Loading...
Agenda 03/11/2025 Item # 8A (Resolution - Petition CU-PL20230004408 - FPL Summit Tower Conditional Use)3/11/2025 Item # 8.A ID# 2025-25 Executive Summary *** This Item Continued from the February 11, 2025 BCC Meeting. *** This item requires that ex-parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve a Resolution of the Board of Zoning Appeals of Collier County, Florida, providing for the establishment of a conditional use to allow a 150-foot tall monopole communications tower that deviates from the required 150-foot separation from residential property by providing an 84-foot separation from residential property to the north on lands zoned Estates (E) and designated Residential Estates Subdistrict within the Rural Golden Gate Estates Sub-Element of the Golden Gate Area Master Plan of the Collier County Growth Management Plan pursuant to sections 2.03.01.B.1.c.12 and 5.05.09 of the Collier County Land Development Code, located on approximately 613+ square feet of a 4.99+ acre tract located at 191 Weber Boulevard North, in Section 2, Township 49 South, Range 26 East, Collier County, Florida. (PL20230004408 - FPL Summit Tower Conditional Use) OBJECTIVE: To have the Board of Zoning Appeals (BZA) review staff's findings and recommendations along with the recommendations of the Collier County Planning Commission (CCPC) regarding the above-referenced petition and render a decision regarding the petition and ensure the project is in harmony with all the applicable codes and regulations in order to ensure that the community's interests are maintained. Per Policy 1.1.8 of the Rural Estates Sub Element of the Golden Gate Area Master Plan adopted in the Growth Management Plan (GMP), to obtain conditional use approval, a super-majority vote (minimum of 4 votes) by the BZA is required for approval of this item. CONSIDERATIONS: The request is to install a 150-foot-tall monopole telecommunications tower (plus a 5-foot lighting rod) with an associated 15-foot by 30-foot compound area at the base of the tower for accessory equipment. The parent parcel is 4.99+ acres, and it is occupied by a Florida Power and Light (FP&L) electric substation and a conservation easement along the south and east sides of the property (Official Records Book 4257, Page 1833). The site is zoned Estates, and the Future Land Use Map designation is Mixed Use District, Residential Estates Subdistrict within the Rural Golden Gate Estates Sub-Element in the Golden Gate Area Master Plan. The electric substation is a permitted essential service use per Land Development Code (LDC) Section 2.01.03. To the north, south, east, and west are single-family residential homes, all zoned Estates (E). Access to the tower will be provided off Weber Boulevard North via an existing driveway within a 20-foot-wide non-exclusive ingress and egress licensed area. When this petition was originally submitted, the tower did not meet all the separation distance requirements applicable to communication towers per the LDC. A companion Variance petition (PL20230007814) was submitted seeking relief from the required 375-foot separations (2.5 times tower height) between the northern and southern residential properties. On February 27, 2024, Collier County adopted Ordinance 2024-05, an LDC Amendment related to wireless communication facilities. The LDC was amended to allow tower structures to be separated from off-site abutting Residential or Estate uses by 100% of the tower height, or 150 feet for the requested tower. Additionally, "alternative" tower structures may now be separated from off-site abutting Residential or Estate uses by 50% of the tower height, or 75 feet for the requested tower. Alternative tower structures are defined in LDC Section 5.05.09.D. as manmade trees, clock towers, bell towers, steeples, light poles, and similar alternative mounting structures that accommodate, camouflage, minimize, or conceal the wireless communication facility equipment. The LDC Amendment also added an allowance for petitioners to request a deviation from the design and development standards applicable to towers as part of the Conditional Use request. Because of this, the Variance petition is no longer necessary and has been withdrawn. The petitioner originally requested two deviations, but the second request for relief from providing a wall or fence around the communication tower was withdrawn to address staff's recommendation and the Planning Commissioner's comments. One deviation is now requested: Page 16 of 4027 3/11/2025 Item # 8.A ID# 2025-25 Deviation #1 requests relief from LDC Sec. 5.05.09.F.2.c. which requires a minimum tower separation of 150 feet from abutting Estates zoned property to the north to allow separation of 84 feet. Per the Separation Plan (Sheet C1 of the Plan Set included as Exhibit "B" of the attached Resolution), there is no applicable fall zone radius per the tower design. The petitioner states that the communication tower will be constructed to the same standards as FP&L's electric transmission poles; the tower will be designed to withstand a Category 5 hurricane; therefore, there is no engineered breakpoint, and no fall zone radius applies. The tower design has a minimum capability for three service users/carrier's equipment. Federal Law It should be noted that Section 704 of the Telecommunications Act of 1996, codified at 47 USC 332(c)(7)(B)(iv) (attached in part as Attachment G to this Executive Summary), prohibits environmental concerns (or health concerns) as a reason for denial of cell towers by a local jurisdiction. If denied, it should not be based on health effects but rather one of the findings specified in LDC Section 10.08.00.D: (1) Consistency with the LDC and GMP; (2) Ingress and egress to the property and proposed structures thereon with particular reference to automotive and pedestrian safety and convenience, traffic flow and control, and access in case of fire or catastrophe; (3) The effect the conditional use would have on neighboring properties in relation to noise, glare, economic or odor effects; (4) Compatibility with adjacent properties and other property in the district. COLLIER COUNTY PLANNING COMMISSION (CCPC) RECOMMENDATION: The CCPC heard Petition CU-PL20230004408 on December 19, 2024, and unanimously recommended approval with Deviation #2 withdrawn per the petitioner. Four residents spoke on the item. Two residents spoke in favor of improved cellular service. One resident expressed concern for the health implications of towers, and the petitioner advised that federal law preempts local governments from considering health matters in local zoning decisions, noting the tower will meet radio frequency maximums set by the Federal Communications Commission. Another resident expressed concern about impacts on property values, and the petitioner stated that studies have been performed that show proximity to a tower does not impact values, and local property appraisers do not factor the proximity of a tower in property valuations. FISCAL IMPACT: The Conditional Use (CU) by and of itself will have no fiscal impact on Collier County. There is no guarantee that the project, at build-out, will maximize its authorized level of development. However, if the CU is approved, a portion of the land could be developed, and the new development will result in an impact on Collier County public facilities. The County collects impact fees prior to the issuance of a Certificate of Occupancy to help offset the impacts of each new development on public facilities. These impact fees are used to fund projects identified in the Capital Improvement Element of the GMP as needed to maintain the adopted Level of Service (LOS) for public facilities. Other fees collected prior to the issuance of a building permit include building permit review fees. Please note that impact fees and taxes collected were not included in the criteria used by staff and the CCPC to analyze this petition. GROWTH MANAGEMENT IMPACT: The subject property is designated Rural Estates, as identified in the Rural Golden Gate Estates Sub-Element of the Golden Gate Area Master Plan (GGAMP) and on the Rural Golden Gate Estates Future Land Use Map of the GMP. Its current zoning is Estates (E). The stated intent is to install a 150-foot monopole communication tower and related accessory equipment. According to the Sub-Element, a Conditional Use for a cellular tower is allowed in the Estates zoning district only on parcels no smaller than 2.25 acres and adjacent to a roadway classified within the Transportation Element as a Collector or Arterial. Based on available information, the lot appears to be approximately 5 acres and is located adjacent to Collier Boulevard, which is classified as a minor arterial roadway, allowing the Conditional Use process without an amendment to the GGAMP. Staff would also like to note that the existing 4.99+ acre parcel is able to be split into two buildable lots, and should a lot split ever be considered in the future, the cell tower must be on property with frontage on Collier Boulevard so as not to create a non-conformity. Staff recommends as a condition of approval: The parent tract shall not be split or altered in any way that would render the tower location to become noncompliant with the Conditional Use Page 17 of 4027 3/11/2025 Item # 8.A ID# 2025-25 Locational Criteria of the Rural Estates Sub-Element of the Golden Gate Area Master Plan of the Growth Management Plan. This proposed project, as conditioned, is consistent with the GGAMP of the GMP. According to the information provided by the applicant, the proposed tower facility will generate a de minimis number of maintenance related trips monthly. Typically, a communication cell tower like this can expect approximately one trip per month, depending on the facility. Therefore, the Conditional Use is found to be consistent with Policy 5.1 of the Transportation Element of the GMP. Environmental review staff has found this project consistent with the Conservation & Coastal Management Element (CCME). The project site consists of 4.99+ acres, with an existing FP&L substation and a 0.78-acre conservation easement within the property. The GMP is the prevailing document to support land use decisions, such as this proposed Conditional Use. Staff is required to make a recommendation regarding