Loading...
Agenda 05/13/2025 Item #16A11 (Recording the Plat of Valencia Sky Replat (Application Number PL20250001791)5/13/2025 Item # 16.A.11 ID# 2025-1250 Executive Summary This item requires that Commission members provide ex-parte disclosure. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the plat of Valencia Sky Replat (Application Number PL20250001791), approval of the Construction and Maintenance Agreement and approval of the Bond Rider for the existing performance security in the amount of $8,114,041.22, in accordance with Florida Statutes section 177.073 and LDC Section 10.02.04.B.4.d. OBJECTIVE: To have the Board of County Commissioners (Board) approve for recording the plat of Valencia Sky Replat, a subdivision of lands located in Section 9, Township 50 South, Range 26 East, Collier County, Florida, in accordance with the LDC Section 10.02.04.B.4. This procedure allows for the Board to approve the plat and associated construction documents for construction purposes and recording purposes concurrently. CONSIDERATIONS: On November 12, 2024, Agenda Item No. 16.A.7., the Board approved the subdivision plat for Valencia Sky (PPLA PL20240006539). At that time, the Developer requested an application for the issuance of residential building permits prior to plat recording, in accordance with Florida Statutes, Section 177.073, and LDC Section 10.02.04.B.4.d, and provided a Construction Maintenance Agreement with a Performance Bond in the amount of $8,114,041.22. Valencia Sky was recorded in Plat Book 75, Pages 72-90, of the Public Records of Collier County, Florida, on December 12, 2024. The Developer now wishes to make changes to the plat, including modifying the rear yard drainage easement within the lots and changing the size of lots 10-35. The Development Review Division of the Growth Management Department has completed the review of the plat of Valencia Sky Replat, and these documents are in compliance with the County Land Development Code and Chapter 177, Florida Statutes. This project is within the Valencia Sky RPUD, Ord. No. 2023-04, as amended. All fees have been paid. A bond rider to the existing security in the amount of 10% of the total cost of the required improvements, and 100% of the cost of any remaining improvements, together with a Construction and Maintenance Agreement for Subdivision Improvements, that will replace and supersede the previously approved Construction and Maintenance Agreement dated November 12, 2024, has been provided in conformance with Section 10.02.04 F.2 of the Land Development Code. There is an Insubstantial Change (ICP) associated with this plat. The required improvements for Valencia Sky ICP, are included in application PL20250001090, and review fees were paid under this application. The Development Review Division recommends that the plat of Valencia Sky Replat be approved for recording. This item is consistent with the Collier County strategic plan objective to operate an efficient and customer-focused permitting process. FISCAL IMPACT: The project cost is estimated at $7,376,401.11 to be borne by the developer and was previously approved with PPLA PL20240006539. The cost breakdown is as follows: a) Water & Sewer $3,289,766.50 b) Drainage, Paving, Grading $4,086,634.61 The Security amount, equal to 110% of the project cost, is $8,114,041.22 (previously approved). Fund: Growth Management Fund 1014 Agency: County Manager Cost Center: 138327 - Land Development Services Total revenue generated by this project: $222,867.04 (previously approved) Page 919 of 5243 5/13/2025 Item # 16.A.11 ID# 2025-1250 The bulk of the review Fees are based on a construction estimate of $7,376,401.11 and were paid under the previously approved PPL( PL20220006390) in June 2023 and under PPLA (PL20240006539) in July 2024. The breakdown is as follows: a) Plat Review Fee ($1,000.00 + $5./ac) $ 1,575.00 b) Construction Drawing Review Fee Water & Sewer (.75% const. est.) $24,673.25 c) Drainage, Paving, Grading (.75% const. est.) $30,649.76 d) Construction Inspection Fee Water & Sewer (2.25% const. est.) $74,019.75 e) Drainage, Paving, Grading (2.25% const. est.) $91,949.28 GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public Facilities (COA) prior to the issuance of the construction plan final approval letter and plat recordation, except when the applicant elects to delay obtaining a COA for non-residential developments that are required to obtain approval of a site development plan prior to the issuance of a building permit. LEGAL CONSIDERATIONS: The applicant is requesting approval of the subdivision plat and construction and maintenance agreement. The Board shall consider the County Manager or designee’s recommendation and shall take evidence and testimony in regard to the subdivision plat requirements identified in LDC sections 10.02.04 B, 10.02.04 C, and other provisions of the LDC, as well as Chapter 177, Florida Statutes. If the Board denies or places conditions on the subdivision plat, it shall state reasons for such denial or conditions. In accordance with the LDC, the applicant is required to submit the subdivision plat to the County Manager or designee for recording within 18 months of the date of approval of the subdivision plat by the Board. However, following approval by the Board, but prior to recordation, the County Manager or designee may approve minor insubstantial changes to the subdivision plat, and the Board may approve any changes that are not minor and insubstantial. This item has been approved as to form and legality, and requires a majority vote for Board approval. --DDP RECOMMENDATIONS: 1. Approve the plat of Valencia Sky Replat, Application Number PL20250001791 for recording. 2. Approve the Bond Rider to the existing Performance Bond in the amount of $8,114,041.22 as performance security for the required improvements; or such lesser amount based on work completed, and as is approved by the Growth Management Department. 3. Approve the Construction and Maintenance Agreement and direct the County Manager or their designee to withhold Certificates of Occupancy until the required improvements have received preliminary acceptance. PREPARED BY: Lucia S. Martin, Project Manager I, Development Review Division ATTACHMENTS: 1. Location Map 2. New CMA & Bond Rider with Existing Bond 3. Existing CMA & Performance Bond 4. Plat Map 5. Opinion of Probable Cost Page 920 of 5243 5/13/2025 Item # 16.A.11 ID# 2025-1250 Page 921 of 5243 VALENCIA SKY LOCATION MAP Page 922 of 5243 CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISON IMPROVEMENTS THIS CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION IMPROVEMENTSenteredintothiS-day-,2025betweenNaplesAssociatesVl,LLLPhereinafter referred to as "Developer", and Board of County Commissioners of Collier County, Florida, hereinafter referred to as the "Board". RECITALS: B. Chapter 4 and 10 of the Collier County Land Development Code required the Developer to post appropriate guarantees forthe construction ofthe improvements required by said subdivision regulations, said guarantees to be incorporated in a bonded agreement for the construction of the required improvements. NOW, THEREFORE, in consideration of the foregoing premises and mutual covenants hereinafter set forth, Developer and the Board do hereby covenant and agree as follows: 1. Developer will cause to be constructed: All required improvements within 36 months from the date of approval of said subdivision plat, said improvements hereinafter referred to as the required improvements. 2. Developer herewith tenders its subdivision performance security (attached hereto as Exhibit "A" and by reference made a part hereof) in the amount of $ 8,114,041.22 which amount represents '10% of the total contract cost to complete the construction plus 100% of the estimated cost of to complete the required improvements at the date of this Agreement. 3. ln the event of default by the Developer or failure of the Developer to complete such improvements within the time required by the Land Development Code, Collier County, may call upon the subdivision performance security to insure satisfactory completion of the required improvements. 4. The required improvements shall not be considered complete until a statement of substantial completion by Developer's engineer along with the final project records have been furnished to be reviewed and approved by the County Manager or his designee for compliance with the Collier County Land Development Code. 5. The County Manager or designee shall, within sixty (60) days of receipt of the statement of substantial completion, either. a) notify the Developer in writing of his preliminary approval of the improvements; or b) notify the Developer in writing of his refusal to approve improvements, therewith specifying those conditions which the Developer must fulfill in order to obtain the County Manager's approval of the improvements. However, in no event shall the County Manager or designee refuse preliminary approval of the improvements if they are in fact constructed and submitted for approval in accordance with the requirements of this Agreement. 6. The Developer shall maintain all required improvements for a minimum period of one year after preliminary approval by the County Manageror his designee. Afterthe one-year maintenance period by the Developer has terminated, the Developer shall petition the County Manager or designee to inspect the requiied improvements. The County Manager or designee shall inspect the improvements and, if found to be still in compliance with the Land Development Code as reflected by final approval by the Board, the Board shall release the remaining 10% of the subdivision performance security, The Developer's responsibilityfor maintenance of the required improvements shall continue unless or until the Board acceptsmaintenance responsibility for and by the County. 11t23t2021 Page 'l of 3 CAO A. Developer has, simultaneously with the delivery of this Agreement, applied forthe approval by the Board of certain plat of a subdivision to be known as: Valencia Sky RePlat Page 923 of 5243 7. Six (6) months after the execution of this Agreement and once within every six (6) months thereafter the Developer may request the County Manager or designee to reduce the dollar amount of the subdivision performance security on the basis of work complete. Each request for a reduction in the dollar amount of the subdivision performance security shall be accompanied by a statement of substantial completion by the Developer's engineer together with the project records necessary for review by the County Manager or designee. The County Manager or designee may grant the request for a reduction in the amount of the subdivision performance security for the improvements completed as of the date of the request. 