Loading...
Backup Documents 05/27/2025 Item #16C 1 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO 1 6 C 1 THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. ** ROUTING SLIP** Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attomey Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. (Enter your Dept here) 3. County Attorney Office County Attorney Office 0/g3 4. BCC Office Board of County BS by MB Commissioners [s] 5. Minutes and Records Clerk of Court's Office PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above may need to contact staff for additional or missing information. Name of Primary Staff Madison Bird Phone Number 2939 Contact/Department Agenda Date Item was / I Agenda Item Number ,� Approved by the BCC 2?(/ZS 4 C Type of Document(s) Number of Original Attached CS41-e Orc .v Documents Attached PO number or account / number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's signature?(stamped unless otherwise stated) MB 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information(Name;Agency;Address; Phone)on an attached sheet. 3. Original document has been signed/initialed for legality. (All documents to be signed by MB the Chairman, with the exception of most letters,must be reviewed and signed by the Office of the County Attorney.) 4. All handwritten strike-through and revisions have been initialed by the County Attorney MB Office and all other parties except the BCC Chairman and the Clerk to the Board. 5. The Chairman's signature line date has been entered as the date of BCC approval of the MB document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's MB signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip N/A should be provided to the County Attorney Office at the time the item is uploaded to the agenda. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 5 Z7 and all changes made during N/A is not the meeting have been incorporated in the attached document. The County Attorney an option for Office has reviewed the changes,if applicable. this line. 9. Initials of attorney verifying that the attached document is the version approved by the /A is not BCC,all changes directed by the BCC have been made, and the document is ready for the an option fa Chairman's signature. this line. I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04;Revised 1.26.05;2.24.05; 11/30/12;4/22/16;9/10/21 16Ci Coder Coup , Procurement Services Change Order Form ®Contract Modification ❑Work Order Modification Contract#: 21-7938 Change#: 7 Purchase Order#: 4500217774 Project#: 70215.2 Contractor/Firm Name: R2T, Inc. Contract/Project: Master Pump Station 302.00 Site Improvements Project Mana er Name: Lourdes Santiago Engineering and Project Management g Division Name: Original Contract/Work Order Amount $ 2,404,514.00 4/26/2022, 11C Original BCC Approval Date; Agenda Item# Current BCC Approved Amount 11/12/24 16C8 Last BCC Approval Date; Agenda Item# Current Contract/Work Order Amount $ 2,404,514.00 03/05/2025 SAP Contract Expiration Date (Master) Dollar Amount of this Change $ 0.00 0.00% Total Change from Original Amount Revised Contract/Work Order Total $ 2,404,514.00 #VALUE! Change from Current BCC Approved Amount Cumulative Changes $ 0.00 0.00% Change from Current Amount Completion Date,Description of the Task(s)Change,and Rationale for the Change Notice to Proceed 1/4/2023 Original 6/27/2024 Last Approved 3/5/2025 Revised Date TBD Date Completion Date Date (Includes this change) #of Days Added 90 Select Tasks ❑Add new task(s) El Delete task(s) ❑Change task(s) ®Other Provide a response to the following: 1.)detailed and specific explanation/rationale of the requested change(s)to the task(s)and/or the additional days added(if requested);2.)why this change was not included in the original contract;and,3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. 