GG MSTU Agenda 09/17/2024September 17, 2024 Golden Gate Beautification M.S.T.U. Page 1 of 1
GOLDEN GATE BEAUTIFICATION M.S.T.U.
8300 Radio Road
READ AHEAD Naples, FL 34104 READ AHEAD
SEPTEMBER 17, 2024
I.CALL TO ORDER
II.ATTENDANCE
Advisory Committee Patricia Spencer – Chair (10/06/2025)
Paula Rogan – Vice Chair (10/06/2027)
Florence “Dusty” Holmes (10/06/2025)
Ron Jefferson (10/06/2026)
-Committee Vacancy -
Staff Brian Wells – PTNE Director
Dan Schumacher – Project Manager
Contractors Mike McGee – Landscape Architect (McGee & Assoc)
Armando Ysaguirre – Grounds Maintenance (A&M Property Maint.)
Wendy Warren – Transcription (Premier)
Sharon Johnson – Sign Renovation (Lykins-Signtek)
III.PLEDGE OF ALLEGIANCE
IV.APPROVAL OF AGENDA
V.APPROVAL OF MINUTES – JULY 16, 2024
VI.LANDSCAPE MAINTENANCE REPORT – A&M PROPERTY MAINTENANCE
VII.LANDSCAPE ARCHITECT’S REPORTS – MCGEE & ASSOCIATES
A.SUNSHINE Boulevard
B.CORONADO Parkway & HUNTER Boulevard
C.TROPICANA Boulevard
VIII.PROJECT MANAGER’S REPORT
IX.BUDGET REPORT
X.Community Welcome Sign Renovation – Golden Gate Pkwy (west) – Sharon
Johnson
XI.Holiday Decorations – Pkwy Flagpole & Renovated Community Sign (West)
XII.OLD BUSINESS
XIII.NEW BUSINESS
A.Irrigation Extension - Pkwy Median 2 & New Bridge over Santa Barbara Canal
XIV.PUBLIC COMMENTS
XV.ADJOURNMENT NEXT MEETING:
OCTOBER 15, 2024 – 4:30 PM
GOLDEN GATE COMMUNITY CENTER
4701 GOLDEN GATE PARKWAY
NAPLES, FL 34116
19.A.b
Packet Pg. 259 Attachment: Agenda & Backup - Golden Gate 09-17-24 (30046 : Golden Gate Beautification MSTU Advisory Committee - September 17, 2024)
July 16, 2024 GOLDEN GATE MSTU 1/5
l
GOLDEN GATE M.S.T.U. ADVISORY
COMMITTEE
8300 Radio Road
Naples, FL 34104
July 16, 2024
MINUTES
I. Call to Order
The meeting was called to order at 5:28 P.M. by Chair Spencer. Attendance was called and a
quorum of three was established.
II. Attendance
Advisory Committee Patricia Spencer – Chair
Paula Rogan – Vice Chair (Excused)
Florence “Dusty” Holmes
Ron Jefferson
- Vacancy -
Staff Brian Wells – PTNE Director (Excused)
Dan Schumacher – Project Manager
Landscape Mike McGee – Landscape Architect, McGee & Associates
Armando & Sylvia Yzaguirre – Grounds Maintenance, A & M Property
Maintenance
Others N/A
III. Pledge of Allegiance
The Pledge of Allegiance was not recited – US flag unavailable.
IV. Approval of Agenda
Chair Spencer moved to approve the Agenda of the Golden Gate MSTU Advisory Committee as
presented. Second by Ms. Holmes. Carried unanimously 3 - 0.
V. Approval of Minutes – June 18, 2024
Chair Spencer moved to approve the minutes of the June 18, 2024, Golden Gate MSTU Advisory
Committee meeting as presented. Second by Ms. Holmes. Carried unanimously 3 - 0.
19.A.b
Packet Pg. 260 Attachment: Agenda & Backup - Golden Gate 09-17-24 (30046 : Golden Gate Beautification MSTU Advisory Committee - September 17, 2024)
McGee & Associates
Landscape Architecture
Design * Environmental Management * Planning * Arborist
5079 Tamiami Trail East / P. O. Box 8052 Naples, Florida 34101
Phone (239) 417-0707 * Fax (239) 417-0708 Page 1 of 5
LC 098 * FL 1023A
Project: GOLDEN GATE BEAUTIFICATION, M.S.T.U. Landscape Architect Report: September 2024
Location: Coronado Parkway & Hunter Blvd.
Project Manager: Dan Schumacher, Collier County Public Services Department, Public Transportation & Neighborhood Enhancements Division
Consultant: McGee & Associates Consultant’s Representative: Michael A. McGee, rla, isa
Landscape Contractor: A & M Property Management Contractor’s Representative: Armando Yzaguirre
Observation Date: 9/3/2024 Report Date: 9/3/2024 Report No.: 10 (FY-24)
AC - Indicates major items recommended to be discussed by Advisory Committee S - Indicates items recommended to be addressed by staff, C - Indicates items recommended to be addressed by Contractor
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
MONTHLY ADDRESSED Yellow - Items recommended to be addressed as soon as
possible or renovation recommendations generally based
upon vehicular or storm damage.
Coronado Pkwy. - All locations X X A general observation of the existing perennial peanut plantings reveals that many of the
beds are filling back in based upon the current contractor maintenance efforts. Some of
the recommended renovation areas over to Liriope may not be necessary. Before
replacements begin it is recommended an additional review be performed to determine
replacement amounts needed at this time.
X X All Alexander palms need to be reviewed to make sure the bubblers are positioned 12-
inches off edge of trunks and pinned to the ground with galvanized u-shaped pins.
X X In all African iris plantings between Alexander palms in narrow width medians the irrigation
heads should be reviewed and replaced as follows: Install Rainbird model 1812 16” ht.
pop-up spray bodies with 1800-EXT 6” ht. extension and a 15CST nozzle on top of a 12”
Sch. 80 riser. Strap sprinkler head to 36” length epoxy coated #5 rebar with stainless steel
adjustable banding. Install rebar 12” into ground. After sprinklers have been installed tip
prune tops of Iris plants direct adjacent to sprinkler heads to ensure maximum spray
pattern.
X X It is recommended that all Perennial peanut plantings and replacement areas that are to
remain shall have an application of 0-0-22-22S-11mg fertilizer and Legume Soil inoculant
at 10 oz. per 100 s.f.
