Loading...
Backup Documents 02/25/2025 Item #16B 2 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO 1 6 B 2 THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. 3. County Attorney Office County Attorney Office 2A-s/62-s' 4. BCC Office Board of County Commissioners L M2// z/s/z5 5. Minutes and Records Clerk of Court's Office �,�7 6A1 2/25125 PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Isabel Soto—TMSD—Transportation Phone Number 239.252.5867 Contact/Department Engineering—Stormwater Agenda Date Item was Agenda Item Number 2024-2249 Approved by the BCC 16.B.2 Type of Document Change Order No 3, Design Services Number of Original Documents Attached 1 Attached for Stormwater Improvements for BCG & CC/CCN Areas, Project No 60102, Agreement No 21-7900, Bowman Gulf Coast,LLC; PO number or account Isabel.Soto(a,colliercountyfl.gov number if document is CC: to be recorded Nadine.Dunham@colliercountyfl.gov INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature IS 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information(Name;Agency;Address;Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be IS signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's IS signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip N/A should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 02/25/2025 and all changes made during IS N/A is not the meeting have been incorporated in the attached document. The County an option for Attorney's Office has reviewed the changes,if applicable. this line. 9. Initials of attorney verifying that the attached document is the version approved by the IS N/A is not BCC,all changes directed by the BCC have been made, and the document is ready for the an option for Chairman's signature. this line. I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 16B2 Cofer County Procurement Services Change Order Form Contract# 21-7900 CO# 3 PO# 4500230354 Project#: 60102.12.3 Project Name: Design Services for Stormwater Improvements for the BCG& CC/CCN Areas Contractor/Consultant Name: Bowman Gulf Coast, LLC Select One: Q Contract Modification(Construction or Project Specific) ❑Work Order Modification Project Manager Name: Isabel Soto Division Name: CPP Stormwater Management Original Contract/Work Order Amount $769.13060 4:12/2022 16 A 24 Original BCC Approval Date;Agenda Item# Current BCC Approved Amount S76913060 10/24/2023 16.B 4 Last BCC Approval Date;Agenda Item# Current Contract/Work Order Amount 5789.13060 04/01/2025 SAP Contract Expiration Date(MASTER) Dollar Amount of this Change s000 0.00% Total%Change from Original Amount Revised Contract/Work Order Total $789,130.60 0.00% % Change from Current BCC Approved Amount Total Cumulative Changes so 0o o.00% %Change from Current Amount Notice to Proceed Task 1.4 os/o4/22 Original NTP Task 1-4 365 Original Final Task 1-4 05/0412023 Last Final Task 1-4:10/30/2024 Date Task 5 08/Oa 23 #of Days lass 5 450 Completion Date Task 5:10/27/24 Approved Date Task 5 10/27/2024 #of Days Added TTask ask 1-4 730 180 Revised Final Date TBD Current Substantial Completion Date N/A 5 (includes this change) (if applicable) Provide responses after each question in box below (Responses should be brief and specific). Attach additional information and/or documentation from the Design Professional and/or Contractor, if needed, with your submission of this Change Order and complete summary on next page Check all that apply to this Change Order request: 0 Add Time; ❑Add funds: ❑ Use of Allowance; ❑ Modify/Delete existing Task(s); ❑Add new Task(s); Q Reallocate funds; ❑ Other(must be explained in detail below) 1. This $0 Change Order is adding time to specific tasks as follows: - Add 180 days to Tasks 1 through 4 (Project Management, Preliminary Design, Design, Permitting) to allow for design revisions and update the Engineer's Opinion of Probable Cost; and - Add 730 days to Task 5 (Post Design Services), to provide Engineer of Record services through the project's Final Completion. 2. Task 1-4 are on a Stop Work effective October 28, 2024; 2 days remaining. Task 5 is on a Stop Work effective July 11, 2024; 108 days remaining. 