8. ln the event the Developer shall fail or neglect to fulfill its obligations under this Agreement, upon certification of such failure, the County Manager or designee may call upon the subdivision performance security to secure satisfactory completion, repair and maintenance of the required improvements. The Board shall have the right to construct and maintain, or cause to be constructed or maintained, pursuant to public advertisement and receipt and acceptance of bids, the improvements required herein. The Developer, as principal underthe subdivision performance security, shall be liable to pay and to indemnify the Board, upon completion of such construction, the final total cost to the Board thereof, including, but not limited to, engineering, legal and contingent costs, together with any damages, either direct or consequential, which the Board may sustain on account of the failure of the Developer to fulfill all of the provisions of this Agreement. 9. All of the terms, covenants and conditions herein contained are and shall be binding upon the Developer and the respective successors and assigns of the Developer. lN WTNESS WHEREOF, the Board and the Developer have caused this Agreement to be executed by their duly authorized representatives this _ day of 2025 SIGNED IN THE PRESENCE OF (Name of Entity) Naples Associate Vl, LLLP a Florida limited liability limited partnership By: Naples Vl Corporation, A Florida corporation, its General Partner,fu-'- Printed Name Iyni(io k( omeo By By A.f-\Cl Printed Name/Title: N. Maria Menen (Provide Proper Evidence of Authority) President \ /'^i A NJ ^-: e(- 11t23t2021 Page 2 of 3 cao By: Printed Name: Page 924 of 5243 ATTEST: CRYSTAL K. KINZEL, CLERK BY Deputy Clerk Approved as to form and legality: BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA By:&rrt L. Saundors, Cha l rrnarr 11t23t2021 Page 3 of 3 qoPage 925 of 5243 Exhibit tt A" o,oPage 926 of 5243 PERFORMANCE BOND KNOW ALL PERSONS BY THESE PRESENTS: that Naples Associates Vl . LLLP 1600 Saworass Co rporate Parkway , Suite 400 Sunrise, FL 33323 (hereinafter referred to as "Owner'') and Endurance Assurance Corporation Mount Juliet, fN 37122-2870 615-553-9500 (Name of Owner) (Address of Owner) (Address of OwneQ (Name of Surety) (Address of Surety) (Address of Surety) (Telephone Number) (hereinafter referred to as "surety") are held and firmly bound unto collier county, Florida, (hereinafter referred to as "county") in the total aggregate sum of Eiqht Million one Hundred tourteen Thousand Fortv One and 221100 Dollars ($8.114.041.22) in lawfut money of tfre UniteO states, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, joinfly and severally, firmly by these presents. Owner and Surety are used for singular or plural, as the context requires. THE coNDlrloN oF THls oBLlcATloN is such that whereas, the owner has submitted for approval by the Board of a certain subdivision p lat named Valenc ia Skv and that certain subdivision shall include specific improvements which are required by Collier County Ordinances and Resolutions (hereinafte r "Land Development Regulations"). This obligation of the Surety shall commence on the date this Bond is executed and shall continue until the date offinal acceptance bythe Board of County C ommissioners of the specific improvemenls described in the La nd Development Regulations (hereinafter the "Guaranty Period"). NOW THEREFORE, if the Owner shall well, truly and faithfully perform its obligations and duties in accordance with the Land Development Regulations during the guaranty period established by the County, and the Owner shall satisfy all claims and demands incuned and shall fully indemnify and save harmless the County from and against all costs and damages which it may suffer by reason of owner's failure to do so, and shall reimburse and repay the County all ouflay and expense which the County may incur in making good any default, then this obligation shall be void, otherwise to remain in full force and effect. PRovlDED, FURTHER, that the said surety, for value received hereby, stipulates and agrees that no change, extension of time, alteration, addition or deletion to the [roposed specific improvements shall in any way affect its obligation on this Bond, and it does hereby waive notice ofany such change, extension of time, alteration, addition or deletion to the pioposed specific improvements. PRovlDED, FURTHER, that it is expressly agreed that the Bond shall be deemed amendedautomatically and immediately, without formal and separate amendments hereto, so as to bind theOwner and the Surety to the full and faithful performance in accordance with the Land DevelopmentRegulations. The term 'Amendment", wherever used in this Bond, and wtrettrei ,ere"in!-to ttisBond, or other documents shall include any alteration, addition or modification of-any' ciaracterwhatsoever. o tNole: Th: original of this phorographic copy of Bond No. LICX10267gg is onJile with the Clerk,s officeand this plrysical reproduction is to be swappedwith the original at time of its fiiing with the Clerkit ificeof Board Minutes and Records] BOND NO. 1tCX1026799 12890 Lebanon Road Page 927 of 5243 STATE OF FLORIDA COUNry OF BROWARD The foregoing i nstrument was acknowled Naples Associates Vl, LLLP, a Florida limited liability limited partnership By: Naples Vl Corporation, a Florida corporation, its general partner ged before me by means of a physical presence or E online By By Printed Name: 'tt",l;o e - Raenero Printed Name: Richard M. Norwalk By:Title: Vice President (Provide Proper Evidence of Authority ACKNOWLEDGEMENT notarization, this day of October ,2024 (year), by Richard M. Noruvalk (name of person) as Vice President for Naoles Vl Corooration. a Florida corooration the general partner of Naoles A ssociates Vl. LLLP. a Florida limited I bilitv limited oartnershio on behalf of said corporation and limited liability partnership (name of party on behalf of whom in slrument was executed) authorized to do business in Florida herein identified as the PRINCIPAL and who is tr Personally Known or ! Produced ldentification Type of ldentification Produced: NOTARY SEAL: (Signature of Notary Public - State of Florida) Notary Public a/) Printed Name of Notary Public My Commission Expires: IETH o 'f#,SIEVET{ [.l, HEIflIAN Co.ryd..io'l, HH 2stolo E gi!! llay 30, 2026 [No-te: The original of this photographic copy of Bond No. L\CX|026799 is onJile with the Clerkt: ofiiceand this plrysical reproduction is to be swapped with the original at time of its fiiing with the Clerkb oficeof Board Minutes and RecordsJ lN WITNESS_WHEREOF, the parties hereto have caused this pERFORMANCE BOND to be executed Uis / 6 tlt t ol Octobet ,2024. WITNESSES: Printed Name: .%x-, Page 928 of 5243 WITNESSES Prrnted Name: Christian Collins By: Printed Na e: Taylor Rosenhaus SURETY: EnduranceAssurance Corporation By Authorized Signature Dale A. Belis Printed Name AttomeV-ln-Fact and Florida Resident Aqent Title STATE OF FLORIDA COUNTY OF PALM BEACH authorized to do business in Florida herein i Produced ldentification Type of ldentificatio The foregoing instrument was acknowledged before me by means of E physical presence or E online notarization, this 17th day of October , 2024 (year) , by Dale A. Belis (name of person) as Attornev-ln-Fact for Endurance Assurance corporation (name of party on behalf of whom instrumenl was eGiute0 dentified as the SURETY and who is E Personally Known or n n Produced NOTARY SEAL: (Signature of Notary Public - State of Florida) Nota u blic:,&rq€is (AlLii STCrr:loi.rt Publi( . stlre::: onc. CaFmitricn: li il,-!ll ny Cofim. E:piies \ov 9. 202j Sonaed thro!gh Nrfarj Nclj [Note: The original of this photographic copy of Bond No. LICXl026799 is on fle with the Clerkb ofice and this plysical reproduction is to be swapped with the original at time of itsfling with the Clerkb ffice of Board Minutes and Recordsl .: By: Printed Name of Notary Public My Commission Expires: \\ I Cl /] 5 Page 929 of 5243 O,SOMPO INTERNATIONAL.ry POWER OF ATTORNEY 9627 KNow ALL BY THESE PRESENTS lhat Endudnc. A3ruanco co.por.don. a oolawae corporatron ('EAc"), Enduranco Amedcrn tn3u.anc. comp.ny, a oetawar6coDoration (EAlc"), Lexon lniurance cornP.ny. a Texas corporalion (-Llc"), and/or Bond slt gulrd tnruranc. comp.ny. a south oakota co{porat;n (jBstc'), €ach.a 'cornpany' and collcctively. 'sompo lnlsmlton.L- do hcGby constitute and appoint g..i Roaintraur, xcvlo woitoitci, Chertri J. trrcrron, strryn surron.chr.l6. D. Nl.l!on, D.l6 A. B.llr, Dlvld Hooy.i, Jln lt aduccl as lrue and lawfut Altomcy(s)-tn-Fact to make. e;ecute. """t,inJa"rir", tor, "nd on its b6hatf assurety or co-sur6ty: bonds and undenakings glven lo. any and all purposeg also to erccule and deliver on ns b€half as aforesaid ren€wals, exlensions. agreoments,waivers, consonls or slapulations relaling lo such bonds or und€rtakings provire4 howev6r. that no singtr bond or undortaking so made, e;ecrled and detiv€red shaobligale lhe Company lor any portjon of the penal sum thereof in excess of th6 sum of On6 Hundrcd IIon Oolert (l1 00,060,000.00]. Stich bonds and undenaiings tor said purposcs. wh€n dut ex!rculed by said atiomey(slin-lact. shatt be binding upon the Company as fuly and to th€ sam6 exlent as dsi9n6d by the PEsidont of th6 Company under its corporate seat anasted by & Corporate Sacretary. This appointm€nt iS made underand by authonty of ccrtein reiotutlons adopt€d by tha board of directors ol each Company by unanimoiJs wrilten consenl efl€ctive the 30bday of March. 2023 for BSIC and LIC and he ,7d day ot May, 2023 ,o, EAC afld EA|C, a copy of which appcars beto{,/ und€;the heaatn! entited "Cenrfcate" This Power of Attomoy is sigmd and sealed by facsimil€ unler and by authorily of tha lollowing resotutron adopt€d by the board ot drrBctors of eaci Company byunanimous written cons€nt ellGcliva the 30m day of March. 