Agenda 01/14/2025 Item #16A 8 (Resolution and release of the maintenance security for the final plat of Isle of Collier Preserve, Phase 9)1/14/2025
Item # 16.A.8
ID# 2024-2187
Executive Summary
Recommendation to approve a Resolution for final acceptance of the private roadway and drainage improvements and
acceptance of the plat dedications for the final plat of Isles of Collier Preserve Phase 9, Application Number
PL20160001197, and authorize the release of the maintenance security in the amount of $262,678.
OBJECTIVE: To have the Board of County Commissioners (Board) grant final acceptance of the infrastructure
improvements associated with the subdivision, accept the plat dedications, and authorize the release of the maintenance
security.
CONSIDERATIONS:
1. The Growth Management Department granted preliminary acceptance of the roadway and drainage
improvements in Isles of Collier Preserve Phase 9 on March 12, 2021.
2. Isles of Collier Preserve Property Owners Association, Inc. will maintain the roadway and drainage
improvements.
3. The required improvements have been constructed in accordance with the Land Development Code. On
October 30, 2024, the Growth Management Department inspected them and recommends their final acceptance.
4. A resolution for final acceptance has been prepared by staff and approved by the County Attorney's Office. The
resolution is a requirement of Section 10.02.05 C of the Land Development Code. A copy of the resolution is
attached.
FISCAL IMPACT: Isles of Collier Preserve Property Owners Association, Inc., will maintain the roadway and
drainage improvements. The existing security of $262,678 will be released upon Board approval. Based on the work
performed and completed pursuant to the terms of the Construction and Maintenance Agreement dated March 21, 2018,
the original security of $1,254,260 has been reduced to the current amount of $262,678.
GROWTH MANAGEMENT IMPACT: There is no growth management impact.
LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for
Board approval. - DDP
RECOMMENDATIONS: To grant final acceptance of the roadway and drainage improvements in Isles of Collier
Preserve Phase 9, Application Number PL20160001197, and authorize:
1. The Chairman to execute the attached resolution authorizing final acceptance of the improvements and plat
dedications.
2. The Clerk of Courts to release the maintenance security.
PREPARED BY: Lucia S. Martin, Project Manager I, Development Review
ATTACHMENTS:
1. Location Map
2. Bond Basis
3. Resolution
4. Plat Map
Page 1599 of 6405
1/14/2025
Item # 16.A.8
ID# 2024-2187
Page 1600 of 6405
ISLES OF COLLIER PRESERVE PHASE 9
LOCATION MAP
Page 1601 of 6405
CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION
IMPROVEMENTS
THIS CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION IMPROVEMENTS entered into
this :l!_!! day of �II-2018 between Minto Sabal Bay, LLC hereinafter referred to
as "Developer," and the Boar_d of County Commissioners of Collier County, Florida, hereinafter referred
to as the "Board.
RECITALS:
A.Developer has, simultaneously with the delivery of this Agreement, applied for the approval by the
Board of a certain plat of a subdivision to be known as: "The Isles of Collier Preserve Phase 9"
B.Chapters 4 and 10 of the Collier County Land Development Code requires the Developer to post
appropriate guarantees for the construction of the improvements required by said subdivision
regulations, said guarantees to be incorporated in a bonded agreement for the construction of the
required improvements.
NOW, THEREFORE, in consideration of the foregoing premises and mutual covenants hereinafter
set forth, Developer and the Board do hereby covenant and agree as follows:
1.Developer will cause to be constructed: the required subdivision improvements -see
attached OPC from Barraco and Associates, Inc. within 24 months from the date of approval
said subdivision plat, said improvements hereinafter referred to as the required
improvements.
2.Developer herewith tenders its subdivision performance security (attached hereto as Exhibit
"A" and by reference made a part hereof) in the amount of $1,254,260.00 which amount
represents 10% of the total contract cost to complete construction plus 100% of the estimate
cost of to complete the required improvements at the date of this Agreement.
3.In the event of default by the Developer or failure of the Developer to complete such
improvements within the time required by the Land Development Code, Collier County, may
call upon the subdivision performance security to insure satisfactory completion of the
required improvements.
4.The required improvements shall not be considered complete until a statement of substantial
completion by Developer's engineer along with the final project records have been furnished
to be reviewed and approved by the County Manager or his designee for compliance with the
Collier County Land Development Code.
5.The County Manager or his designee shall, within sixty (60) days of receipt of the statement
of substantial completion, either: a) notify the Developer in writing of his preliminary approval
of the improvements; or b) notify the Developer in writing of his refusal to approve
improvements, therewith specifying those conditions which the Developer must fulfill in
order to obtain the County Manager's approval of the improvements. However, in no event
shall the County Manager or his designee refuse preliminary approval of the improvements if
they are in fact constructed and submitted for approval in accordance with the requirements
of this Agreement.
