/
     
BGTCRA Agenda 02/06/2025V. kv -B 6, 0 11W Bayshore Gateway Triangle CRA *Bayshore Beautification MSTU Haldeman Creek MSTU Bayshore Gateway Triangle Local Redevelopment Advisory Board Collier County Community Redevelopment Agency (CRA) AGENDA Hybrid Virtual Zoom Regular Meeting 4870 Bayshore Dr Naples Botanical Garden FGCUBuehler Auditorium February 6, 2025 6:00 PM Maurice Gutierrez, Kristin Hood, Steve Rigsbee, Sam Saad, Jr., Al Schantzen, Michael Sherman, James Talano, Bonnie Hawley, Vacant 1. Meeting Called to Order 2. Roll Call 3. Invocation & Pledge of Allegiance 4. Adoption of the Agenda Action Item 5. Public to be Heard (Non -Agenda Items) 6. Consent Agenda (Attachment 1) Action Item a. December 3, 2024, Meeting Minutes b. Financial Report 7. Community and Staff Presentations: a. Public Safety Report by Sheriff's Office b. Collier County Wastewater Robert Von Holle Director, Anthony Mildon, WW Inspector c. Brookside Marina MPUD Ellen Summers, Bowman Consulting (Attachment 2) d. Snappy Car Wash, Jem Frantz (Attachment 3) Action Item e. Shadowlawn/Connecticut Development Michael Whalen, Developer (Attachment 4) Action Item f. Development Report by Laura DeJohn, Johnson Engineering (Attachment 5) 8. Old Business a. Project Manager Projects Update Report (Attachment 6) b. Manager Project Update Report (Attachment 7) 9. New Business a. Advisory Board Application Ron Fowle (Attachment 8) Action Item b. Naples Pier Staging assistance through Bayview Park, Executive Director John Dunnuck 10. Advisory Board and General Communications a. Code Enforcement (Attachment 9) b. Public Comments c. Correspondence \i. CRA Staff- 2 clean ups for March 22 and April 8 ii. Bayshore to Sugden Park Boardwalk Article (Attachment 10) 3335 Tamiami Trail E, Unit 102, Naples, Florida 34112 Phone: 239-252-8844- www.bayshorecra.com Bayshore Gateway Triangle CRA •Bayshore Beautification MSTU Haldeman Creek MSTU iii. Shultz Family College Scholarship Grant Opportunity (Attachment 11) iv. SW Florida Car Seat Education (Attachment 12) d. Advisory Board 11. Next Meeting a. March 6, 2024 @ 6 p.m. Thursday Goals Workshop 12. Adjournment 3335 Tamiami Trail E, Unit 102, Naples, Florida 34112 Phone: 239-252-8844- www.bayshorecra.com Bayshore Gateway Triangle CRA .Bayshore Beautification MSTU Haldeman Creek MSTU MINUTES OF THE COLLIER COUNTY Bayshore Gateway Triangle Local Redevelopment Advisory Board Collier County Community Redevelopment Agency (CRA) Hybrid Virtual Zoom Regular Meeting 3299 Tamiami Trail E., 3rd Floor BCC Chambers Naples, Florida, December 3, 2024 6:OOPM Item 6a-Attachment 1 LET IT BE REMEMBERED, the Collier County Bayshore BGTCRA in and for the County of Collier, having conducted business herein, met on this date at 6 PM in REGULAR SESSION at 3299 Tamiami Trail E., 3rd Floor BCC Chambers Naples, FL 34112 with the following members present: Karen Beatty, Chairwoman Maurice Gutierrez Steve Rigsbee Sam Saad, Jr Al Schantzen James Talano Kristin Hood Michael Sherman (Absent) Bonnie Hawley (Absent) Also present: John Dunnuck,CRA Director Shirley Garcia,CRA/MSTU Manager Tami Scott, CRA/MSTU Project Manager Lisa Blacklidge, Planning Manager, Growth Management Chris Mason, Division Director, Community Planning and Resiliency Trinity Scott, Transportation Management Services Department Head Marshall Miller, Director of Road, Bridge, and Stormwater Maintenance Division Joseph Arclere(via Zoom) Harriet Heithaus (via Zoom) Bill Brown (via Zoom) Bayshore Gateway Triangle CRA .Bayshore Beautification MSTU Haldeman Creek MSTU 1. Meeting called to order. Karen Beatty called to order. 2. Roll Call Quorum established. 3. Invocation & Pledge of Allegiance 4. Adoption to Agenda Action Item To swap 7b Development Report and 7c Growth Management and Transportation Stormwater Report. To move l0a Code Enforcement to 7d. Al Schantzen made a motion to adopt agenda, Karen Beatty seconded the motion, all in favor. Passed unanimously 5. Public to be heard (Non- Agenda Items) None 6. Consent Agenda Action Item A) Financials- Project Update Al Schantzen made a motion to accept agenda Maurice Gutierrez seconded the motion. Passed unanimously B) 2025 Meeting Calendar Al Schantzen made motion to accept 2025 Meeting Calendar Karen Beatty seconded the motion. Passed unanimously 7. Community and Staff Presentations A) Public Safety Report by Sheriffs Office Not available to attend 2 Bayshore Gateway Triangle CRA .Bayshore Beautification MSTU Haldeman Creek MSTU B) Development Report by Laura DeJohn, Johnson Engineering First page- zoning verification letter requests Second page- Brookside mixed land unit development rezoning -1st submittal Item 6 page three is another zoning verification letter where the applicant along Airport Road is just asking questions about commercial and mixed -use viability of the site. On page five, item 11, the Poplar Street Dock - has been reviewed by staff. There are outstanding concerns from the county attorney's office about ownership issues, so this will remain an issue until resolved. On page 6, Mangrove Row, that is two items, the limited density pool item and the site development plan item are both reaching their conclusion. The limited density pool item will be going to the hearing examiner, and I'll keep you posted when the hearing examiner date is set. On page 7, Naples Hotel, that's the one on 41 between Palm Street and Frederick Street. There's a first staff review letter on the site development plan, which means it's early in the process, and there's still a long way to go on that one. Page 8, 3010 Tamiami Trail East. That's a mixed -use project at the site of the old Pizza Hut, and the Planning Commission recommended approval of this item in November. It's now scheduled for a final decision by the board on January 14th. Page 10, the resort on Bay Shore, this is along Areka Avenue. We talked about this last month. It's officially been a canceled request for a pre -application meeting. Will come off next month. On page 11, the Snappy Car Wash is a request for a site plan with deviations and it is continuing to go back and forth with staff comments and now the third applicant submittal has been put in in November. That will also go to the hearing examiner for a public hearing. I'll keep you posted when a date is set. On page 16, Kelly's Roast Beef Tamiami trail and Peters Avenue is very very very close to the finish line they had to pay some final fees and I expect next month I'll be reporting that that's been approved The last item with activity is just the issuance of a zoning verification letter and that's for property on Davis Boulevard it's now occupied by The Body Shop of Naples and it was general information being requested in a zoning letter. C) Growth Management and Transportation Stormwater 3 Bayshore Gateway Triangle CRA .Bayshore Beautification MSTU Haldeman Creek MSTU Follow-up to a lot of the concerns in the Danford Street area,Shadowlawn and other areas that fringe the CRA but have to do with stormwater issues and challenges: Melina Brankov-representing Danford Street residents. Following a meeting with Commissioner Kowal on November 19th. Prepared a letter with all the items to Commissioner Koval. It was sent in copy with the CRA team too. And then we received a response from the executive coordinator of Commissioner Kowal that our letter was forwarded to the Department of Stormwater Management. Urgent issues which we would like to have some immediate or soon resolutions. The major issues on Danford Street, first close to the Bayview Park area, huge four feet pipes which were made by the storm water division or the transportation to have water go through back and forth from the bay. Danford Street is low, so there is water actually coming more on the street from these pipes from the bay and causing partially flooding. The middle side of the street is really very low. It's sunk from heavy trucks with boats and also the construction work that has been going on from Bayview Park to support construction activities on the island and nearby water areas. Collects water which cannot go back to the bay. Also collects water from the east side and the problem with the east side comes because we had a nice project completed on Hamilton, and now Hamilton, according to the new standards, has been raised. And there is no actual way for the water from them to go through under Hamilton into the botanical area where there is the drainage ditch system. And also the east side gets flooded. This flooding comes to the middle of the road and the whole road basically becomes the river. We're also getting water coming from Bay Street, to Danford Street being the lower point of the area. So all this is flooding not only Danford but Bay Street and everyone around. We also have a situation with Windsor,which also sits higher. So properties which are bordering get flooded from basically their backyards. Cathy Shaw- "I will reiterate to the board members as I told you in the last meeting I'm a lifelong resident of Collier County Naples to be exact and I've never seen what I'm seeing happening in our neighborhoods not just Danford not just Bay Street but further down, up in the Pine Street area, Jackson area. And it seems that we're forgetting these generational homes that some of these houses, these people have owned for years and years and years. And they're being 4 Bayshore Gateway Triangle CRA .Bayshore Beautification MSTU Haldeman Creek MSTU flooded, totally flooded out. And I don't necessarily think it's just the stormwater that's coming in, it's that it's not being directed properly. We've got runoff from some of these newer communities that are, like Milena just said, the new community that was built behind Danford. I've never seen water run for two weeks solid. Came down Bay Street, and we have a neighbor in our area on Bay Street. She's been living on Bay Street for, I want to say, 30 odd years. She worked for the county, and she's been very sick and her husband just passed away and she's paralyzed she's not able to move and she's scared to death of what's going to happen her house was totally flooded during Helene and Milton and now she's worried to death am I going to have to leave my home because nothing's being done about the storm water nothing's being directed in the right way we've got Residents that have come down on Danford that have come get you know, this is their retirement. They come here to to enjoy our community and we've never flooded I've called during in the middle of these storms. We spoke last time at the Commission meeting about the sewage and I called in the middle of the night and they said that the sewer was pumping back up out of the water blew the lid off of my sewer line and it was going back into the street and we've got water that's waist deep now where's it going to go it's going to go back into the bay and we want to know why we've got tainted water in our bays and I called and the guy goes oh we have a generator on there but no generator on that I had to go to the end of the street to get a nurse from my mother there was no generator on that so I just feel like we're being neglected and don't know it's a shame because again I'm a lifelong resident of Collier County many of you guys are here for a long time as well and some of you may just be new residents but it's not fair for generational homes to be given up you know legacy places my kids grew up on Danford Street playing basketball and football and whatever and it's not fair for me to have to give up my home because we're not paying attention to the drainage and the speeding down our road. I've gone over the speeding a thousand times with the county about this, and they keep telling us, well, it's got to be a certain amount of speeding. Well, there are no sidewalks, as Melina said, and one person is going to get hit, one person, and that's all it's going to take. So I just ask, I beg you, take up the different things that we have brought before you I don't know you guys don't we talked about this before I know you guys don't have any say in any of this but I don't know who's here to bend because I went to the County Commissioner to talk to him and there were a thousand or a bunch of people there that had other issues sand issues and that issues and whatever but I These are people that live in 5 Bayshore Gateway Triangle CRA .Bayshore Beautification MSTU Haldeman Creek MSTU these homes year-round. We're the people that work for the people that come down here. And we can't live... I mean, I haven't even finished cleaning up from Ian, and I'm starting to clean up from Milton. And no time to even grieve my mom that died in the middle of all of it. It's just a shame. And so I'm asking that you guys would... come up with some solutions or at least consider some of the things that we have brought before you." Mike Rinaldi. "Thanks for your time today. I came here as a concerned neighbor. I live in Royal Harbor and a number of us got involved in an ad hoc committee regarding the proposed zoning change for the Little Italy site. And I wanted to bring up a few general issues. Obviously, you hear about traffic density and noise. Those are straightforward. We also have a very big concern about flooding. And the developer of that site had presented some engineering that showed that they could store water on site and then they'd allow it to percolate. There's no way that that study was a fair study. If you take a look at the retention pond that's behind Verizon, or you look at the little villas that are on Palm, they have a retention pond. Those ponds stay full even during the dry season. So they have to have an alternative way of dealing with their stormwater on that site. When they presented a site plan, they had only 10 foot setbacks, they were going to fill the