X X Recommended all paver areas be pressure washed and treated with “Wet & Forget” mold
treatment spray.
X Recommend reviewing all valve locations for green reflective markers that are missing.
Median #1- Pavers X Pressure cleaning recommended
Median #2- Pavers X Pressure cleaning recommended
Median #3 X X 6 Review palm tree braces to make sure they are not deforming the trunks.
X X 5 Middle area needs (37) 1 gal. Perennial peanut “Golden Glory’ replacements
Median #4 X X 4 (7) Irrigation heads in African iris plants need to be addressed as listed above under all
locations.
X X 10 East median end needs (38) 1 gal. Perennial peanut “Golden Glory’ replacements
X X 10 West median end needs (30) 1 gal. Perennial peanut “Golden Glory’ replacements
X X 10 (1) Iris replacement was installed but it was the wrong type of Iris. This bed is Yellow
African Iris and not Yellow Flag Iris
Median #5 X X 10 Median needs (35) 1 gal. Perennial peanut “Golden Glory’ replacements M&A 5/7/24: Areas contains weeds.
Median #6 X X 4 (4) Irrigation heads in African iris plants need to be addressed as listed above under all
locations.
19.A.b
Packet Pg. 265 Attachment: Agenda & Backup - Golden Gate 09-17-24 (30046 : Golden Gate Beautification MSTU Advisory Committee - September 17, 2024)
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Coronado Pkwy. & Hunter Blvd. Report Date: 9/3/2024 Report No.: 10 (FY24)
Page 2 of 5
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
X X 10 (16) Yellow African Iris replacements are recommended, 3 gal. size plants. M&A 5/7/24: Areas contains weeds.
Median #7 X 4 Remove and herbicide volunteer Strangler Fig vine in Sabal palm trunk.
Median #8 X No major issues observed
Median #9 - Pavers X Pressure cleaning recommended
Median #10 X X At address 5237 & 5254: Remove volunteer Scheffleras growing in palm trunks.
X X 6 Perennial peanut on east end in full of weeds.
X X 9 At address 5327 & 5273: (4) Paurotis palm clumps need to be pruned for thinning and
removal of dead or declining stems.
X X 9 On the west end areas of Perennial Peanut have declined and are missing plants. Install
(105) 1 gal. size ‘Golden Glory” Perennial peanuts. Review irrigation coverage.
X X 9 At address 5389 – 5401: Yellow African Iris bed, Review irrigation coverage issue, (20)
plants are in decline or missing. Replant with 3 gal. size.
Median #11 Bridge X X 9 East end: Needs (13) 1 gal. Perennial peanut “Golden Glory’ replacements
Median #12 X 9 West end: Needs (13) 1 gal. Perennial peanut “Golden Glory’ replacements
Median #13 X X 9 Median: Needs (45) 1 gal. Society garlic replacements
Median #14 X X 9 Repair 12 L.F. of paver border, remove & replace soldier course edge to include
compacted base and mortar edging. Base shall extend 12 -inches beyond current edge of
pavers. Remove all remaining Blueberry flax lilies and mulch. Review irrigation for repairs
and proper coverage. Adjust irrigation heads to proper heights to receive a 4-inch layer
(10 c.y.+/-) of clean native topsoil. Replant median with a double staggered rows of (92)
Liriope ‘Big Blue’, 18” o.c. in 1 gal. size and re-mulch median with a 3-inch layer of mulch.
New plantings are to have offsets as follows: 3-feet of palm trunks, 2-feet from back of
curb & 3-feet off paver edges.
Hunter Blvd. - All locations X X A general observation of the existing perennial peanut plantings reveals that many of the
beds are filling back in based upon the current contractor maintenance efforts. Some of
the recommended renovation areas over to Liriope may not be necessary. Before
replacements begin it is recommended an additional review be performed to determine
replacement amounts needed at this time.
X X All locations with perennial peanut planting shall have a Legume Soil Inoculant product
applied as soon as possible, as well as an application of 0 -0-22-22S-11mg fertilizer.
X X Median #7: In all African iris plantings between Alexander palms in narrow width medians
the irrigation heads should be reviewed and replaced as follows: Install Rainbird model
1812 16” ht. pop-up spray bodies with 1800-EXT 6” ht. extension and a 15CST nozzle on
top of a 12” Sch. 80 riser. Strap sprinkler head to 36” length epoxy coated #5 rebar with
stainless steel adjustable banding. Install rebar 12” into ground. After sprinklers have been
installed tip prune tops of Iris plants direct adjacent to sprinkler heads to ensure maximum
spray pattern.
X X Recommended all paver areas be pressure washed and treated with “Wet & Forget” mold
treatment spray.
X X Mulch needed for medians 1, 2, 3, 4, 5, 6 & eastern half of median 8.
Median #1 10 The south end Alexander palm has been hit for the second or third time and it is
recommended not to replace. Fill depression and plant (2) 3 gal. Juniper parsonii. Cap
bubblers at the location.
19.A.b
Packet Pg. 266 Attachment: Agenda & Backup - Golden Gate 09-17-24 (30046 : Golden Gate Beautification MSTU Advisory Committee - September 17, 2024)
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Coronado Pkwy. & Hunter Blvd. Report Date: 9/3/2024 Report No.: 10 (FY24)
Page 3 of 5
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
Median #2 X X 10 Remove existing Big Rose crown of thorn and finish grade for a uniform profile. Replant
Big Rose area as follows with six staggered rows of (92) Liriope ‘Big Blue’, 18” o.c. in 1
gal. size and re-mulch median with a 3-inch layer of mulch. New plantings are to have
offsets as follows: 3-feet of palm trunks, 2-feet from back of curb & 3-feet off paver edges.
Median #3 X X 6 Perennial peanuts have declined except for the very end. Recommend raking up dead
stems of perennial peanut. Between palms replant areas with two centerline staggered
rows of (27) Liriope ‘Big Blue’, 18” o.c. in 1 gal. size, Triangular area at north end of palms
install 4-5 staggered rows of (115) Liriope ‘Big Blue’, 18” o.c. in 1 gal. size. Total plant
count (142). Re-mulch planning areas with a 3-inch layer of mulch. New plantings are to
have offsets as follows: 4-feet of palm trunks, light poles & shrubs, Outside of narrow
median areas maintain 3-feet from back of curb.
