2023 Floodplain Review Rejected 11/29/2023 11/14/2023 Structural Review Rejected 11/29/2023 11/08/2023 Engineering Review Rejected 11/29/2023 11/07/2023 Mechanical Review Approved 11/29/2023 10/30/2023 Fire Review Not Applicable 11/29/2023 10/30/2023 Architectural Review Rejected 11/29/2023 10/27/2023 3 Re-Submittal Status: Complete Final Type Review Complete 01/17/2025 03/06/2024 Structural Review Approved 01/03/2025 03/06/2024 Floodplain Review Approved 01/03/2025 03/05/2024 Planning Review Approved 01/03/2025 03/04/2024 Architectural Review Approved 01/03/2025 03/04/2024 Engineering Review Approved 01/03/2025 03/04/2024 Fire Review Not Applicable 01/03/2025 03/01/2024 https://cvportal.colliercountyfl.gov/CityvewWeb/Permit/Status?permitld=565889 2/40 6F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Permit Number: PRCS2023073098303 Permit Type: Revision - Building Permit Status: Issued 4 Revision Submittal REVO1 Status: Returned for Correction Final Type Review Complete 09/19/2024 09/04/2024 Floodplain Review Rejected 09/05/2024 09/03/2024 Planning Review Approved 09/05/2024 08/23/2024 Plumbing and Handicap Review Approved 09/05/2024 08/21/2024 Mechanical Review Approved 09/05/2024 08/21/2024 Structural Review Approved 09/05/2024 08/08/2024 Electrical Review Approved 09/05/2024 08/07/2024 Engineering Review Approved 09/05/2024 08/07/2024 Fire Review Approved 09/05/2024 08/07/2024 5 Re-Submittal Status: Complete Final Type Review Complete 10/30/2024 09/26/2024 Structural Review Approved 10/16/2024 09/24/2024 Floodplain Review Approved 10/16/2024 09/24/2024 Fire Review Not Applicable 10/16/2024 09/18/2024 Permit Number: PRCS2023073098304 Permit Type: Revision - Building Permit Status: Issued 6 Revision Submittal REVO2 Status: Complete Final Type Review Complete 01/17/2025 12/11/2024 Floodplain Review Approved 01/03/2025 12/10/2024 Structural Review Approved 01/03/2025 12/05/2024 Architectural Review Approved 01/03/2025 12/04/2024 Engineering Review Approved 01/03/2025 12/04/2024 Fire Review Approved 01/03/2025 12/03/2024 Permit Number: PRCS2023073098305 Permit Type: Revision - Building Permit Status: Issued https://cvportal.colliercountyf.gov/CityVewWeb/Permit/Status?permitid=565889 3/40 16F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal 7 Revision Submittal REVO3 Status: Complete Final Type Review Complete 03/12/2025 02/13/2025 Floodplain Review Approved 02/26/2025 02/13/2025 Structural Review Approved 02/26/2025 01/29/2025 Fire Review Approved 02/26/2025 01/29/2025 Electrical Review Approved 02/26/2025 01/28/2025 Fees Zoning Review-Application $75.00 $75.00 Paid 08/11/2023 FIRE Application-Architectural $932.26 $932.26 Paid 08/11/2023 Structural-Application Fee $50.00 $50.00 Paid 08/11/2023 Electrical-Application Fee $50.00 $50.00 Paid 08/11/2023 Mechanical-Application Fee $50.00 $50.00 Paid 08/11/2023 Plumbing-Application Fee $50.00 $50.00 Paid 08/11/2023 Second and Subsequent Plan Corrections $65.00 $65.00 Paid 03/06/2024 Zoning Review-Additional Reviews $56.25 $56.25 Paid 03/06/2024 Inspection Fee $1,035.00 $1,035.00 Paid 03/06/2024 FIRE Inspection-Commercial/Multi-Family $604.00 $604.00 Paid 03/06/2024 Site Engineering $150.00 $150.00 Paid 03/06/2024 Structural-Review Fee $79.80 $79.80 Paid 03/06/2024 Electrical-Review Fee $79.80 $79.80 Paid 03/06/2024 Plumbing-Review Fee $79.80 $79.80 Paid 03/06/2024 Mechanical-Review Fee $79.80 $79.80 Paid 03/06/2024 BCAI $24.29 $24.29 Paid 03/06/2024 DBPR Surcharge $16.19 $16.19 Paid 03/06/2024 Partial Inspection $45.00 $45.00 Paid 05/24/2024 Partial Inspection $45.00 $45.00 Paid 05/24/2024 Partial Inspection $45.00 $45.00 Paid 05/24/2024 Partial Inspection $45.00 $45.00 Paid 05/24/2024 Partial Inspection $45.00 $45.00 Paid 05/24/2024 Partial Inspection $45.00 $45.00 Paid 05/24/2024 Partial Inspection $45.00 $45.00 Paid 05/24/2024 Partial Inspection $45.00 $45.00 Paid 05/24/2024 Partial Inspection $45.00 $45.00 Paid 05/24/2024 Partial Inspection $45.00 $45.00 Paid 05/24/2024 Partial Inspection $45.00 $45.00 Paid 05/24/2024 Partial Inspection $45.00 $45.00 Paid 05/24/2024 https://cvportal.colliercountyrI.gov/CityViewWeb/PermitlStatus?permitId=565889 4/40 OF 3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Partial Inspection $45.00 $45.00 Paid 05/24/2024 Partial Inspection $45.00 $45.00 Paid 05/24/2024 Partial Inspection $45.00 $45.00 Paid 05/24/2024 Partial Inspection $45.00 $45.00 Paid 07/24/2024 Partial Inspection $45.00 $45.00 Paid 07/24/2024 Partial Inspection $45.00 $45.00 Paid 07/24/2024 Partial Inspection $45.00 $45.00 Paid 07/24/2024 Partial Inspection $45.00 $45.00 Paid 07/24/2024 Partial Inspection $45.00 $45.00 Paid 07/24/2024 Partial Inspection $45.00 $45.00 Paid 07/24/2024 Partial Inspection $45.00 $45.00 Paid 09/12/2024 Partial Inspection $45.00 $45.00 Paid 09/12/2024 Time Specific Inspections During Business Hours $25.00 $25.00 Paid 09/12/2024 Partial Inspection $45.00 $45.00 Paid 09/27/2024 Zoning Review-Review $50.00 $50.00 Paid 09/27/2024 Revision $200.00 $200.00 Paid 09/27/2024 FIRE Review Minimum Fee $100.00 $100.00 Paid 09/27/2024 Zoning Review-Additional Reviews $25.00 $25.00 Paid 12/11/2024 Partial Inspection $45.00 $45.00 Paid 12/11/2024 Time Specific Inspections During Business $25.00 $25.00 Paid 12/11/2024 Hours Revision $50.00 $50.00 Paid 12/11/2024 FIRE Review Minimum Fee $100.00 $100.00 Paid 12/11/2024 Partial Inspection $45.00 $45.00 Paid 02/14/2025 Partial Inspection $45.00 $45.00 Paid 02/14/2025 Partial Inspection $45.00 $45.00 Paid 02/14/2025 Partial Inspection $45.00 $45.00 Paid 02/14/2025 Revision $100.00 $100.00 Paid 02/14/2025 FIRE Review Minimum Fee $100.00 $100.00 Paid 02/14/2025 Reinspection Fee for Building $45.00 $45.00 Paid 05/15/2025 Partial Inspection $45.00 $45.00 Paid 05/15/2025 Partial Inspection $45.00 $45.00 Paid 05/15/2025 Partial Inspection $45.00 $45.00 Paid 05/15/2025 Engineering First Reinspection $65.00 $65.00 Paid 05/15/2025 Partial Inspection $45.00 $45.00 Paid 05/15/2025 Engineering First Reinspection $65.00 $65.00 Paid 05/15/2025 Totals: $5,957.19 $5,957.19 $0.00 PLEASE DO NOT SUBMIT ANY PAYMENTS UNTIL A COLLIER COUNTY PAYMENT SLIP IS DISTRIBUTED https://cvportal.colliercountyfl.gov/CityViewWeb/Permit/Status?permitld=565889 5/40 �F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Total Amount Payable Online: $0.00 Deposits & Bonds Inspections 174-Remodel Com Building Final Pending Schedule? Inspector: 204-Plumbing Final Pending Schedule? Inspector: 502-Electrical Final Pending Schedule? Inspector: 803-Parking Pending Schedule? Inspector: 600-Pre Const Meeting Pending Inspector: 610-Penetration Protection Pending Inspector: 629-Emergency Lighting Pending Inspector: 632-Fire Extinguisher Pending Inspector: 641 -Final Fire Pending Inspector: 513-AudioNideo Final Pending Schedule? Inspector: 612-Fire Barrier Walls/Framing-Rough Pending Inspector: 613-Final Fire Barrier Walls Pending Inspector: 630-Door/Windows/Opening Protection Pending Inspector: 312-Remodel Com A/C Final Pending Schedule? Inspector: 134-Roofing Final Pending Schedule? Inspector: 503-Service Change Pending Schedule? Inspector. 509-TV/Telephone Final Pending Schedule? Inspector: 302-Mechanical Piping Pending Schedule? https://cvportal.colliercountyfl.gov/CityViewWeb/Permit/Status?permitld=565889 6/40 16F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Inspector. Corrections: Correction 1: Partial Pass Inspector Notes Status: Outstanding Date Status Changed: 10/07/2024 Comments: Partial Pass Inspector Notes: Underground piping minus run to thermal tank. 6/10/24. LS Correction 2: Partial Pass Inspector Notes Status: Outstanding Date Status Changed: 10/07/2024 Comments: Partial Pass Inspector Notes: Pump room approximately 200/0 complete ok to proceed 8/19/24 AJ Correction 3: Partial Pass Inspector Notes Status: Outstanding Date Status Changed: 10/07/2024 Comments: Partial Pass Inspector Notes:10/7/24-Stub up for thermal tank u/g piping still incomplete. Pump room piping complete. Ok to insulate. 801 -Site Drainage Pending Schedule? Inspector: Corrections: Correction 1: Inspector Notes Status: Outstanding Date Status Changed: 05/05/2025 Comments: Inspector Notes: 1. Final acceptance must be passed prior to 800 inspections. 511 -Alarm Final Pending Schedule? Inspector: Corrections: Correction 1: Miscellaneous Corrections Status: Outstanding Date Status Chang:. 05/05/2025 Comments: Miscellaneous Corrections: 05/05/2025 Not ready for final. Cancelled onsite. FBC 110.5 //kh 501-Electrical Rough Pending Schedule? Inspector: https://cvportal.colliercountyfl.gov/CityViewWeb/Permit/Status?permitld=565889 7/40 16F3 5/20/25,5:15 PM Permit Application Status-Collier County-Cityvew Portal Corrections: Correction 1: Partial Pass Inspector Notes Status: Outstanding Date Status Changed: 05/05/2025 Commentsi Partial Pass Inspector Notes: 05/05/2025 Bus Duct incomplete. Temporary power in place. Cannot pass rough with temporary wires energized/permanent wiring not landed in their final locations. Temporary panels energized - to be removed. //kh Note; Interior conduits okay in Building K. Lighting at final stage. Inside gear in electrical room okay for rough. Checked site lighting poles -temporarily being fed. Did not check roof of Building K. Did not check water tank. 802-Landscaping Pending Schedule? Inspector. Corrections: Correction 1: Inspector Notes Status: Outstanding Date Status Changed: 05/07/2025 Comments: Inspector Notes: 1. Site acceptance must be passed prior to 800 inspection. 814-Erosion/Silt Pass 3/26/2024 3/26/2024 03/26/2024 Inspector. Nick Duclos((239)789-6198) Send Email 100-Footings Partial Pass 3/28/2024 3/28/2024 03/28/2024 Inspector: Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Carried Forward Date Status Changgdj 03/28/2024 Comments: Partial Pass Inspector Notes: East, West, and South first lift. 3/28/24 S.Hancock 106-Columns Partial Pass 4/3/2024 4/3/2024 04/03/2024 Inspector. Scott Hancock((239)572-2410) Send Email https://cvportal.colliercountyfi.gov/CityviewWeb/Permit/Status?permitld=565889 8,40 5/20/25.5:15 PM Permit Application Status-Collier County-CityView Portal Corrections: b F 3 Correction 1: Partial Pass Inspector Notes Status: Carried Forward Date Stati _Cltanged_ 04/03/2024 Comments: Partial Pass Inspector Notes: Columns CC1 and CC3 on S,E, and W elevations. *Marked on Plans* 4/3/24 S.Hancock 105-Shearwall Partial Pass 4/3/2024 4/3/2024 04/03/2024 Inspector. Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 04/03/2024 Comments: Partial Pass Inspector Notes: East shearwall(CIP Concrete) *Marked on Plans* 4/3/24 S.Hancock 100-Footings Partial Pass 4/3/2024 4/3/2024 04/03/2024 Inspector: Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 04/03/2024 Comments: Partial Pass Inspector Notes: East, West, and South first lift. 3/28/24 S.Hancock Correction 2: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 04/03/2024 Comments: Partial Pass Inspector Notes: South 2nd lift @stepped footer Central footers 3(F4) and 1(F7) *Marked on Plans* 4/3/24 S.Hancock 105-Shearwall Partial Pass 4/4/2024 4/4/2024 04/04/2024 Inspector. Scott Hancock((239)572-2410) Send Email https://cvportal.colliercountyfl.gov/CityVewWeb/Permit/Status?permitld=565889 9/40 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal 1 6 F 3 Corrections: Correction 1: Partial Pass Inspector Notes Status: Carried Forward Pate Status Changed: 04/04/2024 Comments: Partial Pass Inspector Notes: East shearwall(CIP Concrete) 4/3/24 S.Hancock Correction 2: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 04/04/2024 Comments: Partial Pass Inspector Notes: Rebar for shearwall around south pit. 4/4/24 S.Hancock 105-Shearwall Partial Pass 4/5/2024 4/5/2024 04/05/2024 Inspector: Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Resolved Date Status Changed: 04/05/2024 Comments: Partial Pass Inspector Notes: East shearwall(CIP Concrete) 4/3/24 S.Hancock Correction 2: Partial Pass Inspector Notes Status: Resolved Date Status Changed: 04/05/2024 Comments: Partial Pass Inspector Notes: Rebar for shearwall around south pit. 4/4/24 S.Hancock Correction 3: Partial Pass Inspector Notes Status: Resolved Date Status Changed: 04/05/2024 Comments: Partial Pass Inspector Notes: Forms for CIP concrete around South pit 4/5/24 S.Hancock 105-Shearwall Partial Pass 4/9/2024 4/9/2024 04/09/2024 Inspector. Scott Hancock((239)572-2410) Send Email https://cvportal.colliercountyfl.gov/CityViewWeb/Permit/Status?permitld=565889 10/40 5120/25,5:15 PM Permit Application Status-Collier County-CityView Portal Corrections: Correction 1: Partial Pass Inspector Notes Status: Resolved Date Status Changed: 04/09/2024 Comments: Partial Pass Inspector Notes: South CIP concrete shearwall, CB4 4/9/24 S.Hancock 100-Footings Partial Pass 4/19/2024 4/19/2024 04/19/2024 Inspector: Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 04/19/2024 Comments: Partial Pass Inspector Notes: East, West, and South first lift. 3/28/24 S.Hancock Correction 2: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 04/19/2024 Comments: Partial Pass Inspector Notes: South 2nd lift @stepped footer Central footers 3(F4) and 1(F7) *Marked on Plans* 4/3/24 S.Hancock Correction 3: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 04/19/2024 Comments: Partial Pass Inspector Notes: North end footers 3 Housekeeping footers. *Marked on Plans* 4/19/24 S.Hancock 105-Shearwall Partial Pass 4/24/2024 4/24/2024 04/23/2024 Inspector. Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 04/23/2024 Comments: Partial Pass Inspector Notes: North end CIP shear wall. *Marked on plans* 4/23/24 S.Hancock https://cvportal.colliercountyll.gov/CityVewWe6/Perrnit/Status?permitld=565889 11/40 6F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal 106-Columns Partial Pass 4/24/2024 4/24/2024 04/23/2024 Inspector: Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 04/23/2024 Comments: Partial Pass Inspector Notes: Columns CC1 and CC3 on S,E, and W elevations. 4/3/24 S.Hancock Correction 2: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 04/23/2024 Comments: Partial Pass Inspector Notes: East side column CC3 *Marked on plans* 4/23/24 S.Hancock 200-Plumbing Underground Pass 5/1/2024 5/1/2024 05/01/2024 Inspector: William Richards((239)877-8130) Send Email Corrections: Correction 1: Inspector Notes Status: Outstanding Date Status Changed: 05/01/2024 Comments: Inspector Notes: 05/01/2024. 11 floor drains off 6 inch - combination waste &vent system for chilled water chillers. WMR 118-Lintel Beam Cancellation By 5/6/2024 5/6/2024 05/06/2024 Contractor Inspector. Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Inspector Notes Status: Carried Forward Date Status Changed: 05/06/2024 Comments; Inspector Notes: Cancelled per contractor 5/6 10:50a.m. 5/6/24 S.Hancock 119-Fill Cells Cancellation By 5/6/2024 5/6/2024 05/06/2024 Contractor Inspector. Scott Hancock((239)572-2410) Send Email https://cvportal.coiliercountyfl.gov/CityViewWeb/Permit/Status?permitld=565889 12/40 16F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Corrections: Correction 1: Inspector Notes Status: Carried Forward Date Status Changed:. 05/06/2024 Comments: Inspector Notes: Cancelled per contractor 5/6 10:50a.m. 5/6/24 S.Hancock 119-Fill Cells Partial Pass 5/9/2024 5/9/2024 05/09/2024 Inspector: Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Inspector Notes Status: Outstanding Date Status Changed: 07/31/2024 Comments: Inspector Notes: Cancelled per contractor 5/6 10:50a.m. 5/6/24 S.Hancock Correction 2: Partial Pass Inspector Notes Status: Outstanding Date Status Changes 07/31/2024 Comments: Partial Pass Inspector Notes: Ok up to tie beam. 5/9/24 S.Hancock Correction 3: Partial Pass Inspector Notes Status: Outstanding Date Status Changed: 07/31/2024 Comments: Partial Pass Inspector Notes: Fill cells at parapet on new building ok. 7/31/24 S.Hancock 118-Lintel Beam Partial Pass 5/9/2024 5/9/2024 05/09/2024 Inspector. Scott Hancock((239)572-2410) Send Email Corrections: Correction 1. Inspector Notes Status: Carried Forward Date Status Changi 05/09/2024 Comments: Inspector Notes: Cancelled per contractor 5/6 10:50a.m. 5/6/24 S.Hancock https://cvportal.colliercountytl.gov/CityvewiNeb/Permit/Status?permitld=565889 13/40 a 6 F 3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Correction 2: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 05/09/2024 Comments: Partial Pass Inspector Notes: Lintels above 2 doors ©West side. 5/9/24 S.Hancock 104-Tie Beam Partial Pass 5/13/2024 5/13/2024 05/13/2024 Inspector: Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Resolved Date Status Changed: 05/13/2024 Comments: Partial Pass Inspector Notes: Tie beams marked on sheet S105B in orange. 5/13/24 S.Hancock 106-Columns Partial Pass 5/13/2024 5/13/2024 05/13/2024 Inspector: Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 05/13/2024 Comments: Partial Pass Inspector Notes: Columns CC1 and CC3 on S,E, and W elevations. 4/3/24 S.Hancock Correction 2: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 05/13/2024 Comments: Partial Pass Inspector Notes: East side column CC3 *Marked on plans* 4/23/24 S.Hancock Correction 3. Partial Pass Inspector Notes Status: Resolved Date Status Changed: 05/13/2024 Comments: Partial Pass Inspector Notes: Columns marked on sheet S105B in purple. 5/13/24 S.Hancock 103-Floating Slab Partial Pass 5/22/2024 5/22/2024 05/22/2024 Inspector: Stephen Greenwell VEN((239)900-4431) Send Email https://cvportal.colliercountytl.gov/CityViewVJeb/Permit/Status?permitld=565889 14/40 16F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Corrections: Correction 1: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 05/22/2024 Comments: Partial Pass Inspector Notes: New construction area complete. Next inspections for existing construction area. 5/22/24 SGREENWELL 103-Floating Slab Partial Pass 5/29/2024 5/29/2024 05/29/2024 Inspector: Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 05/29/2024 Comments: Partial Pass Inspector Notes: New construction area complete. Next inspections for existing construction area. 5/22/24 SGREENWELL Correction 2: Partial Pass Inspector Notes Status; Carried Forward Date Status Changed: 05/29/2024 Comments: Partial Pass Inspector Notes: Slabs for generator and fuel tanks in enclosed area on North side. 5/29/24 S.Hancock 133-Monolithic Slab Partial Pass 5/31/2024 5/31/2024 05/31/2024 Inspector: Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Resolved Date Status Changed: 05/31/2024 Comments: Partial Pass Inspector Notes: Thermal storage tank pad ok. 5/31/24 S.Hancock 302-Mechanical Piping Partial Pass 6/10/2024 6/10/2024 06/10/2024 Inspector: Lance Sowder((239)302-8275) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 06/10/2024 Comments.: Partial Pass Inspector Notes: Underground piping minus run to thermal tank. 6/10/24. LS 506-Underground Electrical Conduit Partial Pass 6/10/2024 6/10/2024 06/10/2024 https://cvportal.colliercountyfl.gov/CityViewWeb/Permit/Status?permitld=565889 15/40 16F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Inspector: William Bartels((239)351-7220) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 06/10/2024 Comments: Partial Pass Inspector Notes:6/10/24 6/10/24 Generator and site Itg underground As marked on drawings E011 //wrb 106-Shearwall Partial Pass 6/20/2024 6/20/2024 06/20/2024 Inspector: Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 06/20/2024 Comments: Partial Pass Inspector Notes: North end CIP shear wall. *Marked on plans* 4/23/24 S.Hancock Correction 2: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 06/20/2024 Comments: Partial Pass Inspector Notes: Shearwalls @thermal tank ok. 6/20/24 S.Hancock 506-Underground Electrical Conduit Cancellation By 6/21/2024 6/21/2024 06/21/2024 Contractor Inspector: Fred Clum((239)252-4232) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status', Carried Forward Date Status Changed: 06/21/2024 Comments: Partial Pass Inspector Notes:6/10/24 6/10/24 Generator and site Itg underground As marked on drawings E011 //wrb 506-Underground Electrical Conduit Partial Pass 6/28/2024 6/28/2024 06/28/2024 Inspector: William Bartels((239)351-7220) Send Email https://cvportal.colliercountyfl.gov/CityV ewWeb/Permit/Status?permitld=565889 16/40 I6F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Corrections: Correction 1: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 06/28/2024 Comments: Partial Pass Inspector Notes:6/10/24 6/10/24 Generator and site kg underground As marked on drawings E011 //wrb 6/28/24 Under roadway conduits from jail towards generator as marked on E011 //wrb 121 -Elevated Structural Deck Pass 7/10/2024 7/10/2024 07/10/2024 Inspector: Karl O. Pabst((239)877-2502) Send Email Corrections: Correction 1: Inspector Notes Status: Resolved Date Status Changed_ 07/10/2024 Comments: Inspector Notes: Roof above garage. 7/10/24 KP 103-Floating Slab Partial Pass 7/22/2024 7/22/2024 07/22/2024 Inspector: Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Carried Forward Date Status Change 07/22/2024 Comments: Partial Pass Inspector Notes: New construction area complete. Next inspections for existing construction area. 5/22/24 SGREENWELL Correction 2: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 07/22/2024 Comments: Partial Pass Inspector Notes: Slabs for generator and fuel tanks in enclosed area on North side. 5/29/24 S.Hancock Correction 3: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 07/22/2024 Comments: Partial Pass Inspector Notes: Slabs for walking surfaces inside enclosed area with fuel tanks and generator. Recommend some dowling to connect new slabs to existing. This is not required per plans but recommended. 