Loading...
VB MSTU Agenda 10/03/2024Vanderbilt Beach M.S.T.U. Advisory Committee 8300 Radio Road Naples, FL 34104 OCTOBER 3, 2024, 2:00 PM Committee Members and Project Manager will meet at Cocohatchee River Marina-13535 Vanderbilt Drive, Naples, FL 34110 All others are encouraged to attend via Zoom video conference AGENDA I. Call to order and Pledge of Allegiance II. Attendance Advisory Committee Bruce Forman - Chairman (11/13/2027) Bill Sjostrom - Vice Chairman (11/13/2024) Mark Weber (11/15/2025) Gabriella R. Miyamoto (11/13/2027) William Harris (11/13/2024) Aaron Gross, Ground Zero Landscaping Judy Sizensky– Project Manager Rosio Garcia – Operations Coordinator Wendy Warren, Transcriptionist III. Approval of the agenda IV. Approval of the Minutes – May 2, 2024 and September 5, 2024 V. Landscape Maintenance Report - Aaron Gross, Ground Zero Landscaping Services VI. Vanderbilt Drive Refurbishment – Judy Sizensky A. Regatta Corner of VB Dr and VB Beach Rd-Bid #23-8188-Infinite Construction is the Contractor. They have sub- mitted for a ROW permit and ordered the pavers. They anticipate beginning work the first or second week of October. B. Crosswalks (6 with 1 alternate) along VB Dr.- Contractor awaiting delivery confirmation of brick pavers. Once received, NTP will be issued. C. Vanderbilt Dr Landscape- Vanderbilt Beach Rd to Bluebill-Ground Zero Landscaping is almost completed with the installation of the new plantings. VII. Project Manager Report Judy Sizensky A. Current Budget FY 25 - October 2024 B. The sod is the final repair from the utility project. C. The 60% plans are completed for the Greenway Multi-use Bike Path on Vanderbilt Drive the total cost for the project is $347,593.74 D. Gulf Shore Drive - RWA received the work order and are working on the engineering plans. E. Capital Construction started the bench and sidewalk project on 8.27.24. The final completion date is September 26th pending no stop work orders are issued for weather related incidents. F. A request for quote was resent for the decorative fence in Connor Park. The bids are due October 9, 2024. VIII. Old Business A. Mastec has received the final payment. This project is closed. IX. New Business A. Wiggins Pass would like the entrance to the park beautified. The committee to approve an electric gate and a parking sign which would count parking spaces available. Also, the reconfiguring of the median to allow more room at the turn about. The FDEP are working on submitting plans for permit. The parking sign quote is $147K. X. Public Comment XI. Adjourn NEXT MEETING DATE NOVEMBER 7, 2024 COCOHATCHEE RIVER MARINA, 13535 VANDERBILT DR, NAPLES, FL 34110 Page 756 of 784 1 Vanderbilt Beach M.S.T.U Advisory Committee 8300 Radio Road Naples, FL 34104 MAY 2, 2024 I. CALL TO ORDER AND PLEDGE OF ALLEGIANCE Chair Forman called the meeting to order at 2:00 P.M. Roll call was taken, and a quorum of four was established. The Pledge of Allegiance was recited. II. ATTENDANCE Advisory Committee: Bruce Forman – Chair William Sjostrom – Vice Chair Mark Weber Gabriella R. Miyamoto William Arell Harris (ZOOM) Staff: Judy Sizensky - Project Manager Brian Wells – Director, PTNE (Excused) Rosio Garcia – Operations Coordinator Others: Aaron Gross – Ground Zero Landscaping Wendy Warren - Transcriptionist Mr. Weber motioned to allow Mr. Harris to participate in the meeting as a virtual participant due to extraordinary circumstances. Second by Ms. Miyamoto. Carried unanimously 4 – 0. A quorum of five was present. III. APPROVAL OF AGENDA Vice Chair Sjostrom moved to approve the Agenda of the Vanderbilt Beach MSTU Advisory Committee as presented. Second by Mr. Weber. Carried unanimously 5 - 0. IV. APPROVAL OF MINUTES Ms. Miyamoto moved to approve the minutes of the April 4, 2024, Vanderbilt Beach MSTU meeting as presented. Second by Mr. Weber Carried unanimously 5 - 0. V. LANDSCAPE MAINTENANCE REPORT – Aaron Gross, Ground Zero Landscaping Mr. Gross reported: • The Community landscaping looks good. • Fertilizer was applied to the Conner Park area. • Landscape installation, primarily shrubs, in Conner Park will commence in mid-May. Page 757 of 784 2 Ms. Miyamoto motioned