Loading...
Backup Documents 12/10/2024 Item #16F12 ORIGINAL DOCUMENTS CHECKLIST&ROUTING SLIP TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO I c 21 THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE f" Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW**ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s)(List in routing order) Office Initials Date 1. County Attorney's Office County Attorney Office ) p,A,A1 2. BCC Office Board of County Commissioners Chairman !2 0 2 3. Minutes and Records Clerk of Court's Office Pi` •VJ- ( PRIMARY CONTACT INFORMATION ��((II Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addresses above,may need to contact staff for additional or missing information. Name of Primary Staff Bendisa E.Miller,Facilities Division Phone 239-252-8440 Contact/Department Number Bendisa.Miller@colliercountyfl.gov Email Agenda Date Item was December 10,2024 Agenda Approved by the BCC Item 16.FI f 2, Number Type of Document Attached Recommendation to approve Change Order No. 12, Number of adding five days to the Substantial Completion date Original 1 and reconcile the calculation errors from Change Documents Order No. 10 increasing the Owner's Allowance by Attached $20.41 for Purchase Order No.4500229878,under Agreement No.21-7883-ST with O-A-K/Florida,Inc., d/b/a Owen-Ames-Kimball Company,for the Main Campus Upgrades,and authorize the Chairman to sign the attached Change Orders.(Project No.50214) PO number or account The Facilities Division is requesting a completed copy number if the document is to be recorded INSTRUCTIONS&CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is appropriate. Yes N/A(Not (Initial) Applicable) 1. Does the document require the chairman's original signature? N/A 2. Does the document need to be sent to another agency for additional signatures? If yes,provide the Contact N/A Information(Name,Agency,Address,Phone)on an attached sheet. 3. The original document has been signed/initialed for legal sufficiency. (All documents to be signed by the Chairman,except for most letters,must be reviewed and signed by the Office of the County Attorney. BEM 4. All handwritten strikethroughs and revisions have been initialed by the County Attorney's Office and all N/A other parties except the BCC Chairman and the Clerk to the Board. 5. The Chairman's signature line date has been entered as the date of BCC approval of the document or the BEM final negotiated contract date,whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip should be N/A provided to the County Attorney's Office at the time the item is input into SIRE. Some documents are time-sensitive and require forwarding to Tallahassee within a certain time frame,or the BCC's actions are nullified. Be aware of your deadlines! 8. The BCC approved the document on August 2/,ZDI4'and all changes made during the meeting have I N/A is not an been incorporated in the attached document. The County Attorney's Office has reviewed the ( n'�I option for this changes,if applicable. Zit O/Z y 7r" line, 9. Initials of attorney verifying that the attached documefit is the version approved by the BCC,all changes N/A is not an directed by the BCC have been made,and the document is ready for the Chairman's signature. g11141 option for this line. I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 16F12 Co .ferautty Procurement Services Change Order Form Contract# 21-7883-ST CO# 12 PO# 4500229878 Project#: 50214.2 Project Name: First Amendment for Main Campus Upgrades Contractor/Consultant Name: O-A-K/Florida Inc. Select One: ❑� Contract Modification (Construction or Project Specific) ❑Work Order Modification Project Manager Name: Tim Rygiel-PMP,CFM, Project Manager Ill Division Name: Facilities Management Original Contract/Work Order Amount 1 $17,648,689.97 1/9/2024 11G Original BCC Approval Date;Agenda Item# Current BCC Approved Amount $17,648,689.97 1/9/2024 11G Last BCC Approval Date; Agenda Item# Current Contract/Work Order Amount $16,627,040.98 6/18/2025 SAP Contract Expiration Date(MASTER) Dollar Amount of this Change -5.79% Total% Change from Original Amount Revised Contract/ork Order Total ( $16,627,04o se o.00 