7/22/24 S.Hancock https://cvportal.colliercountytl.gov/CityViewWeb/Permit/Status?permitld=565889 17/40 1 6 F 3 5/20/25,5:15 PM Permit Application Status-Collier County-City View Portal 119-Fill Cells Partial Pass 7/31/2024 7/31/2024 07/31/2024 Inspector: Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 07/31/2024 Comments: Partial Pass Inspector Notes: Fill cells at parapet at new building ok. 7/31/24 S.Hancock 302-Mechanical Piping Partial Pass 8/19/2024 8/19/2024 08/19/2024 Inspector. Adam Jerabek((239)944-1860) Send Email Corrections: Correction 1. Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 08/19/2024 Comments: Partial Pass Inspector Notes: Underground piping minus run to thermal tank. 6/10/24. LS Correction 2: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 08/19/2024 Comments: Partial Pass Inspector Notes: Pump room approximately 20% complete ok to proceed 8/19/24 AJ 103-Floating Slab Partial Pass 9/12/2024(12:30pm 9/12/2024 at 12:30 to 1:00pm) PM 09/12/2024 Inspector: Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 09/12/2024 Comments: Partial Pass Inspector Notes: New construction area complete. Next inspections for existing construction area. 5/22/24 SGREENWELL Correction 2: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 09/12/2024 Comments: Partial Pass Inspector Notes: Slabs for generator and fuel tanks in enclosed area on North side. 5/29/24 S.Hancock hops://cvportal.colliercou ntyti.gov/CityvewWeb/Permit/Status?permitld=565889 18/40 16F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Correction 3: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 09/12/2024 Comments: Partial Pass Inspector Notes: Slabs for walking surfaces inside enclosed area with fuel tanks and generator. Recommend some dowling to connect new slabs to existing. This is not required per plans but recommended. 7/22/24 S.Hancock Correction 4: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 09/12/2024 Comments: Partial Pass Inspector Notes: 5 floating slabs in pump room ok. 9/12/24 S.Hancock 100-Footings Cancellation By 9/12/2024 9/12/2024 09/12/2024 Inspector Inspector: Scott Hancock((239)572-2410) Send Email Corrections: Correction 1; Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 09/12/2024 Comments: Partial Pass Inspector Notes: East, West, and South first lift. 3/28/24 S.Hancock Correction 2: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 09/12/2024 Comments: Partial Pass Inspector Notes: South 2nd lift @stepped footer Central footers 3(F4) and 1(F7) *Marked on Plans* 4/3/24 S.Hancock Correction 3- Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 09/12/2024 Comments: Partial Pass Inspector Notes: North end footers 3 Housekeeping footers. *Marked on Plans* 4/19/24 S.Hancock hops://cvportal.colliercountyfl.gov/CityViewWeb/Permit/Status9permitld=565889 19/40 16F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Correction 4: Inspector Notes Status: Carried Forward Date Status Changed: 09/12/2024 Comments: Inspector Notes: Scheduled in order to transfer notes from this permit to new permit pertaining to generator and fuel tank island. Nothing was inspected pertaining to this permit. 9/12/24 S.Hancock 302-Mechanical Piping Partial Pass 10/7/2024 10/7/2024 10/07/2024 Inspector: Gregory McDaniel((239)272-3194) Send Email Corrections: Correction 1; Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 10/07/2024 Comments: Partial Pass Inspector Notes: Underground piping minus run to thermal tank. 6/10/24. LS Correction 2: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 10/07/2024 Comments: Partial Pass Inspector Notes: Pump room approximately 20% complete ok to proceed 8/19/24 Al Correction 3: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 10/07/2024 Comments: Partial Pass Inspector Notes:10/7/24-Stub up for thermal tank u/g piping still incomplete. Pump room piping complete. Ok to insulate. 10/15/2024 10/15/2024 at 103-Floating Slab Pass (10:00am to 10/15/2024 10:30am) 10:00 AM Inspector: Eliezer Lorenzo((239)238-6905) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Outstanding Date Status Changed: 09/12/2024 Comments: Partial Pass Inspector Notes: New construction area complete. Next inspections for existing construction area. 5/22/24 SGREENWELL Correction 2: Partial Pass Inspector Notes Status: Outstanding Date Status Changed: 09/12/2024 Comments: Partial Pass Inspector Notes: Slabs for generator and fuel tanks in enclosed area on North side. 5/29/24 S.Hancock https://cvportal.colliercountyfl.gov/CityVewWeb/Permit/Status?permitld=565889 20/40 16F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Correction 3: Partial Pass Inspector Notes Status: Outstanding Date Status Changed: 09/12/2024 Comments: Partial Pass Inspector Notes: Slabs for walking surfaces inside enclosed area with fuel tanks and generator. Recommend some dowling to connect new slabs to existing. This is not required per plans but recommended. 7/22/24 S.Hancock Correction 4: Partial Pass Inspector Notes Status: Outstanding Date Status Changed: 09/12/2024 Comments: Partial Pass Inspector Notes: 5 floating slabs in pump room ok. 9/12/24 S.Hancock 100-Footings Partial Pass 12/12/2024 12/12/2024 12/12/2024 Inspector: Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 12/12/2024 Comments: Partial Pass Inspector Notes: East, West, and South first lift. 3/28/24 S.Hancock Correction 2: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 12/12/2024 Comments: Partial Pass Inspector Notes: South 2nd lift @stepped footer Central footers 3(F4) and 1(F7) *Marked on Plans* 4/3/24 S.Hancock Correction 3: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 12/12/2024 Comments: Partial Pass Inspector Notes: North end footers 3 Housekeeping footers. *Marked on Plans* 4/19/24 S.Hancock https://cvportal.col liercou ntyfl.gov/CityViewWeb/Permit/Status?permitld=565889 21/40 16F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Correction 4: Inspector Notes Status: Carried Forward Date Status Changed: 12/12/2024 Comments: Inspector Notes: Scheduled in order to transfer notes from this permit to new permit pertaining to generator and fuel tank island. Nothing was inspected pertaining to this permit. 9/12/24 S.Hancock Correction 5: Partial Pass Inspector Notes Status; Carried Forward Date Status Changed: 12/12/2024 Comments: Partial Pass Inspector Notes: Footer for flood wall @west and south elevations ok. 12/12/24 S.Hancock 104-Tie Beam Pass 12/20/2024 12/20/2024 12/20/2024 Inspector. Eliezer Lorenzo((239)238-6905) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Outstanding Date Status Changed: 12/20/2024 Comments: Partial Pass Inspector Notes: roof curve ok 12/20/24 E.Lorenzo 105-Shearwall Partial Pass 1/2/2025 1/2/2025 01/02/2025 Inspector: Timothy Essley((239)571-0769) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 01/02/2025 Comments: Partial Pass Inspector Notes: North end CIP shear wall. *Marked on plans* 4/23/24 S.Hancock Correction 2: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 01/02/2025 Comments: Partial Pass Inspector Notes: Shearwalls @thermal tank ok. 6/20/24 S.Hancock Correction 3: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 01/02/2025 Comments; Partial Pass Inspector Notes: South and West barrier wall sections 1/2/25. T.Essley https://cvportal.colliercounty 1.gov/CityViewWeb/Pennit/Status?pennitld=565889 22/40 16F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal 506-Underground Electrical Conduit Pass with notes 1/6/2025 1/6/2025 01/06/2025 Inspector. Danny York((239)452-0756) Send Email Corrections: Correction 1', Partial Pass Inspector Notes Status: Outstanding Date Status Changed: 06/28/2024 Comments: Partial Pass Inspector Notes:6/10/24 6/10/24 Generator and site Itg underground As marked on drawings E011 //wrb 6/28/24 Under roadway conduits from jail towards generator as marked on E011 //wrb Correction 2: Pass with Inspector Notes Status: Outstanding Date Status Changed: 01/06/2025 Comments: Pass with Inspector Notes: 1/6/25 -Conduits from generator to electrical room in building K -remaining site lighting conduits as marked on plans sheet E011 -underground installation complete//djy 121 -Elevated Structural Deck Pass 1/9/2025 1/9/2025 01/09/2025 Inspector. Eliezer Lorenzo((239)238-6905) Send Email 100-Footings Partial Pass 1/17/2025 1/17/2025 01/17/2025 Inspector: Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 01/17/2025 Comments: Partial Pass Inspector Notes: East, West, and South first lift. 3/28/24 S.Hancock Correction 2: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 01/17/2025 Comments: Partial Pass Inspector Notes: South 2nd lift @stepped footer Central footers 3(F4) and 1(F7) *Marked on Plans* 4/3/24 S.Hancock https://cvportal.colliercountytl.gov/CityVewA b/Permit/Status?permitld=565889 23/40 16F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Correction 3: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 01/17/2025 Comments: Partial Pass Inspector Notes: North end footers 3 Housekeeping footers. *Marked on Plans* 4/19/24 S.Hancock Correction 4: Inspector Notes Status: Carried Forward gate Status Changed: 01/17/2025 Comments: Inspector Notes: Scheduled in order to transfer notes from this permit to new permit pertaining to generator and fuel tank island. Nothing was inspected pertaining to this permit. 9/12/24 S.Hancock Correction 5: Partial Pass Inspector Notes Status: Carried Forward Date Status Changes 01/17/2025 Comments: Partial Pass Inspector Notes: Footer for flood wall @west and south elevations ok. 12/12/24 S.Hancock Correction 6' Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 01/17/2025 Comments: Partial Pass Inspector Notes: North elevation flood wall footer ok. 1/17/25 S.Hancock 100-Footings Pass with notes 1/24/2025 1/24/2025 01/24/2025 Inspector. Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Resolved Date Status Changed: 01/24/2025 Comments: Partial Pass Inspector Notes: East, West, and South first lift. 3/28/24 S.Hancock https://cvportal.colliercountytl.gov/CityViewWeb/Permit/Status?permitld=565889 24/40 r *Ra 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Correction 2: Partial Pass Inspector Notes Status: Resolved Date Status Changed: 01/24/2025 Comments: Partial Pass Inspector Notes: South 2nd lift @stepped footer Central footers 3(F4) and 1(F7) *Marked on Plans* 4/3/24 S.Hancock Correction 3: Partial Pass Inspector Notes Status: Resolved Date Status Changed: 01/24/2025 Comments: Partial Pass Inspector Notes: North end footers 3 Housekeeping footers. *Marked on Plans* 4/19/24 S.Hancock Correction 4: Inspector Notes Status: Resolved Date Status Changed: 01/24/2025 Comments: Inspector Notes: Scheduled in order to transfer notes from this permit to new permit pertaining to generator and fuel tank island. Nothing was inspected pertaining to this permit. 