3. A time extension on Tasks 1-4 is necessary for the consultant to revise proposed plans and update the Engineer's Opinion of Probable Cost as staff continues to work with the consultant on additional design revisions. The revisions involve evaluating, researching, and updating the 100% plans to incorporate further neighborhood improvements identified during the field survey. Task 5, Post Design Services, only has 108 days left which is not sufficient to provide assistance with the bidding process and EOR services during construction. A time extension for Task 5 is necessary to provide services through the project's Final Completion. 4. If this Change Order is not processed, design plans cannot be updated to reflect current field conditions and concerns from residents would not be addressed. Proper EOR services will not be provided to certify Final Completion. Page 1 of 4 Change Order Form(2023_ver.1) c pd 16B2 Corner ier County Procurement Services Change Order Form Contract# 21-7900 CO# 3 PO# 4500230354 Project#: 60102.12.3 Project Name: Design Services for Stormwater Improvements for the BCG & CC/CCN Areas Contractor/Consultant Name: Bowman Gulf Coast, LLC Change Order/Amendment Summary (If additional spaces needed, attached a separate Summary page to this amendment request) COST TIME CO# AMD# Description Additive Deductive Days Total New Justification (+) (-) Added Time Defined 450 days Without this conversion of for Task 5 under time, Task 5 will not be able 1 separate NTP 450 450 to start delaying required services on the project. Adds 365 days to Without this additional time, original contract for the design services cannot 2 tasks 1-4 365 730 be completed. Reallocation of Without this fee reallocation 2 $62,114.00 from the design services cannot Task 4 to Task 3 be completed. Adding 180 days to 180 to Tasks 1-4 Without the added time, plans Tasks 1-4, and Tasks 910; cannot be revised and proper adding 730 days to Task 5 730 to 1,180 provided through Final Task 5 Completion. ❑Check here if additional summary page/s are attached to this Change Order Page 2 of 4 Change Order Form(2023_ver.1) o !! 16B2 Cotter County Procurement Services Change Order Form Contract# 21-7900 CO# 3 PO# 4500230354 Project#: 60102.12.3 Project Name: Design Services for Stormwater Improvements for the BCG & CC/CCN Areas Contractor/Consultant Name: Bowman Gulf Coast, LLC Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above, as fully as if the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Contractor/Consultant/Design Professional signature below must be from an authorized person/officer/director of the Company or listed as the qualified licensed Professional"Project Coordinator"or Design/Engineer Professional under the agreement. Signature authority of person signing will be verified through the contract OR through the Florida Department of State, Division of Corporations (Sunbiz) website(https:l/dos.mvflorida.com%sunbiz/search!). If the person signing is not listed, we will require signature authority by one of the listed officers/directors of the company giving that person signature authority. Sotolsabel Digitally signed by Sotolsabel Prepared by: Date:2025.01.06 09:53:54-05'00' Date: Signature-Division Project Manager Isabel Soto Printed Name Accepted by: Date: Signature-Design/Engineer Professional(if applicable) Printed Name/Title/Company Name O.iinny word by R.d4N Edmund OrySnla Accepted by: Richard Edmund Brylanski a 50 0 4.0517C RULNUMBER•4 A5 109�272790IG•A 9 Date: Signature-Contractor/Consultant/Vendor Richard Brylanski,Sr.Vice President-Bowman Consulting Group LTD Printed Name/Title/Company Name boon nrm *um Hay denPeter Approved by: „•- n- Date: Signature-Division Manager or Designee(Optional) Peter Hayden Printed Name AhmadJay Digitally signed by AhmadJay Approved by: Date:2025.01.06 11:46:01 -05'00' Date: Signature-Division Director or Designee(Optional) Jay Ahmed Printed Name %'.a4' 3-Ge(C Approved by: JJ Date: Signature-Division Administrator or Designee(Optional) Trinity Scott Printed Name Page 3 of 4 Change Order Form(2023_ver.1) CAO O 6B Co ier County Procurement Services Change Order Form Contract# 21-7900 CO# 3 PO# 4500230354 Project#: 60102.12.3 Project Name: Design Services for Stormwater Improvements for the BCG & CC/CCN Areas