Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Backup Documents 03/25/2025 Item #16B 8
ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 1 6 8 8 TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. ** ROUTING SLIP** Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1.Jamie Khawaja Transportation Eng Kiaauai xe 03/31/2025 2. 3. County Attorney Office County Attorney Office 4. BCC Office Board of County Commissioners F$4/ Y Z/Z.S 5. Minutes and Records Clerk of Court's Office p14 41?-/?5 q5 ct-PYI PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above may need to contact staff for additional or missing information. Name of Primary Jamie Khawaja/Transportation Contact Info 239-348-1328, Staff Contact/Dept Eng. Jamie.khawaja@colliercountyFL.gov Agenda Date Item Agenda Item was Approved by 03/25/2025 Number 1 6.B.8 the BCC Type of Number of Original Document(s) Change Order-& Cxe�ulive Documents Attached 1 Attached PO No. or account 4500216796 No. if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's signature?(stamped unless otherwise stated) JAK 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A _ provide the Contact Information(Name;Agency;Address; Phone)on an attached sheet. 3. Original document has been signed/initialed for legality. (All documents to be signed by the Chairman,with the exception of most letters,must be reviewed and signed by the JAK Office of the County Attorney.) 4. All handwritten strike-through and revisions have been initialed by the County Attorney N/A Office and all other parties except the BCC Chairman and the Clerk to the Board. 5. The Chairman's signature line date has been entered as the date of BCC approval of the document or the final negotiated contract date whichever is applicable. JAK 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's JAK signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip N/A should be provided to the County Attorney Office at the time the item is uploaded to the agenda. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 03/25/25 and all changes made during N/A is not the meeting have been incorporated in the attached document. The County Attorney JAK an option for Office has reviewed the changes,if applicable. this line. 9. Initials of attorney verifying that the attached document is the version approved by the N/A is not BCC,all changes directed by the BCC have been made,and the document is ready for the JAK an option for Chairman's signature. this line. I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04;Revised 1.26.05;2 24.05; 1 1/30/12,4/22/16;9/10/21 16 8 8 a4 Ter County Procurement Services Change Order Form Contract# 20-7811 CO#4 PO# 4500216796 Project#: 33563 Project Name: Immokalee Area Improvements-Tiger Grant(Design Build) Contractor/Consultant Name: Quality Enterprises USA Inc. (QE) Select One: 0 Contract Modification (Construction or Project Specific) ❑Work Order Modification Project Manager Name: Jamie Khawaja Division Name: Transportation Engineering Services Original Contract/Work Order Amount 522,869,280.20 02/08/2022;118 Original BCC Approval Date;Agenda Item# Current BCC Approved Amount 622,886,658.04 01/14/2025;16.8.10 Last BCC Approval Date; Agenda Item# Current Contract/Work Order Amount 522,886,658.04 05/27/2025 SAP Contract Expiration Date(MASTER) Dollar Amount of this Change 650,446.78 0.30% Total %Change from Original Amount Revised Contract/Work Order Total $22,037,104.82 0.22% %Change from Current BCC Approved Amount Total Cumulative Changes $67,824.62 0.22% %Change from Current Amount Notice to Proceed Original NTP Original Final II Last Final 03/16/2022 g 800 g 05/24/20?_4J 05/27/2025 Date #of Days Completion Date ��JJ Approved Date #of Days Added Revised Final Date Current Substantial Completion Date 0 (includes this change) NA (if applicable) 03/28/2025 Provide responses after each question in box below (Responses should be brief and specific). Attach additional information and/or documentation from the Design Professional and/or Contractor, if needed, with your submission of this Change Order and complete summary on next page. Check all that apply to this Change Order request: ❑Add Time; ❑✓ Add funds; ❑ Use of Allowance; ( ❑✓ Modify/Delete existing Task(s); ❑Add new Task(s); El Reallocate funds; ❑Other(must be explained in detail below) 1.) This change will add 13 additional driveway adjustments (to reconstruct the portion from the road to the back of the County right-of-way) in project area 4 for $134,221.64. Remove aluminum canopy at the CAT bus transit station for a deduction of$83,774.86 towards the Federal Grant. 2.) N/A 3.) The addition of 13 driveway adjustments is due to new construction of homes & driveways that were built after the conceptual plans & initial survey were completed on 04/26/2021, & incorporated in the request for proposal (RFP) design criteria package opened for bids on 07/01/2021. These additional newly constructed homes & driveways directly impact the tie-in points to the County's right of way and need to be adjusted to match grade lines. The Aluminum Canopy at the CAT transfer station is being removed due to maintenance concerns, the county has encountered issues at other locations with similar designs. Therefore due to the time constraints of this grant project the county will seek to complete this at a later time with an improved/updated design. 4.) If the driveway adjustments & canopy deletion are not approved, the final sidewalk will not be leveled and straight and it would not meet ADA standards in some locations. The Grant Agreement could be terminated by the Federal Highway Administration (FHWA) for not meeting ADA standards and time constraints. Page 1 of 4 Change Order Form(2023_ver.1) CAS) ga Co r County Procurement Services Change Order Form Contract# 20-7811 CO#4 PO# 4500216796 Project#: 33563 Project Name: Immokalee Area Improvements-Tiger Grant (Design Build) Contractor/Consultant Name: Quality Enterprises USA Inc. (QE) Change Order/Amendment Summary (If additional spaces needed, attached a separate Summary page to this amendment request) COST TIME CO# AMD# Description Additive Deductive Days Total New Justification (+) (-) Added Time Add 237 Days Days needed to complete 1 237 1037 project CC Permit Fee Reimburse Collier County Reimbursement & permitting fees paid by 2 + 64 days $17,377.84 64 1101 subcontractor Grady Minor&add days needed to complete project add 67 days Days needed to complete 3 67 1168 project Additional driveway Add driveways needed to meet construction ADA standards along sidewalks. 4 reimbursement & credit $50,446.78 0 1168 Remove canopy at the CAT bus for deletion of CAT station due to maintenance station canopy concerns. ❑Check here if additional summary page/s are attached to this Change Order Page 2 of 4 Change Order Form(2023_ver.1) CA(_) Co r County 16B8 Procurement Services Change Order Form Contract# 20-7811 co#4 Po# 4500216796 Project#: 33563 Project Name: lmmokalee Area Improvements- Tiger Grant (Design Build) Contractor/Consultant Name: Quality Enterprises USA Inc. (QE) Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above, as fully as if the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Contractor/Consultant/Design Professional signature below must be from an authorized person/officer/director of the Company or listed as the qualified licensed Professional "Project Coordinator"or Design/Engineer Professional under the agreement. Signature authority of person signing will be verified through the contract OR through the Florida Department of State, Division of Corporations (Sunbiz) website (https://dos.mvflorida.com/sunbiz/search/). If the person signing is not listed, we will require signature authority by one of the listed officers/directors of the company giving that person signature authority. Opal,e9M q tMnu.4.vhex ThomasMatthew n, u.C.. .Icrgamv. pHu,.,lo...v., .a,.,,., ,,t,., ryu a,evoeu rn CC.ErvJnee..m onr�unw a.,uva v.� erte aum•iD.Du.a wea Prepared b "'°"° "`gve""'�" p Y: Dw roan.,,(t„t,�Cp Date: Signature-Division Project Manager .Jamie Khawaja,Project Manager II,Transportation Engineering Printed Name Accepted by: Date: Signature-Design/Engineer Professional(if applicable) N/A Printed Name/Title/Company Name Accepted by: LOU Gaudio Digitally signed by Lou Gaudio Date:2025.03.11 08:54:47-04'00' Date: Signature-Contractor/ConsultantNendor Louis Gaudio,Vice President,Quality Enterprises USA Inc. Printed Name/Title/Company Name ThomasMatthew thefIl .,<., .,��k �D,,..,,.,t�...,. anoe O.O..eO Ml bJ•GV D CV ln.u.spr iwa.vM OU-Gnyrvim•M N.Yw.ww.OU W VD. Approved b : Oft701<n,x.trc Dnaauy pp Y DMe]0„oS„�3,3,aYD, Date: Signature-Division Manager or Designee(Optional) Matthew Thomas P.E.,Supervisor of Project Management,Transportation Engineering Printed Name Digitally signed by AhmadJay AhmadJay Date:2025.03.1110:09:55-04'00' Approved by: Date: Signature-Division Director or Designee(Optional) Jay Ahmad P.E.,Division Director,Transportation Engineering Printed Name ,(1 Digitally signed by ScottTrinity Dale:2025 Dale:2025.03.11 Approved by: 10:58:15-04'00' Date: Signature-Division Administrator or Designee(Optional) Trinity Scott,Dept Head,Transportation Management Services Dept. Printed Name Page 3 of 4 Change Order Form(2023_ver.1) Cater CountyProcurement Services Change Order Form Contract# 20-7811 CO#4 Po# 4500216796 Project#: 33563 Project Name: Immokalee Area Improvements -Tiger Grant (Design Build) Contractor/Consultant Name: Quality Enterprises USA Inc. (QE) FOR PROCURMENT USE ONLY FY25 CHO Request# 609 Bowden Stephan*e Digitally signe2025.03.1d 2 by16 BowdenStephanie:18:18-0400' ' Approved by: Signature-Procurement Professional Signature/Date Approved by: Signature-Procurement Manager/Director(OPTIONAL) APPROVAL TYPE: ❑ Administrative X Administrative-BCC Report ❑ BCC Stand-Alone ES (BCC Approval Required) BCC APPROVAL ATTEST: Crystal K. Kinzel, Clerk of the Circuit Court BOARD OF COUNTY COMMISSIONERS and Comptroller COLLIER COUNTY, FLORIDA `/A By9j1W-1 �����11i� J " Attest as , s Burt L. Saunders Deed: 09 02, 2.0240. signature only Chairman • , • , Date: 03/2S/25 '4 (SEAL) Agenda# 'C 63 • sad • Ap roved a Fo d egalit G Deputy County Attorney � fQTStL �► � Print Name Page 4 of 4 Change Order Form (2023_ver.1) t..� 16R8 4' Pr-I ',-7:1 r-o al o o rt --. 61 0 0 4 c,i rl kro 13 1 'El 1 1 , I .4•'. . . . — . , A i 111111111111 111 , 3 3 3 73 3 3 > 3 3 3 3 3 3 a) a) a., aa a) LI ria a> al ea a.) ..) c.) > ' > > > > > > > > > 'C C *C 'C 'C .s C .g .LI. .a .c .c •cE ::;, cin cln a m a Iona cn ''AI. :,..2-2..'.-.r;.. 4'a'i ',_P-.,4..*,_.:.'1,0...3 :'.A 6 .3 .<.-.... ,. :--;1•4.• .8,i,2 -i du•s. ,T 6.,,, .. .'o,',. di u() .•3 .c:.;0.1 .r 88 1a; 8 ; : i8 . 88 : ; 8 <: 0 a oiz oi : ii :a < e i: .4 e - p e :e . f) a. n ) t : t . 00 - t" : 4 ; ; - 4 f 4g 10 3 3go4d gi g . , . : g . `' 000 . . o a ::. 0 1:1 •,.. 0 ...-'Col en Ca .- cv 0 (CC, ,o N 00 , - - -. .- CA 0 QUALITY ENTERPRISES USA,INC. Job 9 14322-01 DB IMMOKALEE TIGER GRANT Rates Dale 01/14/25 Work Directive Change f)2-101 Madison Ave Driveway ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personnel Corporate Officer HR $150.00 $195.00 $0.00 $0.00 $0.00 Project Manager HR $125.00 $162.50 $0.00 $0.00 $0.00 Superintendent' HR $85.00 $110.50 $0.00 $0.00 $0.00 Foreman HR $65.00 $110.50 10 $850.00 $0.00 $850.00 Mechanic,Equipment$Truck Operator HR $75.00 $97.50 10 $750.00 :$0.00 $750.00 Laborer HR $55,00 $71,50 40 $2,200.00 $0,00 $2,200.00 Administrative HR $75.00 $97,50 $0.00 $0.00 $0.00 Eau foment, Excavator>Cat 349 HR $250.00 $0.00 $0,00 $0.00 Excavator>Cal 320 HR $200.00 $0.00 $0.00 $0.00 Excavator<Ca1320 HR $150.00 101. $1,500.00 $0,00 $1,500,00 Excavator wlhemmer/Epiroc HR 5350.00 $0.00 $0.00 $0,00 Excavator wlside grip vibratory hammer HR $350.00 $0,00 $0,00 $0.00 Wheel Loader>Cat 962 HR $225.00 $0.00 $0.00 $0.00 Wheel Loader>Cat 938 HR- $175.00 $0.00 $0.00 = $0.00 Wheel Loader<Cat 938 HR $150.00 10 $1,500.00 $0,00 $1,500,00 Bull Dozer HR $175.00 $0.00 $0.00 $0.00 Motor Grader HR $175.00 $0.00 $0.00 $0.00 Soil/Stone Roller HR` $125.00 $0.00 $0.00 : $0.00 Telehandler HR $125.00 $0.00 $0.00 $0.00 Manlift ... '.HR $125.00 - $0.00 $0.00 -:$0.00 Forklift HR $100,00 $0.00 $0.00 $0.00 Broom Tractor HR $95.00 $0.00 $0,00 $0.00. Milling Machine HR $685.00 $0.00 $0.00 $0,00 Skid steer with milling head(bump grinder) HR $150.00 $0.00 $0.00 $0.00 Asphell/Mat.Shullle Buggy HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver Weiler 388 HR $375,00 $0,00 .:$0,00 -::.:$0.00'. Asphalt Paver Cat 1055 FIR $575.00 $0.00 $0.00 $0.00 Asphalt Roller . ... FIR `$125.00 $0.00 $0,00 '.f$0.00 Off Road Dump HR 5250.00 $0.00 $0.00 $0.00 Crane>130ton HR $1,500.00 $0.00 $0,00 $0.00 Crane>30 ton HR $500,00 $0.00 $0.00 $0.00 Crane<30 ton HR $250,00 $0.00 $0.00 $0.00'. Vibratory Hemmer HR $400.00 $0.00 $0.00 $0.00 Concrete Crusher.', . .. HR `:.$685,00 $0,00 $0.00 $0,00. Screener HR $375.00 $0.00 $0.00 $0.00 Push Boat HR e'. $276,00 $0,00 $0.00 $0.00. SectionalMopper Barge HR $175.00 $0.00 $0.00 $0,00 Drone War Photogrammetry '. HR $350.00 $0.00 $0.00 i$0.00 Directional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0.00 Directional Drill AA 440 HR $4,000.00 $0.00 $0.00 $0.00 Lowboy/Tractor HR $175.00 $0.00 $0.00 $0.00. Dump Truck/Roll Off HR $95,00 $0,00 $0.00 $0,00 WaterTruck/Traiter HR $125.00 $0.00 $0.00 $0.00 Tackl?rime Truckfrraller HR $150,00 $0.00 $0.00 $0.00 Lube/MechanlcaTruck HR $125,00 $0.00 $0.00 $0.00 Truck with Hand Tools HR $95.00 10 $950.00 $0.00 $950.00 Pickup HR $40,00- $0,00 $0,00 $0,00 Camera Truck HR $400.00 $0.00 $0,00 $0,00 Vacuum Truck HR` $475.00 $0.00 $0.00 $0.00 Small Equipment $0.00 Air Compressor with Hammer` HR $80.00 $0.00 $0,00 $0,00 Concrete Saw HR $60.00 $0.00 $0.00 $0.00 Plate Compactor HR $60.00 $0.00 $0.00 . $0.00 Trench Box 16'x 10' HR $50.00 $0.00 $0.00 $0,00 Stone Box HR' $50,00 $0.00 $0.00 $0,00 Steel(Road)Plate HR $50.00 $0.00 $0.00 $0.00 WellpolntSystem-..` -HR $250.00 $0.00 .1$0.00 ;:$0.00 3"Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0.00 6"Hydraulic Pump HR $150,00 $0,00 $0.00 $0.00 12"Hydraulic Pump HR $200.00 $0,00 $0.00 $0.00 Cut Off Sew HR $20.00 $0.00 $0.00 $0.00 Light Set HR $50.00 $0.00 $0.00 $0.00 Generator/Welder '. HR $50.00 $0.00 $0.00 $0.00 Generator70kw HR $125.00 $0.00 $0,00 $0,00 Generator 125kw HR $150.00 $0,00 $0,00 $0,00 MOT HR $160.00 $0.00 $0.00 $0.00 Fusing Machine 2.18" HR $150.00 $0.00 $0.00 $0.00. Fusing Machine 18"-42" HR $300.00 $0.00 $0.00 $0.00 Tap Machine-small(3/4"-3") each tap EA ` $750.00 $0.00 . $0.00 $0.00. Tap Machine-large(4"-12") each tap EA $1,000.00 $0.00 $0.00 $0,00 Pipe Trenchless Piercing tool HR ' $250,00 $0,00 $0.00 '$0.00 Pipe Ramming HR $825.00 $0.00 $0.00 $0.00 Material Disposal Fee(concrete,asphalt,debris,etc) PER LOAD $500.00 $0.00 $0.00 $0.00 QEC-4000 PSI Concrete CY $181.00 6.97 $981.17 $0.00 $961.17 Fuel Surcharge EA $40.00 1 $40.00 $0.00 $40.00 Environmental Charge EA $30.00 1 $30.00 $0.00 $30.00 Tax LS $57,87 1 $57,67 $0.00 $57.87 Grand Total: $8.838.84 (.AO QUALITY ENTERPRISES USA,INC. Job# 14322-01 DB IMMOKALEE TIGER GRANT Rates Date 11/19/24 Work Directive Change#2-105 Madison Ave Driveway ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personnel Corporate Olticer HR $150.00 $195.00 $0.00 $0.00 $0.00 Project Manager HR $125.00 $162.50 $0.00 $0.00 $0.00 Superintendent HR` $85.00 $110.50 $0.00 $0.00 $0.00 Foreman HR $85.00 $110,50 8 $680.00 $0.00 $680.00 Mechanic,Equipment&Truck Operator HR $75.00 $97.50 8 $600.00 $0.00 $800.00 Laborer HR $55.00 $71.50 32 $1,760.00 $0,00 $1,760.00 Administrative HR $75.00 $97.50 $0.00 $0.00 $0.00 i 1 Eautament Excavator>Cat 349 HR $250.00 $0.00 $0,00 $0.00 Excavator>Cat 320 HR $200.00 $0.00 $0.00 $0.00 Excavator<Cat 320 HR $150,00 B" $900.00 $0.00 $900,00` Excavator w/hammer/Epiroc HR $350.00 $0.00 $0.00 $0.00 Excavator wlside grip vibratory hammer HR $350,00 $0.00 $0.00 ;$0.00 Wheel Loader>Cat 962 HR $225.00 $0.00 S0.00 $0.00 Wheel Loader>Cat 938 HR $175,00 $0.00 $0.00 $0.00 Wheel Loader<Cat 938 HR $150.00 6 $900.00 $0.00 $900.00 Bull Dozer HR $175.00 $0.00 $0.00 $0.00 Motor Grader HR $175.00 $0.00 $0.00 $0.00 Soil/StoneRoller .:. HR $125.00 .. -. ;$0.00 :':$0.00 `:$0.00 Telehandler HR $125.00 $0.00 $0.00 $0.00 Mantel HR' - '..