Page 1602 of 6405
6.The Developer shall maintain all required improvements for a minimum period of one year
after preliminary approval by the County Manager or his designee. After the one year
maintenance period by the Developer has terminated, the Developer shall petition the County
Manager or his designee to inspect the required improvements. The County Manager or his
designee shall inspect the improvements and, if found to be still in compliance with the Collier
County Land Development Code as reflected by final approval by the Board, the Board shall
release the remaining 10% of the subdivision performance security. The Developer's
responsibility for maintenance of the required improvements shall continue unless or until
the Board accepts maintenance responsibility for and by the County.
7.Six (6) months after the execution of this Agreement and once within every six (6) months
thereafter the Developer may request the County Manager or his designee to reduce the dollar
amount of the subdivision performance security on the basis of work complete, Each request for
a reduction in the dollar amount of the subdivision performance security shall be accompanied by
a statement of substantial completion by the Developer's engineer together with the project
records necessary for review by the County Manager or his designee. The County Manager or his
designee may grant the request for a reduction in the amount of the subdivision performance
security for the improvements completed as of the date of the request.
8.In the event the Developer shall fail or neglect to fulfill its obligations under this Agreement,
upon certification of such failure, the County Manager or his designee may call upon the
subdivision performance security to secure satisfactory completion, repair and maintenance
of the required improvements. The Board shall have the right to construct and maintain, or
cause to be constructed or maintained, pursuant to public advertisement and receipt and
acceptance of bids, the improvements required herein. The Developer, as principal under the
subdivision performance security, shall be liable to pay and to indemnify the Board, upon
completion of such construction, the final total cost to the Board thereof, including, but not
limited to, engineering, legal and contingent costs, together with any damages, either direct
or consequential, which the Board may sustain on account of the failure of the Developer to
fulfill all of the provisions of this Agreement.
9.All of the terms, covenants and conditions herein contained are and shall be binding upon the
Developer and the respective successors and assigns of the Developer.
IN WITNESS WHEREOF, the Board and the Developer have caused this Agreement to be executed by their
duly authorized representatives this 'Jl..!!day of t{�c.6t-" , 2018.
\ ... . ,,, .. ·� DWIGHT E. BR_OCK, CL�RK '�.
Sr,� A� 5-V,,Assista�ounty Attorney
(Name of E���AL BAY, LLC
By: ---'�'--_..:c �"------------
Printed Name/Title: William Bullock, Vice President
(President/VP, or CEO)
By:
A� .5o\.'�.,c.r.,.,....,.'r�'"'
Page 1603 of 6405
PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS: that
Minto Sabal Bay, LLC
440 W. Sample Road, Suite 200
Coconut Creek, FL 33703
(Hereinafter referred to as "Owner") and The Guarantee Company of North America USA One Town Square, Suite 1470 Southfield, MI 48076 (248)281-0281 BOND NO. _a_o,_3_o9_ss ___ _
(Name of Owner)
(Address of Owner)
(Address of Owner)
(Name of Surety)
(Address of Surety)
(Address of Surety)
(Telephone Number)
(hereinafter referred to as "Surety") are held and firmly bound unto Collier County, Florida, (hereinafter
referred to as "County") in the total aggregate sum of 0n,M.,onfwoHund ... ,,..,,.u,ThouHOdTwoHuM,tdS1,�andOOIICXl Dollars
($ 1.254 .260 .00 ) in lawful money of the United States, for the payment of which sum well and truly
to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and
severally, firmly by these presents. Owner and Surety are used for singular or plural, as the context
requires.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Owner has submitted for approval by
the Board of a certain subdivision plat named Isles of Collier Preserve Phase 9 and that
certain subdivision shall include specific improvements which are required by Collier County Ordinances
and Resolutions (hereinafter "Land Development Regulations"). This obligation of the Surety shall
commence on the date this Bond is executed and shall continue until the date of final acceptance by the
Board of County Commissioners of the specific improvements described in the Land Development
Regulations (hereinafter the "Guaranty Period").
NOW THEREFORE, if the Owner shall well, truly and faithfully perform its obligations and duties
in accordance with the Land Development Regulations during the guaranty period established by the
County, and the Owner shall satisfy all claims and demands incurred and shall fully indemnify and save
harmless the County from and against all costs and damages which it may suffer by reason of owner's
failure to do so, and shall reimburse and repay the County all outlay and expense which the County may
incur in making good any default, then this obligation shall be void, otherwise to remain in full force and
effect.
PROVIDED, FURTHER, that the said Surety, for value received hereby, stipulates and agrees that
no change, extension of time, alteration, addition or deletion to the proposed specific improvements
shall in any way affect its obiigation on this Bond, and it does hereby waive notice of any such change,
extension of time, alteration, addition or deletion to the proposed specific improvements.
