Loading...
Backup Documents 01/14/2025 Item #16C 3a ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 1 6 C 3 TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. ** ROUTING SLIP** Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. 3. County Attorney Office County Attorney Office i/c9-7),;.< 4. BCC Office Board of County Commissioners l )5 v Sf I JZ?l25 5. Minutes and Records Clerk of Court's Office 1 07k5"- PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is ded in the event one of the addressees above may need to contact staff for additional or missing information. Name of Primary Staff Diana Dueri/PUD-EPMD Phone Number 239-252-4218 Contact/Department Agenda Date Item was 1/14/2025 Agenda Item Number 16.C.301 Approved by the BCC Type of Document(s) Change Order Number of Original 1 Attached Documents Attached PO number or account number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature(instead of stamp)? DD 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information(Name;Agency;Address;Phone)on an attached sheet. 3. Original document has been signed/initialed for legality. (All documents to be signed by DD the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney.) 4. All handwritten strike-through and revisions have been initialed by the County Attorney DD Office and all other parties except the BCC Chairman and the Clerk to the Board. 5. The Chairman's signature line date has been entered as the date of BCC approval of the document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's DD signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip should be provided to the County Attorney Office at the time the item is uploaded to the agenda. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 1/14/2025 and all changes made during DD N/A is not the meeting have been incorporated in the attached document. The County Attorney an option for Office has reviewed the changes,if applicable. this line. 9. Initials of attorney verifying that the attached document is the version approved by the DD N/A is not BCC,all changes directed by the BCC have been made,and the document is ready for the an option for Chairman's signature. this line. 1:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04;Revised 1.26.05;2.24.05;11/30/12;4/22/16;9/10/21 • 1 6 C3 • Procurement Services Co tt;re County Change Order Form El Contract Modification ❑Work Order Modification 70257.4& 60234.5.1 Contract#: 22-7992R Change#: 2 Purchase Order#: 4500223134 Project#: Contractor/Firm Name: Haskins,Inc. Contract/Project: Palm River Areas 18,2 Public Utilities Renewal Project Manager Name: Diana Dueri,PMP Division Name: EPMD Original Contract/Work Order Amount $ 15,579,339.85 01/i0/23;11A Original BCC Approval Date; Agenda Item# Current BCC Approved Amount $ 15,579,339.85 2/27/24; 113C2 Last BCC Approval Date; Agenda Item# Current Contract/Work Order Amount $ 15,579,339.85 SAP Contract Expiration Date (Master) Dollar Amount of this Change $ 0.00 0.00% Total Change from Original Amount Revised Contract/Work Order Total $ 15,579,339.85 0.00% Change from Current BCC Approved Amount Cumulative Changes $ 0.00 0.00% Change from Current Amount Completion Date, Description of the Task(s)Change,and Rationale for the Change Notice to Proceed 3/13/2023 Original 6/5/2024 Last Approved 12/16/2024 (Revised Date 12/23/2024 Date Completion Date Date Includes this.change) #of Days Added 7 Select Tasks ❑Add new task(s) ❑ Delete task(s) ❑Change tasks) ®Other Provide a response to the following:1.)detailed and specific explanatlonirationaie of the requested change(s)to the task(s)and I or the additional days added(If requested);2.)why this change was not Included in the original contract;and,3.) describe the Impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. This change order is for the addition of 7 days for Rain Delay and WD#6 and the use of$127,721,91 of project allowances as detailed below: Time Extensions Due to Rain 1. This change requests a contract time extension of a half(0.5)day due to rain on October 13,2023;two (2)full day due to rain on March 22,2024 and March 23,2024;and one(1)full day due to rain on June 11,2024.Three and a half(3,5)days total. 2. This change was not included in the original contract as it was unlcnown that heavy rain would impact the area. 3. If the time extension is not processed,the Contractor wi l l not be able to complete the project on schedule and would be liable for liquidated damages for no fault of their own. Work Directive#6:Remove Drainage Pipe Containing Asbestos 1. This change requests that the Contractor remove the unidentified and unmarked perforated drainage pipe that was found to contain asbestos per WD#6. Since WD#6 was issued,2,505,5 feet of perforated drainage pipe containing asbestos has been removed which will be billed at the unit price($44.00/foot)for bid item 2.12 "Removal and Disposal of Asbestos Cement Concrete Water Main". 2. This change was not included in the original contract as the asbestos pipe was not shown on any record drawings related to the project and unknown to the County. 3. If the change is not processed,the contractor will not be able to fulfill the County's Asbestos Removal Plan. Work Directive#6 will use$110,242.00 from the project Stormwater Allowance and will increase the number of days in the contract by 3.5 days. Revised:01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin t3D BCC E5 sl 1 6 C3 Work Directive(W11)#9:Private Property Bubble Up Structures 1. This change requests that the Contractor installs the drainage basin bubble-up structures at 411,448,and 454 Palm River Blvd,and 445 and 459 Golfview Dr to accommodate the existing private property back/ side-yard and/or rood drainage pipes that extended into the ROW. 2, The change was not included in the original contract as the length of the back/side yard and/or roof • • drainage pipes were unknown. 3. If the time extension is not processed, the contractor will not be able to fulfill Collier County's standards on roof drainage in the ROW. Work Directive#9 will use$5,401.57 from the project Stormwater Allowance. Work Directive#10: 12-inch Private Property Yard Drain 1, This change requested that the Contractor install the drainage basin bubble-up structure at 436 Palm River Blvd to accommodate the existing 12"private property yard drainage pipe that extends into the ROW. 2. The change was not included in the original contract as the location of the drainage basin was unknown. 3. If the change is not processed,the contractor will not be able to fulfill Collier County's standards on drainage basins in the ROW. Work Directive#10 will use$2,680.25 from the project Stormwater Allowance. Work Directive#15: Private Property Yard Drain Adjustment 1. This change requested that the Contractor adjust an existing bubble-up structure at 436 Palm River Blvd to provide a greater elevation difference to better drain the back yard,to connect an existing roof drain,and provide a lower 12"outlet that extends into the ROW. 2, The change was not included in the original contract as it was unknown the extent of the existing drainage system on private property. 3. If the change is not processed, flooding on private property would take place as a result of the County's PUR project. This was evident by recent significant rain events that resulted in water being held on private property. • Work Directive#15 will use$8,518.09 from the project Stomwater Allowance. Areas 1 &2 Allowance Summary Beginnina General Allowance $280,000.00 Remaining General Allowance $280,000.00 Beginning Water Allowance $200,000.00 Remaining Water Allowance $200,000.00 Beginning Wastewater Allowance $400,000,00 Remaining Wastewater Allowance $400,000.00 Beginning Stormwater Allowance $150,000.00 CO#1 $ (880.00) Allowance Draw WD#6 $(110,242.00) Allowance Draw WD#9 $ (5,401.57) Allowance Draw WD#10 $ (2,680.25) Allowance Draw WD#15 $ (8,518.09) Remaining Stormwater Allowance $ 22,278.09 Summary of Work Directives: WD#1, 5, & 7 were included on Change Order#1. WDs#6, 9, 10, &.15 are included above in CO#2. WDs#2, 12, 13, & 14 are pending backup from the Contractor. WD.s#3, 4, 8, & 11 do nor include any changes to the Contract time or amount($). Revised;01/14/2021 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMEENTT USE ONLY Actinic; tom=: F BCC ES 1 6 C3 i , (iir-' �� 10/17/2024 Prepared by: ft.__-+ Date: Diana Dueri, PMP Senior Project Manager, EPMD Kt_A 10/17/24 Acceptance of this Change Order shall constitute a modification to contract/work order identified above end will be subject to all the same terms and conditions as contained in the contract I work order indicated above,as fully as if the same were stated in this acceptance.The adjustment,if any,to the Contract hall stitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/ Design Professional arising out of rel t d to the change set forth herein,including claims for impact and delay costs. Accepted by: '' Date: j o// w* RianMa hee—H s s, nc. 10/18/2024 , Accepted by: Date: Justin Frederikaen,P.E.—Q. Grady Minor and Associates, LLC 10/30/2024 Approved by: _ Date: Peter Hyden,Project Manager Supervisor,Capital Project Planning&Program Management-TMS ON.Eyn4nweyele a Wmn Nm a ri A�'a',+ .aryngm BullertBenjamrn°ND t7 °D° %nt.DU.PPet Uae.Ac�a�ra,, OU Maon n C dRdM Ninaaerrent OD POD. OU D bona,OC be DC cefegev OC-nei Approved by: 0.4.2024.10.to 09.52.1144130 Date: Ben Builert,P,E., Principal Project Manager, EPMD Johnssen b Digitally signed byJohnssen_b Date:2024.10.31 08:24:53-04'00' Date: Approved by: Beth Johnssen, Director Capital Project Planning&Program Management-TMS Digitally ugned M MCLeanMatthew M c L e a n M a tt h ew• demON QGMauhew M<Leen®cwfe c gav,CPt-Md h.aw. Man�Genmal OV-ppM Use+AccountL =b Manning and P Ct eM W-PUD OV-Dmwns,DC=bo DC=cdeergw OC•n e, Dte2Cza,,os„a.o,.zeDeroa , , Approved by: Date: Matt McLean,P.E., Director EPMD ZimrntermanB Digitallysigned by ZimmermanBecca ecca Date.2024.11.13 Approved by: tz:az:ls-osna Date: (Procurement Professional) Revised:01/14/2021 (Divisions who may require additional signatures may include on separate sheet) PROCUREMENT USE ONLY AdD,ln el PCC ES ,���1;;;iiilll 1 _ 1 6 C3 Change OrderlAmendment Summary COST TIME CO# AMD# Description Days New Justification Additive(+) Deductive(-) Added Amount Days added for rain day, encountering rock,damaging This CO adds an unlocated water services,and additional 148.5 Days construction of redesigned gravity 1 1 and authorizes the use N/A N/A 153 633 sewer in Area 1;and allowance of the contract utilized for repairing damaged allowance. - unlocated water services and testing unmarked drainage pipe for asbestos. Days added for rain days and WD This CO adds an #15 and allowance fur removing 2 1 additional 5.5 Days and N/A N/A 7 6q0 drainage pipe containing asbestos, authorizes the use of installing private property bubble-up the contract allowance. structures, and 12-inch private property yard drain. 'i. • Revised:01/14/2021 (Divisions who may require additional signatures may Include on separate sheet.) PROCUREMENT USE ONLY Admin BCC ES is 16C3 ATTEST: BOARD OF COUNTY COMMISSIONERS Crystal K:_Kinz'el'4+4; of Courts COLLIER COUNTY,FLORIDA ::0m0 -r ,e6 40 By40,4%.,e1-100110.4"b Burt L. Saunders, Chairman Dated: 0 "► 1.0 i., , 'Attest as to Chairman's signature only App as t fo an legality: By: Scott R.Teach Deputy County Attorney i i i 1 i 16C3 Rain Delay - 2.5 Day October 13, 2023, March 22, 2024, and March 23, 2024 Justin Frederiksen From: Ryan MacPhee <rmacphee@haskinsinc.net> Sent: Friday, March 22, 2024 10:42 AM To: Diana Dueri Cc: benjamin.bullert@colliercountyfl.gov; belwell@haskinsinc.net;Allyson Holland; Perez-Rivera, Miguel; Mabel Lago; gcollier@haskinsinc.net Subject: RE: Rain day 10/13 Good morning, Haskins will not be working today or tomorrow due to the rain. We are requesting 2 days for weather. Wyanacc1'(ee Vice President Haskins Inc. 10956 Enterprise Ave. Bonita Springs, FL Tel. 239-947-1846 Fax. 239-947-3857 Cell. 239-253-7500 Web. Haskinsinc.net At AT�fi p y l From: Diana Dueri<Diana.Dueri@colliercountyfl.gov> Sent: Monday,October 16, 2023 9:26 AM To: Ryan MacPhee<rmacphee@haskinsinc.net> Cc: Benjamin Bullert<Benjamin.Bullert@colliercountyfl.gov>; Ben Elwell<belwell@haskinsinc.net>;Allyson Holland <aholland@gradyminor.com>; Miguel.Perez@stantec.com Subject: RE: Rain day 10/13 Hi Ryan, Your request is approved and it will be reflected in the next change order. Thank you, PMP Project Manager Ill Go.IL County Engineering&Project Management Division 3339 Tamiami Trail East, Suite 303, Naples, FL 34112 Phone: 239-252-4218 Cell:239-601-1290 1 1 6 C3 From: Ryan MacPhee<rmacphee@haskinsinc.net> Sent: Friday, October 13, 2023 7:44 PM To: Diana Dueri<Diana.Dueri@colliercountyfl.gov>;Allyson Holland<aholland@gradyminor.com>; Ben Elwell <belwell@haskinsinc.net>; Benjamin Bullert<Beniamin.Bullert@colliercountyfl.gov>; Ryan MacPhee <rmacphee@haskinsinc.net> Subject: Rain day 10/13 EXTERNAL EMAIL:This email is from an external source. Confirm this is a trusted sender and use extreme caution when opening attachments or clicking links. Haskins is hereby requesting a1/2 rain delay for today due to weather. Thank you, Ryan MacPhee Sent from my Verizon,Samsung Galaxy smartphone Get Outlook for Android Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. 2 1 6 C3 Rain Delay - 1 Day June 11 , 2024 Justin Frederiksen From: Diana Dueri <Diana.Dueri@colliercountyfl.gov> Sent: Tuesday,June 11, 2024 2:46 PM To: rmacphee@haskinsinc.net; belwell@haskinsinc.net Cc: scott.sikorski@stantec.com; Perez-Rivera, Miguel; MLAGO@HASKINSINC.NET;Justin Frederiksen Subject: RE: Palm River Rain Day Request Approved. We will add this to ne next change order. Thank you, Diana Dueri PMP Project Manager III Public Utilities Engineering & Project Management l Office:239-252-4218 Collier Count Mobile:239-601-1290 0 Xa31 Diana.Dueri(a,colliercountyfl.gov From: Ryan MacPhee<rmacphee@haskinsinc.net> Sent:Tuesday,June 11, 2024 2:43 PM To: Diana Dueri<Diana.Dueri@colliercountyfl.gov>;Justin Frederiksen<JFrederiksen@gradyminor.com> Cc: Sikorski,Scott<scott.sikorski@stantec.com>;Perez-Rivera, Miguel <Miguel,Perez@stantec.com>; Ben Elwell <belwell@haskinsinc.net>; MLAGO@HASKINSINC.NET; Ryan MacPhee<rmacphee@haskinsinc.net> Subject: Palm River Rain Day Request EXTERNAL EMAIL: This email is from an external source. Confirm this is a trusted sender and use extreme caution when opening attachments or clicking links. Good afternoon, Just wanted to officially request our rain day for today. 6-11-2024. Thank you, Ryan WacrPriee Vice President Haskins Inc. 10956 Enterprise Ave. Bonita Springs, FL Tel. 239-947-1846 Fax. 239-947-3857 Cell. 239-253-7500 Web. Haskinsinc.net t 16C3 YIATE„ K M `. Y s d �»r. ... ar Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a • public records request,do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. • • is is is is 2 rfF ,, 16C3 Collier County Engineering & Project Management Division [ WD#6 J WORK DIRECTIVE CHANGE CONTRACT#/PROJECT NAME: WORK DIRECTIVE#6 #22-7992R Palm River PUR Areas 1 &2 • PURCHASE ORDER#: 4500223134 DATE OF ISSUANCE: May 22,2023 OWNER: Collier County Board of Commissioners PROJECT#: 70257.4, 60234,5,1 CONTRACTOR: Haskins, Inc. ENGINEER/DESIGN PROFESSIONAL: Q. Grady • Minor&Associates, P.A. You are directed to proceed promptly with the following change(s): • Description: Contractor shall remove the unidentified and unmarked perforated drainage pipe that was tested and found to • contain asbestos. Purpose of Work Directive Change: The contractor located an unmarked and unidentified pipe while potholing on Cypress Way E in Area 2. The pipe material was tested and found to contain asbestos. Contractor shall remove the perforated drainage pipe that contains asbestos as part of this Public Utilities Renewal Project. Reason/Justification: The unidentified pipe was tested and results came back positive for asbestos. Collier County has an Asbestos Removal Plan in place that details the safe work practices whenever asbestos containing material is disturbed. Although this pipe is not identified in the construction plans nor in any known County records, in accordance with Collier County's Asbestos Removal Plan, the pipe shall be removed with this Public Utilities Renewal Project at the contracted unit cost for removing asbestos pipe. Attachments: N/A If a claim is made that the above change(s) have affected Contract/Allowance Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the changes(s). Method of determining change in Method of determining change in Contract Times: Contract/Allowance Price: ® Unit Prices ® Contractor's records ❑ Lump Sum ❑ Engineer's record ❑ Time & Material ❑ Other ❑ Other Estimated increase or decrease in Allowance: Estimated change in Contract Time: TBD TBD RECOMMENDED: AUTHORIZED: 4a, J a By: Allyson Holland, PE By: Diana Dueri, PMP Project Manager Owner's Representative 1 6 C3 WD 46 Backup Page 1 of 54 J Justin Frederiksen From: Ryan MacPhee <rmacphee@haskinsinc.net> Sent: Friday, September 13, 2024 11:29 AM To: Diana Dueri; Eddwie Perez Cc: belwell@haskinsinc.net;Justin Frederiksen; Mabel Lago Subject: RE: Palm River WD 6(removing AC drainage pipe) Haskins is requesting a total of 3.5 days be added to the contract time due to critical path delay for the work performed for this work directive#6. Thank you, Ryan 9'IlaccPliee Vice President Haskins Inc. 10956 Enterprise Ave. Bonita Springs, FL Tel. 239-947-1846 Fax. 239-947-3857 Cell. 239-253-7500 Web. Haskinsinc.net 1t Teq 4 ca •s N 4I i ;9 From:Allyson Holland <aholland@gradyminor.com> Sent: Monday, May 22, 2023 1:33 PM To: Ryan MacPhee<rmacphee@haskinsinc.net>; Ben Elwell<belwell@haskinsinc.net>;Greg Collier <gcollier@haskinsinc.net> Cc: DueriDiana <Diana.Dueri@colliercountyfl.gov>;Justin Frederiksen <JFrederiksen@gradyminor.com>;Sikorski,Scott <scott.sikorski@stantec.com>; Perez-Rivera, Miguel<Miguel.Perez@stantec.com> Subject: Palm River WD 6(removing AC drainage pipe) Good afternoon, Please find Work Directive 6 attached for the Palm River PUR project. Please let me know if you have any questions. Thanks, Allyson M. Holland,P.E. Project Manager GradyMmar 3800 Via Del Rey Bonita Springs,FL 34134 Phone-239.947.1144 Fax-239,947.0375 Web-http://www.gradyminor.com 1 J, - 1 6 C3 • • • W©#6 Backup EXHIBIT A-1 Page 2 of 54 • BID SCHEDULE Bid Schedule 22.7992R Palm River Public Utilities Renewal Project Areas 1 and 2 RIM NO. 015t111710N LOW UNIT PAICI 111.011. AMOUM 717 1ICT1011 I:OINIRAI 1.1 1AeWR41M./O.,v 4 31...n(MA.DIN ITe121 MI,1111Res1 IS 5+1+,D]100 1 S/I+,0W00 Alerinu,7 1.7 61.1nten4 he.el Ty0Mt II 5711604.01 5,14,00340 1J 9110enulA CA $155040 31,10000 14 Iontll0T0V1 A R.1./116I9/6111 LS $1I5,10010 $111,00000 Ls 1r141A.UMLV1n 1611r RMreeimAS, LS $4,640(O 14,e00 CO Li P0,iC.n.rwils•W Ili LS SI10000 S1,10001 LT OlrnMj A Gi.AAM1 LS S41.1610) S63,11103 I.I 04e,1AroMm000141 LS $14,50001 $14,5030O 1.1 I.mw.,Wpm.,sal UAW,MAM,r1 IA 5+1000 I 1 5/9,000.03 1.10 Itn.,1A AA I AI,,..,tan 0 Iir,MALAILL A 61 Clore10.lv.V..y IV 51400 7,Al (316,41141 Ll1 111n..a AA/IImA IAII,n.10,hn1{I Sy 111 S0 1 1S 5111(4.50 1.1) MITI GIMw•4 1 Cplu,rl. tV 16711 S.Si 511,171.01 P A11N44 1. 111.71 1,11 S5IAl7.ls • Is 11111 4.1114 S. 14007 1 11 1206,100.00 • Li! 0,haw./C.,NA11 And 5I4110 1. $116ti )1O 510640000 Ill R.wo,,,04,po.,,.14 94OmA I.IIl05114,66 SA POI w SN 560.44000 • III bMpd.M 14,0.1! 07 51171 Ball $A9,11000 • I.1$ Now Meisel $1 112.75 1110 5116,1/7.50 1.17 1141.4.4),W11,lwAt 31 1/70W 10 11.101/00 1,11 Mr.I.h,p.Ai Tra.R..n•.II (A 31,141 CO 60 $110,701.07 • I.1a Pr)Vpl•p,N.l.y tro•6.114•nM1t IA 130154‘) w 5171,0A400 • 1.70 VSM41 OOAN Pell IA 4167001 I 311,14000 • 1.11 Owns Matson 1t 4.IAt 111eUkn AA 1 AM.94113 CAA.(..n41• r1M S110,503.00 1 $10000000 • .U1RNIe,hob.l M,1.1., ', , SICIIIV I MIN/AA11 SU110114• S1,161,117./1 • I1IM No, I DI1C1141.11601 ( UNIT ( UN17Mc1 11L(117. AM0VI1f111 11150N1:WA71A114T1M 7.1 W1111 MAA Mp.N.I. • I finch C101DIII PVC I/ SA600 ).614 1111,072J0 • I 1.1neh C/0)0111 WC LI $1110) 5,111 5616173.70 104,$,064 DA LI:II. II 51+7.01 1,411 1134,163.70 Iv 1017000.353 VP II 5110A9 105 511,130.70 • 11 Wit..Male V20l al A.M 1 1 II 511.00300 1 101.W0 1 7.1 Oat.Yrh.l • f.nlh0At1 VAh1 IA 1761000 11 S71.910741 • W.uA G.IAYAh. IA1 $S.3I100 70 1)1. 0W • IPIn4h0At.Vey. IA 51.11100 II.. D 531.10S PM.NN1 MI As M1,,14 IA 5051A13.00 )0 1101,70000 • 7.1 W.1..1Im1.1 Na71•'tM I,MT+ IA SI,ISGN 3A 149,10700 • DOA DwS414m1. IA 51,910 CO 21 351,04000 ty tens Swill f IndicCA /3.20003 40 604.00070 • lent 00e14i S.r./ • ILA1211500 31 397,91500 7.1 WIIM M141L M)n 44444,1a1 M11 AAA,D•wt.l . k.xMMrNu+IbpR.w l4MUnI AMnrl«•Ibnte b-I-I to I 55)5001 116 I ill/30003 0. N,wll.InI..lllII1111bw11NMrtt I1k4N1M a.r IA 11,IW00 +1 IL S17,10003 4n.r1l1n 11 11111.61 411111AA0 0,ddI.bee%t...$I.ih PVC WM..Wu6/0AN n.,.AA.2.) • PO,.AN it IpJ«.1a 1n11h AC144 IA $1,110 CO 1/44000 • Cyp..0 WAy 1.44RIn0h IC'A*1 IA $1,200N 19,N000 • CAN III WI,IM/+Mh PVC WM IA $1675.00 16,12100 DnpIINI 0011114104.0,4.,51 WM 74 16.44500 44,44300 Vd Cyp,n W 4112111•Nt1AC 1.1.1 IA 19,11300 $1,11590 At IbAWIIII7)I.PVC VOA (A 17,10000 57,10000 LS M141n.M 1.11.rbleruI I...pl.Phl0 /A IS0)340 19,11700 VA AY11.4n.V.h1A IA 11.16000 1 110,640n) 7.10 (0014I AV.41nt,IMRwtbnl IA SSA/5 OQ I 160,12300 .,....0.11npett4n le UNM10NA1MNn' IA 31,1210) 35.11003 I __... .. -I• CR 54+00 1,74 S/77,901031 7.11 Mo.Allnlwlm.,Ie11d,uw Wide N M. Cl S311b 13 S4.11M 0n•..A1146.AI1 Ai4A1 dbe04,6 AAA rrylml Ay Cot/4 4 CAYMA 13+ TAM S203.003 LO 1 3704001.10 4.11014A 1,1140 MAnN es.