to approve Ground Zero Landscaping’s estimates E660, E661, E662, E663, E664, E665, E666, E667 and E668, dated April 10, 2024, for the landscape renovation of Vanderbilt Drive at a cost not to exceed $70,000.00. Second by Chair Forman. Carried unanimously 5 – 0. VI. VANDERBILT DRIVE REFURBISHMENT – Judy Sizensky Ms. Sizensky reported: A. Regatta Corner of Vanderbilt Drive and Vanderbilt Beach Road • Four (4) bids were received ranging in cost from $361,000 to $516,969. • The Procurement Division recommended the contract be awarded to Infinite Construction LLC. in the amount of $389,172.00. • McGee & Associates has completed the DELORA to verify the credentials of the contractor prior to issuance of the award. • The Procurement Division will review the report and issue a Notice of Recommendation Award (NORA). • With Committee recommendation, the proposed contract will be presented to the Board of County Commissioners (BCC) for consideration. • The project will be scheduled for the second quarter of 2024. Ms. Miyamoto motioned to recommend the Board of County Commissioners (BCC) award Infinite Construction LLC. the contract for the renovation of the corner of The Regatta of Naples and Vanderbilt Drive in the amount of $389,172.00. Second by Vice Chair Sjostrom. Carried unanimously 5 – 0. B. Crosswalks (6 with 1 alternate) Along Vanderbilt Beach Drive Ms. Sizensky reported: • Three (3) of the paver crosswalks will be constructed north of The Regatta, three (3) at The Anchorage, The Dunes of Naples, and Marina Bay and 1-alternate at Bluebill Avenue. • Bluebill Avenue is the alternate as the Road Maintenance Division does not approve brick pavers over the roadway. • A Request for Quote (RFQ) was distributed to the vendor(s) on Collier County General Contractors Contract #19-7525. • Two bids were received: Ajax Paving Industries of Florida for $789,001.50 and Preferred Materials in the amount of $397,124.00. • The Opinion of Cost (OPC) was $377,835.00. • A contract in the amount of $397,124.00 will be awarded to Preferred Materials. Ms. Miyamoto motioned to approve Preferred Materials contract in the amount of $397,124.00 for the installation of six crosswalks, three north of The Regatta of Naples and three at The Anchorage, The Dunes of Naples and Marina Bay. Second by Vice Chair Sjostrom. Carried unanimously 5 – 0. Committee discussion • The County or a CEI firm retained by the MSTU will inspect crosswalk project construction to ensure compliance with Trebilcock Consulting Solutions plans • Crosswalk installation for The Dunes of Naples will be coordinated with Mr. Harris. Page 758 of 784 3 C. Vanderbilt Drive Landscape Vanderbilt Beach Road to Bluebill Avenue Landscape West Side Vanderbilt Drive Ms. Sizensky reported: • Sections of Vanderbilt Drive west of the sidewalk, from Vanderbilt Beach Road to Bluebill Avenue, will be landscaped by Ground Zero Landscaping. • Landscaping will incorporate plantings proposed on McGee & Associates plans for the area west of the sidewalk and the bump out areas as approved by the Committee at the February 2, 2023, MSTU meeting. • The sightline standard at intersections will be adhered to. Ground Zero Landscaping Renovation Proposal • Ground Zero Landscaping reviewed McGee & Associates conceptual plans for the landscape renovation of Vanderbilt Drive. Modifications recommended included: o The west side of the sidewalk will conform to the plans with an adjustment made in Palm trees quantities to accommodate median size. o The east side of the sidewalk will be grass. o In accordance with County regulations, vegetation will not be planted in the swales. o A drip line irrigation system will be designed and installed to ensure adequate water flow to the landscape. • Cost proposals for the renovation were presented for Committee consideration. 