a finding of consistency or inconsistency with the overall GMP as part of the recommendation for approval, approval with conditions, or denial of any conditional use petition. Based on the review above, this request, as conditioned, can be found consistent with the GMP. LEGAL CONSIDERATIONS: Before you is a recommendation by the CCPC for approval of a conditional use (with deviation, allowed by the LDC) authorizing a telecommunications tower within the Estates (E) zoning district. A conditional use is a use that is permitted in a particular zoning district subject to certain restrictions. All testimony given must be under oath. The attached report and recommendations of the CCPC are advisory only and are not binding on you. The petitioner has the burden of demonstrating that the necessary requirements have been met, and you may question the petitioner or staff, to satisfy yourself that the necessary criteria has been satisfied. In addition to meeting the necessary criteria, you may place such conditions and safeguards as you deem appropriate to allow the use, provided that there is competent, substantial evidence that these additional conditions and safeguards are necessary to promote the public health, safety, welfare, morals, order, comfort, convenience, appearance, or the general welfare of the neighborhood. As a further condition of approval of the conditional use, you may require that suitable areas for streets, public rights-of-way, schools, parks, and other public facilities be set aside, improved, and/or dedicated for public use, subject to appropriate impact fee credits. Approval or denial of the petition is by Resolution. Should this item be denied, Florida Statutes section 125.022(3) requires the County to provide written notice to the applicant citing applicable portions of an ordinance, rule, statute, or other legal authority for the denial. This item has been approved as to form and legality, and requires an affirmative vote of four for BZA approval. (DDP) RECOMMENDATIONS: To approve Petition CU- PL20230004408 with a deviation from the required 150-foot separation from residential property by providing an 84-foot separation from residential property to the north, subject to one condition as recommended by the CCPC and incorporated in the Resolution. PREPARED BY: Ray Bellows, AICP, Zoning Manager ATTACHMENTS: 1. CCPC Staff Report 2. Resolution - 010225 3. Att B - Summit Substation Collocation Affidavit 4. Att C - VERIZON WIRELESS_RF_JUSTIFICATION_FPL_SUBSTATION_090982024 5. Att D - Deviation and Justification Statement (1) 6. Att E - Applicants backup 7. Att F - NIM Documents 8. FPL Summit Tower Sign Posting Affidavit 9. legal ad - agenda ID 2025-25 - CU-PL20230004408 FPL Communication Tower-BCC 2-11-25 Page 18 of 4027 CU-PL20230004408 FPL SUMMIT TOWER CONDITIONAL USE Page 1 of 14 December 10, 2024 STAFF REPORT TO: COLLIER COUNTY PLANNING COMMISSION FROM: ZONING DIVISION – ZONING SERVICES SECTION GROWTH MANAGEMENT COMMUNITY DEVELOPMENT DEPARTMENT HEARING DATE: DECEMBER 19, 2024 SUBJECT: PL20230004408; FPL SUMMIT TOWER CONDITIONAL USE PROPERTY OWNER/AGENT: Owner: Florida Power & Light Company Agent(s): James Johnston Property Tax Department Shutts & Bowen LLP 700 Universe Blvd., PSX/JB 300 South Orange Ave., Ste. 1600 Juno Beach, FL 33408 Orlando, FL 32801 Petitioner: Verizon 4700 Exchange Ct., Suite 100 Boca Raton, FL 33431 REQUESTED ACTION: The petitioner requests that the Collier County Planning Commission (CCPC) consider a Conditional Use petition to allow a 150-foot tall monopole communication tower that deviates from the required 150-foot separation from residential property by providing an 84-foot separation from residential property to the north and that deviates from the requirement to screen the tower facility with a wall or fence to allow no wall or fence around the tower on lands zoned Estates within the Rural Golden Gate Estates, pursuant to Section 2.03.01 B.1.c.12 and Section 5.05.09 E.1 and 5.05.09.H. of the Land Development Code. Per Policy 1.1.8 of the Rural Golden Gate Estates Sub Element of the Golden Gate Area Master Plan adopted in the Growth Management Plan, to obtain conditional use approval, a super majority vote (minimum of 4 votes) by the Board of Zoning Appeals shall be required. GEOGRAPHIC LOCATION: The site is located at 191 Weber Boulevard North (Parcel No. 36710200009), on the east side of Collier Boulevard north of the Collier Boulevard/Golden Gate Boulevard West intersection in Section 2, Township 49 South, Range 26 East, Collier County, Florida. (See location map on the following page.) Page 19 of 4027 CU-PL20230004408 FPL SUMMIT TOWER CONDITIONAL USE Page 2 of 14 December 10, 2024 PURPOSE/DESCRIPTION OF PROJECT: The petitioner seeks a Conditional Use for a telecommunications tower per LDC Section 2.03.01 B.1.c.12, subject to LDC Section 5.05.09. The request is to install a 150-foot-tall monopole tower with a five-foot lightning road and a 15-foot by 30-foot equipment area. The parent parcel is ±4.99 acres and is occupied by a Florida Power & Light (FP&L) electric substation and a conservation easement along the south and east sides of the property (OR Book 4257, Page 1833). The site is zoned Estates, and the Future Land Use Map designation is Mixed Use District, Residential Estates Subdistrict within the Rural Golden Gate Estates Sub-Element in the Golden Gate Area Master Plan. The electric substation is a permitted essential service use per LDC Section 2.01.03. The proposed tower is expected to generate minimal traffic, with approximately one maintenance visit per month, or 12 anticipated trips per year, by site technicians. Access to the tower will be provided off Weber Boulevard North via an existing driveway within a 20-foot-wide non- exclusive ingress and egress licensed area. At the time of the original submittal of this petition, the tower did not meet all of the separation distance requirements applicable to communication towers per the LDC, and a companion Variance petition (PL20230007814) was submitted seeking relief from the required 375-foot separations (2.5 times tower height) to the northern southern, and western residential properties. Page 20 of 4027 CU-PL20230004408 FPL SUMMIT TOWER CONDITIONAL USE Page 3 of 14 December 10, 2024 On February 27, 2024, Collier County adopted Ordinance 2024-05, an LDC Amendment related to wireless communication facilities. The LDC was amended to allow tower structures to be separated from off-site abutting Residential or Estate uses by 100% of the tower height, or 150 feet for the requested tower. Additionally, “alternative” tower structures may now be separated from off-site abutting Residential or Estate uses by 50% of the tower height, or 75 feet for the requested tower. Alternative tower structures are defined in LDC Section 5.05.09.D. as manmade trees, clock towers, bell towers, steeples, light poles, and similar alternative mounting structures that accommodate, camouflage, minimize, or conceal the wireless communication facility equipment. The LDC Amendment also added an allowance for petitioners to request a deviation from the design and development standards applicable to towers as part of the Conditional Use request. Because of this, the Variance petition is no longer necessary and has been withdrawn. The petitioner requests two deviations: Deviation #1 requests relief from LDC Sec. 5.05.09.F.2.c. which requires a minimum tower separation of 150 feet from abutting Estates zoned property to the north to allow separation of 84 feet. Deviation #2 requests relief from LDC Section 5.05.09.F.2.g. which requires wireless communication facilities to be screened with a wall or fence to allow the communication tower not to be fenced. See page 11 of this report for discussion of the deviations. Separation from: Past LDC Minimum Separation per 5.05.09.G.7.b and c Current LDC Minimum Separation Per 5.05.09.F.2.c. Proposed Separation Property to North (Estates / residential) 150’ x 2.5 = 375’ 150’ x 1 = 150’ 84’ Property to East (Estates / residential) 150’ x 2.5 = 375’ 150’ x 1 = 150’ 445’ Property to West (Estates / residential) 150’ x 2.5 = 375’ 150’ x 1 = 150’ 449’ Property to South (Estates / residential) 150’ x 2.5 = 375’ 150’ x 1 = 150’ 239’ Page 21 of 4027 CU-PL20230004408 FPL SUMMIT TOWER CONDITIONAL USE Page 4 of 14 December 10, 2024 Page 22 of 4027 CU-PL20230004408 FPL SUMMIT TOWER CONDITIONAL USE Page 5 of 14 December 10, 2024 SURROUNDING LAND USE AND ZONING: This section of the staff report identifies the land uses and zoning classifications for properties surrounding the boundaries of the subject property, which is developed with an FP&L electric substation and zoned Estates (E): North: Single-family residential, zoned Estates (E) East: Single-family residential, zoned Estates (E) South: Single-family residential, zoned Estates (E) West: Single-family residential, zoned Estates (E) Page 23 of 4027 CU-PL20230004408 FPL SUMMIT TOWER CONDITIONAL USE Page 6 of 14 December 10, 2024 GROWTH MANAGEMENT PLAN (GMP) CONSISTENCY: Future Land Use Element (FLUE): The subject property is designated Rural Estates as identified in the Rural Golden Gate Estates Sub-Element of the Golden Gate Area Master Plan (GGAMP) and on the Rural Golden Gate Estates Future Land Use Map (FLUM) of the Growth Management Plan (GMP). The current zoning is Estates (E). The stated intent is to install a 150’ monopole communication tower and related accessory equipment. According to the Sub-Element, a Conditional Use for a cellular tower is allowed in the Estates zoning district only on parcels no smaller than 2.25 acres and adjacent to a roadway classified within the Transportation Element as a Collector or Arterial. Based on available information, the lot appears to be approximately 5 acres and is located adjacent to Collier Boulevard, which is classified as a minor arterial roadway, allowing the Conditional Use process without an amendment to the GGAMP. Staff would also like to note that the existing ±4.99acre parcel is able to be split into two buildable lots, and should a lot split ever be considered in the future; the cell tower must be on property with frontage on Collier Boulevard so as not to create a non- conformity. Staff recommends as a condition of approval: The parent tract shall not be split or altered in any