2023 for Bslc and Llc and the 176-day ot May. 20i3 for iAc a; EAtc ano iit rcsoturion tris n& jirrce been revoked. amended or repealed: RESoLVED that lhe signature of an individual namcd above and hc seel of lhe company rnay be affixed lo any such power of alorn6y or any certilicate retating thoretoby facsimile, and any st,ch power ol attorney or c€rlifcale b€aring such facsimrle signalure or s6al shalt be ,/atid and bi;dang upon the iompany in thc future wrtfirespectto any bond or unde(aking to wh|ch it is attachod. lN WINESS WHEREOF. 6ach fumpany has caused this instrument to be signed by lh6 toflowjng oflicers. and ils corf,orate s6al to be affixed this 25th day ofMey. m23. Endulancs ABsuranco Corporatioo Endurancs American Company Bond Saf.euard ,,' lnauranca Companyt) ay: i. '- Richard Appol; SVP & Sanior Counsat YLs ..1- ,i- 7 r_. I . ^ 1..:,t r -!i ,,."'. :. Bv: ' Richard ay tl t1 Richard On this 25lh day of May, 2023. belore me, personalty came th! abow signatories known to me. lvho b6ing duty swom. did and say thal N"3h"J$l{4rr,o' "t """nofthe Companiesi and lhat he execuied said instrument on behalf of each Company by authority of his ol each Cohpa By :laa :r6r-- uv i:o-.ssfrn expiHe/c/iz.:- '"h'rs''CERTIFICATE l. the undersignsd Ofticer of each Company. DO HEREBY CERT|FYlhat: I That lhe orEinal power of atlomey of which the foregoing is a copy was duly ox6cutad on b€hatf ol cach company and has not since b6€n rEvoke( emandsd or modifed;that the undorcigned has compared lhe forcgoirE copy th€rcof with lhe odginal power of afiomey. and ttral ine same is a true and ;;;t copy of the originat po*6r ofattorney and of *le whol6 thereofi 2. Th6 following are resolutions whbh were adopled by tho-board of dirEcto6 of cach company by unanamous wrilten consBnt efectivo 3ob day of March, 2023 for Bslcand LIC and the 1 76 day of May, 2023 for EAC and EAIC and sai, resolutions have not sirr€ been revoked. emendod or modilied: 'RESoLVED lhat each ot the indiviiuals named bclow is aulhorizcd lo makc, ex€cuto, seal and deliver lor and on bchalf ot the Company any and a bonds,undertrakings or obloations in surety or co-surBty with othe6: RIoHARD M. APPEI-. MATTHEW E. cuRAN, MARGARET Hyt-ANO, SrnnOir r-. srus.CHRISTOPHER L. SPARRO, and be il furth6r RESOLVEO. that ssch of the andividuals named atov6 is aulhorEedlo agpoinl attorneys-inJact tor the purpose o, making. cxeculing. seeling and d€liverinO bonds,undortakings or obligations in surety or co-suEty for end on bchaf of the Company." 3. The undersignod furthor cerldies that lhe ebove resolutions ale tru6 and corrscl copiei oflhe resotutons lN WITNESS WHEREOF, I hav€ hereunto set my hand and at ired lhe corporato seatthis lTth day of 2024 By 0 S xoTIcE: U. s. TREASURY DEPARTxETTS oFFIcE of FoREIGT AssETs coxTRoL IoFAcI possiu€ impact on your sursty cov6.age du6 lo di,lclvBs ,ssued by OFAC'. pt.r.. ...d Uiir Xolix c..rruly. on tlle united Stares TrEasury's wetsite - trnoc:/m.rreasury oovilEsource-cenrerisanctjonsisdN-rrsr. ossgMlsd Nationaland Blocted Psr.on as identfed uv orac. anv corlragi drrt" "on"io""fllio"r.o or trozen conrraciano attfo"i"ilr^J "^v."*.g. p.o$ded ars immsdrareksubiacr to oFAc. when e surEry bond or oth€r hrm oriu'ty coveiase,";;ddil;;-;-h " b,*il r;;;;;;i;.;.;;ffi;il;il ffi;"";;i;ilil#;iauthorization frcm OFAC. Other timitatiorc on tno p.Bmir-sind par,€nE "ray "tso-appty-. --- - [Notel The original of this photographic copy of Bond No. LICX|026799 is onfile with the Cterkb fficeand rhis physical reproduction is-!g le-swappk ffir. tigina! at time of itsfiing with the Clerk's ifficeof o o ar d M ffi-l,ffi, ""*m#*ffi".r,. jnr czr22_z!zo SEAL Counsel ('t ACKNOWLEDGEMENT of the whole lhereof. SEAI 2002 Page 930 of 5243 SOMPO INTERNATIONAL 12890 Leb3non Road, Mount Juliet, TN 37122 GENERAL PURPOSE RIDER To be attached to and form a part of Bond No. EACX4038779, effeclive October 17,2024 issued by the Endurance Assurance Corporation, as Surety, in the amount of Eight Million One Hundred Fourteen Thousand Forty One and 221100 Dollars ($8,'114,041.22), on behalf of Naples Associates Vl, LLLP as Principal and in favor of Collier County, FL, as Obligee: Project Name: Valencia Sky It is understood and agreed that the Bond described above is hereby modified as follows: . The Projec{ Name shall be amended as follows: From: Valencia Sky To: Valencia Sky Replat It is further understood that said Bond shall remain subjecl to all of its terms, conditions, and limitation, except as expressly amended herein. This rider is to be effective as of April 4, 2025. Signed sealed and dated this April 4,2025. lN WTNESS \I/I-IEREOF, Endurance Assurance Corporation has caused its Corporate Seal to be hereunto affixed. Naples Associates Vl, LLLP, a Florida limited liability limited partnership By: Naples Vl Corporation, a Florida corporation, its general partner Endurance Assurance Corporation 'o (Principal) 2t B ,[ Dale A. Belis, AttomeyJ a ct B N ene , Vice CAO ,,)* Page 931 of 5243 Page 932 of 5243 INSURANCE SOMPO INTERNATIONAL POWER OF ATTORNEY KNOW ALL BY THESE PRESENTS, tr€t Enduraro &{rr.nce CorDor.lron, a Hawaro corpoiation ('EAC'), Endurrlc. Arnorlcan lBuranco Cornpaiy, a Dolailare corporation ('EA|C'), Leton lnlurenc. Co p.ny, a Tetas corpoiation ('LlC'), and/oa Bond Saftgurrd lnaurenc. Co.tPrny, a South Oalota co.potation ('BSIC'), each. a 'Cornparry; and c;I€clively, "Sonpo lntamadonal,'do horsby cons{itrtg ard appdnl Baalt Roaa.rhtut, KeUn lryofodc., ChrLa J. t{lelson, Shrwn Burton, Charlg8 D. |.llsl!on, Dalo A 8alls, Davld Hoovor, Ja.ratr tacrlucd as truo and lgwful Afomey(sllrLFacl lo mtke, 6x€dJto, s6al, and dglivo. for, and oi its behaf as sursly or ccsurety; bonds and undedakngg given for any and all purpG€q also to ex€qrto and doliver on its b€hatr as afollcau rsne*ab, extgnsions, agEsnenls, waiv;rs, consenls or stipulgtions relating t6 such bonds or undertakings provij€d, how6ver. lhal no singls t o.ld or urdortaking so made, oxecrrtod and dolivored shal oblioato he Company for eny port$ of th€ p€flal sum the.6cd in 6xc6s of the sum of OrE tluodrcd llllon Odks (tlm,000,0o.lxrl Sudt bonds and undortakingE for said purpG€s, vrhen duly €xsarrted by sai, attomoy(slinjact, shall b€ tinding upon ths Comparry as fully and to the samE €ttent as il signed by the Pr€sil€r of lhe Coanp€ny undet its colporatE seal attsst€d by ib Co.poa8te Sscrotary This appointrnent is made undea and by altho.ity of certain resolutioos adopted by tte boad of directoas od each Cornpany by unanimous waitten cons€nt etreclte the 30i day of March, 2(23 fd BSIC and LIC and tl6 17s day.* t tay, 2023 for EAC and EAIC, a copy of which eppoars bolor under the hGading entided roeft'6cate'. Thi6 power of Attomey is sEned ond sealed by fac6imile under and by authority of the bllovJing resolution adopted by the board of diBclors of each Company by unanimou6 writton consont effedive tho 3Oo day ot March, 2023 for BSIC and LIC and the 17s day of May, 2q23 for EAC ad EAIC and sail Bsolutioo hes nol sirlcs b€en levoked, amended or r@oaled: RESOLVED, that the signeture ol an indivilual nemod abova and th6 scel of tho Comp6ny may bo effix€d to any such po,yer of atoflry or eny celtificate rehting ther€to by facslmile, and any such pow6r of attomoy or cedilicate boaring 6uch taGinilo signature or seal 6hall b€ valid and binding upon the Coanpany in tho fiJturo with resped to any bond or undortaking to whicfr ( is attacied. lN Wm.lESS WHEREOF, €ach Company has caus€d thb inst um€flt to b€ *;rl€d by fr€ folbying otrc€rs, ard lts co.porat€ s€al lo be affxod lhis 25th day ot May, 2023. Endurance American Lexon lnlurance c ornpany Bond SrIegua.d I By By: Rlchrrd lot ouns€l rd Appol ; 6E On this 25th day of May , 2023, b€forB me, personaly c5m€ the ebove siJnalorios knorn to m€, wt|o being duy s!.YoB, dij of th€ Co.npsni6s; and lhai he executed said instumor{ on b€half d eech Cornpany by authority of his of each erpiE'uaz.r..h,$r By: aylor, N blic My Corffnisshn CERTIFICATE l, tho undsrsign€d O,ffic€r of aach Company, DO HEREBY CERTIFY tl|at 1. That th6 odginal poviror of attomey ofwhi* thg forggoiog b a copy was duly eroqrted on b€half of ea.b Compsrry and has n. sincs been revokec ahondod or rnodifu; thal the undersili€d hag compaEd tfl6 fo.sgping copy thoreof rvith flo oaigiMl porvor oa atlo.n6y, ard thal th€ sanE b a tu€ and co.tecl copy ot tho orEinal powe. of attom€y and of lhe wtols theroot 2. Th6 lolbring are r€sohrbrB whidr w€rs adodsd by tll6 bosrd oI dilEdds of aach Cdnpeny by nanimous w'inell consont ofiectivs 30s day ot Marcil, 2023 for BSIC and LIC snd ih€ 1 76 day oI May , 2023 lot EAC and EAIC srd said r€solutiorB hals not since b€en rwok€d, 6m€Med or modifi6d: 'RESOLVED, that 6ach of lh6 irdiviruab nantod b€low b authoriz€d to rEke, 6xeqlto, 6oal and (bliver br and on bohalt dths Cornpany any and allboid6, undertakinos or obligations in suroty or cosur€ly with olhors: RICFIARD M. APPE!, MATTHEW E. CUF,AN. MARGARET HYLAND, S}{ARON L SIMS. CHRISTOPHER L. SPARRO. 6nd be fudher RESOLVED, that each of the individuals narEd above iE aulhorted to appoint atbnEynin-h br lhe purpo6e of mating, executing. 6ealing and defvering bond6, unde^akings or oblilations in auroty or co6uroty h. and or bghaf of tle Cornpany.' 3. The underslgned further certmes that lhe above aesolulions are fue and coreci copies o{-ttueolutions lN WITNESS WHEREOF, I havo hereunto 3ot nry hard and affixod the cotporats s€al lhb '1ts day of of the whole thereoi By: DA i{OTICE: U. 3. TREASURY DEPARflEfa OFFICE OF FOREGTa A33El3 OOiiTROL (OFACI possiue impacl 0.l yorr sursty coverage due to dirEctivB i$euod ty OFAC. PL.a. rtd $k taooca c&ftty. Th€ Olr€ of Foroign Asseb Cornld (OFAC) admhlsls6 end €ifo.css ssndbrB polcy, b63ad on P€d&ndd dsddetms ot 'natlooal om6rg€nqa. OFAC h€s l&nlifed end ftad on tho lJnlt€d staEs lr63$rry'8 wsbsite - htlos://*1^/w.lleasurv.oov/resource-cenler/sanctionrsDN-List. authorizalion from OFAC. Olher limitdtions oo the p.gmlum and p6tmenla may d8o eppty. SEAL Ary r.productlona aro vold. Ssrctt' Clalria Subrl.rlon: LcronclaimAdminlttration(Dsomoointl.com Tolcphdr.: 6lt55t{500 Llllng Addrs..: sofipo lnt m.doll.l; l2E 0 Lrb.non Ro.d; IoulttJull.