* $161w07 IWATIA STSTCM51Vi10tAt 11}30,11100 . • • Page 1of2 16 C3 {`I WD#6 Backup _ Page 3 of 54 public Utitltles Coiner County DAILY REPORT OF CONSTRUCTION l:fieW► Public Utilities Department PALM RIVER PUR AREAS 1 AND 2 Engineering 8 Project Manag ement Division CONSTRUCTION PROJECT Stantec Date:6/1/2023 ski Stantec PIN: 177311742 Accidents ElYes No Day of Week:Thursday Contract Day: 58 Total Days:420/450 Accident Report It: HIGH TEMP(F): 86°F AM Conditions:Cloudy/ PM Conditions: Partly N/A LOW TEMP (F): 75°F Fog Cloudy General Remarks #1- Prime Contractor— Haskins: Cypress Way East, Golfview Drive, Palm River Blvd., Pompano Drive, Eastwood Drive Grep's Crew(SS): • Contractor on site to assist and supervise crews. Planned Activities for the week: • No general activities anticipated. Water System Remarks #1 - Prime Contractor— Haskins: • No water activity observed today. #3-Subcontractor—Tru-Spec Mechanical: Pompano Drive Phase 2 Carlos's Crew(SS): • Station 10+57± to Station 11+17±: Subcontractor installed un-restrained 6-inch DR 18 PVC water main along the north side of Pompano Drive, between houses#675 and#681 Pompano Drive (60 LF). Installed 6-inch water main was measured for payment. i • Station 11+17±to Station 11+57±:Subcontractor installed restrained 6-inch DR 18 PVC water main along the north side of Pompano Drive, between houses #675 and #681 Pompano Drive (40 LF). Installed 6- inch water main was measured for payment. Note: Trench conditions were wet at bottom of trench. Subcontractor placed either #89 stone or#57 stone in bottom of trench. Subcontractor placed and compacted native soil backfill first lift approximately 6-inch above installed water main as approved by E.D.R., with the following lifts placed at approximately 12-inch lifts. Subcontractor placed blue locator tape above installed water main. Subcontractor placed a blue marker ball at approximately 100-foot intervals. Subcontractor used a broom tractor to sweep roadway at end of the day. Planned Activities for the week: • Contractor anticipates installing new water main in Phase#2. Palm River PUR Page 1 of 18 Areas 1 and 2 16C3 WD#6 Backup Page 4 of 54 Wastewater System Remarks #1-Prime Contractor—Haskins: • No activity observed today. Note: Collier County Wastewater Department crew removed from site the generator placed at pump station 103.08, adjacent to house#575 Cypress Way East. Planned Activities for the week: • No planned activities for the week. Stormwater System Remarks #1-Prime Contractor—Haskins: Palm River Blvd. Phase 1 Alberto's Crew(SS): • Station 9+90±: Contractor temporarily repaired collapsed existing concrete driveway at house#459 Palm River Blvd. Existing concrete driveway collapsed at existing stormwater pipe crossing under the driveway. o Contractor installed two (2) 28-foot lengths of 6-inch SDR 26 PVC pipe crossing under driveway, to temporarily replace the collapsed existing stormwater pipe. • Station 12+70±: Contractor excavated collapsed existing stormwater pipe and repaired collapsed stormwater pipe adjacent to house #478 Palm River Blvd. o Contractor installed a length of 8-inch PVC pipe between collapsed existing 12-inch CMP stormwater pipe ends, then sealed the 8-inch PVC pipe into the existing 12-inch CMP using hydraulic cement and Mirafi filter fabric. Cypress Way East Phase 2 Jamie's Crew(SS): • Station 27+61± to 28+50±; Station 28+75± to 29+90±; and Station 30+10± to 30+60±: Contractor is removed existing 6-inch asbestos-cement stormwater pipe along the north right-of-way,on Cypress Way East, between houses #657 to #669, and #669 to #681 Cypress Way East (250 LF). Removed 6-inch asbestos-cement stormwater pipe was measured for payment. o Contractor set up an exclusion zone using caution tape and orange traffic barrels. o Contractor placed "Danger" signs on the exclusion zone. ll: o Contractor wore protective suits and respirators while removing asbestos-cement stormwater pipe. • o Contractor wrapped removed asbestos-cement stormwater pipe in 8 mil LLDPE plastic sleeves, secured with duct tape at the ends.Also, contractor placed "Danger" labels on the wrapped asbestos cement stormwater pipes. o Contractor placed wrapped and labeled asbestos-cement stormwater pipe in a plastic sheeting lined dumpster and removed dumpster from site, to the contractor's store yard. Palm River PUR Page 2 of 18 Areas 1 and 2 16C3 WD#6 Backup Page 5 of 54 1 Dozier 1 0 0 2 - Crew Truck 0 0 0 3 Crew Truck 1 1 11 3 - Trackhoe 2 2 11 3 Front End Loader 1 1 11 Crew Truck 1 1 9 Visitors Name Company Hours at Job Site From: To: RPR Name and Position Hours at Job Site/Office Total Hours Scott Sil<orsl<i,Senior RPR 7:00 a.m. 6:00 p.m. 11.0 hours i 657 Cypress ,Way E Naples/FL A O 66°NE (T) l 26°17'7"N,81°46121"W ±22ft A 14ft a K eYL x" 5 L '''S.4,,,it• . s xiior rse oG6iifrA or et up e is wate1.[errovaofabestos cement storm ` Palm Riverpipe Stantec_SS 01 Jun 2023,,07:48:16 Contractor set up an exclusion zone prior to removing 6-inch asbestos-cement stormwater pipe adjacent to house#657 Cypress Way East, near Sta. 27�61±. Palm River PUR Page 4 of 18 Areas 1 and 2 16C3 WD#6 Backup Page 6 of 54 663 Cypress Way E Naples FL �7°NE(T) O 2Ga17'7"N,81Q46'2Q"W*'I3ft _16ft -.s x x I_F,+- "a .1# ,` . t-- -- Fes},.;. i fY ,'rY ;� .� 'a-ca: �, trJ��.,A 'ti' r i d .. p r -- 7. ti . , t 'J r^._ °" ' -z4 2 „, fix 1i'�-"-ram„ .*:4++a.,e 8d I r. sr �y 'i"V'` ?„. r lc o+, r W ,, \:„. ,, r GANA,S HAZARo,G �' , tom., 7 ; ` AUTN0E4oNir, l AO' .sue - Irti • ti. ,, P p50,1, 5rnD r v`pi't, _ t 3RF �.;„"y`1 1 ➢� „ : E ,010 G';. ra.ate'.av p� P4.40.AA xt :_ `x y�S9 T� �$�� k. r � � x4�i.. ;y.2'g Jew ✓':.4,,-,,,,: ., -,',,,, - .......-,-.-_-.' -__. .' '-f.:...f,,!",,,-'. .- , -',e,.'-''''',..t:Attk'S1 ,`',.-Nei)9.4.4;-- ��'3''�" „. c - £�-r My °`r �.4 R ,,s -....-5: �� x�': % S: sr fplacedDarl9ets,e# 4V: ø z ta4:41 i {,1. -..= . '`M ° ontractor placed a "Danger"sign on exclusion zone prior to removing 6-inch as�estos cement stormwater pipe adjacent to house#657 Cypress Wkr—ay East, near Sta, 27+61±, 663 Cypress Way E Naples FL 0 5-1°NE (T) 26°17'7uN,81°r46'20"W±f ft.:A l6ft d ii�yd " 'ilf N"Z. -:1 Y '' k 1r,Vec:4 ,.y Tirr'1 S' , 7 g#445;1 .- x` rt, t �r' tryAjt Tw ,K ,'5 0 'fps V,-.1-Z;,for t x.A.- 5 r w x�' y z., 5, .• ,e .y,,`i c r .' 'x,r ^ 'rt- T r ,, » �. -� _ , .,ice it-„,.,,,,,,...;......1 �'t ,, � actor-Wire pratQc iveclothing and „, res4,rators while re°iovlrtg-asbestosp' �' , -pipe �P t�ehent „� Palm Raver ekif it ., c , - Jun--- --Q7 Nr-58 Contractor wore protective clothing and respirators during removal of 6-inch asbestos cement stormwater pipe adjacent to house t 657/#663 Cypress Way East, near Sta. 27�61±, { . ' EE Palm River PUR Page 5 of 18 Areas 1 and 2 , 16C3 WD#6 Backup Page 7 of 54 663 Cypress Way E Naples FL 0 24°NE (T) 'Q• 26°17'TN,81°46 '"W..`2Qf13ft :A loft # 5 dE, 01f Dl Pipe) G.,-2?) s fr w , qq TIT ,,..„...,,, • . ...„,„....„....,„.: • i "I'"? ' , i i t Kt II I . • '-.0-,, • EP1th1 ' Vic,. - .,,,,,,„,,,,,, iI {LDPE D ,Vet;. . i \Af 1 I,f\ Sl-1 2l • f Contractor Wrapping removed asbestos cement pipe in 8 mil LLDPE plastic sleeve ' Palm River Stantec SS, 01 Jun 2023,07 53 25 Contractor placed removed 6-inch asbestos-cement stormwater pipe inside 8 mil LLDPE sleeves,adjacent to house#663 Cypress Way East, near Sta. 27+71±. 663 Cypress Way,E Naples FL 13N '� ° (T) O 26°17'7"N,81°4620"1?1/+13ft A 15ft y � N f "✓It J \j 1 T1 l Y..L. a�i.,,,, 6 '? f, ST :41.'F s z , '.tl44-,..t SK 4.N 1 +. ris. �'r �Gtef tea. w, ls+a S� �v > ft, 1 e f - y7.y 2 i, ty - - '^-fir,. , ram: v6'vlr, tgt^ 1� St'? a t. , n A. Y z "- f .LJ' ,Contractor wore an air monitor whil8 # ry - .1 - .ter z ''`x, i, ",removing asbestos cement stormvJ'atei . ,;,? `,- ,,,, pipe Palm River: Stantec_SS 01 Jun 2023,07 59 58', Subcontractor ESH-CORE placed an air monitor on crew member during removal of 6-inch asbestos-cement stormwater pipe adjacent to house #663 Cypress Way East, near Sta. 27+71±. Palm River PUR Page 6 of 18 Areas 1 and 2 is , WD#6 Backup Page 8 of 54 663 Cypress . =E Naples - Q1 -4-'-0 252-°W T); 2Ga17'7"N,81°46'20"W ±13ft ♦ 14ft 7:= RESP/AA f' PROT/C/7 -,j K; , file. �J' s 'i i :.,* -,,--^-,•ai'ii-,..,Z,,,,,,,,4,•' ,f,....;',. ,,!::, , T i G 2' yam.,- 3 l t�,,, • � - v ''a' P rm -r s r,4"> iS I. . �''s ' H:M. F-f .ors, ,� ;;,e ,ram ..H; 73 ry' a' 1�'- i,mi1' qto iF monitor on the 4 y 0xciUBith one -� emovirtg asbestos i ,. ' '" „ cement pi # wf Y ;� .ceme e S t r` '7 ' ,; 0 '�1 2 '52 22 z . .q ser. ..ti�6:ir,•..„ ,..si o,. -x. =, -_ :.. .mac. _ .+ .+_,...'� n�vr Subcontractor ESH-CORE placed an air monitor on exclusion zone during removal of 6-in ch asbestos-cement stormwater pipe adjacent to house#663 Cypress Way East, near Sta. 27+71±. 663 Cypress Way E Naples FL o47°NE(T) ( 26°17'7"N,81°46'20"W±l3ft A 12ft x r F e ,A4' k wee .;a'xS�1 .i"C , -4 .Y *;..i, .,,..;x is+ .� ;. ^ '}l + ,, t'#x �w ,-„'ate,� ��� r � ,;n:hYv+�7,#"'�rft'x yap s• , �-c��* � ����1e!{ z� :.� ,,� • ' F. ' ti.r��a 'a. 'a)P'�+�+,4 21 7'A^3 ' a I --t''` ✓ a-.. i ai 1N:*tA Sx' 1-rt r " ' �.�`, '"::' ''''''. '''',11'-':‘,7,:rt,;Zei,lyel..;-:*''.;=f6k94., ,,'„jt,,:- Contractor removing a length ofasbastos '",--- ' s -.. ,; cement stormwater pipe at 663 Cypress } ' � -4J Way East '~—. ,Polhill Stantec_SS 01 Jun 028-U$ q* Contractor removing length of 6-inch asbestos-cement stormwater pipe, adjacent to house#663 Cypress Way East, near Sta. 27+71±. Palm River PUR Page 7 of 18 Areas 1 and 2 1 6 C3 1 WD #6 Backup i 1 Page 9 of 54 663 Cypress WayFL E Naples '1<-1 [ - ' 17'7"N 81°40 20 W±13ft A 21f 30N et) 0 26° - ---- -,""7---,..:1----k--*-v , - c -,o. • ,,,,, _, ,.,-,_•, - t .' - •izque--Pgrd!--"-"'" PeMP ,uf,.:7,,i,:-.. f . ,'-''1 .' '..,--"$14:4:',744 r:ON.''..,-, , i"", ' ' , ' , '.--',.Wk-1,'tl.r,T,,,i' _•4„,-1,N.gt,- ,,i, i , ,., ,,,, ,r-,s,.',1=1!,,,- .,•„,-,,,--,,Az,,,* ,_ ,,-Rtr, .,;....e,-,' •, ' ' 1 .. -: „-1,0,-#,..„:„....,,t,.iik,„,,,,,„-10.-4. .1'4 .ti 1 -'''''t ,',"--- • ',./.,,,.,h k-45,,,,.7,,,I.4„.4,.,; ,e41,...,,,-)..---, -44.4%,,,.az a" , ^,:' .1"..%. -,-.4;-,,, --„:444-J.-,:c-,.*-.44, -v, „,-4r.-,i, 6 iNik .....,4.„ , _ ,..ett„ .0„,,,,,,,:s. ,A. T.",-y....i.,,,,z4r4,..„1,,,,,,,,,-,,,-,0-.:,;.i.,,, ,,-,,,Ni-0,0;,.n.-:,-;--4,0,--,",,,2,,lir-, •,,„ ,,--.,k., r'''' : ,a .4...:1-"--4.-'t,.,,,°-`,.,.a -,:k4;%.1/4,1,-',• `,-d_ "e alr.V.J.,,%!.,,C:?`,7.4::,..,,4,4.1!'fli C a, ' ...,-__:,:,Oa;Aka',1,,,,,..„,„:, -,,,',,-0.1 ,,,,---,1.4-.s•-•15.,:e'-',..17,..c1,,v,..,i',• „,„: '--5::' ;:,,,.4:44:::.'/,-",-v;:':':- ---,,.,., , -.-PsANI:f....,4+4444"4-','4,,,e1,,i7ts, '•',-*4.*:,4A1,0_..,,,ti -44514--.., .„...5caft...„.- ,,,..,,,..,-„,.,,,,,,,,,,„4,--- ,,.,,-- :1,-. ,---, -..:-.„,,z.4../-,--,4:4,04;,......fmc...ze,t,-,0, -..5 ifyl,.7..:44,,te*Y _ A ;-, 't*•7 ,l'",.,,j' INek-, 1 - .'"'N,NI. r',,,,:',„ --._ ,.....-:• .:'-e`4,M1`,.-rwiA'sT et' NA-Y.''''I', ' ' --T-Pi...' ---'74'' t,..- ''' -'-.-''''.- '- ?„'"-'-';'T•t'''',.--'-':'_ -----.7:--,";&;‘.--4r:.- fuv,,,,,-...,,,,,Ay_ , --..3/,,e. _,...7,r?,,,,..,c,...12.„ ...,- ‘,...... ' 1,3,5,z:et, ,,,,..,-s-...,...., 4-...---,7fr-% 4-"-f. ,,,'...4",- ...-.-,,;:-„,_,.•- - -41%)k, 4.--ii;-,-- ----t1.=•.------x.:4----,41.1 .,--...'''.';',4`'-',"1-.'..4,--,=,-;-, !-;-1 1.'.v."-•-,, t' - •*'-r _ — 1 *.i.,„,,,,,74.,„..22,--,91,,.'"-•>-' ..±44-4.-_,,_ -',. %-',33,,,,-,:m:,,,-;,:',, .,:,..-,', r, , __,,,,,,,,,„,,.., ..,,,,,,..,,,,,-,,,,,_z_[..„:4,`,1_,-4.:-:' I :77,,,, ..,,,1%;,,,r,•'-*:-.1, -,--1' :"."'*,•,*,,,,...,'-'<i'---';'0,,,',7-',` '." • ' 7:•?:7-..:s.;-,,-_;...,,.=';',..._ '',f,%.:,-.ft__. '17` -,.':',,,'\N\-- •-./. .-3,-115-s'ir'-11-4'..6. :,It sbestoW. tr,oianzat . .,_ . ... - l,jrpdi to30003IPPE,01E1°6 sleeve.SS'k ,,,,..„,..-„,a1A-JUrt 2027,5-1:5?. to house #6 Cypress Contractor: placed Length of 6-inch asbestos-cement3;cto 2L71.04.7PiE±. sleeve secured with duct tape,adjacentrmrewssat near WerapylpEaesitn,side 8Smtau I. 663 Cypresst 8794 ,2 E6Naplesi3Fli ft;17ft °17 7 • .. ... , ,.; .,_ -- , - --A.,,,z,. ' • .r*--,.„, ,_--..,,,6-. ' --,-, -•:,,,,,,-„,".„.„,, } ,- ----:.•7. , le.,- - ' -5,4 I. „--.,.... ::,.•:P-V,,,,, , ..,, % .„ -,z-,.:.,,trc,- . '.t,..,-,,,,, -, [ . ., _ . , - — _ ..., -,-,- -..,,. - - Palm River -' asbestos cement 8tormwater pipe ',Wilatfactor placed a Danger label on -- •"- - 0"8.041i itleapped Jun 01 2023, , Stantec SS - , , Contractor placed "Danger" label on 8 mil LLDPE sl2ee4v7el±adjacent to house#663 Cypress Way East, near Sta. 27+71±, , Page 8 of 18 I i, d Palm River PUR t c Areas 1 and 2 ii I:, 1 6 C3 WD#6 Backup Page 10 of 54 681 Cypress Way E Naples FL ,,., , . , O 247°SW(T)-Q 26°17'7tN,81°46'17"W±26ft A 14ft --.1,.` t_ 4'V ','/ t om'• F / .,.., :t...:*..4,.,:2,,-."06, r• : ,i•,„..,,.„---7 • ' ' ''''',--. " '••., i - — i . .,,,,,..,.. .-.1,... .,40-•0 q t e e \ s 4::::::::-;•.‘'' '.1?,30.,4- ,_:-.-.,-._ ,..,,„._, - ,., , A--.f.,.:.-,1,1 .-*-.\_...,.-, ,-. ,. ,_ ,,.k.J.,,,,,-,/.: -,. ,:-,.......-f!;:i,tv..p.,..7.7.7,--7--3",--:- ..„ -' , .-.-‘ . ....:::- ',... •";:‘i't‘,,,.:N'..7„,-;4.: ' - -4.„: , . ,.. Contractor placed removed and.wrapped" _` . #' ` asbestos cement pipe in plastic lined dumpster Palm River StanteCSS 01Jun 2023,08:32:46." =r .. Contractor placed wrapped and labeled 6-inch asbestos-cement stormwater pipe in plastic lined dumpster,prior to being removed from site.,adjacent to house it681 Cypress Way East. 657 Cypress Way E Naples FL -0 64°NE (T) 0 26°17'7"N,'81°46'20"W±22ft..A 14ft�.;. fir ' � .. , 7.1 :so,''-'104.;:t.t..k..iyt,,,,--.441,0-...27., ' .T...:".'jr.;),. • ,-V ,,,',•::::.Ttik.t.t..t.„, -.'...1:74'7,,,•1•„•,,,,..:5-W.,,.......:,,,17'....:y!...K ,.,..,i ,- i tib - EstI € ' ,� M py 4 sod'' R.+ •ire.,"•W:.Ai ^i. "fi S+t, r "--if'''''''''''''''''''''',"'-'a U :iifl, 4.. d }.r'.. ,a,�'�4' 'r- ,.. 4%>r : �'s3 ec r'R1 -�' ^�- 4 z . .ys .il,,7,0 FTr- 4 a.P w,t-1, tt-tP. �i:1 ;e�'�,,. .777 r.: Fes; trt. _�j ctcilii�zl tip Cncq #r . ;> s#ies os e�2nt pipe wlt i native soil Paiiit Riv1 ,$tanfeoa S'.-_;' U1 Juri 2023;11,32: 8 Contractor placed native soil backfill in trench at removed 6-inch asbestos-cement stormwater pipe, adjacent to house#657 Cypress Way East, near Sta. 27+71±, ' Palm River PUR Page 9 of 18 Areas land 2 16 C3 WO#6 Backup Page 11 of 54 PubUC l utdltie Co .er Comity DAILY REPORT OF CONSTRUCTION t7 hew Public Utilities Department PALM RIVER P U R AREAS 1 AND 2 Engineering 8 Project Management Division CONSTRUCTION PROJECT ` Stantec Date:6/2/2023 ' •rski Stantec PIN: 177311742 Accidents Lives ®No Day of Week: Friday Contract Day: 59 Total Days: 420/450 Accident Report tt: HIGH TEMP (F): 86°F AM Conditions: Partly PM Conditions: Partly N/A LOW TEMP (F): 72°F Cloudy Cloudy General.' Remarks #1 - Prime Contractor— Haskins: Cypress Way East, Golfview Drive, Palm River Blvd., Pompano Drive, Eastwood Drive Greq's Crew(SS): • Contractor on site to assist and supervise crews. Planned Activities for the week: • No general activities anticipated. Water System Remarks #1 - Prime Contractor— Haskins: Eastwood Drive Phase 2 Alberto's Crew(SS): • Station 27+55± to Station 28+55±: Contractor installed restrained 8-inch DR 18 PVC water main along the north side of Cypress Way East, between houses#657 and #663 Cypress Way East(100 LF). Installed 8-inch water main was measured for payment. • Station 28+55±to Station 28+95±:Contractor installed un-restrained 8-inch DR 18 PVC water main along the north side of Cypress Way East, between houses #657 and #657 Cypress Way East(40 LF). Installed 8-inch water main was measured for payment. • Station 28+50±:Contractor installed 8-inch x 1'A-inch stainless steel tapping saddle, 114-inch corporation stop valve and 1y2-inch poly tubing for water services to houses #663/#669. Water services will be measured for payment when completed. • Station 28+60±: Contractor installed 8-inch x 2-inch stainless steel tapping saddle, 2-inch corporation stop valve and 2-inch poly tubing for water services to houses #678/#672 Cypress Way East. Water services will be measured for payment when completed. Note: Trench conditions were wet at bottom of trench. Contractor used a 2-inch submersible pump to dewater excavation. Contractor placed #57 stone bedding in bottom of trench prior to installing 8-inch water main. Contractor placed and compacted native soil backfill first lift approximately 6-inch above installed water main as approved by E.O.R., with the following lifts placed at approximately 12-inch lifts. Contractor placed blue Palm River PUR Page 1 of 17 Areas 1 and 2 1 6 C3 WD#6 Backup Page 12 of 54 Stormwater System Remarks #1 -Prime Contractor—Haskins: Palm River Blvd. Phase 1 Alberto's Crew(SS): • No stormwater activity observed today. Eastwood Drive Phase 2 • Station 3+12±to Station 0+92±: Contractor removed existing 6-inch asbestos cement stormwater pipe along the east right-of-way, on Eastwood Drive, between houses #538 and #504 Eastwood Drive (217 LF). Removed 6-inch asbestos cement stormwater pipe was measured for payment. Jamie's Crew(SS): • Station 28+50± to Station 28+75±: Contractor removed existing 6-inch asbestos-cement stormwater pipe under driveway along the north right-of-way, on Eastwood Drive, adjacent to house#699 Cypress Way East (28 LF). Removed 6-inch asbestos cement stormwater pipe was measured for payment. o Contractor set up an exclusion zone using caution tape and orange traffic barrels. o Contractor placed Danger signs on the exclusion zone. o Contractor wore protective suits and respirators while removing asbestos-cement stormwater pipe..` o Contractor wrapped removed asbestos-cement stormwater pipe in 8 mil LLDPE plastic sleeves, secured with duct tape at the ends. Also, contractor placed Danger labels on the wrapped asbestos cement stormwater pipes. o Contractor placed wrapped and labeled asbestos-cement stormwater pipe in a plastic sheeting lined dumpster and removed dumpster from site to the contractor's store yard. #4-Subcontractor—ESH-CORE: Eastwood Drive Phase 2 Eric(SS): • Station 3+12± to Station 0+92±: Subcontractor performed competent person duties for contractor removing existing 6-inch asbestos-cement stormwater pipe along the east right-of-way, on Eastwood Drive, between houses#538 to#504 Eastwood Drive. Eastwood Drive Phase 2 Eric(SS): • Station 28+50± to Station 28+75±: Subcontractor performed competent person duties for contractor removing existing 6-inch asbestos-cement stormwater pipe along the north right-of-way, on Cypress Way East, adjacent to house #669 Cypress Way East. Palm River PUR Page 3 of 17 Areas 1 and 2 o� �� �� ���� . LWD #6 Backup Page 13of54 '-_ Site Off' - ' - - - ' Scott Sikooki Senior RPR 7:00a.m. 5:30c.m. 1I5houm ' | ��� Eastwood U�� U��K�U�� ��U � --_ _ ~_'__~ _ Naples ' ~~ | Contractor set up an exclusion zone prior to removing gonnwator pipe adjacent to house#S36 Eastwood Drive neur8to. 2+7�� � - � Palm K�erPUR PaQeSof17 ^ Areas 1ond 2 , 16C3 WD#6 Backup Page 14 of 54 i 538 Eastwood Dr Naples FL o o o g121 SE (T)'=QQ 26 17 91,$1 46,141N±59ft A 13ft tqw-, -s r 4-:5-0 '- C ° r:: - �-x . • efrl . ^- r t 1• DANGER , 't -, :"* ,, t mot' > CANCW/4ADLUNr, ,44'�� # _'` "'ar :.= - f ,2* 6rti DISEA6tjAZARD, , y .*-,sF.„-.;,-.-'-7,.:1-.;,.:w,,t--,--;,4,%-,-....;,;,:,,,,,,o,`.,-',..,,,,-7*n_);:_",'`'.l,,w*;-'...,- 4, '� €; AUTNC9128D el ar4 .. r 3,rt „s2.a`'`+ 's %s E;ESir RATD- AND ..' rf F` ' "� - PROTE(Toree OTHRvc l ,t�- ,�'S ``r fr r* t - ARE REQUIRED E ' x. ;' IN H15 AREn , c - ,ve' 7-y� . 34s "�- , f-c'—p}as�t 4 .; ,p` faC#or laCesiDan er gn oiT " �,,� ,..„, .t,- '., on zone "3=� �y Paili A1ver a ss - - '/ ` _NU un 2025 07•46. .71 ontractor placed a "anger" sign one-Xs—elusion-zone prior to removing .-inch asbestos cement stormwater pipe adjacent to house#526 Eastwood Drive, near Sta. 2+70±. 538:Eastwood Dr Naples FL �.{.:,;17:,..,.."-zw.6140°SE (T) O 26°17'9"N,81°4613"W+114ft A 12ft,- R r"" �; Y 3x r t °�t,,.u�tlp "'ril�• '�""s r' s 14 it ' 4, ' 'lt-:'tXq r:f ':A y.�tciLf'` S .r,y -r if3 .0 °i { 7' '1 .. 1 ., . ,.., ,,,,,z, ;yyj. Y3 u.5e$" d"1'�>r r ,.a�✓ i�sy�ili .�' `�a 3r e" rr . 17 �' �,rr y. 6 SP.t tiE�4 - Y i.5+ N 3Y-.51-x i iF .. 4 �T 1 ,.E. <,t Y "t =.'i F frz,��`.�`r�iea�, E� ° • W f ? iTX max r 4 t 1 "e -..:a•f it flfl ?,;� ,.,� i l � < T Vgi•li`� d' . ,-S -., ray, 0. 1 '- ,..,-;`,...4'kq:, • `-'-' v� K yp 3i'4. �-. ryas I r ra ..rt �.� -�= r , ` .-. �e ; r v�Y+a3 'F ' .��+'' , !., "Contraotor removed a length:t 6 inch ', ",`'��: asbestos cement stormwaterl�'plpe at 526 .V --' 'f Eastwood Dr °10fr Palm River-° .02 Iprl 2O2 07 46 t)a5 Contractor wore protective clothing and respirators during removal of 6-inch asbestos ' cement stormwater pipe adjacent to house#526 Eastwood Drive, near Sta. 2+70±. Palm River PUR Page 6 of 17 Areas 1 and 2 16C3 WD#6 Backup Page 15 of 54 I i 526 Eastwood Dr Naples FL F 1 0120°SE (T) O 26°17' "N,81°46'14"W±22ft ♦ 14ft ' t y�� 4 t 'f J Ck f .1}8 .3 ..! ,0`'-� xNIY �3si i1::: ..-2.-.,,A4.1,' _'-,-,:i., -,,,. -,„-,-.-..:.'t,..1'4 ,-..,0„,,A4,-, --;., :,.....,,,,,,,,,.. - ,,.-i.,,,, • 5ly�Q' C F �,,�j74' 4 }.ki ,ram»✓r 5 fi� Jr" � FR�i.Y i�f t.� � `.>� ,'�. z g,f�,En � 1 1 Y'a'''., & srnf �� -e- 7 :ri 41,,f,,,,,,,,.,,,_.4--:,....,„7,f6-7 ,-,--A.4 t 1/4'. ''., . ,` •'i'''''', ''' ' .•$0'''''.•l';:t151.0*WIC. 4 i14'n''' 1.*..„,,:- ..z,,,..,.,,..L.,,,:p4.-..,,45.-.11„.1..3.-A.,,.. - 4„.:,,,,,...3.„-.--.,„,2,1,5..._.;.--..:,-:-..4.,-, ..,:20,12:77„>:,44,4„,.::.,.., -, ,,k..4 .V17 t%a-tracAtor wearing a air monitor while x `�3 t ,removing asbestos cement stormwater n �"> .-x � pipe . ,1�aIr►,„ver 8tantec�SS • ;02 Jurt 2023 l 7$1528 Subcontractor ESH-CORE placed an air monitor on crew member during removal of 6-inch asbestos-cement stormwater pipe adjacent to house#526 Eastwood Drive, near Sta. 2+70±. 526 Eastwood Dr Naples FL 0 331°NW (T) O26°17'9"N,81°46'14"W±29ft-A 14ft • �F : • ` 3 f LT+ . - ^ Z erc46 scA, - i W g eJ ,� ',y r f.,r. 9 �: d' /0011 4 J a 0 - }z ESH-CORE placed a air monithron 6� exclusion zone . Palm River Stantec_SS t •' 02 Jun 2023,07 47 27 Subcontractor ESH-CORE placed an air monitor on exclusion zone during removal of 6-inch asbestos-cement stormwater pipe adjacent to house#526 Eastwood Drive, near Sta. 2+70±. Palm River PUR Page 7 of 17 Areas 1 and 2 1 6 C3 WD #6 Backup Page 16 of 54 538Eastwood Dr Naples FL 4/ , i f 0140°SE (T) 0 26°17'9"N,81°46113--W±114ft A 12ft ,, Z.4,T3zr,�41 'C. ;. s 4 S ,;,,q . 