1.Detailed and specific explanation/rationale of the requested change(s)to the task(s)and/or the additional days added(if requested)This is a zero-dollar change order.Stop-work order issued on 1/15/2025 with 49 days remaining.The purpose of this Change Order is to authorize the use of Owner Directed Work Allowance(Pay item#28)and extends substantial and final completion by 90 days.This change order addresses changes specified in Design Change Notice(DCN)#2 due to unexpected conditions as follows: A. DCN#2—CEM Extreme-2P Moisture Trap:To authorize the Contractor to purchase a CEM—Extreme-2P moisture trap and install it on the H2S analyzer at the pump station. All work associated with furnishing and installing the CEM—Extreme -2P moisture trap shall be billed on a time and material basis.After installation of the CEM Extreme—2P moisture trap,increase the Odor Control Unit Airflow to 1,200 CFM and wait for the necessary acclimation period before proceeding with the Performance Testing. 2.Why this change was not included in the original contract?the H2S analyzer specified for the project stopped working because too much moisture had been entrained in the sample tubing. This condition was not expected during design, however,we understand Collier County has had similar experiences with the same H2S analyzer at other locations throughout the County. 3.Describe the impact if this change is not processed.If this change is not processed,the specified H2S analyzer will not function with excessive moisture entrained in the sample tubing. Without these changes,the specified H2S analyzer and OCU will not function as intended and the Contractor will not be able to commence the performance testing required for the project's Substantial Completion. Approved Owner Directed Allowance $313,800.00 CO#1 -$6,450.59 CO#2 -$3,253.58 CO#3 -$18,307.33 CO#4 -$3,815.81 CO#5 -$54,203.53 CO#6 -$27,877.50 CO#7 -$19,209.00 Remaining General Allowance $180,682.66 This change does not increase the contract amount. Revised:01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin a BCC ES 16C1 Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above,as fully as if the same were stated in this acceptance. The adjustment,if any,to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/ Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. SantiagoLou rdes Digitally signed by SantiagoLourdes Prepared by: Date:2025.02.26 14:02:07-05'00' Date: Lourdes Santiago, El, Project Manager III, EPMD KLA 3/3/2 5 uw•r w..V Gana kf 0 C•u5 E•p ..ive :or O'J•RZT Accepted by: George Ajy.,. roq Mrc app.a,.�M,.. 2 26 2025 Date: George Ajy, PE, V. President, R2T, Inc. Approved by: -yA /4.� Date: 2/26/2025 Migu�E,Assoc, Stantec, Inc. Approved by: FandrichShOn ra^� Date: Shon Fandrich, PE, Supervisor Project Management,EPMD h Digitally signed by BelloneJoseph BelloneJose Approved by: p Date:2025.03.04 08:45:09-05'00' Date: Matthew McLean, PE, Director, EPMD B owd e n Ste p h a n i•e Digitally signed by BowdenStephanie ' Approved by: Date:2025.03.05 16:11:16 05'00 Date: (Procurement Professional) r'AO Revised:01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin �� BCC ES 603 16C1 Change Order/Amendment Summary COST TIME CO# AMD# Description Days New Justification Additive(+) Deductive(-) Added Amount This Change Order is to authorize the use of Owner Directed Work Allowance(Pay The installation of a new FDOT item#28).This Type C storm structure. If this 1 change order N/A N/A N/A N/A change is not processed, then the addresses new stormwater system