Loading...
Backup Documents 02/25/2025 Item #16B 9 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO 16 B 9 THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. Coastal Zone Management 3. County Attorney Office County Attorney Office CM& D-SI 4. BCC Office Board of County Commissioners 6. ly j fsi 7/if 5. Minutes and Records Clerk of Court's Office ( r SIZSIZar PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Andrew Miller—TMSD—Capital Project Phone Number 239.252.2922 Contact/ Department Planning, Impact Fees and Program Management Agenda Date Item was 02/25/2025 Agenda Item Number 16.B.9 Approved by the BCC Type of Document Earth Tech CO#2—Park Shore Renourishment Number of Original 1 Attached Documents Attached PO number or account N/A number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature AAM 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information(Name;Agency;Address; Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be AAM signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the AAM document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's AAM signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip N/A should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 12/12/2023 and all changes made during AAM NNW the meeting have been incorporated in the attached document. The County an option for Attorney's Office has reviewed the changes,if applicable. this line. 9. Initials of attorney verifying that the attached document is the version approved by the AAM N/A is not BCC,all changes directed by the BCC have been made,and the document is ready for the an option for Chairman's signature. this line. I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 a 6B9 Ci er Cot. i ly Procurement Services Change Order Form Contract# 24-8292 CO# 2 PO# 4500236559 Project#: 90067 — Project Name: 2024 Park Shore Renourishment Contractor/Consultant Name: Earth Tech Enterprises, Inc. Select One: 121 Contract Modification(Construction or Project Specific) ❑Work Order Modification 1 Project Manager Name: Andrew Miller Division Name: Transportation Engineering Original Contract/Work Order Amount _ $3.817.530.00 I1v1o/2o24 is a 1a Original BCC Approval Date;Agenda Item# Current BCC Approved Amount $3,817,530,00 12/10/2024 1s.s.14Last BCC Approval Date;Agenda Item# Current Contract/Work Order Amount $3,8:r,5e00o 3/+Wzerr> k'I',`2,oi SAP Contract Expiration Date(MASTER) Dollar Amount of this Change $2,715,15 3 oo s �y) Total%Change from Original Amount Revised Contract/Work Order Total $6,556,683 oc 54.'_ %Change from Current BCC Approved Amount Total Cumulative Changes S2,739,15300 71.75% %Change from Current Amount Notice to Proceed 1/2/2025 Original NTP 75 'Original Final 3/18/2025 Last Final 4/2/2025 Date #of Days Completion Date Approved Date #of Days Added 30 Revised Final Date (g/2f2025 J Current Substantial Completion Date 3/3/2025 (includes this change) _ (if applicable) Provide responses after each question in box below (Responses should be brief and specific). Attach additional information and/or documentation from the Design Professional and/or Contractor r` needed. with your submission of this Change Order and complete summary on next page. Check all that apply to this Change Order request:❑r Add Time;I]Add funds;❑Use of Allowance; ❑Modify/Delete existing Task(s);❑Add new Task(s);❑Reallocate funds; ❑Other(musi be explained in detail below) 1.) This Change Order will add 30 days and $2,739,153.00 as well as using the Allowance of $254,000.00 to address increased sand quantity needed to replace sand lost due to erosion of the beach by Hurricanes Debby, Helene, and Milton. 