9/12/24 S.Hancock Correction 5: Partial Pass Inspector Notes Status: Resolved Date Status Changed: 01/24/2025 Comments: Partial Pass Inspector Notes: Footer for flood wall @west and south elevations ok. 12/12/24 S.Hancock Correction 6: Partial Pass Inspector Notes Status: Resolved Date Status Changed: 01/24/2025 Comments: Partial Pass Inspector Notes: North elevation flood wall footer ok. 1/17/25 S.Hancock Correction 7: Pass with Inspector Notes Status: Resolved Date Status Changed: 01/24/2025 Comments: Pass with Inspector Notes: Footers in electrical room ok. All footer inspections complete. 1/24/25 S.Hancock https://cvportal.colliercountyfl.gov/CityViewWeb/Permit/Status?permitld=565889 25/40 6F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal 133-Monolithic Slab Partial Pass 1/24/2025 1/24/2025 01/27/2025 Inspector: Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Carried Forward .Date Status Changed: 01/27/2025 Comments: Partial Pass Inspector Notes: Slab in electrical room ok. 1/24/25 S.Hancock 105-Shearwall Pass 1/29/2025 1/29/2025 01/29/2025 Inspector: Eliezer Lorenzo((239)238-6905) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Outstanding Date Status Changed: 01/02/2025 Comments: Partial Pass Inspector Notes: North end CIP shear wall. *Marked on plans* 4/23/24 S.Hancock Correction 2: Partial Pass Inspector Notes Status: Outstanding Date Status Changed: 01/02/2025 Comments: Partial Pass Inspector Notes: Shearwalls @thermal tank ok. 6/20/24 S.Hancock Correction 3: Partial Pass Inspector Notes Status: Outstanding Date Status Changed: 01/02/2025 Comments: Partial Pass Inspector Notes: South and West barrier wall sections 1/2/25. T.Essley 111 -Dry-in/Flashing Pass 1/31/2025 1/31/2025 01/31/2025 Inspector. Eliezer Lorenzo((239)238-6905) Send Email 106-Columns Pass with notes 2/4/2025 2/4/2025 02/04/2025 Inspector. Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Resolved Date Status Changed: 02/04/2025 Comments: Partial Pass Inspector Notes: Columns CC1 and CC3 on S,E, and W elevations. 4/3/24 S.Hancock https://cvportal.colliercountytl.gov/CityViewWeb/Permit/Status?permitld=565889 26/40 16F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Correction 2: Partial Pass Inspector Notes Status: Resolved Date Status Changed: 02/04/2025 Comments: Partial Pass Inspector Notes: East side column CC3 *Marked on plans* 4/23/24 S.Hancock Correction 3: Pass with Inspector Notes Status: Resolved Date Status Changed: 02/04/2025 Comments: Pass with Inspector Notes: Column inspections complete. 2/4/25 S.Hancock 133-Monolithic Slab Pass with notes 2/4/2025 2/4/2025 02/04/2025 Inspector. Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Resolved Date Status Chanced: 02/04/2025 Comments: Partial Pass Inspector Notes: Slab in electrical room ok. 1/24/25 S.Hancock Correction 2: Pass with Inspector Notes Status: Resolved Date Status Changed: 02/04/2025 Comments: Pass with Inspector Notes: All slab inspections complete. 2/4/25 S.Hancock 119-Fill Cells Cancellation By 2/4/2025 2/4/2025 02/04/2025 Contractor Inspector: Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 02/04/2025 Comments: Partial Pass Inspector Notes: Fill cells at parapet at new building ok. 7/31/24 S.Hancock https://cvportal.colliercountyfi.gov/CityViewWeb/Permit/Status?permitld=565889 27/40 16F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Correction 2: Inspector Notes Status: Carried Forward Date Status Changed: 02/04/2025 Comments: Inspector Notes: Contractor scheduled to clear it out but there is still 1 more fill cell inspection needed. Cancelled. 2/4/25 S.Hancock 153-Shearwall/Stucco Lath Pass 2/12/2025 2/12/2025 02/12/2025 Inspector: Eliezer Lorenzo((239)238-6905) Send Email 151 -Shearwall/Nailing Pass 2/12/2025 2/12/2025 02/12/2025 Inspector: Eliezer Lorenzo((239)238-6905) Send Email 119-Fill Cells Pass 2/12/2025 2/12/2025 02/12/2025 Inspector: Eliezer Lorenzo((239)238-6905) Send Email Corrections: Correction 1: Partial Pass Inspector Notes Status: Outstanding Date Status Changed: 02/04/2025 Comments: Partial Pass Inspector Notes: Fill cells at parapet at new building ok. 7/31/24 S.Hancock Correction 2: Inspector Notes Status: Outstanding Date Status Changed: 02/04/2025 Comments: Inspector Notes: Contractor scheduled to clear it out but there is still 1 more fill cell inspection needed. Cancelled. 2/4/25 S.Hancock 136-Impact Glass Failed-Building 2/26/2025 2/26/2025 02/26/2025 Inspector. Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Inspector Notes Status: Carried Forward Date Status Cha ged: 02/26/2025 Comments: Inspector Notes: Not ready for inspection. FBC110.5.6 2/26/25 S.Hancock 136-Impact Glass Partial Pass 2/27/2025 2/27/2025 02/27/2025 Inspector. Timothy Essley((239)571-0769) Send Email https://cvportal.colliercountyfl.gov/CityViewWeb/Perrnit/Status?permitld=565889 28/40 16F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Corrections: Correction 1: Inspector Notes Status: Carried Forward Date Status Changed: 02/27/2025 Comments: Inspector Notes: Not ready for inspection. FBC110.5.6 2/26/25 S.Hancock Correction 2; Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 02/27/2025 Comments: Partial Pass Inspector Notes: Front and rear store front pans good in new pump room. 2/27/25. T.Essley 136-Impact Glass Partial Pass 3/3/2025 3/3/2025 03/03/2025 Inspector. Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Inspector Notes Status: Carried Forward Date Status Changed: 03/03/2025 Comments: Inspector Notes: Not ready for inspection. FBC110.5.6 2/26/25 S.Hancock Correction 2; Partial Pass Inspector Notes Status: Carried Forward pate Status Changed: 03/03/2025 Comments: Partial Pass Inspector Notes: Front and rear store front pans good in new pump room. 2/27/25. T.Essley Correction 3: Partial Pass Inspector Notes Status: Carried Forward Date Status Chanced: 03/03/2025 Comments: Partial Pass Inspector Notes: East end store fronts front and back frames ok. 3/3/25 S.Hancock 136-Impact Glass Partial Pass 3/18/2025 3/18/2025 03/18/2025 Inspector. Eliezer Lorenzo((239)238-6905) Send Email https://cvportal.colliercountyf1.gov/CityViewWeb/Permit/Status?permitld=565889 29/40 16F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Corrections: Correction 1: Inspector Notes Status: Carried Forward Date Status Changed: 03/18/2025 Comments: Inspector Notes: Not ready for inspection. FBC110.5.6 2/26/25 S.Hancock Correction 2: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 03/18/2025 Comments; Partial Pass Inspector Notes: Front and rear store front pans good in new pump room. 2/27/25. T.Essley Correction 3: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 03/18/2025 Comments: Partial Pass Inspector Notes: East end store fronts front and back frames ok. 3/3/25 S.Hancock Correction 4: Partial Pass Inspector Notes Status: Carried Forward Date Status Changed; 03/18/2025 Comments: Partial Pass Inspector Notes: windows pans ok 3/18/25 E.Lorenzo 136-Impact Glass Pass with notes 3/21/2025 3/21/2025 03/21/2025 Inspector: Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Inspector Notes Status; Resolved Date Status Changed: 03/21/2025 Comments: Inspector Notes: Not ready for inspection. FBC110.5.6 2/26/25 S.Hancock Correction 2: Partial Pass Inspector Notes Status: Resolved Date Status Changed: 03/21/2025 Comments: Partial Pass Inspector Notes: Front and rear store front pans good in new pump room. 2/27/25. T.Essley https://cvportal.colliercountyll.gov/CityViewWeb/Permit/Status?permitld=565889 30/40 16F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Correction 3: Partial Pass Inspector Notes Status: Resolved Date Status Changed: 03/21/2025 Comments: Partial Pass Inspector Notes: East end store fronts front and back frames ok. 3/3/25 S.Hancock Correction 4: Partial Pass Inspector Notes Status: Resolved Date Status Changed: 03/21/2025 Comments: Partial Pass Inspector Notes: windows pans ok 3/18/25 E.Lorenzo Correction 5: Pass with Inspector Notes Status: Resolved Date Status Changed:, 03/21/2025 Comments: Pass with Inspector Notes: All windows and doors ok. Inspection complete. 3/21/25 S.Hancock 510-Alarm Rough Pass 4/4/2025 4/4/2025 04/04/2025 Inspector: Kenneth Hughes((239)776-5225) Send Email 201 -Plumbing Rough-in Pass 5/2/2025 5/2/2025 05/02/2025 Inspector: Randall Gaddini((239)252-2400) Send Email Corrections: Correction 1; Inspector Notes Status: Outstanding Date Status Changed: 05/02/2025 Comments: Inspector Notes:5/2/25. Building K water line pass. RG 118-Lintel Beam Pass 5/5/2025 5/5/2025 05/02/2025 Inspector. Eliezer Lorenzo((239)238-6905) Send Email Corrections: Correction 1: Inspector Notes Status: Outstanding Date Status Changed: 05/09/2024 Comments: Inspector Notes: Cancelled per contractor 5/6 10:50a.m. 5/6/24 S.Hancock Correction 2: Partial Pass Inspector Notes Status: Outstanding Date Status Changed: 05/09/2024 Comments: Partial Pass Inspector Notes: Lintels above 2 doors @West side. 5/9/24 S.Hancock https://cvportal.colliercountyfl.gov/CityViewWeb/Permit/Status?permitld=565889 31/40 16F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal 173-Remodel Corn Framing Pass 5/5/2025 5/5/2025 05/02/2025 Inspector: Eliezer Lorenzo((239)238-6905) Send Email 311 -Remodel Corn A/C Rough Pass with notes 5/5/2025 5/5/2025 05/05/2025 Inspector: Gregory McDaniel((239)272-3194) Send Email Corrections: Correction 1: Pass with Inspector Notes Status: Outstanding Date Status Changed: 05/05/2025 Comments: Pass with Inspector Notes:5/5/25-Correct route/location of ductwork to be corrected on as builts. GM. 801 -Site Drainage Failed-Building 5/5/2025 5/5/2025 05/05/2025 Inspector. Nick Duclos((239)789-6198) Send Email Corrections: Correction 1; Inspector Notes Status: Carried Forward Date Status Changed: 05/05/2025 Comments: Inspector Notes: 1. Final acceptance must be passed prior to 800 inspections. 