( Til 37tZI.2870 o 9627 Arsurance ,ry)a ACKNOWLEDGEMENT and say that &_. SEAI 1996 Page 933 of 5243 EXHIBIT IIB" Signing Authority o{Page 934 of 5243 2024 FLORIDA UM]TED PARTNERSH]P UAL REPORT FILED Mar 05, 2O2{ Secretary oI State 69591'+0594CC Ccruficat€ of Status D$ired: Yes DOCUMEMT' A2{U)mO0?79 Emlryr arm: NAPLES ASSOCTATES Vl. LLLP Clrrefi FYlrEipel Place oI Bushr€3s: I6M SAWGRASS CORPORATE PNUJY STE lM suNRtsf. fL 33X:3 CrrrEr ltr ng Ad*€3s: 15OO SAWGRA55 CORFORATE PKWY STE 4t)o SUNRISE. FL 33323 US FE! I'lrrter: 85-2878109 ilame and Address ot Cur€nt R€gi3teiEd Agcnf: I{ELFMA}I, STEVEN II r6m SIU,GnASS CORFORAIE pK'r/Y STE {OO SUNRISI. FL !3323 lrs rrE erramaa, dttj, r./n r ! ,rrr tarlrdt, tE l}EF F[ a,drlrrgfgi',Egal! rgaftE or rgxiolrn.lgE tt .9!a4.tr dto srt drMr. SIGIJATURE: Srctrofic S{naurc ol Ragi[cr:d fgrtl G€rEral Pertl€ Deldl : DooJrErr , l,lime llAPL.ES t OORP*ATDI{ Addreie tEItrSAhIcR SS CORPOQAIE pTWy sTE roo Car.SlIlZf : SIPIRISE FL 33323 EEclonc Sgnl,ll'E oI Signng Grrrd prfiEr Delal U!lE I lb''tl' 6ilt,t rnr *tt.&t,tidtr.vcrharDrl r aatrtut nv!,! hr d.su6..rdn..,, -rrlqG ryute, rrrrr--n l.w rgra..lLll.,rd4, ultrqrtlai.rrtu,gi5rFdiodtlrhldrst*{!o.na,L.welirat..Y'.-,anr-.rr"n,.,i-t-..+.';lgo,a*.a,E}ti-iJ,&.d!r{.rrn.r. 4F.irr{.nr a. -r radtiir, rll! d lor al,,FBrl SIGNATURE: RICHARD M. NORWAT_X Vp O3/OS/ZO2a Dr[c o'dcPage 935 of 5243 2024 FLORIDA PROFITCORPORANO ti AIIII{UAL REPORT FILED Arr.23,2O24 S€cretary of State s49995a913CC Certincate o, Sletus D€sirEd: Yes DOCUMEMTf P2ilXlm5{372 Entlty 6i :NAPLESVlCORFORAnON Cur€rlt Hnciprl Placr of Busherc: 16M SIwGflASS CORPORATE PARKWAY, SUITE {M suHRtsf . FL 33323 Cursrlt ltilung Ad&Gss: 1600 SAWGRASS CORFORATE PARKWAY. SUITE 4OO SUNRISE, FL 33323 U5 FEI tttrr$er: 85-2333265 Hnm€ and Addreri of Cunerrt R€gister€d Ag6nL I{ELFMA}I, SIEVEN ';I EsQ 't6m SIU,G,RASS CORPOR^TE PIRKWAY" SUTTE ICO SuttlRlsf . FL 3l!23 trs ,E aEs,rrltlda: yi.rtr r,uJ tattlxitrE 6xF potE lrdrl!f,g lr,!gr,Dr9o6te d.rq9lrEEdlgrE rt .l.Edrl;r rrc slt dFkr#rt SIGTIATURE: &drfric si}€ruE c, R€gtn r€d igEn OlIlc€rnxrectfr txlrll : ThlE P l.lrniP EZRATTI. MlSr]A J ,rddrEr) l6m sAhlGR SS CORprOeATf PiNKWAY, SUlIf '&Cty.Srilc.Ii: SI RlsE FL 33323 TIb VP l&me OnwALI(. RrcHlnD M. AddrBa 18OoSAIYGR SS CORPORATE PIRKWAY. SUITE 4M Cry,gr+Zir: gtflRlsE FL 33323 TN|e VP lLm. AH(lIil, RrcHARD ^ld.liBr i6mSAWGR SS CORPORATf PTRKWAY, SI.IITI tfr} C.y.gn lzh: SlSlRlSE FL 33323 SIGNATURE: RICHARD M. NORWALK L!te Trh d AalL39 cirt'qll!.ZiF T& IanE Atb.rr Cirr.Srrrr.altr T.E llrlP Adtars Cit!'SnE.Zipi VP. A5 rA,lT, Al.rit J. r&N SA''JGRASS CORPORATE PARKWAY, SUIIE 'Msu RlsE rL 33323 s HELFITAU STEVEN III. 1600 SAI'iGRASS CORPORATE PARKI'IAY. SUITE 'MsltslRtsE rL !33t3 o4tz3t20?tl Elte-tonc SUrL$l,E !.4 Signilg OmrE tDiterlr Detail VP Oatr: ov3 VP. T MENET,TOEZ, ll. tttARtA 1800 SA'T.GRASS CORPOR TE Pr\FKrrrAY, SUIIE a0ll stjatRtsr rL 33321 I btn, Entyx'r,r.*tEbrdii.rrltr trEl' c r.{raftd.frTrrl D hy rd..Euat -_t ndnr,,rlrou|r,1rur4 rrd rer ir. tsa rTd.rEr.r rrd4 u.rrH1fl*I.lH;XS;ffi *;- il;"i;;;;;;i.,q.',-,..p,o{.,.proro., iiwJ *i;; ..unr,r,Ei,*rE, Page 936 of 5243 EXHIBIT IIC" Opinion of Probable Cost oviPage 937 of 5243 ,6 ROBAU &ASSOCIATES VALENCIA SKY - Plat Recordation Submittal 1 PRELIMINARY OPINION OF PROBABLE COST SUMMARY POTABLE WATER & FIRE SANITARY SEWER GENERAL STORM DRAINAGE PAVING $ 1,288,575.00 $ 2,001,191.50 UTILITIES TOTAL $ 3,289,766.50 $ 629,197.00 TOTAL $ 1,415,664.00 s 2,04t;173.61 CONSTRUCTION TOTAL $ 4,086,634.6I 7,376,401.1l 8,114,04t.22 $ $Contingency ( I l0%) of TOTAL This t.h ha b.a .k ndi.lly sill.d dd shd by M|lthc* W D.fmeo, koia$ioi.l EigiB Ust . SHA AullEr i:rbn Cod. Print d.opix ofthn dsffi.rc mt coNidrcd3iercd..d *d.d.nd th. SH Altlr rlti,n Cod. md b. cifid of, Dy.1..1rc.t @par. No Digitally signed by Matthew DeFrancesco Date: 2024.10.17 10:57:57-04'00' LB A,AU r0/15/:024 l:47 PM Z:\Sharcd\F024O0-0O4 Sandy tec AsscnfliS! PPtA[l G@r.l Cotrsult & Meetin5 TMNTE\PPLA OPC for subdivisior pedormamc boDd\ Orc,! projcct atb.xlsx c4o Page 938 of 5243 RoBAU &ASSoCIATES PRELIMINARY OPINION OF PROBABLE COST VALENCIA SKY Estimated Bl.,: ARB Checked Bl": YWD GENERAL DT]SCRIPTION UNIT QUANTITY U\IT COST TOT.\1, Staked Silt Fence .6 LF LF LS EA EA EA SY ,985 $L50 $ 17.97',t.50 1.50 $ 12.255.00Double Staked Silt Fence Landscape buffers (lncludes Irrigation) Cooper Lights FPL Lights Construction Entrance ( FDOT Stone Bed) Rip-Rap (12") w/ Fabric 8,170 $ $ 364,224.50 S 364,224.50 4t $ 2,500.00 $ 102,500.00 67 S 1,800.00 $ 120,600.00 l 19 $ t 3,500.00 $ 10,500.00 60.00 $ 1,140.00 General Subtotal $629.t97.00 *Excavation fees paid under excavatiod permit l0/15/A[h.ed\402+m4o4 Slndy l5c Ass€mbl.g€ PPLA\oI Gcm6l CoNult & Mc€t'm8s TMNTE\PPI-A OPC for subdivision pcrfonnance bond\Opc_stl prcjccr a$.xtsx l:47 PM oPc_all project a6.rtsx 2 oi9 qo Page 939 of 5243 ROBAU & ASSoCIATES PRELIMINARY OPINION OF PROBABLE COST VALENCIA SK}' Estimated By: -{RB Checked By: MWD PO'[,\BI,T] \\ ATT]R & FIRE DTSCRIPTIO:\I \IT QUANTITY U:{IT COST TOT,\1- 6 8" PVC Waler Main (C-900, DR-18) 10" PVC Water Main (C-900, DR- l8) 8" PVC Water Main (C-900, DR-14) 10" PVC Water Main (C-900, DR-14) 2" Gate Valve w/ Box 8" Gate Valve Box l0" Gate Valve w/ Box Fire Hvdrant Assemblv Permanent Bacterial Sample Point Double Service w/ Curb Stop Single Service W Curb Stop Temp. Gap ConEguration Automatic Flushing Device Temporary Bact. Sample Points & Blow-Off Air Release Valve Connect to WM existing stubout LF LF LF LF EA EA EA EA EA EA EA EA EA EA EA EA ,537 $ 30.00 $ 346,110.00 2,923 $ 36.00 $ 105.228.00 814 $ 33.00 $ 26.862.00 215 $ 39.00 $ 10.725.00 3 $ 750.00 $ 2,2s0.00 45 $ 2,200.00 $ 99,000.00 17 $ 2,800.00 $ 47,600.00 34 $ 7,500.00 $ 255,000.00 .1 $ 3,500.00 $ 14,000.00 I 16 $ 1,600.00 $ 185,600.00 95 $ 1,400.00 $ 133.000.00 $ 3,500.00 $ 3,500.00 $6,800.00 $ 27,2UIOO $ 4,000.00 $ 4.000.00 $ 4,500.00 $ 22,500.00 J 5 2 $ 3,000.00 $ 6,000.00 I0/I5/2i!lltarcd\P\02:l-${04 s dv lnne Ass€mbliSc PPLA\oI Gcmr.l cotrulr & Mcetings TMNTE\PPLA opc for subdivision perforn rce bond\opc ![ projccr_arb.xts,(I :47 PM Orc,a projer_alb. sx oao I of9 Page 940 of 5243 RoBAU &ASSOCIATES PRELIMINARY OPINION OF PROBABLE COST VAI,ENCIA SKY Estimated By: ARB Checked Bv: llWD POTABI,E }\'ATER & FIRE DESCRIPTIOT-Ur..lT QU-{NTITY UNIT cosr TOTAI, Potable Water & Fire Station Subtotal $ 1,288,575.00 6 I0/15/aiEhar.du\02:loo{04 s.rdy Lo. Als.mbLg. PPI-Aol cm.ral coi$h & Meetints IMNTE\PPLA oPc for suMivtroo p.rfonbarcc bo! opc_r[ proj.cr_a,b.x1s,( I:47 PM Opc_all pm.jccr_atb.xtsx 4 of9 %Page 941 of 5243 RoBAU &ASSoCIATES PRELIMINARY OPINION OF PROBABLE COST VALENCIA SKY Estimated By: ARB Checked By: MWD SANITARY SEWER DESCRIPTION U ].{IT QUANTITY UNIT COST TOTAL 8" PVC Sanitary Sewer Main (0 -6'Depth) ,6 LF LF LF LF LF LF EA EA EA EA EA EA EA EA LF EA 4,693 $ 30.00 $ 140,790.00 8" PVC Sanitary Sewer Main (6 -8'Depth) 8" PVC Sanitary Sewer Main (8'-10' Depth) 8" PVC Sanitary Sewer Main (10'-12'Depth) 8" PVC Sanitary Sewer Main ( l2'-14' Depth) 10" PVC Sanitary Sewer Main ( l2 -14' Depth) ,{' Diameter Manholes (0-6' Depth) 4' Diameter Manholes (6'-8'Depth) 4' Diameter Manholes (8'- l0' Depth) 4'Diameter Manholes ( l0'-12' Depth) 4' friameler Manholes ( l2 -14' Depth) 6" Single Clean-out 6" Double Clean-out Video Inspection Lifi Station Average, with Diesel Pump 2,082$62.00$129,084.00 3,213$48.00$155,t84.00 t,438$73.00$104,974.00 t,479$82.00$121,278.00 106$90.00$9.540.00 ll 2t $ ?,200.00 $ l5l,200.00 t7 $ 8,400.00 $ 142,800.00 $ 10,200.00 $ 9t,800.00 $ I1,000.00 $ 88,000.00 $ 13,500.00 $ r2 r,500.00 t0 $ 1,800.00 $ t8,000.00 6i $ t,000.00 $ 63,000.00 132 $ 1,250.00 $ t65,000.00 l3,0ll $3.50 $ 45,608.50 $ 380.000.00 $ 380,000.00 -.{o I 0/ I 5/Zi!lharcd\P',02.140-00:t Sandy tanc Ass€mblag€ PPLA\oI Gcoenl Consull & M.€tinss TMNTE\PPLA OPC for suMivision pcrforinancc bond\OPC all prcjcct arb.xlsx l:47 PM OPC-all proJecr,arb.rlsi 5 ol9 Additional Cost, Drop Manhole for (l2 -14') Page 942 of 5243 RoBAU &Assocnres PRELIMINARY OPINION OF PROBABLE COST VALENCIA SKY Estimated By: ARB Checked By: MWD SANITARY SEWER DESCRIPTIo\L \IT QL,\\TITY I-'\IT COST TOTAL 8" PVC Force Main (C-900, DR-18) 6 LF LF LF LF EA EA EA 1,761 $ 25.50 $ ,14,905.50 127 $ 28.00 $ 3,556.008" PVC Force Main (C-900, DR-14) 6" PVC Force Main (C-900, DR-18) 6" PVC Force Main (C-900, DR-14) Air Release Valves 8" Plug Valve Connect Force Main (simultaneous construction) 45 $ 21.50 $ 967.50 lt $ 24.00 $ 504.00 I $ 4,500.00 $ 18,000.00 $ 2,500.00 $ 2,500.00 $ 3,000.00 s 3,000.00 $ 2,001,19t.50Sanitary Sewer Subtotal C,ao l0/ I 5/AEhared\P\024-0O-004 Sady lae Ass.fblas. PPLA\o| Gcneral Consull & Me€tings TMNTE\PPI-A oPC for slbdivisio! pcrfomancc botd\oPc_lll projet_ai,.xlsr l:47 PM OPC-all projecl,arb. ittx Page 943 of 5243 ROBAU &ASSoCIATES PRELIMINARY OPINION OF PROBABLE COST vALENCIA SKY Estimated By: ARB Checked By: MWD STOR}I DR4.INAGI] t)T]SCRIPTIO\U\IT QUANTITY t \ t'r COST TOTAL 4,',168 $ 35.00 $ 166,880.00 I8" RCP 6 2.{" RCP ]O'RCP ]6" RCP Valley Gutter lnlets Junction Box Type "X" Box DBI FDOT - TYPE "8" CUSTOM DBI FDOT - TYPF] "C" DBI FDOT - TYPE "D" FDOT TYPE 9 15" Flared End Section 18" Flared End Section 2-1" Flared End Section LF LF LF LF LF EA EA EA EA EA EA EA EA EA EA EA 1,193 $ 42.00 $ 50,106.00 t,745 $ 56.00 S 91,720.00 5 1,806 $ 68.00 $ 122,808.00 3,845 $ 80.00 $ 307,600.00 '71 $ 4,000.00 $ 296,000.00 $ 4,000.00 $ 20,000.00 6 $ 2,400.00 $ 14,400.00 $ 3,500.00 $ 7,000.00 2t $ 2,200.00 $ 46,200.00 $ 5,000.00 $ 5,000.00 $ r,000.00 $ 3,000.00 22 $ 6,500.00 $ 143,000.00 j l $ 2,000.00 $ 10,000.00 I $ 2,300.00 $ 9,200.00 $ 2,500.00 $ 12,500.00 ov l0/ 1 5/Z!hared\P\02:l-0{-00.1 Sandy Lanc Assembla8e PPLATOI OmBl CoNult & MeelinSs TMNTE,PPI-{ OPC fo. subdivision pcrfolmmc bond\OPC all prolcct a .xlsx I 47 PM OPC lll prcjc.r_alb.xllr 7 of9 I5' RCP DBI FDOT - TYPE "C" CUSTOM Page 944 of 5243 ROBAU &ASSOCIATES PRELIMINARY OPINION OF PROBABLE COST VALENCIA SKY Estimated By: ARB Checked By: MWD STOR\I DRAI\A(;I] DESCRIPTION UNIT QUANTITY UNIT cosl' TOTAI, 30" Flared End Section ,6 EA EA EA $ 3,250.00 $ 29,250.00 12 $ 3,s00.00 $ 42,000.00 9 6 36" Flared End Section Control Structure $ 5,500.00 $ 33,000.00 Storm Drainage Subtotal $ r,415,664.00 a, l0/ l5l&Ilteed\r\024-oo-004 Sady tlnc Ass€mbl,ge PPLAOI GetlerllCoNrlh & Me€tin8s TMNTE\PPLA Orc for subdivisiotr Frfodna,icc bodd0pc_llt projecr_ltb.xtji l:47 PM OPC_![ projc.r-db.xtsr Page 945 of 5243 ,6 ROBAU &ASSOCIATES PRELIMINARY OPINION OF PROBABLE COST \.At,ENCIA SKY Estimated BJ-: ARB Checked By: MwD PA}'ING DESCRIPTION UNIT QUANTITY UNIT COST TOTAI, 2'Valley Gutter T)?e "D" Curb & Gutter Type "F" Curb & Gutter 3/4" T}?e S-l I I Asphalt (2nd Lift) l" T}?e S-l I I Asphalt (lst Lift) l-l/4" TWe S-I I I Asphak (Ist Liff) (AURORA BLVD) 6" Limerock Base (LBR 100) 8" Limerock Base (LBR 100) (AURORA BLVD) 12" Stabilized Subgrade (LBR ,10) Signage & Pavement Marking 2' Sod Strip Behind Curb ADA Rarnps & Detectable Wamings 5'Wide Sidewalk (4" Thick Concrete) Saw-Cut & Match Existing Pavement LF LF LF SY SY SY SY SY SY LS SY EA LF EA 23,172 $ 13.00 $ 309,016.00 1,170 $ 11.00 $ 12,870.00 7,229 $ 17.00 $ 122,893.00 37,857 $ 6.50 $ 246,070.50 27,224 $ 8.10 $ 220,514.40 10,6s7 $ 10.13 $ 107,955.41 21,224 $ 8.50 $ 231,4&.00 10,657 $ 8.50 $ 90,584.50 48,226 $ 3.00 $ 144,678.00 $ 25,000.00 $ 25,000.00 7,149 $ 2.20 $ 15,727.80 .11 24,571 $ 20.00 $ 491,540.00 $ 500.00 $ 20.500.00 $ 1,500.00 $ 3,000.00 $2.041.773.61Paving Subtotal o I0/ l5/AEhared,F024-m{04 Sardy L3nc As*Dblrg. PPLA\oI Gcncral Corsul & M.ct gs TMNTE\PPI-A OPC tur subdivision p.rtutrll4c bondoPc_all pojdt_.rb.xlsx l:47 PM OPC-all Pmjeci-a't.xlsx Page 946 of 5243 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. 