2.) N/A 3.) This change was not included in the contract because the storms occurred during the summer while design documents were being prepared based on suivuys from January 2024. 4.) If the change is not processed, the public beach will not be renourished adequately to meet the County design standard, placing the upland structures at risk for future storms and erosion. Page 1 of 4 Change Order Form(2023_ver.1) e,2.ti op.° 16B9 CUftier Coflty Procurement Services Change Order Form contract* 24-8292 co#2 Po# 4500236559 Project#: 90067 Project Name: 2024 Park Shore Renourishmenl ContractortConsuitant Name: Earth Tech Enterprises, Inc. Change Order/Amendment Summary (If additional spaces needed, attached a separate Summary page to this amendment request) COST TIME CO# AMD# Description Additive Deductive Days Total New Justification __... (41._-- Added Time add additional time project sand volume 1 to continue 15 90 increased due to previous renourishment i storm season add additional time, Increased volume is additional funding and necessary to provide County 2 ; the use of the allowance $2,739,153.00! 30 120 funds of 254,000 design standard beach width ❑Check here if additional summary page/6 are attached to this Change Order Page 2 of 4 • Change Order Form (2O23_ver.1) 16B cotoer Go rty Procurement Services Change Order Form Contract# 24-6292 co# 2 Po# 4500236559 Project#: 90067 Project Name: 2024 Park Shore Renourishment Contractor/Consultant Name: Earth Tech Enterprises, Inc. Acceptance of this Change Order shall constitute a modification to contract/work order Identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above,as fully as if the same were stated In this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/Design Professional arising out of or related to the change set forth herein,including claims for impact and delay costs. Contractor/Consultant/Design Professional signature below must be from an authorized person/officer/director of the Company or listed as the qualified licensed Professional"Project Coordinator"or Design/Engineer Professional under the agreement. Signature authority of person signing will be verified through the contract OR through the Florida Department of State, Division of Corporations (Sunbiz) website(https://dos.rnvllorida.com/sunblz/search j. If the person signing is not listed, we will require signature authority by one of the listed officers/directors of the company giving that person signature authority. oieiall signed by NlillerAndrew DMali ^nd�e� Date:7025.02.11 Prepared by: 12-38 30-0500' Date: Signature-Division Project Manager Printed Name Digitetly signed by Nicole Nicole Sharp soh:202.502.11 Accepted by. 16:1e:14-osce Date: Signature-Design/Engineer Professional(if applicable) Printer Na e/Company me Accepted by: _._ — — Date: Signature-Contractor/Consultat /Vendor. A Printed Name/ritlel Company Na* Approved by: Date: Signature-Division Manager or Designee(Optional) Printed Name Digitally algrted by Ah mad Jay Od aa20035.02.11 Approved by: 13:3a:53•05W Date: Signature-Division Director or Designee(Optional) Printed Name S lly Digita signed by Scotlly sly cofitTrinity Date:2025.02.14 Approved by: 09:30:59-0500' Date: Signature-Division Administrator or Designee(Optional) Printed Name Page 3 of 4 Change Order Form(2023_ver.1) 16B9 ;ojticy Cour-zty -^ ~�-- -- --�. Procurement Services Change Order Form Contract# 24-8292 Co#2 PO#4500236559 Project#: 90067 Project Name: 2024 Park Shore Renourishment Contractor/Consultant Name: Earth Tech Enterprises, Inc. FOR PROCURMENT USE ONLY FY25 CHO Request# 582 B owd e n Stephanie DigitallyDate: signed2025.02.14 by16:20:Bow36denstephanie-0500' ' Approved by: Signature-Procurement Professional Signature/Date Approved by Signature-Procurement Manager/Director(OPTIONAL) APPROVAL TYPE: ❑ Administrative ❑ Administrative-BCC Report X BCC Stand-Alone ES(BCC Approval Required) BCC APPROVAL ATTEST: Crystal K kin ufi�ftrik• e Circuit Court BOARD OF COUNTY COMMISSIONERS , df h and Cot'mpirol s� �x''�. , ,;;‘�� COLLIER COUNTY, FLORIDA (11 By. By. , ..