802-Landscaping Cancellation By 5/5/2025 5/5/2025 05/05/2025 Inspector Inspector. Nick Duclos((239)789-6198) Send Email 810-Exotic Vegetation Removal Pass 5/5/2025 5/5/2025 05/05/2025 Inspector. Nick Duclos((239)789-6198) Send Email 511 -Alarm Final Cancellation By 5/5/2025 5/5/2025 05/05/2025 Contractor Inspector: Kenneth Hughes((239)776-5225) Send Email Corrections: Correction 1; Miscellaneous Corrections Status: Carried Forward Date Status Changed: 05/05/2025 Comments: Miscellaneous Corrections: 05/05/2025 Not ready for final. Cancelled onsite. FBC 110.5//kh 508-TV/Telephone Rough Pass 5/5/2025 5/5/2025 05/05/2025 Inspector Kenneth Hughes((239)776-5225) Send Email 512-AudioNideo Rough Pass 5/5/2025 5/5/2025 05/05/2025 Inspector. Kenneth Hughes((239)776-5225) Send Email 501 -Electrical Rough Partial Pass 5/5/2025 5/5/2025 05/05/2025 Inspector Kenneth Hughes((239)776-5225) Send Email https://cvportai.colliercountyfl.gov/CityVewWeb/Permit/Status?permitld=565889 32/40 16F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Corrections: Correction 1- Partial Pass Inspector Notes Status: Carried Forward Date Status Changed: 05/05/2025 Comments: Partial Pass Inspector Notes: 05/05/2025 Bus Duct incomplete. Temporary power in place. Cannot pass rough with temporary wires energized/ permanent wiring not landed in their final locations. Temporary panels energized -to be removed. //kh Note; Interior conduits okay in Building K. Lighting at final stage. Inside gear in electrical room okay for rough. Checked site lighting poles -temporarily being fed. Did not check roof of Building K. Did not check water tank. 802-Landscaping Failed-Building 5/7/2025 5/7/2025 05/07/2025 Inspector: Nick Duclos((239)789-6198) Send Email Corrections: Correction 1: Inspector Notes Status: Carried Forward Date Status Changgl 05/07/2025 Comments: Inspector Notes: 1. Site acceptance must be passed prior to 800 inspection. Conditions Guidelines For Electronicaliy_Submitting Documents: Airspace Obstruction Resolved Department: Planning Expiration Date: Due Date: Description: This property is located within the Airport Overlay and is required to be reviewed by the appropriate staff members prior to the issuance of the permit. If the proposed scope of work impedes an airspace surface, additional review will be required to determine if it is an airspace hazard or an airspace obstruction.The additional review, submittal requirements, and criteria are outlined within LDC Section 4.02.06. No permit shall be issued for an airspace hazard, and no permit shall be issued without approval from the impacted airport authority and staff for an airspace obstruction, pursuant to LDC Section 4.02.06. APO 158' BlacklidgeLisa 02/06/2024 11:41 AM Condition Type. Permit Hold https://cvportal.colliercountytl.gov/CityViewWeb/Permit/Status?permitld=565889 33/40 16F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Revision Inspection Hold Resolved Department: Building Review and Permitting Expiration Dates. Due Date: Description: > Revision Inspection Hold. This condition will be resolved once the revision has been issued. Condition Type: Inspection Hold Subdivision/Site Development Acceptance Required Prior to CO Open Department: Engineering expiration Date: Due Date: Description: Acceptance Required Prior to CO. Please contact Engineering Services at (239)252-2417 or GMD.EngineeringSVC@colliergov.net for more information. Condition Type CO Hold Notice of Commencement Not Required Department: Building Review and Permitting Expiration Date: Due Date: Description: Notice of Commencement: Upload to the condition on the portal. NOC not required with county owned property./ChancyTonya 02/20/2024 1:37 PM Condition Ty_pP: Inspection Hold Fire Certificate-Notice of Fire Compliance Open Department: Building Review and Permitting Expiration Date: Due Date: Description: > Fire Certificate- Notice of Fire Compliance Condition Type: CO Hold Documents: Browse. Fire Inspection Scheduling-Greater Naples Open Department: Fire Department Expiration Date: Due Date: Description: Fire Inspection Scheduling go to www.greaternaplesfire.org/resources/schedule-an-inspection Condition Type: Informational Survey will be Required Inactive Department: Building Review and Permitting Expiration Date: Due Date: Description: A Survey is required and must verify that improvements) meet setbacks, easements, and elevation requirements per Chapter 62, Collier County Code of Laws and Ordinances. Throughout the duration of the permit, please review the survey conditions for when to upload the survey. https://cvportal.colliercountyfl.gov/CityViewWeb/Permit/Status?permitld=565889 34/40 16F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityVew Portal Condition Type: Informational Fire Resolved apartment: Building Review and Permitting Expiration Date: Due Date: Description: >Fire Notes: Separate permit required for fire alarm modification KovacsSteven 08/21/2023 12:37 PM Only modifidication for the remodel NOT for access control interface PRFAS20240311568 RiggallLissandra 05/10/2024 10:00 AM Condition Type. CO Hold Defferral Submittal Resolved Department: Building Review and Permitting Expiration Date: Due Date: Description: Permit is on inspection hold until the following deferred items are submitted as a revision: 1. Pre-engineered Aluminum decorative metal perforated panels---- Resolved per Revision #Two. EwingAndrew 12/05/2024 12:52 PM 2. Pre-engineered Aluminum canopy Resolved per Revision iTwo. EwingAndrew 12/05/202.4 12:52 PM EwingAndrew 08/31/2023 11:47 AM *See #11-Deferred Submittal List- EwingAndrew 03/06/2024 9:39 AM Condition Type: Inspection Hold Compaction Test Resolved apartment: Building Review and Permitting Expiration Date: Due Date: Description: Soil Compaction Test. Upload to the condition on the portal. Condition Type: CO Hold Welding/Bolting Certificate Resolved Department: Building Review and Permitting Expiration Date: Due Date: Description: FBC 2204.1 Welding: Provide weld procedure specifications &welder operator performance qualification records per FBC 2204.1. FBC 2204.2 Bolting: The design, installation and inspection of bolts shall be in accordance with the requirements of Sections 2205, 2206, 2207, 2210 and 2211. Provide conformance records as applicable. For electronic submittals upload documents to the condition on the portal. Condition Typg. CO Hold Defferral Submittal Resolved https://cvportal.colliercountyfl.gov/CityViewWeb/Permit/Status?permitld=565889 35/40 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal 1 6 F 3 Department: Building Review and Permitting Expiration Date: Due Date: Description: Permit is on inspection hold until the following deferred items are submitted as a revision: 1. Pre-Engineered Exterior Aluminum Decorative Louvers--Item added in error. N/R. EwingAndrew 12/05/2024 1:03 PM 2. Pre-Engineered Decorative Metal Panels Resolved per Revision #Two. EwingAndrew 12/05/2024 12:52 PM 3. Pre-Engineered Aluminum Canopies Resolved per Revision #Two. EwingAndrew 12/05/2024 12:52 PM 4. Steel Stairs and Railings Resolved per Revision #Two. EwingAndrew 12/05/2024 12:52 PM 5. Glazed Storefront Systems Resolved per Revision #Two. EwingAndrew 12/05/2024 12:52 PM 6. Anchorage of Mechanical Equipment to Structure Resolved per Revision #Two. EwingAndrew 12/05/2024 12:52 PM 7. Precast Hollow-Core Concrete Roof System Resolved per Revision #Two. EwingAndrew 12/05/2024 12:52 PM 8. Roof Attachment Resolved per Revision #Two. EwingAndrew 12/05/2024 12:52 PM 9. Aluminum Flood Panels Resolved per Revision #Two. EwingAndrew 12/05/2024 12:52 PM EwingAndrew 03/06/2024 9:38 AM Condition Type Inspection Hold Request Changes to Permit Contractors or Status Open aepartment: Building Review and Permitting Expiration Date: Due Date: Description: Use the form located at hops://www,colliercountyf(_gov/home/showdocume nt?id=105797&t=63840398498455837Q to request Permit extensions, cancellations, and changes/withdrawals of Contractors, Subcontractors and Qualifiers. Instructions are provided with the form. Change/withdrawal of contractor does not apply to self-issued permits. Contact Building Permit Resolution Services at 239-252-2493 for assistance completing the form. Submit the form by clicking the Browse button below. Condition Type: Informational Documents: Browse.. Sub Contractor(Electrical) Resolved Department: Building Review and Permitting Expiration Date: Due Date: Description: Sub Contractor(Electrical) Upload to the condition on portal. Condition Type: Inspection Hold Sub Contractor(Mechanical) Resolved Department: Building Review and Permitting Expiration Date:. Due Date: Description: Sub Contractor(Mechanical) Upload to the condition on portal. Condition Type: Inspection Hold https://cvportal.colliercountyfl.gov/CityViewWeb/Permit/Status?permitld=565889 36/40 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal 1 6 F 3 Sub Contractor(Plumbing) Resolved Department: Building Review and Permitting . x_piration Date: Due Date: Description: Sub Contractor(Plumbing) Upload to the condition on portal. Condition Ty-pei Inspection Hold Sub Contractor(Roofing) Resolved Department: Building Review and Permitting Expiration Date: Due Date: Description: Sub Contractor(Roofing) Upload to the condition on portal. Condition Type: Inspection Hold Early Work Resolved Department: Building Review and Permitting Expiration Date: Due Date: Description: A request was made (see documents) to commence work as stated in permit application while permit was under review. Per FBC-B Section 105.12 "work starting before permit issuance"said request has been approved and contractor is aware that no work requiring inspections shall be covered and they are moving forward at their own risk. A permit hold will be placed on subject permit to confirm that all aspects allowed under early work approval is still accessible for inspection. Anything covered shall be exposed. ClumFred 02/06/2024 9:43 AM HOLD resolved 3.11.24 TS , ClumFred 03/11/2024 10:26 AM Condition Ty_pg;. Permit Hold Fire Resolved Department: Expiration Date: Due Date: Description: >Fire Notes: Separate permits or revision required for 1. Gen-set with sub fuel tank. 2. Stand alone diesel fuell tanks. MastrobertoThomas 05/16/2024 10:49 AM PREL20240623513 KovacsSteven 06/06/2024 12:44 PM PRFR20240522673 MastrobertoThomas 06/10/2024 12:25 PM Condition Type: CO Hold Elevation Certificate Under Construction Resolved https://cvportal.colliercountyfigov/CityViewWeb/Permit/Status?perrnitld=565889 37/40 16F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Department: Building Review and Permitting Expiration Date: Due Date: Description: At the time of permit application, the permitted structure is in the special flood hazard area. An Under Construction Elevation Certificate is required within 10 days of passing a 103 or 133 inspection of slab or other foundation system. Prior to obtaining County approval of the Under Construction Elevation Certificate, the permit holder's construction activities are at his/her own risk. Under Construction Elevation Certificates must verify the slab meets minimum elevations per the Florida Building Code and Chapter 62, Collier County Code of Laws and Ordinances (e.g., BFE +1 or 18"above the crown of the road, whichever is higher, and the elevation established by the SFWMD