entire site with non -permeable area. I just want to bring that to your attention that don't approve or support anything that doesn't have outside review of water retention. The other thing that kind of concerned me was offsite improvements. A lot of improvements have been approved for the mini triangle already, but there's no off -site improvements. By that I mean additional right-of-way for commercial, additional right-of-way for Palm, additional right-of-way for Frederick Street, and improvements for those. I've worked my entire life in the real estate development industry, Denver, Jacksonville, and in Florida. It's typical when you have larger development that the governmental authority on top of our generous impact fees would require offsite development concessions as well. Nothing was done. Those streets need to be wider to handle the properties that have already been approved, not to mention the ones that will be approved in addition. So please watch out for that. That's a big error. The other thing I wanted to talk about was how things are financed. Most of my career was in commercial real estate financing. I probably did about $4 billion in deals. Apartment buildings are financed by presenting a market study. That's why the first building in the mini triangle got their financing and why they were able to come out of the ground. They said, oh, look at the community. We have a shortage of rentals. There's demand, there's growth. You A Bayshore Gateway Triangle CRA .Bayshore Beautification MSTU Haldeman Creek MSTU can produce a market study in an appraisal that'll show up for anything. And the lender made the loan based upon the developer's ability and the market study. When you go to do a condo project, like, what's it called, Aurora, the 56-unit property, they've been trying to market that for more than three years. It's a failure. The market's telling them, It's not good. I just got the announcement that they're going to start construction. I heard a rumor that they're combining rental units with condo units. I don't know if that's true. But the point is that the market has told them it's not feasible. You require 50% pre -sales in order to get a construction loan. And they've taken years to get that. And you also have to keep in mind there's usually speculators in there that aren't really market people. They're just trying to make a fast buck when the new deal gets done. So I just wanted to alert you that if I were in the lending business and somebody came to me in the mini triangle and said, would you finance this project? I wouldn't touch it. I think we're... causing a problem for the future. And I think we need to be more cautious in what we allow to occur there. And our neighborhood group will be taking a position of no zoning changes on the properties. But please don't make additional concessions to bail out deals that aren't doing well. Thank you for your time." I don't see how we're going to have enough demand to fill that first apartment building. Rents have to be $5,000 to $6,000 a month. You all know that salaries aren't that high here. We don't have a professional class. We have an entrepreneur class that's small, very few professional jobs. Bill Brown -Seasonal property owner of Royal Park Village - "I was just following up on making the committee aware of a letter I had sent to Commissioner Kowal last month representing over 500 property owners in the area, Royal Park Village, Royal Arms, and Naples Land and Yacht, as well as some private residents. Again, we know the topic of discussion is storm surge, so I don't think we have to bend your ear about it anymore. So maybe I can just yield the rest of my time to see if anybody, one of our professionals or anything, can say, is there anything that we can do about this issue?" Lisa Blacklidge- We handle stormwater review, engineering review, landscape, architecture, zoning, anything that really has to do with the site. We do all the reviews for the site along with Stormwater and Transportation 7 Bayshore Gateway Triangle CRA .Bayshore Beautification MSTU Haldeman Creek MSTU Windstar project, it received closeout in 2001. They stopped building, they hit capacity. All these projects, when they're approved, they're reviewed for stormwater runoff, retention. I think there's kind of a misconception that stormwater isn't storm surge. It's rainwater. It's runoff. It's not when we get multiple feet of water coming all at once. The systems aren't designed for those sorts of things. That portion of Windstar was developed in 94. They have a permit from South Florida Water Management District for their stormwater. It basically dictates how much water they can have, where their retention is, how much retention they need, and everything like that. If we head east, we hit the Botanical Garden. I think there was a comment in the questions that were emailed to us about couldn't we just put more stormwater on the Botanical Garden. And unfortunately, that's not really an option because that's all -conservation easements. So, we're not allowed, the state doesn't allow us to put more water or contaminated water or really any water in those easements. Some of them are uplands, some of them are wetlands, but it all has state regulations on what can be done there. Most recently with the Hamilton Ave project, they did a modification to their environmental resource permit with the state that allowed some of the water to be redirected into the garden, but it went into the lake. It didn't just go into the wooded area. And then Hamilton Harbor, I can't really speak on it. It was permitted through the city. There was an analytical agreement, so I don't know what their permitting process was. Sable Bay, which is the new homes that connect at the end of Bay Street. All right, so that's Isles of Collier, phase 16. They're currently under construction, and I did briefly speak with the engineering inspector, who's the supervisor. And he said, as of right now, everything is up to code. They're passing inspections. I'm more than happy to ask him any specific questions. I'm not out there. He's out there on a daily basis. And as far as he can tell, it's to the approved plans. Now, I don't know what those approved plans say. But they were done by an engineer. They were certified by somebody with a license. And that's what they're building to. When the single-family houses are developed, they don't have that environmental resource permit, for the most part. This neighborhood does not. They're developed on a lot -by -lot basis. They have to meet the current FEMA elevations, they have to meet the building code, they have to meet the zoning regulations, and they have .11 Bayshore Gateway Triangle CRA .Bayshore Beautification MSTU Haldeman Creek MSTU to meet stormwater regulations.so have an environmental resource permit that dictates what the water is supposed to be doing on that side. Flood zones fluctuate with the mapping and with environmental factors, and they change throughout the years and based on historical data. stormwater currently, new construction, if there is more than a 40% impervious, so your driveway, your swimming pool, your house, your sheds, if it's more than 40% of your lot, you're required to have some sort of engineered stormwater plant, whether that's on -site retention, French drains, proving that your flood zone is directed into the appropriate drainage channels, whatever that may be. So a lot of these houses were developed before those requirements were in place Kristin Hood "it sounds like changing the code is the answer. So how does that happen?" It would have to be initiated because any code changes would have to be initiated by the public, the advisory boards, the planning commission and any code proposed code exchange is going to require studies to see the feasibility of it and if they're going to be able to do the changes. Trinity Scott - The stormwater management systems are not designed to deal with a major storm surge event. Why we can't make a developer do more than what the code requires them to do, is because it's against the state law. State law does not allow us to exact anything out of a developer that is essentially not required by code or not anything that is required for their development. They are looking at a program to maybe have a state program to assist property owners in raising their homes. or even tearing down and rebuilding. They don't have a lot of particulars for the program yet, but they have a website where you can sign up to continue to get updates. You have some homes that are probably still below the new base flood elevation but are significantly higher than the others along the street. Marshall Miller - design consultant working with one of our project managers the tip of the road that you were talking about, it's about 800 feet. Four or five driveways probably need to be reset once we lift that area and the whole road will be repaved. When we do that, we're also going to look at the swell system bring it back into its 25-year design 9 Bayshore Gateway Triangle CRA .Bayshore Beautification MSTU Haldeman Creek MSTU We need to get our design consultant ready to go with the utilities in the area because some of them, like the water, the city of Naples are old and we need to get them on board to see what we do with that as well as the septic system. Once we have all that in place, we're going to get John Dunnick and his team to come up with a friendly design that will be both CRA and county funded. We propose to do all the right-of-way work while John does all the work with the residents, resetting your driveways and the right-of-way areas. Community member -We're just outside the CRA along Palm Street and individual little streets. Anything planned for that? We have seen a lot of different issues in the last few events, outside of storms, there's not much we can do, but we have made small modifications over the years to, on the south side of 41, that little holding pond. We found that the weir with one of our previous water managers, an engineer, Terry Kurtz, we modified that design. But we are working with the state because you guys' feed into and finally discharge into the 41 right of way, which is their stormwater system. We aim to do all arterial roadways once every six years we have a contractor that's pretty dedicated they're very good at it we've been doing it for the last four years, it's called our clean view and repair program the major systems where all the local It's what I call the tertiary and secondary systems, pretty much dump into before it goes out to the bay or to the state. And they clean them, they view them to look for issues, and then they document what repairs are needed. And then as funding becomes available, we go back and repair those. And when was the last time far areas? So unfortunately, you don't have a lot of arterial roads raised in your areas. Bayshore is on the list for next year. Pilot program in the estates, we got two crews to start a pilot program cleaning swales out in the estates. That's all they do. They're like a machine. They cut back vegetation. They identify issues with the swales. They dig them out and they move on. That's something that's never happened before. I can only give you the details that we have for the estates. Right now, in the estates, there's so much swale, we can only get to them once every 80 years You have 14 maintenance staff under one supervisor that maintains all of South Naples. That is everything from Golden Gate City south. So those guys work very hard to keep this... Entire area is clean and as safe as possible We jumped in and volunteered as a maintenance group to try to bring at least basic level of service to you guys. So, we're hoping that we can see that through. 10 Bayshore Gateway Triangle CRA .Bayshore Beautification MSTU Haldeman Creek MSTU We can see the goal line is in view, but we just have to jump over a few more hurdles to get there. Christopher Mason, Director of Community Planning and Resiliency within the Growth Management Department Study started in 2018 it was paused in 2021, and it was reinitiated in 2022. 2023, after the reinitiation, we had a series of planning charrettes where community officials, stakeholders, educators from higher education such as universities were here. We had a series of three days' worth of planning charrettes. After that, through the months of May and June and over the summer of 2023, up into 2024 here the earlier part of 2024 we've had numerous public meetings so I don't know if anybody remembers the status of the study prior to the reinitiation which was in 2021 there was a presentation to the board and the Army Corps rolled out their what that call array of alternatives and it was met pretty coldly to say the least and what was met pretty coldly and what the resistance to was what was called structural in order to prevent damage from storm surge. The Army Corps is going to be the first to tell you that there's no plan that's going to restrict storm surge 100%. It's just not feasible. However, they do have several mechanisms to slow or abate storm surge with some success over time that they have proven through other studies. Alternatives included hardened structures such as large flood walls and floodgates in certain areas of the county to prevent flooding in back bay areas it was not met very it was it was high opposition to it so the study was paused and we reinitiated those hardened structures those what we call structural motors have been removed from the study so there's nothing that we would consider that's called a hardscape such as a a flood wall or a floodgate everything is trending toward nature -based solutions. And really the nature -based solutions in the toolkit at this point in time are number one, beach nourishment. Number two is going to be potential dune restoration and then mangrove restoration Florida Department of Emergency Management would be working with the federal government, FEMA, for a disbursement of money, but they're not really going to look most likely at a one singular home. They're going to look at raising 60 homes. They're going to look at a large, centralized stormwater collection improvement in a neighborhood. That's what flood mitigation assistance is. Hazard mitigation assistance is a little bit looser. 