X X 10 Median needs action as follows: Remove volunteer Crape myrtle sprouts.
South end: Needs (23) 1 gal. Perennial peanut “Golden Glory’ replacements and (25) 3
gal. Bougainvillea Ms Alice shrubs.
North end: needs (5) 3 gal. Bougainvillea Silhouette shrubs
X X 10 First Alexander palm on south end: Palm is dead and needs to be removed. Excavate
palm and replant with (1) 10 ft. clear trunk Alexander palm.
Median #4 X X 9 South end Golden Glory perennial peanut area: Spray with herbicide to remove remaining
peanut plants. Rake area to remove peanut stems and then replant with six eight
staggered rows of (290 217) Liriope ‘Big Blue’, 18” o.c. in 1 gal. size and re-mulch median
with a 3-inch layer of mulch. New plantings are to have offsets as follows: 3-feet of palm
trunks, 3-feet from back of curb & 3-feet off paver edges.
Median #5
Pump station – Median #5, 7.5
hp, 8” well feeds Hunter &
Coronado, Hydropoint Controller
in median
X X 8 South end: Recommend remaining perennial peanut be spray to remove and then plant
median end with six staggered rows of (130) Liriope ‘Big Blue’, 18” o.c. in 1 gal. size and
re-mulch median with a 3-inch layer of mulch. New plantings are to have offsets as
follows: 4-feet of tree trunk, saw palmetto &irrigation boxes, 3-feet from back of curb & 3-
feet off paver edges.
X X 10 Median north end: Needs (40) 1 gal. Perennial peanut “Golden Glory’ replacements
Median #6 X X 4 At address 2101: Remove volunteer Oyster plants at valve boxes.
X X 10 West end at address 2007: Needs (80) 1 gal. Society garlic replacements
X X 10 Median: (8) Paurotis palm clumps need to be pruned for thinning and removal of declining
stems.
X X At address 2018: (1) Jatropha tree is missing. Replant with 6 ft. overall ht. multi -stem
plant.
Median #7 X X 4 (7) Irrigation heads in African iris plants need to be addressed as listed above under all
locations.
X X 9 Median: Needs (9) Yellow African iris 3 gal. replacements
Median #8 X X 5 At address 5201: Second Alexander palm from east end has broken head and needs
replacement. Excavate palm and replant with (1) 10 ft. clear trunk Alexander palm.
X X 6 At address 5290 & 5300: Paurotis palm clumps need dead fronds and stalks removed, as
well as thinning. Review for disease and treat if needed.
X X 10 West end: Remove dead foliage from within Blueberry flax plants.
X X 10 At address 4201-5241: Needs (175) 1 gal. Perennial peanut “Golden Glory’ replacements
19.A.b
Packet Pg. 267 Attachment: Agenda & Backup - Golden Gate 09-17-24 (30046 : Golden Gate Beautification MSTU Advisory Committee - September 17, 2024)
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Coronado Pkwy. & Hunter Blvd. Report Date: 9/3/2024 Report No.: 10 (FY24)
Page 4 of 5
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
X X 10 At address 5412-5433: Remove remaining Blueberry flax and replant area with two double
staggered rows of (139) Liriope ‘Big Blue’, 18” o.c. in 1 gal. size, New plantings are to
have offsets as follows: 3-feet of palm trunks, 2-feet from back of curb & 3-feet off paver
edges.
X X 10 At address 5412-5340: Replant missing Blueberry Flax lilies, (40) 3 gal. size plants.
Review irrigation coverage before planting.
X X 10 At address 5360-5390: Needs (12) Yellow African iris 3 gal. replacements.
Median #9 X X 10 Median: Needs (30) Yellow African Iris 3 gal. replacements. Review irrigation coverage
before replanting.
Median #10 X X 10 Apply Legume Soil Inoculant product as soon as possible, as well as an application of 0 -0-
22-22S-11mg fertilizer.
.
Median #11 X X 10 Median: Needs (85) Society garlic plants 1 gal. replacements
Median #12 X X 10 Median: Repair 12 L.F. of paver border, remove & replace soldier course edge to include
compacted base and mortar edging. Base shall extend 12 -inches beyond current edge of
pavers.
Remove all remaining Blueberry flax lilies and mulch. Review irrigation for repairs and
proper coverage. Replant median with a double staggered rows of (87) Liriope ‘Big Blue’,
18” o.c. in 1 gal. size and re-mulch median with a 3-inch layer of mulch. New plantings are
to have offsets as follows: 3-feet of palm trunks, 2-feet from back of curb & 3-feet off paver
edges.
QUARTERLY ADDRESSED
Fertilization: X X All locations with perennial peanut planting shall have a Legume Soil Inoculant product
applied as soon as possible, as well as an application of 0-0-22-22S-11mg fertilizer.
.
X X Refer to FY23-24 recommended schedule.
General Irrigation: Previous month water use total per WeatherTrak controller estimate 104,754 gallons.
19.A.b
Packet Pg. 268 Attachment: Agenda & Backup - Golden Gate 09-17-24 (30046 : Golden Gate Beautification MSTU Advisory Committee - September 17, 2024)
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Coronado Pkwy. & Hunter Blvd. Report Date: 9/3/2024 Report No.: 10 (FY24)
Page 5 of 5
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
19.A.b
Packet Pg. 269 Attachment: Agenda & Backup - Golden Gate 09-17-24 (30046 : Golden Gate Beautification MSTU Advisory Committee - September 17, 2024)
McGee & Associates
Landscape Architecture
Design * Environmental Management * Planning * Arborist Page 1 of 3
5079 Tamiami Trail East / P. O. Box 8052 Naples, Florida 34101
Phone (239) 417-0707 * Fax (239) 417-0708
LC 098 * FL 1023A
Project: GOLDEN GATE BEAUTIFICATION, M.S.T.U. Landscape Architect Report: September 2024
Location: Sunshine Blvd.