$125.00 _.. ,-'.$0.00 :($0.00 -:$0.00 Forklift HR $100.00 $0.00 $0.00 $0.00 Broom Tractor HR $95.00 $0.00 $0.00 $0.00 Milling Machine HR $685,00 $0,00 $0.00 $0,00 Skid steer with milling head(bump'grinder) HR $150.00 $0.00 $0.00 $0.00 Asphalt/Mat.Shuttle Buggy HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver Weller 385 HR $375.00 $0.00 $0.00 $0,00 Asphalt Paver Cat 1055 HR $575.00 $0.00 $0.00 $0.00 Asphalt Roller HR $125,00 $0.00 $0.00 $0.00'. Off Road Dump HR $250,00 $0.00 $0.00 $0.00 Crane>130 ton . HR $1,500.00 $0.00 $0.00 $0,00' Crane>30 ton HR $500.00 $0.00 $0.00 $0.00 Crane<30 tan - HR $250,00 $0.00 $0,00 $0.00 Vibratory Hammer HR $400.00 $0.00 $0.00 $0.00 Concrete Crusher:fa HR '. $885.00 - `.:$0.00 ..i$0.00 >:.$0.00 Screener HR $375.00 $0.00 $0.00 $0.00 Puah Boat HR $275.00 $0.00 $0,00 $0,00 SectlonatlFlopperBarge HR $175.00 $0.00 $0.00 $0,00 Drone Lldar Photogrammetry HR $350,00 $0.00 $0,00 $0,00` Directional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0.00 Directional Drill AA 440 _ HR >. $4,000.00 $0,00 :$0.00 $0.00 Lowboy/Tractor : HR .`$175,00 r:$0.00 :'.$0.00 :.`$0,00 Dump TruckdRoil Oft HR $95.00 $0.00 $0.00 $0.00 WaterTruckliraller HR $125.00 $0.00 $0.00 $0.00 Tack/PrimeTruck/Traler HR $150.00 $0.00 $0.00 $0.00 LubelMechanicsTruck 1-IN $125.00 $0.00 $0.00 $0.00 Truck with Hand Tools HR $95.00 8 $780.00 $0.00 $760.00 Pickup HR $40.00 $0,00 $0A0 $0,00. Camera Truck HR $400.00 $0.00 $0.00 $0,00 �'. Vacuum Truck HR -. $475.00 .. J$0,00: $0.00 .:$0.00 II Small Equipment $0.00 Air Compressor with Hammer` HR $60.00 $0,00 $0.00 $0.00 Concrete Saw HR $80.00 2 $120.00 $0.00 $120.00 Plate Compactor':: HR $60.00 4 $240.00 $0.00 $240.00 Trench Box 16'x 10' HR $50.00 $0.00 $0.00 $0.00 is Stone Box HR $50.00 $0.00 $0.00 $0.00 Steel(Road)Plate HR $50.00 $0.00 $0.00 $0.00 WaltpalntSystem.` HR -: $250,00 $0.00 $0.00 $0,00 3"Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0.00 6''Hydraulic Pump HR $150,00 $0.00 S0.00 $0.00 12"Hydraulic Pump HR $200.00 $0.00 $0.00 $0.00 Cut Off Saw : HR $20.00 " $0.00 $0.00 $0.00 Light Set HR $50.00 $0.00 $0.00 $0.00 Generator/Welder` HR $50.00 $0.00 $0.00 $0.00 Generator 70kw HR $125.00 $0.00 $0.00 $0.00 Generator 125kw HR $150,00 $0,00 $0.00 $0,00 MOT HR $150.00 $0.00 $0.00 $0.00 r Fusing Machine 2.16" HR $150.00 $0.00 $0,00 $0,00 Fusing Machine 18"-42" FiR $300.00 $0.00 $0.00 $0.00 Tap Machine•small(314"-3") each tap EA $750.00 $0.00 :$0,00 $0.00 Tap Machine-large(4"-12") each lap EA $1,000.00 $0.00 $0.00 $0.00 Pipe Trenchless Piercing tool HR $250.00 $0.00 $0.00 $0.00 Pipe Ramming HR $625,00 $0.00 $0.00 $0.00 Malaria) Disposal Fee(concrete,asphalt,debris,etc) :::-PER LOAD $500.00 - :-$0.00 -::.$0.00 $0.00 QEC-4000 PSI Concrete CY $161.00 6,3 $1,014.30 $0.00 $1,014.30 Fuel Surcharge-- EA . : $40.00 -:1: $40.00 ::$0.00 : $40.00 Environmental Charge EA $30.00 1 $30.00 $0.00 $30.00 Tax LS $60.88 1 $60,86 $0.00 $80.80 Grand Total: $7,105.16 CA I I 16B8 ..4 QUALITY ENTERPRISES USA,INC, Job k 14322-01 DB IMMOKALEE TIGER GRANT Rates Date 11/20/24 Work Directive Change it2-105 Madison Ave Driveway ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personnel Corporate Officer` HR $150.00- - .$195.00 $0,00 > $0,00 :.$0,00 Project Manager HR $125.00 $162.50 $0.00 $0.00 $0.00 Superintendent HR $85.00 $110.50 " $0.00 $0,00 $0,00 Foreman HR $85,00 $110,50 2 $170.00 $0.00 $170.00 Mechanic,Equipment&Truck Operator HR $75.00 $97.50 2 $150.00 $0.00 $160.00 Laborer HR $55.00 $71,50 16 $880,00 $0.00 $880.00 Administrative HR $75.00 $97.50` $0.00 $0,00 $0.00 Equipment Excavators Cat 349 HR $250.00 $0.00 $0,00 $0,00 Excavator>Cat 320 HR $200.00 $0.00 $0.00 $0.00 Excavator<Cat 320 HR :::$160.00 $0,00 ;$0,00 '::$0,00: Excavator w/hemmer/Epiroc HR $350.00 $0.00 $0.00 $0.00 Excavator w/side grip vibratory hammer HR $350.00 $0.00 S0.00 $0.00 Wheel Loader>Cat 962 HR $225.00 $0.00 S0.00 $0.00 Wheel Loader>Cat 938 HR $175.00 $0.00 $0.00 $0.00 Wheel Loader<Cat 938 HR $150.00 $0.00 $0.00 $0.00 Bull Dozer HR $175,00 $0.00 $0.00 $0,00 Motor Grader HR $175,00 $0,00 $0.00 $0.00 Soil/Stone Roller HR $125.00 $0.00 $0.00 -$0,00 Telehendler HR $125.00 $0.00 $0.00 $0.00 Manlifl HR - $125.00 - - -$0.00 $0.00 $0.00 Forklift HR $100.00 $0.00 $0.00 $0.00 Broom Tractor HR $95.00 $0.00 $0.00 $0.00 Milling Machine HR 5685.00 $0.00 $0.00 $0.00 Skid steer with milling head(bump grinder) HR $150.00 $0.00 $0.00 $0,00. AsphelUMat.Shutlle Buggy HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver Weiler 385 HR $375,00 $0.00 $0,00 $0.00. Asphalt Paver Cat 1055 HR $575.00 $0.00 $0.00 $0.00 Asphalt Roller HR -.'. '::$125.00 _ r:$0.00 $0,00 $0.00 Off Road Dump _ HR $250.00 $0.00 $0.00 $0.00 Crane>1301on HR $1,500.00 $0,00 $0.00 $0.00 Crane>30 ton HR $500.00 $0.00 $0.00 $0.00 Crane<30 ton HR $250.00 $0,00 $0.00 $0,00 Vibratory Hemmer HR $400.00 $0.00 $0.00 $0.00 Concrete Crusher HR $686,00 $0,00 $0,00 $0.00 Screener HR $375,00 $0.00 $0.00 $0.00 Push Boat HR $275.00 $0,00 $0,00 $0,00 Sectional/HopperBarge HR $175,00 $0.00 $0,00 $0.00 Drone Lider Photogrammelry HR $360,00 $0.00 $0.00 $0.00 Directional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0.00 Directional Drill AA 440 HR $4,000.00 i $0,00 $0.00 $0.00 Lowboy/Tractor HR $175,00 $0.00 $0.00 $0.00 Dump Truck/Roll Off HR $95.00 $0.00 $0.00 $0.00 WaterTruck/Trailer HR $125.00 1$0.00 $0.00 $0.00 Tack/PrimeTruck/Trailer HR $150.00 $0.00 $0.00 $0.00 Luba/Mechanics Truck HR $125.00 $0.00 $0.00 $0.00 ( Truck with Hand Toots HR $95.00 2 $190.00 $0.00 $190.00 Pickup -il: HR .:::$40.00 _.$0.00 _.:.$0.00 $0,00. Camera Truck HR $400,00 $0.00 $0.00 $0.00 Vacuum Truck HR $475.00 $0.00 ':$0.00 $0.00 Small Equipment $0.00 Air Compressor with Hammer. HR $60,00 $0.00 $0,00 $0,00 Concrete Saw HR $80.00 $0.00 $0.00 $0.00 Plate Compactor HR $60.00 $0.00 $0,00 :`.$0.00 Trench Box 16'x 10' HR $50.00 $0.00 $0,00 $0.00 Stone Box HR $50.00 $0.00 $0.00 $0.00 Steel(Road)Plate HR $50.00 $0.00 $0.00 $0.00 Wellpolnt System HR $200.00 $0.00 $0.00 $0.00 3"Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0.00 6 Hydraulic Pump HR $150,00 $0,00 $0.00 $0,00 12"Hydraulic Pump HR $200.00 $0.00 $0.00 $0.00 Cut Off Sew HR $20.00 $0.03 $0.00 $0.00 Light Set HR $50.00 $0.00 $0.00 $0.00 Generator/Welder HR-:` :$50,00 .. `,$0.00 $0.00 '$0,00: Generator 70kw HR $125.00 $0.00 $0.00 $0.00 Generator 125kw HR $150.00 $0.00 $0.00 $0,00 MOT HR $150.00 $0.00 $0,00 $0.00 Fusing Machine 2.16" HR $160.00 $0.00 . $0.00 ...`$0,00 Fusing Mechina 18".42" HR $300.00 $0.00 $0.00 $0.00 Tap Machine-small(3/4"-3") .each tap EA $750.00 $0,00 $0.00 $0.00 Tap Machine-large(4"-12") each tap EA $1,000,00 $0.00 $0.00 $0.00 Pipe Trenchleee Piercing tool HR $250,00 $0.00 $0.00 $0.00 Pipe Ramming HR $625,00 $0.00 $0.00 $0.00 Material Disposal Fee(concrete,asphalt,debris,etc) PER LOAD - $500.00 . $0.00 $0.00 :. $0.00. QEC-4000 PSI Concrete CY $161.00 6.3 $1,014.30 $0.00 $1,014.30 Fuel Surcharge` EA $40.00 1 $40.00 $0.00 $40.00 Environmental Charge EA $30.00 1 $30.00 $0.00 $30.00 Tax LS $60.86 1 $60,86 $0.00 $60.86 Grand Total: $2,535.16 Crh O.) QUALITY ENTERPRISES USA,INC, Job A 14322-01 1 6 8 8 DB IMMOKALEE TIGER GRANT Rates Data 11/20124 Work Directive Change#2-107 Dixie Ave Driveway ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personnel i Corporate Officer HR $150.00 -.:$195,00 $0.00 f.$0.00 ::$0.00 Project Manager HR $125,00 $162,50 $0.00 $0.00 $0.00 Superintendent :HR - .$85,00 :-:.$110.60 $0.00 ::`.$0.00 Ca:$0,00 Foreman HR $85.00 $110.50 8 $680.00 $0.00 $880,00 Mechanic,Equipment 8 Truck Operator . :`.HR .,.$75.00 ...$97.50 8 :: $600.00 �;.$0.00 ::$600.00 Laborer HR $55,00 $71.50 32 $1,750.00 $0.00 $1,760.00 Administrative HR $75.00 $97.60 $0.00 $0.00 $0.00 Eautomen( Excavator>Cal 349 HR $260A0 $0,00 $0.00 $0,00 Excavator>Cal 320 HR $200.00 $0.00 $0.00 $0.00 Excavator<Cat 320:. 1HR $160.00 ' 6 '.$900.00 $0.00 $900.00 Excavator wframmer/Epiroc HR $350,00 $0.00 $0.00 $0.00 Excavator w/aide`grip vibratory hammer HR $350,00 $0.00 $0.00 $0.00 Wtreel Loader>Cat 982 HR $225.00 $0,00 $0.00 $0.00 Wneel Loader>Cat938 HR $176,00 $0.00 $0.00 $0.00 Wheel Loader<Cat 938 HR $150.00 6 $900.00 $0.00 $900.00 Bull Dozer HR $175.00 $0.00 $0.00 $0.00 Motor Grader HR $17590 $0.00 $0.00 $0.00 Soo/StonaRoger :` FIR $125.00 $0,00 $0.00 $0.00 Telehandler HR $125.00 $0.00 $0.00 $0.00 Manllft` HR $125.00 $0.00 $0.00 $0,00. Forklift HR $100.00 $0.00 $0.00 $0.00 Broom Tractor %'HR $95.00 $0,00 $0.00 $0.00 Milling Machina FIR $685.00 $0.00 $0.00 $0.00 Skid steer with milling head(bump grinder) �' _.. ';`HR (.'$150,00 $0,00 $0.00 :$0,00 Asphelt/Mat.Shuttle Buggy HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver Welter385 HR $375.00 $0.00 $0,00 $0,00 Asphalt Paver Cat 1055 HR $575.00 $0.00 $0.00 $0,00 Asphalt Roller HR $126.00 $0.00 $0,00 $0,00 Off Road Dump HR $250.00 $0.00 $0.00 $0.00 Crane>130 ton HR $1,500.00 $0,00 7$0,00 $0,00 Crane>30 ton HR $500.00 $0.00 $0.00 $0.00 Crane<30 ton HR $260.00 $0,00 $0,00 $0.00 Vibratory Hammer HR $400.00 $0.00 $0.00 $0.00 Concrete Crusher:`... _. HR 1-:$685.00 .. : $0,00 :I'50,00 :::'$0.00 Screener HR $37500 $0,00 $0.00 $0.00 Push Baal HR $275.00 $0.00 $0.00 $0,00 Sectional/Hopper Barge HR $175.00 $0.00 $0.00 $0.00 Drone Ltdar:PhologrammaUy. :; HR $350.00 $0.00 $0,00 $0,00 Directional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0,00 Directional Drill AA 440 HR $4,000.00 $0,00 $0,00 $0,00 Lowboy/Tractor HR *175,00 $0,00 $0.00 $0,00 Dump Truck/Roll OH HR $95.00 $0.00 $0.00 $0,00 WaterTruck/Trailer` FIR $125.00 $0.00 $0.00 $0.00 Tack/PrIme Truck/Traller HR $150,00 $0.00 $0.00 $0.00 Lube/MechanlcaTruck HR $125,00 $0,00 -;:$0,00 ::$0.00 Truck with Hand Toots HR $95.00 8 $780.00 $0.00 $780.00 Pfckup HR $40.00 $0.00 $0,00 $0.00 Camera Truck HR $400.00 $0.00 $0.00 $0.00 Vacuum Truck - HR .. $475.00 - . $0.00 $0,00 `.$0,00 Small Equipment $0,00 Air Compressor with Hammer :HR $80.00 . $0.00 -$0,00 '::$0,00 Concrete Saw HR $60,00 2 $120.00 $0.00 $120.00 Plate Compactor HR $60,00 4 $240.00 $0,00 $240.00 Trench Box 16'x 10' HR $50.00 $0.00 $0.00 $0.00 Stone Box - HR :i.$50,00. $0.00 :'..$0.00 -:.::$0.00 Steel(Road)Plate HR $50.00 $0.00 $0.00 $0.00 Wellpoint System HR $260.00 $0,00 $0.00 $0,00 j'. 3"Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0.00 6 Hydraulic Pump HR $150.00 $0,00 $0,00 $0,00 12"Hydraulic Pump HR $200,00 $0.00 $0.00 $0.00 Cut Off Sew HR $20,00 $0,00 $0.00 $0,00 Light Set HR $50.00 $0.00 $0.00 $0,00 Generator/Welder` HR $50.00 $0,00 $0.00 $0,00 Generator70kw HR $125.00 $0.00 $0.00 $0.00 Generator 125kw < ':.HR ::' '$150.00 $0.00 :`$0,00 - ::f$0.00 MOT HR $150.00 $0.00 $0,00 $0,00 Fusing Machine 2-18" HR $160.00 $0.00 $0,00 $0,00 Fusing Machine 18"-42" HR $300.00 $0.00 $0.00 $0.00 Tap Machine-small(3/4"-3") each lap EA $750.00 $0.00 $0.00 $0.00 Tap MaclUne-large(4".12') each lap EA $1,000.00 $0.00 $0,00 $0.00 PipeTrenchieso Piercing tool HR $250.00 $0.00 $0,00 $0,00 Pipe Ramming HR $625.00 $0.00 $0.00 $0,00 Material Disposal Fee(concrete,asphalt,debris,etc)' PER LOAD $500,00 $0.00 $0,00 .' $0.00 QEC-4000 PSI Concrete CY $161.00 $0,00 $0.00 $0.00 Fuel Surcharge ` EA $40,00 $0.00 $0.00 $0,00 Environmental Charge EA $30.00 $0.00 $0.00 $0.00 Tax LS $0,00 $0.00 $0.00 $0,00 Grand Total: $5,980.00 CA(..) 16B8 QUALITY ENTERPRISES USA,INC, Job# 14322-01 DO IMMOKALEE TIGER GRANT Rates Dale 11/21/24 Work Directive Change#2-107 Dixie Ave Driveway ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personnel Corporate Officer HR $150.00 $195.00 $0,00 $0.00 $0.00 Project Manager HR $125.00 $182.60 $0,00 $0.00 $0.00 Superintendent HR $85.00 $110.50 $0,00 $0,00 $0.00 Foreman HR $85.00 $110,50 f., $425.00 $0,00 $425.00 Mechanic,Equipment&Truck Operator ( HR $75.00 $07.60 5 $375.00 $0.00 :$375.00 Laborer HR $55.00 $71.60 20 $1,100.00 $0.00 $1,100.00 I Administrative HR $75.00 $97.50 $0.00:' $0.00 $0.00 Equipment Excavator>Cat 349 HR $250.00 $0,00 $0,00 $0,00 Excavator?Cat320 HR $260,00 $0.00 $0.00 $0.00 Excavator<Cat 320 HR $150.00 $0.00 $0.00 $0,00 Excavator w/hammer/Epirac HR $350.00 $0.00 $0.00 $0.00 Excavator w/side grip vibratory hammer HR $350,00 $0.00 r $0.00`'. $0.00 Wheel Loader>Cet 982 HR $225.00 $0.00 $0.00 $0,00 Wheel Loader>Cat 938 HR $175.00 $0.00 $0,00 $0.00: Wheel Loader<Cat 938 HR $150,00 $0.00 $0.00 $0.00 Bull Dozer HR $175.00 $0,00 $0,00 $0,00 Motor Grader HR $175.00 $0.00 $0.00 $0.00 Soil/Stone Roller '` HR $125.00 $0.00 $0,00 $0.00 Telehendler HR $125.00 $0.00 $0.00 $0.00 Manlift ` HR $125,00 $0,00 $0,00 $0,00 Forklift HR $100,00 $0.00 $0,00 $0.00 Broom Tractor HR $95.00 $0.00 $0.00 $0.00 Milling Machine HR $685.00 $0,00 $0.00 $0,00 Skid steer with milling head(bump grinder) HR $150.00 $0,00 $0.00 $0,00 Asphalt/Mal.Shuttle Buggy HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver Weller 385 HR $375.00 $0.00 `. $0,00 $0.00 Asphalt Paver Cat 1055 HR $575.00 $0.00 $0.00 $0.00 Asphalt Roller HR .. $125.00 $0,00 $0,00. $0,00. Off Road Dump HR $250,00 $0.00 $0.00 $0.00 Crane>130Ion HR $1,500.00 $0.00 $0.00 $0.00. Crane>30 ton HR $500,00 $0.00 $0.00 $0,00 Crane<30 ton r.. HR $250.00 $0,00 $0,00 $0.00 Vibratory Hammer HR $400,00 $0,00 $0.00 $0,00 Concrete Cmsher HR $885.00 $0.00 $0.00: $0.00 Screener HR $375.00 $0.00 $0.00 $0.00 Push Boat HR $275.00 $0,00 $0.00 $0,00. SecllonellHopper Barge HR $175.00 $0.00 $0.00 $0.00 Drone LldarPhotogrammetry HR $350.00 $0,00 $0.00 $0,00 Directional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0.00 Directional Drill AA 440 HR $4,000.00 $0,00 $0,00 $0.00 Lowboy/Tractor HR $175.00 $0.00 $0.00 $0,00 Dump Truck/Roll Off HR $95.00 $0.00 $0.00 $0.00 Water Truck/Trailer HR $125.00 $0.00 $0.00` $0,00 Tack/Prime Truck/Trailer HR $150.00 $0.00 $0.00 $0.00 Lube/MechanlcsTruck HR $125.00 $0.00 $0,00 $0.00 Truck with Hand Tools HR $95.00 5 $475.00 $0.00 $475.00 I!, Pickup HR $40.00 $0.00 $0,00 $0,00 Camera Truck HR $400.00 $0.00 $0,00 $0,00 Vacuum Truck HR $475,00 $0.00 ` S0.00' : $0,00 Small Equlpment $0.00 Air Compressor with Hammer. HR $60.00 $0.00 $0.00 .:$0,00 Concrete Saw HR $60.00 $0.00 $0.00 $0.00 Plate Compactor` : HR $60.00 $0,00 $0.00 $0,00 Trench Box 16'x 10' HR $50.00 $0.00 $0.00 $0.00 Stone Box HR $50,00 $0.00 $0,00 $0,00 Steel(Road)Plate HR $50.00 $0.00 $0.00 $0.00 Welipoint System`: HR $250.00 $0.00 $0.00 $0.00. 3"Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0.00 6"Hydraulic Pump HR $150.00 $0,00 $0,00 $0,00 12"Hydraulic Pump HR $200.00 $0.00 $0.00 $0.00 Cut Off Saw HR $20,00 $0.00 $0,00 $0.00 Light Set HR $50.00 $0.00 $0.00 $0.00 Generator/Welder HR $50,00 $0.00 $0,00 $0,00 Generator70kw HR $125.00 $0.00 $0.00 $0,00 Generator 125kw HR $160.00 $0.00 $0,00 $0.00 MOT HR $150.00 $0.00 $0.00 $0.00 Fusing Machine 2-16" HR $150.00 $0.00 $0.00 $0.00 Fusing Machine 18°-42" HR $300.00 $0.00 $0.00 $0.00 Tap Machine-small(3/4"-3") each tap EA $750.00 $0,00 ' $0,00 $0.00 Tap Machine-large(4"-12") each tap EA $1,000.00 $0.00 $0.00 $0.00 Pipe Trenchless Piercing tool HR $250.00 $0.00 $0,00 $0.00 Pipe Ramming HR $625.00 $0.00 $0.00 $0.00 Material Disposal Fee(concrete,asphalt,debris,etc) PER LOAD $500,00 $0.60 : $0.00 $0,00 QEC-4000 PSI Concrete CY $181.00 12.41 $1,998,01 $0.00 $1,998.01 FuelSurGiarge EA $40.00 1 $40.00 $0.00 _`$40.00 Environmental Charge EA $30,00 1 $30.00 $0.00 $30.00 Tax LS $119,88 1 $119.88 $0.00 :$119.88 Grand Total: $4,562.89 CA.0, QUALITY ENTERPRISES USA,INC. Job it 14322-01 1 6 R V DB IMMOKALEE TIGER GRANT Rates Dale 12/17/24 Work Directive Change q2-112 Dixie Ave Driveway ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personne Corporate Officer`- HR ' $150,00 $195.00 $0.00 $0,00 ` $0,00 Project Manager HR $125.00 $162.50 $0.00 $0.00 $0.00 Superintendent HR $85.00 :$110.50 $0.00 $0.00 $0.00 Foreman HR $85.00 $110.50 10 $850.00 $0.00 $850.00 Mechanic,Equipment S Trick Operator HR $75.00 ;'. $97.50 10 $750.00 $0.00 $760.00 Laborer HR $55.00 $71.50 40 $2,200.00 $0.00 $2,200.00 Administrative HR $75.00 $97.50_ :$0.00 _:':$0.00 :"$0.00 Equipment Excavator>Cat 349 HR $260.00 $0.00 $0.00 $0.00 Excavator>Cat 320 HR $200.00 $0.00 $0.00 $0.00 ExcavalorsCat320: HR $150.00 $0.00 $0.00 :`$0.00 Excavatorw/bammer/Epiroc HR $350.00 6 $2,100.00 SQ.00 $2,100.00 Excavatorw/side grip vibratory hemmer HR $350,00 $0.00 $0,00 $0,00 Wheel Loader>Cat 982 HR $225.00 $0.00 S0.00 $0.00 Wheal Loader>Cat 938 HR $175.00 $0.00 60,00 $0.00'. Wheal Loader<Cat 938 HR $150,00 6 $900.00 $0.00 $900.00 Bull Dozer HR $175.00 $0.00 S0,00 $0,00 Motor Grader HR $176,00 $0.00 $0.00 $0,00 Soil/Stone Roller HR : $125.00 $0.00 $0.00 ';$0.00'. Telehandler HR $125.00 $0.00 $0.00 $0.00 Mantlft ... KR `::$125.00 ._ "$0.00. _:I,S0.00 J..