11 Bayshore Gateway Triangle CRA .Bayshore Beautification MSTU Haldeman Creek MSTU A National Flood Insurance Program policy typically offers $250,000 for the structure. The reason it's at a cap of $220,000 is there's something attached to a policy called benefits. D) Code Enforcement John Johnson Are in the midst of a in my experience there a massive hiring 3 investigators 200 cases each Training up employees 2596 There's an active building permit now there that was issued and approved by the county. 8. Old Business A) 17 Acre Update Completed the process with procurement, securing the contractor: Infinite Construction, LLC BOCC meeting to approve contract December 10,2024 Total contract price was $3,372,497 Additional soft costs that will go on with this project, such as CDI services Some miscellaneous costs for permits Next step, assuming it's approved on the 1 Oth, we will sit with the contractor for a pre -construction meeting, also with our consultants. In that meeting, they will provide us with the schedule of when they will start their contract for a 12-month completion date. That's to final completion. Substantial completion is a month prior to that, so 11 months essentially for the contract. B) Projects Update Report Holiday tree lighting is scheduled for Thursday December 5,2024 at the CRA parking lot corner of Bayshore and Coco A&M landscaping has scheduled time to clean the parking lot area prior to the event. Big item this month is the planting at the bridge. BIg thank you to A&M Landscaping, Naples Botanical Garden and Jim Bixler. For the new year 2025, staff is looking at cleaning up Del's pocket park, executing the Bayshore renovation contract and Building the Boardwalk. 9. New Business 12 Bayshore Gateway Triangle CRA .Bayshore Beautification MSTU Haldeman Creek MSTU A) New CRA Office Location- 3335 Tamiami Trail E, Suite 102 10. Advisory Board and General Communications A) Public Comments • N/A B) Correspondence i. CRA Staff CRA meetings moved to Thursday. January -May 1 st Thursday June will meet at Botanical Gardens ii. Tree Lighting Event December 5 Event time is 5pm-9pm iii.Art Exhibition Event December 6 3784 Bayshore Drive Aubrey Rogers High School Art Club C) Advisory Board James Talano "Are we going to undertake a similar invitation to negotiate on the Del's property?" John Dunnuck that will be entirely your decision, but when we presented the workshop last year, that's my intention, is to market it, get it out there, Will be brought up in January as a discussion. Al Schantzen mentioned Baci Pizza moved into weeks ave plaza and is amazing, and classy Maurice Gutierrez asked, "Is Larry Ingram's place for sale?" Shirley Garcia "It's been for sale for a while, but I will check" 15. Next Meeting Date Thursday January 9, 2025 at 6pm- Naples Botanical Gardens 16. Adjournment meeting adjourned. Time adjourned: 8:37pm Maurice Gutierrez, Chairman 13 Bayshore Gateway Triangle CRA .Bayshore Beautification MSTU Haldeman Creek MSTU 14 Item 6b-Attachment 1 Fund 1020 Bayshore/Gateway Triangle Fund / Comm Item BCC Adopt Budget Tot Amend Budget Commitment Actual Available 1020000000 BAYSHORE/GATEWAY TRIANGLE REDEVELOP 283,549.99 1,640,804.60- 1,357,254.61 REVENUE Sub Total 4,891,700.00- 4,962,218.25- 3,798,014.25- 1,164,204.00- REVENUE - OPERATING Sub -Total 20,000.00- 20,000.00- 4,514.25- 15,485.75- 361170 OVERNIGHT INTEREST 13,000.00- 13,000.00- 2,463.36- 10,536.64- 361180 INVESTMENT INTEREST 7,000.00- 7,000.00- 2,050.89- 4,949.11- CONTRIBUTION AND TRANSFERS Sub -Total 4,871,700.00- 4,942,218.25- 3,793,500.00- 1,148,718.25- 410001 TRANSFER FROM 0001 GENERAL FUND 3,793,500.00- 3,793,500.00- 3,793,500.00- 411011 TRANSFER FROM 1011 UNINC AREA MSTD GENERAL 862,400.00- 862,400.00- 862,400.00- 487999 REIMBURSEMENT INTERDEPARTMENTAL 216,800.00- 216,800.00- 216,800.00- 489201 CARRY FORWARD OF ENCUMB AMT BY ADC CODE 70,518.25- 70,518.25- 489900 NEGATIVE 5% ESTIMATED REVENUES 1,000.00 1,000.00 1,000.00 EXPENSE Sub Total 4,891,700.00 4,962,218.25 283,549.99 2,157,209.65 2,521,458.61 PERSONAL SERVICE 500,500.00 500,500.00 65,894.00 130,201.14 304,404.86 OPERATING EXPENSE 364,200.00 434,718.25 217,655.99 39,158.51 177,903.75 634210 IT OFFICE AUTOMATION ALLOCATION 15,100.00 15,100.00 11,325 3,775.00 634970 INDIRECT COST REIMBURSEMENT 39,800.00 39,800.00 39,800 634980 INTERDEPT PAYMENT FOR SERV 65,600.00 65,600.00 65,600.00 634990 LANDSCAPE INCIDENTALS 1,500.00 1,500.00 1,500.00 634999 OTHER CONTRACTUAL SERVICES 100,800.00 168,918.25 135,994.00 17,192.78 15,731.47 639967 TEMPORARY LABOR 35,000.00 35,000.00 35,000.00 640300 OUT OF COUNTY TRAVEL PROFESSIONAL DEVEL 10,000.00 10,000.00 1,854.94 8,145.06 641230 TELEPHONE ACCESS CHARGES 1,400.00 1,400.00 399.23 1,000.77 641700 CELLULAR TELEPHONE 1,500.00 1,500.00 610.15 889.85 641950 POSTAGE FREIGHT AND UPS 500.00 500.00 121.10 378.90 641951 POSTAGE 5,200.00 5,200.00 5,200.00 643100 ELECTRICITY 900.00 900.00 2,531.20 1,396.88 3,028.08- 643400 WATER AND SEWER 1,000.00 1,000.00 1,746.85 753.15 1,500.00- 644620 LEASE EQUIPMENT 2,000.00 2,000.00 1,273.12 636.56 90.32 644800 RENT SUPPLIES 1,000.00 1,000.00 1,000.00 645100 INSURANCE GENERAL 4,200.00 4,200.00 4,200.00 645260 AUTO INSURANCE 500.00 500.00 500.00 646360 MAINTENANCE OF GROUNDS ALLOCATED 20,000.00 20,000.00 11,200.00 2,800.00 6,000.00 646430 FLEET MAINT ISF LABOR AND OVERHEAD 900.00 900.00 231.00 669.00 646440 FLEET MAINT ISF PARTS AND SUBLET 200.00 200.00 200.00 646445 FLEET NON MAINT ISF PARTS AND SUBLET 200.00 200.00 41.07 158.93 646970 OTHER EQUIP REPAIRS AND MAINTENANCE 2,400.00 2,400.00 3,214.75 3,214.75- 647110 PRINTING AND OR BINDING OUTSIDE VENDORS 4,500.00 4,500.00 4,500.00 648170 MARKETING AND PROMOTIONAL 3,500.00 3,500.00- 648174 REGISTRATION FEES 200.00 200.00 1,185.00 985.00- 649030 CLERKS RECORDING FEES ETC 9,400.00 9,400.00 692.37 8,707.63 649100 LEGAL ADVE RTISI NG 1,000.00 1,000.00 1,500.00 500.00- 649990 OTHER MISCELLANEOUS SERVICES 500.00 500.00 500.00 651110 OFFICE SUPPLIES GENERAL 2,500.00 2,500.00 204.50 418.35 1,877.15 651210 COPYING CHARGES 3,000.00 3,000.00 1,481.32 435.93 1,082.75 Fund 1020 Bayshore/Gateway Triangle Fund / Comm Item BCC Adopt Budget Tot Amend Budget Commitment Actual Available 652110 CLOTHING AND UNIFORM PURCHASES 500.00 500.00 500.00 652210 FOOD OPERATING SUPPLIES 1,500.00 1,500.00 1,500.00 652490 FUEL AND LUBRICANTS ISF BILLINGS 800.00 800.00 190.75 609.25 652990 OTHER OPERATING SUPPLIES 20,000.00 20,000.00 2,575.00 17,425.00 652999 PAINTING SUPPLIES 1,500.00 1,500.00 1,500.00 653710 TRAFFIC SIGNS 5,000.00 5,000.00 5,000.00 654110 BOOKS PUBLICATIONS AND SUBSCRIPTIONS 500.00 500.00 30.00 470.00 654210 DUES AND MEMBERSHIPS 2,000.00 2,000.00 604.50 1,395.50 654360 OTHER TRAINING EDUCATIONAL EXPENSES 4,000.00 4,000.00 4,000.00 TRANSFERS 3,975,700.00 3,975,700.00 1,987,850.00 1,987,850.00 911021 TRANSFER TO 1021 BAYSHORE CRA PROJECT FUND 3,975,700.00 3,975,700.00 1,987,850.00 1,987,850.00 RESERVES 51,300.00 51,300.00 51,300.00 991000 RESERVE FOR CONTINGENCIES 14,300.00 14,300.00 14,300.00 993000 RESERVE FOR CAPITAL OUTLAY 1 37,000.00 1 37,000.00 1 1 1 37,000.00 Fund 1021 Bayshore CRA Projects Fund / Comm Item BCC Adopt Budget Tot Amend Budget Commitment Actual Available 1021000000 BAYSHORE CRA PROJECT FUND 5,482,686.13 2,042,486.25- 3,440,199.88- REVENUE Sub Total 3,999,100.00- 17,074,870.61- 2,088,178.92- 14,986,691.69- REVENUE - OPERATING Sub -Total 24,600.00- 24,600.00- 100,328.92- 75,728.92 361170 OVERNIGHT INTEREST 58,145.76- 58,145.76 361180 INVESTMENT INTEREST 24,600.00- 24,600.00- 42,183.16- 17,583.16 CONTRIBUTION AND TRANSFERS Sub -Total 3,974,500.00- 17,050,270.61- 1,987,850.00- 15,062,420.61- 411020 TRANSFER FROM 1020 BAYSHORE/GATEWAT TRIANGLE REDEV 3,975,700.00- 3,975,700.00- 1,987,850.00- 1,987,850.00- 489201 CARRY FORWARD OF ENCUMB AMT BY ADC CODE 13,075,770.61- 13,075,770.61- 489900 NEGATIVE 5% ESTIMATED REVENUES 1,200.00 1,200.00 1,200.00 EXPENSE Sub Total 3,999,100.00 17,074,870.61 5,482,686.13 45,692.67 11,546,491.81 OPERATING EXPENSE 150,000.00 3,414,316.55 705,689.55 45,022.70 2,663,604.30 631401 ENGINEERING FEES DESIGN 357,803.23 282,057.60 33,659.54 42,086.09 634980 INTERDEPT PAYMENT FOR SERV 3,461.52 3,461.52- 634999 OTHER CONTRACTUAL SERVICES 150,000.00 2,994,774.10 357,906.13 6,888.24 2,629,979.73 639990 OTHER CONTRACTUAL SERVICE 61,739.22 60,725.82 1,013.40 646451 LIGHTING MAINTENANCE 5,000.00 5,000.00- CAPITAL OUTLAY 3,349,100.00 12,225,130.03 4,776,996.58 669.97 7,447,463.48 763100 IMPROVEMENTS GENERAL 3,349,100.00 12,225,130.03 4,776,996.58 669.97 7,447,463.48 GRANTS AND DEBT SERVICE 500,000.00 1,435,424.03 1,435,424.03 882100 REMITTANCES PRIVATE ORGANIZATIONS 450,000.00 900,000.00 900,000.00 884200 RESIDENTIAL REHAB 50,000 535,424.03 535,424.03 Fund 1021 Project 50197 Residential Grants BCC Adopt Tot Amend Fund / Comm Item Commitment Actual Available Budget Budget 50197 BAYSHORE CRA PROJECT FUND 50,000 246,422.50 246,422.50 EXPENSE Sub Total 50,000 246,422.50 246,422.50 GRANTS AND DEBT SERVICE 50,000 246,422.50 246,422.50 884200 RESIDENTIAL REHAB 50,000 246,422.50 246,422.50 Fund 1021 Project 50198 Commercial Grants BCC Adopt Tot Amend Fund / Comm Item Commitment Actual Available Budget Budget 50198 BAYSHORE CRA PROJECT FUND 289,001.53 289,001.53 EXPENSE Sub Total 289,001.53 289,001.53 GRANTS AND DEBT SERVICE 289,001.53 289,001.53 884200 RESIDENTIAL REHAB 289,001.53 289,001.53 Fund 1021 Bayshore CRA Projects Fund 1021 Project 50203 Stormwater Fund / Comm Item BCC Adopt Budget Tot Amend Budget Commitment Actual Available 50203 BAYSHORE CRA PROJECT FUND 1,472,200.00 5,617,568.53 1,923,521.90 37,411.54 3,656,635.09 EXPENSE Sub Total 1,472,200.00 5,617,568.53 1,923,521.90 37,411.54 3,656,635.09 OPERATING EXPENSE 564,534.53 574,521.90 37,411.54 47,398.91- 631401 ENGINEERING FEES DESIGN 357,803.23 282,0S7.60 33,6S9.54 42,086.09 634980 INTERDEPT PAYMENT FOR SERV 952.00 952.00- 634999 OTHER CONTRACTUAL SERVICES 206,731.30 292,464.30 2,800.00 88,533.00- CAPITAL OUTLAY 1,472,200.00 5,053,034.00 1,349,000.00 3,704,034.00 763100 IMPROVEMENTS GENERAL 1,472,200.00 S,053,034.00 1,349,000.00 3,704,034.00 Fund 1021 Project 50204 Linwood Fund / Comm Item BCC Adopt Budget Tot Amend Budget Commitment Actual Available 50204 BAYSHORE CRA PROJECT FUND 800,000.00 800,000.00 EXPENSE Sub Total 800,000.00 800,000.00 OPERATING EXPENSE 350,000.00 350,000.00 634999 OTHER CONTRACTUAL SERVICES 350,000.00 3S0,000.00 CAPITAL OUTLAY 450,000.00 450,000.00 763100 IMPROVEMENTS GENERAL 450,000.00 4S0,000.00 Fund 1021 Proiect 50206 Ackerman -Dells Fund / Comm Item BCC Adopt Budget Tot Amend Budget Commitment Actual Available 50206 BAYSHORE CRA PROJECT FUND 615,756.50 12,679.00 603,077.50 EXPENSE Sub Total 615,756.50 12,679.00 603,077.50 OPERATING EXPENSE 12,679.00 12,679.00 634980 INTERDEPT PAYMENT FOR SERV 634999 OTHER CONTRACTUAL SERVICES 12,679.00 12,679.00 CAPITAL OUTLAY 603,077.50 603,077.50 763100 IMPROVEMENTS GENERAL 603,077.50 603,077.50 Fund 1021 Project 50207 Bayshore Parking Lot BCC Adopt Tot Amend Fund / Comm Item Commitment Actual Available Budget Budget 50207 BAYSHORE CRA PROJECT FUND 64,586.31 64,586.31 EXPENSE Sub Total 64,586.31 64,586.31 CAPITAL OUTLAY 64,586.31 64,586.31 763100 IMPROVEMENTS GENERAL 64,586.31 64,586.31 Fund 1021 Bayshore CRA Projects Fund 1021 Project 50208 17 Acre Site Fund / Comm Item BCC Adopt Budget Tot Amend Budget Commitment Actual Available 50208 BAYSHORE CRA PROJECT FUND 1,050,000.00 4,700,868.49 3,433,223.59 3,522.92 1,264,121.98 EXPENSE Sub Total 1,050,000.00 4,700,868.49 3,433,223.59 3,522.92 1,264,121.98 OPERATING EXPENSE 789,630.45 60,725.82 3,522.92 725,381.71 634980 INTERDEPT PAYMENT FOR SERV 2,509.52 2,509.52- 634999 OTHER CONTRACTUAL SERVICES 50,000.00 727,891.23 727,891.23 639990 OTHER CONTRACTUAL SERVICE 61,739.22 60,725.82 1,013.40 CAPITAL OUTLAY 1,000,000.00 3,911,238.04 3,372,497.77 538,740.27 763100 IMPROVEMENTS GENERAL 1,000,000.00 3,911,238.04 3,372,497.77 538,740.27 Fund 1021 Project 50254 Communications BCC Adopt Tot Amend Fund / Comm Item Commitment Actual Available Budget Budget 50254 BAYSHORE CRA PROJECT FUND 125,000.00 125,000.00 EXPENSE Sub Total 125,000.00 125,000.00 OPERATING EXPENSE 125,000.00 125,000.00 634999 OTHER CONTRACTUAL SERVICES 125,000.00 125,000.00 Fund 1021 Project 50255 Public Art BCC Adopt Tot Amend Fund /Comm Item Commitment Actual Available Budget et Budget g 50255 BAYSHORE CRA PROJECT FUND 200,000.00 200,000.00 EXPENSE Sub Total 200,000.00 200,000.00 CAPITAL OUTLAY 200,000.00 200,000.00 763100 IMPROVEMENTS GENERAL 200,000.00 200,000.00 Fund 1021 Project 50256 Commun. Safetv Improve Fund / Comm Item BCC Adopt Budget Tot Amend Budget Commitment Actual Available 50256 BAYSHORE CRA PROJECT FUND 576,900.00 712,799.00 14,868.70 697,930.30 EXPENSE Sub Total 576,900.00 712,799.00 14,868.70 697,930.30 OPERATING EXPENSE 5,000.00 5,000.00- 646451 LIGHTING MAINTENANCE 5,000.00 5,000.00- CAPITAL OUTLAY 576,900.00 712,799.00 9,868.70 702,930.30 763100 IMPROVEMENTS GENERAL 576,900.00 712,799.00 9,868.70 702,930.30 Fund 1021 Project 50258 General Rd Improve Fund / Comm Item BCC Adopt Budget Tot Amend Budget Commitment Actual Available 50258 BAYSHORE CRA PROJECT FUND 400,000.00 1,281,877.72 86,413.98 4,088.24 1,191,375.50 EXPENSE Sub Total 400,000.00 1,281,877.72 86,413.98 4,088.24 1,191,375.50 OPERATING EXPENSE 100,000.00 