permit). Under Construction Elevation Certificate provided: (Todd Short 1/09/2025) Flood Zone: AE ; BFE: 9'; Top of Bottom Floor: 7,7' ; LAG: 6.5' ; HAG: 7.9'. ID: 03/11/2024; Permit approved under FEMA map 5/16/2012. Fin fished EC is required,TorresMilena 01/31/2025 1:12 PM Condition Type: CO Hold Elevation Certificate Open Department: Building Review and Permitting Spiration Date: Due Date: Description: > Elevation Certificate Flood zone: AE; BFE: 7' NAVD Permit app 07/25/2023(Applicable); Per new FEMA AE; 9' NAVD ; Scope: Demo &Replacement of Chiller system + 3380 sqf addition pump room; Chiller building addition to match existing FFE of Chiller building@7.7' NAVD. Condition Type: CO Hold Documents: Browse. Fire Open Department: Expiration Date: Due Date: Description: >Fire Notes: Fire Alarm Revision Required to Interface Access/Egress Control Systems with The Fire Alarm System Before Issuance Of NOFC. RiggallLissandra 05/10/2024 10:02 AM Condition Type: CO Hold CO Hold for Revision Resolved Department: Building Review and Permitting Expiration Date: Due Date: Description: > CO Hold for Revision< Condition Ty_p_ei CO Hold Revision Inspection Hold Resolved https://cvportal.colliercountyfl.gov/CityVewWeb/Permit/Status?pennitld=565889 38/40 16F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Department: Building Review and Permitting Expiration Date: Due Date: Description: > Revision Inspection Hold. This condition will be resolved once the revision has been issued. Condition Type: Inspection Hold CO Hold for Revision Resolved aepartment: Building Review and Permitting xpiration Date: Due Date: Description: > CO Hold for Revision< Condition Type' CO Hold Spot Survey Stipulation Inactive Department: Building Review and Permitting Expiration Date: Due Date: Description: Please upload a Spot Survey demonstrating the finished slab or pool shell that meets the required setbacks, easements, and minimum elevation per Chapter 62, Collier County Code of Laws and Ordinances. Prior to obtaining County approval of the Spot Survey, the permit holder's construction activities are at your own risk. After 10 days an "Inspection HOLD"will be placed on this Permit for survey review. Condition Types Stipulation Spot Survey Inspection Hold Resolved Department: Building Review and Permitting Expiration Date: Due Date', Description: Please upload a Spot Survey demonstrating the finished slab or pool shell that meets the required setbacks, easements, and minimum elevation per Chapter 62, Collier County Code of Laws and Ordinances. Prior to obtaining County approval of the Spot Survey, the permit holder's construction activities are at your own risk. Condition Type: Inspection Hold Revision Inspection Hold Resolved Department: Building Review and Permitting Expiration Date: Due Date: Description: > Revision Inspection Hold. This condition will be resolved once the revision has been issued. Condition Type: Inspection Hold Spot Survey CO Hold Resolved hops://cvportal.colliercountyf.gov/CityViewWeb/Permit/Status?permitld=565889 39/40 16F3 5/20/25,5:15 PM Permit Application Status-Collier County-CityView Portal Department: Building Review and Permitting Expiration Date: Due Date: Description: Please upload a Spot Survey demonstrating that the improvement listed on the permit meets the required setbacks, easements, and minimum elevation per Chapter 62, Collier County Code of Laws and Ordinances as applicable. Condition TYpe CO Hold CO Hold for Revision Resolved impartment: Building Review and Permitting Expiration Date: Due Date: Descripti n: > CO Hold for Revision< Condition Type: CO Hold Engineering Certificate/Letter(Structural) Resolved Apartment: Building Review and Permitting Expiration Date: Due Date: Description: Engineering Certificate/Letter(Structural). Upload to the condition on the portal. Tank certification from Engineer. Added per request of contractor for record keeping; CraftWilliam 03/20/2025 8:36 AM Condition Type: CO Hold Documents & Images https://cvportal.colliercountyfl.gov/CityViewWeb/Permit/Status?permitld=565889 40/40 16F 3 5/20/25,5:23 PM Planning Application Status-Collier County-CityView Portal Planning Application Status PL20240008663 Summary Planning Project Application Number: PL20240008663 Project Name: Collier County Government Center New Chiller Plant Bldg. K-1 (NAP) Project Type: Nominal Approval Process Application Types: Nominal Approval Process (Status: Complete- Closed for Uploads) Application Status: Complete - Closed for Uploads Date Entered: 07/19/2024 Property Owner's Full Name: COLLIER CNTY C/O REAL PROPERTY MANAGEMENT Project Description: On behalf of the Property Owner (Collier County c/o Real Property Management) we are hereby submitting a Nominal Alteration Plan (NAP) application to the previously approved Collier County New Chiller Plant Building K, Jail Generator and Platform project (SDPA- PL20220003162). The project was approved under SDPA-PL20220003162 in February 2024. The filing of this NAP application was subsequently requested by the County, while under review by the Building &Inspection Division. More specifically, this submittal provides additional information for the generators to address Correction Comments 1 through 4 of the Building Department's Outstanding Corrections letter, dated June 19, 2024. Planner: LEGACY: Mark Morton Planner Email: Mark.Morton@calliercountyff.gov Locations Application Types (Click to See Reviews) Nominal Approval Process Application Status: Complete - Closed for Uploads 1 Initial Submittal Status: Accepted Est. Out-come Completin l :Date Zoning Review Nominal Approval Process Approved 07/31/2024 08/01/2024 Fire Review Nominal Approval Process Approved 07/31/2024 07/24/2024 GIS Review Nominal Approval Process Approved 07/31/2024 07/24/2024 Fees Nominal Approval Fee $75.00 $75.00 Paid 07/24/2024 Fire Code Review-NAP $150.00 $150.00 Paid 07/24/2024 No outstanding fees. Totals: $225.00 $225.00 $0.00 https://cvportal.colliercountyfl.gov/CityViewWeb/Planning/Status?planningld=73184 4/2 16F3 5/20/25,5:23 PM Planning Application Status-Collier County-CityView Portal Your project will not be reviewed until all fees are paid in full. Total Amount Payable Online: $0.00 Deposits & Bonds Inspections Conditions Documents & Images https://cvportal.colliercountyfl.gov/CityVievkM/eb/Planning/Status?planningld=73184 2/2 16F3 , 5/20/25,5:25 PM Planning Application Status-Collier County-CityView Portal Planning Application Status PL20230011586 Summary Planning Project Application Number: PL20230011586 Project Name: Collier County Government Center PUD - (PDI) Project Type: Planned Unit Development Insubstantial Change Application Types: Pre-Application Meeting (Status: Approved - Closed for Uploads) Planned Unit Development Insubstantial Change (Status: Approved - Closed for Uploads) Application Status: Approved - Closed for Uploads Date Entered: 07/03/2023 Property Owner's Full Name: COLLIER CNTY C/O REAL PROPERTY MANAGEMENT Project Description: This application is to make a verbiage change to allow for reduced setbacks for structures that house electric, gas, emergency generators or HVAC equipment may have a setback of zero (0) feet. This reduced setback would still have to comply with an NFPA requirements for fire safety which would be demonstrated at the SDPA or building permit stage of review. The PUD currently treats all structures housing HVAC equipment as a 'principal structure'. These types of building are typically treated as accessory structures and allowed a reduced setback but that is not allowed under the current PUD. The County has an aging HVAC system that serves the campus which must be upgraded. The proposed upgrades will be placed where the current existing 'ice farm'equipment is, but this is a space constrained area and a reduced setback is necessary to construct the project. Additionally, the County will be replacing or upgrading emergency generators in the future which by necessity should be located near or adjacent to existing structures that they serve which would be subject to a setback under the current regulations of anywhere from 15'to 110' depending on the height of the adjacent buildings. This would create in some cases an untenable situation, requiring future amendments to the PUD. Since all structures would require permitting through Collier County, compliance of any future structures with current life safety codes would occur, resulting in an appropriate setback being determined with the full consideration of building materials, construction methods and fire ratings based on design. Therefore, this change does not impact any issues related to health safety and welfare. Planner: Sean Sammon Planner Email: Sean.SammonCchcglliercountyfLgovv Locations Application Types (Click to See Reviews) Pre-Application Meeting Application Status: Complete - Add Application Type Pre-Application Status: Accepted Planned Unit Development Insubstantial Change Approval Track: Planning Commission https://cvportal.colliercountytl.gov/CityViewWeb/Planning/Status?planningld=57533 1/3 16F3 5/20/25,5:25 PM Planning Application Status-Collier County-CityView Portal Application Status: Approved - Closed for Uploads 1 Initial Submittal Status: Returned for Correction GIS Review Planned Unit Development Approved 08/07/2023 07/19/2023 Insubstantial Change School District Review Planned Unit Development Approved 08/14/2023 08/14/2023 Insubstantial Change Emergency Management Planned Unit Development Not Applicable 08/07/2023 07/20/2023 Review Insubstantial Change Public Utilities- PUED Review Planned Unit Development Not Applicable 08/07/2023 07/11/2023 Insubstantial Change Engineering Surveyor Review Planned Unit Development Not Applicable 08/07/2023 08/10/2023 Insubstantial Change Planned Unit Development Historical Review Approved 08/07/2023 08/07/2023 Insubstantial Change Transportation Pathways Planned Unit Development Review Insubstantial Change Not Applicable 08/07/2023 07/20/2023 Comprehensive Planning Planned Unit Development Not Applicable 08/07/2023 08/07/2023 Review Insubstantial Change Architectural Review Planned Unit Development Approved 08/07/2023 07/11/2023 Insubstantial Change Engineering Stormwater Planned Unit Development Approved 08/07/2023 07/20/2023 Review Insubstantial Change Landscape Review Planned Unit Development Rejected 08/07/2023 08/04/2023 Insubstantial Change County Attorney Review Planned Unit Development Rejected 08/14/2023 08/14/2023 Insubstantial Change Zoning Review Planned Unit Development Rejected 08/14/2023 08/15/2023 Insubstantial Change Graphics -GIS Review Planned Unit Development Approved 08/07/2023 07/31/2023 Insubstantial Change Fire Review Planned Unit Development Approved 08/07/2023 