3 County Attorney Office County Attorney Office POp d1RlZ1 4. BCC Office Board of County Commissioners Cff t,f/j l /1/20/2 y 5. Minutes and Records Clerk of Court's Office 441 ato / q 1./f Z4124 4 PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Lucia S.Martin Phone Number Ext.2279 Contact/ Department Agenda Date Item was November 12,2024 Agenda Item Number 16.A.7 Approved by the BCC Type of Document Construction and Maintenance Agreement Number of Original 2 Attached and Performance Bond Documents Attached PO number or account number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not appropriate. Initial) Applicable) 1. Does the document require the chairman's original signature? LM 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information(Name;Agency;Address;Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be LM signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the LM document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's LM signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip LM should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 11-12-2024 and all changes made WA is not during the meeting have been incorporated in the attached document. The County 0 9 P , ;option for Attorney's Office has reviewed the changes,if applicable. this line. 9. Initials of attorney verifying that the attached document is the version approved by the p N/A is not BCC,all changes directed by the BCC have been made,and the document is ready for the pp / an option for Chairman's signature. this I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 Page 947 of 5243 CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISON IMPROVEMENTS THIS CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION IMPROVEMENTS entered into this 12th day of November 2024 between Naples Associates VI, LLLP hereinafter referred to as Developer", and Board of County Commissioners of Collier County, Florida, hereinafter referred to as the Board". RECITALS: A. Developer has, simultaneously with the delivery of this Agreement, applied for the approval by the Board of certain plat of a subdivision to be known as: Valencia Sky B. Chapter 4 and 10 of the Collier County Land Development Code required the Developer to post appropriate guarantees for the construction of the improvements required by said subdivision regulations, said guarantees to be incorporated in a bonded agreement for the construction of the required improvements. NOW, THEREFORE, in consideration of the foregoing premises and mutual covenants hereinafter set forth, Developer and the Board do hereby covenant and agree as follows: 1. Developer will cause to be constructed: All required improvements within 36 months from the date of approval of said subdivision plat, said improvements hereinafter referred to as the required improvements. 2. Developer herewith tenders its subdivision performance security (attached hereto as Exhibit "A" and by reference made a part hereof) in the amount of$ 8,114,041.22 which amount represents 10% of the total contract cost to complete the construction plus 100% of the estimated cost of to complete the required improvements at the date of this Agreement. 3. In the event of default by the Developer or failure of the Developer to complete such improvements within the time required by the Land Development Code, Collier County, may call upon the subdivision performance security to insure satisfactory completion of the required improvements. 4. The required improvements shall not be considered complete until a statement of substantial completion by Developer's engineer along with the final project records have been furnished to be reviewed and approved by the County Manager or his designee for compliance with the Collier County Land Development Code. 5. The County Manager or designee shall, within sixty (60) days of receipt of the statement of substantial completion, either: a) notify the Developer in writing of his preliminary approval of the improvements; or b) notify the Developer in writing of his refusal to approve improvements, therewith specifying those conditions which the Developer must fulfill in order to obtain the County Manager's approval of the improvements. However, in no event shall the County Manager or designee refuse preliminary approval of the improvements if they are in fact constructed and submitted for approval in accordance with the requirements of this Agreement. 6. The Developer shall maintain all required improvements for a minimum period of one year after preliminary approval by the County Manager or his designee.After the one-year maintenance period by the Developer has terminated, the Developer shall petition the County Manager or designee to inspect the required improvements. The County Manager or designee shall inspect the improvements and, if found to be still in compliance with the Land Development Code as reflected by final approval by the Board, the Board shall release the remaining 10% of the subdivision performance security. The Developer's responsibility for maintenance of the required improvements shall continue unless or until the Board accepts maintenance responsibility for and by the County. 11/23/2021 Page 1 of 3 Page 948 of 5243 7. Six (6) months after the execution of this Agreement and once within every six (6) months thereafter the Developer may request the County Manager or designee to reduce the dollar amount of the subdivision performance security on the basis of work complete. Each request for a reduction in the dollar amount of the subdivision performance security shall be accompanied by a statement of substantial completion by the Developer's engineer together with the project records necessary for review by the County Manager or designee. The County Manager or designee may grant the request for a reduction in the amount of the subdivision performance security for the improvements completed as of the date of the request. 8. In the event the Developer shall fail or neglect to fulfill its obligations under this Agreement, upon certification of such failure, the County Manager or designee may call upon the subdivision performance security to secure satisfactory completion, repair and maintenance of the required improvements. The Board shall have the right to construct and maintain, or cause to be constructed or maintained, pursuant to public advertisement and receipt and acceptance of bids, the improvements required herein. The Developer, as principal under the subdivision performance security, shall be liable to pay and to indemnify the Board, upon completion of such construction, the final total cost to the Board thereof, including, but not limited to, engineering, legal and contingent costs, together with any damages, either direct or consequential, which the Board may sustain on account of the failure of the Developer to fulfill all of the provisions of this Agreement. 9. All of the terms, covenants and conditions herein contained are and shall be binding upon the Developer and the respective successors and assigns of the Developer. IN WITNESS WHEREOF, the Board and the Developer have caused this Agreement to be executed by their duly authorized representatives this 1 2th day of November 2024. Name of Entity) SIGNED IN THE PRESENCE OF Naples Associates VI, LLLP a Florida limited liability limited partnership By: Naples VI Corporation, A Florida corporation, its General Partner By: By: Printed Name: m< tie) t_ f1 om eft) Name/Title: Richard M. Norwalk, Vice President By: Provide Proper Evidence of Authority) Printed Name: i0 11/23/2021 Page 2 of 3 Q4 Page 949 of 5243 ATTEST: BOARD OF COUNTY COMMISSIONERS CRYSTAL K. KINZEL,. LERK OF COLLIER COUNTY, FLORIDA BY: By: Deputy clerk ,ct Chris 1, 'hairmarr1eht} siVbz,,tr fly Approved as to form and legality: 00.1_,De Doo re k D. Pe!rr Assistant County Attorney a`\ b)\ 11/23/2021 Page 3 of 3 `/ 0Page 950 of 5243 Exhibit "A" Page 951 of 5243 PERFORMANCE BOND BOND NO. LICX1026799 KNOW ALL PERSONS BY THESE PRESENTS: that Naples Associates VI, LLLP Name of Owner) 1600 Sawgrass Corporate Parkway, Suite 400 Address of Owner) Sunrise, FL 33323 Address of Owner) hereinafter referred to as "Owner") and Endurance Assurance Corporation Name of Surety) 12890 Lebanon Road Address of Surety) Mount Juliet, TN 37122-2870 Address of Surety) 615-553-9500 Telephone Number) hereinafter referred to as "Surety") are held and firmly bound unto Collier County, Florida, hereinafter referred to as "County") in the total aggregate sum of Eight Million One Hundred Fourteen Thousand Forty One and 22/100 Dollars ($8,114,041.22) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. Owner and Surety are used for singular or plural, as the context requires. THE CONDITION OF THIS OBLIGATION is such that whereas, the Owner has submitted for approval by the Board of a certain subdivision plat named Valencia Sky and that certain subdivision shall include specific improvements which are required by Collier County Ordinances and Resolutions (hereinafter "Land Development Regulations"). This obligation of the Surety shall commence on the date this Bond is executed and shall continue until the date of final acceptance by the Board of County Commissioners of the specific improvements described in the Land Development Regulations (hereinafter the "Guaranty Period"). NOW THEREFORE, if the Owner shall well, truly and faithfully perform its obligations and duties in accordance with the Land Development Regulations during the guaranty period established by the County, and the Owner shall satisfy all claims and demands incurred and shall fully indemnify and save harmless the County from and against all costs and damages which it may suffer by reason of owner's failure to do so, and shall reimburse and repay the County all outlay and expense which the County may incur in making good any default, then this obligation shall be void, otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received hereby, stipulates and agrees that no change, extension of time, alteration, addition or deletion to the proposed specific improvements shall in any way affect its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration, addition or deletion to the proposed specific improvements. PROVIDED, FURTHER, that it is expressly agreed that the Bond shall be deemed amended automatically and immediately, without formal and separate amendments hereto, so as to bind the Owner and the Surety to the full and faithful performance in accordance with the Land Development Regulations. The term "Amendment", wherever used in this Bond, and whether referring to this Bond, or other documents shall include any alteration, addition or modification of any character whatsoever. 