Loading...
Backup Documents 01/28/2025 Item #16G 1 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO f 6 G 1 THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. ** ROUTING SLIP** Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing_lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. (Enter your Dept here) 3. County Attorney Office County Attorney Office > 1V a� 1 4. BCC Office Board of County 35 en by MB Commissioners [s] 2/ 3/25 5. Minutes and Records Clerk of Court's Office A .7/31,3)S— PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above may need to contact staff for additional or missing information. Name of Primary Staff Madison Bird Phone Number 2939 Contact/Department Agenda Date Item was Agenda Item Number Approved by the BCC 1/23(25 g 16 6 Type of Document(s) Number of Original Attached ON atDocuments Attached PO number or account LJ number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's signature?(stamped unless otherwise stated) MB 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information (Name;Agency;Address; Phone)on an attached sheet. 3. Original document has been signed/initialed for legality. (All documents to be signed by MB the Chairman, with the exception of most letters,must be reviewed and signed by the Office of the County Attorney.) 4. All handwritten strike-through and revisions have been initialed by the County Attorney MB Office and all other parties except the BCC Chairman and the Clerk to the Board. 5. The Chairman's signature line date has been entered as the date of BCC approval of the MB document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's MB signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip N/A should be provided to the County Attorney Office at the time the item is uploaded to the agenda. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullifie . Be aware of your deadlines! 8. The document was approved by the BCC on y$ and all changes made during I N/A is not the meeting have been incorporated in the attar ed document. The County Attorney Vfr"7 an option for Office has reviewed the changes, if applicable. this line. 9. Initials of attorney verifying that the attached document is the version approved by the r_ N/A is not BCC,all changes directed by the BCC have been made,and the document is ready for the 5r' P►', an option for Chairman's signature. /� his.lit)e, I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04;Revised 1.26.05;2.24.05; 11/30/12;4/22/16;9/10/21 1 6 G 1 Col[terCounty Procurement Services Change Order Form Contract# 23-8120 CO# 2 PO# 4500229417 Project#: 33822 Project Name: Bulk Aircraft Hangar at Marco Island Executive Airport Contractor/Consultant Name: DEC Contracting Group, Inc. Select One:❑Q Contract Modification(Construction or Project Specific) ❑Work Order Modification Project Manager Name: Brad Beadles Division Name: OPMD / Airport Authority Original Contract/Work Order Amount $3.063,009.41 10/10/2023 Item#16G1 Original BCC Approval Date;Agenda Item# Current BCC Approved Amount $3.063,009.41 10/10/2023 Item#16G' Last BCC Approval Date;Agenda Item# Current Contract/Work Order Amount $3.063,009.41 7/18/2o2s SAP Contract Expiration Date(MASTER) Dollar Amount of this Change $o.00 o.00% Total%Change from Original Amount Revised Contract/Work Order Total $3,063,009.41 0.00% %Change from Current BCC Approved Amount Total Cumulative Changes $o.00 o.0o% %Change from Current Amount Notice to Proceed 1/29/2024 Original NTP 366 Original Final 1/29/2025 Last Final 7/28/2025 Date #of Days Completion Date Approved Date #of Days Added 4 Revised Final Date 7/30/2025 Current Substantial Completion Date 6/26/2025 (includes this change) (if applicable) Provide responses after each question in box below (Responses should be brief and specific). Attach additional information and/or documentation from the Design Professional and/or Contractor, if needed, with your submission of this Change Order and complete summary on next page Check all that apply to this Change Order request:CI Add Time;❑Add funds; ❑� Use of Allowance; ❑Modify/Delete existing Task(s); ❑Add new