Backup Documents 12/10/2024 Item #16B 8 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO 1 6 B 8
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE
Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office
at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later
than Monday preceding the Board meeting.
**NEW** ROUTING SLIP
Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the
exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attomey Office.
Route to Addressee(s) (List in routing order) Office Initials Date
1.
2. Coastal Zone Management
3. County Attorney Office County Attorney Office n inf
4. BCC Office Board of County
Commissioners 61'4y,f(j 1Z/16124Y
5. Minutes and Records Clerk of Court's Office ft,( �1/ //�,
PRIMARY CONTACT INFORMATION
Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees
above,may need to contact staff for additional or missing information.
Name of Primary Staff Andrew Miller—TMSD—Capital Project Phone Number 239.252.2922
Contact/ Department Planning, Impact Fees and Program
Management
Agenda Date Item was 12/10/2024 Agenda Item Number 16.B:9r g
Approved by the BCC
Type of Document Work Order-H&M—2025 Annual Monitoring Number of Original 1
Attached Documents Attached
PO number or account N/A
number if document is
to be recorded
INSTRUCTIONS & CHECKLIST
Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not
appropriate. (Initial) Applicable)
1. Does the document require the chairman's original signature AAM
2. Does the document need to be sent to another agency for additional signatures? If yes, N/A
provide the Contact Information(Name;Agency;Address; Phone)on an attached sheet.
3. Original document has been signed/initialed for legal sufficiency. (All documents to be AAM
signed by the Chairman,with the exception of most letters, must be reviewed and signed
by the Office of the County Attorney.
4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A
Office and all other parties except the BCC Chairman and the Clerk to the Board
5. The Chairman's signature line date has been entered as the date of BCC approval of the AAM
document or the final negotiated contract date whichever is applicable.
6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's AAM
signature and initials are required.
7. In most cases(some contracts are an exception),the original document and this routing slip N/A
should be provided to the County Attorney Office at the time the item is input into SIRE.
Some documents are time sensitive and require forwarding to Tallahassee within a certain
time frame or the BCC's actions are nullified. Be aware of your deadlines!
8. The document was approved by the BCC on 12/12/2023 and all changes made during AAM N/A is not
the meeting have been incorporated in the attached document. The County an option for
Attorney's Office has reviewed the changes,if applicable. this line.
9. Initials of attorney verifying that the attached document is the version approved by the AAM N/A is not
BCC,all changes directed by the BCC have been made,and the document is ready for the an option for
Chairman's signature. this line.
I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12
16B8
WORK O12DER/PURCIIASE ORDER
Contract 18-7432-CZ"Professional Services Library—Coastal Engineering Category"
Contract Expiration Date: March 9, 2025
This Work Order is for professional Engineering Services for work known as:
Project Name: Collier County Beaches and Inlets Annual Monitoring for 2025
Project No: 90536.1
The work is specified in the proposal dated September 6, which is attached hereto and made a part of
this Work Order. In accordance with Terms and Conditions of the Agreement referenced above, this
Work Order/Purchase Order is assigned to: Humiston & Moore Engineers,P.A.
Scope of Work: As detailed in the attached proposal and the following:
* Task la Collier Beach Data Collection
* Task lb Collier Beach Initial &Final Monitoring Report
* Task 2a Wiggins Pass Data Collection
* Task 2b Wiggins Pass Initial &Final Monitoring Report
* Task 3a Doctors Pass Data Collection
* Task 3b Doctors Pass Initial &Final Monitoring Report
* Task 4a South Marco Beach Data Collection
* Task 4h South Marco Beach Initial &Final Report
* Task 5 2025 Aerial Image Book
Schedule of Work: Complete work within 270 days from the date of the Notice to Proceed which is
accompanying this Work Order. The Consultant agrees that any Work Order that extends beyond the
expiration date of Agreement# 18-7432-CZ will survive and remain subject to the terms and conditions
of that Agreement until the completion or termination of this Work Order.