io %Change from Current BCC Approved Amount Total Cumulative Changes -$1,021,648.99 0.00°%0 % Change from Current Amount Notice to Proceed 2-19-2024 Original NTP 485 Original Final 6-18-2025 Last Final 7-10-2025 Date #of Days Completion Date Approved Date #of Days Added Revised Final Date Current Substantial Completion Date 5 (includes this change) 7"15 2025 (if applicable) 5 11 2025 Provide responses after each question in box below (Responses should be brief and specific). Attach additional information and/or documentation from the Design Professional and/or Contractor, if needed, with your submission of this Change Order and complete summary on next page. Check all that apply to this Chan se Order request: Add Time; ❑Add funds; ❑ Use of Allowance; ❑ Modify/Delete existing Task(s);❑Add new Task(s); 011 Reallocate funds; ❑ Other(must be explained in detail below) 1.) Detail of change/s to be made through this Change Order. This change order will add 5 days to the contract time as a result of work interruption from Hurricane Milton. It will also reconcile calculation errors made on change order#10 and will increase the owner's allowance by $20.41 leaving a new balance of $394,812.38. Additionally, this change will reconcile the SOV to more accurately indicate credits to sub categories. See attached SOV. 2.) If this Change Order is currently under a Stop Work, please identify the date issued and number of days remaining or"N/A" if not applicable. N/A 3.) Explain why this change was not included in the original contract/Work Order. It was unknown that Hurricane Milton would occur and cause work delays. 4.) Describe the impact if this change is not processed. If this change is not processed, the calculation errors on change order#10 and the weather delays due to Hurricane Milton would not be recognized. Eage1 of 4 Change Order Form(2023_ver.1) 16F12 Cote-r county Procurement Services Change Order Form Contract# 21-7883-ST CO# 12 PO# 4500229878 Project#: 50214.2 Project Name: First Amendment for Main Campus Upgrades Contractor/Consultant Name: O-A-K/Florida Inc. Change Order/Amendment Summary (If additional spaces needed, attached a separate Summary page to this amendment request) COST TIME CO# AMD# Description Additive Deductive Days Total New Justification (+) (-) Added Time Direct Material To provide cost savings to 1 Purchase $(391,878.82) the County in the amount of $22,181.82 Direct Material To provide cost savings to 2 Purchase $(335,349.02) the County in the amount of $18,982.02 Direct Material To provide cost savings to 3 Purchase $(267,798.40) the County in the amount of $15,148.40 Adds 7 days to the If this change order is not contract time and processed, the project will not be in 4 uses $11,219,01 of 7 492 compliance with the LDC and Certificate of Completion cannot be the Contingency. obtained. Adds 5 days to the If this change order is not contract time and processed the new system 5 uses $6,473.50 of 5 497 will not operate properly. the Contingency. Administrative change to If this change order is not processed the acknowledge the Schedule of Values will not reflect the 6 subcontractor substitution and transfer of work from the original reconciliation of the Schedule subcontractor to the substitute contractor. of Values. Deductive change If this change order is not 7 order to correct errors $(26,622.75) processed there would be an made on the GMP. overpayment on the payment and performance bonds. Adds 10 days to the If this change order is not processed,all contract time and required changes would not be 8 uses $42,329.74 of 10 507 accounted for posing safety risks, in-continuity,and inability to complete the Contingency. the project. Check here if additional summary page/s are attached to this Change Order Page 2 of 4 Change Order Form(2023_ver.1) 16F 2 Co r County Procurement Services Change Order Form Contract# 21-7883-ST CO# 12 PO# 4500229878 Project#: 50214,2 Project Name: First Amendment for Main Campus Upgrades Contractor/Consultant Name: 0-A-K/Florida Inc. Change Order/Amendment Summary (If additional spaces needed, attached a separate Summary page to this amendment request) • COST