527,247.61 40,783.87 4,088.24 482,375.50 634999 OTHER CONTRACTUAL SERVICES 100,000.00 527,247.61 40,783.87 4,088.24 482,375.50 CAPITAL OUTLAY 300,000.00 754,630.11 45,630.11 709,000.00 763100 IMPROVEMENTS GENERAL 300,000.00 754,630.11 45,630.11 709,000.00 Fund 1021 Bayshore CRA Projects Fund 1021 Project 50259 Multi -Modal Improve BCC Adopt Tot Amend Fund / Comm Item Commitment Actual Available Budget Budget 50259 BAYSHORE CRA PROJECT FUND 150,000.00 150,000.00 EXPENSE Sub Total 150,000.00 150,000.00 CAPITAL OUTLAY 150,000.00 150,000.00 763100 IMPROVEMENTS GENERAL 150,000.00 150,000.00 Fund 1021 Project 50261 Housing BCC Adopt Tot Amend Fund / Comm Item Commitment Actual Available Budget Budget 50261 BAYSHORE CRA PROJECT FUND 295,200.00 295,200.00 EXPENSE Sub Total 295,200.00 295,200.00 OPERATING EXPENSE 295,200.00 295,200.00 634999 OTHER CONTRACTUAL SERVICES 295,200.00 295,200.00 Fund 1021 Project 50262 N Bayshore Enhance Fund / Comm Item BCC Adopt Budget Tot Amend Budget Commitment Actual Available 50262 BAYSHORE CRA PROJECT FUND 689,924.96 11,978.96 677,946.00 EXPENSE Sub Total 689,924.96 11,978.96 677,946.00 OPERATING EXPENSE 429,924.96 11,978.96 417,946.00 634999 OTHER CONTRACTUAL SERVICES 429,924.96 11,978.96 417,946.00 CAPITAL OUTLAY 260,000.00 260,000.00 763100 IMPROVEMENTS GENERAL 260,000.00 260,000.00 Fund 1021 Project 50263 Complete Streets BCC Adopt Tot Amend Fund /Comm Item Actual Available Bud g et BudgetCommitment 50263 BAYSHORE CRA PROJECT FUND 65,765.07 669.97 65,095.10 EXPENSE Sub Total 65,765.07 669.97 65,095.10 CAPITAL OUTLAY 65,765.07 669.97 65,095.10 763100 IMPROVEMENTS GENERAL 65,765.07 669.97 65,095.10 Fund 1021 Bayshore CRA Projects Fund 1021 Project 50270 Mini -Triangle TIF Agreement BCC Adopt Tot Amend Fund /Comm Item Commitment Actual Available et Budget Budget g 50270 BAYSHORE CRA PROJECT FUND 450,000.00 900,000.00 900,000.00 EXPENSE Sub Total 450,000.00 900,000.00 900,000.00 GRANTS AND DEBT SERVICE 450,000.00 900,000.00 900,000.00 882100 REMITTANCES PRIVATE ORGANIZATIONS 450,000.00 900,000.00 900,000.00 Fund 1021 Project 50271 Neighborhood Initiative BCC Adopt Tot Amend Fund /Comm Item Commitment Actual Available Budget et Budget g 50271 BAYSHORE CRA PROJECT FUND 320,100.00 320,100.00 EXPENSE Sub Total 320,100.00 320,100.00 OPERATING EXPENSE 320,100.00 320,100.00 634999 OTHER CONTRACTUAL SERVICES 320,100.00 320,100.00 CITY OF NAPLES (ZONING: N/A) n 73 PROPOSED BOAT SLIPS AS DEPICTED CONSISTENT WITH DEP AND USACOE PERMITS PROPERTY BOUNDARY RON MOGERMAN NAPLES HOLDINGS (ZONING: C-4-GTZO-MXD) POTENTIAL FUTURE CONNECTION FINAL ACCESS LOCATION WILL BE DETERMINED AT THE TIME OF PLAT OR SDP. LEGEND U -40ml0- P.U.D. ACCESS EXISTING EASEMENT TO BE VACATED ......' EXISTING MANGROVES ® PRESERVE ® DEVIATION I I I I I I I I I I SINGLE FAMILY RESIDENTIAL (ZONING: RSFI4) ---I--U--U------ — PROPEK7BOUNDAF�tY -- -- 0 PRESERVE (SEE NATIVE VEG. PRESERVED NOTE) EX. MANGROVES LIMITS r 0 EX 10' FPL EASEMENT (O.R. BOOK 1677, PG. 230) (TO BE VACATED) TRACT R U 1 2 1A EX 15' UTILITY EASEMENT (O.R. BOOK 1401, PG. 2055) (TO BE VACATED) �j EX 15' UTILITY EASEMENT (O.R. BOOK 1432, PG. 1118) (TO BE VACATED) TRACT M Y I (SEE Q DEVELOPMENT NOTE #3) EX 15' UTILITY EASEMENT (O.R. BOOK 421, PG. 35) / J/7 — DAVIS BOULEVARD WAY) ) (100' PUBLIC RIGHT- OF- WAYJ NATIVE VEG. PRESERVED EX. NATIVE VEGETATION = 0.05 AC MIN. REQUIRED / PROVIDED (25%) = 0.014 AC* *PRESERVE CONFIGURATION SHOWN IS CONCEPTUAL AND MAY BE RECONFIGURED AT THE TIME OF SDP PERMITTING OR MAY BE MITIGATED OFFSITE. TRACT M 39 EXISTING DOCK/SLIPS (TYP.) Q U: = UU U:U PROPERTY BOUNDARY TERRA AQUA LLC (ZONING C-4-GTZO-MXD) TRACT M (SEE 0 DEVELOPMENT NOTE #3) FINAL ACCESS LOCATION WILL BE DETERMINED AT THE TIME OF —PLAT OR SDP. I EX 15' UTILITY EASEMENT (O.R. BOOK 421, PG. 33) l TERRA AQUA LLC (ZONING C-4-GTZO-MXD) OPEN SPACE A� MIN. REQUIRED OPEN SPACE: 30% X 8.27 AC = 2.48 AC N 120' 0 60' SCALE: 1" = 120' *THE ENTIRETY OF THE REQ. OPEN SPACE CAN BE PROVIDED WITHIN ANY TRACT DEVELOPMENT NOTES /� 1. MAXIMUM DENSITY IS 66 MULTI -FAMILY RESIDENTIAL DWELLING UNITS WITHIN TRACT R. 2. MAXIMUM NUMBER OF WET BOAT SLIPS CANNOT EXCEED 120 WITHIN TRACT M. 3. THE FLOATING M TRACTS REPRESENT THE PARKING STALLS REQUIRED TO SERVE THE COMMERCIAL COMPONENT OF THE MARINA. THE EXACT LOCATION OF THESE TRACTS ON THE SITE WILL BE DETERMINED AT THE TIME OF PLAT OR SDP PERMITTING. DEVELOPMENT TRACT BREAKDOWN DEVELOPMENT TYPE I ACREAGE (AC) I PERCENTAGE (%) I RAC I M (MARINA) 1 4.177 1 50.5% TRACT R (RESIDENTIAL) 4.097 49.5% TOTAL = 8.274 100.0% EX. LAND USE SUMMARY I DESCRIPTION AGREAGE (AC) PEKGEN I AGE (%) SUBMERGED LANDS ±4.04 48.9% UPLANDS / DEVELOPED ±4.23 51.1% TOTAL = ± 8.27 100.0% J.R. EVANS ENGINEERING, P.A. 9961 INTERSTATE COMMERCE DR. STE #230 DAVIS BROOKSIDE MPUD J.R. s FT. MYERS, FLORIDA 3313 Al E N G I G PHONE: (239) 405-9148 FAX: (239) 288-2537 MASTER CONCEPT PLAN - EXHIBIT C-1 WWW.JREVANSENGINEERING.COM REV DATE: 01-03-25 SHEET: 1 OF 3 CITY OF NAPLES (ZONING: N/A) 10.0- TYPE "A" AD LANDSCAPE BUFFER 73 PROPOSED BOAT SLIPS AS DEPICTED CONSISTENT WITH DEP AND USACOE PERMITS PROPERTY BOUNDARY RON MOGERMAN NAPLES HOLDINGS (ZONING: C-4-GTZO-MXD) 5.0' TYPE "A" LANDSCAPE BUFFER POTENTIAL FUTURE CONNECTION LEGEND -olfm011im- P.U.D. ACCESS ® LANDSCAPE BUFFER UTILITY EASEMENT ACCESS EASEMENT I I I I I I I I I I SINGLE FAMILY RESIDENTIAL (ZONING: RSFI4) � _ —1 —PROPERTr'BOUNDAf�Y — —I— — — NO LANDSCAPE BUFFER REQUIRED ADJACENT TO TRACT M TRACT M 39 EXISTING DOCK/SLIPS (TYP.) Q C� : - -: -A " I+I' :+ + : "" PROPERTY BOUNDARY 10 PRESERVE 5.0' TYPE "A" (SEE NATIVE VEG. PRESERVED NOTE) LANDSCAPE BUFFER EX. MANGROVES LIMITS TRACT M I TRACT R 1 2 � TERRA AQUA LLC TERRA AQUA LLC (ZONING C-4-GTZO-MXD) (ZONING C-4-GTZO-MXD) UTILITY EASEMENT FINAL CONFIGURATION WILL BE DETERMINED AT TIME OF PLAT OR SDP N I I 0 60' 120' SCALE: 1" = 120' QQ9 ti O I oa m� I TRACT M FINAL ACCESS EASEMENT CONFIGURATION I WILL BE DETERMINED AT THE TIME OF PLAT OR SDP PERMITTING, PER EX. F.B.2 I 1010.0' TYPE "D" LANDSCAPE BUFFER FINAL ACCESS LOCATION _ WILL BE DETERMINED AT = �— �THE TIME OF PLAT OR SDP — '— — ® DEVIATION J.R. EVANS ENGINEERING, P.A. .•.•.• EX MANGROVE ® PRESERVE 9961 INTERSTATE COMMERCE DR. STE #230 J.R. FT. MYERS, FLORIDA 3313 E N G I G PHONE: (239) 405-9148 FAX: (239) 288-2537 WWW.JREVANSENGINEERING.COM DAVIS BROOKSIDE MPUD MASTER CONCEPT PLAN - EXHIBIT C-1 REV DATE: 01-03-25 SHEET: 2 OF 3 DEVIATIONS Al 1. DEVIATION FROM LDC SECTION 4.05.04 G. TABLE 17 - PARKING SPACE REQUIREMENTS, SPECIFICALLY FOR MULTI -FAMILY DWELLINGS, WHICH ALLOWS SMALL-SCALE RECREATION FACILITIES THAT ARE ACCESSORY TO A MULTI -FAMILY PROJECT AND INTENDED ONLY FOR THE RESIDENTS OF THAT PROJECT, EXCLUSIVE OF GOLF COURSES/CLUBHOUSES, MAY BE COMPUTED AT 50 PERCENT OF NORMAL REQUIREMENTS WHERE THE MAJORITY OF THE DWELLING UNITS ARE NOT WITHIN 300 FEET OF THE RECREATION FACILITIES AND AT 25 PERCENT OF NORMAL REQUIREMENTS WHERE THE MAJORITY OF THE DWELLING UNITS ARE WITHIN 300 FEET OF THE RECREATION FACILITIES TO INSTEAD ALLOW AMENITY PARKING TO BE EXEMPT. 2. DEVIATION FROM LDC SECTION 4.02.05 B.1. -SPECIFIC DESIGN STANDARDS FOR WATERFRONT LOTS, WHICH STATES "WATERFRONT LANDS ALONG WHICH A BULKHEAD LINE HAS BEEN ESTABLISHED, BUILDINGS MAY BE ERECTED OUT TO, BUT NOT BEYOND, THE BULKHEAD LINE." TO INSTEAD ALLOW ROOFED AND ENCLOSED BALCONIES TO ENCROACH A MAXIMUM OF 10 FEET BEYOND THE BULKHEAD LINE. SITE DEVELOPMENT PLANS PL 20224 08 8 PREPARED FOR: UTOPIA PROPERTIES LLC UTOPIA PROPERTIES TWO LLC 313 LAKEVIEW AVE W BRIGHTWATERS, NY 11718-1904 6,SITEi, ma "_ ft _ o,.akm , a.4....,,,R,.,x.,.o „pum,,.,wo PFoIECT wxrr�crs LOGTIOH sxraNQ a muCPJamffim°nR PnN3ECIIOf11},TOMiNAVLE R d MFNIGE ZE FAST . amct AC mf As I'AnKrnniq r- uraw a.m E`W` I)" A]MU BAN KS FARCE am °"°"'° ENGINEERING Mous. ft m"I Pro(esuonol ENilleelS, PIonmms, d Land SuNryoo Nx»� 3i OPID.4(�xN�fJf-iSxJ /LL EIEY�Il INNAWe! �WTT119TTIffiE IN vMT OEM _� r, * x ,_u 1 A rr I � lp -. EO 4 IT i a � ■ �000 �000 �000 ■ to w :m0 I __ -.. — -- �.•Yr�a _ I N till 1 ii,t,i i i i 1.�i1: ����������T��■SS ■ r _ :� f I I ` t I { � I t �. W wlw mom° �n s� � �-�Z77T _�t F LEGEND. OREUAFE9 �LEL PRGTEG IAT SALT11RICE n-amnz u. a•a•v _ nw ¢usca �.M1,m. m.-s� c tm .+c® Ma`+%mw.s ao.mrs as a+wa .vj nawm w¢,.o RINE m I I S T FENCE Irmo RETIREE REIF tiqwtos MI I eMET SLT FENCE IPPLMA S Item 7e-Attachment 4 Andres Boral, State of Florida, Professional Engineer, License No. 80373. This item has been electronically signed and sealed by Andres Boral, PE on the date indicated here using a SHA authentication code. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. I -V L -V WM — WM CN TOP (WHITE) C� R1-1 TYPICAL DIRECTIONAL ARROW (36"x36") N.T.S. N.T.S. W U) Lq 00 PARKING BY DISABLED PERMIT 6i ONLY 12" w FTO-25 O0 $250.00 FINE z LL HANDICAP SIGN ALL LETTERS ARE 1" SERIES 'C'. TOP PORTION OF SIGN SHALL HAVE A REFLECTIVE BLUE BACKGROUND W/ WHITE REFLECTIVE LEGEND & BORDER. BOTTOM PORTION OF SIGN SHALL HAVE A REFLECTIVE WHITE BACKGROUND W/ BLACK OPAQUE LEGEND & BORDER. HANDICAP SPACE SIGNAGE PER FDOT INDEX 700-102. VERTICAL ACCESSIBLE SIGN DOES NOT HAVE TO BE POLE -MOUNTED AND MAY BE MOUNTED TO THE BUILDING FASCIA INSTEAD. STRIPING NOTES: N W E S 0 10 20 1"=20' EXOTIC VEGETATION NOTE: ALL PROHIBITED EXOTIC VEGETATION SHALL BE REMOVED FROM THE PROJECT SITE AND IT SHALL BE MAINTAINED FREE OF EXOTICS IN PERPETUITY. ADA NOTES: U) U) U) 10' FRONT BUILDING SETBACK U) PROP. 48" HIGH CHAIN LINK FENCE AROUND UTILITY EASEMENT E IST. ±6 WIDE U) CONCRETE elnP:M/ALK 5.96' T —8" PV.c 1. ALL PAVEMENT MARKING AND STRIPING WITHIN 1. DIMENSIONS ARE TO THE CENTERLINE OF O SITE SHALL BE IN ACCORDANCE WITH M.U.T.C.D. MARKINGS. u 10' TYPED' —j 2. ALL STRIPING AND PAVEMENT MARKINGS SHALL 2. AN ACCESS AISLE IS REQUIRED FOR EACH BUFF R BE TWO (2) COATS OF TRAFFIC REFLECTIVE PAINT ACCESSIBLE SPACE WHEN ANGLE PARKING IS (F.D.O.T. INDEX 710) UNLESS OTHERWISE NOTED USED. O ON PLANS OR SPECIFICATION. 3. CRITERIA FOR PAVEMENT MARKINGS ONLY, NOT 3. ALL MARKING WITHIN A PUBLIC R/W SHALL BE IN PUBLIC SIDEWALK CURB RAMP LOCATIONS. FOR THERMOPLASTIC. (F.D.O.T. INDEX 711-001) RAMP LOCATIONS REFER TO PLANS. � 4. ALL EXISTING PAVEMENT MARKINGS THAT ARE IN 4. MOUNT FTP-22-06 SIGN BELOW THE FTP-21-06 SIGN. CONFLICT WITH EXISTING PAVEMENT MARKINGS 5. USE OF THE PAVEMENT SYMBOL IN ACCESSIBLE SHALL BE REMOVED BY HYDROBLASTING. PARKING SPACES IS OPTIONAL. WHEN PAVEMENT SYMBOL IS USED, THE SYMBOL IS EITHER 3'-0" OR PROPERTY 5"-0" HIGH AND WHITE IN COLOR. BOUNDARY C m BUILDING SETBACKS LANDSCAPE BUFFERS T110'FRONT-- REQUIRED PROVIDED REQUIRED PROVIDED BUILDING SETBACK 10, 10.05, NORTH (FRONT)- 10' TYPE D 10, Cn -n 00 10, 10, SOUTH (FRONT): 10' TYPE D 10, 7.5' 52.93' EAST (SIDE)- 15TYPE B 15' 10, 10, WEST (FRONT): 10' TYPE D 10, Cn -n PROJECT AREA BREAKDOWN SQUAREFEET ACRES PERCENTAGE TOTAL 50,144 1.151 100.00% BUILDINGS 15,053 0.346 30.02% PAVEMENT/CONCRETE 13,931 0.320 27.78% IMPERVIOUS 28,984 0.665 57.80% PERVIOUS 21,160 0.486 42.20% CALL 48 HOURS 0 BEFORE YOU DIG 0 tz IT'S THE LAW! Know what's below. DIAL 811 Call before you dig. SUNSHINE STATE ONE CALL OF FLORIDA, INC. * J PRELIMINARY NOT FOR CONSTRUCTION Vuu� T FM "' T F. K WM — WM ZONE: GTZO-R (RMF-6) ZONE: GTZO-R (RMF-6) LAND USE: CHURCH LAND USE: SFR CONNECTICUT A VENUE WM WM - vM WM — — WM "NO PARKING FIRE BY ORDER OF THE I PROP. DETECTABLE DEPARTMENT" I WARNING SURFACE PROPOSED (PER FDOT INDEX STOP SIGN & 24" 522-002), TYP. WHITE STOP BAR PROP. 5' WIDE CONCRETE SIDEWALK 10' FRONTS PROP. CROSS ALK STOP (6" THICK) BUILDING o (PER FDOT INDE _ �- — SETBACK �,, 711-001) �a cR+-+) PROPERTY 0' TYPE 'D' UFFER ■ 81' UNIT 1 3-STORY BUILDING (2-CAR GARAGE) UNIT 2 3-STORY BUILDING co (2-CAR GARAGE) rn� UNIT 3 3-STORY BUILDING (2-CAR GARAGE) 0 N T UNIT 4 3-STORY BUILDING (2-CAR GARAGE) 70' I EXISTING PUMP STATION N PROP. DUMPSTER ENCLOSURE (SEE SHEET 8 L1Z FOR DETAIL) � 81' UNIT 5 3-STORY BUILDING (2-CAR GARAGE) UNIT 6 3-STORY BUILDING (2-CAR GARAGE) UNIT 7 3-STORY BUILDING (2-CAR GARAGE) UNIT 8 3-STORY BUILDING (2-CAR GARAGE) UNIT 9 3-STORY BUILDING (2-CAR GARAGE) BOUNDARY T -- -- — — — v, 0 00 I. ce 1 D _PROP.� POOL o ;UI 00 I `0 6' �- �35� 6' 1n ROPOSED IRECTIONAL Y, RROWS, TYP. ' 24' _ — PROP. HANDICAP PARKI G SIGN PROP.TYPE 'D'„ CURB, TYP. PROPOSED DRY — PROP. HANDICAP DETENTION AREA PARKING SPACE BOTTOM EL. = 3.50, (N.A.V.D.1988) I PROP. TWO (2) o � I It t PICKLEBALL (o PROP. 48" HIGH COURTS CHAIN LINK FENCE AROUND POOL AND PICKLE BALL COURTI I II 60' III -------- - ------� ---- 0 -co °' LO - I� --- — — ,- 10' IIh(C I PROPERTY BOUNDARY 15' TYPE 'B' BUFFER W C)10' FRONT PROPERT BULDING BOURN Y C° FM SETBACK - Fr FM d0jS LINWOOD AVENUE ZONE: GTZO-R (RMF-6) LAND USE: VACANT WM - WM VVIVI - PROPERTY BOUNDARY 7.5' SIDE BUILDING I % SETBACK LOT 29 �I I I I I PROPO�ED I I DIRECTIONALZONE: GTZO-R (RMF-6) ARROWS,TYIII� 'I LAND USE: DUPLEX PROPOSED 6" 1 DOUBLE YELLOW t CENTERLINE STRIPE, TYP. "NO PARKING FIRE LANE BY ORDER OF THE FIRE 53.05' DEPARTMENT" SIGN \'' FM -10' TYPE 'D' BUFFER -PROPOSED STOP SIGN & 24" '— PROP. 5' WIDE WHITE STOP BAR CONCRETE SIDEWALK (6" THICK) ► TN& PROPOSED BUILDING PARKING REQUIREMENTS THREE (3) STORY MULTI -FAMILY DWELLINGS, BUILDING A (4 UNITS) (19,352 SF) 2 SPACES PER UNIT GROUND FLOOR = 6,296 SF SWIMMING POOL, 1 PER 75 S.F. OF WATER AREAS FOR THE 1ST FLOOR = 6,528 SF FIRST 1,000 S.F. 2ND FLOOR = 6,528 SF SMALL-SCALE RECREATION FACILITY 25% OF NORMAL REQ. (3 PER COURT) THREE (3) STORY 9 UNITS PROPOSED BUILDING B (5 UNITS) (24,375 SF) 1,000 SF OF WATER 2 PICKLEBALL COURTS 1ST FLOOR = 7,925 SF 9 UNITS X 2 SPACES = 18 SPACES 2ND FLOOR = 8,225 SF 1,000/75 X 1 SPACE = 13 SPACES 3RD FLOOR = 8,225 SF 2 COURTS X 3 SPACES = 6 SPACES 13 SPACES + 6 SPACES = 19 SPACES 7.5' SIDE 19 SPACES X 0.25 = 5 SPACES BUILDING RESTROOMS (300 SF) SETBACK REQ'D. PARKING = 23 SPACES -PROPERTY PROP'D. PARKING = *20 SPACES BOUNDARY (INCLUDES 1 H/C) ZONE: GTZO-R (RMF-6) *SEE PL20240004639 (APR) LAND USE: SFR 15' TYPE 'B' BUFFER 9 SOUTH DEVELOPMENT STANDARDS TABLE PROPERTY AREA: ALLOWABLE DENSITY TOTAL DENSITY ALLOWED (RMF-6) PROPOSED UNIT NUMBER OF UNITS MULTI -FAMILY UNITS 9 GTZO-R - APARTMENTS MIN. REQUIRED LOT W I DTH (FT) FLOOR AREA (SQ FT) BUILDING SEPARATION DENSITY CALCULATIONS DENSITY IS BASED ON UNDERLYING ZONE DISTRICT (RMF-6) PER LDC 2.05.01.A: RMF-6 = 6 UNITS PER GROSS ACRE 1.15 ACRES X 6 UNITS = 6.9 UNITS MAX. ALLOWED UNITS = 7 UNITS PROPOSED UNITS = 9 UNITS 1. THE APPROVAL OF THESE CONSTRUCTION PLANS DOES NOT AUTHORIZE CONSTRUCTION OF REQUIRED IMPROVEMENTS WHICH ARE INCONSISTENT WITH EASEMENT OF RECORD. 