Compensation: In accordance with the Agreement referenced above, the County will compensate the
Firm in accordance with following method(s): ®Negotiated Lump Sum (NLS) ❑Lump Sum Plus
Reimbursable Costs (LS+RC) ®Time & Material (T&M) (established hourly rate— Schedule A) ❑
Cost Plus Fixed Fee (CPFF), as provided in the attached proposal.
Task la $ 37,960.00 (LS)
Task lb $ 26,528.00 (T&M)
Task 2a $ 32,515.00 (LS)
Task 2b $ 12,688.00 (T&M)
Task 3a $ 12,850.00 (LS)
Task 3b $ 9,318.00 (T&M)
Task 4a $ 15,530.00 (LS)
Task 4b $7, 605.00 (T&M)
Task 5 $ 3,603.00 (T&M)
Page 1 of 3
( `An�
16B8
TOTAL FEE $ 158,597.00
Wally signed by
MIIIerAndrew
MillerAn reV Dale:2024.09.2514:30:43
PREPARED BY: .04.00'
Andrew Miller,Q lManageer Date
sigma by
Johnssen bnsse"-b
Date:2024.09.30
APPROVED BY: - j°h14:42:26.04'00'
Beth Johnssen, Division Director Date
ScottT ri n i t Dgitale.2 signedigned by Scoll0:12:4rinlly
APPROVED BY:
Y 05'00?D24.11.0410:12:48
Trinity Scott, Department Head Date
By the signature below, the Firm (including employees, officers and/or agents) certifies, and hereby
discloses, that, to the best of their knowledge and belief, all relevant facts concerning past,present, or
currently planned interest or activity(financial,contractual,organizational,or otherwise)which relates
to the proposed work; and bear on whether the Firm has a potential conflict have been fully disclosed.
Additionally,the Firm agrees to notify the Procurement Director, in writing within 48 hours of learning
of any actual or potential conflict of interest that arises during the Work Order and/or project duration.
ACCEPTED BY: Humisto re En ineers
/0/N/Ze4g
Br- Moore, President Dat
(Remainder of page intentionally left blank)
Page 2 of 3
C4O
16B8
IN WITNESS WHEREOF, the parties hereto, have each, respectively, by an authorized person or
agent, have executed this Work Order on the date and year first written below.
ATTEST: BOARD OF COUNTY COMMISSIONERS
clerk of Courts COLLIER C U TY, FLORIDA
LT /7�
By: Y•�/ By:
f li' 4 Chris Hall , Ch 'rman
Date . & 7,.,
/1,
(S * i :.
' ��est as to Chairman's I-Iumiston & Moo• 1 ineers
y
at -WY.
By•.._
Firs Witness / O �1 i lature
1"1c�,�.t' t'h,e(N 60j -r Brett D. Moore, President
TType/print witness namet TType/print signature and title1
(1jUwt
�)coeds Witness M +
TType/print witness namet
Approve; a to Form and Legality:
CI*/ (2--
Assistant County ttorney
Cal an &re =
Print Name
Page 3 of 3
AO)
1 6138
:` `.' HUMISTON
I ; &MOORE
. ENGINEERS": 5679 STRAND COURT
)1, COASTAL NAPLES,FLORIDA 34110
:; I;7_ ENGINEERING DESIGN FAX:239 594 2025
'...:.:.-_..,,.,:,. `; AND PERMITTING PHONE:239 594 2021
September 6, 2024
(Proposal valid for 120 days,)
Andrew Miller, Principal Project Manager
Coastal Zone Management(CZM)
Collier County Government
2685 South Horseshoe Drive Unit 103
Naples, FL 34104
Re: Proposal for Collier County Beaches and Inlets Annual Monitoring for 2025
Collier County Contract 18-7432-CZ; HM File No 29-018.2025 Beach-Monitor
Dear Andy:
Enclosed is a proposal for the Collier County Beaches, Wiggins Pass Inlet, Doctors Pass Inlet,
South Marco Beach, monitoring reports (includes survey) for 2025. The completion date for all
work is estimated to be 270 days from the date of the Notice to Proceed. Rectified aerial images
acquired for 2025, provided by the Collier County Property Appraiser's Office, are to be submitted
to the Department of Environmental Protection (DEP) by Humiston and Moore Engineers (HM)
as part of the work described below for all projects and an aerial image book provided to CZM in
pdf format for online posting.
