Agenda 04/08/2025 Item #16C6 (Certification of Financial Responsibility as required by FDEP for the renewal of the operating permit for deep injection well system at the Collier County North Regional Water Treatment Plant)4/8/2025
Item # 16.C.6
ID# 2025-893
Executive Summary
Recommendation to approve and authorize the Chairman to sign the Certification of Financial Responsibility, as required
by the Florida Department of Environmental Protection, for the renewal of the operating permit for the deep injection
well system at the Collier County North Regional Water Treatment Plant.
OBJECTIVE: To certify unconditionally to the Florida Department of Environmental Protection (FDEP) the county’s
obligation to perform plugging and abandonment of the deep injection well system at the Collier County North Regional
Water Treatment Plant (NRWTP) pursuant to Chapter 62-528 Florida Administrative Code.
CONSIDERATIONS: The NRWTP provides drinking water to customers throughout the Collier County Water–Sewer
District area. The purpose of the deep injection well at the water treatment plant is to dispose of the concentrate and
odor control blowdown flows produced by various membrane water treatment processes. The permit, which expires
June 15, 2025, is for Injection Well 2 (IW-2) located at the NRWTP.
Location Date of permit
issuance
Date of permit
expiration
Permit No.
NRWTP – 8005 Vanderbilt Beach Road Ext, Naples, FL
34120
June 15,
2020
June 15,
2025
325802-003-UO/1X
The permit renewal application requires the county to complete and execute a Certification of Financial Responsibility
form. This form certifies that the county will be unconditionally obligated to have the financial resources necessary to
close, plug, and abandon the Class I injection well and related monitoring wells. The current plugging and abandonment
cost estimate is $811,266. In the event that the injection well system fails to meet permit conditions, or the well is no
longer required for its intended use, then plugging and abandonment become necessary.
This action is consistent with previous Board of County Commissioners decisions to approve similar requests for the
water treatment plant’s deep injection well system, most recently on December 13, 2022, as Agenda Item 16.C.11.
This item is consistent with the Collier County strategic plan objective to plan and build public infrastructure and
facilities to effectively, efficiently, and sustainably meet the needs of our community. It is further in support of the
Infrastructure and Asset Management Strategic Focus Area’s objective to optimize the useful life of all public
infrastructure resources through proper planning and preventative maintenance.
FISCAL IMPACT: The actual expenditure of funds is not anticipated and would only be required if an injection well
was to be abandoned. Funds to cover these costs, if needed, are maintained in the Reserves for Contingency line item in
the Water Sewer Operating Fund (4008), which is funded through user fees.
GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with executing this
document.
LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney, is approved as to form and
legality and requires majority vote for approval. -JAK
RECOMMENDATIONS: Approve and authorize the Chairman to sign the Certification of Financial Responsibility, as
required by the Florida Department of Environmental Protection, for the renewal of the operating permit for the deep
injection well system at the Collier County North Regional Water Treatment Plant.
PREPARED BY: Christopher Todd-Water Plant Manager
ATTACHMENTS:
Page 2371 of 5277
4/8/2025
Item # 16.C.6
ID# 2025-893
1. Collier County NCRWTP CFR to be signed
2. Collier County NCRWTP P&A Estimate
3. NCRWTP_P&A_Calcs 2025
Page 2372 of 5277
_________________________________
_________________________________
_________________________________
CERTIFICATION OF FINANCIAL RESPONSIBILITY FOR LOCAL GOVERNMENT
______________________________________________________, a unit of local government of
the State of Florida, hereby certifies that it has unconditionally obligated itself to have the
financial resources necessary to close, plug, and abandon its underground injection well(s)
and related monitoring wells, as required by Chapter 62-528, Florida Administrative Code. It
is further understood that the cost estimate to conduct plugging and abandonment,
established on _____________________, shall be updated thirty (30) months after the date
of permit issuance and this obligation shall incorporate accumulated inflation costs. An
increase exceeding 10 percent compared with the amount stated below shall require submission
of an updated certification form.
Injection Wells and Monitoring Wells Covered By This Agreement:
(attach additional sheet if necessary)
Facility Name: _______________________________________________
Facility Address: ____________________________________________________________
Facility Contact: ____________________________________________________________
Phone Number: _____________________________________________________________
Latitude/Longitude of Injection Well(s): _________________________________________
Current Permit Number: _______________________________________________________
Current Plugging and Abandonment Cost Estimate: _________________________________
(total for all injection and monitoring wells)
It is hereby understood that the cancellation of this certification may not take place without
the prior written consent of the Secretary of the Florida Department of Environmental
Protection.