2. SIGNS WILL BE APPROVED AND PERMITTED SEPARATELY. DENSITY COUNT 1 1.15 AC 6 /AC 6.91 UNITS TOTAL DENSITY PROPOSED PROPOSED 100 133.05 750 4,838 10 34.59 9 9 UNIT BREAKDOWN BATHROOM BUILDING UNIT TYPE BUILDING A, UNIT TYPE BUILDING B STORYS 1 3 3 NUMBER OF BEDROOMS N/A 4 4 LEVEL 1 SF 300 SF 1,574 SF 1,585 SF LEVEL 2 SF N/A 1,632 SF 1,645 SF LEVEL 3 SF N/A 1,632 SF 1,645 SF TOTAL SF 300 SF 4,838 SF 4,875 SF PROJECT: 22-143 DATE: 05/23 N O V M LL 0 N LO U) W U Q CO LO M J d C7 z �ltzE Lj a W W z M LO J M LL N w (� O N z w 0)r fl M C Q w it _ 0' 0 N d o w U) 0 Q Z w U) W U J W Q z 0 U c� z Ir w w z 0 z W J Q O Ems U J J z w ao 0 J W w W ::) U)- Q J � 0 COc~n�o M J W L75 W ° C) a 0 00 a - NZ W U) U) z z z W W w Z 0 OU U OU d z z z w 0 0 0 o U U U O w W w w 0 0 0 w W W a_ a_ IL 0 0 0 W W W In 0 0 LU0 N N N Q o LO N M N a O O O w 0 N_ Z F M Q J J LL 0 (/) QJ � =Q U) Z Z Z O CO Z 0 LU Z � a LU I- 06 SHEET 4 OF 9 Bayshore Gateway Triangle CRA -Bayshore Beautification MSTU Haldeman Creek MSTU February 2025 Development Update Item 7f-Attachment 5 Please Note: Projects with *and highlight have been updated since the last report Yellow highlight indicates old pro'ect with recent activity; Blue highlight indicates new project; - • • • indicates Live Local project Zoning Petitions 1. The Grove (VA) : PL20250000077* Location: 3771 Bayshore Dr Current Zoning: RMF-6-BZO-R1 Owner: Naples Groves Lot 113 LLC Status: Pre application meeting scheduled for 1 /30/2025. The applicant requests a variance to increase the entry feature gates from 42" to 11'6". 2. 3000 Areca Ave (ZLTR) : PL20250000221* Location: 3000 Areca Ave Current Zoning: RMF-6-BZO-NC & RMF-6-BZO-R1(APZ) Owner: 3467 Bayshore Drive LLC Status: Request for Zoning Verification Letter submitted on 1 /09/2025. The applicant requests verification of the current zoning and many units are allowed on the property. 3. Bayshore Warehouse (ZLTR) : PL20250000597* Location: 3270 Bayshore Dr Current Zoning:C-4-BZO-NC Owner: Bayshore Tomorrow LLC Status: Request for Zoning Verification Letter submitted on 1 /17/2025. Seeking to allow an event space for small private events; is proposed onsite and at the free CRA parking lot. Specific questions relate to: maximum number of attendees, prohibited event types, and applicable noise ordinances. height of parking Page 1 of 16 Bayshore Gateway Triangle CRA •Bayshore Beautification MSTU Haldeman Creek MSTU 4. Schilling Lot Line Adjustment (LLA) : PL20250000656* Location: 2800 & 2818 Shoreview Dr Current Zoning: RMF-6-BZO-R2 Owner: Gregory M Schilling Status: First applicant submittal on 1/20/2025. The applicant requests to adjust the lot line between Lots 20, Block 2, Gulf Shores Subdivision by moving the line to the east. 5. 2891 Bayview Dr (PE) : PL20240013928 Location: 2891 Bayview Dr. (former Three60 Market) Current Zoning: C-4-BZO-W Owner: Maddox & Partners LLC Status: Waiver of pre application meeting on 12/12/2024. First applicant submittal is pending. The applicant seeks parking exemption approval associated with commercial building alterations for Seventh South Waterfront Building Permit # PRCS20240626991. Seventh South Waterfront Restaurant (EWA) PL20250000381* Status: First applicant submittal on 1/21/2025. Staff reviews by Engineering Stormwater & Environmental are pending. Seeking Early Work Authorization to renovate the existing restaurant. All site utilities are to remain. The project includes approximately 2,003 existing square feet under air and 1,119 square feet of outdoor deck. Area of work includes the renovation of the existing restaurant, kitchen, and the adjacent decks. The scope consists of erecting a wall to separate the dining and kitchen spaces, while also modifying the seating layout. The addition of a bar will be a part of the project scope as well. FKHIBIT -1 D—k Faci1iri-and P-IL-F: 19 and five feet Page 2 of 16 A Bayshore Gateway Triangle CRA •Bayshore Beautification MSTU Haldeman Creek MSTU 3370 Canal St, Naples Florida (ZLTR): PL20240012009 Location: 3370 Canal Sty Current Zoning: RMF-6-BZO-R1 Owner: Queen Bee LLC I Status: Applicant requested Zoning Verification on 10/21/2024. Staff requested completion of updated application form on 10/22/2024. The applicant inquired about single family or multi -family development potential. 7. Brookside MPUD (PUDZ): PL20240010963 Location: 1933 Davis Blvd; 1949 & 2015 Davis Blvd Current Zoning: C-4-GTZO-MXD and C-4 (submerged lands) Owners: 1933 Davis LLC; Naples Marina Holdings Status: Pre -application meeting held on 10/17/2024.First applicant submittal on 11/12/2024. Applicant submitted additional documents on 11/21/2024. Staff issued first comment letter on 12/31 /2024. Folio # 00386320006 is 1933 Davis Blvd (westernmost property) owned by 1933 Davis LLC. Folio #s 00386120002, 00386080003, Letter LLC 00386200003 are submerged lands owned by 1 y' Naples Marina Holdings LLC; these were rezoned from '��, RSF-4 to C-4 by Ordinance 2023-42, allowing a maximum x= of 120 wet slips. Folio #s 00386160004 & 00386280007 "' " ° ' are 1949 & 2015 Davis Blvd owned by Naples Marina Holdings LLC. Request is to rezone to a Mixed Use PUD to permit 68 multi -family units and a 112-boat slip marina. Eligibility for the residential density is per Growth Management Plan commercial conversion policy, which allows up to 16 units/acre on the 4.1-4.25 acres of upland when converting from commercial to residential use on properties deemed "Consistent by Policy" per the Zoning Re-evaluation Program. 2632 Andrew Drive C-3 (PUDZ): PL20240010093 2632 & 2647 Andrew Drive; 3091 Tamiami Trail E Current Zoning: RMF-6-GTZO-R; C-3-GTZO-MXD Owner: Nicks Restaurant & Houka Lounge, Inc. �e Status: PUD Pre -application meeting held on 9/11/2024. Request to rezone 2632 Andrews Drive and 2647 Andrew xuo srary from RMF-6-GTZO-R to C-3. The property owner also ownsE 11,1311 SF adjacent parcel to the south, 3091 Tamiaimi Trl. East, which is 3, and would like to rezone Andrew Drive properties so that all developed as one project. Seeking to increase residential units developed above a proposed restaurant. COMPANION GMPA- PL20240010942 Naples Workforce Housing Mixed -Use was entered in system on 911712024, then cancelled. Location: Drive the zoned C- can be to be Building Page 3 of 16 Bayshore Gateway Triangle CRA ■Bayshore Beautification MSTU Haldeman Creek MSTU 9. 2076 Airport Rd S (ZLTR): PL20240010768* Location: 2076 Airport Rd S Current Zoning: C-4-GTZO-MXD Owner: Stacks & Racks LLC Ph3 Status: Applicant requested Zoning Verification Letter & staff incomplete submittal letter on 9/13/2024. Applicant submitted additional questions on 11/25/2024. Staff issued Zoning Verification Letter on 1 /14/2025. issued The applicant requests answers to general zoning and - development questions, considering a mixed -use commercial and residential building with commercial use on the first floor and t z residential on the second floor. Staff advised that a 4,000 •• square foot mixed use building is possible on the site; and the maximum eligible density is 12 dwelling units/acre, or 4 units. At least 60 percent of all commercial uses within a mixed -use project must include retail, office, and/or personal service uses to meet the needs of the project and the surrounding residential neighborhoods. 10. Huey Magoos (DR): PL20240009817 Location: 2934 Tamiami Trail E (former Circle K & Shell) Current Zoning: C-4-BZO-NC Owner: NNN TR Inc Status: Pre -application meeting waived based on the previous SDP discussions. First applicant submittal on 9/13/2024.Staff issued first comment letter on 10/14/2024. The applicant seeks deviations from maximum setbacks redevelopment of the existing building into a Huey Required setbacks are 5' minimum & 20' maximum; the is setback 53' from US 41 and 70' from Bayshore Drive. location of the existing building was previously approved SDP #99-014. The Site Plan with Deviations (DR) is decided at a Hearing Examiner hearing. for Magoo's. building The under request Huey Magoos (SDP): PL20230016299 Status: Pre -application meeting held on 11/8/2023. Applicant introduced the project at the 5/7/2024 BGT CRA Advisory Board Meeting. First applicant submittal on 5/31/2024. Staff issued incomplete submittal letter on 6/6/2024. Supplemental documents submitted on 6/19/2024 and 7/14/2024 for First review. Staff issued first comment letter on 8/12/2024. The proposed development includes the demolition of an existing commercial building on 2934 Tamiami Trail East, with the proposed construction of a new —2,650 S.F. restaurant with a drive-thru, parking, and associated drive aisles on a 1.19-acre lot. Page 4 of 16 Bayshore Gateway Triangle CRA -Bayshore Beautification MSTU Haldeman Creek MSTU 12. 3164 Davis BLVD (APR): PL20240005958 Location: 3164 Davis Blvd (Stamper Automotive) Current Zoning: C-5-GTZO-MXD Owner: Brad Thompson- Thompson Davis LLC Status: First applicant submittal on 5/8/2024. Staff issued first comment letter on 6/6/2024 requesting a narrative, justification and detail of parking reduction request. Applicant requests an Administrative Parking Reduction for an repair and sales business Central Auto Center, Inc. l ory. a�vo� 13. 2998 Poplar St -Dock (VA) Va .XF PL20240001262 & 2998 Poplar St -Dock (BD) t PL20240001265 MUM AREA; Location: 2998 Poplar Street Current Zoning: RMF-6-BZO-R1 Owner: Steven Veneziano Jr. (per Appraiser records on 7/3/2024) Status: Pre -application meeting held for companion Variance and Boat Dock Extension on 2/15/2024. First applicant for Boat Dock Extension on 9/12/2024. gpAR A - drawings submitted on 10/28/24. StaffS;,r�E AvaRO% f%IciINIj fRt]iRiy TS%M first comment letter on 11 /21 /2024 with I—EERRVE ,' rejection from County Attorney's OfficeBI indicating that ownership issues remain. Applicant seeks a boat dock extension to proposed 31-foot extension over the 20 feet. See prior plan at top right; • • oacc %•• REFEPElN'PO TO MLW plan at lower right. 14. Bayview Drive Rezone (RZ): PL20230016022 Location: 2643, 2651, 2675 & 2707 Bayview Drive Current Zoning: RSF-4-BZO-R4 Owner: 2643 & 2651 Bayview Dr: Joseph A. Buscemi 2675 Bayview Dr: Jack Hail 2707 Bayview Dr: Bloodmoney R/E Holdings LLC Status: Pre -application meeting held on 11/8/2023. Applicant requests a rezone for four (4) parcels from RSF- R4 to C-4-BZO-W to allow waterfront development in accordance with LDC Section 2.03.07.1. Bayshore Zoning District. Staff advised applicant to submit for a ZVL outlining the applicant's questions before the rezoning can be processed. auto Property submittal Updated issued one allow a allowed updated 4-BZO- Overlay Page 5 of 16 Bayshorc Gateway Triangle CRA •Bayshore Beautification MSTU Haldeman Creek MSTU 15. Mangrove Row (LDBPA): PL20220004927* Location: 2766 Arbutus Street Current Zoning: RMF-6-BZO-R1 Owner: Arbutus Landing LLC Status: Pre -application meeting held 8/3/22. First submittal on 5/25/2023. Staff issued first comment 6/26/2023. Second applicant submittal on 9/18/2023. issued second comment letter on 10/4/2023. Presented CRA AB on 1/11/2024. Third applicant submittal on 3/25/2024. Staff issued third comment letter on 4/9/2024.Fourth applicant submittal on 8/27/2024. Staff fourth comment letter on 10/7/2024 with one comment buffering. Fifth applicant submittal on 11/15/2024. Presented to BGT CRA Advisory Board on 1/9/2025. Examiner date: 02/13/2025. W1. Request for the allocation of two units from the Limited Density Bonus Pool to allow for a multifamily residential development with 8 units at 2766 Arbutus Street. This site is approximately 0.98 acres in size and is in the RMF- 6-BZO-R1 zoning district which allows for six residential units currently. The parcel ID is 81780400004. Decision will be made by Hearing Examiner. Mangrove Row (SDP): PL20220003133 Status: Pre -application meeting held 5/4/22. First applicant submittal on 3/12/2024. Additional documents submitted 3/18/2024. Staff issued first comment letter on 4/16/2024. Second applicant submittal on 8/27/2024.Staff issued second comment letter on 9/30/2024.Third applicant submittal on 11/15/2024. Staff issued third comment letter on 11/26/2024. Request for SDP and Limited Density Bonus Pool Allocation application for a 8-unit townhouse development located on 0.97 acres at 2766 Arbutus Street, Folio 81780400004. Columbia Sussex CPUD (PUDZ): PL20230008099 Location: south side of US 41, between Palm Street and Frederick Street (Parcel Nos. 26880200101, 26880240006, 26880280008, 26880320007, 26880400008, 26880440000, +•�- 26880480002,26880560003) Current Zoning: C-4-GTZO-MXD Owner: T B East Trail LLC sold to CP Naples LLC as of 2/22/2024 NV Status: Pre -application meeting held 5/31/2023. First applicant submittal on 8/10/2023. Staff issued first comment letter on�'; 9/13/2023. Second applicant submittal on 11/27/2023. NIM held on 12/19/2023 at 5:00 pm in the South Regional Library, Meeting Room A (8065 Lely Cultural Pkwy #9005, Naples, FL 34113). Staff issued second comment letter on 1/4/2024. Second NIM held on 2/5/2024 at 5:30 pm at the Botanical Garden FGCU/Buehler Auditorium & presented to BGT CRA AB on 2/8/2024. Third applicant submittal on 3/20/2024. Staff issued third comment letter and signed 2/8/2024 CRA AB meeting minutes on 5/2/2024. Rezone 4.28 acres+/- from C-4/GTMO-MXD to CPUD/GTMO-MXD. The CPUD is intended for a 483-room hotel with maximum zoned height of 124 feet (actual height 139'-6") or 10 stories (seven floors of hotel rooms above three levels of structured parking), including spa and fitness center, restaurant and bar, conference Page 6 of 16 Bayshore Gateway Triangle CRA •Bayshorc Beautification MSTU Haldeman Creek MSTU rooms, ballrooms, a pool deck, and pickle ball. Applicant indicates in third submittal: "the Applicant's architect has undergone a thoughtful redesign... which mitigates any potential adverse impacts on the nearby single-family residential homes... The building has been stepped back away from the residential homes and is oriented towards U.S. 41... the step back has been increased significantly such that is is now 114 feet set back from the property line." Naples Hotel (SDP): PL20240007366* Status: Pre -application meeting held on 7/3/2024.First applicant submittal on 9/9/2024. Applicant submitted additional documents on 10/17/2024. Staff issued first comment letter on 11/21/2024. Second applicant submittal on 01/22/2025. A six -story hotel with 351 keys is proposed with ancillary amenities and parking garage. Offsite improvements include widening Frederick Street from 10- to 11-foot lanes, a right turn lane on Palm Street for access to the development, widening of Palm Street to include an extended northbound approach to Tamiami Trail, and construction of a right turn lane on Tamiami Trail for access to the development. 