will not changes specified function as intended. in Work Directive (WD)#2 due to unexpected conditions. This Change Order is to authorize the use of Owner Directed Work Allowance(Pay Additional Surveying Works. If this item#28).This change is not processed,the 2 change order N/A N/A N/A N/A proposed stormwater drainage addresses system and pond cannot be changes specified completed. in Work Directive (WD)#3 due to unexpected conditions. This Change Order is to authorize the use of Owner Directed Work Allowance(Pay Odor Control Unit Drain Piping item#28).This P 9 3 change order N/A N/A 4 544 Alignment Modifications. If this addresses change is not processed,the odor changes specified control unit will not work properly. in Work Directive (WD)#4 due to unexpected conditions. This Change Order is to authorize the use of Approved Original Electrical Relocation of Electrical Transformer Service Allowance and Owner Relocation and Electrical Meter.If Directed Allowance this change is not processed,the 4 for Electrical N/A N/A N/A N/A contractor will not be able to Transformer and perform the task required in the Meter Relocation. contract documents,which will This Change Order prevent the completion of the addresses project. changes specified in Work Directives #5 and#5A. This Change Order Encasement of both the 4-inch is to authorize the drain pipe and the 12-inch Sch 40 use of Owner PVC suction air pipe in concrete 5 Directed Work N/A N/A 10 554 per RFI#52 and Supplemental Allowance(Pay Drawing#1. If this change is not item#28).This processed,the new pipe will be change order exposed to traffic loadings,and will Revised:01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin 41610 BCC ES AO i6C1 addresses break. This will cause the odor changes specified control to not work properly. in Work Directive (WD)#6 due to unexpected conditions. This Change Order is to authorize the use of Owner Directed Work Allowance(Pay item#28).This Installation of 144 LF of 7-foot high change order chain link fence and two(2)5-foot 6 addresses N/A N/A N/A N/A wide chain link gates. If this change changes specified is not processed. the site will in Design Change remain open to the public which is a Notice(DCN)#1 safety and security risk. due to changes in the design due to different site conditions. This Change Order is to authorize the use of Owner Directed Work Allowance(Pay item#28). This change order 7 addresses N/A N/A 90 644 Purchase and installation of a CEM changes specified —Extreme-2P moisture trap. in Design Change Notice(DCN)#2 related to purchasing a CEM —Extreme-2P moisture trap. CAO Revised:01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Atlmm ; Rpc ' BCC ES Colt County 16C1 .1 Procurement Services Change Order Form Contract# CO# PO# Project#: Project Name: Contractor/Consultant Name: FOR PROCURMENT USE ONLY FY 25 CHO Request# 603 Approved by: Signature-Procurement Professional Signature/Date Approved by: Signature-Procurement Manager/Director(OPTIONAL) APPROVAL TYPE: ❑ Administrative Administrative-BCC Report ❑ BCC Stand-Alone ES(BCC Approval Required) BCC APPROVAL ATTEST: Crystal K. Kinzel, Clerk of the Circuit Court BOARD OF COUNTY COMMISSIONERS and Comptroller COLLIER COUNTY, FLORIDA ttest as to Chairman's o� 6.- 2 UZt signature only Burt L. Saunders Chairman -, Dated Date: 5/27/Z-5 . bit ihtU�r (SEAL) Agenda# 16 C I 1 pproved a to F r12Leg7y: y County Atto 5.,,,/ a 7, Print Name Page 4 of 4 Change Order Form(2023_ver.1) o 0o a ooao 1b C1 O O O O 01 - _ r . 1 N n o 0 t0 C TTo. 0 N o 0 0 f9 .+ C cf a E P - _ n - E ao O i- Z X L w )- .3 W — 0 3 > o rx w E E O n L - Q h il N ° f - n m C ° -° 9 N NU COM ° N >< '° L E N aI N M ` o V f0 N L N 'a N- a E. i - 'o E L11) ° N N U N — �n u v�i .. Q H ° O o a co o E v K a co °p r fL u E ... o o u .