4 1, ' yak lr fi r� -' r/ , 4.01g' ft4, i1 T u�4:fi. t:;k5r�f?wsi�?;', J'r er4pq 7� a le Pile*;, )( v 2 ` +� t1y.',,;-;.rd)" .i1r '� Fitr i �'i}. tc,y,;:'} 4 2v'rIIII 7� '� i, .s i `j vi .a. 4. nP. '*1-d R3'- .tklf�9,�f.-V g3� 4� f. k ' a ! �s'9' , c d �pp> � �"��r�l'g5+,) i+� F r �,. � .,�l� � ✓fa r.> 4r1 I 5 fiAr+a r, "`` 4 rz i ir, ,, 2 e�e Y r w nr•S , 4 A �y°'s s �i4,'4V.�r °!;.,`,''r rat . gym . 5 3, „„- ,, „,,,,,,-, .., 5 ?.41, x 4 tiy4-ti ts ' -11i i< t r "'',.. 1 -y I S t '-‘4'6::1, ,,,,,,„:-.4,2g4.3,4e- -.. .- ,,‘, - -L., __,..,;,',."'N-1-,-;;11,-- -,.41-. ,z' ',.7..",:— :„.".,-;:: D°a'_� 1 Y, 4 "`���" b Y Lam. f"e 'i 4 2 F. ,' H' ° 19tc'C; . Contractor removed a length +f',hch - i,.= ', A,'� y-' ` . asbestos cement stormwate alp- at 626 v L„'' ,1 ` � Eastwood Dr ':: 5 �✓F -lief Stantoe SS . ®Z tl _+ ,s0 4 RY �'' _ Contractor removing length of 6-inch asbestos-cement stormwater pipe, adjacent to house#526 Eastwood Drive, near Sta. 2+70±. 526 Eastwood Dr Naples FL 0 269°W (T) ®26°17'8"N,81°46'14°W±22ft A 13ft �' c'DPIJli 12011� :11.,...4„.„...,,...,,...,,„,,,,,,E, • A riltrirlf591A , . ti ,_-. --,,,, , yR _1 rG•u SViftfn ..- v- ..,.,� 4 , l 11 J.11)11111 0 1,i l �j`f�nll F f j4 i tIIk r , lils,!1 opE 11x �' ill z�rr,,I TI,t�Vi]tfP,G105lANGl Ali: .. Contractor using 8 mil LLDPE sleeves to . wrap removed asbestos cement stormwater pipe Palm River Stantec_SS 02 Jun 2023,07:50:37 Contractor using 8 mil LLDPE sleeve to wrap removed 6-inch asbestos-cement stormwater pipe, adjacent to house#526 Eastwood Drive, near Sta. 2+70±, k' Palm River PUR Page8of17 Areas 1 and 2 f, is 16C3 WD#6 Backup Page 17 of 54 526 Eastwood Dr Naples FL q 100°E(T) QQ 26°'17'9"N,81°46'14"W 159ft ♦;14ft ,. 4d':�F C+y, +`h x�r a mot' 4• r 3 `' & � v' F"� -i " ¢�. `"�,.5,7�cat y��,' �"� �a`"�5� 'T)t6 �>;,t y' r� }+�' a ' r. 3 s`':f; 4'-t'i-4 S rw5.-- ,k 11e- ,, y ,zs�t3`a,.�w i , A sY �♦ r'P 1 SS fiv < y tma s RF �' rF 3 s: 7vv���� �, r fgg j e ;E i o-,p r t yp a ;�r'* *i t'--+ x t ,a, .d'Y ` ,�v 1 fir',,i4 .,t�,s�i''w! t tik, i ,„.. '-,4- ti'i.5.7 ral- �.4:•— '! •.. '.; t fi - 2"i 'ski "j,-.4 E 1,=3't6e k+. �-,, ,�- ff`.7 .``' rk..:(J 4 y `'� r-,-; " �� � ; tCR4� : y ^ # ' ,' f Y.',, '? 4, n a s p^; ,7 � 4 1 , `% k' ' s..• x- � r is .:7r� :. y Cgtrfraatb 'i, 8 c� 4, :1)4`U asbestos Apia a • rt$mkt LLDPE sleeve RAM River S 02 Ju 202$,0�49 OD y r Contractor placed length of 6 inch asbestos cement stormwater pipe inside 8 mil LLDPE sleeve secured with duct tape, adjacent to house#526 Eastwood Drive, near Sta.2+70±. 1 538 Eastwood Dr Naples FL 0 81°E (T) t 26°17`9"N,81°46'14"W t91ft ♦,15ft IA 1:4-'" - .-'. -,' .4'. '-'".. L,''' ,1.-- :a ,g ,' i-T,i1.1 •=i- ' -.'''' ''illi4-''''-' ' , — - *„- fl':' .,,,-:*: ' -'°''' -..,,1-;;,-,- '''' -.. , :,,p,,,„.::,1 i , ..4„ 14iNIA t f` v., , - 5 PS0�NGO SE A jQSQ1OEPS. { )��((�J/ i f' {3 1 tr\N 1k \SEA u0 i3 ! ///,jF j( / lk r ! �'.., COS O\0 GO 16 C.F�/ ".J( , +� f PAN9P�ogNk t J 1 I i i- / i ,, N0\0,0 tN\N t"; N tit 1,1 co'A - _,..,..- -_,, i 8 6fii V' .. . . Contractor placed a Danger label on wrapped asbestos cement stormwater pipe Palm River Stantec m S O Jet0�3 Q7:49:42 Contractor placed "Danger" label on 8v mil LLDPE sleeve,adjacent to house#526 Eastwood Drive, near Sta. 2+70±. • Palm River PUR Page 9 of 17 Areas 1 and 2 16C3 WD#6 Backup 1 Page 18 of 54 675 Cypress U'ay E Naples FL , T i, 0 81°E (T) Q 26°17'7"N,81°46'18"W±114ft A 16ft '."k..\\ s.1' ' '•'.‘-•74:-IrZt.Pr---1, ..,:-;e7,TAi'il .(1.--.!.,, / , s s'. "‘,1, ,,,,, t, i 1 ' i' ".—L---k" \' , a \ � �ti "I i _ 1 I Contractor placed wrapped asbestos cement pipe in plastic lined dumpster Palm River a Stantec_SS 02 Jun 2023,08:48:22:< I Contractor placed wrapped and labeled 6-inch asbestos-cement stormwater pipe in plastic (I lined dumpster,prior to being removed from site, adjacent to house#675 Cypress Way East. 681 Cypress Way E Naples FL 0 233°SW(T) Q 26°17'7"N,81°46'17"W±16ft A 14ft 'sy1'^ -h`rs`�-A. "'?+Y ✓.c —SY ,K/— <>i. Y .15��,. -,—,,Ti - ;.?, w.`.•, timed -_.x..,„, "�,"w c `. .,,t " ''��-- -.?..... -✓ ✓ r ` T• s. v r 3 I = 1 s �_ - L1 - 1/ X ' 7,�, . -t s rC / / J ht t `9 i. 1 r 1`ii 0 J� .**X.c..,a4j,f4.-.".4t41:1'7,..:41:.*."-•.-7,-/i,,, ,,tit .40,.. .0...- ,,C.;.,,t,,,,,..,...:,,f,7,1,,,',,.7-Tr ,.,. _ .Q.,4,,,,T.,.,,F.,:k10.1,,,,,,,,,, y t4 f : Pr7� c st, ftgri41= A� S1 -f'r r "r �,-. 4�r4� �� � "P t� �7&ttfly�yj a ;X4 .a"e` - ' k.� `bdntraCtOgRia,000tra0PO §be.stos , ,_ 1 , ' e ' z q I 'cAlentpipelripastic1.rtd f1po �'' " -. n P m fil • tS ''' , -,- ���0 2 08, 9�7! Stanea; y z �n22 ,0 d r Contractor placed wrapped and labeled 6-inch asbestos-cement stormwater pipe in plastic lined dumpster, prior to being removed from site, adjacent to house#675 Cypress Way East. is I 1 l Palm River PUR Page 10 of 17 r Areas land 2 r. I r; 16C� WD#6 Backup Page 19 of 54 Public Co der County DAILY REPORT OF CONSTRUCTION R newal^ Utilities Department PALM RIVER PUR AREAS 1 AND 2 Engineering&Project Management Division CONSTRUCTION PROJECT ) Stantec Date:6/8/2023 rski, Gerry Stantec PIN: 177311742 Accidents ❑Yes No Hills Day of Week:Thursday Contract Day: 65 Total Days:420/450 Accident Report#: HIGH TEMP(F): 88°F AM Conditions: Partly PM Conditions: Partly N/A LOW TEMP(F): 77°F Cloudy Cloudy General Remarks #1-Prime Contractor—Haskins: Cypress Way East,Golfview Drive, Palm River Blvd., Pompano Drive, Eastwood Drive Alfonso(SS, GH): • Contractor on site to assist and supervise crews. Planned Activities for the week: • No general activities anticipated. Water System Remarks #1 -Prime Contractor—Haskins: Cypress Way East Phase 2 Alberto's Crew(SS, GH): • Station 43+80± to Station 42+20±: Contractor installed un-restrained 10-inch DR 18 PVC water main along the east side of Cypress Way East, between the valley gutter and sidewalk as approved by Grady Minor E.O.R., between houses #414 and #422 Cypress Way East (160 LF). Installed 10-inch water main was measured for payment. Note: Trench conditions were wet at bottom of trench. Contractor used a 2-inch submersible pump to dewater excavation. Contractor placed #57 stone bedding in bottom of trench prior to installing 10-inch water main. Contractor placed and compacted native soil backfill first lift approximately 6-inch above installed water main as approved by E.O.R., with the following lifts placed at approximately 12-inch lifts. Contractor placed blue locator tape above installed water main. Contractor placed a blue marker ball at approximately 100-foot intervals. Contractor used a broom tractor to sweep roadway at end of the day. #2-Subcontractor—Tru-Spec Mechanical: • No activity observed today. Planned Activities for the week: • Contractor anticipates installing new water main in Phase#2, Palm River RJR Page 1of15 Areas 1 and 2 16C3 WD #6 Backup Page 20 of 54 Wastewater System Remarks #1-Prime Contractor—Haskins: • No wastewater activity observed today. Planned Activities for the week: • No planned activities for the week. Stormwater System Remarks #1 - Prime Contractor—Haskins: Cypress Way East Phase 2 AIo ,o', r'_ _.S.. : • Station 31+42± to Station 31+99±: Contractor removed existing 6-inch asbestos-cement stormwater pipe along the north right-of-way, on Cypress Way East, between houses #687 Cypress Way East and #515 Eastwood Drive on Cypress Way East (57 LF). Removed 6-inch asbestos-cement stormwater pipe was measured for payment. o Contractor set up an exclusion zone using caution tape and orange traffic barrels. o Contractor placed Danger signs on the exclusion zone. o Contractor wore protective suits and respirators while removing asbestos cement stormwater pipe. o Contractor wrapped removed asbestos-cement stormwater pipe in 8 mil LLDPE plastic sleeves, secured with duct tape at the ends. Also, contractor placed Danger labels on the wrapped asbestos cement stormwater pipes. o Contractor placed wrapped and labeled asbestos-cement stormwater pipe in a plastic sheeting lined dumpster and removed dumpster from site to the contractor's store yard. 43-Su.contractor- - . , Cypress Way East Phase 2 Eric(SS): • Station 31+42± to Station 31+99±: Subcontractor performed competent person duties for contractor removing existing 6-inch asbestos-cement stormwater pipe along the north right-of-way, on Cypress Way East, between houses#687 Cypress Way East and #515 Eastwood Drive on Cypress Way East. o Subcontractor placed an air monitor on the exclusion zone.Also,subcontractor placed an air monitor on one crew member while removing asbestos cement stormwater pipe. Planned Activities for the week: '' • No planned activities for the week. Palm River PUR Page 2 of 15 Areas 1 and 2 16Ca WD#6 Backup Page 21 of 54 687 Cypress Way E Naples FL 0 313°NW (T) O 26°17'7"N,81°46'16"W t32ft • 14ft > s I t: '1 iY'"'- k ,4 1' Tr h , j ` . . -r, \ ` , Contractor set up exclusion zone brio'ti removing existing asbestos cement water main Palm River Stantec SS 08 Jun 2023, C8:17:52 Contractor set up an exclusion zone using orange traffic barrels and caution tape, prior to removing existing • 6-inch asbestos-cement stormwater pipe,adjacent to house#687 Cypress Way East, near Sta.31+42±. 687 Cypress Way E Naples FL 0 309°NW (T) 0 26°177"N,81°46'16"W±13ft ♦ 15ft I f x ! k -• GANGER :n_� ASBESTOS . Te 7 �t 4 r V x Corttraptcir pldced`a Danger Rican on the N ' • . k �a�rt ":,,,,,,,i:,,,.., -t's'••%•,,,,:lt., . 114 fib 0t4 '} exclusion zono ?Rahn ftrVermp Stantec SS. ' 08 Jun 2023,08:18:51 t,,, Contractor placed a"Danger"sign on the exclusion zone, prior to removing existing 6-inch asbestos-cement stormwater pipe,adjacent to house#687 Cypress Way East, near Sta. 31+42±. Palm River PUR Page 4 of 15 Areas 1 and 2 i 1 6 C VVD#GBackup Page 22of54 687 Cypress Way..E Naples FL, Op ' ` / Af iAFII ire OVID MOZ , Contractor wore protective clothing and respirators while removing existing 6-Inch asbestos- cement xturmwoter pipe, adjacent to house#687 Cypress VVoy East, neurSta. 81+4I±. ^ 'Naples FL ft MINN Contractor +' | | ' . , � | wearing--`�' - � .contractor crew member wearing air monitor while removing existing 6-inch asbestos- cement stormwater pipe,adjacent to house#687 Cypress Way East, near Sta. 31+42±. Palm River PUR Page Scfl5 Areas 1 and 2 � , 1 6 C3 I WD#6 Backup Page 23 of 54 1 • 1 687 Cypress Way E Naples FLU 1 O Q8"E (T) Q 26°17'7"N,81o46161w+13ft a 14ft `` lY t��)-- }��"2 = - =,� � f�1��]+ '• may, y' F:�i'�L�'�y,� ? �Y3 Ji,� 4 ��ll y. 9• r-: • o- ! �` ?9'$:"C..7 y�"N/.fYrvR'j.F""�' + }AS , ' -t • 2 1. r a {,l -P x ., �ir•, s.�f� i r t rr -R F �. '� - -t,,, x - �3' yam, � �•• ..�•¢ 7 4 j s r +t , X h e 1 f!.gyy. M•N '• -'L' � k1•F �� Y.d L � � r,' •``SS? k� i a_ i+'iT70 is ^tt i p�+,),::, ..,, rv,-., 7 = r p 1 c(t a .. . 'e'','�';�.ry - 2�J .Jy,� Vt rf E r �.' P • ITV '� i 1 Rom- �d Y -1 nkl'Y'{e ,,,,, :.c.,,ke+wK 1 i a -7 J3 �' is ..1341'J' rl+U 1a�7'J J41 :f'i" 1' F,KI'�,� ��' Y 4 r vg ar rj4,,,,'Jt y,,.r �s nr ro 7 . y 2• ;ifo ,., ✓ Y,y/si,,. ,,�� ..-`'' tams ,m - -,:- ix , ,.,r4-le i �' .-1,eF roc! fez 5' ^:, a, r {-'FaSr `)'� N W 4 M .6 'E1741:17" cy� ` = eft'.-' , 9$beri3�wS(1-e� �Lrh wk s x �-;,•v Fst der` tifi9 3, } Par Hiver4: EE Stantea$. � '-_ ,9' ,� , -X � ,, o un2023,08:22 21 Subcontractor ESH-CORE placed an air monitor on the exclusion zone while removing existing 6 inch '. asbestos cement stormwater pipe,adjacent to house#687 Cypress Way East, near Sta. 31+42±. i 1 687 Cypress Way E Naples FL_ , 7°N (T) Q 26°17'7"N,81°46"t6"W +22ft ® 14ft i ti ems - i i ti,�, 'y �/^' ,^ k- !, ^1' _t; —4'- "",y_x. ! ., t c' fd` it 1 "r 8_ Li/ .-_, '..,.._ '-�4 Lr`,y ��i.)• "r'il �t, 'r., :irk Y"` ! z :- '"E rtgtiib K ,.s xx, , r.3 a rJ �4t Y f r r iC> a r +y „� s Ys a4f'r tia� S`aw at€w vY 7:- ° 4" l' c..3 . t r�pr�t �t�41:- '1st It wd- ''a' j' ° ,�p'� Pc'`� rrr�-�" �,,,5,E�3 yet •�Y `i '">"k•' ' 1 �i ''i t,7„ H tS,, , k ",A' 5.,�A.,443'h�l^ .4.i -' " ,• , -', , ..^: -. et s,�.�' ') , fi ''�, `,$ rh'4 j A•q g�.'l "1,,�r.}f r'�,. ��', '.�r r,:Xi- �yp e} h �v� Ppc L s s{ c ° • �'a YjS`Y ,,. • u$'y -.:^'ii'k 2'di z Y2 2 • e r. a3 ' >ei' rr •t a.'4`' f' `"�'.;;` �' ,�1. <`Y�S,,ya*j�:,.� •�,xe�a. ,,,. ' i %`,.'"..tn,,wx� J.i. - �' .. i • "�' ., 'fir •S"s`s, 44.a^s,, _!f ,,,s _'_ '^a,2R :.r ! -5s "h� 2i •a� F '�f. s ar :srskt 'H�s.{s _', '` E�Hs ! *�t`�a k .�`iy ,�' ,'!�`rnY=o%t`L„S ,4= •# t• yfl�FW'l�14• ��ra F:R -_-...Y ... •� IY' Y b> Y M1' 1 ..ff�NS' Fy.)+vd' ,v .+.1 F ?f §�Y v^ 1� e ,.,,r" .y �, Y P Ire a. A 2b'4 y • f: `'' try A• k � •� lite .£�,.�'.'4', Yc:�x st -._ SL , r ... 3 i 'G4D .f� it Fla 2 �1� 1 Gantractar removed a length o� xiJtins 6 ., +� 14. � . °;' �� c o y A yx 4 w.a' x.. �,, ' asbestos cerrieni�yaterh9,4i . , •, •gLk, �-` 0., ,- E . S teo SS .,- ,� ,,,r `'�3 Contractor removing length of existing 6-inch asbestos-cement stormwater pipe, adjacent to house#687 Cypress Way East, near Sta. 31+52±. i Palm River PUR Page 6 of 15 Areas1and2 F 1 6 C3 WD#6 Backup l Page 24 of 54 687 Cypress Way E Naples FL Q Q° T ' 26017'7"V,81°46'16'"W '�3ft s 15ft = , :t ..,N •-q. y, 7 qk '•:. Y ..xi f.< � � A a wa r yu- •t ± e s lam -- 17 a! �' .L +"F 4a is 4;141 "^�t Try a -f .e'" 4 Yi ; s 3 , ,- a C ?.V0h - 4 +'y{i .. -mac !: . I��-R u+; , y 4,-fil- ,1-1� � 3-;4 , *__-__e�ta +x R s; Contractor wrapping a length of ove -.�' }i' � ft'x „ if` asbestos cement pipe in LLDPE sieve .I,z: ��„ . 4-. verr r f of r`r, F .i 15. :' -,tj L'. Stantec S5 3 s ',. fl$.1 T; 0 f 1:27 38 Contractor wrapping removed length of existing 6-Inch asbestos-cement stormwater pipe in 8 mil LLDPE t plastic sleeve secured with duct tape,adjacent to house#687 Cypress Way East, near Sta. 31+52±. 687 Cypress Way E Naples FL i c 9,E(T} b 2fi 17 7 N4 81 4 1t W ±13ft ` 14ft 1 r M1 1( r 11 q?-ts' '7 SEW f ru:y a s t ` S" �1iyT ' P.k .t' � 'F�,�� ,J rr .% t`" 1. § •J f r :v .re- !:c e '� s k*` },mod Y r2s M d S[k tr'7 ....yr- v,� $_r LL } 'fix'..• pY',G�"-�4r'� a�v3 t , mac{. r r, "y , ,r� .. • '. 4 € }. -,- }`jck 4 ...,5 S �m jet' ;r _- t' 7 "49 i �ti ,tea_. i Jew �4 - �. ., �''k 1 K'5 s'* .,� a,,,C _ : �5 4'' ,..tr ,t'"+�.. 4-4; ISi S'r i'S}`�' ::tr ""' '�44. t�s.,y e ; ��4 r ate.t,:"r"'''V _,,�:d4�:' .�iYS .,1,,,,„. :! 5 .yc + y Mt 43{ F �y A. -Vn CrkLit V:ip' ' "r„4�• r -� 'rr, '•, k r ',w4F„ n.m,�, r5 r+y ,y k„ ,,, 'x4'•••,:. i ,„. 'g4C: 'N'-,4ft: ..r tlikt1.11".. f`^ At }, 'Y Eft v r� .ti1n:+ t rri t *J irs r t t 7." a d Contractor wrapped removedg�s E cement pipe In 8 mil LLDp 0lasttt`, leeves ' Palm {4� 1` Stantec SS O8 Junrn2023,08 -' 1 Contractor wrapped removed lengths of existing 6-inch asbestos-cement stormwater pipe in 8 mil LLDPE plastic sleeve secured with duct tape,adjacent to house#687 Cypress Way East, near Sta. 31+52±. • Palm River RJRPage 7 of 15 Areas 1 and 2 i',: )j 1 6 C3 WD#6 Backup Page 25 of 54 687 Cypress Way E Naples FL 0 53°NE (T) OO 26°17'7"N,81°46'16"W ±114ft A 14ft 7'71-4%.*;;‘,„. ' `Contractor placed a Danger label on wrapped asbestos cement water main Palm River Stantec_SS 08 Jun 2023,08:29:08 --,-".--.4.-'tf^`+rr.rr,,a.a.,,,...,a.r.,.r.;ile a,a a d1b.:a..11.AIL.din-as.a ar4aa,�►t Contractor placed a "Danger" label on wrapped removed lengths of existing 6-inch asbestos-cement stormwater pipe in 8 mil LLDPE plastic sleeve, ad'acent to house#687 Cy.ress Way East, near Sta.31+52±. 675 Cypress Way E Naples FL ®296°NW (T) OO 26°17'7"N,81°46'18"W±26ft A 14ft •.'_'. ` , We c f ♦ 3. f"w ri'; �o'� `Y '` ` t '3 yam�{{� ,h*,�!`.w-�;3L+�ay `y .,� ".r2'0 ,t , .�-a 'n Contractor placed removed asbestos' t' -4w cement pipe inside plastic lined dumpster SPa4'`iver_ Stantec.SS 08 Jun 2023,'09:2$19 Contractor placed wrapped removed lengths of existing 6-inch asbestos-cement stormwater pi.e inside plastic lined dumpster, prior to bein: removed from site. Palm River PUR Page 8 of 15 Areas 1 and 2 1 6 C3 WD#6 Backup ��s Page 26 of 54 Public Cow Y Count y DAILY REPORT OF CONSTRUCTION -ow � � Public Utilities Department PALM RIVER PUR AREAS 1 AND 2 Engineering&Project Management Division '] Stantec CONSTRUCTION PROJECT 4 Date:5/3/2024 •.' e r s Stantec PIN: 177311742 Accidents DYes ®No Day of Week: Friday Contract Day: 380 Total Days:573/603 Accident Report#: HIGH TEMP (F): 90°F AM Conditions:Sunny PM Conditions: Sunny N/A LOW TEMP (F): 68°F I _ General Remarks #1 - Prime Contractor—Haskins: Cypress Way East, Golfview Drive, Palm River Blvd., Pompano Drive, Eastwood Drive Deon (GH): • Contractor on site to assist and supervise crews. Palm River Blvd. Phase 1 • No activity observed today Planned Activities for the week: • Contractor anticipates restoring the right-of-way along Palm River Blvd. Phase 1. • Contractor anticipates restoring the right-of-way along Golfview Drive Phase 1. Water System Remarks #1-Prime Contractor—Haskins: • No activity observed today. #4-Subcontractor—Curb King: • No activity observed today. Planned Activities for the week: • No activity observed today. Wastewater System Remarks #1 -Prime Contractor—Haskins: Pompano Drive Phase 2 • No activity observed today. #2-Subcontractor—YPC: • No activity observed today. is Palm River PUR Page 1 of 11 Areas 1 and 2 16C3 WD#6 Backup Page 27 of 54 #3 -Subcontractor—Precision Lift Station: • No activity observed today. #5-Subcontractor— Restoration and Protective Solutions: Cypress Way East Phase 1 Dalton's Crew(GH): • Station 14+21±: Subcontractor worked on existing wet well structure, applying final coating layers, at existing pump station 103.08, for existing pump station rehabilitation, adjacent to house #575 Cypress Way East. o Subcontractor applied final coating, on the interior of the wet well, using GasGuard 1000 polymer. o Subcontractor placed confined space blower with duct into wet well prior to entering and applying coating. o Subcontractor used harness to enter wet well. #7 -Subcontractor— MG Electric: Cypress Way East Phase 1 Mark's Crew(GH): • Station 14+21±: Subcontractor continued installing new pump station 103.08 control panel, subcontractor installing electrical conduits between control panel, disconnect switch, meter can, motor junction box, generator receptacle, and FP&L electrical power connection on control panel in the north right-of-way, at east of the wet well, adjacent to house#575 Cypress Way East. Subcontractor installed and placed copper ground rods, copper wire, fence posts, ground clamps and concrete electrical boxes as part of proposed pump station lightning protection. Planned Activities for the week: • Contractor and subcontractors anticipate rehabilitating existing pump station 103.08 on Cypress Way East Phase 1. • Contractor anticipates installing sanitary sewer system on Cypress Way East Phase 2. Stormwater System Remarks #1 -Prime Contractor—Haskins: Pompano Drive Phase 2 Mario's lamie's and Alberto's Crews(GH : • Station 13+57±to Station 0+50±: Contractor removed existing 6-inch asbestos-cement stormwater pipe along the north right-of-way of Pompano Drive, between houses #652 and #536 Pompano Drive, j Removed asbestos-cement pipe was measured for payment(1307-feet). 'i. • Station 3+25±: Contractor removed existing 6-inch asbestos-cement Easovnwater pipe crossing Pompano t: Drive adjacent to house #551 Pompano Drive. Removed asbestos-cement pipe was measured for .' payment (61-feet). o Contractor placed caution tape around excavation. o Contractor posted required "Danger" signage at excavation. Palm River PUR Page 2 of 11 Areas 1 and 2 1 6 C 3 WO#6 Backup Pa e 28 of 54 o Contractor workers wore required PPE while removing asbestos-cement stormwater pipe. o Contractor wrapped removed asbestos-cement stormwater main in 8 mil LLDPE plastic sleeves. o Contractor placed a "Danger" label on 8 mil LLDPE plastic sleeves containing removed asbestos-cement stormwater main. o Contractor loaded wrapped asbestos-cement stormwater main in a lined dumpster and hauled from site to Contractors' storage yard. #6-Subcontractor— ESH-CORE: Pompano Drive Phase 2 Eric (GH): • Station 13+57± to Station 0+50±: Subcontractor performed competent person duties for contractor removing existing 6-inch asbestos cement stormwater pipe along the north right-of-way, on Pompano Drive, between houses#693 and #515 Pompano Drive. o Subcontractor placed an air monitor on the exclusion zone.Also, subcontractor placed an air monitor on one crew member while removing asbestos cement stormwater main. Planned Activities for the week: • No stormwater activity anticipated. Dust Control Activity During the Day Location Time Time Time _ Time Time Eastwood Drive Pompano Drive Contractor(s)and Personnel # Name Type # Hrs Type # Hrs Type # Hrs 1 Prime: Superintendent 1 10.0 Field Supervisor 4 10.0 Pipe Layer 4 10.0 Haskins Operator 2 10.0 _ Laborer 8 10.0 Truck Driver 2 9 2 Sub/Utility:YPC Technician 0 0 Sub/Utility: 3 Precision Lift Field Supervisor 0 0 Laborer 0 0 Station Sub 4 Kin /Utility: Curb Field Supervisor 0 0 Laborer 0 0 g Sub/Utility: Restoration and 5 Field Supervisor 3 9 Laborer 0 0 Protective Solutions 6 Sub/Utility: ESH- Competent 1 9 CORE Person 7 Sub/Utility: MG Supervisor 1 8 Technicians 4 8 Electric Palm River PUR Page 3 of 11 Areas 1 and 2 .'t D { 1 6 C3 WD#6 Backup Page 29 of 54 657 Pompano. Dr Naples 34110 f O 295°NW (M) LAT 26 2866.70 LON 81772593 ±13ft°.A► lift . . w k 1A l 0 t� , i,Gk,, „ sue'' • `-`.AtTr i d.i 1 .` ,y a t t7Ugg31(/j�.1•i1 ` "SAit3 ,iE 14 r s,. _ -1•-,1,,,,1',.74•1,1l may` t t 1 "m C 3 u,' 14 ia`rN • T, Ct , _ -- _ 1 1 141 , to ASBESTOS. l k x "'F GIKI.ANVWI4 Fz; i '�Eb7�'frJf' y J m Au1NCNZAD r""S v ^y ,„7,A f ? PfRSO ono EtV10.A700.f AHD j,, ✓�.