PROVIDED, FURTHER, that it is expressly agreed that the Bond shall be deemed amended
automatically and immediately, without formal and separate amendments hereto, so as to bind the
Page 1604 of 6405
Owner and the Surety to the full and faithful performance in accordance with the Land Development Regulations. The term "Amendment", wherever used in this Bond, and whether referring to this Bond,or other documents shall include any alteration, addition or modification of any character whatsoever.
IN WITNESS WHEREOF, the parties hereto have caused this PERFORMANCE BOND to be executed this 13 th day of March, 2018.
WITNESSES:
Print Name: c-A-� ►'( ll..l\c-Lil 'am Costello V. P. of Finance
Printed Name/Title (Provide Proper Evidence of Authority)
ACKNOWLEDGEMENT STATE oFf Lo��� COUNTY OF !5 .CR.:IS
!HE FQREGOING PER�l�!'JAN�EE}O� WA.S,.f,CKNOWLE GED BEFORE ME THIS �DAY OF t'\,..r� , 20Ci., BY�J • .,.,.,� AS'J, '- '• OF MINTO SABAL BAY, LLC WHO ISPERSONALLY KNOWN TO ME, OR HAS PRODUCED L CENSE AS IDENTIFICATION. -
STATE OF FLORIDA COUNTY OF MIAMI-DADE
hA . ,,,,, .. ,.,, LAUAA LAFAIJCt l?-'1·' �.. MY COMMISSION f FF �ma
!•( . )°1 EXPIRES: February 13, 2020 � .. -;_, t Bcnd&d Thlu Holll'f Public Undtfwrillll
,Rf,,,,,
(SEAL)
The Guarantee Company of North Amerir.a USA
Claudette Alexander Hunt. Attorney in Fact Printed Name/Title (Provide Proper Evidence of Authority)
ACKNOWLEDGMENT
THE FOREGOING PERFORMANCE BOND WAS ACKNOWLEDGED BEFORE ME THIS 1Mb DAY OFMARCH, 2018.. BY CLAUDETTE ALEXANDER HUNT AS ATTORNEY IN FACT OF THE GUARANTEECOMPANY OF NORTH AMERICA USA WHO IS PERSONALLY KNOWN TO ME, OR HAS PRODUCEDLICENSE AS IDENTIFICATION. Notary Public -State of Florida
CAMILLE M. CRUZ
Commission# GG 112026
Expires August 5, 2021 Bonded nw Budge! Notaty Serw:es
(SEAL)
Page 1605 of 6405
1H£ GUARANTEE-The Guarantee Company of North America USA Southfield, Michigan POWER OF ATTORNEY
KNOW ALL BY THESE PRESENTS: That THE GUARANTEE COMPANY OF NORTH AMERICA USA. a corporation organized and existing under the
laws of the State of Michigan, having its principal office in Southfield, Michigan, does hereby constitute and appoint
Claudette Alexander Hunt, Jacqueline Jordan Hampton Aon Risk Services, Inc. of Florida
its true and lawful attorney(s)-in-fact to execute, seal and deliver for and on its behalf as surety, any and all bonds and undertakings, contracts of
indemnity and other writings obligatory In the nature thereof, which are or may be allowed, required or permitted by law, statute, rule, regulation, contract or otherwise.
The execution of such lnstrument(s) in pursuance of these presents, shall be as binding upon THE GUARANTEE COMPANY OF NORTH AMERICA USA as fully and amply, to all Intents and purposes. as if the same had been duty executed and acknowledged by its regularly elected officers at the
principal office.
The Power of Attorney is executed and may be certified so, and may be revoked, pursuant to and by authority of Article IX, Section 9.03 of the By-Laws adopted by the Board of Directors of THE GUARANTEE COMPANY OF NORTH AMERICA USA at a meeting held on the 31 st day of December, 2003.
The President, or any Vice President, acting with any Secretary or Assistant Secretary, shall have power and authority:
1.To appoint Attorney(s)-in-fact, and to authorize them to execute on behalf of the Company. and attach the Seal of the Company thereto.
bonds and undertakings, contracts of Indemnity and other writings obligatory In the nature thereof; and
2.To revoke, at any time, any such Attorney-in-fact and revoke the authority given, except as provided below
3.In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and authority hereby given to the Attorney-in-Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and
construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of
Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. 4.In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given tothe Attorney-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner -
Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation.
Further, this Power of Attorney is signed and sealed by facsimile pursuant to resolution of the Board of Directors of the Company adopted at a meeting duly called and held on the 6th day of December 2011. of which the following is a true excerpt:
RESOLVED that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any Power of Attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, contracts of indemnity and other writings obligatory in the nature thereof, and
such signature and seal when so used shall have the same force and effect as though manually affixed.