TIME CO# AMD# Description Additive Deductive Days Total New Justification (+) (-) Added Time Administrative change to If this change order is not processed acknowledge the the Schedule of Values will not reflect 9 subcontractor substitution and the transfer of work from the original reconciliation of the Schedule of Values under WD#11. subcontractor to the substitute subcontractor. Utilizes $8,467.50 If this change order is not processed, scope elimination and required changes 10 of the Contingency, would not be accounted for as well as not being in compliance with the current Collier County Standards. Utilizes $17,977.30 If this change order is not processed the new fuel storage tank and generators would of the Contingency, not meet the Hazmat requirements and the 11 PH balance of the water would be detrimental to the new equipment being installed. Adds 5 days to the If this change is not processed,the contract and reconcile calculation errors on change order 12 i calculation errors from 5 512 #10 and the weather delays due to CO#10 increasing the Hurricane Milton would not be allowance by$20.41. recognized. ❑Check here if additional summary page/s are attached to this Change Order Page 2 of 4 Change Order Form(2023_ver.1) 16F12 Cott' County Procurement Services Change Order Form Contract# 21-7883-ST CO# 12 PO# 4500229878 Project#: 50214.2 Project Name: First Amendment for Main Campus Upgrades Contractor/Consultant Name: 0-A-K/Florida Inc. Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above, as fully as if the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Contractor/Consultant/Design Professional signature below must be from an authorized person/officer/director of the Company or listed as the qualified licensed Professional "Project Coordinator"or Design/Engineer Professional under the agreement. Signature authority of person signing will be verified through the contract OR through the Florida Department of State, Division of Corporations (Sunbiz) website (https://dos.mvflorida.cam%sunbiz/search/). If the person signing is not listed, we will require signature authority by one of the listed officers/directors of the company giving that person signature authority. • Prepared by: RyglelTlmOtl Iy Digmothy Datlea1ly signed 2024.10.15y12:46:45'0400' Date: Signature-Division Project Manager Tim Rygiel PMP, CFM, Project Manager III, Facilities Management Printed Name K. Todd Griffith DN.ON mn„tuned e,l(Todd 6rimm •It Todd(vl Kirk,o•W rnn WMr:xoKai f.grnrc,nq N<,ou•Sr.\Ice » Accepted by: .,Jden(Director ol5WFLDM, ,,nr.r,-r,.d,j,r,b..,m,r..n.n.,.,.U$ Dar T'..d IC IS`1,1K2o plY) Date: Signature-Design/Engineer Professional (if applicable) K.Todd Griffith, PE, SVP-Director of SWFL Division, Matern Professional Engineering, Inc. Printed Name/Title/Company Name Matthew Zwack Digitally signed by Matthew Zwack Accepted by: Date:2024.10.16 07:55:12-04'00' Date: Signature-Contractor/Consultant/Vendor Matthew Zwack, President, 0-A-K/Florida, Inc. Printed Name(Title/Company Name Approved by: Date: Signature-Division Manager or Designee (Optional) Printed Name McCormickJohn Digitally signed by McCormickJohn Approved by: Date: 2024.10.16 09:09:41 -04'00' Date: Signature-Division Director or Designee (Optional) John McCormick, PE, Facilities Management Printed Name Approved by: Date: Signature-Division Administrator or Designee (Optional) Printed Name Page 3 of 4 Change Order Form(2023_ver.1) 16F12 , 1,,,,,Co , county Procurement Services Change Order Form Contract# 21-7883-ST CO# 12 PO# 4500229878 Project#: 50214.2 Project Name: First Amendment for Main Campus Upgrades Contractor/Consultant Name: O-A-K/Florida Inc. FOR PROCURMENT USE ONLY t FY 25 CHO Request# 507 ZimmermanBecca Dat Digitallye:2024 signed .10.28 by16ZimmermanBecca:2223-0400'' Approved by: Signature-Procurement Professional Signature/Date Approved by: Signature-Procurement Manager/Director(OPTIONAL) APPROVAL TYPE: ❑ Administrative IU Administrative-BCC Report ❑ BCC Stand-Alone ES (BCC Approval Required) BCC APPROVAL ATTEST: Crystal K. Kinzel, Clerk of the Circuit Court BOARD OF COUNTY COMMISSIONERS and Comptroll COLLIER C Y, FLORIDA By: By: ' a "-4 