The monitoring for Doctor Pass Erosion Control Structures and Central Marco Island Regrade
Projects Is complete. These Items are not included in the scope of work for the 2025 monitoring.
The dates shown reflect an anticipated date for the survey and report. These anticipated dates
are dependent upon the authorization date, release of the rectified aerial images, and other
unforeseen conditions such as weather. -
Task 1 Collier Beach- Initial and Final Monitoring Report
Conduct the annual monitoring survey for Collier Beach Nourishment Project consistent with the
monitoring plan approved by the DEP. This scope of work consists of DEP monuments R-17 to
R-84 and R-58A. (Note: R-17 to R-22 will be surveyed as park of Task 2.)
• Survey is scheduled to be completed by January 31, 2025 pending unforeseen conditions
such as poor weather conditions.
• An initial monitoring summary of the analysis will be submitted to CZM 30 days after the
completion of the survey.
• A Final Monitoring Report will be submitted to DEP & CZM 90 days after the completion
of the survey.
The initial monitoring summary includes beach profiles, shoreline and volume change from the
previous monitoring survey, as well as from the most recent nourishment project, beach width
and comparison to the Design Standard. The Final Monitoring Report will include the same
Page 1 of 4
k CAO
16B8
information contained in the initial monitoring summary as well as other information in compliance
with the DEP physical monitoring requirements and applicable recommendations.
Task.1a. Sub Total Data Collection Budget(SDI) $ 37,960 LS
Task lb Initial and Final Monitoring Report(H&M) $26,528 TM
Total Task 1 Subtotal (SDI + H&M) $ 64,488
Deliverable: An electronic copy of the Initial Monitoring Report and Final Monitoring Report.
Task 2 Wiggins Pass—Initial and Final Monitoring Report
Conduct the annual monitoring survey for the Wiggins Pass Navigation Channel Expansion and
Maintenance Dredging Project consistent with the monitoring plan approved by DEP. This scope
of work consists of FDEP monuments R-10 to R-22 including half monuments, the MHWL from
R-17 NE for a minimum of 1500 feet. Stations -2+00 to 15+00 (from R-15 to R-18.5) and the
navigation channel with grid lines 100 feet apart (C-3 thru C-34, CN-35 thru CN37).
• Survey is scheduled to be completed by February 28, 2025 pending unforeseen conditions
such as poor weather conditions.
• An initial monitoring summary of the analysis will be submitted to CZM 30 days after the
completion of the survey.
• A Final Monitoring Report will be submitted to CZM and DEP 90 days after the completion
of the survey.
The initial monitoring summary includes inlet and beach profiles, shoreline and volume change
from the previous monitoring survey and previous dredging project, beach width and comparison
to the Design Standard if applicable. The Final Monitoring Report will include the same
information contained in the initial monitoring summary as well as other information in compliance
with the DEP physical monitoring requirements and applicable recommendations.
Task 2a. Sub Total Data Collection Budget (SDI) $ 32,515 LS
Task 2b Initial and Final Monitoring Report(H&M) $ 12,688 TM
Total Task 2 Subtotal (SDI + H&M) $ 45,203
Deliverable: An electronic copy of the Initial Monitoring Report and Final Monitoring Report.
Task 3 Doctors Pass—Initial and Final Monitoring Report
Conduct the annual monitoring survey for Doctors Pass Maintenance Dredging Project consistent
with the monitoring plan approved by the DEP. This scope of work consists of 77 Dredge
Template Profiles.
• Survey is scheduled to be completed by February 28, 2025 pending unforeseen conditions
such as poor weather conditions.
• An initial monitoring summary of the analysis will be submitted to CZM 30 days after the
completion of the survey.
• A Final Monitoring Report will be submitted to CZM and DEP 90 days after the completion
of the survey.
Page 2 of 4
(A)
16B8
The initial monitoring summary includes inlet profiles, volume change from the previous
monitoring survey and previous dredging project. The Final Monitoring Report will include the
same information contained in the initial monitoring summary as well as other information in
compliance with the DEP physical monitoring requirements and applicable recommendations.