IN WITNESS WHEREOF, THE GUARANTEE COMPANY OF NORTH AMERICA USA has caused this instrument to be signed and
its corporate seal to be affixed by its authorized officer, this 23rd day of February, 2012.
STATE OF MICHIGAN
County of Oakland
THE GUARANTEE COMPANY OF NORTH AMERICA USA
Stephen C. Ruschak, President & Chief Operating Officer Randall Musselman, Secretary
On this 23rd day of February, 2012 before me came the individuals who executed the preceding Instrument, to me personally known, and being by me
duly sworn. said that each is the herein described and authorized officer of The Guarantee Company of North America USA; that the seal affixed to said
instrument is the Corporate Seal of said Company; that the Corporate Seal and each signature were duly affixed by order of the Board of Directors of
Cynthia A. Takai
Notary Public, State of Michigan
County of Oakland
My Commission Expires February 27, 2018
Acting in Oakland County
IN WITNESS WHEREOF, I have hereunto set my hand at The Guarantee Company of North America USA offices the day and year above written.
I. Randall Musselman, Secretary of THE GUARANTEE COMPANY OF NORTH AMERICA USA. do hereby certify that the above and foregoing Is a true and correct copy of a Power of Attorney executed by THE GUARANTEE COMPANY OF NORTH AMERICA USA, which is still in full force and effect.
IN WITNESS WHEREOF, I have thereunto set my hand and attached the seal of said Company this 13 day of /J-C\r� , 2..ol't
Randall Musselman, Secretary
Page 1606 of 6405
NO. I. 110-2
iP5-l II. 160-1
200-1
331-1
331-2
520-1
522-1
522-2
700-1
A. III. 425-1
425-2
425-3
425-4
425-5
425-6
www .barraco.net
Civil Engineers, Land Surveyors and Plannerl-:
ENGINEER'S OPINION OF PROBABLE COST
for the construction of
Isles of Collier Preserve Phase 9 Plat Bond DESCRIPTION
EARTHWORK
Erosion Control
Sodding
ROADWAY
Type "B" Stabilization (12")
Limerock Base wLPrime Coat (6")
Asehalt Concrete Type S-III 3L4" (1st Lift)
August 25, 2016
QUANTITY
1
24,500
5,842
3,818
3,818
Asehalt Concrete Tree S-III 3L4" (Final Lift) 3,818
Type "F" Curb
4" Concrete Sidewalk
ADA Rames wL Detectable Warning
Signing and Pavement Markings
Bridge Crossing**
2,987
2,797
8
1
1
UNIT
LS
SY
SY
SY
SY
SY
LF
SY
EA
LS
LS
PRICE
$z,500.oo
$1.85
SUB-TOTAL
$2.00
$z.oo
$4.5o
$3.zs
s2.oo
$20.00
$1;50.00
$5,000.00
$925,000.00
SUB-TOTAL:
DRAINAGE
Control Structure Inlet
Typ e "9" Inlet
Type "C" Inlet
4' Junction Box
18" Endwall
24" Endwall
Page 1 of 4
1 EA $5,000.00
8 EA $2,900.00
1 EA $3,000.00
1 EA $2,000.00
1 EA $1,500.00
2 EA $2,500.00
AMOUNT
$z,500.oo
�15,325-00
$521825.00
$11,68:f:.0O
$26,z26.oo
$1z,181.oo
$11,31z-s0
�26,883.00
$55,940.00
$3,600.00
$5,000.00
$225,000.00
$1z1J6zaa1.50
$5,000.00
$23,200.00
$3,000.00
$2,000.00
$1,500.00
$5,000.00
Page 1607 of 6405
1 6 A3 4
HEM
NO. DESCRIPTION QUANTITY UNIT
UNI I
PRICE AMOUNT
425-7 Control Structure Weir 1 EA $2,800.00 $2,800.00
430-1 18" RCP Storm Sewer 473 LF $39.oo $18,447.00
430-2 24" RCP Storm Sewer 213 LF $55.oo $11,715.00
430-3 18" ADS Storm Sewer 85 LF $30.00 $2,550.00
530-1 6"-8" Rip Rap 56 SY $40.00 $2,240.00
530-2 8"-i2" Rip Rap 112 SY $90.00 $10,080.00
SUB-TOTAL: $87,532.00
IV. WATERLINE AND ACCESSORIES
A. 12" DR-14 PVC Watermain 41 LF $60.00 $2,460.00
B. 12" DR-18 PVC Watermain 1,309 LF $40.00 $52,360.00
C. 12" Gate Valve 7 EA $3,000.00 $21,000.00
D. Fire Hydrant Assembly 4 EA $3,500.00 $14,000.00
E. Directional Bore (24" DR-11 Casing) 352 LF $240.00 $84,480.00
F. Directional Bore (14" DR-11 Carrier) 352 LF $120.00 $42,240.00
G. 10" Gate Valve 1 EA $1,800.00 $1,800.00
H. 10" DR-14 PVC Watermain 40 LF $50.00 $2,000.00
I. 10" DR-18 PVC Watermain 62 LF $36.00 $2,232.00
J. 8" Gate Valve 1 EA $2,500.00 $2,500.00
K. 8" DR-14 PVC Watermain 33 LF $46.00 $1,518.00
L. 8" DR-18 PVC Watermain 55 LF $33.00 $1,815.00
M. Permanent Bacterial Sample Point 1 EA $1,200.00 $1,200.00
N. Air Release Valve 5 EA $2,000.00 $10,000.00
0. Sub Aqueous Valve Vault 1 EA $1,200.00 $1,200.00
P. Single Water Service 1 EA $1,500.00 $1,500.00
SUB-TOTAL: $242,305.00
Page 2 of 4
Page 1608 of 6405
NO.