07/11/2023 Insubstantial Change Environmental Review Planned Unit Development Approved 08/07/2023 08/07/2023 Insubstantial Change ADA Review Planned Unit Development Not Applicable 08/07/2023 07/20/2023 Insubstantial Change Planned Unit Development Approved 08/07/2023 08/02/2023 Addressing -GIS Review Insubstantial Change 2 Re-Submittal Status: Accepted Addressing - GIS Review Planned Unit Development Approved 12/15/2023 12/08/2023 Insubstantial Change https://cvportal.col liercountyfl.gov/CityViewWeb/Planning/Status?planningld=57533 2/3 16F3 5/20/25,5:25 PM Planning Application Status-Collier County-CityView Portal Fire Review Planned Unit Development Approved 12/15/2023 11/15/2023 Insubstantial Change Zoning Review Planned Unit Development Approved 12/21/2023 12/28/2023 Insubstantial Change County Attorney Review Planned Unit Development Approved 12/21/2023 12/27/2023 Insubstantial Change Landscape Review Planned Unit Development Approved 12/21/2023 12/19/2023 Insubstantial Change Comprehensive Planning Planned Unit Development Not Applicable 12/15/2023 11/22/2023 Review Insubstantial Change Engineering Surveyor Review Planned Unit Development Approved 12/15/2023 12/08/2023 Insubstantial Change Fees Insubstantial Change to PUD Master Plan $1,500.00 $1,500.00 Paid 07/10/2023 Fire Code Review-PDI $100.00 $100.00 Paid 07/10/2023 Legal Advertising Fee $1,008.00 $1,008.00 Paid 06/12/2024 Graphics Property Notification Address Listing $80.00 $80.00 Paid 09/07/2023 t)at€, � aid Property Owner Notifications $1,096.50 $117.00 $979.50 Not Paid Totals: $3,784.50 $2,805.00 $979.50 Your project will not be reviewed until all fees are paid in full. Total Amount Payable Online:$979.50 Add Fees to My Cart. Deposits & Bonds Inspections Conditions Documents & Images https://cvportal.colliercountyfl.gov/CityViewWeb/Planning/Status?planningld=57533 3/3 16F3 5/20/25,5:18 PM Planning Application Status-Collier County-Cityvew Portal Planning Application Status PL20220003162 Summary Planning Project Application Number: PL20220003162 Project Name: New Chiller Plant Building K,Jail Generator&Platform (SDPA) Project Type: Site Development Plan Amendment Application Types: Pre-Application Meeting (Status: Site Inspection - Add Application Type) Site Development Plan Amendment(Status: Site Inspection - Add Application Type) Application Status: Site Inspection - Add Application Type Date Entered: 04/13/2022 Property Owner's Full Name: COLLIER CNTY C/O REAL PROPERTY MANAGEMENT Project Description: To replace existing areas currently utilized by ice tanks and parking with a new Central Energy Plant (CEP) building and Thermal Energy Storage (TES) above ground tank. This will include consideration of access, parking, circulation, water management strategies, existing utility relocations, new utility services, and code minimum landscaping. Planner: David Crane Planner Email: David.CraneftcolliercountytAgy Locations Application Types (Click to See Reviews) Pre-Application Meeting Site Development Plan Amendment Application Status: Site Inspection - Add Application Type 1 Initial Submittal Status: Returned for Correction Addressing -GIS Review Site Development Plan Rejected 09/13/2023 09/11/2023 Amendment Engineering Stormwater Site Development Plan Review Amendment Rejected 09/13/2023 09/13/2023 ADA Review Site Development Plan Amendment Approved 09/13/2023 09/05/2023 Engineering Utilities Review Site Development Plan Rejected 09/13/2023 09/13/2023 Amendment Environmental Review Site Development Plan Amendment Approved 09/13/2023 09/13/2023 Fire Review Site Development Plan Amendment Approved 09/13/2023 08/23/2023 Utility Billing Review Site Development Plan Not Applicable 09/13/2023 08/31/2023 Amendment https://cvportal.colliercountyll.gov/CityViewWeb/Planning/Status?planningld=40079 1/4 16F3 5/20/25,5:18 PM Planning Application Status-Collier County-CityView Portal Transportation Pathways Site Development Plan Review Amendment Rejected 09/13/2023 09/13/2023 Transportation Planning Site Development Plan Review Amendment Approved 09/13/2023 09/07/2023 Zoning Review Site Development Plan Rejected 09/13/2023 09/07/2023 Amendment Architectural Review Site Development Plan Rejected 09/13/2023 08/23/2023 Amendment Landscape Review Site Development Plan Rejected 09/13/2023 09/13/2023 Amendment GIS Review Site Development Plan Amendment Approved 09/13/2023 08/25/2023 2 Re-Submittal Status: Returned for Correction Addressing - GIS Review Site Development Plan Approved 02/07/2024 01/23/2024 Amendment Engineering Stormwater Site Development Plan Review Amendment Approved 02/07/2024 01/22/2024 Engineering Utilities Review Site Development Plan Approved 02/07/2024 01/26/2024 Amendment Fire Review Site Development Plan Approved 02/07/2024 01/18/2024 Amendment Transportation Pathways Site Development Plan Review Amendment Approved 02/07/2024 01/18/2024 Zoning Review Site Development Plan Rejected 02/07/2024 01/26/2024 Amendment Architectural Review Site Development Plan Approved 02/07/2024 01/17/2024 Amendment Landscape Review Site Development Plan Rejected 02/07/2024 02/06/2024 Amendment 3 Re-Submittal Status: Accepted Est. Application Tyne niitcome Completion t', Date Addressing - GIS Review Site Development Plan Approved 03/12/2024 02/21/2024 Amendment Fire Review Site Development Plan Approved 03/12/2024 02/20/2024 Amendment Zoning Review Site Development Plan Approved 03/12/2024 02/21/2024 Amendment Landscape Review Site Development Plan P Amendment Approved 03/12/2024 02/21/2024 https://cvportal.colliercountyfl.gov/CityvlewWeb/Planning/Status?planningld=40079 2/4 16F3 5/20/25,5:18 PM Planning Application Status-Collier County-CityView Portal 4 Pre-Construction Submittal Status: Accepted There are no reviews associated with this application, or you are not authorized to view them. Fees Pre-application Meeting $500.00 $500.00 Paid 05/03/2022 Site Development Plan Amendment $2,500.00 $2,500.00 Paid 08/22/2023 Fire Code Review-Site Development Plan $150.00 $150.00 Paid 08/22/2023 Amendment SDP SDPA Non-residential Buildings fee $200.00 $200.00 Paid 08/22/2023 SDP SDPA Non-residential Floor Area fee $238.00 $238.00 Paid 08/22/2023 Certificate of Adequate Public Faclities $200.00 $200.00 Paid 08/22/2023 Certificate of Adequate Facilities(non- residential) $59.50 $59.50 Paid 08/22/2023 Construction Review Fee $4,056.25 $4,056.25 Paid 08/22/2023 Utility Review Fee $848.99 $848.99 Paid 08/22/2023 Construction Review Fee $17.70 $17.70 Paid 01/17/2024 3rd Review(SDP,SDPA,SDPI, SIP, SIPI) $500.00 $500.00 Paid 02/20/2024 No outstanding fees. Totals: $9,270.44 $9,270.44 $0.00 Your project will not be reviewed until all fees are paid in full. Total Amount Payable Online:$0.00 Deposits & Bonds Inspections Utility Spot Inspection Pending Spot Inspection Pending Utilities Pre-con Passed 04/08/2024 Utility Spot Inspection Passed 04/08/2024 Spot Inspection Passed 04/08/2024 Spot Inspection Passed 04/22/2025 Spot Inspection Passed 04/24/2025 Spot Inspection Passed 05/05/2025 https://cvportal.colliercountyfl.gov/CityvewWeb/Planning/Status?planningld=40079 3/4 5/20/25,5:18 PM Planning Application Status-Collier County-CityView Portal J 6 r Conditions Informational Comments Open Department: Transportation Planning Expiration Date: Due Date: Description: 09/07/2023 Informational Comment: TIS - No additional trip generation is anticipated with the improvements included in this application; no further review for transportation concurrency (adequacy of roadway capacity) for trip banking (reservation of road capacity) is required Stipulations Open Department: Development Review Expiration Date: Due Date: Description: This approval does not constitute approval by City of Naples Utilities. A letter of approval from City of Naples Utilities must be submitted prior to scheduling the pre-construction meeting. Informational Comments Open Department: Development Review Expiration Date: Due Date: Descrl i n: A copy of the SFWMD ERP or permit modification is required at the pre- construction meeting Informational Comments Open ilepartment: Zoning Expiration Date: Due Date: Description: HEX NO 2024-11 revised PUD ORD Section 3.4.D to allow a zero foot separation between HVAC equipment and other existing or proposed principal structures. Documents & Images https://cvportal.colliercountyfl.gov/CityvewWeb/Planning/Status?planningld=40079 4/4 16F3 5/20/25,5:20 PM Mechanical,Electrical,Plumbing,Gas&Fire Permit Application Status-Collier County-CityView Portal Mechanical, Electrical, Plumbing, Gas & Fire Permit Application Status PREL20240623513 Summary Application Number: PREL20240623513 Application Type: Electrical Application Status: Inspections Commenced Property Owner's Full Name: COLLIER CNTY C/O REAL PROPERTY MANAGEMENT Category of Work: Alteration/Remodel Occupancy Code: Utility, miscellaneous- Commercial & M/F Description of Work: Two new emergency power generators (provided by the owner) and related infrastructure to support the new systems being installed at the main campus central energy plant (BLDG K) as part of building permit REF PRCS20230730983 PRCS20240521729 3323 Tamiami TRL E K, (BLDG) , Naples Application Date: 06/05/2024 Issued Date: 08/28/2024 Expiration Date: 06/14/2025 1-2 Family or Comm: Commercial Locations Contacts Permits (Click to See Reviews) Permit Number: PREL2024062351301 Permit Type: Electrical Permit Status: Inspections Commenced 1 Initial Submittal Status: Returned for Correction Final Type Review Complete 07/19/2024 06/19/2024 Planning Review Rejected 07/05/2024 06/18/2024 HazMat Review Rejected 07/05/2024 06/14/2024 Structural Review Rejected 07/05/2024 06/14/2024 Floodplain Review Approved 07/05/2024 06/10/2024 Electrical Review Rejected 07/05/2024 06/07/2024 Fire Review Rejected 07/05/2024 06/06/2024 2 Re-Submittal Status: Complete Final Type Review Complete 09/23/2024 08/26/2024 Structural Review Approved 09/09/2024 08/22/2024 https://cvportal.colliercountyfl.gov/CityViewWeb/Permit/Status?permitld=611850 1al3 5/20/25,5:20 PM Mechanical,Electrical,Plumbing,Gas&Fire Permit Application Status-Collier County-CityView Portal 1 6 F 3 HazMat Review Approved 09/09/2024 08/19/2024 Electrical Review Approved 09/09/2024 08/12/2024 Planning Review Approved 09/09/2024 08/12/2024 Fire Review Approved 09/09/2024 08/12/2024 Fees FIRE Application-Fee $150.00 $150.00 Paid 06/06/2024 Zoning Review-Application $50.00 $50.00 Paid 06/06/2024 Electrical-Application Fee $50.00 $50.00 Paid 06/06/2024 Zoning Review-Additional Reviews $25.00 $25.00 Paid 08/26/2024 Inspection Fee $315.00 $315.00 Paid 08/26/2024 FIRE Review-Generator $350.00 $350.00 Paid 08/26/2024 BCAI $5.48 $5.48 Paid 08/26/2024 DBPR Surcharge $3.65 $3.65 Paid 08/26/2024 FIRE Inspection-Generators $500.00 $500.00 Paid 08/26/2024 Structural-Review Fee $50.00 $50.00 Paid 03/11/2025 Totals: $1,499.13 $1,499.13 $0.00 PLEASE DO NOT SUBMIT ANY PAYMENTS UNTILA COLLIER COUNTY PAYMENT SLIP IS DISTRIBUTED Total Amount Payable Online:$0.00 Deposits & Bonds Inspections 502-Electrical Final Pending Schedule? Inspector: 600-Pre Const Meeting Pending Inspector. 