Cris H61( , Chairman Dated: l Atttst as to Chairman' Date: 12/(0'2`( signature only. (SEAL} Agenda # lc. F. (1_ ve s t and Legality: DeputyS'z,ti County Attorney )1- Q 7IL Print Name Page 4 of 4 f�' Change Order Form(2023_ver.1) 16F12 .:,<Qwe ArreS ar� Building Since 1891 Owen-Ames-Kimball Company 11941 Fairway Lakes Drive,Fort Myers,Florida 33913-8338 Ph 239-561-4141 •Fax 239-561- 1996 October 14, 2024 Tim Rygiel Todd Griffith Project Manager Ill /Facilities Management Director SW Florida Division/Mechanical Engineer Collier County Matern Professional Engineering 3335 Tamiami Trail East Suite 101 12437 Brantley Commons Naples, FL 34112 Fort Myers, Florida 33907 Re: #21-7883-ST—Main Campus Upgrades Request for Time Extension — Hurricane Milton Dear Tim & Todd: Per"Exhibit A General Terms and Conditions (Article 13—Claims and Disputes)", we are respectfully submitting a claim for time extension due to adverse weather conditions beyond the contractor's control as a result from Hurricane Milton. We are requesting 5 additional days to be added to the contract time. This additional time was determined based on the amount of time lost due to preparing for the storm, down time during the storm, and down time after the storm, which took place during the period of 10/07/2024 to 10/11/2024. Please review and let us know if you have any questions or need any additional back up. Very truly yours, 93aian 3dipc& Brian Filipek Project Manager "Iv) AISC 6 F 2 CERTIFIED MIAMI•DADE COUNTY FABRICATOR APPROVED & ERECTOR East Coast Metal Structures, Corp. 620 Whitney Ave., Lantana, Florida 33462 Ph: 561-766-2579 Fax: 561-766-2593 CHANGE ORDER REQUEST #05 FROM: William Graham DATE:9/27/24 JOB: New Chiller Plant K1 COMPANY:Owens,Ames, Kimball ATTN: Brian Filipek Description of Change: - CREDIT for the deletion of the pipe pits on the north/south ends per S103B, S104B, S105B and S201 $-520.00—Material $-264.00—Shop Fabrication $-20.00—Shop Point -825.00—Buyout items(orating) $-1,629.00-SUBTOTAL $-114.00—Soles Tax $-360.00. —Field Installation(4 hrs. @$90/hour) $-160.00—Equipment(4 hrs. @$40/hour) $-2,263.03—TOTAL $-2,243.00 already issued on CO#1 but there was a math error—adjusting here $-20.0.3—additional credit owed The duration to complete the scope of work for this change order shall be (TBD) business days. The contract schedule will be increased by (TBD) business days due to this Change Order. These are approximate timelines and are subject to change at the time of implementation. Your acceptance of this Change Order shall constitute a modification to our agreement. THE AMOUNT OF THE CONTRACT WILL BE DECREASED IN THE AMOUNT OF: $-20.03 SIGNED BY AUTHORIZED REPRESENTATIVE: By my signature above,I attest that I am authorized by my company to enter into an agreement to purchase goods and/or services.By authorizing East Coast Metal Structures,Corp.,to proceed with the work/services as outlined above and for the sum as noted,customer assumes financial responsibility for providing payment for such work/services and guarantees payment for such. 16F 2 IVE !DRYWALL INC. October 2, 2024 Mr. Brian Filipek bfilipek(a7oakfl.com Owens/Ames/Kimball Company. 11941 Fairway Lakes Dr. Ft. Myers, FL 33913 Re: New Chiller Plant Building-Additional Pricing Weather Barrier/Stucco Credits Naples, FL Dear Mr. Filipek, We are pleased to quote you a price for the additional work for the above referenced project per plans prepared by RG Architects dated 7/12/2023 with the following clarifications: Stucco Add/Credit: Additional credit owed due to math error associated with $ ( '38) Lee Drywall weather barrier and stucco credit proposal dated 5/30/24. Total credit to contract: $ ( .38) This additional work will impact our schedule 10 additional days. Please provide us with a written directive if we are to proceed with this additional scope of work followed by an accounting change order. If you have any questions, please don't hesitate to contact us. Respectfully, John Kucaba Estimator/Project Manager john(cr7leedrvwall.com (.(r.I R`,('I YZS V A K c,C I111 1 1 R I'I ;\\I RIM I)IN(i K-I '2(,,k..