Loading...
Backup Documents 03/11/2025 Item #16B 8 ` 6 B 8 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attomey Office. Route to Addressee(s)(List in routing order) Office Initials Date 1.Shannon Bassett PMP, Field Inspector II Transportation Engineering Shannon WO 2025.0312 Bassett 151759 4)1'00 2. Kimberly Brandes, Admin Support Transportation Engineering Brandes B;ena= Specialist II Kimberly°o02-04 2 3. County Attorney Office County Attorney Office /.%91 7/1/ Uk 4. BCC Office Board of County Commissioners N 4 3/i Siz 5. Minutes and Records Clerk of Court's Office i Z! Ol�dt I PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Shannon Bassett/Transportation Contact Information 239-348-1328 Contact/Department Engineering Agenda Date Item was 03/11/2025 Agenda Item Number 16.13.8 Approved by the BCC Type of Document Change Order#1 for adding time to the Number of Original 1 Attached Bike Lanes 111th Ave NE Bluebill Ave Documents Attached Bridge to 7th Ave N Project PO number or account N/A number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature STAMP OK ✓SB 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information(Name;Agency;Address;Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be ✓SB signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the ✓SB document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's ✓ signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip N/A should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 03/11/25 and all changes made during ✓SB N/A is not the meeting have been incorporated in the attached document. The County an.optir;for Attorney's Office has reviewed the changes,if applicable. 2�6 9. Initials of attorney verifying that the attached document is the version approved by the • t BCC,all changes directed by the BCC have been made,and the document is ready for the 4:114 an idAtion for Chairman's signature. this line. 16B8 CI €yr Comity Procurement Services Change Order Form Contract# 23-8150 G2A77 CO#01 PO#4500232595 Project#: 33620.2 FPN441846-1-58-01 Project Name: Bike Lanes 111th Ave N E Bluebill Ave Bridge to 7th Ave N (LAP) Contractor/Consultant Name: Thomas Marine Construction inc. Select One: Contract Modification(Construction or Project Specific) ❑Work Order Modification Project Manager Name: Shannon Bassett PMP Division Name: Transportation Engineering Original Contract/Work Order Amount $1,871.602,07 02/27/24#1681 Original BCC Approval Date;Agenda Item# Current BCC Approved Amount $1,871,602.07 02/27/24#16E31 Last BCC Approval Date;Agenda Item# Current Contract/Work Order Amount $1,871,602,07 103/10/25 SAP Contract Expiration Date(MASTER) Dollar Amount of this Change $0.00 I 0.00% Total%Change from Original Amount Revised Contract/Work Order Total I $1.871,602.07 0.00% % Change from Current BCC Approved Amount Total Cumulative Changes so.00 o.00% °I° Change from Current Amount Notice to Proceed 08/12/24 Original NTP Original Final Last Final 210 03/10/25 03/10/25 Date , #of Days Completion Date Approved Date #of Days Added 14 Revised Final Date 03/24/25 Current Substantial Completion Date 02/08/25 (includes this change) (if applicable) Provide responses after each question in box below (Responses should be brief and specific). Attach additional information and/or documentation from the Design Professional and/or Contractor, if needed, with your submission of this Change Order and complete summary on next page, Check all that apply to this Change Order request:0 Add Time; 0 Add funds; 0 Use of Allowance; 0 Modify/Delete existing Task(s);0 Add new Task(s); 0 Reallocate funds;0 Other(must be explained in detail below) 1.) This change will add an additional Fourteen (14) days to the contract due to inclement weather, hurricanes and observed holidays. 2.) N/A. 3.) Eleven (11) days due to inclement weather, caused in part by hurricanes in September and October 2024 and three (3) days due to the observed holidays on September 2, 2024, November 28, 2024 and November 29, 2024. 