Project Manager: Dan Schumacher, Collier County Public Services Department, Public Transportation & Neighborhood Enhancements Division
Consultant: McGee & Associates Consultant’s Representative: Michael A. McGee, rla, isa
Landscape Contractor: A & M Property Management Contractor’s Representative: Armando Yzaguirre
Observation Date: 9/3/2024 Report Date: 9/3/2024 Report No.: 10 (FY-24)
AC - Indicates major items recommended to be discussed by Advisory Committee S - Indicates items recommended to be addressed by staff, C - Indicates items recommended to be addressed by Contractor
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
MONTHLY ADDRESSED Yellow - Items recommended to be addressed as soon as
possible or renovation recommendations generally based
upon vehicular or storm damage.
All locations X X All Duckbill tree staking system must be reviewed every three months to determine if
cables need to be loosened, rubber straps repositioned and make sure the rubber straps
are not allowed to be grown over by tree bark in the tree branch joints.
Median #1 X X 7 North End: The Blueberry flax lily bed has lost over 50% of the plants. It is recommended
at this point to remove the remaining flax lilies and renovate the bed with a different plant.
Install (52) 2 gal., Zamia pumila – Coontie on 3 ft. centers 3 ft. off tree trunks, back of
curbs and turf edges.
X X 9 North end: Previous replacement Sabal palm has died and needs to be replaced. Match
existing. This type of palm will require (2) bubblers and additional hand watering to
survive its planting.
X X 10 North end: (13) Juniper parsonii 3 gal. that need to be replanted as replacements.
X X 10 Sand cordgrass bed: The bed has (6) plants are dead or missing and need to be replaced
with 3 gal. size Sand cordgrass plants.
X X 10 South end: (9) Juniper replacement plants have declined and/or dead due to sever water
stress. Replant with 3 gal. Juniper parsonii.
X X 10 Middle Bed: Yellow African iris plants (4) plant declined and/or dead. Replant with 1 gal.
Yellow African iris.
Median #2 X 4 At address 2224: A previously planted Tabebuia tree in the turf area at some point was
removed and not replaced. It is recommended to install a Floss Silk tree. (Ceiba Speciosa
11’-13’ Ht., 3.5 Cal., 5’-6’ Spr., 36” dia. B&B or 65 Gal. size container.
X X 10 At address 2224 2236: Tabebuia tree cable support has been cut with what appears to be
the pruning device.
X X 10 South end: Area of previous auto damaged Juniper need to be renovated. Remove
damaged or dead plants and install double row of (26) 3 gal. Juniper parsoni.
X X 10 At address 2248: (10) renovation Yellow African Iris have declined and need to be
replaced. Remove volunteer Blueberry Flax plants in Iris.
M&A 5/7/24: Remove volunteer Firangi Pangi tree in Iris bed.
X X 10 At address 2184: (1) Tabebuia Ipe has been removed. It is recommended to replant with
the same Tabebuia Ipe tree. 11’-13’ Ht., 3.5 Cal., 5’-6’ Spr., 36” dia. B&B or 65 Gal. size
container.
M&A 3/7/23: The tree planted at this location was a
Yellow/Silver Trumpet tree and not an Ipe or Purple trumpet
tree. Removal & replacement is recommended based upon
trunk damage and the inability of this type of tree to become
well rooted. In addition, the metal center support poles has
not been removed after the installation of the Duckbill staking
system. M&A 9/5/23: The tree has been blown over by the
19.A.b
Packet Pg. 270 Attachment: Agenda & Backup - Golden Gate 09-17-24 (30046 : Golden Gate Beautification MSTU Advisory Committee - September 17, 2024)
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Sunshine Blvd. Report Date: 9/3/2024 Report No.: 10 (FY24)
Page 2 of 3
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
recent winds. The north duckbill anchor was installed about
12” not installed to its recommended 24” depth and as a
result the tree pulled the anchor up.
X X 10 At address 2184: The Bougainvillea silhouettes are off color and are stunted in growth.
Additional fertilization is highly recommended. Mulch should be pulled away from being in
contact with the plant trunks.
M&A 2/8/23: (6) plants have declined and/or missing and
need to be replaced. 3 gal. size. M&A 4/4/23: Plant count is
now up to (10) plants and area is dry.
X X 10 At address 2160: (1) Tabebuia tree trunk has been girdled by staking straps. The girdling
location has healed over but will remain a weak point for the main trunk. At this location
an included bark branch union is present so reduce of this branch is recommended to
reduce weight of the branch.
X X 10 North End at 2052: Juniper parsoni have large amount of dead and brown foliage which
appears to be result of insect (e.g. spider mites) or fungal disease. Contractor should
review to treat issue and prune out dead foliage.
M&A 5/3/22: Contractor determined Juniper had a Blight
disease and bed has been treated. Approx. 39-40 plants
involved. M&A 12/6/22 (14) 3 gal. Juniper parsoni needed to
finish replacements.
Median #3 - Pump Station Location-
5 hp, 6” well, VFD
X X 4 At address 1944: Install (2) Dwarf Bougainvillea ‘Helen Johnson’ 3 gal. size.
X X 10
At address 1945: South Trumpet tree Duckbill staking cable has been cut. It could be
vandalism or be from the hedge trimmer because the cable extended into the adjacent
Bougainvillea shrubs. Cable needs to be repaired or replaced.
M&A 3/5/24: The cut Duckbill cable was reconnected, but the
adjusting turnbuckle was removed. The turnbuckles are the
most important part of the Duckbill bracing systems.
Median #4 X X 4 Remove Asparagus fern in Juniper on south end.
Median #5 X X 10 (20+/-) renovation Blueberry flax plants have declined and need to be replaced. Issue
appears to irrigation coverage. Install (20) 1 gal. Blueberry flax.
M&A 6/4/24: Based upon additional plants dying it is
recommended the remaining Blueberry Flax lilies be removed
and the area planted with Zamia. Install (25) 2 gal., Zamia
pumila – Coontie on 3 ft. centers 3 ft. off tree trunks, back of
curbs and turf edges.
Median #6 X X 3 At address 1750 & 1760: Prune back existing Bougainvillea to a 24-inch diameter. Install
(8) Dwarf Bougainvillea ‘Helen Johnson’ 3 gal. size.
X X 9 At address 1720: Water stress has caused the decline of (13-15 20) Iris plants that will
need to be replaced with 3 gal. Yellow African iris plants.
M&A 6/4/24: Remove volunteer Blueberry Flax lilies.
X X 19 At address 1740: The Bougainvillea silhouettes are off color and are stunted in growth.