way that would render the tower location to become noncompliant with the Conditional Use Locational Criteria of the Rural Estates Sub-Element of the Golden Gate Area Master Plan of the Growth Management Plan. This proposed project, as conditioned, is consistent with the GGAMP of the GMP. Transportation Element: The project is consistent with Policy 5.1 of the Transportation Element of the Growth Management Plan, which states: “The County Commission shall review all rezone petitions, SRA designation applications, conditional use petitions, and proposed amendments to the Future Land Use Element (FLUE) affecting the overall countywide density or intensity of permissible development, with consideration of their impact on the overall County transportation system, and shall not approve any petition or application that would directly access a deficient roadway segment as identified in the current AUIR or if it impacts an adjacent roadway segment that is deficient as identified in the current AUIR, or which significantly impacts a roadway segment or adjacent roadway segment that is currently operating and/or is projected to operate below an adopted Level of Service Standard within the five year AUIR planning period, unless specific mitigating stipulations are also approved. A petition or application has significant impacts if the traffic impact statement reveals that any of the following occur: a. For links (roadway segments) directly accessed by the project where project traffic is equal to or exceeds 2% of the adopted LOS standard service volume; b. For links adjacent to links directly accessed by the project where project traffic is equal to or exceeds 2% of the adopted LOS standard service volume; and c. For all other links the project traffic is considered to be significant up to the point where it is equal to or exceeds 3% of the adopted LOS standard service volume. Mitigating stipulations shall be based upon a mitigation plan prepared by the applicant and submitted as part of the traffic impact statement that addresses the project’s significant impacts on all roadways.” Page 24 of 4027 CU-PL20230004408 FPL SUMMIT TOWER CONDITIONAL USE Page 7 of 14 December 10, 2024 According to the information provided by the applicant, the proposed FP&L Summit Substation Communication Tower will generate a de minimis number of maintenance-related trips monthly based on similar facilities in Florida. Typically, a communication cell tower like this can expect approximately one trip per month, depending on the facility. Therefore, the subject's Conditional Use is found to be consistent with Policy 5.1 of the Transportation Element of the GMP. Conservation & Coastal Management Element (CCME): Environmental review staff has found this project to be consistent with the Conservation & Coastal Management Element (CCME). The project site consists of 4.99 acres with an existing FP&L substation and a 0.78- acre conservation easement within the property. Federal Law It should be noted that Section 704 of the Telecommunications Act of 1996, codified at 47 USC 332(c)(7)(B)(iv), prohibits environmental concerns (or health concerns) as a reason for denial of cell towers by a local jurisdiction. If the CCPC recommends denial of the petition, it should not be based on health effects but rather on one of the five areas of analysis below for Conditional Use. STAFF ANALYSIS: Staff has completed a comprehensive evaluation of this land use petition, including the criteria on which a recommendation must be based. This evaluation is completed as part of the Conditional Use Findings provided below. In addition, staff offers the following analyses: Environmental Review: Environmental Services staff has reviewed the Conditional Use petition to address ecological concerns. The property has been developed with an FP&L electric substation. An existing conservation easement dedicated to Collier County for 0.78 acres has been recorded (OR 4257 PG 1833), which meets the preservation standards of LDC Section 3.05.07. The environmental data indicates a gopher tortoise (Gopherus polyphemus) burrow was observed onsite. Consultation with the Florida Fish and Wildlife Conservation Commission (FWCC) regarding guidelines and permitting requirements will be required before construction. Environmental Services staff recommends approval of the petition. Transportation Review: Transportation Planning staff has reviewed the petition request and recommends approval. Landscape Review: Buffers labeled on the Conceptual Site Plan are consistent with the LDC. Final fence/wall and landscaping plans are reviewed at the time of site development plan permitting. Mosquito Control District Review: Per LDC Section 5.05.09.I.3., the applicant must supply a copy of the application to the Collier Mosquito Control District or designee for towers greater than 150 feet in height. The request is for a tower that is 150 feet in height, not greater than 150 feet, so this requirement does not apply. Conditional Use Findings: Before any conditional use recommendation can be offered to the Board of Zoning Appeals (BZA), the Collier County Planning Commission (CCPC) must make findings that: 1) approval of the conditional use will not adversely affect the public; 2) all Page 25 of 4027 CU-PL20230004408 FPL SUMMIT TOWER CONDITIONAL USE Page 8 of 14 December 10, 2024 specific requirements for the individual conditional use will be met; and 3) satisfactory provisions have been made concerning the following matters, where applicable: 1. Section 2.03.01 B.1.c.12 of the LDC permits communication towers as conditional uses, subject to LDC Section 5.05.09. The requested use for a wireless communication facility is allowed as a conditional use in the Estates zoning district, subject to the standards and procedures established in Sections 10. 08.00, Conditional Uses Procedures, and 5.05.09, Wireless Communication Facilities, of the LDC. 2. Consistency with the Land Development Code (LDC) and the Growth Management Plan (GMP). Staff has found this request is consistent with the Growth Management Plan (GMP). The development of conditional uses shall be in compliance with the applicable provisions of the Land Development Code (LDC), with the exception that deviations can be requested from wireless communication facility design and development standards per LDC Section 5.05.09.F.4. Below is a review of applicable LDC standards and the two requested deviations. Height. The proposed tower is consistent with the maximum allowable tower height, which is dependent upon the number of providers accommodated on the tower per LDC Section 5.05.09.F.2.b. The tower is designed to support up to three providers (Verizon plus two others), which corresponds to a maximum height of 185 feet per the LDC. Lightning rods may exceed the height limitation provided the rods are no greater than 10 feet in length. The proposed height of 150 feet plus a 5-foot lightning rod conforms to the LDC. Separations. The proposed tower is not consistent with separation requirements from off-site abutting uses per LDC Section 5.05.09.F.2.c. The separation requirements are 100% of the tower height or 50% of the tower height if an alternative tower structure is proposed. Because the tower is proposed as a monopole design and not an alternative tower structure, the minimum separation requirement is 150 feet. The petitioner states that the communication tower will be constructed to the same standards as its electric transmission poles; the tower will be designed to withstand a Category 5 hurricane. Therefore, there is no engineered breakpoint, and no fall zone radius applies. This is indicated as Note 1. on Plan Sheet C1, Separation Plan. While the proposed separations from Estates zoned residentially occupied property conform to the minimum LDC requirement of 150 feet to the east, west, and south, the proposed separation to the northern Estates zoned residentially occupied property is 84 feet, which deviates from the LDC requirement of 150 feet. See page 11 of this staff report for discussion of proposed Deviations. Screening. Screening standards are enumerated in LDC Section 5.05.09.F.2.g. The petitioner seeks to deviate from the requirement for an 8-foot-tall wall or fence that is 100 percent opaque around the base of the tower. See page 11 of this staff report for discussion of Page 26 of 4027 CU-PL20230004408 FPL SUMMIT TOWER CONDITIONAL USE Page 9 of 14 December 10, 2024 proposed Deviations. The overall height of ground-mounted equipment shall not exceed 12 feet. Dimensions of the equipment cabinets are reviewed against this standard at the time of the site development plan and building permitting. Landscaping. Landscaping standards are enumerated in LDC Section 5.05.09.F.2.h. Buffers labeled on the Conceptual Site Plan are consistent with the LDC. Final fence/wall and landscaping plans are reviewed at the time of site development plan permitting. Access and parking. Access and parking standards are enumerated in LDC Section 5.05.09.F.2.i. One parking space is required for towers that are 185 feet in height or less. Access to the tower is shown on the Conceptual Site Plan (Sheet Z2), which is to be provided off Weber Boulevard North via an existing driveway within a 20-foot-wide non-exclusive ingress and egress licensed area. An adequate area for one parking space appears to be available; final site design plans will be reviewed against these standards at the time of site development plan permitting. Estates. Additional standards apply to wireless communication facilities in the Estates Zoning District. These standards are found in LDC Section 5.05.09.H. and are evaluated below: a. The parcel is a minimum 2.25 acres and adjacent to an arterial or collector road. This criterion is met because the parcel is ±4.99 acres and is located adjacent to Collier Boulevard, which is classified as an arterial roadway. b. The wireless communication facility’s provider has provided evidence that the service provider's search radius for the tower location requires placement of the tower in the Estates Zoning District to meet its coverage requirements and that the wireless communication facility cannot be co-located on an existing tower and provide the same quality service coverage. Per LDC Section 5.05.09 D.4, the search radius area means the