4. ) Weather days are not part of the bid documents but added on as needed and requested by the contractor. This is in accordance with FDOT specifications per the contract. Page 1 of 4 Change Order Form(2023_ver.1) A 1 6 B..8 CAT GOidlity Procurement Services Change Order Form Contract# 23-8150 G2A77 CO# 01 PO# 4500232595 Project#: 33620.2 FPN441846-1-58-01 Project Name: Bike Lanes 111th Ave N E Bluebill Ave Bridge to 7th Ave N (LAP) Contractor/consuitant Name: Thomas Marine Construction inc. Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above, as fully as if the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Contractor/Consultant/Design Professional signature below must be from an authorized person/officer/director of the Company or listed as the qualified licensed Professional"Project Coordinator"or Design/Engineer Professional under the agreement. Signature authority of person signing will be verified through the contract OR through the Florida Department of State, Division of Corporations (Sunbiz) website(https://dos.myfloricia.com%sunhiz/search/). If the person signing is not listed, we will require signature authority by one of the listed officers/directors of the company giving that person signature authority. Shannon Bassett Digitally signed by Shannon Bassett Prepared by: Date:2025.01.17 11:24:45-05'00' Date: Signature-Division Project Manager Shannon Bassett PMP, Field Inspector II, Transportation Enginnering Printed Name Accepted by: Date: Signature-Design/Engineer Professional (if applicable) N/A Printed Name/Title/Company Name Mark D Digitally signed by Mark D Mabee Mabee Date:2025.01.31 Accepted by: II 21 39-0bdo• Date: Signature-Contractor/Consultant/Vettdor Mark Mabee, Vice President, Thomas Marine Construction, Inc Printed Name/Title/Company Name ThomasMatthew Approved by: Date. Signature-Division Manager or Designee(Optional) Matthew Thomas.P.E.,Supervisor of Project Management,Transportation Engineering Printed Name AhmadJay Digitally signed by AhmadJay Approved by: Date:2025.01,21 14:46:49-05'00' Date: Signature-Division Director or Designee(Optional) Jay Ahmad, P.E.. Division Director, Transportation Engineering Printed Name Digdally signed by 5cntt T Tinily ScottTri n i ty Date:21i25.02.04 Approved by: 16 33: 4.0500' Date: Signature-Division Administrator or Designee (Optional) Trinity Scott,Department Head.Transportation Management Services Department Printed Name Page 3 of 4 Change Order Form(2023_ver.1) 16 B8 cc- .7 r County _»per Procurement Services Change Order Form Contract# 23-8150 G2A77 CO# 1 PO#4500232595 Project#: 33620.2 FPN441846-1-58-01 Project Name: Bike Lanes 111th Ave N E Bluebill Ave Bridge to 7th Ave N (LAP) contractor/consultant Name: Thomas Marine Construction inc. FOR PROCURMENT USE ONLY FY 25 CHO Request# 571 Bowden Ste p h a n i e Digitally signed by BowdenStephanie Approved by Date:2025,02.07 11:53:19-05'00' Signature-Procurement Professional Signature/Date Approved by: Signature-Procurement Manager/Director(OPTIONAL) APPROVAL TYPE: C] Administrative X Administrative-BCC Report fl BCC Stand-Alone ES (BCC Approval Required) BCC APPROVAL ATTEST: Crystal K. Kinzel,Cl r he Circuit Court BOARD OF COUNTY COMMISSIONERS and ComptroNer- COLLIER COUNTY, FLORIDA ,' By: ' BY lio.:: A "e4e€441114"' At st to C �� irman's Burt L. Saunders , Chairman trill" rL . = Date: 3/I I/ZS (SEAL) Agenda# ji`, 04.3 \Approve s d gality: CDep County Attorn _ Z44 Q ----.Qa.e. L_ Print Name Page4of4 Change Order Form(2023_ver.1) 1p 16BR Co r Cointo Procurement Services Change Order Form Contract# 23-8150 G2A77 CO# 01 PO# 4500232595 Project#: 33620.2 FPN441846-1-58-01 Project Name: Bike Lanes 111th Ave N E Bluebill Ave Bridge to 7th Ave N (LAP) Contractor/Consultant Name: Thomas Marine Construction inc. Change Order/Amendment Summary (If additional spaces needed,attached a separate Summary page to this amendment request) COST TIME CO# AMD# Description Additive Deductive Days Total New Justification (+) (-) Added Time Add 14 days to I To allow the contractor p1 complete the 14 224 additional time to construct project the project per plan, • • • • ❑Check here if additional summary page/s are attached to this Change Order Page 2 of 4 Change Order Form(2023_ver.1) 1688 Hi hSpans ENGINEERING, INC. 2121 McGregor Blvd, Ste. 200 Fort Myers, FL 33901 Office: 239.433.3000 Fax: 888.449.2462 December 5th, 2024 Letter No. 001 Delivery Via E-mail: Mmabee@tmcfla.com To: Mark D. Mabee, Vice President/Project Manager ADJUSTMENT TO CONTRACT TIME FOR THE EFFECTS OF INCLEMENT Subject: WEATHER, SUSPENSION OF OPERATIONS DURING HOLIDAYS AND SPECIAL EVENTS Fin No: 441846-1-58-01 FAP No: D122 039 B Contract No: G2A77 County: Collier Project Description: Bike Lanes Along 111th Ave. N. East of Bluebill Ave. Bridge to 7th St. N. (LAP) Dear: Mr. Mabee, Inclement Weather The daily reports documenting the effects of inclement weather have been evaluated for the period beginning August 12, 2024 to December 5, 2024. It has been determined 11 calendar day(s) (September 3rd, 4th, 24th, 25th, 26th, 27th, October 7th, 8th, 9th, 10th, 11th) meet the criteria established by the contract for granting additional contract time due to the effects of inclement weather. It has been determined that 11 contract day(s) will be added to the total authorized contract time. Holidays 16B8 As outlined in Specification Subarticle 8-6.4, the Daily Reports documenting the holiday period beginning August 12, 2024 to December 5, 2024 has been evaluated. It has been determined that 3 calendar day(s) (September 2"d, November 28th & 29th) meet the criteria established by the Contract for granting additional time due to the suspension of operations for this holiday period. Veterans Day (Monday November, 11 2024) was a holiday that Thomas Marine Construction elected to work, thus no additional contract day will be granted for this reason. Pursuant to Specification Subarticle 8-7.3.2, 3 contract day(s) will be added to the total authorized contract time. Special Events As outlined in Specification Subarticle 8-6.4, the Daily Reports documenting the Special Event from August 12, 2024 to December 5, 2024. It has been determined that 0 calendar day(s) meet the criteria established by the Contract for granting additional time due to the suspension of operations for this Special Event period. Pursuant to Specification Subarticle 8-7.3.2. 0 contract day(s) will be added to the total authorized contract time. Your company has ten (10) days from receipt of this notice to appeal the number of days granted herein. Any such appeal must be accompanied by all available specific facts supporting your position. Failure to make an appeal or to provide the specific facts within ten (10) days from receipt of this notice shall constitute a waiver of any rights to appeal the Department's decision at a later date. Sincerely, Edward W. Cooper Project Administrator Ah 16B8 AFFIDAVIT REGARDING LABOR AND SERVICES Effective July 1,2024, pursuant to §787.06(13), Florida Statutes,when a contract is executed, renewed,or extended between a nongovernmental entity and a governmental entity, the nongovernmental entity must provide the governmental entity with an affidavit signed by an officer or a representative of the nongovernmental entity under penalty of perjury attesting that the nongovernmental entity does not use coercion for labor or services. Nongovernmental Entity's Name: 1 Thomas Marine Construction,Inc. Address: 8999 High Cotton Lane,Fort Myers,FL 333005 Phone. Number: 239-337-0008 Authorized Representative's Name: Mark D.Mabee Authorized Representative's Title: Vice President Email Address: mmnbee@tmcfla.com AFFIDAVIT 1 Mark D.Mabee _(Name of Authorized Representative),as authorized representative attest that Thomas Marine Construction,Inc. (Name of Nongovernmental Entity)does not use coercion for labor or services as defined in §787.06, Florida Statutes. Under pent i y of perjury,I d lare that I have read the foregoing Affidavit and that the facts stated in it are true. '.. -... ) 1/22/25 (Signatire of authorized fepresentative) Date STATE OF FLORIDA COUNTY OF LEE Sworn to(or affirmed)and subscribed before me,by means of PI physical presence or online notarization this :i;�•� day of ,; �r,, ._., 20.;Vi,bytiloW. 45 "r(;,.;,;, , (Name of Affiant),who produced their as identification or a're personally known to me, t l Notary Public i 1 t . 1 rl _ Commission expires Personally Known ® OR Produced Identification(71 Type of Identification Produced: LINDA SOLICH commission#Hit 346132 •,, iow`,; Expires February 5,2027 CONTRACT,RENEWAL,OR EXTENSION REQUEST FORM Versipn•2025..1. CA