-f�.... �; -:' _i'ITFDSARfA �r,l,:--,,7"i$.,e 3 -:ii,,--r g} �+4, �, 'y4q�e-. r ti5Y Y Contractor setup exclusion zo l t�ricr to '?'' - ; removing AC main i� '`> 4 g STANTEC GH 03 May 2024,08 48:1 . i ,; Contractor setup exclusion zone while removing 6-inch asbestos`cement main,adjacent to house#657 Pompano Drive, near Sta. 7+50+ t^. stormwater ..: . � 1 687 Pompano Dr Naples 34110 O Wl � % fi `! a�31 26.286671 LON:-81.771116 t13ft A!Ot i8N � a F ` r.gy (J ,,/ . - ` .p„ • ",rh'aL 4 ...„r F )' i.� '' r"-Ti. fi , c ' t d y c __ ." "t Y i {4 ' ✓Lr i I iII rli -Jt j� E?s iiiiti f t ��S ' � ! z -f.1 -p ASBESTOS ,: "' rx r %' . - .'"2'9 CANCERANOISM+ wy4 u� �/,�.. c ' �, „.; '''i p'- DBUSENAZW `-r,` �' f �r r3{t ..%. , AUTNOAIIFO �.. y s :.PEASONvasmY S a' •P' i< + �t'r`�'l5 + �}> FtFSPIM70Rf ADOC oia` j ! IY'4 7 e.�,..,..se�-"-"3 �' . ,t* 4'6 14.41 a'e if'v.PROTfCENFCIOTNM } '' z �s , iA,4 .w zst 'i=9_( -� y�ckt ARE AfQVIAIO Y- '�'yo-.'$ G C . 1T ygf 1NTIif AREA '�"',0 1 "4 ' x, '" f�,t ir, �, fareV yrf'. , "- t3 ?fi:q' `° A r y t � "f Ate 4 n� '^i t {$'t..`S��rrr�t to Contra setup exclusion zone-priot t r s$,y_, fFr ,` , .vn ,'main ,i, - alrn River Al' - 4'•; 03 May 2024,08.42 20 EDT Contractor place. "Danger"sign on exclusion zone while removing 6-inch asbestos cement stormwater main, adjacent to house#687 Pompano Drive, near Sta. 12+00±. Palm River PUR Page 5 of 11 Areas 1 and 2 t'. is 1 6 C3 WD#6 Backup Pa•e 30 of 54 690 Pompano Dr Naples 34110 '1- ft l .CiyO 68°E (M) LAT:. 26.286625 LONl •-81.77,1362=±29ft 15ft �Y 'Ju ✓' fc�s.�^,� y.vx" j I i i i I s 1, Fes! '� w "" 6 ��.v'< '`w` a. 4.a • �, "gee *c t��4'�.O�vn tih i fi"� .;7 FY ' i 'r;r1' aT d` ^ .l`�„ Air Monitor ,,'' �' h s t yy E�jC��'t' -' STANTEC GH {i ,,,. `f .' * fi .... ,'' `6 May�(124, 9 0019 E0 ESH-CORE placed a air monitor on the exclusion zone,adjacent i4 p 12+40+. 1 ... ... to house#690 Pompano Drive, near Sta r wS�wfirer 687, Pompano Dr Naples 34 10 019°N (M) LAT 26.286684 LON: 81.771131, ±13ft ♦ 10ft ,..,,..,,,. ',:,-,-.::,-._:, 1, t 4 i' "-P.. 11 '4 i J 1 - { t '� i ',s r t L^.,-.*#r i„:tz,: J �"' T', I M/` *�` A �' �., Fes: lI Cli. .�I� • yx l� '"� ti,,:. \\ ; fi T441,m ,fie-_-'- �x,-C 1 f b h . .. 1�4 4� �s 3a �'.,.`+. ,-...... i {�.'S;. a. eery s , ,`„ �' '',� ' r � t �, �• ` ors i t r �N •._t. ., 1 .. 1r ' t U>. t F t � icy u_. +�1 . ny 1 9i l G `;:' �. "1 ,- fin, • `,Y ' Contractor wore PE ear n i"(- ` Vli� , ,,,...y '41 i y A:A ,,i �� �1 , `�, 3 s "n; ,� i`�.,Palm River AC m in,�� is a w p f a' ST NTEC GH k ' ^1}'I44. .N �,, � -e ``t(`;�,ia,:42,52 EDT. 4 s�Ft. o �s_�►:>1 ':i►ei'i ,cr.R+r;fa�. �e►*erwl�o= :rx s? r Contractor wearing protective clothing and respirators while removing 6-inch asbestos cement stormwater main, adjacent to house#687 Pompano Drive, near Sta. 12+40±. i Palm River PUR Page 6 of 11 i Areas 1 and 2 l i' r 1 16C3 WD#6 Backup Page 31 of 54 645 Pompano Dr Naples 34110 0 319°NW (M) LAT: 26.286628 LON: -81.773105 ±13ft A 15ft 4,... , , ....,-- ,. - \-l< ";.' ",Mr-ritergri -e''' ' Y ^ y% 4 ,� fIll ..r ' x 1 ., t ;2$i4; , ' kd e 'r t(.. • •.1 l 1 •y, .. 'r ! . :t.:;,.::, -- -.... e `� !1+i,�i°1 .- V�+ .1 r .._ 1 .':*4 -- t ,yi,r..4 ` `�•,'. t• '' }, e+,r "a e. 7." - ►^ %.. "01... A ` .. yrfy . /art`,' 11't `$iy^x � ;,,' .i. S 1, . . °,r ill:' y ('"'$7. ;Tk, 4), t �„ A `;h ++; ' •v v •. , i 't s d• 1 Vif'0', •.V *� t's ..:iNns'',;A Guntractdr placing AC m. n '� ' •; g� `• >'el !�" } e r`j s0, :''K' p g � ��1�� .�, � y i i{a.;i�i� � polyethylene casing , y `Yc'..0 , ,�t • •'4.4 ; , S'si y/�. , STANTEC GH ,; , tz a k' 4a,t,1 wit i i :I --O'4 tg.tr 9 ,. . lik Ilk Oh.alh.IfA 11111kS11.411x s►M.elia Yf.I .r A Ia.i8w ito.,c1..dr.dA:all►i s Contractor wrapping removed 6-inch asbestos cement stormwater main inside 8 mil LLDPE plastic sleeve,adjacent to house#645 Pompano Drive, near Sta. 6+00±. 693 Pompano Dr Naples 341I10 0 344°N (M) LAT:26.286683 LON: —81.771025 ±13ft A 18ft ii n..at i T r r' : - r,.A t -+_ 4r -` 4r. fi +�rl7y.�d" y.t�.`� _.7Nf: �,t4 ! �{j. f 'fir ''.. - 7 'r - t }< 'v : ��x' j.ti t . t� .4 ,r..iIllr ( / j4;4,1"11fk .T � + ' i i.-,, .1 -.•_ • • L :,�, - • jj:6' � �' .., •;, i 1, f�. ,•'" .1 �:! ►,.çj; ati ► i 1,1 _ .''tni- , -7 ] •�.. .,y` .�, it 14 pb, iiii [. iti 4per " , 4 Contractor placed remove. '•Cmafh I •;~'- ', ' � ; �, ,+t +,: polyethylene casing Zt': '' - Pa1 ;ver STANTEC GH O:i Iv'Yy 2024,O8:41 4DT Contractor wrapping removed 6-inch asbestos cement stormwater main inside 8 mil LLDPE plastic sleeve,adjacent to house#693 Pompano Drive, near Sta, 13+00±. Palm River PUR Page 7 of 11 Areas 1 and 2 P � | | ! i VVD #O8avkup � Page 32uf54 � � 0 9'— -- --- � /" v"v LA/ 26286 iS MileMO Contractor placed warning sticker onto polyethylene casings Contractor placed a Danger label on wrapped 6-inch asbestos cement stromwater main inside 551 Pompano Dr ' ~ � `^' ' ! ' � \ Olt kgg INN Sit, iR | 00 L6- ch asbe cem�en water m 2,in:insI ou 'Ric V5 Contractor removing G'inch asbestos cement gormwatermain adjacent to � house#693 Pompano Drive, near Sta. 3+50+. Palm River PUR ' Page 8cd11 Areas 1 and 2 .� ���' `\ 1 6 C3 WD#6 Backup Page 33 of 54 Public CoTfierCounty DAILY REPORT OF CONSTRUCTION 1ia�aWar. Public Utilities Department PALM RIVER PUR AREAS 1 AND 2 Engineering&Project Management Division CONSTRUCTION PROJECT Stantec Date:6/10/2024 "ir5'*"actr S o i Stantec PIN: 177311742 Accidents ❑Yes No Day of Week: Monday Contract Day: 418 Total Days:573/603 Accident Report#: HIGH TEMP (F): 91°F AM Conditions: Partly PM Conditions: Partly N/A LOW TEMP (F): 79°F Cloudy Cloudy General Remarks #1 - Prime Contractor— Haskins: Cypress Way East, Golfview Drive, Palm River Blvd., Pompano Drive, Eastwood Drive Deon (SS): • Contractor on site to assist and supervise crews. ) Pompano Drive Phase 2 Cory's Crew(SS): • Stations 9+10±, 10+90±, 11+80±, 12+20±: Contractor placed native soil backfill along restored concrete driveways, at houses#669, #681, and#687 (west and east) Pompano Drive. • Station 11+80±: Contractor excavated and compacted driveway at approximately sub-base elevation, then placed and compacted approximately 6-inches of F.D,O.T. certified compatible limerock base, in preparation for paver driveway restoration, at house #690 Pompano Drive. Restored driveway will be measured for payment when completed. #3-Subcontractor—Superior Interlocking Pavers: Pompano Drive Phase 2 Jack's Crew(SS): • Station 8+00±: Subcontractor worked on restoring paver driveway to house #660 Pompano Drive. Subcontractor placed and graded coarse sand base on previously placed limerock base. Subcontractor began replacing driveway paver bricks. Paver driveway will be measured for payment when completed. Planned Activities for the week: • Contractor anticipates driveway restoration on Pompano Drive Phase 2. Water System Remarks #1- Prime Contractor— Haskins: • No water activity observed today. Planned Activities for the week: • No water activity anticipated. Palm River PUR Page 1 of 18 Areas 1 and 2 1 6 C3 WD#6 Backup Page 34 of 54 Cypress Way East Phase 2 Jarnie's Crew(SS): • Station 31+60± to Station 30+37±: Contractor removed existing 6-inch asbestos-cement stormwater pipe along the north right-of-way of Cypress Way East, between houses #687 and #681 Cypress Way East. Removed asbestos-cement pipe was measured for payment(123-feet). Removed asbestos cement stormwater pipes were measured for payment as asbestos cement water main. • Station 27+57± to Station 24+78±: Contractor removed existing 6-inch asbestos-cement stormwater . pipe along the north right-of-way of Cypress Way East, between houses #657 and #645 Cypress Way • East. Removed asbestos-cement pipe was measured for payment (279-feet). Removed asbestos cement stormwater pipes were measured for payment as asbestos cement water main. • o Contractor placed caution tape around excavation. o Contractor posted required "Danger" signage at excavation. o Contractor workers wore required PPE while removing asbestos-cement water main. o Contractor wrapped removed asbestos-cement water main in 8 mil LLDPE plastic sleeves. o Contractor placed a "Danger" label on 8 mil LLDPE plastic sleeves containing removed asbestos- cement water main. • o Contractor loaded wrapped asbestos-cement water main in a lined dumpster and hauled from site • to contractors' storage yard. #4-Subcontractor—ESH-CORE: Cypress Way East Phase 2 Eric(SS): • Station 31+60± to Station 30+37±: Subcontractor performed competent person duties for contractor removing existing 6-inch asbestos cement stormwater pipe along the north right-of-way,on Cypress Way East, between houses#687 and #681 Cypress Way East. • Station 27+57± to Station 24+78±: Subcontractor performed competent person duties for contractor removing existing 6-inch asbestos cement stormwater pipe along the north right-of-way,on Cypress Way East, between houses#657 and #645 Cypress Way East. o Subcontractor placed an air monitor on the exclusion zone.Also,subcontractor placed an air monitor on one crew member while removing asbestos cement water main. Planned Activities for the week: • Contractor anticipates installing stormwater system on Cypress Way East Phase 2. • Contractor anticipates removing existing asbestos cement stormwater pipes on Cypress Way East Phase 2. Palm River PUR Page 3 of 18 Areas 1 and 2 r 1 6 C3 WD#6 Backup Page 35 of 54 687 Cypress Way E Naples FL 0 75°E (M) Q 26°17'7"N,81°46'16"W ±13ft ♦ 15ft .. tt ';4, •1, d I', ".,. r' . to��ia,� ICJ k �ftE -� 1 tl:1 ,1 eVIF+ . fr.. r �, Contractor set up an exclusion zone while " ' ' 47 , da removing existing asbestos cement stormwater pi Palm River SS Stantec 10 Jun 2024,08:04:11 - Contractor placed a exclusion zone around area to have asbestos-cement stormwater pipes removed, along the north side of Cypress Way East, adjacent to house#687 Cypress Way East, near Sta. 31+40± 687 Cypress Way E Naples FL ®94°E (M) ®26°17'7"N,81°46'16"W±13ft ♦ 15ft i k.ti,,• t5�r. Ill.. -:0 ,� , : 9.1DI&ER ip. ‘ II , A , ,.. . 411,.., _' t ASBESTOS+'� • ,y. fii , E , ,> ,.. ,. ilk" T `r yil u1rc._IALvlc `�L: .4 •, I `� 4 015EI3caTER0 A .1, ,,,....1.,- 1 .�•_ `t , fERSONNFLONLY f .•1Ww -�- — �� RF:RCEZI RS 11N0 + • —, y..✓�'�^"�_y PIIOTEGTII�,((Y cLOTHINO - �t"1' K APE RiOUIRZO C r _ E Or t .ontractor placed a Danger sign on P% Sy xc1usion zo e.� f Palm River SS StanteO' %" ?:, 10 Jun 2024,08:04:58 Contractor placed a Danger sign on exclusion, along the north side of Cypress Way East, adjacent to house#687 Cypress Way East, near Sta.31+40±. Palm River PUR Page 13 of 18 Areas 1 and 2 1 6 C3 (WD#6 Backup Page 36 of 54 .687 Cypress Way`E Naples FL O (} Q 26 17 7 N,tii. 46 16 W±13ft A=7 4ft.36 - rt"..t. ,:r-....,./-7,1,e„,,,,,,„.„... ,,,,f i1 ... . 4 k , . •,., , ..,.._,. _ �+�f�. . w+�wi ,. ,,s„.....„,•;•_„_,,,,,...... . :_. . _ _ . , • ........:,„;.,,,r,....,.„0,_ ...r..,,-.0....______:„___ m..„3.,.... ...„.„.,„„..,,,,._„.„,„,,,,,./., .. ....„, , , , ....„.........,_,„,,,,,:„.„„,„„. . ..„....„.„.„:„...,..........„,...„,,,i..„....::V''''..:S...*At ir„, ..-S'n'A :-. -.- - : --.4.,-....,,,,,i4-47,,,,,.,-„,,,?„,,,,,,,,,-53 r ,*T err P yy: ma's yP ,,. Dk4,..- t +' ,.�y. „-i a "--emu - 'J ,,.' 9 r :>- s Ii ` 'ESl COREplaceda air monitor on _Palm River eSSlutsaiontnezcone - ...,:..;, ' p Jn 2024,08 05.21_ Subcontractor ESH-CORE placed an air monitor on exclusion zone around area to have asbestos cement stormwater pipes removed, along the north side of Cypress Way East,adjacent to house#687 Cypress Way East, near Sta. 31+40±. , 687 Cypress Way.E Naples FL : -prjw,1 x 25° 7 " 1,$ '467-,;-. N t1 ft A l4ft i h• 7 d r11Z--7- -7.'''''' ..--...... ;py sr B [ " -, S ,_:,"Ca'S"5�.. .....r, rrw ar ""` 0 ry a , r # _:-.vex .... , Y� e � � , M •i, ,q ,e.°l-s j.. lye.._" " 7, e"-4: .1 .; �6 � :,.+ " �' �s _ •3 •y � r . ¢( ram r ��4c�'°f` e,,+:111.;hZ �" • V.• -'`-.?:i va"pis 3+` -aa,F'iT ',+.�� .'- s egg yu Vv "' o- �- -, a t'Ciit iilri41 i3 F -.1 '4.' S 'S} ,c«. 'aiP"1` qu`4.g.....'..a,': . ry '.:J. .t Cn#ra+;to vvoie`}rdfective;6lbffil >�a 4�� , ,,�. respirators while removing asbestos ,: .1 ,� Obmcnt storm - • . palm River, ' SaStantec i 0 Jun 2024,OB 05 55 Contractor wore protective clothing and respirators while removing existing 6-inch asbestos-cement stormwater pipes,along the north side of Cypress Way East,adjacent to house #687 Cypress Way East, near Sta. 31+40±. Palm River PUR Page 14 of 18 Areas 1 and 2 16C3 WD#6 Backup Page 37 of 54 687 Cypress Way E Naples FL 0 32°NE (M) U 26°°{17'7"N,81°46'16"W±13ft A 14ft • •,?n 4 r' t n . , hif2 j�V�. �t a^`a is N!'q"yam. iq;g 1 ; -C - 1�: 4a w-A 14 k�k-. rc 1 °"1, AIL i 1 1 1�57 1'�. ^t•. Ji3tYi' 1Ji S"i4i S'▪r4�1 r _ 1' ..l 1'i-v 0,.. tt + / ?,.E - • •- • ' -.-1• ':i-.,•.•;'-''=:...;•-,'•-X' •..•- ,- ' • Alti, ,.•••'...,. ' ',. 'c.OA {{�� / s A. ,1?„ 1 ,+ k. 4. f.4 V 1, i0ir,,-` ,, h'W Crecy member wore a air monitor while `,;;,,,4 ,, �w: ., removing asbestos cement stormwater .�,.. `'. ,., pipes '}�6 jV,O-r;1..t SS Stantec Y10 T' '20 4;0 08 41 t V.►r.r — - � —tl r,t {ar.._.,.r. i .s, y"e r1 * ro►r"`'�-"-y'".." �`v:'"+ -Nar'f_. Contractor crew member wore a air monitor while removing 6-inch asbestos-cement stormwater pipes, along the north side of Cypress Way East, adjacent to house#687 Cypress Way East, near Sta. 31+40±, 687 Cypress Way E Naples FL ®45°NE (M) C. 26°17'7"N,81°46'16"W±13ft A 15ft VYI,1111., I IIYJ V. Q I I9 ',1/'4 �.• ,r y. • v �4�� , r fl ti t 7. 6. i.'"1",. .,,*..:::. fr'li rye f". wrt 1 ti r' - ,p .Y ,, h ,Iri rn w I t G .0 +, . 'A Contractor wrapped removed asbestos '` ,la•' G.. '`° ' cement stormwater pipes in 8 mil LLDPE 4, plastic sleeve Palm River SS Stantec 10 Jun 2024,08:07:28 Contractor wrapped removed existing 6-inch asbestos-cement stormwater pipes inside 8 mil LLDPE plastic sleeves,along the north side of Cypress Way East, adjacent to house#687 Cypress Way East, near Sta.31+60±, Palm River PUR Page 15 of 18 Areas 1 and 2 1 1 6 C3 WD#6 Backup Page 38 of 54 687 Cypress Way.,E Naples FL 646°NE (M)= Z8°17t7''`N,81°46'16"-kW±13ft!£l3 t , , .:,.._.„-,,,.,„..,,---,,,;::.,,,:„.-_-_:. ., -, ,. _ ---,: .-_._,,,. ,-,,,,,,,:,,,,,,,,,,,,,,-_,, : -- .-,,;.-„,,,:,..„.-„,,,,,..---,,,. . . _: _,_„...,:. .-7.'".'„',,,..;;..A4*Ats.r..N:,,,, I, . 2c!:-..,::,:.:::::,,,,,,,3:::NAK-44,:r..,..i.•._....„.,,_,:..,. .,.. ,..i.,-.:-;.___::..,,..:_:,f,,g-:,,::,-.,42,.;c:,...t,„,:,a„,„-.7r.,,,Ni i .„.,?,..„„i.,,,..0„,,,aap......p* .4.,,,.:,,,,,,,:t...:,-:-k.;..4.:1 ,4„:-.. ..7,1*..,:, ,f..2.,.J4.:;,....,‘,,t,. •,,,,:...„:::;:.„:„.„- -,-,-„,...,.,43.i...:2,,,:„,e_ i ......, ...„.., ,,,.. ., �, t; DANGER . s GONTAiH `� .g r, �`� lVDIOSASSESTG CREATSFIBER `'z # AYDIUBA FRANDLONGBISEASFHAIAAD '1,...-' * ` `. ArHING AIRS -`' r+fr ' .� MW+aar ORNFAS ''-. r,M " aF -.y w•�w"t- _- y --- FIBFHS ,,, �, • 1 .� ' y.- b ay lk i'k c C i' d is k � 3 . +''6AI` 4 z" . :6ontractor pttcec'a Danger label on t` Wrapped asbestos cement storm Water j �m� Pipes 4 .� w Palm River • SS St n#ear 10 Jun 2024 06:08:20 - Contractor placed a Danger label on wrapped existing 6-inch asbestos-cement stormwater pipes inside 8 mil LLDPE plastic sleeves,along the north side of Cypress Way East,adjacent to house #687 Cypress Way East, near Sta. 31+60±, 669 Cypress Way E Naples FLU 0 8$'E(M) O 26¢17'8"N;$'7°46'19"W±16 ♦ 14ft .y�r r �yti Y i' '& y •-•:.,,,,--,.;.„;.:: :-,.„..,,,,,,..:,. .44.,,,,_-,-,..:* --,--Tr.-,'--,;-.r. -4 . , -- 'Yj 4 � :Wf w.Y' ri X IG 'tM .4,egi2.ray?lt.... i . i:. Y� 4 j "'a^. 5; .r ` £ - `e+, :-Sx,� '#*' gad : 5 � �r , er c xxs -_ #�"-+(..�," "f .'• T rry.v �`�F��f 'Yrb 'i51"cii 'c6'.'4 "� a`�+ - - SS Stantec JUrt'202q 0813 29 Contractor lined a dumpster with plastic sheeting prior to placing wrapped asbestos-cement , ' stormwater pipes inside,adjacent to house#669 Cypress Way East, near Sta. 29+00±. Page 16 of�8 Palm River PUR Areas 1 and 2 16C3 WD#6 Backup Page 39 of 54 669 Cypress Way E Naples FL 0 99°E (M) OO 26°17'8"N,81°46'19"W±13ft ♦ 14ft tie j� 'Y, , 1 r . �, , ' . ,'y • ,, S. . •A tq� r 01' ' -' - I ' al .t it ✓ r 'is,); :Ctorlplaced wrapped asbestos � .,,,t '. -,F w '; ;'� �&.f t stormwater pipes inside plastic rt, "' `` •`lined dumpster ` Palm River SS Stantec 10 Jun 2024,08:14:15 Contractor placed wrapped asbestos-cement stormwater pipes inside a dumpster lined with plastic sheeting, adjacent to house#669 Cypress Way East, near Sta. 29+00±. 687 Cypress Way E Naples FL 0 266°W(M) OO 26°17'7"N,81°46'16"W ±13ft ♦ 16ft rl. ; . �' .tin y'. ' ' --- ; . _.) �- ear. rd 1. S� �. a. .',i.F:' � try - . „pf' ���<,s ` 1 + ` _.+'� 0 LSD' ,•a--s ^7 „J .J - S"3♦' ♦- • � ' - Y • •..s' n a?r. Contractor compacting lift of native soil backf ill at removed AS stormwater pipes Palm River SS Stantec 10 Jun 2024,09'03:08 rr..r4 Contractor compacting lift of native soil backfill in trench from removing existing asbestos-cement stormwater pipes,along the north side of Cypress Way East,adjacent to house#687 Cypress Way East, near Sta. 31+40±. Palm River PUR Page 17 of 18 Areas 1 and 2 1 6 C3 WD#G Backup Page 40 of 54 Public Comber County DAILY REPORT OF CONSTRUCTION RonevtiaUtlllties;f Public UtiiitiesDepartment PALM RIVER PUR AREAS 1 AND 2 Engineering&Project Management Division CONSTRUCTION PROJECT ( Stantec fr.V-V-7;IDat;,..NA:6/ ki Stantec PIN: 177311742 Accidents ❑Yes ®No Day of Week:Wednesday Contract Day: 420 Total Days:573/603 Accident Report#: HIGH TEMP (F): 87°F AM Conditions: Cloudy/ PM Conditions:Cloudy/ N/A LOW TEMP(F): 77°F Rain Rain General _ Remarks #1- Prime Contractor— Haskins: Cypress Way East, Golfview Drive, Palm River Blvd., Pompano Drive, Eastwood Drive Deon (SS): • Contractor on site to assist and supervise crews. • Progress Meeting at 9:00 a.m. Pompano Drive Phase 2 Cory's Crew(SS): • Station 7+00±:Contractor excavated and compacted driveway at approximately subbase elevation, then placed and compacted approximately 6-inches of F.D.O.T. certified compatible limerock base, in preparation for paver driveway restoration, at house#651 (east) Pompano Drive. Restored driveway will be measured for payment when completed. #3 -Subcontractor—Superior Interlocking Pavers: Pompano Drive Phase 2 Jack's Crew(SS): • No activity due to rain. Planned Activities for the week: • Contractor anticipates driveway restoration on Eastwood Drive and Pompano Drive Phase 2. Water System Remarks #1- Prime Contractor— Haskins: • No water activity observed today. Planned Activities for the week: • No water activity anticipated. Palm River PUR Page 1 of 9 Areas 1 and 2 �t. 1 6 C3 WD#6 Backup l Page 41 of 54 Wastewater System Remarks #1- Prime Contractor—Haskins: • No wastewater activity today due to rain #2- Subcontractor—YPC: • No activity observed today. Planned Activities for the week: • No sanitary sewer work anticipated. Stormwater System Remarks #1- Prime Contractor—Haskins: Cypress Way East Phase 2 Jamie's Crew SS : - • Station 24+78± to Station 22+72±: Contractor removed existing 6-inch asbestos-cement stormwater pipe along the north right-of-way of Cypress Way East, between houses #645 and #633 Cypress Way East. Removed asbestos-cement pipe was measured for payment(206-feet). Removed asbestos cement stormwater pipes were measured for payment as asbestos-cement water main. o Contractor placed caution tape around excavation. o Contractor posted required "Danger" signage at excavation. o Contractor workers wore required PPE while removing asbestos-cement water main, o Contractor wrapped removed asbestos-cement water main in 8 mil LLDPE plastic sleeves. o Contractor placed a "Danger" label on 8 mil LLDPE plastic sleeves containing removed asbestos- cement water main. o Contractor loaded wrapped asbestos-cement water main in a lined dumpster and hauled from site to contractors' stora:e yard. #4-Subcontractor—ESH-CORE: Cypress Way East Phase 2 Eric(SS): • Station 24+78± to Station 22+72±: Subcontractor performed competent person duties for contractor removing existing 6-inch asbestos-cement stormwater pipe along the north right-of-way, on Cypress Way East, between houses#645 and#633 Cypress Way East. o Subcontractor placed an air monitor on the exclusion zone.Also,subcontractor placed an air monitor on one crew member while removing asbestos-cement stormwater pipe. Planned Activities for the week: • Contractor anticipates installing stormwater system on Cypress Way East Phase 2. Palm River PUR Page 2 of 9 Areas 1 and 2 16C3 WD#6 Backup Page 42 of 54 639 Cypress Way E Naples FL ®3049NW (M) Q 26°17'8"N,8'1°46'24"W±19ft ♦ lift A � , f ac, �.� • 9 si ,1 ,. -.,d t ' ,- &'1 ,'r,- x ^�,+1 }sue . ., ,s �' I- 4tt 4 �f51 y �{� al yqW JY 'b" 4�—� '' '0.,^ f-Aiks--'- ':ft'i',1,40VA-;:,#,„.Lk.,,,-'.'t:,,.-,--.'f.'--;.s;;.; ,---4*-i:.::.--Ale4;• 1 i 52-r ft d i Y"J1 r �� .7 `Q� 2 y� o c �¢34 t - x "''k ,-' 4+ ,' '�v'.e..,• .r+. ',°" CQntiraCtgr S@t UJ3 rf 8''{C)USIQq�U�18 le�j � ti, z� i ,r' "�3' ��re`. avmg asbOsta en sto its ` ,�, ,F , SS Stantec � JUri2024,0>34 Ufi 11 Contractor set u.p an exc usion zone whi e removing existing asbestos-cement stormwater pipe along the north side of Cypress Way East, adjacent to house#639 Cypress Way East, near•Sta, 24+50±.'• f f'' 639 Cypress,W�ly;E'Nap1ss,`F ; 1 5 x a` r ° t ii 0 r rr al.8i,W( )x 26 17 $ N,816 24 Wt ♦1lft ». .� r If V>s+A+ Y Ea;4id�,, , fir, }w. ' s 1 046'V ra 4 n piN-�.r1'.k•�?,„' a'r � ?'m 3P,�P" Q7P. a �" ` 'St,' et a tea$< "� c .a:� .. A �1 � r t�tr s '�� -2'r gf:. "rf: 11 Contractor placed a Danger sign on , x � ' exclusion zone Palm River SS Stantec 12,tun 2024,08:34:46 I; Contractor placed a Danger sign on the exclusion zone while removing existing asbestos-cement stormwater f• - pipes along the north side of Cypress Way East,adjacent to house#639 Cypress Way East, near Sta. 24+50±. 1 Palm River PUR Page 5 of 9 Areas 1 and 2 I: 16C3 WD#6 Backup Page 43 of 54 „ 639 Cypress Way E Naples FL tpg 310°NW (M) OO 26977'8"N,81°46'24"W±13ft A lift \ � s, ._.c \ lc.0` am c-� " ! i 'r ,. t -,,of `, , ,--- •— . tli,' -.' r" 7.:-. -----;.'f., \':. ,!.&.-.;‘,`, .•%.1 .,::';''..'-'1Z. --`„,-',.:-.2-4' 1 wmr.:-- ,, ' ,7^,� '. :^_^s , 3. fir.,,"7u - e*. s u?" F '?� a''-ff.A • �."r-' - .