limited area certified by the provider’s Radio Frequency Engineer within which the proposed wireless communication facility needs to be located in order to resolve the provider’s coverage and/or capacity issues in the surrounding area. There is no standard numeric distance for a search radius; instead, the search radius for a particular site depends on many factors, including, but not limited to, the population to be served, geography, and topography. See Attachment B for the petitioner’s required “No Alternative Towers Affidavit.” See Attachment C, the Radio Frequency (RF) Justification Package, which includes an explanation for the need to place the tower in the Estates Zoning District to provide adequate service and address customer complaints due to coverage and capacity issues. The petitioner asserts that “The proposed site will significantly enhance the coverage and capacity need in the area and will bring significant network performance improvements to the existing and future residents of this area. There are no additional existing structures in the area that could support the installation of the Verizon Wireless equipment needed.” Page 27 of 4027 CU-PL20230004408 FPL SUMMIT TOWER CONDITIONAL USE Page 10 of 14 December 10, 2024 Supplemental application requirements apply to wireless communication facilities in the Estates Zoning District. These requirements are found in LDC Section 5.05.09.I.1. and are evaluated below: a. Evidence from a Radio Frequency Engineer that the proposed facilities cannot be installed on another structure in Collier County and shall be located at the proposed site to meet coverage requirements with a composite propagation study illustrating, graphically, existing and proposed coverage in industry-accepted median received signal ranges. See Attachment B for the petitioner’s required “No Alternative Towers Affidavit” and Attachment C for the Radio Frequency (RF) Justification Package, which includes an explanation for the need to place the tower in the Estates Zoning District to provide adequate service and address customer complaints due to coverage and capacity issues. The RF Justification Package includes graphics illustrating existing and proposed coverage and asserts that “The proposed site will significantly enhance the coverage and capacity need in the area and will bring significant network performance improvements to the existing and future residents of this area. There are no additional existing structures in the area that could support the installation of the Verizon Wireless equipment needed.” b. If co-location is not available, the applicant shall submit an affidavit stating that the applicant made diligent efforts for permission to install or co-locate the WCF on all existing support structures located within the search radius for the proposed tower. The applicant shall establish in the application that they are unable to provide service at existing sites nearby, no other existing tower is available (including utility poles), and that no reasonable alternative technology can accommodate the WCF due to one or more of the following factors: (six factors are listed but not re-stated here for brevity) See Attachment B for the petitioner’s required “No Alternative Towers Affidavit,” which states, “A diligent review of the area within the search ring found that there are no existing communication towers and no buildings or structures tall enough to meet the antenna design of 145 feet above ground level.” Mosquito Control District. Because the proposed tower is not greater than 150 feet in height, the requirement that the applicant supply a copy of the application to the Collier Mosquito Control District or designee does not apply per LDC Section 5.05.09.I.3. 3. Ingress and egress to the property and proposed structures thereon, with particular reference to automotive and pedestrian safety and convenience, traffic flow and control, and access in case of fire or catastrophe. Ingress and egress are shown on the Conceptual Site Plan (Sheet Z2) to be provided off Weber Boulevard North via a gated asphalt paved drive within a 20-foot wide non-exclusive ingress and egress licensed area. At the perimeter of the 15-foot x 30-foot equipment compound, a 12-foot-wide access gate is proposed for security. Page 28 of 4027 CU-PL20230004408 FPL SUMMIT TOWER CONDITIONAL USE Page 11 of 14 December 10, 2024 The petitioner states that the use will generate approximately one maintenance visit per month, or 12 anticipated trips per year, by site technicians. 4. The effect the Conditional Use would have on neighboring properties in relation to noise, glare, economic or odor effects. The communication tower is an unmanned facility and is not anticipated to generate noise, odor, or glare. No signals, lighting, or illumination is permitted on towers unless required by the FAA or other applicable authority. Site lighting cannot be more than 20 feet above grade and must be fully shielded and directed downward away from neighboring properties. The tower is not proposed to be illuminated. The tower is anticipated to improve wireless communication capacity and service levels in the area, which not only positively affects economic opportunities but also increases safety within the area with improved coverage and call stability for emergency situations. 5. Compatibility with adjacent properties and other properties in the district. The tower is within the boundaries of the parent parcel, occupied by an FP&L electric substation and a conservation easement along the south and east sides of the property (OR Book 4257, Page 1833). A tower will generate far fewer trips than other uses that are permitted or conditional in the Estates zoning district. Minimum separation distances are established in the LDC to address compatibility with abutting uses in proximity to a proposed tower. Towers in the Estates Zoning District must be separated from the property line of abutting uses by at least 100% of the tower height unless an alternative tower structure is proposed, whereby the separation distances shall be reduced to 50% of the tower height. The petitioner is proposing a 150-foot-tall monopole tower and not an “alternative tower structure.” The minimum required separation distance of 150 feet from abutting property lines is met with the exception of the 84-foot separation proposed from the abutting property to the north. DEVIATION DISCUSSION The allowance for deviations through the Conditional Use process is a new provision introduced through the LDC Amendment related to wireless communication facilities approved by Ordinance 2024-05 on February 27, 2024. LDC Section 5.05.09.F.4. states that an applicant requesting a Conditional Use may request a deviation from the design and development standards of [Section 5.05.09.F] as part of the Conditional Use request. Criteria for the deviation will be the criteria set forth in LDC section 10.08.00.D. The criteria set forth in LDC Section 10.08.00.D. are the findings that are the basis for the Planning Commission’s recommendation for conditional uses. These findings include the criterion that the request is consistent with the LDC. Deviations, by definition, are a departure from consistency with LDC standards. Therefore, this criterion cannot be met when applied to the review of deviations. For this reason, the staff analysis/recommendation includes additional consideration also given to the County’s standard deviation review criteria found in LDC Section 10.02.13.A.3., “the element may be waived without detrimental effect on the health, safety, and welfare of the community.” LDC section 10.02.13.B.5.h, the deviation is “justified as meeting public purposes to a degree at least equivalent to literal application of such regulations.” Page 29 of 4027 CU-PL20230004408 FPL SUMMIT TOWER CONDITIONAL USE Page 12 of 14 December 10, 2024 The petitioner seeks two deviations from the requirements of the LDC. The deviations are directly extracted from the petitioner’s “Deviation and Justification Statement” provided as Attachment D. The staff analysis/recommendation is outlined below. Proposed Deviation # 1: (Separation requirement) Relief from LDC Section 5.05.09.F.2.c. which requires the tower to be separated from abutting Estates zoned property to the north a minimum of 150 feet to allow separation of 84 feet. Petitioner’s Justification: See Attachment D for petitioner’s explanation addressing conditional use findings criteria of LDC Section 10.08.00.D. Staff Analysis and Recommendation: Staff recommends APPROVAL based on the explanations provided by the petitioner that the site has unique constraints limiting the tower placement to the proposed location and that the tower is designed to standards that preclude it from falling, finding in compliance with LDC section 10.02.13.A.3., the petitioner has demonstrated that “the element may be waived without detrimental effect on the health, safety, and welfare of the community” and in compliance with LDC section 10.02.13.B.5.h, the petitioner as demonstrated that the deviation is “justified as meeting public purposes to a degree at least equivalent to literal application of such regulations.” The petitioner’s justification for the reduced separation is based on constraints unique to FP&L substations. The site is constructed as an FP&L substation with required stormwater facilities and conservation areas. Limiting site design constraints result in the proposed tower location, including FP&L’s critical 100-foot setback from the substation building and existing stormwater facilities and conservation areas on the site. Per the Separation Plan (Sheet C1), there is no applicable fall zone radius per the tower design. The petitioner states that the communication tower will be constructed to the same standards as FP&L’s electric transmission poles; the tower will be designed to withstand a Category 5 hurricane; therefore, there is no engineered breakpoint, and no fall zone radius applies. Proposed Deviation # 2: (Screening) Relief from LDC Section 5.05.09.F.2.g, which requires wireless communication facilities to be screened with a wall or fence to ensure that no unauthorized persons can access the facility and to allow the communication tower not to be fenced. Petitioner’s Justification: See Attachment D for petitioner’s