1. E660 Conner Park South $ 2,125.82 2. E661 Heron Ave. Egret Ave. $ 4,358.79 3. E662 Egret Ave. to Conners Ave. $11,374.06 4. E663 Conners Ave. to Seabee Ave. $11,825.80 5. E664 Seagull Ave. To Willet Ave. $ 1,379.45 6. E665 Willet Ave. to Tradewind Ave. $ 7,873.09 7. E666 Tradewind Ave. to Lagoon Ave. $ 8,923.89 8. E667 Lagoon Ave. to Bayside Ave. $11,514.98 9. E668 Pine Ave. to Oak Ave. $ 1,154.58 Total $60,530.46 Ms. Miyamoto motioned to approve Ground Zero Landscaping’s estimates E660, E661, E662, E663, E664, E665, E666, E667 and E668, dated April 10, 2024, for the landscape renovation of Vanderbilt Drive at a cost not to exceed $70,000.00. Second by Chair Forman. Carried unanimously 5 – 0. Bluebill Avenue Landscaping Ms. Sizensky reported: • A planting bed is proposed under the trees and around the utility boxes on Bluebill Avenue, abutting Conner Park. The landscaping will incorporate plant material species used in Conner Park. • The project is contingent on approval from the Parks and Recreation Department. The department will be notified to increase irrigation coverage of the newly landscaped area. • Ground Zero Landscaping submitted a design and cost estimate to refurbish and enhance the utility box area on Bluebill Avenue in the amount of $7,745.80. Page 759 of 784 4 Chair Forman motioned to approve Ground Zero Landscaping’s Estimate #E659, dated April 10, 2024, for an amount not to exceed $8000.00, to landscape the tree and utility box areas on Bluebill Avenue abutting Conner Park. Second by Vice Chair Sjostrom. Carried unanimously 5 – 0. VII. PROJECT MANAGER REPORT – Judy Sizensky Ms. Sizensky reported: A. Budget FY-24 Vanderbilt Beach MSTU Fund 1617 Budget for May 2, 2024, prepared April 25, 2024. Purchase Orders 1. Collier County Utilities – Water and Sewer. 2. FPL – Electricity. 3. Capital Contractors – Sidewalk and bench refurbishment. 4. Ground Zero Landscaping – o Incidentals are for landscape refurbishment and miscellaneous. o Ground Maintenance includes Conner Park and irrigation repairs. 5. MasTec North America – Contract for burial of conduit and placing of equipment for Florida Power & Light, Comcast cable and Century Link for Phase IV. 6. Premier Staffing – Transcription Services. 7. Q Grady Minor & Associates - West Vanderbilt Drive Sidewalks. 8. Site One Landscape Supply – Irrigation Parts & Pumps. Budget Summary a. Line 1, Ad Valorem Tax Millage: Millage assessed is $1,756,300 of which $1,617,283 has been collected leaving a balance of $139,016 to collect. b. Line 11, Carry Forward – Unexpended prior year funds of $4,780,100. c. Line 15, Total Revenue - $7,591,058, including investment interest, transfers, and contributions. d. Line 37, Operating Expense - Of the $6,761,158 budgeted, $849,953 is committed on existing Purchase Orders and $513,383 has been spent, leaving a budget remainder of $5,397,821 available within budget for additional operating expenses as needed. e. Line 39, Capital Outlay - Budgeted at $650,000, is for the current fiscal year long term projects, consistent with the MSTU ordinance and upon a motion from the Advisory Committee. f. Line 40, Transfer to Fund 111 - Of the $96,000 budgeted, $96,000 has been transferred and $0 remains for transfer (PTNE Staff and Support). g. Line 44, Transfer Construction – Of the $50,500 Budgeted, $43,035 has been transferred and a balance of $7,464 remains for transfer (Property Appraiser and Tax Collector). h. Line 46, Capital Reserves - Of the $33,400 budgeted for anticipated Maintenance and Capital projects in future fiscal years as identified in the Asset Management Plan, $0 has been spent and a balance of $33,400 remains. j. Line 47, Total Budget – Of the $7,591,058, tabulated commitments to existing purchase orders total $849,953, $652,419 has been expended leaving a remainder of $6,088,685 available for MSTU expenditures. Page 760 of 784 5 General a. Available funds are sufficient to satisfy outstanding invoices for the landscaping at the Regatta of Naples at Vanderbilt Beach Road and Vanderbilt Drive, the crosswalks, the Vanderbilt Drive landscape renovation project, and the Greenway Multi-Use Path. b. Some FY-23 financial Commitments carried forward to FY-24. c. MasTec financial commitments total $624,622.49 for Phase IV construction. • Final payment approval in the amount of $216,000 was received from the Board of County Commissioners (BCC) on January 9, 2024. • Installation modification to hang the cable over the bridge versus boring underwater generating a cost