� -` P � ! - q,.�A.. �o' fa'In tor.cretJ".ore protectwe clothing e , `� ,, z fl' , spirakors vdhllc removing asbestos ' t "nt s ive> S Staritec 12 JiY1204 35:50" Contractor wore protective clothing and respirators while removing existing asbestos-cement stormwater pipes along the north side of Cypress Way East, adjacent to house#639 Cypress Way East, near Sta. 24+50±. 639 Cypress,Way E Naples FL °40'24"W t13ft �' ft 6°17'8"N,8714°N (M) O2 4 - a `✓ ;}c ray t ._ ' o fh c.'^'�6-._t.,,'-,':'1 0-',...'-4,,,--z—,. 1 r-," v f Sri it's �v : Y�c'-.",r t- `""A g. y_.si.,i, 'F" ., La ' /1/,�°�''' ro"rtrYys! '._,,,- f�7,--- '6'y��. g.,'--,---,,-.-,-„, ' „; -''''''.--7r,'"-,'"--;''''.4---i4 ,ems' �h m�'":t ., z. �F',9 _.. ,Fi`., s--u+,. ?" t ;.r, o d� "lam'.•. a, fir : `'fir.ef a i-1" Crew`member wore a air monitor while -- removing asbestos cement stormwater h_ pipes Palm l3i'er SS Stantec 12;tun 2D24,b8:36:38'' Contractor crew member wearing a air monitor whi a removing existing asbestos-cement stormwafer pipes along the north side of Cypress Way East,adjacent to house#639 Cypress Way East, near Sta. 24+50±, Palm River PUR Page 6 of 9 Areas 1 and 2 16C3 WD#6 Backup 1 Page 44 of 54 • • 639 Cyp •ress Waak Naples FL _ O llE M)f*26°17'8"N,81°46'24" ±13ft A 11ft - - .'4,4 - L,;',C 4.•••••4;•,,'"'41.- 4 -*4!,;....;.5...4,,•••:•_-•::::,,,,,-7,-*., - _ ' i ‘. d- ' t .. i 'e. i r --; "'-T, rr'! + > ,,,;ems^ .w% y',-„ 4*:„• .4 • r ,_.:.ram : N ! .c , x 6S"4 k MESH CORE placed a air monitor on exclusion zone • Palm Fiver SS Staritec _ -12Jun,-2024 08,37i.53 Subcontractor SH- 0•E place. a air monitor on t e excilusion zone while contractor removed existing asbestos-cement 1 stormwater pipes along the north side of Cypress Way East,adjacent to house#639 Cypress Way East, near Sta. 24+50±, • I 639 Cypress Way E Naples F r� x ., i "120°SE(M); C)26°1718"N,81°46'24"W±13ft A 13ft .0•!!::::.--.,--,.. .".4?:;•, . .• — .: A.••--44.1•At,,- :•,* -4.4.5,-Jizi:,-----,:j',--e—tiei-1,-1-:-: -7--------- ,--•'7 ',,I.F:',,,g,--;53:147.7:,-,-,,.., '...1,,'., ::.•; , -' -''''' . - .„r 7 1 .. ,:i 10 � t , I J. J y�, YY 11��ss t Jk. . ' .. i :cam ;' yn Y ---- - 4W -t .y`r".yam ✓� 'v�a'`"�` E 6 �. ,,4-, f -,�-. y gar„ ", Jfz 1'" -,,,,,,'44.-" Teti tractor=Wr'apped removed asbestos cement starrntreater pipe in 8 mil LLDPE ',plastic sleeve P fiXC,Ritier SS Stantec 12 Jun;2024,0 8 34 Contractor aced removed existingasbestos-cement stormwater pipe inside 8 mil LLDP astic sleeve, p P P p along the north side of Cypress Way East,adjacent to house#639 Cypress Way East, near Sta. 24+50±. _ is j Palm River PUR Page 7 of 9 Areas 1 and 2 16C3 WO#6 Backup Page 45 of 54 639 Cypress Way E Naples FL 0 275eW(M) ©26°17'8"N,81°46'24"W±'13ft5�►16ft „3' �.',, U _ .., ,. ,... __..w, tr DAN E COt TgINS A B OS FJBEtiS-. N OGtEA' VOAUS7 . CA,1 f t.!lNG SEASt iAzA A010 t1f;EA� 4106t7VE atali'U IPEf . AAM gt P[N NTP 41 ;r 'Iir . ,- Contractor placed a Danger label on - wrapped asbestos cement stormwater pipe - Palm fiver SS Stantec 12 Jun 2024,08:39:20 Contractor place. a Danger abel on removed existing asbestos-cement stormwater pipe inside 8 mil LLDPE plastic sleeve, along the north side of Cypress Way East, adjacent to house#639 Cypress Way East, near Sta. 24+50±. .639'Cypress Way E Naples FL ` k O 2$ °W(M) O 26°17'8"N,; 1°46'24"'W±18ft a 12ft r 'I 4ry f ,. -fie ',: ���'». ii G f ..% #.""..e,,..;':..i''-s.-.1-,.„.i„.5s-.,,4...--.'i„",•a:.:,•4..-:'.-.;C•.i'.F't.c."i=.'----,--.::y„11.2,1;,,.-,.,.,,.A,-„..t,,--.-,,,-7-,--.7,,;..-4_..;:4-4.,'-.---_'„,7-'_-.-`,,-.,7.,,1".-'..„:•.:-.,„D,-,,,4,::`,:..',:-.,.'.;••,.,'.::'''-,-.',.'—.w.7'.-.—'.-..''.,'.f,'.7'.....:'r:"_4-.,7,..,:--;-r,'-.'-.,::.-.4':'.,.:,.,,,,,-..1-,A.7-r.:',.,'-.-:11'.7•Ii-.,;'•.i'f.'k T..:':,:,.',,1='*,.-e1 tee' y�4 ,p- '' .,RAC' -' 'F ra y~ i]� p • f '• ,�, z v4 'S4- ff" F q _x,§..i'' fr :i „�+� R . fi"i'F K tst.Ntt'" ' 3 `1.. 8�/ ;tuts'.1:'i, 1inzfig rr}..,t r 4f r .. ,' • �.r i ° r- 'Fr ys7 �;T.ff `. '_ se "dj " a ti• �,1, . 93..r1 ,,,, • C . u ,.. P : J t 1 - . „7 j f5 _ 9' it 5 =4 � Yi.- 4 k. r- �.,_'q�Sr. ^t,.. -717 > eS_^, {s,,f F ",4r.-.1,,.,,-::: st J4,Cry.�?yL'st,. nt C ->-, C9fitracter udt�a�.ting lift'of rla� 1 ,7 1 �, ;,r;F io- 4 k-,!¢ " '4. z baokfill in trench from removed AC storfrf� ,? "� ' ,pipe . ' .'Palrft RIVdr' • SS Stantec % 12 iJut1244,08 40 06 Contractor compacting lift of native soil bacl<fill in trench, along the north side of Cypress Way East, adjacent to house#639 Cypress Way East, near Sta.24+50±, Palm River PUR Page 8 of 9 Areas 1 and 2 16C3 WD#6 Backup Page 46 of 54 669 Cypress Way E Naples FL 0 39°NE (M) CO 26°17'7"N,81°46'19"W ±13ft A 15ft g�.,r t.. lw • 1• MTV t?%• . .1 V N'• 4p,111tIT.v- w M' ,.�4 • t 7 -•'°. a.+ ,r}�,ee.+w . . ro t T t y 5'r . , r v . `.Contraetor placed`plastic sheeting inside s� '" dumpster prior to placing wrapped AC storm pipe Palm River SS Stantec 12 Jun 2024,08:43:58 ontractor line. a dumpster with plastics eeting prior to placing removed and wrapped Asbestos-cement stormwater pipes,adjacent to house#669 Cypress Way East, near Sta. 29+10±. 669 Cypress Way E Naples FL 0 88°E (M) CO 26°17'7"N,81°46'19"W±13ft ♦ 17ft t{ ''I r / /ems/ s `e}4 a G 'j S ., ,..)7 y � 'C 2 '• t�Y {fpf;,fir-, ••,� R tf, {'i I•,iiit• `t';' / . � ,.'. _kl Y - ,., �' ,, - :)ate ..• . 0? ' p ', ' 1 ..- Contractor placed wrapped asbestos cement stormwater pipes,inside plastic lined dumpster Palm River SS Stantec 12 Jun 2024,08:45:08 on ractor placed remove• and wrapped asbestos-cemen stormwater pipes inside dumpster lined with elastic sheeting,adjacent to house#669 Cypress Way East, near Sta. 29+10±. Palm River PUR Page 9 of 9 Areas 1 and 2 16C3 WD#6 Backup Page 47 of 54 HPubuc ;,rU�tlttllesf COter County DAILY REPORT OF CONSTRUCTION Public utilities Department PALM RIVER P U R AREAS 1 A N D 2 Engineering&Project Management Division CONSTRUCTION PROJECT Stantec Date: 6/13/2024 • ski Stantec PIN: 177311742 Accidents EYes No Day of Week:Thursday Contract Day: 421 Total Days:573/603 Accident Report#: HIGH TEMP (F): 87°F AM Conditions:Cloudy/ PM Conditions: Cloudy/ N/A LOW TEMP (F): 77°F Rain Rain I +. General Remarks #1 - Prime Contractor—Haskins: Cypress Way East, Golfview Drive, Palm River Blvd., Pompano Drive, Eastwood Drive Deon(SS): • Contractor on site to assist and supervise crews. Pompano Drive Phase 2 Cory's Crew(SS): • Station 9+60±: Contractor excavated and compacted driveway at approximately sub-base elevation, then placed and compacted approximately 6-inches of F.D.O.T. certified compatible limerock base, in preparation for paver driveway restoration, at house #672 Pompano Drive. Restored driveway will be measured for payment when completed. Pompano Drive Phase 2 Cory's Crew(SS): • Station 11+60± to Station 11+00±: Contractor graded the south right-of-way along Pompano Drive, between houses #690 and#684 Pompano Drive. #3 -Subcontractor--Superior Interlocking Pavers: Pompano Drive Phase 2 Jack's Crew(SS): • No activity due to rain. Planned Activities for the week: • Contractor anticipates driveway restoration on Eastwood Drive and Pompano Drive Phase 2. Palm River PUR Page 1 of 11 Areas 1 and 2 1 6 C3 WD#6 Backup Page 48 of 54 Pompano Drive Phase 2 Alberto's Crew(SS): • Station 3+25± to Station 0+73±: Contractor adjusted sanitary sewer service cleanouts, for cleanout concrete collars, along east and west sides of Pompano Drive, at houses #551, #539, #536, #524, #527, #515 Pompano Drive and#633 Cypress Way East on Pompano Drive. Planned Activities for the week: • No sanitary sewer work anticipated. Stormwater System Remarks #1-Prime Contractor— Haskins: Cypress Way East Phase 2 Jamie's Crew(SS): • Station 0+20±to Station 0+55±: Contractor removed existing 6-inch asbestos-cement stormwater pipe along the west right-of-way of Pompano Drive, adjacent to house #515 Pompano Drive. Removed asbestos-cement pipe was measured for payment (38.5-feet). Removed asbestos cement stormwater pipes were measured for payment as asbestos cement water main. o Contractor placed caution tape around excavation. o Contractor posted required "Danger" signage at excavation. o Contractor workers wore required PPE while removing asbestos-cement water main. o Contractor wrapped removed asbestos-cement stormwater main in 8 mil LLDPE plastic sleeves. o Contractor placed a "Danger" label on 8 mil LLDPE plastic sleeves containing removed asbestos- cement water main. o Contractor loaded wrapped asbestos-cement main in a lined dumpster and hauled from site to contractors' storage yard. #4 Subcontractor ESH-CORE: Cypress Way East Phase 2 Eric(SS): • Station 0+20± to Station 0+55±: Subcontractor performed competent person duties for contractor removing existing 6-inch asbestos-cement stormwater pipe along the north right-of-way, on Cypress Way East,adjacent to house #515 Pompano Drive. o Subcontractor placed an air monitor on the exclusion zone.Also, subcontractor placed an air monitor on one crew member while removing asbestos cement stormwater main. Planned Activities for the week: • Contractor anticipates installing stormwater system on Cypress Way East Phase 2. Palm River PUR Page 3 of 11 Areas 1 and 2 16C3 p WD#6 Backup Page 49 of 54 1 684 Pompano Dr Naples FL 0 308°NW (M) Q 26°17'11"N,81°46'17"W±13ft A 14ft .r- .. mkt . 1 A•, f ,9 fie. MYir •.--tv - tea • f 7 ,� x'�x r j----....,Y i (4,—..,;...iik,..,i,* J' 3, 7 s Contractor grading south right of-way on • Pompano Drive ` Pali 6h.:I, ' SS Stantec 13 Jun 2024. 11:305 ` Contractor grading the south right-of-way along Pompano Drive, adjacent to house#684 Pompano Drive, near Sta. 11+00±. 515 Pompano Dr Naples FL 0 70°E (M) Q 26°17'9"N,81°46'27"W ±19ft A lift `l(4 = � ''� 71 -1 '.a y 1 p'- d uwy M / _ ..,ter;,.• j 74 Y OONui �OIWi I.'1. YIIM r lMii a wYu r � py,.,. p. ! . Ni.'. y S �s bt-"t .j�,.ar � 1 -.•.t`r � ; pw?I.•- ''sr• Tar—. i . '.�"i ..V it aF 7 44.c''rc ',4 / / to,< '`'`5 +} st•t••i.ti. +ty4,,-', 0,,,...at.a..,6' ' x.»�� `', 8s A v v a s, -- - Contractor set up an exclusion zone while j '" " ^ removing existing asbestos cement pipes Palm River SS Stantec 13 Jun 2024,0/:51:37 Contractor set up an exclusion zone while removing existing asbestos-cement stormwater pipes along the west side of Pompano Drive, adjacent to house#515 Pompano Drive, near Sta.0+55±. Palm River PUR Page 6 of 11 Areas 1 and 2 1 i 1 ^� ^� �� �� . ! i VYO #0 Backup . ! | Page 5UofS4 � / | � ! ' ` � U� ^K�� 0� � ;� :� ��K� ����KV i -»^63-/*c \wy 9 AN ` R. rio 0. ME& b" � i / ' � - i ContractorplacedaDamgersignontheexcusionzonewhie/emovingoxisdnQasbestos-cementstormwater . pipes along the west side of Pompano Drive,adjacent to house #515 Pompano Drive, near Sta. 0+55±. �~ 515 n-wwxupaxxo Dr Naples nFL. NTAAM -cement stormwater Contractor wore protective clothing and respirators while removing existing asbestos pipes along the west side of Pompano Drive,adjacent to house#515 Pompano Drive, near Sta.0+55±. Palm River PUR Page u/11 Areas 1 and 2 �� ' ' 1 6 C3 WD#6 Backup i Page 51 of 54 515 Pompano Dr Naples FL y� � 0 267°W (M)* _26°17'9"N,81°46'27"W-±133ft A 12ft 5,,,' td� �'- w 's '.fit,i.c r1,,-r. f ? 4Ja '* d S"'.• +i 1 oaf. �f'-'' 1 ,.• 7- 1 ' - - ; " 4tti- 1'. • Contractor crew inember wore a air monitor �' while removing AC pipes Palm River SS Stantec 13 Jun 2024,07:56:45 /" .. ..�, -Contractor crew member wearing a air monitor while removing existing asbestos-cement stormwater r pipes along the west side of Pompano Drive, adjacent to house #515 Pompano Drive, near Sta. 0+55±. 515 Pompano Dr Naples FL 0 65°NE (M) OO 26°17'9"N,81°46'27"W t13ft A 11ft ii,.;:.: ,,, %.,.' - ;—. Ii •ti,-- -! A Ham. it;. f, r CA e0IOS _ p �R AND - J ESH CORE placed' ilfiitt.S 7�JE LUNG �. em ' exclusion zone . A " AZA•• ' Palm(River' i SS Stantec " el ' `' 13 Jun 2024,07:52:35 Subcontractor ESH-CORE placed a air monitor on the excliusion zone while contractor removed existing as sestos-cement stormwater pipes along the west side of Porn sano Drive,adjacent to house#515 Pompano Drive, near Sta,0+55±. i Palm River PUR Page 8 of 11 Areas 1 and 2 16C3 WD#6 Backup Page 52 of 54 515 Pompano Dr Naples F 6 273°W(M) OO j r "-,, ,r.t•4�,, s. 2c 6_3°1714N 8 1}°"4 627� d±26ft L.v af rSyk + s" t 44, r . % ' {# _. 1 � -1� a1 � ot fj vP%''- fie1� _W „� � `# i if � .4 � , s a } 1,',..,,,' :, \ • 3. .1, " ,- i. / t r^ ;- -- - -4,: ---, is e'7 iY A ?YI a 4 ^ • r, e `` v 4 cn .- 4 a �'t F I -fig' R f,,,' v'X�.g .7. `•d'`. lea ..3 ty,—. t:v".+'r rc>X -. .'-v l r{< - , < 4 - -..,._ . k.,,g,5-;....i,,,,,,,:,.....s.-...„-:::..,,;:: 01.1:t1 f. ... -. ,;a- '11'',171-1.;:l'il.'''...i.:-:-.e.71,-AliNF-:‘.r. r� s r "'� '� ,l max- ,s'1.. .� s' .F ,* � �.�en '� 7h,? -C7 C-",7 �a ,s L.,'s^�z .fin J y µ iF TA_ p'E etotr oving length.of existing to t -, 1. . irSi fl,E1sbesto§'cement stormwater pipe P&&R: vef t$ Stantec .13 J`pri 2024,0 4 03 i' Fan - Contractor removing length of existing asbestos-cement stormwater pipe, along the ,. west side of Porn•ano Drive, adjacent to house 1#515 Porn•ano Drive, near Sta.0+55±, 515 Pompano Dr. Naples FL, 347°N (M) ©26°17'9.N,8'1°46`27"W±l6ft=A_-1 f -'' r r.;57 ubr w r�F >l� I yt �.wa t4 n `,. r -`rCy' , den k� ir-N 7 ,e -, v„ e G �, `*JF ;'r x + ter' -3t e :x j�{r y's€�,;r J f Y l4. ��+e t. dgt,s^2A}'•.+"'y yA'+� l y w.� �fL b �; '.°4 i 1x�W, � ��§+5, ac-� ,ram rt •r vF �f 4l, % Y" j S V�Si P f.y ,,. �, i y,„"i,4 �r r Y w'..l: ...v k,-.1..,..-p -4 t z t✓ J `� �4� 1 b x �` ,?'",•'4 4` s,y`.k � 'y?r' " 'rl i -t i E� rid. �s�yn.; ' r "" l3tr V .te '"' cK x ✓i05`,, .im.. ..F: 'r�',- .. r s .. :1 a Co tfa$tdr placed s*O tos cement , s r stormwater pipe inside 8 mil LLDPE plastic' =T `' ` r sleeve Palm River SS Stantec 13 Jun 2024,08:31:00 , - >, -:_ Contractor placed removed existing asbestos-cement stormwater pipe inside 8 mil LLDPE plastic sleeve, along the west side of Pompano Drive, adjacent to house#515 Pompano Drive, near Sta.0+55±. Palm River PUR Page 9 of 11 • Areas 1 and 2 1 6 C3 WD#6 Backup Page 53 of 54 • 515 Pompano Dr Naples FL �DANGEI] - - -CONIAINSASSFSTOS FIBERS AVOID CBGTIH90UBT CAHCFR AND THUD DISEASFIIA1ANO YU _ AVOID ORBITING AISBOINf ASBESTOS MIRE iS FIB(M1S.., Contractor placed a Danger label on { wrapped asbestos cement stormwater pipe Palm River SS Stantec 13 Jar0g4,Q82�d1 Contractor p ace. a Danger abel on removed existing asbestos-cement stormwater pipe inside 8 mil L D'E plasti sleeve, along the west side of Pompano Drive,adjacent to house#515 Pompano Drive, near Sta. 0+55±. ._,• 515 Pompano Dr Naples FL ; o°N (M) ®26°17r8"N,81°46_1.4*f r�� F l # f f �'C''xBlx�G µ� '3 ell 1 <' S 8..,. ( ` 1, • T BEd,-Y sfr �R�a' s r to x 7 sss , f Fr ti _ a _ �yx„�'r`fr ,>=•r, .. �,,. �a'ice. �.,w -ter^-� ,K .^ -< YY Contractor compacting lift of native soil _ backlill at removed stormwater AC pipe � lKolver SS Stantec i3 Jun 20 4,=1.b•40:59 Contractor compacting lift of native soil backfill in trench, along the west side of Pompano Drive, adjacent to house#515 Pompano Drive, near Sta. 0+20±, Palm River PUR Page 10 of 11 Areas 1 and 2 1 6 C3 WD#6 Backup Page 54 of 54 529 Eastwood Dr Naples FL 0 251°W (M) OO 26°17'8"N,81°4615"W ±19ft A 14ft p...,...,-..1,,..,„,„1 ,i' ,\ it 4..c.-,,, ' N.�1 I- 1 vSl bry`ra - y N. Contractor lined dumpster with plastic 5 , ,�,, sheeting prior to placing wrapped AC pipes. ' .. , t"`-+•.....,,. 3 inside x. . :-. , Z'• ., 111 'Mkt-1 SS Stantec 13 Jun 2024,; 0: 3' �' - .. ..........,.—.�,..� . -.—r's+ vP-,r. +S• • S .. _./1114.+f+f" Contractor lined a dumpster with p astic sheeting prior to placing removed and wrapped fvs sbestos-cement stormwater pipes, adjacent to house#529 Eastwood Drive, near Sta. 2+200 1 529 Eastwood Dr Naples FL A 224°SW (M) O 26°1718"N,81°46'15"W ±13ft A 13ft \, "t 1 - ,,,,,...1Z i is e . y A �* z t r.'0 T`LrTyr, r g s Contractor placed wrapped asbestos • °. cement pipes inside plastic lined dumpster Palm River SS Stantec 13 Jun 2024, 10:58:27 Contractor placed removed and wrapped asbestos-cement stormwater pipes inside dumpste lined with plastic sheeting,adjacent to house#529 Eastwood Drive, near Sta. 2+20±, Palm River PUR Page 11 of 11 Areas 1 and 2 16C3 Daily Report Date LF Unit Price Total Cost 6/1/2023 250 $ 44.00 $ 11,000.00 6/2/2023 245 $ 44.00 $ 10,780.00 6/8/2023 57 $ 44.00 $ 2,508.00 5/3/2024 1307 $ 44.00 $ 57,508.00 6/10/2024 402 $ 44.00 $ 17,688.00 6/12/2024 206 $ 44.00 $ 9,064.00 6/13/2024 38.5 $ 44.00 $ 1,694,00 2505.5 Overall Total $ 110,242.00 16C3 Collier County Engineering & Project Management Division WD#9 WORK DIRECTIVE CHANGE CONTRACT#/PROJECT NAME: WORK DIRECTIVE#9 #22-7992R Palm River PUR Areas 1 &2 PURCHASE ORDER#: 4500223134 DATE OF ISSUANCE: January 12,2024 OWNER: Collier County Board of Commissioners PROJECT#: 70257.4, 60234.5.1 CONTRACTOR: Haskins, Inc. ENGINEER/DESIGN PROFESSIONAL: Q. Grady Minor& Associates, P.A. You are directed to proceed promptly with the following change(s): Description: Installation of drainage basin bubble-up structures at 411, 448, and 454 Palm River Boulevard, and 445 and 459 Golfview Drive to accommodate the existing private property back/side-yard and/or roof drainage pipes that extended into the ROW. Purpose of Work Directive Change: To accommodate the existing private property back/side yard and/or roof drainage pipes flow from private property into the ROW. Reason/Justification: During installation of the new drainage infrastructure, it was discovered that the existing back/side yard and/or roof drainage pipes at 411, 448, and 454 Palm River Boulevard, and 445 and 459 Golfview Drive extended into the ROW, which is not allowed per current Collier County standards. Haskins provided a time and material cost estimate to install drainage basin bubble-up structures at the private property drainage pipes on private property that will allow drainage to flow from private property into the ROW and ultimately to the County's stormwater system. This change is to add bubble up structures at 411, 448, 454 Palm River Boulevard and 445 Golfview Drive (one at each property) and three (3) bubble up structures at 459 Golfview Drive. Attachments: Contractor's quote If a claim is made that the above change(s) have affected Contract/Allowance Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the changes(s). Method of determining change in • Method of determining change in Contract Times: Contract/Allowance Price: • ❑ Unit Prices ❑ Contractor's records ❑ Lump Sum ❑ Engineer's record ® Time & Material ❑ Other ❑ Other Estimated increase or(decrease) in Allowance: Estimated change in Contract Time: $15,467.70 N/A RECOMMENDED: AUTHORIZED: 1/12/2024 By: Allyson Holland, PE By: Diana Dueri, PMP Project Manager Owner's Representative 1.. 1 6 C3 WD#9 Backup Page 1 of 12 BnTeq N m HASKINS INC. ll'. s+ 10956 Enterprise Avenue • Bonita Springs,FL 34135 PH. (239)947-1446 FAX(239)947-3(357 BILLED TO: Collier County P.O.8: 4500223134 INVOICES: COMMENCEMENT DATE: INVOICE DATE: DATE&TIME CALL REC'VO: WORK ORDER ll: COMPLETION DATE: DESCRIPTION OF WORK Connect(6)Existing 4"&(1)6"Roof Drain Pipes PERFORMED: to Bubble up Basin on private property STANDAR AFTER EQUIPMENT DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL LABOR DESCRIPTION NUMBER 0 STND HRS. HRS OH/ AFTER HRS, TOTAL OF MEN UNIT PRICE UNIT PRICE HRS./MAN MAN 45 TN EXCAVATOR HR S 275.00 $ - PROJECT MANAGER $ 110.00 $ 165.00 S - 40 TN EXCAVATOR WI HAMMER HR S 280.00 S - SUPERINTENDENT 6 $ 90.00 S 135.00 5 540.00 1 25 TN EXCAVATOR • HR $ 185.00 5 - FOREMAN 1 30 $ 75.00 S 112.50 $ 2,250.00 MIDI EXCAVATOR HR S 140.00 S - EQUIPMENT OPERATOR 1 30 $ 70.00 S 105.00 $ 2,100.00 MINI EXCAVATOR 30 HR S 130.00 $3,900.00 LABORER 1 30 S 45.00 $ 67.50 S 1,350.00 MINI EXCAVATOR W I HAMMER HR $ 150.00 S - FLAGGER S 45.00 S 67.50 $ - RUBBER TIRE BACKHOE HR S 110.00 S - MECHANIC 5 75.00 S 112.50 S - 20 TN LOADER HR S 185.00 S • PIPE LAYER 2 30 S 85.00 $ 97.50 S 3,900.00 15 TN LOADER HR $ 150.00 S - WELDER 5 225.00 $ 337.50 $ - 6 TN LOADER HR S 115.00 S - LABOR SUBTOTAL: $ 10.140.00 BOX BLADE HR 5 95.00 S - TRACK SKID STEER HR S 95.00 S - 15,000 LB DOZER HR $ 110.00 S - MATERIALS INCLUDING 10%MARK UP 35,0001E DOZER HR $ 130.00 S - MATERIALS DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL MOTOR GRADER(SMALL) HR S 110.00 $ - 5 - MOTOR GRADER(LARGE) HR S 125.00 5 - 4"Pipe and bubble up basin 1 LS 5482.94 S 482.94 PAVER(SMALL) HR S 105.00 S - 6-pipe and bubble up basin 1 LS $10128 S 101 28 ASPHALT MILLING MACHINE HR S 375.00 $ - S 3 TON VIBRATORY ROLLER HR $ 45.00 S - S - 6 TON VIBRATORY ROLLER HR 5 55.00 $ - S - 3-TON ASPHALT ROLLER HR S 45.00 S • S - 7-TON ASPHALT ROLLER HR S 55.00 S - $ DUMP TRUCK HR S 125.00 $ - S - ROLL OFF TRUCK HR S 135.00 5 - SubTotal $ 584.22 • LOWBOY TRACTOR HR $ 145.00 S - 10% S 58.42 2 112 TON FLATBED HR $ 65.00 $ - Tax $ 35,05 ROCK CRUSHER HR $ 290.00 S - Fuel Surcharge $ - SCREENER PLANT HR S 270.00 S - Freight S - SOIL STABILIZER HR $ 235.00 5 - TOTAL: S 677.70 STREET SWEEPER HR $ 50.00 $ - LIGHT PLANT _ HR S 20.00 S - VACCUM TRUCK HR S 200.00 S • SUBCONTRACTORS INCLUDING 10%MARK UP VACCUM WAGON HR S 8500 S • SUBCONTRACTORS QUANTITY UNIT UNIT PRICE TOTAL PUMPER TRUCK HR 5 300.00 $ • $ - WATER TRUCK HR S 125.00 $ - $ - MOT•BARRIER WALL(EA.) HR 5 3.00 $ S • MOT-BARRELL(EA.) HR $ 1.25 $ - S - MOT-CONES(EA.) HR $ 0.50 S - �$ • MOT-SIGNS(EA.) HR S 1.00 S - S - 20CY OUMPSTER HR S 25.00 S • 5 - 3"HYDRAULIC PUMP HR S 55.00 5 - S - 4"HYDRAULIC PUMP HR $ 65.00 $ • S - 6"HYDRAULIC PUMP HR $ 75.00 S • S - 8"HYDRAULIC PUMP HR S 95.00 5 - SubTotal $ - 10"HYDRAULIC PUMP HR S 105.00 $ • 10% $ - WELL DRILLIG RIG HR S 225.00 S • Tax S - WELL POINT SYSTEM HR 5 250.00 S - TOTAL: $ • 6"VACUUM PUMP HR $ 50.00 S - 8"VACUUM PUMP HR 5 7000 S 2"ELECTRIC PUMP HR S 15.00 $ PLATE COMPACTOR HR S 20.00 $ TRENCH BOX HR S 40.00 $ PICK-UP TRUCK WI TOOLS 30 HR $ 25.00 5 750.00 EQUIPMENT SUBTOTAL: $4,650.00 TOTAL DUE: $15,467.70 16C3 ® FEL-NAPLES WATERWORKS#136 Deliver To: FERGUSON WATERWORKS 3801 PROSPECT AVE From: Joderek Adams NAPLES,FL 34104 Comments: WD#9 Backup Page 2 of 12 Phone:239-643-4970 Fax:239-643-4946 13:23:43 JAN 10 2024 Page 1 of 2 FEL-NAPLES WATERWORKS#136 Price Quotation Phone: 239-643-4970 Fax: 239-643-4945 Bid No: B319134 Cust Phone: 239-947-1846 Bid Date: 01/10/24 Terms: NET 10TH PROX Quoted By: JA Customer: HASKINS INC Ship To: HASKINS INC 10956 ENTERPRISE AVENUE 10956 ENTERPRISE AVENUE PALM RIVER PUBLIC UTILITI PALM RIVER PUBLIC UTILITI BONITA SPRINGS, FL 34135 BONITA SPRINGS,FL 34135 is Cust PO#: Job Name: PALM RIVER Item Description Quantity Net Price UM Total 4"CONNECTION N900 9 TPRD C/BASIN W/DBL OUT 6 29.640 EA 177.84 i N990 9 GREE SQ GRATE 6 38.280 EA 229.68 NDS1243 3-4 UNIV LCK OUT ADPT 6 7.460 EA 44.76 N1206 UNIV PLUG F/C/BASIN 6 5.110 EA 30.66 SUBTOTAL 482.94 6"CONNECTION • N1200 12X12 C/BASIN W/2 OUT 1 41.870 EA 41.87 N1212 12X12 GREE GRATE F/C/BASIN 1 45.790 EA 45.79 • Ni266 6 UNIV OUT 1 8.510 EA 8.51 N1206 UNIV PLUG F/C/BASIN 1 5.110 EA 5.11 SUBTOTAL 101.28 12"CONNECTION A1276WT 12X6 W/TITE RED 1 262.320 EA 262.32 A066500201BDW 6X20 F2648 WITITE SLD HOPE PIPE 20 4.440 FT 88.80 N2706AG 'NLA 6 UNIVERSAL INLINE DRN W/GRAT 1 205.100 EA 205.10 • SUBTOTAL 556.22 Net Total: $1140.44 Tax: $68.44 Freight: $0.00 Total: $1208.88 HOW ARE WE DOING? WE WANT YOUR FEEDBACK! Scan the QR code or use the link below to 2:P complete a survey about your bids: 0 t https:I/survey.medallia.com/?bidsorder&fc=127&an=47354 16C3 WD#9 Backup Page 3 of 12 *MEe♦ f Oa $ HASKINS INC. L J 10056 Entorprb.Avenuo•Bonita Springs,FL34135 PH.