Task 3a. Sub Total Data Collection Budget (SDI) $ 12,850 LS
Task 3b Initial and Final Monitoring Report(H&M) $ 9,318 TM
Total Task 3 Subtotal (SDI + H&M) $ 22,168
Deliverable: An electronic copy of the Initial Monitoring Report and Final Monitoring Report.
Task 4 South Marco Beach - Initial and Final Monitoring Report
Conduct the annual monitoring survey for the South Marco Beach Nourishment Project consistent
with the monitoring plan approved by the DEP. This scope of work consists of DEP monuments
R-139 to R-148, G-1 thru G-5, and K-1 thru K-2. This survey scope does include the Caxambas
Pass borrow area.
• Survey is scheduled to be completed by March 31, 2025 pending unforeseen conditions
such as poor weather conditions,
• An initial shoreline/volume change summary will be submitted to CZM 30 days after the
completion of the survey.
• A Final Monitoring Report will be submitted to CZM and DEP 90 days after the completion
of the survey.
Task 4a. Sub Total Data Collection Budget(SDI) $ 15,530 LS
Task 4b Initial and Final Report (H&M) $ 7,605 TM
Total Task 5 Subtotal (SDI + H&M) $ 23,135
Deliverable: An electronic copy of the Final Monitoring Report.
Task 5 2025 Aerial Image Book
Prepare an updated aerial image book for the Collier County Beaches ranging from DEP
reference monument R-1 south to R-89 and from Hideaway Beach reference monument H-16
including the entrance to Collier Bay south to DEP reference monument R-148 including
Caxambas Pass. The monument locations will be overlaid along with the names of existing
structures as noted in the 2024 book. The rectified images will be the latest available from the
County Appraiser's Office. The ECL, latest MHWL, and vegetation line will be shown along with
the distance from each to the 2003 Baseline.
Task 5. Aerial Image Book (H&M) $ 3,603 TM
Deliverable: One electronic copy of the final Aerial Image Book.
Total (SDI + H&M) $ 158,597 Tasks 1 thru 5
Page 3 of 4
CAO
16B8
Tasks will be billed on a time and materials basis, unless otherwise noted. The budgets for these
tasks may therefore be considered as not-to-exceed amounts with the understanding that in the
event regulatory requirements or requests from County staff result in Additional Services
exceeding the estimated budget amounts, a budget amendment will be requested.
Please call if you have any questions.
Sincerely yours,
HUMISTON & MOORE ENGINEERS
Brett D. Moore, P.E.
President
Page 4 of 4
S
16B8
Collier County Beaches and Inlets Annual Monitoring 2024 Contract 18-7432-CZ
Project No. 90536
Task"! Collier Beach - Initial& Final Monitoring Report
Task 1 a Data collection-SDI 37,960.00
37,960.00 (LS)
Task lb Final Reporl HM (T&M)
RATE/UNIT HOURS/QTY COST MARKUP AMOUNT
PRN2 Principal 231 20 4,620.00
SDS Engineer 130 80 10,400,00
SIN Scientist/Geologist 115 40 4,600.00
SRT Senior Technician 103 30 3,090,00
TEC Technician 83 46 3,818,00
26,528,00 (TM)
Total: 64,488.00
Task 2 Wiggins Pass - Initial&Final Monitoring Report
Task 2a Data collect SDI (LS) 32,515,00
32,515.00 (LS)
Task 2b Final Report HM (T&M) -
RATE/UNIT HOURS/QTY COST MARKUP AMOUNT
PRN2 Principal 231 8 1,848.00
SDS Engineer 130 40 5,200,00
SIN Scientist/Geologist 115 20 2,300.00
SRT Senior Technician 103 21 2,163.00
CAD Cadd Techniclan 107 11 1,177,00
12,688,00 (TM)
TOTAL 45,203.00
Task 3 Doctors Pass - Initial& Final Monitoring Report
3a Data Collection SDI (LS) 12,850,00
12,850,00 (LS)
3b Final Report HM (T&M)
RATE/UNIT HOURS/QTY COST MARKUP AMOUNT
PRN2 Principal 231 8 1,848.00
SDS Engineer 130 53.5 6,955,00
SRT Senior Technician 103 5 515.00
9,318.00 (TM)
TOTAL 22,168.00
Task 4 South Marco Final Monitoring Report
4a Data Collection SDI (LS) 15,530,00
15,530.00 (LS)
4b Final Report HM (T&M)
RATE/UNIT HOURS/QTY COST MARKUP AMOUNT
PRN2 Principal 231 9 2,079.00
SDS Engineer 130 33 4,290,00
SRT Senior Technician 103 12 1,236.00
7,605.00 (TM)
Total: 23,135.00
Task 5 2024 Aerial Image Book
HM(T&M)
RATE/UNIT HOURS/QTY COST MARKUP AMOUNT
PRN2 Principal 231 3 693.00
SDS Engineer 130 16 2,080,00
TEC Technician 83 10 830,00
Total: 3,603.00 (TM)
Total: 168,697.00
CAO
16B8
Sea Diversified, Inc.