� 't . alb' . r Burt L. Saunders ,Chairman Dated: • .,t Attest at( airman s Date: L I ZS/G✓ signature only. ra�G� (SEAL) Agenda# IL v I rov d orm and Leg 't De ty County Attorney Colleen M Ereo-Q— Print Name Page 4 of 4 Change Order Form(2023_ver.1) CAS 16B9 Christine Arnold From: Andrew Miller Sent: Thursday, February 6, 2025 4:55 PM To: Christopher Darco; Christine Arnold; Maria Becerra Cc: Jay Ahmad Subject: FW: Explanation of lump sum item increase Here's ET's explanation of the cost increase associated with the Lump Sum items for survey,turbidity monitoring,and maintenance of traffic.I agree with their logic. Andrew Miller P.E. Manager-Coastal Management Program fr'N • Transportation Engineering —�-- ; Office:239-252-2922 C011 iC'.r LOU nt lag E3 Andrew.MillerAcolliercountyfl.gov From: Chris Gehring<cg@earthtechenterprises.com> Sent:Thursday,February 6, 2025 4:49 PM To:Andrew Miller<Andrew.Miller@colliercountyfl.gov> Cc:Christopher Darco<Christopher.Darco@colliercountyfl.gov>; Ben Figley<Ben@earthtechenterprises.com> Subject: Explanation of lump sum item increase EXTERNAL EMAIL:This email is from an external source. Confirm this is a trusted sender and use extreme caution when opening attachments or clicking links. Gentlemen.All bid tab items for the additional sand volume on park Shore Beach project Have been increased proportionately with the sand volume increase.These lump sum items are all tasks that are performed daily. The import sand is limited to a 4500 ton per day average.Therefore,there is no opportunity to increase production and shorten the contract time. All items and days are directly tied to the tonnage import of 4500 per day. For example, if the sand volume increases 50%the survey item and M.O.T item will increase 50%along with all other bid tab items. Excluding Mobilization which remained at the original price since we are already on the project. If you need additional explanation,feel free to reach out directly to me Thank you, Chris Gehring President ► k.C. 16B9 EARTH TECH ENTERPfISES 6180 Federal Court Fort Myers, Florida cg@earthtechenterprises.com EarthTechEnterprises.com Under Florida Law, e-mail addresses are public rec:,rds. i' ,:rr tic' not ; :nt your e-mail address released in response to a public records request, do not send electronic mail to this ln,;tead, contact this office by telephone or in writing. 2 CAO) 16B9 Transportation Management Services WORK DIRECTIVE CHANGE CONTRACT#/PROJECT NAME: 24-8292 Park Shore Renourishment CHANGE# I DATE OF ISSUANCE: January 9,2025 EFFECTIVE DATE: January 9,2025 OWNER: Collier County Board of Commissioners PROJECT#: 90067 CONTRACTOR: Earth Tech Enterprises, Inc. ENGINEER/DESIGN PROFESSIONAL: APTIM Environmental and Infrastructure,I..LC, You are directed to proceed promptly with the following change(s): Description: • Modify the bid quantity for item 2,"Horizon Way Access:Transport, Fill Placement.Grading,and Sand"from 167,700 Tons to 312,000 Tons • Adjust price for item 2 based on the adjusted volume at the original unit price of unit price of$18.90i'1N,or 312,000 X $18.90=$5,896,800 • Adjust Lump Sum price for items 3,4,and 5 on a pro-rata bask at a ratio 0f(312.000/167,700) 3.Turbidity Monitoring:$40,930 4.Surveys:$325,581 5.Maintenance of Traffic(MOT)and Weight Ticket Tracking: S208,372 Total new contract amount:$6,556,683 • Adjust