explanation addressing conditional use findings criteria of LDC Section 10.08.00.D. Staff Analysis and Recommendation: Staff recommends DENIAL, finding the petitioner has not demonstrated that the deviation is “justified as meeting public purposes to a degree at least equivalent to literal application of such regulations.” The equipment compound is proposed to be fenced per the LDC requirement; however, the monopole itself is not. The petitioner indicates that FP&L will construct, own, and maintain the tower; technicians will access the antennas on the structure using a crane and basket; and FP&L Page 30 of 4027 CU-PL20230004408 FPL SUMMIT TOWER CONDITIONAL USE Page 13 of 14 December 10, 2024 does not permit fences to be constructed around poles because such fences are considered to be potential climbing aids. Staff notes that the proposed fence surrounding the equipment compound is roughly 6 feet from the tower. Therefore, it would be feasible to fence around the tower with an offset of roughly 6 feet. The petitioner states that the substation property is already a secure compound, so providing an additional fence around the communication tower will not provide additional protection from unauthorized access to the communication tower. Staff notes the survey and site plans show fencing around the substation facility and does not show fencing around the perimeter of the 4.99-acre parcel, so the level of security that exists for the tower is not evident. The petitioner states that the existing, mature tree canopy screens neighboring properties from the tower. Staff notes that a tower extending 150 feet in height can be seen despite the presence of trees in the vicinity of the tower; it is not clear how the trees control for unauthorized access to the structure to the extent that a fence would provide such control. ENVIRONMENTAL ADVISORY COUNCIL (EAC) RECOMMENDATION: This project does not require Environmental Advisory Council (EAC) review, as this project did not meet the EAC scope of land development project reviews as identified in Section 2-1193 of the Collier County Codes of Laws and Ordinances. NEIGHBORHOOD INFORMATION MEETING (NIM): The NIM was held on April 16, 2024, at Max A. Hasse Jr. Community Park, located at 3390 Golden Gate Boulevard West. Approximately 11 members of the public attended. Virtual attendance was also available via ZOOM. The meeting commenced at 6:10 p.m. and ended at approximately 6:50 p.m. The petitioner’s agent, James Johnston, presented information about the proposed wireless communication facility and the justification for the Conditional Use. Comments from attendees included support for the improved cellular service in the area and opposition due to health concerns. See Attachment F for the documentation of the NIM. COUNTY ATTORNEY OFFICE REVIEW: The County Attorney's Office reviewed this staff report on November 20, 2024. RECOMMENDATION: Staff recommends that the Collier County Planning Commission (CCPC) recommend approval of Petition CU-PL20230004008, FPL Summit Tower, to the Board of Zoning Appeals (BZA), subject to the following conditions: Page 31 of 4027 CU-PL20230004408 FPL SUMMIT TOWER CONDITIONAL USE Page 14 of 14 December 10, 2024 1. The telecommunications tower is on a +/-4.99-acre parent tract, which conforms to Conditional Use Locational Criteria of the Rural Estates Sub Element of the Golden Gate Area Master Plan of the Growth Management Plan because the parcel is no smaller than 2.25 acres and is adjacent to Collier Boulevard, which is classified as an arterial. The parent tract shall not be split or altered in any way that would render the tower location to become non-compliant with the Conditional Use Locational Criteria of the Rural Estates Sub Element of the Golden Gate Area Master Plan of the Growth Management Plan. 2. Deviation #2 is denied. An 8-foot-tall wall or fence that is 100 percent opaque is required around the base of the tower per LDC Section 5.05.09.F.2.g. Attachments: A. Draft Resolution B. Petitioner’s No Alternative Towers Affidavit C. RF Justification Package D. Petitioner’s Deviation and Justification Statement E. Application/Backup documents F. NIM Documentation Page 32 of 4027 RESOLUTION NO.2025. WHEREAS, the Legislature of the State of Florida in Chapter 67-1246, Laws of Florida, and Chapter 125, Florida Statutes, has confened on Collier County the power to establish, coordinate and enforce zoning and such business regulations as are necessary for the protection of the public; and WHEREAS, the County pursuant thereto has adopted a Land Development Code (Ordinance No. 2004-41, as amended) which includes a Comprehensive Zontng Ordinance establishing regulations for the zoning of particular geographic divisions of the County, among which is the granting ofConditional Uses; and WHERIAS, the Board of Zoning Appeals (BZA), being the duly appointed and constituted planning board for the area hereby affected, has held a public hearing after notice as in said regulations made and provided, and has considered the advisability of a Conditional Use to allow a I5O-foot-tall monopole communications tower that deviates from the required 150- foot separation from residential property by providing an 84-foot separation from residential property to the north on lands zoned Estates (E) within the Rural Golden Gate Estates Sub- Element and Residential Estates Subdistrict of the Golden Gate Area Master Plan Element of the Collier County Growth Management Plan pursuant to Sections 2.03.01.b.1.c.12 and 5.05.09 of the Collier County Land Development Code on the property hereinafter described, and the Collier County Planning Commission has made findings that the granting olthe Conditional Use will not adversely affect the public interest and the specific requirements goveming the Conditional Use have been met and that satisfactory provision and arrangement have been made conceming all applicable matters required by said regulations and in accordance with Subsection 10.08.00.D. of the Land Development Code; and fzt -cv s-oztt t ooue u rfit FPL Summit Communication Tower cu -PL20230004408 t DD025 Page 1 of2 CAU A RESOLUTION OF THE BOARD OF ZONING APPEALS OF COLLIER COUNTY, FLORIDA PROVIDING FOR THE ESTABLISHMENT OF A CONDITIONAL USE TO ALLOW A TsO-FOOT.TALL MONOPOLE COMMLINICATIONS TOWER THAT DE\'IATES FROM THE REQUIRED I5O. FOOT SEPARATION FROM RESIDENTIAL PROPERTY BY PROVIDING AN 84.FOOT SEPARATION FROM RESIDENTIAL PROPERTY TO THE NORTH ON LANDS ZONED ESTATES (E) AND DESIGNATED RESIDENTIAL ESTATES SUBDISTRICT WITHIN THE RURAL GOLDEN GATE ESTATES SUB-ELEMENT OF THE GOLDEN GATE AREA MASTER PLAN OF THE COLLIER COUNTY GROWTH MANAGEMENT PLAN PURSUANT TO SECTIONS 2.03.01.8.1.c.12 AND 5.05.09 OF THE COLLIER COUNTY LAND DEVELOPMENT CODE, LOCATED ON APPROXIMATELY 613+ SQUARE FEET OF A 4.99+ ACRE TRACT LOCATED AT I9I WEBER BOULEVARD NORTH, IN SECTION 2, TOWNSHIP 49 SOUTH, RANGE 26 EAST, COLLIER COLINTY, FLORIDA. (PL2O23OOO14O8) Page 33 of 4027 WHEREAS, all interested parties have been given opportunity to be heard by this BZA in a public meeting assembled and the BZA having considered all matters presented. NOW, TIIEREFORE, BE IT RESOLVED BY THE BOARD OF ZONING APPEALS OF COLLIER COUNTY, FLORIDA that: Petition Number PL20230004408 filed by James Johnston, Esq. of Shutts & Bowen, LLP, with respect to the property hereinafter described in Exhibit "A", be and the same is hereby approved for a Conditional Use to allow a l5O-foot-tall monopole communications tower that deviates from the required 150-foot separation from residential property by providing an 84-foot separation fiom residential property to the north on lands zoned Estates (E) within the Rural Golden Gate Estates Sub-Element and Residential Estates Subdistrict of the Golden Gate Area Master Plan Element of the Collier County Growth Management Plan pursuant to Sections 2.03.01.b.1.c.12 and 5.05.09 of the Collier County Land Development Code, in accordance with the Conceptual Site Plan described in Exhibit "B", and subject to the conditions and deviations in Exhibit "C". Exhibits 'A", "B", and "C" are attached hereto and incorporated herein by reference. BE IT FURTHER RESOLVED that this Resolution be recorded in the minutes of the Board of Zoning Appeals. This Resolution adopted after motion, second, and super-majority vote, this _ day of 2025. ATTEST: CRYSTAL K. KINZEL, CLERK By: , Deputy Clerk Approved as to form and legality: Derek D. Perry Assistant County Attomey lzt -cv s-oz+z t n eoue t t tfit FPL Summit Communication Tower c u -PL20230004408 t /212025 BOARD OF ZONING APPEALS COLLIER COLTNTY, FLORIDA By: Burt L. Saunders. Chairman Attachments: Exhibit "A" Legal Description Exlibit "B" - Conceptual Site Plan Exhibit "C" - Conditions,/Deviations9$ Page 2 of 2 eqo Page 34 of 4027 EXHIBIT "A" PROPERTY DESCRPIONS PARf,I.{T PARCEL (ofRctAL RECoRD 8O0l( 3796, PAG€ 672) IRACT,t, OF COt RI GAIE ESTAIES, UNII NO. 3, ACCORONG fo rHE PIAT IHEREOF. AS RECORO@ IN PLAT 8OO( +, PAGE 77 AND 76, OT .lHE PUEUC RECORDS OF COTIJER COUNTY. TLO&DA. TJCENSE PARCEL (PRPARED By GEo|INE SJR!€}INC. tNC.) 1IIAT PART OF IRACT.+, COI.DB{ GAIE EST^TES, UNIT NO. 3. AS PER PLAT I}iEREOF RECOROED IN PTAT 8OOl( ', PAGE 77 OF'I}IE PUBIrc RICORDS OF COIIJER CAJNTY, FIOHDA, STIJAIED lN SEC'!|ON 2, TOuNS+IP,19 SOJIH. R^NGE 26 EAST OF SAID COIIIER COUNW' EBNG MORE PAR11CUIJRLY DBCRIBED AS FOI.IOIIE: COMMBTICE AT A FOUNO /t. X ,I. CONCREIE MONUMENT (NO.IDEN.IIRC^TION) AT IHE S.IIERSECITON OF IHE SOUIH I.INE OF IRACT .I, GCI."OET GAIE ESTAIES, UIIT NO. f,, AS PER PLAT THEREOF RECMOD IN PLAT BOO( 1, PAGE 77 ff lHE PUBIJC RECORDS Of COTIJER COUNTY, FLORIDA, t{I}I I}IE IIEST ROAO MGHT-OF.WAY EASEMA{T UNE OF YGBER BOLIIEVARD NORIH (60 TEEI IIIDE PUBUC ROAD RIGHT-tr-WAY EASOTEN0 AS PER DESCR|PI|O{ RECORDED lN OMqAL RECORO EOOI( 169, PACE I3O OF SA,IO PUBUC RECORDS, SAID POINT BENG NOR1H E9'4O'50' $EST, A DISTANCE OF 5O.OO FET FROil lI{E SOIJ]HEASf CORNER OF SAIO TRACT {; I}IE1{CE NORIH OO191O' EAST ALol.IG SAl0 IEST RoAD RlctlT-Of-WAY EASEIIENT Ut{E FOR 22,t.7J FEET; IHENCE NORIH E9'{0'50' tvET FOR 388.66 FIET TO IHE PoINT ff BEGINNING; ]HENCE NoRIH 89'{0'50' viEST FOR 15.00 FEEf; ENCE NORIH 0019'10" EAST FoR 5O.0O FEEI; lHEtCf SotJIH E9'40'50' EAST FOR 15.00 FEET; 1HENCE SOIJ'IH OO'I9'IO. Y€SI FOR 3O.OO FEET TO SAO POINT OF BEGSINING. colrTAlNtNG +5o SQUARE FEET (0.010 ACRES), yoRE OR LESS. 20 FOOT }''DE NON-EXCLUSIE INGRESS A'.ID EGRESS UCt}{S€E (PREPAREO BY GEOUNE SURIGTING, INC.) IHAT PART OF IRACT .I, GOI..DE.I GAIE ESTAIES, UNIT NO. 3, AS PER PLAT I}IEREOF RECOROED IN PI.AT BOOK 1, P^SE 77 OF I}IE PUBIrc RECORDS OF 9OIJJE CqVNt"y, FLOROA, gn'AID tN SECIION 2, IOtrNg{p ,t9 SolJI}|, RAI{GE 26 E^ST OF SAID COIIJER COUNTY, LYNG WIHIN IO FEET OF BO1I{ SID€S OF A CENIBIJNE BENG MORE P^R]ICUIJRI-Y OCSCRIBED AS FOIIOIYS: cof/MENcE AT A FOUNo +' X 4' COI{CREIE Mq{UMETT (NrtDS.lllRcAION) AIlHE SIIERSECIIO OF IHE SOUIH IJNE OF IRACT.I. GOIDE}.I GAIE ESI^IES,qrI No. J. AS pER pllT IHEFEoF RECORoED tN p[Ar BOOX {, PACE 77 (F IHE PUBLIC RECoRDS of colJ.lER coUNTY, iLoRloA, W])l IltE tir€St nom RIGHT-OF-IV Y EASA{ENT tlNE Of wEB BOUIEVARD NORIH (60 FEET irlD€ PUzuC RO^D RIGI{T-OF-WAY EASE}IEI.