\I)1)I I it)ti\I I'I?ic IN(, 16F12 Owen wKimball Building Since 1891 ATTACHMENT 2•SCHEDULE OF VALUES COLLIER COUNTY-NEW CHILLER PLANT BUILDING K • PROJECT:COLLIER COUNTY-NEW CHILLER PLANT BUILDING K LOCATION 3335 Tamiami Trail East, _FL 34112 _ REVISED DATE: DATE 10.26.23 9/30/2024 ARCH/ENG:Malern Engineering/RG Architects Inc. ESTIMATOR PRECON Team Pt ANS DATE:7/12/23 7/18/23 9/12/23 PROJECT SIZE SF 8,232 PREVIOUS REQUESTED DIVISIONS BIDDER I CITY COST 18) TRANSFERS TRANSFER REVISED COST S ................. DIV 01 00 00:GENERAL CONDITIONS .- General Conditions I. Owen•Ames-Kimball $688,250.00 General Requirements Owen-Ames-Kimball $430,250.D0 $470,550.00 -$40 000;;^ $430,550.00 DIV 01 74 23•FINAL CLEANING: Cleaning of entire new addition including all equipment,electrical room and all equipment, Pristine Cleaning $10 344,40 $10,344.40 weeherg epoxy floors,Storefront and Sidewalk Washing, Included r Spill Cleaning prior to Tenant Occupancy Included DIV 02 00 00:EXISTING CONDITIONS 02 20 00-Surveying Q Grady Minor $34 280.00 $34 280.00 02 30 00-Subsurface Investigation Allowance $7 500.00 $7,500.00 02 32 16-Malenals Testing H2R Corp $34,550,00 02 41 00-Selective Demolition 2 Wildcat Demolition $115,525,00 $11 t75 C1 $126 800.00 800.00 Pump Room Slab removal 8 chain-link fence,railings,ramps,sidewalk Included DIV 03 30 00:CONCRETE&MASONRY Concrete B Masonry for pumproom flood walls,roof curbs Commercial Concrete Systems $1,009,271,64 $3441.00 $1012,712.5-I C/P Walls,Housekeeping Pads Included 03 41 13•Precast Concrete Hollow Core Planks-Supply and Install American Precast LLC $32,475.00 $32,475.00 DIV 05:METALS 0512 00•STRUCTURAL STEEL: Structural Steel,Decking,Columns Beams,base plates,steel flanges,supports. East Coast Metal Structures $411 912 00 -$ 1?63.03 $401 716 C;7 Shop Drawings,Anchor Bolts,Embeds Included 05 70 00•DECORATIVE METALS: Aluminum Railings,Ship ladder,Guardrails,Handrails,wall mounted rails Grating,catwak East Coast Metal Structures $118 898.00 $118,898.00 Steel Bollards,shop drawings,included. 'Included 16F1r oraMm..-ambrr comp.,y 230-se1-4I i DIV 06:CARPENTRY ROUGH i FINISHED CARPENTRY: Lee Drywall,Inc 5156,011.73i $166.011.72i Plywood sheathing,temporary guardrails at existing bldg.8 new addition. Induded Temp.guardrails at new pump room roof,temp guardrails at sump pits in new pump room. Included Miscellaneous Carpentry(temporary doors,temp walls.temp locks) Included Installation of doors,and associated hardware. Included Slushing HM door frames onto CMU walls. Induded DIV 07:THERMAL&MOISTURE PROTECTION . Dampproofing new foundation walls Included Dampproofing new CMU wells Included Weather Barrier behind metal panel Included Bentonite Clay Water Proofing Induded Weather Barrier at openings of new Pump Room Included Waterproofing below grade at exterior surfaces of the pipe pit,per 14-S301 Included Combined Dampproofing and Waterproofing package Service Contracting Solutions $21,829.00 -$7,325.00 $14,504,00 DIV 07:ROOFING ................................_....... Single Ply(Kee)Roofing System with LAIC Crowther Roofing and Sheetmetal $325,865.75 $325.865.75 Expansion joints,roof blocking,de into existing budding,flashing,drains,coping caps •Included Lightning Protection Pads Crowther Roofing and Sheetmetal $5,481.00 $5,481.00 Temporary mod-bit roofing over concrete deck, 'Crowther Roofing and Sheetmetal $58,895.38 $58,895.38 DIV 07;WALL&CEILING PANELS 07 42 13.A01-ACM Wall Paneling system Cladding Systems,Inc $119 200,00 $3,382.50 $122,582.50 Reynobond,0.20 Aluminum skins,4mm thick,fire rated core,route and return raineaeen system(p r#FL11794),manufacturer's standard 2-coat colors. Included All clips.hat channels at t6.00,shop drawings and sales taxes,freight. Included 07 84 00•FIRESTOPPING Firestopping for block walls,MEP penetrations to fire-rated walls. Wall Systems Contractors $5.605.00 $5,605.00 07 92 DO-JOINT SEALANTS: Joint Sealants at CMU to CMU joints included Joint Sealants at Miscellaneous Locations included Joint Sealants et new louvers included Joint Sealants at windows .included Joint Sealants at new CMU to Exposes Structure included Joint Sealants Stucco to Metal Panels included Joint Sealants al Control Joints ,included