$0.00' Forklift HR $100.00 $0.00 $0.00 $0.00 Broom Tractor HR $95.00 $0.00 $0.00 $0.00: Milling Machine FIR $685.00 $0.00 $0.00 $0,00 Skld steer with milting head(bump grinder) HR $150.00 $0.00 $0.00 $0,00. Asphalt/Mat,Shuttle Buggy HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver Welter 385 HR . $375,00 '$0,00 $0.00 $0.00 Asphalt Paver Cat 1055 HR $575.00 $0.00 $0.00 $0.00 Asphalt Roller HR $125 00 $0,00 $0,00 $0,00 Off Road Dump HR $250.00 $0.00. $0.00 $0.00 Crane>130 ton HR $1,500.00 : $0,00 $0,00 $0,00' Crane>30ton HR $500.00 $0,00 $0.00 $0,00 Crane<30 ton HR $250,00 $0,00 $0,00 $0,00' Vibratory Hammer KR $400.00 $0.00 $0.00 $0.00 Concrete Crusher :, HR $685.00 $0.00 $0.00 $0.00: Screener HR $375.00 $0.00 $0.00 $0.00 Push Boat HR `-. $275.00 $0.00 $0,00 $0,00. Sectional/HopperBarge HR $175,00 $0.00 $0,00 $0.00. t Drone LidarPhotogrammelry HR $350.00 $0.00 $0,00 $0.00 Directional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0.00 Directional Celli AA440 HR $4,000.00 $0.00 $0,00 $0.00 Lowboy/Tractor HR $176.00 $0.00 $0,00 $0.00 Dump Truck/Roll Off HR $95.00 $0,00 $0.00 $0.00 Water Truck/freiler HR $126.00 $0.00 .$0.00 $0.00 Tack/Prdme Truck/Trailer HR $150.00 $0.00 $0.00 $0.00 Lube/MechanicaTruck HR $125.00 $0.00 $0.00 $0,00. Truck with Hand Tools HR $95.00 10 $950.00 $0.00 $950.00 Pickup HR $40,00 $0.00 $0,00 $0,00 Camera Truck HR $400.00 $0.00 $0.00 $0.00 Vacuum Truck HR-' $475.00 -- `.$0.00 - $0.00 I:$0.00. Small Equipment $0.00 Alr Compressor with Hemmer:' HR $60,00 $0,00 $0,00 $0.00 Concrete Saw HR $60.00 2 $120.00 $0.00 $120.00 Plate Compactor HR $60.00 4 $240,00 $0.00 `:$240.00. Trench Box 16'x 10' HR $50,00 $0.00 $0.00 $0.00 Slone Box HR $50.00 $0.00 $0.00 $0.00 Steel(Road)Plate HR $50.00 $0.00 $0.00 $0.00 Wellpolnt System KR $250.00 $0.00 $0.00 $0,00. 3"Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0.00 6"Hydraulic Pump HR $150,00 $0.00 $0.00 $0.00 12"Hydraulic Pump HR $200.00 $0.00 $0.D0 $0.00 Cut Off Saw HR $20.00 - $0,00 $0.00 $0.00. Light Set HR $50.00 $0.00 $0.00 $0.00 Generator/Welder : HR $50.00 $0,00 $0.00 $0,00 Generator 70kw HR $125,00 $0.00 $0.00 $0.00 Generator 125kw;i - ..FIR '.$150.00 ". . _ .:$0.00 `::$0,00 ,`.:$0.00 MOT HR $150.00 $0.00 $0.00 $0.00 Fusing Machine 2.16" HR $150.00 $0.00 $0,00 $0.00. Fusing Machine 18"-42" HR $300,00 $0.00 $0.00 $0,00 Tap Machine"small(3/4"-3")'each tap '.EA $750,00 $0.00 '..$0.00 _-::.$0.00. Tap Machine-large(4'-12") each lap EA $1,000.00 $0,00 $0.00 $0.00 Pipe Trenchless Piercing tool: HR' $250.00 $0.00 $0.00 $0.00 Pipe Ramming HR $625.00 $0.00 $0.00 $0.00 Material Disposal Fee(concrete,asphalt,debris,etc) PER LOAD $500.00 $0.00 $0.00 $0.00 QEC-4000 PSI Concrete CY $161.00 3.64 $586.04 $0.00 $686.04 Fuel Surcharge > EA $40.00 1 $40.00 $0.00 $40.00 Environmental Charge EA $30.00 1 $30.00 $0.00 $30.00 Tex LS $35.16 _ 1 $35,16 $0.00 `' $35.16 Grand Total: $8,801.20 t' .r0 i QUALITY ENTERPRISES USA,INC, Job 8 14322-01 1 6 B 8 DB IMMOKALEE TIGER GRANT Rates Date 11/15124 Work Directive Change#2-133 Madison Ave Driveway ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personnel Corporate Officer HR $150.00 $195.00 $0.00 :$0.00 $0.00 Project Manager HR $125.00 $162.60 $0.00 $0.00 $0.00 Superintendent HR $85.00 : $110.50 $0.00 $0.00 $0.00 Foremen HR $85.00 $110.50 6 $510.00 $0.00 $510.00 Mechanic,Equipment a Truck Operator HR : $75.00 $97.50 6 $450.00 $0.00 $450.00. Laborer HR $55.00 $71.50 24 $1,320.00 $0,00 $1,320.00 Administrative HR: $75,00 $97.50 : $0.00 $0.00 "$0.00 Equipment Excavator>Cat 349 HR : $250.00 $0.00 $0,00 $0.00 Excavator>Cat 320 HR $200.00 $0.00 $0.00 $0.00 Excavator<Cat`320 HR $150.00 6 ..$900.00 $0.00 :$900.00' Excavator w/hammer/Eplroc HR $350,00 $0.00 $0.00 $0.00 Excavator w/side grip vibratory hammer HR $350,00 $0.00 S0.00 $0.00; Wheel Loader>Cat 982 HR $225.00 $0.00 $0.00 $0.00 Wheel Loader>Cat 938 HR $175 00 $0.00 $0.00 $0A0 Wheel Loader<Cat 938 HR $150,00 6 $900.00 $0.00 $900.00 Bull Dozer HR $175.00 $0,00 $0.00 $0,00 Motor Grader HR $175.00 $0,00 $0.00 $0.00 Soil/Stone Roller l: HR $125.00 $0.00 $0.00 $0.00 Telehandler HR $125.00 $0.00 $0.00 $0.00 Menlltt HR :f$125,00 $0.00 $0.00 $0.00 Forklift FIR $100,00 $0.00 S0.00 $0.00 Broom Tractor HR $95,00 $0,00 $0.00 $0,00: Milling Machine HR $685,00 $0.00 $0.00 $0,00 Skid steer with milling head(bump grinder) HR $150.00 $0,00 $0.00 $0.00 AsphaldMat.Shullle Buggy HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver Welter365 HR $375.00 $0,00 $0,00 $0.00 Asphalt Paver Cat 1055 HR $575.00 $0.00 $0.00 $0.00 Asphalt Roller HR $125.00 $0.00 $0.00 $0.00 Off Road Dump HR $250,00 $0.00 $0.00 $0.00 Crane'>130ton HR $1,600.00 `:$0.00 $0.00 $0.00: Crane>30 ton HR $500.00 $0.00 $0.00 $0.00 Crane<30 ton HR $250.00 : $0,00 $0.00 $0,00 Vibratory Hammer HR $400.00 $0.00 $0.00 $0.00 Concrete Crusher HR:.' HR '.$885.00 $0.00 !.$0.00 $0,00 Screener HR $375.00 $0.00 $0.00 $0.00 Push Boat HR $275.00 $0.00 $0,00 $0.00 Sectional/Hopper Barge HR $175.00 $0.00 $0.00 $0,00 Drone Lklar Photogrammetry . HR: $350.00 $0.00 $0.00 $0.00 Directional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0.00 Directional Drill AA440 'HR $4,000.00 .:_:$0,00. $0,00 :::$0,00. Lowboy/Tractor HR ::$175.00 :.. ;,`$0.00 '$0,00 $0.00 Dump Truck/Roll Off HR $95,00 $0.00 $0.00 $0,00 WaterTruckTrailer- HR $125.00 $0.00 $0.00 $0.00 Tack/Prime Truck/Traller HR $150,00 $0.00 $0.00 $0,00 Lube/Mechanics Truck HR $125.00 $0,00 $0.00 $0,00 Truck with Hand Tools HR $95.00 6 $570.00 $0.00 $570.00 Pickup HR $40,00 $0,00 $0,00 $0,00 Camera Truck HR $400,00 $0.00 $0.00 $0.00 Vacuum Truck - - - . .. - 'HR - $475,00 '$0.00 .:-$0.00 $0.00 Small Equipment $0.00 Air Compressor with Hammer : HR $60.00 $0.00 $0.00 $0,00 Concrete Saw HR $60.00 2 $120.00 $0.00 $120.00 Plate Compactor HR $60.00 4 $240,00 $0.00 $240.00 Trench Box 16'x 10' HR $50.00 $0.00 $0.00 $0.00 Stone Box HR $50.00 $0.00 $0,00 $0,00 Steel(Road)Plate HR $50.00 $0.00 $0.00 $0.00 Wellpoint System HR- $250.00 $OAO $0,00 $0,00 3"Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0.00 6"Hydraulic Pump HR $150.00 $0,00 $0.00 $0,00 12'Hydraulic Pump HR $200.00 $0.00 $0.00 $0.00 Cut Off Saw FIR $20.00 $0,00 $0,00 $0,00 Light Set HR $50.00 $0.00 $0.00 $0.00 Generator/Welder : HR $50.00 <$0.00 $0.00 `$0.00 Generator 70kw HR $125,00 $0.00 $0.00 $0.00 Generator125kW HR $150.00 $0,00 $0,00 $0,00 MOT HR $160.00 $0.00 $0.00 $0.00 Fusing Machine 2-18" HR $150.00 $0,00 .$0.00 ;:$0.00 Fusing Machine 16"-42" HR $300.00 $0.00 $0.00 $0.00 Tap Machine•small(3/4"-3') each tap EA $750.00 $0,00 .$0.00 $0,00 Tap Machine-large(4"-12") each tap EA $1,000.00 $0.00 $0,00 $0.00 Pipe Trenchtess Pieroin9 tool HR $250.00 $0.00 $0.00 $0.00 Pipe Ramming HR $626,00 $0.00 $0.00 $0.00 I_. Materiel Disposal Fee(concrete,asphalt,debris,etc) ` -PER LOAD $500.00 ' $0,00 `:$0.00 ::$0.00 GEC•4000 PSI Concrete CY $161.00 $0.00 $0.00 $0.00 Fuel Surcharge`: EA $40.00 $0.00 $0.00 $0.00 Environmental Charge EA $30.00 $0.00 $0.00 $0.00 Tax Ls $0.00 $040 $0,00 $0.00 Grand Total: $5,010,00 (;A() 16R8 QUALITY ENTERPRISES USA,INC, Job# 14322-01 DB IMMOKALEE TIGER GRANT Rates Date 11/18/24 Work Directive Change P2.133 Madison Ave Driveway ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personnel Corporate Ofticer HR - . $150.00 ''$195,00 `.:$0.00 :.:$0.00 '..$0.00 l Project Manager HR $125.00 $162,50 $0.00 $0.00 $0.00 Superintendent i-. - HR . .:$85.00I:..�$110.50 - - `$0.00 :..,$0.00 $0.00 Foreman HR $85.00 $110.50 5 $425.00 $0.00 $425.00 Mechanic,Equipment 8 Truck Operator HR $75.00 $97.50 5 $375.00 $0.00 $375.00 Laborer HR $55.00 $71,50 20 $1,100.00 $0.00 $1,100.00 1 Administrative HR $75.00 $97.50 ' $0.00 $0.00 $0,00 Equipment Excavator>Cat 349 HR $250.00 $0.00 $0.00 $0.00 Excavator>Cat 320 HR $200.00 $0.00 50.00 $0,00 Excavator<Cat 320 HR $150,00 $0,00 ;50,00 ;$0.00 Excavator w/hammer/Epiroc HR $350,00 $0.00 $0.00 $0.00 Excavator wfslde grip vibratory hammer HR $350,00 $0.00 $0.00 $0.00 Wheel Loader>Cat 962 HR $225.00 $0.00 $0.00 $0.00 Wheal Loader➢Cat 938 HR $175.00 $0.00 $0.00 $0.00 Wheel Loader<Cet938 HR $150.00 $0.00 $0.00 $0.00 Bull Dozer HR : $175,00 $0.00 $0,00 $0.00 Motor Grader HR $17,5,00 $0.00 $0,00 $0.00 Soil/Stone Roller _ -.HR ,':$125.00 l ':$0.00 ;$0,00 ::-.$0,00 Telehandier HR $125.00 $0.00 $0.00 $0.00 Menlift HR $125,00 $0.00 $0.00 $0,00 Forklift HR $100.00 $0.00 $0.00 $0.00 Broom Tractor HR $06.00 $0.00 $0.00 $0.00' Milling Machine HR $685.00 $0,00 $0.00 $0,00 Skid steer will milling head(bump grinder) HR $150.00 $0,00 $0.00 $0.00 Asphalt/Mal.Shutile Buggy HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver Weiler 385 HR $375.00 $0,00 $0.00 '$0.00. Asphalt Paver Cot 1055 HR $575.00 $0.00 $0.00 $0.00 Asphalt Roller HR $125.00 $0,00 $0.00 $0.00 Off Road Dump HR $250.00 $0.00 $0.00 $0.00 Crane>130ton : HR : $1,500.00 $0.00 $0.00 $0.00. Crane>30ton HR $500.00 $0.00 $0.00 $0.00 Crane<30 ton HR $250,00 $0.00 $0.00 $0.00 Vibratory Hemmer HR $400.00 $0.00 $0.00 $0.00 Concrete Crusher:: HR '.':$885,00 "$0.00 '.. $0,00 $0.00. Screener HR $375.00 $0.00 $0.00 $0.00 Push Boat HR $276,00 $0,00 $0,00 $0,00. Sectional/Hopper Barge HR $175.00 $0.00 $0.00 $0.00 Drone Lidar Phologrammetry HR $350.00 $0.00 $0.00 $0.00' Directional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0.00 Directional Drill AA440.. HR..: $4,000,00 - $0,00 $0.00 $0.00. Lowboy/Tractor HR $175.00 $0,00 $0,00 $0,00 Dump Truck/Roll Off HR $95.00 $0.00 $0.00 $0.00 Water Truck/Trailer HR $125.00 $0.00 $0,00 $0.00 Tack/Prime Truck/Traller HR $150,00 $0.00 $0.00 $0.00 Lube/MachanlcaTruck HR $125,00 $0.00 $0.00 $0,00 [ Truck with Hand Tools HR $95.00 5 $475.00 $0.00 $475.00 Pickup HR $40,00 $0,00 $0,00 $0,00 Camera Truck HR $400.00 $0.00 $0.00 $0.00 Vacuum Truck HR $475.00 - $0.00 $0,00 $0.00 Small Edulement $0.00 Air Compressor with Hammer HR $60.00 $0.00 $0.00 $0.00 Concrete Saw HR $60.00 $0.00 $0,a0 $0.00 Plate Compactor HR $60,00 $0.00 $0.00 '$0.00 Trench Box 16'x 10' HR $50.00 $0.00 $0.00 $0.00 Stone Box HR $50.00 $0.00 $0.00 $0.00 Steel(Road)Plate HR $50.00 $0.00 $0.00 $0,00 Wellpolnt System. HR $250.00 $0.00 $0.00 $0.00 3"Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0.00 6"Hydraulic Pump HR $150.00 $0,00 $0.00 $0,00 12"Hydraulic Pump HR $200.00 $0.00 $0.00 $0,00 Cut Off Saw HR $20,00 $0,00 $0,00 $0.00 Light Set HR $50.00 $0.00 $0.00 $0.00 GeneratodWefder> HR $50.00 $0.00 $0.00 $0.00 Generator 70kw HR $125.00 $0.00 $0.00 $0.00 Generator 125kw HR $150,00 $0.00 $0.00 $0.00 MOT HR $150.00 $0.00 $0,00 $0,00 Fusing Machine 2.16" HR .:$150.00 $0.00 $0.00 $0.00. Fusing Machine 18'-42" HR $300.00 $0.00 $0.00 $0.00 Tap Machine-email(3/4".3") each tap EA ` $750.00 $0,00 $0,00 $0.00 Tap Machine-large(4'-12") each lap EA $1,000.00 $0.00 $0.00 $0.00 PlpeTrenchless Piercing tool HR $250.00 $0.00 $0.00 $0.00 Pipe Ramming HR $625.00 $0.00 $0.00 $0.00 Material Disposal Fee(concrete,asphalt,debris,etc) PER LOAD $500.00 $0.00 $0,00 $0,00 OEC-4000 PSI Concrete CY $161.00 10.09 $1,624.49 $0.00 $1,624.49 Fuel Surcharge EA $40.00 i $40.00 $0.00 $40.00 Environmental Charge EA $30.00 1 $30.00 $0.00 $30.00 Tax LS $97,47 1 $97.47 $0.00 $97A7 Grand Total: $4,168.98 r at\(-j 1688 QUALITY ENTERPRISES USA,INC. Job it 14322-01 DB IMMOKALEE TIGER GRANT Rates Date 10/11/24 Work Directive Change 42-210 Washington Ave ST HOURLY 0T HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL personnel Corporate Officer ',HR $150,00 $195.00 - - $0,00 $0,00 :-$0,00 Project Manager HR $125,00 $162,50 $0.00 $0.00 $0.00 Superintendent HR $85.00 $110.50 $0.00 $0.00 $0.00 Foreman HR $85.00 $110,50 8 $680.00 $0.00 $68000 Mechanic,Equipment R Truck Operator HR $75.00 $97.50 8 $600.00 $0.00 $600,00 laborer HR $55.00 $71.50 32 $1,760.00 $000 $1,760.00 Administrative HR $75.00 $97.50 $0.00 $0,00 r $0.00 Equipment Excavator?Cat 349 HR $250.00 $0,00 '. $0.00 $0.00 Excavator>Cat 320 HR $200.00 $0,00 $0.00 $0,00 Excavator<Cat320 HR $150,00 8 $900.00 $0.00::' :$900.00 Excavator wlhammer/Epiroc HR $350.00 $0.00 $0.00 $0.00 Excavatorw/side grip vibratory hammer HR $350.00 $0,00 $0.00 $0.00 Wheel Loader>Cat 982 HR $225.00 $0.00 $0.00 $0.00 Wheel Loader>Cat938 < HR .:$175.00 $0.00 '- $0.00 ` $0,00 Wheel Loader<Cat 938 HR $150.00 6 $900.00 $0.00 $900.00 Bull Dozer HR $175.00 $0.00 $0.00 $0,00 Motor Grader HR $175.00 $0.00 $0,00 $0.00 Soil/Stone Roller HR $125,00 $0.00 $0.00' $0.00 Telehandler HR $125.00 $0.00 $0.00 $0.00 Manlift HR $125,00 $0.00 $0.00 $0.00 Forklift HR $100.00 $0.00 $0,00 $0.00 Broom Tractor HR ;95.00 $0,00 $0.00: $0,00 Milling Machine HR $885.00 $0.00 $0.00 $0.00 Skid steer with milling head(bump grinder) HR $150.00 $0.00 $0.00 $0,00 Asphalt/Mat,Shuttie Buggy HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver Weller 385 HR '' $375.00 $0.00 $0.00: $0,00 Asphalt Paver Cat 1055 HR $575,00 $0.00 $0.00 $0,00 Asphalt Roller HR $125.00 $0,00 $0.00' $0.00 Off Road Dump HR $250.00 $0.00 $0.00 $0.00 Crane>130ton HR $1,500.00 $0,00 :` $0,00- °'$0,00. Crane>30 ton HR $500.00 $0,00 $0.00 $0.00 Crane<30 ton HR $250.00 $0,00 $0,00 $0,00 Vibratory Hemmer HR $400,00 $0.00 $0.00 $0.00 Concrete Crusher HR $885.00 $0,00 $0,00: $0,00 Screener HR $375.00 $0.00 $0.00 $0,00 Push Boat HR $275.00 $0.00 : $0,00` $0,00 Sectional/HopperBarge HR $175.00 $0.00 $0.00 $0,00 Drone LldarPhotogrammetry HR : $350.00 $0.00 $0,00 $0,00' Directional Drtll JT 100 HR $2,000,00 $0,00 $0.00 $0.00 Directional Drill AA 440 HR $4,000.00 $0.00 '$0.00 $0.00 Lowboy/Tractor HR $175.00 $0,00 $0.00. ,$0.00. Dump Truck/Roll Off HR $95.00 $0.00 $0.00 $0,00 Waterlrucklfratler` HR $125.00 $0.00 $0.00 $0,00 Tack/Prime Tmck/Traller HR $150.00 $0.00 $0.00 $0.00 Luba/Mechanics Truck HR $125.00 $0.00 ` ;$0,00 $0.00 Truck with Hand Tools HR $95.00 8 $760 00 $0.00 $760.00 Pickup FIR $40.00 $0.00 $0.00 $0.00. Camera Truck HR $400.00 $0.00 $0.00 $0,00 Vacuum Truck HR $475.00 $0.00 $0.00 $0,00 Small Equipment $0,00 Air Compressor with Hammer HR $60.00 $0,00 $0.00 $0.00 Concrete Saw HR $80.00 2 $120.00 $0,00 $120.00 Plate Compactor` : HR $60,00 4 $240.00 ' $0.00 $240.00 Trench Box 16'x 10' HR $50.00 $0.00 $0.00 $0.00 Stone Box HR $50,00 $0.00 :$0.00 :.:$0.00 Steel(Road)Plate HR $50.00 $0.00 $0.00 $0.00 Wellpolnt System` HR $250.00 $0.00 $0.00 $0.00 3"Trash/Submersible Pump HR $50,00 $0,00 $0.00 $0.00 8"Hydraulic Pump HR $150.00 $0.00 $0,00 $0,00 i'. 12"Hydraulic Pump HR $200.00 $0.00 $0.00 $0.00 Cut Off Saw HR $20,00 $0.00 $0.00 $0.00 Light Set HR $50.00 $0.00 $0.00 $0.00 GeneratoNWelder`..: HR :_ ;$50.00 :::: _ $0,00 c.. $0.00' -;$0,00 Generator 70kw HR $125.00 $0.00 $0.00 $0.00 Generator 125kw HR $150.00 $0,00 $0,00 $0,00 MOT HR $150.00 $0.00 $0,00 $0.00 Fusing Machine 2-16" HR $150.00 $0.00 :$0.00 $0.00. Fusing Machine 18"-42" FIR $300.00 $0.00 $0.00 $0.00 Tap Machine-small(3/4"-3") each tap EA $750,00 $0,00 $0,00 $0.00 Tap Machine-large(4"-12") each tap EA ;1,000.00 $0.00 $0.00 $0.00 Pipe Trenchtess Piercing tool HR $250.00 $0,00 $0,00 $0,00 Pipe Ramming HR $625.00 $0.00 $0.00 $0.00 Material Disposal Fee(concrete,'asphalt,debris,etc) PER LOAD . $500.00 $0.00 ! $0.00 $0.00 QEC-4000 PSI Concrete CY $181.00 $0.00 $0.00 $0.00 Fuel Surcharge.l` EA $40.00 $0.00 $0.00 $000 Environmental Charge EA $30.00 $0,00 $0.00 $0,00 Tax` LS $0.00 $0.00 : $0.00 $0.00 Grand Total, $5,960.00 (..A0 1688 0. QUALITY ENTERPRISES USA,INC, Job# 14322-01 DB IMMOKALEE TIGER GRANT Ratea Date 10/14/24 Work Directive Change#2-210 Washington Ave ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personnel Corporate Officer HR $150.00 $195.00 ` $0.00 $0.00 $0.00 Project Manager HR $125.00 $162.50 $0.00 $0.00 $0.00 Superintendent : HR $85.00 $110,50 $0.00 : $000 $0.00 Foreman HR $85.00 $110.50 2 $170.00 $0.00 $170.00 Mechanic,Equipment&Truck Operator HR $75.00 $97.50 2 $160.00 $0.00 `$150.00 Laborer HR $55.00 $71.50 8 $440.00 $0.00 $440.00 Administrative HR $75.00 $97.50 $0.00 } "$0.00 $0.00. 