savings of $408,000 has been credited to the budget. d. Reimbursement in the amount of $1985 was received from Utilities One for the cost incurred by the MSTU to repair a main irrigation line broken. d. The Q Grady Minor & Associates Purchase Order in the amount of $76,976, covers Construction, Engineering, and Inspection (CEI) work for the landscaping project at the Regatta of Naples. e. FY-24 millage rate of 0.5000, reviewed annually, will fund future projects, as well as the existing MSTU assets identified in the Capital Asset Management Plan. f. Funds not spent in FY-24 (fiscal year 2024) will be carried forward into FY-25. g. Tax millage collected and interest can only be utilized by the MSTU and within the district boundary. B. The Dunes of Naples Landscape Refurbishment Ms. Sizensky reported: • Ground Zero Landscaping completed the restoration to camouflage utility boxes and enhance the lake and roadway areas damaged during the Utility Burial Project. • The Dunes of Naples will install the sod. C. Greenway Multi-Use Bike Path – Vanderbilt Drive – Gulf Shore Drive Ms. Sizensky reported: • A 10-foot bike and pedestrian path north of The Dunes of Naples on Vanderbilt Drive near the bridge cannot be navigated at high tide or during extreme rain events. • The RWA work order for Design and Construction Phase Services in the amount of $58,500.00 was approved. • The total cost of the project is estimated at $333,086.00 which includes RWA’s proposal of $58,500.00 for the engineering services associated with the design and construction phases of the work. • Plans are subject to Road Maintenance approval prior to construction. • The Road Maintenance Division may consider undertaking construction with costs borne by the MSTU. • The Road Maintenance Division will be responsible for maintaining the walkway following completion of construction. D. Benches • A Purchase Order in the amount of $25,200.00 was issued to Capital Contractors for construction of ADA compliant brick paver pads, installation of 2 benches (one new, one reconstructed) and 175 feet of concrete sidewalk installation at Le Dauphin and Moraya Bay on Gulf Shore Drive. Page 761 of 784 6 • Le Dauphin: The HOA will confirm intent to pay for brick pavers for the pad. The MSTU would be responsible for the cost of the bench and pad. • A sketch has been submitted to the permitting department. • Construction will commence mid to end May,2024. VIII. OLD BUSINESS None IX. NEW BUSINESS Ms. Sizensky reported: A. Decorative Wall Extension Conner Park • The Parks and Recreation Department approved extension of the decorative post and rail wall on the south side of the park. • The fence will be extended approximately 62 feet with columns spaced 15 feet apart. • Capital Construction will draft plans incorporating a gate to enable maintenance access for the Parks and Recreation Department. • Cost quotes will be solicited. • Landscape planting will be installed on project completion. B. Summer Meeting Schedule The Committee agreed meetings will not be held in June and July 2024. C. Future Projects The Committee discussed projects for consideration: 1. Gulf Shore Drive, west side: Install/repair sidewalk between paver driveways. 2. Gulf Shore Drive, east side: Extend sidewalk and install bench and paver pad. 3. Gulf Shore Drive, south end, west side: Renovate area including possible crosswalk installation to the Ritz-Carlton Residences. 4. Bluebill Avenue Bridge: Landscape the southern side approaching the bridge. 5. The Dunes of Naples: Landscape the area on the south side of the fence towards the bridge. Mr. Harris will provide Ms. Sizensky a google earth map for the proposed area for reference. A meeting will be scheduled to review the County property records and determine MSTU assets. X. PUBLIC AND COMMITTEE COMMENTS Vanderbilt Drive Walk and Bike Path Doug Fee requested clarification regarding maintenance of the 10-foot-wide pedestrian and bike path north of The Dunes of Naples from Bluebill Avenue to Bonita Beach Road citing grass encroaching the sidewalk poses a safety concern. Ms. Sizensky reported that path maintenance is the responsibility of the County. RWA Inc. has