Plants should be reviewed for irrigation coverage and additional fertilization. Mulch should
be pulled away from being in contact with the plant trunks.
M&A 4/4/23: (26-30 37) Bougainvillea plants have declined
and/or dead. Recommended to remove all and replant bed
with 3 gal. Bougainvillea ‘Silhouettes’
18th Place SW Median X X Recommendation: Remove all surface vegetation (Bougainvillea shrubs) and lower grade
3-inches. Install (7) 3 gal., Aechmea “Raspberry Bromeliad and mulch entire median with
Rice Rock mulch to include filter cloth below Rice Rock mulch.
M&A 6/4/24: With rainy season approaching it is
recommended preparations begin to renovate median as
listed.
18th Ave. S.W. Median X X Recommendation: Remove all surface vegetation and lower grade 3 -inches. Install (8) 3
gal., Aechmea “Raspberry Bromeliad and mulch entire median with Rice Rock mulch to
include filter cloth below Rice Rock mulch.
M&A 6/4/24: With rainy season approaching it is
recommended preparations begin to renovate median as
listed.
QUARTERLY ADDRESSED
Accent/Street Lighting
Lighting Electric Meters & Irrigation
Controller Electric Source Locations
Lighting Electric Meter 2271 Sunshine Blvd., 1 SUN, Alley off 23rd Ave. SW
Lighting Electric Meter & Irrigation Controller Electric, 1995 Sunshine Blvd., 2 SUN, Alley
off 20th PL. SW
Lighting Electric Meter 4642 18th Pl. SW, 3 SUN, North R/W
19.A.b
Packet Pg. 271 Attachment: Agenda & Backup - Golden Gate 09-17-24 (30046 : Golden Gate Beautification MSTU Advisory Committee - September 17, 2024)
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Sunshine Blvd. Report Date: 9/3/2024 Report No.: 10 (FY24)
Page 3 of 3
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
Fertilizations: X Refer to schedule.
Irrigation: X X Controller monitoring indicates zero run time and zero flow. Previous month water use
total per WeatherTrak controller estimate is 0 gallons.
19.A.b
Packet Pg. 272 Attachment: Agenda & Backup - Golden Gate 09-17-24 (30046 : Golden Gate Beautification MSTU Advisory Committee - September 17, 2024)
McGee & Associates
Landscape Architecture
Design * Environmental Management * Planning * Arborist Page 1 of 3
5079 Tamiami Trail East / P. O. Box 8052 Naples, Florida 34101
Phone (239) 417-0707 * Fax (239) 417-0708
LC 098 * FL 1023A
Project: GOLDEN GATE BEAUTIFICATION, M.S.T.U. Landscape Architect Report: September 2024
Location: Tropicana Blvd.
Project Manager: Dan Schumacher, Collier County Public Services Department, Public Transportation & Neighborhood Enhancements Division
Consultant: McGee & Associates Consultant’s Representative: Michael A. McGee, rla, isa
Landscape Contractor: A & M Property Management Contractor’s Representative: Armando Yzaguirre
Observation Date: 9/3/2024 Report Date: 9/3/2024 Report No.: 10 (FY-24)
AC - Indicates major items recommended to be discussed by Advisory Committee S - Indicates items recommended to be addressed by staff, C - Indicates items recommended to be addressed by Contractor.
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
MONTHLY ADDRESSED Yellow - Items recommended to be addressed as soon as
possible or renovation recommendations generally based
upon vehicular or storm damage.
All locations: X Many beds have a thin layer of mulch. Additional mulch to create three-inch coverage is
recommended to help reduce weeds.
X X Recommended all paver areas be pressure washed and treated with “Wet & Forget” mold
treatment spray.
Median #1 X X 8 Recommend renovation of Dwarf Jasmine plantings based upon poor performance at this
location. Remove all surface vegetation and debris except for existing Bromeliads and
replant area with (275) 1 gal. Liriope ‘Big Blue’.
Median #2 X X 3 Remove Asparagus fern on north end of Bougainvillea bed.
X X 3 South end north of Oak tree irrigation head is leaning.
X X 9 The existing quick coupler valve box is broken and deformed and needs to have the top
box and lid removed and new ones installed.
Pedestrian shelter at 31st Ave.
SW
X No major issue observed.
Median #3 Bridge X X North end: On tip of median 3 Juniper have been runover and removal and replacement
is recommended. (3) Juniper parsonii 3 gal. size.
X X 10 South end: (5-8) Yellow African Iris in decline or missing. Replant with 3 gal. size.
X X 9 North end: Remove Blueberry Flax volunteers. M&A 9/6/22: (3) Yellow African Iris in decline or missing.
Replant with 3 gal. size. M&A 3/7/23 the number of
replacements has increased to a total of (9 12).
Median #4 X X 4 At address 3044: Irrigation head is leaning. Recommend remove and install Rainbird
1812 16” ht. pop-up spray head set flush with grade.
X X 4 At address 2860: Install (2) White African Iris 3 gal. size
X X 4 At address 2672: Install (3) White African Iris 3 gal. size
X X 4 At address 2896: Install (1) White African Iris 3 gal. size
X X 10 At address 2930: Recommend removing two Crape myrtles and replace with (2) Crape
Myrtle ‘Natchez’, White, 30 gal., 2” cal., 8’-10’ ht., 5’-6’ spr., Multi-stem (4 min.). Will
require (1) bubbler location with (2) adjustable flood bubblers per tree.
Pedestrian Shelter- 28th Ave. SW X No major issue observed.
Median #5 X X 8 At address 2672: Holly tree has totally defoliated, and main trunk bark is cracking. Decline
would contribute to mature age of 16+/- years and past site conditions. Recommendation
is to schedule removal by excavation and replant with Ilex x attenuate – East Palatka
Holly 10’ Ht., 3’ spr., 3.5” cal. in 65 gal. container
19.A.b
Packet Pg. 273 Attachment: Agenda & Backup - Golden Gate 09-17-24 (30046 : Golden Gate Beautification MSTU Advisory Committee - September 17, 2024)
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Tropicana Blvd. Report Date: 9/3/2024 Report No.: 10 (FY-24)
Page 2 of 3
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
X X 9 At address 2600: Holly tree has totally defoliated, root system is rotting, main trunk has
severe rot due to previous pruning wounds not compartmentalizing and healing over.