° N 9 O w E u c r 3 vo r:4 o G c N u (o ? 12, z w O p 8 a a — 0000 o 1. O6O O ONMr -UN U)t0A (f! v — z¢ • al 0 OH 22SS2 N w 0pNm 0Wm va o y\ L O 30 UG c y r. O a u 2 °• C o vw -OU• N cQ a Y c3 o 4, jyp m co Oo3c °u 0 —` A 2 io -o v o o 0 0 0 - vi o vi o o « a, t0 le m :1:iil —Y Y n.n n .n ^,-vi ° oIlU VFS C0 Za' o00 8 _ ° all\\''') E 2a >°c a U w O pU O 2J0 0 KIli° E ° m ° F H 2 Q > O Q J pU 0 > x N O i N c N O k N N pf N 'N •a- C� L_ 3'=d E N N N O c m m to �°3 z,o°i '6 L. g m m 9.m 1 - -° Q o co a _ ° W Ny O n WJ "co =Jm ,o o -M 4 O Oaw * o > N Ua> h d a n N e > Wa) Z NQN O -9 8 c ° .- v vd a N. Y L 1-7 0 4 L C C N E 8 L != N 0 aI cmo, F 3 .. a `- N Q' d"C .a O N ,. O In a j 3 > y C L C N d ` al Y In O ° -oO `a in 0_ C N h U i ° a0+ o0. ,in 0.L pp NCL• 0 dm c 0 av`�iv+^ ao a`, . a . a ' a an w O co co • M 0 o 0 W N N .°,. a°+NO t O d N C W a i 'O 43 C tD C CC , C.--I a V N+' Q U N ° E E Q W W e .c c ' `° o f 00 c 43 E E . E u E fo v >o ,� o d M N < 2 m " a O• a w n° =n w w °a w ° a v w a n °. 0 n a w ° i°- 'En.,22 16.1 E a - ~ E- I- 1- 1- 1-1-1- Eo 2 B ° _° i U 6 V, CC a CC C' CC CL CC CC CC I->N u y O 0 Em u_ 0 0 .0 N O,a C E s-N M V t0 M `- 1-a-N N N ▪ M M• U rM Z Q - 16Cl VvOQUA PROJECT CHANGE ORDER WAl FR I f rHNC�I OUII PROPOSAL FORM PROJECT NAME: CC Naples MPS 302,FL CHANGE PROPOSAL NO.: 003 0 CUSTOMER: R2T INC SALES ORDER NO.: 0 PO/CONTRACT: F0300005 PROJECT NO.: 2500/000053(2033/001865) DATE: Februa 10 2025 SCOPE OF SUPPLY ITEM NO. DESCRIPTION OF CHANGE AND STATEMENT OF REASON AMOUNT 1 CEM Extreme upgrade for CEM 2 point includes 2 water traps with 4 fasteners,1 12VDC AC/DC convertor, $ 11,730 pump assembly/harness/cable/cable gland,connecting tubes&fittings,2 rolls 1/4 ID x 5/16 OD fep(includes engineering revisions to system design). Sales Tax: $ 938 TOTAL: $ 12,668 FINANCIALS $ 634,232 =INITIAL CONTRACT AMOUNT NOTES: 1.Acceptance of this Change Order proposal will impact the financial values listed on $ 22,575 =PREV APP'VD CHANGE ORDERS AMOUNT any additional outstanding Change Order proposals. $ 656,807 =CURRENT CONTRACT AMOUNT 2.All values in US dollars,unless noted otherwise. $ 12,668 =THIS CHANGE ORDER AMOUNT $ 669,476 =NEW CONTRACT AMOUNT SCHEDULING/TIMING 1)Both parties must sign this form within three business days;and EWT must receive an amended Purchase Order reflecting this Change within ten business days,in order to make this Change Order valid. 2)Delivery of the proposed equipment is estimated three to six weeks after design approval. 3)The Parties agree that as a result of this Change Order,in the event the project schedule is amended and as a result of such project schedule changes,the Buyer agrees that all references to Liquidated Damages,to the extent set forth in the Contract Documents,shall be adjusted accordingly. Seller shall strive to full in full the revised project schedule,however,as the project schedule milestones are approximates only and Seller shall not be liable for any loss or expense(consequential or otherwise)incurred by Buyer or Buyer's customer,if Seller fails to meet the revised delivery dates. 4)Billing Milestone(s)will be created in accordance with original agreed to contract terms. SIGNATURES THE EXISTING TERMS AND CONDITIONS SHALL REMAIN FULL FORCE AND EFFECT UNLESS MODIFIED SPECIFICALLY IN THIS CHANGE ORDER. Eran Wasserman Customer Name(Print) EWT Project Manager Name(Print) ErGin WG/SSCYVnsi 0, Customer Signature EWT Project Manager Signature February 10,2025 Date Date cc: Project Controller,Contract Manager,Project File PM994 Change Order Costing and Pricing Form F00130-ISS V2.00(12/16/2019)