been retained to provide a survey, civil design and construction plans to refurbish the pathway at MSTU expense. Halas Bridge Restoration Vanderbilt Drive Doug Fee suggested the bridge be cleaned to remove mildew and discoloration. Page 762 of 784 7 Ms. Sizensky noted the west half of the bridge is an MSTU asset. Prior inquiries with the Road Maintenance Division cited EPA guidelines restricted bridge cleaning and permitting was required. XI. ADJOURN There being no further business for the good of the County, the meeting was adjourned by order of the Chair at 3:28 P.M. VANDERBILT BEACH M.S.T.U. ADVISORY COMMITTEE Bruce Forman, Chair The minutes approved by the Board/Committee on ,2024 “as submitted” [___] or “as amended” [___]. NEXT MEETING AUGUST 1, 2024 - 2:00 P.M. Cocohatchee River Marina 13535 Vanderbilt Drive Naples Page 763 of 784 1 Vanderbilt Beach M.S.T.U Advisory Committee 8300 Radio Road Naples, FL 34104 SEPTEMBER 5, 2024 I. CALL TO ORDER AND PLEDGE OF ALLEGIANCE Ms. Sizensky called the meeting to order at 2:10 P.M. Roll call was taken, and a quorum was not established. The Pledge of Allegiance was not recited. II. ATTENDANCE Advisory Committee: Bruce Forman – Chair (Excused) William Sjostrom – Vice Chair (Excused) Mark Weber (ZOOM) Gabriella R. Miyamoto William Arell Harris (ZOOM) Staff: Judy Sizensky - Project Manager Brian Wells – Director, PTNE (Excused) Rosio Garcia – Operations Coordinator Others: Aaron Gross – Ground Zero Landscaping (Excused) Wendy Warren - Transcriptionist Public: Raymond Placid – Resident Ray Spinelli - Resident III. APPROVAL OF AGENDA Members agreed to hold an informational meeting in accordance with the Agenda. IV. APPROVAL OF MINUTES – MAY 2, 2024 The minutes of the May 2, 2024, Vanderbilt Beach MSTU meeting will be considered at the October 3, 2024, meeting. V. LANDSCAPE MAINTENANCE REPORT Ms. Sizensky reported: • Sections of Vanderbilt Drive west of the sidewalk, from Vanderbilt Beach Road to Bluebill Avenue, were landscaped by Ground Zero Landscaping. • One section remains to be planted; one section will be re-done. • Landscaping incorporated plantings proposed on McGee & Associates plans for the area west of the sidewalk and the bump out areas as approved by the Committee at the February 2, 2023, MSTU meeting. • Refurbishment of unhealthy shrubs and plants in the park will be addressed. Page 764 of 784 2 Committee and Public Discussion Ms. Sizensky replied to inquiries: • Vanderbilt Drive Palm tree planting between the sidewalk and the residential property line will extend to Vanderbilt Beach Road space permitting. • East side of the sidewalk will be grass. • Landscaping cannot interfere with the culvert drainage. • Plants in decline on Vanderbilt Drive and Conner Park will be replaced. • Removal of exotic vegetation is undertaken by the Parks and Recreation Department. • The Stormwater Division maintains the canals. • The sixty-two foot extension of the decorative post and rail wall on the south side of Conner Park was approved by the Parks and Recreation Department. Landscaping will not be installed on the canal bank. • A County project to install a sidewalk five feet wide along the east side of Vanderbilt Drive, from Vanderbilt Beach Road to 109th Avenue N, approximately 1.2 miles, is out for bid. Project construction, which requires approval from the Board of County Commissioners (BCC), is estimated to commence the second quarter of 2025. Ms. Sizensky will: • Contact the Director of Road Maintenance to request non exotic vegetation not be removed from the canal bank during the grubbing process. • Notify Mr. Placid of the date for fence installation. VI. VANDERBILT DRIVE REFURBISHMENT – Judy Sizensky Ms. Sizensky reported: A. Regatta Corner of Vanderbilt Drive and Vanderbilt Beach Road • The contract was awarded to Infinite Construction LLC. in the amount of $389,172.00. • An on-site meeting was held with Regatta residents to review the renovation. • A ROW permit request has been filed and the pavers ordered. • Project commencement is anticipated for October 2024 with an estimated end of year completion date. B. Crosswalks (6 with 1 alternate) Along Vanderbilt Beach