6au1emen( Excavator Cat 349 HR $250.00 $000 $0.00 $0.00 Excavator`Cat 320 HR $200.00 $0.00 $0.00 $0.00 Excavator<Cat 320 HR $150.00 $0.00 $0.00 $0.00 Excavatorwlhammer/Epirac HR $350.00 $0.00 $0.00 $0.00 Excavator w/side grip vibratory hammer . HR $350.00 $0.00 .$0.00 °$0.00 Wheel Loader>Cet 962 HR $225.00 $0.00 $0.00 $0.00 Wheel Loader>Cat 938 HR $175.00 $0.00 $0.00 $0.1f0 Wheel Loader<Cat 938 HR $160,00 $0.00 $0.00 $0.00 Bull Dozer HR $175.00 $0.00 50.00. $0.00 Motor Grader HR Si75.00 $0.00 $0.00 $0.00 Soil/Stone Roller • 'HR $125.00 $0.00 $0.00 $0,00 Telehandler HR S125.00 S0.00 $0.00 $0.00 Menlift HR $125.00 $0,00 $0.00'. $0,00 Forklift HR S100.00 $0.00 $0.00 $0.00 Broom Tractor HR $95.00 $0.00 $0.00 $0.00 Milling Machine HR $685.00 $0.00 $0.00 $0.00 Skid steer with milling head(bump grinder) HR $150.00 $0,00 $0.00 $0,00 Asphalt/Mat.Shuttle Buggy HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver Wailer 385 HR $375.00 $000 :: $0,00 $0,00 Asphalt Paver Cat 1056 HR S575.00 $0.00 $0.00 $0.00 Asphalt Roller HR $125.00 $0.00 $0.00 $0.00 Off Road Dump HR S250,00 $0.00 $0.00 $0.00 Crane>130 ton HR $1,500.00 $000 $0.00 $0.00 Crane>30 ton HR $500.00 $0.00 $0.00 $0.00 Crane<30 ton HR S25000 $0.00 30,00 $0.00 Vibratory Hammer HR $400,00 $0.00 $0.00 $0.00 Concrete Crusher ` HR $685.00 Soreener HR $375.00 $0.00 $0.00 $0.00 Push Boat HR $276.00 $0,00 $0.00 $0.00. Sectional/Hopper Barge HR S175.00 $0.00 $0.00 $0.00 Drone Lldar Photogrammetry HR $350.00 $0.00 $0,00 $0.00 Directional Drill JT 100 HR $2,000.00 $0.00 $0,00 $0.00 Directional Drill AA440 HR $4,000.00 $0.00 , $0.00 $0.00 Lowboy/Tractor : ' :HR $175.00 : $0.00>: I$0.00 -::$0.00 Dump Truck/Roll ON HR $95.00 $0.00 $0.00 $0.00 Water Truck/Trailer HR $125.00 $0.00 `> $0.00 $0.00 Tack/Prime Truck/Trailer HR S150.00 $0.00 $0.00 $0.00 i' Lube/Mechanics Truck HR $126.00 $0.00 $0.00 $0.00 Truck with Hand Tools HR $95.00 2 $190.00 $0.00 $190.00 Pickup HR $40.00 $0.00` $0.00 $0,00 Camera Truck HR $400.00 $0.00 $0.00 $0.00 Vacuum Truck HR '' $475.00 $0.00 $0.00 $0.00 r Small Eaulement $0.00 Alr Compressor with Hammer HR $60.00 $0,00 $0.00 $000 Concrete Saw HR $60.00 $0.00 $0.00 $0.00 Plate Compactor HR $80,00 $0,00 $0.00 $0.00 Trench Box 16'x 10' HR $50.00 $0.00 $0.00 $0.00 Stone Box HR $50.00 $0.00 $0.00 $0.00 Steel(Road)Plate HR $50.00 $0.00 $0.00 $0.00 Wellpoint System HR $250,00 $0.00 $0.00 $0.00 3"Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0.00 6"Hydraulic Pump` HR $150.00 $0.00 $000 $0.00 12"Hydraulic Pump HR S200.00 $0.00 $0.00 $0.00 Cut Off Saw HR $20.00 $0.00 $0.00 $0,00 Light Set HR $50.00 $0.00 $0.00 $0.00 Generator/Welder - HR :.;$50,00 $0.00 ).'$0.00 :$0.00 Generator 70kw HR $125,00 $0.00 $0.00 $0.00 Generator 125kw:`; HR $150.00 $0.00 $0.00 $0,00 MOT HR $150.00 $0.00 $0,00 $0.00 Fusing Machine 2.16" HR $150.00 $0.00 : $0,00 $0.00 Fusing Machine 18'-42" HR 5300.00 $0.00 $0.00 $0.00 Tap Machine•small(314 -3") each tap EA $750.00 $0,00- $0,00 $0.00 Tap Machine-large(4"-12') each tap EA $1,000.00 $0.00 $0.00 $0.00 Pipe Trenchtess Piercing tool HR $250.00 $0.00 $0.00 $000 Pipe Ramming HR 5625.00 $0.00 $0.00 $0.00 Material Disposal Fee(concrete,asphalt,debris,etc) PER LOAD $500.00 $0.00 $0.00 $0.00 QEC-4000 PSI Concrete CY $161.00 13.02 $2,096.22 $0.00 $2,096.22 Fuel Surcharge' EA $40.00 1 $40.00 $0.00 $40.00 Environmental Charge EA $30.00 1 $30.00 $0.00 $30.00 Tax LS $125.77 1 $125.77 $0.00 $125,77 Grand Total: $3,241.99 CA'1! 16R8 QUALITY ENTERPRISES USA,INC. Job 4 14322-01 DB IMMOKALEE TIGER GRANT Rates Date 10/16/24 Work Directive Change 02-217 Jefferson Ave ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personnel Corporate Officer HR $150.00 $195.00 $0.00 $0.00 $0.00 Project Manager HR $125.00 $162.50 $0.00 $0.00 $0.00 Superintendent HR $85.00 $110.50` $0,00 $0.00 $0.00 Foreman HR $85.00 $110.50 10 $850.00 $0.00 $850.00 Mechanic,Equipment&Truck Operator HR $75,00 $97.50 20 $1,500,00 $0.00 $1,500.00 Laborer HR $55.00 $71.50 60 $3,300.00 $0.00 $3,300.00 Administrative HR $75.00 $97,60 c $0.00 > $0.00 $0,00. Equipment Excavator 5 Cat 349 HR `::$250.00 $0.00'" '':$0,00 $0.00. Excavator>Cat 320 HR $200.00 $0.00 $0.00 $0.00 Excavator<Cat 320 HR $150.00 10 $1,500,00 $0,00 $1,500,00. Excavator w/hammeriEpiroc HR $350.00 $0.00 $0.00 $0.00 Excavator w/side grip vibratory hammer HR $350,00 $0.00 $0.00 $0,00 Wheel Loader>Cat 962 HR $225,00 $0.00 $0,00 $0.00 Wheel Loader>Cat 938 HR $175.00 $0.00 $0,00 $0.00 Wheel Loader<Cat 938 HR $150.00 10 $1,500.00 $0.00 $1,600.00 Bull Dozer HR $175.00 $0.00 $0,00 $0,00 Motor Grader HR $175.00 $0.00 $0.00 $0,00 Soil/Stone Roller HR $125,00 :: -$0.00 : -;.$0.00 :-:::$0.00. Telehendler HR $125.00 $0.00 $0.00 $0.00 MantiR HR. : $125.00 $0.00 $0.00 $0,00 Forklift HR $100,00 $0.00 $0.00 $0,00 Broom Tractor HR $95.00 $0.00 $0.00 $0.00 Milling Machine HR $685.00 $0.00 $0.00 $0.00 Skid steer with milling head(bump grinder) HR $150.00 $0.00 $0,00 $0,00 Asphalt/Mat.Shuttle Buggy HR $375.00 $0.00 $0.00 $0,00 Asphalt Paver Weiler 385 HR $375.00 $0.00 1 $0.00 $0.00'. Asphalt Paver Cat 1055 HR $575.00 $0.00 $0.00 $0.00 Asphalt Roller HR :. $125.00 $0.00 $0,00 $0.00 Off Road Dump HR $250.00 $0.00 $0.00 $0.00 Crane>130 ton HR $1,500.00 $0.00 $0.00 $0,00. Crane>30 ton HR $500.00 $0.00 $0.00 $0.00 Crane<30 ton HR $250.00 $0.00 $0.00 $0.00. Vibratory Harmer HR $400.00 $0.00 $0.00 $0,00 Concrete Crusher :.'-HR ..$885.00 .$0.00 ':$0,00 .$0.00 Screener HR $375.00 $0.00 $0.00 $0.00 Push Boat HR $275.00 $0.00 $0.00 $0,00 Sectional/HopperBarge HR $175.00 $0.00 $0,00 $0,00 Drone LIdarPhotogrammelry HR $350.00 $0.00 $0.00 $0.00 Directional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0.00 Directional Drill AA440 HR 54,000.00 $0.00 $0.00 $0,00. Lowboy/Tractor < HR $175.00 $0,00 $0,00 $0.00 Dump Truck/Roll Off HR $95.00 $0.00 $0.00 $0.00 Water Truck/frellar: HR $125.00 $0.00 $0.00 $0.00. Tack/Prime Truck/Trailer HR $150.00 $0.00 $0.00 $0.00 Lube/MechaniceTruck HR $125.00 $0.00' $0.00 $0,00. Truck with Hand Toole HR $95,00 10 $950.00 $0,00 8960,00 is Pickup' HR $40,00 $0.00. $0.00 $0.00 Camera Truck HR $400.00 $0.00 $0.00 $0.00 Vacuum Truck HR $475.00 $0.00 $0.00 $0.00 Small Equipment $0.00 Air Compressor with Hammer HR . $60.00 $0.00 $0.00 $0,00 Concrete Saw HR $60.00 4 $240.00 $0.00 $240.00 Plate Compactor HR $60.00 4 $240.00 $0.00 $240.00 I', Trench Box 16'x 10' HR $50.00 $0.00 $0.00 $0.00 Stone Box HR $50,00 $0,00 $0.00 $0,00 Steel(Road)Plate FIR $60.00 $0.00 $0.00 $0.00 Wellpoint System HR $250.00 $0,00'- $0.00 $0.00. 3"Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0.00 6"Hydraulic Pump HR $150.00 $0.00 $0.00 $0,00 12"Hydraulic Pump HR $200,00 $0.00 $0.00 $0.00 Cut Off Sew HR $20.00 $0.00:' $0,00 ;:$0,00 Light Set HR $50.00 $0.00 $0.00 $0,00 Generator/Welder HR $50.00 $0.00 $0.00 i$0.00 Generator 70kw FIR $125.00 $0.00 $0.00 $0.00 Generator 125kw HR $150.00 $0,00 $0.00 $0.00 MOT HR $150.00 $0.00 $0.00 $0,00 Fusing Machine 2.16" FIR $160.00 $0,00 $0.00 $0.00 Fusing Machine 18"-42" HR $300.00 $0.00 $0.00 $0.00 Tep Machine-small(3/4 -3")`each tap EA $750.00 $0.00- $0.00 $0,00 Tap Machine-large(4'-12") each tap EA $1,000.00 $0.00 $0.00 $0.00 Pipe Trenchtess Piercing tool HR $250.00 $0.00 $0.00 $0.00 Pipe Ramming HR $625.00 $0.00 $0.00 $0.00 Ma rate Disposal Fee(concrete,asphalt,debris,etc) PER LOAD $500.00 $0.00 $0.00 $0.00 QEC-4000 PSI Concrete CV $161.00 14.23 $2,291.03 $0.00 $2,291.03 Fuel Surcharge EJ, $40,00 1 $40.00 $0.00 $40,00 Environmental Charge EA $30.00 1 $30.00 $0.00 $30.00 Tax LS` $137,48 1 $137.46 $0.00::.$137,46 Grand Total: $12,578.49 CA() 1 • R8 QUALITY ENTERPRISES USA,INC. Job It 14322-01 OS IMMOKALEE TIGER GRANT Rates Date 12/10/24 Work Directive Change#2-311 Calle Amisiad Driveway ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personnel Corporate Officer HR $150.00 $195.00 $0.00 ' $0.00 $0.00 Project Manager HR $125.00 $162.50 $0.00 $0.00 $0.00 Superintendent HR $85.00 $110.50 " $0.00 $0.00 $0,00 Foreman HR $85.00 $110,50 10 $850.00 $0.00 $850.00 Mechanic,Equipment&Truck Operator HR $75.00 $97.50 20 $1,500.00 $0.00 $1,500,00 Laborer HR $55.00 $71.50 60 $3,300.00 $0.00 $3,300.00 Administrative HR $75.00 $97.50 $0.00 $0.00 $0.00 Fqulament Excavator>Cat 349 HR $250.00 $0.00 $0,00 $0.00: Excavator>Cal 320 HR $200.00 $0.00 $0.00 $0.00 Excavator<Cat 320 HR $150.00 $ $1,200.00 $0,00 $1,200.00 Excavator wlhammer/Epiroc HR $350.00 $0.00 $0,00 $0.00 Excavator wlslde grip vibratory hammer : -.`. HR ::$350,00 $0.00 :$0,00 `,f$0,00' Wheat Loader>Cal982 HR $225,00 $0.00 $0,00 $0.00 Wheel Loader>Cat 938 HR $175.00 $0.00` $0.00 $0.00 Wheel Loader<Cat 938 HR $150.00 8 $1,200,00 $0.00 $1,200.00 Bull Dozer HR $175.00 $0.00 - $0,00 $0,00 Motor Grader HR $175.00 $0.00 $0.00 $0.00 Soil/Stone Roller HR $125.00 $0.00 $0.00 $0.00 Telehandler HR $125.00 $0.00 $0.00 $0.00 Manllh'. HR $125.00 _. $0,00' -.:.I$0,00 '.:$0.00 Forklift HR $100.00 $0.00 $0,00 $0.00 Broom Tractor.. HR $95.00 $0.00 - $0.00 -:`$0.00 Milling Machine HR $685.00 $0.00 $0.00 $0.00 Skid steer witi milling head(bump grinder) HR $150.00 $0,00 $0.00 $0,00. Aaphalt/Mat,Shullle Buggy HR $375.00 $0,00 $0.00 $0.00 Asphalt Paver Weller 385 HR a$375.00 $0.00 $0.00 $0.00 Asphalt Paver Cat 1055 HR $575.00 $0.00 $0.00 $0.00 Asphalt Roller HR $125.00 $0.00 $0.00 50,00 Off Road Dump HR $250.00 $0.00 $0.00 $0,00 Crane>130 ton HR $1,500.00 $0.00 : $0,00 $0.00 Crane>30 ton HR $500.00 $0.00 $0.00 $0.00 Crane<30 ton HR $260.00 $0,00 $0.00 $0.00 Vibratory Hammer HR $400.00 $0.00 $0.00 $0.00 Concrete Crusher HR $685.00 $0.00 $0.00 $0,00 ( Screener HR $375,00 $0,00 $0.00 $0.00 Push Boat HR $275,00 $0.00 $0,00 $0.00 Sectional/HopperBerge HR $175.00 $0.00 $0.00 $0,00 ( Drone Lldar Photogratnmetry HR $350.00 $0.00 $0,00 $0,00 Directional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0,00 Directional Drill AA 440 HR $4,000.00 $0.00 $0.00 $0.00 Lowboyfrrector HR $176.00 $0.00 $0.00 "$0.00 Dump Truck/Roil ON HR $95,00 $0,00 $0.00 $0,00 Water Truck/Trailer HR $125.00 - $0.00 $0,00 $0,00 Tack/Prime Truck/Trailer HR $150.00 $0.00 $0.00 $0.00 Lube/Mechanics Truck HR $126.00 $0.00 $0.00 $0.00 Truck with Hand Tools HR $95.00 10 $950.00 $0.00 $950.00 Pickup __ HR :-$40.00 $0.00:.:. :$0.00 :.-$0.00 Camera Truck HR $400.00 $0.00 $0.00 $0,00 Vacuum Truck HR '- $475.00 $0.00 $0.00 .'$0,00 Small Equipment $0.00 Air Compressor with Hammer HR $60.00 $0.00 $0,00 $0.00 Concrete Saw HR $60.00 2 $120.00 80.00 $120.00 Plate Compactor HR $60.00 4 $240.00 $0,00 $240.00 Trench Box 16'x 10' HR $50.00 $0.00 $0.00 $0.00 Stone Box HR $50,00 $0,00 $0.00 $0,00 Steel(Road)Plate HR $50.00 $0.00 $0.00 $0,00 WellpolntSystem - --HR $250.00 $0.00 -$0.00 `.$0.00 3"Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0.00 ;'. 6"Hydraulic Pump -. `'. : HR $150.00 $0.00 _$0.00 .-:'$0,00 12"Hydraulic Pump HR $200.00 $0.00 $0.00 $0.00 Cul Off Sew HR $20,00 $0.00 - $0.00 $0.00 j. Light Set HR $50.00 $0.00 $0.00 $0.00 GeneratorMJelder'. HR $50.00 $0.00 $0.00 $0.00 Generator 70kw HR $125.00 $0.00 $0.00 $0.00 Generator 125kw HR $150.00 $0.00 $0,00 $0,00 MOT HR $150.00 $0,00 $0.00 $0,00 Fusing Machine 2-16" HR $150,00 $0.00 $0.00 $0.00 Fusing Machine 18°-42' HR $390.00 $0.00 $0.00 $0.00 Tap Machine-small(3/4"-3") each tap EA $750.00 $0.00 $0.00 $0.00 Tap Machine-large(4"-12") each fop EA $1,000.00 $0.00 $0.00 $0,00 Pipe Trenchiess Piercing tool HR $250.00 -- - $0.00 $0.00 <.'$0.00 Pipe Ramming HR $825.00 $0.00 $0.00 $0.00 Material Disposal Fee(concrete,asphalt,debris,etc) PER LOAD $500.00 . . $0.00 $0.00 $0.00 QEC-4000 PSI Concrete CY $161,00 4,26 $685,86 $0.00 $885.86 Fuel Surcharge EA $40.00 1 $40.00 $0.00 $40.00 Environmental Charge EA $30.00 1 $30.00 $0.00 $30.00 Tax LS $41.15 1 $41.15 " $0.00 $41.15 1' Grand Total: $10,157.01 y A Cl 6 16R8 { QUALITY ENTERPRISES USA,INC. Job# 14322-01 DB IMMOKALEE TIGER GRANT Rates Dale 10/18/24 Work Directive Change#2-313 Jefferson Ave ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personnel Corporate Officer HR $150,00 $195.00 $0.00 $0.00 $0.00 Projecl Manager HR $125.00 $162,50 $0.00 $0.00 $0.00 Superintendent HR :'$85.00 ' $110.50 $0.00 $0.00 $0.00 Foreman HR $85.00 $110.50 8 $880.00 $0.00 $880.00 Mechanic,Equipment A Truck Operator HR $75.00 $97.50 6 '$450.00 $0.00 ':$450.00 Laborer HR $55.00 $71.50 32 $1,760.00 $0.00 $1,760.00 Administrative HR $75.00 $97.50 $0.00 $0.00 $0.00 Equipment Excavator>Cat349 HR $250.00 $0.00 $0.00 $0,00' Excavator?Cat 320 HR $200.00 $0.00 $0.00 $0.00 Excavator<Cat320 HR $150.00 8 $900,00 $0,00 $900,00 Excavator w/hammerlEpiroc HR $350.00 $0,00 $0.00 $0.00 Excavator w/side grip vibratory hammer HR $350.00 $0.00 $0.00 $0,00 Wheel Loader>Cet 962 FIR $225.00 $0.00 $0.00 $0.00 Wheel Loader>Cat938 HR $175.00 Wheel Loader<Cat 938 HR 8150.00 6 $900.00 $0.00 $900.00 Bull Dozer HR $175.00 $0.00 $0.00 $0.00. Motor Grader HR $175.00 $0.00 $0.00 $0.00 Soil/Stone Railer HR 5125.00 $0.00 $0.00 `$0.00 Telehandier HR $125.00 $0.00 $0.00 $0.00 ManflR :`HR :. r.$125.00 Forklift HR $100.00 $0.00 50.00 $0.00 Broom Tractor HR $95.00 $0.00 :$0,00 !$0.00 Milling Machine HR $685.00 $0.00 $0.00 $0,00 Skid steer with milling head(bump grinder) HR $150.00 $0.00 $0.00 $0.00 Aephalt/Mat.Shutlle Buggy HR $376.00 $0.00 $0.00 $0.00 Asphalt Paver Weiler385 HR _' $375.00 $0.00 $0.00 ':.:$0,00. Asphalt Paver Cal 1055 HR $575.00 $0.00 $0.00 $0,00 Asphalt Roller HR $125.00 $0.00 $0.00 $0,00 Off Road Dump HR $250.00 $0.00 $0,00 $0,00 Crane>130ton HR $1,500.00 $0.00 $0.00 $0.00 Crane>30 ton HR $500.00 $0.00 $0.00 $0.00 Crane s30 ton HR $250.00 '_ $0.00 $0.00 $0.00: Vibratory Hammer HR $400.00 $0.00 $0.00 $0.0a Concrete Crusher HR : $685,00 $0.00 $0.00 $0.00: Screener HR $375.00 $0.00 $0.00 $0.00 Push Boat HR $275.00 .' $0.00 $0.00 $0.00. Sectianat/Hopper Barge HR $175.00 $0.00 $0.00 $0.00 Drone Lider Photogrammetry HR .,$350,00 $0.00 $0.00 $0.00 Directional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0.00 Directional Drill AA 440 HR $4,000.00 $0.00. $0.00 $0.00 Lowboyll-raclor HR $175.00 $0,00 $0.00 $0,00 Dump Truck/Roil Off HR $95.00 $0,00 $0.00 $0.00 Water TruckfRellar` HR $125.00 $0.00 . $0.00 $0.00 Tack/Prime Truck/Trailer HR $150.00 $0.00 $0,00 $0.00 Luba/Mechanics Truck HR $125.00 $0.00 $0.00 $0.00 Truck with Hand Tools HR $95.00 8 $780.00 $0.00 $760.00 Pickup- HR $40.00 $0.00 $0,00 $0,00 Camera Truck FIR $400.00 $0.00 $0.00 $0.00 Vacuum Truck HR $475.00 $0.00 $0.00 $0.00 Small Equipment $0,00 Air Compressor with Hammer HR $80.00 $0,00 : $0.00 ..$0.00 Concrete Saw HR $60.00 2 $120.00 $0.00 $120,00 Plate Compactor HR $60,00 4 . $240.00 $0.00 $240.00 Trench Box 18'x 10' HR $50.00 $0.00 $0.00 $0.00 Stone Box HR $50.00 $0.00 $0.00 $0,00 Steal(Road)Plate HR $50.00 $0.00 $0.00 $0,00 WellpointSystem HR ':$250,00 $0.00 $0.00 $0.00 3"Trash/Submersible Pump HR $50.00 $0.00 $0,00 $0.00 6"Hydraulic Pump HR $160,00 $0.00 '$0.00 $0.00 12'Hydraulic Pump HR $200.00 $0.00 $0.00 $0.00 Cut Off Sew HR $20.00 $0.00 $0.00 $0.00 Light Set HR $50.00 $0.00 $0,00 $0.00 Generator/Walder . HR $50.00 $0.00 :II$0,00 $0.00 Generator 70kw HR $126.00 $0,00 $0.00 $0.00 Generator 125kw HR $150.00 _ $0.00 $0.00 $0.00 MOT HR $150.00 $0.00 $0,00 $0.00 Fusing Machine 2.18" HR $150.00 : 1 $0.00 :$0.00 .:$0.00. Fusing Machine 18"-42" HR $300.00 $0.00 $0.00 $0,00 Tap Machine.small(314 3')'each tap ` EA $750.00 $0.00 $0.00 $0.00 Tap Machine-large(4'-12") each tap EA $1,000.00 $0.00 $0.00 $0,00 Pipe Trenchless Piercing tool HR $250.00 : Pipe RammingHR $625.