4CSJ_il y� 160 Congress Park Drive, 11114
Delray Beach, Florida 33445
Phone: 561-243-4920
) ww v.seadiversified.com
August 23,2024
Mr. Steve Fog;P.E. Sent via electronic mail 08/23/2024
Humiston&Moore Engineers (SF@H►nnistonandh'loore.com)
5679 Strand Court,Suite 110
Naples,Florida 34110
Re: Proposal/Agreement for Professional Services
Collier County 2025 Physical Monitoring Survey
Collier Beach,Wiggins Pass,Doctors Pass & Central Marco
Collier County,Florida
Sea Diversified P.N. 23-3041
Dear Mr. Foge:
In accordance with your request, Sea Diversified, Inc. (SDI) is pleased to submit the following proposal for
professional services. The scope of work shall include bathymetric data collection and onshore/offshore beach
profile surveys along Collier Beach, South Marco Island, Wiggins Pass and Doctors Pass. In accordance with
your summary of scope provided on August 22, 2024, the 2025 monitoring survey effort shall encompass the
following:
Task One: Collier Beach& Offshore Profiles
• Beach profiles at R23 to R84(62 profiles)and R58A,totaling 63 profiles
Task Two: Wiggins Pass Bathymetry and Beach Profiles
• Beach profiles at R-10 to R-22, including intermediate profiles (R-10.5, R-11,5, R-12.5, R-
13.5,R-14,5,R-15,5,R-17.5,R-18.5,R-19.5,R-20.5,R-21.5),totaling 24 transects
• MHWL from R-17 to the NE 1,500 feet on the south side of the inlet
• Entrance channel,Stations-2+00 to 15+00 (R-15 to R-18.5),totaling 18 transects
• Internal channels C-3 to C-34,CN-35,CN-36 and CN-37,totaling 35 transects
Task Three: Doctors Pass Bathymetry-All inlet stations(77 transects)
Task Four: South Marco Island Beach & Offshore Profiles with Borrow Area
Beach profiles at U-139 to R-148, G-1 to G-5,and IC-1 to K-2,totaling 17 profiles
Note:Borrow area survey to match scope of survey by SDI in 2022
General:
SDI shall provide supervision,field/office support staff and equipment to perform the scope of work described,
herewith. All work shall be conducted to the highest level of industry standards and under the responsible charge
of a Professional Surveyor and Mapper registered in the State of Florida. All work shall meet or exceed the
Standards of Practice (Standards) set forth by the Florida Board of Professional Surveyors and Mappers in
Chapter 5J-17, Florida Administrative Code, pursuant to Section 472.027, Florida Statutes, and in compliance
with the Florida Department of Environmental Protection (FDEP) Bureau of Beaches and Coastal Systems
Monitoring Standards for Beach Erosion Control Projects, Sections 01000 and 01100 (Updated October 2014).
If time permits, deviations from the scope of work shall be addressed via formal approved addendum to the
executed Agreement for Professional Services.