0Page 952 of 5243 IN WITNESS WHEREOF, the parties hereto have caused this PERFORMANCE BOND to be executed this /6Fiay of October , 2024. WITNESSES: Naples Associates VI, LLLP, a Florida limited liability limited partnership By: Naples VI Corporation, a Florida corporation, its general partner By: By Printed Name: ( (1io t- Rbm2r, Printed Name: Richard M. Norwalk By: ////',' Title: Vice President Printed Name: Ne(Cn kAtifirverN Provide Proper Evidence of Authority ACKNOWLEDGEMENT STATE OF FLORIDA COUNTY OF BROWARD The foregoing instrument was acknowledged before me by means of x physical presence or El online notarization, this 181" day of October , 2024 (year) , by Richard M. Norwalk (name of person) as Vice President for Naples VI Corporation, a Florida corporation the general partner of Naples Associates VI, LLLP, a Florida limited liability limited partnership on behalf of said corporation and limited liability partnership (name of party on behalf of whom instrument was executed) authorized to do business in Florida herein identified as the PRINCIPAL and who is x Personally Known or Produced Identification Type of Identification Produced: NOTARY SEAL: Signature of Notary Public—State of Florida) Notary Public 49"" := STEVEN M.HELFMAN Common#HH 251040 0 30 2026 Vive•"l ftoa: Expires May ,awl Printed Name of Notary Public My Commission Expires: Page 953 of 5243 WITNESSES: SURETY: Endurance Assurance Corporation By: 1 By: C . mac_ a3 21) Authorized Signature Printed Name: Christian Collins Dale A. Belis By: --Printed Name Printed Name: Taylor Rosenhaus Attorney-In-Fact and Florida Resident Agent Title STATE OF FLORIDA COUNTY OF PALM BEACH The foregoing instrument was acknowledged before me by means of x physical presence or online notarization, this 17th day of October , 2024 (year) , by Dale A. Belis (name of person) as Attorney-In-Fact for Endurance Assurance Corporation (name of party on behalf of whom instrument was executed) authorized to do business in Florida herein identified as the SURETY and who is x Personally Known or El Produced Identification Type of Identification Produced NOTARY SEAL: Signature of Notary Public—State of Florida) KAIL S Nota UbIICi; ZNotapEEsTo:tfF1 3.,, 1qP ,g' Commission=HH 195931 My Comm.Expires Nov 9,2025 hCk1 tte .3rX\ Bonded through National Notary Assn. Printed Name of Notary Public My Commission Expires: \; !CI ,V-; Page 954 of 5243 L, SOMPO INTERNATIONAL POWER OF ATTORNEY 9627 KNOW ALL BY THESE PRESENTS,that Endurance Assurance Corporation,a Delaware corporation("EAC"),Endurance American Insurance Company,a Delaware corporation("EAIC"),Lexon Insurance Company,a Texas corporation("LIC"),and/or Bond Safeguard Insurance Company,a South Dakota corporation("BSIC"),each, a"Company"and collectively,"Sompo International,"do hereby constitute and appoint:Brett Rosenhaus,Kevin Wojtowicz,Charles J.Nielson,Shawn Burton, Charles D.Nielson,Dale A.Belis,David Hoover,Jarrett Merlucci as true and lawful Attorney(s)-In-Fact to make,execute,seal,and deliver for,and on its behalf as surety or co-surety;bonds and undertakings given for any and all purposes,also to execute and deliver on its behalf as aforesaid renewals,extensions,agreements, waivers,consents or stipulations relating to such bonds or undertakings provided,however,that no single bond or undertaking so made,executed and delivered shall obligate the Company for any portion of the penal sum thereof in excess of the sum of One Hundred Million Dollars($100,000,000.00). Such bonds and undertakings for said purposes,when duly executed by said attorney(s)-in-fact,shall be binding upon the Company as fully and to the same extent as if signed by the President of the Company under its corporate seal attested by its Corporate Secretary. This appointment is made under and by authority of certain resolutions adopted by the board of directors of each Company by unanimous written consent effective the 30th day of March,2023 for BSIC and LIC and the 17'day of May,2023 for EAC and EAIC,a copy of which appears below under the heading entitled"Certificate". This Power of Attorney is signed and sealed by facsimile under and by authority of the following resolution adopted by the board of directors of each Company by unanimous written consent effective the 30th day of March,2023 for BSIC and LIC and the 17th day of May,2023 for EAC and EAIC and said resolution has not since been revoked,amended or repealed: RESOLVED,that the signature of an individual named above and the seal of the Company may be affixed to any such power of attorney or any certificate relating thereto by facsimile,and any such power of attorney or certificate bearing such facsimile signature or seal shall be valid and binding upon the Company in the future with respect to any bond or undertaking to which it is attached. IN WITNESS WHEREOF,each Company has caused this instrument to be signed by the following officers,and its corporate seal to be affixed this 25th day of May,2023. End rance Assurance Corporation. Endurance American Lexon Insurance Company _Bond Safeguard nt Insurauc,Company 7.-1:7' n` j n /nInsurance CompanyBy. l-'. r.,.l r! I -;.11r. By .i: ._'! 4);t` By I/, l if By: f t. Richard A el V,R&, enior Counsel Richard A el•SWP".B. nior Counsel Richard Appel; Senior Counsel Ric ardl( A el VP& eniort'ouhselPP „S MS PP a.PPPP S ,,, sesurance p"<,c.an InsG,,,ef.• Pao INS{,p q" i w OOPpoARgT'r. C'o'', c• G7+'Lp Rgj a. t ,w, ec'O q ' FAT. , q s- c SEAL ' W oo" 4 Z, W, SOUTH ;n 1.o; 0i SEAL ` ' DAKOTA ;ofi 9', 2002 '-,- A', 1996 ;Oj t p, INSURANCE 'fti7.%vj•,DELAWARE•'JO DELAWARE 'b3 y T M i 2 COMPANY u.Wa......• u,,,, "' ACKNOWLEDGEMENT ,,''•R....¢- Nnnm,,,un,,,n00°` 9•\`' On this 25th day of May,2023,before me,personally came the above signatories known to me,who being duly sworn,did depose and say that he/ttiay`Ii' tfafpcer of each of the Companies;and that he executed said instrument on behalf of each Company by authority of his offic under th by ws of each Company,: a:'..••..•iO'4 ' a.a By: it...ne. Amy aylor,Not Public My Commissiin Expiresa 3/9f27. CERTIFICATE I,the undersigned Officer of each Company,DO HEREBY CERTIFY that: 1.That the original power of attorney of which the foregoing is a copy was duly executed on behalf of each Company and has not since been revoked,amended or modified; that the undersigned has compared the foregoing copy thereof with the original power of attorney,and that the same is a true and correct copy of the original power of attorney and of the whole thereof; 2.The following are resolutions which were adopted by the board of directors of each Company by unanimous written consent effective 30'h day of March,2023 for BSIC and LIC and the 17'day of May,2023 for EAC and EAIC and said resolutions have not since been revoked,amended or modified: RESOLVED,that each of the individuals named below is authorized to make,execute,seal and deliver for and on behalf of the Company any and all bonds, undertakings or obligations in surety or co-surety with others: RICHARD M.APPEL,MATTHEW E.CURAN,MARGARET HYLAND,SHARON L.SIMS, CHRISTOPHER L.SPARRO, and be it further RESOLVED,that each of the individuals named above is authorized to appoint attorneys-in-fact for the purpose of making,executing,sealing and delivering bonds, undertakings or obligations in surety or co-surety for and on behalf of the Company." 