{T) AS PER O€SCRIPIIOiI RECOFDED INotFloAL RECORo EOO|( 169, PACE tf,O .)F SAID pUBLtC RECOROg SA|D pOtNT BENG '.IOR]H 89'{O'5O' 'AEST, A OSTANCE OF 3O.OO FEET FRorI IHE SOU]}IEAST CORNER OF SND TRACT {; I}IENCE NORII.I OO'I9'IO'EAST ^LO GSAO ITEST ROAD RIGHT-OF-WAY EASEMENT LINE FoR 22I.7J FEEr; IHEI,iCE NOR'IH 69.,+0'50' ITEST FOR 3E8.66 FEET IO THE SC}IJIIIEAS' CORNER Of AN Ls FqoI x 30 FooT UCENSEE PARCEL lHE{Cg NORI}| OO19'IO- EASI ALO..lcIHE E^ST IJNE OF SAIO UC€NSTF PARCE- FOR 17.75 FEET TO ]HE PON' OF EECNNING OF lHE CENIERIJNE OF IHE HMEN O€SC'RIBED 20 F@T WDE NO{-EXCLUE\E INGRESS AND EGRES5 UCENSEB IHENCE SOUI}I 89"IO'50' EAST FOR 56.60 FEEI; IHENC€ NOR1H 7516'55' EAST FOR 95.20 FET;fiENq: soulH 76'{e'36' EAST FoR 62.00 FEEI: I}IENCE SqrIH 69?o,so. EASr_ FOE 176.00 FEET To ^N TMTERSECITON vt.tH SA|D YGST iOAD Elqt-T-.qf-w4y EASBTR{T UNE AND tHE potNT cF IERMINUS oF I}tE tGEtN DESCRIBEO CANIERUNE coNTANtNG 7,906 SOUARE FEET (0.181 ACRES), MORE OR LESS. Page I of2 qo Page 35 of 4027 PROPERTY DESCRIPIIONS (CONNNUED) 5 FOOT II,IOE NON-D(CUJS\E UITI.ITY UCENSEE (PREPAREO BY G€OtJNE SJRICYING, INC.) IHAT PART 0f IRACT ,1, GOLDE{ GAIE ESTAIES. U IT No. 5, as PER PLAT I}BEOF RECORD@ IN PL^T 8OO|( 1, P^C*.77 OF I}E PUBIJC RECORDS OF COtIJER CoUNIY, FLORIoA, SITJAIED lN sEc'llori 2, Tollt{gaP ,19 SOUIH, RANGf, 26 EAST OF SAIO COII.E COUNTY. LI,ING WTIHIN 2.5 FEET OF EOIH SOES OT A CANERUNE EENG MORE PAR]IC1,}I,ARLY OESC&BED AS FQIO$S: couMEIicE AT A FOUND 4' X 4' CONCRSIE nONUMR{T (NO-tDENllFlCAIt0N) AT IHE IN'IESECIION Of IHE SOtJlI{ UNE OF IRACT +, GOI.oRI GAIE ESTAES, UNIT NO. 3. AS PER PLAT'IHEREtr RECORO€O IN PLAT BOO( 4, PAcf.77 tr IHE PUBUC RECORDS OF COTIIR COUNTY, FLORIDA, Y{TH l|f IIEST ROAD RlGltT-oF-rY Y EASEUENT UNE 0F nEBER SOUIEVARo NOR]H (60 FET lnoE PUAIC ROAO flCfir-Of-wAY EASOTRIT) AS PEF DESCffpIoN RECORDED !,1 OfRCIAL RECOfiO EOOK 169. PAGS IJO OF SAID PUBL'C RECOROS, SAD PONT BENC NORIH 89'{0'50. II,EST. A OISIANCE OF 3O.OO FET FROU lHE SqJ'IHEAST CORNER Of SAIO IRACT 4; IHENCE NOR1H OO]9'IO' E^ST AIOI,IG SAl0 YiESt ROAD RIO{T-oF-wAY EAs€r,EN, LINE FoR 22{.73 FEEI; ItEiC€ NORIH 89.,10'50' S,EST FOR 3EE.66 FEr rO IHE SOUI}EAST CORTGR 0r AN i5 FOOT X 30 FOOT I'CENSEE PARC& II{ENCE NORIH OOI9,IO. EAST ALOIIGI}C EAST IJNE OF SAID IJCENSEE PARCEL FOR 3O.OO FEET TO lxf NORIHEAST CORNER 0F SAID IICE}ISEE PARCET-: IHE}ICE NOR'IH E9',1O'5O' tr€Sf ALONG ltlE NORIH UNE Of, SAID UCENSEE PARCEL FOfi 12.50 FEET IO T{E PqNT OF BEGINNING OF IlC CS,IIERUNE OF THE HERAN OESCRIB@ 5 FOOT f,IDE NON-EXCUJS\E UNUTY UCAISEE "IHENCE NORIH OO19'1O' EAST FOR 6I.22 FEET; IHENCE NORIH 89r5'2t' EAST FoR 87.81 FEET: IHENCI sou'lH 77!0'12'EAST FOR 100.00 FEEI; IHEN€ SOUltl 5E55'52'EAST FOR ,l1.Oo FEET; BAiCE SOUIH 8931'12' EAST FOR 178.00 FEE ?o AN IN]ERSECIION I4IIH A IJI{E IXAT E PARAIIIL IIIIH AND OFFSEI 2.5 FEET ITEST OF S^ID Y€Sr ROAD RlGfll-oF-WAY EaSATATT UNe ft{EICE NORII{ OO1910' EASI ALOTIG SAID PARALIIL I,JNE FOR 58.00 FEEI TO AN INIERSECIIOI\I IUIH IHE NORIH UNE Of SAID IRACT { AND IHE PqNT IBIdNUS Of ]HE HEREN OESCRIEEO CSIIERUNE cofiTAltlNc 2,620 souaRE FEET (0.060 Ac-REs), MoRE oR ]ESS. IO FOOT $IDE NOiI-EXCLUSI\G UIIUTY UCENSfF (PREPAREo By cgotlrE s_,R!ErNc. tNc.) IUAT PART 0F IRACT,t, cOLDEl GAIE ESTAIES, UN]T NO. 3, AS pER PLAT IIIREOF RECOROED IN PL^T BOOI( 1, P^CT ?7 OF lHE PUBIJC RECORDS OFgq.!E qopNlf, ttoHoA, sruAED tN sECIloN 2, ?ovrNsltp ,re souT{, RANGE 26 EAST tr SAIO COTI.CR COTJNTY. LYING Itt'tTIIN 5.0 FEET OF BdIH SO€S OF A CE{IERIJNE BENG MORE PAR]ICULARLY DESCRIBO AS FOIJ.OIYS: CoutlElCE AT A FOTJND 4' X {' CONCREIE MoNUME{T (NO-|OE{IIRCAIoN'| ATII{E IN1ERSECIION Of IHE SOJ1H UNE OF IRACT {, GOIbE{ CIIC rSrINd,qryI NO. 3, AS pER PLAT IHgREtr RECORDED tN puT 8OOl< L qACE 77 qllf PUBUC RECORDS OF C0tLfR COJNTY, FLORIOA, t{tH ne rrsr noroRIEIr-OF-IYAY EASEMRIT lINg OF ITEBER BOUI.EVARD NORII{ (60 FEEr WD€PUBttC ROAD mGfiT-OF-tyAy EASEME{I) AS pER DESCRTPIION RECORDED NO'ROAL RECORD BOOX 169, PAGE .I3O i)F S{D PUBUC RECORD{ SAD_F<iIIT BENG NoRIH 8e'to'so' vtBT, A SSIANCE OF 30.00 IEET mou T{Eso{JIHE\sJ coRNER 0F sAo TRACT 4; IHENCE NORIH OO19'1O- EAST A|_ONGSAID YiEST ROAO RGIT-OF-WAY EASEMENT UNE FOR 224.73 Itf,TI IICNE - NORIH 89'{0'50' IIEST FOR 3E6.66 FET rO THE SOU'IIG^ST CORI.ER OF ^NLl_Foor I 30 FooT LtcB.ls€E pARc& IHENCE NoRtlt 89.{0'50- ylEsT AICNGItf soutH UNE 0F SAID ttcErsEE PARCEL FOR 1s.OO rgr ro rxes9lTHnEtI CoRNER 0F SAto UCA.ISEE P^RCEL IHRICE NORIH oo19'1o. EASTALONG IHE TYEST I.tlE f SAIO UCENqfr PARCEL FOR iZ.ZS rlgr rO +rPOO{T OF BEON}'IING Of IHE CRIIBUNE OF IHE HEREN DESCRIBED 'O FOOT !!0q Nq:Elqus\E u]lUTY IJCB{SEE; tHBlcE Nffi'tH Eg.{o'so. tCsT FoR16.50 FEE?]HE PqNT]ERMNUS oF I}IE lIBEil DSSCRIBED C8.,IBUNE.'-' coNrAl}lNG l6J SQ{JARE FEET (O.OO{ ACRES), MORE OR LESS. Page 2 of 2 qo Page 36 of 4027 JI 2II!!!t!lITl-!.1 (J'2.z-*-C)-ZJ_oi.J.,J cc,.)N:,!{Ets.--..EtnnEE;t:st9 aIIiqtspea:,]E:!!Eb":I:5E!IttadEiiliiliffg lff, ili iff lIff I' iii*s ri*iffstilillslliluIE,8.Et qd,r I'tr!iieEdEH !,! Est/h'Ip9+3 i=s;sI IUotz)<oE94$dHoF E.E -' E! )E IIln! rcUN i-fI.r.8tt5EE.,eBPE -----"1(orr ,vd .er E oer sEurD)(rEE,^n-r-rprow.lr!u,or)_l 5 IIIIIIIIIIIIt.*-IIII;iS 56 Ir Ip-lIr!gieEL.-iE'eH fi 5 .E8{ri v6g {rfi!dl e"i t s" gHE Eqi sel E{ (dmc ----1L i T t dt H"!"iEi c9+ r !11 E:EU[:;Etr "lr* Q8 Eb * EEEE ;6 liil :E l;1, E' E ir5Fl iEt{ cr EII! iiEErr E: E!55 ii:: !I$$ E6eE l{ r Ep B A!;33I It i= , i!-nrt.E r ilSEtlls llllEEEilii 9E;p pE E p!!p EUI6IiiIiIII { I g l i" a 5 av 8 iE I I'sll"oe -1tlds-!l! t96 ',ON oYou llNatoc ) i 2 s : 3 t _r5'r E p4 r{.!l' .e.l " ErE r .g E H6!r dflt?tqiit ll I .ll t1 1t ll llI ll e i8 s I El:! !iii iiE; IiHE B4EJ EE t8 6I EE nP ;E Z-*- U a g U q E, f E Iu 8 d U6 IE Eb L_ il'il 6Bt6 g €I I I{ ) ett6bp ))T f $ q__ II I:I I B I T - I ) I l.' \h ffi.,'..-_____ + f -J I a g ( I I I I I I I ) ! g I E ;Id,E, lEI E !;! E E!E r E{:E'pI BF pg+t Eix E E':El<od l rtei; I i j i T'i // --/( r_ t_. \ {_r_ Tlrii L; EB -tiE5 eE ;H 't I I I I IL__ L "u t! El (' lL,) /; { I I I -J E- ul r; B.Ei:7' T} EE HHIt t8 rB ist5 rJ !EE EI:'!IEi!tt: "is iEE z n H1 E E A E b 6 6 II "ti9lItE-1-!rtcIE- EFI8 E9+ r 9=x Eil-@sI !,g;ilrd EiEllclr r-.Eb Ll !8il H5 :t E I I I i 5 I oYa Page 37 of 4027 I iittgIIEil!l!triItriti:!e 2.Z,-o;rl'x,-f IEEEE.--..Eh3!trIHalErQ titIIET!I I E6EEEi I I c ccc c o l E + b e hl q' ll (l ;E' 3nN i;F EHE EEB !E:x: a E E ,i!iI i'; ('( il (c.r ,r. '..! !.c. lu!'a tu) : '(!dcY, rv.-+lE o,0 ,rv r -rHupN 08Y ftno8 EgaEE;qfleIt-III83atE3E.ieEdt hIt --G)66 nF E:i. E9+b 9 =r;6'.! 6< 6 ! t E E .EUt!" dEF EB; {?fr!d! YEI b IIIIIIIIIIIIII35Et-i5titI:lll5Eau 0S E9.b6=trE 6.8 6<oa, lxoez)<u)E96*_2. E)t48poF tr^ ItB ls,ic I I Il--r I -( It-r)llrJti riliItltl)-'r -t 8p Eg frt rE q E I I I I I I I I I I ) :"I g ( A -\ ^ TETE ]Q:! sE EElitiErlirP iEpisEE E:iE9iE eeeEEE!EITE:E! 1"I tat!!t;a r ( I I ) rxr6rJ ^u-G]Ja mI t ,.,.@ ialiluii.;[II I ) r ItcI Z--*-65_i,!1,,,8:.iE ifuEEEE[!IEiiIEr' PEiPPPPEEEEPPEEEEItEi#itE#fiilil lt^-. "-e I ieoe I "lr cE H5 (- aEE ITT !Bh BlfirfEEt, -iHirlEEIEI5 !r!i i! 8; E!- a ;E'I g r 8 tIET E x l. EE et dI fi q "{EE j b I ia6 rl tEi E, l'l t;l ts. 1PE" -at :'T-i fl 9IBF J Ee si gt E5 U6 i1v : E I L F E ;!HTEE-aAEdsEA0{* : I I EuT' \t.j bI b \ E E '9 ( o II ll 1t ( ll ll II ;\ .---\_ P65: { t:li -l E t I EE EO I ER!u E9+b 9_ErE8-:d< IIII:l;tI a5 I Page 38 of 4027 33!Er{E\EcEi ;tat:5IlIit!iIT:j7.(,z;lrlDl-il'a.Jo:!(,E)9 tiIlUoez)<s)E9<t2#dHoF iE3EIt.(lEB,.IrElil!u 1IIIII!IItI,IJIIIIIIIIIIllLI h b I E !EEEt.iat;6:!ili tEt- 6 {a EHod 6EEg rEEb:gt6 E,;E il l" Egct I I I I I I I I I I 3Riu p9.: ;=rE 6rE 6<od a6 :EE --- ?-- - B" qi :t 8r Ti E ----:__ !rt-rE ;! Er -/_ i T I i i I T :I T I I i r, II$is5 l'l .E Idl!: i5fi8 .i Fi!;'iIId TE: I I I i I i ?le:ul5 IJ-l ?\l :Z---*-.OIi8EdtEtHEEtq !e HE (iTiTiTjiiTTii T ti h!1ol HI il{; ig- E'^ s r_ tl :s,tlrllii EiiriEtEE;i I ^.n ,,-.i!.i:uEi .),!o r.tE,\Itr,lIIIItl1ltllltl1ll1lllllltllllltllllltl1l11tle#6!H{*Ei8Ii6s8rI;E \lIIIIi+bk8iiH5 I l'l'f/,'p J III I T ,r,R=Page 39 of 4027 hIcI!i:IqIIIIt.i!iiItd2z-.-(JOE,,,4(,A 9!AIEE."r,)-za6ttso=H9 IIfraflHgtn:lgHIlltoez)<oE9E$HHoF Is!!€EEItIr!lIrEedIE ieI68P1,,!e9i ttl!qdr-l;> EE EE Erl u ;f; c llq.r! 42.11er! Iuit Ellllr rrsffi#ffiffiffiiigffiffiffi1 ffiiffffiffiffil rliff llll ii$fiill lii fffiixl, llil Itu ft ,i E I 8C A9 ip E!,i HE E? EE Pt trt gI . !;iE I F ;Ei5 g E.IiE!,I $ff;[Elt .t!ItI)ilrIIIrl Page 40 of 4027 \o q s \ q) q \,)U U F X qo Page 41 of 4027 EE IiIIIitIFf-L![!IatulooalEr3t: E:9:t;sI l:ie-61o OJE==,fi8E;IIEaEi "'c6,,r t E 6dE'338 q38-a\!i3i1!3troN'tro IIt{IIIIIIII I i i I I I I I I I I I I I I I I I I It t!tI II ! I I t I I ! i iI o i9e?a evAUEsEQ!4U"a6:oi;d<IFFa=ooo=zz5Ez-od=o zotr=trozLELuo- z--agtH sE d84 ,1 ?6F3,, =ts{EZt4la ?EEEI !Fi6r Fz F l zoo =o i< uJlo :6ZIZ . i.i aat16 tfoliir!.EE ElFBEfrltr,l<1i:g bl^'=i=H. EH*;FE F9 eEz "ilrtE sIFCB ffls ,: dlla Z -op9EdEa-k oixsi L!o*6* PHSE= E LJJ o ul o FO FzoO z :Ea! =;?96 lr-* otHBx zlt) - z glr;a 'r-la a i itr sE 93 ?U €g 1ouJ l Fro LIJI E, uJ oF2 uJL E x. =of- ,13 -kl8oli 2aa2 619olr d!,fo x. =la FOt! oE 0- e6Ei9{ d6:e.'9zi:eBi YsEEE: iidpSd di'i€; E65e;:elvE9E3E-oE;!rlE;Et ?:EJ!E::3:fic E;<!rP !eaYEir CPEEE;E5!eeiB: 1 = s I z a q : a { - d B 5 EI I - i { f s zotro U]E o oz Eo o L 6 6 q 5 3q 5tr5 I!aa;LIJozFLIJIJ,.IIciII z7:-i,PisrBiE>52,r,:K;ibPio59: 0aLL()9^:-(o=H.;rr&oo3Eilxx:€ -<oJigPzoEoS<zEJO 5 :o 3*E :ab E o F d, Io a o I azf,o ]- o t ea EiC o&Izo tr z F ff a(l) uJ E.oo uJFa @os$oooX cr) =N 'nO =+ o SdDI = ro ij+t.r CO O-.