Drive Ms. Sizensky reported: • Preferred Materials was awarded a contract in the amount of $397,123.00 to install six paver crosswalks, three north of The Regatta of Naples and three at The Anchorage, the Dunes of Naples and Marina Bay. • A Purchase Order has been issued and the brick pavers ordered. • The project start date, anticipated for October 2024, will be updated at the October meeting. C. Vanderbilt Drive Landscape Vanderbilt Beach Road to Bluebill Avenue Landscape West Side Vanderbilt Drive Ms. Sizensky reported: • Ground Zero’s landscaping of Vanderbilt Drive west of the sidewalk, from Vanderbilt Beach Road to Bluebill Avenue, is near completion. • The sightline standard at intersections was adhered to. • In accordance with County regulations, vegetation was not planted in the swales. Page 765 of 784 3 VII. PROJECT MANAGER REPORT – Judy Sizensky Ms. Sizensky reported: A. Budget FY-24 Vanderbilt Beach MSTU Fund 1617 Budget for September 5, 2024, prepared August 29, 2024. Purchase Orders 1. Collier County Utilities – Water and Sewer. 2. FPL – Electricity. 3. Capital Contractors – Sidewalk and bench refurbishment. 4. Ground Zero Landscaping – o Incidentals are for landscape refurbishment and miscellaneous. o Ground Maintenance includes Conner Park and irrigation repairs. 5. Infinite Construction – Renovation of the corner of The Regatta of Naples and Vanderbilt Drive. 6. MasTec North America – Contract for burial of conduit and placing of equipment for Florida Power & Light, Comcast Cable and Century Link for Phase IV. 7. Preferred Materials – Installation of crosswalks. 8. McGee & Associates – Architectural Landscape services. 9. Premier Staffing – Transcription services. 10. Q Grady Minor & Associates - West Vanderbilt Drive sidewalks. 11. RWA Engineering – Design services for the Greenway multi-use path project. 12. Site One Landscape Supply – Irrigation parts & pumps. Budget Summary a. Line 1, Ad Valorem Tax Millage: Millage assessed is $1,756,300 of which $1,650,012 has been collected leaving a balance of $106,287 to collect. b. Line 11, Carry Forward – Unexpended prior year funds of $4,780,100. c. Line 15, Total Revenue - $7,591,058, including investment interest, transfers, and contributions. d. Line 37, Operating Expense - Of the $6,761,158 budgeted, $1,686,753 is committed to existing Purchase Orders and $650,478 has been spent, leaving a budget remainder of $4,423,705 available within budget for additional operating expenses as needed. e. Line 39, Capital Outlay - Budgeted at $650,000, is for the current fiscal year long term projects, consistent with the MSTU ordinance and upon a motion from the Advisory Committee. f. Line 40, Transfer to Fund 111 - Of the $96,000 budgeted, $96,000 has been transferred and $0 remains for transfer (PTNE Staff and Support). g. Line 44, Transfer Construction – Of the $50,500 Budgeted, $47,438 has been transferred and a balance of $3,061 remains for transfer (Property Appraiser and Tax Collector). h. Line 46, Capital Reserves - Of the $33,400 budgeted for anticipated Maintenance and Capital projects in future fiscal years as identified in the Asset Management Plan, $0 has been spent and a balance of $33,400 remains. j. Line 47, Total Budget – Of the $7,591,058, tabulated commitments to existing purchase orders total $1,686,975, $797,276 has been expended leaving a remainder of $5,108,806 available for MSTU expenditures. Page 766 of 784 4 General a. Available funds are sufficient to satisfy outstanding invoices for the landscaping at the Regatta of Naples at Vanderbilt Beach Road and Vanderbilt Drive, the crosswalks, the Vanderbilt Drive landscape renovation project, and the Greenway Multi-Use Path. b. FY-24 millage rate of 0.5000, reviewed annually, will fund future projects, as well as the existing MSTU assets identified in the Capital Asset Management Plan. c. Funds not spent in FY-24 (fiscal year 2024) will be carried forward into FY-25. d. Tax millage collected and interest can only be utilized by the MSTU and within the district boundary. e. The Fiscal Year 2025 budget is effective October 1, 2024. B. The Dunes of Naples Landscape Refurbishment Ms. Sizensky