3.The undersigned further certifies that the above resolutions are true and correct copies of the resolutions as so recorded and of the whole thereof. IN WITNESS WHEREOF,I have hereunto set my hand and affixed the corporate seal this 17th day of October 12024 By: Dame S. .rie1retary NOTICE: U.S.TREASURY DEPARTMENT'S OFFICE OF FOREIGN ASSETS CONTROL(OFAC) No coverage is provided by this Notice nor can it be construed to replace any provisions of any surety bond or other surety coverage provided.This Notice provides information concerning possible impact on your surety coverage due to directives issued by OFAC. Please read this Notice carefully. The Office of Foreign Assets Control(OFAC)administers and enforces sanctions policy,based on Presidential declarations of"national emergency". OFAC has identified and listed numerous foreign agents,front organizations,terrorists,terrorist organizations,and narcotics traffickers as"Specially Designated Nationals and Blocked Persons". This list can be located on the United States Treasury's website-https://www.treasurv.aov/resource-center/sanctions/SDN-List. In accordance with OFAC regulations,if it is determined that you or any other person or entity claiming the benefits of any coverage has violated U.S.sanctions law or is a Specially Designated National and Blocked Person,as identified by OFAC,any coverage will be considered a blocked or frozen contract and all provisions of any coverage provided are immediately subject to OFAC. When a surety bond or other form of surety coverage is considered to be such a blocked or frozen contract,no payments nor premium refunds may be made without authorization from OFAC. Other limitations on the premiums and payments may also apply. Any reproductions are void. Surety Claims Submission:LexonClaimAdministrationCalsompo-intl.com Telephone:615-553-9500 Mailing Address:Sompo International;12890 Lebanon Road;Mount Juliet,TN 37122-2870 Page 955 of 5243 EXHIBIT " B" Signing Authority Page 956 of 5243 2024 FLORIDA LIMITED PARTNERSHIP ANNUAL REPORT FILED DOCUMENT* A201)00000279 Mar OS, 2024 Entity Name: NAPLES ASSOCIATES VI, LLLP Secretary of State 6959140594CC Current Principal Place of Business: 16E0 SAWGRASS CORPORATE PKViY STE 400 SUNRISE, FL 33323, Current Mailing Address: 1600 SAWGRASS CORPORATE PKWY STE 480 SUNRISE, FL 33323 US FEI Number: 85-2618109 Certificate of Status Desired: Yes Name and Address of Current Registered Agent: HELFMAN, STEVEN 1603 SAWGRASS CORPORATE PKWY STE 400 SUNRISE,FL 33323 LS Ihe atCrie naqied Citify submits cc:4310.a.ael fite ptirp0542 I LYM179,19 regmerec,eft=ar regtsleradaaent or hamth de the Si&ei Ronde. SIGNATURE: ElezIturie Sigrantre Rteted Agent Dale General Partner Detail : Daeutritt Nate NAPLES VI CORPORATION Adtirefia 1600 SAWGRASS CORPORATE PKWY STE 11,01.1 ety Slate,1# SUNRISE FL 33323 nrystir ino:UppiktranitelerOpIld t hay and ot LTA kab AM/vat.",se lila!fun° wAikt71,114,111 kabti a04 6rmsdu Lendur h,Sta 4.9.0efoi1ittyr i tstetd patnitmly aa flh rff rawto ttuU'ac OlVitUk*1.711:1'kb=Wilt,btu IWI ra asi.srmi trapiti LIM Adam. Apouluti 4k41,101, 4.8 MarAmmt NO Wm.JAL,mumumall SIGNATURE:RICHARD M. NORWALK VP 03105/2024 Eleattrit Signalise if Sigring Genetal Partner i1 Dale Old°Page 957 of 5243 2024 FLORIDA PROFIT CORPORATION ANNUAL REPORT FILED DOCUMENT*P201:00054372 Apr 23, 2024 Entity Name: NAPLES VI CORPORATION Secretary of State 949995291CC Current Principal Place of Business: 1600 SAWGRASS CORPORATE PARKWAY,SUITE 400 SUNRISE, FL 33223 Current Mailing Aditkess: 1600 SAWGRASS CORPORATE PARKWAY, SUITE 400 SUNRISE, FL 33323 US FEllthirribter: 85-23332135 Certificate or Status Desired: Yes Name arid Address of Current ReOstered Avant: HEITMAN, STEVEN PA ESO 1600 SAWGRASS CORPORATE PARKWAY,SUITE 40(J SIJNRISE,FL 33323 US oixim named catty slim/nes inn ItT ref rtt.'rtirpom W..Ittkb79,19 riii GfriCt;t Y baitt ra7 MC'Cl'er Fkrada. SIGNATURE: Vetrode Signalize II Registered Agerit Daie Officentirector Detail : ThieP Tale VP,AS Name Et RATTI,MISHA J FANT,ALAN J. Address 1600 SAWGRASS CORPORATE Adittess 1 600 SNUG RA SS CORPORATE PARKWAY,SUITE 403 PARKWAY, SUITE 400 Cy Slat Zip: SUNRISE FL 33323 Cily-Suat,Zip: SUNRISE FL 33122 Title VP Tale VP,T Name NORWALK,RICHARD M. Name MENENDEZ, N.IMARIA Address 1600 SAWGRASS CORPORATE Aiikesa 1600 SAWGRASS CORPORATE PARKWAY,SUITE 400 PARKWAY, SUITE 41X1 Cty Slate,lip: SUNRISE FL 33322 CityStalelip: SUNRISE FL 33121 Title VP TaleS Nart e ARKIN,RICHARD A. Neale HELFMAN STEVEN M. Addt e68, 1 SAWGRASS CORPORATE 1Ein SAWG RA SS CORPORATE PARKWAY,SUITE 4 PARKWAY, SUITE 400 CitySiatelip: SUNRISE FL 33323 CitySLiteliri: SUNRISE FL 33323 rimeaf turnryYutt t`firr a-Swat:Weer haliartUdoe:Mr.4,Avow!ur suckurauriatar rapist kuU ALLIJildee MO VIA My 3a9fttitaloidto NW VIM k.901 Ova L ImaLlo utt...kr atehm,Jet) LW t*eLleAkt.41 Lit US!rework*ur 11,eallidaWAtt Lbuptro UV North bel.1 Mee:ay rionv leitglAmfl ablwqr.est M.All dantirttiat ant/"iiat ittlpsiara. SIGNATURE:RICHARD M. NORWALK VP 04123/2024 Etecafarit Signalise ef Skjnng On:Er Iniretar Detail Date O1 Page 958 of 5243 EXHIBIT "C" Opinion of Probable Cost OVD Page 959 of 5243 4.0 ROBAU & ASSOCIATES Exhibit "A" VALENCIA SKY - Plat Recordation Submittal 1 PRELIMINARY OPINION OF PROBABLE COST SUMMARY POTABLE WATER&FIRE 1,288,575.00 SANITARY SEWER 2,001,191.50 UTILITIES TOTAL 3,289,766.50 GENERAL 629,197.00 STORM DRAINAGE 1,415,664.00 PAVING 2,041,773.61 CONSTRUCTION TOTAL $ 4,086,634.61 TOTAL 7,376,401.11 Contingency(110%) of TOTAL 8,114,041.22 This item has been electronically signed and sealed by Matthew W.DeFrancesco,Professional Engineer Using a SHA Authentication Code. Printed copies of this document are not considered signed and sealed and the SHA Authentication Code must be verified on any electronic copies. tttttttttltltttitl,, t SN`t ..EL Digitally signed 4, E"'SF•ti4\= by Matthew No. €66 o DeFrancesco 1-0 03 % s E uF ctr Date: 2024.10.17 A F / 10:57:57-04'00' tttttttt,tt 10/15/2024 Z:\Shared\P\024-00-004 Sandy Lane Assemblage PPLA''01 General Consult&Meetings TMNTE\PPLA OPC for subdivision performance bond\ L47 PM OPC all project arb.xlsx 1 of 9 ovaPage 960 of 5243 ROBAU &ASSOCIATES PRELIMINARY OPINION OF PROBABLE COST VALENCIA SKY Estimated By:ARB Checked By:MWD GENERAL DESCRIPTION UNIT QUANTITY UNIT TOTAL COST Staked Silt Fence LF 11,985 $ 1.50 $ 17,977.50 Double Staked Silt Fence LF 8,170 $ 1.50 $ 12,255.00 Landscape buffers(Includes Irrigation) LS 1 364,224.50 $ 364,224.50 Cooper Lights EA 41 $ 2,500.00 $ 102,500.00 FPL Lights EA 67 $ 1,800.00 $ 120,600.00 Construction Entrance(FDOT Stone Bed) EA 3 3,500.00 $ 10,500.00 Rip-Rap(12")w/Fabric SY 19 $60.00 $ 1,140.00 General Subtotal 629,197.00 Excavation fees paid under excavation permit 10/15/71Mared\P\024-00-004 Sandy Lane Assemblage PPLA\01 General Consult&Meetings TMNTE\PPLA OPC for subdivision performance bond\OPC_all project_arb.xlsx 1:47 PM OPC_all project_arb.xlsx 2 of 9 0 1/3Page 961 of 5243 4 ROBAU & ASSOCIATES Ad PRELIMINARY OPINION OF PROBABLE COST VALENCIA SKY Estimated By:ARB Checked By:MWD POTABLE WATER&FIRE DESCRIPTION UNIT QUANTITY UNIT TOTAL COST 8"PVC Water Main(C-900,DR-18) LF 11,537 $ 30.00 $ 346,110.00 10"PVC Water Main(C-900,DR-18) LF 2.923 $ 36.00 $ 105,228.00 8"PVC Water Main(C-900,DR-14) LF 814 $ 33.00 $ 26,862.00 10"PVC Water Main(C-900,DR-14) LF 275 $ 39.00 $ 10,725.00 2"Gate Valve w/Box EA 3 750.00 $ 2,250.00 8"Gate Valve w/Box EA 45 $ 2,200.00 $ 99,000.00 10"Gate Valve w/Box EA 17 $ 2,800.00 $ 47,600.00 Fire Hydrant Assembly EA 34 $ 7,500.00 $ 255,000.00 Permanent Bacterial Sample Point EA 4 3,500.00 $ 14,000.00 Double Service W/Curb Stop EA 116 $ 1,600.00 $ 185,600.00 Single Service W/Curb Stop EA 95 $ 1,400.00 $ 133,000.00 Temp.Gap Configuration EA 1 3,500.00 $ 3,500.00 Automatic Flushing Device EA 4 6,800.00 $ 27,200.00 Temporary Bact.Sample Points&Blow-Off EA 1 4,000.00 $ 4,000.00 Air Release Valve EA 5 4,500.00 $ 22,500.00 Connect to WM existing stubout EA 2 3,000.00 $ 6,000.00 10/15/2).Mared\P\024-00-004 Sandy Lane Assemblage PPLA\01 General Consult&Meetings TMNTE\PPLA OPC for subdivision performance bond\OPC_all project_arb.xlsx 1:47 PM OPC_all project_arb.xlsx 3 of 9 O Page 962 of 5243 A L„, ROBAU & ASSOCIATES 00 PRELIMINARY OPINION OF PROBABLE COST VALENCIA SKY Estimated By:ARB Checked By:MWD POTABLE WATER&FIRE DESCRIPTION UNIT QUANTITY UNIT TOTAL COST Potable Water&Fire Station Subtotal 1,288,575.00 10/15/2A2Shared\P\024-00-004 Sandy Lane Assemblage PPLA\01 General Consult&Meetings TMNTE\PPLA OPC for subdivision performance bond\OPC_all project_arb.xlsx 1:47 PM OPCall project_arb.xlsx 4 of 9 Od UPage 963 of 5243 ROBAU & ASSOCIATES PRELIMINARY OPINION OF PROBABLE COST VALENCIA SKY Estimated By:ARB Checked By:MWD SANITARY SEWER DESCRIPTION UNIT QUANTITY UNIT TOTAL COST 8"PVC Sanitary Sewer Main(0'-6'Depth)LF 4,693 $ 30.00 $ 140,790.00 8"PVC Sanitary Sewer Main(6'-8'Depth)LF 3,233 $ 48.00 $ 155,184.00 8"PVC Sanitary Sewer Main(8'-10'Depth) LF 2,082 $ 62.00 $ 129,084.00 8"PVC Sanitary Sewer Main(10'-12'Depth) LF 1,438 $ 73.00 $ 104,974.00 8"PVC Sanitary Sewer Main(12'-14'Depth) LF 1,479 $ 82.00 $ 121,278.00 10"PVC Sanitary Sewer Main(12'-14'Depth) LF 106 $ 90.00 $ 9,540.00 4'Diameter Manholes(0'-6'Depth) EA 21 7,200.00 $ 151,200.00 4'Diameter Manholes(6'-8'Depth) EA 17 $ 8,400.00 $ 142,800.00 4'Diameter Manholes(8'-10'Depth) EA 9 10,200.00 $ 91,800.00 4'Diameter Manholes(10'-12'Depth) EA 8 11,000.00 $ 88,000.00 4'Diameter Manholes(12'-14'Depth) EA 9 13,500.00 $ 121,500.00 Additional Cost,Drop Manhole for(12'-14') EA 10 $ 1,800.00 $ 18,000.00 6"Single Clean-out EA 63 1,000.00 $ 63,000.00 6"Double Clean-out EA 132 $ 1,250.00 $ 165,000.00 Video Inspection LF 13,031 $3.50 $ 45,608.50 Lift Station Average,with Diesel Pump EA 1 380,000.00 $ 380,000.00 10/l5/Zallhared\P\024-00-004 Sandy Lane Assemblage PPLA\O1 General Consult&Meetings TMNTE\PPLA OPC for subdivision performance bond\OPC_all project_arb.xlsx 1:47 PM OPC_all project_arb.xlsx 5 of 9 Q, UPage 964 of 5243 1 ROBAU & ASSOCIATES PRELIMINARY OPINION OF PROBABLE COST VALENCIA SKY Estimated By:ARB Checked By:MWD SANITARY SEWER DESCRIPTION UNIT QUANTITY UNIT TOTAL COST 8"PVC Force Main(C-900,DR-18) LF 1,761 $ 25.50 $ 44,905.50 8"PVC Force Main(C-900,DR-14) LF 127 $ 28.00 $ 3,556.00 6"PVC Force Main(C-900,DR-18) LF 45 21.50 $ 967.50 6"PVC Force Main(C-900,DR-14) LF 21 24.00 $ 504.00 Air Release Valves EA 4 4,500.00 $ 18,000.00 8"Plug Valve EA 1 2,500.00 $ 2,500.00 Connect Force Main(simultaneous construction) EA 1 3,000.00 $ 3,000.00 Sanitary Sewer Subtotal S 2,001,191.50 l0/15/ZO2Shared\P\024-00-004 Sandy Lane Assemblage PPLA\O1 General Consult&Meetings TMNTE\PPLA OPC for subdivision performance bond\OPC_all project_arb.xlsx 1:47 PM OPC_all project_arb.xlsx 6 of 9 0 Page 965 of 5243 1 ROBAU & ASSOCIATES PRELIMINARY OPINION OF PROBABLE COST VALENCIA SKY Estimated By:ARB Checked By:MWD STORM DRAINAGE DESCRIPTION UNIT QUANTITY UNIT TOTAL COST 15"RCP LF 4,768 $ 35.00 $ 166,880.00 18"RCP LF 1,193 $ 42.00 $ 50,106.00 24"RCP LF 1,745 $ 56.00 $ 97,720.00 30"RCP LF 1,806 $ 68.00 $ 122,808.00 36"RCP LF 3,845 $ 80.00 $ 307,600.00 Valley Gutter Inlets EA 74 4,000.00 $ 296,000.00 Junction Box EA 5 4,000.00 $ 20,000.00 Type"X"Box EA 6 2,400.00 $ 14,400.00 DBI FDOT-TYPE"B"CUSTOM EA 2 3,500.00 $ 7,000.00 DBI FDOT-TYPE"C"EA 21 2,200.00 $ 46,200.00 DBI FDOT-TYPE"C"CUSTOM EA 1 5,000.00 $ 5,000.00 DBI FDOT-TYPE"D"EA 1 3,000.00 $ 3,000.00 FDOT TYPE 9 EA 22 6,500.00 $ 143,000.00 15"Flared End Section EA 5 2,000.00 $ 10,000.00 18"Flared End Section EA 4 2,300.00 $ 9,200.00 24"Flared End Section EA 5 2,500.00 $ 12,500.00 10/15/7AB9hared\P\024-00-004 Sandy Lane Assemblage PPLA\OI General Consult&Meetings TMNTE\PPLA OPC for subdivision performance bond\OPC_all project_arb.xlsx L47 PM OPC_all project_arb.xlsx 7 of 9 Q Page 966 of 5243 L.ir ROBAU & ASSOCIATES PRELIMINARY OPINION OF PROBABLE COST VALENCIA SKY Estimated By:ARB