-J - o N=r-LL i^ (o \- L,c;2 E E eEii9 @ e F()Yl-r.U1'lrifi = x qE E< = il 9<xH d = rH Irr X ) "' LLI :)o- o- N r$'' ?= o F ozo C) troNILo r Y L 5 oFFtTtr-TElETstF-TElElTTHE]81EETI.]lllElf;lf;lElElEl;I alalalalEl lEttlil-tlE-tlllil{I 9lE l: l3l:l9lS[];]-ffi:1ffi tr uJF U) ,/Page 42 of 4027 ;iITliiIIt.iltl!irtn2Z_1zOFia,.f I !E!,:EATATEEErd9E iIIt,6EEz6.rc6,ip -J -*-/l I I I I I I I I I I I I I I I I I I I I I I I I I I I I I E E E E b E I E s E t Et_ 1t 3E - o E !i;tEiisI ;iE;EEiiEi; 9pip pE p pppE pqlEIffiittiI (lto6 -_1L 8E\Ip EeEE ;EEI55 ,E !'ni r; il,, Etllii si EEEi E: EEi6.,trii::!tii ,'lE I r.$s Ir!)-u.-----II//Er{iaa5d*t : I E I Et:EE9r:EifitEEI;rElIIIIL oc d:ql;si E:r " Iil i;i'E:nt'i*E Ep ?2 I EE E trp Ep6 rtI tI I l 8EIi8litu lll Ii; ilil l' lllrlr ri fili3reoIts- : I E E65aE'arra :E J bar ,6a ono:B rE4rs a h:t f.'^n-j-I'Ilnm]Jm Idr !v. ..r br @.or tE@)(rEcBrn-r-rp!ow.lrvapr)iie:ElcEiiE$iiiit 1::3A!l El:.ilI:EiElE!5E6ECE:Tb8b9.!EbaEIErEEelnfl!E*tisafrEIEt;Et,tdltr\2sEEi6l:l a hIEliEeEli:i:EiEiig{E9:itllsiiIEEEEE; : I!b{qlEBE*II!eE.E5!El-IiEi:rlFF!!rsffiiu i! !aE ehl3sEiEiEI 8 h P e3I HEqi qB 3 ,It6i6 g .E8t:" E:. ErE{!:q?f !du:r7 i 5 t ':---T-l E I It F! E E H e9 6= a) d 8.i;ii<6EtilicdtI nF =uh'Ip9*3 ;=x;dI 6IU1Endii.slltr6ila',uII............_ti -r+ldre!s' IUoiiaE9Ek) f.l8pog5sd s_ qilE ltI tl ll 1l llI llI E iR 6 t I EJ'N siri eii t !EIE g1 Ee YI EI6_ Eg EI !e Els --tEf= r-mIII ! e u q b lr5g EE ta :d E: d 6 h'. i. 6 e iIs6 r ! f ) L-l I { r' I I I I I I I ) '!r.r !ocv: ^u-+@r oYe (!.r{lrvi r qE a_ i \_____ Eg. 5t L I 'e Ll Ea 6 Z g I T I I Ia q 6 t ! d 7 E il4l ilEiil-aa rF3u H9+ b 9=r r 6Jo EI IT ga /-/ ( .-.-.\-,- .\ I I I I tL ItIil IL' 3b Ei A6 ) L eE BE I T i i i-i Ir ."I*\ lL,) I I I I --J H El:B{ fli8 cd; 6:I 3FiE!tI} 66 t? IE 2 iI!l:ligti ii E E5 E6 r -c5 -c! E E5E i5I Nno3,uovo!'0N96 o I EH :: t .P I I I I s-Page 43 of 4027 ):t iiiiln2Z*'.:-izJ-o!r-) d,!]9='-&Ai-\EPlAlh6Eca5r.: e iiT ) , -EEEt! e ec oc o c o c lifiB B D/ Y }E aq sEfl E , :T f; ?!,esE ^v.-+Jlff m ,ft rr ,.)HITON qgv :nms tEEtf,IFflsfia8isEi:EbiEc E t b PI E3:EIE c. gHt ;Ug EEt p.{ (d.@-G 14F -<Bh.[- E9*,ro=rE E'; E sE!t!i 3EF B,;5 ;ir!dE e53 II,,IIIIIIIIIIIII I I I I 6Ut<iEEdtirIlt6rPdIU EF E:i. E9ib 6ETE E':6I ]UoEz)<a>oEHHHoF I!Eq:EE<dqEfi4 '---\ EE h I iit/FI !6 I r!s -l :x 55 E :, ! 6 ;! .EEui! I t I:l EB db- IE.$," ,EE! -,;( itEiiiti', iiEilii;,, l; I Ig liil I 80 ',' -----\\ ' /l| \- ttJ '-(l t-r)tlrlriltt,ltltltt) -i u8 Etrt! f;t !E ( I I I I I I I I I I t I) Z : ( I I ) il4I I) e! 6t i.Eil8I Et/It u,'ff,.-' - I E E I E*,li;;riEfur,ii PE;PPEPPEEE!PEEPP!iiitiili#iliirr lt^-. "*e t is.e t.eid EF3u E9rb6=iE E':6{oE vE 96 (- ,s g!!i t lrh FiiEf laS EErF9 E -tblRctrfrEiEP d 3 :b iBt pg t;E' a E EI 8 l. rtoI 39-74..iit:"a : L B d{ bH I8 a.{IE t t6 rl !gia";'l .- Tsb:8. Icrj6l! | -rt I :,i-i i) iFd \ o{' I I I ) it II ll ( ll {l itI tl i\;\ ll ltI I---l ilII ll ll "11 E )III-ql'l IIiE Page 44 of 4027 iiia2z.-1zoii-! ccIUoi'z)i<o!.IOise^t il iti2#EiuJ ,{ ,{-8pHoF IIII llLJI : a ! Z---*- ttIE6t39tnI! ". r' aa {9 EE IEl1 i! xn II il'ii i*:irEE, q!$;!lifrii -n:l pE EE 8rpE ad (TTiiITTTiiTTi i i i T I i j !l'l i i T I 'iIRTsil'l ,lr!i{IID " ? Eil; 'i.ili i'E l I i T I T i I i I *i.l i I ,O:lts.d:EbH Pq N li ra le t; SEfiBt.ia :Ii:tade'rEtI ;---*-__-_ E6 =Hr6E I tg go IT g0 lE e : \_*____ I I I I I I I I l I !af P9.r 9!EE 6<od FEEE --8r 5 e,,R E io 'i1_----:__ HEH![tEEEE[[fl ov3 "lrE,Il!,,iIEiIile'r Isi!' iEI" I-l \IIIJIIIIIII ttl t'liIh*th?6H6IIIIIIlIIIIIIIIIIIIIIIIIIIIIII c Er :. it Pn tb 77tr_Page 45 of 4027 ituriiiIt.t!!t!t!ta2z-J-oi,.)3N!EEFrxLaEcar3EIP iiviII,RUz.cEtr:liqfPdIEu1Toez=<(,)>o<t2#)tq8poF 111'8rIItstz6tZ-*-Jt:t:"9!sE8E?EE Iili ii$ffiil lii i#ilffl Iffl Ilr Ir,tui,ll,r la8t::(-p * bP iE E ite EdE ril r;s ff#i ffiiffiffififfliiiiliii i ri fiffi ffiffiiffiiiffiil i csffi rffitrffiifuffiffiffi1 zl i6 :! 6br E6 IE:t E: !s:; 9!,J t:i'ijlEl;IIH0tIhtI:i?II 6 Pa I E ts i Page 46 of 4027 EE+z o odF zoo aIIIIItINL!E.(rLLr d>=fi*AUJuJE.(I It t I , E:EE:!i!ri:ie'6 4eErroAo)E\z tltr6!Sts3 '.EHE';:;;=;t lla-;\-8i,"tI!!!coNLo IIItIiIIIII , i I I I I I I , i I : I I I II I I I aIt!I I ! I I t I o,-o iz di (-) oz Lll(, O ol ff { F c0 Ix I.JJ IJJE uJ t IJ.I U)ult o_ , I a HEH du. ElE1t lgc !l{ oYou llNfEc a .c ,1 : 2 Bs6 d E. -. -,3 !-, ePEFtsafll ES:fi6;H ;ag;:!;HbPE<"i- Es;EgE: :lq=?Ep [:; PE 5H plPEEPS?6 q 5 9 .t _tL&, tl o,\'r8 Eg .\# q+2 ez? A=q e' HS Ekina E Eq:a"-rFE I ,AB E.8E 6I* sEs fr-x:st>a i EsB z.L d a;d1zfc.-- 3=E - e8E;.8.r dEq; e:: s6:.: EE EEIP6rss EEgE q; !*g-a"HB EE I Pd6 { <Y il sh dl : "':aHr: ",tg x iil. 5t9 iir,t Ele slx E i I E zg E 1 E d 5 I ts E 5 ! E P c 5 I tl-trlxlxE-TAETEII I lI lx l:Jx lr I LllllflrlElElElgl;lt_I-Elikkktd<lI tstststst3Etstht-;l:EFFffi;**,ffi&*.,,4ii{r ffi /1., ztt-{7,tIi*,a'J H*-tta\Iqs..f.:.;t!I ffi:E, 4 t o d Page 47 of 4027 5zuloz :o o )dF zool-{NNUJFa)r!<,^JbLOzooEPI aII!IIi I I t I I I I It I t ,,I I ! I I II i EiEr: r;i;EtiEoAo,:E!zZ.SAB,o.54Ei;iFz 1,6 b BL:;q:E IE;-;!9ir,!!AIp"coN'tro IIIIIIIItII I I i I I I I I I I I t I I t i I or. o iz ii () :beB FS6.{ Eetai sP-B o E;EE5 iP,,,E E u-^6tr EEEH: ls?IH r."':iXEPE;. flEgEE Hlsq!o.".ol2 - ay,>ffEle s stq:?F 5 z J 0- uJFa) lFo- tJt OzoO .EE3 5$uEZV r t?:su;Ea 3E= e:fi I e Zsz:14H:RSEE=--ei-: ro HE !E!ee ri EIeii rqe!EeJ eF Pn i8 s- z -,8 -4 )9 3 H,A=5tI E =.t3 ;EEpArEEg "B=BEs'EPE : =HEi-dgHEF E:EE &'Ed i,b6"'= e? 9A s99- 1 N (h]a EEII -9s?isBHHPph;ES5Ytts 9<i .3iF g E E gL!z=coO<dzoqFF trl<FAUc$o:,ooUJ=ot 5n 9? i : Bg E eQe H B'Hs; e6i -6* EAE =d 9-E;PtE HeEE F:E ---- 3>,g?E ,00 gNUSlxl i !J zI t z 8 E = ;g E =c E ElF :[.i e 5 IEIEIEEFdE---+-{r:ilc"t-ulgi]]a F.r ,", t!! ! otou ,tllltE 3 *.:.Page 48 of 4027 F ljIIIIIrj ! II : I I I I It i I, z5o-zoFto-LLlale:s6;a:+etl.iR"6at-o (uE\z I6-aSts3.o-qq3:9qE3;H; I:Ea3iE rltc1113er;.Eo.NLo IIII{tIIIII I I i I I I I I I I I I I I tI iI I I tt I I f I o a) va-9.$$c EGz=Etr,.1 d<G2a\otrtruJ62Cr .dtx9;,ooI!=ov.I 1I EE?: "F3d. t PeE^i :Ex"o ip,.,9 E H"'tsu, =1<Z-E.FE; ? ?rzle tidtl;' -"Y9.. ss;{: ..,83=3 ? Hlle?n s :13 =3 c llE5?F 5 z J o_zo F t o- uJa e<B v3e ,;6 [ 5ig1d ;::- tVB sE"-3f .?Y! LAlr l EgE E p'e -Hie 9 S,5 eBPE' :a6.iiY? ? j 5 .)-1 L___ x litic.ErgEE ='6oaa2fqo.l E=E 6 PE9E 22 ?5 "E -0-,02+ /;=+x9: i (\II l l. ( ))l//l ( .EE3 EBsE6e I a *,'+ + c E * { =I ts i Ef36trt =Ee 3gE.9x i'e;a9;: E EpHii ?4-u,t q ai96 =B{edH 5E eS 12 * ozoFFIIII-TEIBIETEIEIE]tIEEIflBElqHffi o iD ui (-) ti5'i,,- ) I L__ w tl ll Page 49 of 4027 EE NO EiIIttJ3arl I I T, I ! I i I I t i f I ! I 1 t iI It I t I, uJFoO'zu3E(L5zu.JLaP:=q qqEiEEi:!FoA(u:H=EHE.^sEBE elE3;Hi i:EuE E fi"rE;=:P IiBI,d!igIp'?o.NLo tI!!IIiIII! I I I I I I I I I I o U b di o "o-,oz+ s9 EO dy TAFEg93q .9-,1 IESza666ts3ts E@ P; eg ,0c J E s.QExEEis:iEeP'.-Fr EE3 =9itus 3:Uv5 L EPIo9tru EPE 5'E BSd I rEB sEaBe sESEE-. 9;ttr Egvi H-6F;E} F.!Hts= 9Ie6 q:ei =E -& aH :88 8E5 =E .a-.62 I T ll !!II !II ullIrilfl lfll oFF ii!2 z 5(I uJta o uJ t 5z IJJ )3i9eEHiHt?3tri6t xFE8E9P(i\l \\Page 50 of 4027 Fe EII!IiioITJ<oz1o<aELtl a\FU)3Iila=a =Bq.e s.q:q.EltlIai*sti6-jF:: dR'61oAo)E\zF-dg;BEii:iuE E fidts;=eg:lara!tr!,,rEE'?oN'tro IIItiIIIIII !f I t I I I { I I I I l : I I I I I ! tt t t! I I I I I iI II t I o U uJ oF oz LU oF f-o azoFOt!OI.IJo_o oz az U) J o 0- F =uJtz 1 o_ Fz LJl tlJ() Jrrz a E ! Iz I P ! I P t os tr9a\ z( 36 a_9EE rl,(.)aFozldo LIJ zo E,z o t zo t o =zdg IES Ij t dg 39 ee9;,E .Z / 2s iLr 5i E 6.iie=69rga 9t s 6 xHrd FL =i s e I r--1 z(,LUVtiJ9Foz@zoot!E IJ,J UJ oa Ezo N e. L]J o zo oz LlleFozo dt dEIE TE E e I H tuJo=oz tlJotrozI(aIt!IIIIi,IIII!tIIIIIUJotroz i I zotrl !I aI! "tlliliii Izo tr to LLz I I3 fr\l !ie E6 .9 X I oz2(r = t r! ll li'l I Il!II ii ra I Ilr,tl !lriii z (/) ^a>tr (/) LIJtF oI!Fl ctt l) CT LJJoq <aro;>coI; oFFz I zlol zlol 5l EI sl oal()tol d at6EgE 'l E9EEt:9E A^\f riiiiirtliii!III Irri,il !r I iiliti !r Page 51 of 4027 iIIIIItiozo9za<So<fiJZ)<'7ul-ErB<zFIEiSsi65l!!Ei:r;:oJ- (uEvHBBi;:Ei r'li B,,rr;=:d:licoNLo 6 !IIIiiiIlII I , i I I I I I I I I : I I ! I Ii I II t tII ! I 1 I i I I, ( i I I ===I E6 1Ee9{{.i s.{9tj5il LU (-) aaoFFoz zo F ulJ uJ v. uJ =oF LrJJoo-ozo 't J E:H *d-! EfiEE 96-< 6EHd BsE; *rE e Ee -63l9Uo EAPg Eq=t Eg -P .d HA 36P: J : e P (. :i : :l 8l g P { )= P oFF EPIud!!E. cp Page 52 of 4027 EXHIBIT *C" CONDITIONS OF APPROVAL l. The telecommunications tower is on a +/-4.99-acre parent tract, which contbrms to Conditional Use Locational Criteria of the Rural Estates Sub Element of the Golden Gate Area Master Plan of the Growth Management Plan because the parcel is no smaller than 2.25 acres and is adjacent to Collier Boulevard, which is classilied as an arterial. The parent tract shall not be split or altered in any way that would render the tower location to become non- compliant with the Conditional Use Locational Criteria of the Rural Estates Sub Element of the Golden Gate Area Master Plan of the Growth Management Plan. DEVIATIONS Deviation #l - Relief from LDC section 5.05.09.F.2.c, which requires the tower to be separated from abutting Estates zoned property to the north a minimum of 150, to instead allow an 84-foot sepaEtion. [23-CPS-0243 r/r 906212/ I I Page I of I CAO Page 53 of 4027 ACFrOgBx8M6rlLAS_FChgOS7MJwURd2iVg8JbVXKRIRS... https://doc-Og-bc-apps-viewer.googleusercontent.com/viewer/sec... verizon July 30, 2024 Collier County Planning and Development Services 1660 Ringling Blvd., 1st Floor Sarasota, Florida 34236 RE: FPL Summit Substation - Collocation Affidavit To Whom It May Concern: Verizon Wireless Network Design (“Verizon Wireless”) issued a search ring for a new site within the area of Collier County, Florida, south of the intersection of Collier Boulevard and Golden Gate Boulevard West. A diligent review of the area within the search ring found that there are no existing communication towers and no buildings or structures tall enough to meet the antenna design of 145 feet above ground level. If you have any further questions or concerns, please do not hesitate to contact me. Thank you for your consideration. Its: Associate Director - Verizon Wireless Real Estate / Regulatory Date: 7/30/2024 STATE OF Florida COUNTY OF Palm Beach Sworn to (or affirmed) and subscribed before me by means of [X] physical presence or [ ] online notarization this 30th day of July, 2024, by Jhonathan Montenegro, [X] who is personally known or [ ] has produced as identification. [Notary Seal] I