Horizontal and Vertical Data:
Horizontal Datum: Feet, relative to the Florida State Plane Coordinate System, East Zone,North American
Datum of 1983 (NAD83)
Vertical Datum: Feet,relative to the North American Vertical Datum of 1988(NAVD88)
Surveying • Engineering • Applications (qo.)
16BQ
Proposal for Professional Services
Collier County 2025 Physical Monitoring Survey
Collier Beach,Wiggins Pass,Doctors Pass&South Marco
Collier County,Florida
August 23,2024
I '!\ ! !;'.!! l'age2of3
Horizontal/Vertical Control Verification
SDI will verify the horizontal and vertical position of all found and used monuments for the survey. Horizontal
and vertical positions will be verified via Real-Time Kinematic GPS procedures. In the event vertical
obstructions prohibit the use of GPS,conventional methodologies will be employed.
Temporary control points (TBM's) will be set in the event a monument cannot be readily found. As practical,
the TBM will be set at the reference monument location. If the specified location is not practical, the TBM will
be set at a more suitable location either landward or seaward along the specified profile azimuth. H&M shall he
notified of any missing monuments and shall be provided with the horizontal and vertical position of all TBM's.
Onshore Profile Data Collection-Topographic
Onshore profile data collection shall extend from the FDEP profile control monument seaward to approximate
wading depth or as required to overlap the offshore profile data a minimum distance of fifty (50) feet. Profile
data collection shall extend landward to the seawalls or filly(50)feet landward of the five-foot(+5.0')NAVD88
contour line and shall include location of the seaward vegetation line.
In the event there is a physical barrier on line between the beach and the monument, every reasonable attempt
shall be made to extend the survey beyond the barrier to the reference monument position. It is understood that
certain physical barriers may be considered impassible such as large buildings, private residences with difficult
access, waterbodies, mangroves or other heavy vegetation requiring line clearing. At the discretion of the
surveyor, data collection will be terminated at the first physical barrier if deemed impassible using practical
means of extending the survey landward. Profiles terminated due to impassible barriers will be noted in the field
books.
Profile data will be collected using either conventional differential leveling or Real-time Kinematic Differential
Global Positioning techniques. Data points will be collected at a maximum interval of twenty-five(25) feet and
at all grade breaks(exceeding one-foot)and material changes along the profile. In the event the profile control
monument is located more than three hundred (300) feet landward of the vegetation line, data points shall be
extended to intervals of one hundred (100) feet from two hundred (200) feet landward of the approximate
vegetation line to the monument location. The reference monument shall be recorded as range 0.0 along the
profile with positive ranges extending seaward of the monument and negative ranges extending landward of the
monument.
Offshore Profile Data Collection-Bathymetric
Bathymetric profile data shall be collected as close to high tide as practical and shall extend landward to a depth
that overlaps the onshore portion of the survey a minimum distance of fifty (50)feet. Bathymetric profile data
collection shall extend seaward to the negative thirteen (-13) feet NGVD29 contour (approximately -14.5'
NAVD88). Bathymetric data collection shall occur as close to the time of the onshore topographic survey as
practical,which shall not exceed seven(7)days of time difference between the two(2)survey events. Maximum
wave height during the course of bathymetric data collection shall be three(3)feet.
Bathymetric data shall be collected using an automated hydrographic system comprised of a survey launch
equipped with a marine grade sounder, differential global positioning system and computer-based navigation /
data collection system, and when deemed necessary may be interfaced with a DMS-05 Motion Sensor System.
The motion sensor will be employed as necessary to reduce the effects of vessel heave, pitch and roll during the
course of data collection. The sounder shall be calibrated via bar checks prior to the start of the survey. Prior
to the start of the survey a tide staff or gauge will be established in proximity to the project for recording water
Surveying • Engineering • Applications
CqO
16B8
/•� Proposal for Professional Services
Collier County 2025 Physical Monitoring Survey
(7SEA Collier Beach,Wiggins Pass,Doctors Pass&South Marco
Collier County,Florida
August 23,2024
Hi 1 l l<::l! I1 !, Page3of3
levels during the course of the data collection activities. The tide staff or gauge will be set relative to published
control in the vicinity of the project.