V. A. B.
C.
D.
E.
F.
G.
H.
H.
I.
J.
VI. A. B.
VII. A. B.
C.
D.
E.
F.
G.
H.
I.
DESCRIPTION
SEWER SYSTEM
6" DR-18 PVC Forcemain
6" DR-14 PVC Forcemain
Air Release Valve
6" Plug Valve
Directional Bore (16" DR-11 Casing)
Directional Bore (8" DR-11 Carrier)
4'' DR-18 PVC Forcemain
4" Plug Valve
8" SDR-26 Sanitary Sewer
4' Manhole
Liftstation Wetwell
LANDSCAPING
Littoral Shelf Planting Area
Wetland Filter Marsh Planting Area/Created
Wetland
IRRIGATION SYSTEM
10" Gate Valve
10" DR-18 Irrigation Main
10" DR-14 Irrigation Main
Single Irrigation Services
Air Release Valve
Directional Bore (20" DR-11 Casing)
Directional Bore (12" DR-11 Carrier)
4" Gate Valve
4" DR-18 Irrigation Main
QUANTITY
1,300
88
2
3
339
339
7
1
494
2
26,247
23,472
6
1,379
83 10 4
337
337
24
Page 3 of 4
UNIT PRICE AMOUNT
LF $35.00 $45,500.00
LF $38.00 $3,344.oo
EA $2,000.00 $4,000.00
EA $1,200.00 $3,600.00
LF $16 0.00 $54,240.00
LF $75.00 $25,425.00
LF $24.00 $168.00
EA $900.00 $900.00
LF $45.00 $22,230.00
EA $6,500.00 $13,000.00
EA $40,000.00 $40,000.00
SUB-TOTAL: $212,407.00
SF $1.50 $39,37o.5o
SF $2.00 $46,944.00
SUB-TOTAL: $86,314.50
EA $2,800.00 $16,800.00
LF $36.00 $49,6 44.oo
LF $50.00 $4,150.00
EA $400.00 $4,000.00
EA $1,200.00 $4,800.00
LF $200.00 $67,400.00
LF $95.00 $32,015.00
EA $900.00 $900.00
LF $24.00 $576.00
SUB-TOTAL: $180,285.00
Page 1609 of 6405
NO. DESCRIPTION
VIII.SITE LIGHTING
A.FPL Town & Country Street Lights
B.LUMCA CPL0406 (Double) Concept 30
QUANTITY UNIT PRICE
1,4 EA $900.00
8 EA $2,000.00
SUB-TOTAL:
TOTAL:
10% BOND TOTAL:
BOND TOTAL:
Bridge Crossing** Included in EOPC for bonding
purposes only, not included in review fee or
inspection fees since the review and inspections are
completed through another application.
Estimated Date of Completion: 4/17
Barraco and Associates, Inc.
2271 McGregor Boulevard
P.O. Drawer 2800
Fort Myers, FL 33902-2800
Certificate of Authorization No. 7995
Timothy B. Gavin, P.E.
Florida P .E. No. 70675
For the Firm
Timothy B.
Gavin, P.E.
70675
2016.08.26
14:49:55 -04'00'
This Item mu; �D elec:tronlcally signed and sealed u.�ing a
SHA-1 authentication cod.e.
Printed copies of this document are not con,;idcred signed 11nd
sea.led and the SHA-1 :iuthenticalion code must be verified on
any electronic copies.