reported: • Ground Zero Landscaping completed the restoration to camouflage utility boxes and enhance the lake and roadway areas damaged during the Utility Burial Project. • Sod will be installed now that the rainy season has ended. C. Greenway Multi-Use Bike Path – Vanderbilt Drive – Gulf Shore Drive Ms. Sizensky reported: • A 10-foot bike and pedestrian path north of The Dunes of Naples on Vanderbilt Drive near the bridge cannot be navigated at high tide or during extreme rain events. • The RWA work order for Design and Construction Phase Services in the amount of $58,500.00 was approved. • The total cost of the project is estimated at $333,086.00 which includes RWA’s proposal of $58,500.00 for the engineering services associated with the design and construction phases of the work. • The Southwest Florida Water Management District (SWFWMD) will be consulted on the project. • Plans are subject to Road Maintenance approval prior to construction. • The Road Maintenance Division may consider undertaking construction with costs borne by the MSTU. • The Road Maintenance Division will be responsible for maintaining the walkway following completion of construction. Sidewalk Improvement Vanderbilt Beach Road – Gulf Shore Drive A Request for quote to install a new concrete sidewalk and improve drainage on the northeast corner of Vanderbilt Beach Road in front of Buzz’s Lighthouse Restaurant will be solicited. D. Benches Ms. Sizensky reported: • Capital Contractors constructed an ADA compliant brick paver pad and installed a bench at Le Dauphin. The sidewalk from the condominiums to LaPlaya was replaced. • Moraya Bay’s pavers and bench were also renovated by Solid Pave. VIII. OLD BUSINESS None Page 767 of 784 5 IX. NEW BUSINESS Ms. Sizensky reported: A. Decorative Wall Extension Conner Park • The Parks and Recreation Department approved extension of the decorative post and rail wall on the south side of the park. • The fence will be extended approximately sixty-two feet with columns spaced 15 feet apart. • Design and build plans incorporating a gate to enable maintenance access for the Parks and Recreation Department were developed. • A Request for Quote (RFQ) was solicited with a submission due date of September 4, 2024. • One quote was received in the amount of $69,500. Three quotes are required to award a contract. The RFQ will be reissued. • Landscape planting will be installed on project completion. B. Wiggins Pass Entrance Beautification Ms. Sizensky met with Delnor-Wiggins Pass State Park representatives to review the request for MSTU funding to enhance the Wiggins Pass Entrance. • A twelve-foot solar barrier arm, safety loops and a keypad would be installed at the park entrance to alleviate traffic congestion and enhance safety. • Electronic signs would notify visitors of parking lot availability and direct vehicles to other lots, i.e. the Conner Park. • Traffic flow would be assisted by the application of round delineators posts. • Visitors would pay for parking prior to exiting the grounds to alleviate traffic flow. • The gate would be locked down when the park is closed. • The oval median would be shortened to benefit smooth traffic flow, ideally with rounded corners to preserve the palm trees. • Benches will be installed at the turnabout. • Total financial estimate for the project is $8,946.30. • MSTU participation in the project will be considered at the October 2024 meeting. X. PUBLIC AND COMMITTEE COMMENTS • Ms. Sizensky will walk Conner Park with Mr. Gross, Ground Zero Landscaping, and request proposals to refurbish distressed areas. • Request a quote to install a new concrete sidewalk on the northeast corner of Gulf Shore Drive in front of Buzz’s Lighthouse Restaurant. XI. ADJOURN There being no further business for the good of the County, the meeting was adjourned by order of the Chair at 3:07 P.M. Page 768 of 784 6 VANDERBILT BEACH M.S.T.U. ADVISORY COMMITTEE Bruce Forman, Chair The minutes approved by the Board/Committee on ,2024 “as submitted” [___] or “as amended” [___]. NEXT MEETING OCTOBER 3, 2024 - 2:00 P.M. Cocohatchee River Marina 13535 Vanderbilt Drive Naples Page 769 of 784 VANDERBILT MSTU FUND 161700000 October 3rd, 2025 FY25VendorItem PO#Budget Commitments Expenditures Total 1 CUR AD VALOREM TAX (1,786,300.00)$ -$ -$ (1,786,300.00)$ 2 DEL AD VALOREM -$ -$ -$ -$ 3 STATE REVENUE -$ 64,023.57$ 4 OVERNIGHT INTEREST -$ -$ -$ -$ 5 INVESTMENT INTEREST (28,000.00)$ -$ -$ (28,000.00)$ 6 INTEREST TAX COLL.