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0,00 Material Disposal Fee(concrete.asphalt,debris,etc) PER LOAD $500,00 $0.00 .'30.00 .$0.00: QEC-4000 PSI Concrete CY $181,00 $0.00 $0.00 $0.00 Fuel Surcharge EA $40.00 $0.00 $0.00 $0.00 Environmental Charge EA $30.00 $0.00 $0.00 $0.00 Tax LS $0.00 $0.00 $0.00 $0.00 Grand Total: $5,810.00 CA() CA QUALITY ENTERPRISES USA,INC. Job# 14322-01 1 6 R 8 DB IMMOKALEE TIGER GRANT Rates Dale 10/22/24 Work Directive Change#2-313 Jefferson Ave ST HOURLY OT HOURLY 8T OT ST 0T UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personnel Corporate Officer HR $150.00 $195.00 $0.00 $0.00 $0.00 Project Manager HR $125.00 $162.50 $0.00 $0.00 $0,00 Superintendent HR $85.00 $110.50 $0.00 $0.00 $0.00 Foreman HR $85.00 $110.50 5 $425.00 $0.00 $425.00 Mechanic,Equipment&Truck Operator, HR $75.00 $97.50 6 $375.00 $0.00 $375.00 Laborer HR $55.00 $71.50 20 $1,100.00 $0.00 $1,100,00 Administrative HR $75.00 $97.50 $0.00 $0,00 $0.00. Equipment Excavator>Cat 349 .. HR 4$250,00 $0.00. :$0.00 Y:$0.00' Excavator>Cat 320 HR $200.00 $0.00 $0.00 $0.00 Excavator<Cat 320 HR $150.00 $0,00 $0,00 $0.00; Excavator wlhammer/Epiroc HR $350.00 $0,00 $0.00 $0.00 Excavator w/stde grip vibratory hammer :.i HR :- `$350.00 ..: -$0.00 $0.00 :<$0.00 Wheel Loader>Cat 982 HR $225.00 $0.00 $0.00 $0.00 Wheel loader>Cat938 HR :' $175.00 $0.00 $0.00 $0,00. Wheel Loader<Cat 938 HR $150.00 $0.00 $0,00 $0,00 Buil Dozer HR > $175.00 $0.00 $0.00 $0.00 Motor Grader FIR $175.00 $0.00 $0.00 $0.00 Soil/Slone Roller HR $125.00 $0.00 $0.00 $0.00 Telehandler HR $126.00 $0.00 $0.00 $0.00 Manlift HR $125.00 $0,00 $0,00 :,$0,00) Forklift HR $100,00 $0.00 $0.00 $0.00 Broom Tractor HR $95.00 $0.00 $0.00 $0,00 Milling Machine HR $685.00 $0.00 $0.00 $0.00 Skid steer with milling head(bump grinder) HR $150.00 $0,00 $0.00 $0,00 Asphalt/Mat.Shuttle Buggy HR $375.00 $0.00 $0,00 $0.00 Asphalt Pavet Weiler 385 HR : $375.00 $0.00 $0.00 $0,00 Asphalt Paver Cat 1055 HR $575.00 $0.00 $0,00 $0.00 Asphalt Roller HR $125.00 $0,00 $0.00 $0.00 Off Road Dump HR $250.00 $0.00 $0.00 $0.00 Crane>130ton . .. HR $1,600.00 $0.00 $0.00 $0,00 Crane>30ton HR $500.00 $0.00 $0.00 $0.00 Crane<30 ton HR $250.00 $0.00 $0.00 "i$0,00 Vibratory Hammer HR $400.00 $0.00 $0.00 $0.00 Concrete Crusher HR $686.00 $0,00 $0.00 $0,00 Screenar HR $376.00 $0,00 $0.00 $0,00 Push Boat HR $275.00 $0,00 $0.00 $0,00I Sectional/Hopper Barge HR $175.00 $0.00 $0.00 $0.00 Drone Lldar Photogrammetry HR $350.00 $0.00 $0.00 $0.00 Directional Drill JT 100 HR $2,000.00 $0.00 $0,00 $0.00 Olrectonal Drill AA 440 _ HR 64,000,00 $0.00 $0,00 $0,00 Lowboy/Tractor HR $175.00 $0.00 $0.00 $0.00 Dump Truck/Roll Off HR $95.00 $0.00 $0.00 $0.00 WaterTruck/Tralter HR $125.00 $0.00' $0.00 $0.00 Tack/Prime Truck/Trailer HR $150.00 $0.00 $0.00 $0.00 Lube/Mechanics Truck HR $125.00 $0,00 $0,00 $0.00 Truck with Hand Tools HR $95.00 6 $475.00 $0,00 $476,00 Pickup HR ,`:$40,00 $0.00 $0.00 ;::$0.00 Camera Truck HR $400.00 $0.00 $0.00 $0,00 Vacuum Truck HR $475,00 $0.00 $0.00 $0.00 Small Equipment $0.00 Air Compressor with Hammer. HR $60.00 $0.00 $0.00 $0.00 Concrete Saw HR $60.00 $0.00 $0.00 $0.00 Plate Compactor HR $60.00 $0.00 $0.00 $0.00 Trench Box 18'x 10' HR $50.00 $0.00 $0.00 $0.00 Slone Box HR $50.00 $0,00 $0,00 $0,00 Steel(Road)Plate HR $50,00 $0.00 $0.00 $0.00 WellpointSystem HR $250.00 $0.00 $0.00 $0.00 3"Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0,00 6"Hydraulic Pump HR $160,00 $0.00 $0.00 $0.00 12"Hydraulic Pump HR $200,00 $0.00 $0.00 $0.00 Cut Off Sew HR $20.00 $0.00 $0.00 $0.00 Light Set HR $50.00 $0.00 $0.00 $0.00 OeneratorM/elder HR $50.00 $0.00 $0.00 $0,00 Generator 70kw HR $125.00 $0.00 $0.00 $0,00 Generator 125kw :' HR $150.00 $0,00 $0.00 $0.00 MOT HR $150.00 $0.00 $0.00 $0,00 Fusing Machine 2-16" HR $150.00 $0.00 $0.00 $0.00 Fusing Machine 18"-42" HR $300.00 $0.00 $0.00 $0.00 Tap Machine-small(3/4"-3") each tap EA $750.00 $0.0 $0.00 $0,00 Tap Machine-large(4"-12") each lap EA $1,000.00 $0.00 $0.00 $0.00 Pipe Trenchiess Piercing tool HR $250.00 $0.00 $0.00 $0,00 Pipe Ramming HR $625,00 $0.00 $0.00 $0.00 Material Disposal Fee(concrete,asphalt,debris,etc) PER LOAD $500.00 $0.00 $0.00 $0.00 QEC-4000 PSI Concrete CY $161.00 8.31 $1,337.91 $0.00 $1,337,91 Fuel Surcharge` EA` $40.00 1 $40.00 $0.00 $40.001 Environmental Charge EA $30.00 1 $30.00 $0.00 $30.00 Tex LS : $80.27 1< $80.27 $0.00 $80.27 Grand Total: $3,863.18 (AO 16R8 QUALITY ENTERPRISES USA,INC. Job 8 14322-01 DB IMMOKALEE TIGER GRANT Rates Dale 12/17/24 Work Directive Change 42.501 Jefferson Ave ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personnel Corporate Officer : HR $150.00 ::$195.00 $0.00 -$0,00 ::$0.00 Project Manager HR $125.00 $162.50 $0.00 $0.00 $0.00 Suporntendenl HR $85.00 $110.50 : $0.00 $0.00 $0.00 Foreman HR $85.00 $110.50 6 $510.00 $0,00 $510.00 Mechanic,Equipment&Truck Operator _ .::HR '$75.00 '.i$97.50 8 .. $460.00 $0.00 $450.00 Laborer HR $55.00 $71.50 24 $1,320.00 $0,00 $1,320.00 Administrative HR $75.00 $97.50 $0.00 $0.00 $0.00 Eaulnmen( Excavator>Cal 349 HR $250.00 ;$0.00 ''$0.00 s;$0,00 Excavator>Cal 320 HR $200,00 $0.00 $0.00 $0.00 Excavator<Cal 320. HR $160.00 6 $900,00 $0,00 l $900,00 Excavator wlhammer/Eplroc HR $350.00 $0.00 $0.00 $0.00 Excavatorwlalde grip vibratory hammer HR $350.00 $0,00 $0.00 $0.00 Wheel Loader>Cal 962 HR $225.00 $0.00 $0.00 $0.00 Wheel Loader>Cat 938 HR $175.00 $0.00 $0.00 $0.00 Wheel Loader<Cal 938 FIR $150.00 6 $900.00 $0.00 $900.00 Bull Dozer HR $175.00 $0.00 `- $0.00 II.$0.00 Motor Grader HR $175.00 $0,00 $0.00 $0.00 Soil/Stone Roller HR $125.00 $0.00 :`$0.00 $0.00 Telehandler HR $125.00 $0,00 $0.00 $0.00 Manlih HR $125.00 $0.00 $0.00 $0,00 Forklift HR $100.00 $0.00 $0.00 $0.00 Broom Tractor HR $95.00 $0.00 $0.00 $0,00 Milling Machine HR $685.00 $0.00 $0,00 $0,00 Skid steer with milling head(bump gdnder) : �,:HR $150,00 .. :. $0.00 $0.00 :::.,:$0.00 Asphall/Mat.Shuttle Buggy HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver Weller386 HR $376.00 $0.00 $0,00 $0.00 Asphalt Paver Cat 1055 HR $575.00 $0.00 $0.00 $0.00 Asphalt Roller HR $125.00 $0,00 $0.00 $0,00 Off Road Dump HR $250.00 $0.00 $0.00 $0.00 Crane>130 tan : ::.:HR-_. :'$1,500.00 $0.00 :$0,00 $0.00 Crane_30ton HR $500.00 $0.00 $0.00 $0.00 Crane<30 ton HR $250.00 $0.00 $0,00 $0.00 Vibratory Hammer HR $400.00 $0.00 $0,00 $0.00 Concrete Crusher= HR $685.00 $0.00 $0.00 $0.00 ( Screener HR $375.00 $0.00 $0,00 $0.00 Push Boat HR :.. $276.00 $0.00 :.:$0,00 :'.:.$0,00 Sectional/Hopper Berge HR $175.00 $0.00 $0.00 $0.00 Drone Lidar Phologrammetry HR $350.00 $0,00 $0.00 $0.00 Directional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0.00 Directional Drill AA 440 HR $4,000,00 $0.00 $0.00 $0,00 Lowboyffrector HR $175.00 $0,00 $0,00 $0.00 Dump Truck/Roll Off HR $95.00 $0.00 $0.00 $0.00 WaterTrucidTrellsr _ HR $125,00 ':$0.00 $0.00 .''$0.00 Tack/PrimeTruckffrailer HR $150.00 $0.00 $0.00 $0.00 Lube/Maehanlcs Truck HR $125,00 $0.00 $0,00 $0,00 Truck with Hand Tools HR $95.00 6 $570.00 $0.00 $570.00 • Pickup ::HR $40.00 :.:$0.00 -:.$0,00 ::`.;:$0,00 Camera Truck HR $400.00 $0.00 $0.00 $0.00 Vacuum Truck HR $475.00 $0.00 $0.00 $0,00 Smell Eaulnmeni $0.00 Air Compressor:with Hammer -: HR $60.00 $0,00 ..::$0.00 $0.00 Concrete Saw HR $80.00 $0.00 $0.00 $0.00 Plate Compactor :HR :'$60.00 6 _. $360.00 :: $0.00 c. $360,00. Trench Box 18'x 10' HR $50.00 $0.00 $0.00 $0.00 Stone Box HR $50,00 $0.00 $0,00 $0,00 Steel(Road)Plate HR $50.00 $0.00 $0.00 $0.00 Wellpoint System HR :$250.00 $0,00 $0.00 :.:`.$0.00 ;; 3"Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0.00 6"Hydraulic Pump HR $150.00 $0,00 $0,00 $0.00 12"Hydraulic Pump HR $200.00 $0.00 $0.00 $0.00 Cut Off Saw HR $20.00 $0,00 $0.00 $0.00 Light Set HR $50.00 $0.00 $0.00 $0.00 Generator/Welder. .',HR $50.00. : :$0.00 $0.00 J$0.00 Generator70kw HR $125.00 $0.00 $0.00 $0.00 Generator 125kw : 'HR $150.00 - $0.00 $0.00 :$0,00 MOT HR $150.00 $0.00 $0,00 $0.00 Fusing Machine 2-16' HR $450.00 $0,00 :..:$0.00 ''::$0.00 Fusing Machine 18"-42' HR $300,00 $0,00 $0.00 $0.00 Tap Machine-smell(3/4"-3') each tap EA $750.00 $0.00 $0.00 $0.00 Tap Machine-large(4"-12') each tap EA $1,000.00 $0.00 $0.00 $0.00 Pipe Trenchless Piercing tool - - - HR $250.00 - -' $0.00 $0.00 $0.00 Pipe Ramming HR $825.00 $0.00 $0,00 $0.00 Materiel Disposal Fee(concrete,asphalt,debris,etc) PER LOAD $500.00 $0,00 $0.00 $0,00 846 Mine-Bose Rock TN $19.00 9.75 $185,25 $0.00 $185,25 Tax`.` _. -.LS :`$11.12 1 C..$11.12 :`::$0.00 ::'$11.12 AJAX-Superpave Asphalt TN $85.00 $0.00 $0.00 $0.00 10%Mark Up `. .:--::. LS $0.00. _ $0.00 z$0.00 $0.00 Tax LS $0.00 $0.00 $0.00 $0,00 Grand Total: $5,205.37 'CA.( 1 16R8 QUALITY ENTERPRISES USA,INC. Job# 14322-01 DB IMMOKALEE TIGER GRANT Rates Date 12/19/24 Work Directive Change#2-501 Jefferson Ave ST HOURLY OT HOURLY ST 0T ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personnel Corporate Officer HR $150.00 $195,00 $0.00 $0.00 $0,00. Project Manager HR $125.00 $162.50 $0.00 $0.00 $0.00 Superintendent HR $85,00 $110.50 $0.00 $0.00 $0.00 Foreman HR $85,00 $110.50 3 $255.00 $0.00 $255.00 Mechanic,Equipment$,Truck Operator HR $75.00 $97,60 3 $225.00 $0.00 $226.00 Laborer HR $55.00 $71.50 12 $880.00 $0.00 $660.00 Administrative HR .$75.00 $97,50 $0.00 : $0.00 $0,00. ;;oulnmen( Excavator>Cat 349 HR $250.00 $0.00 $0:00 $0.00 Excavator>Cat 320 HR S200.00 $0.00 50.00 $0.00 Excavator<Cat 320. HR $150.00 $0,00 $0.00 $0.00 Excavator wlhammer/Eplroo HR $350.00 $0 00 $0.00 $0.00 Excavator w/side grip vibratory hammer HR $350,00 `' $0.00 $0.00 $0.00. Wheel Loader>Cat 962 HR 8225.00 $0.00 S0.00 $0.00 Wheel Loader>Cat 938 HR $175.00 $0.00 $0.00 $GAO Wheel Loader<Cet 938 HR $150.00 $0.00 $0.00 $0.00 Bull Dozer HR $175.00 $0.00 $0.00: $0.00 Motor Grader HR $175.00 $0.00 $0.00 $0.00 Soill$tone Roller HR $125,00 $0.00 S0.00 $0.00 Telehandler HR S125.00 $0.00 $0.00 $0.00 Manlift' HR S125.00 $0.00 ' $0.00 $0.00 Forklift HR S100.00 $0.00 $0.00 $0.00 Broom Tractor HR $95.00 $0.00 $0.00 $0.00 Milling Machine HR $685,00 $0.00 $0.00 $0.00 Skid steer with milling head(bump gdnder) HR $150,00 $0.00 $0,00 $0.00 AsphalUMat,Shuttie Buggy HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver.Weller385 HR $375,00 2 $750.00 $0.00 $750.00 Asphalt Paver Cat 1055 HR S575.00 $0.00 $0.00 $0.00 Asphalt Roller HR $125.00 2 $250.00 $0,00: :$250.00 Off Road Dump HR S250.00 $0.00 $0.00 $0.00 Crane>130 ton HR $1,500.00 $0.00 $0.00 $0.00 Crane>30 ton HR $500.00 $0.00 $0.00 $0.00 Crane<30 ton HR $250.00 $0.00 $0.00 $0.00 Vibratory Hemmer HR $400.00 $0.00 $0.00 $0.00 Concrete Crusher HR $685.00 $0.00 $0,00' $0.00 Screener HR $375.00 $0.00 $0.00 $0,00 Push Boat HR S275.00 : $0.00 ` ':$0.00 ::$0.00 Sectional/Hopper Barge HR S175.00 $0.00 $0.00 $0.00 Drone LldarPhotogrammetry HR '$350.00 $0.00 $0.00 ` $0.00 Directional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0.00 Directional Drill AA 440 HR $4,000.00 $0.00 $0.00 $0.00 Lowboy7Tractor. HR S175.00 $0.00 $0.00 $0.00 Dump Truck/Roll Off HR $95.00 $0.00 $0.00 $0.00 WaterTrucklTralfer HR S125.00 $0,00 $0.00_ $0.00 Tack/Prime Truck/Traller HR S150.00 2 $300.00 $0.00 $300.00 Luba/MechanlcsTruck HR S125.00 $0.00 ' $0.00' $0.00 Truck wllh Hand Tools HR $95.00 3 $285.00 $0.00 $285.00 Pickup' HR $40,00 $0.00 : $0.00 $0,00 Camera Truck HR S400.00 $0.00 $0.00 $0,00 Vacuum Truck HR. S475,00 $0.00 _ $0.00 $0,00 Small Equipment $0.00 Air.Compressor with Hammer : HR $60.00 $0,00 . $0.00 $0.00 Concrete Saw HR $60.00 $0.00 $0.00 $0.00 Plate Compactor HR $60.00 $0,00 $0.00': $0.00 Trench Box 16'x 10' HR $50.00 $0.00 $0.00 $0.00 Stone Box HR $50.00 $0.00 $0.00: $0.00 Steel(Road)Plate HR $50.00 $0.00 $0.00 $0.00 WetlpointSystem` HR :$250.00 $0.00 $0.00> $0,00 3"Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0.00 6"Hydraulic Pump i HR $150.00 $0.00 $0.00' ...$0,00 12°Hydraulic Pump HR $200.00 $0.00 $0.00 $0.00 Cut Off Sew HR $20.00 $0,00 $0.00: $0.00 Light Set HR $50.00 $0.00 $0.00 $0.00 Generator/Welder:: I HR `..$60.00 ': $0.00 :. $0.00 `:$0.00 ( Generator 70kw HR $125.00 $0.00 $0.00 $0.00 Generator125kw `: HR $150.00 $0.00 $0.00'' $0.00 MOT HR $150.00 $0.00 $0.00 $0.00 Fusing Machine 2.16" HR $150.00 $0.00 $0.00 $0.00 Fusing Machine 18"-42 HR $300,00 $0.00 $0.00 $0.00 Tap Machine-:small(3/4"-:3") each tap EA $750.00 $0.00 $0.00 $0.00 Tap Machine-large(4'-12") each tap EA $1,000.00 $0.00 $0.00 $0.00 Pipe Trenchleas Plerclng tool HR $250.00 $0.00 $0.00 $0.00 Pipe Ramming HR S625.00 $0.00 $0.00 $0.00 Material Disposal Fee(concrete,asphalt,debris,etc) PER LOAD: $500.00 $0,00 $0,00 ` $0.00 846 Mine-Base Rock TN $17.00 $0.00 $0.00 $0.00 Tax G LS $0.00 $0,00 ` $0.00 $0.00 Preferred-Superpave Asphalt TN $80.00 4.68 $374.40 $0.00 $374.40 OH+P LS $37,44 1 $37A4 $0.00 $37A4 Tax LS $22.46 1 $22.46 $0.00 $22.48 Grand Total: $3,159.30 C".r .f QUALITY ENTERPRISES USA,INC, Job# 14322-01 1 6 it 8 DB IMMOKALEE TIGER GRANT Rates Dato 01/27/25 Work Directive Change#2-721 Dade St Driveway ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personne Corporate OfOcer'- HR $150.00 $195.00 $0,00 $0.00 $0.00 Project Manager HR $125.00 $182.50 $0.00 $0.00 $0.00 Superintendent HR $85.00 $110,50 - $0.00 $0.00 . $0,00 Foreman HR $85,00 $110,50 10 $850,00 $0.00 $850,00 Mechanic,Equipment$.Truck Operator: HR $75.00 $97.50 14 $1,050,00`:. $0.00 $1,050,00 Laborer HR $55.00 $71.50 40 $2,200.00 $0.00 $2,200.00 Administrative HR $75.00 $97.50 $0.00 $0.00 $0,00 Equipment Excavator>Cat 349 HR $250.00 $0.00 : $0.00 $0.00' Excavator?Cat 320 HR $200.00 $0.00 $0.00 $0.00 Excavator<Cat320 HR $150,00 8 $1,200.00 $0.00 $1,200.00 Excavator w/hammer/Epiroc HR $350.00 $0.00 $0.00 $0.00 Excavator w/side grip vibratory hammer HR $350.00 $0.00. :'$0.00 ::$0.00 Wheel Loader>Ca1952 HR $225.00 $0.00 $0.00 $0.00 Wheeh Loader>Cat938 HR $175.00 $0.00 $0.00 $0.00 Wheel Loader;Cat 938 HR $150.00 8 $1,200.00 $0.00 $1,200.00 Bull Dozer HR $175.00 $0.00 $0.00 $0.00 Motor Grader HR $175.00 $0.00 $0.00 $0.00 Solt/Slone Roller :: HR : $125.00 $0.00: $0.00 "$0.00 Tetehandlar HR $125.00 $0.00 $0.00 $0.00 Manlift HR $125,00 $0.00 $0.00 $0.00. Forklift HR $100,00 $0.00 $0.00 $0,00 Broom Tractor HR $95.00 $0.00`' $0,00 $0.00 Milling Machine HR $885.00 $0.00 $0.00 $0.00 Skid steer with milling head(bump grinder) HR $150,00 $0.00! $0.00 $0,00 Asphell/MaLShuttie Buggy HR $375,00 $0.00 $0.00 $0,00 Asphalt Paver Weiler 385 _. HR $375.00 $0.00' $0.00 '$0.00 Asphalt Paver Cal 1055 HR $575.00 $0.00 $0.00 $0,00 Asphalt Roller HR : $125.00 $0.00 - $0.00 $0,00 Off Road Dump HR $250.00 $0.00 $0.00 $0.00 Crane>130 ton FIR $1,500.00 $0.00 $0.00 $0.00 Crane>30Ion HR $500.00 $0.00 $0.00 $0.00 Crane<30 ton _ HR -::$250.00 $0.00 :. $0.00 '$0,00 Vibratory Hammer HR $400.00 $0.00 $0.00 $0.00 Concrete crusher- HR :$685.00 '$0,00 :$0.00 ::$0,00 Screener HR $37540 $0.00 $0.00 $0.00 Push Boat HR $275.00 $0.00 ' $0.00 $0,00 Sectional/Hopper Barge HR $175.00 $0.00 $0.00 $0.00 DroneLidarPhotogrammetry HR $350.00 $0.00 $0.00 $0.00 Directional Drill JT 100 HR $2,000,60 $0.00 $0.00 $0.00 Directional Drill AA44Q HR $4,000.00 $1100 > $0.00 ::$0,00 Lowboy/Tractor HR $175.00 $0.00 $0,00 $0,00. Dump Truck/Roil Off HR $95.00 4 $380.00 $0.00 $380.00 WaterTruck/Traller. HR $125.00 _ $0.00 , $0,00 $0,00 Tack/Prime Truck Trailer HR $150.00 $0.00 $0,00 $0.00 Lube/Mechanics Truck : :: HR $125.00 : $0.00 : $0,00 $0.00 Truck with Hand Tools HR $95.00 10 $950.00 $0.00 $950,00 i' Pickup HR $40.00 $0.00 $0.00 $0.00 . Camera Truck HR $400.00 $0.00 $0.00 $0.00 I Vacuum Truck HR $475.00 $0.00 $0.00 $0.00 Small Equipment $0.00 Air Compressor with Hammer':: HR $60.00 $0.00::` $0.00 :$0.00. I' Concrete Saw HR $60.00 2 $120.00 $0.00 $120.00 Plate Compactor HR $80,00 4 : $240.00 $0.00 $240.00 Trench Box 16'x 10' HR $50,00 $0,00 $0.00 $0.00 Stone Box HR $50,00 $0,00 $0,00 $0,00 Steel(Road)Plate HR $50.00 $0.00 $0.00 $0.00 WellpointSystem HR $250.00 $0.00 " $0.00 $0,00 3"Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0,00 6"Hydreulto Pump HR $150.00 $0.00' $0.00 $0,00 12"Hydrauiic Pump HR $200.00 $0.00 $0.00 $0.00 Cul Off Saw HR $20.00 $0.00 : $0.00 $0.00 Light Set HR $50.00 $0.00 $0.00 $0,00 Generator/Welder HR $50.00 $0.00 $0.00 $0.00 Generator 70kw HR $125.00 $0.00 $0.00 $0.00 Generator 125kw HR $150.00: : $0.00 $0.00 ,:1$0.00 MOT HR $150,00 50.00 $0.00 $0.00 Fusing Machine 2-16^ HR _. $160.00 $0.00 $0.00 $0,00 Fusing Machine 18"-42" HR $300.00 $0.00 $0.00 $0.00 Tap Machine-small(314"-3") each tap EA $750.00 $0.00 : $0.00 $0,00 Tap Machine-large(4'-12") each tap EA $1,000.00 $0.00 $0.00 $0.00 Pipe Trenchless Piercing tool HR $250.00 $0.00 $0.00 $0,00 Pipe Ramming HR $625,00 $0.00 $0.00 $0.00 Material, Disposal Fee(concrete,asphalt,debris,etc) PER LOAD $500.00 $0.00 $0.00 $0.00 QEC-4000 PSI Concrete CY $161.00 $0.00 $0,00 $0,00 Fuel Surcharge . EA $40.00 $0.00 .