17. Shadley Property (ZTLR): PL20240007872 Location: Bayshore Drive (surrounded by the CRA 17-acre Current Zoning: C-2BZO-NC and MH-BZO-NC Owner: Clyde O Shadley Trust Applicant: Pacific Horizon Development Corp / Harry Status: Applicant submitted request for Zoning Verification 6/27/2024. Staff issued a letter on 7/9/2024 requesting resubmittal to document the applicant's additional questions conference call on 7/8/2024. See also page 8, Bayshore Dr Single Family Homes (PPL): PL20240009862 & Shadley Property (SDP): PL20240006510 site) Bandinel Letter on per Site is 2.5 acres (roughly 1.5 acres of lake), zoned C-2 / BZO-NC (dry land) which allows mixed use and MH / BZO-NC (lake). Applicant seeks to verify if subdivision of the parcel into 7 fee simple townhome lots is allowed. Proposing 3 story townhomes, approximately 3,000 square feet under air and new turn lane from Bayshore Drive. Page 7 of 16 Bayshore Gateway Triangle CRA -Bayshore Beautification MSTU Haldeman Creek MSTU Development Review Petitions 17. Bayshore Dr Single Family Homes (PPL) Location: Bayshore Drive (surrounded by the CRA Current Zoning: C-2-BZO-NC and MH-BZO-NC Owner: Clyde O Shadley Trust Applicant: Noel J. Davies Status: Pre -application meeting held on 10/01/2024 PL20240009862 17-acre site) See also page 7, Shadley Property (ZLTR): PL20240007872 Applicant proposes five single family homes on 2.5 acres (roughly 1.5 acres of lake). Property is zoned C-2 / BZO-NC (dry land) which allows mixed use and MH / BZO-NC (lake). Action by the Board of County Commissioners would be required to change this access condition in Ord. 92- 43: The property is limited to a single access along the southern boundary abutting the vacated Kelly Court. No additional access points shall be permitted onto Bayshore Drive. Shadley Property (SDP): PL20240006510 Status: Pre -application meeting held on 6/5/2024. See also page 7, Shadley Property (ZLTR): PL20240007872 Applicant proposed 8 detached residential townhomes acres (roughly 1.5 acres of lake). Property is zoned C-2 NC (dry land) which allows mixed use and MH / BZO- (lake). Pre -application notes state that a Zoning Verification Letter is required. The residential use is permitted, but density must be gained through the bonus pool. 18. 844059 Verizon (SDPI) : PL20250000302* Location: 2370 Kirkwood Ave. Current Zoning: C-5-GTZO-MXD Owner: NCWPCS MPL 27 YEAR SITES TOWER HOLDINGS LLC Status: First applicant submittal on 1/09/2025. Request for Insubstantial Change for ground work only, to install Verizon concrete pad and stairs, 60 KW LP generator, propane tank, and HVAC at the existing cell tower site. 19. Windstar on Naples Bay - Fitness Center (SDPA) PL20240013453* on 2.5 / BZO- NC density Page 8 of 16 Bayshore Gateway Triangle CRA ■Bayshore Beautification MSTU Haldeman Creek MSTU Location: 1700 Windstar Blvd • Current Zoning: PUD Owner: Windstar Club, Inc.'"_y Status: Pre -application meeting waived as 11/21/2024. First applicant submittal on 12/5/2024.Staff Issued first comment 1 /09/2025. Request to add a Fitness Center as a story to the existing Cart Barn building at County Club. 20. Harmony Shores (PSP): PL20240009879 & Harmony (PPL):PL20240009881 Location: 5 Bamboo Drive Current Zoning: MH-BZO-R1 Owner: Harmony Shores Venture II LLC Applicant: Toll Brothers Status: Pre -application meeting held on 9/12/2024. r of letter on i I second Windstar Applicant proposes Harmony Shores Preliminary Subdivision Plat and Subdivision Construction Plans and Plat (PPL) for 36 single detached units on 9.4 acres. The scope of the project includes utility, drainage, surface water management infrastructure, landscape, lighting improvements. 21. Install New 500 Gallon Tank (SDPI): PL20240009000 Location: 2600 Davis Blvd. (Sunbelt Rentals) Current Zoning: C-5-GTZO-MXD Owner: Southern Region Dev LLC Status: Applicant submitted on 7/29/2024. Staff issued incomplete letter on 8/1 /2024. Insubstantial Change to install a new 500 gallon above ground for diesel. `x Shores T rT I f CA TAT{ C 22. Metropolitan Naples Marketing Trailer (SIP): PL20240008250 (PSP) to family _ roadway, and l submittal storage tank Page 9 of 16 Bayshore Gateway Triangle CRA ■Bayshore Beautification MSTU Haldeman Creek MSTU Location: 1931 Tamiami Trail E Current Zoning: MPUD-GTZO-MXD Owner: Metropolitan Naples LLC Status: Pre -application meeting held 7/24/2024. Site Improvement Plan for a temporary marketing/leasing trailer Metropolitan Naples. 23. 2947 Peters Ave (SDP): PL20240006717 Location: 2947 Peters Ave Current Zoning: C-3-GTZO-MXD Owner: Cal -German Inc. Status: Pre -application meeting held on 6/13/2024. ~}' �4 4k'A56L4P a . -•4 - �1 � 'PROJECT LOCATION. ` Applicant proposes a 4,500-sf car storage building for 4 private auto storage units with upstairs loft/lounge/offices on 0.32 acres zoned C- 3/GTZO-MXD. Pre-app notes state this is considered to be Warehouse/Mini-Storage and will require a rezone from C-3 to C-5 to allow Mini -Storage use on the site. 24. Snappy Car Wash (DR): PL20240003066* Location: 3300 Davis Blvd. Current Zoning:C-4-GTZO-MXD Owner: RKDavis Real Est Holdings LLC C/O Michael Duffy Status: Pre -application meeting waived. First applicant on 3/8/2024. First staff review letter issued on 4/25/2024. applicant submittal on 7/5/2024. Staff issued second comment 8/5/2024.Third applicant submittal on 11/14/2024. Applicant submitted revised letter, deviations narrative, and site plan on 12/06/2024. Hearing Examiner scheduled for 2/13/2025. Deviation requested to reduce north from 10' to 5' wide and reduce from (348 SF) (408 SF) row with trees 30 on center to no row with trees 60' on center to accommodate pedestrian path ramp through Davis Blvd. buffer. Compensating buffer area is proposed along the entry drive be made by Hearing Examiner. for submittal Second letter on hearing buffer a hedge hedge and Final decision will Snappy Car Wash (SDP): PL20220001088* Status: Pre -application meeting held on 3/15/2022. First applicant submittal on 9/8/2023. Staff issued first comment letter on 10/12/2023. Second applicant submittal on 7/1/2024. Staff issued second comment letter on 7/29/2024. Third applicant submittal on 12/04/2024. Staff issued third comment letter on 1/02/2025. Applicant seeks to redevelop former Joey D's as a 4,400 square foot car wash facility. Page 10 of 16 Bayshore Gateway Triangle CRA •Bayshorc Beautification MSTU Haldeman Creek MSTU 25. Justin's Village MF (SDP): PL20230013521 Location: 3163 Justins Way (off Calusa Ave) Current Zoning: RMF-12-GTZO Owner: SMH PROPERTIES OF SWFL INC (St. Matthew's House) Status: Pre -application meeting held on 8/24/2023. Construction of multi -family units per approved zoning Ordinance allowing up to 28 units on 2.33 acres. Justin's Village Replat (FP): PL20240007734 Status: Pre -application meeting held on 7/30/2024. Applicant requests a Replat of Justin's Village to support the Multifamily SDP. 2023-21, 26. 9 South (fka Shadowlawn Drive Multi -Family Development) (SDP): PL20220005562* Location: 1795 Shadowlawn Drive � — Current Zoning: RMF-6-GTZO-R Owner: Paradise Coast Development, LLC Status: Pre -application meeting held on 9/13/2022. First submittal on 6/15/2023. Staff issued first comment letter on 8/4/2023. Second applicant submittal on 1/29/2024. Staff second comment letter on 2/20/2024. Third applicant on 5/3/2024. Staff issued third comment letter on 5/31/2024. applicant submittal on 8/8/2024. Staff issued fourth comment 9/4/2024. Applicant proposes a 9-unit multi -family development at 1795 Shadowlawn Dr along with associated utility connections, a stormwater system, a parking lot, landscaping & site lighting. Shadowlawn Drive Multi -Family (LDBPA): PL20230013981* Status: Pre -application meeting held on 9/19/2023. First submittal on 3/19/2024. Application fee paid on 4/29/2024. issued first comment letter on 5/22/2024. Second applicant submittal on be scheduled. applicant issued submittal Fourth letter on applicant Staff 12/17/2024.Hearing Examiner date to Request for 2 units from the Density Bonis Pool. The property is made up of three lots with a total area of 1.15 acres and will include two (2) new 3-story buildings (13,675 & 17,250 S.F.), a parking lot, and associated site improvements. The first floor will have parking lots with an elevator and stairs per building. The second and third floors will be the 9 proposed units. Final decision will be made by Hearing Examiner. 1795 Shadowlawn Drive Administrative Parking Reduction (APR): PL20240004639 Status: First applicant submittal on 4/9/2024. Staff issued APR approval on 5/14/2024. Request to reduce the required parking for the pool from 3.5 spaces to 0 spaces. Staff found that LDC 4.02.16.E requires 2 spaces for each unit in a multifamily building with 3 or more bedrooms. Nine units & 20 parking spaces are proposed. LDC 4.02.16.E does not require additional parking for recreational areas of multi- family buildings. Since the pool and pickleball courts are for residential use only and parking is not required for the pool and courts, parking for the pool and courts may be reduced to zero. Page 11 of 16 Bayshore Gateway Triangle CRA ■Bayshore Beautification MSTU Haldeman Creek MSTU Final Actions/Letters Issued 19. Windstar on Naples Bay — Temporary Facilities (SIP) : PL20240013181* Status: Pre -application meeting waived as of 11/21/2024. First applicant submittal on 11/22/2024. Application approved on 1/07/2025. Request to modify temporary facilities approved for -- clubhouse under PL20220002398, including removal `fix + ' �_.• 'h. I-- TRAILER restroom trailer and a new temporary office trailer. _ - '' FFWON vo �! WME TRAILER k {{ FFE=J.O HAY[l . - .. A .Wuff4rfe 27. 3010 Tamiami TO E (MUP): PL20220006931* --- Location: 3010 Tamiami Trail E. Current Zoning:C-3-GTZO-MXD Owner: D&D Retirement Trust, LLC Status: Pre-app meeting held 11/22/2022. First applicant ' l' submittal on 1/23/2023. First staff review letter issued on 3/6/2023. Second applicant submittal on 5/22/2023. Second staff letter issued on 6/27/2023. NIM held on 7/25/2023. Third applicant submittal on 10/27/2023. Third staff review letter issued 12/5/2023. Presented to BGT CRA AB on 1/11/2024. Fourth applicant submittal on 1/23/2024. Staff reviews finalized as of 3/22/2024. Second NIM held on 9/05/2024. Planning Commission recommended approval on 11/21/2024. Board of County Commissioners approved on 1/14/2025. Windstar of the review on Application for a Mixed -Use Project (MUP). The 0.6-acre parcel is zoned C-3-GTZO-MXD and is in an Activity Center. The pre-existing building (former Pizza Hut) is now commercial office space. Applicant seeks 7 dwelling units with commercial space at ground level and 4 stories of residential, with roof level amenities. Requires 7 units from the density bonus pool. Page 12 of 16 Bayshore Gateway Triangle CRA •Bayshorc Beautification MSTU Haldeman Creek MSTU 28. Pine Street Storage Warehouse (SDPI) : PL20240013197 Location: 2447 Pine St Current Zoning: C-4-GTZO-MXD Owner: 2447 Pine St Condominium Association, LLC. Status: First applicant submittal on 11/19/2024. Approval letter issued on 12/20/2024. This project was recently permitted under SDPA PL20210001598 and constructed and completed. One of the tenants wishes to perform a improvement to add a 591-sf mezzanine to one of the units within the 14,513-sf storage warehouse. This modification increases the building's square footage to 15,104 sf. 29. KRB Naples (SDP): PL20220003647 Location: 3230 Tamiami Trail E. (at Peters Ave.) Current Zoning: C-3-GTZO-MXD Owner: 3230 Tamiami LLC Status: Pre -application meeting held on 6/16/2022. Incomplete applicant submittal on 11/4/2022. Applicant submitted additional materials on 11/11 and 11/17/2022. Staff issued comment letter 12/9/2022. Applicant submitted additional material on 5/12/2023. Applicant second submittal on 6/7/2023. Staff issued second comment letter on 7/5/2023. Applicant third submittal on 12/11/2023. Staff issued third comment letter on 1/9/2024. Fourth applicant submittal on 3/21/2024. Staff issued fourth comment 4/17/2024. Fifth applicant submittal on 10/21/2024.Staff issued comment letter on 11/20/2024 with one comment to submit the review fee; fee paid by applicant on 11/26/2024. Approval letter on 12/05/2024. KRB (Kelley's Roast Beef) Naples requests construction of two restaurants & applicable parking. Request changed to construct #1, Restaurant: 3,609 SF; Building #2, Storage/Warehouse: SF. Total Building #1 + Building #2 = 11,049 SF 30. 