(239)947-1846 FAX(239)047.3B67 9"•.a....o, BILLED TO: Collier County P.O.k INVOICE/: 2024-7 COMMENCEMENT DATE: 2/16/2024 j INVOICE DATE: 3/1/2074 DATE 4 TIME CALL REC'VD: WORK ORDER/: COMPLETION DATE: 2/19/2024 . DESCRIPTION OF WORK PROJECT NAME: Palm River Public UliBty Renewal Areas 1 S 2 PERFORMED: Palm River Wort Directive 59 STANDA ' STND "ND HAS IDLE IDLE HAD NUMBER RD STND HRS. AFTER AFTER HRS. EQUIPMENT DESCRIPTION UNIT OTT TOTAL HRS UNIT HRS UNIT TOTAL LABOR DESCRIPTION OF MEN HRSJMA UNIT PRICE HRS OH/ UNIT PRICE PRICE PRICE N MAN 45 TN EXCAVATOR HR 5 276.00 3 137.50 - PROJECT MANAGER 3 11000 $ 165.00 $ - 40 TN EXCAVATOR WI HAMMER HR $ 250.00 $ 140.00 - SUPERINTENDENT 3 00.00 S 135.00 S - 25 TN EXCAVATOR HR $ 185 W $ 92-50 - FOREMAN 7.25 S 75.00 5 112.50 5 643.76 MI01 EXCAVATOR HR $ 140.00 $ 70.00 - EQUIPMENT OPERATOR 725 $ 70.00 5 105.00 5 507.50 MINI EXCAVATOR HR 1 7.25 3 130.00 5 65.00 942.50 PIPE LAYER 7.25 5 8500 5 97.50 3 47125 MINI EXCAVATOR W/HAMMER HR 3 15000 5 7500 • LABORER 725 S 4500 I 67.50 S 32825 RUBBER TIRE BACKHOE HR S 110W $ 55.00 • LABORER 7.25 S 4500 $ 67.50 3 32825 20 TN LOADER HR 1 7.25 S 18500 $ 92.50 1341.25 LABORER 7 25 S 45.00 S 67.50 $ 32825 15 TN LOADER HR 3 150.00 $ 75.W - LABOR SUBTOTAL: $ 2,501.25 6TNLOADER HR S 11500 3 57.50 - BOX BLADE HR $ 95.00 $ 47 50 TRACK SKID STEER HR $ 9500 3 4750 S - MATERIALS INCLUDING 10%MARK UP 16.000 LB DOZER HR $ 110.00 $ 55.00 $ - MATERIALS DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL 35.000 LB DOZER HR S 13000 S 6500 5 Ferguson 1 LS 532.52 3 32.52 1.95 MOTOR GRADER(SMALL.) • HR 5 110 CO 5 55 00 5 • Ferguson 1 LS 3284.93 $ 284 93 17.11 MOTOR GRADER(LARGE) HR S 125 00 5 52 50 3 - Ferguson 1 LS 532.32 5 32.32 1.94 PAVER(SMALL) HR I 10500 $ 5250 3 - Home Depot 1 LS $25.36 5 25.38 1.55 ASPHALT MILLING MACHINE HR 5 375 00 S 157 50 3 - $ • 3 TON VIBRATORY ROLLER HR $ 45.00 S 22.60 3 - S - 8 TON VIBRATORY ROLLER HR $ 55 W S 27.50 3 - 5 - 3-TON ASPHALT ROLLER HR 3 4500 $ 2250 3 • __ __ S - 7-TON ASPHALT ROLLER HR I 5500 3 2750 5 • $ - DUMP TRUCK HR f 12500 3 8250 5 • SubTolaI 5 375.15 ROLL OFF TRUCK HR $ 13500 3 67.50 3 - 10% 5 3752 LOWBOY TRACTOR HR I 145.00 3 7250 3 - Tax 1 2285 • • 2 1/2 TON FLATBED HR 3 55.00 5 32 50 S - Fuel SUMharOa $ - ROCK CRUSHER HR $ 29000 $ 14500 3 - Freight $ - SCREENERPLANT HR 5 27000 5 135.00 5 - TOTAL: 5 435,32 SOIL STABILIZER HR $ 23500 S 117.50 I - STREET SWEEPER HR S 50.00 S 2500 3 - LIGHT PLANT HR $ 2000 I 10.00 3 - SUBCONTRACTORS INCLUDING 15%MARK UP VACCUM TRUCK HR S 200.00r S 10000 3 - SUBCONTRACTORS QUANTITY UNIT UNIT PRICE TOTAL VACCUM WAGON HR 3 85.00 $ 42.50 $ - $ - PUMPER TRUCK HR $ 300.00 S /50.00 $ - S - WATER TRUCK HR f 125.00 3 62.50 3 - $ - MOT•BARRIER WALL(EA.) HR $ 300 0 1.60 S - $ - MOT.DARRELL(EA.) HR f 1.25 S 0.63 5 - S - MOT-CONES(EA.) HR $ 0.50 3 0.25 S - $ - MOT-SIGNS LA.) HR S 1.00 S 0.50 3 - • 5 - 20CY DUMPSTER EA S 475.00 S 237.50 S - $ - 3"HYDRAULIC PUMP HR f 66.00 S 27.50 f - 5 - 4"HYDRAULIC PUMP HR $ 65.00 $ 32.50 5 - 3 - 6"HYDRAULIC PUMP HR S 75.00 3 37 SO S - SubTolal S - 6"HYDRAULIC PUMP HR 3 05.00 3 42.50 S - 16% f 10"HYDRAULIC PUMP FIR 3 105 W $ 52.50 $ - Tax _5 - WELL DRILLING RIG HR 3 22500 $ 112.50 3 - TOTAL: S - WELL POINT SYSTEM HR 3 25000 3 125.00 5 - 6-VACUUM PUMP HR $ 50.00 3 25.00 5 - 6"VACUUM PUMP HR $ 70.00 S 35 005 2"ELECTRIC PUMP HR $ 15.00 5 7.60 f • PLATE COMPACTOR HR f 20.00 3 1000 $ - TRENCH BOX HR $ 40.00 3 20.00 S - PICK-UP TRUCK WI TOOLS HR I 7.25 3 25.00 3 12.50 5 181.25 EQUIPMENT SUBTOTAL:3 2,465.00 TOTAL DUE: /8,401.157 1 6 C3 • WD # 9 Back up Page 4 of 120 FERGUSON' I INVOICE NUMBER TOTAL DUE CUSTOMER PAGE L 1629408 $34.47 47354 1 of 1 WATERWORKS 17323 JEAN STREET PLEASE REFER TO INVOICE NUMBER WHEN FT MYERS, FL 33967-9998 MAKING PAYMENT AND REMIT TO: FEL-FT.MYERS WATERWORKS#127 PO BOX 100286 Please contact with Questions: 239-433-0555 ATLANTA,GA 30384-0286 MASTER ACCOUNT NUMBER:188628 SHIP TO: COUNTER PICK UP 3801 PROSPECT AVE HASKINS INC NAPLES, FL 34104 10956 ENTERPRISE AVENUE PALM RIVER PUBLIC UTILITI BONITA SPRINGS,FL 34135 SHIP SELL TAX CODE CUSTOMER ORDER NUMBER SALESMAN JOB NAME INVOICE DATE BATCH WHSE. WHSE. in/17f, 4k Gj 10 136 136 FL2COL DEONIDES 082 PALM RIVER PUBLIC UTILITI 02/16/24 90113 ORDERED SHIPPED ITEM NUMBER DESCRIPTION UNIT PRICE UM AMOUNT 2 2 N13 4 GREE RND GRATE 4.950 EA 9.90 2 2 P4oS9P 4 PVC S40 SXS 90 ELL 22.620 EA 22.62 INVOICE SUB-TOTAL 32.62 TAX Collier 1.96 LEAD LAW WA1NING:IT IS ILLEGAL TO INSTALL PRODUCTS THAT ARE NOT"LEAD FREE"IN ACCORDANCE WITH US FEDERAL OR OTHER APPLICABLE LAW IN POTABLE WATER SYSTEMS ANTICIPATED FOR HUMAN CONSUMPTION PRODUCTS W TH'NP IN THE DE SCRIPTION ARE NOT L SAD FREE AND CAN ONLY BE INSTALLED IN NON-POTABLE APPLICATIONS.BUYER IS SOLELY RESPONSIBLE FOR PRODUCT SELECTION. Looking for a more convenient way to pay your bill? • Log in to Ferguson.com and request access to Online Bill Pay. --- TERMS: NET 10TH PROX ORIGINAL INVOICE TOTAL DUE $34.47 All past due amounts are subject to a service charge of 1.5%per month,or the maximum allowed by law,If lower.If Buyer falls to pay within terms,then In addition to other remedies,Buyer agrees to pay Seller all costs of collection,including reasonable attorney fees.Complete terms and conditions are available upon request or at https://www.ferguson.com/content/website-info/terms-of-sale,Incorporated by reference.Seller may convert checks to ACH. 1 6 C 3 --- WD # 9 Backup Page 5 of 12 %$ FERGUSON' 1629185 $302.04 47364 loll WATERWORKS 17323 JEAN STREET PLEASE REFER TO INVOICE NUMBER WHEN FT MYERS, FL 33967-9998 MAKING PAYMENT AND REMIT TO: FEL-FT.MYERS WATERWORKS#127 PO BOX 100286 Please contact with Questions: 239-433-0555 ATLANTA, GA 30384-0286 MASTER ACCOUNT NUMBER:188628 COUNTER PICK UP 3801 PROSPECT AVE HASKINS INC NAPLES,FL 34104 10956 ENTERPRISE AVENUE PALM RIVER PUBLIC UTILITI BONITA SPRINGS,FL 34136 SHIP SELL TAX CODE CUSTOMER ORDER NUMBER SALESMAN JOB NAME INVOICE DATE BATCH WHSE. WHSE. 10 136 136 FL2COL BEN 082 PALM RIVER PUBLIC UTILITI 02/15/24 90093 • CMPEFqr:I., SHIPPED ITEM NUMBER DESCRIPTION UNIT PRICE tIM AMOI.JNT 6 5 N13 4 GREE RND GRATE 4.950 EA 24.76 1 1 A0699WT 6 W/TITE 90 ELL 66.600 EA 56.60 1 1 SFG6105FGDADA 6 DI FLAT PIPE GRATE ADA COMPLIANT 90.480 EA 90.48 5 5 P40S9P 4 PVC S40 SXS 90 ELL 22.620 EA 113.10 INVOICE SOB-TOTAL 284.93 TAX Collier 17.11 LEAD LAW WARNING:IT IS ILLEGAL TO INSTALL PRODLCTS THAT ARE NOT"LEAD FREE"IN ACCORDANCE WITH US FEDERAL OR OTHER APPLICABLE LAW IN POTABLE WATER SYSTEMS ANTICIPATED FOR HUMAN CONSUMPTION PRODUCTS WTH'NP IN THE DESCRIPTION ARE NOT L IAD FREE AND CAN ONLY BE INSTALLED IN NON-POTABLE APPLICATIONS.OUYER IS SOLELY RESPONSIBLE FOR PRODUCT SELECTION. Looking for a more convenient way to pay your bill'? Log in to Ferguson corn and request access to Online Bill Pay. TERMS: NET 10TH PROX ORIGINAL INVOICE TOTAL DUE $302.04 All past due amounts are subject to a service charge of 1.5%per month,or the maximum allowed by law,if lower.If Buyer fails to pay within terms,then In addition to other remedies,Buyer agrees to pay Seller all costs of collection,including reasonable attorney fees.Complete terms and conditions are available upon request or at https://www.ferguson,comicontenUwebsIte-infonerms-of-sale,Incorporated by reference.Seller may convert checks to ACH. ( • . 1603 i 1 1 1 FERIGLIS*N* VALP/1 fZi'vEi/- • .1_ WD#9 Backup vpe6y Page 6 of 12 • . . ... . 1•MOOR SALESMAN 1 • • . ORDER NO. REQUIRED DATE SHIP WHS. SELL WHS. 'TAG P.O.NO. ir i. ! CUSTOMER NO. CUSTOMER ALPHA CONTRACT NO. i3ID NO. ORDER DATE ORDERED BY INSTRUCTIONS . •oML CONTACT 'VENDOR •' ' g '' ', •,, • - • . . , _. '<4 ' :- . ',A,,, • [ LI,!'? ' . - ' • •VENDOR P.O.Na _ . . _ . D; ? SHP VIA •ROUTE?I0. [ REINS. ODA .. . . : • . '''itr, ... . -0 :0!: PCS PARS REAlS DRAM .LENGTHS'BUNDLES ROUTE DUET. CUSTOMER P.O.ND. JOB NAME ATTM MP WE -SHIP DATE muvema FSY -FAME:EV CHECKED DIY 1 . i I . L1HE' ORDER flrf. SHIP OTT. DIM cam DEICHIPTION NIT PANE UIM TOTAL P.O.NO. • AISLE V i D . . . . - . .. • . --. .-77-77.-.7 .- . • - - ' 7--- -) . .- . - I I i 1 .. ' i 1 . ! t 1 - 1 !61.011ririliPAM-0,,,,A.OrtHtILIT:4431:a''',4919.01,21:49 k-1-1E.TU"Er' '''''11"1' I DI,IIIITAL-:,.,,AITil;A;AVETPYti.P. ,,,l'„-...,911.111.4-11:07,1 ' ji 'H'I•di,'_ r -mu:.[In 1 I M.,grgAgiittiOWFORLIkallePT019101MIKOA*VILVAMIL9,16 ' • I I g OW'IFI'Mt704VA:A}3 .•;;T:LA' -s---eri;------;4"-4.--,-;----.---,- , 1 1 is CUSTOMER'S TERMS: 7,1 SIGNATURE: DATE: is for•AFr--:(-,e :,..., [ i. 1 • [ F • 1 1 1.: I F ,.••.. 1. •„, 4 I 1 6 C3 j j WD # 9Backup . Page6of12 OFA pp / COPY _.,...„ ... . ' '';•/N"1:1:: C)MI) f k•• H�� doers :W L l.t et more done„. • 11941 BONITA BCH RD SE BONT Th SPRINGS, FL 34135 (239)947-5868 637a 00037 43598 02/19/24 07:07 AM I SALE CASHTER CHARLES 0`:.-'i308760 PVC CEMENT <A> 15.48 i . .' PVC CEMENT HEAVY DUTY CLEAR • G:,,1P1 I•I.1024 4IN 900 EL <A> .1 Ji R/DRAIN EL 900 03034 PVC 9.9U ,l ,h, SUBTOTAL 25.3E TOTAS L TAX $27.03 xxa:,t:i,:,;O0CXX4135 HOME DEPOT IiSL'IS 27.03 nlI, r 013E 019728/7370135 TA iin:,K.LNS INC Ih11.IIA 0FONTDES Chip Read. . ATO Au000000049999U8400305 TOO PLCC PHO)L . PRO XTRA MEMBER STATEMENT ' • PRO XTRA 1lflll fliill 184G SUMMARYf 202' PRO XTRA SPEND 02/18: $:I0,690.69 € I2024UDES:PROXTRA SAVINGS 02/18: $547.38 A:, of 0819/2GI:NI your Pa1nt Rewards t level Is Siiver: Spend 5707.69 more In • Wal Ifyinl.} paint purchases to earn Gold EI (20.OX off) on select paint items. Get the CREOTI' LINE your business nods PLUS earn Perks 4X FASTER when you loin Pro Xtra. register, R use your Pro Kira • i.oarrltmrlrala'lA�ioniedeF�ntSAop/( yd0l.E1tX). C'3 73 02/lc: /2L1 07 : 07 AM I l 19i111\1 1 l 6373 37 43598 02/19/2024 4092 RETURN POLICY DEFINITIONS POLICY ID AYS POLIC�iE EXPIRES OM A 1'i. 365 DID WE NAIL IT? i Take a short survey for a chance TO WIN A $5,000 HOME DEPOT GIFT CARD�•' Opine en espaAol WWW.h�)miidei ll'tt.ct)@/sLIry ey uPASSWORD: 24119o3748522 • • Ij ' Entries must be roiM)leled within 14 days of purchase. Entrants must be 18 or. olde • II r to ixirchasepnecesa rules ii1'I I II i 1 6 C3 .Ntovre&„ 4,Q`coxstnucm.4>) WD # 9 Backup i g ; I fINC. Page 7 of 12__.____ `$,, ,f 10956 Enterprise Avenue • Bonita Springs,FL 34135 PH. (239)947-1846 FAX(239)947-3857 " DAILY REPORT OF CONSTRUCTION { 'Contractor's Name: Haskins Inc. Date: Total Project Description: PO U: 0 Work Directive Change#9 I j Onsite Personnel Total Hours from Total Hrs from 4 PM to 7AM Job Title # Total Hours 7 AM to 4 PM (only weekdays) (plus weekends&Holidays) Project Manager 0 ` 0 0 0 Superintendent 0 0 0 0 Foreman 2 7.25 0 7.25 Equipment Operator 2 7.25 0 7,25 Pipe Layer 2 7.25 0 7,25 Laborer 2 7.25 0 7.25 Laborer 2 7.25 0 7.25 Laborer 2 7.25 0 7.25 Driver- Roll Off 0, 0 0 0 Driver- Lowboy 0. 0 0 0 is Description Work Performed Equipment on Site Total Total idle Hoursper Description # Total Standard Hours per Equip Equipment Equipment Hours Roll Off Truck `p 0 0 0 Lowboy 0 0 0 0 Pick Up Truck with Tools 2 7.25 0 7.25 Front end loader 2 7.25 0 7.25, Mini Trackhoe 2 7.25 0 7.25 0 0 0 0 0 is 0 0 0 0 0 ' 0 0 0 0 0 0 ,p 0 0 0 Completed by: Ben Elwell, President e is is 1 6 C3 WD # 9 Back Up ;trip• Clit ' Y DAILY CONSTRUCTION QUANT Page 8 of 12 '1 q PALM RIVER PUR Public Utilities Department Growth Managemont Department AREAS 1 AND 2 Stafrdi ?t Date:2/16/2024 inspector Scott Sikorski Stantec PIN: 177311742 Day of Week:Friday Contract Day:303 Total Days:420/450 Estimated Work Performed(General) Contr/Sub Pay Item Completed Description/Location Code Qty. Units — WDC#10 Station 6i•50t:Contractor worked on Work Directive Change#10,as Time and Materials,at house#436 Palm River Blvd.,to relocate an existing 12-Inch HDPE stormwater pipe in the east right-of-way and on private property at house#442 Palm River Blvd.to private property at house#436 Palm River Blvd.and install a 12-inch x 6-inch stormwater pipe reducer and 6-inch bubbler grate.Contractor removed several existing Ficus landscape plants along the property fine to accommodate relocation at house#442 Palm River Blvd. Contractor installed bubbler grate at approximately El.9.00.Contractor graded a 1 WDC#10 swale from the bubbler grate to the new inline din. T&M o Time:7:15 a.m.to 10:30 a.m.=3.25 hour o Manpower:One (1)forej n one(1)operator,one(1) pipe layer,three (3) laborers. o Equipment:One(1) crew truck,one(1)front end loader, one(1) mini trackhoe. ✓ o Materials/H M-294 12-inch x 8-inch eccentric cap,A/i-I 8-Inch x 6-inch eccentric reducer,ADS 6-inch 90-degree bend,approximately 3-feet of 6-inch HOPE pipe,6-inch iron grate,Mirafi filter fabric. !' WDC#9 Station 8+10±:Contractor worked on Work Directive Change#9,as Time and Materials,at house#448#448 Palm River Blvd.,to install bubbler grate on existing 4-inch PVC roof gutter and yard drainpipe on private property.Contractor excavated existing 4-inch PVC drainpipe and generated parts list. 1 WDC#9 T&M Station 9+101:Contractor worked on Work Directive Change#9,as Time and Materials,at house 1#454 Palm River Blvd.,to install bubbler grate on existing 4-Inch Sch 40 PVC roof gutter drainpipe on private property.Contractor excavated and removed a length of existing 4- inch Sch 40 PVC drainpipe in the right-of-way and installed 4-inch Sch 40 90-degree bend and 4-inch bubbler grate on private property. • o Time: 12:50 p.m.to 3:50 a.m.=3.0 hours. Palm River PUR Page 1 of 2 Areas 1 and 2 ) 16C3 WD # 9 Backup Page9of12 • • o Manpower:One(1)foman,one (1)operator, one (?) _ —� pipe layer,three (3)laborersy- ✓ o Equipment: On01.)crew truck, one(1)front end loader, one(1) mini trackhoe. o Materials:One(1)4-inch Sch 40 90-degree bend,one(1)4- inch grate(installed at house#454),. • Estimated Work Performed(Water) Contr/Sub Pay Item Completed Description/Location Code Qty. Units Estimated Work Performed(Wastewater) Contr/Sub Pay item Completed • Description/Location Code • Qty. Units Estimated Work Performed(Stormwater System) Contr/Sub Pay Item Completed Description/Location Code Qty. Units # Inspector Signature Contractor Signature Date Scot. Sikorsle,Se for RPR 2-16-2024 1/4. • • . • • • • Page 2 of 2 Palm River PUR Areas 1 and 2 16C3 AV PiMk: DAILY CONSTRUCTION QUANTITI S 13r'"`� "` ,f PALM RIVER PUR GrowthPubartment ln nic tilities t Maagem Department AREAS 7. AND 2Stantec Date:2/19/2024 Inspector: Scott Sikorski Stantec PIN:177311742 Day of Week: Monday Contract Day:306 Total Days:420/450 Estimated Work Performed(General) Contr/Sub Pay Item Completed Description/ Location Code qty, Units WDC#9 Station 44+40±:Contractor worked on Work Directive Change #9,as Time and Materials,at house#47.1 Golfview Drive on Palm River Blvd., and installed bubbler grate on existing 4-inch Sch 40 PVC roof gutter drainpipe on private property. Contractor excavated and removed a length of existing 4-inch Sch 40 PVC drainpipe in the right-of-way and installed 4-inch Sch 40 90-degree bend and 4-inch bubbler grate on private property. Station 8+10±:Contractor worked on Work Directive Change#9,as Time and Materials,at house#44B Palm River Blvd. (north),and installed bubbler grate on existing 4-inch thin wall PVC roof gutter drainpipe on private property.Contractor excavated and removed a length of existing 4-inch PVC drainpipe in the right-of-way and installed 4-inch 90-degree bend and 4-Inch bubbler grate on private property. Station 8+40±:Contractor worked on Work Directive Change #9,as Time and Materials, at house#459 Golfview Drive (south),and 1 WDC#9installed bubbler grate on existing 4-inch thin wall PVC roof gutter - T&M drainpipe on private property.Contractor excavated and removed a length of existing 4-inch PVC drainpipe in the right-of-way and installed 4-inch 90-degree bend and 4-inch bubbler grate on private property. Station 8+60±:Contractor worked on Work Directive Change#9, as Time and Materials,at house #459 Golfview Drive(middle),and installed bubbler grate on existing 4-inch thin wall PVC roof gutter drainpipe on private property.Contractor excavated and removed a length of existing 4-inch PVC drainpipe in the right-of-way and installed 4-inch 90-degree bend and 4-Inch bubbler grate on private property. Station 9+18±:Contractor worked on Work Directive Change#9, as Time and Materials,at house#459 Golfview Drive(north),and Installed bubbler grate on existing 4-inch thin wall PVC roof gutter drainpipe on private property.Contractor excavated and removed a length of existing 4-Inch PVC drainpipe in the right-of-way and installed 4-inch 90-degree bend and 4-inch bubbler grate on private property. Page 1 of 2 Palm River PUR Areas 1 and 2 16C3 Station 7+20±:Contractor worked on Work Directive Change#9,as Time and Materials,at house#445 Golfview Drive (north),and installed bubbler grate on existing 6-inch i-IDPE roof gutter drainpipe on private property.Contractor excavated and removed a length of existing 6-inch HOPE drainpipe in the right-of-way and installed 6-Inch 90-degree bend and 6-inch bubbler grate on private property. o Time: 7:00 a.m.to 11:15 a.m.=4,25 hours. o Manpower: One(1)foreman, one (1)operator,one (1) pipe layer,three(3) laborers. o Equipment:One(1)crew truck,one (1)front end loader, one(1) mini trackhoe. o Materials:One(1)4-inch Sch 40 90-degree bend,one(1)4- Inch plastic grate, approximately 27-inch length of 4-inch Sch 40 PVC pipe at house #411 Golfview Drive on Palm River Blvd., one (1)4-inch 90-degree bend, approximately 6-inch length of 4-inch PVC pipe, one (1) 4-inch plastic grate at house#448(north)Palm River Blvd.,one(1)4-inch 90-degree bend,approximately 9-inch length of 4-inch PVC pipe, one (1.) 