Recommendation is to schedule removal by excavation and replant with Ilex x attenuate –
East Palatka Holly 10’ Ht., 3’ spr., 3.5” cal. in 65 gal. container
X X 9 At address 2654: (3) White African Iris missing, replant with 3 gal. size.
X X 9 At address 2578: (3) White African Iris in decline, replant with 3 gal. size.
X X 9 At address 2520: Remove volunteer Crape myrtles growing in Bougainvillea bed. M&A 11/7/22: it is recommended due to the amount of
shade over this planting location that the existing
Bougainvillea and Crape myrtle sprouts be removed, and
the area planted with Bromeliads. (45) Neoregelia
carolinae ‘Tricolor’, 6” pots, 24” o.c.+/-, first row 4’ off
back of curb. M&A 9/5/23: It appears carpe myrtle
sprouts have been treated with herbicide.
X 2 At address 2600: Recommend Oak, 18” caliper, 50% damaged in main trunk from broken
off large branch be monitored yearly.
M&A 6/6/23: This Oak is adjacent to the declined Holly
tree at address 2701 that is being recommended for
removal and replacement. It is recommended that this
Oak tree be coordinated for removal by excavation and
replace with Quercus virginiana ‘Cathedral’ 11’-13’ ht.,
3.5 cal., 5’ spr. 36” dia. root ball or 65 gal. container.
Median #6 (Pavers only) X X No major issue observed. Recommended pavers be pressure washed and treated with
“Wet & Forget” mold treatment spray.
QUARTERLY ADDRESSED
Accent/Street Lighting X Multiple accent lighting fixtures appear to have corroded metal edges and hazy and/or
dirty lenses which reduces light levels. It is recommended all lights be reviewed for
cleaning or replacements if needed.
X Median #1 south light pole fixture has been turned out of alignment with the median.
Lighting Disconnect & Sensor
Locations
East R/W between 13th Ave. & PL. Lighting Disconnect & Sensor
West Alley off 28th Ave. SW Lighting Disconnect & Sensor
West R/W in Alley between G.G. Pkwy. & 26th PL. SW, Lighting Disconnect & Sensor
West R/W at corner of 30th PL. SW & Tropicana Lighting Disconnect & Sensor
Fertilizations: X X Refer to schedule to be developed with Contractor.
Irrigation: X Previous month water use total per WeatherTrak controller estimate 180,255 gallons.
19.A.b
Packet Pg. 274 Attachment: Agenda & Backup - Golden Gate 09-17-24 (30046 : Golden Gate Beautification MSTU Advisory Committee - September 17, 2024)
McGee & Associates
Landscape Architecture
GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Tropicana Blvd. Report Date: 9/3/2024 Report No.: 10 (FY-24)
Page 3 of 3
LOCATION/WORK AREA AC S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS
19.A.b
Packet Pg. 275 Attachment: Agenda & Backup - Golden Gate 09-17-24 (30046 : Golden Gate Beautification MSTU Advisory Committee - September 17, 2024)
Golden Gate M.S.T.U.
Fund 1621
September 17, 2024
FY-24 Vendor Item PO# Budget Commitments Expenditures Available
1 MILLAGE COLLECTED & INTEREST MSTU Revenues (682,100.00)$ -$ (713,486.72)$ 31,386.72$
2 CARRY FORWARD Unexpended Prior Year Funds (1,713,176.44)$ -$ -$ (1,713,176.44)$
3 ALL REVENUES (2,395,276.44)$ -$ (713,486.72)$ (1,681,789.72)$
McGee & Associates Landscape Architect (FY-24)4500228494 6,380.05$ 19,234.95$
4 ENG. FEES & OTHERS (631403)39,062.00$ 6,380.05$ 19,234.95$ 13,447.00$
5 INDIRECT COST REIMBURSE (634970)Collier County Indirect Cost Direct Pay 5,900.00$ -$ 5,900.00$ -$
A&M Property Maintenance 4500231470 14,450.00$ 550.00$
Mainscape Landscape Incidentals 4500226952 28,650.00$ 1,350.00$
6 LANDSCAPE INCIDENTALS (634990)30,000.00$ 43,100.00$ 1,900.00$ (15,000.00)$
Mainscape Grounds Maintenance 4500226952 26,936.40$ 93,063.60$
A&M Property Maintenance 4500231470 40,790.00$ 34,210.00$
7 OTHER CONTRACTUAL (634999)214,200.00$ 67,726.40$ 127,273.60$ 19,200.00$
Highland Products / Park Catalog (2) Trash Receptacles 4500232212 -$ 1,229.00$
Lykins Signtek & Development "Welcome" Sign 4500232891 6,548.00$ -$
Tree Scaping (FY-24)Tree & Palm Maintenance (05.21.24)4500231546 2,500.00$ 500.00$
Tree Scaping (FY-24)Tree & Palm Maintenance (03.05.24)4500230376 -$ 27,017.50$
Tree Scaping (FY-23)Tree & Palm Maintenance (08.28.23)4500225911 -$ 8,898.00$
NEMW (FY-24)Pump Station Maintenance (11.20.23)4500228807 -$ 1,275.00$
8 OTHER CONTRACTUAL (639990)38,898.30$ 9,048.00$ 38,919.50$ (9,069.20)$
9 ELECTRICITY (643100)FPL Electricity 4700004885 3,500.00$ 1,622.68$ 2,876.32$ (999.00)$
10 INSURANCE GENERAL(645100)Collier County Insurance Direct Pay 500.00$ -$ 500.00$ -$