$0.00 $0.00 Environmental Charge EA $30.00 $0.00 $0.00 $0.00 Tax LS $0.00 $0.00 $0.00 $0,00 Grand Total: $8,190.00 (..7.(.) 16B8 QUALITY ENTERPRISES USA,INC. Job# 14322-0i DB IMMOKALEE TIGER GRANT Rates Date 01/27/25 Work Directive Change 42-721 Dade SI Driveway ST HOURLY OT HOURLY ST OT ST 0T UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL persongel Corporate Officer HR $150,00 :.$195,00 :: $0,00 ::$0.00 $0.00. Project Manager HR $125.00 $182.50 $0.00 $0,00 $0,00 Superintendent '.: 'HR $05.00 ::$110.50 $0.00 $0.00 $0.00 Foreman HR $85.00 $110.60 8 $680.00 $0.00 $680.00 Mechanic,Equipment&Truck Operator HR $75.00 $97.60 8 $600.00 $0.00 $600.00 Laborer HR $55.00 $71.50 24 $1,320.00 $0.00 $1,320.00 Administrative HR `$75.00: $97.50 $0.00 $0.00 $0.00 );aulomanl Excavator>Cat 349 HR $250.00 $0.00 $0.00 $0,00 Excavator>Cat 320 HR $200.00 $0.00 $0,00 $0,00 Excavator<Cat 320 HR: $150.00 8 $900.00 $0.00 $900.00. Excavator wfhammer/Eplroc HR $350.00 $0.00 $0.00 $0.00 Excavator w/sidegdp vibratory hammer HR $350.00 $0.00 $0.00 $0.00 Wheel Loader>Cat 962 HR $225,00 $0,00 $0.00 $0,00 Wheel Loader>Cet 938 HR $175.00 $0.00 $0.00 $0.00 Wheel Loader<Cat 938 HR $150.00 6 $900,00 $0,00 $900,00 Bull Dozer HR $175.00 $0.00 $0.00 $0.00 Motor Grader HR $175.00 $0.00 $0.00 $0.00 Soil/Stone Roller HR $125.00 $0.00 $0.00 $0,00 Telehendlor HR $125.00 $0.00 $0.00 $0.00 MantiR HR $125.00 $0.00 $0,00 $0.00 Forklift HR $100.00 $0.00 $0.00 $0.00 Broom Tractor HR $95,00 $0.00 $0.00 $0,00 Milling Machine HR $685.0D $0.00 $0.00 $0.00 Skid steer with milling head(bump grinder) HR $150.00 $0.00 $0,00 $0,00 Asphal9Mat.Shuttle Buggy HR $376.00 $0.00 $0.00 $0.00 Asphalt Paver Weller385 -:HR `:$375,00 I$0,00 ;$0.00 ''$0,00 Asphalt Paver Cat 1055 HR $575.00 $0.00 $0.00 $0.00 Asphalt Roller _ HR $125,00 $0,00 $0.00 $0,00 Off Road Dump HR $250.00 30.00 $0.00 $0.00 Crane>130 ton HR : $1,500.00 $0.00 -$0.00 :::$0,00 Crane>30 ton HR $500.00 $0.00 $0.00 $0.00 Crane<30ton HR $250.00 $0,00 $0.00 $0,00 Vibratory Hammer HR $400.00 $0,00 $0.00 $0,00 Concrete Crusher HR $685.00 $0,00 $0.00 $0.00 Screener HR 5375.00 $0.00 $0.00 $0.00 Push Boat HR $275.00 $0.00 $0.00 $0.00 Sectional/Hopper Barge HR $175.00 $0.00 $0.00 $0.00 Drone Ltdar Photogrammetry : HR $350.06 $0.OD $0.00 $0.00 Directional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0.00 Directional Drill AA 440 HR : $4,000.00 $0,00 $0.00 ''$0.00, Lowboy/Tractor -- HR :$175.00 . .$0,00 :->.$0.00 -:c$0,00. Dump Truck/Roll OH HR 595.00 $0.00 $0.00 $0.00 Water:TruckfTraller: HR r$125.00 $0,00 '.:`$0.00 ':':$0,00 Tack/Prime Truck/Trailer HR $150.00 $0.00 $0.00 $0.00 Lube/Mechanics Truck ,' HR-: $125,00. ::$0.00 ;i$0,00 .f,:$0.00 Truck with Hand Tools HR $95.00 8 $760.00 $0.00 $760.00 Pickup HR ... $40.00 .'$0,00 $0,01) ':,$0.00 Camera Truck HR $400,00 $0.00 $0.00 $0.00 Vacuum Truck . ... :-HR $475.00 r.:$0,00 :'$0,00 '. .::$0.00 Small Eaulament $0.00 Air Compressor with Hammer :: HR $80,00 $0.00 '.:.$0.00 $0,00 Concrete Saw HR $80.00 $0.00 $0.00 $0.00 Plate Compactor . HR $60.00 $0,00 $0.00 $0,00 Trench Box 16'x 10' HR $50.00 $0.00 $0.00 $0.00 Stone Box HR _. :$50.00- _.$0.00 '$0,00 :`.:$0.00 Steel(Road)Plate HR $50.00 $0.00 $0.00 $0.00 Wellpotnt System HR $250.00 $0,00 $0,00 $0,00 3"Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0,00 8"Hydraulic Pump HR $150,00 $0,00 $0,00 $0,00 12"Hydraulic Pump HR $200.00 $0.00 30,00 $0.00 Cut Off Saw HR $20.00 $0.00 30.00 $0,00. Light Sat HR $50.00 $0.00 $0.00 $0,00 Generator/Welder : HR - $50.00 SO.00 $0.00 $0,00 Generator70kw HR $125.00 $0.00 $0.00 $0,00 Generator125kw ::HR $150.00 $0.00 '.--..$0.00 $0,00 MOT HR $150.00 $0.00 $0.00 $0.00 Fusing Machine 2.16' HR $150.00 $0,00 $0.00 $0.00 Fusing Machine 18'-42" HR $300.00 $0.00 $0.00 $0.00 Tap Machine-small(3/4"-3") each lap EA $750.00 $0.00 - :$0,00 $0,00 Tap Machine-large(4"-12") each tap EA $1,000.00 $0.00 $0.00 $0.00 Pipe Trenchless Piercing tool HR $250.00 $0.00 $0.00 $0.00 Pipe Ramming HR $625.00 $0.00 $0.00 $0.00 Material Disposal Fee(concrete,asphalt,debris;etc) PER LOAD $500.00 $0.00 $0.00 $0,00 Mack Concrete-Type C Inlet Structures EA $1,288.00 2 $2,578.00 $0.00 $2,576.00 OH+P LS $257.60 1 $257.80 $0.00 $257.60 Tex LS $154.56 1 $154.56 $0.00 $164.66 Ferguson-15x20HP.DW GRAY SLD PL PIPE 'FT $21.28 38 $608.64 ::.$0.00 ::$808,84 OH+P LS $80.86 1 $80.86 $0.00 $80.86 Tax LS $48.52 1 $48.52 $0,00 $48,62 Grand Total: $9,086.18 r C.AO 1 6 R 8 QUALITY ENTERPRISES USA,INC. Job 4 14322-01 DB IMMOKALEE TIGER GRANT Rates Dale 01/28/25 Work Directive Change#2-721 Dade St Driveway ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personnel Corporate Officer HR $150.00 $195.00 $0.00 $0.00 $0,00 Project Manager HR $125.00 $162.50 $0.00 $0.00 $0.00 Superintendent HR $85.00 $110.50 ' $0.00 $0.00 $0.00 Foreman HR $85,00 $110.50 6 $425.00 $0.00 $425.00 Mechanic,Equipment&Truck Operator HR $75.00 $97.50 5 $375.00 $0.00 $375.00 Laborer HR $55,00 $71.50 20 $1,100.00 $0.00 $1,100.00 Administrative HR $75.00 $97.50 $0.00 $0.00 $0.00'. Equipment Excavator?Cat 349 HR " $250.00 $0.00 $0.00 $0.001 Excavator>Cat 320 HR $200.00 $0.00 $0.00 $0.00 Excavator<Cat 320 HR` $150,00 $0.00 $0.00 $0,00' Excavator w/hammer/Epiroc HR $360.00 $0.00 S0.00 $0.00 Excavator w/side grip vibratory hammer HR $350.00 $0.00 S0.00 $0.00' Wheal Loader>Cat 962 HR $225.00 $0.00 $0.00 $0.00 Wheel Loader>Cat938 HR l$176.00 $0.00 $0.00 $0,00 Wheel Loader<Cat 938 HR $150.00 $0.00 $0.00 $0.00 Bull Dozer HR $175.00 $0.00 $0.00 $0.00 Motor Grader HR $175,00 $0.00 $0.00 $0.00 Soll/Stone Roller :: HR ':: $125.00 $0.00 $0.00 $0.00 Telehandier HR $125.00 $0.00 $0.00 $0.00 Manllft HR $125.00 $0.00 S0.00 $0.00 Forklift HR $t00.00 $0.00 $0.00 $0.00 Broom Tractor HR $95.00 $0.00 $0.00 '$O:DO Milling Machine HR $685.00 $0.00 $0.00 $0.00 Skid steer with milling head(bump grinder) HR $160,00' $0.00 $0.00 $0.00 Asphall/Mat.Shuttle Buggy HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver Weller 385 HR $375,00 $0.00 $0.00 $0.00: Asphalt Paver Cat 1055 HR $575.00 $0.00 $0.00 $0.00 Asphalt Roller HR $125,00 $0.00 $0.00 $0.00 Off Road Dump HR $250.00 $0,00 $0.00 $0.00 Crane>130ton i': HR $1,500.00 $0.00 $0.00 $0.00' Crane>30 ton HR $500.00 $0.00 $0.00 $0.00 Crane<30 ton HR $250.00 $0.00 $0.00 $0.00 Vibratory Hammer HR $400.00 $0.00 $0.00 $0.00 Concrete Crusher,. _. HR _:$685.00 f$0.00- :$0.00 ::$0.00.. Screener HR $375.00 $0.00 $0.00 $0.00 Push Boat HR $275.00 $0.00 $0.00 $0.00 Sectional/Hopper Barge HR $175.00 $0.00 $0.00 $0.00 Drone LIdar Photogrammetry HR $350.00 - $0.00 $0.00 $0.00 Directional Drill JT 100 HR $2,000.00 $0.00 $0.00 $0.00 Directional Drill AA440 : HR .$4,000.00 $0.00. :.::$0.00 ;$0.00: LowboyfTractor HR $175.00 _. $0.00 ::._$0.00 $0.00'. Dump Truck/Roll Off HR $95.00 $0.00 $0.00 $0.00 WaterTruck/Traller HR : $125.00 $0.00 $0.00 $0.00 Tack/Prime Truck/Trailer HR $150,00 $0,00 $0,00 $0.00 Lube/MechanlcsTruck HR $125.00 $0.00 $0.00 . '$0.00 Truck with Hand Tools HR $95.00 6 $475.00 $0.00 $475.00 Pickup HR $40.00 $0.00 $0.00 $0.00 Camera Truck HR $400,00 $0,00 $0.00 $0.00 Vacuum Truck ... HR H $475.00 $0,00 :.$0.00 $0.00 Small Equipment $0.00 Air Compressor with Hammer HR '..$60.00 ;,$0.00- ::'$0.00 r;$0.00 Concrete Saw HR $80.00 $0.00 $0.00 $0.00 Plate Compactor HR $80.00 $0.00 $0,00 $0.00 Trench Box 16'x 10' HR $50.00 $0.00 $0,00 $0.00 Stone Box HR $50,00 $0.00 $0.00 $0.00 Steal(Road)Plate HR $50.00 $0.00 $0,00 $0,00 Wellpolnt System HR $250,00 '$0.00 ':,$0.00 ::$0.00 3"Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0.00 6"Hydraulic Pump - - HR $150,00 : $0.00 :.r$0.00 '..$0.00. 12"Hydraulic Pump HR $200.00 $0.00 $0.00 $0.00 Cut Off Saw HR $20.00 $0.00 $0.00 $0.00 Light Set HR $50.00 $0,00 $0.00 $0.00 I'.. GeneralorN/eider HR : $50.00-- $0.00 ',:$0.00 ``$0.00 Generator70kw HR $125.00 $0,00 $0.00 $0.00 Generator 125kw HR $150.00 $0.00 $0.00 $0.00 MOT HR $150.00 $0.00. $0.00 $0.00 Fusing Machine 2.18" ._ HR `.$150.00 $0.00 $0.00 `.:$0.00 Fusing Machine 18"-42" HR $300.00 $0.00 $0.00 $0.00 Tap Machine-small(3/4 .3") each tap EA $750,00 $0.00 i`$0.00 $0.00 Tap Machine-large(4"-12") each tap EA $1,000.00 $0.00 $0.00 $0,00 Pipe Trenchlesa Piercing tool HR $250.00 $0.00 $0.00 $0.00 Pipe Ramming HR $625.00 $0,00 $0.00 $0,00 Malarial, Disposal Fee(concrete,asphalt,debris,etc) .PER LOAD $500.00 $0.00 $0.00 $0.00 QEC-4000 PSI Concrete CY $161.00 5.59 $899.99 $0.00 $899.99 Fuel Surcharge ` EA $40.00 1 $40.00 $0.00 $40.00 Environmental Charge EA $30,00 1 $30.00 $0.00 $30.00 Tax LS. $54.00 1 $54,00 $0,00 $54.00 Grand Total: $3,398.99 , 1 6 R 8 QUALITY ENTERPRISES USA,INC. Job a14322-01 DB IMMOKALEE TIGER GRANT Rates Date 01/14/25 Work Directive Change A2-1003 Madison Ave Driveway ST HOURLY OT HOURLY ST 0T ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL parsortnel Corporate Officer HR $150,00 $195.00 $0.00 $0.00 $0.00 Project Manager HR $125,00 $162.50 $0.00 $0.00 $0.00 Superintendent HR $85.00 $110.50 : $0.00 $0.00 $0.00 Foreman HR $85.00 $110.50 10 $850.00 $0.00 $850.00 Mechanic,Equipment&Truck Operator HR $75.00 $97.60 10 $750.00 $0.00 $750.00. Laborer HR $56.00 $71.60 40 $2,200.00 $0.00 $2,200.00 Administrative HR $75.00 $97.50 $0.00 $0.00 $0.00. Equipment Excavator>Cat 349 HR $250,00 $0.00 ::$0.00 $0.00 Excavator>Cat 320 HR $200,00 $0.00 $0.00 $0.00 Excavator<Cat320 HR $150,00 6 $900.00<' $0.00 $900.00 Excavatorwmemmer/Eplroc HR $350.00 $0.00 $0.00 $0.00 Excavator w/sfde grip vibratory hammer': HR $350.00 _ $0.00 $0.00 $0.00 Wheel Loader>Cat 982 HR $225.00 $0.00 $0.00 $0.00 Wheel Loader>Cat 938 HR $175.00 $0.00 ' $0.00 $0.00 Wheel Loader<Cat 938 HR $150.00 6 $900,00 $0.00 $900.00 Bull Dozer HR- $175.00 $0.00 $0:00 '' $0.00 Motor Grader HR $175.00 $0.00 $0.00 $0.00 Soil/Stone Reiter':: HR $125.00 $0.00 $0.00 $0.00 Telehendler HR $125.00 $0.00 $0.00 $0.00 Maniift HR $125.00 $0,00 $0,00 :.-.:$0,00. Forklift HR $100.00 $0.00 $0.00 $0.00 Broom Tractor HR.. $95.00 .... $0.00 $0.00 '..:$0.00.. Milling Machine HR $885.00 $0.00 $0.00 $0.00 Skid steer with milling head(bump grinder) HR $150,00 $0.00 $0.00 $0,00 Asphalt/Mat.Shuttle Buggy HR $375.00 $0,00 $0.00 $0,00 Asphalt Paver Weiler 385 HR - $375.00 $0,00 $0.00 $0,00 Asphalt Paver Cat 1055 HR $575.00 $0.00 $0.00 $0.00 Asphalt Roller HR $125.00 $0.00 $0.00 I:$0,00 ON Road Dump HR $250.00 $0,00 $0.00 $0.00 Crane>130ton HR $1,500.00 $0.00. $0.00 $0,00. Crane>30 ton HR $500.00 $0.00 $0.00 $0.00 Crane<30 ton : HR $250 00 $0.00 $0.00 $0.00 Vibratory Hemmer HR $400.00 $0.00 $0.00 $0.00 Concrete Crusher'' HR $685,00 $0.00< $0.00 $0.00 Screener HR $375,00 $0,00 $0.00 $0.00 Push Boat HR $276.00 $0,00 $0.00 $0.00 Sectional/HopperBerge HR $175.00 $0.00 $0.00 $0.00 Drone LldarPhologrammelry HR $350.00 $0.00 '. $0.00 $0.00 Directional Drill JT 100 HR 52,000.00 $0.00 $0.00 $0.00 Directional Drill AA 440 HR $4,000,00 $0.00:- :$0.00 :`$0.00 Lowboy/Tractor HR : $175,00 $0.00 : $0.00 $0,00 Dump Truck/Roll Off HR $95.00 $0.00 $0,00 $0.00 WaterTruck/Traller' HR `.r$125.00 ' $0.00 :2$0,00 '$0,00 Tack/Prime Truck/Trailer HR $150.00 $0.00 $0.00 $0,00 Luba/Mechanics Truck HR $125,00 $0.00 $0.00 $0.00 Truck with Hand Tools HR $95.00 10 $950.00 $0.00 $950.00 Pickup HR $40.00 $0.00 : $0.00 $0.00 Camera Truck HR $400.00 $0.00 $0.00 $0.00 { Vacuum Truck HR $475.00 $0.00 $0.00 `$0.00 Small Equipment $0.00 Air Compressor with Hemmer HR $60.00 $0.00 $0.00 $0.00 Concrete Sew HR $60.00 2 $120.00 $0.00 $120,00 Plate Compactor HR $60.00 4 $240,00 - $0.00 $240.00 Trench Box 16'x 10' HR $50.00 $0.00 $0,00 $0,00 Stone Box HR $50.00 $0.00 $0.00 $0,00 ` Steel(Road)Plate HR $50.00 $0.00 $0.00 $0.00 Wellpolnt System HR $250.00 $0,00 $0.00 $0,00 3"Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0.00 6"Hydraulic Pump HR' $150.00 $0.00" $0.00 $0.00 12"Hydraulic Pump HR $200.00 $0.00 $0.00 $0.00 Cut Off Saw HR $20.00 $0.00 $0.00 $0.00 Light Set HR $50.00 $0.00 $0.00 $0.00 GeneratorNVelder: HR $50.00 $0.00 $0.00 $0.00 Generator 70kw HR $125.00 $0.00 $0.00 $0,00 Generator 125kw HR $150.00 $0.00 $0.00 $0,00 MOT HR $150.00 $0.00 $0.00 $0.00 Fusing Machine 2-16' HR $150.00 $0.00 $0.00 $0.00 Fusing Machin 18"-42" HR $300.00 $0.00 $0.00 $0.00 Tap Machine-small(3/4"-3") each tap EA $750.00 $0,00 $0.00 $0.00 Tap Machine-large(4'-12") each tap EA $1,000.00 $0.00 $0.00 $0.00 Pipe Trenchless Piercing tool - HR $260.00-` $0.00 $0,00 $0.00 Pipe Ramming HR $626.00 $0.00 $0,00 $0.00 Material Disposal Fee(concrete,asphalt,debris,etc) PER LOAD $500.00 $0.00 $0.00 $0.00 QEC-4000 PSI Concrete CY $161.00 4,57 $735,77 $0.00 $735.77 Fuel Surcharge EA $40.00 1 $40,00 $0.00 $40,00 Environmental Charge EA $30.00 1 $30.00 $0.00 $30.00 Tax LS $44,15 1 $44.15 $0.00 $44.15 Grand Total: $7,759.92 CA() 1 6 R 8 QUALITY ENTERPRISES USA,INC. Job 14322-01 DB IMMOKALEE TIGER GRANT Rates Date 01/24/25 Work Directive Change#2-1103 Jefferson Ave ST HOURLY OT HOURLY ST OT ST 0T UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personnel Corporate Officer HR $150,00 $195,00 $0,00 $0.00 $0.00 Project Manager HR $125,00 $162.50 $0.00 $0.00 $0.00 Superintendent : HR $86,00 $110.50 $0.00 $0.00 $0,00 Foreman HR $85.00 $110.50 6 $510.00 $0.00 $510.00 Mechanic,Equipment a Truck Operator HR $75.00 $97.50 8 $450.00 $0.00 $450.00 Laborer HR $55.00 $71.50 24 $1,320.00 $0.00 $1,320.00 Administrative HR $75.00` $97.50 $0,00 $0.00 $0.00! Equipment Excavator>Cat 349 HR $250.00 $0,00 $0,00 $0.00 Excavator>Cat 320 HR $200.00 $0.00 $0.00 $0.00 Excavator<Cat 320 HR $150.00 5 $750.00 $0.00 $760.00. Excavator w/hammer(Epiroc HR $350.00 $0.00 $0.00 $0.00 Excavator w/side grip vibratory hammer HR $350.00 $0.00 $0.00 $0,00 Wheel Loader>Cet962 HR $225.00 $0.00 $0.00 $0.00 Wheel Loader>Cat 938 HR $175,00 $0.00 50.00 $0.00 Wheel Loader<Cat 938 HR $150.00 5 $750.00 S0.00 $750,00 Bull Dozer HR : $175.00 $0,00 $0,00 $0,00 Motor Grader HR $176.00 $0.00 $0,00 $0,00 Soil/Stone Roller _. HR $125.00 $0.00 $0.00 '$0,00 Telehandler HR $125.00 $0.00 $0.00 $0.00 Manllft': HR : $125.00 $0,00 $0,00 $0,00 Forklift HR $100,00 $0.00 $0,00 $0.00 Broom Tractor HR $95.00 $0,00 $0.00 $0.00 Milling Machine HR $685,00 $0.00 $0.00 $0.00 Skid steer with milling head(bump grinder) HR $150.00 $0,00 $0.00 $0,00 Asphalt/Mat.Shuttle Buggy HR $375.00 $0.00 $0.00 $0,00 Asphalt Paver Weiler 385 HR $375.00 $0.00 $0,00 $0,00 Asphalt Paver Cal 1055 HR $575.00 $0.00 $0.00 $0.00 Asphalt Roller HR $125.00 $0,00 $0,00 $0,00 Off Road Dump HR $250.00 $0.00 $0.00 $0,00 Crane>130ton HR $1,500.00 $0,00 $0,00 $0,00 Crane>30 ton HR $500.00 $0.00 $0.00 $0.00 Crane<30ton HR $250,00 $0.00 $0.00 $0,00 Vibratory Hammer HR $400.00 $0.00 $0.00 $0.00 Concrete Crusher ' HR $685.00 $0,00 $0,00 $0.00 Screener HR $375.00 $0.00 $0.00 $0.00 Push Boat HR $275,00 $0,00 $0,00 $0,00 SectionalHopperBarge HR $175.00 $0.00 $0.00 $0.00 Drone Lidar Photogrammelry HR $350.00 $0.00 $0.00 $0.00 Directional Drill JT 100 HR $2,000.00 $0.00 $0,00 $0.00 Directional Drill AA 440 HR $4,000.00 $0.00 $0.00 $0,00. ii Lowboy/Tractor HR $175,00 $0.00 $0.00 $0,00 Dump Truck/Roll Off HR $95.00 $0.00 $0.00 $0.00 WaterTruck/frailer HR $126,00 $0.00 $0.00 $0.00 Tack/Prime Truck/Traller HR $150.00 $0.00 $0.00 $0.00 Luba/Mechanics Truck HR $125,00 $0.00 $0,00 . $0.00 Truck with Hand Tools HR $95.00 6 $570.00 $0.00 $570.00 Pickup HR $40,00 $0,00 $0,00 $0,00 Camera Truck HR $400.00 $0.00 $0.00 $0.00 Vacuum Truck : -:HR $475.00 $0.00 $0.00 $0.00 Small Equipment $0,00 Air Compressor with Hammer: HR : $60,00 _ ',$0.00 $0.00 $0.00 Concrete Saw HR $60.00 2 $120.00 $0.00 $120.00 Plate Compactor HR $60.00 $0,00 $0,00 $0.00 Trench Box 16'x 10' HR $50.00 $0,00 $0.00 $0.00 Stone Box HR' $50.00' $0.00 $0.00 $0,00 Steal(Road)Plate HR $50.00 $0.00 $0.00 $0.00 Wellpoinl System HR $250.00 $0,00 $0.00 $0.00 3"Trash/Submersible Pump HR $50.00 $0.00 $0.00 $0.00 6"Hydraulic Pump' HR $150.00 $0,00 $0.00 .