Combined Joint Sealants Package Sennce Contracting Solutions $17,312,00 $17,312.00 07 95 13•Expansion Control System Service Contracting Solutions $4,024.00 $4,024.00 DIV 06:OPENINGS 08 10 00•Doors,Frames&Hardware Supply ,Pinnacle Door end Hardware $97,300.00 $97 300.00 08 80 00-Glass&Glazing Precision Glass Solutions inc. $41.220.00 $41,220.00 Pegs 2 16pi2 Cnaen-Ames-Klmbdl Company 236'561-4111 DIV 09:FINISHES 09 20 00•STUCCO Full Stucco replacement of existing_building and generator enclosureldemo 8 new world_ Lee Drywall $239,278.00 $22,303.03 $216,974.97 Stucco for new Addition(wall between new addition and existing building alleyway) Lee Drywall $60,574.25 $14,763.65 $75,337.90 Exterior scaffolding around new and existing building for stucco end painting work. Lee Drywall $63,836.20 $63,836.20 Stucco General Labor to be tracked by CM Allowance $75,000.00 $75,000.00 09 30 00•FLOOR LEVELING&EPDXY FINISHES Grinding off exiting finishes quality Camel&Flooring $19,459.51 $19,459.51 Applying a homogeneous layer of floor leveling compound throughout chiler room,pump room, and proposed electrical room prior to application of flooring finishes. ;Quality Carpel&Flooring $86,424.49 $86,424.49 PAINTING: Service Contracting Solutions $87,967.00 $1,826.09 $89,793.00 Interior exposed structures,ceilings,wells Painting(pump om,chiller roam,electrical room) ,included Exterior painting of al new stucco finishes(building K and gen.enclosure) included DIV 10:SPECIALTIES 10 00 00•SPECIALTIES: Fire Extinguisher and Cabinets Crowther Specialties $2,530.00 $2,530.00 1014 00•Signage 2 Visual $5,308.00 $5,308.00 ADA Compliant Roam Id restroom,and project signs Included 10 71 13.43.A02•PERFORATED ALUMINUM PANELS: Aluminum Fixed Sunscreens and associated attachments,engineering,finishes Perfection Architectural Systems $217,388,00 $217,388,00 Manufacturer•Perfection's Aluminum Canopy System 10 71 19•FLOOD PANEL SYSTEM Matenals Orange Flood Control.LLC $47,508.00 $47,508,00 Installation.engineering.bathtub testing Orange Flood Control,LLC $72,760,00 $72,760,00 10 7316•PROTECTIVE COVERS Perfection Architectural Systems $42,365.00 $42.365.00 Includes Centric BR5-36 Panels included Tx4'Frame,8'Gutters,Aluminum Pipes,1.5'x6'x0,78'Serf-mating Rigid Rdl Lock la Suspended Canopies included DIV 22 00 00:PLUMBING Complete Plumbing Packa$e B8l Contractors,Inc $127,162.00 $844.00 $128,006.00 DIV 23 00 00:HVAC Complete HVAC Package.including BIM Coordination BSI Contractors,Inc $3,984,000,00 $45,041.00 $4,029,041.00 Stainless Steel Piping under TES Tank Bbl Contractors,Inc $7,752.00 $7,752.00 23 71 13-Thermal Storage Tank The CROM Corporation $2,719,433.00 $2,702,000,00 DIV 26:ELECTRICAL ELECTRICAL: Electrical Package,including lightning protection system Nauti Electric Inc. $2,370,287.50 .$16,925.00 $2,387,212.50 ...... ..... All Low Voltage Systems Nauti Electric Inc. $68,752.50 $68,752.50 Tank Lighting Nauti Electric Inc. $60,000.00 $60,000.00 Page 3 16F12 Oran Amu-Kimbell Company DO-561.I41 DIV 31:EARTHWORK SITEWORK: Pavement Maintenance i. $897,565.87 -$11,2750C' $886,290.87 Mobilization&General Requirements Induded Earthwork Included Site Concrete Included Asphalt Repair Included 31 23 00-Vihrotory Soils Modification •Earth Teck $143,000.0CI $143,000.00 Termite Control/Soil Treatment Northwest Exterminating $3,046.20 $3,046.20 DIV 32:EXTERIOR IMPROVEMENTS LandscaPe 8 Irrigation ;Big Tree,Inc. $114,795.00 $2 2,'82'0 $117.077.10 DIV 33:UTILITIES UNDERGROUNG UTILITIES: •Strickler Brothers ,LS S729,475.00 $7,917.00 $737,392.00 Mobilization&General Requirements included Storm Drainage included Water Utilities included Pine utilities included Sanitary Sewerage Utilities included .Subtotal $16,041,967.42 .. $16,041,143.61' General Liability insurance 05% $80 209.84 $80,209.84 Pollution Insurance 0,0003 $4,315,29 $4,315.29 Bldg.Permit fees ! 0 5% $80.209.84 $80,209.84 Builders Risk Insurance r 0.0% $0.00 $0.00 P&P Bond 0.75% $120,314.76 $120,314.76. Contingency 3,0% 5461,259.02 -$17.602.51 ... •$8,447.09 S455,112.42 Subtotal f/6,8011,278,18 j18,78t 3t2.7$ CMFee 5.0% $840.413.81 $1,808.41 S840,754.4? TOTAL $17,648,689.97 $17,622,067,22 Page 4