11 BUILDING RM ISF (646180)Facilities Special Services picked up 1 5x8 US Flag for Golden Gate Beautification 115.68$ (115.68)$
12 SPRINKLER SYSTEM(646311)SiteOne Irrigation Parts & Pumps 4500227230 5,000.00$ 3,917.16$ 3,347.37$ (2,264.53)$
13 MULCH(646318)Southeast Spreading County Brown 4500229086 15,000.00$ -$ 19,425.00$ (4,425.00)$
Simmonds Electrical Electrical Services 4500227227 10,000.00$ 5,000.00$ -$ 5,000.00$
14 LIGHTING MAINTENANCE(646451)10,000.00$ 5,000.00$ -$ 5,000.00$
15 LICENSE & PERMITS(649010)2,000.00$ -$ -$ 2,000.00$
P-card Bee Hive Removal n/a -$ 350.00$
Premier Staffing Transcription 4500227901 1,819.60$ 1,158.30$
Naples Christmas Tree Lighting Holiday Decorations 4500228355 -$ 2,850.00$
16 OTHER MISCELLANEOUS (649990)3,000.00$ 1,819.60$ 4,358.30$ (3,177.90)$
17 OFFICE SUPPLIES (651110)100.00$ -$ -$ 100.00$
18 COPYING CHARGES(651210)J.M. Todd Copier CPC 4500227403 200.00$ 48.02$ 101.98$ 50.00$
19 FERT HERB CHEM(652310)5,000.00$ -$ 947.40$ 4,052.60$
20 OTHER OPERATING (652990)500.00$ -$ -$ 500.00$
21 OPERATING EXPENSES 372,860.30$ 138,661.91$ 224,900.10$ 9,298.29$
22 PTNE STAFF & DIVISION OVERHEAD (911011)-2.7%65,000.00$ -$ 65,000.00$ -$
23 PROPERTY APPRAISER (930600)-0.2%5,300.00$ -$ 4,953.98$ 346.02$
24 TAX COLLECTOR (930700)-0.6%13,700.00$ -$ 13,282.81$ 417.19$
25 COUNTY OVERHEAD 3.5%84,000.00$ -$ 83,236.79$ 763.21$
26 IMPROVEMENTS GENERAL (763100)Thomas Marine (CO1)Pkwy Bridge - MSTU Railing Upgrade 4500215903 1,938,416.14$ -$ 22,115.38$ 1,916,300.76$
27 CAPITAL PROJECTS 1,938,416.14$ -$ 22,115.38$ 1,916,300.76$
27 ALL EXPENSES 2,395,276.44$ 138,661.91$ 330,252.27$ 1,926,362.26$
28 FY-24 BUDGET GRAND TOTAL = ALL REVENUES - ALL EXPENSES -$ 138,661.91$ (383,234.45)$ 244,572.54$
Page 1/2
19.A.b
Packet Pg. 276 Attachment: Agenda & Backup - Golden Gate 09-17-24 (30046 : Golden Gate Beautification MSTU Advisory Committee - September 17, 2024)
Golden Gate M.S.T.U.
Fund 1621
September 17, 2024
516,253,177 FY 13 Final Taxable Value 7.8%Total Available Balance 1,926,362.26$
533,888,677 FY 14 Final Taxable Value 3.4% Plus Commited And Not Spent 138,661.91$
575,541,732 FY 15 Final Taxable Value 7.8%
611,031,317 FY 16 Final Taxable Value 6.2%Estimated Cash 2,065,024.17$
673,743,701 FY 17 Final Taxable Value 10.3%
749,340,700 FY 18 Final Taxable Value 11.2%
813,136,298 FY 19 Final Taxable Value 8.5%Prepared 09.11.2024 ZS
885,583,987 FY 20 Final Taxable Value 8.9%
987,248,891 FY 21 Final Taxable Value 11.5%
1,067,233,321 FY 22 Final Taxable Value 8.1%
1,214,827,173 FY 23 Final Taxable Value 13.8%+8.9% Average
$1,351,201,209 FY 24 Gross Taxable Value
11.23%Adjustment FY 23 to FY 24
FY 24 Gross MSTU Revenue FY 23
Millage 0.5000 0.5000 0.5 mill cap
Tax Dollars $675,601 $607,414 $68,187 Increase
Page 2/2
19.A.b
Packet Pg. 277 Attachment: Agenda & Backup - Golden Gate 09-17-24 (30046 : Golden Gate Beautification MSTU Advisory Committee - September 17, 2024)
19.A.b
Packet Pg. 278 Attachment: Agenda & Backup - Golden Gate 09-17-24 (30046 : Golden Gate Beautification MSTU Advisory Committee - September 17, 2024)
We appreciate your business
A&M Property Maintenance, LLC
4396 OWENS WAY
AVE MARIA, FL 34142 US
+1 2395030303
aandmtotal@yahoo.com
Estimate
ADDRESS
Dan Schumacher
Golden Gate MSTU
3299 Tamiami Trail E Ste700
Naples, FL 34112-5749
SHIP TO
Dan Schumacher
Golden Gate MSTU
Golden Gate MSTU
Naples, FL 34112-5749
ESTIMATE #1544
DATE 08/14/2024
P.O. NUMBER
4500231470
ACTIVITY QTY RATE AMOUNT
GOLDEN GATE MSTU-HUNTER BLVD
Median #1
(1) Fill depression and plant 2, 3-gal. Juniper Parsonni
(2) Cap Bubblers
Material Cost: 2, 3-gal Juniper Parson 2 11.00 22.00
Median #11 Bridge
(1) Replacement of 85, 1-gal Society Garlic
Material Cost: 85, 1-gal Society Garlic 85 5.00 425.00
Median #2
(1) Remove the existing Big Rose Crown of Thorns and finish the grade for a
uniform profile.
(2) Replant area with six staggered rows of 92, 1-gal Liriope "Big Blue" 18"o.c.
Material Cost: 92, 1-gal Liriope “Big Blue” 18”o.c.92 5.00 460.00
Median #3
(1) Remove volunteer Crape Myrtle sprouts.
(2) North End:
(a) Plant 5, 3-gal Bougainvillea Silhouette shrubs. Rake up dead stems of
perennial peanut
(b) Rake up dead stems from Perennial Peanut
(c) Replant area between palms with two centerline staggered rows of 27, -1 gal
Liriope “Big Blue” 18” o.c.
(3) Triangular Area at North End of Palms:
(a) Install 4-5 staggered rows of 115, 1-gal Liriope “Big Blue” 18” o.c.