$0.00 12"Hydraulic Pump HR $200.00 $0.00 $0.00 $0.00 Cut Off Sew HR $20,00 $0,00 $0.00 $0,00 Light Set HR $50.00 $0.00 $0.00 $0.00 Generator/Welder HR $50.00 $0.00 $0.00 $0.00 Generator 70kw HR $125.00 $0.00 $0.00 $0.00 Generator 125kw :' HR $150.00 $0.00 $0.00 $0.00 MOT HR $150.00 $0.00 $0.00 $0.00 Fusing Machine 2.16" HR $150.00 $0.00 $0.00 $0,00 Fusing Machine 18"-42" HR $300,00 $0.00 $0.00 $0.00 Tap Machine-small(3/4 -.3") each tap EA `' $750.00 $0.00 $0.00 $0,00 Tap Machine-large(4"-12') each tap EA $1,000.00 $0.00 $0.00 $0.00 Pipe Trenchless Piercing tool ' HR $250.00 $0.00 $0.00 $0.00 Pipe Ramming HR $625.00 $0.00 $0.00 $0.00 Material Disposal Fee(concrete,asphalt,debris,etc) PER LOAD $500.00 $0,00 $0,00 $0,00 QEC-4000 PSI Concrete CY $t61,00 $0.00 $0.00 $0.00 Fuel Surcharge EA $40.00 $0.00 $0.00 $0.00 Environmental Charge EA $30.00 $0.00 $0.00 $0.00 Tax LS $0.00 $0,00 $0.00 $0,00 Grand Total; $4,470.00 CA() 16138 QUALITY ENTERPRISES USA,INC. Jab S 14322-01 DB IMMOKALEE TIGER GRANT Rates Dale 02/07/25 Work Directive Change#2.1103 Jefferson Ave ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Personnel Corporate Officer HR $150.00 $195.00 $0.00 $0.00 $0.00 Project Manager HR $125,00 $162.60 $0.00 $0.00 $0.00 Superintendent : HR $85.00 $110.50 $0.00 $0,00 $0.00 Foreman HR $85.00 $110,50 10 $850,00 $0.00 $850.00 Mechanic,Equipment&Truck Operator HR $75.00 $97.50 $0.00 $0.00 $0.00 Laborer HR $55.00 $71.50 40 $2,200,00 $0.00 $2,200,00 Administrative HR `" $75.00 $97,50 $0,00 $0.00 $0.00 gdutoment Excavator>Cat 349 HR $250,00 $0.00 $0.00 $0.00 Excavator>Cat 320 HR $200.00 $0.00 $0.00 $0.00 Excavator<Cat 320 HR $150.00 $0.00 $0,00 $0,00: Excavator wlhammer/Eplroc HR $350,00 $0.00 $0,00 $0.00 Excavator wlside gnp vibratory hammer HR - $350.00 $0.00 $0.00 $0.00 Wheel Loader>Cat 962 HR $225.00 $0.00 50.00 $0.00 Wheel Loader>Cat 838 HR $176.00 $0.00 $0.00 $0,00 Wheel Loader<Cat 938 HR $150.00 $0.00 $0.00 $0.00 Bull Dozer HR $175,00 $0.00 $0.00 $0.00 Motor Grader HR $175.00 $0,00 $0.00 $0.00 Soil/Stone Roller HR $125.00 $0,00 $0.00 $0.00 Telehandier HR $125.00 $0.00 $0.00 $0.00 Madill' HR -. -. $125.00 --... _ ,.$0,00 -$0.00 $0,00 Forklift HR $100.00 $0.00 $0.00 $0.00 Broom Tractor HR $95,00 $0.00 $0.00 $0.00 Milling Machine HR $685.00 $0,00 $0.00 $0.00 Skid steer with milling head(bump grinder)` HR $150.00 $0,00 $0.00 $0,00 AsphaltlMat.Shuttle Buggy HR $375.00 $0.00 $0.00 $0.00 Asphalt Paver Weiler 385 HR $376.00 $0,00 $0.00 $0,00 Asphalt Paver Cat 1055 HR $575.00 $0.00 $0.00 $0.00 Asphalt Roller HR $125.00` $0,00 $0,00 $0,00 Off Road Dump HR $250,00 $0.00 $0.00 $0.00 Crane>130 ton HR $1,500.00 ' $0.00 $0.00 $0,00 Crane>30 ton HR $500,00 $0.00 $0.00 $0.00 Crane<301on HR $250.00 $0.00 $0.00 $0.00 Vibratory Hammer HR $400.00 $0.00 $0.00 $0.00 Concrete Crusher- _. HR <$885,00 . $0.00 -$0.00 :.$0.00 Screener HR $375.00 $0.00 $0.00 $0,00 Push Boat HR $278,00 $0.00 :$0.00 $0.00 Sectional/Hopper Barge HR $175,00 $0.00 $0,00 $0.00 Drone LIdar Photogrammetry:: HR _ I$350,00 $0.00 ..'$0.00 $0.00 Directional Drill JT 100 HR $2,000.00 $0.00 $0,00 $0,00 Directional Drill AA 440 HR $4,000.00 -:$0.00 $0.00 $0.00 Lowboy/Tractor HR: " $175.00 $0.00 $0.00 $0.00 Dump Truck/Roll Off HR $95.00 $0,00 $0.00 $0,00 Water Truckft7ailer'. HR $125.00 $0.00 $0.00 $0.00 Tack/Prima TruckfTraller HR $150.00 $0.00 $0.00 $0,00 LubelMechanlcs Truck HR - $125.00 $0.00 $0.00 $0.00 Truck with Hand Toole HR $95.00 10 $950.00 $0.00 $960.00 Pickup HR : $40,00 "$0,00 '.$0,00 $0,00. Camera Truck HR $400.00 $0.00 $0.00 $0,00 Vacuum Truck >:. HR. $475.00 $0.00 $0.00 :`$0.00 f�- Small Equlpment $0.00 Air Compressor with Hammer:.. . ,HR $80.00 :. ':$0.00 :$0.00 `$0.00 Concrete Saw FIR $80.00 2 $120.00 $0.00 $120.00 Plate Compactor HR $60.00 4 $240.00 $0.00 $240.00 Trench Box 18'x 10' HR $50.00 $0.00 $0.00 $0.00 Stone Box HR $50.00 $0.00 $0.00 =$0.00 Steel(Road)Plate HR $60.00 $0.00 $0,00 $0.00 Wellpoint System '- HR $250.00 $0,00 $0.00 $0.00 3"Trash/Submersible Pump HR $50.00 $0.0D $0.00 $0.00 6"Hydraulic Pump : :`HR ':$150,00 :$0,00 ',$0.00 'c.$0.00 12"Hydraulic Pump HR $200.00 $0.00 $0.00 $0.00 Cut Off Saw HR $20.00 $0.00 $0.00 $0.00 Light Set HR $50.00 $0.00 $0.00 $0.00 Generator/Weider: HR $60,00 $0.00 $0.00 $0.00 Generator70kw HR $125.00 $0.00 $0.00 $0,00 Generator 125kw, HR $150.00 $0.00 $0.00 $0,00 MOT FIR $160.00 $0.00 $0.00 $0.00 Fusing Machine 2.16 HR $150,00 $0.00 $0.00 $0.00 Fusing Machine 18"-42" HR $300.00 $0.00 $0.00 $0.00 Tap Machine-ema9(3/4 -3") each tap EA $760.00 '-.:$0.00 I$0,00 ,`.:$0.00 Tap Machine-large(4"-12") each tap EA $1,000,00 $0.00 $0.00 $0.00 Pipe Trenchless Piercing fool HR $250.00 $0,00 $0,00 $0,00 Pipe Ramming HR $625.00 $0.00 $0.00 $0.00 Malaria( Disposal Fee(concrete,asphalt,debris,etc) PER LOAD $500.00 $0.00 $0.00 $0,00 QEC-4000 PSI Concrete CY $161,00 $0.00 $0.00 $0.00 Fuel Surcharge` EA $40.00 $0.00 $0,00 $0.00 Environmental Charge EA $30.00 $0.00 $0.00 $0.00 Tex LS $0.00 $0,00 $0,00 $0.00 Grand Total: $4,360.00 0 I 6 R 8 40 Ajax Paving Industries of Florida,LLC QJAx An Equal Opportunity Employer One Ajax Drive • North Venice,FL 34275 -.ND Main:941.486.3600 • Fax:941.486.3500 Please be aware that due to the volatility of material prices,AC, fuels, and trucking we cannot guarantee these prices. Do not bid future work using the prices below they can change at anytime and without notice. To lock-in project specific pricing contact Roger Owens at 813-267-2298 or Sonny Webb at 239-470-8732. QE Accepts the rate given at $85.00 per ton Gold Customers Effective May 6, 2024 Location S-1 S-3 9.5C 12.5C FC 9.5C w/ FC 12.5C wl recycle 76-22 recycle 76-22' Plant 1 North Venice $88.00 $88.00 $88.00 $88.00 $115.00 $115.00 Plant 2 Punta Gorda $86.00 $86.00 $86.00 $86.00 $121.00 $121.00 Plant 3 Palmetto $87.00 $87.00 $87.00 $87.00 $112.00 $112.00 Plant 4 Ft. Myers $86.00 $86.00 $86.00 $86.00 $121.00 $121.00 Plant 5 Odessa $92.00 $92.00 $92.00 $92.00 $118.00 $118.00 Plant 6 Tampa $87.00 $87.00 $87.00 $87.00 $112.00 $112.00 Plant 7 Largo $92.00 $92.00 $92.00 $92.00 $118.00 $118.00 Plant 8 Lake Wales $92.00 $92.00 $92.00 $92.00 $118.00 $118.00 a . .f ,r,_ ', Via. ,i. ,`i° .i ',11 ,C M 16R8 0 FERGUSON" FEL-NAPLES WATERWORKS#136 Deliver To: ROBERT 3801 PROSPECT AVE From; Tyler A Evenson WATERWORKS NAPLES,FL 34104 Comments: Phone:239-643-4970 Fax:239-643-4945 18:06:11 JAN 31 2023 Page 1 of 5 FEL-NAPLES WATERWORKS#136 Price Quotation Phone:230-643-4970 Fax: 239-643-4945 Bid No: B305102 Cust Phone: 239-435-7200 Bid Date: 01/26/23 Terms: NET 10TH PROX Quoted By: TAE Customer: QUALITY ENTERPRISES USA INC Ship To: QUALITY ENTERPRISES USA INC 3494 SHEARWATER STREET 3494 SHEARWATER STREET NAPLES, FL 34117 NAPLES, FL 34117 Cust PO#: *REV 2.1.23` Job Name: TIGER GRANT Item Description Quantity Net Price UM Total ADS HP A156500201BPL 15X20 HP N12 DW GRAY SLD PL PIPE 16980 21.280 FT 361334.40 A246500201BPL 24X20 HP N12 DW GRAY SLD PL PIPE 6060 40,140 FT 243248.40 A306500201BPL 30X20 HP N12 DW GRAY SLD PL PIPE 1220 63.200 FT 77104.00 A36650020113PL 36X20 HP N12 DW GRAY SLD PL PIPE 1020 69.900 FT 71298.00 ADS HP DW ADAPT FITTINGS (44 HOW ARE WE DOING? WE WANT YOUR FEEDBACK! p.,; El Scan the QR code or use the link below to �`'� complete a survey about your bids: ■ https://survey.medallic.com/?bidsorder&fc=136&on=14817 N`` ib R 8 'wl�l coNoRsm 3494 Shearwater Street,Naples,FL 34117 QTE Naples,Florida 34117 (239)-293-5297 Quote#: QE04132025 Customer: Quote Date: 511r2024 Quality Enterprises Valid Until: Matt Murphy-Project Manager Account#: 1580 DESCRIPTION UOM QTY RATE AMOUNT • 4000 PSI CONCRETE MIX REGULAR CY 1 161 $161.00 CY $0.00 CY $0.00 CY $0.00 CY $0.00 FIBER CY - $8 $0.00 FUEL SURCHARGE Truck 1 $40 $40.00 ENVIROMENTAL SURCHARGE Truck 1 $30 $30.00 Subtotal $231.00 Tax rate 6,0% Sales tax $9.66 TRAVEL(>20mi1es) Miles - $1.50 $0,00 SHORT LOAD FEE - $250.00 $0.00 Total $240,66 Comments or Special Instructions: Project name/Number:Job it 14322-01-EB Inlrnokalee Tiger Grant-RFQ Project address: Notes: ( Cancellations without 24-hr notice will be charged$300 Any load under(3)Yards•Additional$250 Standard Hours:8.00am-5:O0pm,Monday through Friday Scheduled'Alter Hours'Fee•$500 shod load fee Loads between(3-8)Yards=Additional 5200 short load fee Unscheduled/Emergency Fes=53,000 Waiting time;Each truck is allow to stay 45 minutes to unload on site;$1,501minute will be charged The minimum load for each delivery Is 1.5 cubic yards. agar the Aral 45 minutes. No charge will be Incurred for cancellations due to weather.Travel fon:$1.50 per mile after 20 mile., Saturday Additional Fees•$300ltruck Fuel surcharge per truck•$40 per truck. ff Enviromenlel charge per truck•530 Fiber 55 per yard(i1 needed) Quote prepared by: Quote approval by: QEC Representative 1'. Vanessa Rendon 786.6240641 i'. i'. ( CA() 1 6 88 r Purchase Order ® PO#: 14322-01014 Project: 14322-01 C-DB Immokalee Area Improvements-Ti! Page:1 QUALITY ENTERPRISES Vendor: Mack Concrete Industries, Inc. Date Ordered: 04/07/23 11593 23902 County Road 561 Ordered By: Matt Murph Astatula, FL 34705 US Expected Date: Payment Terms: Net 30 Days Bill: Quality Enterprises USA, Inc. Ship To: 3494 Shearwater St 403 New Market Road Naples, FL 34117 US Immokalee, FL 34142 Via: Item Material Description Send UM Units Unit Cost Total 1 INLET,DT BOT,TYPE C<10' Y EA 308.000 1,289.00000 397,012.00 2 INLET,DT BOT,TYPE D<10' Y EA 20.000 2,064.00000 41,280,00 3 MANHOLE,P-7<10' Y EA 15,000 3,827.00000 57,405.00 4 MANHOLE,J-7<10' Y EA 3.000 3,827,00000 11,481,00 'This Is a Buy America Project. All materials must comply with the Buy American Act, SubTotal 607,178.00 Please refer to page 2 of PO. Tax:FL 30,430.68 Tax:FL10 5,071.78 NOTE:1,All working materials to be provided In accordance with the provisions of the prime contract,contract drawings and specifications. 2.This Purchase Order supersedes subcontractors Total: 542,680.46 proposals and or contracts.3.Price firm for the duration of the project.4,All deliveries of materials to be signed and accepted by QE personnel.We reserve the right to withhold payment If vendor does not provide a signed acknowledgment and acceptance signature from a QE employee.5,All vendor Invoices and packing slips must reference this PO number. QE Accepts the rate given at $1288.00 per EA Authorized Signature: - t Vendor Signature: CV" Quality Enterprises USA,Inc. 3494 Shearwater St, Naples,FL 34117 Phone:239.435.7200 Fax: 239.435,7202 CA() h 16R8 . -- -, .-Nisson e Purchase Order PO#: 14322-C1014 Project; 14322-01 C-De Immokalee Area Improvements-TI; Page:2 QUALITY ENTERPRISES PROCUREMENT OF RECOVERED MATERIALS Supplier agrees to comply with Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act, and the regulatory provisions of 40 CFR Part 247, In the performance of this contract and to the extent practicable,the Contractor and subcontractors are to use products containing the highest percentage of recovered materials for Items designated by the Environmental Protection Agency(EPA) under 40 CFR Part 247 whenever: a)The contract requires procurement of$10,000 or more of a designated item during the fiscal year; or, b)The contractor has procured $10,000 or more of a designated item using Federal funding during the previous fiscal year. The list of EPA-designated items is available at www.epa.gov/epawaste/conserve/tools/cpg/products, Section 6002(c) establishes exceptions to the preference for recovery of EPA-designated products if the contractor can demonstrate the'ten is: a) Not reasonably available within a timeframe providing for compliance with the contract performance schedule; b)Fails to meet reasonable contract performance requirements; or c) Is only available at an unreasonable price. BUY AMERICAN PREFERENCE The supplier agrees to comply with 49 USC§ 50101,which provides that Federal funds may not be obligated unless all stee and manufactured goods used in AIP-funded projects are produced In the United States, unless the FAA has issued a waives for the product; the product Is listed as an Excepted Article, Material Or Supply In Federal Acquisition Regulation subpart 25.108; or Is Included In the FAA Nationwide Buy American Waivers Issued list. BUY AMERICAN CERTIFICATION The supplier agrees to comply with 49 USC§50101,which provides that Federal funds may not be obligated unless all stee and manufactured goods used In AIP-funded projects are produced in the United States, unless the FAA has issued a waive' for the product; the produc)is listed as an Excepted Article, Material Or Supply in Federal Acquisition Regulation subpart 25,108; or is Included in the FAA Nationwide Buy American Waivers Issued list. Quality Enterprises USA,Inc. 3494 Shearwater St, Naples,FL 34117 Phone:239.435.7200 Fax: 239.435.7202 c:Al 16B8 Matt Murphy From: Willis, Stephen (Preferred Materials) <Stephen.Willis@preferredmaterials.com> Sent: Tuesday, March 14, 2023 10:48 AM To: Matt Murphy Subject: RE: [EXT] 14322-01 - ITGP- RFP -Asphalt Follow Up Flag: Follow up Flag Status: Flagged Matt, Use the Following pricing for this project: QE Accepts the rate given at $80.00 per tan SP9.5 TLC 40% RAP-$86/ton SP12.5 TLC 40% RAP-$85/ton These prices are good through 2024 Stephen R.Willis Senior Account Manager Preferred Materials A CRH COMPANY C (813)924-7050 E stephen.willis(a.preferredrnaterials.com www.preferredmaterials.com From: Matt Murphy<MMurphy@geusa.com> Sent: Monday, February 20, 2023 11:31 AM To:Willis,Stephen (Preferred Materials)<Stephen.Willis@preferredmaterials.com> Subject: [EXT] 14322-01-ITGP- RFP-Asphalt Importance: High CAUTION:This email originated from outside of the organization.Do not click links or open attachments unless you are expecting this email and know the contents are safe.If you believe this email may be phishing or malicious,please use the Report Phish button. Stephen, Please provide me with pricing for the Immokalee Tiger Grant Project. We will be starting the project in April, and it will span approximately two years,The project is in Immokalee. The attached excel spreadsheet contains the project tabulation. Thank you, Matt Murphy 1 16R8 CII) 846 M 11.1 ...t -z-qs.,.`"-`' " ,,...r,of p, CI \v‘ J, (1) 16000 Immokalee Road Hours of Operation =11. Naples, FL 34120 Monday-Friday I 7am -5pm NNE 0 Material , = Commercial Base Rock $1 6.00/ton FDOT Base Rock $17.00/ton FDOT 11/2" Base Rock $19.00/ton , ti:lk Double Crush Limerock $17.00/ton 57 Stone $30.00/ton:11, Ballast Stone $29.00/ton Rip Rap 6" - 12" $50.00/ton Rip Rap 12" - 24" $50.00/ton 1111) Rip Rap 24" - 36" $50.00/ton i Pill Seawall Boulders 36" + $50.00/ton Shot Rock $11.00/ton 13) 5" Shot Rock $13.00/ton 011) Prices Effective 1-1-2024 Notes: • Prices do not include any applicable sales tax. • All prices are subject to change without notice. • Please make checks payable to: Quality Enterprises USA, Inc. 13494 Shearwater Street I Naples, FL 34117 Plant Operations Manager Billing Information .s, w Barry Blankenship Christine McCartney (513) 260-7961 (239) 398-5789 2024 bblankenship@geusa.com cmccartney@geusa.com , QU,►,LITY l :. 