Page 4 of 4
AMOUNT'
$12,600.00
$16,000.00
$28 600.00
$2,026,600.00
$202,660.00
$2,229,260.00
Page 1610 of 6405
JTEM NO. DESCRIPTION I.EARTHWORK
110-2 Erosion Control
575-1 Sodding
II.ROADWAY
160-1 Type "B" Stabilization (12")
200-1 Limerock Base w/Prime Coat (6")
331 -1 Asphalt Concrete Type S-IIJ 3/4'' ( 1st Lift)
331-2 Asphalt Concrete Type S-III 3/4" (Final Lift)
520-1 Type "F" Curb
522-1 4'' Concrete Sidewalk
522-2 ADA Ramps w/ Detectable Warning
700-1 Signing and Pavement Markings
A.Bridge Crossing
www.barraco.net
Civil Engineers, Land Surveyors and Planners
ENGINEER'S OPINION OF PROBABLE COST
for the construction of
Isles of Collier Preserve Phase 9
Plat Bond
March 22, 2018 ORIGJNAL CONSTRUCTED REMAINING QUANfl'IT QUANTITY QUANfl1Y UNIT 24,500
3,818
3,818
3,818
2,797 8 1
0
0
0
0
0
0
0
0
0
0
1 LS
24,500 SY
5,842 SY
3,818 SY
3,818 SY
3,818 SY
2,987 LF
2,797 SY
8 EA
1 LS
0 LS
Page 1 of 5 UNIT PRICE $7,500.00
$1.85
SUB-TOTAL
$2.00
$7.00
$4.5o
$3.75
$9.00
$20.00
$450.00
$5,000.00
$975,000.00
SUB-TOTAL: ORIGINAL AMOUNT $7,500.00
$45,325.00
$52,825.00
$11,684.00
$26,726.00
$17,181.00
$i4,3i7.50
$26,883.00
$55,940.00
$3,600.00
$5,000.00
$975,000.00
$1,136,331.50 CONSTRUCTED REMAINING AMOUNT AMOUNT $0.00 $7,500.00
$0.00 $45,325-00
$0.00 $52,825.00
$0.00 $11,684.00
$0.00 $26,726.00
$0.00 $17,181.00
$0.00 $14,317.50
$0.00 $26,883.00
$0.00 $55,94o.oo
$0.00 $3,600.00
$0.00 $5,000.00
$975,000.00 $0.00
$975,000.00 $161,331.50
Page 1611 of 6405
ITEM
NO.
III.
425-1
425-2
125-3
125-4
125-5
425-6
1 25-2
430-1
130-2
43o-3
530-1
530-2
IV. A. B.
C.
D.
E.
F.
G.
H.
DESCRIPTION
DRAINAGE
Control Structure Inlet
Type "2" Inlet
Type "C" Inlet
f Junction Box
18" Endwall
2f' Endwall
Control Structure Weir
18" RCP Storm Sewer
21" RCP Storm Sewer
18" ADS Storm Sewer
6"-8" R.ie Rae
8"-1 2 " R.ie Rae
WATERLINE AND ACCESSORIES
12 " DR-14 PVC Watermain
12" DR-18 PVC Watermain
1 2" Gate Valve
Fire H;r:drant Assembl:r:
Direclional Bore (24" DR-u Casing)
Directional Bore (14" DR-11 Carrier)
10" Gate Valve
10" DR-14 PVC Watermain
ORIGINAL CONSTRUCTED REMAINING
QUANTITY QUANTITY QUANTITY
1 0 1
8 0 8
0
1 0 1
1 0 1
2 0 2
0
42 3 0 423
2� 0 213
85 0 85
56 0 56
11 2 0 11 2
41 0 41
1,302 0 1,302
7 0 z
4 0 4
35 2 0 35 2
35 2 0 35 2
1 0 l
40 0 40
Page 2 of 5
UNIT ORIGINAL CONSTRUCTED REMAINING UNIT PRICE AMOUNT AMOUNT AMOUNT
EA $5!000.00 $51000.00 $0.00 $51000.00
EA $2,200.00 $23,200.00 $0.00 $231200.00
EA $3,000.00 $31000.00 $0.00 $3,000.00
EA $21000.00 $21000.00 $0.00 $21000.00
EA $1,500.00 $1,500.00 $0.00 $1,500.00
EA $2!500.00 $51000.00 $0.00 $5,000.00
EA $2,800.00 $2,800.00 $0.00 $2!800.00
LF $32.00 $181442-00 $0.00 $18,442.00
LF $55.00 $11,215.00 $0.00 $11,z15.oo
LF $30.00 $2!550.00 $0.00 $2,550.00
SY i10.oo $2,240.00 $0.00 $2,240.00
SY $20.00 $10!080.00 $0.00 $10,080.00
SUB-TOTAL: $8zz5J2.00 $0.00 $87,532.00
LF $60.00 $2,460.00 $0.00 $2,460.00
LF $40.00 �5 2,360.00 $0.00 $521360.00
EA $3,000.00 $211000.00 $0.00 $21,000.00
EA $3,500.00 $14,000.00 $0.00 $14,000.00
LF $240.00 i841480.oo $0.00 $84!480.00
