Agenda 01/28/2025 Item #16G 1 (Administratively approved Change Order No. 2, adding four days to the contract time and use $12,626.46 from the Owner's Allowance for Work Directive #2)1/28/2025 Item # 16.G.1 ID# 2024-2269 Executive Summary Recommendation to ratify administratively approved Change Order No. 2, adding four days to the contract time and use $12,626.46 from the Owner's Allowance for Work Directive #2 under Agreement No. 23-8120 (Purchase Order 4500229417) with DEC Contracting Group, Inc., for the “Bulk Aircraft Hangar at Marco Island Executive Airport,” and authorize the Chairman to sign the attached Change Order. (Project No. 33822) OBJECTIVE: To ratify administratively approved Change Order No. 2 allowing for four additional days of contract time and use of $12,626.46 of the Owner’s Allowance for required structural changes to the base design of the Bulk Aircraft Hangar at Marco Island Executive Airport. CONSIDERATIONS: Change Order No. 2 to Agreement No. 23-8120 (the “Agreement”) with DEC Contracting Group, Inc. (the “Contractor”) is a request to add four days to the contract time under the Agreement and use $12,626.46 of the allotted Owner’s Allowance. Work Directive No. 2 was administratively approved by the Contractor and staff on October 24, 2024. The underlying cost of the project under the Agreement will not increase and as explained further below, the $12,626.46 of the Owner’s Allowance used to reimburse the Contractor will be set off by a deductive change order provided by the engineering design firm for the project. Change Order No. 2 is necessary due to an oversight of the structural engineer task for the hangar’s structural design. The rebar and other hardware (pedestals and curbs) required to strengthen the concrete slab and to connect the structural steel to the foundation and floor concrete slab was sized uniformly at one length for all areas on the poured concrete. However, the concrete slab was not designed to be one uniform thickness. The slab tapers in thickness, from a maximum at the hangar entrance to a minimum thickness at the rear portion of the hangar. The specified hardware must vary in length to achieve the same structural integrity at all connection locations. The base structural design had to be altered, and the altered plans were provided to the Contractor to construct in accordance with the redesigned task. The responsible structural engineer redesigned the task at no cost to the County, but the Contractor had to change the connecting hardware and add additional rebar to the slab’s connection points, along with some areas requiring additional concrete, which resulted in added expense. However, the design engineer, Hole Montes, Inc., accepted responsibility for the oversights of its structural engineering subcontractor and agreed to process a deductive Change Order No. 1 on its agreement with the County that reduces its contract amount by the same $12,626.46 it is costing the Contractor to construct the redesigned work. As a result, the additional work performed under Change Order No. 2 will be at no additional cost to the County. The County’s Procurement Services Division administratively approved Change Order No. 2, as authorized under the Procurement Ordinance, Section Nineteen, Contract Administration, Section 19, subsection 3.b. This item is consistent with the Collier County Strategic Plan with a focus on Infrastructure and Asset Management and Community Development by continuing to follow a master planning process with the County’s three airports. By maximizing the hangar space at the land-constrained Marco Island Executive Airport, we will help meet customer demand and enhance revenues, therefore promoting fiscal stewardship and maintaining self-sustaining airports. FISCAL IMPACT: Change Order No. 2 will result in no cost increase to Agreement 23-8120 but will increase the contract construction days by 4 days, from 344 days to 348 days. While there is no cost increase to the DEC Contract, the amount of $12,626.46 would be deducted from the owner’s allowance of $155,417.70, reducing it to $142,791.24. GROWTH MANAGEMENT IMPACT: This item is consistent with Section B: Intermodal & Multimodal Transportation, Subsection 2: Aviation of the Transportation Element of the Growth Management Plan. LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote for Board approval. —SRT RECOMMENDATIONS: That the Board ratify administratively approved Change Order No. 2, adding four days to Page 2666 of 3681 1/28/2025 Item # 16.G.1 ID# 2024-2269 the contract time and reducing the Owner’s Allowance by $12,626.46 from $155,417.70 to $142,791.24 for Work Directive No. 2 under Agreement No. 23-8120 (Purchase Order 4500229417) with DEC Contracting Group, Inc., for the “Bulk Aircraft Hangar at Marco Island Executive Airport,” and authorize the Chairman to sign the attached Change Order. (Project No. 33822). PREPARED BY: Bryant Garrett, AAE - Executive Airports Manager ATTACHMENTS: 1. 