(4) South End:
(a) Plant 25, 3-gal Bougainvillea Ms Alice shrubs (2) Plant 23, 1-gal Perennial
Peanut “Golden Curry”
Material Cost: 5, 3-gal Bougainvillea Silhouette 5 11.00 55.00
Material Cost: 142, 1-gal Liriope “Big Blue” 18” o.c.142 5.00 710.00
Material Cost: 25, 3-gal Bougainvillea Ms Alice 25 11.00 275.00
Material Cost: 23, 1-gal Perenniel Peanut “Golden Glory"23 5.00 115.00
19.A.b
Packet Pg. 279 Attachment: Agenda & Backup - Golden Gate 09-17-24 (30046 : Golden Gate Beautification MSTU Advisory Committee - September 17, 2024)
We appreciate your business
ACTIVITY QTY RATE AMOUNT
Median #4
(1) South End:
(a) Spray Perennial Peanut “Golden Curry” with herbicide
(b) Rake area to remove peanut stems
(c) Replant with 6 staggered rows of 217, 1-gal Liriope “Big Blue” 18 0.c.
Material Cost: 217, 1-gal Liriope “Big Blue” 18 o.c.217 5.00 1,085.00
Median #5
(1) North End:
(a) Replacement of 40, 1-gal Perennial Peanut “Golden Glory"
(2) South End:
(a) Spray to remove remaining Perennial Peanut "Golden Glory"
(b) Plant median end with six staggered rows of 130, 1-gal Liriope "Big Blue" 18"
o.c.
Material Cost: 40, 1-gal Perennial Peanut “Golden Glory"40 5.00 200.00
Material Cost: 130, 1-gal Liriope "Big Blue" 18" o.c.130 5.00 650.00
Median #6
(1) West end at address 2007: Replacement of 80, 1-gal Society Garlic
Material Cost; 80, 1-gal Society Garlic 80 5.00 400.00
Median #7
(1) Replacement of 9, 3-gal Yellow African Iris
(2) Address 7 irrigation heads in African Iris plants
Material Cost: 9, 3-gal Yellow African Iris 9 11.00 99.00
Median #8
(1) At address 4201-5241
(a) Replacement of 175, 1-gal Perennial Peanut “Golden Glory”
(2) At address 5360-5390
(a) Replacement of 12, 3-gal Yellow African Iris
(3) At address 5412-5340
(a) Review irrigation coverage before planting
(b) Replant 40, 3-gal Blueberry Flax Lilies
(4) At address 542-5433
(a) Remove remaining Blueberry Flax Lilies and replant with double staggered
rows of 139, 1-gal Liriope “Big Blue” 18” o.c.
Material Cost: 175, 1-gal Perennial Peanut “Golden Glory"175 5.00 875.00
Material Cost: 12, 3-gal Yellow African Iris 12 11.00 132.00
Material Cost: 40, 3-gal Blueberry Flax Lilies 40 11.00 440.00
Material Cost: 139, 1-gal Liriope “Big Blue” 18” o.c.139 5.00 695.00
Median #9
(1) Review irrigation coverage before planting
(2) Replacement of 30, 3-gal Yellow African Iris
Material Cost: 30, 3-gal Yellow African Iris 30 11.00 330.00
Material Mark-Up 6,968 0.15 1,045.20
(46) Landscape Supervisor
1 man, 25 hours
25 82.50 2,062.50
(47) Landscape Laborer
4 men, 25 hours
100 55.00 5,500.00
(48) Irrigation Supervisor
1 man, 9 hours
9 82.50 742.50
(49) Irrigation Technician
1 man, 9 hours
9 55.00 495.00
19.A.b
Packet Pg. 280 Attachment: Agenda & Backup - Golden Gate 09-17-24 (30046 : Golden Gate Beautification MSTU Advisory Committee - September 17, 2024)
We appreciate your business
TOTAL $16,813.20
Accepted By Accepted Date
19.A.b
Packet Pg. 281 Attachment: Agenda & Backup - Golden Gate 09-17-24 (30046 : Golden Gate Beautification MSTU Advisory Committee - September 17, 2024)
We appreciate your business
A&M Property Maintenance, LLC
4396 OWENS WAY
AVE MARIA, FL 34142 US
+1 2395030303
aandmtotal@yahoo.com
Estimate
ADDRESS
Dan Schumacher
Golden Gate MSTU
3299 Tamiami Trail E Ste700
Naples, FL 34112-5749
SHIP TO
Dan Schumacher
Golden Gate MSTU
Golden Gate MSTU
Naples, FL 34112-5749
ESTIMATE #1545
DATE 08/14/2024
P.O. NUMBER
4500231470
ACTIVITY QTY RATE AMOUNT
GOLDEN GATE MSTU-TROPICANA BLVD
Median #1
(1) Remove all surface vegetation and debris except for existing Bromeliads
(2) Replant with 275, 1-gal Liriope “Big Blue"
Material Cost: 275, 1-gal Liriope “Big Blue"275 5.00 1,375.00
Median #3 Bridge
(1) North End
(a) Remove current plant material
(b) Replant 12, 3-gal Yellow African Iris
(2) South End
(a) Remove current plant material
(b) Replant 8, 3-gal size Yellow African Iris
Material Cost: 20, 3-gal Yellow African Iris 20 11.00 220.00
Median #4
(1) At address 3044
(a) Remove and install Rainbird 1812 16” ht pop-up spray heads set flush with
grade
(2) At address 2672
(a) Install 3, 3-gal White African Iris
(3) At address 2860
(a) Install 2, 3-gal White African Iris
(4) At address 2896
(a) Install 1, 3-gal White African Iris
Material Cost: 6, 3-gal White African Iris 6 11.00 66.00
Median #5
(1) At address 2578
(a) Remove current plant material
(b) Replant 3, 3-gal White African Iris
(2) At address 2654
(a) Remove current plant material
(b) Replant 3, 3-gal White African Iris
Material Cost: 6, 3-gal White African Iris 6 11.00 66.00
(46) Landscape Supervisor
1 man, 16 hours
16 82.50 1,320.00
19.A.b
Packet Pg. 282 Attachment: Agenda & Backup - Golden Gate 09-17-24 (30046 : Golden Gate Beautification MSTU Advisory Committee - September 17, 2024)
We appreciate your business
ACTIVITY QTY RATE AMOUNT
(47) Landscape Laborer
2 men, 16 hours
32 55.00 1,760.00
(48) Irrigation Supervisor
1 man, 1 hours
1 82.50 82.50
TOTAL $4,889.50
Accepted By Accepted Date
19.A.b
Packet Pg. 283 Attachment: Agenda & Backup - Golden Gate 09-17-24 (30046 : Golden Gate Beautification MSTU Advisory Committee - September 17, 2024)