LF $120.00 $42,240.00 $0.00 $�p1240.oo
EA $1,800.00 $1 800.00 $0.00 $1 800.00
LF $50.00 $2,000.00 $0.00 $2,000.00
Page 1612 of 6405
ITEM ORIGINAL CONSTRUCTED REMAINING UNIT ORIGINAL CONSTRUCTED REMAINING NO. DESCRIPTION QUANTI1Y QUANTI1Y QUANTI1Y UNIT PRICE AMOUNT AMOUNT AMOUNT
I.10" DR-18 PVC Watermain 62 0 62 LF $36.00 $2,232.00 $0.00 $2,232.00
J.8" Gate Valve 1 0 1 EA $21500.00 $2,500.00 $0.00 $2,500.00 K.8" DR-11 PVC Watermain 33 0 33 LF $1;6.00 $1!518.00 $0.00 $1,518.00
L.8" DR-18 PVC Watermain ss 0 ss LF $33.00 $1,815.00 $0.00 $1,815.00
M. Permanent Bacterial SamEle Point 1 0 1 EA $1,200.00 $1,200.00 $0.00 $1,200.00
N.Air Release Valve 5 0 5 EA $2,000.00 $101000.00 $0.00 $101000.00
0.Sub Agueous Valve Vault 1 0 1 EA $11200.00 $1,200.00 $0.00 $11200.00
P.Single Water Service 1 0 1 EA $11500.00 $1 1500.00 $0.00 111500.00
SUB-TOTAL: $2�2!305.00 $0.00 $2�2!305.00
V.SEWER SYSTEM
A.6" DR-18 PVC Forcemain 11300 0 1,300 LF $35.00 $15,500.00 $0.00 $15,500.00 B.6" DR-11 PVC Forcemain 88 0 88 LF $38.00 $3!344.00 $0.00 $313:l:l-OO
C.Air Release Valve 2 0 2 EA $2,000.00 $1;,000.00 $0.00 $1;,000.00
D.6" Plug Valve 3 0 3 EA $1,200.00 $31600.00 $0.00 $31600.00
E.Directional Bore (16" DR-11 Casing)332 0 332 LF $160.00 $51,210.00 $0.00 $51,210.00
F.Directional Bore (8" DR-11 Carrier)332 0 332 LF $z5.oo $25,125.00 $0.00 $25,425.00
G.:!'' DR-18 PVC Forcemain z 0 z LF $21.00 $168.00 $0.00 $168.00
H.6" Plug Valve I 0 1 EA $900.00 $200.00 $0.00 $200.00
H.8" SDR-26 Sanita12: Sewer 121 0 121 LF $15.00 $22,230.00 $0.00 $22,230.00
I. :l' Manhole 2 0 2 EA $6,500.00 $13,000.00 $0.00 $13,000.00 J.Liftstation Wetwell 0 I EA $10,000.00 $:i0,000.00 $0.00 $1;0,000.00
SUB-TOTAL: $212,1oz.oo $0.00 $212!�oz.oo
Page 3 of 5
Page 1613 of 6405
.M ORIGINAL CONSTRUCTED REMAINING UNIT ORIGINAL CONSTRUCTED REMAINING
iO. DESCRIPTION QUANTI1Y QUANTI1Y QUANTl1Y UNIT PRICE AMOUNT AMOUNT AMOUNT
VI. LANDSCAPING A.Littoral Shelf Planting Area 26 ,212 0 26 ,212 SF $1.50 $32,32o,50 $0.00 $J21J2o.50
Wetland Filter Marsh Planting Area/Created B.Wetland 2 3,122 0 23,122 SF $2.00 $16,211.00 $0.00 $161211.00
SUB-TOTAL: $861Jl�Hi0 $0.00 $862314.50
VII.IRRIGATION SYSTEMA.10" Gate Valve 6 0 6 EA $2 ,800.00 $16,800.00 $0.00 $16 ,800.00
B.10" DR-18 Irrigation Main 1,;122 0 12J79 LF $36 .00 $1226 11-00 $0.00 $12,6 11.00
C.10" DR-11 Irrigation Main.8 3 0 83 LF $50.00 $1,150.00 $0.00 $11150.00
D.Single Irrigation SeIVices 10 0 10 EA $100.00 $1,000.00 $0.00 $�1zooo.oo
E.Air Release Valve 1 0 1 EA $1,200.00 $1 1800.00 $0.00 $12800.00
F.Directional Bore (20" DR-11 Casing)337 0 332 LF $200.00 $621100.00 $0.00 $62,100.00
G.Directional Bore (12" DR-11 Carrier)332 0 332 LF $25.00 $322015.00 �0.00 $32 ,015.00
H.1" Gate Valve 1 0 EA $200.00 $200.00 $0.00 $200.00 I.f' DR-18 Irrigation Main 21 0 21 LF $21.00 $526.00 $0.00 $5 26 .00
SUB-TOTAL: $1801285.00 $0.00 $1802285.00
Page 4 of 5
Page 1614 of 6405
ITEM NO. DESCRIPTION VIII.SITE LIGHTING
A.FPL Town & Country Street Lights
B.LUMCA CPL0406 (Double) Concept 30
Estimated Date of Completion: 12/18
Barraco and Associates, Inc.