23-8120 Contract_DEC_FullyExec_Reduced MKY Marco Bulk Hangar 2. 23-8120_FirstAmend_DECContracting 3. 23-8120_Second_Amend_DECContracting 4. Change Order 2 DEC Bulk Hangar Contract for BOCC Meeting January 14 2025 signed and CAO stamped 5. DEC Affidavit regarding Labor & Services January 2025 Page 2667 of 3681 Page 2668 of 3681 Page 2669 of 3681 Page 2670 of 3681 Page 2671 of 3681 Page 2672 of 3681 Page 2673 of 3681 Page 2674 of 3681 Page 2675 of 3681 Page 2676 of 3681 Page 2677 of 3681 Page 2678 of 3681 Page 2679 of 3681 Page 2680 of 3681 Page 2681 of 3681 Page 2682 of 3681 Page 2683 of 3681 Page 2684 of 3681 Page 2685 of 3681 Page 2686 of 3681 Page 2687 of 3681 Page 2688 of 3681 Page 2689 of 3681 Page 2690 of 3681 Page 2691 of 3681 Page 2692 of 3681 Page 2693 of 3681 Page 2694 of 3681 Page 2695 of 3681 Page 2696 of 3681 Page 2697 of 3681 Page 2698 of 3681 Page 2699 of 3681 Page 2700 of 3681 Page 2701 of 3681 Page 2702 of 3681 Page 2703 of 3681 Page 2704 of 3681 Page 2705 of 3681 Page 2706 of 3681 Page 2707 of 3681 Page 2708 of 3681 Page 2709 of 3681 Page 2710 of 3681 Page 2711 of 3681 Page 2712 of 3681 Page 2713 of 3681 Page 2714 of 3681 Page 2715 of 3681 Page 2716 of 3681 Page 2717 of 3681 Page 2718 of 3681 Page 2719 of 3681 Page 2720 of 3681 Page 2721 of 3681 Page 2722 of 3681 Page 2723 of 3681 Page 2724 of 3681 Page 2725 of 3681 Page 2726 of 3681 Page 2727 of 3681 Page 2728 of 3681 Page 2729 of 3681 Page 2730 of 3681 Page 2731 of 3681 Page 2732 of 3681 Page 2733 of 3681 Page 2734 of 3681 Page 2735 of 3681 Page 2736 of 3681 Page 2737 of 3681 Page 2738 of 3681 Page 2739 of 3681 Page 2740 of 3681 Page 2741 of 3681 Page 2742 of 3681 Page 2743 of 3681 Page 2744 of 3681 Page 2745 of 3681 Page 2746 of 3681 Page 2747 of 3681 Page 2748 of 3681 Page 2749 of 3681 Page 2750 of 3681 Page 2751 of 3681 Page 2752 of 3681 Page 2753 of 3681 Page 2754 of 3681 Page 2755 of 3681 Page 2756 of 3681 Page 2757 of 3681 Page 2758 of 3681 Page 2759 of 3681 Page 2760 of 3681 Page 2761 of 3681 Page 2762 of 3681 Page 2763 of 3681 Page 2764 of 3681 Page 2765 of 3681 Page 2766 of 3681 Page 2767 of 3681 Page 2768 of 3681 Page 2769 of 3681 Page 2770 of 3681 Page 2771 of 3681 Page 2772 of 3681 Page 2773 of 3681 Page 2774 of 3681 Page 2775 of 3681 Page 2776 of 3681 Page 2777 of 3681 Page 2778 of 3681 Page 2779 of 3681 Page 2780 of 3681 Page 2781 of 3681 Page 2782 of 3681 Page 2783 of 3681 Page 2784 of 3681 Page 2785 of 3681 Page 2786 of 3681 Page 2787 of 3681 Page 2788 of 3681 Page 2789 of 3681 Page 2790 of 3681 Page 2791 of 3681 Page 2792 of 3681 Page 2793 of 3681 Page 2794 of 3681 Page 2795 of 3681 Page 2796 of 3681 Page 2797 of 3681 Page 2798 of 3681 Page 2799 of 3681 Page 2800 of 3681 Page 2801 of 3681 Page 2802 of 3681 Page 2803 of 3681 Page 2804 of 3681 Page 2805 of 3681 Page 2806 of 3681 Page 2807 of 3681 Page 2808 of 3681 Page 2809 of 3681 Page 2810 of 3681 Page 2811 of 3681 Page 2812 of 3681 Page 2813 of 3681 Page 2814 of 3681 Page 2815 of 3681 Page 2816 of 3681 Page 2817 of 3681 Page 2818 of 3681 Page 2819 of 3681 Page 2820 of 3681 Page 2821 of 3681 Page 2822 of 3681 Page 2823 of 3681 Page 2824 of 3681 Page 2825 of 3681 Page 2826 of 3681 Page 2827 of 3681 Page 2828 of 3681 Page 2829 of 3681 Page 2830 of 3681 Page 2831 of 3681 Page 2832 of 3681 Page 2833 of 3681 Page 2834 of 3681 Page 2835 of 3681 Page 2836 of 3681 Page 2837 of 3681 Page 2838 of 3681 Page 2839 of 3681 Page 2840 of 3681 Page 2841 of 3681 Page 2842 of 3681 Page 2843 of 3681       Page 2844 of 3681              Page 2845 of 3681       Page 2846 of 3681       Page 2847 of 3681       Page 2848 of 3681       Page 2849 of 3681       Page 2850 of 3681       Page 2851 of 3681       Page 2852 of 3681       Page 2853 of 3681       Page 2854 of 3681       Page 2855 of 3681       Page 2856 of 3681       Page 2857 of 3681       Page 2858 of 3681       Page 2859 of 3681       Page 2860 of 3681       Page 2861 of 3681       Page 2862 of 3681       Page 2863 of 3681       Page 2864 of 3681       Page 2865 of 3681       Page 2866 of 3681 Page 2867 of 3681 Page 2868 of 3681 Page 2869 of 3681 Page 2870 of 3681 Page 2871 of 3681 Page 2872 of 3681 Page 2873 of 3681 Page 2874 of 3681 Page 2875 of 3681