Task(s); ❑ Reallocate funds;El Other(must be explained in detail below) 1.)Detail of change/s to be made through this Change Order. This Change Order#2 addresses the redesign of the foundations, in regard to the pedestal height, anchor bolt embedment depth, and additional rebar detailed by the structural engineer. The redesign includes additional rebar around the anchor bolts, as well as longitudinal rebar through the foundation/pedestal. Additional concrete was required. A work directive was issued to the contractor on Friday October 25, 2024 to keep project on schedule. The cost of the change order will come from the owners allowance, so no change on the DEC contract amount is required. The owner's allowance will be reduced from$155,417.70 by$12,626.46 to$142,791.24. 2.) If this Change Order is currently under a Stop Work, please identify the date issued and number of days remaining or"N/A" if not applicable. The project was not under a stop work order at the time of the work directive. 3.) Explain why this change was not included in the original contract/Work Order. The nature of the change is an oversight on the part of the structural engineer. The work was in the original bid documents, but it was designed incorrectly. Change Order#2 will cost$12,626.46 from the owners's allowance, but no increase to the DEC contract. There will be an identical reduction in the Bowman (Hole-Montes)contract due to the structural engineer being responsible for this Change Order and the structural engineer is a sub-contractor to Bowman. The reduction in the Bowman (Hole-Montes)contract will be processed separately as Change Order#1 on their contract(20-7806)for Post Design work. 4.) Describe the impact if this change is not processed. Without the change order, the structural integrity of the foundation and building could be compromised if constructed as designed. This change order allows the project to stay on schedule and accomplish the project to the proper bid specifications. Without this change order,the foundations, footings, and floor slab cannot be poured. Page 1 of 4 Change Order Form(2023_ver.1) CAO 1 6 G 1 co ter County Procurement Services Change Order Form Contract# 23-8120 CO#2 PO# 4500229417 Project#: 33822 Project Name: Bulk Aircraft Hangar at Marco Island Executive Airport Contractor/Consultant Name: DEC Contracting Group, Inc. Change Order/Amendment Summary (If additional spaces needed,attached a separate Summary page to this amendment request) COST TIME CO# AMD# Description Additive Deductive Days Total New Justification (+) (-) Added Time Repeating construction work on the flue The nature of this change order is Hurricane Milton Avrnah Hangar at Marco Island Executive Airport that was Completed and Inspected prior or a damage.This is not a DEC paw, r engineering error, to the onset of Humana Mdton on October or a contractor mistake.DEC made reasonable 1 iqn.2024,end was damaged due to the 8 374 precautions to protect the work prior to the storm,but it atone surge landing on the eonseuclan sae could not repel the amount of flooding from the storm The cost of$9,5 82.30 pal cone born the surge.Since all of the work was in the original bid Owners Allowance and n already part of Ma documents,it is relatively simple to ensure that the pricing mnoscla's coned price is reasonable to repeat the work. cue m on..eegc n the one.Ors,.a..Wee q The current"as-bid design utilized anchoring hardware of d the tooM.aoo.q Sootdae.....r.l.a Curs.. rue.montane an e.a..va t.yn mace WI a uniform length throughout the floor concrete slab. u.a.,.n aedn..w WOW*no.MOP,.a.ww However.the slab's design had varying Thicknesses,and by wwaw. ..len.•rn.ea..ee eel..new re. 2 rot ea.e a....ton.or....e. 4 378 a uniform length anchor bolt used throughout the entire m.len n.raea.ws...m wl.e ne ea.w^•. floor slab could not be used without making supplemental nncem tit a,y,rns.we d•Ir,.sr n.,e..wat max.Ni r m changes.Without these correction and additions,the ...a,Wen a.ae...a by me wee*snd nne deeps foundation and Moor slab would not hold up to the weight mound aDECrora sate e.waloes.Ye and rigors of further construction. ❑Check here if additional summary page/s are attached to this Change Order Page 2 of 4 Change Order Form(2023_ver.1) 1 6 G I Colter County Procurement Services Change Or der ge O der Form Contract# 23-8120 CO# 2 PO# 4500229417 Project#: 33822 Project Name: Bulk Aircraft Hangar at Marco Island Executive Airport Contractor/Consultant Name: DEC Contracting Group, Inc. Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above,as fully as if the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Contractor/Consultant/Design Professional signature below must be from an authorized person/officer/director of the Company or listed as the qualified licensed Professional"Project Coordinator"or Design/Engineer Professional under the agreement. Signature authority of person signing will be verified through the contract OR through the Florida Department of State, Division of Corporations (Sunbiz) website (https://dos.mvflorida.com/sunbiz/search/). If the person signing is not listed, we will require signature authority by one of the listed officers/directors of the company giving that person signature authority. RossdaleNick Digitally signed by RossdaleNick Prepared by: Date:2024 12.30 08:49:59-05'00' Date: Signature-Division Project Manager Printed Name Dgdally signed by Austin Ty+er Brown Contact Info.aorownAo bowman.com Accepted by: Date.2024 12.30 09 30.37.05'00' Date: 12/30/2024 Signature-Design/Engineer Professional(if applicable) Austin Brown,P.E.,Bowman Consulting Group Printed Name/Title/Company Name Erika Bodenstein Digitally signed by Erika Bodenstein Accepted by: Date:2024.12.30 10:50:38-05'00' Date: 12.30.2024 Signature-Contractor/Consultant/Vendor Erika Bodenstein DEC Contracting Group, Inc.Vice President Printed Name/Title/Company Name GarrettBryant Digitally signed by GarrettBryant Approved by: '1 Date:2024.12.30 11:01:09-05'00' Date. Signature-Division Manager or Designee(Optional) Printed Name HuttonDarren Digitally signed by HuttonDarren Approved by: Date:2024.12 30 14 07:11 -05'00' Date: Signature-Division Director or Designee(Optional) Printed Name AhmadJay Digitally signed by AhmadJay Approved by: Date:2024.12.30 14 20:23-05'00' Date: Signature-Division Administrator or Designee(Optional) Printed Name Page 3 of 4 Change Order Form(2023_ver.1) CAO 16G1 Collier County Procurement Services Change Order Form Contract# 23-8120 CO#2 PO# 4500229417 Project#: 33822 Project Name: Bulk Aircraft Hangar at Marco Island Executive Airport Contractor/Consultant Name: DEC Contracting Group, Inc. FOR PROCURMENT USE ONLY FY 25 CHO Request# 536 Zi m merman Becca Digitally signed by ZimmermanBecca Approved by: Date:2024.12.30 15 57:20-05'00' Signature-Procurement Professional Signature/Date Approved by: Signature-Procurement Manager/Director(OPTIONAL) APPROVAL TYPE: Li Administrative 1 Administrative-BCC Report ❑ BCC Stand-Alone ES(BCC Approval Required) BCC APPROVAL ATTEST: Crystal K. Kiti2el, Clerk of the Circuit Court BOARD OF COUNTY COMMISSIONERS and Comptroller COLLIER COUNTY, FLORIDA By: . L.k By; a!• . r0110— �'}} Attest as to Chairman's Dated: '' -(.-`. �5 signature only Burt L. Saunders, Chairman y. (SEAL) Agenda# I f S/25 I'661 A roved a F an Lega ut County Attorn y tet' he le4!L Print Name Page 4 of 4 Change Order Form(2023_ver.1) 1 6 G 1 CONTRACTING GROUP, INC. Dedicated to Excellence in Construction October 23, 2024 Request for Change Order Project: Bulk Aircraft Hangar RCO No.002 Description: RFI #11 Response To: Brad Beadles Marco Island Executive Airport Items: Description Amount 1 Southern Shore Proposal $12,025.20 Markups: Rate 1 5% $601.26 Totals: Items $12,025.20 Markup $601.26 $12,626.46 Supporting Documents: RCO#2 Backup Documents As discussed time is of the essence with approval of this RCO and issuance of a work directive to not cause delay. This RCO is only for RFI #11. The extent of additional cost and time impacts associated with a potential delay are unknown at this time because the delay is ongoing. DEC Contracting will keep records of all cost and time impacts and present those for contract cost and time modifications once it is