4-inch plastic grate at house #459 (south) Golfview Drive, one (1) 4-inch 90-degree bend, approximately 9-inch length of 4-Inch PVC pipe one (1) 4- inch plastic grate at house #459 (middle) Golfview Drive, one (1) 4-inch 90-degree bend, approximately 11-inch length of 4-inch PVC pipe, one (1) 4-inch plastic grate at house #459 (north) Golfview Drive, one (1)6-inch ABS 90- degree bend,approximately 10-inch length of 6-inch I-IDPE pipe, one (1) 6-inch iron grate at house #445 (north) Golfvlew Drive. Estimated Work Performed(Water) Contr/Sub Pay Item Completed Description/Location Code Qty. Units Estimated Work Performed (Wastewater) Contr/Sub Pay Item Completed Description/Location Code Qty. Units I - Estimated Work Performed (Stormwater System) Contr/Sub Pay Item Completed Description/Location Code Qty. Units Inspector Signature Contractor Signature Date Scott Sikors ' ntor RPR 2-19-2024 Palm River PUR . Page 2 of 2 Areas 1 and 2 16C3 Collier County Engineering & Project Management Division WD # 10 WORK DIRECTIVE CHANGE CONTRACT#/PROJECT NAME: WORK DIRECTIVE# 10 #22-7992R Palm River PUR Areas 1 &2 PURCHASE ORDER#: 4500223134 DATE OF ISSUANCE: February 13,2024 OWNER: Collier County Board of Commissioners PROJECT#: 70257.4,60234.5.1 CONTRACTOR: Haskins, Inc. ENGINEER/DESIGN PROFESSIONAL: Q. Grady Minor& Associates, P.A. You are directed to proceed promptly with the following change(s): Description: Installation of drainage basin bubble-up structure at 436 Palm River Boulevard to accommodate the existing 12" private property yard drainage pipe that extends into the ROW. Purpose of Work Directive Change: To accommodate the existing 12"private property yard drainage pipe flow from private property into the ROW. Reason/Justification: During installation of the new drainage infrastructure, it was discovered that the existing 12" yard drainage pipe at 436 Palm River Boulevard extended into the ROW, which is not allowed per current Collier County standards. Haskins provided a time and material cost estimate to install a drainage basin bubble-up structure at the private property drainage pipe on private property that will allow drainage to flow from private property into the ROW and ultimately to the County's stormwater system. This change is to add bubble up structure at 436 Palm River Boulevard. Attachments: Contractor's quote If a claim is made that the above change(s) have affected Contract/Allowance Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the changes(s). Method of determining change in Method of determining change in Contract Times: Contract/Allowance Price: ❑ Unit Prices ❑ Contractor's records ❑ Lump Sum ❑ Engineer's record ® Time& Material El Other ❑ Other Estimated increase or(decrease) in Allowance: Estimated change in Contract Time: $6,389.22 N/A RECOMMENDED: AUTHORIZED: By: Allyson Holland, PE By: Diana Dueri, PMP 2/13/2024 Project Manager Owner's Representative 1 6 C3 • • WD # 10 Backup Page 1 of 7 eOn1q • y' a� HS16VS INC. , 10956 EntorprlseAvenue • Bonita Springs,FL 34135 PH. (239)947.1046 FAX(239)947-3057 BILLED TO: Collier County P.D.11: 4500223134 INVOICE/I: COMMENCEMENT DATE; INVOICE DATE: 1/19/2024 DATE&TIME CALL REC'VD: WORK ORDER N: COMPLETION DATE: DESCRIPTION OF WORK Connect Existing 12"Roof Drain Pipe to Bubble PERFORMED: up Basin on private property STANDAR AFTER EQUIPMENT DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL LABOR DESCRIPTION NUMBER D STND HRS. HRS OH! AFTER HRS. TOTAL OF MEN HRS.fMAN UNIT PRICE MAN UNIT PRICE 45 TN EXCAVATOR HR $ 275.00 5 - PROJECT MANAGER $ 110.00 $ 165,00 $ - 40 TN EXCAVATOR W/HAMMER HR S 280.00 S - SUPERINTENDENT 1 4 $ 90,00 $ 135.00 $ 380.00 25 TN EXCAVATOR HR $ 185.00 S - FOREMAN 1 10 5 75.00 $ 112,50 $ 750.00 MIDI EXCAVATOR HR S 140.00 $ - EQUIPMENT OPERATOR 1 10 $ 70,00 $ 105,00 S 700.00 MINI EXCAVATOR 10 HR $ 130.00 S 1,300.00 LABORER 1 10 $ 45.00 $ 67.50 $ 450.00 MINI EXCAVATOR Wl HAMMER HR S 150.00 $ - FLAGGER $ 45,00 S 67.50 $ - RUBBER TIRE BACKHOE HR $ 110.00 S - MECHANIC S 75.00 $ 112.50 5 - 20 TN LOADER HR $ 185.00 S - PIPE LAYER 2 10 5 65.00 $ 97.50 5 1,300.00 15 TN LOADER HR $ 150.00 $ - WELDER $ 225.00 5 337.50 $ - 6 TN LOADER FIR $ 115.00 $ - LABOR SUBTOTAL: $ 3,560.00 BOX BLADE HR $ 95.00 S - i TRACK SKID STEER HR 5 95.00 $ - 15,000LBDOZER HR $ 110.00 $ - MATERIALS INCLUDING 10%MARK UP 35,000 LB DOZER HR 5 130.00 5 - MATERIALS DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL • MOTOR GRADER(SMALL) HR S 110.00 S - $ - MOTOR GRADER(LARGE) HR S 125.00 $ - 12"Pipe and bubble up basin $1.00 LS 5558.22 $ 556.22 • PAVER(SMALL) HR S 105.00 $ - S - • ASPHALT MILLING MACHINE HR $ 375.00 $ - S - f• 3 TON VIBRATORY ROLLER HR $ 45.00 $ - 5 - 6 TON VIBRATORY ROLLER HR $ 55.00 S - 5 3-TON ASPHALT ROLLER HR S 45.00 S - $ - 7-TON ASPHALT ROLLER HR S 55.00 S • $ • DUMP TRUCK HR S 125.00 5 - 5 - ROLL OFF TRUCK HR S 135.00 $ - SubTotal $ 558,22 LOWBOY TRACTOR HR $ 145.00 $ - 10..4 $ 55,62 2 1/2 TON FLATBED HR $ 65.00 $ - Tax $ 33,37 ROCK CRUSHER HR $ 290.00 S - Fuel Surcharge S SCREENER PLANT HR $ 270.00 $ - Freight 5 - SOIL STABILIZER HR $ 235.00 S • TOTAL: $ 645.22 • STREET SWEEPER HR S 50.00 $ - LIGHT PLANT HR $ 20.00 $ • (, VACCUM TRUCK HR $ 200.00 $ - SUBCONTRACTORS INCLUDING 10%MARK UP • VACCUM WAGON HR $ 85.00 $ - . SUBCONTRACTORS QUANTITY UNIT UNIT PRICE TOTAL • PUMPER TRUCK HR $ 300,00 5 - $ - • • WATER TRUCK HR $ 125.00 $ - - Sod 800 SF •50.55 5 440.00 MOT-BARRIERWALL(EA.) HR 5 3.00 S - $ MOT-BARRELL(EA.) HR S 1.25 5 - $ - MOT-CONES(EA.) HR $ 0.50 $ - $ - MOT-SIGNS(EA.) HR 5 1.00 $ - $ - 20CY DUMPSTER HR $ 25.00 S - $ 3"HYDRAULIC PUMP HR $ 55.00 $ - $ ' - • 4"HYDRAULIC PUMP HR 5 65.00 $ - $ - I.• 6"HYDRAULIC PUMP HR S 75.00 S - S - • e"HYDRAULIC PUMP FIR $ 85.00 $ - SubTotal 5 440.00 10"HYDRAULIC PUMP HR $ 105.00 5 - 10% $ 44,00 • • WELL DRiLLIG RIG HR 5 225.00 $ - Tax 5 - WELL POINT SYSTEM HR $ 250.00 $ - TOTAL: $ 484.00 • 6"VACUUM PUMP HR 5 50.00 $ - 8"VACUUM PUMP HR 5 70.00 $ - 2"ELECTRIC PUMP 10 HR S 15.00 $ 150,00 PLATE COMPACTOR HR $ 20.00 S - I. TRENCH BOX HR S 40.00 $ - PICK-UP TRUCK WI TOOLS 10 HR $ 25.00 5 250.00 • EQUIPMENT SUBTOTAL: 5 1.700.00 • TOTAL DUE: $6,3139.ZZ 16C3 r C♦ FERGUSON® FEL-NAPLES WATERWORKS#138 Deliver To: 3801 PROSPECT AVE From: Joderek Adams IND # 10 Backup WATERWORKS NAPLES,FL 34104 Comments: { Phone:239.843-4970 Page 2 O 7 --- __.. Fax:239-643-4945 • 13:23:43 JAN 10 2024 Page 1 of 2 FEL-NAPLES WATERWORKS#136 Price Quotation Phone:239-643-4970 Fax:239-643-4945 Bid No: B319134 Cust Phone: 239-947-1846 Bid Date: 01/10/24 Terms: NET 10TH PROX Quoted By: JA Customer: HASKINS INC Ship To: HASKINS INC 10956 ENTERPRISE AVENUE 10956 ENTERPRISE AVENUE PALM RIVER PUBLIC UTILITI PALM RIVER PUBLIC UTILITI BONITA SPRINGS,FL 34135 BONITA SPRINGS, FL 34135 Cust PO#: Job Name: PALM RIVER item Description Quantity Net Price UM Total 4"CONNECTION { N900 9 TPRD C/BASIN W/DBL OUT 6 29,640 EA 177.84 N990 9 GREE SQ GRATE 6 38.280 EA 229.68 NDS1243 3-4 UNIV LCK OUT ADPT 6 7.460 EA 44.76 N1206 UNIV PLUG F/C/BASIN 6 5.110 EA 30.66 SUBTOTAL 482.94 6"CONNECTION N1200 12X12 C/BASIN W/2 OUT 1 41.870 EA 41.87 N1212 12X12 GREE GRATE F/C/BASIN 1 45.790 EA 45.79 N1266 6 UNIV OUT 1 8.510 EA 8.51 , N1206 UNIV PLUG F/C/BASIN 1 5.110 EA 5.11 SUBTOTAL 101.28 12"CONNECTION • A1276WT 12X6 W/TITE RED 1 262.320 EA 262.32 A06650020IBDW 6X20 F2648 WITITE SLD HDPE PIPE 20 4.440 FT 88.80 N2706AG *NLA 6 UNIVERSAL INLINE DRN W/GRAT 1 205.100 EA 205.10 SUBTOTAL 556.22 Net Total: $1140.44 Tax: $68.44 Freight: $0.00 Total: $1208.88 is ,,0 HOW ARE WE DOING? WE WANT YOUR FEEDBACK! ,. Scan the QR code or use the link below to complete a survey about your bids: p ' https:/lsurvey.medallia.coml?bidsorder&fc=127&on=47354 1 6 C3 • WD# 10 Backup Page 3 of 7 F T.m. g HASKINS INC. \ P; { 10956 Enterprise Avenue•Bonita Springs,FL 34135 ��- PH.(239)047-1040 MAX(230)047.3057 BILLED TO: Collier County P.O.0: INVOICE R: 2024.7 COMMENCEMENT DATE: 2/16/2024 ' INVOICE DATE: 311/2024 DATE&TIME CALL REG'VD WORK ORDER II: COMPLETION DATE: 2/16/2024 DESCRIPTION OF WORK PROJECT NAME: Palm River Public Ulillly Renewal Areas 1 A 2 PERFORMED: Petro River Work Directive 010 STND HRS IDLE HRS STANDA AFTER STND tOLE NUMBER RD STND HRS. AFTER HRS. EQUIPMENT DESCRIPTION UNIT OTY UNIT UNIT TOTAL LABOR DESCRIPTION HRS OM! TOTAL • 1111S PRICE FIRS PRICE OF MEN MRSJMA UNIT PRICE UNIT PRICE • N MAN I 45 TN EXCAVATOR HR $ 275.00 S 137.50 $ • PROJECT MANAGER 5 110.00 $ 165.00 $ - • • 40 TN EXCAVATOR W7 HAMMER 11R 5 280.00 5 140.00 S - SUPERINTENDENT $ 90 00 5 135.00 $ - • 26 TN EXCAVATOR HR , S 185.00 5 92.50 5 - FOREMAN 3.25 5 75.00 5 112.50 5 243.75 • MIDI EXCAVATOR HR 5 140.00 S 70.00 $ - EQUIPMENT OPERATOR 3.25 S 70,00 5 105.00 5 227,50 • MINI EXCAVATOR HR 1 3.25 5 130.00 5 65.00 5 422.50 PIPE LAYER 3.25 S 65.00 $ 97.50 5 211.25 MINI EXCAVATOR W1HAMMER HR S 15000 S 75.00 $ - LABORER 3.25 $ 45.00 S 67.50 $ 146.25 • RUBBER TIRE BACKHOE HR $ 11000 5 55.00 5 •- LABORER 3.25 5 45.00 $ 67.50 $ 146.25 • • 20 TN LOADER HR 1 3.25 5 185.00 5 92.50 5 601.25 LABORER • 3.25 5 45.00 5 67,50 5 146.25 I 15 TN LOADER HR 5 150.00 $ 75.00 S - LABOR SUBTOTAL: $ 1,121.25 • 6 TN LOADER HR 5 115.00 S 57.50 S - BOX BLADE HR 5 95.00 $ 47.50 5 - TRACK SKID STEER HR 5 95.00 5 47.50 5 • MATERIALS INCLUDING 10%MARK UP 15,000 LB DOZER HR $ 110.00 5 55.00 5 • MATERIALS DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL 38,000 LB DOZER IiR $ 130.00 5 65.00 5 - Fmouson 1 LS $391 38 5 391.38 23.46 MOTOR GRADER(SMALL) HR $ 110.00 $ 55.00 5 - MOTOR GRADER(LARGE) HR $ 125.00 5 62.50 5 - $ . PAVER(SMALL) HR S 105.00 5 52,50 $ - $ ASPHALT MILLING MACHINE Hit $ 375.00 5 187.50 $ - 5 - 3 TON VIBRATORY ROLLER HR $ 45,00 $ 22.50 $ • $ - 6 TON VIBRATORY ROLLER HR $ 55.00 $ 27.50 $ - $ - 3•TON ASPHALT ROLLER HR $ 45.00 $ 22.50 $ $ 7-TON ASPHALT ROLLER HR $ 55.00 $ 27.50 S • S • DUMP TRUCK HIS $ 125.00 $ 62.50 $ - Sublolol $ 391.38 ROLL OFF TRUCK HR S 135.00 S 67.50 $ 10% S 39.14 LOWBOY TRACTOR HR $ 145.00 5 72.50 $ - Tex $ 23.46 2112 TON FLATBED HR $ 65.00 5 32.50 S • Fuel Surcharge $ - ROCK CRUSHER HR $ 290.00 $ 145.00 $ - Freight• $ - SCREENER PLANT HR $ 270.00 $ 135.00 S TOTAL: r$ 454.00 SOIL STABILIZER HR 3 235.00 5 117.50 S - STREET SWEEPER HR $ 50.00 $ 25.00 $ - LIGHT PLANT HR S 20.00 $ 70.00 5 - SUBCONTRACTORS INCLUDING 15%MARK UP VACCUM TRUCK HR 5 200.00- $ 560.00 $ - SUBCONTRACTORS QUANTITY UNIT UNIT PRICE TOTAL VACCUM WAGON HR S 85.00 $ 42.50 S - $ • PUMPER TRUCK HR $ 300.00 5 150.00 $ - $ - WATER TRUCK HR $ 125.00 5 62.50 $ 5 MOT-BARRIER WALL(EA.) HR $ 3.00 $ 1.50 5 $ MOT-HARRELL(EA.) HR $ 1.25 5 0.63 S - S - MOT•CONES(EA) HR $ 0.50 5 0.25 5 $ - MOT-SIGNS(EA.) HR 5 1,00 5 0.50 S • S 2DCY DUMPSTER EA 5 47500 5 237.50 S - 5 - 3"HYDRAULIC PUMP HR 5 55.00 5 27.5D 5 - 5 - 4"HYDRAULIC PUMP HR $ 65.00 $ 32.50 $ . 5 - 6"HYDRAULIC PUMP HR $ 75.00 5 37.50 5 • 506701el $ . 8'•HYDRAULIC PUMP HR $ 85.00 $ 42.50 5 - 15% S - ID"HYDRAULIC PUMP HR $ 105.00 5 52.50 $ - Tax 5 - WELL DRILLING RIO HR $ 225.00 5 112.50 $ - TOTAL: $ - WELL POINT SYSTEM HR $ 250.00 3 125.00 $ - 6"VACUUM PUMP HR $ 50,00 $ 25.00 $ - 8"VACUUM PUMP FIR $ 70.00 $ 35.00 $ • 2"ELECTRIC PUMP HR 5 15.00 5 7.50 $ - j PLATE COMPACTOR FIR $ 20.00 5 10.00 $ - TRENCH BOX HR 5 40.00 5 20.00 $ - PICK-UP TRUCK W1 TOOLS HR 1 3.25 S 25.00 $ 12.50 $ 81.25 EQUIPMENT SUBTOTAL: S 1,105.00 TOTAL DUE: $2,680.25 • • • • • • • 16C3 WD # 1OBackup Page 4 of 7 ------------ FERGUS®1V® INVOICE NUMBER TOTAL DUE CUSTOMER PAGE 1628558 $414.86 47354 1 of 1 WATERWORKS 17323 JEAN STREET PLEASE REFER TO INVOICE NUMBER WHEN FT MYERS,FL 33967-9998 MAKING PAYMENT AND REMIT TO: FEL-FT.MYERS WATERWORKS#127 PO BOX 100286 Please contact with Questions: 239.433-0555 ATLANTA,GA 30384-0286 MASTER ACCOUNT NUMBER:188628 SHIP TO; COUNTER PICK UP 3801 PROSPECT AVE HASKINS INC NAPLES, FL 34104 10966 ENTERPRISE AVENUE PALM RIVER PUBLIC UTILITI BONITA SPRINGS,FL 34135 SHIP SELL TAX CODE CUSTOMER ORDER NUMBER SALESMAN JOB NAME 'INVOICE DATE BATCH WHSE. WHSE. W OC,:1:t tO 10 136 136 FL2COL 082 PALM RIVER PUBLIC UTILITI 02/16/24 90070 ORDERED SHIPPED ITEM NUMBER DESCRIPTION UNIT PRICE UM AMOUNT 1 1 SFG8106FGDADA 6 DI FLAT PIPE GRATE ADA COMPLIANT 90,480 EA 90.48 1 1 A1218WT 12X8 W(TITE RED COUP 186.280 EA 106.26 1 1 A0878WT 8X6 HDPE DUAL WALL RED W/TITE SXB 58.020 EA 58.02 1 1 A0699WT 6 W/TITE 90 ELL 56,600 EA 56,60 INVOICE SUB-TOTAL 391.38 TAX Collier 23.48 LEAD LAW WARNING;IT IS ILLEGAL TO INSTALL PRODUCTS THAT ARE NOT"LEAD FREE"IN ACCORDANCE WITH 1,S FEDERAL OR OTHER APPLICABLE LAW IN POTABLE WATER SYSTEMS ANTICIPATED FOR HUMAN CONSUMPTION. I F RODUCTS WITH'RP IN THE DESCRIPTION ARE NOT LEAD FREE AND CAN ONLY BE INSTALLED IN I\ON-POTABLE APPLICATIONS.BUYER IS SOLELY RESPONSIBLE FOR PRODUCT SELECTION. Looking for a more convenient way to pay your bill? Log in to Ferguson.com and request access to Online Bill Pay. 1 1 I TERMS: NET 10TH PROX ORIGINAL INVOICE TOTAL DUE $414.06 All past due amounts are subject to a service charge of 1.5%per month.or the maximum allowed by law,if lower.If Buyer fails to pay within terms,then In addition to other remedies,Buyer agrees to pay Seller all costs of collection,including reasonable attorney fees.Complete terms and conditions are available upon request or at hItps://www.Ferguson.com/contenUwebsite-Info/terms-of-safe,Incorporated by reference.Seller may convert checks to ACH. 16C3 44ATE,q�e WD # 10 Backup iHASKINS Page 5 of 7 A. e rtV "s1 10956 Enterprise Avenue • Bonita Springs,FL 34135 PH. (239)947-1846 FAX(239)947-3857 Vacs,n.i`6m`, DAILY REPORT OF CONSTRUCTION Contractor's Name:Haskins Inc. Date: Total Project Description; PO#: 0 Work Directive Change#10 Onsite Personnel Total Hours from Total Hrs from 4 PM to 7AM Job Title # Total Hours 7 AM to 4 PM (only weekdays) (plus weekends&Holidays) Project Manager 0 0 0 0 Superintendent 0 0 0 0 Foreman 1 , 3.25 0 3.25 Equipment Operator 1 3.25 0 3.25 Pipe Layer 1 3.25 0 3.25 Laborer 1 3,25 0 3.25 Laborer 1 3.25 0 3,25 Laborer 1 3.25 0 3,25 Driver- Roll Off 0 0 0 0 Driver- Lowboy 0 0 0 0 Description Work Performed ii ' Equipment on Site Total Description # Total Standard Hours per Equip Total Idle Hours per Equipment Equipment Hours Roll Off Truck 0 0 0 0 Lowboy 0 0 0 0 Pick Up Truck with Tools 1 3,25 0 3,25 Front end loader 1 3.25 0 3.25 Mini Trackhoe 1 3.25 0 3.25 0 0 0 0 0 0 . 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Completed by: Ben Elwell, President 1 6 C3 WD # 10 Backup Page 6 of 7 DAILY CONSTRUCTION QUANTITIES Public Utilities Department PALM RIVER PUR Growth Management Department AREAS a. AND 2 Stantec Date:2/16/2024 Inspector: Scott Sikorski Stantec PIN:177311742 Day of Week: Friday Contract Day:303 Total Days:420/450 Estimated Work Performed(General) Contr/Sub Pay Item Completed Description/Location Code Qty. Units WDC#10 Station 6+50±:Contractor worked on Work Directive Change#10,as Time and Materials,at house#436 Palm River Blvd.,to relocate an existing 12-inch HDPE stormwater pipe in the east right-of-way and on private property at house#442 Palm River Blvd.to private property at house#436 Palm River Blvd. and install a 12-inch x 6-inch stormwater pipe reducer and 6-inch bubbler grate.Contractor removed several existing Ficus landscape plants along the property line to accommodate relocation at house #442 Palm River Blvd.Contractor installed bubbler grate at approximately El.9.00.Contractor graded a 1 WDC#10 swale from the bubbler grate to the new inline djin. - T&M o Time:7:15 a.m.to 10:30 a.m. =3.25 hours_ o Manpower:One(1) foremen,one (1)operator, one (1) pipe layer,three (3) laborers. o Equipment:One(1) crew truck, one(1)front end loader, one(1)mini trackhoe. 1 o MaterlaisJ/H M-294 12-inch x 8-inch eccentric cap,A/H 8-Inch x 6-inch eccentric reducer,ADS 6-inch 90-degree bend,approximately 3-feet of 6-inch HDPE pipe,6-inch iron grate, Mirafl filter fabric. WDC#9 Station 8+10±:Contractor worked on Work Directive Change 119,as Time and Materials,at house #448#448 Palm River Blvd., to install bubbler grate on existing 4-inch PVC roof gutter and yard drainpipe on private property. Contractor excavated existing 4-inch PVC drainpipe and generated parts list. 1 WDC#9 Station 9+10±:Contractor worked on Work Directive Change#9,as T&M Time and Materials,at house#454 Palm River Blvd., to install bubbler grate on existing 4-inch Sch 40 PVC roof gutter drainpipe on private property.Contractor excavated and removed a length of existing fl- inch Sch 40 PVC drainpipe in the right-of-way and installed 4-inch Sch 40 90-degree bend and 4-Inch bubbler grate on private property. o Time: 12:50 p.m.to 3:50 a.m.=3.0 hours, Palm River PUR Page 1 of 2 Areas1and2 16 �� *� ° �� ���� VV[] # 10Backup Page 7 of / | - n manpower;one(1)fopman,one(i)operator,one , � �e���thm� �) �m � | o Equipment: \crew truck,one(d front end loader, me( '�mini tmckho . o Materials:One(1)4-inch Sch 40 90-degree bend,one(1)4- / inch grate(installed at house#454). Completed Contr/Sub Pay item Description Location Qty. Units # Code -Est a - ^ _ vv�^"p=p°~"up"°--��^~�^-',,- - �``'~-,---'- Completed Cnn�/8ub p»V8om Location ' !'— Description Qty. Vnho / � # _ Code - ' - ^`--==- --~~—tpdr.or - Conoo�ted Cont�Sub Pay Item /��ut�n ' oexcnpnnn. {�y. Units # Code _�_--- ' ' Date —|nopadorS|K��� Contractor Signature _ _ 2-IU-2024 ' ko KPR [ | | � ` ! _— Page 3of 2 Pu(m River PUK Areas 1 and 2 ' 16C3 Collier County Engineering & Project Management Division WORK DIRECTIVE CHANGE — --- CONTRACT#/PROJECT NAME: WORK DIRECTIVE# 15 422-7992R Palm River PUR Areas 1 &2 PURCHASE ORDER#: 4500223134 DATE OF ISSUANCE: July 19,2024 OWNER: Collier County Board of Commissioners PROJECT#: 70257.4, 60234,5.1 CONTRACTOR: Haskins, Inc. ENGINEER/DESIGN PROFESSIONAL: Q.Grady Minor&Associates, P.A. You are directed to proceed promptly with the following change(s): Description: This WD is to direct the Contractor to lower and relocate an existing stormwater inlet,to regrade the area around the stormwater inlet within the ROW and on private property, to lower and adjust an existing private property bubble-up structure (providing a 12" inlet/outlet), and to adjust an existing private property roof drain bubble up structure to assist with stormwater discharge from private property to prevent flooding on private property at 436 Palm River Boulevard. Purpose of Work Directive Change: To provide a greater elevation difference between the stormwater system within the ROW and the existing private property drainage structures to assist with stormwater discharge from private property to prevent flooding on private property at 436 Palm River Boulevard. Reason/Justification: During recent significant rain events it has become evident that the private property bubble-up structure is holding water and does not have sufficient differential elevation to convey stormwater from private property to the ROW. This was an unforeseen condition and requires immediate attention to avoid potential flooding on private property. Attachments: Contractor's quote If a claim is made that the above change(s) have affected Contract/Allowance Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the changes(s). Method of determining change in Method of determining change in Contract Times: Contract/Allowance Price: ❑ Unit Prices ❑ Contractor's records ❑ Lump Sum ❑ Engineer's record • ® Time & Material ❑ Other ❑ Other Estimated increase or(decrease) in Allowance: Estimated change in Contract Time: • $12,507.00 N/A RECOMMENDED: AUTHORIZED: d 7/19/2024 7/22/2024 By: Justin Frederiksen, PE By: Diana Dueri, PMP Project Manager Owner's Representative 1 6 C3 WD # 15 Backup • • • Page 1 of 13 • • �� wnren^o9 -- -- - -,� • • • • ` Z. ' HASKINS INC. 'zy` pl�,g 10956EnlorprlsoAvoreuo • Bonito Springs,FL34135 PH. (239)947.1846 FAX(239)947.3857 BILLED TO; Collier County P.O.0: 4500223134 INVOICES: COMMENCEMENT DATE: INVOICE DATE: 7/11/2024 DATE&TIME CALL REC'VD: WORK ORDERS: COMPLETION DATE: DESCRIPTION OF WORK Lower 12"yard drain at 438 Palm River Blvd.& PERFORMED: lower 12"yard drain Al 442 Palm River Blvd. NUMBER STANDAR STND HRS, AFTER AFTER HRS. EQUIPMENT DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL LABOR DESCRIPTION OF MEN D TOTAL UNIT PRICE HAS OH) UNIT PRICE HRS./MA MAN 46 TN EXCAVATOR HR $ 275.00 $ - PROJECT MANAGER $ 110.00 $ 165.00 $ - 40 TN EXCAVATOR WI HAMMER HR 5 280.00 $ - SUPERINTENDENT 1 6 5 90.00 $ 135.00 $ 540.00 25 TN EXCAVATOR HR 5 185.00 $ • FOREMAN 1 14 $ 75.00 $ 112.50 5 1,050.00 MIDI EXCAVATOR HR 5 540.00 5 - EQUIPMENT OPERATOR 1 14 S 70.00 S 105.00 S 980.00 MINI EXCAVATOR 14 HR $ 130.0D $1,820.00 LABORER 1 14 $ 45.00 5 67.50 S 630.00 MINI EXCAVATOR W I HAMMER HR S 150.00 $ - FLAGGER $ 45.00 $ 87.50 S - RUBBER TIRE BACKHOE HR $ 110.00 $ - MECHANIC $ 75,00 $ 112.50 $ - 20 TN LOADER HR $ 185.00 S - PIPE LAYER 2 14 $ 65.00 $ 97.50 5 1,820.00 16 TN LOADER HR $ 150.00 5 - WELDER 5 225.00 $ 337.50 5 - 6 TN LOADER HR $ 115.00 $ - LABOR SUBTOTAL: $ 5,020.00 BOX BLADE HR $ 95.00 S - • TRACK SKID STEER HR $ 95.00 $ - 16,000 LB DOZER HR $ 110.00 $ - MATERIALS INCLUDING 10%MARK UP 36,000 LB DOZER HR $ 130.00 $ - MATERIALS DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL MOTOR GRADER(SMALL) HR $ 110.00 5 - Ferguson $1.00 LS $1,098.47 $ 1,098.47 MOTOR GRADER(LARGE) HR $ 125.00 $ - $ - PAVER(SMALL) HR $ 105.00 $ - , $ - ASPHALT MILLING MACHINE HR $ 375.00 $ • $ - I 3 TON VIBRATORY ROLLER HR $ 45.00 $ $ 6 TON VIBRATORY ROLLER HR 5 55.00 S - $ - 3-TON ASPHALT ROLLER HR $ 45.00 $ $ t 7-TON ASPHALT ROLLER HR $ 55.00 $ - 5 DUMP TRUCK HR $ 125.00 $ $ ROLL OFF TRUCK HR $ 135.00 5 - SubTotal $ 1,098.47 LOWBOY TRACTOR HR $ 145.00 5 - 10% $ 109.85 2 112 TON FLATBED HR $ 65.00 $ - Tax S 65.91 ROCK CRUSHER HR $ 290.00 5 - Fuel Surchargo $ - SCREENER PLANT HR $ 270.00 $ - Freight $ - SOIL STABILIZER HR $ 235.00 $ - TOTAL: 5 1,274.23 STREET SWEEPER HR 5 50.00 $ - LIGHT PLANT HR $ 20.00 $ - VACCUM TRUCK HR $ 200.00 $ - SUBCONTRACTORS INCLUDING 10%MARK UP is VACCUM WAGON HR S 85,00 S - SUBCONTRACTORS QUANTITY UNIT UNIT PRICE TOTAL PUMPER TRUCK HR $ 300.00 $ - Zoysia Sod 600 SF 50.80 $ 480.00 WATER TRUCK HR $ 125.00 5 - Floralam Sod 600 SF S0.55 5 330.00 MOT-BARRIER WALL(EA.) HR 5 3,00 $ - S - MOT•BARRELL(EA.) HR $ 1.25 $ - $ - MOT-CONES(EA.) HR $ 0.50 5 - $ - MOT-SIGNS(EA.) HR 5 1.00 5 - - $ - 20CY DUMPSTER HR $ 25.00 S - $ - 3"HYDRAULIC PUMP HR $ 55.00 S - $ - 4"HYDRAULIC PUMP HR $ 65.00 $ - $ - il.. 6"HYDRAULIC PUMP HR $ 75.00 5 - S - 8"HYDRAULIC PUMP HR 5 65.00 5 - SubTotal $ 810.00 10"HYDRAULIC PUMP HR S 105.00 S - 10% $ 81.00 WELL BRILLIG RIG HR $ 225.00 $ - Delivery Charge S 75.00 WELL POINT SYSTEM HR $ 250.00 5 - Tax $ 52.65 • 6"VACUUM PUMP HR 5 50.00 $ - TOTAL: $ 1,018.65 8"VACUUM PUMP HR $ 70.00 $ - 2"ELECTRIC PUMP HR S 15,00 S - PLATE COMPACTOR _ HR $ 20.00 $ - TRENCH BOX HR $ 40.00 $ - PICK-UP TRUCK WI TOOLS 30 HR $ 25.00 5 750.00 EQUIPMENT SUBTOTAL: $2,570.00 • TOTAL DUE: $9,882.88 1 6 C3 %/C FERGUSON' FEL-NAPLES WATERWORKS#136 3801 PROSPECT AVE Deliver To:From: Joderek Adams —�.- WATERWORKS NAPLES,FL 34104 Comments: WD # 15 Backup Page 2 of 13 • Phone:239-643-4970 Fax:239-643-4945 • 11:13:15 NOV 01 2023 Page 1 of 1 FEL-NAPLES WATERWORKS#136 Price Quotation Phone: 239-643-4970 Fax:239-643-4945 Bid No: B316809 Cust Phone: 239-947-1846 Bid Date: 11/01/23 Terms: NET 10TH PROX Quoted By: JA • Customer: HASKINS INC Ship To: HASKINS INC 10956 ENTERPRISE AVENUE 10956 ENTERPRISE AVENUE PALM RIVER PUBLIC UTILITI PALM RIVER PUBLIC UTILITI BONITA SPRINGS, FL 34135 BONITA SPRINGS, FL 34135 Cust PO#: YARD DRAINS Job Name: PALM RIVER PUBLIC UTILITI Item Description Quantity Net Price UM Total 4"CONNECTION [ N900 9 TPRD C/BASIN W/DBL OUT 3 29.640 EA 88.92 ( N990 9 GREE SQ GRATE 3 38.280 EA 114.84 NDS1243 3-4 UNAV LCK OUT ADPT 3 7,460 EA 22.38 N1206 UNIV PLUG F/C/BASIN This is what was used 3 5.110 EA 15.33 ;� SI I BT(1TAt 741 47 (12"CONNECTION A1299WT 12 W/TITE MLD 90 ELL 1 241.660 EA 241.66 A12650020DW 12X20 F2648 W/TITE SLD HDPE PIPE 20 11.790 FT 235.80 N2712AG12N 12X12 INLINE DRN WI GRATE 1 621.010 EA 621.01 SUBTOTAL 1098.47 Net Total: $1339.94 Tax: $93.80 Freight: $0.00 Total: $1433.74 Quoted prices are based upon receipt of the total quantity for immediate shipment(48 hours). SHIPMENTS BEYOND 48 HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE.QUOTES FOR PRODUCTS SHIPPED FOR RESALE ARE NOT FIRM UNLESS NOTED OTHERWISE. • CONTRACTOR CUSTOMERS:1F YOU HAVE DBE/MBEIWBE/NBE/SDVBEISBE GOOD FAITH EFFORTS DIVERSITY GOALS/REQUIREMENTS ON A FEDERAL,STATE,LOCAL GOVERNMENT,PRIVATE SECTOR PROJECT,PLEASE CONTACT YOUR BRANCH SALES REPRESENATIVE • IMMEDIATELY PRIOR TO RECEIVING A QUOTE/ORDER. Seller not responsible for delays,lack of product or increase of pricing due to causes beyond our control,and/or based upon Local,State and Federal laws governing type of products that can be sold or put into commerce. This Quote is offered contingent upon the Buyer's acceptance of Seller's terms and conditions,which are incorporated by reference and found either following this document,or on the web at https://www.ferguson,com/contentlwebsite-info/terms-of-sale Govt Buyers: All items are open market unless noted otherwise. LEAD LAW WARNING:It is illegal to install products that are not"lead free"in accordance with US Federal or other applicable law in potable water systems anticipated for human consumption.Products with*NP in the description are NOT lead free and can only be installed in non-potable applications.Buyer is solely responsible for product selection. HOW ARE WE DOING? WE WANT YOUR FEEDBACK! © - Scan the QR code or use the link below to i p� complete a survey about your bids: _1 https:i/survey.medallia.cam!?bidsorder&fc=127&ori=47354 1 6 C3 I WD # 15 Backup - INVOICE ! � �_�_- _ -- Page 3 0� 13 # 798 7717 5th Terrace Lehigh Acres, Florida 33936 Date: Apr 30, 2024 Bill To: Balance Due: $2,903.19 Haskins Inc. 10956 Enterprise Ave Bonita Springs, Florida 34135 item Quantity Rate Amount Bahia sod:patchwork installed 3200 $0.41 $1,296.00 The Lords Way Zoysia sod: installed 1600 $0.80 $1,280.00 Palm River Project Delivery: Collier County 2 $75.00 $150.00 Per truck ! 