MARK BAESCH I Notary Public • State of Florida - Commission # HH 520700 My Comm. Expires Apr 27, 2028 I Bonded through National Notary Assn. Print Name: Mark Baesch Notary Public, State of: Florida My Commission Number: HH 520700 My Commission Expires: April 27th, 2028 1 of 1 7/30/2024, 1:27 PM Page 54 of 4027 RF Justification Package FPL Summit Substation Prepared by Verizon Wireless RF Engineering William Compton September, 2024 Page 55 of 4027 Capacity is the need for more wireless resources.Cell sites have a limited amount of resources to handle voice calls,data connections,and data volume.When these limits are reached,user experience quickly degrades.This could mean customers may no longer be able to make/receive calls nor be able to browse the internet.It could also mean that webpages will be very slow to download. Coverage is the need to expand wireless service into an area that either has no service or bad service. The request for service often comes from customers or emergency personnel. Expansion of service could mean improving the signal levels in a large apartment complex or new residential community. It could also mean providing new service along a newly built highway. Introduction: There are two main drivers that prompt the need for a new cell site.One is coverage and the other is capacity. Page 56 of 4027 Capacity is the amount of resources a cell site has to handle customer demand. We utilize sophisticated programs that use current usage trends to forecast future capacity needs. Since it takes an average of (1-3) years to complete a cell site project, we have to start the acquisition process several years in advance to ensure the new cell site is in place before the existing cell site hits capacity limits. Location, Location, Location. A capacity cell site needs to be as close as possible to the center of the user population and network demand as that ensures a more even traffic distribution around the cell. A typical cell site is configured in a circular pie shape, with each slice (aka. sector) holding 33% of the total cell site resources. Optimal performance is achieved when traffic is evenly distributed across the 3 sectors. A new site placed too close to an existing cell site generates unwanted interference to existing customers and does not offload far away traffic and is therefore an ineffective capacity offload solution. Page 57 of 4027 Need Case for: FPL SUBSTATION The existing network in eastern Collier County south of the intersection of Collier Blvd. and Golden Gate Blvd. W has coverage and resulting capacity issues. The proposed site will be surrounded by single family residential buildout on large wooded lots which are very difficult to provide adequate service. This area generates significant numbers of customer complaints due to coverage and capacity issues. The proposed site will significantly enhance the coverage and capacity need in the area and will bring significant network performance improvements to the existing and future residents of this area. There are no additional existing structures in the area that could support the installation of the Verizon Wireless equipment needed . Page 58 of 4027 LTE Current Coverage Proposed Site Page 59 of 4027 LTE Proposed Coverage Proposed Site Page 60 of 4027 Neighbor Sites with VzW Installations and Distance G F E C BA H D3.1miles 2.6miles 1.8miles 4.1miles 3.4miles 3.1miles 3.7miles 3.5miles 2.2miles I Page 61 of 4027 First Tier Neighbors and Proposed Site Information Map Label Latitude Longitude FCC ASR FCC Structure Owner Structure Type VzW Centerline (ft)VzW Site Name A 26.272146°-81.725683°Crown Castle Monopole 162 N Naples Fire Station B 26.270231°-81.691585°Crown Castle Monopole 190 Randall Relo C 26.257853°-81.689604°Crown Castle Monopole 135 AT&T CR 951 D 26.254447°-81.625161°1022178 Crown Castle Lattice 140 Crown Rock Road E 26.228389°-81.632175°1208812 Golden Gate Fire Control Lattice 143 Baker F 26.200486°-81.689624°SBA Monopine 135 Unity Faith G 26.181613°-81.694378°1293475 American Towers Guyed 154 Tasha H 26.209689°-81.740664°1272658 SBA 2012 TC Assets, LLC Monopole 143 Seagate Baptist Church I 26.242771°-81.735891°1205615 SBA Towers II LLC Monopole 125 Vineyards Community Park Proposed Site 26.232311°-81.686814°TBD TBD Monopole 145 FPL Substation Page 62 of 4027 Page 63 of 4027 Page 64 of 4027 Page 65 of 4027 Page 66 of 4027 TOWER PLACEMENT EXHIBIT Z1 SITE NAME: FPL SUMMIT SUBSTATION SITE No.: 5000046085 FUZE PROJECT #: 17003208 NORTH SCALE: N.T.S. TOWER PLACEMENT EXHIBIT 1 Z1 TOWER SEPARATION TABLE (FROM EDGE OF BASEPLATE TO PROPERTY LINE) Page 67 of 4027 Page 68 of 4027 Page 69 of 4027 Page 70 of 4027 Page 71 of 4027 Page 72 of 4027 Page 73 of 4027 Page 74 of 4027 Page 75 of 4027 Page 76 of 4027 Page 77 of 4027 Page 78 of 4027 Page 79 of 4027 Page 80 of 4027 Page 81 of 4027 Page 82 of 4027 Page 83 of 4027 Page 84 of 4027 Page 85 of 4027 Page 86 of 4027 Page 87 of 4027 Page 88 of 4027 Page 89 of 4027 Page 90 of 4027 Page 91 of 4027 Page 92 of 4027 Page 93 of 4027 Page 94 of 4027 Page 95 of 4027 Page 96 of 4027 Page 97 of 4027 Page 98 of 4027 Page 99 of 4027 Page 100 of 4027 Page 101 of 4027 Page 102 of 4027 Page 103 of 4027 Page 104 of 4027 Page 105 of 4027 Page 106 of 4027 Page 107 of 4027 Page 108 of 4027 Page 109 of 4027 Page 110 of 4027 Page 111 of 4027 Page 112 of 4027 Page 113 of 4027 Page 114 of 4027 Page 115 of 4027 Page 116 of 4027 Page 117 of 4027 Page 118 of 4027 Page 119 of 4027 Page 120 of 4027 Page 121 of 4027 Page 122 of 4027 Page 123 of 4027 Page 124 of 4027 Page 125 of 4027 Page 126 of 4027 Page 127 of 4027 Page 128 of 4027 Page 129 of 4027 Page 130 of 4027 Page 131 of 4027 Page 132 of 4027 Page 133 of 4027 Page 134 of 4027 Page 135 of 4027 Page 136 of 4027 Page 137 of 4027 Page 138 of 4027 Page 139 of 4027 Page 140 of 4027 Page 141 of 4027 Page 142 of 4027 Page 143 of 4027 Page 144 of 4027 Page 145 of 4027 Page 146 of 4027 Page 147 of 4027 Page 148 of 4027 Page 149 of 4027 Page 150 of 4027 Page 151 of 4027 Page 152 of 4027 Page 153 of 4027 Page 154 of 4027 Page 155 of 4027 Page 156 of 4027 Page 157 of 4027 Page 158 of 4027 Page 159 of 4027 Page 160 of 4027 Page 161 of 4027 Page 162 of 4027 Page 163 of 4027 Page 164 of 4027 Page 165 of 4027 Page 166 of 4027 Page 167 of 4027 Page 168 of 4027 Page 169 of 4027 Page 170 of 4027 Page 171 of 4027 Page 172 of 4027 Page 173 of 4027 Page 174 of 4027 Page 175 of 4027 Page 176 of 4027 Page 177 of 4027 Page 178 of 4027 Page 179 of 4027 Page 180 of 4027 Page 181 of 4027 Page 182 of 4027 Page 183 of 4027 Page 184 of 4027 Page 185 of 4027 Page 186 of 4027 Page 187 of 4027 Page 188 of 4027 Page 189 of 4027 Page 190 of 4027 Page 191 of 4027 Page 192 of 4027 Page 193 of 4027 Page 194 of 4027 Page 195 of 4027 Page 196 of 4027 Page 197 of 4027 Page 198 of 4027 Page 199 of 4027 Page 200 of 4027 Page 201 of 4027 Page 202 of 4027 Page 203 of 4027 Page 204 of 4027 Page 205 of 4027 Page 206 of 4027 Page 207 of 4027 Page 208 of 4027 Page 209 of 4027 Page 210 of 4027 Page 211 of 4027 Page 212 of 4027 Page 213 of 4027 Page 214 of 4027 Page 215 of 4027 Page 216 of 4027 Page 217 of 4027 Page 218 of 4027 Page 219 of 4027 Page 220 of 4027 Page 221 of 4027 Page 222 of 4027 Page 223 of 4027 Page 224 of 4027 Page 225 of 4027 Page 226 of 4027 Page 227 of 4027 Page 228 of 4027 FP&L Summit Substation Communication Tower Neighborhood Information Meeting April 16, 2024 Page 229 of 4027 Team •James Johnston with Shutts & Bowen •Mark Baesch with Verizon Wireless •Bill Compton, Verizon Wireless RF Engineer •Tim Young with Crown Castle on behalf of FP&L •Jacqueline Gwynn with Smartlink Page 230 of 4027 Request •Conditional Use to permit installation of 150’ tall monopole communication tower on property with Estate future land use and zoning •Communication tower will be owned by FP&L with Verizon Wireless as anchor licensee •Located at 191 Weber Boulevard North on FP&L electric substation property Electric substation use to remain Page 231 of 4027 Page 232 of 4027 Page 233 of 4027 Page 234 of 4027 Communication Tower •150’ Monopole communication tower Monopole design has reduced visual impacts •Location abuts existing electric substation •Accessed from Weber Boulevard through existing substation entrance •Designed to accommodate two additional providers to prevent communication tower proliferation in the area •Set back from property lines -84’ to north, 239’ to south, 446’ to east, and 211’ to west •Designed by FP&L to meet transmission pole requirements, including wind loading Page 235 of 4027 Page 236 of 4027 Page 237 of 4027 Page 238 of 4027 Verizon •Existing coverage and capacity gap in the area Significant customer complaints •150’ tower height necessary to resolve coverage and capacity issues Closest towers range in height from 125’ to 190’ Height permitted by code •Closest existing tower is 1.8 miles away No existing towers or structures in search ring on which Verizon antennas can be located Antennas required in Estates zoning district to meet coverage and capacity needs •Site will significantly enhance coverage and capacity and result in major network performance improvements Page 239 of 4027 Page 240 of 4027 Page 241 of 4027 Page 242 of 4027 Communication Tower Benefits •Will improve coverage and capacity in the area •Good wireless service is important for public safety Over 80% of all 911 calls made from wireless devices Improves E911 •Sited on an existing electric substation site Fencing and mature tree canopy along perimeter provide buffering and screening •Unmanned facility so no impact to public services, including roads •Certified appraiser studies show proximity to towers does not impact property values Collier County Property Appraiser does not take proximity to communication towers into account in valuing property Page 243 of 4027 Conditional Use Review Procedures •Application submitted and under review by Collier County staff •Neighborhood Information Meeting to inform neighborhood about application •Public hearings Planning Commission -makes recommendation to Collier County Board of Zoning Appeals (BCC) •Not yet scheduled •Board of Zoning Appeals (BCC) •Final decision on conditional use application •Not yet scheduled Page 244 of 4027 Thank You Questions? Page 245 of 4027 Page 246 of 4027 Page 247 of 4027 Page 248 of 4027 Page 249 of 4027 Page 250 of 4027