2271 McGregor Boulevard
P.O. Drawer 2800
Fort Myers, FL 33902-2800
Certificate of Authorization No. 7995
For the Firm ORIGINAL CONSTRUCTED REMAINING QUAN1TIY QUANTITY QUANTITY UNIT UNIT PRICE 14 0 14 EA $900.00
8 0 8 EA $2,000.00
SUB-TOTAL:
TOTAL:
10% BOND TOTAL:
BOND TOTAL:
Page 5 of 5 ORIGINAL AMOUNT $12,600.00
$16,000.00
$28 600.00
$2,026,600.00
$202,660.00
$2,229,260.00 CONSTRUCTED AMOUNT $0.00
$0.00
$0.00
$975,000.00 REMAINING AMOUNT $12,600.00
$16,000.00
$28 600.00
$1,051,600.00
$202,660.00
$1,254,260.00
I
Page 1615 of 6405
c,ilff",Coutrty
Growlfr Management Division
Planning & Regulation
Land Development Services
March 24, 2020
The Guarantee Company of North America. USA
One Town Square, Ste. 200
Southfield. MI. 48076
RE: Your Performance Bond No. 80130955 / Minto Communities. LLC
lsles of Collier Preserve Phase 9 - PL20160001197 - Bond reduction request No. I
Dear Sir or Madarn
Please be advised that based on the work completed to date, the subject Performance
Bond may now be reduced by $991,582.00, leaving an available balance of$262,678.00.
The remaining balance represents $202,660.00 as the required l07o maintenance security.
plus $60,01 8.00 in uncompleted improvements.
An original Bond Rider should be directed to this office reducing the value of the Bond,
"all other terms and conditions of original Performance Bond shall remain in full force
and etfect".
Should you have any questions, please advise
Very Truly Yours.
S.olu 1ftoul&wottA
John R. Houldsworth
Senior Site Plans Reviewer
,ls!u:lr ouldsu orlh rrlcolIic lgo\.ncI
Cc: Barraco & Associates
Land Ds€lopnrent Ssvbes . 2800 North Horseshoe Ddve . Naptes, Florida 34104.239-252-2400 , www.coltiergov.net
Page 1616 of 6405
Page 1617 of 6405
Page 1618 of 6405
RESOLUTTON NO.25-
A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF
COLLIER COUNTY, FLORIDA AUTHORIZING FINAL ACCEPTANCE
OF CERTAIN ROADWAY AND DRAINAGE IMPROVEMENTS AND
PLAT DEDICATIONS IN ISLES OF COLLIER PRESERVE PHASE 9
ACCORDING TO THE PLAT THEREOF RECORDED IN PLAT BOOK
63, PAGES 9I THROUGH 91, AND RELEASE OF THE MAINTENANCE
SECURITY.
WHEREAS, the Board of County Commissioners of Collier County, Florida, on
December 13,2016, approved the plat oflsles of Collier Preserve Phase 9 for recording; and
WHEREAS, the Developer has constructed and maintained the roadway and drainage
improvements in accordance with the approved plans and specifications as required by the Land
Development Code (Collier County Ordinance No. 04-41, as amended); and
WHEREAS, the Developer is requesting final acceptance of the roadway and drainage
improvements and release ofthe maintenance security; and
WHEREAS, the Development Review Division has inspected the roadway and drainage
improvements, and is recommending acceptance of said facilities.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER COLINTY, FLORIDA, that final acceptance is hereby
granted for those roadway and drainage improvements and plat dedications in lsles of Collier
Preserve Phase 9, pusuant to the plat thereof recorded in Plat Book 63, pages 91 through 94, and
the Clerk is hereby authorized to release the maintenance security.
BE IT FURTHER RESOLVED AND ORDERED that the roadway and drainage
improvements within Isles of Collier Preserve Phase 9 will be maintained privately in the future
and will not be the responsibility of Collier County.
day ol
This Resolution adopted after motion, second and majority vote favoring same, this _
2025.
DATE:
ATTEST:
CRYSTAL K. KINZEL, CLERK
Deputy Clerk
Approved as to form and legality:
Derek D. Perry
Assistant County Attomey
BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY, FLORIDA
Bv:
Burt L. Saunders. Chairman
t
122-EtS -047 22 I t 90 t 397 / tl Page I of I
CAOPage 1619 of 6405
Page 1620 of 6405
Page 1621 of 6405
Page 1622 of 6405
Page 1623 of 6405