3117 Areca Ave (ZLTR): PL20240012044 Location: 3117 Areca Ave Current Zoning: RMF-6-BZO-R1 Owner: Blessed In Naples LLC'' Status: Applicant requested Zoning Verification on 10/23/2024. Staff issued Zoning Verification on 11 /20/24. i has been tenant existing total on letter on fifth TIS issued Building 7,540 Letter Letter The applicant inquired about single family or multi -family development potential. Staff's letter states that RMF-6 and BZO-R1 zoning allow for both single family and multi -family dwellings, however, the property's lot width and lot area are substandard for a multi -family dwelling. Based on the district's design standards, staff determined that this property does not meet the minimum requirements for a multi -family dwelling and can only be developed as a single-family. Page 13 of 16 Bayshorc Gateway Triangle CRA •Bayshore Beautification MSTU Haldeman Creek MSTU 31. Gulf Gate Plaza (ZLTR): PL20240012728* Location: 2900 Tamiami Trl E Current Zoning: C-4-GTZO-MXD Owner: GULF GATE PLAZA, LLC Status: Applicant requested Zoning Verification Letter on 11/12/2024. Zonina Verification letter issued on 12/13/2024. The applicant requested verification that multi -family over commercial would be allowed on this parcel, zoned C-4 and GTZO overlay, and requested information on maximum multi -family density and commercial intensity. Staff advised that u f mixed use projects are allowed; LDC 4.02.16.C.8.j states that a mix of uses are required so that any one use (residential or nonresidential) does not exceed 80 percent of the gross building square footage; and maximum density is 12 units per acre. 32. Naples Project (ZLTR): PL20240011722 Location: 3064 Davis Blvd (Body Shop of Naples) Current Zoning: C-5-GTZO-MXD Owner: 3064 Davis Blvd LLC Status: Applicant requested Zoning Verification Letter 10/10/2024.Zoning Verification Letter issued on 11 /7/2024. The applicant is Bock & Clark Corporation, an NV5 Company, seeking general zoning verification and any variance, certificates of occupancy, and approved site applicable to the property at 3064 Davis Blvd. 33. 2180 Kirkwood Ave (ZLTR): PL20240010470 Location: 2180 Kirkwood Ave Current Zoning: C-5-GTZO-MXD Owner: 2190-80 Kirkwood Ave LLC. Status: Applicant requested Zoning Verification Letter on 9/5/2024. Zoning Verification letter issued on 10/8/2024. The applicant requests verification that the site will allow rental, detailing and minor repairs for a Street Legal Golf Cart (Low Vehicle) Rental Company (www.ZoomAround.com). Staff determined that a Streetlegal Golf Cart Rental Company that delivery/pickup, detailing, and minor repairs on the subject is not a permitted use and would require a conditional use application. 34. Linwood Shop (SDP): PL20230015697 on history of plans cleaning, Speed offers property Page 14 of 16 �km Bayshore Gateway Triangle CRA -Bayshore Beautification MSTU Haldeman Creek MSTU Location: 2365 Linwood Avenue T` Current Zoning: C-5-GTZO-MXD Owner: JR Descendants' Trust a '' Status: Pre -application meeting held on 10/24/2023. First ` applicant submittal on 3/12/2024. First staff review letter issued on y 4/11/2024. Second applicant submittal on 5/19/2024. Second staff review letter issued on 6/17/2024. Second applicant submittal on r 7/5/2024. Third staff review letter issued on 7/31/2024. Fourth applicant submittal on 9/4/2024.SDP Approval letter issued on 10/8/2024. The existing 5,000 sf storage building and parking lot will be demolished. The project will consist of approximately 8,000 SF of F I IL F ; ' storage space for the property owner's private automobile collection. The project is gated and not open to the public. WSA Bayshore Hotel (SDP): PL20200001971 Location: Bayshore Drive south of Lunar Street (Parcel Nos. 53353320002, 53353360004, 53353400003) Current Zoning:C-4-BZO-NC Owner: BBH Group, LLC Status: Pre -application meeting held on 10/20/2020. Applicant first submittal on 9/22/2021. Staff issued incomplete submittal letter on 9/23/2021. Additional materials submitted 10/8/2021. Staff issued first review comment letter on 11/5/2021. Applicant second submittal on 7/7/2022. Staff issued second incomplete submittal letter on 7/7/2022. Additional materials submitted 8/8/2022. Staff issued second review comment letter on 8/9/2022. Applicant third submittal on 3/14/2023. Staff issued third review comment letter on 4/6/2023. Applicant fourth submittal on 5/17/2024. Staff issued incomplete letter on 5/17/2024. Additional materials submitted on 6/11/2024. Staff issued fourth review comment letter on 7/5/2024. Applicant's fifth submittal on 8/2/2024. Deviation approval issued on 9/13/2024. SDP Approval letter issued on 9/17/2024.771 23-room four story 'boutique hotel', with accessory amenities for guests including floor lobby cafe and rooftop pool/outdoor area. In the May 17, 2024 submittal it is that the project has a new architect, MHK Architecture. Three deviations were approved: (1) to the right turn lane at the project entrance Bayshore Drive; (2) to waive the compensating Right of Way that would be for a right turn lane; and (3) to reduce the throat length from 50 feet to 30 feet. ground dining noted waive along required driveway Page 15 of 16 *4, g Fit"—ple ,k 7, 60d DriI id L 1*1A 7ok Y -Js� #I tt In 4. Ai iLee-Stjt t jw Im * � It, 1 — kit A , k. n J 7- efferson Ms ,Ave 71 leake%� IF k ioniiA� J, 4L Mox Av'e,l ILwit See.,-,-9 ot ft, e _1 -.xi4 ARK Y 7V.r A V 11 LL iz" 11.�rkMi L 17".' . -nd*e 'r rw- ■La 11 t 'to W, W41 L - 'I, L , — 11—K A . Week Av.-,- 1 Tm- Av' 7. 10 OW XI 0 .4 VOW g -y' e Bre­.,.­ .,L ayview-Dr, "Ic ".QX 40111R."A _4 i �gZ * f OR qulfvieW)l jar 4t1Aw. A7, �,S=, �j "ve'r 0A N, —1 4 a r�!, 4�t A v 'e`7 t R, t e Ai e f val�u ir:e�­.y 117 k Y4, 4 V,,,,,Ui.da D1 i It Z,4c,!pj*p Wk5li j"Niaw Y '4 "ofrMeM Mr! m *r ed nr , 44/1 Su Ls e,,A g VTW 1=tA x At -4, , Gw� AL 1516 7v, p G '�D qrd St7� Aloe, Stt w, aw %11 JOHNS 151V.iLs.Bl� ,r6,itY Way �Q r C M� Nor 9 ,:.. i _�%t '- -P T =ta`tcwu`cF1C7V�" erl� �7e't'i 11te*4 n.0 7, .7Li,n F'r ye Glades Blvd 51 _ j� �4 Walkeol,n` C�Ie'dor�ia- ve 'Uaaixllve Irito, gree, IM Way _dot A Rid 14 S �Te,yl-Rd 7­1 If CIII Jf 6t I., all! ,7 1,77 LIZ" A 4". Wtiel la,taon,Way� % Ve 'Ln cl EIg 11, lid r!nl. U !Jr• G-—I f �.rd,.'Rd w 1, I !Ofj�V_r . - ` �r V ji. I4A Wilk I Aj C� ..7'Bbtlinicill'PleFe"Cif, ,40 T 0 2,q R-ose Av_1 E.. ,pl,@r AA E P� 0 % Q 41 !T! wt K6-ftfa'ss( IT611r " in LrU" L JC�MtQge.,Grplg,A�Y`e 2 Jiz wA M. ' n -DA t;EW1bd , 41 Pn C.tv MD�ra ni I_D all. 41* Pine Tree Mr, noon N-11 We e� ®rovoe - to,�� FILE No. SCALE - I — Bayshore Gateway Triangle CRA .Bayshore Beautification MSTU Haldeman Creek MSTU MEMORANDUM TO: BBMSTU and CRA ADVISORY BOARD VIA: JOHN DUNNUCK, CRA DIRECTOR FROM: TAMI SCOTT, PROJECT MANAGER SUBJECT: CURRENT PROJECTS Item 8a- Attachment 6 DATE: FEBRUARY 6, 2025 Tami Scott - Project Manager Bayshore CRA and MSTU Cell 239-778-6598 • Miscellaneous Maintenance and Landscaping o New planting at roundabout has been completed o New planting at Thomasson Drive medians has been completed. o New planting at CRA Parking lot medians has been completed. o New planting at Del's pocket park has been partially completed. • Your Speed is Signs o Staff is still working on getting a vender to install the signs. Staff is reviewing a new proposal from a Miami firm, total cost $45,000. • Crosswalk Study o Staff met with Akins Engineering, we are awaiting a proposal for two Crosswalk studies, one for Bayshore Drive and one for Shadowlawn. Stakeholders will participate in the studies once the proposal is received and reviewed. • Halderman creek survey o Staff is waiting on the final proposal from Humiston and Moore to proceed with the survey. • 17 Acres Boardwalk Project o Construction kickoff meeting: January 10, 2025 o Exotic vegetation removal has started we anticipate this will take approximately 6 weeks o Groundbreaking ceremony schedule for February 6, 2025 Offices: 3299 Tamiami Trail, Unit 103, Naples, Florida 34112 Phone: 239-252-8844 Online: www.BGTCRA.com Memorandum Bayshore Gateway Triangle CRA . Bayshore Beautification MSTU Haldeman Creek MSTU To: BGTCRA Local Redevelopment Advisory Board From: Shirley Garcia, CRA/MSTU Manager Subject: Projects Report Update Date: February 6, 2025 Updates: 1. The property purchase for 2695 Francis Ave has a closing date of 2/13/25. All documents have been signed and approved. Staff will do a walk-through inspection of the property on 2/10/25. 2. Solar Street Light has been installed on Commercial Drive as requested by the community as of 1/31/25, staff will continue to monitor the pilot project. 3. Annual Report Draft- Requesting Board feedback no later than close of business February 10' 4. CDBG Grant Application is being submitted to purchase property on Pineland Ave contiguous lots to CRA owned Francis Ave property. Funds are available and this will require purchase prior to July 1 st. The property will be used as a passive park for 5 years and Stormwater infrastructure soon thereafter. This is consistent with the Redevelopment Goals 5.3.3 and the boards priority list. 5. Shadowlawn Corridor/Gateway Triangle Masterplan RFP in process Memorandum Bayshore Gateway Triangle CRA . Bayshore Beautification MSTU Haldeman Creek MSTU To: BGTCRA Local Redevelopment Advisory Board From: Shirley Garcia, CRA/MSTU Manager Subject: Projects Report Update Date: February 6, 2025 Updates: Item 8b-Attachment 7 1. The property purchase for 2695 Francis Ave has a closing date of 2/13/25. All documents have been signed and approved. Staff will do a walk-through inspection of the property on 2/10/25. 2. Solar Street Light has been installed on Commercial Drive as requested by the community as of 1/31/25, staff will continue to monitor the pilot project. 3. Annual Report Draft- Requesting Board feedback no later than close of business February 10' 4. CDBG Grant Application is being submitted to purchase property on Pineland Ave contiguous lots to CRA owned Francis Ave property. Funds are available and this will require purchase prior to July 1 st. The property will be used as a passive park for 5 years and Stormwater infrastructure soon thereafter. This is consistent with the Redevelopment Goals 5.3.3 and the boards priority list. 5. Shadowlawn Corridor/Gateway Triangle Masterplan RFP in process Advisory Board Application Form Collier County Government 3299 Tamiami Trail East, Suite 800 Naples, FL 34112 (239) 252-8400 Item 9a-Attachment 8 Application was received on: 01/15/2025 07:57:55 PM Name: Ronald a Fowle Jr Email Address: ronkeyf@aol.com Home Address: 151 San Salvador st. City/Zip Code: Naples, 34113 Primary Phone: 239-564-1116 Secondary Phone: 239-774-4400 Board or Committee: Bayshore/Gateway Triangle Local Redevelopment Advisory Board Category (if Applicable): 41 Business owner Place of Employment? Naples car wash Do you or your employer do business with the County? Yes Explain: Car washing & detailing How many years have you lived in Collier County? More than 15 Home many months out of the year do you reside in Collier County? I am a year-round resident Have you been convicted or found guilty of a criminal offense (any level felony or first degree misdemeanor only)? No Would you and/or any organizations with which you are affiliated benefit from decisions or recommendations made by this advisory board? No Are you a registered voter in Collier County? Yes Do you currently hold an elected office? No Do you now serve, or have you ever served on a Collier County board or committee? No Please list your community activities and positions held: Education: Experience / Background: 1/15/25, 12:58 PM Collier Now Work to begin on boardwalk connection project BAYSHORE- SUGDEN PARK Item 10c.ii - Attachment 10 By Aisling Swift A long -anticipated boardwalk that will connect Bayshore Drive with Sugden Regional Park received the goahead to begin construction this year. The Board of County Commissioners last month unanimously approved awarding a $3.33 million contract to Fort Myers -based Infinite Construction LLC, as well as an allowance of $37,000 for unforeseen site and other problems. All funds will come from the Bayshore Community Redevelopment Agency through taxes paid by property owners there. Construction is expected to take 12 months and could be completed by March 2026. "The boardwalk ... is expected to become a fantastic recreational destination that will create safe and attractive pedestrian and bicycle linkages, facilitate community events, invite additional desirable redevelopment activity and allow more citizens to better access the park," Tami Scott, the Bayshore CRA project manager, told commissioners in a written summary. Bayshore is the county's up-andcoming arts -centric neighborhood. In 2022, Bayshore Drive won the Florida chapter of the American Planning Association's "Great Places in Florida People's Choice Award." The association cited its bike lanes, pedestrian walks and beautification amenities, as well as its "sense of place, cultural and historical interest, community involvement and a vision for tomorrow." The boardwalk will be the latest improvement in a once run-down area improved by the Bayshore CRA, the Municipal Service Taxing Unit Beautification Committee, local artists, store owners and residents. In 2006, six years after the Bayshore CRA was formed, it purchased the 17-acre property — about 10 acres of which is water — for $4.6 million, and began plans for a cultural arts center in 2010, but