Checked By:MWD STORM DRAINAGE DESCRIPTION UNIT QUANTITY UNIT TOTAL COST 30"Flared End Section EA 9 3,250.00 $ 29,250.00 36"Flared End Section EA 12 3,500.00 $ 42,000.00 Control Structure EA 6 5,500.00 $ 33,000.00 Storm Drainage Subtotal 1,415,664.00 10/15/2252ghared\P\024-00-004 Sandy Lane Assemblage PPLA\Ol General Consult&Meetings TMNTE\PPLA OPC for subdivision performance bond\OPC_all project_arb.xlsx 1:47 PM OPC_all project_arb.xlsx 8 of 9 0 Page 967 of 5243 f ) ROBAU & ASSOCIATES s PRELIMINARY OPINION OF PROBABLE COST VALENCIA SKY Estimated By:ARB Checked By:MWD PAVING DESCRIPTION UNIT QUANTITY UNIT TOTAL COST 2'Valley Gutter LF 23,772 $ 13.00 $ 309,036.00 Type"D"Curb&Gutter LF 1,170 $ 11.00 $ 12,870.00 Type"F"Curb&Gutter LF 7,229 $ 17.00 $ 122,893.00 3/4"Type S-111 Asphalt(2nd Lift)SY 37,857 $ 6.50 $ 246,070.50 1"Type S-111 Asphalt(1st Lift) SY 27,224 $ 8.10 $ 220,514.40 1-1/4"Type S-111 Asphalt(1st Lift)(AURORA BLVD) SY 10,657 $ 10.13 $ 107,955.41 6"Limerock Base(LBR 100) SY 27,224 $ 8.50 $ 231,404.00 8"Limerock Base(LBR 100)(AURORA BLVD) SY 10,657 $ 8.50 $ 90,584.50 12"Stabilized Subgrade(LBR 40) SY 48,226 $ 3.00 $ 144,678.00 Signage&Pavement Marking LS 1 25,000.00 $ 25,000.00 2'Sod Strip Behind Curb SY 7,149 $ 2.20 $ 15,727.80 ADA Ramps&Detectable Warnings EA 41 500.00 $ 20,500.00 5'Wide Sidewalk(4"Thick Concrete) LF 24,577 $ 20.00 $ 491,540.00 Saw-Cut&Match Existing Pavement EA 2 1,500.00 $ 3,000.00 Paving Subtotal 2,041,773.61 l0/15/2Itnhared\P\024-00-004 Sandy Lane Assemblage PPLA\01 General Consult&Meetings TMNTE\PPLA OPC for subdivision performance bond\OPC_a11 project_arb.xlsx L:47 PM OPCall project_arb.xlsx 9 of 9 Page 968 of 5243 George W. HackneyDigitally signed by George W. HackneyDN:E=George.Hackney@abbinc.com,CN=George W. Hackney, O="Agnoli, Barber & Brundage, Inc.", L=Naples, S=Florida, C=USDate: 2025.03.20 13:08:06-04'00'Page 969 of 5243 Page 970 of 5243 Page 971 of 5243 Page 972 of 5243 Page 973 of 5243 Page 974 of 5243 Page 975 of 5243 Page 976 of 5243 Page 977 of 5243 Page 978 of 5243 Page 979 of 5243 Page 980 of 5243 Page 981 of 5243 Page 982 of 5243 Page 983 of 5243 Page 984 of 5243 Page 985 of 5243 Page 986 of 5243 Page 987 of 5243 POTABLE WATER & FIRE 1,288,575.00$ SANITARY SEWER 2,001,191.50$ UTILITIES TOTAL 3,289,766.50$ GENERAL 629,197.00$ STORM DRAINAGE 1,415,664.00$ PAVING 2,041,773.61$ CONSTRUCTION TOTAL 4,086,634.61$ TOTAL 7,376,401.11$ Contingency (110%) of TOTAL 8,114,041.22$ This item has been electronically signed and sealed by Matthew W. DeFrancesco, Professional Engineer Using a SHA Authentication Code. Printed copies of this document are not considered signed and sealed and the SHA Authentication Code must be verified on any electronic copies. VALENCIA SKY - Plat Recordation Submittal 1 PRELIMINARY OPINION OF PROBABLE COST SUMMARY 10/15/2024 1:47 PM Z:\Shared\P\024-00-004 Sandy Lane Assemblage PPLA\01 General Consult & Meetings TMNTE\PPLA OPC for subdivision performance bond\ OPC_all project_arb.xlsx 1 of 9 Page 988 of 5243 VALENCIA SKY Estimated By: ARB Checked By: MWD GENERAL DESCRIPTION UNIT QUANTITY UNIT TOTAL COST Staked Silt Fence LF 11,985 1.50$ 17,977.50$ Double Staked Silt Fence LF 8,170 1.50$ 12,255.00$ Landscape buffers (Includes Irrigation) LS 1 364,224.50$ 364,224.50$ Cooper Lights EA 41 2,500.00$ 102,500.00$ FPL Lights EA 67 1,800.00$ 120,600.00$ Construction Entrance ( FDOT Stone Bed) EA 3 3,500.00$ 10,500.00$ Rip-Rap (12") w/ Fabric SY 19 60.00$ 1,140.00$ General Subtotal $629,197.00 *Excavation fees paid under excavation permit PRELIMINARY OPINION OF PROBABLE COST 10/15/2024 1:47 PM Z:\Shared\P\024-00-004 Sandy Lane Assemblage PPLA\01 General Consult & Meetings TMNTE\PPLA OPC for subdivision performance bond\OPC_all project_arb.xlsx OPC_all project_arb.xlsx 2 of 9 Page 989 of 5243 VALENCIA SKY Estimated By: ARB Checked By: MWD POTABLE WATER & FIRE DESCRIPTION UNIT QUANTITY UNIT TOTAL COST 8" PVC Water Main (C-900, DR-18) LF 11,537 30.00$ 346,110.00$ 10" PVC Water Main (C-900, DR-18) LF 2,923 36.00$ 105,228.00$ 8" PVC Water Main (C-900, DR-14) LF 814 33.00$ 26,862.00$ 10" PVC Water Main (C-900, DR-14) LF 275 39.00$ 10,725.00$ 2" Gate Valve w/ Box EA 3 750.00$ 2,250.00$ 8" Gate Valve w/ Box EA 45 2,200.00$ 99,000.00$ 10" Gate Valve w/ Box EA 17 2,800.00$ 47,600.00$ Fire Hydrant Assembly EA 34 7,500.00$ 255,000.00$ Permanent Bacterial Sample Point EA 4 3,500.00$ 14,000.00$ Double Service W/ Curb Stop EA 116 1,600.00$ 185,600.00$ Single Service W/ Curb Stop EA 95 1,400.00$ 133,000.00$ Temp. Gap Configuration EA 1 3,500.00$ 3,500.00$ Automatic Flushing Device EA 4 $6,800.00 27,200.00$ Temporary Bact. Sample Points & Blow-Off EA 1 4,000.00$ 4,000.00$ Air Release Valve EA 5 4,500.00$ 22,500.00$ Connect to WM existing stubout EA 2 3,000.00$ 6,000.00$ PRELIMINARY OPINION OF PROBABLE COST 10/15/2024 1:47 PM Z:\Shared\P\024-00-004 Sandy Lane Assemblage PPLA\01 General Consult & Meetings TMNTE\PPLA OPC for subdivision performance bond\OPC_all project_arb.xlsx OPC_all project_arb.xlsx 3 of 9 Page 990 of 5243 VALENCIA SKY Estimated By: ARB Checked By: MWD POTABLE WATER & FIRE DESCRIPTION UNIT QUANTITY UNIT TOTAL COST PRELIMINARY OPINION OF PROBABLE COST Potable Water & Fire Station Subtotal 1,288,575.00$ 10/15/2024 1:47 PM Z:\Shared\P\024-00-004 Sandy Lane Assemblage PPLA\01 General Consult & Meetings TMNTE\PPLA OPC for subdivision performance bond\OPC_all project_arb.xlsx OPC_all project_arb.xlsx 4 of 9 Page 991 of 5243 VALENCIA SKY Estimated By: ARB Checked By: MWD SANITARY SEWER DESCRIPTION UNIT QUANTITY UNIT TOTAL COST 8" PVC Sanitary Sewer Main (0'-6' Depth) LF 4,693 30.00$ 140,790.00$ 8" PVC Sanitary Sewer Main (6'-8' Depth) LF 3,233 48.00$ 155,184.00$ 8" PVC Sanitary Sewer Main (8'-10' Depth) LF 2,082 62.00$ 129,084.00$ 8" PVC Sanitary Sewer Main (10'-12' Depth) LF 1,438 73.00$ 104,974.00$ 8" PVC Sanitary Sewer Main (12'-14' Depth) LF 1,479 82.00$ 121,278.00$ 10" PVC Sanitary Sewer Main (12'-14' Depth) LF 106 90.00$ 9,540.00$ 4' Diameter Manholes (0'-6' Depth) EA 21 7,200.00$ 151,200.00$ 4' Diameter Manholes (6'-8' Depth) EA 17 8,400.00$ 142,800.00$ 4' Diameter Manholes (8'-10' Depth) EA 9 10,200.00$ 91,800.00$ 4' Diameter Manholes (10'-12' Depth) EA 8 11,000.00$ 88,000.00$ 4' Diameter Manholes (12'-14' Depth) EA 9 13,500.00$ 121,500.00$ Additional Cost, Drop Manhole for (12'-14') EA 10 1,800.00$ 18,000.00$ 6" Single Clean-out EA 63 1,000.00$ 63,000.00$ 6" Double Clean-out EA 132 1,250.00$ 165,000.00$ Video Inspection LF 13,031 3.50$ 45,608.50$ Lift Station Average, with Diesel Pump EA 1 380,000.00$ 380,000.00$ PRELIMINARY OPINION OF PROBABLE COST 10/15/2024 1:47 PM Z:\Shared\P\024-00-004 Sandy Lane Assemblage PPLA\01 General Consult & Meetings TMNTE\PPLA OPC for subdivision performance bond\OPC_all project_arb.xlsx OPC_all project_arb.xlsx 5 of 9 Page 992 of 5243 VALENCIA SKY Estimated By: ARB Checked By: MWD SANITARY SEWER DESCRIPTION UNIT QUANTITY UNIT TOTAL COST PRELIMINARY OPINION OF PROBABLE COST 8" PVC Force Main (C-900, DR-18) LF 1,761 25.50$ 44,905.50$ 8" PVC Force Main (C-900, DR-14) LF 127 28.00$ 3,556.00$ 6" PVC Force Main (C-900, DR-18) LF 45 21.50$ 967.50$ 6" PVC Force Main (C-900, DR-14) LF 21 24.00$ 504.00$ Air Release Valves EA 4 4,500.00$ 18,000.00$ 8" Plug Valve EA 1 2,500.00$ 2,500.00$ Connect Force Main (simultaneous construction) EA 1 3,000.00$ 3,000.00$ Sanitary Sewer Subtotal 2,001,191.50$ 10/15/2024 1:47 PM Z:\Shared\P\024-00-004 Sandy Lane Assemblage PPLA\01 General Consult & Meetings TMNTE\PPLA OPC for subdivision performance bond\OPC_all project_arb.xlsx OPC_all project_arb.xlsx 6 of 9 Page 993 of 5243 VALENCIA SKY Estimated By: ARB Checked By: MWD STORM DRAINAGE DESCRIPTION UNIT QUANTITY UNIT TOTAL COST 15" RCP LF 4,768 35.00$ 166,880.00$ 18" RCP LF 1,193 42.00$ 50,106.00$ 24" RCP LF 1,745 56.00$ 97,720.00$ 30" RCP LF 1,806 68.00$ 122,808.00$ 36" RCP LF 3,845 80.00$ 307,600.00$ Valley Gutter Inlets EA 74 4,000.00$ 296,000.00$ Junction Box EA 5 4,000.00$ 20,000.00$ Type "X" Box EA 6 2,400.00$ 14,400.00$ DBI FDOT - TYPE "B" CUSTOM EA 2 3,500.00$ 7,000.00$ DBI FDOT - TYPE "C" EA 21 2,200.00$ 46,200.00$ DBI FDOT - TYPE "C" CUSTOM EA 1 5,000.00$ 5,000.00$ DBI FDOT - TYPE "D" EA 1 3,000.00$ 3,000.00$ FDOT TYPE 9 EA 22 6,500.00$ 143,000.00$ 15" Flared End Section EA 5 2,000.00$ 10,000.00$ 18" Flared End Section EA 4 2,300.00$ 9,200.00$ 24" Flared End Section EA 5 2,500.00$ 12,500.00$ PRELIMINARY OPINION OF PROBABLE COST 10/15/2024 1:47 PM Z:\Shared\P\024-00-004 Sandy Lane Assemblage PPLA\01 General Consult & Meetings TMNTE\PPLA OPC for subdivision performance bond\OPC_all project_arb.xlsx OPC_all project_arb.xlsx 7 of 9 Page 994 of 5243 VALENCIA SKY Estimated By: ARB Checked By: MWD STORM DRAINAGE DESCRIPTION UNIT QUANTITY UNIT TOTAL COST PRELIMINARY OPINION OF PROBABLE COST 30" Flared End Section EA 9 3,250.00$ 29,250.00$ 36" Flared End Section EA 12 3,500.00$ 42,000.00$ Control Structure EA 6 5,500.00$ 33,000.00$ Storm Drainage Subtotal 1,415,664.00$ 10/15/2024 1:47 PM Z:\Shared\P\024-00-004 Sandy Lane Assemblage PPLA\01 General Consult & Meetings TMNTE\PPLA OPC for subdivision performance bond\OPC_all project_arb.xlsx OPC_all project_arb.xlsx 8 of 9 Page 995 of 5243 VALENCIA SKY Estimated By: ARB Checked By: MWD PAVING DESCRIPTION UNIT QUANTITY UNIT TOTAL COST 2' Valley Gutter LF 23,772 13.00$ 309,036.00$ Type "D" Curb & Gutter LF 1,170 11.00$ 12,870.00$ Type "F" Curb & Gutter LF 7,229 17.00$ 122,893.00$ 3/4" Type S-111 Asphalt (2nd Lift) SY 37,857 6.50$ 246,070.50$ 1" Type S-111 Asphalt (1st Lift) SY 27,224 8.10$ 220,514.40$ 1-1/4" Type S-111 Asphalt (1st Lift) (AURORA BLVD) SY 10,657 10.13$ 107,955.41$ 6" Limerock Base (LBR 100) SY 27,224 8.50$ 231,404.00$ 8" Limerock Base (LBR 100) (AURORA BLVD) SY 10,657 8.50$ 90,584.50$ 12" Stabilized Subgrade (LBR 40) SY 48,226 3.00$ 144,678.00$ Signage & Pavement Marking LS 1 25,000.00$ 25,000.00$ 2' Sod Strip Behind Curb SY 7,149 2.20$ 15,727.80$ ADA Ramps & Detectable Warnings EA 41 500.00$ 20,500.00$ 5' Wide Sidewalk (4" Thick Concrete) LF 24,577 20.00$ 491,540.00$ Saw-Cut & Match Existing Pavement EA 2 1,500.00$ 3,000.00$ Paving Subtotal $2,041,773.61 PRELIMINARY OPINION OF PROBABLE COST 10/15/2024 1:47 PM Z:\Shared\P\024-00-004 Sandy Lane Assemblage PPLA\01 General Consult & Meetings TMNTE\PPLA OPC for subdivision performance bond\OPC_all project_arb.xlsx OPC_all project_arb.xlsx 9 of 9 Page 996 of 5243