_________________________________ NOTARY: See Next Page
(Signature)
(Print Name)
(Title)
(Date)
1
Page 2373 of 5277
_______________________________________________
_______________________________________________
Notary Form
State of Florida
County of: _________________________
Sworn to (or affirmed) and subscribed before me this ____ day of ______________, ______
by ______________________________________________________________,
(Name of person making statement)
[__] Personally known to me
OR
[__] Produced the following identification ________________________________________
Notary Signature
Print, Type, or Stamp Commissioned Name of Notary Public
Apply Seal of Notary Public below -State of Florida
2
Page 2374 of 5277
Youngquist Brothers, LLC
15465 Pine Ridge Road
Fort Myers, FL 33908
Phone (239) 489-4444
Collier County NCRWTP P&A Estimate 1
February 24, 2025
Leah Palomo, G.I.T.
Geologist
CDM Smith
4000 Ponce de Leon Blvd, Suite 720
Coral Gables, FL 33146
Subject: Collier County North County Regional Water Treatment Plant
8205 Vanderbilt Beach Rd, Naples, FL 34120
RE: Plug & Abandonment Estimate
Injection Well IW-1
Mobilization / Demobilization $ 95,000.00
Kill Well / Remove Wellhead $ 25,000.00
Geophysical Logging $ 17,500.00
F&E Gravel from 3300’ to 2507’ (1730 CF) @ $25/CF $ 43,250.00
F&E Cement from 2507’ to Surface (2865 CF) @ $25/CF $ 71,625.00
Complete Below Ground / Add Monument $ 12,500.00
Subtotal for Injection Well No. 1 $264,875.00
Injection Well IW-2
Mobilization / Demobilization $ 95,000.00
Kill Well / Remove Wellhead $ 25,000.00
Geophysical Logging $ 17,500.00
F&E Gravel from 3210’ to 2508’ (1532 CF) @ $25/CF $ 38,300.00
F&E Cement from 2508’ to Surface (2874 CF) @ $25/CF $ 71,850.00
Complete Below Ground / Add Monument $ 12,500.00
Subtotal for Injection Well No. 2 $260,150.00
Monitor Well DZMW-1
Mobilization / Demobilization $ 25,000.00
Kill Well / Remove Wellhead $ 15,000.00
Geophysical Logging $ 15,000.00
F&E Cement for UMZ & LMZ to Surface (1361 CF) @ $25/CF $ 34,025.00
Complete Below Ground / Add Monument $ 10,000.00
Subtotal for Monitor Well DZMW-1 $ 99,025.00
Subtotal Plugging & Abandonment Cost $624,050.00
15% Contingency $ 93,608.00
Total Estimate for Injection Wells & Monitor Well $717,658.00
Please contact me should you have any questions.
Page 2375 of 5277
Youngquist Brothers, LLC
15465 Pine Ridge Road
Fort Myers, FL 33908
Phone (239) 489-4444
Collier County NCRWTP P&A Estimate 2
Respectfully,
Matthew Young
Matt Young
Contract Administrator
Youngquist Brothers, LLC
Page 2376 of 5277
Table 4.1 Cost Estimate for Plugging and Abandoning IW-1, IW-2 and DZMW-1, Collier County NCRWTP Deep Injection Well System
Cost Item IW-1 Cost Item IW-2 Cost Item DZMW-1
Contractor Mobilization $95,000 Contractor Mobilization $95,000 Contractor Mobilization $25,000
Kill Well, Remove Wellhead $25,000 Kill Well, Remove Wellhead $25,000 Kill Well, Remove Wellhead $15,000
Geophysical Logging (caliper log)$17,500 Geophysical Logging (caliper log)$17,500 Geophysical Logging $15,000
Cement Volume (cubic feet):2,865 Cement Volume (cubic feet):2,874 Upper and Lower Zone Cement Volume (cubic feet):1,361
Cement Cost (cost per cubic feet):$25 Cement Cost (cost per cubic feet):$25 Cement (cost per cubic feet):$25
Cement Cost:$71,625 Cement Cost:$71,850 Casing Cement Cost:$34,025
Aggregate Volume (cubic feet):1,730 Aggregate Volume (cubic feet):1,532
Aggregate (cost per cubic feet):$25.00 Aggregate (cost per cubic feet):$25.00
Aggregate Cost:$43,250 Aggregate Cost:$38,300
Complete below ground/ Add monument $12,500 Complete below ground/ Add monument $12,500 Complete below ground/ Add monument $10,000
Subtotal $264,875 Subtotal $260,150 Subtotal $99,025
Contingency (at 15%):$39,731 Contingency (at 15%):$39,023 Contingency (at 15%):$14,854
Consulting Fees (at 15%)$39,731 Consulting Fees (at 15%)$39,023 Consulting Fees (at 15%)$14,854
Total for Plugging & Abandonment $344,337 Total for Plugging & Abandonment $338,196 Total for Plugging & Abandonment $128,733
Total Estimate for Plugging and Abandoning
Injection Wells IW-1 and IW-2 and one Dual
Zone Monitor Well DZMW-1
$811,266