Contractor/Consultant Name: Bowman Gulf Coast, LLC FOR PROCURMENT USE ONLY FY 25 CHO Request# 551 ZimmermanBZimm D`9'taennanB'"5+9neeccad by pp by: ecca Date:2025.01.14 Approved 10.27.18-05'00' Signature-Procurement Professional Signature/Date Approved by: Signature-Procurement Manager/Director(OPTIONAL) APPROVAL TYPE: Administrative ❑ Administrative-BCC Report j BCC Stand-Alone ES (BCC Approval Required) BCC APPROVAL ATTEST: Crystal K; Kinzej ,Clerk.gf the Circuit Court BOARD OF COUNTY COMMISSIONERS and Comptroll = COLLIER COUNTY, FLORIDA • By: By: Dated: OZ j 5 Burt L. Saunders, Chairman Attest as to Chairmareo signature only. (SEAL) Agenda# 16 82 2/2S/z5 A roved a t Fo nd egality: Deputy County A orney Gs Q !Ge L Print Name Page 4 of 4 9 Change Order Form(2023_ver.1) 'AO Bowman 16 B 2 December 18, 2024 Peter Hayden, PE, Supervisor—Project Management Capital Project Planning, Impact Fees and Program Management 2685 Horseshoe Drive Suite 103 Naples, FL 34104 RE: Project: Design Services for Stormwater Improvements for the BCG&CC/CCN Areas Change Order 3 PO 4500230354 Dear Mr. Hayden: Please consider this letter as a request to provide a change order for the above referenced Collier County project.The amended contract dated October 30,2023,had a schedule with an assumed total duration of 366 days to complete tasks 1 thru 4 providing an end of contract for those tasks as October 30,2024.County staff has requested that additional changes be considered to incorporate additional design improvements identified after neighborhood survey completion.Additionally, newly available data on residential driveways,collected through updated permit records,will be integrated to reflect the latest neighborhood layouts since field surveying.Therefore,we are requesting that Tasks 1-4 be extended by 180 days to provide the evaluation and conduct research on the variety of options staff would like to consider.Additionally,due to this extended design phase,Task 5,which involves post-design services,will be delayed.We are therefore also requesting an extension for Task 5 by 730 days to ensure comprehensive post- design support. fl94Sy1Nrna mi d..,bR„nd VC Obowrw,„m, Richard Edmund Brylanski :rice""*y� ,, 5N!ALIKAMEN.YAW,2.d,2,ld6f. c.0 Provided by: Bowman Gulf Coast LLC (DBA Hole Montes A Bowman Company) 12355 Sunrise Valley Drive, Suite 520 Reston,VA 20191 Richard E. Brylanski, P.E.Sr.Vice President 6200 Whiskey Creek Drive, Fort Myers,FL 33919 P:239.985.1200 bowman.com C:1(} 16B2 AFFIDAVIT REGARDING LABOR AND SERVICES Effective July 1, 2024, pursuant to § 787.06(13), Florida Statutes, when a contract is executed, renewed, or extended between a nongovernmental entity and a governmental entity, the nongovernmental entity must provide the governmental entity with an affidavit signed by an officer or a representative of the nongovernmental entity under penalty of perjury attesting that the nongovernmental entity does not use coercion for labor or services. Nongovernmental Entity's Name: Bowman Gulf Coast LLC Address: 6200 Whiskey Creek Drive Fort Myers FL 33919 Phone Number: 239.985.1200 Authorized Representative's Name: Richard Brylanski Authorized Representative's Title: Sr.vice President Email Address: rbrylanski@bowman.com AFFIDAVIT I RichardRrylanski (Name of Authorized Representative), as authorized representative attest that Bowman Gulf Coast LLC (Name of Nongovernmental Entity) does not use coercion for labor or services as defined in§787.06, Florida Statutes. Under p'e�nalty of•perjury, I declare that I have read the foregoing Affidavit and that the facts stated in it are true. ) (Signature of authorized representative) Date STATE OF +,t ail tY 6 COUNTY OF �- 1 t Sworn to (or affirmed)and subscribed before me, by means oft❑physical presence or❑ online notarization this day of )a+^, , 20 2;by .„,ct\t,rj 'c( yi,,.,ski(Name of Affiant), who produced his Florida Driver's License as identification. J ( . k __.-- Notary Public(no4 require l when.digital) �wwwx$ w+, 1? jD KEYN !�'' +` f MY JAC COMMISSIONL d HH275120LOPEZ ..)„ f cf .2.c 2.{., '+o„„cl EXPIRES:July 19,2026 Commissi6n Expires '�+tnnnnnrtnnne+nnnry Personally Known ❑ OR Produced Identification El Type of Identification Produced: 4(,