-$ -$ -$ -$ 7 REVENUE STRUCTURE (1,814,300.00)$ -$ -$ (1,814,300.00)$ 8 TRANSFERS FROM PROP APP -$ -$ -$ 9 TRANSFERS FROM TAX COLL -$ -$ -$ 10 REIMBURSEMENT -INTERDEPT.-$ -$ -$ -$ 11 CARRY FORWARD GENERAL (5,052,000.00)$ -$ -$ (5,052,000.00)$ 12 CARRY FOR OF ENCUMB AMT (1,004,867.28)$ -$ -$ (1,004,867.28)$ 13 NEG 5% EST REV 90,800.00$ -$ -$ 90,800.00$ 14 TRANSFERS & CONTRIB (5,966,067.28)$ -$ -$ (5,966,067.28)$ 15 TOTAL REVENUE (7,780,367.28)$ 1,165,277.28$ -$ (6,615,090.00)$ 16 SURVEYING FEES 100,000.00$ -$ -$ 100,000.00$ 17 INDIRECT COST Collier County Indirect Cost Direct Pay 6,000.00$ 6,000.00$ -$ -$ 18 INTERDEPT PAYMENT Collier County Real Property Department Direct Pay 1,000.00$ -$ 1,000.00$ Ground Zero Landscaping Serv Landscape Incidentals PO TBD 10330010 100,000.00$ 57,000.00$ -$ -$ -$ -$ -$ 19 LANDSCAPE INCIDENTALS 100,000.00$ 57,000.00$ -$ 43,000.00$ INFINITE CONSTRUCTION LLC 4500232472 419,171.98$ Ground Zero 10330010 30,560.00$ DRMP, INC 4500232514 58,760.00$ Preferred Materials Brick paver crosswalk 4500232149 437,124.80$ RWA Engineering 4500231986 58,363.00$ MCGEE & ASSOCIATES MCGEE & ASSOCIATES 4500231013 6,197.50$ Q Grady Minor WO West Vanderbilt Dr Sidewalks 4500225615 Capital Contractors Sidewalk and bench refurbishment 4500231023 25,250.00$ 20 OTHER CONTRACTUAL 6,244,867.28$ 1,035,427.28$ -$ 5,209,440.00$ 21 POST FREIGHT UPS 100.00$ -$ 100.00$ 22 ELECTRICITY FPL Electricity 4700004865 700.00$ 550.00$ -$ 150.00$ 23 WATER AND SEWER Collier County Utility Water & Sewer 4700004940 100,000.00$ 60,000.00$ -$ 40,000.00$ 24 RENT BUILDINGS St. John the Evangelist Meeting Room Rental Working on PO REQ 800.00$ 800.00$ -$ -$ 25 INSURANCE GENERAL Collier County Insurance General Direct -$ -$ -$ 26 SPRINKLER SYSTEM MAIN Site One Irrigation Parts 4500227226 10,000.00$ 3,000.00$ -$ 7,000.00$ 27 MULCH 5,000.00$ 5,000.00$ 28 LICENCES AND PERMITS 2,000.00$ -$ 2,000.00$ 29 CLERKS RECORDING FEES 1,000.00$ 1,000.00$ 30 LEGAL ADVERTISMENT NDN 4500227814 -$ -$ -$ 31 OTHER MISCELLANEOUS Premier Staffing Transcriptionist Serv. 4500227789 2,500.00$ 2,500.00$ -$ -$ 32 OFFICE SUPPLIES Office Supplies 200.00$ -$ 200.00$ 33 COPYING CHARGES JM Todd Monthly CPC (shared) (monthly lease)4500227043 200.00$ -$ -$ 200.00$ 35 FERT HERB CHEM 2,000.00$ -$ 2,000.00$ 36 OTHER OPER SUPPLIES 500.00$ 500.00$ 37 OPERATING EXPENSE 6,576,867.28$ 1,165,277.28$ -$ 5,411,590.00$ 38 IMPROVEMENTS GENERAL 1,000,000.00$ -$ 1,000,000.00$ 39 CAPITAL OUTLAY 1,000,000.00$ -$ -$ 1,000,000.00$ 40 TRANS TO 1011 UNINCOR 102,300.00$ -$ -$ 102,300.00$ 41 TRANSFERS 102,300.00$ -$ -$ 102,300.00$ 42 Budget Trans from Appraiser 14,500.00$ -$ -$ 14,500.00$ 43 Budget Trans from Tax Collector 36,700.00$ -$ -$ 36,700.00$ Page 770 of 784 VANDERBILT MSTU FUND 161700000 October 3rd, 2025 FY2544TRANSFERS CONST 51,200.00$ -$ -$ 51,200.00$ 45 RESV For Capital Out 50,000.00$ -$ -$ 50,000.00$ 46 RESERVES 50,000.00$ -$ -$ 50,000.00$ 47 TOTAL BUDGET 7,780,367.28$ 1,165,277.28$ -$ 6,615,090.00$ 2,068,487,415 FY 10 Final Taxable Value 2,005,897,752 FY 11 Final Taxable Value Total Available Balance 6,615,090.00$ 1,910,384,837 FY 12 Final Taxable Value Plus Commited And Not Spent 1,165,277.28$ 1,904,053,751 FY 13 July 1 Taxable Value 1,945,640,639 FY 14 July 1 Taxable Value Estimated Cash 7,780,367.28$ 2,044,186,286 FY 15 July 1 Taxable Value 2,195,715,846 FY 16 July 1 Taxable Value 2,385,578,106 FY 17 July 1 Taxable Value 2,560,181,524 FY 18 July 1 Taxable Value 5,994,067.28$ 2,673,862,805 FY 19 July 1 Taxable Value 2,805,690,115 FY 20 July 1 Taxable Value 2,874,630,743 FY 21 July 1 Taxable Value 2,977,182,419 FY22 July 1 Taxable Value Actual Cash 3,404,417,979 FY23 July 1 Taxable Value Prepared on 10/03/2024 Z 3,512,537,975 FY24 July 1 Taxable Value 3,841,472,517 FY25 July 1 Taxable Value 11.17% FY 25 FY 24 Estimated Cash Less Uncollected Ad Valorem Taxes Page 771 of 784