contract time for days to substantial completion to 90 days,or April 2,2025. Purpose of Work Directive Change: Sand volume increase is due to significant erosion from Hurricanes Debby, Helene, and Milton during the summer of 2024. Attachments: A PTTM pre-construction vs,design volume table If a claim is made that the above change(s)have affected Contract Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the changes(s). Method of determining change in Contract Price: Method of determining change in Contract Times: • Unit Prices ❑ Contractor's records ® Lump Sum [; kngineer's record ❑ Other Q Other based on sand supply rate from mine Estimated increase(decrease) in Contract Price Estimated change in Contract Time: $2,993,153.00 Increase by 45 calendar days. RECOMMENDED: AUTHORIZED: Digitally signed by Sharp, Digitally signed by "jC°I� MitlerAndrew""tiler""drew Sharp, I\IICOIe0 13:2 .050to By: 1110545O By: 09 53:23�OS'00' Engineer Owner's Representative AO ) 16B9 COLLIER COUNTY-2024 PARK SHORE RENOURISTIM ENT PRE-cONS'IRIIC 1 ION VOLUMIi UPDATE J,inwlry 2025 PROFILE EFFECTIVE ORIGINAL DESIGN ORIGINAL DESIGN PRE-CONSTRUCTION PRE-CONSTRUCTION NUMBER LENGTH VOLUME TONNAGE VOLUME TONNAGE (FT) (CY) (TONS) (CY) (TONS) R-43+600(Taper) 400 1,70D 2.550 5,000 7,500 R-44 521 4,500 6,750 13,00D 19,500 R-45 1,078 15,200 22,800 33,900 50,850 R-46 1,040 14,800 22.200 15,700 23,550 R-47 953 2,800 4,200 7,300 10,950 RA8 996 3,700 5.550 10,000 15.000 R-49 1,077 7,600 11.400 13,100 19,650 1-50 1,208 3,600 5,400 18,700 28,050 R-51 1,108 8,500 12.750 16,700 25.050 R-52 967 33,300 49,950 39,300 58,950 R-53 1,060 13,900 20,850 30,100 45,15D R-54 535 1,600 2,400 3,800 5,700 R-54+400(Taper) 400 600 900 1,400 2,100 TOTAL 11,342 111,800 167,700 _ 208,000 - 312�000 I f CAS} 16B9 AFFIDAVIT REGARDING LABOR AND SERVICES Effective July 1, 2024, pursuant to§787.06(13), Florida Statutes,when a contract Is executed, renewed, or extended between a nongovernmental entity and a governmental entity, the nongovernmental entity must provide the governmental entity with an affidavit signed by an officer or a representative of the nongovernmental entity under penalty of perjury attesting that the nongovernmental entity does not use coercion for labor or services. Nongovernmental Entity's Name: E/J g T-ci 1 CCp1 EN-it 2 PP TS C S -:j,.t L Address: 618o FE0t2A-L LovP'T Fonr M-IG1.SI L. 33"10S Phone Number: 3'1 914 _L 1 3 Authorized Representative's Name: i,v r LlrA M G rrrCE J fz Authorized Representative's Title: V Q , In F. A CC TO Z Email Address: CGe tARiktC:cV\ trN rC. 2fR TS E S (d "\ AFFIDAVIT I, Wf1t< .,,., Cr' Pr'-c.L Jr (Name of Authorized Representative),as authorized representative attest that tiiiai N TCc'tt 4'N 1ep- P t-r (,t, r'( ame of Nongovernmental Entity)does not use coercion for labor or services as defined in§787.06, Florida Statutes. Under penalty f perjury, I declare that I have read the foregoing Affidavit and that the facts stated in it are true. //; '1 " r,?— (r -) v ew r (Slgnatu a of authorized representative) Date STATE OF r Loft rnA COUNTY OF - E C Sworn to(or affirmed)and subscribed before me, by means of 0 physical presence or 0 online notarization this 1/ day of FF.b ,e-.c , 20t5 , by l,.4J/44.,,, G-Pr,&_.? (Name of Affiant),who produced their as identification or are personally known to me. '- !"//'u'/��� ✓v-� �XV- ';u^�.,, JOHN J ECKERLE III Nor£ar Public C tr.�� f;' NotaryPublic State of Floriday frCommssionNHH 604425��' My Comm.Expires Dec 21,1026 JR-/i.,/ -$". ' Bonded through National Notary Assn. Commission Expires Personally Known ®OR Produced Identification CO Type of Identification Produced: CONTRACT,RENEWAL,OR EXTENSION REQUEST FORM version:202c)CAO