Digital Ground Photography
During the course of field data collection, digital photographs shall be taken at approximate mid-beach along
each profile line. Three (3)photographs shall be captured, one each shore-parallel north and south of the profile
and one towards the monument location. An additional photograph of the monument or TBM shall be taken with
sufficient clarity to read the monument stamping. Digital images shall be provided to H&M in .jpg format at a
minimum 640 x 480 resolution.
Data Processing and Final Deliverables
Upon completion of field survey activities,data will be edited and reduced to the project datum and translated to
an x,y,z,ASCII format for submittal to H&M. H&M will be provided the following deliverables:
1. Survey report certified by a Professional Surveyor and Mapper.
2. Description of all monuments and TBM's used for the survey, including identification, stamping,
coordinates,elevations and profile azimuths. Control description shall be provided in both hardcopy
and digital formats(ASCII and Excel),as applicable.
3, Bathymetric data and/or profile data in ASCII x,y,z format
4. Digital photographs in.jpg format with appropriate labeling
5. Metadata files
Cost Breakdown:
Task One: $ 37,960.00
Task Two: $ 32,515.00
Task Three: $ 12,850.00
Task Four: $ 15,530.00
Total: $ 98,855.00
Should you have questions or require additional information please do not hesitate to contact us at your
convenience. We appreciate this opportunity to assist you with this project and look forward to hearing from you
soon,
Best Regards, Approved this clay of ,2024
William T. Sadler Jr.,P.E.,P.S.M. Mr. Steve Foge,P.E.or Authorized
President,Sea Diversified,Inc. Humiston&Moore Engineers Representative
Surveying • Engineering • Applications
Fc)
16B8
DocuSIgn Envelope ID:40AA2CF0.7E13A-4606•A662.2113EG0C5C49A
* k * *
SCHEDULE B-ATTACHMENT 1
RATE SCHEDULE
di��rikrt w�{.r<^y�,'7{�c�.tyr{Wt).g}v. 1i: ����i.1.c.,�. n)
:.l :3.5iti,�7l.rJ.•ene.,�.t .p/,W 1r , ftgi y:. 1.{;''!1'•'1if�41 t';: �)rvt \t �e;�C! - q 4iVi�� sr r it 1 �:: t�•A,SU
r.'C:.�G .t.�i�. 7..�3 !�� �l •,+ .l.tiV'.1�.. i' r,, �17Y 1 1`rt��.1 �i 1 {''i
4 r ,.zt r�'.lr;.�ja'�aa�4i rlSR77+;:k�i r!: ,r�rAbifk?I,� t0..:z�,t r,1'r •
Principal $231 .
Senior Project Manager $203
Project Manager $160
Senior Engineer $177
Engineer $130 •
Senior Inspector $126
Inspector $93
Senior Planner $150 •
Planner $120
_ Senior Designer $140
Designer $105
Environmental Specialist $120
Senior Environmental Specialist $167
Scientist/Geologist $115
Senior Scientist/Geologist $153
Marine BiologisUHydrogeologist $120
Senior Marine Biologist/Hydrogeologist $145
Senior GIS Specialist $155
GIS Specialist $115
Clerical/Administrative $73
Senior Technician $103
Technician $83
Surveyor and Mapper $125
CADD Technician $107
Survey Crew-2 man $145
Survey Crew-3 man $180
Survey Crew-4 man $215 •
Senior Architect $160
Architect $125
The above hourly rates are applicable to Time and Materials task(s) only. The above list may not be all
inclusive. Hourly rates for additional categories required to provide particular project services shall be
mutually agreed upon by the County and firm, in writing, on a project by project basis, as needed, and will
be set forth In the Work Order agreed upon by the parties,
El Grant Funded:The above rates are for purposes of providing estimate(s), as required by the grantor
agency.
* * * * *.
Page 2 of'3
'First Amendment to Agreement 11 18.7432-CZ
Humiston&Moore Engineers,P.A.
CM)