77-1 ENTERPRISES -A() 16B8 QUALITY ENTERPRISES USA,INC, Additional Management time due to multiple revisions to Canopy ST HOURLY OT HOURLY ST OT ST OT UNIT RATE RATE HOURS HOURS TOTAL TOTAL TOTAL Additional cost for boxing out for columns and repour of same Superintendent HR $85.00 $110.50 50 $4,250.00 $0.00 $4,250.00, Foreman HR $85.00 $110,50 50 $4,250.00 $0,00 $4,250.00 Survey HR $95.00 , $123.50 10 $950.00 $0.00 $950.00 Laborer HR $55.00 $71.50 200 $11,000.00 $0.00 $11,000.00 Administrative HR $75.00 $97.50 2 $150.00 $0.00 $150.00 Material Concrete 3 cy $525.00 Grand Total: $21,125.00 Original Price: $140,000.00 Dragon Re-Engineering: $10,000.00 Additional Arch Design Fee(H Level and Johnson): $12,100.14 QE Additional PM time and Concrete Work: $21,125.00 Elect conduit for canopy: $13,000,00 Total Credit: $83,774,86 QE is willing to accept the the short pay of$525.00 even though the cost of the concrete is higher. f 1 6 $ 8 coNcaFra 3494 Shearwater Street,Naples,FL 34117 QUOTE Naples,Florida 34117 (239)-293.5297 it Quote#: QEQ0-132025 Customer: Quote Date: g11f2024 Quality Enterprises Valid Until: Matt Murphy-Project Manager Account#: 1580 DESCRIPTION UOM QTY RATE AMOUNT 4000 PSI CONCRETE MIX REGULAR CY 1 161 $161.00 CY $0.00 CY $0.00 CY $0.00 CY $0.00 FIBER CY - $8 $0.00 FUEL SURCHARGE Truck 1 $40 $40.00 ENVIROMENTAL SURCHARGE Truck 1 $30 $30.00 Subtotal $231.00 Tax rate 6,0% Sales tax $9.66 TRAVEL(>20miles) Miles - $1.50' $0.00 SHORT LOAD FEE - $250,00 $0.00 Total $240.66 Comments or Special Instructions: Project name/Number:Job#14322-01-DB Immokalee Tiger Grant-RFQ Project address: Notes: Cancellations without 24-hr notice will be charged$300 Any load under(3)Yards=Additional$250 Standard Hoare:8:00en1-5:Oopm,Monday through Friday Scheduled'After Hours'Fee=$500 short load fee Loads between(3-8)Yards=Additional$200 short load fee UnacheduledtEmergency Fee=$3,000 Welting time:Each truck Is allow to stay 45 minutes to unload on site;$1,501minute will be charged The minimum load for each delivery Is 1.5 cubic yards. after the first 45 minutes, No charge will be incurred for cancellations due to weather.Travel fee:$1.50 per mile after 20 miles, Saturday Additional Fees=$30011ruck Fuel surcharge per truck=340 per truck. Envkomenlal charge per truck=330 Fiber$8 per yard it needed) Quote prepared by: Quote approval by: QEC Representative Vanessa Rendon 786-6240641 • • CAC) 1688 Freedom Aluminum and Steel Inc. Estimate F: 239-332-4334 2614 Lafayette St. Date Estimate# Ft. Myers, FL 33916 8/31/2021 8283 Customer Contact Name/Address Job Address Quality Enterprise Quality Enterprise Tiger Grant Tiger Grant tnunokalee Cat Facility lmmokalce Cal Facility Attn:Adrian Reid Attn:Adrian Reid Customer Phone Customer Fax Terms Rep Project 50%down RG Tiger Grant Description Qty Rate Total We will fabricate and install an extrude deck walkway cover pen 140,000.00 140,000.00 plan.Approx 1026 sq 0 15'tall and 090 sq 0 12'tall. is Total £140,000.00 Acceptance of Proposal The above prices,specifications and conditions are hereby accepted.You are authorized to do the work as specified. Date: Signature ii CA 1688 rr fi Dragon Recreation Services ra ^• • • 5784 Enterprise Parkway Ft Myers, FL 33905 <� ° �` (239)565.8645 - awl • Stoney@dragonrecreation.com • August 8, 2023 Matt Murphy—Project Manager Engineering&Construction Services 3494 Shearwater Street, Naples, FL 34117 RE: Bus Transfer Facility Revised Engineering Immokalee, Florida Matt, Please accept this letter as our Proposal for supplying and installing Aluminum Walkway Covers for your Bus Transfer Facility located in Immokalee, Florida. We are proposing 6"x 6" and 6" x 8" extruded aluminum columns and 6"x 10" extruded aluminum beams.We have included 6"aluminum gutters and and fascia as well as 6" aluminum decking. We have also included structural drawings by a licensed Florida structural engineer. Standard baked enamel finish—Bronze, White or Bright Silver. Description—Alunimun Walkway Covers Unit Total 1 Extruded Alunimun Walkway Covers per CD's $ 138,600.00 1 Florida Sales Tax $ Inc 1 Drawings&Structural Calculations S 2.500.00 Shade Total $ 141,100.00 Installation $ 50,500.00 Total $ 191,600.00 Freight $ 6,500.00 Total Structures $ 198,100.00 Our proposal includes all materials,equipment, Florida Sales Tax, engineered drawings and freight. Exclusion: Permits Please note with the price of aluminum being as volatile as it is,the material price if good for 30 days Sincerely, • 11Page CA() 1638 i»1 EXHIBIT <'K', Application for Payment Form (MANDATORY AS PART OF EVERY INVOICE/BILL) FORM OF SUBCONTRACTOR APPLICATION OF PAYMENT From SubContractor: Application Date: 3/6/202.5 Dragon Recreation Services,Inc. Payment Application No. 1 21301 S Tamiaml Trl. Estero,FL 33928 for work accomplished through the dale: 2/28/2025 QE Job k: 14322-01 RE: C•DO immokalee Area Improvements•Tiger Grant Original Contract Amount $ '175,000.00 Total Change Orders to Date $ tl 0n Revised Contract Amount $ 175,000.00 Total Completed and Stored To Date $ 1n,11110.trn Less Retainage-0%: $ t)00 Total Earned Less Retainage $ 10,000,00 Less Previously Invoiced $ tt 00 AMOUNT DUE THIS APPLICATION $ 10,000.n0 ATTACH SCHEDULE OF VALUES AND ACCOMPANYING DOCUMENTATION TO THIS APPLICATION SUBCONTRACTOR'S CERTIFICATION: The undersigned SUBCONTRACTOR certifies IhaL (1)all previous progress payments received from Quality Enterprises USA, Inc.(QE)on account of Work done under the Contract referred to above have been applied to discharge In full all obligations of SUBCONTRACTOR Incurred in connection with Work covered by prior Applications for Payment numbered through Inclusive; (2)title to ell materials and equipment incorporated In said Work or otherwise listed In or covered by this Application for Payment will pass to QE at time of payment free and clear of all liens,claims,security interests and encumbrances(except such as covered by Bond acceptable to OWNER); (3)all amounts have been paid for work which previous payments were issued and received from QE and that current payment Is now due;end (4)SUBCONTRACTOR agrees that all overruns as shown on the monthly estimate summary shall,In fact, be added to the revised contract and shall be Incorporated Into a future Change Order: • CA() 1688 1,N.T.S....C.,.......1C.r...^",,I.1....,..... X'. II ..i..-1 ! — ul = XI Ul ni C E ri r I C C rsi CI L.I4 g 6 t , — — c-4 H C..) _D ...—._———..--.... -- Lc." I— ....- ..-/ c> h c: .',-...-,1 ' C) - _____,__—._._. _____, ,,, 6 ,_, ...;.. • O 6 B 1 m - --- 1-A' _ 6- -0. ..e.,- rii -4 1 7:4 CI — cl, F;3" 1 ....<,: .,1.. , H.) 6_, •:, = 0 , C El .,_,., - C_C ....". , ,--,- .• I 0 = 0 C) C-5 6 Ic...-3 ' --r..- '.... .7..,.. N. Gi. F R ,..... C 1 cn I ,_ — —,----- CD 0 e, a ra ,....,. .,.._ _.. ; 4.3 I C E 8- 4.) . ,.._ ... E — (1) Pa 7 E L Ll 14 I— CO 0 cri I -.-.. 0 -.-t L3 _.q.. ta_ — ...... — ........ ••••• • C'A(_) 1 1688 level ARCHITECTURE•DESIGN CONSULTING January 31, 2024 Lou Gaudio Quality Enterprises 3494 Shearwater Street Naples, FL 34117 RE: IMMOKALEE CAT BUS SHELTER•— CHANGE ORDER #1 Dear Lou, level(ARCHITECT) has previously prepared permit drawings to Quality Enterprises (CLIENT)for a Collier Area Transit Bus Shelter located in Immokalee, Florida. Requested design modifications from the County has necessitated additional services that are outlined below: SCOPE OF WORK ARCHITECTURAL AND ENGINEERING Architectural-$3,362.50 • Modified design to accommodate county request to eliminate the exterior restroom vestibules • Coordination with engineers and CLIENT • Outline specifications as requested • additional low voltage notes/comments on card readers • request to recess CMU walls by 2" • changes to fixtures and accessories • request to use a different roofing system and associated coordination/review Structural—$3,358.88 • Modified structural design to accommodate county request to eliminate the vestibule's that enter the restrooms • Modifed sections/details to accommodate county request to recess the CMU walls by 2" at base • Add concrete plinth to canopy column bases MEP Engineering-$2,475,00 • Mechanical, Electrical, Plumbing design Revisions to previously completed MEP Drawings • Re-schedule and re-select plumbing fixtures based on selection modifications from the County • Adjust sanitary&Domestic water to be consistent with plan updates(enclosing vestibules) • Remove Conditioned MAU to change restrooms to non-conditioned spaces • Update exhaust based on proposed ACH for non-conditioned ventilation • Update schedules and details • Update Light plans in accordance with requested changes and new ceiling. 1110 Pine Ridge Road_Suite 201 I Naples, Florida 34108 I p 239.877.6777 I www.hlevel.info I License#:AA26002625 CA(.. 1 6 g 8 COMPENSATION H Level Design proposes to provide the above outlined scope of services at fixed fee as outlined below: DESIGN FEE: $9,196.38 Sincerely, HLevel LLC Accepted Brandt Henning, AIA, NCARB, LEED AP Lou Gaudio Date 2024 HOURLY RATES AND REIMBURSABLE EXPENSE SCHEDULE Classification Hourly Rate Architect/Principal $200.00 Registered Interior Designer $150.00 Architectural Designer $125.00 In House Expense Cost Black/White Print 8,5"x 11" $.25 per page Color Print 8.5" x 11" $1,00 per page Black/White Print 11" x 17" $.50 per page Color Print 11"x 17" $2.00 per page Expenses not detailed above are billed using a 1.10 multiplier, GENERAL CONDITIONS 1. Either party, upon seven (7) days written notice, may terminate this proposal. In the event of termination by the Owner,the Owner shall pay the Designer for all services performed and reimbursable expenses due up to the date of termination.ARCHITECT agrees to provide the Owner with copies of all design and research materials completed to date. 2. Fees and schedules quoted within the proposal are based on the return of this signed proposal within thirty(30)calendar days,or a shorter period if otherwise specified elsewhere in this proposal. 3. The ARCHITECT is not responsible if the Owner or Contractor(s) make changes to the project without notification to the ARCHITECT. 4. The ARCHITECT or representatives of the ARCHITECT reserves the right to photograph the exterior and interior of the project upon completion and use such photographs and descriptions of the project in the ARCHITECT's marketing efforts. 5. Drawings and specifications, as instruments of service,are the property of the ARCHITECT. The ARCHITECT reserves the exclusive copyright to these items and provides them to the Owner for the use on ) www.hlevel.info . 1688 this project only. Any reproduction or reuse of the drawings, specifications, and sample boards without the prior written consent of the ARCHITECT is not permitted. 6. Delays in payment will result in delays of the project.The ARCHITECT will not be held liable for any delays in your project due to delays In payment. 7. If a retainer is required for the project, it is not refundable if the project is cancelled before the completion of a phase.The retainer will be credited toward the final payment upon completion of the project. 8. The ARCHITECT shall not be responsible for job safety, means and methods of construction,and third party lawsuits. 9. The ARCHITECT performs services based on the most current codes.Corrections required as a result of enactment of changes in code, review authority policy,or commonly accepted review authority practice shall be an additional service. 10. The ARCHITECT performs services based on the best available data and the Investigation of existing conditions to the best of the ARCHITECT's ability.The ARCHITECT will not be responsible for the discovery of toxic or hazardous substances at the site or in existing structures, or for unforeseen conditions discovered during the course of the project that were not apparent during initial reviews.Such events may necessitate extensive design changes and additional services and fees. 11. The conditional use process is subjective and HLevel shall not be held liable should the project not be approved by the local jurisdiction. II www.hlevel.in aA() i6B8 Johnson Structural Engineering, LLC 2029 Rivers Rd. Naples, FL 34120 INVOICE#1109 Phone: (239)451-3433 DATE: 1/15/2024 Email:justin@jstructural.com PROJECT#22-007 BILL TO: Brandt Henning HLevel LLC 1110 Pine Ridge Rd. Naples, FL 34108 Phone: (239)384-6083 JOB DESCRIPTION TOTAL Immokalee CAT Facility — N 1st St., Immokalee, FL 34142 Construction Administration: Review of structural submittals as requested (Aluminum canopy i $1,072.50 shop drawings & engineering design— 1st review)—5.5hr x $195/hr. SUBTOTAL $1,072.50 TOTAL DUE $1,072.50 Make all checks payable to Johnson Structural Engineering, LLC THANK YOU FOR YOUR BUSINESS! CAO 1688 Johnson Structural Engineering, LLC ii 2029 Rivers Rd. Naples, FL 34120 INVOICE#1128 Phone: (239)451-3433 DATE: 3/27/2024 Email:justin©jstructural.com PROJECT#22-007 BILL TO: Brandt Henning HLevel LLC 1110 Pine Ridge Rd. Naples, FL 34108 Phone: (239) 384-6083 JOB DESCRIPTION TOTAL Immokalee CAT Facility — N 1st St., Immokalee, FL 34142 Construction Administration: Review of structural submittals as requested (Aluminum canopy $731,25 shop drawings &engineering design calculations—2nd review)—3.75hr x$195/hr. SUBTOTAL $731.25 TOTAL DUE L $73125 Make all checks payable to Johnson Structural Engineering, LLC THANK YOU FOR YOUR BUSINESS! CAo i 6g d 'Iwan n'sEieQtano -.. • - g430VanderbiltBeach Rd #180 � 1/ 5O �SNop(esa L 34109U , 04 ..-...,,,,. ... ..., :.... , ,,,,.... ,". • :•, . . .•...- - bffje�swari�oriSslectriacom , htt // •w hsorf electric com . t� i1�pter rises SA,"►nc SHIP TO INVOICE 8647 Qualls Enter rises USA, Inc 3494; ha!mate r Street 3494 Sh000 i•ter Atreet c::'. ." : f�apTes, L 34l t4 - Nspies, FL �34114 DATE 07/18/2024 TERMS Net 30 DUE DATE 08/17/2024 DATEAC1IVlTY QTY RATE AMOUNT Services 1 13,000.00 13,000.00 • Conduit Installation-UG for canopy • . r , d' Payment nbt received,•wlthfrr•to rms stated obov•s,•will result in ah • -.,-tonal charge of i;,!i%pete kn ntii'.of the o lerdue balahce:. (Mltiirnum charge$24 0O/Month)In addition the customer Is respo:ns!bIQ,for the total,opsto the co]leotiotis process InOl.itdlhg reasona le attorneys foes incurred,: pile•yearwarrarity,on all work and mat•erials suppliectby tvaheoh's`Blootrtc To rAt DUL $13,.000:00 1 J • • t 1I 1 16R8 Freedom Aluminum and Steel Inc. Estimate F: 239-332-4334 2614 Lafayette St. Date Estimate 4 Ft. Myers, FL 33916 8/3112021 8283 Customer Contact Name/Address Job Address Quality Enterprise Quality Enterprise Tiger Grant Tiger Grant Irnmokalee Cat Facility Immokalee Cat Facility Aitn:Adrian Reid Attu:Adrian Reid Customer Phone Customer Fax Terms Rep Project 50%down RG Tiger Grant Description Qty Rate Total We will fabricate and install an extrude deck walkway cover pen 140,000,00 140,000.00 plan,Approx 1026 sq It 15'tall and 690 sq H 12'tall. Total $140,000.00 Acceptance of Proposal The above prices,specifications and conditions arc hereby accepted. You are authorized to do the is work as specified. Date: Signature ., 4f. 16R8 i` Dragon Recreation Services 44 1 i,,,,�';v.,,,,„,,,,,, t .v 5784 Enterprise Parkway ris=�r t Ft Myers, FL 33905 c ,. 4:,,.',„1,� +4: ..4i l.ke., ' ,.. (239)565.8645 " ' 't�s ,� Stoney@dragonrecreation.com August 8, 2023 Matt Murphy—Project Manager Engineering&Construction Services 3494 Shearwater Street, Naples, FL 34117 RE: Bus Transfer Facility Immokalee,Florida Matt, Please accept this letter as our Proposal for supplying and Installing Aluminum Walkway Covers for your Bus Transfer Facility located in Immokalee, Florida.We are proposing 6"x 6" and 6" x 8"extruded aluminum columns and 6"x 10" extruded aluminum beams.We have included 6" aluminum gutters and and fascia as well as 6"aluminum decking.We have also Included structural drawings by a licensed Florida structural engineer.Standard baked enamel finish—Bronze,White or Bright Silver, Description—Alunimun Walkway Covers Unit Total 1 Extruded Alunimun Walkway Covers per CD's $ 138,600.00 1 Florida Sales Tax $ Inc 1 Drawings&Structural Calculations 5 2,500.00 Shade Total $ 141,100,00 Installation S 50.500.00 Total $ 191,600.00 Freight $ 6.500.00 Total Structures $198,100.00 Our proposal includes all materials,equipment, Florida Sales Tax,engineered drawings and freight. Exclusion:Permits Please note with the price of aluminum being as volatile as it is,the material price if good for 30 days Sincerely, l 1IPage