632-Fire Extinguisher Pending Inspector: 641 -Final Fire Pending Inspector: 501 -Electrical Rough Pending Schedule? Inspector: 503-Service Change Pending Schedule? Inspector: 506-Underground Electrical Conduit Pending Schedule? https://cvportal.colliercountytl.gov/CityviewWeb/Permit/Status?perrnitld=611850 2/8 5/20/25,5:20 PM Mechanical,Electrical,Plumbing,Gas&Fire Permit Application Status-Collier County-CityView Portal 16 F 3 Inspector. 844-HazMat Final Inspection Pending Schedule? Inspector. Michael Winkler((239)252-2501) Send Email 115-Building Final Pending Schedule? Inspector: 110-Tie Down Pending Schedule? Inspector: 841 -HazMat Tank Set Pending Schedule? Inspector. 103-Floating Slab Pass with notes 9/13/2024 9/13/2024 09/12/2024 Inspector: Scott Hancock((239)572-2410) Send Email Corrections: Correction 1: Pass with Inspector Notes Status: Resolved Date Status Chan9e 09/12/2024 Comments: Pass with Inspector Notes: Inspections previously completed under permit#20230730983. Partial pass: Slabs for generator and fuel tanks in enclosed area on north side 5/29/24 S.Hancock Partial pass: Slabs for walking surfaces inside enclosed area with fuel tanks and generator. Recommend some dowling to connect new slabs to existing. This is not required per plans but recommended. 7/22/24 S.Hancock 841 -HazMat Tank Set Failed 11/21/2024 Inspector. Michael Winkler((239)252-2501) Send Email Conditions Guideline For Flectronically_5ubmitting Documents: Request Changes to Permit Contractors or Status Open Department: Building Review and Permitting expiration Date: Due Date: Description: Use the form located at https://www.colliercountyfl.gov/home/showdocume nt?id=105797&t=638403984984558370 to request Permit extensions, cancellations, and changes/withdrawals of Contractors, Subcontractors and Qualifiers. Instructions are provided with the form. Right-of-Way (ROW) and Well permits may only use this process for cancellations. Change/withdrawal of contractor does not apply to self-issued permits. Contact Building Permit Resolution Services at 239-252-2493 for assistance completing the form. Submit the form by clicking the Browse button below. Condition Type Informational hops://cvportal.colliercountyfl.gov/CityViewWeb/Permit/Status?permitld=611850 3/$ 5/20/25,5:20 PM Mechanical,Electrical,Plumbing,Gas&Fire Permit Application Status-Collier County-CityView Portal Documents: Browse. PREL2024623513-Extension.psf PREL20240623513 Extension Peyuest.p�lf Fire Inspection Scheduling-Greater Naples Open Department: Fire Department Expiration Date: Due Date: Description: Fire Inspection Scheduling go to www.greaternaplesfire.org/resources/schedule-an-inspection Condition Type.j Informational Fire Certificate-Notice of Fire Compliance Open p_epartment: Building Review and Permitting Expiration Date: Due Date: Description: > Fire Certificate - Notice of Fire Compliance Condition Type: CO Hold Documents: Browse.. HazMat Primary&Secondary Integrity Testing Open • https://cvportal.colliercountyfl.gov/CityViewWeb/Perrnit/Status?permitld=611850 4/8 5/20/25,5:20 PM Mechanical,Electrical,Plumbing,Gas&Fire Permit Application Status-Collier County-CityView Portal 1 6 F 3 Department: Solid & Hazardous Waste Management Expiration Date: Due Date: Description: PRIMARY &SECONDARY TIGHTNESS TESTING PRIOR to FILLING TANK Please email proof of passing testing to Michael.Winkler@CollierCountyFl.Gov or provide at inspection AST- non-diked tank Testing required on the tank post-delivery to insure it wasn't damaged during transport or setting at the site. If fuel has been introduced, an inert gas must be used such as nitrogen. Please follow the manufacturer's guidelines, NFPA 30, or STI for testing procedures. If vacuum was applied to the interstice at the factory prior to being shipped, in lieu of onsite tightness testing, a manifest of the vacuum application at the factory must be provided to compare to the post-delivery gauge reading. ****Convault tanks require that testing on the tank only be conducted by an authorized factory trained representative AST- diked Tank Testing required on the tank post-delivery to insure it wasn't damaged during transport or setting at the site (see setbacks below), Testing required on primary tank only since the interstitial space is not sealed and tank emergency vents by design to the atmosphere. If fuel has been introduced, an inert gas must be used such as nitrogen. Please follow the manufacturer's guidelines, NFPA 30, or STI for testing procedures. AST Spill Containment single walled Hydrostatic testing of the spill bucket at the fillport for lhr factory made or 24hrs for field-fabricated made. Condition Type: CO Hold Documents: Browse.. HazMat Operability Testing Open Department: Solid & Hazardous Waste Management Expiration Date: • Due Date: Description: OPERABILITY TESTING Please email proof of passing testing to Michael.Winkler@CollierCountyFI.Gov or provide at inspection AST-genset Install and testing of the interstitial sensor/gauge to verify operability and to define a positive response, i.e. what happens when triggered and is it clear to the operator that it's a leak alarm. Install &testing of the high-level alarm to verify audible at the fill and set no higher than 90% - If tight fill, install and testing of the overfill prevention valve set at 90% - Inches to gallons chart posted by fillport or near tank/ in kiosk/ enclosure of genset by fillport A visual volumetric fill gauge installed and visible at fillport Condition Type: CO Hold https://cvportal.colliercountyfl.gov/CityViewWeb/Permit/Status?permitld=611850 5/8 5/20/25,5:20 PM Mechanical,Electrical,Plumbing,Gas&Fire Permit Application Status-Collier County-CityView Portal 16 F 3 Documents: Browse. Miscellaneous Conditions Open Department: Solid & Hazardous Waste Management expiration Date: Due Date: Description: REMOTE FILL A high-level alarm set at no higher than 90% audible at the fillport, a fuel level indicator at the fillport, and an overfill prevention valve set no higher than 95% in the tank. Remote fill pipe should have in order a quick connect, check valve, then block valve in fill box containment. — Definition of private way: a right of way classified as an incorporeal hereditament of a real nature for the benefit of a person or group of persons and not the public at large to pass over land owned by another. Condition Type: CO Hold Miscellaneous Conditions Open https://cvportal.colliercountyfl.gov/CityViewWeb/Permit/Status?permltld=611850 6/8 16F3 5/20/25,5:20 PM Mechanical,Electrical,Plumbing,Gas&Fire Permit Application Status-Collier County-CityView Portal Department: Solid & Hazardous Waste Management Expirations Date: Due Date: Description: MISCELLANEOUS The installation of the hazardous material tank must be compliant with the applicable portions of NFPA 20, 30, 30A, 37, 110, 407 and 62-761/762, Florida Administrative Code. Emergency and normal vent piping must terminate outside the enclosure or room. AST TANK CONSTRUCTION - Tank must be UL listed for flammable and combustible liquids of type UL-142, 2080, or 2085; or approved by another 3rd party laboratory for use with flammable and combustible liquids. Emergency venting as specified in NFPA 30 must be present on all tank compartments, including the interstice of a double walled tank AST TANK LOCATION &SET - Property Line [UL-142 (<275=5', 275-750=10',750-12,000=15', >12,000=20'] protection from exposures is public fire department so value is not 2X***Definition of public way: any passageway (as an alley, road, highway, boulevard, turnpike) or part thereof(as a bridge) open as of right to the public and designed for travel by vehicle, on foot, or in a manner limited by statute (as by excluding pedestrians or commercial vehicles) - Tank (UL- ) must be setback 5 feet from nearest side of any public way and from nearest building on same property - Tank must be setback-- feet from property line that is or can be built upon, including the opposite side of a public way*** - Tank and all piping must be setback greater than 500 feet from a well that servers more than 25 people or has more than 15 connections Potable well setback from tank and piping must be greater than 100' for wells that serve less than 25 people or have less than 15 connections. - 3'minimum buffer around the tank to allow hazmat teams/first responders to adequately move around the system and to allow for inspection / maintenance, i.e. not right against a fence, wall, etc. - Shell to shell spacing of ASTs is a minimum of 3'(NFPA 30, 22.4.2.1) other than IIIB - Tank anchored - Tank grounded AST PLACARDS NFPA 704 placard posted for emergency responders on ASTs, enclosure, or outside door where it can't be hidden with the door open. - Tank volume Product type/visible at filiport Condition Type: CO Hold Sub Contractor(Electrical) Resolved Department: Building Review and Permitting ap rationDate: Due Date: Description: Sub Contractor (Electrical) Upload to the condition on portal. Condition Type: Inspection Hold Spot Survey Stipulation Inactive https://cvportal.colliercountyfl.gov/CityViewWeb/Permit/Status?permitld=611850 7/8 16F3 5/20/25,5:20 PM Mechanical,Electrical,Plumbing,Gas&Fire Permit Application Status-Collier County-CityView Portal Department: Building Review and Permitting Expiration Date: Due Date: Description: Please upload a Spot Survey demonstrating the finished slab or pool shell that meets the required setbacks, easements, and minimum elevation per Chapter 62, Collier County Code of Laws and Ordinances. Prior to obtaining County approval of the Spot Survey, the permit holder's construction activities are at your own risk. After 10 days an "Inspection HOLD" will be placed on this Permit for survey review. Condition Type: Stipulation Spot Survey Inspection Hold Open Department: Building Review and Permitting fxpiration Date: Due Date: Description: Please upload a Spot Survey demonstrating the finished slab or pool shell that meets the required setbacks, easements, and minimum elevation per Chapter 62, Collier County Code of Laws and Ordinances. Prior to obtaining County approval of the Spot Survey, the permit holder's construction activities are at your own risk. Condition Ty_pj Inspection Hold Documents: Browse.. Documents & Images https://cvportal.colliercountyfl.gov/Cityviewt& b/Peimit/Status?permitld=611850 8/8