1 Subtotal: $2,726.00 Tax (6.5%): $177.19 Total: $2,903.19 IrJ li 16C3 WD # 1 Backup if Page4of13 INVOICE # 827 7717 5th Terrace Lehigh Acres, Florida 33936 Date: Jun 4,2024 Bill To: $3,447.94 Haskins Inc. 10956 Enterprise Ave Bonita Springs, Florida 34135 Item Quantity Rate Amount Floratam: installed Delivery: 5750 $0.55 $3,162.50 Collier County 1 $75.00 $75.00 Per truck Subtotal: $3,237.50 Tax (6.5%): $210.44 Total: $3,447.94 Notes: Palm River Project is is 1 6 C3 • • WD # 15 Backup • • Page5of13 • • • JIAl6nP "till 'T. HASK S INC- : A.,le al iiiar 10960 Enlerprlse Avn nue•Bonita Springs,FL 34135 pH.(239)947-1848 PAX(239)947-3857 f BILLED TO: Collier County P.O.S: INVOICES: 2024-7 COMMENCEMENT DATE: INVOICE DATE: 012212024 DATE S TIME CALL REC'VD: WORK ORDER II: COMPLETION DATE: DESCRIPTION OF WORK PROJECT NAME: Palm River Public UUIRy Renewal PERFORMED: WDCP15- s STANDA STND HAS IDLE HRS AFTER STND IDLE NUMBER RD STND HRS. AFTER HRS- EQUIPMENT DESCRIPTION UNIT OTT TOTAL HRS UNIT HR9 UNIT TOTAL LABOR DESCRIPTION OF MEN NRSJMA UNIT PRICE HRS ON/ UNIT PRICE PRICE PRICE N MAN 45 TN EXCAVATOR HR 3 275.00 S 197.50 $ • SUPERINTENDENT 1 12 5 90.00 0.6,$ 135.00 $ 1,147.60 12.5 40 TN EXCAVATOR W7 HAMMER HR 3 280.00 $ 140.00 $ - FOREMAN 1 0.6 5 75.00 0.25 S 112,60 S 65.03 0.75 25 TN EXCAVATOR HR - $ 105.00 5 92.50 $ - EQUIPMENT OPERATOR 1 12 $ 7000 0.5 S 105.00 $ 892.00 12.6 MIDI EXCAVATOR HR $ 140.00 S 70.00 $ • PIPE LAYER 1 72 5 86.00 0.5 3 97.50 $ 820.75 12.5 MINI EXCAVATOR HR I 7.5 S 13000 $ 65.00 5 975.OD LABORER 1 12.5 $ 45.00 0.75$ 67.60 $ 013.13 13,25 MINI EXCAVATOR W 1HAMMER HR $ 160.00 3 75.00 5 - LABORER 1 12.5 $ 45.00 075$ 87.50 S 613.13 13.25 RUBBER TIRE BACKNOE HR_ 3 110.00 5 55.00 3 - LABORER t 5 4600 0.25 3 67.60 $ 16.66 0.25 20 TN LOADER HR I H$ 105,00 5 92.50 $ 1,480.00 LABORER 1 $ 45.00 0.25 S 87.50 $ 16.06 0.25 15 TN LOADER HR $ 150.00 5 75.00 S - LABOR SUBTOTAL: 3 4,164.30 6 TN LOADER HR S 115.00 3 57.50 $ - BOX BLADE HR 5 95.00 5 47.50 $ - TRACK SKID STEER HR 3 95.00 $ 47.60 $ - MATERIALS INCLUDING 10%MARK UP 16.000 LB DOZER HR $ 110.00 $ 55.00 $ - MATERIALS DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL 35,000 LB DOZER HR 3 130.00 $ 65,00 5 - Ferguson 1 Le 5665.12 3 605.12 $ 43.24 MOTOR GRADER(SMALL) HR $ 110.00 S 55.00 5 • 5 • MOTOR GRADER(LARGE) HR 5 126.00 $ 62.50 S - $ - PAVER(SMALL) HR $ 105.00 3 52.50 $ • S - ASPHALT MILUNO MACHINE HR $ 37500 5 167,50 $ - S - 3 TON VIBRATORY ROLLER HR 1 46.00 5 22.60 f - $ - 6 TON VIBRATORY ROLLER HR $ 55.00 $ 2750 $ - $ - siON ASALT ROLLER HR $ 45.00 S 22.50 3 - 5 - 7-TON APHSPHALT ROLLER HR $ 56.00 $ 27.50 5 - 5 - i DUMP TRUCK HR $ 125.00 $ 62.50 3 - . SubTnlal 5 605.12 ROLL OFF TRUCK HR S 135.00 $ 67.50 $ - 107. $ 66.51 LOWBOY TRACTOR HR $ 145.00 $ 72.50 5 Tax $ 43.24 2112 TON FLATBED HR 3 05.00 3 32.50 5 Fuel Surcharge S - ROCK CRUSHER HR S 280.00 5 145.00 f - FT roe; $ - 5 SCREENER PLANT _HR S 270.00 S 196.00 f • TOTAL: S 774.07 SOIL STABILIZER HR 3 236.00 $ 117.60 S - STREET SWEEPER HR 3 50.00 $ 25.00 3 LIGHT PLANT HR S 20.00 S 1000 $ - SUBCONTRACTORS INCLUDING 15%MARK UP VACCUM TRUCK FIR $ 200,00 3 100.00 5 - ■UBCONTIIACTORS QUANTITY UNIT UNIT PRICE TOTAL ' VACCUM WAGON HR 5 85.00 $ 42.50 3 - ABOMOOIN cob 6 Trucking _ 1 _ LS 3840.00 5 040.00 3 41.60 PUMPER TRUCK HR 3 300.00 3 160.00 $ - 5 • WATER TRUCK HR 5 125.00 $ 6260 $ - $ I MOT-BARRIER WALL[EA.) HR S 3.00 S 1.50 $ - 3 - MOT.DARRELL(EA.) HR $ 1.25 5 0.63 5 • f - MOT•CONES(EA.) HR $ 0,50 $ 0.25 $ - S - MOT•SIGNS(EA.) HR $ 1.00 S 0.50 3 • 3 • 20CY DUMPSTER EA $ 475.00 3 237.60 S • S - 1"HYDRAULIC PUMP HR _ $ 66.00 3 27.50 3 • S - 4"HYDRAULIC PUMP HR $ 55.00 3 32.50 $ - 5 - 6^HYDRAULIC PUMP HR $ 75.00 3 37.50 $ - BubTo1a1 5 840.00 r HYDRAULIC PUMP HR $ 65.00 $ 4250 5 - 15% 5 96.00 10"HYDRAULIC PUMP HR $ 105,00 $ 62.50 5 - Tar S 41,60 WELL DRILLING RIO HR 5 225.00 S 112.60 S • TOTAL: 3 777.50 WELL POINT SYSTEM HR 3 250.09 $ 126.00 5 - 6"VACUUM PUMP HR $ 60.00 5 25.00 6 • I"VACUUM PUMP HR 3 70,00 $ 36.00 1 2"ELECTRIC PUMP HR S 15.00 $ 7.60 $ - Can only mark up 10%_$81.00 PLATE COMPACTOR HR S 20.00 $ 10.00 $ TRENCH BOX HR $ 46.00 $ 2000 s - markup allowed;changing the I PICK-UP TRUCK WfTOOLS HR I 13.25$ 25.00 3 1260 S 331.25 total to$8,518.09 EQUIPMENT SUBTOTAL:S 2.786.25 ji TOTAL DU El $8,523,1 O . : : is ' is U 16C3. WD # 15 Backup %% FERGUSON. Page 6 of 13 y INVOICE NUMBER TOTAL DUE `'CUSTOMER PAGE ". WATERWORKS 1648768 $708.36 47354 1 of I 17323 JEAN STREET PLEASE REFER TO INVOICE NUMBER WHEN FT MYERS, FL 33967-9998 MAKING PAYMENT AND REMIT TO: FEL-FT.MYERS WATERWORKS#127 PO BOX 100286 Please contact with Questions: 239-433-0555 ATLANTA,GA 30384-0286 MASTER ACCOUNT NUMBER:188628 SHIP TO: COUNTER PICKUP 17323 JEAN STREET HASKINS INC FT MYERS, FL 33967-9998 10956 ENTERPRISE AVENUE PALM RIVER PUBLIC UTILITI BONITA SPRINGS,FL 34135 • SHIP SELL TAX CODE CUSTOMER ORDER NUMBER SALESMAN JOB NAME INVOICE DATE BATCH WHSE, WHSE. 10 • 127 127 FL2LEE 082 PALM RIVER PUBLIC UTILITI 07/23/24 91160 ORDERED SHIPPED ITEM NUMBER DESCRIPTION UNIT PRICE UM AMOUNT 20 20 A126500200W 12X20 F2648 WJTITE SLD HDPE PIPE 13.160 FT 263.20 1 1 A1265AA 12 N12 HDPE SPLT COUP 22.540 EA 22.54 1 1 A1292AN65B 12 N12 PROLINK WT 22-1/2 ELL 322.780 EA 322.78 1 1 A0699WT 6 WRITE 90 ELL 56.600 EA 56.60 INVOICE SUB-TOTAL 665.12 TAX Lee 43.24 .......... +LEAD LAW WARNING:IT IS ILLEGAL TO INSTALL PRODUCTS THAT ARE NOT"LEAD FREE"IN ACCORDANCE WITH US FEDERAL OR OTHER APPLICABLE LAW IN POTABLE WATER SYSTEMS ANTICIPATED FOR HUMAN CONSUMPTION PRODUCTS W TH'NP IN THE DESCRIPTION ARE NOT LEAD FREE AND CAN ONLY BE INSTALLED IN NON-POTABLE APPLICATIONS.BUYER IS SOLELY RESFONSIBLE FOR PRODUCT SELECTION. Looking for a more convenient way to pay your bill? S Log in to Ferguson.com and request access to Online Bill Pay. -d I I I TERMS: NET 10TH PROX ORIGINAL INVOICE TOTAL DUE $708,36 All past due amounts are subject to a service charge of 1.5%per month,or the maximum allowed by law,if lower.If Buyer fails to pay within terms,then in addition to other remedies,Buyer agrees to pay Seller all costs of collection,including reasonable attorney fees.Complete terms and conditions are available upon request or at https://www.Ferguson.com/content/website-info/terms-of-sale,incorporated by reference.Seller may convert checks to ACH. 16C3. WD # 15 Backup '` ' Page 7 of 13 INVOICE ,- --- # 873 7717 5th Ter Lehigh Acres, FL 33936 Date: Aug 9, 2024 Bill To: Balance Due: $681.60 Haskins Inc. 10956 Enterprise Ave Bonita Springs, Florida 34135 Item Quantity Rate Amount Floratam Sod: installed 400 $0.55 $220.00 436 palm river blvd Naples Fl 34110 Zoysia Sod:installed 400 $0.80 $320.00 442 Palm River Blvd Naples, FL 34110 Delivery 1 $100.00 $100.00 Subtotal: $640.00 Tax (6.5%): $41.60 Total: $681.60 III li tl 1 6 C3 f r t. �-A DAIL i L FRUL��® j l) Iliftitvi, sg-,tYpc- I .: PALM RIVER R,UR Public Utilities Department Growth Management Department AREAS 1 AND 2 Stantec Date:7/23/2024 WD # 15 Backup mmm_ Inspector: Scott Sikorski Stantec PIN:177311742 Day of Week:Tuesday Contract Day:457 Total Days:573/603 Page 8 of 13 Estimated Work Performed(General) Contr/Sub Pay Item Completed # Code Description/Location Qty. Units Estimated Work Performed(Water) . Contr/Sub Pay Item Completed # Code Description/Location Qty. Units Estimated Work Performed (Wastewater) Contr/Sub Pay Item Completed # Code Description/Location Qty. Units Station 38+50±to Station 39+17±;Contractor installed approximately 67-feet of 10-inch SDR 26 PVC sanitary sewer main, 1 3.1 ii between new manhole SMH-229 and proposed manhole SMH-230, 67 LF along Cypress Way East,between houses#454 and#446 Cypress Way East. Estimated Work Performed(Stormwater System) Contr/Sub Pay Item Completed # Code Description/Location Qty. Units WDC#15 Station 6+57t: Contractor worked on Work Directive Change #15 at house #436 Palm River Blvd., modifying existing 12-inch HDPE backyard drainpipe to provide better drainage of private property where 12-inch HDPE stormwater pipe was previously connected to the existing stormwater pipe in the right-of-way.Work was measured for payment as Time and Materials. o Contractor excavated existing 12-inch HDPE stormwater pipe on T& 'I 1 WDC#15 private property and removed previously installed 12-inch x 6- M j inch HDPE cap, 6-inch 90.degree bend,length of 6-inch HDPE pipe and 6-inch grate. Contractor excavated inline drain S-225 and lowered previously installed inline drain grate assembly approximately 1.0-foot. Contractor relocated roof gutter drainpipe and bubbler box east on private property to allow for grading slope down to existing 12-inch HDPE private property drainpipe invert. Contractor installed a short length of 12-inch Palm River PUR Page 1 of 2 Areas 1 and 2 16C3 WD # 15 Backup HDPE drainpipe onto the existing backyard drainpipe, extending Page 9 of 13 drainpipe to the edge of the right-of-way and cut the end off ofthe 12-inch HDPE pipe to accommodate a mitered end finish and • regraded a swale between the 12-inch HOPE private property drainpipe and inline drain S-225 grate assembly. Also, contractor •regraded area around inline inlet S-225 to provide a maximum slope of no greater than approximately 3 to 1. o Time:8:30,a.m..to 4:00 p.m.=7.5 hours. o Manpower:.One (1) superintendent, one (1) operator, one (1) pipe layer,two(2)laborers. • • o Equipment: One.(1) crew truck, one (1) mini trackhoe, one (1) front end loader. o Materials: Approximately 6-feet of 12-inch HOPE stormwater pipe, one (1) 12-inch HDPE 22,5 degree bend,silt fence material. Inspector Signature Contractor Signature Date Scott ikorski,Senior RPR 7-23-2024 ^^ • • • • • • I - Palm River PUR Page 2 of 2 Areas 1 and 2 1 6 C3 P1'„!.�4 '��„ • � ', ,.. rya ,�� -- ;.> DAILY CONSTRUCTION k A` 9 �� IC ,� �� �� rya ��. -1,`- � I ( 2 Public Utilities Department PALM RIVER PuR ' - Growth Management Department AREAS 1 AND 2 fit-Int ,c. Date:7/24/2024 WD # 15 Backup Inspector: Scott Sikorski Stantec PIN: 177311742 Page 10 of 13 Day of Week:Wednesday Contract Day:458 Total Days: 573/603 Estimated Work Performed(General)` Contr/Sub Pay Item Completed Description/Location # Code Qty. Units Estimated Work Performed(Water) Contr/Sub Pay Item Completed Description/Location # Code Qty, Units Estimated`Work Performed (Wastewater) Contr/Sub Pay Item Completed Description/Location # Code City,,.. Units _ ....._. Station 39+17±to Station 39+31±:Contractor installed approximately 14-feet of 10-inch SDR-26 PVC sanitary sewer main, .. 14 LE 1 3.1 II between new manhole SMH-229 and proposed manhole SMH-230, along Cypress Way East, adjacent to house#446 Cypress Way East. - Estimated Work Performed(StarmwaterSystem) - Contr/Sub Pay Item Completed. Description/Location Qty. Units # Code WDC#15 Station 6+57±: Contractor worked on Work Directive Change #15 at house #436 Palm River Blvd., modifying existing 12-inch HDPE backyard drainpipe to provide better drainage of private property where 12-inch HDPE stormwater pipe was previously connected to the existing stormwater pipe in the right-of-way.Work was measured for payment as Time and Materials. o Contractor placed 4-inch tall wooden concrete forms with 1 WDC#15 dimensions of approximately 4-foot 3-inches long x 3-foot T&M wide with approximately 6-inch x 6-inch x 3-foot footer under the end of the 12-inch drainpipe and placed concrete for mitered end section at end of private property 12-inch HDPE backyard drainpipe, on private property. Also, contractor placed #4 reinforcement steel deformed bars in mitered end concrete. Contractor removed concrete forms. o Time: 11:30 a.m.to 4:30 p.m. =4.5 hours. _ Palm River PUR Page 1 of 2 Areas 1 and 2 1 6 C3 WD # 15 Backup o Manpower: One (1) superintendent, one (1) operator, Page 11 of 13 one(1) pipe layer,two(2)iab9rers. --- o Equipment:One(1)crew truck. o Materials: Preferred concrete, mix design 3000 TR! FM4 3% 4" Fib Monofilament 'A" 3.75#, length of #4 reinforcement steel deformed bars, 2-inch x 4-inch wooden concrete forms. Inspector Signature Contractor Signature Date Scott Si (orski, S nio RPR 7-24-2024 I i ' 1 i - Palm River PUR Page 2 of 2 Areas 1 and 2 is 16C3 n , r '' 'C ,,,„ ;..Y,ty DAILY CONSTRUCTION QUANTITIES Public Utilities Department PALM RIVER PUR .* Growth iVianagement Department AREAS 1:ANp 2 ,, 1 4 ?, , Aa a i ,-z.c. Date:7/26/2024 WD # 15 Backup Inspector: Scott Sikorski Stantec PIN: 177311742 Day of Week:Friday Contract Day:460 Total Days:573/603 Page 12 of 13 _ Estimated Work Performed(General) , Contr/Sub Pay Item Completed Description/Location # Code Qty. Units Estimated Work Performed(Water) Contr/Sub Pay Item Completed # Code Description/Location Qty. Units Estimated Work Performed(Wastewater) Contr/Sub Pay Item Completed # Code Description/Location qty, Units } Estimated Work Performed(Stormwater System) Contr/Sub Pay Item Completed # Code Description/Location Qty. Units WDC#15 Station 6+57±: Contractor worked on Work Directive Change #15 at house #436 Palm River Blvd., modifying existing 12-inch HDPE backyard drainpipe to provide better drainage of private property where 12-inch HDPE stormwater pipe was previously connected to the existing stormwater pipe in the right-of-way.Work was measured for payment as Time and Materials. T& M 1 WDC#15 o Contractor finish graded area in preparation for sod restoration. o Time:8:15 a.m.to 8:45a.m.=0.5 hours. o Manpower:One(1)foreman,two(2) laborers. o Equipment:One(1)crew truck,one(1)front end loader. o Materials: None. Inspector Signature Contractor Signature _ Date Scott 'korski„eni r RpR 7-26-2024 Palm River PUR Page 1 of 1 Areas 1 and 2 1-: 1 6 C3 6 ,a r } A ,,'` ,r,,:%, s tit d1l f._.,, ete - G o el y DAILY CONSTRUCTION QUANTITIES -k r, f PALM RIVER,�ylk(._..)) 1 )) \v/, r �y ... Public,Utilities Department `,, ,!, ( _ 1 I Growth Management Department AREAS 1 AN D Z FBI tCa Date:8/1/2024 __.__ 'W D # 15 Backup Inspector: ScottSikorski Stantec PIN: 177311742 Page 13 of 13 Day of Week:Thursday Contract Day:466 Total Days:573/603 - ---- - __I r: Estimated Work Performed(General) Contr/Sub Pay Item Completed # Code Description/Location Qty. Units Contr/Sub Pay Item Estimated Work Performed (Water) Completed # Code Description/Location Qty. Units Estimated Work Performed (Wastewater) Contr/Sub Pay Item Completed # Code Description/Location Qty. Units Station 39+40±to Station 39+99±:Contractor installed approximately 59-feet of 10-inch SDR 26 PVC sanitary sewer main, 59 LF 1 3.1 ii between new manhole SMH-229 and proposed manhole SMH-230, along Cypress Way East,adjacent to house#446 Cypress Way East. 1 3.5 Station 39+99±:Contractor installed new manhole SMH-230, 1 EA adjacent to house#446 Cypress Way East. Estimated Work Performed(Stormwater System) Contr/Sub Pay item Completed # Code Description/Location Qty. Units WDC#15 G Station 6+57±: Subcontractor Affordable Sod and Trucking worked on Work Directive Change #15 at house #436 Palm River Blvd. Work was measured for payment as Time and Materials. o Subcontractor placed Floritam sod in the right-of-way, 5 WDC#15 around inline inletS-225 to 12-inch HDPE private property - T&M backyard drainpipe mitered end section on private property. o Time: 4:15 p.m.to 4:30 p.m. =0.25 hours. o Manpower:One(1)foreman,four(4) laborers. o Equipment:One (1)crew truck, one(1) forklift. o Materials: Floritam sod. Palm River PUR Page 1 of 2 Areas 1 and 2 1 6 C3 !E{I 41ATEg4 WD# 15 Backup] S\�N H mHASKINS INC. Page 14 of 18 , fi 10956 Enterprise Avenue • Bonita Springs,FL 34135 PH. (239)947-1846 FAX(239)947-3857 --"nts,Ft i g'•\` DAILY REPORT OF CONSTRUCTION Contractor's Name: Haskins Inc. Date: Tuesday,July 23,2024 Project Description: PO#: Onsite Personnel Total Hours Total Hrs from 4 PM from Job Title # Worked From: Worked Until: 7 AM to 4 PM to 7AM Total Hours (only (plus weekends& weekdays) Holidays) Superintendent 1 8:30 AM 4:00 PM 7.5 7.5 Foreman 0 Equipment Operator 1 8:30 AM 4:00 PM 7.5 7.5 Pipe Layer 1 8:30 AM 4:00 PM 7.5 7.5 Laborer 1 8:30 AM 4:00 PM 7.5 7.5 Laborer 1 8:30 AM 4:00 PM 7.5 7.5 Laborer 0 Laborer 0 Driver-Roll Off 0 Driver-Lowboy 0 Description Work Performed Equipment on Site Total Stand Total Idle Total Hours of Description # Hours per Hours per Equipment On Equip Equip Site Notes Roll Off Truck 0 Lowboy 0 Pick-Up Truck 1 7.5 7.5 Mini Trackhoe 1 7,5 7.5 Front end loader 1 7.5 7.5 Forklift 0 0 0 U Completed By: Ben Elwell,President 16C3 �1ATEq WD# 15 Backup ��0 x xocrio 4�e9i m __ Page 15 of 18 s, 2 _ tr 10956 Enterprise Avenue • Bonita Springs,FL 34135 PH. (239)947-1846 FAX(239)947-3857 DAILY REPORT OF CONSTRUCTION Contractor's Name:Haskins Inc. Date: Wednesday,July 24,2024 Project Description: PO#: 0 0 Onsite Personnel Total Hours Total Hrs from 4 PM from to 7AM Job Title # Worked From: Worked Until: 7 AM to 4 PM Total Hours (plus weekends& (only weekdays) Holidays) Superintendent 1 11:30 AM 4:30 PM 4.5 0.5 5 Foreman 0 Equipment Operator 1 11:30 AM 4:30 PM 4.5 0.5 5 Pipe Layer 1 11:30 AM 4:30 PM 4.5 0.5 5 Laborer 1 11:30 AM 4:30 PM 4.5 0.5 5 Laborer 1 11:30 AM 4:30 PM 4,5 0.5 5 Laborer 0 Laborer 0 Driver-Roll Off 0 Driver-Lowboy 0 Description Work Performed Equipment on Site Total Stand Total Idle Total Hours of Description # Hours per Hours per Equipment On Equip Equip Site Notes Roll Off Truck 0 Lowboy 0 Pick-Up Truck 1 5 5 Mini Trackhoe 0 Front end loader 0 Forklift 0 0 0 0 0 0 0 Completed By: Ben Elwell, President 1 6 C3 vJAfCR�6Q�o WD# 15 Backup w c HASKINS INC., Page 16 of 18 10956 Enterprise Avenue • Bonita Springs,Fl_34135 PH. (239)947-1846 FAX(239)947-3857 -04 "r4ns,rt �n DAILY REPORT OF CONSTRUCTION Contractor's Name: Haskins Inc. Date: Friday,July 26,2024 Project Description: PO#: 0 0 Onsite Personnel Total Hours Total Hrs from 4 PM from Job Title # Worked From: Worked Until: 7 AM to 4 PM to TAM Total Hours (plus weekends& (only weekdays) Holidays) Superintendent 0 Foreman 1 8:15 AM 8:45 AM 0.5 0.5 Equipment Operator 0 Pipe Layer 0 Laborer 1 8:15 AM 8:45 AM 0.5 0.5 Laborer 1 8:15 AM 8:45 AM 0.5 0.5 Laborer 0 Laborer 0 Driver-Roll Off 0 Driver-Lowboy 0 Description Work Performed Equipment on Site Total Stand Total Idle Total Hours of Description # Hours per Hours per Equipment On Equip Equip Site Notes Roll Off Truck 0 Lowboy 0 Pick-Up Truck 1 0.5 0.5 Mini Trackhoe 0 Front end loader 1 0.5 0.5 Forklift 0 0 0 0 0 0 0 Completed By: Ben Elwell, President I'. 16C3 . ! v1 ATEy,� WD# 15 Backup ��0 i o oi 69�0 HASKINS INC. Page 17 of 18 41 10956 EnterpriseAvenue • Bonita Springs,FL 34135 PH. (239)947-1846 FAX(239)947-3857 DAILY REPORT OF CONSTRUCTION Contractor's Name: Haskins Inc. Date: Thursday,August 1, 2024 Project Description: PO#: 0 0 '!r Onsite Personnel Total Hours Total Mrs from 4 PM from Job Title # Worked From: Worked Until: 7 AM to 4 PM to 7AM Total Hours (only (plus weekends& weekdays) Holidays) Superintendent 0 Foreman 1 4:15 PM 4:30 PM 0.25 0.25 Equipment Operator 0 Pipe Layer 0 Laborer 1 4:15 PM 4:30 PM 0.25 0.25 Laborer 1 4:15 PM 4:30 PM 0.25 0.25 Laborer 1 4:15 PM 4:30 PM 0.25 0.25 Laborer 1 4:15 PM 4:30 PM 0.25 0.25 Driver- Roll Off 0 Driver- Lowboy 0 Description Work Performed Equipment on Site is Total Stand Total Idle Total Hours of Description # Hours per Hours per Equipment On Equip Equip Site Notes Roll Off Truck 0 Lowboy 0 Pick-Up Truck 1 0,25 0.25 Mini Trackhoe 0 Front end loader 0 Forklift 1 0.25 0.25 0 0 0 0 0 0 Completed By: Ben Elwell,President 1 6 C 3 WATEq �iP toNs*nucnot WD# 15 Backup 1, IN0 El-11 � ii `fi S INC. Page 18 of 18 Y'vas,Fat`l" s 10956 Enterprise Avenue • Bonita Springs,FL 34135 PH. (239)947-1 846 FAX(239)947-38. DAILY REPORT OF CONSTRUCTION Contractor's Name: Haskins Inc. Date: Total Project Description: PO if: 0 0 Onsite Personnel Total Hours from Total Hrs from 4 PM to 7AM Job Title it Total Hours 7 AM to 4 PM (only weekdays) (plus weekends & Holidays) Superintendent 1 12 0.5 12.5 Foreman 1 0,5 0.25 0,75 Equipment Operator 1 12 0.5 12.5 Pipe Layer 1 12 0.5 12,5 Laborer 1 12.5 0.75 13.25 Laborer 1 12.5 0.75 13.25 Laborer 1 0 0.25 0,25 Laborer 1 0 0.25 0.25 Description Work Performed Equipment on Site Total Description it Total Standard Hours per Equip Total Idle Hours per Equipment Equipment Hours Roll Off Truck 0 0 0 0 Lowboy 0 0 0 0 Pick-Up Truck 1 13.25 0 13.25 Mini Trackhoe 1 7.5 0 7.5 Front end loader 1 8 0 8 Forklift 1 0.25 0 0.25 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Completed by: Ben Elwell, President