that part of the plan was put on hold. In May 2023, commissioners asked Naples -based Stantec Consulting Services Inc. to complete the boardwalk design. The project was put out to bid last July and Infinite Construction, the lowest bidder, was selected over three others. A 15-foot hardscaped, lighted pathway, with benches and decorative trash cans, will be at the center of the property. A 400-foot promenade will turn into an elevated 1,350foot boardwalk that meanders through wetlands and uplands before connecting with Sugden Park. The pedestrian -only pathway will allow bicycles but no vehicles, except an emergency vehicle, if necessary. The CRA and MSTU partnered with Naples Botanical Garden, which selected easy -to -maintain landscaping and native plantings. There also will be osprey poles and lookout and fishing areas, but no kayak launch because the water would only allow kayaks to go in circles. However, the boardwalk will be elevated so kayaks can go underneath. about:blank 1/2 1/15/25, 12:58 PM Collier Now The boardwalk is intended to be an amenity for the neighboring community because there's no extra parking. It will be open from dawn to dusk; the entrance and exit will be controlled by gates. Maintenance will be handled by the MSTU Beautification Committee. BOARDWALK from page A3 to A4 Copyright (c) 2025 Naples Press, Edition 1/10/2025 Powered by TECNAVIA Friday, 01/10/2025 Page .A03 Copyright (c) 2025 Naples Press, Edition 1/10/2025 about:blank 2/2 Item 10c.iii- Attachment 11 RICHARD A SCHULZE FAMILY FOUNDATION 2025 Requirements Richard M. Schulze Family Foundation College Scholarship Program The Schulze Family Foundation is committed to providing assistance to students from middle -income families who do not receive federal grant assistance. We welcome applications from graduating high school seniors with strong academic records who have distinguished themselves within their school, community and/or house of worship. In Collier County, up to fifteen (15) scholarships of $5,000 per year will be awarded to students for four consecutive years of full-time college enrollment with satisfactory academic performance at a four-year accredited college or university. This year's scholarship application will be open from January 6, 2025 to April 1, 2025 and can be found online at SchulzeFamilyFoundation.or To be considered for the Schulze Familv Foundation Colleue Scholarship, applicants must: ❑ Be a U.S. citizen who will be a 2025 graduate of one of the following Collier County high schools: Florida Aubrey Rogers High School Golden Gate High School Mason Classical Academy Barron Collier High School Gulf Coast High School Naples High School Community School of Naples Immokalee High School Palmetto Ridge High School Donahue Academy Lely High School Seacrest Country Day School Everglades City School Lorenzo Walker Technical High School St. John Neumann Catholic High School First Baptist Academy Marco Island Academy The Village School of Naples ❑ Have a minimum of a 3.0 unweighted cumulative GPA (on a 4.0 scale) ❑ Show unmet financial need through the Free Application for Federal Student Aid (FAFSA) ❑ Not be receiving need -based federal grant assistance (Pell) All items listed below will need to be uploaded by 11:59pm EST on April 1, 2025 to be considered.. ❑ Two letters of recommendation • Must be from high school teachers/staff ❑ An official high school transcript directly from the high school (include fall grades) ❑ Resume of achievement, leadership and activities within your school, community and/or house of worshi . ❑ An essay in 500 words or less • Mr. Schulze believes the skills he learned as a young newspaper delivery boy helped him both personally and as founder of Best Buy. Tell us about an experience in your own life (positive or negative) that taught you a lifelong lesson that you carry with you today. ❑ A copy of your Financial Aid Notification of Award • From your college of choice or colleges you are considering FL students contact: Ana DiMercurio, Senior Program Officer, amdimercurio@schulzefamilyfoundation.org, 239-451-3033 Schulze Family Foundation College Scholarship RICHARD A Frequently Asked Questions i SCHULZE FAMILY FOUNDAI10N Who is Richard M. Schulze? Richard M. "Dick" Schulze, the founder of The Richard M. Schulze Family Foundation, is also founder and chairman emeritus of Best Buy Co., Inc., the world's largest multi -channel, consumer -electronic retailer. Born and raised in St. Paul, Minnesota, Schulze is the ultimate entrepreneur and is living the American dream. From a modest background, he and a hand-picked team built a retail empire based in the Twin Cities. Through it all, he adhered to his life-long values of integrity, humility, honesty, and respect — both in his professional career and his personal life. In years to come, Schulze hopes to be remembered by a personal legacy involving three major contributions through business, entrepreneurship education and philanthropy. To read more about Mr. Schulze go to SchulzeFamilyFoundation.org and click on Our Founder. Who should apply? Schulze Family Foundation College Scholarships are awarded from a competitive applicant pool of high school seniors from middle income families who are U. S. citizens, attend one of the eligible high schools, show unmet financial need and do not receive federal grant assistance (Pell Grant). Where will I find the application? The Schulze Family Foundation College Scholarship application is online at SchulzeFamilyFoundation. Which high schools are eligible? Florida- Aubrey Rogers H.S., Barron Collier H.S., Community School of Naples, Donahue Academy, Everglades City School, First Baptist Academy, Golden Gate H.S., Gulf Coast H.S., Immokalee H.S., Lely H.S., Lorenzo Walker Technical H.S., Marco Island Academy, Mason Classical Academy, Naples H.S., Palmetto Ridge H.S., Seacrest Country Day School, St. John Neumann Catholic H.S., The Village School of Naples May I apply if I have permanent resident status? This scholarship requires the recipients to be U.S. citizens. Is there a GPA requirement? You must have a minimum cumulative unweighted GPA of 3.0 (on a 4.0 scale) and it must be submitted on an official high school transcript that includes senior fall grades. Do I need to submit a standardized test score? No, there is no ACT/SAT requirement for the 2025-2026 application. What is the value of the scholarship? A Schulze Family Foundation College Scholarship is $5000 per year for four consecutive years of full-time enrollment with satisfactory academic progress at a four-year accredited college or university. How many scholarships will be awarded? Each year, up to 15 Schulze Family Foundation College Scholarships are awarded to graduates from eligible high schools in Collier County. How do you determine if I have unmet need? You must file the Free Application for Federal Student Aid (FAFSA) and have the results sent to the college(s) you are considering. After your FAFSA is processed, you will receive a FAFSA Submission Summary which will have information that you will need to complete your application. In addition, you will need to upload the Financial Aid Notification of Award that you receive from your chosen college or colleges you are considering. Who should write my recommendation letters? Choose teachers, counselors or other adults in your life who know you and can speak to your strengths, your weaknesses, and the impact you have had on those around you. When you complete the application, it will ask for the name and email address of your recommender and provide a way to email your request for a recommendation letter from our system. Have the name and email of your selected recommenders with you when you complete the application. Remember that your two recommendations must be submitted by your high school teachers/counselors/staff. How should I submit my application? The Schulze Family Foundation College Scholarship application is online at Schulze FamilVFoundation.org. You will be asked to "create new account" by providing your email address and a password. Use an email address that you will check often and make a note of your password, so you can access your account later. What if I forget my password? You may click on "forgot your password" and you will receive an email to reset your password. May I use the "back" button to return to a previous page within the application? No. The back button will delete the information you have entered. Use the "previous step" to go back. May I start the application and come back to it later? Yes. Our system will let you save your application and return to it later. How does my high school know where to send my official transcript? When you enter the name and email address of the school official who will send your transcript, our system will instruct you to add your name to text that is provided. This email will be your official request of the school official and inform them that an email will come from our system with a link for them to submit your official high school transcript. How do my recommenders know how to upload their letters? When you enter the name and email of each of your recommenders, our system will instruct you to add your name to text that is provided. This email will be your official request of your recommender and inform them that an email will come from our system with a link for them to submit your recommendation. What if my recommenders do not want to upload their letter and would rather send you a copy? FL students can have their recommenders email a copy to amdimercurio@schulzefamilyfoundation.org or send a paper copy to Ana DiMercurio, Schulze Family Foundation, 999 Vanderbilt Beach Road, Suite 710, Naples, FL 34108. Are all the scholarship materials due by April 1, 2025? YES. Everything must be submitted by 11:59 EST on April 1, 2025. It is in your best interest to file your FAFSA and complete the financial aid process as soon as possible to receive full consideration. We understand that you are not in control of the financial aid process. If you do not have your financial aid notification(s) of award by April 1, 2025, please contact us directly. Are the awards made by May 1? Not necessarily. Awarding a scholarship that is need based requires financial aid information from the colleges as part of the application. This information may delay the awarding of some of the scholarships. Do you have any advice for me? 1. Take this process seriously. You have one opportunity to share your story with the scholarship committee. At the very least, we expect to see good grammar, punctuation, a solid resume, and a well -developed essay. 2. Do not wait until the last minute. Use your project management skills to create a timeline and stick to it. 3. If you invest a few hours of your time, you could receive $20,000. That is an incredible return on investment. What if I have questions? Florida students contact: Ana DiMercurio, Senior Program Officer, 239-451-3033, amdimercurio@schulzefamilyfoundation.org Item 10c.iv- Attachment 12 SAFE 2025 Child Passenger Safety/Car Seat MODS Assistance in Southwest Florida SOUTHWEST FLORIDA Safe Kids SWFL is committed to serving our communities in Child Passenger Safety as well as supporting our Child Passenger Safety Technicians across Southwest, Florida. We have frequent car seat checkup events across our five -county region (Hendry, Glades, Collier, Charlotte and Lee). In -person appointments can be scheduled by calling locations near you (below) and a *new*, convenient, no cost "virtual" appointment can be made at https://carseateducation.org/caregiver-resources (or scan QR Code) (with virtual appointment, in -patient, prior to discharge and donated car seat, provide discharge nurse with technician name and tech number - supplied at time of appointment) W: la Agencies that have Certified Child Passenger Safety Technicians: " "''`.'",IRE UW CALL TO BOOK AN APPOINTMENT WITH A CHILD PASSANGER SAFETY TECHNICIAN TO GET PERSONALIZED CAR SEAT EDUCATION AND/OR AN INSPECTION LEE COUNTY • Golisano Children's Hospital CPS Program - 239-343-5101 • South Trail Fire Department - 239-936-5281 1 • Lehigh Acres Fire Department - 239-303-5300 • Bonita Springs Fire Department - 239-949-6200 TECH TUESDAY -1ST/3RD TUESDAY OF THE MONTH 9AM - 11AM • North Fort Myers Fire Department — 239-997-8654 CALL FOR APPOINTMENT 239-343- • San Carlos Park Fire Department - 239-267-7525 5101 • Matlacha/Pine Island Fire Control District - 239-283- GOLISANO CHILDREN'S, FORT 0030 MYERS, EMERGENCY CHARLOTTE COUNTY DEPARTMENT PARKING LOT • Port Charlotte Health Department - 941-624-7200 COLLIER COUNTY Checkup Event • Collier County EMS - 239-252-3740 • Collier County Sheriff's Office - 239-252-9300 CAPE CORAL FIRE DEPARTMENT LAST SATURDAY OF EACH MONTH • Twinkle Twinkle Little Store - 239-262-5904 9AM - 11AM • Greater Naples Fire Rescue - 239-774-2800 CALL FOR APPOINTMENT AND HENDRY and GLADES COUNTY LOCATION OF THE MONTH • Hendry County Public Safety - 863-517-1081 239-343-5101 • Health Planning Council - Early Steps - 239-322-9723 JN Revised: 1/23/2025 Naples P ier Rebuild CITY OF NAPLES PUBLIC WORKS Timeline September 2022 - Hurricar April 2023 - Award of Desic Contract to THA/MHK October 2024 - Award of Construction Contract to Shoreline Foundation, Inc. Construction Schedule Begins after USACE Permit and FEMA Approval Overall 18 months Demolition 4-6 months Bayview Park Contractor removes pier debris Place on barge, take to Bayview Park, and then remove to landfill. No debris will be stacked on site. Use of Bayview only required for demolition portion of the Pier work. 4-6 months depending on difficulty Most of area will remain open. Use of the boat ramp will be maintained. Limited daily and weekly operation. Estimated use would be 2 days per week. Am D3nicrd 5i