known. DEC reserves its right under the contract to file cost and time impacts once known. Respectfully, Erika Bodenstein Vice President 1560\lattho% I)riN e.Suite R. fort M ers. Florida 33907 (2391 332-4322—Office (2391 3 32-018(1—Fax info ci-deccontractini.cora MC 152643(1 CAS 16G1 Marco Island Airport 2 REV: SOUTHERN SHORE •( OhISIRtICrIfN It+C• CHANGE ORDER REQUEST Date: 10/23/2024 COR#: 2 REV: To: DEC Contracting Group, Inc. Project Name: Marco Island Airport Project#: 24016 Description: REV 1 Narrative- RFI #11 Reference(s): FWA Cost Breakdown Price 3450 Concrete Columns $10,932.00 Additional Labor-Pedestals and Curbs REV 1,@ Hanger Slab $7,200.00 Addittional Material-Pedestals and Curbs,Rev 1 t Hanger Slab,including $3,732.00 concrete,reinforcing,accessories,tie wire,standees/meshups and pump SCHEDULE IMPACT: Subtotal $10,932.00 Markup 10.000% $1,093.20 Bond 5.000%d $0.00 Insurance 3 000% $0.00 TOTAL COR AMOUNT $12,025.20 W'ql1'164L7 10/73/24 DEC Contracting Group, Inc. Date Southern Shore Construction Inc. Date This Form(PRT COR wroreakdown Deta,t)was produced with CMIS^'Software 0 1992.2024 Edectus Inc. PAGE 1 of 1 16G1 Division/Department Name WORK DIRECTIVE CHANGE CONTRACT#/PROJECT NAME: 23-8120 MKY Bulk Hangar CHANGE#02 DATE OF ISSUANCE: 10/24/2024 EFFECTIVE DATE: 10/25/2024 OWNER: Collier County Board of Commissioners PROJECT#:33822 CONTRACTOR:DEC ENGINEER/DESIGN PROFESSIONAL: BOWMAN You are directed to proceed promptly with the following change(s): Description: The work directive addresses the redesign of the foundations,in regard to the pedestal height,anchor bolt embedment depth,and additional rebar detailed by the structural engineer.The redesign includes additional rebar around the anchor bolts as well as longitudinal rebar through the foundation/pedestal.Additional concrete shall be added as necessary to account for the change in thickness of the pedestals. Purpose of Work Directive Change:The original design of the foundation did not take into account the sloping of the slab floor;therefore,the pedestals are thicker than what is called out on in the plan set. Attachments:Email with Time and Material Breakdown If a claim is made that the above change(s)have affected Contract Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the changes(s). Method of determining change in Contract Price: Method of determining change in Contract Times: O Unit Prices ❑ Contractor's records ❑ Lump Sum ® Engineer's record ® Other Time and Material ❑ Other Estimated increase(decrease)in Contract Price Estimated change in Contract Time: $ 12,626.46 Increase by 4 calendar days. RECOMMENDED: AUTHORIZED: By: a By: Soot U� Engineer 1 f vvA(u t". Owner's Representative 1'A( 16G1 From: Douo Masch To: Ryan Younker frvan.vounker(&atkinsrealis.om);Brad Beadles Cc: Erika Bodenstein;Chris Freeman Subject: RE:Marco Bulk Aircraft Hanger RCO#2-RFt#11 Response Date: Thursday,October 24,2024 11:41:50 AM Good Morning Please see itemized narrative below for your use. We had figured 2 man days for the 8 man crew @ 10 hrs which includes the cutting/fabricating rebar,setting steel,making forms specific to the varying heights,setting and installing the forms for the pedestals and the curbs,pouring the additional concrete,finishing,stripping,and cleanup. The material includes an additional 4.17 yds at the curb&additional 2 yds at the pedestals with the standard waste factor($1425.00),plus an additional 65 sticks of 15 rebar to cut and bend horizontal continuous bars at curb perimeter,with corners and lap plus additional pedestal U bars($1070.00),$150.00 in accessories which includes tie wire,nails,standees/ bolsters/meshups,an additional hour of pump time($250.00)w/sales tax/fuel surcharge and delivery fees down to Marco making up the balance of the$3732.00 Please let me now if you need anything further or have any questions. Thank You, DOUGLAS R. MASCH II, LED AP°BD+C PRESIDENT www.deccontractine.com 1560 MATTHEW DR.SUITE B FORT MYERS,FLORIDA 33907 239.332.4322-OFFICE 239.332.0180-FAX 239.462.1028—MOBILE CGC1 5:2643C DOUG@DECCONTRACTING.COM From:Doug Masch Sent:Wednesday, October 23,2024 12:46 PM